annex 3: project monitoring sheets (all versions)
TRANSCRIPT
PM Form 3-1 Monitoring Sheet Summary
To Chief Representative of JICA Nigeria Office
PROJECT MONITORING SHEETS
Project Title : The Federal Capital Territory Reduction of Non-Revenue Water Project Version of the Sheet: Ver. 0 Term: -
Name: Akinori Miyoshi Title: Chief Advisor Submission Date: 6 November 2014
I. Summary 1 Progress 1-1 Progress of Inputs 1-2 Progress of Activities 1-3 Achievement of Output 1-4 Achievement of the Project Purpose 1-5 Changes of Risks and Actions for Mitigation 1-6 Progress of Actions undertaken by JICA 1-7 Progress of Actions undertaken by Nigerian side 1-8 Other remarkable/considerable issues related/affect to the project (such as other
JICA's projects, activities of counterparts, other donors, private sectors, NGOs etc.) 2 Delay of Work Schedule and/or Problems (if any)2-1 Detail 2-2 Cause 2-3 Action to be taken 2-4 Roles of Responsible Persons/Organization 3 Modification of the Project Implementation Plan3-1 PO 3-2 Other modifications on detailed implementation plan (Remarks: The amendment of R/D and PDM (title of the project, duration, project site(s), target group(s), implementation structure, overall goal, project purpose, outputs, activities, and input) should be authorized by JICA HQ. If the project team deems it necessary to modify any part of R/D and PDM, the team may propose the draft.)
4 Preparation by Nigerian side toward after completion of the Project
II. Project Monitoring Sheet I & II (as attached)
Annex3-1
PM
For
m3-
2M
onito
ring
She
et I
Proj
ect T
itle:
The
Fed
eral
Cap
ital T
errit
ory
Red
uctio
n of
Non
-Rev
enue
Wat
er P
roje
ctVe
rsio
n 1
Proj
ect P
erio
d: O
ctob
er 2
014
to M
arch
201
8D
ated
6 N
ov. 2
014
Impl
emen
ting
Org
aniz
atio
n: F
eder
al C
apita
l Ter
ritor
y A
dmin
istr
atio
n (F
CTA
) / F
eder
al C
apita
l Ter
ritor
y W
ater
Boa
rd (F
CTW
B)
Dic
rect
Ben
efic
iarie
s: F
CTW
B, r
elev
ant s
taff
of F
CTW
B H
eadq
uart
ers
and
pilo
t Are
a O
ffice
sPr
ojec
t Site
: FC
TPi
lot A
rea
Offi
ces:
Jab
i, G
arki
I an
d G
udu
Nar
rativ
e Su
mm
ary
Obj
ectiv
ely
Verif
iabl
e In
dica
tors
Mea
ns o
f Ver
ifica
tion
Impo
rtan
t Ass
umpt
ion
Ach
ieve
men
tR
emar
ks<O
vera
ll G
oal>
Not
e(*)
: Tar
get v
alue
(X%
), w
hich
is e
xpec
ted
to b
e de
term
ined
inth
e m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n, s
hall
bete
ntat
ivel
y fil
led
whe
n th
e fin
al d
raft
was
app
rove
d by
the
Dire
ctor
of F
CTW
B, w
hich
sha
ll be
fina
lized
whe
n th
e pl
an is
app
rove
d by
FCT A
<Pro
ject
Pur
pose
>
Not
e(**
): Ta
rget
for e
ach
PM
A is
exp
ecte
d to
be
dete
rmin
ed b
y th
een
d of
the
first
qua
rter o
f the
sec
ond
year
<Out
puts
>
Not
e (*
1): N
RW
com
pone
nts
targ
eted
by
Out
put 2
are
(i) i
nvis
ible
leak
age;
(ii)
cust
omer
met
er m
alfu
nctio
n; a
nd (i
ii) il
lega
l con
nect
ion
Leve
l of N
on-R
even
ue W
ater
(NR
W) i
s re
duce
d at
the
serv
ice
area
of
FCTW
B
1a. R
ecor
d of
mon
thly
NR
W ra
tio is
kep
t by
Dis
tribu
tion
Dep
artm
ent f
rom
the
third
qua
rter o
f the
firs
t yea
r of t
he P
roje
ct1b
. Mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
its m
onth
ly J
oint
Man
agem
ent M
eetin
g fro
m th
e th
ird q
uarte
r of t
hefir
st y
ear o
f the
Pro
ject
1c. Q
uarte
rly N
RW
ratio
of t
he s
ervi
ce a
rea
of F
CTW
B is
repo
rted
to th
e B
oard
of D
irect
ors
of F
CTW
B fr
om th
e th
ird q
uarte
r of t
hefir
st y
ear o
f the
Pro
ject
A. S
taff
of F
CTW
B (i
.e. m
embe
rs o
fN
RW
Man
agem
ent T
eam
and
Pilo
tN
RW
Act
ion
Team
s) tr
aine
d th
roug
hth
e P
roje
ct d
o no
t lea
ve th
e of
fice
inla
rge
num
bers
a. D
ate
of a
ppro
val o
f the
plan
b. R
esul
t of m
onito
ring
byN
RW
Man
agem
ent T
eam
c. R
esul
ts o
f joi
ntas
sess
men
t bas
ed o
n th
ecr
iteria
set
by
the
Pro
ject
d. R
ecor
d of
NR
W ra
tio k
ept
by D
istri
butio
n D
epar
tmen
t
3a&
3b.
Dat
e of
offi
cial
lette
rsu
bmitt
ing
draf
t stra
tegi
cpl
an a
nd a
nnua
l rec
urre
ntan
d ca
pita
l pla
n3c
. Dat
e of
app
rova
l of t
hem
anua
l
2. M
etho
ds/o
pera
tiona
l pro
cedu
res
for e
ffect
ive
NR
W re
duct
ion
are
esta
blis
hed
thro
ugh
pilo
t pro
ject
s at
Pilo
t Met
erin
g A
reas
(PM
As)
und
erpi
lot A
rea
Offi
ces
(*1)
2a. R
ecor
d of
NR
W ra
tioke
pt b
y th
e D
istri
butio
nD
epar
tmen
t2b
. Dat
e of
app
rova
l of t
hem
anua
ls
3a. B
y O
ctob
er 2
017,
dra
ft m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
) is
subm
itted
by
FCTW
B to
FC
TA fo
r rev
iew
and
appr
oval
3b. B
y O
ctob
er 2
017,
an
annu
al N
RW
redu
ctio
n pl
an (2
018)
isin
corp
orat
ed in
FC
WTB
’s a
nnua
l rec
urre
nt a
nd c
apita
l pla
n (2
018)
for s
ubm
issi
on to
FC
TA fo
r rev
iew
and
app
rova
l3c
. A p
lann
ing
man
ual f
or N
RW
redu
ctio
n is
app
rove
d by
the
Dire
ctor
of F
CTW
B b
y th
e en
d of
the
Pro
ject
3. A
med
ium
-term
stra
tegi
c pl
an o
f FC
TWB
for N
RW
redu
ctio
n is
deve
lope
d, u
tiliz
ing
the
resu
lts o
f Out
put 1
-2 (*
2)
1. L
evel
of N
RW
of t
he s
ervi
ce a
rea
of F
CW
TB is
mon
itore
d re
gula
rly
a. T
he m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
)is
app
rove
d by
FC
TA b
y th
e en
d of
the
Pro
ject
.b.
NR
W re
duct
ion
oper
atio
ns o
f the
firs
t qua
rter o
f 201
8 sp
ecifi
edin
the
annu
al p
lan
of th
e ab
ove
plan
are
car
ried
out a
ccor
ding
toth
e pl
an b
y FC
TWB
c. R
elev
ant s
taff
of F
CTW
B (i
.e. m
embe
rs o
f NR
W M
anag
emen
tTe
am a
nd P
ilot N
RW
Act
ion
Team
s) b
ecom
e eq
uipp
ed w
ith s
kills
and
know
ledg
e ne
cess
ary
for N
RW
redu
ctio
n ac
cord
ing
to th
ecr
iteria
set
by
the
Pro
ject
for e
ach
leve
ld.
NR
W ra
tio o
f eac
h P
MA
in th
e la
st q
uarte
r of t
he P
roje
ct re
ache
sits
resp
ectiv
e ta
rget
(**)
2a. D
ecre
ase
rate
of N
RW
ratio
for e
ach
Sub
Met
erin
g A
rea
of a
PM
A re
ache
s at
leas
t 80%
of i
ts ta
rget
at t
he e
nd o
f the
resp
ectiv
eN
RW
redu
ctio
n op
erat
ions
2b. T
echn
ical
man
uals
for A
rea
Offi
ce m
anag
ers
and
field
oper
ator
s (i.
e. te
chni
cal o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ngau
dio
visu
al m
ater
ials
, are
app
rove
d by
Hea
d of
Dep
artm
ent (
HoD
)fo
r Dis
tribu
tion
and
HoD
for C
omm
erce
by
the
first
qua
rter o
f the
third
yea
r of t
he P
roje
ct
A. P
olic
y su
ppor
t for
NR
W re
duct
ion
is n
ot d
isco
ntin
ued
Pol
icy
supp
ort
for N
RW
redu
ctio
n is
not
disc
ontin
ued
B. N
atur
al d
isas
ter/
pol
itica
l ins
tabi
lity/
eco
nom
ic c
risis
that
affe
ct th
ese
rvic
e ar
ea o
f FC
TWB
do
not
occu
rC
. Act
iviti
es to
impl
emen
t the
med
ium
-tem
stra
tegi
c pl
an a
re n
otdi
scon
tinue
d or
del
ayed
Not
e (*
2): A
med
ium
-term
stra
tegi
c pl
an is
a fi
ve-y
ear p
lan,
whi
ch m
ay in
clud
e m
ediu
m-te
rm ta
rget
, stra
tegi
es a
nd a
ctio
ns, t
imef
ram
e, h
uman
reso
urce
requ
irem
ent,
on-th
e-jo
b tra
inin
g m
echa
nism
, cos
t-ben
efit
anal
ysis
of N
RW
redu
ctio
n, e
tc. I
t is
note
d th
at N
RW
com
pone
nts
addr
esse
d by
the
stra
tegi
c pl
an a
re n
ot li
mite
d to
the
ones
men
tione
d in
(*1)
abo
ve: t
hey
shal
l be
disc
usse
d an
d de
term
ined
in d
evel
opin
g th
e ou
tline
of t
he s
trate
gic
plan
(thr
ough
Act
ivity
3-4
).
Pro
ject
Mon
itor
ing
She
et I
(R
evis
ion
ofP
roje
ct D
esig
n M
atri
x)
a: A
nnua
l NR
W ra
tio is
redu
ced
to X
%(*
) at t
he e
nd o
f the
yea
r20
21a.
Rec
ord
of N
RW
ratio
kep
tby
Dis
tribu
tion
Dep
artm
ent
1a. M
onth
ly re
cord
of N
RW
ratio
.1b
&1c
. M
ater
ial f
orm
eetin
gs s
ubm
itted
by
the
Dis
tribu
tion
Dep
artm
ent
Cap
acity
of F
CTW
B fo
r NR
W re
duct
ion
is s
treng
then
ed
Annex3-2
PM
For
m3-
2M
onito
ring
She
et I
Act
iviti
esIm
port
ant A
ssum
ptio
nTh
e N
iger
ian
Side
The
Japa
nese
Sid
e
Pre-
Con
ditio
ns
Issu
es &
Cou
nter
mes
ures
Not
e (*
3) S
elec
tion
crite
ria o
f PM
A a
re a
s fo
llow
s: (i
) Saf
ety
for n
ight
wor
ks is
sec
ured
in m
easu
ring
min
imum
nig
ht fl
ow: (
ii) D
istri
butio
n ne
twor
k is
sep
arat
ed a
nd it
is e
asy
to is
olat
e it
in m
easu
ring
NR
W ra
tio: a
nd (i
ii) N
RW
ratio
is s
uppo
sedl
y hi
gh.
Not
e (*
4) W
orki
ng G
roup
for N
RW
pla
nnin
g w
ould
con
sist
of P
roje
ct M
anag
er (a
s ch
air)
, Dep
uty
Pro
ject
Man
ager
, Tec
hnic
al M
anag
ers,
Hea
d of
Fin
ance
Dep
t., H
ead
of P
rodu
ctio
n D
ept.,
Hea
d of
PR
S U
nit,
and
mem
bers
of N
RW
Man
agem
ent T
eam
.
Trai
ning
of t
he N
iger
ian
Proj
ect P
erso
nnel
in J
apan
Four
per
sons
mut
ually
agre
ed u
pon
will
be
train
edin
Jap
an a
nnua
lly
Equi
pmen
t1.
Bul
k m
eter
s fo
r wat
ertre
atm
ent p
lant
s2.
Wat
er fl
ow m
eter
s,va
lves
, and
cus
tom
er m
eter
sfo
r SM
A3.
Lea
kage
det
ectio
neq
uipm
ent f
or P
MA
4. P
ipe
repa
ir eq
uipm
ent f
orP
MA
5. V
ehic
les(
Pic
k-up
s)6.
Oth
er e
quip
men
t mut
ually
agre
ed u
pon
as n
eces
sary
2-1
Rev
iew
exi
stin
g N
RW
red
uctio
n op
erat
ions
at e
ach
pilo
t Are
a O
ffice
2-2
Con
duct
cap
acity
ass
essm
ent o
f the
rele
vant
sta
ff of
eac
h pi
lot A
rea
Offi
ce2-
3 Id
entif
y an
d se
lect
a P
ilot M
eter
ing
Are
a (P
MA
) for
eac
h pi
lot A
rea
Offi
ce b
ased
on
the
sele
ctio
n cr
iteria
of P
MA
(*3)
2-4
Pre
pare
/upd
ate
dist
ribut
ion
netw
ork
draw
ings
for e
ach
PM
A2-
5 In
stal
l wat
er fl
ow m
eter
s to
eac
h P
MA
and
mea
sure
in/o
utflo
ws
mon
thly
2-6
Zone
eac
h P
MA
into
Sub
Met
erin
g A
reas
(SM
A)
2-7
Isol
ate
a S
MA
by
inst
allin
g va
lves
2-8
Upd
ate
the
dist
ribut
ion
netw
ork
draw
ings
for e
ach
SM
A2-
9 M
easu
re a
n in
itial
leve
l of N
RW
of e
ach
SM
A2-
10 D
etec
t tar
get N
RW
com
pone
nts
(i.e.
invi
sibl
e le
akag
e, c
usto
mer
met
er m
alfu
nctio
n, a
nd il
lega
l con
nect
ion)
of e
ach
SM
A2-
11 D
evel
op a
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
,inc
ludi
ngre
duct
ion
targ
et, f
or re
view
by
Hea
d of
Dis
tribu
tion
Dep
artm
ent
2-12
Rev
iew
and
app
rove
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
2-13
Impl
emen
t the
NR
W re
duct
ion
oper
atio
ns a
t eac
h S
MA
2-14
Mon
itor t
he p
rogr
ess
of th
e N
RW
redu
ctio
n op
erat
ions
of e
ach
SM
A2-
15 M
easu
re le
vel o
f NR
W o
f eac
h S
MA
at t
he e
nd o
f the
resp
ectiv
eop
erat
ions
2-16
Pre
pare
a re
port
on p
ilot p
roje
cts,
cov
erin
g A
ctiv
ity 2
-1~2
-15
2-17
Dev
elop
man
uals
for N
RW
redu
ctio
n fo
r Are
a O
ffice
man
ager
s an
dfie
ld o
pera
tors
(i.e
. tec
hnic
al o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
visu
al m
ater
ials
A Fu
rnis
hed
offic
es fo
r Jap
anes
eE
xper
t Tea
m a
re s
ecur
ed a
tH
eadq
uarte
rs a
nd e
ach
Pilo
t Are
aO
ffice
of F
CTW
BB
Pro
ject
Per
sonn
el is
ass
igne
d w
ithth
e fin
aliz
ed li
st
Japa
nese
Exp
erts
1. C
hief
Adv
isor
/ N
RW
Red
uctio
n P
lann
ing
2. D
eput
y C
hief
Adv
isor
/N
RW
Red
uctio
n P
lann
ing
3. N
RW
Red
uctio
nO
pera
tions
Man
agem
ent
4. L
eaka
ge D
etec
tion
Tech
nolo
gy5.
Com
mer
cial
Los
s6.
Hyd
raul
ic A
naly
sis
/ GIS
7. P
rocu
rem
ent
Man
agem
ent /
Coo
rdin
ator
8. O
ther
exp
erts
mut
ually
agre
ed u
pon
as n
eces
sary
1-1
Inst
all b
ulk
met
ers
to w
ater
trea
tmen
t pla
nts
1 an
d 2
1-2
Mea
sure
mon
thly
wat
er p
rodu
ctio
n of
wat
er tr
eatm
ent p
lant
s 1,
2 ,3
,an
d 4
1-3
Tally
the
abov
e w
ater
pro
duct
ion
data
mon
thly
1-4
Cal
cula
te th
e m
onth
ly w
ater
con
sum
ptio
n ba
sed
on th
e bi
lling
dat
a1-
5 C
alcu
late
mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
usi
ngth
e da
ta o
btai
ned
from
Act
ivity
1-3
and
1-4
Inpu
ts
3-1
Est
ablis
h a
Wor
king
Gro
up fo
r NR
W p
lann
ing
(*4)
3-2
Rev
iew
exi
stin
g pl
ans,
impl
emen
tatio
n st
ruct
ure,
on-
the-
job
train
ing
mec
hani
sm, e
tc. r
elat
ed to
NR
W re
duct
ion
at F
CTW
B3-
3 C
ondu
ct h
ydra
ulic
and
wat
er p
ress
ure
dist
ribut
ion
anal
yses
of t
hepi
pelin
e ne
twor
ks3-
4 D
evel
op o
utlin
es o
f the
med
ium
-term
stra
tegi
c pl
an a
nd it
s an
nual
NR
W re
duct
ion
plan
3-5
Dev
elop
the
first
med
ium
-term
stra
tegi
c pl
an (2
018-
2022
) for
appr
oval
by
FCTA
3-6
Dev
elop
an
annu
al N
RW
redu
ctio
n pl
an b
ased
on
the
stra
tegi
c pl
anas
an
inte
gral
par
t of a
n an
nual
recu
rren
t and
cap
ital p
lan
of F
CTW
B fo
rap
prov
al b
y FC
TA3-
7 D
evel
op a
pla
nnin
g m
anua
l for
NR
W re
duct
ion
Proj
ect P
erso
nnel
1. P
roje
ct D
irect
or: D
irect
or o
f Eco
nom
ic P
lann
ing,
Res
earc
h an
dS
tatis
tic D
epar
tmen
t, FC
TA2.
Pro
ject
Man
ager
: Dire
ctor
of F
CTW
B3.
Dep
uty
Pro
ject
Man
ager
: HoD
for A
dmin
istra
tion
and
Sup
ply/
FCTW
B4.
Tec
hnic
al M
anag
ers
(Als
o Le
ader
s of
NR
W M
anag
emen
tTe
am):
HoD
for D
istri
butio
n an
d H
oD fo
r Com
mer
ce /F
CTW
B5.
Mem
bers
of N
RW
Man
agem
ent T
eam
(FC
TWB
):- H
ead
of S
peci
al P
roje
ct U
nit o
f Dis
tribu
tion
Dep
artm
ent (
asC
oord
inat
or)
- Rel
evan
t Hea
d of
Uni
t (H
oU) a
nd o
ffice
rs o
f the
Dis
tribu
tion
Dep
artm
ent,
Com
mer
ce D
epar
tmen
t, an
d A
dmin
istra
tion
and
Sup
ply
Dep
artm
ent
6. H
eads
of o
ther
rele
vant
Dep
artm
ents
and
Uni
t of F
CTW
B: H
oDfo
r Fin
ance
, HoD
for P
rodu
ctio
n, H
oU fo
r Pla
nnin
g R
esea
rch
and
Sta
tistic
s (P
RS
)7.
Mem
bers
of N
RW
Act
ion
Team
: Are
a M
anag
er, A
ssis
tant
Are
aM
anag
er (D
istri
butio
n), A
ssis
tant
Are
a M
anag
er (C
omm
erce
),te
chni
cal o
ffice
rs (D
istri
butio
n) a
nd m
eter
read
ers
(Com
mer
ce) o
fea
ch p
ilot A
rea
Offi
ce8.
Oth
er p
erso
nnel
mut
ually
agr
eed
upon
as
nece
ssar
y
Land
, Bui
ldin
g an
d Fa
cilit
ies
1. O
ffice
bui
ldin
g an
d fa
cilit
ies
nece
ssar
y fo
r the
impl
emen
tatio
n of
the
Pro
ject
2. O
ffice
spa
ces
and
nece
ssar
y fa
cilit
ies
for t
he J
apan
ese
Exp
erts
at th
e FC
TWB
Hea
dqua
rters
and
eac
h P
ilot A
rea
Offi
ce, i
nclu
ding
inte
rnet
con
nect
ion
and
air c
ondi
tione
rs3.
Oth
er fa
cilit
ies
mut
ually
agr
eed
upon
as
nece
ssar
y
Loca
l Cos
ts1.
Cos
t for
inst
alla
tion,
ope
ratio
n an
d m
aint
enan
ce o
f the
prov
ided
equ
ipm
ent a
nd c
ost f
or p
ipe
repa
ir at
PM
As
2. A
dmin
istra
tion
and
oper
atio
nal c
osts
, inc
ludi
ng c
osts
for
loca
l tra
vel f
or th
e P
roje
ct P
erso
nnel
A N
atur
al d
isas
ter/p
oliti
cal/
inst
abili
ty/e
cono
mic
cris
is th
at a
ffect
the
proj
ect a
ctiv
ities
do
not o
ccur
Annex3-3
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
Coun
terme
asur
esOu
tput
-11-
1R/
DW
PSu
rvey
Instal
lation
1-2
R/D
WP
1-3
R/D
WP
1-4
R/D
WP
Revie
wSy
stem
Modif
icatio
n1-
5R/
DW
P
Outp
ut-2
2-1
R/D
WP
2-2
R/D
WP
Base
line
Inter
im-1
Inter
im-2
Final
2-3
R/D
WP
2-4
R/D
WP
2-5
R/D
WP
2-6
R/D
WP
2-7
R/D
WP
2-8
R/D
WP
2-9
R/D
WP
2-10
R/D
WP
2-11
R/D
WP
Each
SMA
2-12
R/D
WP
2-13
R/D
WP
2-14
R/D
WP
2-15
R/D
WP
2-16
R/D
Inter
imFin
alW
PInt
erim
Final
2-17
R/D
Draft
Finali
zatio
nMo
difica
tion
WP
Draft
Finali
zatio
nMo
difica
tion
Outp
ut-3
3-1
R/D
WP
3-2
R/D
WP
3-3
R/D
WP
3-4
R/D
WP
3-5
R/D
WP
3-6
R/D
WP
3-7
R/D
WP
Oct
Nov
Meas
ure i
n/outf
lows
Surve
y wate
r con
sump
tion
Calcu
late N
RW ra
tio
Detec
t invis
ible l
eaka
geDe
tect c
ustom
er m
eter m
alfun
ction
Detec
t illeg
al co
nnec
tion
Oper
ation
for in
visibl
e lea
kage
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Dec
Jan
Feb
Mar
Sep
Oct
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Instal
l bulk
mete
rs to
water
trea
tmen
tpla
nts 1
and 2
Meas
ure m
onthl
y wate
r pro
ducti
on of
water
trea
tmen
t plan
ts 1,
2, 3,
and 4
Tally
the a
bove
wate
r pro
ducti
on da
tamo
nthly
Deve
lop m
anua
ls for
NRW
redu
ction
for
Area
Offic
e man
ager
s and
field
oper
ators
(i.e. te
chnic
al off
icers
and
meter
read
ers),
inclu
ding a
udio
visua
lma
terial
s
Activ
ities
Instal
l wate
r flow
mete
rs to
each
PMA
and m
easu
re in
/outflo
ws m
onthl
yZo
ne ea
ch P
MA in
to Su
b Mete
ring
Area
s (SM
A)Iso
late a
SMA
by in
stallin
g valv
es
Upda
te the
distr
ibutio
n netw
ork
draw
ings f
or ea
ch S
MAMe
asur
e an i
nitial
leve
l of N
RW of
each
SMA
Detec
t targ
et NR
W co
mpon
ents
(i.e.
invisi
ble le
akag
e, cu
stome
r mete
rma
lfunc
tion,
and i
llega
l con
necti
on) o
fea
ch S
MA
Calcu
late t
he m
onthl
y wate
rco
nsum
ption
base
d on t
he bi
lling d
ataCa
lculat
e mon
thly N
RW ra
tio of
the
servi
ce ar
ea of
FCT
WB
using
the d
ataob
taine
d fro
m Ac
tivity
1-3 a
nd 1-
4
Revie
w ex
isting
NRW
redu
ction
oper
ation
s at e
ach p
ilot A
rea O
ffice
Cond
uct c
apac
ity as
sess
ment
ofor
ganiz
ation
and t
he re
levan
t staf
fIde
ntify
and s
elect
a Pilo
t Mete
ring A
rea
(PMA
) for
each
Pilo
t Are
a Offic
e bas
edon
the s
electi
on cr
iteria
of P
MAPr
epar
e/upd
ate di
stribu
tion n
etwor
kdr
awing
s for
each
PMA
Deve
lop a
plann
ing m
anua
l for N
RWre
ducti
on
Estab
lish a
Wor
king G
roup
for N
RWre
ducti
on pl
annin
g
Leve
l of N
RW o
f the
serv
ice ar
ea o
f FCT
WB
is m
onito
red
regu
larly
Meth
ods/o
pera
tiona
lpr
oced
ures
for e
ffect
iveNR
W re
duct
ion
are
esta
blish
ed th
roug
hpi
lot p
rojec
ts at
Pilo
tMe
terin
g Ar
eas (
PMAs
)un
der p
ilot A
rea O
ffice
s
A m
ediu
m-te
rm st
rate
gic
plan
of F
CTW
B fo
r NRW
redu
ctio
n is
deve
lope
d,ut
ilizin
g th
e res
ults
of
Outp
ut-1
&2
Oper
ation
for c
ustom
er m
eter
Oper
ation
for il
legal
conn
ectio
n
Oper
ation
for in
visibl
e lea
kage
Oper
ation
for c
ustom
er m
eter
Oper
ation
for il
legal
conn
ectio
n
Meas
ure i
n/outf
lows
Surve
y wate
r con
sump
tion
Calcu
late N
RW ra
tio
Revie
w ex
isting
plan
s, im
pleme
ntatio
nstr
uctur
e, on
-the-
job tr
aining
mech
anism
, etc.
relat
ed to
NRW
redu
ction
at F
CTW
BCo
nduc
t hyd
rauli
c and
wate
r pre
ssur
edis
tributi
on an
alyse
s of th
e pipe
line
netw
orks
Deve
lop ou
tlines
of th
e med
ium-te
rmstr
ategic
plan
and i
ts an
nual
NRW
redu
ction
plan
(app
rova
l by t
heDi
recto
r)
Deve
lop a
NRW
redu
ction
oper
ation
plan o
f eac
h SMA
, inclu
ding r
educ
tion
targe
t for r
eview
by H
ead o
f Dist
ributi
onDe
partm
ent
Revie
w an
d app
rove
NRW
redu
ction
oper
ation
plan
of ea
ch S
MAIm
pleme
nt NR
W re
ducti
on op
erati
ons a
tea
ch S
MA
Monit
or th
e pro
gres
s of th
e NRW
redu
ction
oper
ation
s of e
ach S
MA
Meas
ure l
evel
of NR
W of
each
SMA
atthe
end o
f the r
espe
ctive
oper
ation
s
Prep
are a
repo
rt on
pilot
proje
cts,
cove
ring A
ctivit
y 2-1
~2-1
5
Deve
lop th
e firs
t med
ium-te
rm st
rateg
icpla
n (20
18-2
022)
for a
ppro
val b
y FCT
ADe
velop
an an
nual
NRW
redu
ction
plan
base
d on t
he st
rateg
ic pla
n as a
nint
egra
l par
t of a
n ann
ual re
curre
nt an
dca
pital
plan o
f FCT
WB
for ap
prov
al by
FCTA
OnemonthbeforePresidentialElectionon14thFebruary
Annex3-4
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Issue
Solut
ion1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
42JIC
A Ex
pert
1Ak
inori M
IYOS
HIR/
D C
hief A
dviso
r / N
RW R
educ
tion P
lannin
gW
P2
Take
toshi
FUJIY
AMA
R/D
Dep
uty C
hief A
dviso
r / N
RW R
educ
tion P
lannin
gW
P3
Toru
TOY
ODA
R/D
NRW
Red
uctio
n Ope
ratio
ns M
anag
emen
tW
P4
Kiyo
shi K
IYAM
AR/
D Le
akag
e Dete
ction
Tec
hnolo
gyW
P5
Taku
ji OKU
BOR/
D C
omme
rcial
Loss
WP
6Sh
inta S
EGAW
AR/
D H
ydra
ulic A
nalys
is / G
ISW
P7
Kazu
hiro I
SHIU
RAR/
D P
rocu
reme
nt Ma
nage
ment
/ Coo
rdina
torW
PEq
uipm
ent
1Le
akag
e dete
ction
equip
ment
R/D
*3PM
Asin
Japa
n(JI
CA)
WP
Tend
er &
Deli
very
2Bu
lk me
ters (
ultra
sonic
flow
meter
)R/
D*W
TPin
Japa
n(JI
CA E
xper
t)W
PTe
nder
3W
ater m
eter,
flow
meter
and v
alves
R/D
*3PM
Asin
Nige
ria(JI
CA E
xper
t)W
PTe
nder
& D
elive
ry4
Pipe
repa
ir equ
ipmen
tR/
D*3
PMAs
in Ni
geria
(JICA
)W
P5
Vehic
les (P
ickup
truc
k)R/
D*L
eaka
ge D
etecti
onin
Nige
ria(JI
CA)
WP
6GI
S so
ftwar
e, off
ice eq
uipme
ntR/
D*F
CTW
B HQ
sin
Nige
ria(JI
CA)
WP
Loca
l Con
sulta
nt1
Modif
icatio
n of b
illing
and c
ollec
tion S
ystem
R/D
WP
2GI
S an
d data
base
train
ingR/
DW
PTr
ainin
g in
Japa
nR/
DW
P
R/D
WP
Phas
e-1 (
Oct 2
014 -
Dec
2016
, 27 m
onths
)Ph
ase-
2 (Ja
n 201
7 - M
ar 20
18, 1
5 mon
ths)
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Issue
Solut
ion1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
42Pl
anni
ng, M
onito
ring
and
Coor
dina
tion
1R/
DJC
C to
discu
ss A
PO w
ill be
WP
in No
vemb
er2
R/D
WP
3R/
DAP
O wi
ll be p
repa
red i
nW
PFC
TWB'
s ann
ual re
curre
nt an
d4
R/D
Prog
ress
of pr
eviou
s mon
thW
Pne
xt mo
nth, is
sues
&solu
tions
,5
R/D
Prog
ress
of pr
eviou
s qua
rter
WP
next
quar
ter, is
sues
&solu
tions
,6
R/D
Achie
veme
nt of
PDM
and
WP
PO m
onito
red
7R/
DW
P8
R/D
WP
9R/
DKi
ck of
fFin
alW
PKi
ck of
fFin
al10
Colle
ct an
d org
anize
data
for In
dicato
rs of
PDM
Indica
tor fo
r Pro
ject P
urpo
sea
R/D
Indica
tor fo
r Pro
ject P
urpo
seW
Pb
Cond
uct jo
int ca
pacit
y ass
essm
ent o
f the r
eleva
nt sta
ffR/
DInd
icator
for P
rojec
t Pur
pose
Prep
are C
apac
ity D
evelo
pmen
t (CD
) Plan
WP
Base
line
Inter
im-1
Inter
im-2
Final
cR/
DInd
icator
for P
rojec
t Pur
pose
WP
dR/
DW
PRe
ports
/ Doc
umen
ts11
R/D
WP
12R/
DW
P13
R/D
WP
Publ
ic Re
latio
ns14
R/D
WP
15R/
DW
PMo
nito
ring
and
Evalu
atio
n in
the P
ost-P
rojec
t per
iod
16Po
st Mo
nitor
ing by
JICA
(not
desc
ribed
here
)17
Post
Evalu
ation
by JI
CA(n
ot de
scrib
ed he
re)
Jan
Feb
Oct
Nov
Dec
Feb
Mar
Apr
May
Jun
Aug
Sep
Oct
Nov
Dec
Apr
May
Apr
May
Jun
Jul
Aug
Jan
Jul
Jul
Aug
Sep
Jul
Aug
Sep
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Proje
ct Co
imple
tion R
epor
t
Wor
k Plan
Deve
lop cr
iteria
for c
apac
ity as
sess
ment
for ea
ch le
vel o
f the
relev
ant s
taff (
i.e. m
embe
rs of
NRW
Mgm
t and
Acti
on T
eams
)
Set r
educ
tion t
arge
t for e
ach P
MA by
the f
irst q
uarte
r of th
e sec
ond
year
Jan
Inpu
ts (t
he Ja
pane
se si
de)
Dura
tion
/ Pha
sing
Colle
ct an
d org
anize
for I
ndica
tors f
or se
mi-a
nnua
l Join
t Mon
itorin
g
Proje
ct Pr
ogre
ss R
epor
t
Orga
nize J
oint C
oord
inatio
n Com
mitte
e (JC
C)
Deve
lop D
etail P
lan of
Ope
ratio
ns (D
PO) f
or re
view
and a
ppro
val b
yJC
CDe
velop
Ann
ual P
lan of
Ope
ratio
ns (A
PO) f
or re
view
and a
ppro
val
by JC
C
Moni
torin
g Pl
anAp
rMa
yJu
n
Mar
Nov
Dec
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Sep
Oct
Nov
Dec
Feb
Mar
Jun
Jul
Aug
Sep
Oct
Mar
Oct
Nov
Dec
Jan
Feb
Mar
Jan
Feb
Deve
lop P
rojec
t Web
site
Prep
ratio
n of p
ublic
relat
ions m
ateria
ls
Orga
nize m
onthl
y tec
hnica
l mee
tings
Orga
nize q
uarte
rly pr
oject
meeti
ngs
Cond
uct J
oint M
onito
ring s
emi-a
nnua
lly
Subm
it Mon
itorin
g She
et to
JICA
Nige
ria O
ffice s
emi-a
nnua
lly
Monit
oring
Miss
ion fr
om JI
CA fo
r Join
t Rev
iew
Orga
nize i
nform
ation
shar
ing se
mina
rs for
FCT
WB/
FCTA
, inclu
ding
Area
Offic
es
OnemonthbeforePresidentialElectionon14thFebruary
Annex3-5
PM Form 3-2 Monitoring Sheet II
Project Monitoring Sheet II (Revision of Plan of Operation)Responsibility of Members
Version 1Project Title: The Federal Capital Territory Reduction of Non-Revenue Water Project Dated 6 Nov. 2014
Responsible Responsible Other Major InputOrganization Person Implementors JICA Experts Remarks
(Nigeria) (Nigeria) (Nigeria) Japan NigeriaOutput-1 Dist. Dpt HoD(Dist) Chief Advisor (CA), Dy.CA
1-1 R/D Dist. Dpt HoU(Pipeline)/D Tech Officers (Pipeline) CA, Dy.CA Bulk meters Installation, Prod Dpt will be consultedWP Prod. Dpt HoU(Metering)/D O&M cost
1-2 R/D Dist. Dpt HoU(Pipeline)/D Tech Officers (Pipeline) CA, Dy.CA If bulks are installed inside the plants,WP Prod. Dpt HoU(Prod)/Prod Tech Officers (Prod) Prod Dept shall measure.
1-3 R/D Dist. Dpt HoU(Water Monitoring) HoU(Water Monitoring) CA, Dy.CAWP
1-4 R/D Com Dpt HoU(Billing)/C Billing staff CA, Dy.CA Cost forWP software
1-5 R/D Dist. Dpt HoU(Logistics)/D Logistics officer CA, Dy.CAWP
Output-2 Dist. Dpt, Com. Dept HoD(Dist)(Com) CA and other Experts Vehicles O&M cost2-1 R/D Dist. Dpt, Com. Dpt HoD(Dist)(Com) AM, AAM (Dist)(Com) CA, Dy.CA, NRW reduction
WP2-2 R/D Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team CA and other Experts
WP2-3 R/D Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team CA, Dy.CA, NRW reduction
WP AM, AAM (Dist)(Com)
2-4 R/D Dist. Dpt HoD(Dist) HoU(Logistics)&officers NRW reduction,WP HoU(GIS)&officers Hydraulic analysis
2-5 R/D Dist. Dpt Area Manager(AM) AAM(Dist) NRW reduction, Water flow Installation andWP Tech Officers(Dist) Hydraulic analysis meters O&M cost
2-6 R/D Dist. Dpt HoU(Logistics)/D AM, AAM(Dist)(Com) NRW reduction,WP HoU(Metering)/D HoU(GIS)&officers Hydraulic analysis
2-7 R/D Dist. Dpt AM Tech Officers(Dist) NRW reduction Valves Installation andWP AAM(Dist) O&M cost
2-8 R/D Dist. Dpt HoU(Logistics)/D AAM(Dist),HoU(GIS)&officers NRW reduction,WP HoU(Logistics)&officers Hydraulic analysis
2-9 R/D Dist. Dpt HoD(Dist) NRW reductionWP
Area Office AAM(Dist) Tech Officers(Dist) NRW reductionArea Office AAM(Com) Meter Readers(Com) NRW reductionDist Dpt HOU(Logstics)/D Logistics Officer NRW reduction
2-10 R/D Dist. Dpt, Com. Dpt AM NRW reductionWP
Dist. Dpt AAM(Dist) Tech Officers(Dist) Leakage detection Detection equip. O&M cost Staff of Pipeline Unit (Dist) will join.Com. Dpt AAM(Com), HoU(Metering)/D Meter Readers(Com) Com LossDist. Dpt, Com. Dpt AAM(Dist)(Com),HoU(Detec)/C Meter Readers(Com) Com Loss Staff of Detection Unit (Com) will join.
2-11 R/D Dist. Dpt AM AAM (Dist)(Com) NRW reduction, LeakageWP detection, Com Loss
Each SMA
2-12 R/D Dist Dpt HoD(Dist) Relevant HoUs NRW reductionWP
2-13 R/D Dist. Dpt, Com. Dpt AM NRW reductionWP
Dist. Dpt AAM(Dist) Tech Officers(Dist) Leakage detection Repair equip. Repair costCom. Dpt AAM(Com), HoU(Metering)/D AAM(Com), HoU(Metering)/D Com Loss Cust. Meters Install, O&M costDist. Dpt, Com. Dpt AAM(Dist)(Com),HoU(Detec)/C AAM(Dist)(Com),HoU(Detec)/C Com Loss
2-14 R/D Area Office AM NRW reductionWP
Dist. Dpt AAM(Dist) Tech Officers(Dist) Leakage detectionCom. Dpt AAM(Com), HoU(Metering)/D AAM(Com), HoU(Metering)/D Com LossDist. Dpt, Com. Dpt AAM(Dist)(Com),HoU(Detec)/C AAM(Dist)(Com),HoU(Detec)/C Com Loss
2-15 R/D Area Office AM NRW reductionWP
Area Office AAM(Dist) Tech Officers(Dist) NRW reductionArea Office AAM(Com) Meter Readers(Com) NRW reductionDist Dpt HOU(Logstics)/D Logistics Officer NRW reduction
2-16 R/D Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team, AM, CA, Dy.CA, NRW reduction,WP Leakage detection, Com loss
2-17 R/D Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team, AM, CA, Dy.CA, NRW reduction,WP AAM (Dist)(Com) Leakage detection, Com
Coordinator
Output-3 FCTWB PM CA, Dy.CA3-1 R/D FCTWB PM Working Group CA, Dy.CA, NRW reduction
WP3-2 R/D FCTWB PM Working Group CA, Dy.CA, NRW reduction
WP
3-3 R/D Dist Dpt HoU(Logistics)/D HoU(Logistics)&officers Hydraulic analysisWP HoU(Pipeline)/D HoU(GIS)&officers
HoU(Pipeline)&officers3-4 R/D FCTWB PM Working Group CA, Dy.CA, NRW reduction
WP
3-5 R/D FCTWB PM Working Group CA, Dy.CA, NRW reductionWP
3-6 R/D FCTWB PM Working Group CA, Dy.CA, NRW reductionWP
3-7 R/D FCTWB PM Working Group CA, Dy.CA, NRW reductionWP
Measure in/outflowsSurvey water consumptionCalculate NRW ratio
Detect invisible leakageDetect customer meter malfunctionDetect illegal connection
Operation for invisible leakage
Install bulk meters to water treatmentplants 1 and 2Measure monthly water production ofwater treatment plants 1, 2, 3, and 4Tally the above water production datamonthly
Develop manuals for NRW reduction forArea Office managers and fieldoperators (i.e. technical officers andmeter readers), including audio visualmaterials
Activities
Install water flow meters to each PMAand measure in/outflows monthlyZone each PMA into Sub MeteringAreas (SMA)Isolate a SMA by installing valves
Update the distribution networkdrawings for each SMAMeasure an initial level of NRW of eachSMA
Detect target NRW components (i.e.invisible leakage, customer metermalfunction, and illegal connection) ofeach SMA
Calculate the monthly waterconsumption based on the billing dataCalculate monthly NRW ratio of theservice area of FCTWB using the dataobtained from Activity 1-3 and 1-4
Review existing NRW reductionoperations at each pilot Area OfficeConduct capacity assessment oforganization and the relevant staffIdentify and select a Pilot Metering Area(PMA) for each Pilot Area Office basedon the selection criteria of PMAPrepare/update distribution networkdrawings for each PMA
Develop a planning manual for NRWreduction
Establish a Working Group for NRWreduction planning
Level of NRW of theservice area of FCTWBis monitored regularly
Methods/operationalprocedures for effectiveNRW reduction areestablished throughpilot projects at PilotMetering Areas (PMAs)under pilot Area Offices
A medium-term strategicplan of FCTWB for NRWreduction is developed,utilizing the results ofOutput-1&2
Operation for customer meterOperation for illegal connection
Operation for invisible leakageOperation for customer meterOperation for illegal connection
Measure in/outflowsSurvey water consumptionCalculate NRW ratio
Review existing plans, implementationstructure, on-the-job trainingmechanism, etc. related to NRWreduction at FCTWBConduct hydraulic and water pressuredistribution analyses of the pipelinenetworksDevelop outlines of the medium-termstrategic plan and its annual NRWreduction plan (approval by theDirector)
Develop a NRW reduction operationplan of each SMA, including reductiontarget for review by Head of DistributionDepartmentReview and approve NRW reductionoperation plan of each SMAImplement NRW reduction operations ateach SMA
Monitor the progress of the NRWreduction operations of each SMA
Measure level of NRW of each SMA atthe end of the respective operations
Prepare a report on pilot projects,covering Activity 2-1~2-15
Develop the first medium-term strategicplan (2018-2022) for approval by FCTADevelop an annual NRW reduction planbased on the strategic plan as anintegral part of an annual recurrent andcapital plan of FCTWB for approval byFCTA
Annex3-6
PM Form 3-2 Monitoring Sheet II
Project Monitoring Sheet II (Revision of Plan of Operation)Responsibility of Members
Version 1Project Title: The Federal Capital Territory Reduction of Non-Revenue Water Project Dated 6 Nov. 2014
Remarks
JICA Expert1 Akinori MIYOSHI R/D
Chief Advisor / NRW Reduction Planning WP2 Taketoshi FUJIYAMA R/D
Deputy Chief Advisor / NRW Reduction Planning WP3 Toru TOYODA R/D
NRW Reduction Operations Management WP4 Kiyoshi KIYAMA R/D
Leakage Detection Technology WP5 Takuji OKUBO R/D
Commercial Loss WP6 Shinta SEGAWA R/D
Hydraulic Analysis / GIS WP7 Kazuhiro ISHIURA R/D
Procurement Management / Coordinator WPEquipment
1 Leakage detection equipment R/D*3PMAs in Japan (JICA) WP
2 Bulk meters (ultrasonic flow meter) R/D*WTP in Japan (JICA Expert) WP
3 Water meter, flow meter and valves R/D*3PMAs in Nigeria (JICA Expert) WP
4 Pipe repair equipment R/D*3PMAs in Nigeria (JICA) WP
5 Vehicles (Pickup truck) R/D*Leakage Detection in Nigeria (JICA) WP
6 GIS software, office equipment R/D*FCTWB HQs in Nigeria (JICA) WP
Local Consultant1 Modification of billing and collection System R/D
WP2 GIS and database training R/D
WPTraining in Japan R/D
WP
R/DWP
Responsible Responsible Other Major InputOrganization Person Implementors JICA Experts Remarks
(Nigeria) (Nigeria) (Nigeria) Japan NigeriaPlanning, Monitoring and Coordination
1 R/D FCTWB PM Dy. PM CA and other ExpertsWP
2 R/D FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsWP AM
3 R/D FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsWP AM
4 R/D Dist. Dpt, Com. Dpt NRW Mgt Team NRW Mgt Team, AM CA and other ExpertsWP Coordinator
5 R/D FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsWP AM
6 R/D FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsWP AM
7 R/D CA, Dy.CAWP
8 R/D JICA JICA HQ To be determinedWP
9 R/D FCTWB PM Dy.PM CA and other ExpertsWP
10 Collect and organize data for Indicators of PDM Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Expertsa R/D Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Experts
WPb Conduct joint capacity assessment of the relevant staff R/D Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Experts
Prepare Capacity Development (CD) Plan WPc R/D Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Experts
WPd R/D Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Experts
WPReports / Documents
11 R/D FCTWB PM Dy. PM, NRW Mgt TeamWP
12 R/D FCTWB PM Dy. PM, NRW Mgt TeamWP
13 R/D FCTWB PM Dy. PM, NRW Mgt Team CA and other ExpertsWP
Public Relations14 R/D FCTWB PM NRW Mgt Team, HoU(PR) CA, Dy.CA, Coordinator
WP15 R/D FCTWB PM NRW Mgt Team, HoU(PR) CA, Dy.CA, Coordinator Public Relation Unit under Director(PM)
WP will collaborateMonitoring and Evaluation in the Post-Project period
16 Post Monitoring by JICA (not described here) JICA17 Post Evaluation by JICA (not described here) JICA
Project Coimpletion Report
Work Plan
Develop criteria for capacity assessment for each level of therelevant staff (i.e. members of NRW Mgmt and Action Teams)
Set reduction target for each PMA by the first quarter of the secondyear
Inputs (the Japanese side)
Duration / Phasing
Collect and organize for Indicators for semi-annual Joint Monitoring
Project Progress Report
Organize Joint Coordination Committee (JCC)
Develop Detail Plan of Operations (DPO) for review and approval byJCCDevelop Annual Plan of Operations (APO) for review and approvalby JCC
Monitoring Plan
Develop Project Website
Prepration of public relations materials
Organize monthly technical meetings
Organize quarterly project meetings
Conduct Joint Monitoring semi-annually
Submit Monitoring Sheet to JICA Nigeria Office semi-annually
Monitoring Mission from JICA for Joint Review
Organize information sharing seminars for FCTWB/FCTA, includingArea Offices
Annex3-7
PM Form 3-1 Monitoring Sheet Summary
2
completed, and then Bill of Quantities (BoQ) was prepared based on the design. While four bulk flow meters (ultrasonic) are being procured by JICA in Japan, preparation of chamber construction has been suspended due to inadequate Counterpart Fund of FCTWB for implementation.
Phase 2Clear Water
Tank
Phase 1Clear Water
Tank
DN1500mmDIP
DN1500mm
DIP
DN1500mm
DIP
DN1200mmDIP
DN600mmDIP
Bwari
Reservoirs 2 & 5 Reservoirs 3 & 4
Kubwa/Gwako/Airport
DN1500mmSteel?
Phase 3 & 4¥¥¥¥
70m
50m
100m
Cable x 4
Ultrasonic FlowMeterand Chamber (Plan)
Lower Usuma Treatment Works(Phase 1 & 2)
Chamber Chamber
¥¥¥¥
Figure 1 Schematic of Location of Bulk Flow Meter (Ultrasonic)
Situation of billing management of FCTWB have been assessed for modification of the existing billing system in order to measure total outflow from the whole water supply system. JICA Experts pointed out that a large number of existing duplicated/return bills may have caused various wastefulness as well as unreliable financial analysis including NRW. Specification of billing system will be discussed and determined only after fact finding and shows the way to treating these kinds of bills properly such as invalidation or elimination.
[Activities for Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.] Existing NRW reduction operations were reviewed at the FCTWB Headquarters and pilot Area offices, and also in order to find out baseline level, assessment of FCTWB’s organizational capacity and individual capacity of project members. The assessment results are shown in “Capacity Assessment and Capacity Development Plan, March 2015”, which was approved by FCTWB.
Annex3-10
PM Form 3-1 Monitoring Sheet Summary
3
FCTWB and JET jointly confirmed one PMA for each of three Pilot Area Office selected from the several PMA which meet selection criteria, namely “Area 2-2 & 3 & 7” (approx. 1,400 customers) under Garki I Area Office, “Prince & Princess” (approx. 1,100) under Gudu Area Office and “Jabi” (approx. 900) under Jabi Area Office.
Figure 2 Location Map of Pilot Metering Areas (PMAs)
Subsequently, each selected PMA was zoned into some Sub-Metering Areas (SMAs) which NRW reduction operations will be implemented in the field such as leakage detection, replacement of malfunctioning water meters and detection of illegal connections.
Following designing and zoning of PMAs/SMAs, distribution network drawings have been prepared by GIS together with information gathering from related Units and Area Offices.
Annex3-11
PM Form 3-1 Monitoring Sheet Summary
4
Facility designing of chambers for water flow meters and boundary/isolation valves in PMA, aiming to measure monthly in/outflow, as well as specifying the meters were completed, and then BoQ was prepared based on the design. While the meters will be procured by JICA Experts in Nigeria, preparation of chamber construction has been suspended due to inadequate Counterpart Fund of FCTWB for implementation.
In the current situation that PMAs/SMAs have not yet been created physically (NRW reduction operations cannot be implemented in the selected PMAs/SMAs), JICA Experts have held theoretical lectures for NRW Management Team and NRW Action Team members as well as on-the-job training (OJT) to the extent possible.
[Activities for Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.] Members of Working Group for NRW reduction planning were selected and existing plans, implementation structure, OJT mechanism, etc. related to NRW reduction at FCTWB were reviewed preliminarily. Most of activities for Output-3 will be done in Phase-2 of the Project scheduled in 2017 and 2018, but a few activities were done.
1-3 Achievement of Output
[Output-1: Level of NRW of the service area of FCTWB is monitored regularly.] Indicator: 1a: Record of monthly NRW ratio is kept.
1b: Monthly NRW ratio is reported. 1c: Quarterly NRW ratio is reported.
Current Status: Significant progress / On track / Little progress / Delayed / To be revised, * As stated in Section 2-1 Detail, 2 Delay of Work Schedule and/or Problems (if any), necessary data cannot be measured due to delay of activities, but actions have been taken. Target Date of Achievement: Indicator 1a&1b will be obtained from April 2016, Indicator 1c from October 2016.
[Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.] Indicator: 2a: Decrease rate of NRW ratio for each Sub Metering Area reaches at least 80% of its
target.2b: Technical manuals are approved.
Current Status: Significant progress / On track / Little progress / Delayed / To be revised, * As stated in Section 2-1 Detail, 2 Delay of Work Schedule and/or Problems (if any), necessary data cannot be measured due to delay of activities, but actions have been taken, and theoretical lectures and preparation of drawings through OJT have been done.
Annex3-12
PM Form 3-1 Monitoring Sheet Summary
5
Target Date of Achievement: Indicator 2a will be obtained from November 2016, Indicator 2b from June 2016.
[Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.] Indicator: 3a: Draft medium-term strategic plan (2018-2022) is submitted by FCTWB to FCTA.
3b: An annual NRW reduction plan (2018) is incorporated in FCTWB’s annual recurrent and capital plan (2018).
3c: A planning manual for NRW reduction is approved. Indicator will be obtained in Phase-2 of the Project scheduled in 2017 and 2018, but Working Group members were selected and existing plans, etc. related to NRW reduction at FCTWB were reviewed preliminarily.
1-4 Achievement of the Project Purpose
[Project Purpose: Capacity of FCTWB for NRW reduction is strengthened.] Indicator: a: The medium-term strategic plan (2018-2022) is approved by FCTA.
b: NRW reduction operations of the first quarter of 2018 are carried out. c: Relevant staff become equipped with skills and knowledge necessary for NRW
reduction. d: NRW ratio of each PMA in the last quarter of the Project reaches its respective
target.Indicator cannot be obtained because of limited progress, but skills and knowledge necessary for NRW reduction has been gradually developed through lectures and OJT.
1-5 Changes of Risks and Actions for Mitigation
No concerns over project implementation, but inadequate power supply and time-consuming procedures for custom clearance / tax exemption may be negatively affect smooth operation of the project.
1-6 Progress of Actions undertaken by JICA
To mitigate the above electricity problems that caused difficulty in efficient works at the project office, as an extra input, JICA decided to procure a standby generator with wiring work for the project office to ensure smooth implementation of the Project.
Regarding equipment in the process of procurement in Japan such as ultrasonic flow meter and leakage detector, JICA will provide necessary information to FCTWB in a timely manner for
Annex3-13
PM Form 3-1 Monitoring Sheet Summary
6
smooth customs clearance and tax exemption. Close communication with relevant agencies including FMOF and FMWR is important.
As mentioned in Section 1-1, Progress of Inputs, GIS software and all office equipment were procured and will be handed over to FCTWB soon. Vehicles and materials such as valves, water meters for pilot project implementation have not yet been procured.
Specifications of modification of billing system and GIS training to be contracted out to local company by JICA Experts have been discussed.
JICA has prepared the first training of the Nigerian project personnel in Japan scheduled in August 2015.
1-7 Progress of Actions undertaken by Nigerian side
FCTWB will work on the above customs clearance and tax exemption. Provision of necessary information will be requested to JICA in a timely manner. Close communication is important.
FCTWB has worked on securing necessary budget for the Project, namely Counterpart Fund, but the currently available amount is not sufficient to implement necessary project activities such as construction of chambers (see Section 2-1). Expenses for field activities such as repair related to Output-2 have not yet come up.
Security measures for JICA Experts in the field activities have been considered such as issue of identification card.
As mentioned in Section 1-1, Progress of Inputs, office spaces and necessary facilities including internet connection for JICA Experts have been provided in FCTWB Headquarters, but those in pilot Area Offices have been in preparation.
1-8 Other remarkable/considerable issues related/affect to the project (such as other JICA's projects, activities of counterparts, other donors, private sectors, NGOs etc.)
None
2 Delay of Work Schedule and/or Problems (if any)
2-1 Detail
(1) Insufficient 2015 Counterpart Fund It has caused delay or postpone of activities not only for Output-1, particularly Activity 1-1 related to bulk flow meter installation at outlet of water treatment plant, followed by 1-2 and 1-5, but also
Annex3-14
PM Form 3-1 Monitoring Sheet Summary
7
for Output-2, particularly Activity 2-5 and 2-7 related to PMAs/SMAs creation by installing flow meters and valves in pilot projects, followed by 2-9 to 2-17. This also has delayed preparation of procurement of flow meters and valves for Activity 2-5 and 2-7. (2) Existing duplicated/return bills It may have caused unreliable financial analysis including NRW and therefore needs to be solved prior to the modification of billing system.
2-2 Cause
(1) Insufficient 2015 Counterpart Fund Request of Counterpart Fund was approved by FCTA, but it has been disbursed partially. Although it is general in Nigeria, that government authorities and parastatals suffer from irregularity and shortfall of budget, situation is more unsound than usual, especially this presidential-election year.
(2) Existing duplicated/return bills FCTWB has not been able to completely and effectively treat duplicated/return bills for a long period.
2-3 Action to be taken
(1) Insufficient 2015 Counterpart Fund JICA Experts proposed cost-reducing modification of PMA/SMA design and downscaling chamber to casing or temporary excavation, but total cost still exceeded the current limited fund. FCTWB and JICA Experts adopt an interim alternate plan to avoid suspension of project implementation due to inadequate Counterpart Fund, which intends to carry on activities in three PMAs with developing capacity of NRW reduction and maintaining motivation of project members. The plan prioritized construction of valve casings in a few selected SMAs in each PMA within the current limited fund, and pilot projects will be implemented on a SMA basis. Monthly in/outflow in PMAs will be estimated by measurement using ultrasonic flow meter to be installed in temporary excavation. FCTWB will proceed to reconfirm size of valve and construction of valve casing, meanwhile, JICA Experts will prepare procurement of valves and fittings.
(2) Existing duplicated/return billsJICA Experts suggested postponing modification of billing system proactively and encouraged
FCTWB to treat duplicated/return bills by invalidation or elimination. FCTWB has constituted a committee to clarify facts accurately and then will take measures properly against these kinds of bills. Fact finding has started and collected information will be analyzed by FCTWB with support from JICA Experts.
Annex3-15
PM Form 3-1 Monitoring Sheet Summary
8
2-4 Roles of Responsible Persons/Organization
[FCTWB] - Reconfirmation of pipe size and material where valves will be installed: Pipeline Unit and pilot Area Offices under supervision of Head of Department (HOD) Distribution.
- Preparation and procurement/construction of valve casings: Pipeline Unit, Logistics Unit and Unit in charge of procurement under supervision of HOD Administration & Supply and HOD Distribution.
- Forming a committee for duplicated/return bills: HOD Commerce. - Fact finding of duplicated/return bills: relevant units and all Area Offices under supervision of HOD Commerce.
- Analysis of collected information of duplicated/return bills: Monitoring and Detection Unit under supervision of HOD Commerce.
- Taking measures against duplicated/return bills such as invalidation or elimination: relevant units under supervision of HOD Commerce.
[JICA Experts] - Support to reconfirmation of pipe size and material where valves will be installed. - Support to preparation and procurement/construction of valve casings. - Procurement of valves and fittings. - Support to analysis of collected information of duplicated/return bills.
3 Modification of the Project Implementation Plan
3-1 Plan of Operation
Due to the above problems and other reasons, Plan of Operation (PO) has been revised. See the Project Monitoring Sheet II as attached.
3-2 Other modifications on detailed implementation plan
(Remarks: The amendment of R/D and PDM (title of the project, duration, project site(s), target group(s), implementation structure, overall goal, project purpose, outputs, activities, and input) should be authorized by JICA HQ. If the project team deems it necessary to modify any part of R/D and PDM, the team may propose the draft.)
None
4 Preparation by Nigerian side toward after completion of the Project
Annex3-16
PM Form 3-1 Monitoring Sheet Summary
9
To be considered.
II. Project Monitoring Sheet I & II (as attached)
AnnexAnnex-1: Project Member List
Annex3-17
PM
For
m 3
-2M
onito
ring
She
et I
Proj
ect T
itle:
The
Fed
eral
Cap
ital T
errit
ory
Red
uctio
n of
Non
-Rev
enue
Wat
er P
roje
ctVe
rsio
n 1
Proj
ect P
erio
d: O
ctob
er 2
014
to M
arch
201
8D
ated
6 N
ov. 2
014
Impl
emen
ting
Org
aniz
atio
n: F
eder
al C
apita
l Ter
ritor
y A
dmin
istr
atio
n (F
CTA
) / F
eder
al C
apita
l Ter
ritor
y W
ater
Boa
rd (F
CTW
BD
icre
ct B
enef
icia
ries:
FC
TWB
, rel
evan
t sta
ff of
FC
TWB
Hea
dqua
rter
s an
d pi
lot A
rea
Offi
ces
Proj
ect S
ite:
FCT
Pilo
t Are
a O
ffice
s: J
abi,
Gar
ki I
and
Gud
uN
arra
tive
Sum
mar
yO
bjec
tivel
y Ve
rifia
ble
Indi
cato
rsM
eans
of V
erifi
catio
nIm
port
ant A
ssum
ptio
nA
chie
vem
ent
Rem
arks
<Ove
rall
Goa
l>
Not
e(*)
: Tar
get v
alue
(X%
), w
hich
is e
xpec
ted
to b
e de
term
ined
inth
e m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n, s
hall
bete
ntat
ivel
y fil
led
whe
n th
e fin
al d
raft
was
app
rove
d by
the
Dire
ctor
of
FCTW
B, w
hich
sha
ll be
fina
lized
whe
n th
e pl
an is
app
rove
d by
FCTA
<Pro
ject
Pur
pose
>
Not
e(**
): Ta
rget
for e
ach
PM
A is
exp
ecte
d to
be
dete
rmin
ed b
y th
een
d of
the
first
qua
rter o
f the
sec
ond
year
<Out
puts
>
Not
e (*
1): N
RW
com
pone
nts
targ
eted
by
Out
put 2
are
(i) i
nvis
ible
leak
age;
(ii)
cust
omer
met
er m
alfu
nctio
n; a
nd (i
ii) il
lega
l con
nect
ion
Pro
ject
Mon
itor
ing
She
et I
(R
evis
ion
ofP
roje
ct D
esig
n M
atri
x)
a: A
nnua
l NR
W ra
tio is
redu
ced
to X
%(*
) at t
he e
nd o
f the
yea
r 202
1a.
Rec
ord
of N
RW
ratio
kep
tby
Dis
tribu
tion
Dep
artm
ent
1a. M
onth
ly re
cord
of N
RW
ratio
.1b
&1c
. M
ater
ial f
or m
eetin
gssu
bmitt
ed b
y th
e D
istri
butio
nD
epar
tmen
t
Cap
acity
of F
CTW
B fo
r NR
W re
duct
ion
is s
treng
then
ed
Indi
cato
r can
not b
eob
tain
ed b
ecau
se o
f lim
ited
prog
ress
.
Indi
cato
r can
not b
eob
tain
ed b
ecau
sem
easu
rem
ent o
f inf
low
and
outfl
ow to
/from
dis
tribu
tion
syst
em is
not
read
y.
Indi
cato
r can
not b
eob
tain
ed b
ecau
se o
f lim
ited
prog
ress
, but
nec
essa
rykn
owle
dge
for N
RW
redu
ctio
n ha
s be
engr
adua
lly d
evel
oped
thro
ugh
lect
ures
and
OJT
.
See
the
Out
put-2
of
Mon
itorin
gS
heet
II
2a. D
ecre
ase
rate
of N
RW
ratio
for e
ach
Sub
Met
erin
g A
rea
of a
PM
A re
ache
s at
leas
t 80%
of i
ts ta
rget
at t
he e
nd o
f the
resp
ectiv
eN
RW
redu
ctio
n op
erat
ions
2b. T
echn
ical
man
uals
for A
rea
Offi
ce m
anag
ers
and
field
ope
rato
rs(i.
e. te
chni
cal o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
vis
ual
mat
eria
ls, a
re a
ppro
ved
by H
ead
of D
epar
tmen
t (H
oD) f
orD
istri
butio
n an
d H
oD fo
r Com
mer
ce b
y th
e fir
st q
uarte
r of t
he th
irdye
ar o
f the
Pro
ject
See
the
Out
put-1
of
Mon
itorin
gS
heet
II
See
the
Out
put-2
of
Mon
itorin
gS
heet
II
See
the
Out
put-3
of
Mon
itorin
gS
heet
II
A. P
olic
y su
ppor
t for
NR
W re
duct
ion
is n
ot d
isco
ntin
ued
Pol
icy
supp
ort f
orN
RW
redu
ctio
n is
not
dis
cont
inue
dB
. Nat
ural
dis
aste
r/ p
oliti
cal i
nsta
bilit
y/ e
cono
mic
cris
is th
at a
ffect
the
serv
ice
area
of F
CTW
B d
o no
t occ
urC
. Act
iviti
es to
impl
emen
t the
med
ium
-tem
stra
tegi
c pl
an a
re n
otdi
scon
tinue
d or
del
ayed
Not
e (*
2): A
med
ium
-term
stra
tegi
c pl
an is
a fi
ve-y
ear p
lan,
whi
ch m
ay in
clud
e m
ediu
m-te
rm ta
rget
, stra
tegi
es a
nd a
ctio
ns, t
imef
ram
e, h
uman
reso
urce
requ
irem
ent,
on-th
e-jo
b tra
inin
g m
echa
nism
, cos
t-ben
efit
anal
ysis
of N
RW
redu
ctio
n, e
tc. I
t is
note
d th
at N
RW
com
pone
nts
addr
esse
d by
the
stra
tegi
c pl
an a
re n
ot li
mite
d to
the
ones
men
tione
d in
(*1)
abo
ve: t
hey
shal
l be
disc
usse
d an
d de
term
ined
in d
evel
opin
g th
e ou
tline
of t
he s
trate
gic
plan
(thr
ough
Act
ivity
3-4
).
Indi
cato
r can
not b
eob
tain
ed b
ecau
se p
ilot
proj
ects
are
stil
l at t
hest
age
of p
repa
ratio
n, b
utth
eore
tical
lect
ures
and
prep
arat
ion
of d
raw
ings
thro
ugh
OJT
hav
e be
endo
ne.
Indi
cato
r will
be
obta
ined
inP
hase
-2 o
f the
Pro
ject
sche
dule
d in
201
7 an
d20
18, b
ut W
orki
ng G
roup
mem
bers
wer
e se
lect
edan
d ex
istin
g pl
ans
and
etc.
wer
e re
view
ed.
3a. B
y O
ctob
er 2
017,
dra
ft m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
) is
subm
itted
by
FCTW
B to
FC
TA fo
r rev
iew
and
appr
oval
3b. B
y O
ctob
er 2
017,
an
annu
al N
RW
redu
ctio
n pl
an (2
018)
isin
corp
orat
ed in
FC
WTB
’s a
nnua
l rec
urre
nt a
nd c
apita
l pla
n (2
018)
for s
ubm
issi
on to
FC
TA fo
r rev
iew
and
app
rova
l3c
. A p
lann
ing
man
ual f
or N
RW
redu
ctio
n is
app
rove
d by
the
Dire
ctor
of F
CTW
B b
y th
e en
d of
the
Pro
ject
3. A
med
ium
-term
stra
tegi
c pl
an o
f FC
TWB
for N
RW
redu
ctio
n is
deve
lope
d, u
tiliz
ing
the
resu
lts o
f Out
put 1
-2 (*
2)
Leve
l of N
on-R
even
ue W
ater
(NR
W) i
s re
duce
d at
the
serv
ice
area
of
FCTW
B
1a. R
ecor
d of
mon
thly
NR
W ra
tio is
kep
t by
Dis
tribu
tion
Dep
artm
ent
from
the
third
qua
rter o
f the
firs
t yea
r of t
he P
roje
ct1b
. Mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
its m
onth
ly J
oint
Man
agem
ent M
eetin
g fro
m th
e th
ird q
uarte
r of t
hefir
st y
ear o
f the
Pro
ject
1c. Q
uarte
rly N
RW
ratio
of t
he s
ervi
ce a
rea
of F
CTW
B is
repo
rted
toth
e B
oard
of D
irect
ors
of F
CTW
B fr
om th
e th
ird q
uarte
r of t
he fi
rst
year
of t
he P
roje
ct
A. S
taff
of F
CTW
B (i
.e. m
embe
rs o
fN
RW
Man
agem
ent T
eam
and
Pilo
tN
RW
Act
ion
Team
s) tr
aine
d th
roug
hth
e P
roje
ct d
o no
t lea
ve th
e of
fice
inla
rge
num
bers
a. D
ate
of a
ppro
val o
f the
plan
b. R
esul
t of m
onito
ring
byN
RW
Man
agem
ent T
eam
c. R
esul
ts o
f joi
ntas
sess
men
t bas
ed o
n th
ecr
iteria
set
by
the
Pro
ject
d. R
ecor
d of
NR
W ra
tio k
ept
by D
istri
butio
n D
epar
tmen
t
3a&
3b.
Dat
e of
offi
cial
lette
rsu
bmitt
ing
draf
t stra
tegi
c pl
anan
d an
nual
recu
rren
t and
capi
tal p
lan
3c. D
ate
of a
ppro
val o
f the
man
ual
2. M
etho
ds/o
pera
tiona
l pro
cedu
res
for e
ffect
ive
NR
W re
duct
ion
are
esta
blis
hed
thro
ugh
pilo
t pro
ject
s at
Pilo
t Met
erin
g A
reas
(PM
As)
und
erpi
lot A
rea
Offi
ces
(*1)
2a. R
ecor
d of
NR
W ra
tio k
ept
by th
e D
istri
butio
nD
epar
tmen
t2b
. Dat
e of
app
rova
l of t
hem
anua
ls
1. L
evel
of N
RW
of t
he s
ervi
ce a
rea
of F
CW
TB is
mon
itore
d re
gula
rly
a. T
he m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
)is
app
rove
d by
FC
TA b
y th
e en
d of
the
Pro
ject
.b.
NR
W re
duct
ion
oper
atio
ns o
f the
firs
t qua
rter o
f 201
8 sp
ecifi
ed in
the
annu
al p
lan
of th
e ab
ove
plan
are
car
ried
out a
ccor
ding
to th
epl
an b
y FC
TWB
c. R
elev
ant s
taff
of F
CTW
B (i
.e. m
embe
rs o
f NR
W M
anag
emen
tTe
am a
nd P
ilot N
RW
Act
ion
Team
s) b
ecom
e eq
uipp
ed w
ith s
kills
and
know
ledg
e ne
cess
ary
for N
RW
redu
ctio
n ac
cord
ing
to th
ecr
iteria
set
by
the
Pro
ject
for e
ach
leve
ld.
NR
W ra
tio o
f eac
h P
MA
in th
e la
st q
uarte
r of t
he P
roje
ct re
ache
sits
resp
ectiv
e ta
rget
(**)
Annex3-18
PM
For
m 3
-2M
onito
ring
She
et I
Act
iviti
esIm
port
ant A
ssum
ptio
nTh
e N
iger
ian
Side
The
Japa
nese
Sid
e
Pre-
Con
ditio
ns
Issu
es &
Cou
nter
mes
ures
Not
e (*
3) S
elec
tion
crite
ria o
f PM
A a
re a
s fo
llow
s: (i
) Saf
ety
for n
ight
wor
ks is
sec
ured
in m
easu
ring
min
imum
nig
ht fl
ow: (
ii) D
istri
butio
n ne
twor
k is
sep
arat
ed a
nd it
is e
asy
to is
olat
e it
in m
easu
ring
NR
W ra
tio: a
nd (i
ii) N
RW
ratio
is s
uppo
sedl
y hi
gh.
Not
e (*
4) W
orki
ng G
roup
for N
RW
pla
nnin
g w
ould
con
sist
of P
roje
ct M
anag
er (a
s ch
air)
, Dep
uty
Pro
ject
Man
ager
, Tec
hnic
al M
anag
ers,
Hea
d of
Fin
ance
Dep
t., H
ead
of P
rodu
ctio
n D
ept.,
Hea
d of
PR
S U
nit,
and
mem
bers
of N
RW
Man
agem
ent T
eam
.
3-1
Est
ablis
h a
Wor
king
Gro
up fo
r NR
W p
lann
ing
(*4)
3-2
Rev
iew
exi
stin
g pl
ans,
impl
emen
tatio
n st
ruct
ure,
on-
the-
job
train
ing
mec
hani
sm, e
tc. r
elat
ed to
NR
W re
duct
ion
at F
CTW
B3-
3 C
ondu
ct h
ydra
ulic
and
wat
er p
ress
ure
dist
ribut
ion
anal
yses
of t
hepi
pelin
e ne
twor
ks3-
4 D
evel
op o
utlin
es o
f the
med
ium
-term
stra
tegi
c pl
an a
nd it
s an
nual
NR
W re
duct
ion
plan
3-5
Dev
elop
the
first
med
ium
-term
stra
tegi
c pl
an (2
018-
2022
) for
app
rova
lby
FC
TA3-
6 D
evel
op a
n an
nual
NR
W re
duct
ion
plan
bas
ed o
n th
e st
rate
gic
plan
as
an in
tegr
al p
art o
f an
annu
al re
curr
ent a
nd c
apita
l pla
n of
FC
TWB
for
appr
oval
by
FCTA
3-7
Dev
elop
a p
lann
ing
man
ual f
or N
RW
redu
ctio
n
Proj
ect P
erso
nnel
1. P
roje
ct D
irect
or: D
irect
or o
f Eco
nom
ic P
lann
ing,
Res
earc
h an
dS
tatis
tic D
epar
tmen
t, FC
TA2.
Pro
ject
Man
ager
: Dire
ctor
of F
CTW
B3.
Dep
uty
Pro
ject
Man
ager
: HoD
for A
dmin
istra
tion
and
Sup
ply/
FCTW
B4.
Tec
hnic
al M
anag
ers
(Als
o Le
ader
s of
NR
W M
anag
emen
t Tea
m):
HoD
for D
istri
butio
n an
d H
oD fo
r Com
mer
ce /F
CTW
B5.
Mem
bers
of N
RW
Man
agem
ent T
eam
(FC
TWB
):- H
ead
of S
peci
al P
roje
ct U
nit o
f Dis
tribu
tion
Dep
artm
ent (
asC
oord
inat
or)
- Rel
evan
t Hea
d of
Uni
t (H
oU) a
nd o
ffice
rs o
f the
Dis
tribu
tion
Dep
artm
ent,
Com
mer
ce D
epar
tmen
t, an
d A
dmin
istra
tion
and
Sup
ply
Dep
artm
ent
6. H
eads
of o
ther
rele
vant
Dep
artm
ents
and
Uni
t of F
CTW
B: H
oDfo
r Fin
ance
, HoD
for P
rodu
ctio
n, H
oU fo
r Pla
nnin
g R
esea
rch
and
Sta
tistic
s (P
RS
)7.
Mem
bers
of N
RW
Act
ion
Team
: Are
a M
anag
er, A
ssis
tant
Are
aM
anag
er (D
istri
butio
n), A
ssis
tant
Are
a M
anag
er (C
omm
erce
),te
chni
cal o
ffice
rs (D
istri
butio
n) a
nd m
eter
read
ers
(Com
mer
ce) o
fea
ch p
ilot A
rea
Offi
ce8.
Oth
er p
erso
nnel
mut
ually
agr
eed
upon
as
nece
ssar
y
Land
, Bui
ldin
g an
d Fa
cilit
ies
1. O
ffice
bui
ldin
g an
d fa
cilit
ies
nece
ssar
y fo
r the
impl
emen
tatio
n of
the
Pro
ject
2. O
ffice
spa
ces
and
nece
ssar
y fa
cilit
ies
for t
he J
apan
ese
Exp
erts
at
the
FCTW
B H
eadq
uarte
rs a
nd e
ach
Pilo
t Are
a O
ffice
, inc
ludi
ngin
tern
et c
onne
ctio
n an
d ai
r con
ditio
ners
3. O
ther
faci
litie
s m
utua
lly a
gree
d up
on a
s ne
cess
ary
Loca
l Cos
ts1.
Cos
t for
inst
alla
tion,
ope
ratio
n an
d m
aint
enan
ce o
f the
prov
ided
equ
ipm
ent a
nd c
ost f
or p
ipe
repa
ir at
PM
As
2. A
dmin
istra
tion
and
oper
atio
nal c
osts
, inc
ludi
ng c
osts
for
loca
l tra
vel f
or th
e P
roje
ct P
erso
nnel
A N
atur
al d
isas
ter/p
oliti
cal/
inst
abili
ty/e
cono
mic
cris
is th
at a
ffect
the
proj
ect a
ctiv
ities
do
not o
ccur
- Uns
tabl
e po
wer
con
ditio
ns in
proj
ect o
ffice
will
be
settl
ed b
ypr
ovis
ion
of g
ener
ator
by
JIC
A a
s an
extra
sup
port.
- Ina
dequ
ate
Cou
nter
part
Fund
may
caus
e fu
rther
del
ay o
f pro
ject
sche
dule
. To
avoi
d su
spen
sion
,sc
hedu
le a
nd im
plem
entin
gpr
oced
ures
will
be
mod
ified
cons
ider
ing
a cu
rren
t lim
ited
fund
.- A
larg
e nu
mbe
r of d
uplic
ated
/ ret
urn
bills
may
hav
e ca
used
unr
elia
ble
finan
cial
ana
lysi
s in
clud
ing
NR
W.
Fact
will
be
clar
ified
acc
urat
ely
and
the
bills
will
be
treat
ed p
rope
rly b
yFC
TWB
, suc
h as
inva
lidat
ion
orel
imin
atio
n.- S
moo
th c
usto
ms
clea
ranc
e an
d ta
xex
empt
ion
of e
quip
men
t to
beim
porte
d fro
m J
apan
will
be
ensu
red
in c
lose
com
mun
icat
ion.
A F
urni
shed
offi
ces
for J
apan
ese
Exp
ert T
eam
are
sec
ured
at
Hea
dqua
rters
and
eac
h P
ilot A
rea
Offi
ce o
f FC
TWB
B P
roje
ct P
erso
nnel
is a
ssig
ned
with
the
final
ized
list
Japa
nese
Exp
erts
1. C
hief
Adv
isor
/ N
RW
Red
uctio
n P
lann
ing
2. D
eput
y C
hief
Adv
isor
/N
RW
Red
uctio
n P
lann
ing
3. N
RW
Red
uctio
nO
pera
tions
Man
agem
ent
4. L
eaka
ge D
etec
tion
Tech
nolo
gy5.
Com
mer
cial
Los
s6.
Hyd
raul
ic A
naly
sis
/ GIS
7. P
rocu
rem
ent M
anag
emen
t/ C
oord
inat
or8.
Oth
er e
xper
ts m
utua
llyag
reed
upo
n as
nec
essa
ry
Trai
ning
of t
he N
iger
ian
Proj
ect P
erso
nnel
in J
apan
Four
per
sons
mut
ually
agr
eed
upon
will
be tr
aine
d in
Jap
anan
nual
ly
1-1
Inst
all b
ulk
met
ers
to w
ater
trea
tmen
t pla
nts
1 an
d 2
1-2
Mea
sure
mon
thly
wat
er p
rodu
ctio
n of
wat
er tr
eatm
ent p
lant
s 1,
2 ,3
,an
d 4
1-3
Tally
the
abov
e w
ater
pro
duct
ion
data
mon
thly
1-4
Cal
cula
te th
e m
onth
ly w
ater
con
sum
ptio
n ba
sed
on th
e bi
lling
dat
a1-
5 C
alcu
late
mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
usi
ng th
eda
ta o
btai
ned
from
Act
ivity
1-3
and
1-4
Inpu
ts
Equi
pmen
t1.
Bul
k m
eter
s fo
r wat
ertre
atm
ent p
lant
s2.
Wat
er fl
ow m
eter
s, v
alve
s,an
d cu
stom
er m
eter
s fo
rS
MA
3. L
eaka
ge d
etec
tion
equi
pmen
t for
PM
A4.
Pip
e re
pair
equi
pmen
t for
PM
A5.
Veh
icle
s(P
ick-
ups)
6. O
ther
equ
ipm
ent m
utua
llyag
reed
upo
n as
nec
essa
ry
2-1
Rev
iew
exi
stin
g N
RW
red
uctio
n op
erat
ions
at e
ach
pilo
t Are
a O
ffice
2-2
Con
duct
cap
acity
ass
essm
ent o
f the
rele
vant
sta
ff of
eac
h pi
lot A
rea
Offi
ce2-
3 Id
entif
y an
d se
lect
a P
ilot M
eter
ing
Are
a (P
MA
) for
eac
h pi
lot A
rea
Offi
ce b
ased
on
the
sele
ctio
n cr
iteria
of P
MA
(*3)
2-4
Pre
pare
/upd
ate
dist
ribut
ion
netw
ork
draw
ings
for e
ach
PM
A2-
5 In
stal
l wat
er fl
ow m
eter
s to
eac
h P
MA
and
mea
sure
in/o
utflo
ws
mon
thly
2-6
Zone
eac
h P
MA
into
Sub
Met
erin
g A
reas
(SM
A)
2-7
Isol
ate
a S
MA
by
inst
allin
g va
lves
2-8
Upd
ate
the
dist
ribut
ion
netw
ork
draw
ings
for e
ach
SM
A2-
9 M
easu
re a
n in
itial
leve
l of N
RW
of e
ach
SM
A2-
10 D
etec
t tar
get N
RW
com
pone
nts
(i.e.
invi
sibl
e le
akag
e, c
usto
mer
met
er m
alfu
nctio
n, a
nd il
lega
l con
nect
ion)
of e
ach
SM
A2-
11 D
evel
op a
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
,inc
ludi
ngre
duct
ion
targ
et, f
or re
view
by
Hea
d of
Dis
tribu
tion
Dep
artm
ent
2-12
Rev
iew
and
app
rove
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
2-13
Impl
emen
t the
NR
W re
duct
ion
oper
atio
ns a
t eac
h S
MA
2-14
Mon
itor t
he p
rogr
ess
of th
e N
RW
redu
ctio
n op
erat
ions
of e
ach
SM
A2-
15 M
easu
re le
vel o
f NR
W o
f eac
h S
MA
at t
he e
nd o
f the
resp
ectiv
eop
erat
ions
2-16
Pre
pare
a re
port
on p
ilot p
roje
cts,
cov
erin
g A
ctiv
ity 2
-1~2
-15
2-17
Dev
elop
man
uals
for N
RW
redu
ctio
n fo
r Are
a O
ffice
man
ager
s an
dfie
ld o
pera
tors
(i.e
. tec
hnic
al o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
visu
al m
ater
ials
Annex3-19
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
Coun
terme
asur
esOu
tput
-11-
1W
/PSu
rvey
Instal
lation
Revis
edPr
epar
ation
Prep
arati
onCo
nstru
ction
Instal
lation
Actua
l1-
2W
/PRe
vised
Actua
l1-
3W
/PRe
vised
Actua
l1-
4W
/PRe
view
Syste
m Mo
difica
tion
Revis
edRe
view
Spec
ificati
onMo
difica
tion
Actua
l1-
5W
/PRe
vised
Actua
lOu
tput
-22-
1W
/PRe
vised
Actua
l2-
2W
/PBa
selin
eIn
terim
-1In
terim
-2Fin
alRe
vised
Actua
l2-
3W
/PRe
vised
Actua
l2-
4W
/PRe
vised
Actua
l2-
5W
/PRe
vised
Prep
arati
onCo
nstru
ct. an
d Ins
tall.
Actua
l2-
6W
/PRe
vised
Actua
l2-
7W
/PRe
vised
Actua
l2-
8W
/PRe
vised
Actua
l2-
9W
/PRe
vised
Actua
l2-
10W
/PRe
vised
Actua
l
2-11
W/P
Revis
edAc
tual
2-12
W/P
Revis
edAc
tual
2-13
W/P
Revis
edAc
tual
2-14
W/P
Revis
edAc
tual
2-15
W/P
Revis
edAc
tual
2-16
W/P
Inter
imFin
alRe
vised
Actua
l2-
17W
/PDr
aftFin
aliza
tion
Modif
icatio
nRe
vised
Actua
l
Outp
ut-3
3-1
W/P
Revis
edAc
tual
3-2
W/P
Revis
edAc
tual
3-3
W/P
Revis
edAc
tual
3-4
W/P
Revis
edAc
tual
3-5
W/P
Revis
edAc
tual
3-6
W/P
Revis
edAc
tual
3-7
W/P
Revis
edAc
tual
W/P
Phas
e-1 (
Oct 2
014 -
Dec
2016
, 27 m
onth
s)Ph
ase-
2 (Ja
n 20
17 -
Mar 2
018,
15 m
onth
s)Re
vised
Actua
l
None
None
None
None
None
None
None
None
None
None
Expe
rt Te
am w
as no
t in N
igeira
in mo
st of
perio
d betw
een
Janu
nary
2015
and A
pril 2
015.
--
None
None
To be
delay
ed
Inter
im re
port
may b
ere
sche
duled
acco
rding
topr
ogre
ss.
None
None
None
None
FCDA
is an
obse
rver.
Wor
king G
roup
mem
bers
were
selec
ted.
None
Revie
w wa
s don
epr
elimi
narily
.No
ne
Delay
edTh
eore
tical
lectur
es w
ere
done
prior
to fie
ld wo
rks.
None
None
None
None
None
None
None
To be
delay
ed
To be
delay
ed
To be
delay
ed
To be
delay
edNo
neNo
ne
Exist
ing P
C as
socia
ted w
ithAG
IS.
Ongo
ingRe
strict
ion of
data
extra
ction
shou
ld be
remo
ved.
Cons
tructi
on an
d ins
tallat
ionsh
ould
be co
mmen
ced a
s soo
nas
addit
ional
fund i
s rea
dy, b
ythe
end o
f 201
5 at th
e late
st.
Delay
ed. T
o be i
nstal
led w
iththe
curre
nt lim
ited f
und.
None
Due t
o the
curre
nt lim
ited
fund,
cons
tructi
on w
ill be
postp
oned
. Unti
lins
tallat
ion, u
ltraso
nicflo
w me
ter w
ill be
subs
titued
temp
orar
ilyAl
most
comp
leted
None
None
None
Exist
ing P
C as
socia
ted w
ithAG
IS.
Ongo
ingRe
strict
ion of
data
extra
ction
shou
ld be
remo
ved.
None
None
Delay
ed. T
his w
ill fol
low A
ctivit
y2-
7.
Desig
n of c
hamb
ers,
spec
ificati
on of
flow
meter
, BoQ
wer
epr
epar
ed. F
low m
eters
are i
n the
proc
ess o
fpr
ocur
emen
t.
Due t
o the
curre
nt lim
ited
fund,
cons
tructi
on w
ill be
postp
oned
. This
does
not
have
an ad
vers
effec
t on
the P
rojec
t in th
e sho
rtter
m.
Cons
tructi
on of
cham
bers
shou
ld be
comm
ence
d as s
oon
as ad
dition
al fun
d is r
eady
, by
the en
d of 2
015 a
t the l
atest.
Curre
nt sit
uatio
n of b
illing
and s
ystem
have
been
asse
ssed
.
A lar
ge nu
mber
ofdu
plica
ted/re
turn b
illsex
ist, w
hich w
ill be
treate
d by F
CTW
B.
FCTW
B wi
ll for
m a c
ommi
ttee
and c
larify
facts
of du
plica
ted/
retur
n bills
. Sys
tem m
odica
tion
will b
e disc
usse
d in l
ine w
ithtre
atmen
t of th
e bills
.
None
None
Comp
leted
None
Tthe
resu
lt was
appr
oved
byFC
TWB.
Base
line a
sses
smen
twa
s don
e.No
ne
C omp
leted
None
Nov
Dec
Jan
Feb
Zone
each
PMA
into
Sub M
eterin
gAr
eas (
SMA)
Isolat
e a S
MA by
insta
lling v
alves
Upda
te the
distr
ibutio
n netw
ork
draw
ings f
or ea
ch S
MA
Meas
ure a
n init
ial le
vel o
f NRW
of ea
chSM
A
Mar
Apr
May
Jun
Jul
Aug
Activ
ities
Oct.
Nov
Dec
Jan
Feb
Leve
l of N
RW o
f the
serv
ice ar
ea o
f FCT
WB
is m
onito
red
regu
larly
Meth
ods/o
pera
tiona
lpr
oced
ures
for e
ffect
iveNR
W re
duct
ion
are
esta
blish
ed th
roug
hpi
lot p
rojec
ts at
Pilo
tMe
terin
g Ar
eas (
PMAs
)un
der p
ilot A
rea O
ffice
s
Revie
w ex
isting
NRW
redu
ction
oper
ation
s at e
ach p
ilot A
rea O
ffice
Cond
uct c
apac
ity as
sess
ment
ofor
ganiz
ation
and t
he re
levan
t staf
f
Identi
fy an
d sele
ct a P
ilot M
eterin
gAr
ea (P
MA) f
or ea
ch P
ilot A
rea O
ffice
base
d on t
he se
lectio
n crite
ria of
PMA
Prep
are/u
pdate
distr
ibutio
n netw
ork
draw
ings f
or ea
ch P
MA
Instal
l wate
r flow
mete
rs to
each
PMA
and m
easu
re in
/outflo
ws m
onthl
y
Mar
Instal
l bulk
mete
rs to
water
trea
tmen
tpla
nts 1
and 2
Meas
ure m
onthl
y wate
r pro
ducti
on of
water
trea
tmen
t plan
ts 1,
2, 3,
and 4
Tally
the a
bove
wate
r pro
ducti
on da
tamo
nthly
Calcu
late t
he m
onthl
y wate
rco
nsum
ption
base
d on t
he bi
lling d
ata
Calcu
late m
onthl
y NRW
ratio
of th
ese
rvice
area
of F
CTW
B us
ing th
e data
obtai
ned f
rom
Activ
ity 1-
3 and
1-4
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Feb
Mar
Apr
May
Jun
Oct
Nov
Dec
Jan
Jul
Aug
Sep
Oct
Meas
ure l
evel
of NR
W of
each
SMA
atthe
end o
f the r
espe
ctive
oper
ation
s
Revie
w an
d app
rove
NRW
redu
ction
oper
ation
plan
of ea
ch S
MA
Imple
ment
NRW
redu
ction
oper
ation
sat
each
SMA
Monit
or th
e pro
gres
s of t
he N
RWre
ducti
on op
erati
ons o
f eac
h SMA
Detec
t targ
et NR
W co
mpon
ents
(i.e.
invisi
ble le
akag
e, cu
stome
r mete
rma
lfunc
tion,
and i
llega
l con
necti
on) o
fea
ch S
MADe
velop
a NR
W re
ducti
on op
erati
onpla
n of e
ach S
MA, in
cludin
g red
uctio
ntar
get fo
r rev
iew by
Hea
d of D
istrib
ution
Depa
rtmen
t
Deve
lop ou
tlines
of th
e med
ium-te
rmstr
ategic
plan
and i
ts an
nual
NRW
redu
ction
plan
(app
rova
l by t
heDi
recto
r)De
velop
the f
irst m
edium
-term
stra
tegic
plan (
2018
-202
2) fo
r app
rova
l by F
CTA
Deve
lop an
annu
al NR
W re
ducti
on pl
anba
sed o
n the
stra
tegic
plan a
s an
integ
ral p
art o
f an a
nnua
l recu
rrent
and
capit
al pla
n of F
CTW
B for
appr
oval
byFC
TADe
velop
a pla
nning
man
ual fo
r NRW
redu
ction
Prep
are a
repo
rt on
pilot
proje
cts,
cove
ring A
ctivit
y 2-1
~2-1
5
Deve
lop m
anua
ls for
NRW
redu
ction
for A
rea O
ffice m
anag
ers a
nd fie
ldop
erato
rs (i.e
. tec
hnica
l offic
ers a
ndme
ter re
ader
s), in
cludin
g aud
io vis
ual
mate
rials
A m
ediu
m-te
rmst
rate
gic p
lan o
f FCT
WB
for N
RW re
duct
ion
isde
velo
ped,
util
izing
the
resu
lts o
f Out
put-1
&2
Estab
lish a
Wor
king G
roup
for N
RWre
ducti
on pl
annin
g
Revie
w ex
isting
plan
s, im
pleme
ntatio
nstr
uctur
e, on
-the-
job tr
aining
mech
anism
, etc.
relat
ed to
NRW
redu
ction
at F
CTW
BCo
nduc
t hyd
rauli
c and
wate
r pre
ssur
edis
tributi
on an
alyse
s of th
e pipe
line
netw
orks
Dura
tion
/ Pha
sing
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Annex3-20
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Issue
Solut
ion1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
42JIC
A Ex
pert
1Ak
inori M
IYOS
HIW
/P C
hief A
dviso
r / N
RW R
educ
tion P
lannin
gRe
vised
Actua
l2
Take
toshi
FUJIY
AMA
W/P
Dep
uty C
hief A
dviso
r / N
RW R
educ
tion P
lannin
gRe
vised
Actua
l3
Toru
TOY
ODA
W/P
NRW
Red
uctio
n Ope
ratio
ns M
anag
emen
tRe
vised
Actua
l4
Kiyo
shi K
IYAM
AW
/P Le
akag
e Dete
ction
Tec
hnolo
gyRe
vised
Actua
l5
Taku
ji OKU
BOW
/P C
omme
rcial
Loss
Revis
edAc
tual
6Sh
inta S
EGAW
AW
/P H
ydra
ulic A
nalys
is / G
ISRe
vised
Actua
l7
Kazu
hiro I
SHIU
RAW
/P P
rocu
reme
nt Ma
nage
ment
/ Coo
rdina
torRe
vised
Actua
lEq
uipm
ent
1Le
akag
e dete
ction
equip
ment
W/P
Tend
er &
Deli
very
*3PM
Asin
Japa
n(JI
CA)
Revis
edAc
tual
2Bu
lk me
ters (
ultra
sonic
flow
meter
)W
/PTe
nder
*WTP
in Ja
pan
(JICA
)Re
vised
Meter
Insta
llatio
nAc
tual
3W
ater m
eter,
flow
meter
and v
alves
W/P
Tend
er &
Deli
very
*3PM
Asin
Nige
ria(JI
CA E
xper
t)Re
vised
Actua
l4
Pipe
repa
ir equ
ipmen
tW
/P*3
PMAs
in Ni
geria
(JICA
Exp
ert)
Revis
edAc
tual
5Ve
hicles
(Pick
up tr
uck)
W/P
*Lea
kage
Dete
ction
in Ni
geria
(JICA
)Re
vised
Actua
l6
GIS
softw
are,
office
equip
ment
W/P
*FCT
WB
HQs
in Ni
geria
/Othe
r(JI
CA E
xper
t)Re
vised
Actua
lLo
cal C
onsu
ltant
1Mo
difica
tion o
f billi
ng an
d coll
ectio
n sys
temW
/PRe
vised
Actua
l2
GIS
and d
ataba
se tr
aining
W/P
Revis
edAc
tual
Train
ing
in Ja
pan
W/P
Revis
edAc
tual
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Issue
Solut
ion1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
42Pl
anni
ng, M
onito
ring
and
Coor
dina
tion
1W
/PRe
vised
Actua
l2
W/P
Revis
edAc
tual
3W
/PRe
vised
Actua
l4
W/P
Revis
edAc
tual
5W
/PRe
vised
Actua
l6
W/P
Revis
edAc
tual
7W
/PRe
vised
Actua
l8
W/P
Revis
edAc
tual
9W
/PKi
ck of
fFin
alRe
vised
Actua
l10
Colle
ct an
d org
anize
data
for In
dicato
rs of
PDM
aW
/PRe
vised
Actua
lb
Cond
uct jo
int ca
pacit
y ass
essm
ent o
f the r
eleva
nt sta
ffW
/PBa
selin
eIn
terim
-1In
terim
-2Fin
alRe
vised
Prep
are C
apac
ity D
evelo
pmen
t (CD
) Plan
Actua
lc
W/P
Revis
edAc
tual
dW
/PRe
vised
Actua
lRe
ports
/ Doc
umen
ts11
W/P
Revis
edAc
tual
12W
/PRe
vised
Actua
l13
W/P
Revis
edAc
tual
Publ
ic Re
latio
ns14
W/P
Revis
edAc
tual
15W
/PRe
vised
Actua
lMo
nito
ring
and
Evalu
atio
n in
the P
ost-P
rojec
tper
iod
16Po
st Mo
nitor
ing by
JICA
(not
desc
ribed
here
)17
Post
Evalu
ation
by JI
CA(n
ot de
scrib
ed he
re)
None
None
None
None
None
None
None
None
None
.No
ne
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
To be
hand
ed ov
er so
on.
Mostl
y com
pleted
.No
ne
Syste
m mo
dicati
on w
ill be
discu
ssed
in lin
e with
trea
tmen
tof
dupli
cated
/retur
n bills
.
None
None
To be
cond
ucted
in A
ug. o
rSe
p. 20
15, c
onsid
ering
prep
arati
on of
pilot
proje
ct
None
None
None
None
None
None
None
None
None
None
None
None
Smoo
th cu
stoms
clear
ance
and t
axex
empti
on sh
ould
be
Clos
e com
munic
ation
betw
een J
ICA
and
FCTW
B is
impe
rativ
e.Pe
riod o
f insta
llatio
n will
bede
termi
ned b
y JIC
A.Sm
ooth
custo
mscle
aran
ce an
d tax
exem
ption
shou
ld be
Clos
e com
munic
ation
betw
een J
ICA
and
FCTW
B is
impe
rativ
e.De
layed
To be
proc
ured
in lin
ewi
th FC
TWB's
proc
urem
ent .
Delay
edTo
be pr
ocur
ed in
line
with
FCTW
B'spr
ocur
emen
t .No
neNo
ne
None
None
None
None
None
None
None
None
None
None
None
None
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Inpu
ts (t
he Ja
pane
se si
de)
Oct.
Nov
Dec
Jan
Feb
Mar
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Moni
torin
g Pl
anOc
t.No
vDe
cJa
nFe
b
Cond
uct J
oint M
onito
ring s
emi-a
nnua
lly
Subm
it Mon
itorin
g She
et to
JICA
Nige
ria O
ffice s
emi-a
nnua
lly
Monit
oring
Miss
ion fr
om JI
CA fo
r Join
t Rev
iew
Orga
nize i
nform
ation
shar
ing se
mina
rs for
FCT
WB/
FCTA
, inclu
ding
Area
Offic
es
Deve
lop cr
iteria
for c
apac
ity as
sess
ment
for ea
ch le
vel o
f the
relev
ant s
taff (
i.e. m
embe
rs of
NRW
Mgm
t and
Acti
on T
eams
)
Set r
educ
tion t
arge
t for e
ach P
MA by
the f
irst q
uarte
r of th
e sec
ond
year
Mar
Orga
nize J
oint C
oord
inatio
n Com
mitte
e (JC
C)
Deve
lop D
etail P
lan of
Ope
ratio
ns (D
PO) f
or re
view
and a
ppro
val
by JC
C
Deve
lop A
nnua
l Plan
of O
pera
tions
(APO
) for
revie
w an
d app
rova
lby
JCC
Orga
nize m
onthl
y tec
hnica
l mee
tings
Orga
nize q
uarte
rly pr
oject
meeti
ngs
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Colle
ct an
d org
anize
for I
ndica
tors f
or se
mi-a
nnua
l Join
t Mon
itorin
g
Wor
k Plan
Proje
ct Pr
ogre
ss R
epor
t
Proje
ct Co
mplet
ion R
epor
t
Deve
lop P
rojec
t Web
site
Prep
ratio
n of p
ublic
relat
ions m
ateria
lsNe
wslet
ter is
issu
ed qu
arter
ly.
JCC
is an
occa
sion o
f dec
ision
-ma
king.
APO
is pr
epar
ed in
para
rrel
with
FCT
WB's
annu
al re
curre
ntan
d cap
ital p
lanMo
nthly
prog
ress
, plan
, issu
es,
solut
ions a
nd et
c are
discu
ssed
.Qu
arter
ly pr
ogre
ss, p
lan,
issue
s, so
lution
s and
etc a
redis
cuss
ed.
Achie
veme
nt of
PDM
and
prog
ress
of P
O ar
e mon
itore
djoi
ntly.
Base
line a
sses
smen
t was
done
. Tthe
resu
lt was
appr
oved
by F
CTW
B.
Wor
k Plan
was
prep
ared
and
appr
oved
by F
CTW
B.
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Annex3-21
Project Monitoring Sheet II (Revision of Plan of Operation) PM Form 3-3 Monitoring Sheet II
Resonsibility of Members .
Version 1Project Title: The Federal Capital Territory Reduction of Non-Revenue Water Project Dated 6 Nov. 2014
Responsible Responsible Other Major InputOrganization Person Implementors JICA Experts Remarks
(Nigeria) (Nigeria) (Nigeria) Japan NigeriaOutput-1 Dist. Dpt HoD(Dist) Chief Advisor (CA), Dy.CA
1-1 W/P Dist. Dpt HoU(Pipeline)/D Tech Officers (Pipeline) CA, Dy.CA Bulk meters Installation, Prod Dpt will be consultedRevisedActual Prod. Dpt HoU(Metering)/D O&M cost
1-2 W/P Dist. Dpt HoU(Pipeline)/D Tech Officers (Pipeline) CA, Dy.CA If bulks are installed inside the plants,RevisedActual Prod. Dpt HoU(Prod)/Prod Tech Officers (Prod) Prod Dept shall measure.
1-3 W/P Dist. Dpt HoU(Water Monitoring) HoU(Water Monitoring) CA, Dy.CARevisedActual
1-4 W/P Com Dpt HoU(Billing)/C Billing staff CA, Dy.CA Cost forpgradingRevised
Actual software1-5 W/P Dist. Dpt HoU(Logistics)/D Logistics officer CA, Dy.CA
RevisedActual
Output-2 Dist. Dpt, Com. Dept HoD(Dist)(Com) CA and other Experts Vehicles O&M cost2-1 W/P Dist. Dpt, Com. Dpt HoD(Dist)(Com) AM, AAM (Dist)(Com) CA, Dy.CA, NRW reduction
RevisedActual
2-2 W/P Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team CA and other ExpertsRevisedActual
2-3 W/P Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team CA, Dy.CA, NRW reductionRevised AM, AAM (Dist)(Com)Actual
2-4 W/P Dist. Dpt HoD(Dist) HoU(Logistics)&officers NRW reduction,RevisedActual HoU(GIS)&officers Hydraulic analysis
2-5 W/P Dist. Dpt Area Manager(AM) AAM(Dist) NRW reduction, Water flow Installation andRevised
Actual Tech Officers(Dist) Hydraulic analysis meters O&M cost2-6 W/P Dist. Dpt HoU(Logistics)/D AM, AAM(Dist)(Com) NRW reduction,
RevisedActual HoU(Metering)/D HoU(GIS)&officers Hydraulic analysis
2-7 W/P Dist. Dpt AM Tech Officers(Dist) NRW reduction Valves Installation andRevisedActual AAM(Dist) O&M cost
2-8 W/P Dist. Dpt HoU(Logistics)/D AAM(Dist),HoU(GIS)&officers NRW reduction,RevisedActual HoU(Logistics)&officers Hydraulic analysis
2-9 W/P Dist. Dpt HoD(Dist) NRW reductionRevisedActual
2-10 W/P Dist. Dpt, Com. Dpt AM NRW reductionRevisedActual
2-11 W/P Dist. Dpt AM AAM (Dist)(Com) NRW reduction, LeakageRevised detection, Com LossActual
2-12 W/P Dist Dpt HoD(Dist) Relevant HoUs NRW reductionRevisedActual
2-13 W/P Dist. Dpt, Com. Dpt AM NRW reductionRevisedActual
2-14 W/P Area Office AM NRW reductionRevisedActual
2-15 W/P Area Office AM NRW reductionRevisedActual
2-16 W/P Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team, AM, CA, Dy.CA, NRW reduction,RevisedActual Leakage detection, Com loss
2-17 W/P Dist. Dpt, Com. Dpt HoD(Dist)(Com) NRW Mgt Team, AM, CA, Dy.CA, NRW reduction,Revised AAM (Dist)(Com) Leakage detection, Com
lossActual Coordinator
Output-3 FCTWB PM CA, Dy.CA3-1 W/P FCTWB PM Working Group CA, Dy.CA, NRW reduction
RevisedActual
3-2 W/P FCTWB PM Working Group CA, Dy.CA, NRW reductionRevisedActual
3-3 W/P Dist Dpt HoU(Logistics)/D HoU(Logistics)&officers Hydraulic analysisRevised HoU(Pipeline)/D HoU(GIS)&officersActual HoU(Pipeline)&officers
3-4 W/P FCTWB PM Working Group CA, Dy.CA, NRW reductionRevisedActual
3-5 W/P FCTWB PM Working Group CA, Dy.CA, NRW reductionRevisedActual
3-6 W/P FCTWB PM Working Group CA, Dy.CA, NRW reductionRevisedActual
3-7 W/P FCTWB PM Working Group CA, Dy.CA, NRW reductionRevisedActual
W/PRevisedActual
Zone each PMA into Sub MeteringAreas (SMA)
Isolate a SMA by installing valves
Update the distribution networkdrawings for each SMA
Measure an initial level of NRW of eachSMA
Activities
Level of NRW of theservice area of FCTWBis monitored regularly
Methods/operationalprocedures for effectiveNRW reduction areestablished throughpilot projects at PilotMetering Areas (PMAs)under pilot Area Offices
Review existing NRW reductionoperations at each pilot Area Office
Conduct capacity assessment oforganization and the relevant staff
Identify and select a Pilot MeteringArea (PMA) for each Pilot Area Officebased on the selection criteria of PMAPrepare/update distribution networkdrawings for each PMA
Install water flow meters to each PMAand measure in/outflows monthly
Install bulk meters to water treatmentplants 1 and 2
Measure monthly water production ofwater treatment plants 1, 2, 3, and 4
Tally the above water production datamonthly
Calculate the monthly waterconsumption based on the billing data
Calculate monthly NRW ratio of theservice area of FCTWB using the dataobtained from Activity 1-3 and 1-4
Measure level of NRW of each SMA atthe end of the respective operations
Review and approve NRW reductionoperation plan of each SMA
Implement NRW reduction operationsat each SMA
Monitor the progress of the NRWreduction operations of each SMA
Detect target NRW components (i.e.invisible leakage, customer metermalfunction, and illegal connection) ofeach SMADevelop a NRW reduction operationplan of each SMA, including reductiontarget for review by Head of DistributionDepartment
Develop outlines of the medium-termstrategic plan and its annual NRWreduction plan (approval by theDirector)Develop the first medium-term strategicplan (2018-2022) for approval by FCTA
Develop an annual NRW reduction planbased on the strategic plan as anintegral part of an annual recurrent andcapital plan of FCTWB for approval byFCTADevelop a planning manual for NRWreduction
Prepare a report on pilot projects,covering Activity 2-1~2-15
Develop manuals for NRW reductionfor Area Office managers and fieldoperators (i.e. technical officers andmeter readers), including audio visualmaterials
A medium-termstrategic plan of FCTWBfor NRW reduction isdeveloped, utilizing theresults of Output-1&2
Establish a Working Group for NRWreduction planning
Review existing plans, implementationstructure, on-the-job trainingmechanism, etc. related to NRWreduction at FCTWBConduct hydraulic and water pressuredistribution analyses of the pipelinenetworks
Duration / Phasing
Annex3-22
Project Monitoring Sheet II (Revision of Plan of Operation) PM Form 3-3 Monitoring Sheet II
Resonsibility of Members .
Version 1Project Title: The Federal Capital Territory Reduction of Non-Revenue Water Project Dated 6 Nov. 2014
Remarks
JICA Expert1 Akinori MIYOSHI W/P
Chief Advisor / NRW Reduction Planning RevisedActual
2 Taketoshi FUJIYAMA W/P Deputy Chief Advisor / NRW Reduction Planning Revised
Actual3 Toru TOYODA W/P
NRW Reduction Operations Management RevisedActual
4 Kiyoshi KIYAMA W/P Leakage Detection Technology Revised
Actual5 Takuji OKUBO W/P
Commercial Loss RevisedActual
6 Shinta SEGAWA W/P Hydraulic Analysis / GIS Revised
Actual7 Kazuhiro ISHIURA W/P
Procurement Management / Coordinator RevisedActual
Equipment1 Leakage detection equipment W/P
*3PMAs in Japan (JICA) RevisedActual
2 Bulk meters (ultrasonic flow meter) W/P*WTP in Japan (JICA) Revised
Actual3 Water meter, flow meter and valves W/P
*3PMAs in Nigeria (JICA Expert) RevisedActual
4 Pipe repair equipment W/P*3PMAs in Nigeria (JICA Expert) Revised
Actual5 Vehicles (Pickup truck) W/P
*Leakage Detection in Nigeria (JICA) RevisedActual
6 GIS software, office equipment W/P*FCTWB HQs in Nigeria/Other (JICA Expert) Revised
ActualLocal Consultant
1 Modification of billing and collection system W/PRevisedActual
2 GIS and database training W/PRevisedActual
Training in Japan W/PRevisedActual
Responsible Responsible Other Major InputOrganization Person Implementors JICA Experts Remarks
(Nigeria) (Nigeria) (Nigeria) Japan NigeriaPlanning, Monitoring and Coordination
1 W/P FCTWB PM Dy. PM CA and other ExpertsRevisedActual
2 W/P FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsRevisedActual AM
3 W/P FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsRevisedActual AM
4 W/P Dist. Dpt, Com. Dpt NRW Mgt Team NRW Mgt Team, AM CA and other ExpertsRevisedActual Coordinator
5 W/P FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsRevisedActual AM
6 W/P FCTWB PM Dy. PM, NRW Mgt Team, CA and other ExpertsRevisedActual AM
7 W/P CA, Dy.CARevisedActual
8 W/P JICA JICA HQ To be determinedRevisedActual
9 W/P FCTWB PM Dy.PM CA and other ExpertsRevisedActual
10 Collect and organize data for Indicators of PDM Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Expertsa W/P Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Experts
RevisedActual
b Conduct joint capacity assessment of the relevant staff W/P Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other ExpertsRevised
Prepare Capacity Development (CD) Plan Actualc W/P Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other Experts
RevisedActual
d W/P Dist. Dpt, Com. Dpt NRW Mgt Team's Coordinator NRW Mgt Team, AM CA and other ExpertsRevisedActual
Reports / Documents11 W/P FCTWB PM Dy. PM, NRW Mgt Team
RevisedActual
12 W/P FCTWB PM Dy. PM, NRW Mgt TeamRevisedActual
13 W/P FCTWB PM Dy. PM, NRW Mgt Team CA and other ExpertsRevisedActual
Public Relations14 W/P FCTWB PM NRW Mgt Team, HoU(PR) CA, Dy.CA, Coordinator
RevisedActual
15 W/P FCTWB PM NRW Mgt Team, HoU(PR) CA, Dy.CA, Coordinator Public Relation Unit under Director(PM)RevisedActual will collaborate
Monitoring and Evaluation in the Post-Project period16 Post Monitoring by JICA (not described here) JICA17 Post Evaluation by JICA (not described here) JICA
Inputs (the Japanese side)
Monitoring Plan
Conduct Joint Monitoring semi-annually
Submit Monitoring Sheet to JICA Nigeria Office semi-annually
Monitoring Mission from JICA for Joint Review
Organize information sharing seminars for FCTWB/FCTA, includingArea Offices
Develop criteria for capacity assessment for each level of therelevant staff (i.e. members of NRW Mgmt and Action Teams)
Set reduction target for each PMA by the first quarter of the secondyear
Organize Joint Coordination Committee (JCC)
Develop Detail Plan of Operations (DPO) for review and approvalby JCC
Develop Annual Plan of Operations (APO) for review and approvalby JCC
Organize monthly technical meetings
Organize quarterly project meetings
Collect and organize for Indicators for semi-annual Joint Monitoring
Work Plan
Project Progress Report
Project Completion Report
Develop Project Website
Prepration of public relations materials
Annex3-23
Ma
Ma
Ma
Ma
Ma
Wat
er S
upp
nage
men
t of W
a
Wat
er S
upp
nage
men
t of W
a
Tra
inee
-to-
nage
’t an
d N
RW
Tra
inee
-to-
nage
’t an
d N
RW
Tra
inee
-to-
nage
’t an
d N
RW
ply
Adm
inis
tra
Wat
er S
uppl
y Se
r
ply
Adm
inis
tra
Wat
er S
uppl
y Se
r
-be
for
Wat
er S
W R
educ
tion
in
-be
for
Wat
er S
W R
educ
tion
in
-be
for
Wat
er S
W R
educ
tion
in atio
n fo
r B
ette
rvic
es (2
015)
atio
n fo
r B
ette
rvic
es (2
014)
Supp
ly S
ervi
ce
Aug
. 201
5
Supp
ly S
ervi
ce
Aug
. 201
5
Supp
ly S
ervi
ce
Aug
. 201
5
er er es es es
Ma
(Wa
( Ma
Wat
er S
upp
nage
men
t of W
a
O&
M
of
U
ater
Dis
trib
utio
n
Tra
inee
-to-
nage
’t an
d N
RW
ply
Adm
inis
tra
Wat
er S
uppl
y Se
r
Urb
an
Wat
er
on a
nd S
ervi
ces)
-be
for
Wat
er S
W R
educ
tion
in atio
n fo
r B
ette
rvic
es (2
013)
Supp
ly
Syst
em
) (20
12)
Supp
ly S
ervi
ce
Aug
. 201
5)
er m es
Annex3-24
(Wa
(Le
(Wa
Sup
O&
M
of
U
ater
Dis
trib
utio
n
Non
-Rev
e
akag
e C
ontr
ol)
O&
M
of
U
ater
Dis
trib
utio
n
Com
preh
en
pply
Sys
tem
(20U
rban
W
ater
on a
nd S
ervi
ces)
enue
W
ater
) (20
14)
Urb
an
Wat
er
on a
nd S
ervi
ces)
nsiv
e E
ngin
eer
013)
Supp
ly
Syst
em
) (20
15)
Man
agem
en
Supp
ly
Syst
em
) (20
12)
ring
on
W
atem nt m er
Annex3-25
PM Form 3-1 Monitoring Sheet Summary
2
- Engr. A. A. Nahuche, Head of Department (HOD) Distribution - Mr. Adis S. Muhammad, HOD Commerce - Engr. Aliyu Usman, HOD Reservoir and Production - Mr. Musa Dikko, Head of Pipeline Unit, Distribution
1-2 Progress of Activities
[Activities for Output-1: Level of NRW of the service area of FCTWB is monitored regularly.] Activity 1-1: Four bulk flow meters (ultrasonic) and data logger have been procured and delivered to FCTWB by JICA. Procurement process of chamber construction is ongoing, but actual works has been suspended due to dearth of Counterpart Fund of FCTWB for implementation.
Activity 1-4: Duplicated/returned bills have been identified by all Area Offices and corresponding Units of Headquarters, and forwarded to the Committee assigned to update the records. However, the data has not yet been shared with JICA Expert Team for analysis of information related to NRW.
[Activities for Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.] Activity 2-4: Two PCs and GIS software were handed over to FCTWB. The software has been set installed into PCs. Distribution network drawings for Gudu Area Office have been completed, while Jabi and Garki I are ongoing.
Activity 2-5 to 2-7: PMAs/SMAs have been designed prior to their physical creation and NRW reduction operations. See the Annex-3: Location of Chambers for Flow Meter/Valves in each PMA.
Activity 2-5 and 2-7: Verification of pipe size and materials has been conducted in all three PMAs. Similarly excavation for installation of flow meters, valves and construction of chambers is to commence in Gudu by FCTWB in the beginning of November 2015. JICA Expert Team has procured materials (flow meters, valves and fittings) for Gudu and Jabi, while procurement of materials for Garki I is ongoing.
Activity 2-10: Collection of baseline data related to commercial loss such as water consumption of customers domiciled in the selected PMAs/SMAs is ongoing, however the progress is slow due to certain challenges, multiple billing, estimated billing, different kind of meters installed, etc. Acceleration of the data collection is crucial to avoid delay of the other activities following this.
[Activities for Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
Annex3-30
PM Form 3-1 Monitoring Sheet Summary
3
No activities as planned in this period.
1-3 Achievement of Output
[Output-1: Level of NRW of the service area of FCTWB is monitored regularly.] Indicator: 1a: Record of monthly NRW ratio is kept by Distribution Department from the third
quarter of the first year of the Project1b: Monthly NRW ratio of the service area of FCTWB is reported to its monthly Joint
Management Meeting from the third quarter of the first year of the Project. 1c: Quarterly NRW ratio of the service area of FCTWB is reported to the Board of
Directors of FCTWB from the third quarter of the first year of the Project. Current Status: Significant progress / On track / Little progress / Delayed / To be revised, * As stated in Section 2-1 Detail, 2 Delay of Work Schedule and/or Problems (if any), necessary data cannot be measured due to delay of activities, but actions have been taken. Target Date of Achievement: Indicator 1a&1b will be obtained from April 2016, Indicator 1c from October 2016.
[Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.] Indicator: 2a: Decrease rate of NRW ratio for each Sub Metering Area of a PMA reaches at least
80% of its target at the end of the respective NRW reduction operations.2b: Technical manuals for Area Office managers and field operators (i.e. technical
officers and meter readers), including audio visual materials, are approved by Head of Department (HoD) for Distribution and HoD for Commerce by the first quarter of the third year of the Project.
Current Status: Significant progress / On track / Little progress / Delayed / To be revised, * As stated in Section 2-1 Detail, 2 Delay of Work Schedule and/or Problems (if any), necessary data cannot be measured due to delay of activities, but actions have been taken, and theoretical lectures and preparation of drawings through OJT have been done. Target Date of Achievement: Indicator 2a will be obtained from November 2016, Indicator 2b from June 2016.
[Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.] Indicator: 3a: By October 2017, draft medium-term strategic plan for NRW reduction (2018-2022)
is submitted by FCTWB to FCTA for review and approval.3b: By October 2017, an annual NRW reduction plan (2018) is incorporated in
Annex3-31
PM Form 3-1 Monitoring Sheet Summary
4
FCWTB’s annual recurrent and capital plan (2018) for submission to FCTA for review and approval.
3c: A planning manual for NRW reduction is approved by the Director of FCTWB by the end of the Project.
Indicator will be obtained in Phase-2 of the Project scheduled in 2017 and 2018, but Working Group members were selected and existing plans, etc. related to NRW reduction at FCTWB were reviewed preliminarily.
1-4 Achievement of the Project Purpose
[Project Purpose: Capacity of FCTWB for NRW reduction is strengthened.] Indicator: a: The medium-term strategic plan for NRW reduction (2018-2022) is approved by
FCTA by the end of the Project.b: NRW reduction operations of the first quarter of 2018 specified in the annual plan of
the above plan are carried out according to the plan by FCTWB. c: Relevant staff of FCTWB (i.e. members of NRW Management Team and Pilot NRW
Action Teams) become equipped with skills and knowledge necessary for NRW reduction according to the criteria set by the Project for each level.
d: NRW ratio of each PMA in the last quarter of the Project reaches its respective target (**). Note(**): Target for each PMA is expected to be determined by the end of the first quarter of the second year
Indicator cannot be obtained because of limited progress, but skills and knowledge necessary for NRW reduction has been gradually developed through lectures, OJT and the first counterpart training in August 2015 in Japan.
1-5 Changes of Risks and Actions for Mitigation
Release of the additional approved Counterpart Fund is hampered by the new government policy, namely Treasury Single Account (TSA). Inadequate power supply and time-consuming procedures for custom clearance / tax exemption, which were captured in the previous project monitoring sheet, have been solved.
1-6 Progress of Actions undertaken by JICA
Equipment from Japan such as ultrasonic flow meter and leakage detector were procured and delivered to FCTWB by JICA. JICA provided necessary information to FCTWB in a timely manner for smooth customs clearance and tax exemption.
Annex3-32
PM Form 3-1 Monitoring Sheet Summary
5
As mentioned in Section 1-1, Progress of Inputs, office equipment (PCs, printer, copier and etc.) and GIS software were handed over to FCTWB. Two vehicles (Toyota Hilux 4WD) and materials for pilot project implementation (flow meters, valves and fittings) have been procured and delivered to FCTWB, except that of Garki I..
JICA Expert Team issued procurement notice to consulting firms for GIS training, while the procurement of consultant for modification of billing system has been suspended due to issues of duplicated/returned bills.
The first batch of the Nigerian project personnel was trained in Japan by JICA in August 2015.
1-7 Progress of Actions undertaken by Nigerian side
Customs clearance and tax exemption were obtained by FCTWB which facilitated clearance of tools and equipment procured by JICA from Japan.
FCTWB secured the approval of 2015 Counterpart Fund for the Project. Timely release of the Fund was hampered by the government policy of TSA.
Adequate security was provided to JICA Expert Team in the field. Issue of identification card is in progress.
As mentioned in Section 1-1, Progress of Inputs, office spaces and necessary facilities including internet connection for JICA Expert Team have been provided in FCTWB Headquarters, but those in pilot Area Offices is still been in preparation.
1-8 Other remarkable/considerable issues related/affect to the project (such as other JICA's projects, activities of counterparts, other donors, private sectors, NGOs etc.)
Absence of legal instrument (enabling law) establishing FCTWB.
2 Delay of Work Schedule and/or Problems (if any)
2-1 Detail
(1) Limited Progress of Activities for Output-1 Activities for Output-1 have been delayed or postponed, particularly Activity 1-1 related to bulk flow meter installation at outlet of water treatment plant, followed by Activity 1-2 and 1-5. On the other hand, activities for Output-2, particularly Activity 2-5 and 2-7 related to PMA/SMA physical creation by installing flow meters and valves in pilot projects, which were regarded as delayed in the previous monitoring, has been addressed and progressing.
Annex3-33
PM Form 3-1 Monitoring Sheet Summary
6
(2) Suspension of Activity 1-4Activity 1-4 for modification of billing system has been suspended due to duplicated/returned bills. It may have caused unreliable financial analysis including NRW and therefore needs to be solved prior to the modification of billing system. (3) Delay in implementing Activity 2-5 and 2-7Procurement of flow meters and valves in Activity 2-5 and 2-7 has been delayed due to non-existence of as-built drawings in FCTWB, but pipe size and materials have been identified by physical verification. (4) AGIS Security Administrative Password Policy of Abuja Geographical Information System (AGIS) on data restriction has hindered the use of AGIS data by the Project.
2-2 Cause
(1) Limited Progress of Activities for Outut-1 Insufficient 2015 Counterpart Fund has caused this. Request of 2015 Counterpart Fund to be allocated to activities for Output-1 was approved by FCTA, but its release has been hampered by the new government policy of TSA.
(2) Suspension of Activity 1-4Existing duplicated/returned bills have caused this. FCTWB has not been able to completely and effectively treat duplicated/returned bills. (3) Delay in implementing Activity 2-5 and 2-7Non-existence of as-built drawings has caused this. As-built drawings are supposed to be handed over to FCTWB, but actually it has not been done appropriately. There is lack of information sharing among relevant departments and other infrastructural developer such as mass housing estate developer. (4) AGIS Security Administrative Password This is the policy of AGIS.
2-3 Action to be taken
(1) Limited Progress of Activities for Outut-1 FCTWB will liaise closely with FCTA for quick release of Counterpart Fund as soon as the government policy of TSA is stabilized.
(2) Suspension of Activity 1-4FCTWB collated all the duplicated/returned bills, verified them and commenced the deactivation process for the bills. Report will be submitted by the middle of November 2015 to JICA Expert Team to analyze them jointly for water balance. After the deactivation and analysis, water
Annex3-34
PM Form 3-1 Monitoring Sheet Summary
7
connection and data creation will be centralized by HODs (Distribution and Commerce) in the Headquarters to avoid duplication. (3) Delay in implementing Activity 2-5 and 2-7FCTWB, particularly GIS Unit and Pipeline Unit, will update GIS network drawings by physical verification during routine maintenance and capture GPS location for existing facilities. FCTWB will obtain as-built drawings of new/old facilities certainly from FCDA’s Engineering Services Department and FCT Agency for Mass Housing. (4) AGIS Security Administrative Password FCTWB will gradually develop its own customized GIS database.
2-4 Roles of Responsible Persons/Organization
[FCTWB] - Liaison with FCTA for quick release of Counterpart Fund: Director of FCTWB and HOD Finance - Update of GIS database for distribution network (ongoing): GIS Unit, Pipeline Unit and Area Offices
- Reconfirmation of pipe size and material where valves will be installed (ongoing): Pipeline Unit and pilot Area Offices under supervision of Head of Department (HOD) Distribution.
- Procurement/construction of valve casings/chambers and supervision (ongoing): Pipeline Unit, Logistics Unit and Unit in charge of procurement under supervision of HOD Administration & Supply and HOD Distribution.
- Forming a committee for duplicated/returned bills (completed): HOD Commerce. - Deactivation of duplicated/returned bills (ongoing): relevant units and all Area Offices under supervision of HOD Commerce.
- Analysis of collected information of duplicated/returned bills for water balance: Monitoring and Detection Unit under supervision of HOD Commerce.
[JICA Expert Team] - Support to confirmation of pipe size and material where valves will be installed (ongoing). - Support to preparation and procurement (completed) and construction of valve casings/chambers (ongoing).
- Procurement of valves and fittings (ongoing). - Procurement of GIS training (ongoing) - Support to analysis of duplicated/returned bills for water balance. - Procurement of modification of billing system
3 Modification of the Project Implementation Plan
Annex3-35
PM Form 3-1 Monitoring Sheet Summary
8
3-1 Plan of Operation
Due to the above problems and other reasons, Plan of Operation (PO) has been rescheduled. See the Project Monitoring Sheet II as attached.
3-2 Other modifications on detailed implementation plan
(Remarks: The amendment of R/D and PDM (title of the project, duration, project site(s), target group(s), implementation structure, overall goal, project purpose, outputs, activities, and input) should be authorized by JICA HQ. If the project team deems it necessary to modify any part of R/D and PDM, the team may propose the draft.)
Based on the recognition between JICA and FCTWB, JICA made the decision to enhance the Project through additional activities such as installation of zonal meters and establishment of framework of water distribution management. Accordingly, PDM will be revised in the third Joint Coordinating Committee (JCC) meeting.
4 Preparation by Nigerian side toward after completion of the Project
To be considered.
II. Project Monitoring Sheet I & II (as attached)
AnnexAnnex-1: List of the procured Equipment for the Project Annex-2: Training Programme (1st Training in August 2015) Annex-3: Location of Chambers for Flow Meter/Valves in each PMA (Plan)
Annex3-36
PM
For
m 3
-2M
onito
ring
She
et I
PD
M1
Proj
ect T
itle:
The
Fed
eral
Cap
ital T
errit
ory
Red
uctio
n of
Non
-Rev
enue
Wat
er P
roje
ctVe
rsio
n 1
Proj
ect P
erio
d: O
ctob
er 2
014
to M
arch
201
8D
ated
6 N
ov. 2
014
Impl
emen
ting
Org
aniz
atio
n: F
eder
al C
apita
l Ter
ritor
y A
dmin
istr
atio
n (F
CTA
) / F
eder
al C
apita
l Ter
ritor
y W
ater
Boa
rd (F
CTW
BD
icre
ct B
enef
icia
ries:
FC
TWB
, rel
evan
t sta
ff of
FC
TWB
Hea
dqua
rter
s an
d pi
lot A
rea
Offi
ces
Proj
ect S
ite:
FCT
Pilo
t Are
a O
ffice
s: J
abi,
Gar
ki I
and
Gud
uN
arra
tive
Sum
mar
yO
bjec
tivel
y Ve
rifia
ble
Indi
cato
rsM
eans
of V
erifi
catio
nIm
port
ant A
ssum
ptio
nA
chie
vem
ent
Rem
arks
<Ove
rall
Goa
l>
Not
e(*)
: Tar
get v
alue
(X%
), w
hich
is e
xpec
ted
to b
e de
term
ined
inth
e m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n, s
hall
bete
ntat
ivel
y fil
led
whe
n th
e fin
al d
raft
was
app
rove
d by
the
Dire
ctor
of
FCTW
B, w
hich
sha
ll be
fina
lized
whe
n th
e pl
an is
app
rove
d by
FCTA
<Pro
ject
Pur
pose
>
Not
e(**
): Ta
rget
for e
ach
PM
A is
exp
ecte
d to
be
dete
rmin
ed b
y th
een
d of
the
first
qua
rter o
f the
sec
ond
year
<Out
puts
>
Not
e (*
1): N
RW
com
pone
nts
targ
eted
by
Out
put 2
are
(i) i
nvis
ible
leak
age;
(ii)
cust
omer
met
er m
alfu
nctio
n; a
nd (i
ii) il
lega
l con
nect
ion
Pro
ject
Mon
itor
ing
She
et I
(R
evis
ion
ofP
roje
ct D
esig
n M
atri
x)
Leve
l of N
on-R
even
ue W
ater
(NR
W) i
s re
duce
d at
the
serv
ice
area
of
FCTW
B
1a. R
ecor
d of
mon
thly
NR
W ra
tio is
kep
t by
Dis
tribu
tion
Dep
artm
ent
from
the
third
qua
rter o
f the
firs
t yea
r of t
he P
roje
ct1b
. Mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
its m
onth
ly J
oint
Man
agem
ent M
eetin
g fro
m th
e th
ird q
uarte
r of t
hefir
st y
ear o
f the
Pro
ject
1c. Q
uarte
rly N
RW
ratio
of t
he s
ervi
ce a
rea
of F
CTW
B is
repo
rted
toth
e B
oard
of D
irect
ors
of F
CTW
B fr
om th
e th
ird q
uarte
r of t
he fi
rst
year
of t
he P
roje
ct
A. S
taff
of F
CTW
B (i
.e. m
embe
rs o
fN
RW
Man
agem
ent T
eam
and
Pilo
tN
RW
Act
ion
Team
s) tr
aine
d th
roug
hth
e P
roje
ct d
o no
t lea
ve th
e of
fice
inla
rge
num
bers
a. D
ate
of a
ppro
val o
f the
plan
b. R
esul
t of m
onito
ring
byN
RW
Man
agem
ent T
eam
c. R
esul
ts o
f joi
ntas
sess
men
t bas
ed o
n th
ecr
iteria
set
by
the
Pro
ject
d. R
ecor
d of
NR
W ra
tio k
ept
by D
istri
butio
n D
epar
tmen
t
3a&
3b.
Dat
e of
offi
cial
lette
rsu
bmitt
ing
draf
t stra
tegi
c pl
anan
d an
nual
recu
rren
t and
capi
tal p
lan
3c. D
ate
of a
ppro
val o
f the
man
ual
Indi
cato
r will
be
obta
ined
inP
hase
-2 o
f the
Pro
ject
sche
dule
d in
201
7 an
d20
18, b
ut W
orki
ng G
roup
mem
bers
wer
e se
lect
edan
d ex
istin
g pl
ans,
etc
.re
late
d to
NR
W re
duct
ion
at F
CTW
B w
ere
revi
ewed
prel
imin
arily
.
3a. B
y O
ctob
er 2
017,
dra
ft m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
) is
subm
itted
by
FCTW
B to
FC
TA fo
r rev
iew
and
appr
oval
3b. B
y O
ctob
er 2
017,
an
annu
al N
RW
redu
ctio
n pl
an (2
018)
isin
corp
orat
ed in
FC
WTB
’s a
nnua
l rec
urre
nt a
nd c
apita
l pla
n (2
018)
for s
ubm
issi
on to
FC
TA fo
r rev
iew
and
app
rova
l3c
. A p
lann
ing
man
ual f
or N
RW
redu
ctio
n is
app
rove
d by
the
Dire
ctor
of F
CTW
B b
y th
e en
d of
the
Pro
ject
3. A
med
ium
-term
stra
tegi
c pl
an o
f FC
TWB
for N
RW
redu
ctio
n is
deve
lope
d, u
tiliz
ing
the
resu
lts o
f Out
put 1
-2 (*
2)
See
the
Out
put-1
of
Mon
itorin
gS
heet
II
See
the
Out
put-2
of
Mon
itorin
gS
heet
II
See
the
Out
put-3
of
Mon
itorin
gS
heet
II
A. P
olic
y su
ppor
t for
NR
W re
duct
ion
is n
ot d
isco
ntin
ued
Pol
icy
supp
ort f
orN
RW
redu
ctio
n is
not
dis
cont
inue
dB
. Nat
ural
dis
aste
r/ p
oliti
cal i
nsta
bilit
y/ e
cono
mic
cris
is th
at a
ffect
the
serv
ice
area
of F
CTW
B d
o no
t occ
urC
. Act
iviti
es to
impl
emen
t the
med
ium
-tem
stra
tegi
c pl
an a
re n
otdi
scon
tinue
d or
del
ayed
2. M
etho
ds/o
pera
tiona
l pro
cedu
res
for e
ffect
ive
NR
W re
duct
ion
are
esta
blis
hed
thro
ugh
pilo
t pro
ject
s at
Pilo
t Met
erin
g A
reas
(PM
As)
und
erpi
lot A
rea
Offi
ces
(*1)
2a. R
ecor
d of
NR
W ra
tio k
ept
by th
e D
istri
butio
nD
epar
tmen
t2b
. Dat
e of
app
rova
l of t
hem
anua
ls
1. L
evel
of N
RW
of t
he s
ervi
ce a
rea
of F
CW
TB is
mon
itore
d re
gula
rly
a. T
he m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
)is
app
rove
d by
FC
TA b
y th
e en
d of
the
Pro
ject
.b.
NR
W re
duct
ion
oper
atio
ns o
f the
firs
t qua
rter o
f 201
8 sp
ecifi
ed in
the
annu
al p
lan
of th
e ab
ove
plan
are
car
ried
out a
ccor
ding
to th
epl
an b
y FC
TWB
c. R
elev
ant s
taff
of F
CTW
B (i
.e. m
embe
rs o
f NR
W M
anag
emen
tTe
am a
nd P
ilot N
RW
Act
ion
Team
s) b
ecom
e eq
uipp
ed w
ith s
kills
and
know
ledg
e ne
cess
ary
for N
RW
redu
ctio
n ac
cord
ing
to th
ecr
iteria
set
by
the
Pro
ject
for e
ach
leve
ld.
NR
W ra
tio o
f eac
h P
MA
in th
e la
st q
uarte
r of t
he P
roje
ct re
ache
sits
resp
ectiv
e ta
rget
(**)
2a. D
ecre
ase
rate
of N
RW
ratio
for e
ach
Sub
Met
erin
g A
rea
of a
PM
A re
ache
s at
leas
t 80%
of i
ts ta
rget
at t
he e
nd o
f the
resp
ectiv
eN
RW
redu
ctio
n op
erat
ions
2b. T
echn
ical
man
uals
for A
rea
Offi
ce m
anag
ers
and
field
ope
rato
rs(i.
e. te
chni
cal o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
vis
ual
mat
eria
ls, a
re a
ppro
ved
by H
ead
of D
epar
tmen
t (H
oD) f
orD
istri
butio
n an
d H
oD fo
r Com
mer
ce b
y th
e fir
st q
uarte
r of t
he th
irdye
ar o
f the
Pro
ject
Not
e (*
2): A
med
ium
-term
stra
tegi
c pl
an is
a fi
ve-y
ear p
lan,
whi
ch m
ay in
clud
e m
ediu
m-te
rm ta
rget
, stra
tegi
es a
nd a
ctio
ns, t
imef
ram
e, h
uman
reso
urce
requ
irem
ent,
on-th
e-jo
b tra
inin
g m
echa
nism
, cos
t-ben
efit
anal
ysis
of N
RW
redu
ctio
n, e
tc. I
t is
note
d th
at N
RW
com
pone
nts
addr
esse
d by
the
stra
tegi
c pl
an a
re n
ot li
mite
d to
the
ones
men
tione
d in
(*1)
abo
ve: t
hey
shal
l be
disc
usse
d an
d de
term
ined
in d
evel
opin
g th
e ou
tline
of t
he s
trate
gic
plan
(thr
ough
Act
ivity
3-4
).
Nec
essa
ry d
ata
cann
ot b
em
easu
red
due
to d
elay
of
activ
ities
, but
act
ions
hav
ebe
en ta
ken,
and
theo
retic
alle
ctur
es a
nd p
repa
ratio
n of
draw
ings
thro
ugh
OJT
have
bee
n do
ne.
See
the
Out
put-2
of
Mon
itorin
gS
heet
II
a: A
nnua
l NR
W ra
tio is
redu
ced
to X
%(*
) at t
he e
nd o
f the
yea
r 202
1a.
Rec
ord
of N
RW
ratio
kep
tby
Dis
tribu
tion
Dep
artm
ent
1a. M
onth
ly re
cord
of N
RW
ratio
.1b
&1c
. M
ater
ial f
or m
eetin
gssu
bmitt
ed b
y th
e D
istri
butio
nD
epar
tmen
t
Cap
acity
of F
CTW
B fo
r NR
W re
duct
ion
is s
treng
then
ed
Indi
cato
r can
not b
eob
tain
ed b
ecau
se o
f lim
ited
prog
ress
.
Nec
essa
ry d
ata
cann
ot b
em
easu
red
due
to d
elay
of
activ
ities
, but
act
ions
hav
ebe
en ta
ken.
Indi
cato
r can
not b
eob
tain
ed b
ecau
se o
f lim
ited
prog
ress
, but
ski
lls a
ndkn
owle
dge
nece
ssar
y fo
rN
RW
redu
ctio
n ha
s be
engr
adua
lly d
evel
oped
thro
ugh
lect
ures
, OJT
and
the
first
cou
nter
part
train
ing
in A
ugus
t 201
5 in
Jap
an.
Annex3-37
PM
For
m 3
-2M
onito
ring
She
et I
Act
iviti
esIm
port
ant A
ssum
ptio
nTh
e N
iger
ian
Side
The
Japa
nese
Sid
e
Pre-
Con
ditio
ns
Not
e (*
3) S
elec
tion
crite
ria o
f PM
A a
re a
s fo
llow
s: (i
) Saf
ety
for n
ight
wor
ks is
sec
ured
in m
easu
ring
min
imum
nig
ht fl
ow: (
ii) D
istri
butio
n ne
twor
k is
sep
arat
ed a
nd it
is e
asy
to is
olat
e it
in m
easu
ring
NR
W ra
tio: a
nd (i
ii) N
RW
ratio
is s
uppo
sedl
y hi
gh.
Not
e (*
4) W
orki
ng G
roup
for N
RW
pla
nnin
g w
ould
con
sist
of P
roje
ct M
anag
er (a
s ch
air)
, Dep
uty
Pro
ject
Man
ager
, Tec
hnic
al M
anag
ers,
Hea
d of
Fin
ance
Dep
t., H
ead
of P
rodu
ctio
n D
ept.,
Hea
d of
PR
S U
nit,
and
mem
bers
of N
RW
Man
agem
ent T
eam
.
2-1
Rev
iew
exi
stin
g N
RW
red
uctio
n op
erat
ions
at e
ach
pilo
t Are
a O
ffice
2-2
Con
duct
cap
acity
ass
essm
ent o
f the
rele
vant
sta
ff of
eac
h pi
lot A
rea
Offi
ce2-
3 Id
entif
y an
d se
lect
a P
ilot M
eter
ing
Are
a (P
MA
) for
eac
h pi
lot A
rea
Offi
ce b
ased
on
the
sele
ctio
n cr
iteria
of P
MA
(*3)
2-4
Pre
pare
/upd
ate
dist
ribut
ion
netw
ork
draw
ings
for e
ach
PM
A2-
5 In
stal
l wat
er fl
ow m
eter
s to
eac
h P
MA
and
mea
sure
in/o
utflo
ws
mon
thly
2-6
Zone
eac
h P
MA
into
Sub
Met
erin
g A
reas
(SM
A)
2-7
Isol
ate
a S
MA
by
inst
allin
g va
lves
2-8
Upd
ate
the
dist
ribut
ion
netw
ork
draw
ings
for e
ach
SM
A2-
9 M
easu
re a
n in
itial
leve
l of N
RW
of e
ach
SM
A2-
10 D
etec
t tar
get N
RW
com
pone
nts
(i.e.
invi
sibl
e le
akag
e, c
usto
mer
met
er m
alfu
nctio
n, a
nd il
lega
l con
nect
ion)
of e
ach
SM
A2-
11 D
evel
op a
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
,inc
ludi
ngre
duct
ion
targ
et, f
or re
view
by
Hea
d of
Dis
tribu
tion
Dep
artm
ent
2-12
Rev
iew
and
app
rove
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
2-13
Impl
emen
t the
NR
W re
duct
ion
oper
atio
ns a
t eac
h S
MA
2-14
Mon
itor t
he p
rogr
ess
of th
e N
RW
redu
ctio
n op
erat
ions
of e
ach
SM
A2-
15 M
easu
re le
vel o
f NR
W o
f eac
h S
MA
at t
he e
nd o
f the
resp
ectiv
eop
erat
ions
2-16
Pre
pare
a re
port
on p
ilot p
roje
cts,
cov
erin
g A
ctiv
ity 2
-1~2
-15
2-17
Dev
elop
man
uals
for N
RW
redu
ctio
n fo
r Are
a O
ffice
man
ager
s an
dfie
ld o
pera
tors
(i.e
. tec
hnic
al o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
visu
al m
ater
ials
Issu
es &
Cou
nter
mes
ures
- Ins
uffic
ient
201
5 C
ount
erpa
rt Fu
nd h
as c
ause
d lim
ited
prog
ress
of a
ctiv
ities
for
Out
ut-1
. FC
TWB
will
liai
se c
lose
ly w
ith F
CTA
for q
uick
rele
ase
of th
e Fu
nd a
sso
on a
s th
e go
vern
men
t pol
icy
of T
SA
is s
tabi
lized
.- E
xist
ing
dupl
icat
ed/re
turn
ed b
ills
have
cau
sed
susp
ensi
on o
f Act
ivity
1-4
.FC
TWB
col
late
d al
l the
dup
licat
ed/re
turn
ed b
ills,
ver
ified
them
and
com
men
ced
the
deac
tivat
ion
proc
ess
for t
he b
ills.
Rep
ort w
ill b
e su
bmitt
ed b
y th
e m
iddl
e of
Nov
embe
r 201
5 to
JIC
A E
xper
t Tea
m to
ana
lyze
them
join
tly fo
r wat
er b
alan
ce.
- Non
-exi
sten
ce o
f as-
built
dra
win
gs h
as c
ause
d de
lay
in im
plem
entin
g A
ctiv
ity 2
-5an
d 2-
7. F
CTW
B w
ill u
pdat
e G
IS n
etw
ork
draw
ings
by
phys
ical
ver
ifica
tion
durin
gro
utin
e m
aint
enan
ce a
nd c
aptu
re G
PS
loca
tions
for e
xist
ing
faci
litie
s. F
CTW
B w
illob
tain
as-
built
dra
win
gs o
f new
/old
faci
litie
s ce
rtain
ly fr
om F
CD
A’s
Eng
inee
ring
Ser
vice
s D
epar
tmen
t and
FC
T A
genc
y fo
r Mas
s H
ousi
ng.
- Pol
icy
of A
buja
Geo
grap
hica
l Inf
orm
atio
n S
yste
m (A
GIS
) on
data
rest
rictio
n ha
shi
nder
ed th
e us
e of
AG
IS d
ata
by th
e P
roje
ct. F
CTW
B w
ill g
radu
ally
dev
elop
its
own
cust
omiz
ed G
IS d
atab
ase.
A N
atur
al d
isas
ter/p
oliti
cal/
inst
abili
ty/e
cono
mic
cris
is th
at a
ffect
the
proj
ect a
ctiv
ities
do
not o
ccur
A F
urni
shed
offi
ces
for J
apan
ese
Exp
ert T
eam
are
sec
ured
at
Hea
dqua
rters
and
eac
h P
ilot A
rea
Offi
ce o
f FC
TWB
B P
roje
ct P
erso
nnel
is a
ssig
ned
with
the
final
ized
list
1-1
Inst
all b
ulk
met
ers
to w
ater
trea
tmen
t pla
nts
1 an
d 2
1-2
Mea
sure
mon
thly
wat
er p
rodu
ctio
n of
wat
er tr
eatm
ent p
lant
s 1,
2 ,3
,an
d 4
1-3
Tally
the
abov
e w
ater
pro
duct
ion
data
mon
thly
1-4
Cal
cula
te th
e m
onth
ly w
ater
con
sum
ptio
n ba
sed
on th
e bi
lling
dat
a1-
5 C
alcu
late
mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
usi
ng th
eda
ta o
btai
ned
from
Act
ivity
1-3
and
1-4
Inpu
ts
3-1
Est
ablis
h a
Wor
king
Gro
up fo
r NR
W p
lann
ing
(*4)
3-2
Rev
iew
exi
stin
g pl
ans,
impl
emen
tatio
n st
ruct
ure,
on-
the-
job
train
ing
mec
hani
sm, e
tc. r
elat
ed to
NR
W re
duct
ion
at F
CTW
B3-
3 C
ondu
ct h
ydra
ulic
and
wat
er p
ress
ure
dist
ribut
ion
anal
yses
of t
hepi
pelin
e ne
twor
ks3-
4 D
evel
op o
utlin
es o
f the
med
ium
-term
stra
tegi
c pl
an a
nd it
s an
nual
NR
W re
duct
ion
plan
3-5
Dev
elop
the
first
med
ium
-term
stra
tegi
c pl
an (2
018-
2022
) for
app
rova
lby
FC
TA3-
6 D
evel
op a
n an
nual
NR
W re
duct
ion
plan
bas
ed o
n th
e st
rate
gic
plan
as
an in
tegr
al p
art o
f an
annu
al re
curr
ent a
nd c
apita
l pla
n of
FC
TWB
for
appr
oval
by
FCTA
3-7
Dev
elop
a p
lann
ing
man
ual f
or N
RW
redu
ctio
n
Proj
ect P
erso
nnel
1. P
roje
ct D
irect
or: D
irect
or o
f Eco
nom
ic P
lann
ing,
Res
earc
h an
dS
tatis
tic D
epar
tmen
t, FC
TA2.
Pro
ject
Man
ager
: Dire
ctor
of F
CTW
B3.
Dep
uty
Pro
ject
Man
ager
: HoD
for A
dmin
istra
tion
and
Sup
ply/
FCTW
B4.
Tec
hnic
al M
anag
ers
(Als
o Le
ader
s of
NR
W M
anag
emen
t Tea
m):
HoD
for D
istri
butio
n an
d H
oD fo
r Com
mer
ce /F
CTW
B5.
Mem
bers
of N
RW
Man
agem
ent T
eam
(FC
TWB
):- H
ead
of S
peci
al P
roje
ct U
nit o
f Dis
tribu
tion
Dep
artm
ent (
asC
oord
inat
or)
- Rel
evan
t Hea
d of
Uni
t (H
oU) a
nd o
ffice
rs o
f the
Dis
tribu
tion
Dep
artm
ent,
Com
mer
ce D
epar
tmen
t, an
d A
dmin
istra
tion
and
Sup
ply
Dep
artm
ent
6. H
eads
of o
ther
rele
vant
Dep
artm
ents
and
Uni
t of F
CTW
B: H
oDfo
r Fin
ance
, HoD
for P
rodu
ctio
n, H
oU fo
r Pla
nnin
g R
esea
rch
and
Sta
tistic
s (P
RS
)7.
Mem
bers
of N
RW
Act
ion
Team
: Are
a M
anag
er, A
ssis
tant
Are
aM
anag
er (D
istri
butio
n), A
ssis
tant
Are
a M
anag
er (C
omm
erce
),te
chni
cal o
ffice
rs (D
istri
butio
n) a
nd m
eter
read
ers
(Com
mer
ce) o
fea
ch p
ilot A
rea
Offi
ce8.
Oth
er p
erso
nnel
mut
ually
agr
eed
upon
as
nece
ssar
y
Land
, Bui
ldin
g an
d Fa
cilit
ies
1. O
ffice
bui
ldin
g an
d fa
cilit
ies
nece
ssar
y fo
r the
impl
emen
tatio
n of
the
Pro
ject
2. O
ffice
spa
ces
and
nece
ssar
y fa
cilit
ies
for t
he J
apan
ese
Exp
erts
at
the
FCTW
B H
eadq
uarte
rs a
nd e
ach
Pilo
t Are
a O
ffice
, inc
ludi
ngin
tern
et c
onne
ctio
n an
d ai
r con
ditio
ners
3. O
ther
faci
litie
s m
utua
lly a
gree
d up
on a
s ne
cess
ary
Loca
l Cos
ts1.
Cos
t for
inst
alla
tion,
ope
ratio
n an
d m
aint
enan
ce o
f the
prov
ided
equ
ipm
ent a
nd c
ost f
or p
ipe
repa
ir at
PM
As
2. A
dmin
istra
tion
and
oper
atio
nal c
osts
, inc
ludi
ng c
osts
for
loca
l tra
vel f
or th
e P
roje
ct P
erso
nnel
Japa
nese
Exp
erts
1. C
hief
Adv
isor
/ N
RW
Red
uctio
n P
lann
ing
2. D
eput
y C
hief
Adv
isor
/N
RW
Red
uctio
n P
lann
ing
3. N
RW
Red
uctio
nO
pera
tions
Man
agem
ent
4. L
eaka
ge D
etec
tion
Tech
nolo
gy5.
Com
mer
cial
Los
s6.
Hyd
raul
ic A
naly
sis
/ GIS
7. P
rocu
rem
ent M
anag
emen
t/ C
oord
inat
or8.
Oth
er e
xper
ts m
utua
llyag
reed
upo
n as
nec
essa
ry
Trai
ning
of t
he N
iger
ian
Proj
ect P
erso
nnel
in J
apan
Four
per
sons
mut
ually
agr
eed
upon
will
be tr
aine
d in
Jap
anan
nual
ly
Equi
pmen
t1.
Bul
k m
eter
s fo
r wat
ertre
atm
ent p
lant
s2.
Wat
er fl
ow m
eter
s, v
alve
s,an
d cu
stom
er m
eter
s fo
rS
MA
3. L
eaka
ge d
etec
tion
equi
pmen
t for
PM
A4.
Pip
e re
pair
equi
pmen
t for
PM
A5.
Veh
icle
s(P
ick-
ups)
6. O
ther
equ
ipm
ent m
utua
llyag
reed
upo
n as
nec
essa
ry
Annex3-38
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
Coun
terme
asur
esOu
tput
-11-
1W
/PSu
rvey
Instal
lation
Revis
edPr
epar
ation
Cons
tructi
onIns
tallat
ionAc
tual
1-2
W/P
Revis
edAc
tual
1-3
W/P
Revis
edAc
tual
1-4
W/P
Revie
wSy
stem
Modif
icatio
nRe
vised
Spec
ificati
onMo
difica
tion
Actua
l1-
5W
/PRe
vised
Actua
lOu
tput
-22-
1W
/PRe
vised
Actua
l2-
2W
/PBa
selin
eIn
terim
-1In
terim
-2Fin
alRe
vised
Actua
l2-
3W
/PRe
vised
Actua
l2-
4W
/PRe
vised
Actua
l2-
5W
/PRe
vised
Cons
truct.
& In
stall.
Actua
l
2-6
W/P
Revis
edAc
tual
2-7
W/P
Revis
edAc
tual
2-8
W/P
Revis
edAc
tual
2-9
W/P
Revis
edAc
tual
2-10
W/P
Revis
edAc
tual
2-11
W/P
Revis
edAc
tual
2-12
W/P
Revis
edAc
tual
2-13
W/P
Revis
edAc
tual
2-14
W/P
Revis
edAc
tual
2-15
W/P
Revis
edAc
tual
2-16
W/P
Inter
imFin
alRe
vised
Actua
l2-
17W
/PDr
aftFin
aliza
tion
Modif
icatio
nRe
vised
Actua
l
Outp
ut-3
3-1
W/P
Revis
edAc
tual
3-2
W/P
Revis
edAc
tual
3-3
W/P
Revis
edAc
tual
3-4
W/P
Revis
edAc
tual
3-5
W/P
Revis
edAc
tual
3-6
W/P
Revis
edAc
tual
3-7
W/P
Revis
edAc
tual
W/P
Phas
e-1 (
Oct 2
014 -
Dec
2016
, 27 m
onth
s)Ph
ase-
2 (Ja
n 20
17 -
Mar 2
018,
15 m
onth
s)Re
vised
Actua
lDu
ratio
n / P
hasin
g
Meas
ure l
evel
of NR
W of
each
SMA
atthe
end o
f the r
espe
ctive
oper
ation
s
Revie
w an
d app
rove
NRW
redu
ction
oper
ation
plan
of ea
ch S
MA
Imple
ment
NRW
redu
ction
oper
ation
sat
each
SMA
Monit
or th
e pro
gres
s of t
he N
RWre
ducti
on op
erati
ons o
f eac
h SMA
Detec
t targ
et NR
W co
mpon
ents
(i.e.
invisi
ble le
akag
e, cu
stome
r mete
rma
lfunc
tion,
and i
llega
l con
necti
on) o
fea
ch S
MADe
velop
a NR
W re
ducti
on op
erati
onpla
n of e
ach S
MA, in
cludin
g red
uctio
ntar
get fo
r rev
iew by
Hea
d of D
istrib
ution
Depa
rtmen
t
Deve
lop ou
tlines
of th
e med
ium-te
rmstr
ategic
plan
and i
ts an
nual
NRW
redu
ction
plan
(app
rova
l by t
heDi
recto
r)De
velop
the f
irst m
edium
-term
stra
tegic
plan (
2018
-202
2) fo
r app
rova
l by F
CTA
Deve
lop an
annu
al NR
W re
ducti
on pl
anba
sed o
n the
stra
tegic
plan a
s an
integ
ral p
art o
f an a
nnua
l recu
rrent
and
capit
al pla
n of F
CTW
B for
appr
oval
byFC
TADe
velop
a pla
nning
man
ual fo
r NRW
redu
ction
Prep
are a
repo
rt on
pilot
proje
cts,
cove
ring A
ctivit
y 2-1
~2-1
5
Deve
lop m
anua
ls for
NRW
redu
ction
for A
rea O
ffice m
anag
ers a
nd fie
ldop
erato
rs (i.e
. tec
hnica
l offic
ers a
ndme
ter re
ader
s), in
cludin
g aud
io vis
ual
mater
ials
A m
ediu
m-te
rmst
rate
gic p
lan o
f FCT
WB
for N
RW re
duct
ion
isde
velo
ped,
util
izing
the
resu
lts o
f Out
put-1
&2
Estab
lish a
Wor
king G
roup
for N
RWre
ducti
on pl
annin
g
Revie
w ex
isting
plan
s, im
pleme
ntatio
nstr
uctur
e, on
-the-
job tr
aining
mech
anism
, etc.
relat
ed to
NRW
redu
ction
at F
CTW
BCo
nduc
t hyd
rauli
c and
wate
r pre
ssur
edis
tributi
on an
alyse
s of t
he pi
pelin
ene
twor
ks
Mar
Instal
l bulk
mete
rs to
water
trea
tmen
tpla
nts 1
and 2
Meas
ure m
onthl
y wate
r pro
ducti
on of
water
trea
tmen
t plan
ts 1,
2, 3,
and 4
Tally
the a
bove
wate
r pro
ducti
on da
tamo
nthly
Calcu
late t
he m
onthl
y wate
rco
nsum
ption
base
d on t
he bi
lling d
ata
Calcu
late m
onthl
y NRW
ratio
of th
ese
rvice
area
of F
CTW
B us
ing th
e data
obtai
ned f
rom
Activ
ity 1-
3 and
1-4
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Feb
Mar
Apr
May
Jun
Oct
Nov
Dec
Jan
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Zone
each
PMA
into
Sub M
eterin
gAr
eas (
SMA)
Isolat
e a S
MA by
insta
lling v
alves
Upda
te the
distr
ibutio
n netw
ork
draw
ings f
or ea
ch S
MA
Meas
ure a
n init
ial le
vel o
f NRW
of ea
chSM
A
Mar
Apr
May
Jun
Jul
Aug
Activ
ities
Oct.
Nov
Dec
Jan
Feb
Leve
l of N
RW o
f the
serv
ice ar
ea o
f FCT
WB
is m
onito
red
regu
larly
Meth
ods/o
pera
tiona
lpr
oced
ures
for e
ffect
iveNR
W re
duct
ion
are
esta
blish
ed th
roug
hpi
lot p
rojec
ts at
Pilo
tMe
terin
g Ar
eas (
PMAs
)un
der p
ilot A
rea O
ffice
s
Revie
w ex
isting
NRW
redu
ction
oper
ation
s at e
ach p
ilot A
rea O
ffice
Cond
uct c
apac
ity as
sess
ment
ofor
ganiz
ation
and t
he re
levan
t staf
f
Identi
fy an
d sele
ct a P
ilot M
eterin
gAr
ea (P
MA) f
or ea
ch P
ilot A
rea O
ffice
base
d on t
he se
lectio
n crite
ria of
PMA
Prep
are/u
pdate
distr
ibutio
n netw
ork
draw
ings f
or ea
ch P
MA
Instal
l wate
r flow
mete
rs to
each
PMA
and m
easu
re in
/outflo
ws m
onthl
y
None
None
Delay
ed.
Comp
leted
None
Base
line a
sses
smen
twa
s don
e.No
ne
Comp
leted
None
Delay
ed. C
onstr
uctio
n of
cham
bers
shou
ld be
comm
ence
d as s
oon a
s 201
5Co
unter
part
Fund
is re
lease
d,by
the e
nd of
2015
at th
elat
est.
Desig
n of c
hamb
ers,
spec
ificati
on of
flow
meter
, BoQ
wer
epr
epar
ed.
Cons
tructi
on ha
s bee
npo
stpon
ed du
e to
insuff
icien
t Cou
nterp
art
Fund
. FCT
WB
will l
iaise
close
ly wi
th FC
TA fo
rqu
ick re
lease
of th
eFu
nd.
Delay
ed. S
ystem
mod
icatio
nwi
ll be d
iscus
sed i
n line
with
treatm
ent o
f
Situa
tion o
f billi
ng an
d its
syste
m ha
ve be
enpa
rtially
asse
ssed
.
Dupli
cated
/retur
ned b
illsex
ist, w
hich w
ill be
treate
d by F
CTW
B.
Ongo
ing bu
t dela
yed.
Polic
y of
AGIS
on da
ta re
strict
ion ha
shin
dere
d the
use o
f AGI
S da
ta.
Draw
ings f
or G
udu A
rea
Offic
e hav
e bee
nco
mplet
ed.
FCTW
B wi
ll gra
duall
yde
velop
its ow
ncu
stomi
zed G
ISDe
layed
, but
instal
lation
will
start
soon
.
Delay
ed, b
ut ins
tallat
ion w
illsta
rt so
on.
Flow
meter
s for
Gud
uan
d Jab
i hav
e bee
npr
ocur
ed an
d deli
vere
d.Pr
ocur
emen
t in G
arki
I ison
going
.
Comp
leted
None
Delay
ed.
None
FCTW
B wi
ll gra
duall
yde
velop
its ow
ncu
stomi
zed G
ISNo
neNo
neDe
layed
. This
will
follow
Acti
vity
2-5 a
nd 2-
7.
Non-
exist
ence
of as
-buil
tdr
awing
s. FC
TWB
will
upda
te GI
S ne
twor
kdr
awing
s by p
hysic
alve
rifica
tion d
uring
routi
nema
inten
ance
and c
aptur
eGP
S loc
ation
s for
exist
ingfac
ilities
. FCT
WB
will
obtai
n as-b
ulit d
rawi
ng of
new/
old fa
cilitie
s cer
tainly
from
FCDA
and M
ass
Hous
ing.
None
None
Delay
ed. T
his w
ill fol
low A
ctivit
y2-
14.
Delay
ed. I
nterim
repo
rt ma
y be
resc
hedu
led ac
cord
ing to
actua
l pro
gres
s.
None
None
None
None
FCDA
was
adde
d as a
nob
serve
r.W
orkin
g Gro
up m
embe
rswe
re se
lected
, but
will b
ere
viewe
d in P
hase
-2.
None
Revie
w wa
s don
epr
elimi
narily
, but
will b
ere
viewe
d in P
hase
-2.
None
Delay
ed. T
his w
ill fol
low A
ctivit
y2-
9.Th
eore
tical
lectur
es an
dfac
t find
ings w
ere d
one
prior
to fie
ld wo
rks.
None
None
None
None
None
None
None
Delay
ed. T
his w
ill fol
low A
ctivit
y2-
10.
Delay
ed. T
his w
ill fol
low A
ctivit
y2-
11.
Delay
ed. T
his w
ill fol
low A
ctivit
y2-
12.
Delay
ed. T
his w
ill fol
low A
ctivit
y2-
13.
N one
None
None
None
To be
imple
mente
d in P
hase
-2
To be
imple
mente
d in P
hase
-2.N
one
None
None
None
To be
imple
mente
d in P
hase
-2.
To be
imple
mente
d in P
hase
-2.N
one
None
To be
imple
mente
d in P
hase
-2.N
one
None
Expe
rts w
ere n
ot in
Nige
ira in
most
of pe
riod b
etwee
nJa
nuna
ry an
d Apr
il 201
5.
--
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Annex3-39
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Issue
Solut
ion1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
42JIC
A Ex
pert
1Ak
inori M
IYOS
HIW
/P C
hief A
dviso
r / N
RW R
educ
tion P
lannin
gRe
vised
Actua
l2
Take
toshi
FUJIY
AMA
W/P
Dep
uty C
hief A
dviso
r / N
RW R
educ
tion P
lannin
gRe
vised
Actua
l3
Toru
TOY
ODA
W/P
NRW
Red
uctio
n Ope
ratio
ns M
anag
emen
tRe
vised
Actua
l4
Kiyo
shi K
IYAM
AW
/P Le
akag
e Dete
ction
Tec
hnolo
gyRe
vised
Actua
l5
Taku
ji OKU
BOW
/P C
omme
rcial
Loss
Revis
edAc
tual
6Sh
inta S
EGAW
AW
/P H
ydra
ulic A
nalys
is / G
ISRe
vised
Actua
l7
Kazu
hiro I
SHIU
RA (-
Aug/2
015)
, Hiro
ki NI
IMUR
A (S
ep/20
15-)
W/P
Pro
cure
ment
Mana
geme
nt / C
oord
inator
Revis
edAc
tual
Equi
pmen
t1
Leak
age d
etecti
on eq
uipme
ntW
/PTe
nder
& D
elive
ry*3
PMAs
in Ja
pan
(JICA
)Re
vised
Actua
l2
Bulk
meter
s (ult
raso
nic flo
w me
ter)
W/P
Tend
er*W
TPin
Japa
n(JI
CA)
Revis
edMe
ter In
stalla
tion
Actua
l3
Wate
r mete
r, flo
w me
ter an
d valv
esW
/PTe
nder
& D
elive
ry*3
PMAs
in Ni
geria
(JICA
Exp
ert)
Revis
edAc
tual
4Pi
pe re
pair e
quipm
ent
W/P
*3PM
Asin
Nige
ria(JI
CA E
xper
t)Re
vised
Actua
l5
Vehic
les (P
ickup
truc
k)W
/P*L
eaka
ge D
etecti
onin
Nige
ria(JI
CA)
Revis
edAc
tual
6GI
S so
ftwar
e, off
ice eq
uipme
ntW
/P*F
CTW
B HQ
sin
Nige
ria/O
ther
(JICA
Exp
ert)
Revis
edAc
tual
Loca
l Con
sulta
nt1
Modif
icatio
n of b
illing
and c
ollec
tion s
ystem
W/P
Revis
edSp
ecific
ation
Modif
icatio
nAc
tual
2GI
S an
d data
base
train
ingW
/PRe
vised
Actua
lTr
ainin
g in
Japa
nW
/PRe
vised
Actua
l20
1420
1520
1620
1720
18Mo
nito
ring
Rema
rksIss
ueSo
lution
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
Plan
ning
, Mon
itorin
g an
d Co
ordi
natio
n1
W/P
Revis
edAc
tual
2W
/PRe
vised
Actua
l3
W/P
Revis
edAc
tual
4W
/PRe
vised
Actua
l5
W/P
Revis
edAc
tual
6W
/PRe
vised
Actua
l7
W/P
Revis
edAc
tual
8W
/PRe
vised
Actua
l9
W/P
Kick
off
Final
Revis
edAc
tual
10Co
llect
and o
rgan
ize da
ta for
Indic
ators
of PD
Ma
W/P
Revis
edAc
tual
bCo
nduc
t joint
capa
city a
sses
smen
t of th
e rele
vant
staff
W/P
Base
line
Inte
rim-1
Inte
rim-2
Final
Revis
edPr
epar
e Cap
acity
Dev
elopm
ent (
CD) P
lanAc
tual
cW
/PRe
vised
Actua
ld
W/P
Revis
edAc
tual
Repo
rts / D
ocum
ents
11W
/PRe
vised
Actua
l12
W/P
Revis
edAc
tual
13W
/PRe
vised
Actua
lPu
blic
Relat
ions
14W
/PRe
vised
Actua
l15
W/P
Revis
edAc
tual
Moni
torin
g an
d Ev
aluat
ion
in th
e Pos
t-Pro
jectp
erio
d16
Post
Monit
oring
by JI
CA(n
ot de
scrib
ed he
re)
17Po
st Ev
aluati
on by
JICA
(not
desc
ribed
here
)
Delay
ed. T
o be d
iscus
sed i
nlin
e with
trea
tmen
t of
dupli
cated
/retur
ned b
ills.
None
News
letter
is is
sued
quar
terly.
JCC
meeti
ngs w
ere c
ondu
cted
twice
.
APO
is pr
epar
ed in
para
rrel
with
FCT
WB's
annu
al re
curre
ntan
d cap
ital p
lanMo
nthly
prog
ress
, plan
, issu
es,
solut
ions a
nd et
c are
discu
ssed
.Qu
arter
ly pr
ogre
ss, p
lan,
issue
s, so
lution
s and
etc a
redis
cuss
ed.
Achie
veme
nt of
PDM
and
prog
ress
of P
O ar
e mon
itore
djoi
ntly.
Syste
m ha
s bec
ome
outda
ted. A
ppro
priat
eas
sess
ment
is ne
eded
.De
layed
, but
proc
urem
ent is
ongo
ing.
None
None
1st tr
aining
was
cond
ucted
.No
neNo
ne
None
None
None
None
None
None
Colle
ct an
d org
anize
for I
ndica
tors f
or se
mi-a
nnua
l Join
t Mon
itorin
g
Wor
k Plan
Proje
ct Pr
ogre
ss R
epor
t
Proje
ct Co
mplet
ion R
epor
t
Deve
lop P
rojec
t Web
site
Prep
ratio
n of p
ublic
relat
ions m
ateria
ls
Cond
uct J
oint M
onito
ring s
emi-a
nnua
lly
Subm
it Mon
itorin
g She
et to
JICA
Nige
ria O
ffice s
emi-a
nnua
lly
Monit
oring
Miss
ion fr
om JI
CA fo
r Join
t Rev
iew
Orga
nize i
nform
ation
shar
ing se
mina
rs for
FCT
WB/
FCTA
, inclu
ding
Area
Offic
es
Deve
lop cr
iteria
for c
apac
ity as
sess
ment
for ea
ch le
vel o
f the
relev
ant s
taff (
i.e. m
embe
rs of
NRW
Mgm
t and
Acti
on T
eams
)
Set r
educ
tion t
arge
t for e
ach P
MA by
the f
irst q
uarte
r of th
e sec
ond
year
Mar
Orga
nize J
oint C
oord
inatio
n Com
mitte
e (JC
C)
Deve
lop D
etail P
lan of
Ope
ratio
ns (D
PO) f
or re
view
and a
ppro
val
by JC
C
Deve
lop A
nnua
l Plan
of O
pera
tions
(APO
) for
revie
w an
d app
rova
lby
JCC
Orga
nize m
onthl
y tec
hnica
l mee
tings
Orga
nize q
uarte
rly pr
oject
meeti
ngs
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Moni
torin
g Pl
anOc
t.No
vDe
cJa
nFe
b
Nov
Dec
Jan
Feb
Mar
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Inpu
ts (t
he Ja
pane
se si
de)
Oct.
Partia
lly re
viewd
.
None
None
None
None
None
None
None
None
None
None
None
None
Proc
ured
and d
elive
red t
oFC
TWB.
None
None
None
None
Proc
ured
and d
elive
red t
oFC
TWB.
Smoo
th cu
stoms
clear
ance
and t
axex
empti
on w
ere e
nsur
ed.
None
Proc
ured
and d
elive
red t
oFC
TWB.
Smoo
th cu
stoms
clear
ance
and t
axex
empti
on w
ere e
nsur
ed.
None
Delay
ed. S
ome w
ere p
rocu
red
and d
elive
red t
o FCT
WB
but
other
are o
ngoin
g.
None
None
Delay
ed. T
o be p
rocu
red i
n line
with
activ
ities f
or O
utput-
2.No
neNo
ne
Proc
ured
and d
elive
red t
oFC
TWB.
Prop
er us
e for
proje
ctac
tivitie
s sho
uld be
obse
rved d
uring
the
None
Wor
k Plan
was
prep
ared
and
appr
oved
by F
CTW
B.
FCTW
B wi
ll disc
uss P
Rthr
ough
web
site.
None
None
None
None
None
.No
ne
None
None
None
None
None
None
None
None
None
None
None
None
None
Owne
rship
and i
nitiat
iveof
FCTW
B ar
e key
s.Mo
nitor
ing w
ay is
trans
ferre
d to F
CTW
Bgr
adua
lly.
None
None
None
None
None
None
None
None
Base
line a
sses
smen
t was
done
. Tthe
resu
lt was
appr
oved
by F
CTW
B.
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Annex3-40
Anne
x-1
Upd
ated
on
31/1
0/20
15Li
st o
f the
pro
cure
d Eq
uipm
ent f
or th
e Pr
ojec
tN
o.Eq
uipm
ent
Spec
ifica
tion
Qua
ntity
Rem
arks
Japa
n N
iger
iaFo
r Act
ivity
1-2
1U
ltras
onic
flow
met
er (s
tatio
nary
, 220
m)
Toky
o Ke
iki,
UFL
-30
2Lo
wer
Usu
ma
Wat
er T
reat
men
t Pla
nt2
Ultr
ason
ic fl
ow m
eter
(sta
tiona
ry, 3
00m
)To
kyo
Keik
i, U
FL-3
02
Low
er U
sum
a W
ater
Tre
atm
ent P
lant
3D
ata
logg
er(s
tatio
nary
)C
HIN
O, K
R21
60M
NO
A1
Low
er U
sum
a W
ater
Tre
atm
ent P
lant
For A
ctiv
ity 2
-4 a
nd 2
-81
GIS
sof
twar
eIn
ter g
raph
(Hex
agon
), G
eom
edia
Ess
entia
ls, G
SPX5
005
1H
Qs
2G
IS s
oftw
are
ESR
I Arc
GIS
Bas
ic V
10.3
1H
Qs
3Pl
otte
r (A0
)H
P D
esig
njet
T52
01
HQ
s4
GPS
term
inal
Gar
min
Ore
gon
650
2H
Qs
5Pe
rson
al c
ompu
ter
HP
Mod
el ,
Des
ktop
, 500
HD
, 4G
B R
am, W
indo
ws
8.1
2H
Qs
6An
ti-vi
rus
softw
are
Nor
ton
Inte
rnet
Sec
urity
/ St
anda
rd2
HQ
s7
UPS
Blue
Gat
e , 1
.2kV
A2
HQ
sFo
r Act
ivity
2-5
1U
ltras
onic
flow
met
er (s
tatio
nary
)To
kyo
Keik
i, U
FL-3
01
Gar
ki I
Pilo
t Are
a O
ffice
2D
ata
logg
er(p
orta
ble)
ASH
RID
GE
, Tex
tlog
Mul
ti1
Gar
ki I
Pilo
t Are
a O
ffice
3Fl
ow m
eter
Dia
. 150
mm
with
fitti
ngs
To b
e de
term
ined
thro
ugh
Activ
ity 2
-4, t
hen
proc
ured
add
itina
lly.
4Fl
ow m
eter
Dia
. 200
mm
with
fitti
ngs
1To
be
dete
rmin
ed th
roug
h Ac
tivity
2-4
, the
n pr
ocur
ed a
dditi
nally
.5
Flow
met
erD
ia. 2
50m
m w
ith fi
tting
sTo
be
dete
rmin
ed th
roug
h Ac
tivity
2-4
, the
n pr
ocur
ed a
dditi
nally
.6
Flow
met
erD
ia. 3
00m
m w
ith fi
tting
s2
To b
e de
term
ined
thro
ugh
Activ
ity 2
-4, t
hen
proc
ured
add
itina
lly.
For A
ctiv
ity 2
-71
Slui
ce v
alve
Dia
. 50m
m w
ith fi
tting
sTo
be
dete
rmin
ed th
roug
h Ac
tivity
2-4
, the
n pr
ocur
ed a
dditi
nally
.2
Slui
ce v
alve
Dia
. 80m
m w
ith fi
tting
sTo
be
dete
rmin
ed th
roug
h Ac
tivity
2-4
, the
n pr
ocur
ed a
dditi
nally
.3
Slui
ce v
alve
Dia
. 100
mm
with
fitti
ngs
To b
e de
term
ined
thro
ugh
Activ
ity 2
-4, t
hen
proc
ured
add
itina
lly.
4Sl
uice
val
veD
ia. 1
50m
m w
ith fi
tting
s6
To b
e de
term
ined
thro
ugh
Activ
ity 2
-4, t
hen
proc
ured
add
itina
lly.
5Sl
uice
val
veD
ia. 2
00m
m w
ith fi
tting
s4
To b
e de
term
ined
thro
ugh
Activ
ity 2
-4, t
hen
proc
ured
add
itina
lly.
6Sl
uice
val
veD
ia. 2
50m
m w
ith fi
tting
sTo
be
dete
rmin
ed th
roug
h Ac
tivity
2-4
, the
n pr
ocur
ed a
dditi
nally
.7
Slui
ce v
alve
Dia
. 300
mm
with
fitti
ngs
2To
be
dete
rmin
ed th
roug
h Ac
tivity
2-4
, the
n pr
ocur
ed a
dditi
nally
.Fo
r Act
ivity
2-1
01
Ultr
ason
ic fl
ow m
eter
(por
tabl
e)To
kyo
Keik
i, U
FP-2
06
3 Pi
lot A
rea
Offi
ces
2D
ata
logg
er(p
orta
ble)
ASH
RID
GE
, Tex
tlog
Mul
ti6
3 Pi
lot A
rea
Offi
ces
3Le
ak n
oise
cor
rela
tor
FUJI
TEC
OM
, LC
-250
02
3 Pi
lot A
rea
Offi
ces,
to b
e st
ored
in H
Qs.
4W
ater
leak
det
ecto
rFU
JITE
CO
M, D
NR
-18
63
Pilo
t Are
a O
ffice
s5
Non
-met
al p
ipe
loca
tor
GO
OD
MAN
, D-3
053
3 Pi
lot A
rea
Offi
ces
6M
etal
loca
tor
FUJI
TEC
OM
, F-9
0M3
3 Pi
lot A
rea
Offi
ces
7Ti
me
inte
gral
wat
er le
ak d
etec
tor
FUJI
TEC
OM
, FSJ
-13
3 Pi
lot A
rea
Offi
ces
8Ac
oust
ic ro
dFU
JITE
CO
M, L
SP-1
.59
3 Pi
lot A
rea
Offi
ces
9D
ista
nce
met
e rTO
EI L
IGH
T, T
L-12
33
Pilo
t Are
a O
ffice
s10
Ham
mer
dril
lH
itach
i Kok
i, PR
-38E
33
Pilo
t Are
a O
ffice
s11
Borin
g ba
rFU
JITE
CO
M, 1
m3
3 Pi
lot A
rea
Offi
ces
12D
rill b
itU
NIK
A, H
EXEL
L 19
.0x8
009
3 Pi
lot A
rea
Offi
ces
13Po
rtabl
e re
sidu
al c
hlor
ine
anal
yzer
HAN
NA,
HI9
6711
C3
3 Pi
lot A
rea
Offi
ces
14M
etal
pip
e an
d ca
ble
loca
tor
FUJI
TEC
OM
, PL-
960
33
Pilo
t Are
a O
ffice
s15
Ref
eren
ce m
eter
Aich
Tok
ei D
enki
, TR
-III
33
Pilo
t Are
a O
ffice
s16
Leak
age
quan
tity
mea
sure
men
t dev
ice
FUJI
TEC
OM
, FLQ
-23
3 Pi
lot A
rea
Offi
ces
17Pe
rson
al c
ompu
ter
HP
Mod
el ,
Des
ktop
, 500
HD
, 2G
B R
am, W
indo
ws
7 Pr
ofes
sion
al3
3 Pi
lot A
rea
Offi
ces
18An
ti-vi
rus
softw
are
Nor
ton
Inte
rnet
Sec
urity
/ St
anda
rd3
3 Pi
lot A
rea
Offi
ces
19U
PSBl
ue G
ate
, 1.2
kVA
33
Pilo
t Are
a O
ffice
s20
Inkj
et p
rinte
rH
P D
eskj
et 2
545
33
Pilo
t Are
a O
ffice
s21
Di g
ital c
amer
aC
anon
IXU
S 14
53
3 Pi
lot A
rea
Offi
ces
For A
ctiv
ity 2
-13
1G
ener
ato r
200V
, 3-P
hase
, 2.4
kVA
3To
be
proc
ured
soo
n.2
Asph
alt c
utte
r36
00R
PM, 1
3kW
3To
be
proc
ured
soo
n.3
Con
cret
e br
eake
r3
To b
e pr
ocur
ed s
oon.
4Sm
all-s
ized
dew
ater
ing
pum
p2"
3To
be
proc
ured
soo
n.5
Smal
l-siz
ed ta
mpe
r3
To b
e pr
ocur
ed s
oon.
6El
ectri
c dr
um30
-50m
3To
be
proc
ured
soo
n.7
Cus
tom
er m
eter
Dia
. 2/3
" with
fitti
ngs,
con
vent
iona
l typ
e38
8To
be
dete
rmin
ed th
roug
h Ac
tivity
2-1
0, th
en p
rocu
red.
8C
usto
mer
met
e rD
ia. 1
" with
fitti
ngs,
con
vent
iona
l typ
e25
9To
be
dete
rmin
ed th
roug
h Ac
tivity
2-1
0, th
en p
rocu
red.
9C
usto
mer
met
erD
ia. 5
0mm
with
fitti
ngs,
con
vent
iona
l typ
e89
To b
e de
term
ined
thro
ugh
Activ
ity 2
-10,
then
pro
cure
d.10
Cus
tom
er m
ete r
Dia
. 80m
m w
ith fi
tting
s, c
onve
ntio
nal t
ype
23To
be
dete
rmin
ed th
roug
h Ac
tivity
2-1
0, th
en p
rocu
red.
11C
usto
mer
met
erD
ia. 1
00m
m w
ith fi
tting
s, c
onve
ntio
nal t
ype
7To
be
dete
rmin
ed th
roug
h Ac
tivity
2-1
0, th
en p
rocu
red.
For O
utpu
t 21
Pick
up tr
uck
for p
ilot s
ites
Toyo
ta H
ilux
4WD
2H
Qs
and
thre
e Pi
lot A
rea
Offi
ceFo
r Ope
ratio
n of
the
Proj
ect
1La
ser p
rinte
rH
P L
aser
jet P
ro 4
00A
1H
Qs
2In
kjet
prin
ter
HP
Offi
ceje
t 771
0 W
ide
Form
at1
HQ
s3
Mul
tifun
ctio
n co
pier
Nas
huat
ec/ R
icoh
MP2
501S
P1
HQ
s4
Gra
phic
/mov
ie e
ditin
g so
ftwar
eW
indo
ws
Mov
ie M
aker
(Fre
e), M
icro
soft
Pow
erpo
int (
Prei
nsta
lled)
1H
Qs
Cou
nty
to P
urch
ase
Annex3-41
Annex 2 Training Programme (1st Training in August 2015)Title of Training Course:
The Federal Capital Territory Reduction of Non-Revenue Water Project (Water Supply Services Management and NRW Reduction)
Purpose of Training:
Schedule and Contents of Training CourseDate Contents Description Division/Section in charge Place
14/8(Fri) Traveling ( Abuja - ) *Turkish Airlines TK62415/8(Sat) Traveling ( - Istanbul - Abuja - ) *Turkish Airlines TK05016/8(Sun) Traveling ( - Tokyo - Yokohama)
Orientation Briefing of Training Course JICA Yokohama
Courtesy Call Director General of Yokohama Waterworks Bureau (YWWB) International OperationsDivision YWWB HQs
Overview of Water Supply inJapan and Yokohama
To understand water supply, institutions, laws and regulations in Japan,and water supply services of YWWB. Construction Division JICA Yokohama
Self-supporting AcountingSystem and Public-Private
Partnership (PPP)
To understand self-supporting accounting system and PPP of YWWB, andchallenges in their adoption.
Accounting and FinanceDivision YWWB HQs
Rehabilitation Project ofPurification Plant by PFI
To understand conditions of PPP adoption and current issues andadvantages through the case of YWWB. Kawai Purification Plant Kawai
Purification Plant
Membrane Filtration To visit ceramic membrane filtration at purification plant rehabilitated byPPP. Kawai Purification Plant Kawai
Purification Plant
Water Tariff Management
To enhance understanding of water tariff management for right(customer-friendly) billing and collection through the case of YWWBincluding customer management, welfare-purpose exemption andsystematic suspension of water supply against debtor.
Pricing Division JICA Yokohama
Customer Services (CS)Center To enhance understanding of CS though the practical case of YWWB Services Promotion Division Customer
Services CenterCustomer Services (CS) and
Public Relations (PR)To enhance understanding of CS and PR through the case of YWWB suchas customer comments and education for elementary students. Services Promotion Division JICA Yokohama
Mapping SystemTo enhance understanding of formulation of GIS, its utilization,management of inventory and drawings through the case of YWWB, inparticular, Mapping System and Network Drawing Book.
Water Supply Division,Pipeline Information Section
NishiyaPurification Plant
Water Supply OperationManagement
To enhance understanding of water supply operation management throughthe case of YWWB, such as Water Supply Block System and SCADAcovering water sources, purification plants, reservoirs and distributionnetwork.
Water Purification Division,Water Supply Control andManagement Section
NishiyaPurification Plant
Outline of Leakage (NRW)Prevention
To understand water leakage as a part of NRW through lectures onmechanism of leakage occurrence, leakage survey planning and detectionequipment.
Water Supply Division,Water Leakage ManagementSection
NishiyaPurification Plant
Leakage DetectionDemonstration (Training
Facility)
To understand advantage of training facility owned by water supplyservices agency for capacity development and technology succession.
Water Supply Division,Water Leakage ManagementSection
Pipe TrainingYard (NishiyaPurification Plant)
22/8(Sat)23/8(Sun)
Aged Pipe Replacement Plan To enhance understanding necessity of pipe rehabilitation, itsprioritization and aspects of service life (lifespan) through the case of Water Supply Division JICA Yokohama
Pipe Replacement Works To enhance understanding of supervision and safety control ofconstruction works through site visit. Area Construction Division Field Site
Water Meter MaintenanceTo enhance understanding of components of water meter and itsmaintenance, as well as necessity of its accuracy check through meteringtest at laboratory of YWWB.
Maintenance Division, WaterMeter Section
Nakamura WaterPlaza (MeterYard)
Human ResourcesDevelopment (HRD)
To enhance understanding of HRD through the case of YWWB, inparticular, Career Build-up Programme, Personnel Relocation Programmeand tools such as Achievement Check Sheet.
Personnel Affairs Division YWWB HQs
Technology Succession To enhance understanding of technology succession through lecture onroutine OJT and training programme.
Human ResourcesDevelopment Division YWWB HQs
Water Supply Planning To enhance understanding of Water Demand Forecasting, calculation ofDesign Water Supply and accordingly Facility Development Planning. Planning Division JICA Yokohama
Asset Management To enhance understanding of Asset Management, in particular, servicelife (lifespan), priortization and inspection & maintenance. Planning Division JICA Yokohama
Medium-Term Management &Financial Planning
To enhance understanding of how to set vision, long/medium-term goalsand annual objectives, and progress management of them, financialplanning and annual budgeting for comprehensive management of watersupply services through the case of YWWB. Also, to understand thebalance between income and expenditure and how to set water tariffscheme based on it for self-supporting accounting system.
Business Planning Division JICA Yokohama
Purification PlantTo enhance understanding of conventional purification process (receivingwell, sedimentation, filtration, chemical dosing facilties such asflocculant) and appropriate operation and maintenance of purification
Kosuzume Purification Plant KosuzumePurification Plant
Preparation of Action Plan Trainees prepare Action Plan(s) for contribution to FCTWB, based onknowledge gained in training course. YWC JICA Yokohama
Presentation Presentation of Action Plan, questions and answers, discussion YEC, YWCEvaluation Meeting JICA
Certificate Awarding JICA29/8(Sat) Traveling ( Yokohama - Tokyo - Istanbul - Abuja) *Turkish Airlines TK051&TK623
JICA Yokohama
Necessity of comprehensive management of water supply services, and knowledge and technology about NRW reduction are shared and diffusedin FCTWB. In particular,1. Trainees understand institution and system of water supply services and various efforts in Japan and Yokohama City, and then can comparethem with those in Nigeria.2. Trainees understand a variety of skills and practical approaches about NRW reduction, and then contribute to taking appropriate response toNRW in Pilot Metering Area (PMA) and apply their know-how gained to routine works of FCTWB.3. Trainees enhance understanding of planning and operations in water supply services, and then contribute to future improvement ofmanagement of water supply services of FCTWB.
25/8(Tue)
26/8(Wed)
28/8(Fri)
17/8(Mon)
18/8(Tue)
19/8(Wed)
20/8(Thu)
21/8(Fri)
24/8(Mon)
27/8(Thu)
Annex3-42
SMA
3
SMA
2
SMA
1
PMA
Gudu
A
nnex
3 L
ocat
ion
of C
ham
bers
for F
low
Met
er/V
alve
s in
eac
h P
MA
(Pla
n)
PMA
Jabi
DN200 uPVC
DN150 uPVC
DN100 uPVC
DN100 uPVC
No.
10
No.
1
No.
13
No.
2 N
o.12
No.
7
No.
8 N
o.3
No.
11
No.
4 N
o.9
Whe
n th
ere
is su
pply
are
a af
ter t
his p
oint
, the
pos
ition
of
valv
e N
o.10
and
met
er N
o.14
sh
ould
be
chan
ged.
No.
14
M
No.
1
No.
2
No.
5
No.
6 N
o.7
No.
9
No.
8
No.
10
No.
11
No.
12
No.
4
No.
3
Gark
i 1 P
MA
M
SMA
Flow
Met
er
Isol
atio
n Va
lve
Step
Tes
t Val
ve
Lege
nd
SMA
1
SMA
2
SMA
3
No.
E
Con
nect
ed to
DN
450
Val
ve
Exi
stin
g, w
ork
or n
ot?
M
Not
Fou
nd
Sho
uld
be O
pen
Sho
uld
be M
oved
Not
Con
nect
ed
to D
N30
0
Not
foun
d
Val
ve E
xist
ing,
w
ork
or n
ot?
Val
ve E
xist
ing,
w
ork
or n
ot?
M
Sho
uld
be M
oved
Siz
e 10
0 no
t 50
Sho
uld
be M
oved
Mai
n in
let v
alve
to th
e ar
ea
Con
nect
ion
to M
ain
Pip
elin
e ha
s no
t con
firm
ed
The
Are
a w
ater
sup
pled
by
DN
100
laid
in F
unm
ilayo
Ran
som
kuti
Stre
et, s
houl
d be
incl
uded
SM
A 1
The
Are
a w
ater
sup
pled
by
DN
300
laid
in M
uhm
mad
uB
uhar
iWay
sh
ould
be
excl
uded
from
SM
A 1
PM Form 3-1 Monitoring Sheet Summary
1
To Chief Representative of JICA Nigeria Office
PROJECT MONITORING SHEETS
Project Title : The Federal Capital Territory Reduction of Non-Revenue Water Project Version of the Sheet: Ver. 3 Term covered: November, 2015 - August, 2016
Name: Akinori Miyoshi Title: Chief Advisor Submission Date: 22 September 2016
I. Summary
1 Progress
1-1 Progress of Inputs
[The Nigerian Side] Project Personnel All project members including Project Director, Project Manager, Deputy Project Manager, Technical Managers, Non-Revenue Water (NRW) Management Team members, NRW Action Team members have been involved in the Project. Land, Building and Facilities Office spaces and necessary facilities at the Federal Capital Territory Water Board (FCTWB) have been provided for the Japanese side. Construction of chambers for bulk flow meters has been implemented since December 2015 but is currently suspended due to non-release of the Counterpart Fund. Chambers for flow meters and valves for the selected PMAs/SMAs were constructed. Local Costs Installation, operation and maintenance of the provided equipment and leakage repair inPMAs/SMAs have been done.
[The Japanese Side]JICA Experts Japan International Cooperation Agency (JICA) Expert Team consisting of a Chief Advisor and members for ten areas of expertise were assigned to the works in Nigeria for 35.7 man-months between November 2015 and August 2016 (56.4 man-months from the commencement of the Project in November 2014). Equipment Flowmeters, valves for the selected PMAs/SMAs and equipment for maintenance including leakage repair were procured in Nigeria for three pilot Area Offices. See the Annex-1: List of
Annex3-46
Equipment for the Project. Procurement of equipment for water distribution management such as zonal meters, data loggers, telemetric monitoring system, etc. has been in process in Japan. Facilities Specifications of modification of existing billing system were finalized. Chamber construction for zonal meters is being implemented by the Nigerian contractor since March 2016. Training of the Nigerian Project Personnel GIS training on software of both GeoMedia and ArcGIS for eight project members from Distribution Department and MIS Unit was conducted in Abuja in the period between 23rd
November and 1st December 2015. Following the previous training in August 2015, the second training in Japan for eight project members from both Distribution Department and Commerce Department was conducted in the period between 19th June and 2nd July 2016. See the Annex-2: The Second Training in Japan.
1-2 Progress of Activities
[Activities for Output-1: Level of NRW of both the service area of FCWTB and water distribution areas monitored regularly.]
No Activity Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)1-1 Install bulk meters to water
treatment plants 1 and 2Delayed.Design of chambers, specification of flow meter, BoQ were prepared.Construction has been postponed due to insufficient Counterpart Fund.
Progress: 75%, Behind: 7.5 monthsDelayed and suspended.Local contractors outsourced by FCTWB have constructed chambers for bulk meters. Construction of three chambers was completed while the fourth one is 50% completed. However, cable installation, ladder and fencing are pending.The construction has been suspended due to non-payment. This is due to non-release of the Counterpart Fund.
1-2 Measure monthly water production of water treatment plants 1, 2, 3, and 4
No progress and delayed as a result of delay in Activity 1-1.
Progress: 0%, Behind: 7.0 monthsDelayed as a result of delay in Activity 1-1.After Activity 1-1, the Project needs at least 6 months for monitoring this Activity.
1-3 Tally the above water production data monthly
No progress and delayed as a result of delay in Activity 1-1 and 1-2.
Progress: 0%, Behind: 7.0 monthsDelayed as a result of delay in Activity 1-1 and 1-2.After Activity 1-1 and 1-2, the Project needs at least 6 months for monitoring this Activity.
1-4 Calculate the monthly water Situation of billing and its system Progress: 40%, Behind: 7.5 months
Annex3-47
No Activity Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)consumption based on the billing data
have been partially assessed. In this process, the Project identified existence of duplicated/returned bills which cause inaccurate analysis of water consumption. So, the Project has suspended the Activity and will resume in line with treatment of duplicated/returned bills by FCTWB.
Delayed. FCTWB has collected information of returned bills and has deactivated them. The returned bills cause inaccuracy of calculating NRW ratio.The final specification for billing system modification was adopted.After modification, the Project needsat least 6 months for monitoring this Activity.
1-5 Calculate monthly NRW ratio of the service area of FCTWB using the data obtained from Activity 1-3and 1-4
No progress and delayed as a result of delay in Activity 1-3 and 1-4.
Progress: 0%, Behind: 7.5 monthsDelayed as a result of delay in Activity 1-3 and 1-4.The Project needs at least 6 months for monitoring this Activity after obtaining the data from Activity 1-3and 1-4.
1-6 Install zonal meters, water pressure sensor and pilot remote monitoring (telemetry) system
-(*Added in PDM2 after the monitoring.)
Progress: 65%, Behind: 1.5 monthsBeing delayed.Planning/designing of zonal meters, BoQ and specifications were completed.Construction of 6 out of 8 chambers was completed by the local contractor outsourced by JICA while the remaining 2 is ongoing.Consistent rain has affected the process of excavation of rock at the chamber site.Construction will continue as soon as favorable weather condition is achievable.
1-7 Measure and collect data for water distribution management such as water flow of zonal meters and water pressure
-(*Added in PDM2 after the monitoring.)
Progress: 0%, Behind: 0.0 monthsThe Activity will be implemented after the completion of Activity 1-6.)
[Activities for Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Activity Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)2-1 Review existing NRW
reduction operations at each pilot Area Office
Completed. Completed.
2-2 Conduct capacity assessment of organization and the relevant staff
Baseline assessment was done in Nov.-Dec. 2014 for all project members (excluding Project Director, Project Manager and Deputy Project Manager) as well as organization, institutional and social aspects.Capacity development plan was prepared and approved by FCTWB.
Progress: 50%, Behind: 7.0 monthsDelayed as a result of delay in Activity 2-9 to 2-15.Interim assessment will be done when pilot project terminates.
Annex3-48
No Activity Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)2-3 Identify and select a Pilot
Metering Area (PMA) for each Pilot Area Office based on the selection criteria of PMA
Completed.Based on criteria such as security, leakage conditions, network drawings, number of customers,three PMAs were selected:Gudu: Prince & PrincessJabi: JabiGarki I: Area 2-2&3&7
Completed.
2-4 Prepare/update distribution network drawings for each PMA
Ongoing but delayed.Drawings for PMA of Gudu Area Office were prepared.AGIS security has hindered data import/export and analysis.
Completed.AGIS security has still hindered data import/export and analysis.
2-5 Install water flow meters to each PMA and measure in/outflows monthly
Ongoing but Delayed.Flow meters for Gudu and Jabi have been procured and delivered. Procurement in Garki I is ongoing.
Progress: 90%, Behind: 9.0 monthsDelayed as a result of electrical works for the ultrasonic flow meter to be installed in Garki I.All mechanical flow meters were procured and installed except the ultrasonic flow meter in Garki I. (Discussion with AEDC is ongoing.)FCTWB will complete electricity connection for the ultrasonic flow meter in Garki I.
2-6 Zone each PMA into Sub Metering Areas (SMA)
Completed.Design for zoning was done.
Completed.
2-7 Isolate a SMA by installing valves
Ongoing but delayed.Valves for Gudu and Jabi have been procured and delivered. Procurement in Garki I is ongoing.
Completed.
2-8 Update the distribution network drawings for each SMA
Delayed but ongoing.Drawings for SMAs of Gudu Area Office have been prepared.AGIS security has hindered data import/export and analysis.
Progress: 80%, Behind: 2.0 monthsDelayed.All existing pipelines, valves and hydrants were captured. Locations of leakage and illegal connections will be captured.AGIS security has still hindered data import/export and analysis.
2-9 Measure an initial level of NRW of each SMA
No progress and delayed as a result of delay in Activity 2-5 and 2-7.
Progress: 75%, Behind: 5.5 monthsDelayed as a result of different meter types, non-accessibility to meter and complexity in commercial aspects such as customer categories, water tariffs, units and Area Offices for reading, billing systems and automated estimate billing.24 hrs flow measurement, MNF survey, Step test, Meter error test and Meter reading were completed.
Annex3-49
No Activity Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)24hrs customer consumption survey, Unbilled authorized customer listing and consumption survey are ongoing.
2-10 Detect target NRW components (i.e. invisible leakage, customer meter malfunction, and illegal connection) of each SMA
No progress and delayed as a result of delay in Activity 2-9.Theoretical lectures and fact findings were done prior to field works.
Progress: 75%, Behind: 5.5 monthsDelayed as a result of different meter types, non-accessibility to meter and complexity in commercial aspects such as customer categories, water tariffs, units and Area Offices for reading, billing systems and automated estimate billing.Leakage detection acoustic survey and Illegal connection survey were completed.
2-11 Develop a NRW reduction operation plan of each SMA, including reduction target for review by Head of Distribution Department
No progress and delayed as a result of delay in Activity 2-10.
Progress: 30%, Behind: 4.5 monthsDelayed and the Activity has been done provisionally.The plan is under preparation.
2-12 Review and approve NRW reduction operation plan of each SMA
No progress and delayed as a result of delay in Activity 2-11.
Progress: 30%, Behind: 4.5 monthsDelayed and the Activity has been done provisionally.The plan is under preparation.
2-13 Implement NRW reduction operations at each SMA
No progress and delayed as a result of delay in Activity 2-12.
Progress: 45%, Behind: 4.5 monthsDelayed and the Activity has been done provisionally.Repair of leakages completed in three PMAs. Meter replacement and installation is ongoing in Gudu.
2-14 Monitor the progress of the NRW reduction operations of each SMA
No progress and delayed as a result of delay in Activity 2-13.
Progress: 45%, Behind: 4.5 monthsDelayed and the Activity has been done provisionally.Repair of leakages completed in three PMAs. Meter replacement and installation is ongoing in Gudu.
2-15 Measure level of NRW of each SMA at the end of the respective operations
No progress and delayed as a result of delay in Activity 2-14.
Progress: 0%, Behind: 6.5 monthsDelayed and the activity follows Activity 2-14.
2-16 Prepare a report on pilot projects, covering Activity 2-1~2-15
No progress and delayed as a result of delay in Activity 2-15.
Progress: 0%, Behind: 2.0 monthsDelayed and the activity follows Activity 2-15.
2-17 Develop manuals for NRW reduction for Area Office managers and field operators (i.e. technical officers & meter readers), incl. audio visual materials
No progress. Progress: 0%, Behind: 2.0 monthsDelayed and the activity follows the above Activities.
Annex3-50
[Activities for Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Activity Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)3-1 Establish a Working Group
for NRW reduction planningCompleted, but will be reviewed in Phase-2.
Completed, but will be reviewed in Phase-2.
3-2 Review existing plans, implementation structure, on-the-job training mechanism, etc. related to NRW reduction at FCTWB
Completed, but will be reviewed in Phase-2.
Completed, but will be reviewed in Phase-2.
3-3 Conduct hydraulic and water pressure distribution analyses of the pipeline networks
To be implemented in Phase-2. To be implemented in Phase-2.AGIS security may hinder data import/export and analysis.
3-4 Develop outlines of the medium-term strategic plan and its annual NRW reduction plan (approval by the Director)
To be implemented in Phase-2. To be implemented in Phase-2.
3-5 Develop the first medium-term strategic plan (2018-2022) for approval by FCTA
To be implemented in Phase-2. To be implemented in Phase-2.
3-6 Develop an annual NRW reduction plan based on the strategic plan as an integral part of an annual recurrent and capital plan of FCTWB for approval by FCTA
To be implemented in Phase-2. To be implemented in Phase-2.
3-7 Develop a planning manual for NRW reduction
To be implemented in Phase-2. To be implemented in Phase-2.
3-8 Review existing plans, activities and implementing structure, etc. related to water distribution management
-(*Added in PDM2 after the monitoring.)
Progress: 70%, Behind: 7.0 monthsDelayed as a result of delay in information submission from Area Offices.6 out of 13 Area Offices submitted the required information.There was difficulty in implementation due to dearth of as-built drawings which will have provided sufficient information on pipeline and appurtenances.
3-9 Establish framework of water distribution management
-(*Added in PDM2 after the monitoring.)
Progress: 25%, Behind: 0.5 monthsBeing delayed.Water Distribution Management Committee was established and concept was endorsed.There was difficulty in implementation due to dearth of as-built drawings which will have provided sufficient information on pipeline and appurtenances.
Annex3-51
1-3 Achievement of Output
[Output-1: Level of NRW of the service area of FCTWB is monitored regularly.]
No Indicator Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)1a Record of monthly NRW ratio
is kept by Distribution Department from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed).Monthly NRW ratio based results ofActivity 1-5 has not been obtained due to delay in Activity 1-1 to 1-4.So, time frame is changed from the third quarter of the first year to the third quarter of the second year.
No achievement (delayed).Monthly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-1to 1-4.In the current schedule, it is expected that monthly NRW ratio will be obtained from Dec. 2016, the first quarter of the third year.
1b Monthly NRW ratio of the service area of FCTWB is reported to its monthly Joint Management Meeting from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed).Same as the above in Indicator 1a.
No achievement (delayed).Same as the above in Indicator 1a.
1c Quarterly NRW ratio of the service area of FCTWB is reported to the Board ofDirectors (*replace by “Management” in PDM2) ofFCTWB from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed).Quarterly NRW ratio based results of Activity 1-5 has not been obtained due to delay in Activity 1-1 to 1-4.So, time frame is changed from the third quarter of the first year to the third quarter of the second year.
No achievement (delayed).Quarterly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-1to 1-4.In the current schedule, it is expected that quarterly NRW ratio will be obtained from Mar. 2017, the second quarter of the third year.
1d Periodic records of data on water distribution management such as water flow of zonal meters and water pressure are kept by Distribution Department from the first quarter of the third year of the Project.
-(*Added in PDM2 after the monitoring.)
No achievement (as planned).
Verification of Achievement and Implementing ProcessUnder the condition that the Counterpart Fund for inputs by the Nigerian side has not been released, FCTWB has made efforts for chamber construction by outsourcing and staff assignment and logistics. But, the chamber construction has been suspended due to non-release of the Fund, and this has caused delay of measuring and tallying monthly water production data in Activity 1-2 and 1-3.Since a large number of return bills exist in the billing system, as a decision making of project operation, the Project suspended modification of the billing system, which is an input by the Japanese side, and then requested that FCTWB collects information on the return bills and deactivates them prior to conducting the modification. As a result, this has caused delay of calculating monthly water consumption in Activity 1-4.Consequently, monthly NRW ratio has not been calculated in Activity 1-5, and Indicator 1a, 1b and 1c Although the Project has not achieved Indicator 1a, 1b and 1c and been behind the schedule, there are no problems in the implementing process. However, monitoring period for six months at least may not be ensured in the current schedule.
Annex3-52
[Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Indicator Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)2a Decrease rate of NRW ratio
for each Sub Metering Area of a PMA reaches at least 80% of its target at the end of the respective NRW reduction operations.
No achievement.Although time frame is not specified, this indicator is supposed to be obtained in Sep. 2015, the fourth quarter of the first year. So, this means delayed.
No achievement (delayed).Although time frame is not specified, this indicator has not been obtained, this mean delayed.In the current schedule, it is expected that this indicator will be obtained from Oct. 2016, the first quarter of the third year.
2b Technical manuals for Area Office managers and field operators (i.e. technical officers and meter readers), including audio visual materials, are approved by Head of Department (HoD) for Distribution and HoD for Commerce by the first quarter of the third year of the Project.
No achievement (as planned). No achievement (as planned).
Verification of Achievement and Implementing ProcessUnder the condition that the Counterpart Fund for inputs by the Nigerian side has not been released, FCTWB has made efforts for chamber construction by outsourcing, procurement of materials, installation, staff assignment and logistics. But, quality of the input, particularly constructed facilities and work performance, has been not necessarily ensured properly or as planned, although minimum functionality exists at least.On the other hand, inputs from the Japanese side, mostly Experts and procurement of equipment, have been done as planned or necessary. However, NRW ratios in PMAs/SMAs have not yet calculated as a result of different meter types, non-accessibility to meter and complexity in commercial aspects such as customer categories, water tariffs, units and Area Offices for reading, billing systems and automated estimate billing.Conditions and difficulty in implementing activities as well as issues vary by pilot Area Offices, but pilot project will lead to fruitful findings and lessons for FCTWB and the Project. Sense of participation in the Project and motivation of project members from pilot Area Offices are holistically high.Although the Project has not achieved Indicator 2a and been behind the schedule, there are no problems in the implementing process.
Annex3-53
[Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Indicator Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)3a By October 2017, draft
medium-term strategic plan for NRW reduction (2018-2022) is submitted by FCTWB to FCTA for review and approval.
No achievement (as planned). No achievement (as planned).
3b By October 2017, anannual NRW reduction plan (2018) is incorporated in FCWTB’s annual recurrent and capital plan (2018) for submission to FCTA for review and approval.
No achievement (as planned). No achievement (as planned).
3c A planning manual for NRW reduction is approved by the Director of FCTWB by the end of the Project.
No achievement (as planned). No achievement (as planned).
3d By November 2016, framework of water distribution management is established.
-(*Added in PDM2 after the monitoring.)
No achievement (as planned).
Verification of Achievement and Implementing ProcessIndicator 3a, 3b and 3c and related activities for Output-3 are subject to Phase 2 of the Project, which is scheduled to be implemented from January 2017.Activities related to Indicator 3d are in progress as plan with participation of all Area Offices, although it has taken time to collect information.
1-4 Achievement of the Project Purpose
[Project Purpose: Capacity of FCTWB for NRW reduction is strengthened.]
No Indicator Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)a The medium-term strategic
plan for NRW reduction (2018-2022) is approved by FCTA by the end of the Project.
No achievement (as planned). No achievement (as planned).
b NRW reduction operations of the first quarter of 2018 specified in the annual plan of the above plan are carried out according to the plan by FCTWB.
No achievement (as planned). No achievement (as planned).
c Relevant staff of FCTWB (i.e. members of NRW Management Team and Pilot NRW Action Teams) become equipped with
Ongoing.Skills and knowledge necessary for NRW reduction, such as PMA /SMA designing, preparation of GIS network drawings have been gradually
Ongoing.Skills and knowledge necessary for NRW reduction, such as minimum night flow survey, step test, leakage detection, meter error test for water
Annex3-54
No Indicator Previous Monitoring (as at Nov.2015) Current Monitoring (as at Aug.2016)skills and knowledge necessary for NRW reduction according to the criteria set by the Project for each level.
developed through lectures, OJT and the first training in Japan in Aug. 2015.
balance analysis has been developed through lectures, OJT and the second training in Japan in Jun.-Jul. 2016.
d NRW ratio of each PMA in the last quarter of the Project reaches its respective target (**).Note(**):Target for each PMA is expected to be determined by the end of the first quarter of the second year.
No achievement (as planned). No achievement (as planned).
Verification of Achievement and Implementing ProcessBudget constraint of the Nigerian side is a possible obstructive factor against achievement of project purpose, particularly Indicator b.Achievement in Indicator c resulted from the activities for Output-2.FCTWB is willing to expand NRW reduction into the whole service area, and the necessity of cross-departmental function for NRW reduction such as task force is being recognized gradually.
1-5 Changes of Risks and Actions for Mitigation
Due to collapse in oil prices and shrinking revenue, recent budget constraint of the Nigerian side including non-release of the Counterpart Fund corresponds to an important assumption “A.Natural disaster / political instability / economic crisis that affect the Project activities do not occur.”Under this situation, there is a high possibility that FCTWB cannot complete the chamber construction of the bulk flowmeter (Output 1). Also, there is a high possibility that FCTWB cannot procure smoothly necessary materials for Output 2 activities. This is why there is a high-risk that the Project further delays and the outcome of the Project would be reduced.
1-6 Progress of Actions undertaken by JICA
The JICA Expert Team has encouraged the Nigerian relevant organization for budget execution, however, it is difficult to release of the Counterpart Fund. Non-release of the Fund is a decision by the Nigerian Government.Also, the JICA Expert Team and FCTWB have negotiated with contractors to let them continue the chamber construction, however, contractors have not accepted because FCTWB cannot make an assurance for payment for construction.
1-7 Progress of Actions undertaken by Nigerian side
FCTWB has already submitted the request letters to FCTA for budget execution and dealt with all the necessary procedures, but the release of the Counterpart Fund is yet to be effected.
Annex3-55
1-8 Other remarkable/considerable issues related/affect to the project (such as other JICA's projects, activities of counterparts, other donors, private sectors, NGOs etc.)
(1) Legal Instrument (Enabling Law) establishing FCTWB
Legal instrument (enabling law) establishing FCTWB as an autonomous body has not yet been approved by the current National Assembly.
(2) Grant Aid Project by Japan
“The Project for Introduction of Clean Energy by Solar Electricity Generation System” for Lower Usuma Water Treatment Plants was commissioned in late August 2016. This contributes to stable water supply to customers of FCTWB.
(3) Situation of Actions raised in previous Monitoring in November 2015
(3)-1: Action for “Limited Progress of Activities for Outut-1”FCTWB will liaise closely with FCTA for quick release of Counterpart Fund as soon as the government policy of Treasury Single Account is stabilized. Situation: The Counterpart Fund approved in the financial year 2015 was not released even the financial year was extended as an extralegal measure until March 2016. The Nigerian side revalidated this approved Fund in the financial year 2016 by approval of FCT Minister and Permanent Secretary, however, the Fund has not yet been released.
(3)-2: Action for “Suspension of Activity 1-4”FCTWB collated all the duplicated/returned bills, verified them and commenced the deactivation process for the bills. Report will be submitted by the middle of November 2015 to JICA Expert Team to analyze them jointly for water balance. After the deactivation and analysis, water connection and data creation will be centralized by HODs (Distribution and Commerce) in the Headquarters to avoid duplication. Situation: FCTWB verified about 4,800 of the return bills and deactivated them by July 2016, and consequently, conditions of billing system modification was met. The final specification for billing system modification was adopted.
(3)-3: Action for “Delay in implementing Activity 2-5 and 2-7”FCTWB, particularly GIS Unit and Pipeline Unit, will update GIS network drawings by physical verification during routine maintenance and capturing GPS location for existing facilities. FCTWB will obtain as-built drawings of new/old facilities certainly from Federal Capital Development Agency’s (FCDA) Engineering Services Department and FCT Agency for Mass Housing. Situation: FCTWB, particularly GIS Unit, Pipeline Unit and Area Offices, is updating GIS
Annex3-56
network drawings by physical verification during routine maintenance and capturing GPS location for existing facilities. There is no remarkable progress in obtaining as-built drawings of new/old facilities certainly from FCDA’s Engineering Services Department and FCT Agency for Mass Housing, because of disordered storage conditions and not well organized process of drawing management.
(3)-4: Action for “AGIS Security”FCTWB will gradually develop its own customized GIS database. Situation: FCTWB is updating its own GIS database as mentioned in (3)-3, meanwhile, FCTWB has referred the challenge to FCTA's Permanent Secretary and is working closely with AGIS to solve the issue.
(4) Situation of Actions for Recommendation by JICA Monitoring Survey Mission inprevious Monitoring in November 2015
(4)-1: Action for “Further efforts towards the project management and a stronger sense of ownership by FCTWB”Situation: Monthly technical meetings with attendance of 20-30 members have been organized and facilitated by Technical Manager and Coordinator. This means a sense of ownership among working level staff in project management has been enhanced.
(4)-2: Action for “Project management on the basis of Monitoring Sheets”Situation: Project members have understood concept and usefulness of Monitoring Sheets through practical and joint monitoring process. Although Project members have suggested preparing Monitoring Sheets by themselves with voluntary efforts, the knowledge and skills of preparation will be gradually developed.
(4)-3: Action for “Sharing of Capacity Assessment and Development Plan”Situation: The Project has planned to conduct interim capacity assessment when development of capacity on NRW reduction is expected through pilot project activities for Output 2, as well as mini-workshop for enhancing motivation. However, due to delay in most of Pilot project activities, these have not been conducted.
2 Inspection of the Project Implementation Process
2-1 Evaluation on the Process of Capacity Development
There is no issue. The JICA Expert Team accelerates the Nigerian counterparts’ ownership when they implement the capacity development.
2-2 Monitoring and Information Sharing
Annex3-57
Monitoring system between the JICA Expert Team and FCTWB is satisfied. Both sides share theinformation on the progress of the Project activities through daily communication, monthly and quarterly regular meetings.
2-3 Communication among the Project Team
There is no issue.
2-4 Involvement by JICA Nigeria Office
JICA Nigeria Officer, who is in charge of this Project management in JICA Nigeria office, has often visited the Project office and has communicated with the Project Team.
2-5 Involvement of Counterpart
Generally, the Project members from the Nigerian side have been involved well through participation in the Project activities and attendance in monthly and quarterly regular meetings. Especially, one FCTWB staff belonging to Gudu Area Office has a high motivation to implement the voluntary NRW reduction activities outside the Pilot Metering Area based on action plan which was prepared by him in the training course in Hokkaido, Japan.From the beginning, the Project aims to promote such voluntary NRW reduction activities outside the Pilot Metering Area by the Nigerian side self-effort, this is good example of the Project activities.
2-6 Assignment of Counterparts
Generally, the Nigerian side has assigned roles and responsibilities to appropriate staff. However,considering sustainability of implementing NRW reduction based on a NRW reduction strategic plan to be prepared through Output 3 activities, it may be necessary for the Nigerian side to enhance project management skill for working level staff such as Head of Unit for example. Such project management skill should be enhanced through the Project activities. In addition, the existing operational structure should be reviewed.
2-7 Involvement of Relevant Organizations
FCTA has been involved well in the Project as the chair of Joint Coordination Committee (JCC) and also has assisted and advised the Project in dealing with issues including the Counterpart Fund and AGIS security.The Project has shared information with other relevant organizations such as FCDA, FederalMinistry of Water Resources (FMWR), Embassy of Japan and international development partners through JCC meetings, workshops and newsletters. JICA organized a stakeholder meeting which was chaired by FMWR with attendance of Kaduna State Water Board in November 2015.
Annex3-58
2-8 Other Issues related to Project Implementation Process
(1) Communication between Distribution Department and Commerce DepartmentThe JICA Expert Team reported that Distribution Department and Commerce Department have to implement the cross-cutting activities for NRW reduction. Both Departments understand the importance of collaboration and active communication, however they need to collaborate more to the success of the Project. Also, active participation of Commerce Staff (FCTWB Headquarters)particularly in the field activities is a key to success of the Project and improvement in water supply services.
(2) Necessity for Strengthening Partnership between FCDA and FCTWBIt is necessary for FCTWB to obtain the updated as-built drawings and information correctly and timely for proper operation, maintenance and implementing NRW reduction activities efficiently. However, FCWB has not been able to obtain the updated as-built drawings and information in respect of its operation and maintenance activities from FCDA that is in charge of provision of infrastructure. This is as a result of lack of feedback system between the two sister agencies. So, FCTWB is encouraged to always share its operation and maintenance experiences with FCDA while FCDA is equally advised to carry along FCTWB in its water project implementation.
(3) Lack of the Quality ManagementThe monitoring survey mission found quality of information and performance as well as quality of constructed facilities is not properly managed by FCTWB. For example,
(a) Information such as deliverables from FCTWB has lacked often accuracy, so this has led to decrease in data reliability and duplication of effort.
(b) There are many honeycombs on the surface of the concrete of constructed chambers for the bulk flowmeter.
(c) In Garki I Pilot area, FCTWB cannot read PMA flowmeter regularly because of mortar plastering on entire concrete slab covers.
(d) In Gudu Pilot area, inside of the chamber for PMA flowmeter is in muddy conditions because FCTWB has not placed concrete slab covers.
It is very important to pay attention to quality management in order to enhance the Project outcome with adequate performance, avoid further delay of the Project and keep sustainability through proper operation and maintenance.
3 Other Issue from the Technical Aspect
This is the view of the monitoring survey mission from JICA headquarters about prepaid meter.
(1) Structures of Prepaid Meters
Annex3-59
FCTWB has two types of prepaid meters. The one shown to the mission was of combination of mechanical meter and an electronic device mounted threon (the manufacturer: Henan Suntront Tech Co., Ltd., China) The mechanical part measures flow and the electronic device seemed calculating consumption and water charge accordingly and deducting it from a pre-paid amount. Two pre-paid meters installed were shown to the mission in Gudu area. One of them was found indicating blank display because of battery run-out and dismantled from the service connection. The meters of this model are owned and operated by a private contractor.
The other model is of ultrasonic flowmeter, which is composed of outdoor unit for measurement and indoor unit for charging and display (Manufacturer: Universal Metering System, UK). Both are connected by wireless.
(2) Life of Prepaid MetersBecause the former model of pre-paid meters uses mechanical part similar to the conventional model, the life of a prepaid meter will be governed by the mechanical part and assumed as 6 to 7 years at the longest or two to three years from the mission’s experience in developing countries. As the Gudu case suggests, a pre-paid meter has another elements to consider, a battery. An Electronic device requires power, that is supplied by a built-in battery. Although some manufacturers claim battery life may be 10 years nowadays, but a Gudu case may suggest otherwise. The replacement of a prepaid meter costs three to eight times more than a conventional one.
Since there is no moving part in the latter model, the meter life is expected much longer than mechanical one and governed by the life of battery.
(3) Meter-reading and MaintenanceIt should be noted that meter-reading of prepaid meters should be regularly done by a waterservice provider itself or by a contractor unless the service provider maintains data collection and analysis of individual customers at the time of pre-payment of water charges. If this process of customer information is omitted, an opportunity to detect malfunctioning meters or illegal connections including meter-bypassing will be lost.
JICA is planning to extend technical assistance to a city in Palestine, and suburbs of the city is found successfully deploying prepaid meters. The water service provider of the suburbs contracted with the supplier of prepaid meters for performance guarantee and maintenance services of meters. The same service provider required the meter supplier tailoring software to accommodate the provider’s requests such as lower water rate for limited consumption by low income families, recording seasonal and daily fluctuation of demands, and abnormally high or low consumption of individual customers.
Annex3-60
Unless such systematic cares are taken by water provider, use of prepaid meters is critical in terms of NRW reduction and the financial aspect of water service provider.
4 Delay of Work Schedule and/or Problems (if any)
4-1 Detail
(1) Delay of the Project
Available monitoring period of Activities 1-2 to 1-5 will be insufficient due to delay in the Activities. The Project needs at least six months for monitoring the Activities 1-2 to 1-5.
(2) SMA out of PMA Monitoring Area
PMA meters were relocated from originally-designed position to other position in Jabi and Garki I due to difficulty in implementation, which results in making a SMA each be out of PMA monitoring area.
4-2 Cause
(1) Delay of the Project
(1)-1 The chamber construction for bulk flowmeters and procurement of necessary materials for pilot activities has delayed and suspended due to non-release of the Counterpart Fund in 2015&2016.
(1)-2 It takes a lot of time to obtain the correct situation due to non-existence of the as-built drawings and the restriction of GIS usage. FCTWB has to update GIS network drawings by physical verification during routine maintenance and capturing GPS locations for existing facilities.
(2) SMA out of PMA Monitoring Area
Jabi (SMA1) It founds that it was physically difficult to settle the PMA flowmeter and to monitor water flow at the original location, because the distance from the ground level to the location of pipeline was unexpectedly deep (6.3m from the ground level). See the Annex-3: Location of the SMAs to be removed from PMA Monitoring. This is why the Project Team has to change the location for setting the PMA flowmeter to other location.
Garki I (SMA2-1)
Annex3-61
It founds that FCTWB could not supply water to the western area in SMA2 if the Project Team closes the valve at the original location. See the Annex-3: Location of the SMAs to be removedfrom PMA Monitoring. This is why the Project Team has to change the location for setting the PMA flowmeter to other location in order to continue supplying water to habitants in the western area in SMA2.
The reason why such situation happened is that FCTWB does not have as-built drawings which reflect the latest correct situation.
4-3 Action to be taken
(1) Against “Delay of the Project”
(1)-1 Extension of the Project Period As a result of the second joint monitoring survey, both sides found the Project delays sixmonths from the original plan of operation, and also found that it is impossible to secure necessary time frame to monitor the monthly water production, consumption and NRW ratio within the present project period. Without the monitoring of them, the Project cannot make a realistic NRW reduction strategic plan through the activities of Output 3, so that it is indispensable for securing the Project’s outcome. In addition, both sides confirmed that the Nigerian side cannot fulfill some undertaking (completion of the chamber construction of bulk flowmeter and cable installation) due to the non-release of the Counterpart Fund. Therefore, as a countermeasure against this issue, the Nigerian side requested to the Japanese side to extend the project period in order to secure the necessary time frame to monitor the monthly water production, consumption and NRW ratio.
(1)-2 Taking over the Chamber Construction and Procurement of Small Materials for Pilot Activities
FCTWB is liaising closely with FCTA for quick release of the Counterpart Fund, however, both sides confirmed that it is almost difficult for the Nigerian side to complete the chamber construction for bulk flowmeter. It is indispensable to complete the construction in order to set the bulk flowmeter for monitoring monthly water production in Output 1 activities. In addition, both sides confirmed that there are some possibilities to procure small materials for Pilot activities in Output 2. Therefore, as a countermeasure against this issue, the Nigerian side requested to the Japanese side to take some undertakings as below:
- The total cost of chamber construction for bulk flowmeters (civil works and cable installation) (* related to Output 1)
- Procurement of small materials for pilot activities that are yet to be procured by FCTWB
Annex3-62
(*related to Output 2)
(1)-3 Relaxing the Restriction of GIS Usage Now that FCTWB cannot get access to some critical information for the Project activities, the restriction has to be relaxed.
(2) Against “SMA out of PMA Monitoring Area”
(2)-1 Removing the SMA out of PMA Both sides technically confirmed that SMA 1 in Jabi and SMA 2-1 in Garki I are constrained to be out of PMA monitoring area. See the Annex-3: Location of the SMAs to be removed from PMA Monitoring. In order to avoid further delay of the Project activities (Activity 2-8 to 2-16), the Project Team has to remove these SMAs from the target of the Project. As a result, the number of SMAs need to be reduced as below: - Jabi : 2 areas- Garki I : 3 areas (SMA2-2 will not be removed.)
(2)-2 Collecting necessary Information from FCDA
FCTWB has to get the necessary information in order to implement the Project activities efficiently.
4-4 Roles of Responsible Persons/Organization
[Nigerian Side]
(1) For “Delay of the Project”
(1)-1 Extension of the Project Period If JICA headquarters approves this Monitoring Sheet, the Japanese side prepares the draft revised Record of Discussion (R/D) for this purpose. After the discussion on the revised version of R/D, the Nigerian side signs the revised one.
(1)-2 Taking over the Chamber Construction and Procurement of Small Materials for Pilot Activities
If JICA headquarters approves this Monitoring Sheet, FCTWB terminates the original contract between FCTWB and contractors as soon as possible before the JICA Expert Team conducts a new contract with the contractors based on terms and conditions of the original contract.
(1)-3 Relaxing the Restriction of GIS Usage FCTWB has referred the challenge to FCTA's Permanent Secretary and is working closely
Annex3-63
with AGIS to solve the issue.
(2) For “SMA out of PMA Monitoring Area”
FCTWB obtains necessary as-built drawings of new/old facilities certainly from FCDA’s Engineering Services Department and FCT Agency for Mass Housing.
[Japanese Side]
(1) For “Delay of the Project”
(1)-1 Extension of the Project Period Based on the request from the Nigerian side, the Japanese side considers the extension of Project period after completion of the chamber construction for bulk flowmeter to secure the necessary time frame for the monitoring period for the monthly water production, consumption and NRW ratio. If JICA headquarters approves the extension of the project period, the Japanese side prepares the draft revised R/D for this purpose.
(1)-2 Taking over the Chamber Construction and Procurement of Small Materials for Pilot Activities
Based on the request from the Nigerian side, the Japanese side considers taking over some undertakings in order to avoid further delay of the Project as below:
- The total cost of chamber construction for bulk flowmeters (civil works and cable installation) (*related to Output 1)
- Procurement of small materials for pilot activities that are yet to be procured by FCTWB (*related to Output 2)
5 Modification of the Project Implementation Plan
5-1 Plan of Operation
As described above, based on the request from the Nigerian side, the extension of Project period will be considered by the Japanese side after completion of the chamber construction for bulk flowmeter to secure the necessary time frame for the monitoring period for the monthly water production, consumption and NRW ratio.
5-2 Other modifications on detailed implementation plan
None. (Remarks: The amendment of R/D and PDM (title of the project, duration, project site(s), target
Annex3-64
group(s), implementation structure, overall goal, project purpose, outputs, activities, and input) should be authorized by JICA headquarters. If the Project Team deems it necessary to modify any part of R/D and PDM, the Team may propose the draft.)
6 Preparation by Nigerian side toward after completion of the Project
To be considered.
II. Project Monitoring Sheet I & II (as attached)
Annex Annex-1: List of Equipment for the Project Annex-2: The Second Training in Japan Annex-3: Location of the SMAs to be removed from PMA Monitoring Annex-4: Participants in Preparation of Monitoring Sheet and Photos
Annex3-65
PM F
orm
3-2
Pro
ject
Mon
itorin
g Sh
eet I
PD
M3
Proj
ect T
itle:
The
Fed
eral
Cap
ital T
errit
ory
Red
uctio
n of
Non
-Rev
enue
Wat
er P
roje
ctVe
rsio
n 3
Proj
ect P
erio
d: O
ctob
er 2
014
to M
arch
201
8D
ated
22
Sep
. 201
6Im
plem
entin
g O
rgan
izat
ion:
Fede
ral C
apita
l Ter
ritor
y Ad
min
istr
atio
n (F
CTA
) / F
eder
al C
apita
l Ter
ritor
y W
ater
Boa
rd (F
CTW
B)
Dic
rect
Ben
efic
iarie
s: F
CTW
B, r
elev
ant s
taff
of F
CTW
B H
eadq
uart
ers
and
pilo
t Are
a O
ffice
sPr
ojec
t Site
: FC
TPi
lot A
rea
Offi
ces:
Jabi
, Gar
ki I
and
Gud
uN
arra
tive
Sum
mar
yO
bjec
tivel
y Ve
rifia
ble
Indi
cato
rsM
eans
of V
erifi
catio
nIm
port
ant A
ssum
ptio
nAc
hiev
emen
tR
emar
ks<O
vera
ll G
oal>
a: A
nnua
l NR
W ra
tio is
redu
ced
to X
%(*
) at t
he e
nd o
f the
yea
r 202
1
Not
e(*)
: Tar
get v
alue
(X%
), w
hich
is e
xpec
ted
to b
e de
term
ined
in th
e m
ediu
m-
term
stra
tegi
c pl
an fo
r NR
W re
duct
ion,
sha
ll be
tent
ativ
ely
fille
d w
hen
the
final
draf
t was
app
rove
d by
the
Dire
ctor
of F
CTW
B, w
hich
sha
ll be
fina
lized
whe
n th
epl
an is
app
rove
d by
FC
TA
<Pro
ject
Pur
pose
>
Not
e(**
): Ta
rget
for e
ach
PM
A is
exp
ecte
d to
be
dete
rmin
ed b
y th
e en
d of
the
firs t
quar
ter o
f the
sec
ond
year
.<O
utpu
ts>
Not
e (*
1): N
RW
com
pone
nts
targ
eted
by
Out
put 2
are
(i) i
nvis
ible
leak
age;
(ii)
cust
omer
met
er m
alfu
nctio
n; a
nd (i
ii) il
lega
l con
nect
ion
Not
e (*
2): A
med
ium
-term
stra
tegi
c pl
an is
a fi
ve-y
ear p
lan,
whi
ch m
ay in
clud
e m
ediu
m-te
rm ta
rget
, stra
tegi
es a
nd a
ctio
ns, t
imef
ram
e, h
uman
reso
urce
requ
irem
ent,
on-th
e-jo
b tra
inin
g m
echa
nism
, cos
t-ben
efit
anal
ysis
of N
RW
redu
ctio
n, e
tc. I
t is
note
d th
at N
RW
com
pone
nts
addr
esse
d by
the
stra
tegi
c pl
an a
re n
ot li
mite
d to
the
ones
men
tione
d in
(*1)
abo
ve: t
hey
shal
l be
disc
usse
d an
d de
term
ined
in d
evel
opin
g th
e ou
tline
of t
he s
trate
gic
plan
(thr
ough
Act
ivity
3-4
).
2. M
etho
ds/o
pera
tiona
l pro
cedu
res
for e
ffect
ive
NR
W re
duct
ion
are
esta
blis
hed
thro
ugh
pilo
t pro
ject
s at
Pilo
t Met
erin
g A
reas
(PM
As)
und
erpi
lot A
rea
Offi
ces
(*1)
2a. D
ecre
ase
rate
of N
RW
ratio
for e
ach
Sub
Met
erin
g A
rea
of a
PM
A re
ache
s at
leas
t 80%
of i
ts ta
rget
at t
he e
nd o
f the
resp
ectiv
e N
RW
redu
ctio
n op
erat
ions
.2b
. Tec
hnic
al m
anua
ls fo
r Are
a O
ffice
man
ager
s an
d fie
ld o
pera
tors
(i.e
.te
chni
cal o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
vis
ual m
ater
ials
, are
appr
oved
by
Hea
d of
Dep
artm
ent (
HoD
) for
Dis
tribu
tion
and
HoD
for C
omm
erce
by th
e fir
st q
uarte
r of t
he th
ird y
ear o
f the
Pro
ject
.
2a. R
ecor
d of
NR
W ra
tio k
ept
by th
e D
istri
butio
n D
epar
tmen
t2b
. Dat
e of
app
rova
l of t
hem
anua
ls
Indi
cato
r 2a :
Non
e an
dde
laye
d as
a re
sult
of d
elay
inA
ctiv
ities
2-5
, 2-8
to 2
-16
and
inpu
t fro
m th
e N
iger
ian
side
.In
dica
tor 2
b : N
one
Indi
cato
r 1a&
1b&
1c: N
one
and
dela
yed
as a
resu
lt of
dela
y in
Act
iviti
es 1
-1 to
1-5
and
inpu
t fro
m th
e N
iger
ian
side
.In
dica
tor 1
d : N
one
3. A
med
ium
-term
stra
tegi
c pl
an o
f FC
TWB
for N
RW
redu
ctio
n is
deve
lope
d, u
tiliz
ing
the
resu
lts o
f Out
put 1
-2 (*
2)3a
. By
Oct
ober
201
7, d
raft
med
ium
-term
stra
tegi
c pl
an fo
r NR
W re
duct
ion
(201
8-20
22) i
s su
bmitt
ed b
y FC
TWB
to F
CTA
for r
evie
w a
nd a
ppro
val.
3b. B
y O
ctob
er 2
017,
an
annu
al N
RW
redu
ctio
n pl
an (2
018)
is in
corp
orat
ed in
FCW
TB’s
ann
ual r
ecur
rent
and
cap
ital p
lan
(201
8) fo
r sub
mis
sion
to F
CTA
for
revi
ew a
nd a
ppro
val.
3c. A
pla
nnin
g m
anua
l for
NR
W re
duct
ion
is a
ppro
ved
by th
e D
irect
or o
f FC
TWB
by th
e en
d of
the
Pro
ject
.3d
. By
Nov
embe
r 201
6, fr
amew
ork
of w
ater
dis
tribu
tion
man
agem
ent i
ses
tabl
ishe
d.
3a&
3b. D
ate
of o
ffici
al le
tter
subm
ittin
g dr
aft s
trate
gic
plan
and
annu
al re
curre
nt a
nd c
apita
lpl
an3c
. Dat
e of
app
rova
l of t
hem
anua
l3d
. Im
plem
entin
g st
ruct
ure
and
wor
kflo
w o
f wat
er d
istri
butio
nm
anag
emen
t
Indi
cato
r 3a :
Non
e.In
dica
tor 3
b : N
one.
Indi
cato
r 3c :
Non
e.In
dica
tor 3
d : W
ater
Dis
tribu
tion
Man
agem
ent
Com
mitt
ee w
as e
stab
lishe
dan
d co
ncep
t was
end
orse
d.
1. L
evel
of N
RW
of b
oth
the
serv
ice
area
of F
CW
TB a
nd w
ater
dis
tribu
tion
area
s is
mon
itore
d re
gula
rly1a
. Rec
ord
of m
onth
ly N
RW
ratio
is k
ept b
y D
istri
butio
n D
epar
tmen
t fro
m th
e th
irdqu
arte
r of t
he s
econ
d ye
ar o
f the
Pro
ject
.1b
. Mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
its
mon
thly
Join
t Man
agem
ent M
eetin
g fro
m th
e th
ird q
uarte
r of t
he s
econ
d ye
ar o
f the
Pro
ject
.1c
. Qua
rterly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
Man
agem
ent o
f FC
TWB
from
the
third
qua
rter o
f the
sec
ond
year
of t
he P
roje
ct.
1d. P
erio
dic
reco
rds
of d
ata
on w
ater
dis
tribu
tion
man
agem
ent s
uch
as w
ater
flow
of z
onal
met
ers
and
wat
er p
ress
ure
are
kept
by
Dis
tribu
tion
Dep
artm
ent f
rom
the
first
qua
rter o
f the
third
yea
r of t
he P
roje
ct.
1a. M
onth
ly re
cord
of N
RW
ratio
1b&
1c. M
ater
ial f
or m
eetin
gssu
bmitt
ed b
y th
e D
istri
butio
nD
epar
tmen
t1d
. Per
iodi
c re
cord
s of
dat
a on
wat
er d
istri
butio
n m
anag
emen
t
A. S
taff
of F
CTW
B (i
.e. m
embe
rs o
fN
RW
Man
agem
ent T
eam
and
Pilo
tN
RW
Act
ion
Team
s) tr
aine
d th
roug
h th
eP
roje
ct d
o no
t lea
ve th
e of
fice
in la
rge
num
bers
a. T
he m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
) is
appr
oved
by F
CTA
by
the
end
of th
e P
roje
ct.
b. N
RW
redu
ctio
n op
erat
ions
of t
he fi
rst q
uarte
r of 2
018
spec
ified
in th
e an
nual
plan
of t
he a
bove
pla
n ar
e ca
rried
out
acc
ordi
ng to
the
plan
by
FCTW
B.
c. R
elev
ant s
taff
of F
CTW
B (i
.e. m
embe
rs o
f NR
W M
anag
emen
t Tea
m a
nd P
ilot
NR
W A
ctio
n Te
ams)
bec
ome
equi
pped
with
ski
lls a
nd k
now
ledg
e ne
cess
ary
for
NR
W re
duct
ion
acco
rdin
g to
the
crite
ria s
et b
y th
e P
roje
ct fo
r eac
h le
vel.
d. N
RW
ratio
of e
ach
PM
A in
the
last
qua
rter o
f the
Pro
ject
reac
hes
its re
spec
tive
targ
et (*
*).
a. D
ate
of a
ppro
val o
f the
pla
nb.
Res
ult o
f mon
itorin
gby
NR
W M
anag
emen
t Tea
mc.
Res
ults
of j
oint
ass
essm
ent
base
d on
the
crite
ria s
et b
y th
eP
roje
ctd.
Rec
ord
of N
RW
ratio
kep
t by
Dis
tribu
tion
Dep
artm
ent
A. P
olic
y su
ppor
t for
NR
W re
duct
ion
isno
t dis
cont
inue
d P
olic
y su
ppor
t for
NR
Wre
duct
ion
is n
ot d
isco
ntin
ued
B. N
atur
al d
isas
ter/
pol
itica
l ins
tabi
lity/
eco
nom
ic c
risis
that
affe
ct th
e se
rvic
ear
ea o
f FC
TWB
do
not o
ccur
C. A
ctiv
ities
to im
plem
ent t
he m
ediu
m-
tem
stra
tegi
c pl
an a
re n
ot d
isco
ntin
ued
or d
elay
ed
Indi
cato
r a: N
one.
Indi
cato
r b: N
one.
Indi
cato
r c: E
nhan
ced
capa
city
has
not
yet
bee
nas
sess
ed, b
ut s
kills
and
know
ledg
e ha
s be
ende
velo
ped
thro
ugh
lect
ures
,O
JT b
y JI
CA
Exp
ert T
eam
and
two
train
ings
in J
apan
inA
ugus
t 201
5 an
d Ju
ne-J
uly
2016
.In
dica
tor d
: Non
e.
Pro
ject
Mon
itor
ing
She
et I
(R
evis
ion
of P
roje
ct D
esig
n M
atri
x)
a. R
ecor
d of
NR
W ra
tio k
ept b
yD
istri
butio
n D
epar
tmen
tN
one.
Leve
l of N
on-R
even
ue W
ater
(NR
W) i
s re
duce
d at
the
serv
ice
area
of
FCTW
B
Cap
acity
of F
CTW
B fo
r NR
W re
duct
ion
is s
treng
then
ed
Annex3-66
PM F
orm
3-2
Pro
ject
Mon
itorin
g Sh
eet I
Activ
ities
Im
port
ant A
ssum
ptio
nTh
e N
iger
ian
Side
The
Japa
nese
Sid
e
Pre-
Con
ditio
ns
Not
e (*
3) S
elec
tion
crite
ria o
f PM
A a
re a
s fo
llow
s: (i
) Saf
ety
for n
ight
wor
ks is
sec
ured
in m
easu
ring
min
imum
nig
ht fl
ow: (
ii) D
istri
butio
n ne
twor
k is
sep
arat
ed a
nd it
is e
asy
to is
olat
e it
in m
easu
ring
NR
W ra
tio: a
nd (i
ii) N
RW
ratio
is s
uppo
sedl
y hi
gh.
Not
e (*
4) W
orki
ng G
roup
for N
RW
pla
nnin
g w
ould
con
sist
of P
roje
ct M
anag
er (a
s ch
air),
Dep
uty
Pro
ject
Man
ager
, Tec
hnic
al M
anag
ers,
Hea
d of
Fin
ance
Dep
t., H
ead
of P
rodu
ctio
n D
ept.,
Hea
d of
PR
S U
nit,
and
mem
bers
of N
RW
Man
agem
ent T
eam
.
Faci
litie
s1.
Mod
ifica
tion
of e
xist
ing
billin
gsy
stem
2. C
ham
bers
for b
ulk
met
ers
for
wat
er tr
eatm
ent p
lant
s, z
onal
met
ers
and
wat
er p
ress
ure
sens
ors
Inpu
tsA
. Nat
ural
dis
aste
r / p
oliti
cal /
inst
abilit
y /
econ
omic
cris
is th
at a
ffect
the
Pro
ject
activ
ities
do
not o
ccur
.1-
1 In
stal
l bul
k m
eter
s to
wat
er tr
eatm
ent p
lant
s 1
and
21-
2 M
easu
re m
onth
ly w
ater
pro
duct
ion
of w
ater
trea
tmen
t pla
nts
1, 2
, 3an
d 4
1-3
Tally
the
abov
e w
ater
pro
duct
ion
data
mon
thly
1-4
Cal
cula
te th
e m
onth
ly w
ater
con
sum
ptio
n ba
sed
on th
e bi
lling
data
1-5
Cal
cula
te m
onth
ly N
RW
ratio
of t
he s
ervi
ce a
rea
of F
CTW
B u
sing
the
data
obt
aine
d fro
m A
ctiv
ity 1
-3 a
nd 1
-41-
6 In
stal
l zon
al m
eter
s, w
ater
pre
ssur
e se
nsor
and
pilo
t rem
ote
mon
itorin
g(te
lem
etry
) sys
tem
1-7
Mea
sure
and
col
lect
dat
a fo
r wat
er d
istri
butio
n m
anag
emen
t suc
h as
wat
er fl
ow o
f zon
al m
eter
s an
d w
ater
pre
ssur
e
Proj
ect P
erso
nnel
1. P
roje
ct D
irect
or: D
irect
or o
f Eco
nom
ic P
lann
ing,
Res
earc
h an
d S
tatis
ticD
epar
tmen
t, FC
TA2.
Pro
ject
Man
ager
: Dire
ctor
of F
CTW
B3.
Dep
uty
Pro
ject
Man
ager
: HoD
for A
dmin
istra
tion
and
Sup
ply/
FCTW
B4.
Tec
hnic
al M
anag
ers
(Als
o Le
ader
s of
NR
W M
anag
emen
t Tea
m):
HoD
for
Dis
tribu
tion
and
HoD
for C
omm
erce
/FC
TWB
5. M
embe
rs o
f NR
W M
anag
emen
t Tea
m (F
CTW
B):
- Hea
d of
Spe
cial
Pro
ject
Uni
t of D
istri
butio
n D
epar
tmen
t (as
Coo
rdin
ator
)- R
elev
ant H
ead
of U
nit (
HoU
) and
offi
cers
of t
he D
istri
butio
n D
epar
tmen
t,C
omm
erce
Dep
artm
ent,
and
Adm
inis
tratio
n an
d S
uppl
y D
epar
tmen
t6.
Hea
ds o
f oth
er re
leva
nt D
epar
tmen
ts a
nd U
nit o
f FC
TWB
: HoD
for F
inan
ce,
HoD
for P
rodu
ctio
n, H
oU fo
r Pla
nnin
g R
esea
rch
and
Sta
tistic
s (P
RS
)7.
Mem
bers
of N
RW
Act
ion
Team
: Are
a M
anag
er, A
ssis
tant
Are
a M
anag
er(D
istri
butio
n), A
ssis
tant
Are
a M
anag
er (C
omm
erce
), te
chni
cal o
ffice
rs(D
istri
butio
n) a
nd m
eter
read
ers
(Com
mer
ce) o
f eac
h pi
lot A
rea
Offi
ce8.
Oth
er p
erso
nnel
mut
ually
agr
eed
upon
as
nece
ssar
y
Japa
nese
Exp
erts
1. C
hief
Adv
isor
/ N
RW
Red
uctio
n P
lann
ing
/ Wat
erD
istri
butio
n M
anag
emen
t 12.
Dep
uty
Chi
ef A
dvis
or /
NR
WR
educ
tion
Pla
nnin
g3.
NR
W R
educ
tion
Ope
ratio
nsM
anag
emen
t4.
Lea
kage
Det
ectio
nTe
chno
logy
5. C
omm
erci
al L
oss
6. H
ydra
ulic
Ana
lysi
s / G
IS7.
Pro
cure
men
t Man
age'
t /C
oord
inat
or8.
Fac
ility
Des
ign
/ Con
stru
ctio
nS
uper
visi
on9.
Equ
ipm
ent D
esig
n /
Inst
alla
tion
10. W
ater
Dis
tribu
tion
Man
agem
ent 2
11. R
emot
e M
onito
ring
12. O
ther
exp
erts
mut
ually
agre
ed u
pon
as n
eces
sary
2-1
Rev
iew
exi
stin
g N
RW
redu
ctio
n op
erat
ions
at e
ach
pilo
t Are
a O
ffice
2-2
Con
duct
cap
acity
ass
essm
ent o
f the
rele
vant
sta
ff of
eac
h pi
lot A
rea
Offi
ce2-
3 Id
entif
y an
d se
lect
a P
ilot M
eter
ing
Are
a (P
MA
) for
eac
h pi
lot A
rea
Offi
ce b
ased
on
the
sele
ctio
n cr
iteria
of P
MA
(*3)
2-4
Pre
pare
/upd
ate
dist
ribut
ion
netw
ork
draw
ings
for e
ach
PM
A2-
5 In
stal
l wat
er fl
ow m
eter
s to
eac
h P
MA
and
mea
sure
in/o
utflo
ws
mon
thly
2-6
Zone
eac
h P
MA
into
Sub
Met
erin
g A
reas
(SM
A)
2-7
Isol
ate
a S
MA
by
inst
allin
g va
lves
2-8
Upd
ate
the
dist
ribut
ion
netw
ork
draw
ings
for e
ach
SM
A2-
9 M
easu
re a
n in
itial
leve
l of N
RW
of e
ach
SM
A2-
10 D
etec
t tar
get N
RW
com
pone
nts
(i.e.
invi
sibl
e le
akag
e, c
usto
mer
met
er m
alfu
nctio
n, a
nd il
lega
l con
nect
ion)
of e
ach
SM
A2-
11 D
evel
op a
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
,inc
ludi
ngre
duct
ion
targ
et, f
or re
view
by
Hea
d of
Dis
tribu
tion
Dep
artm
ent
2-12
Rev
iew
and
app
rove
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
2-13
Impl
emen
t the
NR
W re
duct
ion
oper
atio
ns a
t eac
h S
MA
2-14
Mon
itor t
he p
rogr
ess
of th
e N
RW
redu
ctio
n op
erat
ions
of e
ach
SM
A2-
15 M
easu
re le
vel o
f NR
W o
f eac
h S
MA
at t
he e
nd o
f the
resp
ectiv
eop
erat
ions
2-16
Pre
pare
a re
port
on p
ilot p
roje
cts,
cov
erin
g A
ctiv
ity 2
-1~2
-15
2-17
Dev
elop
man
uals
for N
RW
redu
ctio
n fo
r Are
a O
ffice
man
ager
s an
dfie
ld o
pera
tors
(i.e
. tec
hnic
al o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
visu
al m
ater
ials
A. F
urni
shed
offi
ces
for J
apan
ese
Exp
erts
are
sec
ured
at t
heH
eadq
uarte
rs a
nd e
ach
Pilo
t Are
a O
ffice
of F
CTW
B.
B. P
roje
ct P
erso
nnel
is a
ssig
ned
with
the
final
ized
list
.
Land
, Bui
ldin
g an
d Fa
cilit
ies
1. O
ffice
bui
ldin
g an
d fa
cilit
ies
nece
ssar
y fo
r the
impl
emen
tatio
n of
the
Pro
ject
2. O
ffice
spa
ces
and
nece
ssar
y fa
cilit
ies
for t
he J
apan
ese
Exp
erts
at t
he F
CTW
BH
eadq
uarte
rs a
nd e
ach
pilo
t Are
a O
ffice
, inc
ludi
ng in
tern
et c
onne
ctio
n an
d ai
rco
nditi
oner
s3.
Cha
mbe
rs fo
r bul
k m
eter
s fo
r wat
er tr
eatm
ent p
lant
s, fl
ow m
eter
s an
d va
lves
for t
he s
elec
ted
PM
As/
SM
As.
4. E
lect
ric w
iring
to b
ulk/
zona
l met
ers,
logg
ers
and
pres
sure
sen
sors
.5.
Oth
er fa
cilit
ies
mut
ually
agr
eed
upon
as
nece
ssar
y
Issu
es &
Cou
nter
mes
ures
A. D
elay
of t
he P
roje
ct: A
vaila
ble
mon
itorin
g pe
riod
of A
ctiv
ities
1-2
to 1
-5 w
ill be
insu
ffici
ent d
ue to
del
ay in
the
Act
iviti
es.
(Cau
se)
- Del
ay a
nd s
uspe
nsio
n of
the
cham
ber c
onst
ruct
ion
for b
ulk
flow
met
ers
and
proc
urem
ent
of n
eces
sary
mat
eria
ls fo
r pilo
t act
iviti
es d
ue to
non
-rele
ase
of th
e C
ount
erpa
rt Fu
nd in
2015
&20
16.
- Tak
ing
a lo
t of t
ime
to o
btai
n th
e co
rrect
situ
atio
n du
e to
non
-exi
sten
ce o
f the
as-
built
draw
ings
and
the
rest
rictio
n of
GIS
usa
ge.
(Cou
nter
mea
sure
)- E
xten
sion
of t
he p
roje
ct p
erio
d ba
sed
on th
e re
ques
t fro
m th
e N
iger
ian
side
.- T
akin
g ov
er th
e ch
ambe
r con
stru
ctio
n an
d pr
ocur
emen
t of s
mal
l mat
eria
ls fo
r Pilo
tac
tiviti
es fr
om th
e N
iger
ian
side
to th
e Ja
pane
se s
ide
base
d on
the
requ
est f
rom
the
Nig
eria
n si
de.
- Rel
axin
g th
e re
stric
tion
of G
IS u
sage
B. S
MA
out o
f PM
A M
onito
ring
Area
: PM
A m
eter
s w
ere
relo
cate
d fro
m o
rigin
ally
-de
sign
ed p
ositi
on to
oth
er p
ositi
on in
Jab
i and
Gar
ki I
due
to d
iffic
ulty
in im
plem
enta
tion.
(Cau
se)
It w
as p
hysi
cally
diff
icul
t to
settl
e th
e P
MA
flow
met
er a
nd to
mon
itor w
ater
flow
at t
heor
igin
al lo
catio
n, b
ecau
se th
e di
stan
ce fr
om th
e gr
ound
leve
l to
the
loca
tion
of p
ipel
ine
was
une
xpec
tedl
y de
ep in
Jab
i (S
MA
1). F
CTW
B c
ould
not
sup
ply
wat
er to
the
wes
tern
area
in S
MA
2 if
the
Pro
ject
Tea
m c
lose
s th
e is
olat
ing
valv
e at
the
orig
inal
loca
tion
inG
arki
I (S
MA
2-1)
.(C
ount
erm
easu
re)
- Rem
ovin
g th
e S
MA
out
of P
MA
: Bot
h si
des
tech
nica
lly c
onfir
med
that
SM
A 1
in J
abi
and
SM
A 2
-1 in
Gar
ki I
are
cons
train
ed to
be
out o
f PM
A m
onito
ring
area
. In
orde
r to
avoi
d fu
rther
del
ay o
f the
Pro
ject
act
iviti
es (A
ctiv
ity 2
-8 to
2-1
6), t
he P
roje
ct T
eam
has
tore
mov
e th
ese
SM
As
from
the
targ
et o
f the
Pro
ject
.- C
olle
ctin
g ne
cess
ary
Info
rmat
ion
from
FC
DA
: FC
TWB
has
to g
et th
e ne
cess
ary
info
rmat
ion
in o
rder
to im
plem
ent t
he P
roje
ct a
ctiv
ities
effi
cien
tly.
Loca
l Cos
ts1.
Cos
t for
inst
alla
tion,
ope
ratio
n an
d m
aint
enan
ce o
f the
pro
vide
d eq
uipm
ent a
ndco
st fo
r pip
e re
pair
at P
MA
s2.
Adm
inis
tratio
n an
d op
erat
iona
l cos
ts, i
nclu
ding
cos
t for
loca
l tra
vel f
or th
eP
roje
ct P
erso
nnel
, dem
urra
ge a
t loc
al c
usto
ms
poin
t, lic
ensi
ng c
ost o
f rad
ioap
plic
atio
n an
d co
st fo
r com
mun
icat
ion
of te
lem
etric
dev
ice
for s
elec
ted
zona
lm
eter
(s) a
nd w
ater
pre
ssur
e se
nsor
(s)
3. O
ther
cos
ts m
utua
lly a
gree
d up
on a
s ne
cess
ary
3-1
Est
ablis
h a
Wor
king
Gro
up fo
r NR
W p
lann
ing
(*4)
3-2
Rev
iew
exi
stin
g pl
ans,
impl
emen
tatio
n st
ruct
ure,
on-
the-
job
train
ing
mec
hani
sm, e
tc. r
elat
ed to
NR
W re
duct
ion
at F
CTW
B3-
3 C
ondu
ct h
ydra
ulic
and
wat
er p
ress
ure
dist
ribut
ion
anal
yses
of t
hepi
pelin
e ne
twor
ks3-
4 D
evel
op o
utlin
es o
f the
med
ium
-term
stra
tegi
c pl
an a
nd it
s an
nual
NR
W re
duct
ion
plan
3-5
Dev
elop
the
first
med
ium
-term
stra
tegi
c pl
an (2
018-
2022
) for
app
rova
lby
FC
TA3-
6 D
evel
op a
n an
nual
NR
W re
duct
ion
plan
bas
ed o
n th
e st
rate
gic
plan
as
an in
tegr
al p
art o
f an
annu
al re
curre
nt a
nd c
apita
l pla
n of
FC
TWB
for
appr
oval
by
FCTA
3-7
Dev
elop
a p
lann
ing
man
ual f
or N
RW
redu
ctio
n3-
8 R
evie
w e
xist
ing
plan
s, a
ctiv
ities
and
impl
emen
ting
stru
ctur
e, e
tc.
rela
ted
to w
ater
dis
tribu
tion
man
agem
ent
3-9
Est
ablis
h fra
mew
ork
of w
ater
dis
tribu
tion
man
agem
ent
Trai
ning
of t
he N
iger
ian
Proj
ect P
erso
nnel
1. F
our p
erso
ns m
utua
lly a
gree
dup
on w
ill be
trai
ned
in J
apan
annu
ally
2. G
IS tr
aini
ng in
Nig
eria
Equi
pmen
t1.
Bul
k m
eter
s an
d lo
gger
s fo
rw
ater
trea
tmen
t pla
nts
2. W
ater
flow
met
ers,
val
ves,
and
cust
omer
met
ers
for S
MA
3. L
eaka
ge d
etec
tion
equi
pmen
tfo
r PM
A4.
Pip
e re
pair
equi
pmen
t for
PM
A5.
Veh
icle
s (P
ick-
ups)
6. G
ener
ator
for p
roje
ct o
ffice
7. Z
onal
met
ers,
logg
ers
and
wat
er p
ress
ure
sens
ors
8. T
elem
etric
mon
itorin
g sy
stem
with
sta
ndby
pow
er g
ener
atin
gfa
cilit
y fo
r sel
ecte
d zo
nal
met
er(s
) and
/or w
ater
pre
ssur
ese
nsor
(s).
9. O
ther
equ
ipm
ent m
utua
llyag
reed
upo
n as
nec
essa
ry
Annex3-67
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Prog
ress
upd
ated
: 31s
t Aug
ust 2
016
2014
2015
2016
2017
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
33Co
unter
meas
ures
Outp
ut-1
1-1
W/P
Surve
yIns
tallat
ionRe
vised
Prep
arati
onCo
nstru
ction
Instal
lation
Actua
lSu
spen
ded
Susp
ende
dIns
tallat
ion
1-2
W/P
Revis
edAc
tual
Meas
urem
ent
1-3
W/P
Revis
edAc
tual
Meas
urem
ent
1-4
W/P
Revie
wSy
stem
Modif
icatio
nRe
vised
Spec
ificati
onMo
difica
tion
Actua
lCo
ncep
tSp
ecific
ation
Spec
ificMo
difica
tion
Meas
urem
ent
1-5
W/P
Revis
edAc
tual
Calcu
lation
1-6
W/P
Suve
ry &
Desig
nCo
nstru
ction
Instal
lation
Revis
edAc
tual
Tend
erIns
tallat
ion
1-7
W/P
Revis
edAc
tual
Outp
ut-2
2-1
W/P
Revis
edAc
tual
2-2
W/P
Base
line
Inter
im-1
Revis
edAc
tual
2-3
W/P
Revis
edAc
tual
2-4
W/P
Revis
edAc
tual
2-5
W/P
Revis
edCo
nstru
ct. &
Insta
ll.Ac
tual
Susp
ende
d
2-6
W/P
Revis
edAc
tual
2-7
W/P
Revis
edCo
nstru
ct. &
Insta
ll.Ac
tual
Susp
ende
d
2-8
W/P
Revis
edAc
tual
2-9
W/P
Revis
edAc
tual
2-10
W/P
Revis
edAc
tual
2-11
W/P
Revis
edAc
tual
Prov
ision
ally
2-12
W/P
Revis
edAc
tual
Prov
ision
ally
-Co
mplet
ed.
Delay
ed.
All e
xistin
g pipe
lines
, valv
es an
d hyd
rants
wer
e cap
tured
.Lo
catio
ns of
leak
age a
nd ill
egal
conn
ectio
ns w
ill be
captu
red.
AGIS
secu
rity ha
s hind
ered
data
impo
rt/ex
port
and
analy
sis.
FCTW
B ha
s refe
rred t
he ch
allen
ge to
FCT
A's P
erma
nent
Secre
tary a
nd is
wor
king c
losely
with
AGI
S to
solve
the
i
Delay
ed as
a re
sult o
f elec
trical
works
for t
he ul
traso
nic flo
w me
ter to
be in
stalle
d in G
arki
I.
All m
echa
nical
flow
meter
s wer
e pro
cure
d and
insta
lled
exce
pt the
ultra
sonic
flow
meter
in G
arki
I. (D
iscus
sion
with
AEDC
is on
going
.)
-Co
mplet
ed
Delay
ed as
a re
sult o
f diffe
rent
meter
types
, non
-acc
essib
ility t
o mete
r and
comp
lexity
in co
mmer
cial a
spec
tssu
ch as
custo
mer c
atego
ries,
water
tariffs
, unit
s and
Are
a Offic
es fo
rre
ading
, billi
ng sy
stems
and
autom
ated e
stima
te bil
ling.
Diffe
rent
meter
type
s, no
n-ac
cess
ibility
to m
eter a
ndco
mplex
ity in
comm
ercia
l asp
ects
shou
ld be
focu
sed i
nthe
Pha
se 2.
Delay
ed. T
he A
ctivit
y has
been
done
prov
ision
ally.
The p
lan is
unde
r pre
para
tion.
None
24 hr
s flow
mea
sure
ment,
MNF
surve
y, St
ep te
st, M
eter
erro
r tes
t and
Mete
r rea
ding w
ere c
omple
ted. 2
4hrs
custo
mer c
onsu
mptio
n sur
vey,
Unbil
led au
thoriz
edcu
stome
r listi
ng an
d con
sump
tion s
urve
y are
ongo
ing.
Leak
age d
etecti
on ac
ousti
c sur
vey a
nd Ill
egal
conn
ectio
nsu
rvey w
ere c
omple
ted.
Loca
l con
tracto
rs ou
tsour
ced b
y FCT
WB
have
cons
tructe
dch
ambe
rs for
bulk
meter
s. Co
nstru
ction
of th
ree c
hamb
ers
was c
omple
ted w
hile t
he fo
urth
one i
s 50%
comp
leted
.Ho
weve
r, ca
ble in
stalla
tion,
ladde
r and
fenc
ing ar
epe
nding
.
The c
onstr
uctio
n has
been
susp
ende
d due
to no
n-pa
ymen
t. Th
is is
due t
o non
-relea
se of
the C
ounte
rpar
tFu
nd.
FCTW
B is
liaisi
ng cl
osely
with
FCT
A for
quick
relea
se of
the F
und.
After
insta
llatio
n, the
Pro
ject n
eeds
at le
ast 6
mon
ths fo
rmo
nitor
ing th
is Ac
tivity
.
FCTW
B wi
ll com
plete
electr
icity
conn
ectio
n for
the
ultra
sonic
flow
meter
in G
arki
I.Th
ere w
as di
fficult
y in i
mplem
entat
ion du
e to d
earth
of as
-bu
ilt dr
awing
s whic
h will
have
prov
ided s
uffici
ent
infor
matio
n on p
ipelin
e and
appu
rtena
nce
.Th
is ha
s led
to re
locati
on of
PMA
mete
rs fro
m or
igina
lly-
desig
ned p
ositio
n to o
ther p
ositio
n in J
abi a
nd G
arki
I,wh
ich re
sults
in m
aking
a SM
A ea
ch be
out o
f PMA
monit
oring
.FC
TWB
will d
iscus
s cha
lleng
e abo
ut as
-buil
t dra
wing
s with
FCTA
and F
CDA.
Comp
leted
None
-Co
mplet
edAG
IS se
curity
has h
inder
ed da
ta im
port/
expo
rt an
dan
alysis
.FC
TWB
has r
eferre
d the
chall
enge
to F
CTA'
s Per
mane
ntSe
cretar
y and
is w
orkin
g clos
ely w
ith A
GIS
to so
lve th
eiss
ue.
Comp
leted
None
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 2-
9 to 2
-15.
Base
line
asse
ssme
nt wa
s don
e in N
ov.-D
ec.
2014
.
None
.Int
erim
asse
ssme
nt wi
ll be d
one w
hen p
ilot p
rojec
tter
mina
tes.
After
mod
ificati
on, t
he P
rojec
t nee
ds at
leas
t 6 m
onths
for
monit
oring
this
Activ
ity.
No pr
ogre
ss. D
elaye
d as a
resu
lt of
delay
in A
ctivit
y 1-3
and 1
-4.
None
The P
rojec
t nee
ds at
leas
t 6 m
onths
for m
onito
ring t
hisAc
tivity
after
obtai
ning t
he da
ta fro
m Ac
tivity
1-3 a
nd 1-
4.
Being
delay
ed.
Delay
ed. F
CTW
B ha
s coll
ected
infor
matio
n of r
eturn
ed bi
lls an
d has
deac
tivate
d the
m. T
he re
turne
d bills
caus
e ina
ccur
acy o
f calc
ulatin
g NRW
ratio
.
Final
spec
ificati
on fo
r billi
ng sy
stem
modif
icatio
n was
adop
ted.
No pr
ogre
ss.
- -
Revie
w an
d app
rove
NRW
redu
ction
oper
ation
plan
of ea
ch S
MA
Prog
ress
: 30
%Be
hind:
4.5mo
nths
100% 75%
50%
25%
Deve
lop a
NRW
redu
ction
oper
ation
plan o
f eac
h SMA
, inclu
ding r
educ
tion
targe
t for
revie
w by
Hea
d of
Distr
ibutio
nDe
partm
ent
Prog
ress
: 30
%Be
hind:
4.5mo
nths
100% 75%
50%
25%
Detec
t tar
get N
RW co
mpon
ents
(i.e.
invisi
ble le
akag
e, cu
stome
r mete
rma
lfunc
tion,
and i
llega
l con
necti
on)
of ea
ch S
MAPr
ogre
ss:
75%
Behin
d:5.5
month
s
100% 75%
50%
25%
Meas
ure a
n init
ial le
vel o
f NRW
of ea
chSM
A
Prog
ress
: 75
%Be
hind:
5.5mo
nths
100% 75%
50%
25%
Upda
te the
distr
ibutio
n netw
ork
draw
ings f
or ea
ch S
MA Prog
ress
: 80
%Be
hind:
2.0mo
nths
100% 75%
50%
25%
Isolat
e a S
MA by
insta
lling v
alves
Prog
ress
: 10
0%10
0% 75%
50%
25%
Zone
each
PMA
into
Sub M
eterin
gAr
eas (
SMA)
Prog
ress
: 100
%10
0% 75%
50%
25%
Prog
ress
: 90
%Be
hind:9
.0mon
ths10
0% 75%
50%
25%
Prep
are/u
pdate
distr
ibutio
n netw
ork
draw
ings f
or ea
ch P
MA Prog
ress
: 100
%10
0% 75%
50%
25%
Meth
ods/o
pera
tiona
lpr
oced
ures
for e
ffect
iveNR
W re
duct
ion
are
esta
blish
ed th
roug
hpi
lot p
rojec
ts at
Pilo
tMe
terin
g Ar
eas (
PMAs
)un
der p
ilot A
rea O
ffice
s
Revie
w ex
isting
NRW
redu
ction
oper
ation
s at e
ach p
ilot A
rea O
ffice
Prog
ress
: 100
%10
0% 75%
50%
25%
Cond
uct c
apac
ity as
sess
ment
ofor
ganiz
ation
and t
he re
levan
t staf
f
Prog
ress
: 100
%10
0% 75%
50%
25%
Prog
ress
: 50
%Be
hind:
7.0mo
nths
100% 75%
50%
25%
Identi
fy an
d sele
ct a P
ilot M
eterin
gAr
ea (P
MA) f
or ea
ch P
ilot A
rea O
ffice
base
d on t
he se
lectio
n crite
ria of
PMA
Instal
l wate
r flow
mete
rs to
each
PMA
and m
easu
re in
/outflo
ws m
onthl
y
Meas
ure a
nd co
llect
data
for w
ater
distrib
ution
man
agem
ent s
uch a
s wate
rflo
w of
zona
l mete
rs an
d wate
rPr
ogre
ss:
0%
Behin
d:0.0
month
s
100% 75%
50%
25%
Instal
l zon
al me
ters,
water
pres
sure
sens
or an
d pilo
t rem
ote m
onito
ring
(telem
etry)
syste
mPr
ogre
ss:
65%
Behin
d:1.5
month
s
100% 75%
50%
25%
25%
Aug
Sep
Oct
Calcu
late m
onthl
y NRW
ratio
of th
ese
rvice
area
of F
CTW
B us
ing th
e data
obtai
ned f
rom
Activ
ity 1-
3 and
1-4
Prog
ress
: 0%
Behin
d:7.5
month
s
100% 75%
50%
25%
Calcu
late t
he m
onthl
y wate
rco
nsum
ption
base
d on t
he bi
lling d
ata
Prog
ress
: 40
%Be
hind:
7.5mo
nths
100% 75%
50%
25%
50%
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Jun
Leve
l of N
RW o
f bot
hth
e ser
vice a
rea o
fFC
WTB
and
wate
rdi
strib
utio
n ar
eas
mon
itore
d re
gular
ly
Instal
l bulk
mete
rs to
water
trea
tmen
tpla
nts 1
and 2
Prog
ress
: 75
%Be
hind:
7.5mo
nths
100% 75%
50%
25%
Nov
Nov
Dec
Tally
the a
bove
wate
r pro
ducti
on da
tamo
nthly
Prog
ress
: 0%
Behin
d:7.0
month
s
100% 75%
50%
25%
Meas
ure m
onthl
y wate
r pro
ducti
on of
water
trea
tmen
t plan
ts 1,
2, 3,
and 4
Prog
ress
: 0%
Behin
d:7.0
month
s
100% 75%
PO
3Pr
ojec
t Mon
itorin
g Sh
eet I
I (Pl
an o
f Ope
ratio
ns)
Orig
inal
Plan
(Wor
k Plan
) and
Rev
ision
of S
ched
ule,
Actu
al W
orks
and
Prog
ress
Delay
ed an
d sus
pend
ed.
No pr
ogre
ss. D
elaye
d as a
resu
lt of
delay
in A
ctivit
y 1-1
.
Plan
ning/d
esign
ing of
zona
l mete
rs, B
oQ an
dsp
ecific
ation
s wer
e com
pleted
.Co
nstru
ction
of 6
out o
f 8 ch
ambe
rs wa
s com
pleted
by th
eloc
al co
ntrac
tor ou
tsour
ced b
y JIC
A wh
ile th
e rem
aining
2is
ongo
ing.
Cons
isten
t rain
has a
ffecte
d the
proc
ess o
f exc
avati
on of
rock
at th
e cha
mber
site.
Cons
tructi
on w
ill co
ntinu
e as s
oon a
s fav
orab
le we
ather
cond
ition i
s ach
ievab
le.
Activ
ities
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
Jan
Feb
Mar
Apr
May
Jun
Jul
May
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Revised
Wearehe
re.
Add
ition
allyrequ
ired
Mon
itorin
gPe
riod
Ori g
inalTarget.
Annex3-68
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Prog
ress
upd
ated
: 31s
t Aug
ust 2
016
PO
3Pr
ojec
t Mon
itorin
g Sh
eet I
I (Pl
an o
f Ope
ratio
ns)
Orig
inal
Plan
(Wor
k Plan
) and
Rev
ision
of S
ched
ule,
Actu
al W
orks
and
Prog
ress
Revised
Wearehe
re.
Orig
inalTarget.
2-13
W/P
Revis
edAc
tual
Prov
ision
ally
Prov
ision
ally
2-14
W/P
Revis
edAc
tual
Prov
ision
ally
2-15
W/P
Revis
edAc
tual
2-16
W/P
Inter
imFin
alRe
vised
Actua
l
2-17
W/P
Draft
Finali
zatio
nRe
vised
Actua
l
Outp
ut-3
3-1
W/P
Revis
edAc
tual
3-2
W/P
Revis
edAc
tual
3-3
W/P
Revis
edAc
tual
3-4
W/P
Revis
edAc
tual
3-5
W/P
Revis
edAc
tual
3-6
W/P
Revis
edAc
tual
3-7
W/P
Revis
edAc
tual
3-8
W/P
Revis
edAc
tual
3-9
W/P
Revis
edAc
tual
W/P
Phas
e-1 (
Oct 2
014 -
Dec
2016
, 27 m
onth
s)Re
vised
Actua
l
2014
2015
2016
2017
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
33Co
unter
meas
ures
JICA
Expe
rt1
Akino
ri MIY
OSHI
W/P
Chie
f Adv
isor /
NRW
Red
uctio
n Plan
ning /
Wate
r Dist
ributi
onRe
vised
Man
agem
ent
Actua
l2
Take
toshi
FUJIY
AMA
W/P
Dep
uty C
hief A
dviso
r / N
RW R
educ
tion P
lannin
gRe
vised
Actua
l3
Toru
TOY
ODA
W/P
NRW
Red
uctio
n Ope
ratio
ns M
anag
emen
tRe
vised
Actua
l4
Kiyo
shi K
IYAM
AW
/P Le
akag
e Dete
ction
Tec
hnolo
gyRe
vised
Actua
l5
Taku
ji OKU
BO (-
Dec/2
015)
, Hiro
yuki
MORI
TA (J
an/20
16-)
W/P
Com
merci
al Lo
ssRe
vised
Actua
l6
Shint
a SEG
AWA
W/P
Hyd
rauli
c Ana
lysis
/ GIS
Revis
edAc
tual
7Ka
zuhir
o ISH
IURA
(-Au
g/201
5), H
iroki
NIIM
URA
(Sep
/2015
-)W
/P P
rocu
reme
nt Ma
nage
ment
/ Coo
rdina
torRe
vised
Actua
l8
Take
toshi
FUJIY
AMA
(-Mar
/2016
), Sh
inich
iro S
ATOH
(Apr
/2016
-)W
/PFa
cility
Des
ign /
Cons
tructi
on S
uper
vision
Revis
edAc
tual
9Ki
yosh
i KIY
AMA
W/P
Equip
ment
Desig
n / In
stalla
tion
Revis
edAc
tual
Delay
ed. T
he A
ctivit
y has
been
done
prov
ision
ally.
Repa
ir of le
akag
es co
mplet
ed in
3 PM
As. M
eter
repla
ceme
nt an
d ins
tallat
ion is
ongo
ing in
Gud
u.Ou
tstan
ding p
ayme
nt du
e to c
ontra
ctor.
This
is du
e to n
on-re
lease
of th
e Cou
nterp
art F
und.
FCTW
B is
liaisi
ng cl
osely
with
FCT
A for
quick
relea
se of
the F
und.
Ther
e was
diffic
ulty i
n imp
lemen
tation
due t
o dea
rth of
as-
built
draw
ings w
hich w
ill ha
ve pr
ovide
d suff
icien
tinf
orma
tion o
n pipe
line a
nd ap
purte
nanc
es.
FCTW
B wi
ll disc
uss c
halle
nge a
bout
as-b
uilt d
rawi
ngs w
ithFC
TA an
d FCD
A.
-1.0
0 man
-mon
th-
-2.4
0 man
-mon
th-
-4.0
0 man
-mon
th-
-7.1
3 man
-mon
th-
-3.4
7 man
-mon
th-
-10
.33 m
an-m
onth
-
-6.6
3 man
-mon
th-
-11
.30 m
an-m
onth
-
-3.8
3 man
-mon
th-
Being
delay
ed.
Wate
r Dist
ributi
on M
anag
emen
t Com
mitte
e was
estab
lishe
d and
conc
ept w
as en
dorse
d.
Expe
rts w
ere n
ot in
Nige
ira in
mos
t of
perio
d betw
een J
anun
ary
and A
pril
2015
.
22 m
onths
None
To be
imple
mente
d in P
hase
-2.
None
None
Delay
ed as
a re
sult o
f dela
y in
infor
matio
n sub
miss
ion fr
om A
rea
Offic
es.
6 out
of 13
Are
a Offic
es su
bmitte
d the
requ
ired
infor
matio
n.
To be
imple
mente
d in P
hase
-2.
None
None
To be
imple
mente
d in P
hase
-2.
None
None
To be
imple
mente
d in P
hase
-2.
None
AGIS
secu
rity ha
s hind
ered
data
impo
rt/ex
port
and
analy
sis.
FCTW
B ha
s refe
rred t
he ch
allen
ge to
FCT
A's P
erma
nent
Secre
tary a
nd is
wor
king c
losely
with
AGI
S to
solve
the
issue
.
To be
imple
mente
d in P
hase
-2.
None
None
Comp
leted
, but
will b
e rev
iewed
in P
hase
-2.
None
-Co
mplet
ed, b
ut wi
ll be r
eview
ed in
Pha
se-2
.No
ne
None
None
Delay
ed. T
he ac
tivity
follo
ws A
ctivit
y2-
15.
None
None
Delay
ed. T
he ac
tivity
follo
ws th
eab
ove A
ctivit
ies.
None
None
Delay
ed. T
he ac
tivity
follo
ws A
ctivit
y2-
14.
Engin
eerin
g Ser
vices
Dep
artm
ent o
fFC
DA w
as ad
ded a
s an o
bser
ver.
Feb
Mar
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Apr
May
Jun
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dura
tion
/ Pha
sing
Inpu
ts (t
he Ja
pane
se si
de)
Oct.
Nov
Dec
Jan
Estab
lish f
rame
work
of wa
terdis
tributi
on m
anag
emen
t
Prog
ress
: 25
%Be
hind:
0.5mo
nths
100% 75%
50%
25%
Revie
w ex
isting
plan
s, ac
tivitie
s and
imple
menti
ng st
ructu
re, e
tc. re
lated
towa
ter di
stribu
tion m
anag
emen
tPr
ogre
ss:
70%
Behin
d:7.0
month
s
100% 75%
50%
25%
Deve
lop a
plann
ing m
anua
l for N
RWre
ducti
on
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75%
50%
25%
Deve
lop an
annu
al NR
W re
ducti
on pl
anba
sed o
n the
stra
tegic
plan a
s an
integ
ral p
art o
f an a
nnua
l recu
rrent
and
capit
al pla
n of F
CTW
B for
appr
oval
by F
CTA
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75%
50%
25%
Deve
lop th
e firs
t med
ium-te
rm st
rateg
icpla
n (20
18-2
022)
for a
ppro
val b
y FCT
A
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75%
50%
25%
Deve
lop ou
tlines
of th
e med
ium-te
rmstr
ategic
plan
and i
ts an
nual
NRW
redu
ction
plan
(app
rova
l by t
heDi
recto
r)Pr
ogre
ss:
0%
(Acti
vity i
n Pha
se-2
)
100% 75%
50%
25%
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75%
50%
25%
Prog
ress
: 100
%(R
eview
ed in
Pha
se-2
)
100% 75%
50%
25%
Cond
uct h
ydra
ulic a
nd w
ater p
ress
ure
distrib
ution
analy
ses o
f the
pipe
line
netw
orks
A m
ediu
m-te
rmst
rate
gic p
lan o
f FCT
WB
for N
RW re
duct
ion
isde
velo
ped,
util
izing
the
resu
lts o
f Out
put-1
&2
Estab
lish a
Wor
king G
roup
for N
RWre
ducti
on pl
annin
g
Prog
ress
: 100
%(R
eview
ed in
Pha
se-2
)
100% 75%
50%
25%
Revie
w ex
isting
plan
s, im
pleme
ntatio
nstr
uctur
e, on
-the-
job tr
aining
mech
anism
, etc.
relat
ed to
NRW
redu
ction
at F
CTW
B
Deve
lop m
anua
ls for
NRW
redu
ction
for A
rea O
ffice m
anag
ers a
nd fie
ldop
erato
rs (i.e
. tec
hnica
l offic
ers &
read
ers),
incl.
audio
visua
l mate
rials
Prog
ress
: 0%
Behin
d:2.0
month
s
100% 75%
50%
25%
Prep
are a
repo
rt on
pilot
proje
cts,
cove
ring A
ctivit
y 2-1
~2-1
5
Prog
ress
: 0%
Behin
d:2.0
month
s
100% 75%
50%
25%
Meas
ure l
evel
of NR
W of
each
SMA
atthe
end o
f the
resp
ectiv
e ope
ratio
ns
Prog
ress
: 0%
Behin
d:6.5
month
s
100% 75%
50%
25%
Monit
or th
e pro
gress
of th
e NRW
redu
ction
oper
ation
s of e
ach S
MA
Prog
ress
: 45
%Be
hind:
4.5mo
nths
100% 75%
50%
25%
Imple
ment
NRW
redu
ction
oper
ation
sat
each
SMA
Prog
ress
: 45
%Be
hind:
4.5mo
nths
100% 75%
50%
25%
Toachievethem
inthepe
riod,
Review
ofsurvey
metho
dsan
dnu
mbe
rofsam
ple,redu
ction
ofnu
mbe
rofS
MAs.
Annex3-69
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Prog
ress
upd
ated
: 31s
t Aug
ust 2
016
PO
3Pr
ojec
t Mon
itorin
g Sh
eet I
I (Pl
an o
f Ope
ratio
ns)
Orig
inal
Plan
(Wor
k Plan
) and
Rev
ision
of S
ched
ule,
Actu
al W
orks
and
Prog
ress
Revised
Wearehe
re.
Orig
inalTarget.
10Sh
inta S
EGAW
AW
/PW
ater D
istrib
ution
Man
agem
ent 2
Revis
edAc
tual
11Se
igo G
OTO
W/P
Remo
te Mo
niotor
ingRe
vised
Actua
l12
Kenji
YOS
HIDA
(-De
c/201
5), T
akas
hi MO
RI (J
an/20
16-)
W/P
Pro
cure
ment
Mana
geme
nt / C
oord
inator
2Re
vised
Actua
lEq
uipm
ent
1Le
akag
e dete
ction
equip
ment
W/P
*3PM
Asin
Japa
n(JI
CA)
Revis
edAc
tual
2Bu
lk me
ters (
ultra
sonic
flow
meter
)W
/P*W
TPin
Japa
n(JI
CA)
Revis
edIns
tallat
ionAc
tual
Instal
lation
3W
ater m
eter,
flow
meter
and v
alves
W/P
*3PM
Asin
Nige
ria(JI
CA E
xper
t)Re
vised
Actua
l4
Pipe
repa
ir equ
ipmen
tW
/P*3
PMAs
in Ni
geria
(JICA
Exp
ert)
Revis
edAc
tual
5Ve
hicles
(Pick
up tr
uck)
W/P
*Lea
kage
Dete
ction
in Ni
geria
(JICA
)Re
vised
Actua
l6
GIS
softw
are,
office
equip
ment
W/P
*FCT
WB
HQs
in Ni
geria
/Othe
r(JI
CA E
xper
t)Re
vised
Actua
l7
Zona
l mete
rs, pr
essu
re se
nsor
s and
remo
te mo
nitor
ing sy
stem
W/P
*Who
le Sy
stem
in Ja
pan
(JICA
)Re
vised
Actua
lLo
cal C
onsu
ltant
1Mo
difica
tion o
f billi
ng an
d coll
ectio
n sys
temW
/PRe
vised
Spec
ificati
onMo
difica
tion
Actua
lCo
ncep
tSp
ecific
ation
Spec
ificMo
difica
tion
2GI
S an
d data
base
train
ingW
/PRe
vised
Actua
l3
Cons
tructi
on of
cham
bers
for zo
nal m
eter a
nd w
ater
W/P
pres
sure
sens
orRe
vised
Actua
l4
Instal
lation
of st
andb
y pow
er ge
nera
tion a
nd st
orag
e batt
ery
W/P
Revis
edAc
tual
5Co
nstru
ction
of ch
ambe
rs for
bulk
meter
W/P
(inclu
ding c
able
instal
lation
)Re
vised
Actua
lTr
ainin
g in
Japa
nW
/PPl
an: 4
train
ees x
3 tim
es =
12 tr
ainee
sRe
vised
Actua
l: 4 tr
ainee
s x 1
(Man
agem
ent)
+ 8 t
raine
ss x
1 (D&
C Jo
int) =
12 tr
ainAc
tual
2014
2015
2016
2017
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
33Co
unter
meas
ures
Plan
ning
, Mon
itorin
g an
d Co
ordi
natio
n1
W/P
Revis
edAc
tual
2W
/PRe
vised
Actua
l3
W/P
Revis
edAc
tual
4W
/PRe
vised
Actua
l5
W/P
Revis
edAc
tual
6W
/PRe
vised
Actua
l7
W/P
Revis
edAc
tual
8W
/PRe
vised
Actua
l9
W/P
Kick
off
Revis
edAc
tual
10Co
llect
and o
rganiz
e data
for I
ndica
tors o
f PDM
aW
/PRe
vised
Actua
lb
Cond
uct jo
int ca
pacit
y ass
essm
ent o
f the
relev
ant s
taff
W/P
Base
line
Inter
im-1
Revis
edPr
epar
e Cap
acity
Dev
elopm
ent (
CD) P
lanAc
tual
cW
/PRe
vised
Actua
ld
W/P
Revis
edAc
tual
Repo
rts /
Docu
men
ts11
W/P
Revis
edAc
tual
12W
/PRe
vised
Actua
l13
W/P
Revis
edAc
tual
Publ
ic Re
latio
ns14
W/P
Revis
edAc
tual
15W
/PRe
vised
Actua
lM
onito
ring
and
Evalu
atio
n in
the P
ost-P
rojec
t per
iod
16Po
st Mo
nitor
ing by
JICA
(not
desc
ribed
here
)-
--
17Po
st Ev
aluati
on by
JICA
(not
desc
ribed
here
)-
--
News
letter
is su
ppos
ed to
issu
edqu
arter
ly.Ne
wslet
ter w
as is
sued
once
in Ja
nuar
y 201
6 sinc
eNo
vemb
er 20
15 du
e to t
he lim
ited p
rogre
ss of
the P
rojec
t.No
ne
-No
neNo
ne
FCTW
B wi
ll disc
uss P
R thr
ough
webs
ite.
None
None
-W
ork P
lan fo
r add
itiona
l sup
port
from
JICA
for zo
nal
meter
s, wa
ter di
stribu
tion m
anag
emen
t was
prep
ared
inNo
vemb
er 20
15.
None
-Dr
aft P
rojec
t Pro
gress
Rep
ort w
as pr
epar
ed.
Being
finali
zed.s
oon.
-No
ne du
e to d
elay i
n Acti
vity 2
-9.
None
-On
going
for J
oint M
onito
ring i
n Sep
tembe
r 201
6.
Quar
terly
prog
ress
, plan
, issu
es,
solut
ions a
nd et
c are
disc
usse
d.Qu
arter
ly pr
oject
meeti
ngs w
ere h
eld tw
ice si
nce
Nove
mber
2015
, not
quar
terly
due t
o the
limite
d pro
gress
of the
Pro
ject.
None
Monit
oring
shee
t was
subm
ited o
nce s
ince N
ovem
ber
2015
due t
o the
limite
d pro
gress
of th
e Pro
ject.
Joint
mon
itorin
g was
held
once
sinc
e Nov
embe
r 201
5 due
to the
limite
d pro
gress
of th
e Pro
ject.
None
-Co
mplet
edNo
ne
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 2-
9 to 2
-15.
Bas
eline
asse
ssme
nt wa
s don
e in N
ov.-D
ec.
None
.Int
erim
asse
ssme
nt wi
ll be d
one w
hen p
ilot p
rojec
tter
mina
tes.
-Mo
nitor
ing m
ission
from
JICA
atten
ded j
oint r
eview
inNo
vemb
er 20
15.
None
-W
orks
hop/S
emina
r was
held
once
in F
ebru
ary 2
016 s
ince
Nove
mber
2015
.No
ne
Owne
rship
and i
nitiat
ive of
FCT
WB
are k
eys t
o suc
cess
ofthe
Pro
ject.
Monit
oring
meth
od an
d doc
umen
tation
are t
rans
ferre
d to
FCTW
B gra
duall
y.
Achie
veme
nt of
PDM
and p
rogre
ss of
PO ar
e mon
itore
d join
tly.
APO
is pr
epar
ed in
para
rrel w
ithFC
TWB'
s ann
ual re
curre
nt an
dca
pital
plan
APO
was p
repa
red i
n Nov
embe
r 201
5. Th
e Cou
nterp
art
Fund
as ca
pital
cost
was a
ppro
ved i
n 201
5 and
reva
lidate
d in 2
016.
The C
ounte
rpar
t Fun
d has
not y
et be
en re
lease
d. FC
TWB
is lia
ising
clos
ely w
ith F
CTA
for qu
ick re
lease
of th
e Fun
d.
Month
ly pr
ogre
ss, p
lan, is
sues
,so
lution
s and
etc a
re di
scus
sed.
Month
ly tec
hnica
l mee
tings
wer
e held
ever
y mon
ths fr
omNo
vemb
er 20
15 ex
cept
Febr
uary
and M
ay 20
16.
None
-Th
rid JC
C me
eting
was
in N
ovem
ber 2
015.
None
-No
neNo
ne
-No
neNo
ne
1st t
raini
ng w
as co
nduc
ted fo
r 4tra
inees
from
Man
agem
ent
in Au
gust
2015
.
Comp
leted
. 2nd
train
ing w
as co
nduc
ted fo
r 8 tr
ainee
s fro
mjoi
ntly D
istrib
ution
and C
omme
rce in
June
-July
2016
.No
ne
-Co
mplet
ed. 8
mem
bers
partic
ipated
in th
e tra
ining
.No
ne
Being
delay
ed.
Cons
tructi
on of
6 ou
t of 8
cham
bers
were
comp
leted
bythe
loca
l con
tracto
r outs
ource
d by J
ICA
while
the
rema
ining
2 is
ongo
ing.
Cons
isten
t rain
has a
ffecte
d the
proc
ess o
f exc
avati
on of
rock
at th
e cha
mber
site.
Con
struc
tion w
ill co
ntinu
e as
soon
as fa
vora
ble w
eathe
r con
dition
s is a
chiev
able.
To be
valid
ated b
y app
rova
l of
monit
oring
shee
t by J
ICA
Head
quar
ters
-Pr
ocur
emen
t is on
going
.Sm
ooth
custo
ms cl
eara
nce a
nd ta
x exe
mptio
n are
key.
Delay
ed.
Final
spec
ificati
on fo
r billi
ng sy
stem
modif
icatoi
n was
adop
ted.
None
-Ha
nded
over
and c
omple
ted.
Prop
er us
e for
proje
ct ac
tivitie
s sho
uld be
obse
rved d
uring
the P
rojec
t.
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-0.8
3 man
-mon
th-
-2.9
3 man
-mon
th-
-2.5
0 man
-mon
th-
Proje
ct Pr
ogre
ss R
epor
t
Proje
ct Co
mplet
ion R
epor
t
Deve
lop P
rojec
t Web
site
Prep
ratio
n of p
ublic
relat
ions m
ateria
ls
Monit
oring
Miss
ion fr
om JI
CA fo
r Join
t Rev
iew
Orga
nize i
nform
ation
shar
ing se
mina
rs for
FCT
WB/
FCTA
, inclu
ding
Area
Offic
es
Deve
lop cr
iteria
for c
apac
ity as
sess
ment
for ea
ch le
vel o
f the
relev
ant s
taff (
i.e. m
embe
rs of
NRW
Mgm
t and
Acti
on T
eams
)
Set r
educ
tion t
arge
t for
each
PMA
by th
e firs
t qua
rter o
f the
seco
ndye
ar
Colle
ct an
d orga
nize f
or In
dicato
rs for
semi
-ann
ual J
oint M
onito
ring
Wor
k Plan
Deve
lop D
etail P
lan of
Ope
ratio
ns (D
PO) f
or re
view
and a
ppro
val
by JC
C
Dev e
lop A
nnua
l Plan
of O
pera
tions
(APO
) for
revie
w an
d app
rova
lby
JCC
Orga
nize m
onthl
y tec
hnica
l mee
tings
Orga
nize q
uarte
rly pr
oject
meeti
ngs
Cond
uct J
oint M
onito
ring s
emi-a
nnua
lly
Subm
it Mon
itorin
g She
et to
JICA
Nige
ria O
ffice s
emi-a
nnua
lly
Apr
May
Jun
Orga
nize J
oint C
oord
inatio
n Com
mitte
e (JC
C)
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Feb
Mar
Moni
torin
g Pl
anOc
t.No
vDe
cJa
n
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Annex3-70
Annex-1 Updated on 31/08/2016List of Equipment for the Project
No. Equipment Specification Quantity Hand- RemarksJapan Nigeria Plan Actual over
For Activity 1-2
1 Ultrasonic flow meter (stationary, 220m) Ultrasonic pulse transmit time difference method, sensor for 600-1,500mm, 220mcable 2 2 including installation, commissioning and training
2 Ultrasonic flow meter (stationary, 300m) Ultrasonic pulse transmit time difference method, sensor for 600-1,500mm, 300mcable 2 2 including installation, commissioning and training
3 Data logger (stationary) Paperless, 6 points, 1s-1h record cycle, 4-20mA, trend, bar graph and histrical trenddisplays 1 1 for the above No.1&2 ultrasonic flow meters
For Activity 1-6
1 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 10mcable 6 - Not yet including installation, commissioning and training
2 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 20mcable 3 - Not yet including installation, commissioning and training
3 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 30mcable 2 - Not yet including installation, commissioning and training
4 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 40mcable 2 - Not yet including installation, commissioning and training
5 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 25-250mm, 10m cable 1 - Not yet including installation, commissioning and training
6 Data logger (stationary) Paperless, 6pts, 1s-1h record cycle, 4-20mA, trend, bar graph and histrical trenddisplays 13 - Not yet for the above No.1-5 ultrasonic flow meters
7 Data logger (portable) 2ch (flow and pressure), 1s - 24h record cycle, 4-20mA, 5 years battery life 2 - Not yet
8 Remote Monitoring System Telemetry with transmission, modem/router, container, interface, PC, printer, UPS,server, etc 2 - Not yet Pilot system
9 Solar System 80VA, 1.0kW (not yet confirmed) 2 - Not yet for the above ultrasonic flow meter10 Solar System 80VA, 0.3kW (not yet confirmed) 8 - Not yet for the above ultrasonic flow meter11 Solar System 110VA, 0.4kW (not yet confirmed) 1 - Not yet for the above ultrasonic flow meter12 Solar System 110VA, 0.4kW (not yet confirmed) 2 - Not yet for the above ultrasonic flow meter and telemetry system
For Activity 2-4 and 2-81 GIS software Intergraph Geomedia Essential 1 1 Software has been adopted by AGIS. V13.12 GIS software ESRI ArcGIS Basic Version 10.3 1 1 Mainly for data input3 Plotter (A0) A0 1 1
4 GPS terminal High sensitivity, 2,000pts, 200routes, IPX7, built-in camera (5mega-pixel), USB,nickel hydride battery pack 2 2 Garmin
5 Personal computer 500HD, 4 GB Ram, Windows 7or8, Microsoft Office installed, Mouse 2 26 Anti-virus software 2 2 for the above PCs (No.5)7 UPS 1.2kVA 2 2
For Activity 2-51 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 450mm, 20m cable 1 12 Data logger (portable) 2ch (flow and pressure), 1s - 24h record cycle, 4-20mA, 5 years battery life 1 1 for the above No.1 ultrasonic flow meter3 Flow meter Dia. 50mm with fittings - - -4 Flow meter Dia. 80mm with fittings - - -5 Flow meter Dia. 100mm with fittings - - -6 Flow meter Dia. 150mm with fittings 0 17 Flow meter Dia. 200mm with fittings 1 28 Flow meter Dia. 250mm with fittings 0 09 Flow meter Dia. 300mm with fittings 3 3
For Activity 2-71 Sluice valve Dia. 50mm with fittings 2 0 -2 Sluice valve Dia. 80mm with fittings 0 0 -3 Sluice valve Dia. 100mm with fittings 9 14 Sluice valve Dia. 150mm with fittings 12 75 Sluice valve Dia. 200mm with fittings 6 86 Sluice valve Dia. 250mm with fittings 2 07 Sluice valve Dia. 300mm with fittings 10 6
For Activity 2-10
1 Ultrasonic flow meter (portable) Ultrasonic pulse transmit time difference method, sensors (small x3, medium x6,large x3) 6 6
2 Data logger (portable) 2ch (flow and pressure), 1s - 24h record cycle, 4-20mA, 5 years battery life 6 63 Leak noise correlator Main unit, preamplifier and piezoelectric sensor 2 24 Water leak detector Acoustic type, piezoelectric sensor 6 65 Non-metal pipe locator Electromagnetic induction type for plastic pipe (PVC, PE) 3 36 Metal locator Optical and acoustical output signal, 50cm depth 3 37 Time integral water leak detector Automatic leak noise determination method 3 38 Acoustic rod 1.5m length 9 99 Distance meter Max. 10km, 10cm scale 3 3
10 Hammer drill Dia. 38mm, 270rpm, 3,000 stroke/min 3 311 Boring bar Dia. 16mm, 1.0m length 3 312 Drill bit Dia.19×800mm 9 913 Portable residual chlorine analyzer DPD, absorptiometry, 0.02-2.00mg/L 3 314 Metal pipe and cable locator 5m depth 3 315 Reference meter Portable built-in case type, 13-25mm 3 316 Leakage quantity measurement device 13-25mm 3 317 Personal computer 500HD, 2GB Ram, Windows 7or8, Microsoft Office installed, Mouse 3 318 Anti-virus software 3 3 for the above PCs (No.17)19 UPS 1.2kVA 3 320 Inkjet printer A4, Color, All-in-one 3 321 Digital camera Compact type, Optical zoom, 10 mega-pixel (min), LCD 3 3
For Activity 2-131 Generator 200V, 6.5kVA 3 32 Asphalt cutter 3600RPM, 13kW 3 33 Concrete breaker 3 34 Small-sized dewatering pump 2" 3 35 Small-sized tamper 3 36 Electric drum 50m 3 37 Customer meter Dia. 2/3" with fittings, conventional type (388) - Not yet To be determined through baseline survey.8 Customer meter Dia. 1" with fittings, conventional type (259) - Not yet To be determined through baseline survey.9 Customer meter Dia. 50mm with fittings, conventional type (89) - Not yet To be determined through baseline survey.
10 Customer meter Dia. 80mm with fittings, conventional type (23) - Not yet To be determined through baseline survey.11 Customer meter Dia. 100mm with fittings, conventional type (7) - Not yet To be determined through baseline survey.12 Compact Reciprocating Saw Pipe cutting 3 3
For Output 21 Pickup truck for pilot sites 2 2
For Operation of the Project1 Laser printer A4, B/W 1 12 Inkjet printer A3, Color 1 13 Multifunction copier A3, B/W 1 14 Graphic/movie editing software Windows Movie Maker, Microsoft Powerpoint 1 1 Free or preinstalled softwares to be utilized.5 Projector 3,000 Lummen, HDMI, VGA, USB port 1 1
Procurement in
Annex3-71
Annex 2: The Second Training in Japan
The Second Training in Japan
Course Name: The Federal Capital Territory Reduction of Non-Revenue Water Project (Distribution and Commerce)
Purpose:
1. All trainees belonging to both Distribution and Commerce understand system/outline of water supply services in
Japan and Yokohama City, and then can compare them with those in Nigeria and FCTWB.
2. Through participation in common lectures, visiting and discussions, all trainees belonging to both Distribution
and Commerce understand systems and efforts for operation and maintenance and NRW reduction.
3. Through participation in lectures and visiting related to each area, Distribution or Commerce separately, trainees
belonging to each area understand systems, technologies, methodologies and efforts for operation and
maintenance and NRW reduction.
4. In consideration of consistency to the action plan proposed by trainees participated in the 1st Training in August
2015, more practical and pragmatic action plan for realization is prepared by trainees belonging to both
Distribution and Commerce jointly.
5. Eventually, the action plan and their knowledge are fully utilized for implementation of appropriate operation
and maintenance and cross-organizational NRW reduction by FCTWB.
Programme:
1. Common Subject: Water Supply in Japan, Non-Revenue Water, Self-support Accounting System, Distribution
Management, Mapping System (GIS), Yokohama Water Supply Museum, Water Meter, Service Connection &
Inspection, Water Supply Facility Development Planning, Medium-Term Management and Financial Planning,
Schoolchild Education Activity in Water Treatment Plant
2. Distribution: Facility O&M, Leakage Prevention, Leakage Detection Demonstration, Supervision & Inspection,
Water Supply Operation & Management
3. Commerce: Water Tariff, Public Relations, Customer Services, Meter Reading, Human Resources Development
Period: 19th June to 2nd July 2016
Receiving Water Utility: Yokohama City Waterworks Bureau
Participants: 8 project members (Distribution: 4, Commerce: 4) Name Position in the Project Position in FCTWB
Engr. Abolade Rasaki Lawal Coordinator, NRW Management Team Head of Special Projects Unit, Distribution
Mr. Habib Ahmed Kiru NRW Action Team Leader Area Manager, Gudu Area Office
Mr. Mohammed Dauda Debo NRW Management Team member Technical Officer, Pipeline Unit, Distribution
Mr. Abdulrahman Shehu Sani Ditto Senior Technical Officer / Head of Prepaid Meter Unit, Distribution
Mr. Danjumma Isah Ditto Chief Commercial Officer, Head of Monitoring and Detection Unit, Commerce
Mr. Shehu Sulaiman Ditto Head of GIS, Head of AMR Operations, Distribution / Commerce
Mr. Aliyu Muhammad Maradun Ditto Chief Commercial Officer, Head of Major Consumers Unit, Commerce
Mrs. Rose Aniekan Akpan Ditto Head of Billing Unit, Commerce
Annex3-72
Annex 3 Location of t
Figure:
SMA to be r
the SMAs to
Location of
removed
be removed f
f the SMA to
from PMA M
o be remove
Monitoring
ed from PMAA Monitorinng (Jabi)
Annex3-73
Annex 3
SM
Location of t
Figure: L
MA to be rem
the SMAs to
Location of t
moved
be removed f
the SMA to b
from PMA M
be removed
Monitoring
from PMA Monitoringg (Garki I)
Annex3-74
Annex 4: Participants in Preparation of Monitoring Sheet and Photos
Participants in Preparation of Monitoring Sheet
Day 1: 6th September 2016 for Project Monitoring Sheet II S/N NAME POSITION
1 Nahuche A.A HOD Distribution (Technical Manager) 2 Adis Muhammed S. HOD Commerce (Technical Manager) 3 Lawal Abolade R. Head [Special Projects] (Coordinator) 4 Aminu Umar B. Head[Ops&Wm] 5 Abdul Yusuf Sup [P&P] 6 Masaud Abdullahi Head[metering] 7 Ozumi Abdul AAM[Dist] Gudu 8 Muhammed A. Ops&Wm 9 Suleiman Shehu Head [GIS]
10 Rabiu M.Kabir Head [Logistics] 11 Dikko Musa Head[PL/WC] 12 Maradun Aliyu Head [M.C.O] 13 Adenuga A.O AM Garki 14 Owolabi I.O Head Customer Care 15 Sulaiman A. Mulid AAM[Comm] Jabi 16 Salihu O. Sadiq AAM[Dist] Jabi 17 Isah Danjuma Head[Moni/Plaza]18 Akinori Miyoshi CA, JICA Expert Team
Day 2: 7th September 2016 for Project Monitoring Sheet II S/N NAME POSITION
1 Nahuche A.A HOD Distribution (Technical Manager) 2 Muhammed Adis HOD Commerce (Technical Manager) 3 Lawal Abolade R. Head [Special Projects] (Coordinator) 4 Dikko Musa Head[PL&Wc] 5 Aliyu Maradun Head [MCO] 6 Adeyemi Taiwo Head [Emb& Corp] 7 Abdul Yusuf Sup[P&P] 8 Abdul Ozumi AAM [Dist] Gudu 9 Shehu Sulaiman Head GIS
10 Rabiu M.Kabir Head Logistics 11 Mohammed A Ops&Wm 12 Moh’d Ramat AM Jabi 13 Aminu Umar B. Head[Ops&Wm] 14 Owolabi Isaac Head[Customer Care] 15 Adenuga A.o AM Garki 16 Isah Danjuma Head[Moni/Plaza]17 Masaud Abdullahi Head[Metering] 18 Akinori Miyoshi CA, JICA Expert Team
Day 3: 8th September 2016 for Project Monitoring Sheet I S/N NAME POSITION
1 S.T. Bello HOD Admin&Supply (Deputy Project Manager) 2 Nahuche A.A HOD Distribution (Technical Manager) 3 Adis Muhammed S. HOD Commerce (Technical Manager) 4 Lawal Abolade R. Head [Special Projects] (Coordinator) 5 Muhammed A. Ops&Wm 6 Akinori Miyoshi CA, JICA Expert Team
Annex3-75
Annex 4: Participants in Preparation of Monitoring Sheet and Photos
Day 4: 19th September 2016 for Project Monitoring Sheet Summary S/N NAME POSITION
1 Hudu Bello Director (Project Manager) 2 S.T. Bello HOD Admin&Supply (Deputy Project Manager) 3 Nahuche A.A HOD Distribution (Technical Manager) 4 Adis Muhammed S. HOD Commerce (Technical Manager) 5 Lawal Abolade R. Head [Special Projects] (Coordinator) 6 Rabiu M.Kabir Head [Logistics] 7 Akinori Miyoshi CA, JICA Expert Team
Day 5: 21st September 2016 for Project Monitoring Sheet Summary S/N NAME POSITION
1 S.T. Bello HOD Admin&Supply (Deputy Project Manager) 2 Nahuche A.A HOD Distribution (Technical Manager) 3 Adis Muhammed S. HOD Commerce (Technical Manager) 4 Lawal Abolade R. Head [Special Projects] (Coordinator) 5 Rabiu M.Kabir Head [Logistics] 6 Muhammed A. Ops&Wm 7 Akinori Miyoshi CA, JICA Expert Team
Monitoring Mission Members from JICA Headquarters (13th to 22nd September 2016) S/N NAME POSITION
1 Yoshiki Omura Senior Advisor in Urban Water Supply 2 Keisuke Yamagami Project Officer, Water Resources Group, Global
Environment Department
Annex3-76
Annex 4: Participants in Preparation of Monitoring Sheet and Photos
Photos of Preparation of Monitoring Sheet
Day 1: 6th September 2016
Preparation of Project Monitoring Sheet II (Attendance: NRW Management Team members and Action Team Leaders)
Day 2: 7th September 2016
Preparation of Project Monitoring Sheet II (Attendance: NRW Management Team members and Action Team Leaders)
Day 3: 8th September 2016
Preparation of Project Monitoring Sheet I (Attendance: Deputy Project Manager, Technical Managers and Coordinator)
Day 4: 19th September 2016
Preparation of Project Monitoring Sheet Summary (Attendance: Project Manager, Deputy Project Manager, Technical Managers and Coordinator)
Annex3-77
PM Form 3-1 Monitoring Sheet Summary
2
the Annex-1: List of Equipment for the Project. Procurement of equipment for water distribution management such as zonal meters, data loggers, telemetric monitoring system, etc. has been in process in Japan. Facilities Modification of existing billing system including training to relevant staff in FCTWB was completed. Chamber construction for both bulk and zonal flow meters including cable installation was completed by the Nigerian contractor.
1-2 Progress of Activities
[Activities for Output-1: Level of NRW of both the service area of FCWTB and water distribution areas monitored regularly.]
No Activity Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016)1-1 Install bulk meters to water
treatment plants 1 and 2 Progress: 75%, Behind: 7.5 months Delayed and suspended. Local contractors outsourced by FCTWB have constructed chambers for bulk meters. Construction of three chambers was completed while the fourth one is 50% completed. However, cable installation, ladder and fencing are pending. The construction has been suspended due to non-payment. This is due to non-release of the Counterpart Fund.
Completed. However, data acquisition seems to be not always available, which may be due to not water-filled flow inside pipelines.
1-2 Measure monthly water production of water treatment plants 1, 2, 3, and 4
Progress: 0%, Behind: 7.0 months Delayed as a result of delay in Activity 1-1. After Activity 1-1, the Project needs at least 6 months for monitoring this Activity.
Progress: 0%, Behind: 9.5 months Ready to measure monthly water production but the Project needs at least 6 months for monitoring this Activity.
1-3 Tally the above water production data monthly
Progress: 0%, Behind: 7.0 months Delayed as a result of delay in Activity 1-1 and 1-2. After Activity 1-1 and 1-2, the Project needs at least 6 months for monitoring this Activity.
Progress: 0%, Behind: 9.5 months Ready to measure monthly water production but the Project needs at least 6 months for monitoring this Activity.
1-4 Calculate the monthly water consumption based on the billing data
Progress: 40%, Behind: 7.5 months Delayed. FCTWB has collected information of returned bills and has deactivated them. The returned bills cause inaccuracy of calculating NRW ratio.The final specification for billing system modification was adopted. After modification, the Project needs at least 6 months for monitoring this Activity.
Completed (billing system modification only). Ready to calculate monthly water consumption, but the Project needs at least 6 months for monitoring this Activity.
1-5 Calculate monthly NRW ratio Progress: 0%, Behind: 7.5 months Progress: 0%, Behind: 4.5 months
Annex3-80
PM Form 3-1 Monitoring Sheet Summary
3
No Activity Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016)of the service area of FCTWB using the data obtained from Activity 1-3 and 1-4
Delayed as a result of delay in Activity 1-3 and 1-4. The Project needs at least 6 months for monitoring this Activity after obtaining the data from Activity 1-3 and 1-4.
Ready to calculate monthly NRW ratio, but the Project needs at least 6 months for monitoring this Activity.
1-6 Install zonal meters, water pressure sensor and pilot remote monitoring (telemetry) system
Progress: 65%, Behind: 1.5 months Being delayed. Planning/designing of zonal meters, BoQ and specifications were completed. Construction of 6 out of 8 chambers was completed by the local contractor outsourced by JICA while the remaining 2 is ongoing. Consistent rain has affected the process of excavation of rock at the chamber site. Construction will continue as soon as favorable weather condition is achievable.
Progress :90%, Behind: 4.5 months Delayed. Construction of chambers for zonal meters was completed Zonal meters, water pressure sensor and pilot remote monitoring (telemetry) system have been procured in Japan.
1-7 Measure and collect data for water distribution management such as water flow of zonal meters and water pressure
Progress: 0%, Behind: 0.0 months The Activity will be implemented after the completion of Activity 1-6.
Progress: 0%, Behind: 4.5 months Delayed as a result of delay in Activity 1-6. The Activity will be implemented after the completion of Activity 1-6.
[Activities for Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Activity Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016)2-1 Review existing NRW
reduction operations at each pilot Area Office
Completed. Completed.
2-2 Conduct capacity assessment of organization and the relevant staff
Progress: 50%, Behind: 7.0 months Delayed as a result of delay in Activity 2-9 to 2-15. Interim assessment will be done when pilot project terminates.
Completed.
2-3 Identify and select a Pilot Metering Area (PMA) for each Pilot Area Office based on the selection criteria of PMA
Completed. Completed.
2-4 Prepare/update distribution network drawings for each PMA
Completed. AGIS security has still hindered data import/export and analysis.
Completed. AGIS security has still hindered data import/export and analysis in spite of FCTA PS’s instruction.
2-5 Install water flow meters to each PMA and measure in/outflows monthly
Progress: 90%, Behind: 9.0 months Delayed as a result of electrical works for the ultrasonic flow meter to be installed in Garki I.
Completed, but partially and provisionally. Check/repair a PMA meter in Jabi and complete fully electricity
Annex3-81
PM Form 3-1 Monitoring Sheet Summary
4
No Activity Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016)All mechanical flow meters were procured and installed except the ultrasonic flow meter in Garki I. (Discussion with AEDC is ongoing.) FCTWB will complete electricity connection for the ultrasonic flow meter in Garki I.
connection for the ultrasonic flow meter in Garki I
2-6 Zone each PMA into Sub Metering Areas (SMA)
Completed. Completed.
2-7 Isolate a SMA by installing valves
Completed. Completed.
2-8 Update the distribution network drawings for each SMA
Progress: 80%, Behind: 2.0 months Delayed. All existing pipelines, valves and hydrants were captured. Locations of leakage and illegal connections will be captured. AGIS security has still hindered data import/export and analysis.
Completed.
2-9 Measure an initial level of NRW of each SMA
Progress: 75%, Behind: 5.5 months Delayed as a result of different meter types, non-accessibility to meter and complexity in commercial aspects such as customer categories, water tariffs, units and Area Offices for reading, billing systems and automated estimate billing. 24 hrs flow measurement, MNF survey, Step test, Meter error test and Meter reading were completed. 24hrs customer consumption survey, Unbilled authorized customer listing and consumption survey are ongoing.
Completed.
2-10 Detect target NRW components (i.e. invisible leakage, customer meter malfunction, and illegal connection) of each SMA
Progress: 75%, Behind: 5.5 months Delayed as a result of different meter types, non-accessibility to meter and complexity in commercial aspects such as customer categories, water tariffs, units and Area Offices for reading, billing systems and automated estimate billing. Leakage detection acoustic survey and Illegal connection survey were completed.
Provisionally completed. Re-detection may be done if necessary.
2-11 Develop a NRW reduction operation plan of each SMA, including reduction target for review by Head of
Progress: 30%, Behind: 4.5 months Delayed and the Activity has been done provisionally. The plan is under preparation.
Provisionally completed. Revision may be done if necessary.
Annex3-82
PM Form 3-1 Monitoring Sheet Summary
5
No Activity Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016)Distribution Department
2-12 Review and approve NRW reduction operation plan of each SMA
Progress: 30%, Behind: 4.5 months Delayed and the Activity has been done provisionally. The plan is under preparation.
Provisionally completed. Revision may be done if necessary.
2-13 Implement NRW reduction operations at each SMA
Progress: 45%, Behind: 4.5 months Delayed and the Activity has been done provisionally. Repair of leakages completed in three PMAs. Meter replacement and installation is ongoing in Gudu.
Provisionally completed. Further operations may be done if necessary.
2-14 Monitor the progress of the NRW reduction operations of each SMA
Progress: 45%, Behind: 4.5 months Delayed and the Activity has been done provisionally. Repair of leakages completed in three PMAs. Meter replacement and installation is ongoing in Gudu.
Provisionally completed. Further monitoring may be done if necessary.
2-15 Measure level of NRW of each SMA at the end of the respective operations
Progress: 0%, Behind: 6.5 months Delayed and the activity follows Activity 2-14.
Provisionally completed. Detailed check and revision may be done if necessary.
2-16 Prepare a report on pilot projects, covering Activity 2-1~2-15
Progress: 0%, Behind: 2.0 months Delayed and the activity follows Activity 2-15.
Provisionally completed. Detailed check may be done if necessary.
2-17 Develop manuals for NRW reduction for Area Office managers and field operators (i.e. technical officers & meter readers), incl. audio visual materials
Progress: 0%, Behind: 2.0 months Delayed and the activity follows the above Activities.
Provisionally completed. Revision may be done if necessary.
Annex3-83
PM Form 3-1 Monitoring Sheet Summary
6
[Activities for Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Activity Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016)3-1 Establish a Working Group
for NRW reduction planning Completed, but will be reviewed in Phase-2.
Completed, but will be reviewed in Phase-2.
3-2 Review existing plans, implementation structure, on-the-job training mechanism, etc. related to NRW reduction at FCTWB
Completed, but will be reviewed in Phase-2.
Completed, but will be reviewed in Phase-2.
3-3 Conduct hydraulic and water pressure distribution analyses of the pipeline networks
To be implemented in Phase-2. AGIS security may hinder data import/export and analysis.
To be implemented in Phase-2. AGIS security has still hindered data import/export and analysis in spite of FCTA PS’s instruction.
3-4 Develop outlines of the medium-term strategic plan and its annual NRW reduction plan (approval by the Director)
To be implemented in Phase-2. To be implemented in Phase-2.
3-5 Develop the first medium-term strategic plan (2018-2022) for approval by FCTA
To be implemented in Phase-2. To be implemented in Phase-2.
3-6 Develop an annual NRW reduction plan based on the strategic plan as an integral part of an annual recurrent and capital plan of FCTWB for approval by FCTA
To be implemented in Phase-2. To be implemented in Phase-2.
3-7 Develop a planning manual for NRW reduction
To be implemented in Phase-2. To be implemented in Phase-2.
3-8 Review existing plans, activities and implementing structure, etc. related to water distribution management
Progress: 70%, Behind: 7.0 months Delayed as a result of delay in information submission from Area Offices. 6 out of 13 Area Offices submitted the required information. There was difficulty in implementation due to dearth of as-built drawings which will have provided sufficient information on pipeline and appurtenances.
Progress: 75%, Behind: 11.0 monthsDelayed as a result of delay in information submission from Area Offices. 8 out of 13 Area Offices submitted the required information. There was difficulty in implementation due to dearth of as-built drawings which will have provided sufficient information on pipeline and appurtenances.
3-9 Establish framework of water distribution management
Progress: 25%, Behind: 0.5 months Being delayed. Water Distribution Management Committee was established and concept was endorsed. There was difficulty in implementation due to dearth of as-built drawings which will have provided sufficient information on pipeline and appurtenances.
Progress: 25%, Behind: 4.5 months Delayed as a result of delay in Activity 1-6 and 1-7.
Annex3-84
PM Form 3-1 Monitoring Sheet Summary
7
1-3 Achievement of Output
[Output-1: Level of NRW of the service area of FCTWB is monitored regularly.]
No Indicator Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016)1a Record of monthly NRW ratio
is kept by Distribution Department from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed). Monthly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-1 to 1-4. In the current schedule, it is expected that monthly NRW ratio will be obtained from Dec. 2016, the first quarter of the third year.
No achievement (delayed). Monthly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-2 to 1-4. In the current schedule, it is expected that monthly NRW ratio will be obtained from the second quarter of the third year.
1b Monthly NRW ratio of the service area of FCTWB is reported to its monthly Joint Management Meeting from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed). Same as the above in Indicator 1a.
No achievement (delayed). Same as the above in Indicator 1a.
1c Quarterly NRW ratio of the service area of FCTWB is reported to the Board of Directors (*replace by “Management” in PDM2) of FCTWB from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed). Quarterly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-1 to 1-4. In the current schedule, it is expected that quarterly NRW ratio will be obtained from Mar. 2017, the second quarter of the third year.
No achievement (delayed). Quarterly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-2 to 1-4. In the current schedule, it is expected that quarterly NRW ratio will be obtained from Mar. 2017, the second quarter of the third year.
1d Periodic records of data on water distribution management such as water flow of zonal meters and water pressure are kept by Distribution Department from the first quarter of the third year of the Project.
No achievement (as planned). No achievement (as planned).
Verification of Achievement and Implementing Process Although a critical problem particularly delay in chamber construction for bulk flowmeters under Activity 1-1 was solved by taking-over by the Japanese side and also modification of billing system was completed, monthly NRW ratio has not been ready. So, the Project has not achieved Indicator 1a, 1b and 1c, and need monitoring period for six months. There are no problems in the implementing process since the previous project monitoring.
Annex3-85
PM Form 3-1 Monitoring Sheet Summary
8
[Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Indicator Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016) 2a Decrease rate of NRW ratio
for each Sub Metering Area of a PMA reaches at least 80% of its target at the end of the respective NRW reduction operations.
No achievement (delayed). Although time frame is not specified, this indicator has not been obtained, this mean delayed. In the current schedule, it is expected that this indicator will be obtained from Oct. 2016, the first quarter of the third year.
Most of results did not reach the target level. Provisional NRW Ratio (%)
Before After ChangeGudu SMA-1 52.0 62.9 +10.9 SMA-2 53.9 49.0 -4.9 Jabi SMA-2 47.6 48.0 +0.4 SMA-3 86.4 67.2 -19.2 Garki I SMA-1 86.6 82.9 -3.7 SMA-2 79.0 85.0 +6.0 SMA-3 68.8 41.8 -27.0
Detailed re-check of results and follow up activities to achieve the target level are immediately necessary by utilizing lessons and learnt.
2b Technical manuals for Area Office managers and field operators (i.e. technical officers and meter readers), including audio visual materials, are approved by Head of Department (HoD) for Distribution and HoD for Commerce by the first quarter of the third year of the Project.
No achievement (as planned). Technical manuals were prepared and provisionally approved. Revision may be necessary.
Verification of Achievement and Implementing Process In spite of existence of different meter types, non-accessibility to meter and complexity in commercial aspects such as customer categories, water tariffs, Units and Area Offices for reading, billing systems and automated estimate billing, the Project completed all activities for Output-2. However, some activities need to be followed up in Phase-2 of the Project because some decrease rate of NRW ratio did not reach to criteria of Indicator 2a. There are no problems in the implementing process since the previous project monitoring.
Annex3-86
PM Form 3-1 Monitoring Sheet Summary
9
[Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Indicator Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016) 3a By October 2017, draft
medium-term strategic plan for NRW reduction (2018-2022) is submitted by FCTWB to FCTA for review and approval.
No achievement (as planned). No achievement (as planned).
3b By October 2017, an annual NRW reduction plan (2018) is incorporated in FCWTB’s annual recurrent and capital plan (2018) for submission to FCTA for review and approval.
No achievement (as planned). No achievement (as planned).
3c A planning manual for NRW reduction is approved by the Director of FCTWB by the end of the Project.
No achievement (as planned). No achievement (as planned).
3d By November 2016, framework of water distribution management is established.
No achievement (as planned). No achievement (delayed). Framework has not been ready due to delay in Activity 1-6 and 1-7.
Verification of Achievement and Implementing Process Indicator 3a, 3b and 3c and related activities for Output-3 are subject to Phase 2 of the Project, which is scheduled to be implemented from January 2017. Activities related to Indicator 3d are in progress with participation of all Area Offices; however, it has taken time to collect information.
1-4 Achievement of the Project Purpose
[Project Purpose: Capacity of FCTWB for NRW reduction is strengthened.]
No Indicator Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016) a The medium-term strategic
plan for NRW reduction (2018-2022) is approved by FCTA by the end of the Project.
No achievement (as planned). No achievement (as planned).
b NRW reduction operations of the first quarter of 2018 specified in the annual plan of the above plan are carried out according to the plan by FCTWB.
No achievement (as planned). No achievement (as planned).
c Relevant staff of FCTWB (i.e. members of NRW Management Team and Pilot NRW Action Teams) become equipped with
Ongoing. Skills and knowledge necessary for NRW reduction, such as minimum night flow survey, step test, leakage detection, meter error test for water
Ongoing. Results of interim capacity assessment in Nov.-Dec. 2016 show that capacity developed has not reached to the criteria. Follow-up
Annex3-87
PM Form 3-1 Monitoring Sheet Summary
10
No Indicator Previous Monitoring (as at Aug.2016) Current Monitoring (as at Dec.2016) skills and knowledge necessary for NRW reduction according to the criteria set by the Project for each level.
balance analysis has been developed through lectures, OJT and the second training in Japan in Jun.-Jul. 2016.
capacity development is necessary in Phase-2 of the Project.
d NRW ratio of each PMA in the last quarter of the Project reaches its respective target (**). Note(**):Target for each PMA is expected to be determined by the end of the first quarter of the second year.
No achievement (as planned). No achievement (as planned).
Verification of Achievement and Implementing Process Budget constraint of the Nigerian side is a possible obstructive factor against achievement of project purpose, particularly Indicator b. Achievement in Indicator c resulted from the activities for Output-2. The Project has developed capacity but achievement is limited because the various conditions revealed and lack of counterpart fund have hindered smooth implementation expected by the Project, then the activities lacked continuity. FCTWB is willing to expand NRW reduction into the whole service area, and the necessity of cross-departmental function for NRW reduction such as task force is being recognized gradually.
1-5 Changes of Risks and Actions for Mitigation
Due to collapse in oil prices and shrinking revenue, recent budget constraint of the Nigerian side including non-release of the Counterpart Fund has corresponded to an important assumption “A. Natural disaster / political instability / economic crisis that affect the Project activities do not occur.” However, as an action discussed in the previous project monitoring, taking over chamber construction and procurement of small materials for Pilot activities by Japanese side, which response to request from the Nigerian side, has mitigated this risk.
1-6 Progress of Actions undertaken by JICA
The JICA Expert Team completed chamber construction and procured small materials for Pilot activities.
1-7 Progress of Actions undertaken by Nigerian side
FCTWB cooperated with the JICA Expert Team for smooth taking over and implementation of chamber construction. As of 15th December 2016, the Counterpart Fund was released eventually, but it was too late to make up for delay of the Project.
1-8 Other remarkable/considerable issues related/affect to the project (such as other JICA's projects, activities of counterparts, other donors, private sectors, NGOs etc.)
Annex3-88
PM Form 3-1 Monitoring Sheet Summary
11
(1) Legal Instrument (Enabling Law) establishing FCTWB
Legal instrument (enabling law) establishing FCTWB as an autonomous body has not yet been approved by the current National Assembly. To carry it forward, FCTWB suggested conducting joint (FCTWB-JICA) feasibility study to bring out benefits of an autonomous FCTWB as part of the Project.
(2) Grant Aid Project by Japan
Under the further agreement between two Governments, “The Project for Introduction of Clean Energy by Solar Electricity Generation System” for Lower Usuma Water Treatment Plants has been expanded/extended with construction of additional facilities. This contributes further to stable water supply to customers of FCTWB.
(3) Situation of Actions raised in previous Monitoring in September 2016
(3)-1: Action for “Assignment of Counterparts” Considering sustainability of implementing NRW reduction based on a NRW reduction strategic plan to be prepared through Output 3 activities, it may be necessary for the Nigerian side to enhance project management skill for working level staff such as Head of Unit for example. Such project management skill should be enhanced through the Project activities. In addition, the existing operational structure should be reviewed. Situation: There is no change, but the Project will discuss in the beginning of Phase-2 of the Project.
(3)-2: Action for “Involvement of Relevant Organizations” FCTA has been involved well in the Project as the chair of Joint Coordination Committee (JCC) and also has assisted and advised the Project in dealing with issues including the Counterpart Fund and AGIS security. Situation: FCTWB has tried to involve AGIS for removal/relaxation of GIS security since FCTA's Permanent Secretary instructed to solve issues. Although AGIS agreed to relax the security, but there is no concrete action by AGIS, accordingly no improvement in GIS of FCTWB.
(4) Situation of Actions for Other Issues related to Project Implementation Process and from the Technical Aspect in previous Monitoring in September 2016
(4)-1: Action for “Communication between Distribution Department and Commerce Department” The JICA Expert Team reported that Distribution Department and Commerce Department have to implement the cross-cutting activities for NRW reduction. Both Departments understand the importance of collaboration and active communication; however they need
Annex3-89
PM Form 3-1 Monitoring Sheet Summary
12
to collaborate more to the success of the Project. Also, active participation of Commerce Staff (FCTWB Headquarters) particularly in the field activities is a key to success of the Project and improvement in water supply services. Situation: FCTWB and the JICA Expert Team have discussed cross-cutting organizational structure among Distribution Department, Commerce Department and Area Offices for effective planning and implementation of NRW reduction from Phase-2 of the Project. This will be concluded in the beginning of Phase-2 based on lessons and learnt obtained from Phase-1.
(4)-2: Action for “Necessity for Strengthening Partnership between FCDA and FCTWB” It is necessary for FCTWB to obtain the updated as-built drawings and information correctly and timely for proper operation, maintenance and implementing NRW reduction activities efficiently. However, FCWB has not been able to obtain the updated as-built drawings and information in respect of its operation and maintenance activities from FCDA that is in charge of provision of infrastructure. This is as a result of lack of feedback system between the two sister agencies. So, FCTWB is encouraged to always share its operation and maintenance experiences with FCDA while FCDA is equally advised to carry along FCTWB in its water project implementation. Situation: The Project has communicated officially/bilaterally with FCDA for setting up further relationship and information sharing. The Project will carry on communication in Phase-2.
(4)-3: Action for “Lack of the Quality Management” Quality of information and performance as well as quality of constructed facilities is not properly managed by FCTWB. It is very important to pay attention to quality management in order to enhance the Project outcome with adequate performance, avoid further delay of the Project and keep sustainability through proper operation and maintenance. Situation: There is no remarkable improvement since the previous joint monitoring, but the Project will keep focusing on this issue for improvement in Phase-2.
(4)-4: Action for “Prepaid Meter” Unless systematic cares are taken by FCTWB, use of prepaid meters is critical in terms of NRW reduction and the financial aspect of FCTWB. Situation: The Project assembled information on different types of existing meters including prepaid meters from relevant Units and Area Offices and discussed them among project members, and will keep discussing further based on the results of Activities for Output-2.
2 Delay of Work Schedule and/or Problems (if any)
Annex3-90
PM Form 3-1 Monitoring Sheet Summary
13
2-1 Detail
(1) Delay of the Project (Output-1)
Same as a result of the previous project monitoring, the Project has still delayed for six (6) months from the original plan of operation as of the end of Phase-1 of the Project, and also Project needs a certain time frame to monitor the monthly water production, consumption and NRW ratio. Without the monitoring of them, the Project cannot make a realistic NRW reduction strategic plan through the activities of Output 3, so that it is indispensable for securing the Project’s outcome. Available monitoring period of Activities 1-2 to 1-5 is insufficient, so the Project needs at least six months for monitoring the Activities 1-2 to 1-5.
(2) Data Acquisition by Bulk Flowmeters (Output-1)
Through commissioning of ultrasonic flow meters as bulk flowmeters, the Project found out that data acquisition seems to be not always available, which may be due to not water-filled flow inside pipelines and should be solved as soon as possible.
(3) Less-than-successful Results of the Project (Output-2)
A series of activities and operations for NRW reduction in PMAs/SMAs were completed, however should be followed up and monitored because decrease in NRW ratio in some SMAs resulted in less-than-successful.
Table Decrease in NRW Ratio (Provisional) Before (%) After (%) Decrease Points in NRW Ratio
Gudu
SMA-1 52.0 62.9 +10.9
SMA-2 53.9 49.0 -4.9
Jabi
SMA-2 47.6 48.0 +0.4
SMA-3 86.4 67.2 -19.2
Garki I
SMA-1 86.6 82.9 -3.7
SMA-2 79.0 85.0 +6.0
SMA-3 68.8 41.8 -27.0
2-2 Cause
(1) Delay of the Project (Output-1)
Annex3-91
PM Form 3-1 Monitoring Sheet Summary
14
The chamber construction for bulk flowmeters and procurement of necessary materials for pilot activities, which had delayed and suspended due to non-release of the Counterpart Fund in 2015&2016, were sorted out by JICA’s intervention, particularly taking over chamber construction based on request from the Nigerian side. However, Activities 1-2 to 1-5 are still behind the schedule.
(2) Data Acquisition by Bulk Flow Meter (Output-1)
Possible causes are: interference by water flow from new water treatment plant (No.3&4) to water flow from old plant (No.1&2), not-well-planned operation with securing water level in clear water tanks and so on.
(3) Less-than-successful Results of the Project (Output-2)
Detailed re-check is necessary, but there are possible reasons of unsuccessful/unexpected results of decrease NRW ratio:
Frequent change of conditions which are supposed to be not changed, during activities between baseline measurement and ex-post measurement such as: Late-identified additional or missing customers and major consumers, Late-identified existence or non-existence of pipeline and extension, malfunctioning valves, Late-identified difference between PMA/SMA design based on as-built drawings (if any) or information from staff and actual situation
Difficulty in obtaining a certain number for effective data for water balance analysis, particularly water consumption by water meter reading, which may cause unreliability of analysis.
Measurement of water flow and water meter reading for a short interval of time such as daily or weekly are sensitive to irregular situation and errors, and it affects directly calculation of NRW ratio.
Reoccurrence of NRW (leakage, illegal connection) in the long period among baseline measurement, NRW reduction operations and ex-post measurement.
2-3 Action to be taken
(1) Delay of the Project (Output-1)
In the previous project monitoring, the Nigerian side requested to the Japanese side to extend the project period in order to secure the necessary time frame to monitor the monthly water production, consumption and NRW ratio. JICA headquarters approved the previous monitoring sheets and considered completion of chamber construction for bulk flowmeters which was taken over by Japanese side, so the Project period will be extended for six months
Annex3-92
PM Form 3-1 Monitoring Sheet Summary
15
for monitoring the Activities 1-2 to 1-5.
(2) Data Acquisition by Bulk Flowmeters (Output-1)
The Project needs immediately to monitor water flow, investigate causes and find possible solutions through discussion among relevant Departments and Units.
(3) Less-than-successful Results of the Project (Output-2)
The Project needs immediately detailed re-check of results/data, continuous and further activities to reduce NRW to a certain degree as follow-up activities in Phase-2 of the Project by utilizing lessons and learnt in Phase-1.
However, on the condition that FCTWB improves fundamentals of water supply services such as as-built drawings and complexity in commercial aspects including various customer categories, water tariffs, Units and Area Offices for reading, NRW reduction can be an effective solution for water supply services of FCTWB.
2-4 Roles of Responsible Persons/Organization
[Nigerian Side]
(1) Delay of the Project (Output-1)
After the discussion on the draft amendment of R/D, the Nigerian side signs the amendment.
(2) Data Acquisition by Bulk Flowmeters (Output-1)
FCTWB needs immediately to monitor water flow, investigate causes and find possible solutions through discussion among relevant Departments and Units.
(3) Less-than-successful Results of the Project (Output-2)
FCTWB repeats immediately Activity 2-10 to 2-15 to reduce NRW to a certain degree as follow-up activities.
[Japanese Side]
(1) Delay of the Project (Output-1)
The Japanese side prepares the draft amendment of Record of Discussion (R/D) to extend the Project period. After the discussion on the draft amendment of R/D, the Japanese side signs the amendment.
(2) Data Acquisition by Bulk Flowmeters (Output-1)
Annex3-93
PM Form 3-1 Monitoring Sheet Summary
16
JICA Expert Team supports FCTWB to monitor water flow, investigate causes and find possible solution through discussion among relevant Departments and Units.
(3) Less-than-successful Results of the Project (Output-2)
JICA Expert Team re-checks closely results and supports FCTWB to repeat Activity 2-10 to 2-15 to reduce NRW to a certain degree as follow-up activities.
3 Modification of the Project Implementation Plan
3-1 Plan of Operation
Now that chamber construction for bulk flowmeters was completed, as discussed in the previous project monitoring, based on the request from the Nigerian side, the extension of Project period is considered by the Japanese side to secure the necessary time frame for the monitoring period for the monthly water production, consumption and NRW ratio.
3-2 Other modifications on detailed implementation plan
Both sides will amend Record of Discussion (R/D) to extend the Project period for six (6) months. (Remarks: The amendment of R/D and PDM (title of the project, duration, project site(s), target group(s), implementation structure, overall goal, project purpose, outputs, activities, and input) should be authorized by JICA headquarters. If the Project Team deems it necessary to modify any part of R/D and PDM, the Team may propose the draft.)
4 Preparation by Nigerian side toward after completion of the Project
To be considered.
II. Project Monitoring Sheet I & II (as attached)
AnnexAnnex-1: List of Equipment for the Project Annex-2: Participants in Preparation of Project Monitoring Sheets and Photos
Annex3-94
PM
For
m 3
-2 P
roje
ct M
onito
ring
She
et I
PD
M3
Proj
ect T
itle:
The
Fed
eral
Cap
ital T
errit
ory
Red
uctio
n of
Non
-Rev
enue
Wat
er P
roje
ctVe
rsio
n 3
Proj
ect P
erio
d: O
ctob
er 2
014
to M
arch
201
8D
ated
22
Sep
. 201
6Im
plem
entin
g O
rgan
izat
ion:
Fede
ral C
apita
l Ter
ritor
y Ad
min
istr
atio
n (F
CTA
) / F
eder
al C
apita
l Ter
ritor
y W
ater
Boa
rd (F
CTW
B)
Dic
rect
Ben
efic
iarie
s: F
CTW
B, r
elev
ant s
taff
of F
CTW
B H
eadq
uart
ers
and
pilo
t Are
a O
ffice
sM
onito
ring:
20
Dec
. 201
6Pr
ojec
t Site
: FC
TPi
lot A
rea
Offi
ces:
Jabi
, Gar
ki I
and
Gud
uN
arra
tive
Sum
mar
yO
bjec
tivel
y Ve
rifia
ble
Indi
cato
rsM
eans
of V
erifi
catio
nIm
port
ant A
ssum
ptio
nA
chie
vem
ent
Rem
arks
<Ove
rall
Goa
l>a:
Ann
ual N
RW
ratio
is re
duce
d to
X%
(*) a
t the
end
of t
he y
ear 2
021
Not
e(*)
: Tar
get v
alue
(X%
), w
hich
is e
xpec
ted
to b
e de
term
ined
in th
e m
ediu
m-
term
stra
tegi
c pl
an fo
r NR
W re
duct
ion,
sha
ll be
tent
ativ
ely
fille
d w
hen
the
final
draf
t was
app
rove
d by
the
Dire
ctor
of F
CTW
B, w
hich
sha
ll be
fina
lized
whe
n th
epl
an is
app
rove
d by
FC
TA
<Pro
ject
Pur
pose
>
Not
e(**
): Ta
rget
for e
ach
PMA
is e
xpec
ted
to b
e de
term
ined
by
the
end
of th
efir
st q
uarte
r of t
he s
econ
d ye
ar.
<Out
puts
>
Not
e (*
1): N
RW
com
pone
nts
targ
eted
by
Out
put 2
are
(i) i
nvis
ible
leak
age;
(ii)
cust
omer
met
er m
alfu
nctio
n; a
nd (i
ii) il
lega
l con
nect
ion
Pro
ject
Mon
itor
ing
She
et I
(R
evis
ion
of P
roje
ct D
esig
n M
atri
x)
a. R
ecor
d of
NR
W ra
tio k
ept b
yD
istri
butio
n D
epar
tmen
tN
one.
Leve
l of N
on-R
even
ue W
ater
(NR
W) i
s re
duce
d at
the
serv
ice
area
of
FCTW
B
Cap
acity
of F
CTW
B fo
r NR
W re
duct
ion
is s
treng
then
ed
A. S
taff
of F
CTW
B (i.
e. m
embe
rs o
fN
RW
Man
agem
ent T
eam
and
Pilo
tN
RW
Act
ion
Team
s) tr
aine
d th
roug
h th
ePr
ojec
t do
not l
eave
the
offic
e in
larg
enu
mbe
rs
a. T
he m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
) is
appr
oved
by F
CTA
by
the
end
of th
e Pr
ojec
t.b.
NR
W re
duct
ion
oper
atio
ns o
f the
firs
t qua
rter o
f 201
8 sp
ecifi
ed in
the
annu
alpl
an o
f the
abo
ve p
lan
are
carr
ied
out a
ccor
ding
to th
e pl
an b
y FC
TWB.
c. R
elev
ant s
taff
of F
CTW
B (i.
e. m
embe
rs o
f NR
W M
anag
emen
t Tea
m a
nd P
ilot
NR
W A
ctio
n Te
ams)
bec
ome
equi
pped
with
ski
lls a
nd k
now
ledg
e ne
cess
ary
for
NR
W re
duct
ion
acco
rdin
g to
the
crite
ria s
et b
y th
e Pr
ojec
t for
eac
h le
vel.
d. N
RW
ratio
of e
ach
PMA
in th
e la
st q
uarte
r of t
he P
roje
ct re
ache
s its
resp
ectiv
e ta
rget
(**)
.
a. D
ate
of a
ppro
val o
f the
pla
nb.
Res
ult o
f mon
itorin
gby
NR
W M
anag
emen
t Tea
mc.
Res
ults
of j
oint
ass
essm
ent
base
d on
the
crite
ria s
et b
y th
ePr
ojec
td.
Rec
ord
of N
RW
ratio
kep
t by
Dis
tribu
tion
Dep
artm
ent
A. P
olic
y su
ppor
t for
NR
W re
duct
ion
isno
t dis
cont
inue
d Po
licy
supp
ort f
orN
RW
redu
ctio
n is
not
dis
cont
inue
dB.
Nat
ural
dis
aste
r/ p
oliti
cal i
nsta
bilit
y/ e
cono
mic
cris
is th
at a
ffect
the
serv
ice
area
of F
CTW
B do
not
occ
urC
. Act
iviti
es to
impl
emen
t the
med
ium
-te
m s
trate
gic
plan
are
not
dis
cont
inue
dor
del
ayed
Indi
cato
r a: N
one.
Indi
cato
r b: N
one.
Indi
cato
r c: R
esul
ts o
f int
erim
capa
city
ass
essm
ent i
n N
ov.-
Dec
. 201
6 sh
ow th
at c
apac
ityde
velo
ped
has
not r
each
edto
the
crite
ria. F
ollo
w-u
pca
paci
ty d
evel
opm
ent i
sne
cess
ary
in P
hase
-2 o
f the
Proj
ect.
Indi
cato
r d: N
one.
Not
e (*
2): A
med
ium
-term
stra
tegi
c pl
an is
a fi
ve-y
ear p
lan,
whi
ch m
ay in
clud
e m
ediu
m-te
rm ta
rget
, stra
tegi
es a
nd a
ctio
ns, t
imef
ram
e, h
uman
reso
urce
requ
irem
ent,
on-th
e-jo
b tra
inin
g m
echa
nism
, cos
t-ben
efit
anal
ysis
of N
RW
redu
ctio
n, e
tc. I
t is
note
d th
at N
RW
com
pone
nts
addr
esse
d by
the
stra
tegi
c pl
an a
re n
ot li
mite
d to
the
ones
men
tione
d in
(*1)
abo
ve: t
hey
shal
l be
disc
usse
d an
d de
term
ined
in d
evel
opin
g th
e ou
tline
of t
he s
trate
gic
plan
(thr
ough
Act
ivity
3-4
).
2. M
etho
ds/o
pera
tiona
l pro
cedu
res
for e
ffect
ive
NR
W re
duct
ion
are
esta
blis
hed
thro
ugh
pilo
t pro
ject
s at
Pilo
t Met
erin
g Ar
eas
(PM
As) u
nder
pilo
t Are
a O
ffice
s (*
1)
2a. D
ecre
ase
rate
of N
RW
ratio
for e
ach
Sub
Met
erin
g Ar
ea o
f a P
MA
reac
hes
at le
ast 8
0% o
f its
targ
et a
t the
end
of t
he re
spec
tive
NR
W re
duct
ion
oper
atio
ns.
2b. T
echn
ical
man
uals
for A
rea
Offi
ce m
anag
ers
and
field
ope
rato
rs (i
.e.
tech
nica
l offi
cers
and
met
er re
ader
s), i
nclu
ding
aud
io v
isua
l mat
eria
ls, a
reap
prov
ed b
y H
ead
of D
epar
tmen
t (H
oD) f
or D
istri
butio
n an
d H
oD fo
r Com
mer
ceby
the
first
qua
rter o
f the
third
yea
r of t
he P
roje
ct.
2a. R
ecor
d of
NR
W ra
tio k
ept
by th
e D
istri
butio
n D
epar
tmen
t2b
. Dat
e of
app
rova
l of t
hem
anua
ls
Indi
cato
r 2a:
Mos
t of r
esul
tsdi
d no
t rea
ch ta
rget
leve
l.Fo
llow
up
activ
ities
toac
hiev
e th
e ta
rget
leve
l are
nece
ssar
y by
util
izin
gle
sson
s an
d le
arnt
.In
dica
tor 2
b : T
echn
ical
man
uals
wer
e pr
epar
ed a
ndpr
ovis
iona
lly a
ppro
ved.
Indi
cato
r 1a &
1b&1
c: N
one
and
dela
yed
as a
resu
lt of
dela
y in
Act
iviti
es 1
-2 to
1-5
.In
dica
tor 1
d : N
one
3. A
med
ium
-term
stra
tegi
c pl
an o
f FC
TWB
for N
RW
redu
ctio
n is
deve
lope
d, u
tiliz
ing
the
resu
lts o
f Out
put 1
-2 (*
2)3a
. By
Oct
ober
201
7, d
raft
med
ium
-term
stra
tegi
c pl
an fo
r NR
W re
duct
ion
(201
8-20
22) i
s su
bmitt
ed b
y FC
TWB
to F
CTA
for r
evie
w a
nd a
ppro
val.
3b. B
y O
ctob
er 2
017,
an
annu
al N
RW
redu
ctio
n pl
an (2
018)
is in
corp
orat
ed in
FCW
TB’s
ann
ual r
ecur
rent
and
cap
ital p
lan
(201
8) fo
r sub
mis
sion
to F
CTA
for
revi
ew a
nd a
ppro
val.
3c. A
pla
nnin
g m
anua
l for
NR
W re
duct
ion
is a
ppro
ved
by th
e D
irect
or o
f FC
TWB
by th
e en
d of
the
Proj
ect.
3d. B
y N
ovem
ber 2
016,
fram
ewor
k of
wat
er d
istri
butio
n m
anag
emen
t is
esta
blis
hed.
3a&3
b. D
ate
of o
ffici
al le
tter
subm
ittin
g dr
aft s
trate
gic
plan
and
annu
al re
curr
ent a
ndca
pita
l pla
n3c
. Dat
e of
app
rova
l of t
hem
anua
l3d
. Im
plem
entin
g st
ruct
ure
and
wor
kflo
w o
f wat
er d
istri
butio
nm
anag
emen
t
Indi
cato
r 3a:
Non
e.In
dica
tor 3
b : N
one.
Indi
cato
r 3c:
Non
e.In
dica
tor 3
d : F
ram
ewor
k ha
sno
t bee
n re
ady
due
to d
elay
in A
ctiv
ity 1
-6 a
nd 1
-7.
1. L
evel
of N
RW
of b
oth
the
serv
ice
area
of F
CW
TB a
nd w
ater
dist
ribut
ion
area
s is
mon
itore
d re
gula
rly1a
. Rec
ord
of m
onth
ly N
RW
ratio
is k
ept b
y D
istri
butio
n D
epar
tmen
t fro
m th
eth
ird q
uarte
r of t
he s
econ
d ye
ar o
f the
Pro
ject
.1b
. Mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
its
mon
thly
Join
t Man
agem
ent M
eetin
g fro
m th
e th
ird q
uarte
r of t
he s
econ
d ye
ar o
f the
Proj
ect.
1c. Q
uarte
rly N
RW
ratio
of t
he s
ervi
ce a
rea
of F
CTW
B is
repo
rted
toM
anag
emen
t of F
CTW
B fro
m th
e th
ird q
uarte
r of t
he s
econ
d ye
ar o
f the
Pro
ject
.1d
. Per
iodi
c re
cord
s of
dat
a on
wat
er d
istri
butio
n m
anag
emen
t suc
h as
wat
erflo
w o
f zon
al m
eter
s an
d w
ater
pre
ssur
e ar
e ke
pt b
y D
istri
butio
n D
epar
tmen
tfro
m th
e fir
st q
uarte
r of t
he th
ird y
ear o
f the
Pro
ject
.
1a. M
onth
ly re
cord
of N
RW
ratio
1b&1
c. M
ater
ial f
or m
eetin
gssu
bmitt
ed b
y th
e D
istri
butio
nD
epar
tmen
t1d
. Per
iodi
c re
cord
s of
dat
a on
wat
er d
istri
butio
n m
anag
emen
t
Annex3-95
PM
For
m 3
-2 P
roje
ct M
onito
ring
She
et I
Act
iviti
es
Impo
rtan
t Ass
umpt
ion
The
Nig
eria
n Si
deTh
e Ja
pane
se S
ide
Pre-
Con
ditio
ns
Not
e (*
3) S
elec
tion
crite
ria o
f PM
A ar
e as
follo
ws:
(i) S
afet
y fo
r nig
ht w
orks
is s
ecur
ed in
mea
surin
g m
inim
um n
ight
flow
: (ii)
Dis
tribu
tion
netw
ork
is s
epar
ated
and
it is
eas
y to
isol
ate
it in
mea
surin
g N
RW
ratio
: and
(iii)
NR
W ra
tio is
sup
pose
dly
high
.N
ote
(*4)
Wor
king
Gro
up fo
r NR
W p
lann
ing
wou
ld c
onsi
st o
f Pro
ject
Man
ager
(as
chai
r), D
eput
y Pr
ojec
t Man
ager
, Tec
hnic
al M
anag
ers,
Hea
d of
Fin
ance
Dep
t., H
ead
of P
rodu
ctio
n D
ept.,
Hea
d of
PR
S U
nit,
and
mem
bers
of N
RW
Man
agem
ent T
eam
.
Inpu
tsA.
Nat
ural
dis
aste
r / p
oliti
cal /
inst
abili
ty/ e
cono
mic
cris
is th
at a
ffect
the
Proj
ect
activ
ities
do
not o
ccur
.1-
1 In
stal
l bul
k m
eter
s to
wat
er tr
eatm
ent p
lant
s 1
and
21-
2 M
easu
re m
onth
ly w
ater
pro
duct
ion
of w
ater
trea
tmen
t pla
nts
1, 2
, 3an
d 4
1-3
Tally
the
abov
e w
ater
pro
duct
ion
data
mon
thly
1-4
Cal
cula
te th
e m
onth
ly w
ater
con
sum
ptio
n ba
sed
on th
e bi
lling
dat
a1-
5 C
alcu
late
mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
usin
g th
eda
ta o
btai
ned
from
Act
ivity
1-3
and
1-4
1-6
Inst
all z
onal
met
ers,
wat
er p
ress
ure
sens
or a
nd p
ilot r
emot
em
onito
ring
(tele
met
ry) s
yste
m1-
7 M
easu
re a
nd c
olle
ct d
ata
for w
ater
dis
tribu
tion
man
agem
ent s
uch
asw
ater
flow
of z
onal
met
ers
and
wat
er p
ress
ure
Proj
ect P
erso
nnel
1. P
roje
ct D
irect
or: D
irect
or o
f Eco
nom
ic P
lann
ing,
Res
earc
h an
d St
atis
ticD
epar
tmen
t, FC
TA2.
Pro
ject
Man
ager
: Dire
ctor
of F
CTW
B3.
Dep
uty
Proj
ect M
anag
er: H
oD fo
r Adm
inis
tratio
n an
d Su
pply
/FC
TWB
4. T
echn
ical
Man
ager
s (A
lso
Lead
ers
of N
RW
Man
agem
ent T
eam
): H
oD fo
rD
istri
butio
n an
d H
oD fo
r Com
mer
ce /F
CTW
B5.
Mem
bers
of N
RW
Man
agem
ent T
eam
(FC
TWB)
:- H
ead
of S
peci
al P
roje
ct U
nit o
f Dis
tribu
tion
Dep
artm
ent (
as C
oord
inat
or)
- Rel
evan
t Hea
d of
Uni
t (H
oU) a
nd o
ffice
rs o
f the
Dis
tribu
tion
Dep
artm
ent,
Com
mer
ce D
epar
tmen
t, an
d Ad
min
istra
tion
and
Supp
ly D
epar
tmen
t6.
Hea
ds o
f oth
er re
leva
nt D
epar
tmen
ts a
nd U
nit o
f FC
TWB:
HoD
for F
inan
ce,
HoD
for P
rodu
ctio
n, H
oU fo
r Pla
nnin
g R
esea
rch
and
Stat
istic
s (P
RS)
7. M
embe
rs o
f NR
W A
ctio
n Te
am: A
rea
Man
ager
, Ass
ista
nt A
rea
Man
ager
(Dis
tribu
tion)
, Ass
ista
nt A
rea
Man
ager
(Com
mer
ce),
tech
nica
l offi
cers
(Dis
tribu
tion)
and
met
er re
ader
s (C
omm
erce
) of e
ach
pilo
t Are
a O
ffice
8. O
ther
per
sonn
el m
utua
lly a
gree
d up
on a
s ne
cess
ary
Japa
nese
Exp
erts
1. C
hief
Adv
isor
/ N
RW
Red
uctio
n Pl
anni
ng /
Wat
erD
istri
butio
n M
anag
emen
t 12.
Dep
uty
Chi
ef A
dvis
or /
NR
WR
educ
tion
Plan
ning
3. N
RW
Red
uctio
n O
pera
tions
Man
agem
ent
4. L
eaka
ge D
etec
tion
Tech
nolo
gy5.
Com
mer
cial
Los
s6.
Hyd
raul
ic A
naly
sis
/ GIS
7. P
rocu
rem
ent M
anag
e't /
Coo
rdin
ator
8. F
acili
ty D
esig
n / C
onst
ruct
ion
Supe
rvis
ion
9. E
quip
men
t Des
ign
/In
stal
latio
n10
. Wat
er D
istri
butio
nM
anag
emen
t 211
. Rem
ote
Mon
itorin
g12
. Oth
er e
xper
ts m
utua
llyag
reed
upo
n as
nec
essa
ry
2-1
Rev
iew
exi
stin
g N
RW
redu
ctio
n op
erat
ions
at e
ach
pilo
t Are
a O
ffice
2-2
Con
duct
cap
acity
ass
essm
ent o
f the
rele
vant
sta
ff of
eac
h pi
lot A
rea
Offi
ce2-
3 Id
entif
y an
d se
lect
a P
ilot M
eter
ing
Area
(PM
A) fo
r eac
h pi
lot A
rea
Offi
ce b
ased
on
the
sele
ctio
n cr
iteria
of P
MA(
*3)
2-4
Prep
are/
upda
te d
istri
butio
n ne
twor
k dr
awin
gs fo
r eac
h PM
A2-
5 In
stal
l wat
er fl
ow m
eter
s to
eac
h PM
A an
d m
easu
re in
/out
flow
sm
onth
ly2-
6 Zo
ne e
ach
PMA
into
Sub
Met
erin
g Ar
eas
(SM
A)
2-7
Isol
ate
a SM
A by
inst
allin
g va
lves
2-8
Upd
ate
the
dist
ribut
ion
netw
ork
draw
ings
for e
ach
SMA
2-9
Mea
sure
an
initi
al le
vel o
f NR
W o
f eac
h SM
A2-
10 D
etec
t tar
get N
RW
com
pone
nts
(i.e.
invi
sibl
e le
akag
e, c
usto
mer
met
er m
alfu
nctio
n, a
nd il
lega
l con
nect
ion)
of e
ach
SMA
2-11
Dev
elop
a N
RW
redu
ctio
n op
erat
ion
plan
of e
ach
SMA
,incl
udin
gre
duct
ion
targ
et, f
or re
view
by
Hea
d of
Dis
tribu
tion
Dep
artm
ent
2-12
Rev
iew
and
app
rove
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h SM
A2-
13 Im
plem
ent t
he N
RW
redu
ctio
n op
erat
ions
at e
ach
SMA
2-14
Mon
itor t
he p
rogr
ess
of th
e N
RW
redu
ctio
n op
erat
ions
of e
ach
SMA
2-15
Mea
sure
leve
l of N
RW
of e
ach
SMA
at th
e en
d of
the
resp
ectiv
eop
erat
ions
2-16
Pre
pare
a re
port
on p
ilot p
roje
cts,
cov
erin
g Ac
tivity
2-1
~2-1
52-
17 D
evel
op m
anua
ls fo
r NR
W re
duct
ion
for A
rea
Offi
ce m
anag
ers
and
field
ope
rato
rs (i
.e. t
echn
ical
offi
cers
and
met
er re
ader
s), i
nclu
ding
aud
iovi
sual
mat
eria
ls
A. F
urni
shed
offi
ces
for J
apan
ese
Expe
rts a
re s
ecur
ed a
t the
Hea
dqua
rters
and
eac
h Pi
lot A
rea
Offi
ce o
f FC
TWB.
B. P
roje
ct P
erso
nnel
is a
ssig
ned
with
the
final
ized
list
.
Equi
pmen
t1.
Bul
k m
eter
s an
d lo
gger
s fo
rw
ater
trea
tmen
t pla
nts
2. W
ater
flow
met
ers,
val
ves,
and
cust
omer
met
ers
for S
MA
3. L
eaka
ge d
etec
tion
equi
pmen
tfo
r PM
A4.
Pip
e re
pair
equi
pmen
t for
PMA
5. V
ehic
les
(Pic
k-up
s)6.
Gen
erat
or fo
r pro
ject
offi
ce7.
Zon
al m
eter
s, lo
gger
s an
dw
ater
pre
ssur
e se
nsor
s8.
Tel
emet
ric m
onito
ring
syst
emw
ith s
tand
by p
ower
gen
erat
ing
faci
lity
for s
elec
ted
zona
lm
eter
(s) a
nd/o
r wat
er p
ress
ure
sens
or(s
).9.
Oth
er e
quip
men
t mut
ually
agre
ed u
pon
as n
eces
sary
Land
, Bui
ldin
g an
d Fa
cilit
ies
1. O
ffice
bui
ldin
g an
d fa
cilit
ies
nece
ssar
y fo
r the
impl
emen
tatio
n of
the
Proj
ect
2. O
ffice
spa
ces
and
nece
ssar
y fa
cilit
ies
for t
he J
apan
ese
Expe
rts a
t the
FCTW
B H
eadq
uarte
rs a
nd e
ach
pilo
t Are
a O
ffice
, inc
ludi
ng in
tern
et c
onne
ctio
nan
d ai
r con
ditio
ners
3. C
ham
bers
forfl
ow m
eter
s an
d va
lves
for t
he s
elec
ted
PMAs
/SM
As.
4. E
lect
ric w
iring
to b
ulk/
zona
l met
ers,
logg
ers
and
pres
sure
sen
sors
.5.
Oth
er fa
cilit
ies
mut
ually
agr
eed
upon
as
nece
ssar
y
Issu
es &
Cou
nter
mea
sure
s(1
) Del
ay o
f the
Pro
ject
(Out
put-1
)Is
sue
Avai
labl
e m
onito
ring
perio
d of
Act
iviti
es 1
-2 to
1-5
is in
suffi
cien
t, so
the
Proj
ect n
eeds
at
leas
t six
mon
ths
for m
onito
ring
the
Activ
ities
1-2
to 1
-5.
Cou
nter
mea
sure
sTh
e Pr
ojec
t per
iod
will
be
exte
nded
for s
ix m
onth
s fo
r mon
itorin
g th
e Ac
tiviti
es 1
-2 to
1-
5. (2) D
ata
Acq
uisi
tion
by B
ulk
Flow
Met
er (O
utpu
t-1)
Issu
eTh
e Pr
ojec
t fou
nd o
ut th
at d
ata
acqu
isiti
on is
not
alw
ays
avai
labl
e, w
hich
may
be
due
tono
t wat
er-fi
lled
flow
insi
de p
ipel
ines
and
sho
uld
be s
olve
d as
soo
n as
pos
sibl
e.C
ount
erm
easu
res
The
Proj
ect n
eeds
imm
edia
tely
to in
vest
igat
e ca
uses
, fin
d po
ssib
le s
olut
ions
thro
ugh
disc
ussi
on a
mon
g re
leva
nt D
epar
tmen
ts a
nd U
nits
.
(3) L
ess-
than
-suc
cess
ful R
esul
ts o
f the
Pro
ject
(Out
put-2
)Is
sue
A se
ries
of a
ctiv
ities
for N
RW
redu
ctio
n in
PM
As/S
MAs
wer
e co
mpl
eted
, how
ever
shou
ld b
e fo
llow
ed u
p an
d m
onito
red
beca
use
decr
ease
in N
RW
ratio
in s
ome
SMAs
resu
lted
in le
ss-th
an-s
ucce
ssfu
l.C
ount
erm
easu
res
The
Proj
ect n
eeds
imm
edia
tely
det
aile
d re
-che
ck o
f res
ults
/dat
a, c
ontin
uous
and
furth
erac
tiviti
es to
redu
ce N
RW
to a
cer
tain
deg
ree
as fo
llow
-up
activ
ities
by
utili
zing
less
ons
and
lear
nt in
Pha
se-1
.
Loca
l Cos
ts1.
Cos
t for
inst
alla
tion,
ope
ratio
n an
d m
aint
enan
ce o
f the
pro
vide
d eq
uipm
ent
and
cost
for p
ipe
repa
ir at
PM
As2.
Adm
inis
tratio
n an
d op
erat
iona
l cos
ts, i
nclu
ding
cos
t for
loca
l tra
vel f
or th
ePr
ojec
t Per
sonn
el, d
emur
rage
at l
ocal
cus
tom
s po
int,
licen
sing
cos
t of r
adio
appl
icat
ion
and
cost
for c
omm
unic
atio
n of
tele
met
ric d
evic
e fo
r sel
ecte
d zo
nal
met
er(s
) and
wat
er p
ress
ure
sens
or(s
)3.
Oth
er c
osts
mut
ually
agr
eed
upon
as
nece
ssar
y
3-1
Esta
blis
h a
Wor
king
Gro
up fo
r NR
W p
lann
ing
(*4)
3-2
Rev
iew
exi
stin
g pl
ans,
impl
emen
tatio
n st
ruct
ure,
on-
the-
job
train
ing
mec
hani
sm, e
tc. r
elat
ed to
NR
W re
duct
ion
at F
CTW
B3-
3 C
ondu
ct h
ydra
ulic
and
wat
er p
ress
ure
dist
ribut
ion
anal
yses
of t
hepi
pelin
e ne
twor
ks3-
4 D
evel
op o
utlin
es o
f the
med
ium
-term
stra
tegi
c pl
an a
nd it
s an
nual
NR
W re
duct
ion
plan
3-5
Dev
elop
the
first
med
ium
-term
stra
tegi
c pl
an (2
018-
2022
) for
app
rova
lby
FC
TA3-
6 D
evel
op a
n an
nual
NR
W re
duct
ion
plan
bas
ed o
n th
e st
rate
gic
plan
as a
n in
tegr
al p
art o
f an
annu
al re
curr
ent a
nd c
apita
l pla
n of
FC
TWB
for
appr
oval
by
FCTA
3-7
Dev
elop
a p
lann
ing
man
ual f
or N
RW
redu
ctio
n3-
8 R
evie
w e
xist
ing
plan
s, a
ctiv
ities
and
impl
emen
ting
stru
ctur
e, e
tc.
rela
ted
to w
ater
dis
tribu
tion
man
agem
ent
3-9
Esta
blis
h fra
mew
ork
of w
ater
dis
tribu
tion
man
agem
ent
Faci
litie
s1.
Mod
ifica
tion
of e
xist
ing
billi
ngsy
stem
2. C
ham
bers
for b
ulk
met
ers
for
wat
er tr
eatm
ent p
lant
s, z
onal
met
ers
and
wat
er p
ress
ure
sens
ors
Trai
ning
of t
he N
iger
ian
Proj
ect P
erso
nnel
1. F
our p
erso
ns m
utua
llyag
reed
upo
n w
ill b
e tra
ined
inJa
pan
annu
ally
2. G
IS tr
aini
ng in
Nig
eria
Annex3-96
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Mon
itorin
g: 20
Dec
. 201
620
1420
1520
1620
1720
18Mo
nito
ring
Rema
rksAc
hieve
ment
Issue
&1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
42Co
unter
meas
ures
Outp
ut-1
1-1
W/P
Surve
yIns
tallat
ionRe
vised
Actua
lSu
spen
ded
Susp
ende
dIns
tallat
ion
1-2
W/P
Revis
edAc
tual
Meas
urem
ent
1-3
W/P
Revis
edAc
tual
Tally
ing
1-4
W/P
Revie
wSy
stem
Modif
icatio
nRe
vised
Actua
lCo
ncep
tSp
ecific
ation
Spec
ificati
onMo
difica
tion
Calcu
lating
1-5
W/P
Revis
edAc
tual
Calcu
lating
1-6
W/P
Suve
ry &
Desig
nCo
nstru
ction
Instal
lation
Suve
ry &
Desig
nRe
vised
Actua
lTe
nder
Tend
er
1-7
W/P
None
.Re
vised
Actua
l
Outp
ut-2
2-1
W/P
Revis
edAc
tual
2-2
W/P
Base
line
Inter
im-1
Revis
edAc
tual
2-3
W/P
Revis
edAc
tual
2-4
W/P
Revis
edAc
tual
2-5
W/P
Revis
edAc
tual
Susp
ende
d
2-6
W/P
Revis
edAc
tual
2-7
W/P
Revis
edAc
tual
Susp
ende
d
2-8
W/P
Revis
edAc
tual
2-9
W/P
Revis
edAc
tual
2-10
W/P
Revis
edAc
tual
2-11
W/P
Revis
edAc
tual
2-12
W/P
Revis
edAc
tual
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)Pl
an o
f Sch
edul
e and
Act
ual W
ork P
erio
d
The A
ctivit
y will
be im
pleme
nted a
fter t
he co
mplet
ion of
Activ
ity 1-
6.
Chec
k/rep
air a
PMA
meter
in Ja
bi an
d com
plete
fully
electr
icity
conn
ectio
n for
the u
ltraso
nic flo
w me
ter in
Gar
kiI - -
--
-Re
-dete
ction
may
be do
ne if
nece
ssar
y.
-Pr
ovisi
onall
y com
pleted
.Re
vision
may
be do
ne if
nece
ssar
y.
Comp
leted
.Da
ta ac
quisi
tion s
eems
to be
not a
lway
s ava
ilable
, whic
hma
y be d
ue to
not w
ater-f
illed f
low in
side p
ipelin
es.
Read
y to m
easu
re m
onthl
y wate
r pro
ducti
on bu
t the
Proje
ct ne
eds a
t leas
t 6 m
onths
for m
onito
ring t
hisAc
tivity
.
None
..
None
.Re
ady t
o mea
sure
mon
thly w
ater p
rodu
ction
but t
hePr
oject
need
s at le
ast 6
mon
ths fo
r mon
itorin
g this
Activ
ity.
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 1-
1.
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 1-
1.
Cons
tructi
on of
cham
bers
for zo
nal m
eters
was c
omple
tedZo
nal m
eters,
wate
r pre
ssur
e sen
sor a
nd pi
lot re
mote
monit
oring
(tele
metry
) sys
tem ha
ve be
en pr
ocur
ed in
Japa
n.
-
-Co
mplet
ed
-Co
mplet
ed
Comp
leted
Isolat
e a S
MA by
insta
lling v
alves
Prog
ress
: 10
0%10
0% 75%
50%
25%
Zone
each
PMA
into
Sub M
eterin
gAr
eas (
SMA)
Prog
ress
: 100
%10
0% 75%
50%
-
-Co
mplet
ed, b
ut pa
rtially
and p
rovis
ionall
y.
-Co
mplet
ed
-Pr
ovisi
onall
y com
pleted
.Re
vision
may
be do
ne if
nece
ssar
y.
Comp
leted
Prov
ision
ally c
omple
ted.
-
-Co
mplet
edAG
IS se
curity
has h
inder
ed da
ta im
port/
expo
rt an
dan
alysis
.FC
TWB
has r
eferre
d the
chall
enge
to F
CTA'
s Per
mane
ntSe
cretar
y and
is w
orkin
g clos
ely w
ith A
GIS
to so
lve th
eiss
ue.
Comp
leted
-
-Co
mplet
ed(P
hase
-1).
-
Delay
ed.
Delay
ed. F
CTW
B ha
s coll
ected
infor
matio
n of r
eturn
ed bi
lls an
d has
deac
tivate
d the
m. T
he re
turne
d bills
caus
e ina
ccur
acy o
f calc
ulatin
g NRW
ratio
.
Comp
leted
(billi
ng sy
stem
modif
icatio
n only
)
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 1-
6.
-
Revie
w an
d app
rove
NRW
redu
ction
oper
ation
plan
of ea
ch S
MA
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Deve
lop a
NRW
redu
ction
oper
ation
plan o
f eac
h SMA
, inclu
ding r
educ
tion
targe
t for
revie
w by
Hea
d of
Distr
ibutio
nDe
partm
ent
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Detec
t tar
get N
RW co
mpon
ents
(i.e.
invisi
ble le
akag
e, cu
stome
r mete
rma
lfunc
tion,
and i
llega
l con
necti
on)
of ea
ch S
MAPr
ogre
ss:
100%
(Pro
vision
al)10
0% 75%
50%
25%
Meas
ure a
n init
ial le
vel o
f NRW
of ea
chSM
A
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Upda
te the
distr
ibutio
n netw
ork
draw
ings f
or ea
ch S
MA Prog
ress
: 10
0%10
0% 75%
50%
25%
25%
Prog
ress
: 10
0%10
0% 75%
50%
25%
Prep
are/u
pdate
distr
ibutio
n netw
ork
draw
ings f
or ea
ch P
MA Prog
ress
: 100
%10
0% 75%
50%
25%
Meth
ods/o
pera
tiona
lpr
oced
ures
for e
ffect
iveNR
W re
duct
ion
are
esta
blish
ed th
roug
hpi
lot p
rojec
ts at
Pilo
tMe
terin
g Ar
eas (
PMAs
)un
der p
ilot A
rea O
ffice
s
Revie
w ex
isting
NRW
redu
ction
oper
ation
s at e
ach p
ilot A
rea O
ffice
Prog
ress
: 100
%10
0% 75%
50%
25%
Cond
uct c
apac
ity as
sess
ment
ofor
ganiz
ation
and t
he re
levan
t staf
f
Prog
ress
: 100
%10
0% 75%
50%
25%
Prog
ress
: 10
0%(P
hase
-1)
100% 75
%
50%
25%
Identi
fy an
d sele
ct a P
ilot M
eterin
gAr
ea (P
MA) f
or ea
ch P
ilot A
rea O
ffice
base
d on t
he se
lectio
n crite
ria of
PMA
Instal
l wate
r flow
mete
rs to
each
PMA
and m
easu
re in
/outflo
ws m
onthl
y
Meas
ure a
nd co
llect
data
for w
ater
distrib
ution
man
agem
ent s
uch a
s wate
rflo
w of
zona
l mete
rs an
d wate
rPr
ogre
ss:
0%
Behin
d:4.5
month
s
100% 75
%
50%
25%
Instal
l zon
al me
ters,
water
pres
sure
sens
or an
d pilo
t rem
ote m
onito
ring
(telem
etry)
syste
mPr
ogre
ss:
90%
Behin
d:4.5
month
s
100% 75
%
50%
25%
Calcu
late m
onthl
y NRW
ratio
of th
ese
rvice
area
of F
CTW
B us
ing th
e data
obtai
ned f
rom
Activ
ity 1-
3 and
1-4
Prog
ress
: 0%
Behin
d:9.5
month
s
100% 75
%
50%
25%
Calcu
late t
he m
onthl
y wate
rco
nsum
ption
base
d on t
he bi
lling d
ata
Prog
ress
: 10
0%Re
ady t
oca
lculat
e
100% 75
%
50%
25%
50%
25%
Meas
ure m
onthl
y wate
r pro
ducti
on of
water
trea
tmen
t plan
ts 1,
2, 3,
and 4
Prog
ress
: 0%
Behin
d:9.5
month
s
100% 25
%
Aug
Dec
May
Jun
Jul
Aug
Sep
Oct
Sep
Oct
50%
75%
Feb
Mar
Apr
May
Jun
Jul
May
Jun
Leve
l of N
RW o
f bot
hth
e ser
vice a
rea o
fFC
WTB
and
wate
rdi
strib
utio
n ar
eas
mon
itore
d re
gular
ly
Instal
l bulk
mete
rs to
water
trea
tmen
tpla
nts 1
and 2
Prog
ress
: 10
0%10
0% 75%
50%
25%
Nov
Nov
Dec
Tally
the a
bove
wate
r pro
ducti
on da
tamo
nthly
Prog
ress
: 0%
Behin
d:9.5
month
s
100% 75
%
Activ
ities
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
Jan
Mar
PO
3
-
Jan
Feb
Mar
Apr
-
Read
y to c
alcula
te mo
nthly
water
cons
umpti
on, b
ut the
Proje
ct ne
eds a
t leas
t 6 m
onths
for m
onito
ring t
hisAc
tivity
.
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 1-
3 and
1-4.
None
Read
y to c
alcula
te mo
nthly
NRW
ratio
, but
the P
rojec
tne
eds a
t leas
t 6 m
onths
for m
onito
ring t
his A
ctivit
y.
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Asof
theen
dof
Dec.2016
Annex3-97
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Mon
itorin
g: 20
Dec
. 201
6
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)Pl
an o
f Sch
edul
e and
Act
ual W
ork P
erio
dP
O3
Asof
theen
dof
Dec.2016
2-13
W/P
Revis
edAc
tual
Prov
ision
ally
2-14
W/P
Revis
edAc
tual
2-15
W/P
Revis
edAc
tual
2-16
W/P
Inter
imFin
alRe
vised
Actua
l
2-17
W/P
Draft
Finali
zatio
nFin
aliza
tion
Revis
edAc
tual
Outp
ut-3
3-1
W/P
Revis
edAc
tual
3-2
W/P
Revis
edAc
tual
3-3
W/P
Revis
edAc
tual
3-4
W/P
Revis
edAc
tual
3-5
W/P
Revis
edAc
tual
3-6
W/P
Revis
edAc
tual
3-7
W/P
Revis
edAc
tual
3-8
W/P
Revis
edAc
tual
3-9
W/P
Revis
edAc
tual
W/P
Phas
e-1 (
Oct 2
014 -
Dec
2016
, 27 m
onth
s)Ph
ase-
2 (Ja
n 201
7 - M
ar 20
18, 1
5 mon
ths)
Revis
edAc
tual
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
Coun
terme
asur
esJIC
A Ex
pert
1Ak
inori M
IYOS
HIW
/P C
hief A
dviso
r / N
RW R
educ
tion P
lannin
g / W
ater D
istrib
ution
Revis
ed M
anag
emen
tAc
tual
2Ta
ketos
hi FU
JIYAM
AW
/P D
eputy
Chie
f Adv
isor /
NRW
Red
uctio
n Plan
ning
Revis
edAc
tual
3To
ru T
OYOD
AW
/P N
RW R
educ
tion O
pera
tions
Man
agem
ent
Revis
edAc
tual
4Ki
yosh
i KIY
AMA
W/P
Leak
age D
etecti
on T
echn
ology
Revis
edAc
tual
5Ta
kuji O
KUBO
(-De
c/201
5), H
iroyu
ki MO
RITA
(Jan
/2016
-)W
/P C
omme
rcial
Loss
Revis
edAc
tual
6Sh
inta S
EGAW
AW
/P H
ydra
ulic A
nalys
is / G
ISRe
vised
Actua
l7
Kazu
hiro I
SHIU
RA (-
Aug/2
015)
, Hiro
ki NI
IMUR
A (S
ep/20
15-)
W/P
Pro
cure
ment
Mana
geme
nt / C
oord
inator
Revis
edAc
tual
8Ta
ketos
hi FU
JIYAM
A (-M
ar/20
16),
Shini
chiro
SAT
OH (A
pr/20
16-)
W/P
Facil
ity D
esign
/ Co
nstru
ction
Sup
ervis
ionRe
vised
Actua
l9
Kiyo
shi K
IYAM
AW
/PEq
uipme
nt De
sign /
Insta
llatio
nRe
vised
Actua
l
-Pr
ovisi
onall
y com
pleted
.Fu
rther
oper
ation
s may
be do
ne if
nece
ssar
y.
Furth
er m
onito
ring m
ay be
done
if ne
cess
ary.
-Pr
ovisi
onall
y com
pleted
.
Ther
e was
diffic
ulty i
n imp
lemen
tation
due t
o dea
rth of
as-
built
draw
ings w
hich w
ill ha
ve pr
ovide
d suff
icien
tinf
orma
tion o
n pipe
line a
nd ap
purte
nanc
es.
FCTW
B wi
ll disc
uss c
halle
nge a
bout
as-b
uilt d
rawi
ngs w
ithFC
TA an
d FCD
A.
-
-1.0
0 man
-mon
th-
-3.5
0 man
-mon
th-
-4.0
0 man
-mon
th-
-9.2
0 man
-mon
th-
-3.4
7 man
-mon
th-
-11
.17 m
an-m
onth
-
-8.0
0 man
-mon
th-
-13
.07 m
an-m
onth
-
-6.7
7 man
-mon
th-
(Wate
r Dist
ributi
on M
anag
emen
t Com
mitte
e was
estab
lishe
d and
conc
ept w
as en
dorse
d.)
Expe
rts w
ere n
ot in
Nige
ira in
mos
t of
perio
d betw
een J
anun
ary
and A
pril
2015
.
27 m
onths
-
To be
imple
mente
d in P
hase
-2.
None
-
Delay
ed as
a re
sult o
f dela
y in
infor
matio
n sub
miss
ion fr
om A
rea
Offic
es.
8 out
of 13
Are
a Offic
es su
bmitte
d the
requ
ired
infor
matio
n.
-
To be
imple
mente
d in P
hase
-2.
None
None
To be
imple
mente
d in P
hase
-2.
None
AGIS
secu
rity ha
s still
hind
ered
data
impo
rt/ex
port
and
analy
sis in
spite
of F
CTA
PS’s
instru
ction
.
To be
imple
mente
d in P
hase
-2.
None
--
To be
revie
wed i
n Pha
se-2
.Co
mplet
ed.
-
Prov
ision
ally c
omple
ted.
Detai
led ch
eck a
nd re
vision
may
be do
ne if
nece
ssar
y.
-Pr
ovisi
onall
y com
pleted
.De
tailed
chec
k may
be do
ne if
nece
ssar
y.
-Pr
ovisi
onall
y com
pleted
.Re
vision
may
be do
ne if
nece
ssar
y.
-
Comp
leted
.
To be
imple
mente
d in P
hase
-2.
None
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 1-
6 and
1-7.
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Aug
Sep
Oct
Nov
Feb
Mar
Apr
May
Jun
Jul
Dura
tion
/ Pha
sing
Inpu
ts (t
he Ja
pane
se si
de)
Oct.
Nov
Dec
Jan
Estab
lish f
rame
work
of wa
terdis
tributi
on m
anag
emen
t
Prog
ress
: 25
%Be
hind:
4.5mo
nths
100% 75
%
50%
25%
Revie
w ex
isting
plan
s, ac
tivitie
s and
imple
menti
ng st
ructu
re, e
tc. re
lated
towa
ter di
stribu
tion m
anag
emen
tPr
ogre
ss:
75%
Behin
d:11.0
month
s
100% 75
%
50%
25%
Deve
lop a
plann
ing m
anua
l for N
RWre
ducti
on
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75
%
50%
25%
Deve
lop an
annu
al NR
W re
ducti
on pl
anba
sed o
n the
stra
tegic
plan a
s an
integ
ral p
art o
f an a
nnua
l recu
rrent
and
capit
al pla
n of F
CTW
B for
appr
oval
by F
CTA
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75
%
50%
25%
Deve
lop th
e firs
t med
ium-te
rm st
rateg
icpla
n (20
18-2
022)
for a
ppro
val b
y FCT
A
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75
%
50%
25%
Deve
lop ou
tlines
of th
e med
ium-te
rmstr
ategic
plan
and i
ts an
nual
NRW
redu
ction
plan
(app
rova
l by t
heDi
recto
r)Pr
ogre
ss:
0%
(Acti
vity i
n Pha
se-2
)
100% 75
%
50%
25%
Prog
ress
: 0
%(A
ctivit
y in P
hase
-2)
100% 75
%
50%
25%
Prog
ress
: 100
%(R
eview
ed in
Pha
se-2
)
100% 75
%
50%
25%
Cond
uct h
ydra
ulic a
nd w
ater p
ress
ure
distrib
ution
analy
ses o
f the
pipe
line
netw
orks
A m
ediu
m-te
rmst
rate
gic p
lan o
f FCT
WB
for N
RW re
duct
ion
isde
velo
ped,
util
izing
the
resu
lts o
f Out
put-1
&2
Estab
lish a
Wor
king G
roup
for N
RWre
ducti
on pl
annin
g
Prog
ress
: 100
%(R
eview
ed in
Pha
se-2
)
100% 75
%
50%
25%
Revie
w ex
isting
plan
s, im
pleme
ntatio
nstr
uctur
e, on
-the-
job tr
aining
mech
anism
, etc.
relat
ed to
NRW
redu
ction
at F
CTW
B
Deve
lop m
anua
ls for
NRW
redu
ction
for A
rea O
ffice m
anag
ers a
nd fie
ldop
erato
rs (i.e
. tec
hnica
l offic
ers &
read
ers),
incl.
audio
visua
l mate
rials
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Prep
are a
repo
rt on
pilot
proje
cts,
cove
ring A
ctivit
y 2-1
~2-1
5
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Meas
ure l
evel
of NR
W of
each
SMA
atthe
end o
f the
resp
ectiv
e ope
ratio
ns
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Monit
or th
e pro
gress
of th
e NRW
redu
ction
oper
ation
s of e
ach S
MA
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Imple
ment
NRW
redu
ction
oper
ation
sat
each
SMA
Prog
ress
: 10
0%(P
rovis
ional)
100% 75
%
50%
25%
Feb
Mar
Apr
May
Jun
Feb
Mar
To be
revie
wed i
n Pha
se-2
.
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Annex3-98
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Mon
itorin
g: 20
Dec
. 201
6
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)Pl
an o
f Sch
edul
e and
Act
ual W
ork P
erio
dP
O3
Asof
theen
dof
Dec.2016
10Sh
inta S
EGAW
AW
/PW
ater D
istrib
ution
Man
agem
ent 2
Revis
edAc
tual
11Se
igo G
OTO
W/P
Remo
te Mo
niotor
ingRe
vised
Actua
l12
Kenji
YOS
HIDA
(-De
c/201
5), T
akas
hi MO
RI (J
an/20
16-)
W/P
Pro
cure
ment
Mana
geme
nt / C
oord
inator
2Re
vised
Actua
lEq
uipm
ent
1Le
akag
e dete
ction
equip
ment
W/P
*3PM
Asin
Japa
n(JI
CA)
Revis
edAc
tual
2Bu
lk me
ters (
ultra
sonic
flow
meter
)W
/P*W
TPin
Japa
n(JI
CA)
Revis
edAc
tual
Instal
lation
3W
ater m
eter,
flow
meter
and v
alves
W/P
*3PM
Asin
Nige
ria(JI
CA E
xper
t)Re
vised
Actua
l4
Pipe
repa
ir equ
ipmen
tW
/P*3
PMAs
in Ni
geria
(JICA
Exp
ert)
Revis
edAc
tual
5Ve
hicles
(Pick
up tr
uck)
W/P
*Lea
kage
Dete
ction
in Ni
geria
(JICA
)Re
vised
Actua
l6
GIS
softw
are,
office
equip
ment
W/P
*FCT
WB
HQs
in Ni
geria
/Othe
r(JI
CA E
xper
t)Re
vised
Actua
l7
Zona
l mete
rs, pr
essu
re se
nsor
s and
remo
te mo
nitor
ing sy
stem
W/P
*Who
le Sy
stem
in Ja
pan
(JICA
)Re
vised
Actua
lLo
cal C
onsu
ltant
1Mo
difica
tion o
f billi
ng an
d coll
ectio
n sys
temW
/PRe
vised
Actua
lCo
ncep
tSp
ecific
ation
Spec
ificati
onMo
difica
tion
2GI
S an
d data
base
train
ingW
/PRe
vised
Actua
l3
Cons
tructi
on of
cham
bers
for zo
nal m
eter a
nd w
ater
W/P
pres
sure
sens
orRe
vised
Actua
l4
Instal
lation
of st
andb
y pow
er ge
nera
tion a
nd st
orag
e batt
ery
W/P
Revis
edAc
tual
5Co
nstru
ction
of ch
ambe
rs for
bulk
meter
W/P
(inclu
ding c
able
instal
lation
)Re
vised
Actua
lCo
nstru
ction
Train
ing
in Ja
pan
W/P
Plan
: 4 tr
ainee
s x 3
times
= 12
train
ees
Revis
edAc
tual: 4
train
ees x
1 (M
anag
emen
t) +
8 tra
iness
x 1 (
D&C
Joint
) = 12
train
Actua
l20
1420
1520
1620
1720
18Mo
nito
ring
Rema
rksAc
hieve
ment
Issue
&1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
42Co
unter
meas
ures
Plan
ning
, Mon
itorin
g an
d Co
ordi
natio
n1
W/P
Revis
edAc
tual
2W
/PRe
vised
Actua
l3
W/P
Revis
edAc
tual
4W
/PRe
vised
Actua
l5
W/P
Revis
edAc
tual
6W
/PRe
vised
Actua
l7
W/P
Revis
edAc
tual
8W
/PRe
vised
Actua
l9
W/P
Kick
off
Final
Revis
edAc
tual
10Co
llect
and o
rganiz
e data
for I
ndica
tors o
f PDM
aW
/PRe
vised
Actua
lb
Cond
uct jo
int ca
pacit
y ass
essm
ent o
f the
relev
ant s
taff
W/P
Base
line
Inter
im-1
Inter
im-2
Final
Revis
edPr
epar
e Cap
acity
Dev
elopm
ent (
CD) P
lanAc
tual
Base
line
Inter
im-1
cW
/PRe
vised
Actua
ld
W/P
Revis
edAc
tual
Repo
rts /
Docu
men
ts11
W/P
Revis
edAc
tual
12W
/PRe
vised
Actua
l13
W/P
Revis
edAc
tual
Publ
ic Re
latio
ns14
W/P
Revis
edAc
tual
15W
/PRe
vised
Actua
lM
onito
ring
and
Evalu
atio
n in
the P
ost-P
rojec
t per
iod
16Po
st Mo
nitor
ing by
JICA
(not
desc
ribed
here
)-
--
17Po
st Ev
aluati
on by
JICA
(not
desc
ribed
here
)-
--
News
letter
s hav
e bee
n iss
ued.
None
-
-No
ne.
-
FCTW
B wi
ll disc
uss P
R thr
ough
webs
ite.
None
-
Wor
k Plan
s wer
e pre
pare
d twi
ce.
Comp
leted
.-
Prog
ress
Rep
orts
were
prep
ared
twice
.Co
mplet
ed.
-
-Pr
ovisi
onall
y com
pleted
.Re
vision
may
be do
ne if
nece
ssar
y.
-Co
mplet
ed
Quar
terly
prog
ress
, plan
, issu
es,
solut
ions a
nd et
c are
disc
usse
d.No
ne.
-
Monit
oring
shee
t was
subm
ited i
n .Se
p. 20
16 an
d to b
esu
bmtte
d in D
ec.20
16
Joint
mon
itorin
g was
held
twice
in S
ep. 2
016 a
nd D
ec.
2016
.
-
-Co
mplet
ed-
-Co
mplet
ed (P
hase
-1)
-
-Mo
nitor
ing m
ission
from
JICA
atten
ded j
oint r
eview
in S
ep.
2016
[.No
ne
-No
ne.
-Owne
rship
and i
nitiat
ive of
FCT
WB
are k
eys t
o suc
cess
ofthe
Pro
ject.
Monit
oring
meth
od an
d doc
umen
tation
are
trans
ferre
d to F
CTW
B gra
duall
y.
Achie
veme
nt of
PDM
and p
rogre
ss of
PO ar
e mon
itore
d join
tly.
-No
ne.
-
Month
ly pr
ogre
ss, p
lan, is
sues
,so
lution
s and
etc a
re di
scus
sed.
Month
ly tec
hnica
l mee
tings
wer
e held
mos
tly ev
ery
month
s.-
-Th
e Fou
rth m
eetin
g in S
ep. 2
016 a
nd th
e Fifth
mee
ting i
nDe
c. 20
16.
-
-No
ne.
-
To be
imple
mente
d in P
hase
-2.
None
-
1st t
raini
ng fo
r 4 tr
ainee
s in A
ug.
2015
fand
2nd t
raini
ng fo
r 12 t
raine
esin
Jun.-
Jul. 2
016.
Comp
leted
.-
-Co
mplet
ed.
-
-Co
mplet
ed.
-
Take
n ove
r by J
ICA.
Comp
leted
.-
-Pr
ocur
emen
t is on
going
.Sm
ooth
custo
ms cl
eara
nce a
nd ta
x exe
mptio
n are
key.
-Co
mplet
ed.
-
-Ha
nded
over
and c
omple
ted.
Prop
er us
e for
proje
ct ac
tivitie
s sho
uld be
obse
rved d
uring
the P
rojec
t.
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-0.8
3 man
-mon
th-
-4.0
0 man
-mon
th-
-2.5
0 man
-mon
th-
Proje
ct Pr
ogre
ss R
epor
t
Proje
ct Co
mplet
ion R
epor
t
Deve
lop P
rojec
t Web
site
Prep
ratio
n of p
ublic
relat
ions m
ateria
ls
Monit
oring
Miss
ion fr
om JI
CA fo
r Join
t Rev
iew
Orga
nize i
nform
ation
shar
ing se
mina
rs for
FCT
WB/
FCTA
, inclu
ding
Area
Offic
es
Deve
lop cr
iteria
for c
apac
ity as
sess
ment
for ea
ch le
vel o
f the
relev
ant s
taff (
i.e. m
embe
rs of
NRW
Mgm
t and
Acti
on T
eams
)
Set r
educ
tion t
arge
t for
each
PMA
by th
e firs
t qua
rter o
f the
seco
ndye
ar
Colle
ct an
d orga
nize f
or In
dicato
rs for
semi
-ann
ual J
oint M
onito
ring
Wor
k Plan
Deve
lop D
etail P
lan of
Ope
ratio
ns (D
PO) f
or re
view
and a
ppro
val
by JC
C
Deve
lop A
nnua
l Plan
of O
pera
tions
(APO
) for
revie
w an
d app
rova
lby
JCC
Orga
nize m
onthl
y tec
hnica
l mee
tings
Orga
nize q
uarte
rly pr
oject
meeti
ngs
Cond
uct J
oint M
onito
ring s
emi-a
nnua
lly
Subm
it Mon
itorin
g She
et to
JICA
Nige
ria O
ffice s
emi-a
nnua
lly
Feb
Mar
Apr
May
Jun
Orga
nize J
oint C
oord
inatio
n Com
mitte
e (JC
C)
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Moni
torin
g Pl
anOc
t.No
vDe
cJa
nJa
nFe
bMa
rAp
rMa
yJu
nJu
lMa
rJu
lAu
gSe
pOc
tNo
vDe
cJa
nFe
b
PresidentialElectionon14thFebruary(Postponed)
PresidentialElectionon28thMarchandStateElectionon11thApril
Annex3-99
Annex-1 Updated on 20/12/2016List of Equipment for the Project
No. Equipment Specification Quantity Hand- RemarksJapan Nigeria Plan Actual over
For Activity 1-21 Ultrasonic flow meter (stationary, 220m) Ultrasonic pulse transmit time difference method, sensor for 600-1,500mm, 220m 2 2 including installation, commissioning and training2 Ultrasonic flow meter (stationary, 300m) Ultrasonic pulse transmit time difference method, sensor for 600-1,500mm, 300m 2 2 including installation, commissioning and training3 Data logger (stationary) Paperless, 6 points, 1s-1h record cycle, 4-20mA, trend, bar graph and histrical trend 1 1 for the above No.1&2 ultrasonic flow meters
For Activity 1-61 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 10m cable 6 - Not yet including installation, commissioning and training2 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 20m cable 3 - Not yet including installation, commissioning and training3 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 30m cable 2 - Not yet including installation, commissioning and training4 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 300-1,500mm, 40m cable 2 - Not yet including installation, commissioning and training5 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 25-250mm, 10m cable 1 - Not yet including installation, commissioning and training6 Data logger (stationary) Paperless, 6pts, 1s-1h record cycle, 4-20mA, trend, bar graph and histrical trend 13 - Not yet for the above No.1-5 ultrasonic flow meters7 Data logger (portable) 2ch (flow and pressure), 1s - 24h record cycle, 4-20mA, 5 years battery life 2 - Not yet8 Remote Monitoring System Telemetry with transmission, modem/router, container, interface, PC, printer, UPS, 2 - Not yet Pilot system9 Solar System 80VA, 1.0kW (not yet confirmed) 2 - Not yet for the above ultrasonic flow meter
10 Solar System 80VA, 0.3kW (not yet confirmed) 8 - Not yet for the above ultrasonic flow meter11 Solar System 110VA, 0.4kW (not yet confirmed) 1 - Not yet for the above ultrasonic flow meter12 Solar System 110VA, 0.4kW (not yet confirmed) 2 - Not yet for the above ultrasonic flow meter and telemetry system
For Activity 2-4 and 2-81 GIS software Intergraph Geomedia Essential 1 1 Software has been adopted by AGIS. V13.12 GIS software ESRI ArcGIS Basic Version 10.3 1 1 Mainly for data input3 Plotter (A0) A0 1 1
4 GPS terminal High sensitivity, 2,000pts, 200routes, IPX7, built-in camera (5mega-pixel), USB,nickel hydride battery pack 2 2 Garmin
5 Personal computer 500HD, 4 GB Ram, Windows 7or8, Microsoft Office installed, Mouse 2 26 Anti-virus software 2 2 for the above PCs (No.5)7 UPS 1.2kVA 2 2
For Activity 2-51 Ultrasonic flow meter (stationary) Ultrasonic pulse transmit time difference method, sensor for 450mm, 20m cable 1 12 Data logger (portable) 2ch (flow and pressure), 1s - 24h record cycle, 4-20mA, 5 years battery life 1 1 for the above No.1 ultrasonic flow meter3 Flow meter Dia. 50mm with fittings - - -4 Flow meter Dia. 80mm with fittings - - -5 Flow meter Dia. 100mm with fittings - - -6 Flow meter Dia. 150mm with fittings 0 17 Flow meter Dia. 200mm with fittings 1 28 Flow meter Dia. 250mm with fittings 0 09 Flow meter Dia. 300mm with fittings 3 3
For Activity 2-71 Sluice valve Dia. 50mm with fittings 2 0 -2 Sluice valve Dia. 80mm with fittings 0 0 -3 Sluice valve Dia. 100mm with fittings 9 14 Sluice valve Dia. 150mm with fittings 12 75 Sluice valve Dia. 200mm with fittings 6 86 Sluice valve Dia. 250mm with fittings 2 07 Sluice valve Dia. 300mm with fittings 10 6
For Activity 2-101 Ultrasonic flow meter (portable) Ultrasonic pulse transmit time difference method, sensors (small x3, medium x6, 6 62 Data logger (portable) 2ch (flow and pressure), 1s - 24h record cycle, 4-20mA, 5 years battery life 6 63 Leak noise correlator Main unit, preamplifier and piezoelectric sensor 2 24 Water leak detector Acoustic type, piezoelectric sensor 6 65 Non-metal pipe locator Electromagnetic induction type for plastic pipe (PVC, PE) 3 36 Metal locator Optical and acoustical output signal, 50cm depth 3 37 Time integral water leak detector Automatic leak noise determination method 3 38 Acoustic rod 1.5m length 9 99 Distance meter Max. 10km, 10cm scale 3 3
10 Hammer drill Dia. 38mm, 270rpm, 3,000 stroke/min 3 311 Boring bar Dia. 16mm, 1.0m length 3 312 Drill bit Dia.19×800mm 9 913 Portable residual chlorine analyzer DPD, absorptiometry, 0.02-2.00mg/L 3 314 Metal pipe and cable locator 5m depth 3 315 Reference meter Portable built-in case type, 13-25mm 3 316 Leakage quantity measurement device 13-25mm 3 317 Personal computer 500HD, 2GB Ram, Windows 7or8, Microsoft Office installed, Mouse 3 318 Anti-virus software 3 3 for the above PCs (No.17)19 UPS 1.2kVA 3 320 Inkjet printer A4, Color, All-in-one 3 321 Digital camera Compact type, Optical zoom, 10 mega-pixel (min), LCD 3 3
For Activity 2-131 Generator 200V, 6.5kVA 3 32 Asphalt cutter 3600RPM, 13kW 3 33 Concrete breaker 3 34 Small-sized dewatering pump 2" 3 35 Small-sized tamper 3 36 Electric drum 50m 3 37 Customer meter Dia. 2/3" with fittings, conventional type 388 0 -8 Customer meter Dia. 1" with fittings, conventional type 259 6009 Customer meter Dia. 50mm with fittings, conventional type 89 0 -
10 Customer meter Dia. 80mm with fittings, conventional type 23 0 -11 Customer meter Dia. 100mm with fittings, conventional type 7 0 -12 Compact Reciprocating Saw Pipe cutting 3 3
For Output 21 Pickup truck for pilot sites 2 2
For Operation of the Project1 Laser printer A4, B/W 1 12 Inkjet printer A3, Color 1 13 Multifunction copier A3, B/W 1 14 Graphic/movie editing software Windows Movie Maker, Microsoft Powerpoint 1 1 Free or preinstalled softwares to be utilized.5 Projector 3,000 Lummen, HDMI, VGA, USB port 1 1
Procurement in
Annex3-100
Annex 2: Participants in Preparation of Project Monitoring Sheets and Photos
Participants in Preparation of Draft Project Monitoring Sheet
Day: 19th September 2016 S/N NAME POSITION
1 S.T. Bello HOD Admin&Supply (Deputy Project Manager) 2 Nahuche A.A HOD Distribution (Technical Manager) 3 Adis Muhammed S. HOD Commerce (Technical Manager) 4 Lawal Abolade R. Head [Special Projects] (Coordinator) 5 Dikko Musa Head[PL&Wc] 6 Rabiu M.Kabir Head [Logistics] 7 Suleiman Shehu Head [GIS] 8 Akinori Miyoshi CA, JICA Expert Team 9 Takashi Mori JICA Expert Team
Photos of Preparation of Draft Project Monitoring Sheet
Preparation of Project Monitoring Sheets (Attendance: NRW Management Team members)
Preparation of Project Monitoring Sheets (Attendance: NRW Management Team members)
Annex3-101
monitoring system and etc. were procured in Japan, delivered and handed over to FCTWB. Equipment for solar powering systems for zonal meters, data loggers and telemetric monitoring system were procured in Nigeria, delivered and handed over to FCTWB. Installation of zonal meters, data loggers, telemetric monitoring system and solar powering systems is ongoing from July to August 2017. Materials for follow-up activities of pilot projects such as pipe, fittings, valves and etc. were procured. Refer to the Annex-1: List of Equipment for the Project.
Facilities There are no inputs during this monitoring period.
Training of the Nigerian Project Personnel The third training in Japan for six delegation officials from both Federal Capital Development Authority (FCDA) and FCTWB was conducted in the period between 10th and 14th July 2017. Refer to the Annex-2: The Third Training in Japan.
Annex3-104
1-2 Progress of Activities
[Activities for Output-1: Level of NRW of both the service area of FCWTB and water distribution areas monitored regularly.]
No Activity Previous Monitoring (as at Dec.2016)
*Progress against Phase-1 Work Plan
Current Monitoring (as at Jul.2017)*Progress against Phase-2 Work Plan
1-1 Install bulk meters to water treatment plants 1 and 2
Completed.However, data acquisition seems to be not always available, which may be due to not water-filled flow inside pipelines.
Completed.
1-2 Measure monthly water production of water treatment plants 1, 2, 3, and 4
Progress: 0%, Behind: 9.5 monthsReady to measure monthly water production but the Project needs at least 6 months for monitoring this Activity.
Progress: 0%, Behind: 7.0 monthsFlow data measurement has not always been available, which is due to non-full of water flow inside pipelines and electrical challenges (fuse burning).The Project needs at least 6 months for monitoring this Activity.
1-3 Tally the above water production data monthly
Progress: 0%, Behind: 9.5 monthsReady to measure monthly water production but the Project needs at least 6 months for monitoring this Activity.
Progress: 0%, Behind: 7.0 monthsThe Project needs at least 6 months for monitoring this Activity.
1-4 Calculate the monthly water consumption based on the billing data
Completed (billing system modification only).Ready to calculate monthly water consumption, but the Project needs at least 6 months for monitoring this Activity.
Behind: 7.0 months (Calculationpending)Zonal coding is ongoing for water distribution management.The Project needs at least 6 months for monitoring this Activity.Re-evaluation and update of the modified billing system is necessary.Constant power supply, adequate provision for consumables and SOP are necessary.
1-5 Calculate monthly NRW ratio of the service area of FCTWB using the data obtained from Activity 1-3 and 1-4
Progress: 0%, Behind: 4.5 monthsReady to calculate monthly NRW ratio, but the Project needs at least 6 months for monitoring this Activity.
Progress: 0%, Behind: 7.0 monthsThe Project needs at least 6 months for monitoring this Activity.
1-6 Install zonal meters, water pressure sensor and pilot remote monitoring (telemetry) system
Progress :90%, Behind: 4.5 monthsDelayed.Construction of chambers for zonal meters was completed Zonal meters, water pressure sensor and pilot remote monitoring (telemetry) system have been procured in Japan.
Progress :95%, Behind: 0.0 monthsSetting-up of zonal meters has not been done properly due to non-full of water flow inside pipelines (Automatic Gain Adjustment for data correction).Constant power supply and adequate provision for logistics are necessary.
1-7 Measure and collect data for water distribution management such as water flow of zonal meters and water pressure
Progress: 0%, Behind: 4.5 monthsDelayed as a result of delay in Activity 1-6.The Activity will be implemented after the completion of Activity 1-6.
Progress: 0%, Behind: 0.0 monthsThe Activity will be implemented after the completion of Activity 1-6.
Annex3-105
[Activities for Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Activity Previous Monitoring (as at Dec.2016)*Progress against Phase-1 Work Plan
Current Monitoring (as at Jul.2017)*Progress against Phase-2 Work Plan
2-1 Review existing NRW reduction operations at each pilot Area Office
Completed. Completed.
2-2 Conduct capacity assessment of organization and the relevant staff
Progress: 50%, Behind: 0.0 monthsDone for Phase-1.
Progress: 50%, Behind: 2.0 monthsAssessment will be done after the completion of follow-up activities in Garki I and also NRW monitoring in pilot Area offices.
2-3 Identify and select a Pilot Metering Area (PMA) for each Pilot Area Office based on the selection criteria of PMA
Completed. Completed.
2-4 Prepare/update distribution network drawings for each PMA
Completed.AGIS security has still hindered data import/export and analysis in spite of FCTA PS’s instruction.
Completed.Refer to Activity 3-3.
2-5 Install water flow meters to each PMA and measure in/outflows monthly
Completed, but partially and provisionally.Check/repair a PMA meter in Jabi and complete fully electricity connection for the ultrasonic flow meter in Garki I
Completion (installation only).Meter reading in Gudu is ongoing.Adequate provision for logistics and SOP are necessary for monitoring monthly in/outflows.
2-6 Zone each PMA into Sub Metering Areas (SMA)
Completed. Completed.
2-7 Isolate a SMA by installing valves
Completed. Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Discrepancy between as-built drawings and actual situation on ground exist, and updated as-builtdrawings are not available. Information management with standardization and quality should be improved.
2-8 Update the distribution network drawings for each SMA
Completed. Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Refer to Activity 3-3.
2-9 Measure an initial level of NRW of each SMA
Completed. Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area
Annex3-106
No Activity Previous Monitoring (as at Dec.2016)*Progress against Phase-1 Work Plan
Current Monitoring (as at Jul.2017)*Progress against Phase-2 Work Plan
Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Activity in Garki I will be repeated.Administrative complication with respect to Commerce operations (mixture of customer categories,meter types, reading divisions, water tariff, etc.) has suffered the Activity. Streamlining, simplification, uniform management are necessary.
2-10 Detect target NRW components (i.e. invisible leakage, customer meter malfunction, and illegal connection) of each SMA
Provisionally completed.Re-detection may be done if necessary.
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Activity in Garki I will be repeated and will be kept in pilot Area offices based on results of Activity 2-5.
2-11 Develop a NRW reduction operation plan of each SMA, including reduction target for review by Head of Distribution Department
Provisionally completed.Revision may be done if necessary.
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Revision will be done in Garki I.
2-12 Review and approve NRW reduction operation plan of each SMA
Provisionally completed.Revision may be done if necessary.
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW reduction.Revision will be done in Garki I.
2-13 Implement NRW reduction operations at each SMA
Provisionally completed.Further operations may be done if necessary.
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW reduction.Further operations will be done in Garki I.
2-14 Monitor the progress of the NRW reduction operations of each SMA
Provisionally completed.Further monitoring may be done if necessary.
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW reduction.Further operations will be done in Garki I.
2-15 Measure level of NRW of each SMA at the end of the respective operations
Provisionally completed.Detailed check and revision may be done if necessary.
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW
Annex3-107
No Activity Previous Monitoring (as at Dec.2016)*Progress against Phase-1 Work Plan
Current Monitoring (as at Jul.2017)*Progress against Phase-2 Work Plan
reduction.Further operations will be done in Garki I.
2-16 Prepare a report on pilot projects, covering Activity 2-1~2-15
Provisionally completed.Detailed check may be done if necessary.
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW reduction.Revision will be done after the completion of Activity 2-10 to 2-15.
2-17 Develop manuals for NRW reduction for Area Office managers and field operators (i.e. technical officers & meter readers), incl. audio visual materials
Provisionally completed.Revision may be done if necessary.
Progress: 50%, Behind: 0.0 months(Follow-up)Revision ongoing.Finalization will be done after the completion of Activity 2-10 to 2-16.
Annex3-108
[Activities for Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Activity Previous Monitoring (as at Dec.2016)
Current Monitoring (as at Jul.2017)
3-1 Establish a Working Group for NRW reduction planning
Completed, but will be reviewed in Phase-2.
Reviewed and completed.
3-2 Review existing plans, implementation structure, on-the-job training mechanism, etc. related to NRW reduction at FCTWB
Completed, but will be reviewed in Phase-2.
Reviewed and Completed.Lack of HRD planning of FCTWB's staff.FCTWB should have comprehensive training programme including OJT and internal training.
3-3 Conduct hydraulic and water pressure distribution analyses of the pipeline networks
To be implemented in Phase-2.AGIS security has still hindered data import/export and analysis in spite of FCTA PS’s instruction.
Progress: 00%, Behind: 2.0 monthsTo be completed by November 2017.Close communication and feed-back with FCDA should be enhanced.Pipeline and customer information should be entered extensively into GIS for all service areas.
3-4 Develop outlines of the medium-term strategic plan and its annual NRW reduction plan (approval by the Director)
To be implemented in Phase-2. Progress: 25%, Behind: 0.0 monthsDraft content was prepared and officers were selected provisionally.Scenarios of NRW reduction strategic plan has been discussed.To be completed by November 2017.
3-5 Develop the first medium-term strategic plan (2018-2022) for approval by FCTA
To be implemented in Phase-2. Progress: 00%, Behind: 0.0 monthsTo be completed by March 2018.
3-6 Develop an annual NRW reduction plan based on the strategic plan as an integral part of an annual recurrent and capital plan of FCTWB for approval by FCTA
To be implemented in Phase-2. Progress: 00%, Behind: 0.0 monthsTo be completed by March 2018.
3-7 Develop a planning manual for NRW reduction
To be implemented in Phase-2. Progress: 00%, Behind: 0.0 monthsTo be completed by March 2018.
3-8 Review existing plans, activities and implementing structure, etc. related to water distribution management
Progress: 75%, Behind: 11.0 monthsDelayed as a result of delay in information submission from Area Offices.8 out of 13 Area Offices submitted the required information.There was difficulty in implementation due to dearth of as-built drawings which will have provided sufficient information on pipeline and appurtenances.
Progress: 80%, Behind: 0.0 monthsSome Area Offices submitted the required information.To be completed by October 2017.Close communication and feed-back among FCTWB's divisions should beenhanced.Pipeline and customer information should be entered extensively into GIS for all service areas.
3-9 Establish framework of water distribution management
Progress: 25%, Behind: 4.5 monthsDelayed as a result of delay in Activity 1-6 and 1-7.
Progress: 25%, Behind: 0.0 monthsTo be completed by October 2017.
Annex3-109
1-3 Achievement of Output
[Output-1: Level of NRW of the service area of FCTWB is monitored regularly.]
No Indicator Previous Monitoring (as at Dec.2016)
Current Monitoring (as at Jul.2017)
1a Record of monthly NRW ratio is kept by Distribution Department from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed).Monthly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-2to 1-4.In the current schedule, it is expected that monthly NRW ratio will be obtained from the second quarter of the third year.
None and delayed as a result of delay in Activities 1-2 to 1-5.
1b Monthly NRW ratio of the service area of FCTWB is reported to its monthly Joint Management Meeting from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed).Same as the above in Indicator 1a.
None and delayed as a result of delay in Activities 1-2 to 1-5.
1c Quarterly NRW ratio of the service area of FCTWB is reported to the Board ofDirectors (*replace by “Management” in PDM2) of FCTWB from the third quarter of the first (*replace by “second” in PDM2) year of the Project.
No achievement (delayed).Quarterly NRW ratio based results of Activity 1-5 has not been still obtained due to delay in Activity 1-2to 1-4.In the current schedule, it is expected that quarterly NRW ratio will be obtained from Mar. 2017, the second quarter of the third year.
None and delayed as a result of delay in Activities 1-2 to 1-5.
1d Periodic records of data on water distribution management such as water flow of zonal meters and water pressure are kept by Distribution Department from the first quarter of the third year of the Project.
No achievement (as planned). None and delayed as a result of delay in Activities 1-6 and 1-7.
Verification of Achievement and Implementing ProcessAlthough the Project found out the failure of main units of bulk flow meters in the beginning of March 2017, FCTWB purchased spare parts from Japan and repaired them with support of JICA Expert Team for data acquisition to achieve Output-1. Also, based on preliminary investigation by FCTWB and JICA Expert Team, FCTWB has communicated with FCDA to discuss solutions to non-full water flow inside pipelines and interference along trunk mains by water flow from new water treatment plant (No.3&4) to water flow from old plant (No.1&2) at the upstream point of bulk flow meters.To avoid further delay, FCTWB has accomplished tax exemption for import of zonal meters, telemetric system and etc. procured from Japan.There are no problems in the implementing process during this monitoring period.
Annex3-110
[Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Indicator Previous Monitoring (as at Dec.2016) Current Monitoring (as at Jul.2017)2a Decrease rate of NRW
ratio for each Sub Metering Area of a PMA reaches at least 80% of its target at the end of the respective NRW reduction operations.
Most of results did not reach the target level.Provisional NRW Ratio (%)
Before After Red.
Point
Gudu
SMA-1 52.0 62.9 -10.9
SMA-2 53.9 49.0 4.9
Jabi
SMA-2 47.6 48.0 -0.4
SMA-3 86.4 67.2 19.2
Garki I
SMA-1 86.6 82.9 3.7
SMA-2 79.0 85.0 -6.0
SMA-3 68.8 41.8 27.0
Detailed re-check of results and follow up activities to achieve the target level are immediately necessary by utilizinglessons and learnt.
Achieved in Gudu and Jabi pilot Area Offices, but not achieved in Garki I.NRW Ratio (%)
Bef Aft Red.
Point
Target After
Full (80%)
Gudu
SMA-1 52.0 14.3 37.7 26.0(31.2) OK
SMA-2 53.9 28.7 25.2 27.0(32.3) OK
Jabi
SMA-2 45.6 21.1 24.5 22.8(27.4) OK
SMA-3 87.6 42.6 45.0 43.8(52.6) OK
Garki I
SMA-1 85.1 62.2 22.9 42.6(51.1) No
SMA-2 74.8 78.2 -3.4 37.4(44.9) No
SMA-3 70.0 53.7 16.3 35.0(42.0) No
2b Technical manuals for Area Office managers and field operators (i.e. technical officers and meter readers), including audio visual materials, are approved by Head of Department (HoD) for Distribution and HoD for Commerce by the first quarter of the third year of the Project.
Technical manuals were prepared and provisionally approved.Revision may be necessary.
Technical manuals were prepared and provisionally approved, but reviewed and updated in Phase-2.
Verification of Achievement and Implementing ProcessUnder the circumstances that the Counterpart Fund 2017 has not been available as a result of non-passage of 2017 appropriation, the Project made efforts of implementation of pilot projects as follow-up activities to achieve the target in March and April 2017 with concentrated inputs including supervisors and supporters from the FCTWB Headquarters and other Area Offices.The activities related to pilot projects have been suspended from July 2017, but as soon as installation of zonal meters and solar powering systems is completed, the Project resumes the activities.There are no problems in the implementing process during this monitoring period.
Annex3-111
[Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Indicator Previous Monitoring (as at Dec.2016) Current Monitoring (as at Jul.2017)3a By October 2017, draft
medium-term strategic plan for NRW reduction (2018-2022) is submitted by FCTWB to FCTA for review and approval.
No achievement (as planned). None (as planned).
3b By October 2017, an annual NRW reduction plan (2018) is incorporated in FCWTB’s annual recurrent and capital plan (2018) for submission to FCTA for review and approval.
No achievement (as planned). None (as planned).
3c A planning manual for NRW reduction is approved by the Director of FCTWB by the end of the Project.
No achievement (as planned). None (as planned).
3d By November 2016, framework of water distribution management is established.
No achievement (delayed).Framework has not been ready due to delay in Activity 1-6 and 1-7.
None and delayed. Framework has not been ready due to delay in Activity 1-6, 1-7, 3-8 and 3-9.
Verification of Achievement and Implementing ProcessThe activities related to medium-term strategic plan for NRW reduction have been suspended from July 2017, but as soon as installation of zonal meters and solar powering systems is completed, the Project resumes the activities.There are no problems in the implementing process during this monitoring period.
Annex3-112
1-4 Achievement of the Project Purpose
[Project Purpose: Capacity of FCTWB for NRW reduction is strengthened.]
No Indicator Previous Monitoring (as at Dec.2016) Current Monitoring (as at Jul.2017)a The medium-term strategic
plan for NRW reduction (2018-2022) is approved by FCTA by the end of the Project.
No achievement (as planned). None (as planned).
b NRW reduction operations of the first quarter of 2018 specified in the annual plan of the above plan are carried out according to the plan by FCTWB.
No achievement (as planned). None (as planned).
c Relevant staff of FCTWB (i.e. members of NRW Management Team and Pilot NRW Action Teams) become equipped with skills and knowledge necessary for NRW reduction according to the criteria set by the Project for each level.
Ongoing.Results of interim capacity assessment in Nov.-Dec. 2016 show that capacity developed has not reached to the criteria. Follow-up capacity development is necessary in Phase-2 of the Project.
Follow-up capacity development have been done in Phase-2 of the Project.
d NRW ratio of each PMA in the last quarter of the Project reaches its respective target (**).Note(**):Target for each PMA is expected to be determined by the end of the first quarter of the second year.
No achievement (as planned). None (as planned). Inflow data has been read in Gudu, but not in Jabi and Garki I.
Verification of Achievement and Implementing ProcessBudget constraint from the Nigerian side has slowed down the achievement of project purpose, particularly Indicator b.There are no problems in the implementing process during this monitoring period.
1-5 Changes of Risks and Actions for Mitigation
Following last physical year 2016, recent budget constraint of the Nigerian side including non-release or late-release of the Counterpart Fund has corresponded to an important assumption “A.Natural disaster / political instability / economic crisis that affect the Project activities do not occur.”in 2017, too. As an action discussed in the past project monitoring, taking over procurement of small materials for Pilot activities by the Japanese side, subsequent to the request from the Nigerian side, has mitigated this risk.
1-6 Progress of Actions undertaken by JICA
The JICA Expert Team procured small materials for the follow-up Pilot activities.
Annex3-113
1-7 Progress of Actions undertaken by Nigerian side
FCTWB cooperated with the JICA Expert Team for smooth procurement of small materials for the follow-up Pilot activities. FCTWB has requested FCTA for the immediate release of the Counterpart Fund.
1-8 Other remarkable/considerable issues related/affect to the project (such as other JICA's projects, activities of counterparts, other donors, private sectors, NGOs etc.)
(1) Personnel Reassignment of the FCTWB’s Project Members
In June 2017, the Director of FCTWB, Technical Managers (Heads of Distribution and Commerce) and other Project members including Pilot Area Managers were relocated. FCTWB needs to assure transfer of information, knowledge and lessons learned in the Project activities to his/her successor and other members.
(2) Delay in Release of Counterpart Fund 2017
Though national budget for 2017 was approved in June 2017, but FCT budget for 2017 is still in the process of the approval. Accordingly, the Counterpart Fund 2017 has not been released yet. The Nigerian side needs to keep in touch with JICA Expert Team on the status of FCT budget approval and release of the Counterpart Fund.
(3) Legal Instrument (Enabling Law) establishing autonomous FCTWB
Through deliberations of bills by the sub-committee for FCT, the FCTWB Bill was presented at public hearing and then passed to the National Assembly for approval. Hereafter, remaining steps are approvals by the National Assembly and then the President. In anticipation of autonomy in the near future, JICA Expert Team suggests FCTWB set up apreparatory committee or task-force to discuss solutions to various issues and challenges surrounding FCTWB as well as strengthening and improvement in management.
(4) Administrative Complication with respect to Commerce Operations
Mixture of customer categories, meter types, reading divisions and water tariff, etc. have caused inefficiency in commerce operations which leads to financial losses of FCTWB. JICA Expert Team suggests FCTWB to resolve the issues in consideration of streamlining, simplification and uniform management among relevant Units.
(5) Project Vehicle
Investigation of conditions of the project vehicle damaged by the traffic accident in March 2017 and arrangement of an alternate vehicle for implementing project activities are necessary. FCTWB will send staff in charge to the Federal Road Safety Corps in Lokoja for the investigation, and also will bring back then repair the vehicle if possible, or purchase a new vehicle by using
Annex3-114
Counterpart Fund if the conditions are critical.
(6) Situation of Actions raised in the past Monitoring
(6)-1: Action for “Involvement of Counterparts”One FCTWB staff belonging to Gudu Area Office has a high motivation to implement the NRW reduction activities by his effort outside the Pilot Metering Area based on action plan which was prepared by him in the training course in Hokkaido, Japan.From the beginning, the Project aims to promote such NRW reduction activities outside the Pilot Metering Area by the Nigerian self-effort, this is good example of the Project activities.Situation: He has identified a candidate project site, materials to be procured for the implementation of the action plan and prepared estimated cost. However, the budget for funding has not been approved.
(6)-2: Action for “Assignment of Counterparts”Considering sustainability of implementing NRW reduction based on a NRW reduction strategic plan to be prepared through Output 3 activities, it may be necessary for the Nigerian side to enhance project management skill for working level staff such as Head of Unit for example. Such project management skill should be enhanced through the Project activities. In addition, the existing operational structure should be reviewed.Situation: Remarkably, FCTWB created new unit “NRW Unit” consisting of a Unit Head and two staff in Distribution Department in March 2017, which deals with all NRW aspects. Since this establishment, NRW Unit has been always a center point in project implementation and project management skill is being developed through the Project.
(6)-3: Action for “Involvement of Relevant Organizations”FCTA has been involved well in the Project as the chairperson of Joint Coordination Committee (JCC) and also has assisted and advised the Project in dealing with issues including the Counterpart Fund and AGIS security. Situation: Due to non-responsive action by AGIS and then no relaxation in AGIS security, FCTWB decided to establish its own GIS which is separated from AGIS security.
(6)-4: Action for “Communication between Distribution Department and Commerce Department”
The JICA Expert Team reported that Distribution Department and Commerce Department have to implement the cross-cutting activities for NRW reduction. Both Departments understand the importance of collaboration and active communication; however they need to collaborate more to the success of the Project. Also, active participation of Commerce staff (FCTWB Headquarters) particularly in the field activities is a key to success of the Projectand improvement in water supply services.Situation: The newly-created “NRW Unit” is expected to work in conjunction with all
Annex3-115
stakeholders.
(6)-5: Action for “Necessity for Strengthening Partnership between FCDA and FCTWB”It is necessary for FCTWB to obtain the updated as-built drawings and information correctly and timely for proper operation, maintenance and implementing NRW reduction activities efficiently. However, FCWB has not been able to obtain the updated as-built drawings and information in respect of its operation and maintenance activities from FCDA charged with responsibility of providing infrastructure. This is as a result of lack of feedback system between the two sister agencies. So, FCTWB is encouraged to always share its operation and maintenance experiences with FCDA while FCDA is equally advised to carry along FCTWB in its water project implementation.Situation: The Project has communicated officially/bilaterally with FCDA for setting up further relationship and information sharing. Remarkably, through occasion of participating in the third training in Japan by delegation officials comprised of FCDA and FCTWB, their partnership has been more strengthened through shared awareness and knowledges.
(6)-6: Action for “Lack of the Quality Management”The monitoring survey mission found quality of information and performance as well as quality of constructed facilities is not properly managed by FCTWB. For example, (a) Information such as deliverables from FCTWB has lacked often accuracy, so this has led
to decrease in data reliability and duplication of effort.(b) There are many honeycombs on the surface of the concrete of constructed chambers for
the bulk flowmeter.(c) In Garki I Pilot area, FCTWB cannot read PMA flowmeter regularly because of mortar
plastering on entire concrete slab covers.(d) In Gudu Pilot area, inside of the chamber for PMA flowmeter is in muddy conditions
because FCTWB has not placed concrete slab covers.It is very important to pay attention to quality management in order to enhance the Project outcome with adequate performance, avoid further delay of the Project and keep sustainability through proper operation and maintenance.Situation: Quality management of FCTWB has been improved through joint supervision of construction of bulk/zonal meter chambers and solar power system installation, etc.
2 Delay of Work Schedule and/or Problems (if any)
2-1 Detail
(1) Delay of the Project (Output-1)
Same as the previous monitoring, the Project has been delayed for six (6) months from the original plan of operation, and also Project needs certain time frame to monitor the water
Annex3-116
production, consumption and NRW ratio. Without the monitoring, the Project cannot make a realistic NRW reduction strategic plan through the activities of Output 3, so that it is indispensable for securing the Project’s outcome.Available monitoring period of Activities 1-2 to 1-5 is insufficient, so the Project needs at least six months for monitoring the Activities 1-2 to 1-5.
(2) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
Through commissioning and/or periodical monitoring of bulk and zonal flow meters (ultrasonic meters), the Project found out that data acquisition is not always available due to non-full of water flow inside pipelines and also electrical challenges at bulk flow meters. Thus, the Project needs to solve this problem technically as soon as possible which leads to non-achievement of Activity 1-2 to 1-7.
(3) Irregular Billing (Output-1)
Billing has not been regularly done due to non-constant power supply and other operational challenges, however the situation has begun to improve. June bills were produced while July bills is in process.
(4) Unsuccessful Results of the Pilot Project (Output-2)
A series of follow-up activities and operations for NRW reduction in PMAs/SMAs were completed in April 2017, however should be repeated and monitored particularly in Garki I, because the targeted reduction in NRW ratio was not achieved. See the following table.
Table Reduction in NRW Ratio (Follow-Up)PMA/SMA Before (%) After (%) Reduction
PointTarget Ratio After (%)
Full (80% case)Acceptance
GuduSMA-1 52.0 14.3 37.7 26.0 (31.2) OKSMA-2 53.9 28.7 25.2 27.0 (32.3) OK
JabiSMA-2 45.6 21.1 24.5 22.8 (27.4) OKSMA-3 87.6 42.6 45.0 43.8 (52.6) OK
Garki ISMA-1 85.1 62.2 22.9 42.6 (51.1) NotSMA-2 74.8 78.2 +3.4 37.4 (44.9) NotSMA-3 70.0 53.7 16.3 35.0 (42.0) Not
2-2 Cause
(1) Delay of the Project (Output-1)
In the Phase-1, the chamber construction for bulk flow meters and procurement of necessary materials for pilot activities had delayed and suspended activities due to non-release of the
Annex3-117
Counterpart Fund in 2015 and 2016. These were solved by JICA’s intervention, particularly taking over chamber construction based on request from the Nigerian side. However, Activities 1-2 to 1-5 are still behind the schedule.
(2) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
One of possible causes seems to be interference along trunk mains by water flow from new water treatment plants (No.3&4) to water flow from old plants (No.1&2) at the upstream point of bulk flow meters. However essentially, the Project identifies main cause as the situation that water supply (production) does not meet water demand in the whole system of FCTWB.
(3) Irregular Billing (Output-1)
The inability of regular billing is attributed to non-constant power supply. Also, non-fully optimized billing application has caused disorder of billing operations.
(4) Unsuccessful Results of the Pilot Project (Output-2)
As a change of conditions, new inlet pipeline into a SMA was discovered at the last minute during the follow-up activities in Garki I, which brought confusion to the implementation and analysis. In consideration of characteristics of Garki I pilot area, the Project assumes that
Phase 2Clear Water
Tank
Phase 1Clear Water
Tank
DN1500mmDIP
DN
1500
mm
DIP
DN
1500
mm
DIP
DN
1200
mm
GRP
DN600mmGRP
Bwari
Reservoirs 2 & 5 Reservoirs 3 & 4 Kubwa/Gwako/Airport
DN1000mmSteel
Phase 3 & 4¥¥¥¥
CableUltrasonic Flow Meterand Chamber
Lower Usuma Treatment Works(Phase 1 & 2)
Chamber Chamber
¥¥¥¥
Operation House
Fence
Interference at Injection Point
Annex3-118
missing major consumers in the list and undiscovered inlet/outlet or connections caused unexpected results of the pilot project.
2-3 Action to be taken
(1) Delay of the Project (Output-1)
In the past monitoring, the Nigerian side requested to the Japanese side to extend the project period in order to secure the necessary time frame to monitor the water production, consumption and NRW ratio, then the Japanese side agreed it through approval of the past monitoring sheets by the JICA headquarters. So, the Project period will be extended for six months for monitoring the Activities 1-2 to 1-5.
(2) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
The Project continues to monitor water flow. As proposed by the Nigerian side, the Project identifies how to estimate water supply (production) based on available and reliable data which the Project can obtain with support of JICA Expert Team. And, FCTWB solves electrical challenges of bulk meters immediately after detecting the cause.
(3) Irregular Billing (Output-1)
Improvement in power supply conditions for resumption of regular billing has been addressed in FCTWB since June 2017. The updated billing system and its operation are re-evaluated holistically and FCTWB reviews and prepares SOP for billing operations with support of JICA Expert Team.
(4) Unsuccessful Results of the Pilot Project (Output-2)
As further follow-up activities, the Project repeats NRW reduction operations with focusing on major consumers in Garki I pilot area. Even if the operations lead to unsuccessful results again,FCTWB identifies factors responsible and analyzes cost-benefit.
2-4 Roles of Responsible Persons/Organization
[Nigerian Side]
(1) Delay of the Project (Output-1)
The Nigerian side signed the amendment of Record of Discussion (R/D) to extend the Project period in the end of December 2016, so will proceed to revision of PDM (PDM3 to PDM4) for this extension.
(2) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
Annex3-119
FCTWB gathers all necessary data for the estimation of water supply (production) and distribution with the support of JICA Expert Team (effective measured data, proportional ratio among trunk and/or distribution mains, operation hours and any other useful data).
(3) Irregular Billing (Output-1)
FCTWB keeps constant power supply improving for continuous billing operations with necessary provisions. Also, FCTWB coordinates the system integrator and relevant Units such as MIS, billing and AMR to re-evaluate the numerous challenges of billing system operations and then solves them by reviewing and preparing SOP.
(4) Unsuccessful Results of the Pilot Project (Output-2)
FCTWB repeats Activity 2-10 to 2-15 to reduce NRW to a certain degree as further follow-upactivities with concentrated inputs including manpower, immediately after the completion of ongoing Activity 1-6.
[Japanese Side]
(1) Delay of the Project (Output-1)
The Japanese side signed the amendment of Record of Discussion (R/D) to extend the Project period in the end of December 2016, so will proceed to revision of PDM (PDM3 to PDM4) for this extension.
(2) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
JICA Expert Team supports FCTWB to identify how to estimate water supply (production) based on available and reliable data which the Project can obtain.
(3) Irregular Billing (Output-1)
JICA Expert Team supports FCTWB on re-evaluation of the system operations, also review and preparation of SOP.
(4) Unsuccessful Results of the Pilot Project (Output-2)
JICA Expert Team supports FCTWB to repeat NRW reduction operations with focusing on major consumers in Garki I pilot area, identify factors responsible and analyze cost-benefit.
3 Modification of the Project Implementation Plan
3-1 Plan of Operation
In accordance with extension of project period for six months through revision of PDM (PDM3 to
Annex3-120
PDM4), the Project will extend all relevant activities and allocate necessary inputs for the extended period in Plan of Operation (PO3 to PO4).
3-2 Other modifications on detailed implementation plan
None.
4 Preparation by Nigerian side toward after completion of the Project
To be considered.
II. Project Monitoring Sheet I & II (as attached)
Annex Annex-1: List of Equipment for the Project Annex-2: The Third Training in JapanAnnex-3: Participants in Preparation of Project Monitoring Sheets and Photos
Annex3-121
PM
For
m 3
-2 P
roje
ct M
onito
ring
She
et I
PD
M3
Proj
ect T
itle:
The
Fed
eral
Cap
ital T
errit
ory
Red
uctio
n of
Non
-Rev
enue
Wat
er P
roje
ctVe
rsio
n 3
Proj
ect P
erio
d: O
ctob
er 2
014
to M
arch
201
8D
ated
22
Sep
. 201
6Im
plem
entin
g O
rgan
izat
ion:
Fed
eral
Cap
ital T
errit
ory
Adm
inis
trat
ion
(FC
TA) /
Fed
eral
Cap
ital T
errit
ory
Wat
er B
oard
(FC
TWB)
Dic
rect
Ben
efic
iarie
s: F
CTW
B, re
leva
nt s
taff
of F
CTW
B H
eadq
uart
ers
and
pilo
t Are
a O
ffice
sM
onito
ring:
31
Jul.
2017
Proj
ect S
ite: F
CT
Pilo
t Are
a O
ffice
s: J
abi,
Gar
ki I
and
Gud
uN
arra
tive
Sum
mar
yO
bjec
tivel
y Ve
rifia
ble
Indi
cato
rsM
eans
of V
erifi
catio
nIm
port
ant A
ssum
ptio
nAc
hiev
emen
tR
emar
ks<O
vera
ll G
oal>
a: A
nnua
l NR
W ra
tio is
redu
ced
to X
%(*
) at t
he e
nd o
f the
yea
r 202
1
Not
e(*)
: Tar
get v
alue
(X%
), w
hich
is e
xpec
ted
to b
e de
term
ined
in th
e m
ediu
m-
term
stra
tegi
c pl
an fo
r NR
W re
duct
ion,
sha
ll be
tent
ativ
ely
fille
d w
hen
the
final
draf
t was
app
rove
d by
the
Dire
ctor
of F
CTW
B, w
hich
sha
ll be
fina
lized
whe
n th
epl
an is
app
rove
d by
FC
TA
<Pro
ject
Pur
pose
>
Not
e(**
): Ta
rget
for e
ach
PM
A is
exp
ecte
d to
be
dete
rmin
ed b
y th
e en
d of
the
first
qua
rter o
f the
sec
ond
year
.<O
utpu
ts>
Not
e (*
1): N
RW
com
pone
nts
targ
eted
by
Out
put 2
are
(i) i
nvis
ible
leak
age;
(ii)
cust
omer
met
er m
alfu
nctio
n; a
nd (i
ii) il
lega
l con
nect
ion
Pro
ject
Mon
itor
ing
She
et I
a. R
ecor
d of
NR
W ra
tio k
ept b
yD
istri
butio
n D
epar
tmen
tN
one.
Leve
l of N
on-R
even
ue W
ater
(NR
W) i
s re
duce
d at
the
serv
ice
area
of
FCTW
B
Cap
acity
of F
CTW
B fo
r NR
W re
duct
ion
is s
treng
then
ed
A. S
taff
of F
CTW
B (i
.e. m
embe
rs o
fN
RW
Man
agem
ent T
eam
and
Pilo
tN
RW
Act
ion
Team
s) tr
aine
d th
roug
hth
e P
roje
ct d
o no
t lea
ve th
e of
fice
inla
rge
num
bers
a. T
he m
ediu
m-te
rm s
trate
gic
plan
for N
RW
redu
ctio
n (2
018-
2022
) is
appr
oved
by F
CTA
by
the
end
of th
e P
roje
ct.
b. N
RW
redu
ctio
n op
erat
ions
of t
he fi
rst q
uarte
r of 2
018
spec
ified
in th
e an
nual
plan
of t
he a
bove
pla
n ar
e ca
rried
out
acc
ordi
ng to
the
plan
by
FCTW
B.
c. R
elev
ant s
taff
of F
CTW
B (i
.e. m
embe
rs o
f NR
W M
anag
emen
t Tea
m a
nd P
ilot
NR
W A
ctio
n Te
ams)
bec
ome
equi
pped
with
ski
lls a
nd k
now
ledg
e ne
cess
ary
for
NR
W re
duct
ion
acco
rdin
g to
the
crite
ria s
et b
y th
e P
roje
ct fo
r eac
h le
vel.
d. N
RW
ratio
of e
ach
PM
A in
the
last
qua
rter o
f the
Pro
ject
reac
hes
itsre
spec
tive
targ
et (*
*).
a. D
ate
of a
ppro
val o
f the
pla
nb.
Res
ult o
f mon
itorin
gby
NR
W M
anag
emen
t Tea
mc.
Res
ults
of j
oint
ass
essm
ent
base
d on
the
crite
ria s
et b
y th
eP
roje
ctd.
Rec
ord
of N
RW
ratio
kep
t by
Dis
tribu
tion
Dep
artm
ent
A. P
olic
y su
ppor
t for
NR
W re
duct
ion
isno
t dis
cont
inue
d P
olic
y su
ppor
t for
NR
W re
duct
ion
is n
ot d
isco
ntin
ued
B. N
atur
al d
isas
ter/
pol
itica
l ins
tabi
lity/
eco
nom
ic c
risis
that
affe
ct th
e se
rvic
ear
ea o
f FC
TWB
do
not o
ccur
C. A
ctiv
ities
to im
plem
ent t
he m
ediu
m-
tem
stra
tegi
c pl
an a
re n
ot d
isco
ntin
ued
or d
elay
ed
Indi
cato
r a: N
one.
Indi
cato
r b: N
one.
Indi
cato
r c: F
ollo
w-u
pca
paci
ty d
evel
opm
ent h
ave
been
don
e in
Pha
se-2
of t
heP
roje
ct.
Indi
cato
r d: N
one.
Inflo
w d
ata
has
been
read
in G
udu,
but
not i
n Ja
bi a
nd G
arki
I.
Not
e (*
2): A
med
ium
-term
stra
tegi
c pl
an is
a fi
ve-y
ear p
lan,
whi
ch m
ay in
clud
e m
ediu
m-te
rm ta
rget
, stra
tegi
es a
nd a
ctio
ns, t
imef
ram
e, h
uman
reso
urce
requ
irem
ent,
on-th
e-jo
b tra
inin
g m
echa
nism
, cos
t-ben
efit
anal
ysis
of N
RW
redu
ctio
n, e
tc. I
t is
note
d th
at N
RW
com
pone
nts
addr
esse
d by
the
stra
tegi
c pl
an a
re n
ot li
mite
d to
the
ones
men
tione
d in
(*1)
abo
ve: t
hey
shal
l be
disc
usse
d an
d de
term
ined
in d
evel
opin
g th
e ou
tline
of t
he s
trate
gic
plan
(thr
ough
Act
ivity
3-4
).
2. M
etho
ds/o
pera
tiona
l pro
cedu
res
for e
ffect
ive
NR
W re
duct
ion
are
esta
blis
hed
thro
ugh
pilo
t pro
ject
s at
Pilo
t Met
erin
g A
reas
(PM
As)
und
erpi
lot A
rea
Offi
ces
(*1)
2a. D
ecre
ase
rate
of N
RW
ratio
for e
ach
Sub
Met
erin
g A
rea
of a
PM
A re
ache
sat
leas
t 80%
of i
ts ta
rget
at t
he e
nd o
f the
resp
ectiv
e N
RW
redu
ctio
n op
erat
ions
.2b
. Tec
hnic
al m
anua
ls fo
r Are
a O
ffice
man
ager
s an
d fie
ld o
pera
tors
(i.e
.te
chni
cal o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
vis
ual m
ater
ials
, are
appr
oved
by
Hea
d of
Dep
artm
ent (
HoD
) for
Dis
tribu
tion
and
HoD
for C
omm
erce
by th
e fir
st q
uarte
r of t
he th
ird y
ear o
f the
Pro
ject
.
2a. R
ecor
d of
NR
W ra
tio k
ept
by th
e D
istri
butio
n D
epar
tmen
t2b
. Dat
e of
app
rova
l of t
hem
anua
ls
Indi
cato
r 2a:
Ach
ieve
d in
Gud
u an
d Ja
bi p
ilot A
rea
Offi
ces,
but
not
ach
ieve
d in
Gar
ki I.
Indi
cato
r 2b :
Tec
hnic
alm
anua
ls w
ere
prep
ared
and
prov
isio
nally
app
rove
d, b
utre
view
ed a
nd u
pdat
ed in
Pha
se-2
.
Indi
cato
r 1a&
1b&
1c: N
one
and
dela
yed
as a
resu
lt of
dela
y in
Act
iviti
es 1
-2 to
1-5
.In
dica
tor 1
d : N
one
and
dela
yed
as a
resu
lt of
del
ayin
Act
iviti
es 1
-6 a
nd 1
-7.
3. A
med
ium
-term
stra
tegi
c pl
an o
f FC
TWB
for N
RW
redu
ctio
n is
deve
lope
d, u
tiliz
ing
the
resu
lts o
f Out
put 1
-2 (*
2)3a
. By
Oct
ober
201
7, d
raft
med
ium
-term
stra
tegi
c pl
an fo
r NR
W re
duct
ion
(201
8-20
22) i
s su
bmitt
ed b
y FC
TWB
to F
CTA
for r
evie
w a
nd a
ppro
val.
3b. B
y O
ctob
er 2
017,
an
annu
al N
RW
redu
ctio
n pl
an (2
018)
is in
corp
orat
ed in
FCW
TB’s
ann
ual r
ecur
rent
and
cap
ital p
lan
(201
8) fo
r sub
mis
sion
to F
CTA
for
revi
ew a
nd a
ppro
val.
3c. A
pla
nnin
g m
anua
l for
NR
W re
duct
ion
is a
ppro
ved
by th
e D
irect
or o
fFC
TWB
by
the
end
of th
e P
roje
ct.
3d. B
y N
ovem
ber 2
016,
fram
ewor
k of
wat
er d
istri
butio
n m
anag
emen
t is
esta
blis
hed.
3a&
3b. D
ate
of o
ffici
al le
tter
subm
ittin
g dr
aft s
trate
gic
plan
and
annu
al re
curre
nt a
ndca
pita
l pla
n3c
. Dat
e of
app
rova
l of t
hem
anua
l3d
. Im
plem
entin
g st
ruct
ure
and
wor
kflo
w o
f wat
er d
istri
butio
nm
anag
emen
t
Indi
cato
r 3a:
Non
e.In
dica
tor 3
b: N
one.
Indi
cato
r 3c:
Non
e.In
dica
tor 3
d: N
one
and
dela
yed.
Fra
mew
ork
has
not
been
read
y du
e to
del
ay in
Act
ivity
1-6
, 1-7
, 3-8
and
3-9
.
1. L
evel
of N
RW
of b
oth
the
serv
ice
area
of F
CW
TB a
nd w
ater
dist
ribut
ion
area
s is
mon
itore
d re
gula
rly1a
. Rec
ord
of m
onth
ly N
RW
ratio
is k
ept b
y D
istri
butio
n D
epar
tmen
t fro
m th
eth
ird q
uarte
r of t
he s
econ
d ye
ar o
f the
Pro
ject
.1b
. Mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
its
mon
thly
Join
t Man
agem
ent M
eetin
g fro
m th
e th
ird q
uarte
r of t
he s
econ
d ye
ar o
f the
Pro
ject
.1c
. Qua
rterly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
is re
porte
d to
Man
agem
ent o
f FC
TWB
from
the
third
qua
rter o
f the
sec
ond
year
of t
he P
roje
ct.
1d. P
erio
dic
reco
rds
of d
ata
on w
ater
dis
tribu
tion
man
agem
ent s
uch
as w
ater
flow
of z
onal
met
ers
and
wat
er p
ress
ure
are
kept
by
Dis
tribu
tion
Dep
artm
ent
from
the
first
qua
rter o
f the
third
yea
r of t
he P
roje
ct.
1a. M
onth
ly re
cord
of N
RW
ratio
1b&
1c. M
ater
ial f
or m
eetin
gssu
bmitt
ed b
y th
e D
istri
butio
nD
epar
tmen
t1d
. Per
iodi
c re
cord
s of
dat
a on
wat
er d
istri
butio
n m
anag
emen
t
Annex3-122
PM
For
m 3
-2 P
roje
ct M
onito
ring
She
et I
Activ
ities
Im
port
ant A
ssum
ptio
nTh
e N
iger
ian
Side
The
Japa
nese
Sid
e
Pre-
Con
ditio
ns
Not
e (*
3) S
elec
tion
crite
ria o
f PM
A a
re a
s fo
llow
s: (i
) Saf
ety
for n
ight
wor
ks is
sec
ured
in m
easu
ring
min
imum
nig
ht fl
ow: (
ii) D
istri
butio
n ne
twor
k is
sep
arat
ed a
nd it
is e
asy
to is
olat
e it
in m
easu
ring
NR
W ra
tio: a
nd (i
ii) N
RW
ratio
is s
uppo
sedl
y hi
gh.
Not
e (*
4) W
orki
ng G
roup
for N
RW
pla
nnin
g w
ould
con
sist
of P
roje
ct M
anag
er (a
s ch
air),
Dep
uty
Pro
ject
Man
ager
, Tec
hnic
al M
anag
ers,
Hea
d of
Fin
ance
Dep
t., H
ead
of P
rodu
ctio
n D
ept.,
Hea
d of
PR
S U
nit,
and
mem
bers
of N
RW
Man
agem
ent T
eam
.
Inpu
tsA
. Nat
ural
dis
aste
r / p
oliti
cal /
inst
abili
ty/ e
cono
mic
cris
is th
at a
ffect
the
Pro
ject
activ
ities
do
not o
ccur
.1-
1 In
stal
l bul
k m
eter
s to
wat
er tr
eatm
ent p
lant
s 1
and
21-
2 M
easu
re m
onth
ly w
ater
pro
duct
ion
of w
ater
trea
tmen
t pla
nts
1, 2
, 3an
d 4
1-3
Tally
the
abov
e w
ater
pro
duct
ion
data
mon
thly
1-4
Cal
cula
te th
e m
onth
ly w
ater
con
sum
ptio
n ba
sed
on th
e bi
lling
dat
a1-
5 C
alcu
late
mon
thly
NR
W ra
tio o
f the
ser
vice
are
a of
FC
TWB
usi
ng th
eda
ta o
btai
ned
from
Act
ivity
1-3
and
1-4
1-6
Inst
all z
onal
met
ers,
wat
er p
ress
ure
sens
or a
nd p
ilot r
emot
em
onito
ring
(tele
met
ry) s
yste
m1-
7 M
easu
re a
nd c
olle
ct d
ata
for w
ater
dis
tribu
tion
man
agem
ent s
uch
asw
ater
flow
of z
onal
met
ers
and
wat
er p
ress
ure
Proj
ect P
erso
nnel
1. P
roje
ct D
irect
or: D
irect
or o
f Eco
nom
ic P
lann
ing,
Res
earc
h an
d S
tatis
ticD
epar
tmen
t, FC
TA2.
Pro
ject
Man
ager
: Dire
ctor
of F
CTW
B3.
Dep
uty
Pro
ject
Man
ager
: HoD
for A
dmin
istra
tion
and
Sup
ply/
FCTW
B4.
Tec
hnic
al M
anag
ers
(Als
o Le
ader
s of
NR
W M
anag
emen
t Tea
m):
HoD
for
Dis
tribu
tion
and
HoD
for C
omm
erce
/FC
TWB
5. M
embe
rs o
f NR
W M
anag
emen
t Tea
m (F
CTW
B):
- Hea
d of
Spe
cial
Pro
ject
Uni
t of D
istri
butio
n D
epar
tmen
t (as
Coo
rdin
ator
)- R
elev
ant H
ead
of U
nit (
HoU
) and
offi
cers
of t
he D
istri
butio
n D
epar
tmen
t,C
omm
erce
Dep
artm
ent,
and
Adm
inis
tratio
n an
d S
uppl
y D
epar
tmen
t6.
Hea
ds o
f oth
er re
leva
nt D
epar
tmen
ts a
nd U
nit o
f FC
TWB
: HoD
for F
inan
ce,
HoD
for P
rodu
ctio
n, H
oU fo
r Pla
nnin
g R
esea
rch
and
Sta
tistic
s (P
RS
)7.
Mem
bers
of N
RW
Act
ion
Team
: Are
a M
anag
er, A
ssis
tant
Are
a M
anag
er(D
istri
butio
n), A
ssis
tant
Are
a M
anag
er (C
omm
erce
), te
chni
cal o
ffice
rs(D
istri
butio
n) a
nd m
eter
read
ers
(Com
mer
ce) o
f eac
h pi
lot A
rea
Offi
ce8.
Oth
er p
erso
nnel
mut
ually
agr
eed
upon
as
nece
ssar
y
Japa
nese
Exp
erts
1. C
hief
Adv
isor
/ N
RW
Red
uctio
n P
lann
ing
/ Wat
erD
istri
butio
n M
anag
emen
t 12.
Dep
uty
Chi
ef A
dvis
or /
NR
WR
educ
tion
Pla
nnin
g3.
NR
W R
educ
tion
Ope
ratio
nsM
anag
emen
t4.
Lea
kage
Det
ectio
nTe
chno
logy
5. C
omm
erci
al L
oss
6. H
ydra
ulic
Ana
lysi
s / G
IS7.
Pro
cure
men
t Man
age'
t /C
oord
inat
or8.
Fac
ility
Des
ign
/ Con
stru
ctio
nS
uper
visi
on9.
Equ
ipm
ent D
esig
n /
Inst
alla
tion
10. W
ater
Dis
tribu
tion
Man
agem
ent 2
11. R
emot
e M
onito
ring
12. O
ther
exp
erts
mut
ually
agre
ed u
pon
as n
eces
sary
2-1
Rev
iew
exi
stin
g N
RW
redu
ctio
n op
erat
ions
at e
ach
pilo
t Are
a O
ffice
2-2
Con
duct
cap
acity
ass
essm
ent o
f the
rele
vant
sta
ff of
eac
h pi
lot A
rea
Offi
ce2-
3 Id
entif
y an
d se
lect
a P
ilot M
eter
ing
Are
a (P
MA
) for
eac
h pi
lot A
rea
Offi
ce b
ased
on
the
sele
ctio
n cr
iteria
of P
MA
(*3)
2-4
Pre
pare
/upd
ate
dist
ribut
ion
netw
ork
draw
ings
for e
ach
PM
A2-
5 In
stal
l wat
er fl
ow m
eter
s to
eac
h P
MA
and
mea
sure
in/o
utflo
ws
mon
thly
2-6
Zone
eac
h P
MA
into
Sub
Met
erin
g A
reas
(SM
A)
2-7
Isol
ate
a S
MA
by
inst
allin
g va
lves
2-8
Upd
ate
the
dist
ribut
ion
netw
ork
draw
ings
for e
ach
SM
A2-
9 M
easu
re a
n in
itial
leve
l of N
RW
of e
ach
SM
A2-
10 D
etec
t tar
get N
RW
com
pone
nts
(i.e.
invi
sibl
e le
akag
e, c
usto
mer
met
er m
alfu
nctio
n, a
nd il
lega
l con
nect
ion)
of e
ach
SM
A2-
11 D
evel
op a
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
,inc
ludi
ngre
duct
ion
targ
et, f
or re
view
by
Hea
d of
Dis
tribu
tion
Dep
artm
ent
2-12
Rev
iew
and
app
rove
NR
W re
duct
ion
oper
atio
n pl
an o
f eac
h S
MA
2-13
Impl
emen
t the
NR
W re
duct
ion
oper
atio
ns a
t eac
h S
MA
2-14
Mon
itor t
he p
rogr
ess
of th
e N
RW
redu
ctio
n op
erat
ions
of e
ach
SM
A2-
15 M
easu
re le
vel o
f NR
W o
f eac
h S
MA
at t
he e
nd o
f the
resp
ectiv
eop
erat
ions
2-16
Pre
pare
a re
port
on p
ilot p
roje
cts,
cov
erin
g A
ctiv
ity 2
-1~2
-15
2-17
Dev
elop
man
uals
for N
RW
redu
ctio
n fo
r Are
a O
ffice
man
ager
s an
dfie
ld o
pera
tors
(i.e
. tec
hnic
al o
ffice
rs a
nd m
eter
read
ers)
, inc
ludi
ng a
udio
visu
al m
ater
ials
A. F
urni
shed
offi
ces
for J
apan
ese
Exp
erts
are
sec
ured
at t
heH
eadq
uarte
rs a
nd e
ach
Pilo
t Are
aO
ffice
of F
CTW
B.
B. P
roje
ct P
erso
nnel
is a
ssig
ned
with
the
final
ized
list
.
Equi
pmen
t1.
Bul
k m
eter
s an
d lo
gger
s fo
rw
ater
trea
tmen
t pla
nts
2. W
ater
flow
met
ers,
val
ves,
and
cust
omer
met
ers
for S
MA
3. L
eaka
ge d
etec
tion
equi
pmen
t for
PM
A4.
Pip
e re
pair
equi
pmen
t for
PM
A5.
Veh
icle
s (P
ick-
ups)
6. G
ener
ator
for p
roje
ct o
ffice
7. Z
onal
met
ers,
logg
ers
and
wat
er p
ress
ure
sens
ors
8. T
elem
etric
mon
itorin
gsy
stem
with
sta
ndby
pow
erge
nera
ting
faci
lity
for s
elec
ted
zona
l met
er(s
) and
/or w
ater
pres
sure
sen
sor(s
).9.
Oth
er e
quip
men
t mut
ually
agre
ed u
pon
as n
eces
sary
Land
, Bui
ldin
g an
d Fa
cilit
ies
1. O
ffice
bui
ldin
g an
d fa
cilit
ies
nece
ssar
y fo
r the
impl
emen
tatio
n of
the
Pro
ject
2. O
ffice
spa
ces
and
nece
ssar
y fa
cilit
ies
for t
he J
apan
ese
Exp
erts
at t
heFC
TWB
Hea
dqua
rters
and
eac
h pi
lot A
rea
Offi
ce, i
nclu
ding
inte
rnet
con
nect
ion
and
air c
ondi
tione
rs3.
Cha
mbe
rs fo
rflow
met
ers
and
valv
es fo
r the
sel
ecte
d P
MA
s/S
MA
s.4.
Ele
ctric
wiri
ng to
bul
k/zo
nal m
eter
s, lo
gger
s an
d pr
essu
re s
enso
rs.
5. O
ther
faci
litie
s m
utua
lly a
gree
d up
on a
s ne
cess
ary
Issu
es &
Cou
nter
mea
sure
s(1
) Del
ay o
f the
Pro
ject
(Out
put-1
)Is
sue:
Ava
ilabl
e m
onito
ring
perio
d of
Act
iviti
es 1
-2 to
1-5
is in
suffi
cien
t, so
the
Pro
ject
need
s at
leas
t six
mon
ths
for m
onito
ring
the
Act
iviti
es 1
-2 to
1-5
.C
ount
erm
easu
res:
The
Pro
ject
per
iod
will
be
exte
nded
for s
ix m
onth
s fo
r mon
itorin
g th
eA
ctiv
ities
1-2
to 1
-5. R
ecor
d of
Dis
cuss
ion
was
am
ende
d fo
r thi
s ex
tens
ion
in D
ec.
2016
, but
PD
M h
as n
ot b
een
revi
sed.
(2) D
ata
Acqu
isiti
on b
y B
ulk
and
Zona
l Flo
w M
eter
s (O
utpu
t-1)
Issu
e : T
he P
roje
ct fo
und
out t
hat d
ata
acqu
isiti
on is
not
alw
ays
avai
labl
e du
e to
non
-full
of w
ater
flow
insi
de p
ipel
ines
of b
ulk
met
ers
as w
ell a
s po
ssib
ly z
onal
met
ers,
and
als
obu
lk m
eter
s ha
s su
ffere
d fro
m e
lect
rical
cha
lleng
es.
Cou
nter
mea
sure
s: T
he P
roje
ct c
ontin
ues
to m
onito
r wat
er fl
ow. T
he P
roje
ct id
entif
ies
how
to e
stim
ate
wat
er s
uppl
y (p
rodu
ctio
n) b
ased
on
avai
labl
e an
d re
liabl
e da
ta w
hich
the
Pro
ject
can
obt
ain
with
sup
port
of J
ICA
Exp
ert T
eam
. And
, FC
TWB
sol
ves
elec
trica
lch
alle
nges
of b
ulk
met
ers
imm
edia
tely
afte
r det
ectin
g th
e ca
use.
(3) I
rreg
ular
Bill
ing
(Out
put-1
)Is
sue:
Bill
ing
has
not b
een
regu
larly
don
e du
e to
non
-con
stan
t pow
er s
uppl
y an
d ot
her
oper
atio
nal c
halle
nges
, how
ever
the
situ
atio
n ha
s be
gun
to im
prov
e.C
ount
erm
easu
res :
The
Nig
eria
n si
de k
eeps
add
ress
ing
impr
ovem
ent i
n po
wer
sup
ply,
and
re-e
valu
ates
upd
ated
biil
ling
syst
em o
pera
tions
hol
istic
ally
, the
n re
view
s an
dpr
epar
es S
OP
with
sup
port
of J
ICA
Exp
ert T
eam
.
(4) U
nsuc
cess
ful R
esul
ts o
f the
Pilo
t Pro
ject
(Out
put-2
)Is
sue:
Fol
low
-up
activ
ities
for N
RW
redu
ctio
n in
PM
As/
SM
As
wer
e co
nduc
ted,
how
ever
the
decr
ease
in N
RW
ratio
in G
arki
I is
not
enc
oura
ging
.C
ount
erm
easu
res:
The
Pro
ject
nee
ds to
repe
at N
RW
redu
ctio
n in
Gar
ki I
pilo
t Are
aO
ffice
to a
chie
ve th
e ta
rget
.
Loca
l Cos
ts1.
Cos
t for
inst
alla
tion,
ope
ratio
n an
d m
aint
enan
ce o
f the
pro
vide
d eq
uipm
ent
and
cost
for p
ipe
repa
ir at
PM
As
2. A
dmin
istra
tion
and
oper
atio
nal c
osts
, inc
ludi
ng c
ost f
or lo
cal t
rave
l for
the
Pro
ject
Per
sonn
el, d
emur
rage
at l
ocal
cus
tom
s po
int,
licen
sing
cos
t of r
adio
appl
icat
ion
and
cost
for c
omm
unic
atio
n of
tele
met
ric d
evic
e fo
r sel
ecte
d zo
nal
met
er(s
) and
wat
er p
ress
ure
sens
or(s
)3.
Oth
er c
osts
mut
ually
agr
eed
upon
as
nece
ssar
y
3-1
Est
ablis
h a
Wor
king
Gro
up fo
r NR
W p
lann
ing
(*4)
3-2
Rev
iew
exi
stin
g pl
ans,
impl
emen
tatio
n st
ruct
ure,
on-
the-
job
train
ing
mec
hani
sm, e
tc. r
elat
ed to
NR
W re
duct
ion
at F
CTW
B3-
3 C
ondu
ct h
ydra
ulic
and
wat
er p
ress
ure
dist
ribut
ion
anal
yses
of t
hepi
pelin
e ne
twor
ks3-
4 D
evel
op o
utlin
es o
f the
med
ium
-term
stra
tegi
c pl
an a
nd it
s an
nual
NR
W re
duct
ion
plan
3-5
Dev
elop
the
first
med
ium
-term
stra
tegi
c pl
an (2
018-
2022
) for
app
rova
lby
FC
TA3-
6 D
evel
op a
n an
nual
NR
W re
duct
ion
plan
bas
ed o
n th
e st
rate
gic
plan
as a
n in
tegr
al p
art o
f an
annu
al re
curre
nt a
nd c
apita
l pla
n of
FC
TWB
for
appr
oval
by
FCTA
3-7
Dev
elop
a p
lann
ing
man
ual f
or N
RW
redu
ctio
n3-
8 R
evie
w e
xist
ing
plan
s, a
ctiv
ities
and
impl
emen
ting
stru
ctur
e, e
tc.
rela
ted
to w
ater
dis
tribu
tion
man
agem
ent
3-9
Est
ablis
h fra
mew
ork
of w
ater
dis
tribu
tion
man
agem
ent
Faci
litie
s1.
Mod
ifica
tion
of e
xist
ing
billi
ngsy
stem
2. C
ham
bers
for b
ulk
met
ers
for
wat
er tr
eatm
ent p
lant
s, z
onal
met
ers
and
wat
er p
ress
ure
sens
ors
Trai
ning
of t
he N
iger
ian
Proj
ect P
erso
nnel
1. F
our p
erso
ns m
utua
llyag
reed
upo
n w
ill b
e tra
ined
inJa
pan
annu
ally
2. G
IS tr
aini
ng in
Nig
eria
Annex3-123
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Moni
torin
g: 31
July.
2017
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
4344
4546
4748
Coun
terme
asur
esOu
tput
-11-
1W
/PSu
rvey
Instal
lation
Revis
edAc
tual
Susp
ende
dSu
spen
ded
Instal
lation
1-2
W/P
Revis
edAc
tual
Meter
Fau
ltsRe
pair
Obse
rvatio
n
1-3
W/P
Revis
edAc
tual
Susp
ende
d
1-4
W/P
Revie
wSy
stem
Modif
icatio
nRe
vised
Actua
lCo
ncep
tSp
ecific
ation
Spec
ificati
onMo
difica
tion
Susp
ende
dZo
nal C
oding
1-5
W/P
Revis
edAc
tual
Susp
ende
d
1-6
W/P
Suve
ry &
Desig
nCo
nstru
ction
Instal
lation
Revis
edCu
stom
Clea
ranc
eSo
larIns
tallat
ionAc
tual
Tend
erTe
nder
1-7
W/P
None
.Re
vised
Actua
l
Outp
ut-2
2-1
W/P
Revis
edAc
tual
2-2
W/P
Base
line
Inter
im-1
Revis
edInt
erim
2Fin
alAc
tual
2-3
W/P
Revis
edAc
tual
2-4
W/P
Revis
edAc
tual
2-5
W/P
Revis
edAc
tual
Susp
ende
d
2-6
W/P
Revis
edAc
tual
2-7
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
dSu
spen
ded d
ue to
Acti
vity 1
-6.
2-8
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.
2-9
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.
2-10
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.
2-11
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.
2-12
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)PP
O3
Plan
of S
ched
ule a
nd A
ctua
l Wor
k Per
iod
Activ
ities
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
May
Jun
Jul
Aug
Sep
Leve
l of N
RW o
f bot
hth
e ser
vice a
rea o
fFC
WTB
and
wate
rdi
strib
utio
n ar
eas i
sm
onito
red
regu
larly
Instal
l bulk
mete
rs to
water
trea
tmen
tpla
nts 1
and 2
Meas
ure m
onthl
y wate
r pro
ducti
on of
water
trea
tmen
t plan
ts 1,
2, 3,
and 4
Tally
the a
bove
wate
r pro
ducti
on da
tamo
nthly
Calcu
late t
he m
onthl
y wate
rco
nsum
ption
base
d on t
he bi
lling d
ata
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
-Co
mplet
ed.
-
Prog
ress
: 100
%10
0% 75%
50%
25%
Delay
ed.
None
.Flo
w da
ta me
asur
emen
t has
not a
lway
s bee
n ava
ilable
,wh
ich is
due t
o non
-full o
f wate
r flow
insid
e pipe
lines
and
electr
ical c
halle
nges
(fus
e bur
ning)
.Th
e Pro
ject n
eeds
at le
ast 6
mon
ths fo
r mon
itorin
g this
Activ
ity.
Prog
ress
: 00%
Behin
d: 7.0
mon
ths(P
h2)
100% 75
%
50%
25%
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 1-
2.No
ne.
The P
rojec
t nee
ds at
leas
t 6 m
onths
for m
onito
ring t
hisAc
tivity
.
Prog
ress
: 00%
Behin
d: 7.0
mon
ths(P
h2)
100% 75
%
50%
25%
Comp
leted
(billin
g sys
temmo
difica
tion o
nly)..
FCT
WB
has
colle
cted i
nform
ation
of re
turne
d bills
and h
as de
activ
ated t
hem.
The
retur
ned b
ills ca
use i
nacc
urac
y of
calcu
lating
NRW
ratio
.
Calcu
lation
pend
ing.
Zona
l cod
ing is
ongo
ing fo
r wate
r dist
ributi
onma
nage
ment.
The P
rojec
t nee
ds at
leas
t 6 m
onths
for m
onito
ring t
hisAc
tivity
.Re
-eva
luatio
n and
upda
te of
the m
odifie
d billin
g sys
tem is
nece
ssar
y. Co
nstan
t pow
er su
pply,
adeq
uate
prov
ision
for
cons
umab
les an
d SOP
are n
eces
sary.
Prog
ress
: 100
%Be
hind:
7.0 m
onths
(Ph2
)
100% 75
%
50%
25%
Calcu
late m
onthl
y NRW
ratio
of th
ese
rvice
area
of F
CTW
B us
ing th
e data
obtai
ned f
rom
Activ
ity 1-
3 and
1-4
Delay
ed as
a re
sult o
f dela
y in
Activ
ity 1-
3 and
1-4.
None
.Th
e Pro
ject n
eeds
at le
ast 6
mon
ths fo
r mon
itorin
g this
Activ
ity.
Prog
ress
: 00%
Behin
d: 7.0
mon
ths(P
h2)
100% 75
%
50%
25%
Instal
l zon
al me
ters,
water
pres
sure
sens
or an
d pilo
t rem
ote m
onito
ring
(telem
etry)
syste
m
Delay
ed.
Equip
ment
from
Japa
n suc
h as z
onal
meter
s was
deliv
ered
and h
ande
d ove
r to F
CTW
B. In
stalla
tion i
son
going
by F
CTW
B wi
th su
ppor
t of J
ICA
Expe
rt Te
am.
Solar
syste
ms w
ere p
rocu
red b
y JIC
A in
Nige
ria an
dins
tallat
ion is
ongo
ing by
the N
igeria
n sup
plier
.
Settin
g-up
of zo
nal m
eters
has n
ot be
en do
ne pr
oper
lydu
e to n
on-fu
ll of w
ater f
low in
side p
ipelin
es (A
utoma
ticGa
in Ad
justm
ent fo
r data
corre
ction
).Co
nstan
t pow
er su
pply
and a
dequ
ate pr
ovisi
on fo
rlog
istics
are n
eces
sary.
Prog
ress
: 95%
Behin
d: 0.0
mon
ths(P
h2)
100% 75
%
50%
25%
Meas
ure a
nd co
llect
data
for w
ater
distrib
ution
man
agem
ent s
uch a
swa
ter flo
w of
zona
l mete
rs an
d wate
r
Not c
omple
ted in
Pha
se-1
as a
resu
ltof
delay
in A
ctivit
y 1-6
.Th
e Acti
vity w
ill be
imple
mente
d afte
r the
comp
letion
ofAc
tivity
1-6.
pres
sure
Prog
ress
: 00%
Behin
d: 0.0
mon
ths10
0% 75%
50%
25%
Meth
ods/o
pera
tiona
lpr
oced
ures
for
effe
ctive
NRW
redu
ctio
n ar
ees
tabl
ished
thro
ugh
pilo
t pro
jects
at P
ilot
Mete
ring
Area
s (PM
As)
unde
r pilo
t Are
a Offi
ces
Revie
w ex
isting
NRW
redu
ction
oper
ation
s at e
ach p
ilot A
rea O
ffice
-Co
mplet
ed-
Prog
ress
: 100
%10
0% 75%
50%
25%
Cond
uct c
apac
ity as
sess
ment
ofor
ganiz
ation
and t
he re
levan
t staf
fDo
ne fo
r Pha
se-1
(50%
).Ph
ase-
2 pen
ding.
Asse
ssme
nt wi
ll be d
one a
fter t
he co
mplet
ion of
follo
w-up
activ
ities i
n Gar
ki I a
nd al
so N
RW m
onito
ring i
n pilo
t Are
aoff
ices.
Prog
ress
: 50%
Behin
d 2.0
month
s10
0% 75%
50%
25%
Identi
fy an
d sele
ct a P
ilot M
eterin
gAr
ea (P
MA) f
or ea
ch P
ilot A
rea O
ffice
base
d on t
he se
lectio
n crite
ria of
PMA
-Co
mplet
ed-
Prog
ress
: 100
%10
0% 75%
50%
25%
Prep
are/u
pdate
distr
ibutio
n netw
ork
draw
ings f
or ea
ch P
MA-
Comp
leted
Refer
to A
ctivit
y 3-3
.
Prog
ress
: 100
%10
0% 75%
50%
25%
Instal
l wate
r flow
mete
rs to
each
PMA
and m
easu
re in
/outflo
ws m
onthl
y-
Comp
leted
(insta
llatio
n only
).Me
ter re
ading
in G
udu i
s ong
oing.
Adeq
uate
prov
ision
for lo
gistic
s and
SOP
are n
eces
sary
for m
onito
ring m
onthl
y in/o
utflow
s.
Prog
ress
: 100
%10
0% 75%
50%
25%
Zone
each
PMA
into
Sub M
eterin
gAr
eas (
SMA)
-Co
mplet
ed-
Prog
ress
: 100
%10
0% 75%
50%
25%
Isolat
e a S
MA by
insta
lling v
alves
Follo
lw-u
p acti
vity i
n the
Pha
se-2
.Co
mplet
ed in
Gud
u and
Jabi
Area
Offic
es, b
utpr
ovisi
onall
y com
pleted
in G
arki
I bec
ause
of un
succ
essfu
lNR
W re
ducti
on.
Activ
ity in
Gar
ki I w
ill be
repe
ated.
Disc
repa
ncy b
etwee
n as-b
uilt d
rawi
ngs a
nd ac
tual
situa
tion o
n gro
und e
xist, a
nd up
dated
as-b
uilt d
rawi
ngs
are n
ot av
ailab
le. In
forma
tion m
anag
emen
t with
stand
ardiz
ation
and q
uality
shou
ld be
impr
oved
.Pr
ogre
ss: 9
0%Be
hind 2
.0 mo
nths
(Ph2
Foll
ow-u
p)
100% 75
%
50%
25%
Upda
te the
distr
ibutio
n netw
ork
draw
ings f
or ea
ch S
MAFo
llolw
-up a
ctivit
y in t
he P
hase
-2.
Comp
leted
in G
udu a
nd Ja
bi Ar
ea O
ffices
, but
prov
ision
ally c
omple
ted in
Gar
ki I b
ecau
se of
unsu
cces
sful
NRW
redu
ction
.
Activ
ity in
Gar
ki I w
ill be
repe
ated.
Refer
to A
ctivit
y 3-3
.
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
Meas
ure a
n init
ial le
vel o
f NRW
ofea
ch S
MAFo
llolw
-up a
ctivit
y in t
he P
hase
-2.
Comp
leted
in G
udu a
nd Ja
bi Ar
ea O
ffices
, but
prov
ision
ally c
omple
ted in
Gar
ki I b
ecau
se of
unsu
cces
sful
NRW
redu
ction
.
Activ
ity in
Gar
ki I w
ill be
repe
ated.
Admi
nistra
tive c
ompli
catio
n with
resp
ect to
Com
merce
oper
ation
s (mi
xture
of cu
stome
r cate
gorie
s, me
ter ty
pes,
read
ing di
vision
s, wa
ter ta
riff, e
tc.) h
as su
ffere
d the
Activ
ity. S
tream
lining
, sim
plific
ation
, unif
orm
mana
geme
ntar
e nec
essa
ry.
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
Detec
t targ
et NR
W co
mpon
ents
(i.e.
invisi
ble le
akag
e, cu
stome
r mete
rma
lfunc
tion,
and i
llega
l con
necti
on)
Follo
lw-u
p acti
vity i
n the
Pha
se-2
.Co
mplet
ed in
Gud
u and
Jabi
Area
Offic
es, b
utpr
ovisi
onall
y com
pleted
in G
arki
I bec
ause
of un
succ
essfu
lNR
W re
ducti
on.
Activ
ity in
Gar
ki I w
ill be
repe
ated a
nd w
ill be
kept
in pil
otAr
ea of
fices
base
d on r
esult
s of A
ctivit
y 2-5
.
of ea
ch S
MAPr
ogre
ss: 9
0%Be
hind 2
.0 mo
nths
(Ph2
Foll
ow-u
p)
100% 75
%
50%
25%
Deve
lop a
NRW
redu
ction
oper
ation
plan o
f eac
h SMA
, inclu
ding r
educ
tion
targe
t for r
eview
by H
ead o
f
Follo
lw-u
p acti
vity i
n the
Pha
se-2
.Co
mplet
ed in
Gud
u and
Jabi
Area
Offic
es, b
utpr
ovisi
onall
y com
pleted
in G
arki
I bec
ause
of un
succ
essfu
lNR
W re
ducti
on.
Revis
ion w
ill be
done
in G
arki
I.
Distr
ibutio
nDe
partm
ent
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
Revie
w an
d app
rove
NRW
redu
ction
oper
ation
plan
of ea
ch S
MAFo
llolw
-up a
ctivit
y in t
he P
hase
-2.
Comp
leted
in G
udu a
nd Ja
bi Ar
ea O
ffices
, but
not
comp
leted
in G
arki
I bec
ause
of un
succ
essfu
l NRW
redu
ction
.
Revis
ion w
ill be
done
in G
arki
I.
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
45
Jan
Fe7
llatio
n
odific
ation
rAp
r
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-Up
Custto
mCl
3031
Mar
Apr
Annex3-124
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Moni
torin
g: 31
July.
2017
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)PP
O3
Plan
of S
ched
ule a
nd A
ctua
l Wor
k Per
iod
2-13
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.Pr
ovisi
onall
y
2-14
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.
2-15
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d due
to A
ctivit
y 1-6
.
2-16
W/P
Inter
imFin
alRe
vised
Follo
w-Up
Actua
lSu
spen
ded d
ue to
Acti
vity 1
-6.
2-17
W/P
Draft
Finali
zatio
nFin
aliza
tion
Revis
edFo
llow-
UpFin
aliza
tion
Actua
l
Outp
ut-3
3-1
W/P
Revis
edAc
tual
3-2
W/P
Revis
edAc
tual
3-3
W/P
Revis
edAc
tual
3-4
W/P
Revis
edAc
tual
3-5
W/P
Revis
edAc
tual
3-6
W/P
Revis
edAc
tual
3-7
W/P
Revis
edAc
tual
3-8
W/P
Revis
edAc
tual
3-9
W/P
Revis
edAc
tual
W/P
Phas
e-1 (
Oct 2
014 -
Dec
2016
, 27 m
onth
s)Ph
ase-
2 (Ja
n 201
7 - M
ar 20
18, 1
5 mon
ths)
Revis
edPh
ase-
2 (Ja
n 201
7 - S
ep 20
18, 2
1 mon
ths)
Actua
l
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
4344
4546
4748
Coun
terme
asur
esJIC
A Ex
pert
1Ak
inori M
IYOS
HIW
/P C
hief A
dviso
r / N
RW R
educ
tion P
lannin
g / W
ater D
istrib
ution
Revis
ed M
anag
emen
tAc
tual
2Ta
ketos
hi FU
JIYAM
AW
/P D
eputy
Chie
f Adv
isor /
NRW
Red
uctio
n Plan
ning
Revis
edAc
tual
3To
ru T
OYOD
AW
/P N
RW R
educ
tion O
pera
tions
Man
agem
ent
Revis
edAc
tual
4Ki
yosh
i KIY
AMA
W/P
Leak
age D
etecti
on T
echn
ology
Revis
edAc
tual
5Hi
royu
ki MO
RITA
W/P
Com
merci
al Lo
ssRe
vised
Actua
l6
Hiro
yuki
MORI
TAW
/P H
ydra
ulic A
nalys
is / G
ISRe
vised
Actua
l7
Tosh
inobu
KAS
UYA
W/P
Pro
cure
ment
Mana
geme
nt / C
oord
inator
Revis
edAc
tual
8To
mohir
o SHI
MIZU
W/P
Facil
ity D
esign
/ Con
struc
tion S
uper
vision
Revis
edAc
tual
9Ki
yosh
i KIY
AMA
W/P
Equip
ment
Desig
n / In
stalla
tion
Revis
edAc
tual
Imple
ment
NRW
redu
ction
oper
ation
sat
each
SMA
Follo
lw-u
p acti
vity i
n the
Pha
se-2
.Co
mplet
ed in
Gud
u and
Jabi
Area
Offic
es, b
ut no
tco
mplet
ed in
Gar
ki I b
ecau
se of
unsu
cces
sful N
RWre
ducti
on.
Furth
er op
erati
ons w
ill be
done
in G
arki
I.
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
Monit
or th
e pro
gres
s of th
e NRW
redu
ction
oper
ation
s of e
ach S
MAFo
llolw
-up a
ctivit
y in t
he P
hase
-2.
Comp
leted
in G
udu a
nd Ja
bi Ar
ea O
ffices
, but
not
comp
leted
in G
arki
I bec
ause
of un
succ
essfu
l NRW
redu
ction
.
Furth
er m
onito
ring w
ill be
done
in G
arki
I.
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
Meas
ure l
evel
of NR
W of
each
SMA
atthe
end o
f the r
espe
ctive
oper
ation
sFo
llolw
-up a
ctivit
y in t
he P
hase
-2.
Comp
leted
in G
udu a
nd Ja
bi Ar
ea O
ffices
, but
not
comp
leted
in G
arki
I bec
ause
of un
succ
essfu
l NRW
redu
ction
.
Furth
er m
easu
reme
nt wi
ll be d
one i
n Gar
ki I.
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
Prep
are a
repo
rt on
pilot
proje
cts,
cove
ring A
ctivit
y 2-1
~2-1
5Fo
llolw
-up a
ctivit
y in t
he P
hase
-2.
Comp
leted
in G
udu a
nd Ja
bi Ar
ea O
ffices
, but
not
comp
leted
in G
arki
I bec
ause
of un
succ
essfu
l NRW
redu
ction
.
Revis
ion w
ill be
done
after
the c
omple
tion o
f Acti
vity 2
-10
to 2-
15.
Prog
ress
: 90%
Behin
d 2.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
Deve
lop m
anua
ls for
NRW
redu
ction
for A
rea O
ffice m
anag
ers a
nd fie
ldop
erato
rs (i.e
. tech
nical
office
rs &
Follo
lw-u
p acti
vity i
n the
Pha
se-2
.Re
vision
Ong
oing.
Finali
zatio
n will
be do
ne af
ter th
e com
pletio
n of A
ctivit
y 2-
10 to
2-16
.
read
ers),
incl.
audio
visua
l mate
rials
Prog
ress
: 50%
Behin
d 0.0
month
s(P
h2 F
ollow
-up)
100% 75
%
50%
25%
A m
ediu
m-te
rmst
rate
gic p
lan o
fFC
TWB
for N
RWre
duct
ion
is de
velo
ped,
utiliz
ing
the r
esul
ts o
fOu
tput
-1&2
Estab
lish a
Wor
king G
roup
for N
RWre
ducti
on pl
annin
gNR
W U
nit sh
ould
be ce
ntere
d in t
heAc
tivity
.W
orkig
grou
p was
estab
liesh
ed at
advis
ory l
evel
and w
orkin
g lev
elre
spec
tively
.
Revie
w an
d com
pleted
.-
Prog
ress
: 100
%(P
h2 re
view)
100% 75
%
50%
25%
Revie
w ex
isting
plan
s, im
pleme
ntatio
nstr
uctur
e, on
-the-
job tr
aining
mech
anism
, etc.
relat
ed to
NRW
-Re
viewe
d and
Com
pleted
.La
ck of
HRD
plan
ning o
f FCT
WB'
s staf
f.FC
TWB
shou
ld ha
ve co
mpre
hens
ive tr
aining
prog
ramm
einc
luding
OJT
and i
ntern
al tra
ining
.re
ducti
on at
FCT
WBP
rogr
ess:
100%
(Ph2
revie
w)10
0% 75%
50%
25%
Cond
uct h
ydra
ulic a
nd w
ater p
ress
ure
distrib
ution
analy
ses o
f the p
ipelin
ene
twor
ks
FCTW
B de
cided
to de
velop
its ow
nda
tabas
e and
GIS
, and
then
purch
ased
satel
lite im
ages
.
None
.To
be co
mplet
ed by
Nov
embe
r 201
7.Cl
ose c
ommu
nicati
on an
d fee
d-ba
ck w
ith F
CDA
shou
ldbe
enha
nced
.Pi
pelin
e and
custo
mer in
forma
tion s
hould
be en
tered
exten
sively
into
GIS
for al
l ser
vice a
reas
.Pr
ogre
ss: 0
0%Be
hind 2
.0 mo
nth10
0% 75%
50%
25%
Deve
lop ou
tlines
of th
e med
ium-te
rmstr
ategic
plan
and i
ts an
nual
NRW
redu
ction
plan
(app
rova
l by t
he
-Dr
aft co
ntent
was p
repa
red a
nd of
ficer
s wer
e sele
cted
prov
ision
ally.
Scen
arios
of N
RW re
ducti
on st
rateg
ic pla
nwe
re pr
epar
ed.
To be
comp
leted
by N
ovem
ber 2
017.
Dire
ctor)
Prog
ress
: 25%
Behin
d 0.0
month
100% 75
%
50%
25%
Deve
lop th
e firs
t med
ium-te
rmstr
ategic
plan
(201
8-20
22) f
or ap
prov
alby
FCT
A
-No
ne.
To be
comp
leted
by M
arch
2018
.
Prog
ress
: 00%
Behin
d 0.0
month
100% 75
%
50%
25%
Deve
lop an
annu
al NR
W re
ducti
onpla
n bas
ed on
the s
trateg
ic pla
n as a
nint
egra
l par
t of a
n ann
ual re
curre
nt an
dca
pital
plan o
f FCT
WB
for ap
prov
al
-No
neTo
be co
mplet
ed by
June
2018
.
by F
CTA
Prog
ress
: 00%
Behin
d 0.0
month
100% 75
%
50%
25%
Deve
lop a
plann
ing m
anua
l for N
RWre
ducti
on-
None
To be
comp
leted
by Ju
ly 20
18.
Prog
ress
: 00%
Behin
d 0.0
month
100% 75
%
50%
25%
Revie
w ex
isting
plan
s, ac
tivitie
s and
imple
menti
ng st
ructu
re, e
tc. re
lated
towa
ter di
stribu
tion m
anag
emen
t
Not c
omple
ted in
Pha
se-1
as a
resu
ltof
delay
in in
forma
tion s
ubmi
ssion
from
Area
Offic
es.
Some
Are
a Offic
es su
bmitte
d the
requ
ired i
nform
ation
.To
be co
mplet
ed by
Octo
ber 2
017.
Clos
e com
munic
ation
and f
eed-
back
amon
g FCT
WB'
sdiv
ision
s sho
uld be
enha
nced
.Pi
pelin
e and
custo
mer in
forma
tion s
hould
be en
tered
exten
sively
into
GIS
for al
l ser
vice a
reas
.Pr
ogre
ss: 8
0%Be
hind:0
.0 mo
nth10
0% 75%
50%
25%
Dura
tion
/ Pha
sing
-34
mon
ths6 m
onths
will
be ex
tende
d afte
r ame
ndme
nt of
R/D
and
revis
ion of
PDM
Ver
.3.
50%
25%
Estab
lish f
rame
work
of wa
terdis
tributi
on m
anag
emen
tW
ater D
istrib
ution
Man
agem
ent
Comm
ittee w
as es
tablis
hed a
ndco
ncep
t was
endo
rsed,
but n
otco
mplet
ed in
Pha
se-1
as a
resu
lt of
delay
in A
ctivit
y 1-6
, 1-7
and 3
-8.
None
To be
comp
leted
by O
ctobe
r 201
7.
Prog
ress
: 25%
Behin
d: 0.0
mon
th10
0% 75%
Mar
Apr
May
Jun
Jul
Aug
Inpu
ts (t
he Ja
pane
se si
de)
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
11.17
MM
in Ph
ase-
11.6
7 MM
-
8.00 M
M in
Phas
e-1
2.30 M
M-
Sep
12.07
MM
in Ph
ase-
13.1
3 MM
-
6.77 M
M in
Phas
e-1
1.60 M
M-
3.50 M
M in
Phas
e-1
1.87 M
M-
4.00 M
M in
Phas
e-1
1.53 M
M-
9.20 M
M in
Phas
e-1
2.30 M
M-
3.47 M
M in
Phas
e-1
0.00 M
M-
1.00 M
M in
Phas
e-1
0.83 M
M-
45
Jan
Fe7
rAp
r
Follo
w-Up
Follo
w-Up
Follo
w
Follo
w
3031
Mar
Apr
Annex3-125
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Moni
torin
g: 31
July.
2017
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)PP
O3
Plan
of S
ched
ule a
nd A
ctua
l Wor
k Per
iod
10Ta
kesh
i YAJ
IMA
W/P
Wate
r Dist
ributi
on M
anag
emen
t 2Re
vised
Actua
l11
Tomo
hiro S
HIMI
ZUW
/PRe
mote
Monio
toring
/ Rem
ote M
onito
ring S
ystem
Insll
ation
Re
vised
& Tr
aining
1Ac
tual
12Ta
kash
i MOR
IW
/PRe
mote
Monit
oring
Sys
tem In
sllati
on &
Tra
ining
2Re
vised
Actua
l13
Tosh
inobu
KAS
UYA
W/P
Remo
te Mo
nitor
ing S
ystem
Insll
ation
& T
raini
ng 3
Revis
edAc
tual
14Ta
kash
i MOR
IW
/P P
rocu
reme
nt Ma
nage
ment
/ Coo
rdina
tor 2
Revis
edAc
tual
15No
boru
OSA
KABE
W/P
Finan
cial A
nalys
is / O
rgan
izatio
nRe
vised
Actua
lEq
uipm
ent
1Le
akag
e dete
ction
equip
ment
W/P
*3PM
Asin
Japa
n(JI
CA)
Revis
edAc
tual
2Bu
lk me
ters (
ultra
sonic
flow
meter
)W
/P*W
TPin
Japa
n(JI
CA)
Revis
edAc
tual
Instal
lation
3W
ater m
eter,
flow
meter
and v
alves
W/P
*3PM
Asin
Nige
ria(JI
CA E
xper
t)Re
vised
Actua
l4
Pipe
repa
ir equ
ipmen
tW
/P*3
PMAs
in Ni
geria
(JICA
Exp
ert)
Revis
edAc
tual
5Ve
hicles
(Pick
up tr
uck)
W/P
*Lea
kage
Dete
ction
in Ni
geria
(JICA
)Re
vised
Actua
l6
GIS
softw
are,
office
equip
ment
W/P
*FCT
WB
HQs
in Ni
geria
/Othe
r(JI
CA E
xper
t)Re
vised
Actua
l7
Zona
l mete
rs, pr
essu
re se
nsor
s and
remo
te mo
nitor
ing sy
stem
W/P
*Who
le Sy
stem
in Ja
pan
(JICA
)Re
vised
Actua
l8
Stan
dby p
ower
gene
ratio
n and
stor
age b
atter
y (So
lar)
W/P
in Ni
geria
(JICA
)Re
vised
Actua
lNi
geria
n Co
nsul
tant
/Con
tract
or1
Modif
icatio
n of b
illing a
nd co
llecti
on sy
stem
W/P
Revis
edAc
tual
Conc
ept
Spec
ificati
onSp
ecific
ation
Modif
icatio
n2
GIS
and d
ataba
se tr
aining
W/P
Revis
edAc
tual
3Co
nstru
ction
of ch
ambe
rs for
zona
l mete
r and
wate
r W
/Ppr
essu
re se
nsor
Revis
edAc
tual
4Ins
tallat
ion of
stan
dby p
ower
gene
ratio
n and
stor
age b
atter
yW
/P(S
olar)
Revis
edAc
tual
5Co
nstru
ction
of ch
ambe
rs for
bulk
meter
W/P
(inclu
ding c
able
instal
lation
)Re
vised
Actua
lCo
nstru
ction
Train
ing
in Ja
pan
W/P
Plan
: 4 tr
ainee
s x 3
times
= 12
train
ees
Revis
edAc
tual: 4
train
ees x
1 (M
anag
emen
t) +
8 tra
iness
x 1 (
D&C
Joint
) = 12
tra
Actua
l20
1420
1520
1620
1720
18Mo
nito
ring
Rema
rksAc
hieve
ment
Issue
&1
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
3031
3233
3435
3637
3839
4041
4243
4445
4647
48Co
unter
meas
ures
Plan
ning
, Mon
itorin
g an
d Co
ordi
natio
n1
W/P
Revis
edKi
ck-o
ffAc
tual
Kick
-off
1st
2nd
3rd
4th5th
6th2
W/P
Revis
edAc
tual
3W
/PRe
vised
Actua
l4
W/P
Revis
edAc
tual
5W
/PRe
vised
Actua
l6
W/P
Revis
edAc
tual
7W
/PRe
vised
Actua
l8
W/P
Revis
edAc
tual
9W
/PKi
ck of
fFin
alRe
vised
Actua
l10
Colle
ct an
d org
anize
data
for In
dicato
rs of
PDM
aW
/PRe
vised
Actua
lb
Cond
uct jo
int ca
pacit
y ass
essm
ent o
f the r
eleva
nt sta
ffW
/PBa
selin
eInt
erim
-1Int
erim
-2Fin
alRe
vised
Inter
im 2-
1Fin
alPr
epar
e Cap
acity
Dev
elopm
ent (
CD) P
lanAc
tual
Base
line
Inter
im-1
cW
/PRe
vised
Actua
ld
W/P
Revis
edAc
tual
Repo
rts / D
ocum
ents
11W
/PRe
vised
Actua
l12
W/P
Revis
edAc
tual
13W
/PRe
vised
Actua
lPu
blic
Relat
ions
14W
/PRe
vised
Actua
l15
W/P
Revis
edAc
tual
Moni
torin
g an
d Ev
aluat
ion
in th
e Pos
t-Pro
ject p
erio
d16
Post
Monit
oring
by JI
CA(n
ot de
scrib
ed he
re)
--
-17
Post
Evalu
ation
by JI
CA(n
ot de
scrib
ed he
re)
--
-
0.83 M
M in
Phas
e-1
0.00 M
M-
-0.6
7 MM
-
2.50 M
M in
Phas
e-1
0.00 M
M-
-0.8
7 MM
-
-Ha
nded
over
and c
omple
ted.
None
-0.3
0 MM
-
4.00 M
M in
Phas
e-1
0.00 M
M-
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
One o
f two H
iliux w
as da
mage
d in a
ccide
nt on
18th
March
2017
. FCT
WB
will p
urch
ase a
n alte
rnate
amd m
onito
r use
of pr
oject
vehic
les pr
oper
ly.
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted. In
stalla
tion i
s ong
oing.
-Co
mplet
ed.
-
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted. In
stalla
tion i
s ong
oing.
Settin
g-up
of zo
nal m
eters
has n
ot be
en do
ne pr
oper
lydu
e to n
on-fu
ll of w
ater f
low in
side p
ipelin
es (A
utoma
ticGa
in Ad
justm
ent fo
r data
corre
ction
).
-
Take
n ove
r by J
ICA.
Comp
leted
.-
-Co
mplet
ed.
-
-Co
mplet
ed.
-
-Ins
tallat
ion is
ongo
ing.
1st tr
aining
for 4
train
ees i
n Aug
ust
2015
fand
2nd t
raini
ng fo
r 12
traine
es in
June
-July
2016
.
Comp
leted
. 3rd
train
ing fo
r 6 de
legati
on of
ficial
s fro
mFC
DA an
d FCT
WB
was c
ondu
tcted
in Ju
ly 20
17.
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Apr
May
Jun
Jul
Aug
Sep
Moni
torin
g Pl
anOc
t.No
vDe
cJa
nFe
bMa
r
The P
rojec
t and
know
ledge
obtai
ned i
n tra
ining
will
bebr
iefed
to F
CT M
iniste
r, ES
and P
S.
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Ditto
Orga
nize m
onthl
y tec
hnica
l mee
tings
-Te
chnic
al me
eting
s wer
e held
but n
ot mo
nthly.
This
is be
caus
e of in
tensiv
e inp
uts of
the P
rojec
t mem
bers
to Ac
tities
, par
ticula
rly fie
ld wo
rks. M
eetin
gs w
ere d
one a
sne
eded
basis
.
Orga
nize J
oint C
oord
inatio
n Com
mitte
e (JC
C)-
6th JC
C me
etig w
as he
ld in
May 2
017.
-
Deve
lop D
etail P
lan of
Ope
ratio
ns (D
PO) f
or re
view
and a
ppro
val
by JC
C-
None
in P
hase
-2.
Unles
s CP
Fund
is ap
prop
riated
and r
eleas
ed ba
sed o
nbu
dget
plan,
the pl
anne
d acti
vities
cann
ot be
imple
mente
d.De
velop
Ann
ual P
lan of
Ope
ratio
ns (A
PO) f
or re
view
and a
ppro
val
by JC
C-
None
in P
hase
-2.
Orga
nize q
uarte
rly pr
oject
meeti
ngs
-No
ne.
Ditto
Cond
uct J
oint M
onito
ring s
emi-a
nnua
llyAc
hieve
ment
of PD
M an
d pro
gres
sof
PO ha
ve be
en m
onito
red j
ointly
throu
gh th
e Pro
ject.
Ongo
ing.
Owne
rship
and i
nitiat
ive of
FCT
WB
are k
eys t
o suc
cess
ofthe
Pro
ject. M
onito
ring m
ethod
and d
ocum
entat
ion ar
etra
nsfer
red t
o FCT
WB
grad
ually
.Su
bmit M
onito
ring S
heet
to JIC
A Ni
geria
Offic
e sem
i-ann
ually
Not y
et be
en do
ne fo
r Pha
se-2
.
Deve
lop cr
iteria
for c
apac
ity as
sess
ment
for ea
ch le
vel o
f the
relev
ant s
taff (
i.e. m
embe
rs of
NRW
Mgm
t and
Acti
on T
eams
)-
Comp
leted
Revis
ion of
targ
et ca
pacit
y will
be di
scus
sed.
Done
for P
hase
-1.
Not y
et be
en do
ne fo
r Pha
se-2
.-
Monit
oring
Miss
ion fr
om JI
CA fo
r Join
t Rev
iewDo
ne fo
r Pha
se-1
.No
t yet
been
done
for P
hase
-2.
Sche
duled
in A
ugus
t 201
7 and
Mar
ch 20
18.
Orga
nize i
nform
ation
shar
ing se
mina
rs for
FCT
WB/
FCTA
,inc
luding
Are
a Offic
esSe
mina
rs we
re he
ld tw
ice in
Pha
se-
1.Se
mina
r was
held
in Ma
y 201
7 in P
hase
-2.
-
Wor
k Plan
-W
ork P
lan (P
hase
-2) w
as pr
epar
ed an
d app
rove
d.-
Proje
ct Pr
ogre
ss R
epor
tPr
ogre
ss R
epor
ts we
re pr
epar
edtw
ice in
Pha
se-1
.Co
mplet
ed.
-
Set r
educ
tion t
arge
t for e
ach P
MA by
the f
irst q
uarte
r of th
ese
cond
year
-Ha
ve be
en se
t pro
vision
ally.
-
Colle
ct an
d org
anize
for I
ndica
tors f
or se
mi-a
nnua
l Join
tMo
nitor
ing-
Have
been
done
.-
Prep
ratio
n of p
ublic
relat
ions m
ateria
lsNe
wslet
ters h
ave b
een i
ssue
d.No
ne in
Pha
se-2
.-
Proje
ct Co
mplet
ion R
epor
t-
None
.-
Deve
lop P
rojec
t Web
site
FCTW
B wi
ll disc
uss P
R thr
ough
webs
ite.
None
in P
hase
-2.
-
45
Jan
Fe7Ap
rr
3031
Kick
-o
-2Mar
Apr
Annex3-126
Anne
x-1
Upda
ted on
31/7/
2017
List
of E
quip
men
t for
the P
rojec
tNo
.Eq
uipme
ntSp
ecific
ation
Quan
tityHa
nd-
Rema
rksJa
pan
Nige
riaPla
nAc
tual
over
For A
ctivi
ty 1-
21
Ultra
sonic
flow
meter
(stat
ionar
y, 22
0m)
Ultra
sonic
pulse
tran
smit t
ime d
iffere
nce m
ethod
, sen
sor f
or 60
0-1,5
00mm
, 220
m ca
ble2
2Do
neinc
luding
insta
llatio
n, co
mmiss
ioning
and
traini
ng2
Ultra
sonic
flow
meter
(stat
ionar
y, 30
0m)
Ultra
sonic
pulse
tran
smit t
ime d
iffere
nce m
ethod
, sen
sor f
or 60
0-1,5
00mm
, 300
m ca
ble2
2Do
neinc
luding
insta
llatio
n, co
mmiss
ioning
and
traini
ng
3Da
ta log
ger (
statio
nary)
Pape
rless
, 6 po
ints,
1s-1
h rec
ord
cycle
, 4-2
0mA,
tren
d, ba
r gra
ph an
d his
trical
trend
disp
lays
11
Done
for th
e abo
ve N
o.1&2
ultra
sonic
flow
meter
s
For A
ctivi
ty 1-
61
Ultra
sonic
flow
meter
(stat
ionar
y)Ul
traso
nic pu
lse tr
ansm
it tim
e diffe
renc
e meth
od, s
enso
r for
300-
1,500
mm, 1
0m ca
ble6
6Do
neinc
luding
insta
llatio
n, co
mmiss
ioning
and
traini
ng2
Ultra
sonic
flow
meter
(stat
ionar
y)Ul
traso
nic pu
lse tr
ansm
it tim
e diffe
renc
e meth
od, s
enso
r for
300-
1,500
mm, 2
0m ca
ble3
3Do
neinc
luding
insta
llatio
n, co
mmiss
ioning
and
traini
ng3
Ultra
sonic
flow
meter
(stat
ionar
y)Ul
traso
nic pu
lse tr
ansm
it tim
e diffe
renc
e meth
od, s
enso
r for
300-
1,500
mm, 3
0m ca
ble2
2Do
neinc
luding
insta
llatio
n, co
mmiss
ioning
and
traini
ng4
Ultra
sonic
flow
meter
(stat
ionar
y)Ul
traso
nic pu
lse tr
ansm
it tim
e diffe
renc
e meth
od, s
enso
r for
300-
1,500
mm, 4
0m ca
ble2
2Do
neinc
luding
insta
llatio
n, co
mmiss
ioning
and
traini
ng5
Ultra
sonic
flow
meter
(stat
ionar
y)Ul
traso
nic pu
lse tr
ansm
it tim
e diffe
renc
e meth
od, s
enso
r for
25-2
50mm
, 10m
cable
11
Done
includ
ing in
stalla
tion,
comm
ission
ing an
d tra
ining
6Da
ta log
ger (
statio
nary)
Pape
rless
, 6pts
, 1s-1
h rec
ord
cycle
, 4-2
0mA,
tren
d, ba
r gra
ph an
d his
trical
trend
disp
lays
1313
Done
for th
e abo
ve N
o.1-5
ultra
sonic
flow
meter
s7
Data
logge
r (po
rtable
)2c
h (flo
w an
d pr
essu
re),
1s -
24h r
ecor
d cy
cle, 4
-20m
A, 5
year
s batt
ery l
ife2
2Do
ne
8Re
mote
Monit
oring
Sys
temTe
lemetr
y with
tran
smiss
ion, m
odem
/route
r, co
ntaine
r, int
erfac
e, PC
, prin
ter, U
PS, s
erve
r, etc
22
Done
Pilot
syste
m
9So
lar S
ystem
Type
-1, 1
100W
8-
Done
for th
e abo
ve ul
traso
nic flo
w me
ter10
Solar
Sys
temTy
pe-2
, 160
0W2
-Do
nefor
the a
bove
ultra
sonic
flow
meter
11So
lar S
ystem
Type
-3-1
, 130
0W2
-Do
nefor
the a
bove
ultra
sonic
flow
meter
and
telem
etry s
ystem
12So
lar S
ystem
Type
-3-2
, 130
0W1
-Do
nefor
the a
bove
ultra
sonic
flow
meter
For A
ctivi
ty 2-
4 and
2-8
1GI
S so
ftwar
eInt
ergr
aph G
eome
dia E
ssen
tial
11
Done
Softw
are h
as be
en ad
opted
by A
GIS.
V13
.12
GIS
softw
are
ESRI
ArcG
IS B
asic
Versi
on 10
.31
1Do
neMa
inly f
or d
ata in
put
3Plo
tter (
A0)
A01
1Do
ne
4GP
S ter
mina
lHi
ghse
nsitiv
ity,2
,000p
ts,20
0rou
tes,I
PX7,
built-
inca
mera
(5me
ga-p
ixel),
USB,
nicke
lhyd
ride
batte
ry pa
ck2
2Do
neGa
rmin
5Pe
rsona
l com
puter
500H
D, 4
GB R
am, W
indow
s 7or
8, Mi
croso
ft Of
fice i
nstal
led, M
ouse
22
Done
6An
ti-viru
s soft
ware
22
Done
for th
e abo
ve P
Cs (N
o.5)
7UP
S1.2
kVA
22
Done
For A
ctivi
ty 2-
51
Ultra
sonic
flow
meter
(stat
ionar
y)Ul
traso
nic pu
lse tr
ansm
it tim
e diffe
renc
e meth
od, s
enso
r for
450m
m, 20
m ca
ble1
1Do
ne2
Data
logge
r (po
rtable
)2c
h (flo
w an
d pr
essu
re),
1s -
24h r
ecor
d cy
cle, 4
-20m
A, 5
year
s batt
ery l
ife1
1Do
nefor
the a
bove
No.1
ultra
sonic
flow
meter
3Flo
w me
terDi
a. 50
mm w
ith fit
tings
00
-4
Flow
meter
Dia.
80mm
with
fittin
gs0
0-
5Flo
w me
terDi
a. 10
0mm
with
fitting
s0
0-
6Flo
w me
terDi
a. 15
0mm
with
fitting
s0
1Do
ne7
Flow
meter
Dia.
200m
m wi
th fitt
ings
12
Done
8Flo
w me
terDi
a. 25
0mm
with
fitting
s0
0-
9Flo
w me
terDi
a. 30
0mm
with
fitting
s3
3Do
neFo
r Act
ivity
2-7
1Slu
ice va
lveDi
a. 50
mm w
ith fit
tings
20
-2
Sluice
valve
Dia.
80mm
with
fittin
gs0
0-
3Slu
ice va
lveDi
a. 10
0mm
with
fitting
s9
1Do
ne4
Sluice
valve
Dia.
150m
m wi
th fitt
ings
127
Done
5Slu
ice va
lveDi
a. 20
0mm
with
fitting
s6
8Do
ne6
Sluice
valve
Dia.
250m
m wi
th fitt
ings
20
-7
Sluice
valve
Dia.
300m
m wi
th fitt
ings
106
Done
Proc
urem
ent in
Annex3-127
Anne
x-1
Upda
ted on
31/7/
2017
List
of E
quip
men
t for
the P
rojec
tNo
.Eq
uipme
ntSp
ecific
ation
Quan
tityHa
nd-
Rema
rksJa
pan
Nige
riaPla
nAc
tual
over
Proc
urem
ent in
For A
ctivi
ty 2-
101
Ultra
sonic
flow
meter
(por
table)
Ultra
sonic
pulse
tran
smit t
ime d
iffere
nce m
ethod
, se
nsor
s (sm
all x3
, med
ium x6
, larg
e x3)
66
Done
2Da
ta log
ger (
porta
ble)
2ch (
flow
and
pres
sure
), 1s
- 24
h rec
ord
cycle
, 4-2
0mA,
5 ye
ars b
atter
y life
66
Done
3Le
ak no
ise co
rrelat
orMa
in un
it, pr
eamp
lifier
and
piezo
electr
ic se
nsor
22
Done
4W
ater le
ak d
etecto
rAc
ousti
c typ
e, pie
zoele
ctric
sens
or6
6Do
ne5
Non-
metal
pipe
loca
torEle
ctrom
agne
tic in
ducti
on ty
pe fo
r pla
stic p
ipe (P
VC, P
E)3
3Do
ne6
Metal
loca
torOp
tical
and
acou
stica
l outp
ut sig
nal, 5
0cm
depth
33
Done
7Tim
e inte
gral
water
leak
dete
ctor
Autom
atic l
eak n
oise d
eterm
inatio
n meth
od3
3Do
ne8
Acou
stic r
od1.5
m len
gth
99
Done
9Di
stanc
e mete
rMa
x. 10
km, 1
0cm
scale
33
Done
10Ha
mmer
drill
Dia.
38mm
, 270
rpm,
3,00
0 stro
ke/m
in3
3Do
ne11
Borin
g ba
rDi
a. 16
mm, 1
.0m le
ngth
33
Done
12Dr
ill bit
Dia.1
9×80
0mm
99
Done
13Po
rtable
resid
ual c
hlorin
e ana
lyzer
DPD,
abso
rptio
metry
, 0.02
-2.00
mg/L
33
Done
14Me
tal pi
pe an
d ca
ble lo
cator
5m d
epth
33
Done
15Re
feren
ce m
eter
Porta
ble bu
ilt-in
case
type
, 13-
25mm
33
Done
16Le
akag
e qua
ntity
meas
urem
ent d
evice
13-2
5mm
33
Done
17Pe
rsona
l com
puter
500H
D, 2G
B Ra
m, W
indow
s 7or
8, Mi
croso
ft Of
fice i
nstal
led, M
ouse
33
Done
18An
ti-viru
s soft
ware
33
Done
for th
e abo
ve P
Cs (N
o.17)
19UP
S1.2
kVA
33
Done
20Ink
jet pr
inter
A4, C
olor,
All-in
-one
33
Done
21Di
gital
came
raCo
mpac
t typ
e, Op
tical
zoom
, 10 m
ega-
pixel
(min)
, LCD
33
Done
For A
ctivi
ty 2-
131
Gene
rator
200V
, 6.5k
VA3
3Do
ne2
Asph
alt cu
tter
3600
RPM,
13kW
33
Done
3Co
ncre
te br
eake
r3
3Do
ne4
Small
-size
d de
water
ing pu
mp2"
33
Done
5Sm
all-si
zed
tampe
r3
3Do
ne6
Electr
ic dr
um50
m3
3Do
ne7
Custo
mer m
eter
Dia.
2/3" w
ith fit
tings
, con
venti
onal
type
388
0-
8Cu
stome
r mete
rDi
a. 1"
with
fittin
gs, c
onve
ntion
al typ
e25
960
0Do
ne9
Custo
mer m
eter
Dia.
50mm
with
fittin
gs, c
onve
ntion
al typ
e89
0-
10Cu
stome
r mete
rDi
a. 80
mm w
ith fit
tings
, con
venti
onal
type
230
-11
Custo
mer m
eter
Dia.
100m
m wi
th fitt
ings,
conv
entio
nal ty
pe7
0-
12Co
mpac
t Rec
iproc
ating
Saw
Pipe
cuttin
g3
3Do
neFo
r Out
put 2
1Pi
ckup
truc
k for
pilot
sites
22
Done
For O
pera
tion
of th
e Pro
ject
1La
ser p
rinter
A4, B
/W1
1Do
ne2
Inkjet
erA3
, Colo
r1
1Do
ne3
Multif
uncti
on co
pier
A3, B
/W1
1Do
ne4
Grap
hic/m
ovie
editin
g so
ftwar
eW
indow
s Mov
ie Ma
ker,
Micro
soft
Powe
rpoin
t1
1Do
neFr
ee or
prein
stalle
d so
ftwar
es to
be ut
ilized
.5
Proje
ctor
3,000
Lumm
en, H
DMI, V
GA, U
SB po
rt1
1Do
ne
Annex3-128
The Third Training in Japan
Course Name: The Federal Capital Territory Reduction of Non-Revenue Water Project, NRW Reduction
(Strategy)
Purpose:
The participants visit “Yokohama City”, as a model case or benchmark, the second largest city in Japan,
- To understand institutions and organization structure of integrated water supply services, and
planning, designing and O&M and coordination and feedback among them.
- To understand bases, knowledge and methodology of water supply services/O&M including
non-revenue water reduction.
The participants compare them with those of FCT and utilize them in contribution for further
improvement and implementation in development and O&M of water supply services of FCT.
Programme:
- Water Supply O&M System- Water Supply Control and Management- History of Waterworks Technology- Water Distribution Management- Outline of Water Supply Installation (Service Connection)- NRW Contents / Water Pressure Control- Water Treatment Plant- Water Leakage Detection- Pipeline Information Management- Water Meter Maintenance- Construction Management and As-built Drawing Making- Self-support Accounting System and PPP- Management (Business) Plan- Water Demand Forecasting (Facility Development Planning)- Replacement of Aged Pipes
Period: 9th to 15th July 2017
Receiving Water Utility: Yokohama City Waterworks Bureau
Participants: 6 delegation officials (FCDA: 4, FCTWB: 2)
Name Organ. Position in FCTWBEngr. AHMAD Shehu Hadi FCDA Director, Department of Engineering Services
Engr. EZEOHA Ferdinand Obiora FCDA Deputy Director, Water & Sewage, Department of Engineering Services
Engr. OSAYANDE Joseph Uyi FCDA Deputy Director, Department of Engineering Design and Evaluation
Engr. OLUWADAMISI Emmanuel Abiodun FCDA Deputy Director. Engineering PPP, Department of Mass Housing / PPP
Engr. ALIYU Abubakar Usman FCTWB Head of Department, Department of Production,
Engr. LAWAL Rasaki Abolade FCTWB Assistant Director, Distribution Department
Annex3-129
Participants in Preparation of Draft Monitoring Sheets
Day 1: 31st July 2017 for Draft Project Monitoring Sheet IIS/N NAME POSITION1 Lawal Abolade R. Head [Special Projects] (Coordinator)2 Rabiu M.Kabir Head [NRW]3 Dikko Musa Head[PL/WC]4 Muazo Aliyu S.B Ag Head[Comm.]5 Mohammed E Gana AAM[Dist.] Garki16 Choji Pam Ag. Area Manager Garki17 Aluko Tope Head[E&M]8 Amos Bulus PEE[M&E]9 Mumini Raifu Ag. Area Manager Gwarinpa
10 Sulaiman A Muhammad AgArea Manager Jabi11 Abubakar Danladi Distribution Dept.12 Abbas A. Ahmed Head[Public Relation]13 Ibrahim Umar Ag Area Manager Gudu14 Muhammed Dauda Pipeline Unit15 Kenneth Madu Snr. Craftman16 Titus Dawan Garki1[Commerce]17 Ezeh Hillary Surveyor/ GIS18 Rose Akpan Head[Billing]19 Abdularahman shehu Sani Head[prepaid Meter]20 Shehu Suleiman Head[GIS]21 Salihu Sadiq AAM [Dist.] Jabi22 Abdul Yusuf Superintendent[P&P Estate]23 Abdul Ozumi AAM[Dist.] Gudu24 Akinori Miyoshi CA, JICA Expert Team
Day 2: 1st August 2017 for Draft Project Monitoring Sheet IS/N NAME POSITION1 Nahuche A.A Ag Director (Project Manager)2 Lawal Abolade R. Head [Special Projects] (Coordinator)3 Rabiu M.Kabir Head [NRW]4 Dikko Musa Head [PL&Wc]5 Pheobe Ocheja Ag Head [Admin&Supply]6 Muazu Aliyu S. B Ag Head[Commerce]7 Abbas Ahmed Head[Public Relation]8 Rose Akpan Head[Billing]9 Hasfat Ahmed Lawi Head[Finance and Account]
10 Aliyu Ahmad Usuman Asst. Director11 Ezeh Hillary Surveyor[GIS]12 Akinori Miyoshi CA, JICA Expert Team
Annex3-130
Day 3: 3rd August 2017 for Draft Project Monitoring Sheet SummaryS/N NAME POSITION1 Nahuche A.A Ag Director (Project Manager)2 Lawal Abolade R. Head [Special Projects] (Coordinator)3 Rabiu M.Kabir Head [NRW]4 Dikko Musa Head [PL&Wc]5 Hasfat Ahmed Lawi Head[Finance and Account]6 Aliyu Ahmad Usuman Asst. Director7 Muazu Aliyu S. B Ag Head[Commerce]8 Pheobe Ocheja Ag Head [Admin&Supply]9 Agbontaen O. S. Head [Reservoirs&Production]
10 Yahaya O. Kuike Audit11 Akinori Miyoshi CA, JICA Expert Team
Day 4: 21st August 2017 for Draft Project Monitoring Sheet SummaryS/N NAME POSITION1 Nahuche A.A Ag Director (Project Manager)2 Lawal Abolade R. Head [Special Projects] (Coordinator)3 Rabiu M.Kabir Head [NRW]4 Dikko Musa Head [PL&Wc]5 Hasfat Ahmed Lawi Head[Finance and Account]6 Aliyu Ahmad Usuman Asst. Director7 Pheobe Ocheja Ag Head [Admin&Supply]8 Agbontaen O. S. Head [Reservoirs&Production]9 Shehu Suleiman Head [GIS]
10 Bamidele Olatunji Head [International Cooperation]11 Akinori Miyoshi CA, JICA Expert Team
Monitoring Mission Members from JICA Headquarters (21st to 24th August 2017)S/N NAME POSITION1 Yoshiki Omura Senior Advisor in Urban Water Supply2 Hiroki Ishimaru Project Officer, Water Resources Group,
Global Environment Department
Annex3-131
Photos of Preparation of Monitoring Sheet
Day 1: 31st July 2017
Preparation of Draft Project Monitoring Sheet II(Attendance: NRW Management Team members and Action Team Members)
Day 2: 1st August 2017
Preparation of Draft Project Monitoring Sheet I(Attendance: Project Manager, Deputy Project Manager, NRW Management Team members and FCTWB Management)
Day 3: 3rd August 2017
Preparation of Draft Project Monitoring Summary(Attendance: Project Manager, Deputy Project Manager, NRW Management Team members and FCTWB Management)
Day 4: 21st August 2017
Revision of Draft Project Monitoring Sheet I, II and Summary(Attendance: Project Manager, Deputy Project Manager, NRW Management Team members and FCTWB Management)
Annex3-132
PM Form 3-1 Monitoring Sheet Summary
1
To Chief Representative of JICA Nigeria Office
PROJECT MONITORING SHEETS
Project Title: The Federal Capital Territory Reduction of Non-Revenue Water Project Version of the Sheet: Ver. 6 Term covered: August, 2017 - June, 2018
Name: Akinori Miyoshi Title: Chief Advisor Submission Date: 28 June 2018
I. Summary
1 Progress
1-1 Progress of Inputs
[The Nigerian Side]
Project Personnel All project members including Project Director, Project Manager, Deputy Project Manager, Technical Managers, Non-Revenue Water (NRW) Management Team members, NRW Action Team members have been involved in the Project.
Land, Building and Facilities Office spaces and necessary facilities at the Federal Capital Territory Water Board (FCTWB) have been provided for the Japanese side.
Local Costs Cost for operation and maintenance of the provided equipment, and also administrative and operational costs for local traveling, demurrage and communication of telemetric device have been provided. However, these costs had been paid temporarily by the Japanese side because of delay in release of the Counterpart Fund, which were refunded.
[The Japanese Side]
JICA Experts Japan International Cooperation Agency (JICA) Expert Team consisting of a Chief Advisor and members for nine areas of expertise were assigned to the works in Nigeria for 22.1 person-months between August 2017 and June 2018 (106.6 person-months from the commencement of the Project in November 2014).
Equipment Zonal meters, data loggers, telemetric monitoring system and solar powering systems were installed from June to September 2017, and additional adjustment was done in November 2017.
Annex3-133
Facilities There are no inputs during this monitoring period.
Training of the Nigerian Project Personnel There are no inputs during this monitoring period.
1-2 Progress of Activities
[Activities for Output-1: 1. Level of NRW of both the service area of FCWTB and water distribution areas is monitored and estimated.]
No Activity Previous Monitoring (as at Jul. 2017)*Progress against Phase-2 Work Plan
Current Monitoring (as at Jun.2018)*Progress against Phase-2 Work Plan
1-1 Install bulk meters to water treatment plants 1 and 2
Completed. Completed.
1-2 Measure/estimate water production of water treatment plants 1, 2, 3 and 4
Progress: 0%, Behind: 7.0 monthsFlow data measurement has not always been available, which is due to non-full of water flow inside pipelines and electrical challenges (fuse burning).The Project needs at least 6 months for monitoring this Activity.
Completed in February 2018.
1-3 Tally the above water production data/estimation
Progress: 0%, Behind: 7.0 monthsThe Project needs at least 6 months for monitoring this Activity.
Completed in February 2018.
1-4 Calculate the water consumption based on the billing data
Completed.Zonal coding is ongoing for water distribution management.The Project needs at least 6 months for monitoring this Activity.Re-evaluation and update of the modified billing system is necessary.Constant power supply, adequate provision for consumables and SOP are necessary.
Completed.However, customers’ zonal coding is still ongoing as a fundamental condition for water distribution management.Periodic billed consumption has been not recorded because of non regular meter reading and billing. Constant power supply, adequate provision for consumables and SOP are necessary.
1-5 Calculate NRW ratio of the service area of FCTWB using the results obtained from Activity 1-3 and 1-4
Progress: 0%, Behind: 7.0 monthsThe Project needs at least 6 months for monitoring this Activity.
Completed in February 2018.
1-6 Install zonal meters, water pressure sensor and pilot remote monitoring (telemetry) system
Progress :95%, Behind: 0.0 monthsSetting-up of zonal meters has not been done properly due to non-full of water flow inside pipelines (Automatic Gain Adjustment for data correction).Constant power supply and adequate provision for logistics are necessary.
Completed in August 2017.After completion, loggers’ failure were observed at Tank 2 and Tank Kubwa due to power instability and lightning, but they were replaced or fixed.Solar panel for zonal meter located at roof-top of Tank 5 was stolen in February 2018.
1-7 Measure/estimate and collect data for water distribution management such as water flow of zonal meters and water pressure
Progress: 0%, Behind: 0.0 monthsThe Activity will be implemented after the completion of Activity 1-4 and 1-6.
Progress: 85%, Behind: 0.0 monthsThe Activity will be completed after the completion of customers’ zonal coding stated in Activity 1-4, before July 2018.
Annex3-134
[Activities for Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Activity Previous Monitoring (as at Jul. 2017) *Progress against Phase-2 Work Plan
Current Monitoring (as at Jun.2018)*Progress against Phase-2 Work Plan
2-1 Review existing NRW reduction operations at each pilot Area Office
Completed. Completed.
2-2 Conduct capacity assessment of organization and the relevant staff
Progress: 50%, Behind: 2.0 monthsAssessment will be done after the completion of follow-up activities in Garki I and also NRW monitoring in pilot Area offices.
Progress: 65%, Behind: 10.0 monthsAssessment was done partially after the completion of pilot projects, and will be completed after NRW monitoring in pilot Area offices in July and August 2018.
2-3 Identify and select a Pilot Metering Area (PMA) for each Pilot Area Office based on the selection criteria of PMA
Completed. Completed.
2-4 Prepare/update distribution network drawings for each PMA
Completed.Refer to Activity 3-3.
Completed.
2-5 Install water flow meters to each PMA and measure in/outflows monthly
Completed (installation only).Meter reading in Gudu is ongoing.Adequate provision for logistics and SOP are necessary for monitoring monthly in/outflows.
Completed.However, a mechanical PMA meter inJabi PMA is not functioning, and data from an ultrasonic PMA meter is not transferred to portable logger in Garki I PMA.
2-6 Zone each PMA into Sub Metering Areas (SMA)
Completed. Completed.
2-7 Isolate a SMA by installing valves
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Discrepancy between as-built drawings and actual situation on ground exist, and updated as-builtdrawings are not available. Information management with standardization and quality should be improved.
Completed in October 2017.
2-8 Update the distribution network drawings for each SMA
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Refer to Activity 3-3.
Completed in October 2017.
2-9 Measure an initial level of NRW of each SMA
Progress: 90%, Behind: 2.0 months(Follow-up)
Completed in October 2017.
Annex3-135
No Activity Previous Monitoring (as at Jul. 2017) *Progress against Phase-2 Work Plan
Current Monitoring (as at Jun.2018)*Progress against Phase-2 Work Plan
Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Activity in Garki I will be repeated.Administrative complication with respect to Commerce operations (mixture of customer categories, meter types, reading divisions, water tariff, etc.) has suffered the Activity. Streamlining, simplification, uniform management are necessary.
2-10 Detect target NRW components (i.e. invisible leakage, customer meter malfunction, and illegal connection) of each SMA
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Activity in Garki I will be repeated and will be kept in pilot Area offices based on results of Activity 2-5.
Completed in October 2017.
2-11 Develop a NRW reduction operation plan of each SMA, including reduction target for review by Head of Distribution Department
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but provisionally completed in Garki I because of unsuccessful NRW reduction.Revision will be done in Garki I.
Completed in October 2017.
2-12 Review and approve NRW reduction operation plan of each SMA
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW reduction.Revision will be done in Garki I.
Completed in October 2017.
2-13 Implement NRW reduction operations at each SMA
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki Ibecause of unsuccessful NRW reduction.Further operations will be done in Garki I.
Completed in October 2017.
2-14 Monitor the progress of the NRW reduction operations of each SMA
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW reduction.Further operations will be done in Garki I.
Completed in October 2017.
2-15 Measure level of NRW of each SMA at the end of the respective operations
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I
Completed in October 2017.
Annex3-136
No Activity Previous Monitoring (as at Jul. 2017) *Progress against Phase-2 Work Plan
Current Monitoring (as at Jun.2018)*Progress against Phase-2 Work Plan
because of unsuccessful NRW reduction.Further operations will be done in Garki I.
2-16 Prepare a report on pilot projects, covering Activity 2-1~2-15
Progress: 90%, Behind: 2.0 months(Follow-up)Completed in Gudu and Jabi Area Offices, but not completed in Garki I because of unsuccessful NRW reduction.Revision will be done after the completion of Activity 2-10 to 2-15.
Completed in October 2017.
2-17 Develop manuals for NRW reduction for Area Office managers and field operators (i.e. technical officers & meter readers), incl. audio visual materials
Progress: 50%, Behind: 0.0 months(Follow-up)Revision ongoing.Finalization will be done after the completion of Activity 2-10 to 2-16.
Completed in May 2018.
Annex3-137
[Activities for Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Activity Previous Monitoring (as at Jul. 2017) *Progress against Phase-2 Work Plan
Current Monitoring (as at Jun.2018)*Progress against Phase-2 Work Plan
3-1 Establish a Working Group for NRW reduction planning
Reviewed and completed. Completed.
3-2 Review existing plans, implementation structure, on-the-job training mechanism, etc. related to NRW reduction at FCTWB
Reviewed and Completed.Lack of HRD planning of FCTWB's staff.FCTWB should have comprehensive training programme including OJT and internal training.
Completed.
3-3 Conduct hydraulic and water pressure distribution analyses of the pipeline networks
Progress: 00%, Behind: 2.0 monthsTo be completed by November 2017.Close communication and feed-back with FCDA should be enhanced.Pipeline and customer information should be entered extensively into GIS for all service areas.
Completed in November 2017.
3-4 Develop outlines of the medium-term strategic plan and its annual NRW reduction plan (approval by the Director)
Progress: 25%, Behind: 0.0 monthsDraft content was prepared and officers were selected provisionally.Scenarios of NRW reduction strategic plan has been discussed.To be completed by November 2017.
Completed in November 2017.
3-5 Develop the first medium-term strategic plan (2019-2023) for approval by FCTA
Progress: 00%, Behind: 0.0 monthsTo be completed by March 2018.
Progress: 95%, Behind: 3.0 monthsWorking Group and Advisory Group members have been involved in documentation and check/comments.To be completed by the end of June2018.
3-6 Develop an annual NRW reduction plan based on the strategic plan as an integral part of an annual recurrent and capital plan of FCTWB for approval by FCTA
Progress: 00%, Behind: 0.0 monthsTo be completed by March 2018.
Progress: 80%, Behind: 1.0 monthsWorking Group, particularly NRW Unit has been involved in documentation based on the first medium-term strategic plan (2019-2023).To be completed by the end of July 2018.
3-7 Develop a planning manual for NRW reduction
Progress: 00%, Behind: 0.0 monthsTo be completed by March 2018.
Progress: 80%, Behind: 0.0 monthsJICA Expert Team and NRW Unit have been involved in preparation.To be completed by the end of July 2018.
3-8 Review existing plans, activities and implementing structure, etc. related to water distribution management
Progress: 80%, Behind: 0.0 monthsSome Area Offices submitted the required information.To be completed by October 2017.Close communication and feed-back among FCTWB's divisions should be enhanced.Pipeline and customer information should be entered extensively into GIS for all service areas.
Completed in October 2017.
3-9 Establish framework of water distribution management
Progress: 25%, Behind: 0.0 monthsTo be completed by October 2017.
Progress: 85%, Behind: 8.5 monthsThe Activity will be completed after
Annex3-138
No Activity Previous Monitoring (as at Jul. 2017) *Progress against Phase-2 Work Plan
Current Monitoring (as at Jun.2018)*Progress against Phase-2 Work Plan
the completion of customers’ zonal coding stated in Activity 1-4, before July 2018.
1-3 Achievement of Output
[Output-1: 1. Level of NRW of both the service area of FCWTB and water distribution areas is monitored and estimated.]
No Indicator Previous Monitoring (as at Jul. 2017) Current Monitoring (as at Jun.2018)1a Record of NRW ratio is
kept by NRW Unit.None and delayed as a result of delay in Activities 1-2 to 1-5.
NRW ratio was estimated because of data deficiency at bulk meters and recorded.Periodic billed consumption has been not calculated easily because of non monthly meter reading and billing cycle.
1b NRW ratio of the service area of FCTWB is reported to its Joint Management Meeting.
None and delayed as a result of delay in Activities 1-2 to 1-5.
NRW ratio was estimated because of data deficiency at bulk meters and reported.
1c NRW ratio of the service area of FCTWB is reported to Management of FCTWB.
None and delayed as a result of delay in Activities 1-2 to 1-5.
NRW ratio was estimated because of data deficiency at bulk meters and reported.
1d Periodic records of data and estimation on water distribution management such as water flow of zonal meters and water pressure are kept by NRW Unit.
None and delayed as a result of delay in Activities 1-6 and 1-7.
Water flow has been recorded by zonal meters although data deficiency.Billed consumption have been not calculated due to delay in customers’zonal coding.
Verification of Achievement and Implementing ProcessBased on preliminary investigation by the Project Team, FCTWB had communicated with FCDA to discuss solutions to non-full water flow inside pipelines and interference along trunk mains by water flow from new water treatment plant (Phases 3&4) to water flow from old plant (Phases 1&2) at the upstream side of bulk flow meters. Then, FCTA started relocation works of injection point from the upstream side to the downstream side in June 2018.
Annex3-139
[Output-2: Methods/operational procedures for effective NRW reduction are established through pilot projects at Pilot Metering Areas (PMAs) under pilot Area Offices.]
No Indicator Previous Monitoring (as at Jul. 2017) Current Monitoring (as at Jun.2018)2a Decrease rate of NRW
ratio for each Sub Metering Area of a PMA reaches at least 80% of its target at the end of the respective NRW reduction operations.
Achieved in Gudu and Jabi pilot Area Offices, but not achieved in Garki I.
NRW Ratio (%)Bef(%)
Aft(%)
Red.Point
Target
(%)
status
Gudu
SMA-1 52.0 14.3 37.7 31.2 OK
SMA-2 53.9 28.7 25.2 32.3 OK
Jabi
SMA-2 45.6 21.1 24.5 27.4 OK
SMA-3 87.6 42.6 45.0 52.6 OK
Garki I
SMA-1 85.1 62.2 22.9 51.1 No
SMA-2 74.8 78.2 -3.4 44.9 Non
SMA-3 70.0 53.7 16.3 42.0 No
Not successful in SMA-2 of Garki I due to difficulty in identifying the installed pipeline, however the Project concluded indicator was generally achieved in all three PMAs. Pilot project spent the period between Nov. 2014 and Dec. 2016 intermittently and the follow up between Mar. and Oct. 2017.
NRW Ratio (%)Bef
(%)
Aft
(%)
Red.
Point
Target
(%)
status
Gudu
SMA-1 52.0 12.1 39.9 31.2 OK
SMA-2 53.9 29.9 24.0 32.3 OK
PMA 53.3 20.4 32.9 32.0 OK
Jabi
SMA-2 45.6 21.1 24.5 27.4 OK
SMA-3 87.6 42.6 45.0 52.6 OK
PMA 70.0 30.9 39.1 42.0 OK
Garki I
SMA-1 85.1 45.2 39.9 51.1 OK
SMA-2 74.8 49.3 25.5 44.9 Non
SMA-3 70.0 27.4 42.6 42.0 OK
PMA 74.8 34.7 40.1 44.9 OK
2b Technical manuals for Area Office managers and field operators (i.e. technical officers and meter readers), including audio visual materials, are approved by Head of Department (HoD) for Distribution and HoDfor Commerce.
Technical manuals were prepared and provisionally approved, but reviewed and updated in Phase-2.
Technical manuals were reviewed and updated in May 2018.Approval process is ongoing.
Verification of Achievement and Implementing ProcessUnder the circumstances that 2017 Counterpart Fund was not released as scheduled due to delay in non-passage of 2017 appropriation and FCTA’s internal process, the Project made efforts of implementation of pilot projects as follow-up activities to achieve the target with concentrated inputs including supervisors and supporters from the FCTWB Headquarters and other Area Offices from September to October 2017.
Annex3-140
[Output-3: A medium-term strategic plan of FCTWB for NRW reduction is developed, utilizing the results of Output-1&2.]
No Indicator Previous Monitoring (as at Jul. 2017) Current Monitoring (as at Jun.2018)3a Draft medium-term
strategic plan for NRW reduction (2019-2023) is submitted by FCTWB to FCTA for review and approval.
None (as planned). Not yet.To be submitted in early July 2018, after JCC’s approval of the draft medium-term strategic plan.
3b An annual NRW reduction plan (2019) is incorporated in FCWTB’s annual recurrent and capital plan (2019) for submission to FCTA for review and approval.
None (as planned). Not yet.The incorporation can be done after FCTA’s approval of the draft medium-term strategic plan and when FCWTB’s annual recurrent and capital plan (2019) is prepared probably in October 2019 which is after the termination of the Project.So, FCTWB highlighted the need to modify this indicator (refer to 3-1).
3c A planning manual for NRW reduction is approved by the Director of FCTWB.
None (as planned). Not yet.To be approved by the end of August 2018.
3d Framework of water distribution management is established.
None and delayed. Framework has not been ready due to delay in Activity 1-6, 1-7, 3-8 and 3-9.
Ongoing but delayed due to delay in Activity 1-7 and 3-9.
Verification of Achievement and Implementing ProcessAlthough it took time, working and advisory groups’ members contributed effectively to documentation and check/comments/advices in preparation of the draft medium-term strategic plan.
Annex3-141
1-4 Achievement of the Project Purpose
[Project Purpose: Capacity of FCTWB for NRW reduction is strengthened.]
No Indicator Previous Monitoring (as at Jul. 2017) Current Monitoring (as at Jun.2018)a The medium-term
strategic plan for NRW reduction (2019-2023) is approved by FCTA by the end of the Project.
None (as planned). Not yet.To be approved by the end of August 2018.
b Relevant staff of FCTWB (i.e. members of NRW Management Team and Pilot NRW Action Teams) become equipped with skills and knowledge necessary for NRW reduction according to the criteria set by the Project for each level.
Follow-up capacity development have been done in Phase-2 of the Project.
Capacity development have been done in Phase-2 of the Project.Follow up to be completed by the end of August 2018.
c NRW ratio of each PMA is monitored.
None (as planned). Inflow data has been read in Gudu, but not in Jabi and Garki I.
Partially monitored.Inflow data has been read in Gudu, but not in Jabi and Garki I due to malfunctioning of a mechanical PMA meter in Jabi and data transfer failure from an ultrasonic PMA meter to portable data logger in Garki I.
Verification of Achievement and Implementing ProcessIn relation to Indicator c, less awareness and ownership have caused proper reporting and information sharing on problems among FCTWB Headquarters and pilot Area Offices and then delay in prompt measures.
1-5 Changes of Risks and Actions for Mitigation
Although enabling law establishing autonomous FCTWB was enacted in the end of 2017 and members of governing Board of FCTWB were appointed in March 2018, FCTWB still depends financially on FCTA. Following the past physical years 2016 and 2017, recent budget constraint of the Nigerian side including non-release or late-release of the Counterpart Fund and recurrent budget has corresponded to an important assumption “A. Natural disaster / political instability / economic crisis that affect the Project activities do not occur.” in 2018, too. Recent budget constraint has posed an impediment in the Project monitoring with adequate logistics.
1-6 Progress of Actions undertaken by JICA
None.
1-7 Progress of Actions undertaken by Nigerian side
Annex3-142
National budget for 2018 was approved in the middle of June 2018, so FCTWB needs to request FCTA for the immediate release of the Counterpart Fund or adequate recurrent budget.
1-8 Other remarkable/considerable issues related/affect to the project (such as other JICA's projects, activities of counterparts, other donors, private sectors, NGOs etc.)
(1) Personnel Reassignment of the FCTWB’s Project Members
Same as the last monitoring, Technical Manager (Head of Commerce) and some Project members were reassigned since August 2017. FCTWB needs to consider his/her experiences in the Project and assure transfer of information, knowledge and lessons learned in the Project activities to his/her successor and other members.
(2) Delay in Release of 2018 Counterpart Fund
As mentioned above, though national budget for 2018 was approved in the middle of June 2018, FCT budget for 2018 is still in the process of the approval. Accordingly, 2018 Counterpart Fund has not yet been released. The Nigerian side needs to keep in touch with JICA Expert Team on the status of FCT budget approval and release of the Counterpart Fund.
(3) Preparation for FCTWB Autonomy
As of September 2017, JICA Expert Team suggested establishing a preparatory committee,listing up and scheduling preparatory activities in expectation for autonomy. Following enactment of enabling law for autonomous FCTWB in December 2017, JICA Expert Team assisted FCTWB in financial data collection, calculation of unit cost, price and profitable tariff, then financial analysis including profit-loss statement and cash flow until 2023 in accordance with the medium-term strategic plan for NRW reduction.In preparation for full transition of FCTWB to an autonomous agency, FCTWB should utilize these deliverables to advance step by step as scheduled.
(4) Administrative Complication with respect to Commerce Operations
Same as several times of the past monitoring, mixture of customer categories, meter types, reading divisions and water tariff, and irregular billing cycle and also lagged billing reflection of payment record, etc. have caused inefficiency in commerce operations affecting NRW reduction, which leads to financial losses of FCTWB and customer dissatisfaction. JICA Expert Team suggests FCTWB to solve the issues in consideration of streamlining, simplification and uniform management among relevant Units. In preparation for full transition of FCTWB to an autonomous agency as well as implementation of NRW reduction according to the medium-term strategic plan and annual plans, these issues should be seriously discussed among governing Board and management FCWTB based on lesson learnt from the Project.
Annex3-143
(5) Project Vehicle
As a result of condition check of the project vehicle damaged by the traffic accident in Lokoja in March 2017, FCTWB concluded impossibility of repair and will purchase a new vehicle by using Counterpart Fund. Process of procurement is ongoing. All project vehicles for NRW reduction should be used strictly for implementation of the medium-term strategic plan for NRW reduction.
2 Delay of Work Schedule and/or Problems (if any)
2-1 Detail
(1) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
Through monitoring of bulk and zonal flow meter reading (ultrasonic meters) for system input volume, the Project found out that data acquisition is not always available due to non-full flow of water at bulk flow meters in the previous monitoring, which results in difficulty in calculating/monitoring system input volume as well as NRW ratio of the whole water supply system.
(2) Customers’ Zonal and PMA Coding (Output-1)
Customers’ zonal and PMA coding is still ongoing (80% completed) as a fundamental condition for water distribution management and NRW monitoring, and FCTWB has faced in difficulty in identifying their locations.
(3) Irregular Billing Cycle (Output-1)
Same as the previous monitoring, from the fact that bills were issued at 6 times in the past 12 months, meter reading and billing has not been done in regular intervals, which causes difficulty in calculation/monitoring of billed water consumption.
(4) Monitoring of NRW Ratio and/or related Data in Zone and PMA
a) System input volume to Zone 5 is not measurable for NRW monitoring. b) Also, system input volume to PMAs in Jabi and Garki I are not measurable or recordable for
NRW monitoring. c) Prepaid meter payment record in Gudu PMA has not been submitted regularly from Metering
Unit to NRW Unit.
2-2 Cause
(1) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
Based on the Project Team’s preliminary investigation, FCTWB and FCDA identified
Annex3-144
interference along trunk mains by water flow from new water treatment plants (Phases 3&4) to water flow from old plants (Phases 1&2) at the upstream side of bulk flow meters as a cause of non-full flow of water and also overflow from water treatment plants (Phases 3&4).
(2) Customers’ Zonal and PMA Coding (Output-1)
Some customers lack address information in billing system database, so zonal coding has slowed down.
(3) Irregular Billing Cycle (Output-1)
The inability of regular billing is attributed to operational challenges such as dearth of billing paper and non-constant power supply which are caused by funding problem.
(4) Monitoring of NRW Ratio and/or related Data in Zone and PMA
a) Solar panel for zonal meter located at roof-top of Tank 5 was stolen in February 2018. b) A mechanical meter in Jabi PMA is not functioning, and data from an ultrasonic PMA meter
seems to have not been transferred to portable data logger in Garki I PMA. c) Existing prepaid meter software cannot create data sheets.
2-3 Action to be taken
(1) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
Since the previous monitoring, the Project estimated system input volume based on available and reliable data which the Project can obtain, and continue to do it. As a result of discussions and close collaboration between FCDA and FCTWB about water flow interference at an injection point along a trunk main by water flow from new water treatment plant (Phases 3&4) to water flow from old plant (Phases 1&2) at the upstream side of bulk flow meters, FCDA started relocation works of the injection point from the upstream side to the downstream side in June 2018, and will complete it by the end of July 2018.
(2) Customers’ Zonal and PMA Coding (Output-1)
Customers’ address information should be clarified one by one and efficiently, then zonal andPMA coding should be completed by the second week of July 2018.
(3) Irregular Billing Cycle (Output-1)
Any possible measures and efforts are taken to ensure regular meter reading and billing. The issue should be escalated properly to not only management of FCTWB but also governing Board and FCTA to address importance of regular billing for improvement in calculation of billed water consumption, and to obtain their understanding and necessary funding.
(4) Monitoring of NRW Ratio and/or related Data in Zone and PMA
Annex3-145
a) The solar system should be recovered by utilizing spare panels from other solar systems by the end of July 2018, and those spare panels will be restocked later.
b) A PMA mechanical meter in Jabi PMA should be replaced, and data transfer failure from an ultrasonic PMA meter to data logger in Garki PMA should be solved by the end of July 2018.
c) Prepaid meter payment record in Gudu PMA should be submitted regularly from Metering Unit to NRW Unit by utilizing an alternative data source.
2-4 Roles of Responsible Persons/Organization
[Nigerian Side]
(1) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
NRW Unit continues to estimate system input volume based on available and reliable data which the Project can obtain. As soon as FCDA completes relocation works of the injection point from the upstream side to the downstream side by the end of July 2018, FCDA and FCTWB will work on cabling works, then FCTWB will monitor bulk and zonal flow meter reading (ultrasonic meters) for system input volume as originally designed.
(2) Customers’ Zonal and PMA Coding (Output-1)
- Relevant Units such as MIS, billing, AMR and NRW as task team identify list of customers whom address information is unclear for zonal coding.
- By customer category, relevant Units such as major consumers and Area Office cooperate with task team for clarification of address information.
- Then, task team completes immediately zonal coding by clarified information as well as PMA coding based on pilot project customer list.
(3) Irregular Billing Cycle (Output-1)
NRW Unit and Billing Unit escalate the issue to management of FCTWB, then from FCTWB to Board members and FCTA to address importance of regular billing for improvement in calculation of billed water consumption, and to obtain their understanding and necessary budget allocation.
(4) Monitoring of NRW Ratio and/or related Data in Zone and PMA
a) Both NRW Unit and Facility & Electro-Mechanical Unit work on solar panel installation and supervision.
b) Process of procurement of a mechanical meter is ongoing. NRW Unit, Pipeline Unit and Area Office replace the mechanical PMA meter by new one in Jabi. NRW Unit and Facility & Electro-Mechanical Unit investigate situation of data transfer from ultrasonic PMA meter
Annex3-146
logger in Garki I, then take necessary measures. c) Metering Unit obtains prepaid meter payment record from Revenue Unit, then submit it in
suitable format to NRW Unit monthly.
[Japanese Side]
(1) Data Acquisition by Bulk and Zonal Flow Meters (Output-1)
JICA Expert Team provides necessary supports to FCTWB, particularly NRW Unit to continue estimating system input volume based on available and reliable data which the Project can obtain, and provides necessary and possible assistance for relocation works of the injection point.
(2) Customers’ Zonal and PMA Coding (Output-1)
JICA Expert Team provides necessary supports to FCTWB.
(3) Irregular Billing Cycle (Output-1)
JICA Expert Team provides necessary supports to FCTWB.
(4) Monitoring of NRW Ratio and/or related Data in Zone and PMA
JICA Expert Team provides necessary supports to FCTWB.
3 Modification of the Project Design Matrix and Project Implementation Plan
3-1 Project Design Matrix and Plan of Operation
As a result of this monitoring, the Project Team confirmed process and suggests revision of PDM (PDM4 to PDM5) as below, as well as Plan of Operation (PO4 to PO5).
(1) FCTA’s Approval Process of the Medium-term Strategic Plan for NRW Reduction
The draft medium-term strategic plan for NRW reduction (2019-2023) is submitted by FCTWB to FCTA for review and approval as the indicator “3a” for Output-3, and then the approval shall be done by the end of the Project as the indicator “a” for Project Purpose. For this approval process, the Nigerian side confirmed that governing board of FCTWB authorized by FCTA takes responsibility of the approval.
(2) Incorporation of Annual NRW Reduction Plan (2019) to FCTWB’s Annual Recurrent and Capital Budget Plan (2019)
FCTWB prepares annual recurrent and capital budget plan in October in recent years, so annual NRW reduction plan (2019) is not likely to be incorporated to annual recurrent and capital budget plan by September 2018, the end of the Project.
Annex3-147
The Nigerian side requested to modify the indicator 3b for Output-3 as below, as a revision of the present PDM4. Before modification (PDM4): “3b. An annual NRW reduction plan (2019) is incorporated in FCWTB’s annual recurrent and capital plan (2019) for submission to FCTA for review and approval.”After modification (PDM5): “3b. An annual NRW reduction plan (2019) is incorporated in FCWTB’s annual recurrent budget plan (2019) or committed on its incorporation by the General Manager of FCTWB for submission to FCTA for review and approval.”
3-2 Other modifications on detailed implementation plan
None.
4 Preparation by Nigerian side toward after completion of the Project
- Follow up for incorporation of the annual NRW reduction plan (2019) to FCTWB’s annual recurrent budget plan (2019)
- Follow up for modification of FCTWB’s budget templates- Standing imprest either monthly or quarterly basis for routine activities - Set up staffing, office and equipment storage - Monitoring of NRW ratio and related data (the whole system, zones and PMAs) - Preparatory survey on zones - Regular reporting to Management and governing Board of FCTWB
II. Project Monitoring Sheet I & II (as attached)
Annex Annex-1: Participants in Preparation of Project Monitoring Sheets and Photos
Annex3-148
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Moni
torin
g: 27
Jun.
2018
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
4344
4546
4748
Coun
terme
asur
esOu
tput
-11-
1W
/PSu
rvey
Instal
lation
Revis
edAc
tual
Susp
ende
dSu
spen
ded
Instal
lation
1-2
W/P
Revis
edAc
tual
Meter
Fau
ltsRe
pair
Obse
rvatio
nRe
pair
1-3
W/P
Revis
edAc
tual
Susp
ende
d
1-4
W/P
Revie
wSy
stem
Modif
icatio
nRe
vised
Actua
lCo
ncep
tSp
ecific
ation
Spec
ificati
onMo
difica
tion
Susp
ende
dRe
pair
Zona
l Cod
ing
1-5
W/P
Revis
edAc
tual
Susp
ende
d
1-6
W/P
Suve
ry &
Desig
nCo
nstru
ction
Instal
lation
Revis
edAc
tual
Tend
erCu
stoms
C.
Solar
Instal
lation
Tend
er
1-7
W/P
Revis
edAc
tual
c
Outp
ut-2
2-1
W/P
Revis
edAc
tual
2-2
W/P
Base
line
Inter
im-1
Revis
edInt
erim
2Fin
alAc
tual
2-3
W/P
Revis
edAc
tual
2-4
W/P
Revis
edAc
tual
2-5
W/P
Revis
edAc
tual
Susp
ende
d
2-6
W/P
Revis
edAc
tual
2-7
W/P
Revis
edFo
llow-
UpAc
tual
Susp
ende
d
2-8
W/P
Revis
edFo
llow-
UpAc
tual
2-9
W/P
Revis
edFo
llow-
UpAc
tual
2-10
W/P
Revis
edFo
llow-
UpAc
tual
2-11
W/P
Revis
edFo
llow-
UpAc
tual
2-12
W/P
Revis
edFo
llow-
UpAc
tual
2-13
W/P
Revis
edFo
llow-
UpAc
tual
2-14
W/P
Revis
edFo
llow-
UpAc
tual
2-15
W/P
Revis
edFo
llow-
UpAc
tual
Meas
ure l
evel
of NR
W of
each
SMA
atthe
end o
f the r
espe
ctive
oper
ation
s-
Comp
leted
in O
ctobe
r 201
7.-
Prog
ress
: 100
%10
0% 75%
50%
25%
Monit
or th
e pro
gres
s of th
e NRW
redu
ction
oper
ation
s of e
ach S
MA-
Comp
leted
in O
ctobe
r 201
7.-
Prog
ress
: 100
%10
0% 75%
50%
25%
Imple
ment
NRW
redu
ction
oper
ation
s at
each
SMA
-Co
mplet
ed in
Octo
ber 2
017.
-
Prog
ress
: 100
%10
0% 75%
50%
25%
Revie
w an
d app
rove
NRW
redu
ction
oper
ation
plan
of ea
ch S
MA-
Comp
leted
in O
ctobe
r 201
7.-
Prog
ress
: 100
%10
0% 75%
50%
25%
Deve
lop a
NRW
redu
ction
oper
ation
plan o
f eac
h SMA
, inclu
ding r
educ
tion
targe
t for r
eview
by H
ead o
f
-Co
mplet
ed in
Octo
ber 2
017.
-
Distr
ibutio
nDe
partm
ent
Prog
ress
: 100
%10
0% 75%
50%
25%
Detec
t targ
et NR
W co
mpon
ents
(i.e.
invisi
ble le
akag
e, cu
stome
r mete
rma
lfunc
tion,
and i
llega
l con
necti
on)
-Co
mplet
ed in
Octo
ber 2
017.
-
of ea
ch S
MAPr
ogre
ss: 1
00%
100% 75%
50%
25%
Meas
ure a
n init
ial le
vel o
f NRW
of ea
chSM
A-
Comp
leted
in O
ctobe
r 201
7.-
Prog
ress
: 100
%10
0% 75%
50%
25%
Upda
te the
distr
ibutio
n netw
ork
draw
ings f
or ea
ch S
MA-
Comp
leted
in O
ctobe
r 201
7.-
Prog
ress
: 100
%10
0% 75%
50%
25%
Isolat
e a S
MA by
insta
lling v
alves
-Co
mplet
ed in
Octo
ber 2
017.
-
Prog
ress
: 100
%10
0% 75%
50%
25%
Zone
each
PMA
into
Sub M
eterin
gAr
eas (
SMA)
-Co
mplet
ed-
Prog
ress
: 100
%10
0% 75%
50%
25%
Instal
l wate
r flow
mete
rs to
each
PMA
and m
easu
re in
/outflo
ws m
onthl
y-
Comp
leted
A me
chan
ical P
MA m
eter in
Jabi
PMA
is no
t func
tionin
g,an
d data
from
an ul
traso
nic P
MA m
eter is
not tr
ansfe
rred t
opo
rtable
logg
er in
Gar
ki I P
MA.
Prog
ress
: 100
%10
0% 75%
50%
25%
-
Prog
ress
: 100
%10
0% 75%
50%
25%
Prep
are/u
pdate
distr
ibutio
n netw
ork
draw
ings f
or ea
ch P
MA-
Comp
leted
Refer
to A
ctivit
y 3-3
.
Prog
ress
: 100
%10
0% 75%
50%
25%
Meth
ods/o
pera
tiona
lpr
oced
ures
for e
ffect
iveNR
W re
duct
ion
are
esta
blish
ed th
roug
h pi
lot
proj
ects
at P
ilot M
eter
ing
Area
s (PM
As) u
nder
pilo
tAr
ea O
ffice
s
Revie
w ex
isting
NRW
redu
ction
oper
ation
s at e
ach p
ilot A
rea O
ffice
-Co
mplet
ed-
Prog
ress
: 100
%10
0% 75%
50%
25%
Cond
uct c
apac
ity as
sess
ment
ofor
ganiz
ation
and t
he re
levan
t staf
f-
Ongo
ingAs
sess
ment
was d
one p
artia
lly af
ter th
e com
pletio
n of p
ilot
proje
cts, a
nd w
ill be
comp
leted
after
NRW
mon
itorin
g in
pilot
Area
offic
es in
July
and A
ugus
t 201
8.Pr
ogre
ss: 6
5%Be
hind 1
0.0 m
onths
100% 75%
50%
25%
Identi
fy an
d sele
ct a P
ilot M
eterin
g Are
a(P
MA) f
or ea
ch P
ilot A
rea O
ffice b
ased
on th
e sele
ction
crite
ria of
PMA
-Co
mplet
ed
Meas
ure/e
stima
te an
d coll
ect d
ata fo
rwa
ter di
stribu
tion m
anag
emen
t suc
h as
water
flow
of zo
nal
-Th
e Acti
vity w
ill be
comp
leted
after
the c
omple
tion o
fcu
stome
rs’ zo
nal c
oding
state
d in A
ctivit
y 1-4
, befo
re Ju
ly20
18.
meter
s and
wate
rpr
essu
rePr
ogre
ss: 8
5%Be
hind:
0.0 m
onths
100% 75%
50%
25%
Ongo
ing
Instal
l zon
al me
ters,
water
pres
sure
sens
or an
d pilo
t rem
ote m
onito
ring
(telem
etry)
syste
m
-Co
mplet
ed in
Aug
ust 2
017.
After
comp
letion
, logg
ers’
failur
e wer
e obs
erve
d at T
ank 2
and T
ank K
ubwa
due t
o pow
er in
stabil
ity an
d ligh
tning
, but
they w
ere r
eplac
ed or
fixed
.So
lar pa
nel fo
r zon
al me
ter lo
cated
at ro
of-top
of T
ank 5
was s
tolen
in F
ebru
ary 2
018.
Prog
ress
: 100
%10
0% 75%
50%
25%
Calcu
late N
RW ra
tio of
the s
ervic
e are
aof
FCTW
B us
ing th
e res
ults o
btaine
dfro
m Ac
tivity
1-3 a
nd 1-
4
-Co
mplet
ed in
Feb
ruar
y 201
8.-
Prog
ress
: 100
%Es
timate
d10
0% 75%
50%
25%
-Co
mplet
edCu
stome
rs’ zo
nal c
oding
is st
illon
going
as a
fund
amen
tal
cond
ition
for w
ater
dist
ribut
ion m
anag
emen
t.Pe
riodic
bille
d co
nsum
ption
has
bee
n no
t rec
orde
d be
caus
e of
non
regu
lar m
eter
read
ing a
nd b
illing.
Con
stant
pow
er su
pply,
adeq
uate
pro
vision
for c
onsu
mable
s and
SOP
are
nec
essa
ry.Pr
ogre
ss: 1
00%
Zona
l cod
ing is
ongo
ing.
100% 75%
50%
25%
-Co
mplet
ed in
Feb
ruar
y 201
8.-
Prog
ress
: 100
%Sw
itch-
over
issu
ere
main
s.
100% 75%
50%
25%
-Co
mplet
ed in
Feb
ruar
y 201
8.-
Prog
ress
: 100
%Sw
itch-
over
issu
ere
main
s.
100% 75%
50%
25%
-Co
mplet
ed.
-
Prog
ress
: 100
%10
0% 75%
50%
25%
May
Jun
Jul
Aug
Sep
Leve
l of N
RW o
f bot
h th
ese
rvice
area
of F
CWTB
and
wate
r dist
ribut
ion
area
s is m
onito
red
and
estim
ated
.
Instal
l bulk
mete
rs to
water
trea
tmen
tpla
nts 1
and 2
Meas
ure/e
stima
te wa
ter pr
oduc
tion o
fwa
ter tr
eatm
ent p
lants
1, 2,
3, an
d 4
Tally
the a
bove
wate
r pro
ducti
onda
ta/es
timati
on
Calcu
late t
he w
ater c
onsu
mptio
n bas
edon
the b
illing
data
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Activ
ities
Oct.
Nov
Dec
Jan
Feb
Mar
Apr
Nov
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)PP
O4
Plan
of S
ched
ule a
nd A
ctua
l Wor
k Per
iod
45
Jan
Fe7
llatio
n
odific
ation
rAp
r
Follo
w
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-Up
Follo
w-UpCu
s
3031
Mar
Apr
Annex3-151
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Moni
torin
g: 27
Jun.
2018
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)PP
O4
Plan
of S
ched
ule a
nd A
ctua
l Wor
k Per
iod
2-16
W/P
Inter
imFin
alRe
vised
Follo
w-Up
Actua
l
2-17
W/P
Draft
Finali
zatio
nFin
aliza
tion
Revis
edFo
llow-
UpFin
aliza
tion
Actua
l
Outp
ut-3
3-1
W/P
Revis
edAc
tual
3-2
W/P
Revis
edAc
tual
3-3
W/P
Revis
edAc
tual
3-4
W/P
Revis
edAc
tual
3-5
W/P
Revis
edAc
tual
3-6
W/P
Revis
edAc
tual
3-7
W/P
Revis
edAc
tual
3-8
W/P
Revis
edAc
tual
3-9
W/P
Revis
edAc
tual
W/P
Phas
e-1 (
Oct 2
014 -
Dec
2016
, 27 m
onth
s)Ph
ase-
2 (Ja
n 201
7 - M
ar 20
18, 1
5 mon
ths)
Revis
edPh
ase-
2 (Ja
n 201
7 - S
ep 20
18, 2
1 mon
ths)
Actua
l
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
4344
4546
4748
Coun
terme
asur
esJIC
A Ex
pert
1Ak
inori M
IYOS
HIW
/P-
- C
hief A
dviso
r / N
RW R
educ
tion P
lannin
g / W
ater D
istrib
ution
Revis
ed M
anag
emen
tAc
tual
2Ta
ketos
hi FU
JIYAM
AW
/P-
- D
eputy
Chie
f Adv
isor /
NRW
Red
uctio
n Plan
ning
Revis
edAc
tual
3To
ru T
OYOD
AW
/P-
- N
RW R
educ
tion O
pera
tions
Man
agem
ent
Revis
edAc
tual
4Ki
yosh
i KIY
AMA
W/P
--
Leak
age D
etecti
on T
echn
ology
Revis
edAc
tual
5Hi
royu
ki MO
RITA
W/P
--
Com
merci
al Lo
ssRe
vised
Actua
l6
Hiro
yuki
MORI
TAW
/P-
- H
ydra
ulic A
nalys
is / G
ISRe
vised
Actua
l7
Tosh
inobu
KAS
UYA
W/P
--
Pro
cure
ment
Mana
geme
nt / C
oord
inator
Revis
edAc
tual
8To
mohir
o SHI
MIZU
W/P
--
Facil
ity D
esign
/ Con
struc
tion S
uper
vision
Revis
edAc
tual
9Ki
yosh
i KIY
AMA
W/P
--
Equip
ment
Desig
n / In
stalla
tion
Revis
edAc
tual
10Ta
kesh
i YAJ
IMA
W/P
--
Wate
r Dist
ributi
on M
anag
emen
t 2Re
vised
Actua
l11
Tomo
hiro S
HIMI
ZUW
/P-
-Re
mote
Monio
toring
/ Rem
ote M
onito
ring S
ystem
Insll
ation
Re
vised
& Tr
aining
1Ac
tual
12Ta
kash
i MOR
IW
/P-
-Re
mote
Monit
oring
Sys
tem In
sllati
on &
Tra
ining
2Re
vised
Actua
l13
Tosh
inobu
KAS
UYA
W/P
--
Remo
te Mo
nitor
ing S
ystem
Insll
ation
& T
raini
ng 3
Revis
edAc
tual
14Ta
kash
i MOR
IW
/P-
- P
rocu
reme
nt Ma
nage
ment
/ Coo
rdina
tor 2
Revis
edAc
tual
15No
boru
OSA
KABE
W/P
--
Finan
cial A
nalys
is / O
rgan
izatio
nRe
vised
Actua
lEq
uipm
ent
1Le
akag
e dete
ction
equip
ment
W/P
*3PM
Asin
Japa
n(JI
CA)
Revis
edAc
tual
2Bu
lk me
ters (
ultra
sonic
flow
meter
)W
/P*W
TPin
Japa
n(JI
CA)
Revis
edAc
tual
Instal
lation
3W
ater m
eter,
flow
meter
and v
alves
W/P
*3PM
Asin
Nige
ria(JI
CA E
xper
t)Re
vised
Actua
l4
Pipe
repa
ir equ
ipmen
tW
/P*3
PMAs
in Ni
geria
(JICA
Exp
ert)
Revis
edAc
tual
5Ve
hicles
(Pick
up tr
uck)
W/P
*Lea
kage
Dete
ction
in Ni
geria
(JICA
)Re
vised
Actua
l6
GIS
softw
are,
office
equip
ment
W/P
*FCT
WB
HQs
in Ni
geria
/Othe
r(JI
CA E
xper
t)Re
vised
Actua
l
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
One o
f two H
iliux w
as da
mage
d in a
ccide
nt on
18th
March
2017
. FCT
WB
will p
urch
ase a
n alte
rnate
amd m
onito
r use
of pr
oject
vehic
les pr
oper
ly.
-Ha
nded
over
and c
omple
ted.
None
-Ha
nded
over
and c
omple
ted.
None
-
-Ha
nded
over
and c
omple
ted.
None
- -- -- -- -- -- -
Sep
- -
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Inpu
ts (t
he Ja
pane
se si
de)
Oct.
Nov
Dec
Jan
Feb
25%
Dura
tion
/ Pha
sing
-34
mon
ths6 m
onths
will
be ex
tende
d afte
r ame
ndme
nt of
R/D
and
revis
ion of
PDM
Ver
.3.
50%
25%
Estab
lish f
rame
work
of wa
terdis
tributi
on m
anag
emen
t-
Ongo
ingTh
e Acti
vity w
ill be
comp
leted
after
the c
omple
tion o
fcu
stome
rs’ zo
nal c
oding
state
d in A
ctivit
y 1-4
, befo
re Ju
ly20
18.
Prog
ress
: 85%
Behin
d: 8.5
mon
th10
0% 75%
Revie
w ex
isting
plan
s, ac
tivitie
s and
imple
menti
ng st
ructu
re, e
tc. re
lated
towa
ter di
stribu
tion m
anag
emen
t
-Co
mplet
ed in
Octo
ber 2
017.
-
Prog
ress
: 100
%10
0% 75%
50%
Deve
lop a
plann
ing m
anua
l for N
RWre
ducti
on-
Ongo
ingJIC
A Ex
pert
Team
and N
RW U
nit ha
ve be
en in
volve
d in
prep
arati
on.
To be
comp
leted
by th
e end
of Ju
ly 20
18.
Prog
ress
: 00%
Behin
d 0.0
mon
th10
0% 75%
50%
25%
Deve
lop an
annu
al NR
W re
ducti
on pl
anba
sed o
n the
stra
tegic
plan a
s an
integ
ral p
art o
f an a
nnua
l recu
rrent
and
capit
al pla
n of F
CTW
B for
appr
oval
-On
going
Wor
king G
roup
, par
ticula
rly N
RW U
nit ha
s bee
n inv
olved
indo
cume
ntatio
n bas
ed on
the f
irst m
edium
-term
stra
tegic
plan (
2019
-202
3).
To be
comp
leted
by th
e end
of Ju
ly 20
18.
by F
CTA
Prog
ress
: 80%
Behin
d 1.0
mon
th10
0% 75%
50%
25%
Deve
lop th
e firs
t med
ium-te
rm st
rateg
icpla
n (20
19-2
023)
for a
ppro
val b
y FCT
A-
Ongo
ingW
orkin
g Gro
up an
d Adv
isory
Grou
p mem
bers
have
been
involv
ed in
docu
menta
tion a
nd ch
eck/c
omme
nts.
To be
comp
leted
by th
e end
of Ju
ne 20
18.
Prog
ress
: 95%
Behin
d 3.0
mon
th10
0% 75%
50%
25%
-
Prog
ress
: 100
%10
0% 75%
50%
25%
Deve
lop ou
tlines
of th
e med
ium-te
rmstr
ategic
plan
and i
ts an
nual
NRW
redu
ction
plan
(app
rova
l by t
he
-Co
mplet
ed in
Nov
embe
r 201
7.-
Dire
ctor)
Prog
ress
: 100
%10
0% 75%
50%
25%
A m
ediu
m-te
rm st
rate
gic
plan
of F
CTW
B fo
r NRW
redu
ctio
n is
deve
lope
d,ut
ilizin
g th
e res
ults
of
Outp
ut-1
&2
Estab
lish a
Wor
king G
roup
for N
RWre
ducti
on pl
annin
g-
Comp
leted
.-
Prog
ress
: 100
%(P
h2 re
view)
100% 75%
50%
25%
Revie
w ex
isting
plan
s, im
pleme
ntatio
nstr
uctur
e, on
-the-
job tr
aining
mech
anism
, etc.
relat
ed to
NRW
-Co
mplet
ed.
-
redu
ction
at F
CTW
BPr
ogre
ss: 1
00%
(Ph2
revie
w)10
0% 75%
50%
25%
Cond
uct h
ydra
ulic a
nd w
ater p
ress
ure
distrib
ution
analy
ses o
f the p
ipelin
ene
twor
ks
-Co
mplet
ed in
Nov
embe
r 201
7.
Deve
lop m
anua
ls for
NRW
redu
ction
for
Area
Offic
e man
ager
s and
field
oper
ators
(i.e. te
chnic
al off
icers
& me
ter
-Co
mplet
ed in
May
2018
.-
read
ers),
incl.
audio
visua
l mate
rials
Prog
ress
: 100
%10
0% 75%
50%
25%
Prep
are a
repo
rt on
pilot
proje
cts,
cove
ring A
ctivit
y 2-1
~2-1
5-
Comp
leted
in O
ctobe
r 201
7.-
Prog
ress
: 100
%10
0% 75%
50%
25%
45
Jan
Fe7
rAp
r
Follo
w
3031
Mar
Apr
Annex3-152
Proj
ect T
itle:
The
Fed
eral
Capi
tal T
errit
ory R
educ
tion
of N
on-R
even
ue W
ater
Pro
ject
Moni
torin
g: 27
Jun.
2018
Proj
ect M
onito
ring
Shee
t II (
Plan
of O
pera
tions
)PP
O4
Plan
of S
ched
ule a
nd A
ctua
l Wor
k Per
iod
7Zo
nal m
eters,
pres
sure
sens
ors a
nd re
mote
monit
oring
syste
mW
/P*W
hole
Syste
min
Japa
n(JI
CA)
Revis
edAc
tual
8St
andb
y pow
er ge
nera
tion a
nd st
orag
e batt
ery (
Solar
)W
/Pin
Nige
ria(JI
CA)
Revis
edAc
tual
Nige
rian
Cons
ulta
nt/C
ontra
ctor
1Mo
difica
tion o
f billi
ng an
d coll
ectio
n sys
temW
/PRe
vised
Actua
lCo
ncep
tSp
ecific
ation
Spec
ificati
onMo
difica
tion
2GI
S an
d data
base
train
ingW
/PRe
vised
Actua
l3
Cons
tructi
on of
cham
bers
for zo
nal m
eter a
nd w
ater
W/P
pres
sure
sens
orRe
vised
Actua
l4
Instal
lation
of st
andb
y pow
er ge
nera
tion a
nd st
orag
e batt
ery
W/P
(Sola
r)Re
vised
Actua
l5
Cons
tructi
on of
cham
bers
for bu
lk me
terW
/P(in
cludin
g cab
le ins
tallat
ion)
Revis
edAc
tual
Cons
tructi
onTr
ainin
g in
Japa
nW
/PPl
an: 4
train
ees x
3 tim
es =
12 tr
ainee
sRe
vised
Actua
l: 4 tr
ainee
s x 1
(Man
agem
ent)
+ 8 tr
aines
s x 1
(D&C
Joint
) = 12
train
eAc
tual
2014
2015
2016
2017
2018
Moni
torin
gRe
marks
Achie
veme
ntIss
ue &
12
34
56
78
910
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
3132
3334
3536
3738
3940
4142
4344
4546
4748
Coun
terme
asur
esPl
anni
ng, M
onito
ring
and
Coor
dina
tion
1W
/PRe
vised
Kick
-off
Actua
lKi
ck-o
ff1s
t2n
d3r
d4th
5th6th
7th2
W/P
Revis
edAc
tual
3W
/PRe
vised
Actua
l4
W/P
Revis
edAc
tual
5W
/PRe
vised
Actua
l6
W/P
Revis
edAc
tual
7W
/PRe
vised
Actua
l8
W/P
Revis
edAc
tual
9W
/PKi
ck of
fFin
alRe
vised
Actua
l10
Colle
ct an
d org
anize
data
for In
dicato
rs of
PDM
aW
/PRe
vised
Actua
lb
Cond
uct jo
int ca
pacit
y ass
essm
ent o
f the r
eleva
nt sta
ffW
/PBa
selin
eInt
erim
-1Int
erim
-2Fin
alRe
vised
Final
Prep
are C
apac
ity D
evelo
pmen
t (CD
) Plan
Actua
lBa
selin
eInt
erim
-1Int
erim
-2c
W/P
Revis
edAc
tual
dW
/PRe
vised
Actua
lRe
ports
/ Doc
umen
ts11
W/P
Revis
edAc
tual
12W
/PRe
vised
Actua
l13
W/P
Revis
edAc
tual
Publ
ic Re
latio
ns14
W/P
Revis
edAc
tual
15W
/PRe
vised
Actua
lMo
nito
ring
and
Evalu
atio
n in
the P
ost-P
rojec
t per
iod
16Po
st Mo
nitor
ing by
JICA
(not
desc
ribed
here
)-
--
17Po
st Ev
aluati
on by
JICA
(not
desc
ribed
here
)-
--
--
--
Prep
ratio
n of p
ublic
relat
ions m
ateria
ls-
None
-
Proje
ct Co
mplet
ion R
epor
t-
--
Deve
lop P
rojec
t Web
site
FCTW
B wi
ll disc
uss P
R thr
ough
webs
ite.
None
-
Wor
k Plan
--
-
Proje
ct Pr
ogre
ss R
epor
t-
--
Set r
educ
tion t
arge
t for e
ach P
MA by
the f
irst q
uarte
r of th
e sec
ond
year
--
-
Colle
ct an
d org
anize
for I
ndica
tors f
or se
mi-a
nnua
l Join
t Mon
itorin
g-
Ongo
ing-
Deve
lop cr
iteria
for c
apac
ity as
sess
ment
for ea
ch le
vel o
f the
relev
ant s
taff (
i.e. m
embe
rs of
NRW
Mgm
t and
Acti
on T
eams
)-
-Re
vision
of ta
rget
capa
city w
ill be
disc
usse
d.
-Pa
rtially
in S
ep-N
ov 20
17, F
eb 20
18-
Monit
oring
Miss
ion fr
om JI
CA fo
r Join
t Rev
iew-
Augu
st 20
18-
Orga
nize i
nform
ation
shar
ing se
mina
rs for
FCT
WB/
FCTA
, inclu
ding
Area
Offic
es-
-In
Septe
mber
2018
Orga
nize q
uarte
rly pr
oject
meeti
ngs
--
-
Cond
uct J
oint M
onito
ring s
emi-a
nnua
llyOn
going
Subm
it Mon
itorin
g She
et to
JICA
Nige
ria O
ffice s
emi-a
nnua
llyTo
be su
bmitte
d.
-
Orga
nize m
onthl
y tec
hnica
l mee
tings
-Te
chnic
al me
eting
s wer
e held
but n
ot mo
nthly.
-
Orga
nize J
oint C
oord
inatio
n Com
mitte
e (JC
C)-
Augu
st 20
17 an
d Jun
e 201
8-
Deve
lop D
etail P
lan of
Ope
ratio
ns (D
PO) f
or re
view
and a
ppro
val b
yJC
C-
--
Deve
lop A
nnua
l Plan
of O
pera
tions
(APO
) for
revie
w an
d app
rova
lby
JCC
--
Moni
torin
g Pl
anOc
t.No
vDe
cJa
nFe
bMa
r
The P
rojec
t and
know
ledge
obtai
ned i
n tra
ining
will
bebr
iefed
to F
CT M
iniste
r, ES
and P
S.
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Oct
Nov
Dec
Jan
Feb
Apr
May
Jun
Jul
Aug
Sep
1st tr
aining
for 4
train
ees i
n Aug
ust
2015
fand
2nd t
raini
ng fo
r 12 t
raine
esin
June
-July
2016
.
Comp
leted
. 3rd
train
ing fo
r 6 de
legati
on of
ficial
s fro
m FC
DAan
d FCT
WB
was c
ondu
tcted
in Ju
ly 20
17.
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Aug
Sep
-
Take
n ove
r by J
ICA.
Comp
leted
.-
-Co
mplet
ed.
-
-Co
mplet
ed.
-
-Ins
tallat
ion is
ongo
ing.
-Ha
nded
over
and c
omple
ted. In
stalla
tion i
s ong
oing.
-Co
mplet
ed.
-
-Ha
nded
over
and c
omple
ted. In
stalla
tion i
s ong
oing.
Settin
g-up
of zo
nal m
eters
has n
ot be
en do
ne pr
oper
ly du
eto
non-
full o
f wate
r flow
insid
e pipe
lines
(Auto
matic
Gain
Adjus
tmen
t for d
ata co
rrecti
on).
SOP
dt
l
45
Jan
Fe7
rAp
r30
31
Kick
-o
-2
Apr
Mar
Annex3-153
Participants in Preparation of Draft Monitoring Sheets
Day 1: 20st June 2018 for Draft Project Monitoring SheetsS/N NAME POSITION
1 Nahuche A.A General Manager (Project Manager)2 Aliyu Ahmad Usuman Asst. Director3 Lawal Abolade R. Head [Special Projects] (Coordinator)4 Dikko Musa Head [PL/WC]5 Adeyemi A. Taiwo H.O.D Commerce6 Rabiu M.Kabir Head [NRW]7 Fabikun Adedeji Kehinde Head [MIS]8 Shehu Suleiman Head [GIS]9 Abdullahi Masaud Area Manager Gwarinpa10 Abubakar Ubale S.E Civil11 Igbinosa Courage NRW12 Abdulrahman Shehu Sani Head Metering13 Muhammed Dauda Pipeline Unit14 Sulaiman A Muhammed Area Manager Jabi15 Abdul Ozumi AAM[Dist.] Gudu16 Mohammed E Gana AAM[Dist.] Garki I17 Izegaegbe A. Ayo AAM[Com.] Garki I18 Bashir Adamu AAM[Com.] Gudu19 Abdul Yusuf Superintendent, Gudu20 Ezeh Hillary Surveyor/ GIS21 Abubakar Danladi Senior Foreman22 Titus Dawan Commerce, Garki I23 Ibrahim Yauri Senior Foreman24 Akinori Miyoshi CA, JICA Expert Team
Day 2: 27th June 2018 for Draft Project Monitoring SheetsS/N NAME POSITION
1 Nahuche A.A General Manager (Project Manager)2 Aliyu Ahmad Usuman Asst. Director3 Lawal Abolade R. Head [Special Projects] (Coordinator)4 Pheobe Ocheja HOD [Admin&Supply]5 Hasfat Ahmed Lawi HOD [Finance and Account]6 Lola Okobi HOD [Quality Control]7 Dikko Musa Head [PL/WC]8 Bamidele Olatunji Head [International Cooperation]9 Rabiu M.Kabir Head [NRW]10 Fabikun Adedeji Kehinde Head [MIS]11 Shehu Suleiman Head [GIS]12 Abdullahi Masaud Area Manager Gwarinpa13 Abubakar Ubale S.E Civil14 Abdulrahman Shehu Sani Head [Metering]15 Rose Akpan Head [Billing]16 Yahaya O. Kuike Head [Audit]17 Dada Commerce18 Abdulrahman Mohammed NRW19 Akinori Miyoshi CA, JICA Expert Team
Annex3-154
Photos of Preparation of Monitoring Sheet
Day 1: 20th June 2018
Information sharing and discussion about project progress
(Attendance: NRW Management Team members and Action Team Members)
Day 2: 27th June 2018
Preparation of Draft Project Monitoring Sheets
(Attendance: Project Manager, Deputy Project Manager, NRW Management Team members and FCTWBManagement)
Annex3-155