EXECUTIVE SUMMARY FOR

THE PUBLIC

PROPOSED ZCMCI NICKEL -

CHROMITE MINING PROJECT

Barangays Guinabon and Guisguis, Sta. Cruz, Zambales

ZAMBALES CHROMITE MINING COMPANY,

INC. 3rd Floor, DMCI Homes Corporate Center, 1321 Apolinario St., Brgy.

Bangkal, Makati City

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 1

1 PROJECT INFORMATION

Pangalan ng Proyekto ZCMCI Nickel-Chromite Mining Project

Lokasyon Barangay Guinabon at Barangay Guisguis, Munisipyo ng Sta. Cruz, Probinsya ng Zambales

MPSA No. 005-91-III

Uri ng Proyekto Minahan

Laki: Area: 536.5726 hectares Deposito ng Nickel Measured 1,690,000 DMT @ 1.36% Ni Indicated 2,930,000 DMT @ 1.33% Ni Inferred 1,270,000 DMT @ 1.32% Ni Combined 5,890,000 DMT @ 1.34% Ni Chromite: Mga chromite ore na makikita lang habang nagmimina ng nickel Mine Area = 256.268 hectares

Extraction Rate Nickel = 1,000,000WMT per year (at 35% moisture) Chromite = Mga chromite ore na makikita lang habang nagmimina ng nickel

Bagay na miminahin: Nickel at Chromite

Paraan ng Pagmimina Surface Mining Method (Contour-Based)

Tagal ng Mina 11 na taon

Ang ZCMCI Nickel – Chromite Mining Project na makikita sa Barangay Guinabon at Guisguis, Sta. Cruz, Zambales, ay nabigyan ng Mineral Production Sharing Agreement (MPSA) No. 005-91-III, at may laki na 536.5726 hectares.

Ang MPSA ng ZCMCI ay napapaligiran ng ibang mining companies, kabilang dito ang, Eramen Minerals Incorporated (EMI), LNL Archipelago Minerals, Inc. (LAMI), Benguetcorp. Nickel Mines, Inc. (BNMI), Shangfil Mining and Trading Corporation (SMTC), and Zambales Diversified Metals Corporation (ZDMC). Ang mga kumpanyang ito ay may operasyon, at maliban sa ZDMC, ginagamit ang parehong barangay road papunta sa munisipyo ng Sta. Cruz. Lahat ng mining companies sa lugar ay nagmimina ng nickel at chromite, maliban sa Shangfil na chromite lamang ang minimina. Ang lokasyon ng MPSA ng proyektong ito, at ang mga katabing minahan sa Zambales, ay makikita sa Figure 1, at ang detalye ng ibang katabing minahan ay makikita sa Table 1.

Table 1: Detalye ng ibang Mining Companies na nasa Paligid ng Project Site

Company Area

(Hectares)

Direction Relative to ZCMCI Site

MPSA MPSA

Expiration Commodity

Eramen Minerals Incorporated (EMI)

4,619.6869 West to

Southwest 209-2005-III

April 18, 2030

Nickel laterite ore, cobalt, chromite, and

other associated minerals

LNL Archipelago Minerals, Inc. (LAMI)

951.5734

North to Northwest

268-2008-III August

25, 2033

Nickel laterite ore, cobalt, chromite, and

other associated minerals

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 2

Company Area

(Hectares)

Direction Relative to ZCMCI Site

MPSA MPSA

Expiration Commodity

Filipinas Mining Corp. (Contractor)

Benguetcorp. Nickel Mines, Inc. (BNMI)

1,406.7362 West to

Southwest, adjacent to EMI

226-2005-III December 15, 2030

Nickel laterite ore, cobalt, chromite, and

other associated minerals

Shangfil Mining and Trading Corporation

(SMTC) 448.9048

South of Parcel 2

250-2007-III July 27,

2032 Chromite and other associated minerals

Zambales Diversified Metals Corporation

(ZDMC) 3,765.3853

South, adjacent to EMI

191-2004-III May 21,

2029

Nickel laterite ore, cobalt, chromite, and

other associated minerals

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 3

Figure 1: Adjacent MPSA to the Project Site

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 4

2 PROPOSED PROJECT COMPONENTS

2.1 Contour-Based Surface Mining of Nickel

Ang pagtanggal ng halaman at topsoil ay gagawin sa mga piling lokasyon lamang, at paunti-unti, upang malimitahan ang epekto sa lupa. Ang pansamantalang waste dump facility at stockyard ay ilalagay sa parte ng MPSA and wala gaanong halaman at patag.

Kapag naalis na ang topsoil, ay saka sisimulan ang paggawa ng mine benches. Ang mining bench ay magkakaroon ng lapad na 5 metro at taas na 3 metro. Ang bench slope ay lalagyan ng anggulo ng 60 degrees at hindi sosobra ng 90 degrees, at ang kabuoang pit slope ay 30 degrees. Ang mga bench ay lalagyan ng kanal sa may paanan nito, upang makadaloy ng maayos ang tubig ulan. Ang mga kanal mula sa mga bench ay papapuntahin sa mga settling ponds.

Ang laki ng lupang maaapektuhan ay 256.268 hectares para sa buong 11 taon na mine life, at makakkuha ng higit o kumulang na 11,213,280 WMT ng nickel laterite, na may 35% moisture, at 1.34% Ni. Para sa ECC Application na ito, ang ZCMCI ay humihingi ng pahintulot para sa extraction rate na 1,000,000 WMT ng nickel ore na may 35% moisture. Walang processing ng nickel ore na gagawin sa project site, pagkuha, pagtabi, at pag-hauling lamang.

2.2 Chromite Extraction

Kung may makitang mga chromite ore habang nagmimina ng nickel, at kung ito ay nasa tamang grado na pambenta, ay isasama na ito sa pagbenta ng nickel. Wala ding processing ng chromite ore na gagawin sa project site, pagkuha, pagtabi, at pag-hauling lamang. Ang anumang paggiling o gravity na concentration na gagawin sa chromite ore, ay nasa desisyon at responsibilidad na ng buyer, at hindi maaaring gawin sa minahan.

Table 2: Main Project Facilities Details

Facility Description Covered Area

Mine Area Total of 11,000,000 WMT of nickel ore, over 11 years 256.268 Hectares

Topsoil Stockpile Area Designated stockpile area for topsoil recovered 10.777 Ha

Access Roads Main in-pit roads 5.5Ha

Table 3: Support Facilities for the Proposed Project

Facility Description Covered Area

Admin Complex The Office Building shall be the headquarters of the Project managers. It will hold the offices of the Resident Manager, Mine Planning, MEPEO, CRO, Safety and Health, clinic, survey and geology, administrative, and finance personnel.

20, 000 m2

Staff House A staff house will be constructed to serve as a housing facility for the mine personnel.

Assay Laboratory

The assay laboratory will be constructed inside the MPSA mainly to serve the mining requirements of the project.

Motorpool Area

The motorpool area shall be established for the care and maintenance of all the necessary equipment in relation to the project operation.

10,000 m2

Nursery A nursery area shall be established to support the revegetation and rehabilitation activities of the Project.

200 m2

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 5

Figure 2: Site Development Map

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 6

3 PROJECT RATIONALE

Binabalak gawin ng ZCMCI ang proyekto na ito, hindi lamang para kumita, pero para din sa kapakanan at pag-unlad ng komunidad. Ang project site ay mayaman sa nickel, at hindi bagay gaing taniman. Ang project site ay napapaligiran din ng ibang mga minahan. Ang gobyerno ng Pilipinas, probinsya, at munisipyo ay makakakuha ng benepisyo mula sa mga buwis at permit na manggagaling sa proyektong ito. Ang proyekto ay makakatulong din sa pagbibigay ng oportunidad para sa trabaho, at pagbibigay ng mga community development projects. Makakatulong ang proyekto sa pag-unlad ng ekonomiya ng komunidad at sa bansa. Magkaka-benepisyo ang lokal na mga trabahador, at mga business na may bahagi sa pagmimina. Ang pagsuporta ng kumpanya sa edukasyon at mga pagbibigay ng mga skills training ay makaktulong din sa paghahanap ng trabaho.

Pwedeng kumita ang residents sa pamamagitan ng pagpasok bilang empleyado sa minahan, o kaya pagtatayo ng maliit na business. Mapapaigi din ang stado ng kalusugan ng komunidad sa pamamagitan ng magsasaayos ng kumpanya ng isang medical team.

Ang pagsuporta ng kumpanya ng imprastrakturang pang-edukasyon ay tutulong din gawing mabubutingestudyante ang mga kabataan na may mas malaking pag-asang magkaroon ng magandang trabaho balang araw. Ang mga skills na matutuhan bilang empleyado ng kumpanya, o kaya matutuhan sa mga workshop, ay maari ding magamit sa paghahanap ng trabaho matapos ang mine life ng ZCMCI. Magkakaroon din ng suportang pinansyal ang lokal na gobyerno galling sa mga programang EPEP, FMRDP, at SDMP.

Mayroong pangangailangan ang world market ng 1.9 milyong toneladang nickel, kada taon. Ang Pilipinas ang pang-lima sa pinakamalaking supplier ng nickel sa mundo, at ang pinakamalaking buyer ay ang China, para sa paggawa ng stainless. Layunin ng proyektong ito na matulungan punuin ang pangangailangan ng world market.

4 PROCESS/TECHNOLOGY

Ang nickel ay itinutirung sa bansa na DSO (Direct Shipment Ores), kung saan ang kiakailangan lamang ang pisikal na pagtanggal ng nickel mula sa lupa. Yung lupa na mayaman sa nickel ay dadalhin sa laboratory para tingnan ang dami ng moisture. Kung ito ay matagpuang may mataas na moisture, o basing-basa, ang lupa ay ilalagay sa stockpile area, upang mabilad at matuyo, hanggang sa bumaba sa nararapat na moisture content. Kapag natuyo na, ito ay dadalhin at ikakarga sa mga barge, papunta sa buyer. Ang material flowsheet ng pagmimina ng nickel ay makikita sa Figure 3.

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 7

Figure 3: Direct Shipment Ores Material Flowsheet

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 8

Figure 4: ZCMCI 11-Year Mine Plan

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 9

5 PROJECT LOCATION

Ang ZCMCI Nickel – Chromite Mining Project ay makikita sa Barangay Guinabon at Guisguis, Sta. Cruz, Zambales, nasasaklawan ng Mineral Production Sharing Agreement (MPSA) No. 005-91-III, at may kabuoang laki na 536.5726 hectares. Ang proyektong ito ay napapaligiran ng mga sumusunod na coordinates:

Table 4: Boundary Coordinates of the Project Site

Corner Longitude Latitude

PARCEL 1

1 15° 46' 17.58" N 120° 1' 24.22" E

2 15° 46' 27.34" N 120° 1' 24.22" E

3 15° 46' 37.1" N 120° 1' 24.22" E

4 15° 46' 46.86" N 120° 1' 24.22" E

5 15° 46' 46.9" N 120° 1' 33.45" E

6 15° 46' 46.9" N 120° 1' 43.53" E

7 15° 46' 46.9" N 120° 1' 53.61" E

8 15° 46' 56.62" N 120° 1' 53.61" E

9 15° 46' 56.66" N 120° 2' 3.69" E

10 15° 46' 56.66" N 120° 2' 13.77" E

11 15° 46' 46.9" N 120° 2' 13.82" E

12 15° 46' 46.9" N 120° 2' 23.85" E

13 15° 46' 46.9" N 120° 2' 33.93" E

14 15° 46' 37.1" N 120° 2' 33.94" E

15 15° 46' 27.34" N 120° 2' 33.94" E

16 15° 46' 17.67" N 120° 2' 34.03" E

17 15° 46' 17.58" N 120° 2' 23.9" E

18 15° 46' 17.58" N 120° 2' 13.82" E

19 15° 46' 17.58" N 120° 2' 3.74" E

20 15° 46' 27.34" N 120° 2' 3.69" E

21 15° 46' 27.34" N 120° 1' 53.66" E

22 15° 46' 17.62" N 120° 1' 53.66" E

23 15° 46' 17.58" N 120° 1' 43.58" E

24 15° 46' 17.58" N 120° 1' 33.5" E

Area 196.0336 hectares

PARCEL 2

1 15° 45' 28.78" N 120° 2' 44.06" E

2 15° 45' 38.54" N 120° 2' 44.02" E

3 15° 45' 48.3" N 120° 2' 44.02" E

4 15° 45' 58.06" N 120° 2' 44.02" E

5 15° 45' 58.06" N 120° 2' 33.98" E

6 15° 46' 17.67" N 120° 2' 34.03" E

7 15° 46' 27.34" N 120° 2' 33.94" E

8 15° 46' 37.1" N 120° 2' 33.94" E

9 15° 46' 37.1" N 120° 2' 44.06" E

10 15° 46' 46.86" N 120° 2' 44.02" E

11 15° 46' 46.9" N 120° 2' 54.09" E

12 15° 46' 46.9" N 120° 3' 4.17" E

13 15° 46' 37.14" N 120° 3' 4.22" E

14 15° 46' 37.14" N 120° 3' 14.25" E

15 15° 46' 27.379" N 120° 3' 14.3" E

16 15° 46' 17.62" N 120° 3' 14.3" E

17 15° 46' 17.61" N 120° 3' 24.32" E

18 15° 46' 7.86" N 120° 3' 24.38" E

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 10

Corner Longitude Latitude

19 15° 45' 58.1" N 120° 3' 24.38" E

20 15° 45' 58.06" N 120° 3' 14.3" E

21 15° 45' 48.34" N 120° 3' 14.3" E

22 15° 45' 38.58" N 120° 3' 14.3" E

23 15° 45' 28.82" N 120° 3' 14.3" E

24 15° 45' 28.78" N 120° 3' 4.22" E

25 15° 45' 28.78" N 120° 3' 0" E

26 15° 45' 30" N 120° 3' 0" E

27 15° 45' 30" N 120° 2' 54.14" E

28 15° 45' 30" N 120° 2' 45" E

29 15° 45' 28.78" N 120° 2' 45" E

Area 259.5089 hectares

PARCEL 3

1 15° 45' 58.06" N 120° 1' 43.58" E

2 15° 46' 7.82" N 120° 1' 43.53" E

3 15° 46' 17.58" N 120° 1' 43.53" E

4 15° 46' 17.62" N 120° 1' 53.61" E

5 15° 46' 17.62" N 120° 2' 3.69" E

6 15° 46' 7.86" N 120° 2' 3.74" E

7 15° 46' 7.82" N 120° 1' 53.66" E

8 15° 45' 58.1" N 120° 1' 53.66" E

Area 27.0701 hectares

PARCEL 4

1 15° 45' 48.369" N 120° 2' 13.841" E

2 15° 45' 58.06" N 120° 2' 13.841" E

3 15° 45' 58.1" N 120° 2' 23.85" E

4 15° 45' 48.369" N 120° 2' 23.921" E

Area 8.9257 hectares

PARCEL 5

1 15° 45' 38.606" N 120° 1' 53.54" E

2 15° 45' 48.3" N 120° 1' 53.61" E

3 15° 45' 48.34" N 120° 2' 3.69" E

4 15° 45' 38.606" N 120° 2' 3.761" E

Area 9.0228 hectares

PARCEL 6

1 15° 45' 19.01" N 120° 1' 43.58" E

2 15° 45' 28.77" N 120° 1' 43.53" E

3 15° 45' 28.82" N 120° 1' 53.61" E

4 15° 45' 28.82" N 120° 2' 3.69" E

5 15° 45' 28.82" N 120° 2' 13.77" E

6 15° 45' 28.82" N 120° 2' 23.85" E

7 15° 45' 19.06" N 120° 2' 23.9" E

8 15° 45' 19.06" N 120° 2' 13.82" E

9 15° 45' 19.06" N 120° 2' 3.74" E

10 15° 45' 19.06" N 120° 1' 53.66" E

Area 36.0115 hectares

Ang munisipyo ng Santa Cruz, Zambales ay isang first-class municipality. Ito ay nababakuran sa hilaga ng Infanta, Pangasinan, sa silangan ng Aguilar, Pangasinan, sa timog ng Candelaria, Zambales, and at sa kanluran ng West Philippine Sea. Ang munisipyo ay maaaring mapuntahan sa pamamagitan ng kotse, at halos 7 oras na byahe mula Manila. Ang lugar na sakop ng proyekto ay 13 km mula sa Santa Cruz Municipal Hall.

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 11

Figure 5: Topographic Map and Location Map

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 12

6 PROPONENT PROFILE

Proponent Name Zambales Chromite Mining Company, Inc. (ZCMCI)

Address 3rd Floor, DMCI Homes Corporate Center, 1321 Apolinario St. Brgy. Bangkal, Makati City

Key Personnel Ramon Manuel R. Briones Vice President for Operation

Contact Number (02) 823-7963 / 0949-8889446

Contact Email Address [email protected]

7 PREPARER PROFILE

Preparer Name: Axceltechs, Inc.

Office Address: Unit 10C, Lansbergh Place 170 Tomas Morato, Quezon City

Contact Person (s): Engr. Paulo Noni T. Tidalgo

Contact Number (02) 376-0043

8 DEVELOPMENT PLAN, DESCRIPTION OF PROJECT PHASES, AND CORRESPONDING TIMEFRAMES

8.1 Pre-Construction Phase

Sa phase ng proyektong ito ginagawa ang pag-arkila sa lokal na empleyadong kailangan sa project development. Sa phase din na ito isinasagawa ang pagkuha ng mga documento o permit mula sa gobyerno bago magsimula ng konstruksiyon, tulad ng Environmental Compliance Certificate (ECC).

Ang Communication Education and Public Awareness (CEPA) campaign ay gagawin para mabalitaan ang mga stakeholders sa mga Gawain at stado ng proyekto.

8.2 Construction Phase

Sa phase na ito, magkakaroon ng karagdagang pangangailangan ng mga empleyado para konstruksiyon nga mga mine components. Bibigyan ng prayoridad ang pagtanggap ng mga lokal na skilled workers.

Ang pangunahing gagawin sa phase na ito ay ang paggawa ng acces road sa loob ng project site. Gagawin ang konstruksiyon na ito, at ang lahat ng pasilidad sa minahan, habang binibigyan ang konsiderasyon at ingat na paliitin ang maiistorbong lupa hanggang maaari. Lahat ng kalye sa loob ng minahan ay lalagyan din ng drainage sa tabi para daluyan ng tubig ulan.

Ang lahat ng area na miminahin ay lalagyan ng settling ponds para maiwasan ang paglabo ng tubig sa paligid. Papadaanin din sa mga setlling pond ang tubig na dadalo sa mga drainage sa kalye ng ZCMCI. Lahat ng topsoil na tatanggalin sa minahan, na hindi maaaring ibenta ay itatabi sa topsoil stockpile area, at gagamitin sap ag-tabon sa mga hukay ng mga lugar na natapos nang minahin, at sa pagtatanim bilang parte ng progressive rehabilitation.

8.3 Operation Phase

Sa phase na ito, magkakaroon ng karagdagang pangangailangan ng mga empleyado para sa regular na operasyon ng minahan. Bibigyan ng prayoridad ang pagtanggap ng mga lokal na skilled workers.

Pagkatapos ng pagtatanggal ng topsoil, maaari nang bigyan ng hugis ang minahan. Kasama dito ang paggawa ng horizontal benches o terraces, kung saan kada bench ay may lapad na 10 meters at taas

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 13

na 3 meters. Habang ginagawa ang mga bench, and nickel ore ay kukunin na, at ilalagay sa mga 30-ton capacity dump trucks at ilalagay sa mga stock pile areas.

Sa phase na ito, magkakaroon din ng revegetation o pagtatanim sa mga minahan na natapos nang hukayin, kada taon. Ito ay para masigurado ng makapal na ang dami ng halaman, at malago na ang mga ito, bago pa matapos ang buhay ng mina.

8.4 Abandonment Phase

Alinsunod sa Constitution ng bansa sa paninigurado ng availability, sustainability, at equitable na distribusiyon ng likas na yaman, mandato ng gobyerno natin na lahat ng minahan ay pamamahalaan ng responsible sa mga aspetong teknikal, pinansyal, social, cultural, at environmental, para mapabuti ang pag-unlad ng ating bansa. Ang isang layunin nitong batas ay ang pagtataguyod ng isang polisiya sa kumpanya ng maayos na land use, pagkatapos ng pagmimina.

Ang remediation at rehabilitasyon ng mga lugar na minina ay bibigyan ng prayoridad, para masolusyonan lahat ng masamang epekto na naidulot ng pagmmimina. Gagawin ang pagprotekta ng kalikasan sa pamamagitan ng pagpili at pagtutupad ng nararapat na rehabilitasyon sa bawat project component, upang mapigilan ang sakuna sa tao at sa kalikasan.

Ito ang mga layunin ng Final Mine Rehabilitation Plan:

• Rehabilitate o tamnan yung mga lugar na naapektuhan ng mina o nung mga impastraktura. Ayusin din ang hugis ng mga slope, upang masiguradong stable mga ito, bago simulant ang pagtatanim;

• Magkaroon ng progressive rehabilitation na sang-ayon sa mga komento o suhestiyon ng komunidad, galling sa mga gagawin na stakeholder consultation;

• Bawasan ang negatibong epekto sa kagandahang ng kapaligiran, sa pamamagitan ng paggawa ng maayos na landform, sang ayon sa natural na stado bago minahin ang lugar, at taniman ng mga puno;

• Alisin ang mga hadlang sa kaligtasan at maayos kalusugan na idinudulot ng saradong minahan sa komunidad;

• Alisin lahat ng hindi kailangan na gamit at pasilidad na ginamit nung operasyon, at i-rehab yung mga lugar na tinayuan ng mga ito, bago isara ang minahan;

• Ibigay ang halaga ng gagastusin sa implementasyon ng mga programa para sa rehabilitasyon, at para maisaayos ang final land use ng lugar.

Ang ZCMCI ay magpapasa ng Final Mine Rehabilitation and/or Decommissioning Plan (FMR/DP) sa Mines and Geosciences Bureau para maaprubahan.

9 DELINEATION OF IMPACT AREAS

Ang lugar na napapailalim sa EIA ay batay sa nakitang mga direkta at hindi direktang apektado na mga lugar sa iminungkahing proyekto. Tulad ng itinakda sa DAO 2017-15, ang direct impact area, ay mga tuntunin ng physical environment, kung saan ang lahat ng mga pasilidad ng proyekto ay dapat ayusin. Sa kabilang banda, ang mga indirect impact area, ay mga lugar na kung saan napailalim ang aktibidad/konstruksyon na nasa labas ng proyekto ngunit napapaloob sa hurisdiksyon ng Munisipyo ng Sta. Cruz ay itinuturing na mga hindi direktang apektado na lugar.

Ayon sa DAO 2010-21, ang direktang apektado na barangay ay ang Barangay Guinabon at Barangay Guisguis, habang ang hindi direktang apektadong lugar ay ang Municipio ng Sta. Cruz, Zambales.

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 14

Aspect Direct Impact Area

Soil Ang lugar na nasa loob ng MPSA at ang mga lugar na nakapalibot sa mga minahan.

Terrestrial Ecology Ang mga lugar na maraming puno o halaman na paglalagyan ng mga settling ponds, kalye, at matatamaan ng mining operation.

Water

Base sa ginawang EIS Study, ang direct impact area ay ang pinakamalapit na anyong tubig, at mga aquifer na malapit sa proyekto. Walang anyong tubig na dumadaan sa project site. Ang Sta. Cruz River ay makikita halos 4km sa kanluran ng project site, at ang Cabaluan River ay makikita 2.5km, timog ng project site. May mga tributaries o daluyan ng tubig na makikita sa loob ng project site, ngunit ang mga ito ay natutuyo kapag tag-araw. Ang mga samples para sa study ay kinuha kapag meron sa loob ng project site, at sa mga poso na nasa komunidad.

Air and Noise

Base sa ginawang pag-aaral sa proyekto, ang direct impact area ay ang Barangay Guinabon at Barangay Guisguis. May mga kabahayang maapektuhan ang air quality at ingay, galling sa operasyon ng proyekto, lalo na sa pag-hauling. Ang MPSA ng ZCMCI ay malayo sa komunidad, at napapaligiran ng ibang mga mining companies, na merong sariling mga ECC.

People

Bilang host barangay ng proyekto, ang buong Barangay Guinabon at Barangay Guisguis ang direct impact area. Kung paguusapan ay ang socio-economic na aspeto, ang proyekto ay makaktulong sa pagtaas ng makokolektang tax ng lokal na pamahalaan, pagkakaroon ng mga trabaho, at pagkakaroon ng mga livelihood programs sa parehong barangay.

10 COMMITMENT TO PREVENT ADVERSE NEGATIVE IMPACTS

10.1 Pollution Control Devices

Gagawa ng mga sedimentation/settling ponds para pigilan ang pagkalat ng sediments na manggagaling sa project site. Ang mga ito ay gagawin gamit ang compacted na lupa, at ilalagay sa tabi ng mga minahan. Ang silbi ng mga sedimentation/settling ponds ay saluhin ang mga tubig ulan o malabong tubig, at ipunin ito, hanggang sa bumaba ang mga sediments at luminaw ang tubig. Maliban sa mga sedimentation/settling ponds, maglalagay din ng energy dissipators at bioengineering designs para mapigilan ang paglabo ng mga ilog na dadaluyan ng tubig, at mga landslides.

Magtatayo din ng materials recovery facility (MRF) sa loob ng project site, at gagawin ang paghihiwalay o segregation ng basura. Ang MRF ay gagamitan ng bakal at kongkretong pundasyon, kahoy na frame, at corrugated galvanized iron sheet na bubong. Ito ay may laki na 40m2 at may 3 hati para sa iba’t ibang klase ng basura.

Maglalagay din ng 3-chambered septic tanks sa mga pasilidad na magkakaroon ng domestic waste. Layunin ng mga pollution control devices ang bawasan ang dumi at basura na manggagaling sa proyekto, at mabawasan din ang negatibong epekto ng proyekto.

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 15

10.2 Manpower

Pina-plano ng ZCMCI na mag-operate ng 2 shift kada araw, at 300 araw kada taon. Tinatayang mga 749 na empleyado ang kakailanganin sa buong buhay ng proyekto. Makikita ang breakdown ng mga empleyadong kakailanganin kada project phase sa Table 5.

Table 5: Manpower Breakdown per Project Phase

Pre-construction

Number

Skills/Expertise Needed Jobs Available per gender

Sourcing Scheme for Position Position

Technical (Skilled)

Rank and File

Male Female

Resident Mine Manager 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Division Managers (Operations, Engineering, SHESD, Admin and Finance)

4 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Office Staff 5 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

TOTAL 10

Construction

Number Skills/Expertise Needed Jobs Available per gender

Sourcing Scheme for Position Position

Technical (Skilled)

Rank and File

Male Female

Resident Mine Manager 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Division Manager – Operations, Engineering, SHESD, Admin and Finance

4 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Project Comptroller 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Purchaser 2 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Office Staff 10 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Security Personnel 12 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Contractors 100 ✓ ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

TOTAL 130

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 16

Operation and Maintenance

Number

Skills/Expertise Needed Jobs Available per gender

Sourcing Scheme for Position Position

Technical (Skilled)

Rank and File

Male Female

Resident Mine Manager 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Division Managers (Operations, Engineering, SHESD, Admin and Finance)

4 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Project Comptroller 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Senior Staff 4 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Junior Staff 6 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Office Staff 15 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Operations Regular Staff 30 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Security Personnel 30 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Contractors 500 ✓ ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

TOTAL 591

Rehabilitation

Number

Skills/Expertise Needed Jobs Available per gender

Sourcing Scheme for Position Position

Technical (Skilled)

Rank and File

Male Female

SHESD Head 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Forrester/Envi/Rehab 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Safety Personnel 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

CRO 1 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

ZAMBALES CHROMITE MINING CORPORATION Executive Summary for the Public

Page 17

Rehabilitation

Number

Skills/Expertise Needed Jobs Available per gender

Sourcing Scheme for Position Position

Technical (Skilled)

Rank and File

Male Female

Office Staff 4 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

Contractor/Laborers 10 ✓ ✓ ✓ Priority hiring of qualified individuals from host sitio/purok,

barangay, municipal, province, then national.

TOTAL 18

11 INFORMATION WHERE TO GET A COPY OF THE EIS

Ang EIA ay maaaring makita sa EMB Website at EMB Region III office, samantalang ang kopya ng EIS Summary for the Public ay makikita sa Munisipyo ng Sta. Cruz, Zambales, at sa EMB Website.