AMERICAN FORK CITY COUNCIL
MAY 11, 2021
REGULAR SESSION AGENDA
Maximum Occupancy for meeting will be capped at 50 attendees due to COVID restrictions. To
view the meeting live, go to www.americanfork.gov/agendacenter
The American Fork City Council will meet in regular session on Tuesday, May 11, 2021, in the
American Fork City Hall, 31 North Church Street, commencing at 7:00 p.m. The agenda shall be
as follows:
REGULAR SESSION
1. Pledge of Allegiance; Invocation by Council Member Carroll; roll call.
2. Twenty-minute public comment period - limited to two minutes per person.
3. City Administrator's Report
4. Council Reports
5. Mayor's Report
COMMON CONSENT AGENDA
(Common Consent is that class of Council action that requires no further discussion or which is routine in nature.
All items on the Common Consent Agenda are adopted by a single motion unless removed from the Common
Consent Agenda.)
1. Approval of the April 13, 2021 city council minutes.
2. Approval of the April 20, 2021 work session minutes.
3. Approval of the authorization to release the Improvements Durability Retainer of
$1190.60 for FURRY TAILS TRANSFURMATIONS, located at 55 East 400 North.
4. Approval of the authorization to release the Improvements Construction Guarantee in the
amount of $30,686.00 and issue a Notice of Acceptance for the GROVE CREEK PLAZA
construction of public improvements located at 358 North 1100 East.
5. Ratification of city payments (April 28, 2021 to May 4, 2021) and approval of purchase
requests over $25,000.
ACTION ITEMS
1. Review and action of a Reimbursement Agreement for 500 East and 1700 South with
Phelon Lakeland, LLC.
2. Review and action of a Development Agreement with Brad Reynolds for Meadows at
American Fork Phase 2.
3. Review and action on an ordinance adopting an amendment to Section 17.7.507.F.6 of
the American Fork City Municipal Code regarding building primary orientation.
4. Review and action on subdivisions, commercial projects, condominiums, and PUD's
including 1) plat approval; 2) method of satisfaction of water rights requirements; 3)
posting of an improvement bond or setting of a time frame for improvement installation;
and 4) authorization to sign the final plat and acceptance of all dedications to the public
and to have the plat recorded.
May 11, 2021 2 | P a g e
a. Review and action on the final plat of Autumn Crest Phase 1 Plat E Subdivision,
located in the vicinity of 930 East 1040 North in the R-1-9,000 Residential zone.
5. Review and action on approval of the city’s fiscal year ending June 30, 2022, tentative budget.
6. Review and action on a settlement agreement and lease agreement with ROA General,
Inc.
7. Adjournment.
Dated this 6th day of May 2021.
Terilyn Lurker
City Recorder
• In accordance with the Americans with Disabilities Act, the City of American Fork will make reasonable
accommodations to participate in the meeting. Requests for assistance can be made by contacting the City
Recorder at 801-763-3000 at least 48 hours in advance of the meeting.
• The order of agenda items may be changed to accommodate the needs of the City Council, staff, and the
public.
AGENDA ITEM Common consent consideration regarding authorization to release the
Improvements Durability Retainer of $ 1190.60 for FURRY TAILS TRANSFURMATIONS ,
located at 55 East 400 North.
SUMMARY RECOMMENDATION The City Engineer recommends that the Improvements
Durability Retainer be released. The improvements were found in a condition meeting City
standards for workmanship and performance after one (1) year of service.
BACKGROUND Pursuant to the terms of Sections 17.9.100 and 17.9.403 of the City
Development Code, the City Council may authorize the release of the Improvements Durability
Retainer following the one (1) year durability testing period. The release is based on a finding
that the quality of construction and materials have endured without evidence of unusual
depreciation, wear, non-conformance of City standards or need for remedial action.
BUDGET IMPACT Following the release of the Improvements Durability Retainer, the City
is responsible for all future maintenance and replacement costs for any publicly-owned property
or improvement. In developments with Home-Owners or Unit-Owners Associations, all common
area maintenance and replacement responsibilities will then fall to the Association. All privately-
owned improvements will be the responsibility of the owner of the given parcel.
SUGGESTED MOTION Move to authorize the City Engineer to issue documents and/or
payments to release the Improvements Durability Retainer of $ 1190.60 for FURRY TAILS
TRANSFURMATIONS. Find that the quality of construction and materials have endured
without evidence of unusual depreciation, wear, non-conformance of City standards, or need for
remedial action.
SUPPORTING DOCUMENTS
Durability_Release_Authorization-Furry Tails Transfurmations (PDF)
Performance Guarantee - Furry Tail Transfurmation (XLSX)
Department Public Works
Director Approval Scott Sensanbaugher
REQUEST FOR COUNCIL ACTION
CITY OF AMERICAN FORK
MAY 11, 2021
4.3
Packet Pg. 3
IMPROVEMENT WARRANTY RELEASE AUTHORIZATION
The City Council of American Fork City, a Municipal Corporation and Body Politic in the State of Utah, hereby authorizes the release of the Improvement Warranty for FURRY TAILS TRANSFURMATIONS pursuant to the terms of Section 17.9.100 and 17.9.403 of the City Development Code. The City Council finds that the quality of construction and materials have endured without evidence of unusual depreciation, wear, non-conformance to City standards, or need for remedial action. The City Council hereby authorizes the City Engineer to issue a letter to the financial guarantee institution authorizing release of the Improvement Warranty or to issue an authorized City check as appropriate for the type of guarantee provided. Amount Released: $___1,190.60______________ PASSED THIS 11 DAY OF _MAY__, 2021 ___________________________________ City Representative, American Fork City ATTEST: __________________________________ Terilyn Lurker, City Recorder
4.3.a
Packet Pg. 4
Att
ach
men
t: D
ura
bili
ty_R
elea
se_A
uth
ori
zati
on
-Fu
rry
Tai
ls T
ran
sfu
rmat
ion
s (
Du
rab
ility
Rel
ease
- F
UR
RY
TA
ILS
TR
AN
SF
UR
MA
TIO
NS
)
Date Date Date Date Date Date
Name of Development:
Release Amount Release Amount Release Amount Release Amount Release Amount Release Amount Balance#1 Requested #2 Requested #3 Requested #4 Requested #5 Requested #6 Requested
ROADWAY
101 4" Sidewalk 1000 SF $8.00 $8,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $8,000.00
6" Sidewalk 160 SF $10.00 $1,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,600.00
Asphalt patching 403 SF $2.00 $806.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $806.00
1000 CONSTRUCTION MANAGEMENT/MISC. Blank
1001 Testing and Inspections 1 LS $2,500.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,500.00
Improvement Assurance $11,906.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $12,906.00 Available for Release
Improvement Warranty $1,190.60 Released 5/11/21 $1,190.60 Durability Period
Total $13,096.60
Furry Tail Transfurmation
Description of Item Quantity Unit Unit Price Total
4.3.b
Packet Pg. 5
Att
ach
men
t: P
erfo
rman
ce G
uar
ante
e -
Fu
rry
Tai
l Tra
nsf
urm
atio
n (
Du
rab
ility
Rel
ease
- F
UR
RY
TA
ILS
TR
AN
SF
UR
MA
TIO
NS
)
AGENDA ITEM (Common Consent Agenda) - Consideration regarding authorization to
release the Improvements Construction Guarantee in the amount of $ 30,686.00 and issue a
Notice of Acceptance for the GROVE CREEK PLAZA construction of public improvements
located at 358 North 1100 East.
SUMMARY RECOMMENDATION The City Engineer recommends that the Improvements
Construction Guarantee (ICG) be released. The improvements were found in a condition meeting
City standards and specifications and in conformance with the approved project construction
plans.
BACKGROUND Pursuant to the terms of Sections 17.9.100 and 17.9.304 of the City
Development Code, the City Council may authorize the release of the ICG and issue a "Notice of
Acceptance" of the project improvements. Following the issuance of the Notice of Acceptance,
the City accepts ownership of the project improvements. The project will then enter the one (1)
year Durability Testing Period as specified in section 17.9.400 of the City Development Code.
In issuing a Notice of Acceptance, the City Council finds that:
• The condition of the improvements are found to be satisfactory.
• All liens have been released, all outstanding fees paid, costs of administration paid, and
reimbursement payments to prior developers (if any) have been made.
• The project clean-up is found to be satisfactory.
The City may request a current title report or other such measures or reports as deemed
appropriate by the City as a means of determining the existence of any unreported liens or other
claims upon the project. All financial information (if any) provided by the developer is attached.
The Council may request additional information as deemed necessary.
BUDGET IMPACT Following the release of the ICG, there is a one (1) year Durability
Testing Period wherein ten percent (10%) of the total ICG is held to ensure the durability of the
constructed improvements.
SUGGESTED MOTION Move to accept the improvements and authorize the Mayor to
execute the Notice of Acceptance for the GROVE CREEK PLAZA public improvements
located at 358 North 1100 East. To authorize the issuance of documents and/or payments to
Department Public Works
Director Approval Scott Sensanbaugher
REQUEST FOR COUNCIL ACTION
CITY OF AMERICAN FORK
MAY 11, 2021
4.4
Packet Pg. 6
release the Improvement Construction Guarantee (ICG). Commence the Durability Testing
Period by retaining ten percent (10%) of the ICG. To find that the project improvements are in a
condition meeting City ordinances, standards, and specifications and are in conformance with the
approved project construction plans.
Note: With passage of the Common Consent Agenda items, the City Council will enact the
motion and findings as noted in the "Suggested Motion" heading found above.
SUPPORTING DOCUMENTS
Notice of Acceptance-Grove Creek Plaza (PDF)
Notice of Completion-Grove Creek Plaza (PDF)
Performance Guarantee - Grove Creek Plaza (XLSX)
4.4
Packet Pg. 7
NOTICE OF ACCEPTANCE / IMPROVEMENT COMPLETION ASSURANCE
RELEASE AUTHORIZATION
The City Council of American Fork City, a Municipal Corporation and Body Politic in the State of Utah, hereby authorizes the release of the Improvement Completion Assurance for GROVE CREEK PLAZA. Council accepts the improvements completed with the finding that said improvements are in a condition meeting City ordinances, standards, and specifications, are in conformance with the approved project construction plans, and all conditions for release as detailed in section 17.9.304 of the City Code have been satisfied. The City Council hereby authorizes the issuance of a letter to the financial guarantee institution authorizing release of the Improvement Completion Assurance or to issue an authorized City check as appropriate for the type of guarantee provided. Upon issuance of this Notice of Acceptance, the Improvement Warranty Period shall commence as detailed in section 17.9.400 of the City Development Code. An amount totaling ten percent (10%) of the Improvement Completion Assurance funds will be held as the Improvement Warranty pursuant to the City Performance Guarantee ordinance. Amount Released: $_30,686.00_______________ PASSED THIS ___11____DAY OF_____MAY__________, __2021___. ___________________________________ City Representative, American Fork City ATTEST: ________________________________ Terilyn Lurker, City Recorder
4.4.a
Packet Pg. 8
Att
ach
men
t: N
oti
ce o
f A
ccep
tan
ce-G
rove
Cre
ek P
laza
(F
inal
Bo
nd
Rel
ease
- G
RO
VE
CR
EE
K P
LA
ZA
)
NOTICE OF COMPLETION AND REQUEST FOR RELEASE
Projects and/or subdivisions completed within the corporate limits of American Fork City Mayor of American Fork 51 East Main American Fork, UT 84003 Re:________________________________ Dear Mayor: As the project and/or subdivision construction has now been completed in full, I request that the Improvement Completion Assurance be released in full up to one hundred percent (100%) of the initial construction costs. Following the release of the Improvement Completion Assurance, I understand that the one (1) year Improvement Warranty period will commence wherein ten percent (10%) of the total Improvement Completion Assurance is held to ensure the durability of the constructed improvements per City Ordinance Section 17.9. I, _______________________________, the owner, developer, and authorized representative of __________________________________ Subdivision/Project, do hereby request the release of the Improvement Completion Assurance. I certify that all liens have been released, all outstanding fees paid, costs of administration paid, and reimbursement payments to prior developers (if any) have been made, and the project clean-up is complete. Project: __________________________________________________________ Address: __________________________________________________________ Requested Amount: ________________________________________________________ ________________________________________ ______________________________ Owner/Developer Date
DocuSign Envelope ID: 0A30CB4F-4B2B-403F-A952-061975B45EA1
$30,686.00
Troy Monty
358 North County Blvd., American Fork, UT 84003
Grove Creek Plaza Performance Bond
Grove Creek Plaza
Utah Valley Repair Inc. for the Grove Creek Plaza
4.4.b
Packet Pg. 9
Att
ach
men
t: N
oti
ce o
f C
om
ple
tio
n-G
rove
Cre
ek P
laza
(F
inal
Bo
nd
Rel
ease
- G
RO
VE
CR
EE
K P
LA
ZA
)
BOND RELEASE REQUESTDevelopment Name:
Development Address:
*All outstanding fees must be paid prior to any release.
Quantity
Bond Type:
Please send check/bank letter to:
Name:
Bank (if applicable):
Address:
City: State: Zip:
Phone: Email:
Signature: Date:
City Official Use Only
Administrative Signature: Date:
Inspector Signature: Date:
Units Total
Inspector Use Only
Complete?
Yes/NoDescription of Item Unit Price
Total
Partial Improvement Assurance Release
Final Improvement Assurance Release
Improvement Warranty Release (10% Durability Release)
Cash Deposit Escrow Account Letter of Credit Surety Bond
Fees paid and current
Page 1 of 2
DocuSign Envelope ID: 0A30CB4F-4B2B-403F-A952-061975B45EA1
Orem
358 North County Blvd., American Fork, UT 84003
UT
801-400-0581
Capital Community Bank
X
Grove Creek Plaza
84058
The money is being held at Capital Community Bank. Once the escrow bond is released, the bank will deal
with it, and there is no need to send a check. Please send the bank letter to the address below.
49 W. University Parkway
X
$30,686.00
4.4.b
Packet Pg. 10
Att
ach
men
t: N
oti
ce o
f C
om
ple
tio
n-G
rove
Cre
ek P
laza
(F
inal
Bo
nd
Rel
ease
- G
RO
VE
CR
EE
K P
LA
ZA
)
BOND RELEASE REQUESTDevelopment Name:
Development Address:
Quantity
Inspector Use Only
Complete?
Description of Item Units Unit Price Total Yes/No
Page 2 of 2
DocuSign Envelope ID: 0A30CB4F-4B2B-403F-A952-061975B45EA1
Grove Creek Plaza
N/A
358 North County Blvd., American Fork, UT 84003
4.4.b
Packet Pg. 11
Att
ach
men
t: N
oti
ce o
f C
om
ple
tio
n-G
rove
Cre
ek P
laza
(F
inal
Bo
nd
Rel
ease
- G
RO
VE
CR
EE
K P
LA
ZA
)
Date Called In:04-12-2021
Date Inspect On:
04-12-2021 AM
PM
American Fork 275 E 200 N
American Fork, UT 84003 PHONE # (801) 763-3065
[email protected] INSPECTION REPORT
OWNER/BUILDER: JLR CONTRACTORS Requested by: ADDRESS: 358 NORTH 1100 EAST, GROVE CREEK PLAZA , American Fork Phone #: PERMIT #: 20-0481 Email: Description: Permit Type: CommercialINSPECTION OF ITEMS LISTED BELOW:Inspections
CONDITION OF INSPECTION:
PASS 40 PARTIAL PASS NO PASS
ITEMIZED AND DESCRIBED AS FOLLOWS:
DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR
1. Slab on Deck 2. Spot Footings 3. Tilt Panel 4. Stone Lath
5. Stair Tread 6. Above Grid 7. Site Inspection 8. Demising Walls
9. Water Meter Set 10. Temp PowerPassed: 08/04/20
11. Footings/PiersPassed: 08/07/20
12. Und. PlumbingPassed: 09/01/20
13. Und. Mechanical 14. Und. Electrical 15. Electrical Trench 16. Slab/Holddowns
17. Slab on Grade 18. Foundation WallsPassed: 09/01/20
19. Sewer/Water Lateral 20. Rough FramingPassed: 04/07/21
21. Rough ElectricalPassed: 11/12/20
22. Rough MechanicalPassed: 11/12/20
23. Rough PlumbingPassed: 11/12/20
24. Rough GasPassed: 11/12/20
25. Int/Ext SheerPassed: 11/19/20
26. Fire Wall 27. Shear Wall 28. Insulation
29. Interior Sheetrock 30. LathPassed: 10/22/20
31. Shower Pan 32. Permanent PowerPassed: 12/10/20
33. Electric Meter Set 34. Drive Approach 35. Roof 36. Solar Panel
37. Other -Passed: 11/12/20
38. Stop Work Notice 39. Final 40. Final C/O - rePassed: 04/12/21
04-12-2021 at 11:39:33 AM Mike Ulmer
4.4.b
Packet Pg. 12
Att
ach
men
t: N
oti
ce o
f C
om
ple
tio
n-G
rove
Cre
ek P
laza
(F
inal
Bo
nd
Rel
ease
- G
RO
VE
CR
EE
K P
LA
ZA
)
Certificate of Occupancy American Fork City Commercial Division
This certificate is issued pursuant to the requirements outlined in section 111 of the International Building Code. At the time of issuance, this building or portion of building as described below was inspected for compliance with the various building construction ordinances of American Fork City and found in compliance for the use and occupancy listed.
The building construction codes this permit was issued under are as follows: 2018 International Building Code and/or 2015 International Residential Code, 2017 National Electric Code, 2018 International Plumbing Code, 2018 International Mechanical Code and/or 2018 International Fuel Gas Code.
Building Official: Date April 12, 2021 Dan Rojas, Chief Building Official
Permit No: 20-0481
Type of Permit: New Commercial
Building Address: 358 North 1100 East
Owner: Grove Creek Plaza
Contractor: JLR Contractors
Zone: PO
Group: B/M
Construction Type: V-B
Occupancy Load: 166 Spr. Sys. Used: Y
Spr. Sys. Req.: Y
4.4.b
Packet Pg. 13
Att
ach
men
t: N
oti
ce o
f C
om
ple
tio
n-G
rove
Cre
ek P
laza
(F
inal
Bo
nd
Rel
ease
- G
RO
VE
CR
EE
K P
LA
ZA
)
Date Date Date Date Date Date
Name of Development: 5/11/2021 FINAL
Release Amount Release Amount Release Amount Release Amount Release Amount Release Amount Balance#1 Requested #2 Requested #3 Requested #4 Requested #5 Requested #6 Requested
500 SEWER Blank
510 Connect to Existing 1 Each $1,000.00 $1,000.00 1 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
600 CULINARY WATER Blank
601 8" DI Culinary Water 157 LF $28.00 $4,396.00 157 $4,396.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
602 8" Gate Valve 1 Each $1,400.00 $1,400.00 1 $1,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
603 6" Gate Valve 1 Each $1,200.00 $1,200.00 1 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
607 Connect to Existing Water 1 Each $2,000.00 $2,000.00 1 $2,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
611 Fire Hydrant Assembly 1 Each $4,000.00 $4,000.00 1 $4,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
612 1" Water Service Lateral 5 Each $1,500.00 $7,500.00 5 $7,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
613 Blow off 1 Each $1,400.00 $1,400.00 1 $1,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
700 PRESSURIZED IRRIGATION Blank
720 1" Irrigation Service 1 Each $1,500.00 $1,500.00 1 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
800 STREETS Blank
806 6' Sidewalk 53 LF $30.00 $1,590.00 53 $1,590.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
810 Driveway Apron 1 Each $200.00 $200.00 1 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
812 Demolition and Removal of existing Drive Approach 2 Each $500.00 $1,000.00 2 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
1000 CONSTRUCTION MANAGEMENT/MISC. Blank
1001 As Builts Mylar & Disks 1 Each $1,000.00 $1,000.00 1 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
1003 Testing, Cleaning, Inspections 1 LS $2,500.00 $2,500.00 1 $2,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Improvement Completion Assurance $30,686.00 $30,686.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Available for Release
Improvement Warranty $3,068.60 $3,068.60 Durability Period
Total Bond Amount $33,754.60
Street Lights
Street Lights 13,168.75$
Total Fees $13,168.75
10-4410-276
Grove Creek Plaza
Description of Item Quantity Unit Unit Price Total
4.4.c
Packet Pg. 14
Att
ach
men
t: P
erfo
rman
ce G
uar
ante
e -
Gro
ve C
reek
Pla
za (
Fin
al B
on
d R
elea
se-
GR
OV
E C
RE
EK
PL
AZ
A)
AGENDA ITEM Review and action of a Reimbursement Agreement for 500 East and 1700
South with Phelon Lakeland, LLC.
SUMMARY RECOMMENDATION Phelon Lakeland, LLC proposes a Reimbursement
Agreement for system improvements along 500 East and 1700 South of the recently approved
Lakeland Industrial Park development.
BACKGROUND The City Council approved the Lakeland Industrial Park subdivision
development at the May 5, 2020 special session meeting. Phelon Lakeland, LLC has been
working closely with the City's Public Works Department on a plan for the upsizing of the
underground utilities and sidewalk improvements along 500 East and 1700 South in compliance
with the approved Master Plans.
A Reimbursement Agreement was drafted by the developer and reviewed by the City Attorney's
office. The agreement outlines the parameters for the construction cost of the storm drain,
pressurized irrigation and trail improvements along 500 East and 1700 South.
The system improvement impact fees reimbursement adds up to $534,292.00 for storm drain
improvements, $389,141.00 for pressurized irrigation improvements and $16,605.00 for trail
improvements. The total cost for the system improvements adds up to $940,038.00.
BUDGET IMPACT An amount no greater than $940,038.00 for the upsizing of the public
improvements along 500 East and 1700 South, which will be applied as storm drain, pressurized
irrigation and trail impact fee reimbursements.
SUGGESTED MOTION Move to approve the Reimbursement Agreement with Phelon
Lakeland, LLC for an amount no greater than $940,038.00 for system improvements along 500
East and 1700 South.
SUPPORTING DOCUMENTS
Reimbursement Agreement - Lakeland Industrial Park (PDF)
Department Public Works
Director Approval Scott Sensanbaugher
REQUEST FOR COUNCIL ACTION
CITY OF AMERICAN FORK
MAY 11, 2021
5.1
Packet Pg. 15
Revised Feb 01 2018 FORM NUMBER 002-00-002 Page 1 of 5 Approved as to form: American Fork City Attorney
REIMBURSEMENT AGREEMENT
This Reimbursement Agreement ("Agreement") is entered into as of this ___ day of _____________________, 2021, by and between Phelon Lakeland, LLC with its principal offices located at 731 North Coulson Drive, Lindon, UT 84042 ("Developer") and American Fork City, a municipal corporation and political subdivision of the State of Utah with its principal offices located at 51 East Main Street, American Fork, Utah 84003 ("City").
RECITALS
WHEREAS, Developer owns certain parcels of property located in American Fork, Utah County, Utah, specifically Parcel 13:078:0091, 13:078:0093, and 13:078:0062 which consists of approximately 26.7 acres and is further described in Exhibit A attached hereto (the “Property”). WHEREAS, the parties have learned that there are certain mutually beneficial, cooperative and cost-cutting ways their respective properties can assist in the development of the other; WHEREAS, pursuant to Section 13.80.030 of the American Fork Code of Ordinances and in compliance with Section 11-36a-402 of the Utah Code Annotated, the parties desire to provide for certain “system improvements,” as that term defined in Section 11-36a-102 of the Utah Code Annotated, in conjunction with the development of the Property by Developer; NOW, THEREFORE, in consideration of the mutual covenants contained herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the City and Developer hereby agree as follows:
AGREEMENT
1. Storm Drain Line. Developer is proposing to install storm sewer lines through its project at the required minimum size as required by City codes and standards. The City seeks to have the pipe within development upsized to a 60-inch pipe to accommodate additional off-site uses. Each upsized pipe is a system improvement. The lengths of pipe, associated materials and costs are set forth, and agreed to as shown, in the attached Exhibit B. 2. Pressurized Irrigation Line. Developer is proposing to install pressurized irrigation lines through its project at the required minimum size as required in City codes and standards. The City seeks to have the pipe within development upsized to a 30-inch pipe to accommodate additional off-site uses. Each upsized pipe is a system improvement. The lengths of pipe, associated materials and costs are set forth, and agreed to as shown, in the attached Exhibit B.
3. Sidewalk/Trail. Developer is proposing to construct a sidewalk at the required minimum size as required in City codes and standards. The City seeks to have some or all of the sidewalk within the development upsized to a 10’ trail to accommodate additional off-site uses.
5.1.a
Packet Pg. 16
Att
ach
men
t: R
eim
bu
rsem
ent
Ag
reem
ent
- L
akel
and
Ind
ust
rial
Par
k (
Rei
mb
urs
emen
t A
gre
emen
t fo
r 50
0 E
ast
and
170
0 S
ou
th w
ith
Ph
elo
n
Revised Feb 01 2018 FORM NUMBER 002-00-002 Page 2 of 5 Approved as to form: American Fork City Attorney
Each upsized sidewalk is a system improvement. The additional work, associated materials and costs are set forth, and agreed to as shown, in the attached Exhibit B. 4. System Improvements Reimbursement. The public improvements described above are each a System Improvement and collectively the “System Improvements.” The City agrees to reimburse Developer for the System Improvements in an amount equal to the actual costs of the System Improvements, not to exceed the amounts set forth in Exhibit B. 5. Time of Reimbursement. The City shall provide to Developer two reimbursement payments. The first reimbursement payment will be made within thirty days of completion of all storm drain system improvements for the Project. Completion for the first payment shall mean completion of construction and passed inspections of the storm drain system improvements. The second reimbursement payment will be made within thirty days of completion of remaining upsized system improvements for the Project. Completion of the second payment shall mean completion of construction, inspection and acceptance by the City Council. 6. Choice of Law. This Agreement shall be governed by, and construed in accordance with, the laws of the State of Utah. 7. Entire Agreement. This Agreement constitutes the entire agreement between the parties regarding the subject matter hereof and supersedes all prior understandings, written or oral, regarding the subject matter hereof. 8. Modification. This Agreement may only be modified or altered by a writing signed by both parties. 9. Attorney Fees. In the event either party seeks to enforce the terms hereof in a lawsuit or other proceeding, the prevailing party shall be entitled to an award of the costs incurred, including reasonable attorney fees. 10. Execution. This Agreement may be executed in multiple original counterparts, each of which shall be deemed to be an original and all of which, taken together, shall constitute one and the same Agreement. 11. Severability. The provisions of this Agreement shall be deemed to be severable, and if any provision of this Agreement is determined to be invalid or unenforceable by any court of competent jurisdiction, such invalidity or unenforceability shall not affect or limit the validity or unenforceability of the remaining provisions hereof. 12. Third-Party Beneficiary Interests. Nothing contained in this Agreement is intended to benefit any person or entity other than the parties to this Agreement and/or their respective successors and assigns; and no representation or warranty is intended for the benefit of, or to be relied upon by, any person or entity which is not a party to this Agreement and/or their respective successors and assigns.
5.1.a
Packet Pg. 17
Att
ach
men
t: R
eim
bu
rsem
ent
Ag
reem
ent
- L
akel
and
Ind
ust
rial
Par
k (
Rei
mb
urs
emen
t A
gre
emen
t fo
r 50
0 E
ast
and
170
0 S
ou
th w
ith
Ph
elo
n
Revised Feb 01 2018 FORM NUMBER 002-00-002 Page 3 of 5 Approved as to form: American Fork City Attorney
13. Binding Effect. This Agreement shall inure to the benefit of, and be binding upon, the parties hereto and their respective heirs, representatives, officers, agents, employees, members, successors and assigns. WHEREFORE, the parties have executed the foregoing to be effective on the date appearing above. PHELON LAKELAND, LLC AMERICAN FORK CITY _______________________________ ________________________________ By: Stephen W. Phelon Bradley J. Frost Its: General Partner Mayor, American Fork City ATTEST: __________________________________ City Recorder
Approved as to content:
_______________________________ City Engineer
5.1.a
Packet Pg. 18
Att
ach
men
t: R
eim
bu
rsem
ent
Ag
reem
ent
- L
akel
and
Ind
ust
rial
Par
k (
Rei
mb
urs
emen
t A
gre
emen
t fo
r 50
0 E
ast
and
170
0 S
ou
th w
ith
Ph
elo
n
Revised Feb 01 2018 FORM NUMBER 002-00-002 Page 4 of 5 Approved as to form: American Fork City Attorney
EXHIBIT A Parcel Legal Description
Commencing at a pointed located South 89°29’06” East along the Section line 1144.59 feet and South 1477.92 feet from the Northwest corner of Section 36, Township 5 South Range 1 East, Salt Lake Base and Meridian; thence South 89°14’38” East 583.81 feet; thence South 86°27’18” East 35.24 feet; thence along arc of a 1000 foot radius curve to the left 61.87 feet, (chord bear South 88°13’39” East 61.86 feet); thence Eat 105.46 feet; thence South 9.03 feet; thence East 38.11 feet; thence South 00°00’02” West 659.26 feet; thence East 224.00 feet; thence South 00°01’05” West 17.64 feet; thence South 89°58’46” West 2.79 feet; thence South 642.00 feet; thence West 465.14 feet’ thence North 00°37’36” East 582.88 feet; thence North 89°14’38” West 594.42 feet; thence North 00°34’56” East 749.08 feet to the point of beginning. Area = 905,504 square feet or 20.78 acres Basis of Bearing = South 89°29’06” East along Section line Lot created = 3 Lots
5.1.a
Packet Pg. 19
Att
ach
men
t: R
eim
bu
rsem
ent
Ag
reem
ent
- L
akel
and
Ind
ust
rial
Par
k (
Rei
mb
urs
emen
t A
gre
emen
t fo
r 50
0 E
ast
and
170
0 S
ou
th w
ith
Ph
elo
n
Revised Feb 01 2018 FORM NUMBER 002-00-002 Page 5 of 5 Approved as to form: American Fork City Attorney
EXHIBIT “B” Description of Improvements and estimated cost (bid schedule)
Reimbursement
PRESSURIZED IRRIGATION Blank30" DI PI Line 570 LF $218.00 $124,260.00 570 LF $25.00 $14,250.00 $110,010.0030" DI PI Line 780 LF $218.00 $170,040.00 0 LF $218.00 $0.00 $170,040.0030" x8" Cross 1 Each $23,664.00 $23,664.00 1 Each $1,000.00 $1,000.00 $22,664.0030" Butterfly Valve 1 Each $19,524.00 $19,524.00 1 Each $2,000.00 $2,000.00 $17,524.0030" Cap 1 Each $4,022.00 $4,022.00 0 Each $4,022.00 $0.00 $4,022.00Cathodic Protection 1 LS $45,592.00 $45,592.00 0 LS $45,592.00 $0.00 $45,592.0030" Isolator 1 Each $10,389.00 $10,389.00 0 Each $10,389.00 $0.00 $10,389.00STREETS BlankBase and Grade for 10' Sidewalk 615 LF $14.00 $8,610.00 615 LF $7.00 $4,305.00 $4,305.0010' Sidewalk 615 LF $40.00 $24,600.00 615 LF $20.00 $12,300.00 $12,300.00STORM DRAINAGE Blank60" Endwall 2 Each $5,800.00 $11,600.00 0 Each $2,320.00 $0.00 $11,600.0060" RCP Storm Drain 1644 LF $293.00 $481,692.00 0 LF $293.00 $0.00 $481,692.008x8 SD Box 1 Each $12,500.00 $12,500.00 0 Each $12,500.00 $0.00 $12,500.0096" SDMH 3 Each $12,500.00 $37,500.00 2 Each $4,500.00 $9,000.00 $28,500.00MISCELLANEOUS Blank4" Conduit 890 LF $4.00 $3,560.00 0 LF $4.00 $0.00 $3,560.006" Conduit 890 LF $6.00 $5,340.00 0 LF $6.00 $0.00 $5,340.00
TOTAL REIMBURSEMENT $940,038.00
Total Total
Actual Minimum Standard (Pioneering)
Description of Item Quantity Unit Unit Price Total Quantity Unit Unit Price
5.1.a
Packet Pg. 20
Att
ach
men
t: R
eim
bu
rsem
ent
Ag
reem
ent
- L
akel
and
Ind
ust
rial
Par
k (
Rei
mb
urs
emen
t A
gre
emen
t fo
r 50
0
AGENDA ITEM Review and action of an Agreement with Lakeview Meadows South LLC,
Lakeview Meadows LLC, and Brad Reynolds Construction, Inc. for Meadows at American Fork
Phase 2
SUMMARY RECOMMENDATION City staff recommend approval of an agreement with
Lakeview Meadows South LLC, Lakeview Meadows LLC, and Brad Reynolds Construction,
Inc. enabling development of Meadows at American Fork Phase 2 and the construction of certain
infrastructure as defined in the attached proposed agreement.
BACKGROUND The City Council approved the Meadows at American Fork Phase 2 (aka
Cottages at Lakeside Phase 2) District Framework Phase 2 at the November 26, 2019 regular
session meeting. The developer has been working closely with the City's Public Works
Department on a plan for the system improvements and upsizing along 350 South and 700 West
in compliance with the approved Master Plans and the city's Standards and Specifications.
An agreement was drafted by City personnel and including the City Attorney, and has been
reviewed and accepted by the developer. The agreement outlines the parameters for the
construction costs of the system improvements along 350 South and 700 West and defines
responsibilities for the various parties, including the dedication of necessary rights of way and
easements.
BUDGET IMPACT For the public improvements and upsizing along 350 South and 700
West, the following impact fee reimbursements will be paid by the City. An amount no greater
than $423,950.00 will be applied as road impact fee reimbursements. An amount no greater than
$12,282.00 will be applied as a culinary water impact fee reimbursement.
SUGGESTED MOTION Move to approve the agreement with Lakeview Meadows South
LLC, Lakeview Meadows LLC, and Brad Reynolds Construction, Inc. enabling development of
Meadows at American Fork Phase 2, and the construction of certain infrastructure as defined in
the attached proposed agreement.
SUPPORTING DOCUMENTS
Meadows at AF Phase 2 - Development Agreement (PDF)
Department Public Works
Director Approval Scott Sensanbaugher
REQUEST FOR COUNCIL ACTION
CITY OF AMERICAN FORK
MAY 11, 2021
5.2
Packet Pg. 21
1
AGREEMENT This Agreement (the “Agreement”) is entered into this ____ day of _______________, 2021, by and between Lakeview Meadows South, LLC, a Utah limited liability company (“LMS”), Lakeview Meadows, LLC, a Utah limited liability company (“LM”), Brad Reynolds Construction, Inc., a Utah corporation (“Contractor”), and American Fork City, a political subdivision of the State of Utah (“City”) (LMS, LM, Contractor, and City are sometimes collectively referred to herein as the “Parties”).
RECITALS
A. LMS owns real property located in American Fork, Utah, which is described on Exhibit “A” attached hereto (the “Property”). LMS is developing the Property as a housing subdivision called Meadows at American Fork Phase II (the “Phase II Project”). Contractor is the general contractor for the Phase II Project.
B. The adjacent real property to the North of the Phase II Project is owned by LM, and is developed as a housing subdivision called The Meadows at American Fork (the “Phase I Project”).dv
C. LMS and Contractor have submitted final Plans for the Phase II Project for review and approval by City (the “Plans,” a copy of which is attached hereto as Exhibit “B”).
D. LMS, LM, Contractor, and City wish to set forth certain terms and agreements they have reached related to the access to the Phase I Project and the development of the Phase II Project.
TERMS OF AGREEMENT
NOW THEREFORE, for good and valuable consideration, the sufficiency of which is hereby acknowledged, the Parties agree as follows:
1. Dedication of Property for 350 South Street. LMS shall dedicate the real property necessary for the construction of 350 South Street as shown on Exhibit “C” attached hereto (the “350 South Street Parcel”) to the City for public right-of-way.
2. Construction of 350 South Street. Contractor shall construct 350 South Street along the South boundary of the Property, including painting, stripping, signage, and 3 street lights, in accordance with the Plans and in accordance with the TOD-District Connector Cross Section attached hereto as Exhibit “D”.
3. Payment for 350 South Street. In consideration of the dedication of the 350 South Street Parcel and Contractor’s agreement to construct 350 South along the south boundary of the Phase II Project the City shall pay to LMS the sum of $250,000.00. Payment shall be made within 30 days of completion of construction of 350 South Street and City Council’s acceptance of the improvements.
5.2.a
Packet Pg. 22
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
2
4. Additional Pavement Required by Subsurface Soil Conditions. The City shall reimburse Contractor for the actual costs, not to exceed $75,000.00, of the additional pavement required as a result of subsurface soil conditions for 350 South Street due to the upsizing of the road, as set forth in the Report of CMT Engineering Laboratories attached hereto as Exhibit “E”. However, if the City and CMT Engineering Laboratories, all agree that a geotextile grid can be used in lieu of additional pavement, the maximum reimbursement shall be $57,290.00. Contractor shall provide to the City Engineer verification of expenses within ten days of completion of 350 South Street. Payment shall be made to Contractor within 30 days of and City Council’s acceptance of 350 South Street.
5. ADA and Bike Ramps. Contractor shall install, widen, move and/or remove ADA and bike ramps on 350 South Street and 700 West Street in accordance with the Plans. Said cost and expense shall be that of the Contractor.
6. 700 West Street. The Phase I Project and the Phase II Project shall not have direct access to 700 West Street. LM, LMS and Contractor shall not be responsible to the City or any other person or entity for any costs whatsoever in connection with 700 West Street, whether such costs be designated as tie-in fees, impact fees, reimbursement for construction costs, or in any other manner.
7. Access Easement. LMS and shall grant to LM a cross access easement across the Phase II Project to allow for a secondary access for Phase I Project on 350 South Street. LM shall grant to LMS a cross access easement across the Phase I Project to allow for secondary access to the Phase II Project on 200 South.
8. Temporary Fire Road. Upon execution of this Agreement, the temporary access road located along 700 West shall be closed and serve only as an emergency access road. LM shall install signs within thirty (30) days indicating Emergency Access Only. Upon completion of 350 South Street and sufficient access to Phase I Project from 350 South Street through Phase II Project, the temporary access road along 700 West shall be closed to all traffic.
9. Water Pipe in 350 South Street. Contractor shall install an upsized 12” water line (minimum size as required by City Codes and standards is 8”) under 350 South Street the length of the South boundary of the Property in accordance with the Plans. In consideration of the installation of the upsized water line, City shall pay to Contractor the actual cost of the upsize not to exceed $12,282.00. Contractor shall provide to the City Engineer verification of expenses within ten days of completion of the waterline installation. Payment shall be made within 30 days of the City Council’s acceptance of the water line.
10. Storm Drain. Contractor shall install storm drains in accordance with the Plans. The storm drains shall tie into the storm drains on the Willow Glen project at the location shown on Page C-201 of the Plans. City acknowledges that it has obtained all necessary approvals from Willow Glen Townhomes, L.L.C., and other persons or entities.
11. Conduits. Contractor shall install two 6” conduits, two 4” conduits and four vaults for future use under or along 350 South Street or 700 West, as depicted on Page C-300 of
5.2.a
Packet Pg. 23
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
3
the Plans. The City will reimburse Contractor for the actual cost of such installation, not to exceed $18,450.00
12. Dedication of Public Utility Easement – Phase I Project. LM shall dedicate to the City a 10 feet wide public utility easement along 200 South and 700 West as shown on Exhibit F attached hereto.
13. Dedication of Public Utility Easement – Phase II Project. LMS shall dedicate to the City a 10 feet wide public utility easement along 700 West and 350 South as shown on Exhibit F.
14. Dedication of Temporary Construction Easement. LM shall dedicate a temporary construction easement to the City on the northwest portion of the Phase I Project near the intersection of 200 South and 700 West within seven days of the City providing a Notice of Intent to Proceed to LM. The easement shall remain in effect until the City provides to LM a Notice of Completion, or twenty-four months after the Notice of Intent to Proceed, whichever occurs first. Said easement shall be as described in Exhibit F. In consideration of the dedication of the easement, the City shall pay to LM the sum of $500.00.
15. Construction of Side Path. City shall construct a 12-feet wide side path along the east boundary of Phase I Project and Phase II Project (the west edge of 700 West) in the right-of-way provided as described in items #14 and #15 below and as shown on the Plans.
16. Dedication of Right-of-Way – Phase I Project. LM shall dedicate right-of-way along 200 South and 700 West as shown on Exhibit F. In consideration of the dedication of the right-of-way, the City shall pay to LM the sum of $47,995.59. In the event this dedication requires the relocation of LM’s monument sign at the northwest corner of the Phase I Project, City shall pay the reasonable costs of its relocation to a location agreed upon by the parties.
17. Dedication of Right-of-Way – Phase II Project. LMS shall dedicate right-of-way along 700 West as shown on Exhibit F. In consideration of the dedication of the right-of-way, the City shall pay to LMS the sum of $32,004.41.
18. Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Utah, without reference to choice-of-law rules.
19. Waiver and Modification. This Agreement may not be amended, superseded or
cancelled, and none of the terms and conditions may be waived except by written instrument executed by each Party hereto; or, in the case of a waiver, by the Party waiving compliance.
20. Entire Agreement. This Agreement (including the documents referred to herein)
contains the entire agreement between the Parties with respect to the subject matter hereof and supersedes all prior understandings and agreements.
21. Assignment, Successors and Assigns. Each Party agrees that it will not assign, sell, transfer, delegate or otherwise dispose of, whether voluntarily or involuntarily, or by operation of law, any right or obligation under this Agreement. Subject to the foregoing limits on
5.2.a
Packet Pg. 24
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
4
assignment and delegation, this Agreement shall be binding upon and shall inure to the benefit of the Parties and their respective successors and permitted assigns.
22. Counterparts and Electronic Signatures. This Agreement may be executed in
counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Signatures delivered by e-mail, facsimile, or other electronic means may be relied upon as originals.
23. Non-waiver. The failure in any one or more instances of a party to insist upon
performance of any of the terms, covenants or conditions of this Agreement, to exercise any right or privilege in this Agreement conferred, or the waiver by said party of any breach of any of the terms, covenant or conditions of this Agreement, shall not be construed as a subsequent waiver of any such terms, covenants, conditions, rights or privileges, but the same shall continue and remain in full force and effect as if no such forbearance or waiver had occurred.
24. Third Parties. Nothing in this Agreement is intended to confer upon any party
other than the parties hereto (and their respective heirs, successors, legal representatives and permitted assigns) any rights, remedies, liabilities, or obligations under or by reason of this Agreement.
25. Severability. Any term or provision of this Agreement that is invalid or
unenforceable in any situation in any jurisdiction shall not affect the validity or enforceability of the remaining terms and provisions hereof or the validity or enforceability of the offending term or provision in any other situation or in any other jurisdiction.
26. Construction. The Parties have participated jointly in the negotiation and drafting
of this Agreement. In the event an ambiguity or question of intent or interpretation arises, this Agreement shall be construed as if drafted jointly by the Parties and no presumption or burden of proof shall arise favoring or disfavoring any Party by virtue of the authorship of any of the provisions of this Agreement.
In witness whereof, this Agreement is made and entered as of the date set forth above.
Lakeview Meadows South, LLC,
a Utah limited liability company
By: _____________________ Its: _____________________ Lakeview Meadows, LLC, a Utah limited liability company
By: _____________________
5.2.a
Packet Pg. 25
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5
Its: _____________________ Brad Reynolds Construction, Inc., a Utah corporation
By: _____________________ Its: _____________________ American Fork City,
a political subdivision of the State of Utah
By: ______________________ Its: ______________________
5.2.a
Packet Pg. 26
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
6
EXHIBIT “A”
PROPERTY DESCRIPTION
A parcel of land situate in the Northeast Quarter of Section 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian, more particularly described as follows:
Beginning at a point being North 00°24'14" East 116.05 feet along the section line and West 1,825.72 feet from the East Quarter Corner of Section 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian; and running
thence South 00°50'29" West 224.84 feet; thence North 89°27'26" West 155.29 feet; thence South 89°45'37" West 107.56 feet; thence North 89°21'35" West 261.62 feet; thence North 88°56'13" West 103.76 feet; thence South 89°45'50" West 56.70 feet; thence North 02°24'05" East 236.24 feet; thence South 88°34'36" East 678.49 feet to the point of beginning.
Contains 157,326 Square Feet or 3.612 Acres Tax Parcel No. 13-042-0098
5.2.a
Packet Pg. 27
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
7
EXHIBIT “B”
5.2.a
Packet Pg. 28
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
1. ALL WORK SHALL CONFORM TO AMERICAN FORK CITY STANDARDS & SPECIFICATIONS.
2. CALL BLUE STAKES AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES.
3. BENCHMARK ELEVATION = NORTHEAST CORNER SECTION 22, T3S, R1W SALT LAKE BASE & MERIDIAN ELEV. =4565.30'.
700 WEST 350 SOUTHAMERICAN FORK CITY, UTAH 84003
INDEX OF DRAWINGS1-1 BOUNDARY SURVEYC-001 GENERAL NOTESC-100 SITE PLANC-200 OVERALL GRADING AND DRAINAGE PLANC-201 GRADING AND DRAINAGE PLANC-202 GRADING AND DRAINAGE PLANC-300 UTILITY PLANC-400 EROSION CONTROL PLANPP-1 350 SOUTH PLAN AND PROFILEPP-2 350 SOUTH PLAN AND PROFILEPP-3 STORM DRAIN LATERALS PLAN AND PROFILEC-500 DETAILS
C-501 DETAILSC-502 DETAILSC-503 DETAILSC-504 DETAILSL-101 LANDSCAPE PLANL-102 LANDSCAPE PLANL-103 LANDSCAPE PLANL-501 LANDSCAPE DETAILSL-201 IRRIGATION PLANL-501 IRRIGATION DETAILS
GENERAL NOTES
MEADOWS AT AMERICAN FORKPHASE II
VICINITY MAP
NOTICE TO CONTRACTOR
UTILITY DISCLAIMERTHE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND / OR ELEVATIONS OF EXISTING UTILITIES ASSHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND WHERE POSSIBLE,MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THECONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TOREQUEST EXACT FIELD LOCATIONS OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATEALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON OR RELATED TO THESE PLANS SHALLCONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE PUBLIC ISPROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COMPLY WITH THE "OCCUPATIONAL SAFETY AND HEALTHREGULATIONS OF THE U.S. DEPARTMENT OF LABOR AND THE STATE OF UTAH DEPARTMENT OF INDUSTRIAL RELATIONSCONSTRUCTION SAFETY ORDERS." THE CIVIL ENGINEER SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTORSAND SUBCONTRACTORS COMPLIANCE WITH SAID REGULATIONS AND ORDERS.
CONTRACTOR FURTHER AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB-SITE CONDITIONS DURINGTHE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THISREQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THECONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE CIVIL ENGINEER HARMLESS FROM ANY AND ALLLIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FORLIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR ENGINEER.
NOTICE TO DEVELOPER/CONTRACTORUNAPPROVED DRAWINGS REPRESENT WORK IN PROGRESS, ARE SUBJECT TO CHANGE, AND DO NOT CONSTITUTE AFINISHED ENGINEERING PRODUCT. ANY WORK UNDERTAKEN BY DEVELOPER OR CONTRACTOR BEFORE PLANS AREAPPROVED IS UNDERTAKEN AT THE SOLE RISK OF THE DEVELOPER, INCLUDING BUT NOT LIMITED TO BIDS, ESTIMATION,FINANCING, BONDING, SITE CLEARING, GRADING, INFRASTRUCTURE CONSTRUCTION, ETC.
NO SCALE
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.Know what's
R
200 SOUTH
I-15
7230
WES
T
570 W
700 W
EST
7300 N ST
SITE
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
COMPANY CONTACT NUMBER
AMERICAN FORK CITY PUBLIC WORKS- CULINARY WATER/PRESSURIZED IRRIGATION JAY BREMS (801)763-3060- SEWER/STORM WATER ASHTON HARDY (801)763-3060- CITY INSPECTOR DEE HOWARD (801)763-3060- SWPPP INSPECTOR HARLAN NIELSON (801)763-3060AMERICAN FORK CITY FIRE MARSHAL MAT SACCO (801)763-3045AF FIBER WILL DAVIS (801)897-9826AMERICAN FORK IRRIGATION COMPANY ERNIE JOHN (801)471-6576CENTURY LINK BILL WESTFALL (432)623-4252COMCAST ELYSIA VALDEZ (801)401-3017DOMINION ENERGY TRENT JOHNSON (801)853-6548ROCKY MOUNTAIN POWER TERIA WALKER (801)756-1310TIMPANOGOS SPECIAL SERVICE DISTRICT DAVID BARLOW (801)756-5231
5.2.a
Packet Pg. 29
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
WILLOW GLEN PHASE 2
TOP OFBANK
W
G
GGGGGGGGGG
G
G
G G
G
FWL
FWL
FWL
FWL
W W
WW
W W W W W W W W W W W W
SS SSSS
SS
SSSS
SS
SS
SSSS
SSSS
SSSS
SSSS
SS
SS SS
W W W W W W
W
W W WW W W
WW
W
W W WW W
WW
EE
E
E E E E E E E E E
E
E E E
E
SD SD SD SD
SDSD
SSSS
SSSS
SSSS
SS
SS SS SS SS SS SS SS SS SS SS SS SS SSSS
SEXIST. SSMH
SEXIST. SSMH
SEXIST. SSMH
EXIST. SDCBEXIST. SDCB SQR
EXIST. SDCB
DEXIST. SDCO
EXIST. SDCBEXIST. SDCB SQR
H Y DEXIST. FIRE HYDRANT
SET BARAND CAP
SET BARAND CAP
EXISTING DITCH
TOP OF BANKFENCE IS ON
PROP. LINE
AMERICANFORK CITY13:042:0009
AMERICANFORK CITY13:043:0092
S 88°34'36" E 678.49'
S 0°
50'29
" W
224.8
4'
N 89°27'26" W 155.29'S 89°45'37" W 107.56'N 89°21'35" W 261.62'N 88°56'13" W 103.76'S 89°45'50" W56.70'
N 2°
24'05
" E
236.2
4'
CONTAINS:157,326 sq.ft.3.612 acres
TOTAL SURVEYED PARCELSEWER UTILITY EASEMENTOCTOBER 17, 2017
ENTRY NO. 102883:2017
SET BARAND CAP
SET BARAND CAP SET BAR
AND CAP SET BARAND CAP
SET BARAND CAP
SET BARAND CAP
POINT OFBEGINNING
700 W
EST
STRE
ET(P
UBLI
C ST
REET
)
LAKEVIEW MEADOWS, LLC13:042:0097
AF U
TAH,
LLC
13:0
41:0
088
AMERICANFORK CITY13:041:0086
OPEN FIELD
OPEN FIELD
CALL BLUESTAKES@ 1-800-662-4111 AT LEAST 48HOURS PRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
NORTHEAST CORNERSECTION 22T3S, R1WSLB&M
ELEVATION = 4565.30'
BENCHMARK
LOCATED IN THE EAST 1/2OF SECTION 22,
TOWNSHIP 5 SOUTH, RANGE 1 EAST,SALT LAKE BASE AND MERIDIAN
AMERICAN FORK CITY, UTAH COUNTY UTAH
SECTION CORNER
MONUMENT
SET NAIL & WASHER
SET ENSIGN REBAR AND CAP
WATER METER
WATER MANHOLE
WATER VALVE
FIRE HYDRANT
IRRIGATION VALVE
SANITARY SEWER MANHOLE
STORM DRAIN CLEAN OUT
STORM DRAIN CATCH BASIN
STORM DRAIN COMBO BOX
SIGN
UTILITY MANHOLE
UTILITY POLE
GAS METER
GAS LINE
CATCH BASIN (SQUARE)
WETLAND AREA
MINOR CONTOURS 1' INCREMENT
MAJOR CONTOURS 5' INCREMENT
CONCRETE
ADJACENT RIGHT OF WAY
RIGHT OF WAY
SECTION LINE
PROPERTY LINE
ADJACENT PROPERTY LINE
DEED LINE
TANGENT LINE
FENCE
EDGE OF ASPHALT
SANITARY SEWER
STORM DRAIN LINE
WATER LINE
IRRIGATION LINE
TELEPHONE LINE
OVERHEAD POWER
LIGHT POLE (DOUBLE)
LIGHT POLE (SINGLE)
H Y D
U
D
D
S
IRR
WV
W
G OHP
T
IRR
EAST 1/4 CORNERSECTION 22, T5S, R1E,SLB&MNOT FOUND
BASI
S OF
BEA
RING
REFERENCE CORNERSECTION 22, T5S, R1E, SLB&M
FOUND 3" U.C. BRASS CAP MON
NORT
H 00
°24'1
4" E
AST
266
4.93'
(REC
ORD)
NORT
H 03
°29'1
8" E
AST
2637
.69' (
RECO
RD)
2637
.68' (
MEAS
URED
)
116.0
5'
WEST 1825.72'
SOUTH 77°15'16" EAST145.71' (RECORD)
NORTHEAST CORNERSECTION 22, T5S, R1E, SLB&MFOUND 3" U.C. BRASS CAP MON
( IN FEET )HORZ: 1 inch = ft.
SURVEYOR'S NARRATIVE
DATE
I, Patrick M. Harris , do hereby state that I am a Registered Professional Land Surveyor and that I hold Certificate No. 286882 asprescribed by the laws of the State of Utah and represent that I have made a survey of the following described property. The purpose of thissurvey is to provide a Boundary and Topographic survey to our client. The Basis of Bearing is the line between the Witness to the East QuarterCorner and the Northeast Corner of Section 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian, said line measuring North03°29'18" West 2637.68 feet.
PROPERTY DESCRIPTIONA parcel of land situate in the Northeast Quarter of Section 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian, more particularlydescribed as follows:
Beginning at a point being North 00°24'14" East 116.05 feet along the section line and West 1,825.72 feet from the East Quarter Corner ofSection 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian; and running
thence South 00°50'29" West 224.84 feet;thence North 89°27'26" West 155.29 feet;thence South 89°45'37" West 107.56 feet;thence North 89°21'35" West 261.62 feet;thence North 88°56'13" West 103.76 feet;thence South 89°45'50" West 56.70 feet;thence North 02°24'05" East 236.24 feet;thence South 88°34'36" East 678.49 feet to the point of beginning.
Contains 157,326 Square Feet or 3.612 Acres
Tax Parcel No. 13-042-0098
NAMELicense No.
2548
.88'
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
5.2.a
Packet Pg. 30
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
NOTE: MAY CONTAIN ABBREVIATIONS THAT ARE NOT USED IN THIS PLAN SET.
ABBREVIATIONS
1. ALL CONSTRUCTION MUST STRICTLY FOLLOW THE STANDARDS AND SPECIFICATIONS SET FORTH BY: THE DESIGN ENGINEER, LOCALAGENCY JURISDICTION, APWA (CURRENT EDITION), AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.). THEORDER LISTED ABOVE IS ARRANGED BY SENIORITY. THE LATEST EDITION OF ALL STANDARDS AND SPECIFICATIONS MUST BEADHERED TO. IF A CONSTRUCTION PRACTICE IS NOT SPECIFIED BY ANY OF THE LISTED SOURCES, CONTRACTOR MUST CONTACTDESIGN ENGINEER FOR DIRECTION.
2. CONTRACTOR TO STRICTLY FOLLOW THE MOST CURRENT COPY OF THE SOILS REPORT FOR THIS PROJECT. ALL GRADINGINCLUDING BUT NOT LIMITED TO CUT, FILL, COMPACTION, ASPHALT SECTION, SUBBASE, TRENCH EXCAVATION/BACKFILL, SITEGRUBBING, AND FOOTINGS MUST BE COORDINATED DIRECTLY WITH SOILS REPORT.
3. CONTRACTOR MUST VERIFY ALL EXISTING CONDITIONS BEFORE BIDDING, AND BRING UP ANY QUESTIONS BEFORE SUBMITTING BID.
4. CONTRACTOR SHALL PROVIDE A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE CITY, STATE, OR COUNTY REGULATIONS FORWORKING IN THE PUBLIC WAY.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ACCORDING TO GOVERNING AGENCY STANDARDS. WET DOWN DRYMATERIALS AND RUBBISH TO PREVENT BLOWING.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ADJACENT SURFACE IMPROVEMENTS.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY SETTLEMENT OF OR DAMAGE TO EXISTING UTILITIES.
8. THE CONTRACTOR IS RESPONSIBLE TO FURNISH ALL MATERIALS TO COMPLETE THE PROJECT.
9. ALL EXPOSED SURFACES WILL HAVE A TEXTURED FINISH, RUBBED, OR BROOMED. ANY "PLASTERING" OF NEW CONCRETE WILL BEDONE WHILE IT IS STILL "GREEN".
10. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL REQUIRED PERMITS ANDAPPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED ANDTHOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES.
11. THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THESE PLANS ARE BASED ON FIELD SURVEYS AND LOCAL UTILITYCOMPANY RECORDS. IT SHALL BE THE CONTRACTOR'S FULL RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES TOLOCATE THEIR FACILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. NO ADDITIONAL COMPENSATION SHALL BE PAID TO THECONTRACTOR FOR DAMAGE AND REPAIR TO THESE FACILITIES CAUSED BY HIS WORK FORCE. CONTRACTOR SHALL STARTINSTALLATION AT LOW POINT OF ALL NEW GRAVITY UTILITY LINES.
12. ALL DIMENSIONS, GRADES, AND UTILITY DESIGN SHOWN ON THE PLANS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TOCONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST, PRIOR TO PROCEEDING WITHCONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FORWORK HAVING TO BE REDONE DUE TO THE DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS, IF SUCHNOTIFICATION HAS NOT BEEN GIVEN.
13. NO CHANGE IN DESIGN LOCATION OR GRADE WILL BE MADE BY THE CONTRACTOR WITHOUT THE WRITTEN APPROVAL OF THEPROJECT ENGINEER.
14. NATURAL VEGETATION AND SOIL COVER SHALL NOT BE DISTURBED PRIOR TO ACTUAL CONSTRUCTION OF A REQUIRED FACILITY ORIMPROVEMENT. MASS CLEARING OF THE SITE IN ANTICIPATION OF CONSTRUCTION SHALL BE AVOIDED.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING, MAINTAINING, OR RESTORING ALL MONUMENTS AND MONUMENTREFERENCE MARKS WITHIN THE PROJECT SITE. CONTACT THE CITY OR COUNTY SURVEYOR FOR MONUMENT LOCATIONS ANDCONSTRUCTION DETAILS.
16. EXISTING UTILITY INFORMATION SHOWN IS FOR INFORMATIONAL PURPOSES ONLY. IT IS DERIVED FROM ON-SITE SURVEY AND/ORUTILITY MAPPING PROVIDED TO THE ENGINEER, AND THEREFORE UTILITIES MAY NOT BE LOCATED CORRECTLY, EITHERHORIZONTALLY OR VERTICALLY, AND MAY NOT BE ALL INCLUSIVE. CONTRACTOR IS REQUIRED TO FOLLOW THE PROCEDUREOUTLINED BELOW:
16.1. CONTRACTOR IS REQUIRED TO LOCATE AND POTHOLE ALL EXISTING UTILITY LINES (BOTH HORIZONTALLY AND VERTICALLY)THAT AFFECT THE PROJECT CONSTRUCTION, EITHER ON-SITE OR OFF-SITE, AND DETERMINE IF THERE ARE ANY CONFLICTSWITH THE DESIGN OF THE SITE AS SHOWN ON THE APPROVED PLANS PRIOR TO ANY CONSTRUCTION. IF IT IS DETERMINEDTHAT CONFLICTS EXIST BETWEEN EXISTING UTILITIES AND DESIGN UTILITIES (OR ANOTHER ASPECT OF PROPOSEDCONSTRUCTION) THE ENGINEER MUST BE NOTIFIED IMMEDIATELY TO CORRECT THE CONFLICTS BEFORE ANY WORK CAN BEGIN.IF THE CONTRACTOR FAILS TO FOLLOW THIS ABSOLUTE REQUIREMENT AND CONFLICTS ARISE DURING CONSTRUCTION THECONTRACTOR WILL BEAR THE SOLE RESPONSIBILITY TO FIX THE CONFLICTS.
16.2. CONTRACTOR IS REQUIRED TO VERIFY THAT PROPER COVER AND PROTECTION OF EXISTING UTILITY LINES IS MAINTAINED ORATTAINED WITHIN THE DESIGN ONCE VERIFICATION OF THE EXISTING UTILITIES IS COMPLETED AS OUTLINED IN 16.1 ABOVE.
16.3. IN ADDITION TO 16.1 AND 16.2 ABOVE THE CONTRACTOR WILL VERIFY DEPTHS OF UTILITIES IN THE FIELD BY "POTHOLING" AMINIMUM OF 300 FEET AHEAD OF PROPOSED PIPELINE CONSTRUCTION TO AVOID POTENTIAL CONFLICTS WITH DESIGNEDPIPELINE ALIGNMENT AND GRADE AND EXISTING UTILITIES.
16.4. IF A CONFLICT ARISES BETWEEN EXISTING UTILITIES AND DESIGN UTILITIES (OR ANOTHER ASPECT OF PROPOSEDCONSTRUCTION) AS DETERMINED UNDER 16.1, 16.2 OR 16.3 THE CONTRACTOR WILL NOTIFY THE ENGINEER IMMEDIATELY TORESOLVE THE CONFLICT.
16.5. IF A CONFLICT ARISES BETWEEN EXISTING UTILITIES AND DESIGN UTILITIES (OR ANOTHER ASPECT OF PROPOSEDCONSTRUCTION) RESULTING FROM THE CONTRACTOR'S NEGLIGENCE TO IDENTIFY AND/OR “POTHOLE” EXISTING UTILITIES ASREQUIRED IN 16.1, 16.2 AND 16.3 ABOVE, THE CONTRACTOR WILL BE REQUIRED TO RESOLVE THE CONFLICT WITHOUTADDITIONAL COST OR CLAIM TO THE OWNER OR ENGINEER.
17. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO COST TOOWNER.
18. CONSULT ALL OF THE DRAWINGS AND SPECIFICATIONS FOR COORDINATION REQUIREMENTS BEFORE COMMENCING CONSTRUCTION.
19. AT ALL LOCATIONS WHERE EXISTING PAVEMENT ABUTS NEW CONSTRUCTION, THE EDGE OF THE EXISTING PAVEMENT SHALL BESAWCUT TO A CLEAN, SMOOTH EDGE.
20. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE MOST RECENT, ADOPTED EDITION OF ADA ACCESSIBILITYGUIDELINES.
21. CONTRACTOR SHALL, AT THE TIME OF BIDDING AND THROUGHOUT THE PERIOD OF THE CONTRACT, BE LICENSED IN THE STATE OFUTAH AND SHALL BE BONDABLE FOR AN AMOUNT REQUIRED BY THE OWNER.
22. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL WATER, POWER, SANITARY FACILITIES AND TELEPHONE SERVICES ASREQUIRED FOR THE CONTRACTOR'S USE DURING CONSTRUCTION.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND TESTING OF ALL FACILITIES CONSTRUCTEDUNDER THIS CONTRACT. ALL TESTING SHALL CONFORM TO THE REGULATORY AGENCY'S STANDARD SPECIFICATIONS. ALLRE-TESTING AND/OR RE-INSPECTION SHALL BE PAID FOR BY THE CONTRACTOR.
24. IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER PLACEMENT OF IMPROVEMENTS TO BECONSTRUCTED BY THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROMDAMAGE. COST OF REPLACING OR REPAIRING EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMSREQUIRING REMOVAL AND/OR REPLACEMENT. THERE WILL BE NO EXTRA COST DUE TO THE CONTRACTOR FOR REPLACING ORREPAIRING EXISTING IMPROVEMENTS.
25. WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE INSTALLATION OF THE WORK COVERED BYTHESE PLANS OR SPECIFICATIONS, SAID FACILITIES SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE WITH MATERIALS EQUALTO OR BETTER THAN THE MATERIALS USED IN THE ORIGINAL EXISTING FACILITIES. THE FINISHED PRODUCT SHALL BE SUBJECT TOTHE APPROVAL OF THE OWNER, THE ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY.
26. CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE RECORD DRAWINGS SHOWING THE FINAL LOCATION ANDLAYOUT OF ALL STRUCTURES AND OTHER FACILITIES. RECORD DRAWINGS SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS,AND ADJUSTMENTS TO ALL IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE PREPAREDAND SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL DELIVER TO THEENGINEER ONE SET OF NEATLY MARKED RECORD DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. RECORD DRAWINGSSHALL BE REVIEWED AND THE COMPLETE RECORD DRAWING SET SHALL BE CURRENT WITH ALL CHANGES AND DEVIATIONSREDLINED AS A PRECONDITION TO THE FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE.
27. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT ISUNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THEFIRST QUALITY ARE TO BE USED.
28. ALL EXISTING GATES AND FENCES TO REMAIN UNLESS OTHERWISE NOTED ON PLANS. PROTECT ALL GATES AND FENCES FROMDAMAGE.
29. ALL EXISTING TREES ARE TO REMAIN UNLESS OTHERWISE NOTED ON PLANS. PROTECT ALL TREES FROM DAMAGE.
30. ASPHALT MIX DESIGN MUST BE SUBMITTED AND APPROVED BY THE GOVERNING AGENCY PRIOR TO THE PLACEMENT.
31. CONTRACTORS ARE RESPONSIBLE FOR ALL OSHA REQUIREMENTS ON THE PROJECT SITE.
32. A UPDES (UTAH POLLUTANT DISCHARGE ELIMINATION SYSTEM) PERMIT IS REQUIRED FOR ALL CONSTRUCTION ACTIVITIES 1 ACRE ORMORE AS WELL AS A STORM WATER POLLUTION PREVENTION PLAN.
1. EXISTING UTILITY INFORMATION SHOWN IS FOR INFORMATIONAL PURPOSES ONLY. IT IS DERIVED FROM ON-SITE SURVEYAND MAY NOT BE LOCATED CORRECTLY AND IS NOT ALL INCLUSIVE. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIESWITHIN THE PROJECT LIMITS BEFORE BEGINNING DEMOLITION/CONSTRUCTION.
2. THERE MAY BE BURIED UTILITIES WITHIN THE LIMITS OF DISTURBANCE THAT ARE NOT SHOWN ON THE PLANS DUE TO LACKOF MAPPING OR RECORD INFORMATION. CONTRACTOR SHALL NOTIFY THE ENGINEER WHEN UNEXPECTED UTILITIES AREDISCOVERED.
3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR LOCATING AND PROTECTING FROM DAMAGE ALL EXISTING UTILITIESAND IMPROVEMENTS WHETHER OR NOT SHOWN ON THESE PLANS. THE FACILITIES AND IMPROVEMENTS ARE BELIEVED TOBE CORRECTLY SHOWN BUT THE CONTRACTOR IS REQUIRED TO SATISFY HIMSELF AS TO THE COMPLETENESS ANDACCURACY OF THE LOCATIONS. ANY CONTRACTOR PERFORMING WORK ON THIS PROJECT SHALL FAMILIARIZE HIMSELFWITH THE SITE AND SHALL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING DIRECTLY,OR INDIRECTLY, FROM HIS OPERATIONS, WHETHER OR NOT SAID FACILITIES ARE SHOWN ON THESE PLANS.
1. TRAFFIC CONTROL AND STRIPING TO CONFORM TO THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.).
2. BARRICADING AND DETOURING SHALL BE IN CONFORMANCE WITH THE REQUIREMENTS OF THE CURRENT M.U.T.C.D.
3. NO STREET SHALL BE CLOSED TO TRAFFIC WITHOUT WRITTEN PERMISSION FROM THE APPROPRIATE AGENCY, EXCEPTWHEN DIRECTED BY LAW ENFORCEMENT OR FIRE OFFICIALS.
4. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PROVIDE FOR SMOOTH TRAFFIC FLOW AND SAFETY. ACCESS SHALL BEMAINTAINED FOR ALL PROPERTIES ADJACENT TO THE WORK.
5. DETOURING OPERATIONS FOR A PERIOD OF SIX CONSECUTIVE CALENDAR DAYS, OR MORE, REQUIRE THE INSTALLATION OFTEMPORARY STREET STRIPING AND REMOVAL OF INTERFERING STRIPING BY SANDBLASTING. THE DETOURING STRIPINGPLAN OR CONSTRUCTION TRAFFIC CONTROL PLAN MUST BE SUBMITTED TO THE GOVERNING AGENCY FOR REVIEW ANDAPPROVAL.
6. ALL TRAFFIC CONTROL DEVICES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AT THE END OF THE WORK TO THESATISFACTION OF THE GOVERNING AGENCY.
7. TRAFFIC CONTROL DEVICES (TCDs) SHALL REMAIN VISIBLE AND OPERATIONAL AT ALL TIMES.
8. ALL PERMANENT TRAFFIC CONTROL DEVICES CALLED FOR HEREON SHALL BE IN PLACE AND IN FINAL POSITION PRIOR TOALLOWING ANY PUBLIC TRAFFIC ONTO THE PORTIONS OF THE ROAD(S) BEING IMPROVED HEREUNDER, REGARDLESS OF THESTATUS OF COMPLETION OF PAVING OR OTHER OFF-SITE IMPROVEMENTS CALLED FOR BY THESE PLANS.
9. THE CONTRACTOR SHALL PROVIDE BARRICADES, SIGNS, FLASHERS, OTHER EQUIPMENT AND FLAG PERSONS NECESSARYTO INSURE THE SAFETY OF WORKERS AND VISITORS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING UTAH TRANSIT AUTHORITY (UTA) IF THE CONSTRUCTIONINTERRUPTS OR RELOCATES A BUS STOP OR HAS AN ADVERSE EFFECT ON BUS SERVICE ON THAT STREET TO ARRANGEFOR TEMPORARY RELOCATION OF STOP.
TRAFFIC CONTROL AND SAFETY NOTES
GRADING AND DRAINAGE NOTES1. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE
RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL RELATED ADDENDUMS.
2. THE CONTRACTOR SHALL STRIP AND CLEAR THE TOPSOIL, MAJOR ROOTS AND ORGANIC MATERIAL FROM ALL PROPOSEDBUILDING AND PAVEMENT AREAS PRIOR TO SITE GRADING. (THE TOPSOIL MAY BE STOCKPILED FOR LATER USE INLANDSCAPED AREAS.)
3. THE CONTRACTOR SHALL REMOVE ALL ORGANIC MATERIAL AND OTHER DELETERIOUS MATERIALS PRIOR TO PLACINGGRADING FILL OR BASE COURSE. THE AREA SHOULD BE PROOF-ROLLED TO IDENTIFY ANY SOFT AREAS. WHERE SOFTAREAS ARE ENCOUNTERED, THE CONTRACTOR SHALL REMOVE THE SOIL AND REPLACE WITH COMPACTED FILL.
4. ALL DEBRIS PILES AND BERMS SHOULD BE REMOVED AND HAULED AWAY FROM SITE OR USED AS GENERAL FILL INLANDSCAPED AREAS.
5. THE CONTRACTOR SHALL CONSTRUCT THE BUILDING PAD TO THESE DESIGN PLANS AS PART OF THE SITE GRADINGCONTRACT, AND STRICTLY ADHERE TO THE SITE PREPARATION AND GRADING REQUIREMENTS OUTLINED IN THEGEOTECHNICAL REPORT.
6. THE CONTRACTOR SHALL GRADE THE PROJECT SITE TO PROVIDE A SMOOTH TRANSITION BETWEEN NEW AND EXISTINGASPHALT, CURB AND GUTTER, AND ADJOINING SITE IMPROVEMENTS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE AND DEBRIS ON ADJACENT STREETS WHEN EQUIPMENT ISTRAVELING THOSE STREETS.
8. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL CONDITIONS AND RECOMMENDATIONS OUTLINED IN THE GEOTECHNICALREPORT AND TAKE ALL NECESSARY PRECAUTIONS AND RECOMMENDED PROCEDURES TO ASSURE SOUND GRADINGPRACTICES.
9. THE CONTRACTOR SHALL TAKE APPROPRIATE GRADING MEASURES TO DIRECT STORM SURFACE RUNOFF TOWARDS CATCHBASINS.
10. THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THESE PLANS ARE BASED ON ON-SITE SURVEY. IT SHALL BETHE CONTRACTORS' FULL RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES TO LOCATE THEIR FACILITIESPRIOR TO PROCEEDING WITH CONSTRUCTION. NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE CONTRACTOR FORDAMAGE AND REPAIR TO THESE FACILITIES CAUSED BY HIS WORK FORCE.
11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL NECESSARY CUTS AND FILLS WITHIN THE LIMITSOF THIS PROJECT AND THE RELATED OFF-SITE WORK, SO AS TO GENERATE THE DESIRED SUBGRADE, FINISH GRADES, ANDSLOPES SHOWN.
12. THE CONTRACTOR IS WARNED THAT AN EARTHWORK BALANCE WAS NOT NECESSARILY THE INTENT OF THIS PROJECT. ANYADDITIONAL MATERIAL REQUIRED OR LEFTOVER MATERIAL FOLLOWING EARTHWORK OPERATIONS BECOMES THERESPONSIBILITY OF THE CONTRACTOR.
13. THE GRADING CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE OWNER TO PROVIDE FOR THE REQUIREMENTS OFTHE PROJECT STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND ASSOCIATED PERMIT. ALL CONTRACTORACTIVITIES 1 ACRE OR MORE IN SIZE ARE REQUIRED TO PROVIDE A STORM WATER POLLUTION PREVENTION PLAN.
14. ALL CUT AND FILL SLOPES SHALL BE PROTECTED UNTIL EFFECTIVE EROSION CONTROL HAS BEEN ESTABLISHED.
15. THE USE OF POTABLE WATER WITHOUT A SPECIAL PERMIT FOR BUILDING OR CONSTRUCTION PURPOSES INCLUDINGCONSOLIDATION OF BACKFILL OR DUST CONTROL IS PROHIBITED. THE CONTRACTOR SHALL OBTAIN ALL NECESSARYPERMITS FOR CONSTRUCTION WATER FROM GOVERNING AGENCY.
16. THE CONTRACTOR SHALL MAINTAIN THE STREETS, SIDEWALKS, AND ALL OTHER PUBLIC RIGHT-OF-WAYS IN A CLEAN, SAFEAND USABLE CONDITION. ALL SPILLS OF SOIL, ROCK OR CONSTRUCTION DEBRIS SHALL BE PROMPTLY REMOVED FROM THEPUBLICLY-OWNED PROPERTY DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT. ALL ADJACENTPROPERTY, PRIVATE OR PUBLIC, SHALL BE MAINTAINED IN A CLEAN, SAFE, AND USABLE CONDITION.
UTILITY NOTES1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS, CITY AND STATE
REQUIREMENTS AND THE MOST RECENT EDITIONS OF THE FOLLOWING: THE INTERNATIONAL PLUMBING CODE, UTAHDRINKING WATER REGULATIONS, APWA MANUAL OF STANDARD PLANS AND SPECIFICATIONS. THE CONTRACTOR ISREQUIRED TO ADHERE TO ALL OF THE ABOVE-MENTIONED DOCUMENTS UNLESS OTHERWISE NOTED AND APPROVED BY THEENGINEER.
2. CONTRACTOR SHALL COORDINATE LOCATION OF NEW "DRY UTILITIES" WITH THE APPROPRIATE UTILITY COMPANY,INCLUDING BUT NOT LIMITED TO: TELEPHONE & INTERNET SERVICE, GAS SERVICE, CABLE, AND POWER.
3. EXISTING UTILITIES HAVE BEEN SHOWN ON THE PLANS BASED ON ON-SITE SURVEY. PRIOR TO COMMENCING ANY WORK, ITSHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE EACH UTILITY COMPANY LOCATE, IN THE FIELD, THEIR MAIN ANDSERVICE LINES. THE CONTRACTOR SHALL NOTIFY BLUE STAKES AT 1-800-662-4111 48 HOURS IN ADVANCE OF PERFORMINGANY EXCAVATION WORK. THE CONTRACTOR SHALL RECORD THE BLUE STAKES ORDER NUMBER AND FURNISH ORDERNUMBER TO OWNER AND ENGINEER PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TODIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF BLUE STAKES. IT SHALL BE THECONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEMDURING THE PERFORMANCE OF THIS CONTRACT. ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BYTHE CONTRACTOR. THE CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITYCOMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT.
4. CARE SHOULD BE TAKEN IN ALL EXCAVATIONS DUE TO POSSIBLE EXISTENCE OF UNRECORDED UTILITY LINES. EXCAVATIONREQUIRED WITHIN PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND. CONTRACTOR SHALL REPAIR ANYDAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT CONTRACTOR'SEXPENSE.
5. TRENCH BACKFILL MATERIAL AND COMPACTION TESTS ARE TO BE TAKEN PER APWA STANDARD SPECIFICATIONS (CURRENTEDITION), SECTION 02320 - BACKFILLING TRENCHES, OR AS REQUIRED BY THE GEOTECHNICAL REPORT IF NATIVE MATERIALSARE USED. NO NATIVE MATERIALS ARE ALLOWED IN THE PIPE ZONE. THE MAXIMUM LIFT FOR BACKFILLING EXCAVATIONS ISDETERMINED BY THE GEOTECHNICAL RECOMMENDATIONS.
6. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFORMING TO LOCAL AND FEDERAL CODES GOVERNING SHORING ANDBRACING OF EXCAVATIONS AND TRENCHES AND FOR THE PROTECTION OF WORKERS.
7. THE CONTRACTOR IS REQUIRED TO KEEP ALL CONSTRUCTION ACTIVITIES WITHIN THE APPROVED PROJECT LIMITS. THISINCLUDES, BUT IS NOT LIMITED TO VEHICLE AND EQUIPMENT STAGING, MATERIAL STORAGE AND LIMITS OF TRENCHEXCAVATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN PERMISSION AND/OR EASEMENTS FROM THEAPPROPRIATE GOVERNING ENTITY AND/OR INDIVIDUAL PROPERTY OWNER(S) FOR WORK OR STAGING OUTSIDE OF THEPROJECT LIMITS.
8. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE, CAUSED BY ANY CONDITION INCLUDING SETTLEMENT, TOEXISTING UTILITIES FROM WORK PERFORMED AT OR NEAR EXISTING UTILITIES. THE CONTRACTOR SHALL TAKE ALLMEASURES NECESSARY TO PROTECT ALL EXISTING PUBLIC AND PRIVATE ROADWAY AND UTILITY FACILITIES. DAMAGE TOEXISTING FACILITIES CAUSED BY THE CONTRACTOR MUST BE REPAIRED BY THE CONTRACTOR AT HIS/HER EXPENSE TO THESATISFACTION OF THE OWNER OF SAID FACILITIES.
9. ALL WATER LINE AND SEWER LINE INSTALLATION AND TESTING TO BE IN ACCORDANCE WITH LOCAL GOVERNING AGENCY'SSTANDARDS AND SPECIFICATIONS.
10. ALL MANHOLES, HYDRANTS, VALVES, CLEANOUT BOXES, CATCH BASINS, METERS, ETC. MUST BE RAISED OR LOWERED TOFINAL GRADE PER APWA (CURRENT EDITION) STANDARDS AND INSPECTOR REQUIREMENTS. CONCRETE COLLARS MUST BECONSTRUCTED ON ALL MANHOLES, CLEANOUT BOXES, CATCH BASINS, AND VALVES PER APWA STANDARDS. ALL MANHOLE,CATCH BASIN, OR CLEANOUT BOX CONNECTIONS MUST BE MADE WITH THE PIPE CUT FLUSH WITH THE INSIDE OF THE BOXAND GROUTED OR SEALED.
11. CONTRACTOR SHALL NOT ALLOW ANY GROUNDWATER OR DEBRIS TO ENTER THE NEW OR EXISTING PIPE DURINGCONSTRUCTION.
12. SILT AND DEBRIS ARE TO BE CLEANED OUT OF ALL STORM DRAIN BOXES. CATCH BASINS ARE TO BE MAINTAINED IN ACLEANED CONDITION AS NEEDED UNTIL AFTER THE FINAL BOND RELEASE INSPECTION.
13. CONTRACTOR SHALL CLEAN ASPHALT, TAR OR OTHER ADHESIVES OFF OF ALL MANHOLE LIDS AND INLET GRATES TO ALLOWACCESS.
14. EACH TRENCH SHALL BE EXCAVATED SO THAT THE PIPE CAN BE LAID TO THE ALIGNMENT AND GRADE AS REQUIRED. THETRENCH WALL SHALL BE SO BRACED THAT THE WORKMEN MAY WORK SAFELY AND EFFICIENTLY. ALL TRENCHES SHALL BEDRAINED SO THE PIPE LAYING MAY TAKE PLACE IN DEWATERED CONDITIONS.
15. CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE MEANS AND DEVICES WITH WHICH TO REMOVEPROMPTLY AND TO PROPERLY DISPOSE OF ALL WATER ENTERING THE TRENCH EXCAVATION.
16. ALL SEWER LINES AND SEWER SERVICES SHALL HAVE A MINIMUM SEPARATION OF 10 FEET, EDGE TO EDGE, FROM THEWATER LINES. IF A 10 FOOT SEPARATION CAN NOT BE MAINTAINED, CONSTRUCT PER GOVERNING AGENCY'S MINIMUMSEPARATION STANDARDS.
17. CONTRACTOR SHALL INSTALL THRUST BLOCKING AT ALL WATERLINE ANGLE POINTS AND TEES.
18. ALL UNDERGROUND UTILITIES SHALL BE IN PLACE PRIOR TO INSTALLATION OF CURB, GUTTER, SIDEWALK AND STREETPAVING.
19. CONTRACTOR SHALL INSTALL MAGNETIC LOCATING TAPE CONTINUOUSLY OVER ALL NONMETALLIC PIPE.
GENERAL NOTES
DEMOLITION NOTES
APWA AMERICAN PUBLIC WORKS ASSOCIATIONAR ACCESSIBLE ROUTEASTM AMERICAN SOCIETY FOR TESTING AND MATERIALSAWWA AMERICAN WATER WORKS ASSOCIATIONBOS BOTTOM OF STEPBVC BEGIN VERTICAL CURVEC CURVECB CATCH BASINCF CURB FACE OR CUBIC FEETCL CENTER LINECO CLEAN OUTCOMM COMMUNICATIONCONC CONCRETECONT CONTINUOUSDIA DIAMETERDIP DUCTILE IRON PIPEELEC ELECTRICALELEV ELEVATIONEOA EDGE OF ASPHALT EVC END OF VERTICAL CURVEEW EACH WAYEXIST EXISTINGFF FINISH FLOORFG FINISH GRADEFH FIRE HYDRANTFL FLOW LINE OR FLANGEGB GRADE BREAKGF GARAGE FLOORGV GATE VALVEHC HANDICAPHP HIGH POINTIRR IRRIGATIONK RATE OF VERTICAL CURVATURELD LAND DRAINLF LINEAR FEETLP LOW POINTMEX MATCH EXISTINGMH MANHOLEMJ MECHANICAL JOINTNG NATURAL GROUNDNIC NOT IN CONTRACTNO NUMBEROC ON CENTEROCEW ON CENTER EACH WAYOHP OVERHEAD POWERPC POINT OF CURVATURE OR PRESSURE CLASSPCC POINT OF COMPOUND CURVATUREPI POINT OF INTERSECTIONPIV POST INDICATOR VALVEPL PROPERTY LINEPRC POINT OF REVERSE CURVATUREPRO PROPOSEDPT POINT OF TANGENCYPVC POINT OF VERTICAL CURVATUREPVI POINT OF VERTICAL INTERSECTIONPVT POINT OF VERTICAL TANGENCYR RADIUSRD ROOF DRAINROW RIGHT OF WAYS SLOPESAN SWR SANITARY SEWERSD STORM DRAINSEC SECONDARYSS SANITARY SEWERSTA STATIONSW SECONDARY WATER LINETBC TOP BACK OF CURBTOG TOP OF GRATETOA TOP OF ASPHALTTOC TOP OF CONCRETETOF TOP OF FOUNDATIONTOW TOP OF WALLTOS TOP OF STEPTYP TYPICALVC VERTICAL CURVEWIV WALL INDICATOR VALVEW WATER LINE
CO
CO
GV
G
T
E
SECTION CORNER
EXISTING MONUMENT
PROPOSED MONUMENT
EXISTING REBAR AND CAP
SET ENSIGN REBAR AND CAP
EXISTING WATER METER
PROPOSED WATER METER
EXISTING WATER MANHOLE
PROPOSED WATER MANHOLE
EXISTING WATER BOX
EXISTING WATER VALVE
PROPOSED WATER VALVE
EXISTING FIRE HYDRANT
PROPOSED FIRE HYDRANT
PROPOSED FIRE DEPARTMENT CONNECTION
EXISTING SECONDARY WATER VALVE
PROPOSED SECONDARY WATER VALVE
EXISTING IRRIGATION BOX
EXISTING IRRIGATION VALVE
PROPOSED IRRIGATION VALVE
EXISTING SANITARY SEWER MANHOLE
PROPOSED SANITARY SEWER MANHOLE
EXISTING SANITARY CLEAN OUT
EXISTING STORM DRAIN CLEAN OUT BOX
PROPOSED STORM DRAIN CLEAN OUT BOX
EXISTING STORM DRAIN INLET BOX
EXISTING STORM DRAIN CATCH BASIN
PROPOSED STORM DRAIN CATCH BASIN
EXISTING STORM DRAIN COMBO BOX
PROPOSED STORM DRAIN COMBO BOX
EXISTING STORM DRAIN CLEAN OUT
EXISTING STORM DRAIN CULVERT
PROPOSED STORM DRAIN CULVERT
TEMPORARY SAG INLET PROTECTION
TEMPORARY IN-LINE INLET PROTECTION
ROOF DRAIN
EXISTING ELECTRICAL MANHOLE
EXISTING ELECTRICAL BOX
EXISTING TRANSFORMER
EXISTING UTILITY POLE
EXISTING LIGHT
PROPOSED LIGHT
EXISTING GAS METER
EXISTING GAS MANHOLE
EXISTING GAS VALVE
EXISTING TELEPHONE MANHOLE
EXISTING TELEPHONE BOX
EXISTING TRAFFIC SIGNAL BOX
EXISTING CABLE BOX
EXISTING BOLLARD
PROPOSED BOLLARD
EXISTING SIGN
PROPOSED SIGN
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
EXISTING FLOW DIRECTION
EXISTING TREE
DENSE VEGETATION
EXISTING EDGE OF ASPHALT
PROPOSED EDGE OF ASPHALT
EXISTING STRIPING
PROPOSED STRIPING
EXISTING FENCE
PROPOSED FENCE
EXISTING FLOW LINE
PROPOSED FLOW LINE
GRADE BREAK
EXISTING STORM DRAIN LINE
PROPOSED STORM DRAIN LINE
ROOF DRAIN LINE
CATCHMENTS
HIGHWATER LINE
EXISTING SANITARY SEWER
PROPOSED SANITARY SEWER LINE
PROPOSED SAN. SWR. SERVICE LINE
EXISTING LAND DRAIN LINE
PROPOSED LAND DRAIN LINE
PROPOSED LAND DRAIN SERVICE LINE
EXISTING CULINARY WATER LINE
PROPOSED CULINARY WATER LINE
PROPOSED CULINARY WATER SERVICE LINE
EXISTING SECONDARY WATER LINE
PROPOSED SECONDARY WATER LINE
PROPOSED SEC. WATER SERVICE LINE
EXISTING IRRIGATION LINE
PROPOSED IRRIGATION LINE
EXISTING OVERHEAD POWER LINE
EXISTING ELECTRICAL LINE
EXISTING GAS LINE
EXISTING TELEPHONE LINE
ACCESSIBLE ROUTE
SAW CUT LINE
STRAW WATTLE
TEMPORARY BERM
TEMPORARY SILT FENCE
LIMITS OF DISTURBANCE
EXISTING WALL
PROPOSED WALL
EXISTING CONTOURS
PROPOSED CONTOURS
BUILDABLE AREA WITHIN SETBACKS
PUBLIC DRAINAGE EASEMENT
EXISTING ASPHALT TO BE REMOVED
PROPOSED ASPHALT
EXISTING CURB AND GUTTER
PROPOSED CURB AND GUTTER
PROPOSED REVERSE PAN CURB AND GUTTER
TRANSITION TO REVERSE PAN CURB
CONCRETE TO BE REMOVED
EXISTING CONCRETE
PROPOSED CONCRETE
BUILDING TO BE REMOVED
EXISTING BUILDING
PROPOSED BUILDING
WV
S
D
IRR
swv
W
H Y D
H Y D
DD
D
S
IRR
swv
WV
W
XXXX.XXTBC
XXXX.XXTBC
SS
W W
SW
LEGEND
e
g
t
HWL
LD
NOTE: MAY CONTAIN SYMBOLS THAT ARE NOT USED IN THIS PLAN SET.
D
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
5.2.a
Packet Pg. 31
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
xx
xx
xx
xx
x
xxxxxxxxxxxxxxxxxxx
x
23
22
2120
19
350 SOUTH
700 W
EST
PHASE 1
TBC DATAD=36°38'49"R=25.00'L=15.99'
TBC DATAD=40°31'42"R=25.00'L=17.68'
TBC DATAD=89°23'24"R=30.00'L=46.80'(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
20-PLEX
20-PLEX20-PLEX
10-PLEX
10-PLEX
ENTRANCEPARK
(BICYCLE TRACK)
(PUBLIC STREET)
(PUB
LIC
STRE
ET)
22
1
1
3 3
33
4
4
4
4
4
5
5
55
9.0'(TYP.) 9.0'
(TYP.)
18.0'
(TYP
.)
18.0'
(TYP
.)
22.0' (TYP.)
9.0'
26.0'
24.0'
24.0'
9.0'(TYP.)
26.0'
28.2'
11.2'(TYP.) 10.6'
(TYP.)
10.6'(TYP.) 11.2'
(TYP.)
11.2'
11.2'
18.0'
18.0'
19.5'
16.1'
18.0'
12.0'
12.0'
20.0'
5
12.2'
8.4'
12.0'13
.5'
17.5'
12.0' 2.0' 27.0'
10.0'
2.0' 11
.0'11
.0'11
.0'
2.0'2.0' 6.0
'
4.0'
5.0'
4.0'
6 7
7
7
3
7
7
7
8 8
7
7
7
99
7
8 9
11
11
12
12 12
12
10
10
13
14
15
15
16
16
17
17
17
17
17 18
4.0' 12.0'
19
20 25 2526
26
26
26
2323
21
22
22
24
24
MATCH EXIST
MATCH EXIST
MATCH EXIST
78.0'
46.0'
150.8'
26
18.0'
16.8'
25.3'
16.6'
12.3'
1.0'1.0'
30.0'
11.5'
17.5'
SEE BELOW FORREMOVAL OFTEMPORARYACCESS ROADFOR PHASE 1
10.0'
PUE
10.0'PUE
29
REMOVE EXIST ADA RAMP
SIGHT TRIANGLE
SIGHT TRIANGLE
6.0'6.0'
30 30 INSTALL R3-17 "BIKE LANE" SIGNW/R3-17bP "ENDS" PLAQUE
INSTALL BIKE RAMP(RAMP TO 0" C.F.)
31
24.0'
7" STEP
INSTALL MAIL KIOSK
CURB CUT FORKIOSK ACCESS
15
15
11.5'
6.0' 10.0'
(TYPE I)(TYPE I)
(TYPE I)
(TYPE I)
(TYPE II)
1. ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS.
2. ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS.
3. SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNSTHROUGHOUT SITE.
4. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORMTRAFFIC CONTROL DEVICES).
5. ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED,INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOTTHEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS.
6. NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT.
7. THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC.UNLESS OTHERWISE NOTED ON THESE PLANS.
8. IF RUTTING/PUMPING OCCURS DURING CONSTRUCTION, NOTIFY AMERICAN FORK CITY ENGINEER ANDPROVIDE A PLAN FOR MITIGATION.
GENERAL NOTES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
STANDARD ASPHALT PAVEMENT PER GEOTECHNICAL REPORT AND DETAIL 1/C-500.
350 SOUTH ASPHALT PAVEMENT PER GEOTECHNICAL REPORT AND DETAIL 2/C-500.
SAWCUT EXISTING ASPHALT PAVEMENT TO PROVIDE A CLEAN EDGE FOR THE TRANSITION BETWEENEXISTING AND PROPOSED ASPHALT PAVEMENT.
INSTALL 4” THICK CONCRETE SIDEWALK PER AMERICAN FORK CITY STANDARDS AND SPECIFICATIONS.THICKEN TO 6" AT DRIVE APPROACHES.
INSTALL 5" THICK CONCRETE SIDEWALK PER APWA STANDARD PLAN NO. 231 AND SPECIFICATIONS.
STAIRS IN SIDEWALK PER DETAIL 10/C-500. SEE GRADING PLAN FOR ELEVATION INFORMATION. SEE DETAIL14/C-500 FOR HANDRAIL INFORMATION.
INSTALL 24” TYPE "E" CURB AND GUTTER PER AMERICAN FORK CITY STANDARD DETAIL 15.1 ANDSPECIFICATIONS.
INSTALL 24” REVERSE PAN CURB AND GUTTER PER DETAIL 9/C-500.
TRANSITION BETWEEN TYPE "E" CURB AND GUTTER AND REVERSE PAN CURB AND GUTTER.
INSTALL 6” TYPE “P” CURB WALL PER APWA STANDARD PLAN NO. 209.
INSTALL 3' WATERWAY PER DETAIL 8/C-500.
INSTALL HANDICAP ACCESS RAMP PER APWA STANDARD PLAN NO. 235 WITH DETECTABLE WARNINGSURFACE PER APWA STANDARD PLAN NO. 238.
BENCH. SEE ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.
MONUMENT SIGN. SEE ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.
SCOPE OF WORK:PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THEDETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS:
15
16
17
18
19
20
21
22
23
24
25
26
INSTALL ROCK RETAINING WALL PER DETAIL 11/C-500. SEE GRADING PLANS FOR ELEVATION INFORMATION.
INSTALL TRASH ENCLOSURE PER DETAIL 12/C-500 WITH 6" THICK CONCRETE APRON WITH #4 REBAR @ 24"O.C. E.W. ON 6” GRAVEL BASE.
4" WIDE SOLID WHITE PAVEMENT MARKING PER M.U.T.C.D. STANDARD PLANS.
4" WIDE DASH DROP WHITE PAVEMENT MARKING PER M.U.T.C.D. STANDARD PLANS.
8" WIDE SOLID WHITE PAVEMENT MARKING PER M.U.T.C.D. STANDARD PLANS.
4" DOUBLE YELLOW PAVEMENT MARKING PER M.U.T.C.D. STANDARD PLANS.
6" THICK CROSSWALK PAVEMENT MARKINGS PER M.U.T.C.D. STANDARD PLANS.
12" WIDE SOLID WHITE STOP BAR PER M.U.T.C.D. STANDARD PLANS.
PAINTED ADA SYMBOL AND ASSOCIATED HATCHING PER M.U.T.C.D. STANDARD PLANS.
INSTALL COMBINATION STREET AND "STOP" SIGN PER M.U.T.C.D. STANDARD PLANS.
PAINTED LANE-USE ARROWS PER M.U.T.C.D. STANDARD PLANS.
INSTALL COLUMN STREET LIGHT PER AMERICAN FORK CITY TOD STANDARDS AND SPECIFICATIONS.
REMOVE AND PROPERLY DISPOSE OF EXIST ASPHALT PAVEMENT.
REMOVE EXIST DRIVE APPROACH. INSTALL 30" STANDARD CURB AND GUTTER PER AMERICAN FORK CITYSTANDARD DETAIL 15.1 AND SPECIFICATIONS. MATCH EXIST CURB ELEVATIONS.
INSTALL 8' PRECAST FENCE PER DETAIL SHOWN ON SHEET C-504.
INSTALL BICYCLE PAVEMENT MARKINGS PER MUTCD STANDARD PLANS.
4" WIDE BROKEN YELLOW PAVEMENT MARKING PER MUTCD STANDARD PLANS.
27
28
29
30
31
xx
xx
hpoh
poh
poh
p
700 WEST
200 S
OUTH
2728
2820.0'
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
( IN FEET )HORZ: 1 inch = ft.
AMERICAN FORK TOD ZONINGDISTRICT: GARDEN
SUB-DISTRICT: GENERAL MIXED USE (G-MU)
BLOCK: TYPE 3LOT: TYPE 6
TOTAL DWELLING UNITS = 80TOTAL PARKING STALLS REQUIRED(@1.5 STALLS/UNIT) = 120
PARKING SUMMARYDESCRIPTION PARKING STALLS
GARAGE 48
TANDEM 48
OPEN 20
COVERED 30
ADA COVERED 2
TOTAL STALLS 148
LAND USE SUMMARY
AREA TYPE AREA (ACRES) PERCENTAGE(%)
BUILDING AREA 0.89 24.7
PARK/DRIVE 1.07 29.7
OPEN SPACE(PRIVATE) 0.71 19.8
PUBLIC R/WDEDICATION 0.93 25.8
TOTAL 3.61 100.0
TOTAL UNITS 80
DENSITY (DU/AC) 22
NOTE: THIS PARCEL IS LOCATEDWITHIN FEMA FLOOD ZONE "X"AS SHOWN ON FIRM PANEL4955170120B, EFFECTIVE07/17/2002
PHASE 1: TEMPORARY ACCESS ROAD
( IN FEET )HORZ: 1 inch = ft.
IRRIGABLE ACRES =0.59 AC
BUILDING SUMMARYBUILDING TYPE NUMBER OF
BUILDINGS1-BEDROOM
UNITS2 BEDROOM
UNITS3-BEDROOM
UNITS
10-PLEX 2 4 10 6
20-PLEX 3 12 39 9
TOTAL 5 16 49 15
5.2.a
Packet Pg. 32
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
xx
xx
xx
xx
xx
xx
xx
x
xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
xx
xx
rd
rd rd rd rd rd
rd
rd
rdrdrdrdrdrdrdrdrd
rd rd
23
22
2120
19
RD
RD
RDRD
RD RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RDRD
RD
RD
RDRDRD
RD RD
RDRD
RDRD
RDRD
RD RD RD RD
RD
RD
452545214522
45234524
45264527
4528
4530
4527
4528
4529
4525
4523
4524
4526
4526
4526
4527
4528
4529
4522
4525
4523
45234524
4520
4525
4525
4521 4522
4523
4523
4524
4524
45264526
4527
4527
45274527
4528
4529
4529
4530
4535
4540
4540
4530
FF=4527.18FF=4527.14
FF=4528.58
FF=4523.00
FF=4523.21
D
D
D
D
D
D
D
DD
D
D
sd
sd
sdsd
sdsd
sdsdsdsdsdsd
sds
sdsd
sd
sd sd sd sd
sdsdsdsdsd
sdsd
sdsd
sdsd
sdsd
sdsd
sdsd
sdsd
sd
sdsd
sdsd
sdsd
sd
SD SD SD SD SD SD SD SD SD SD
SDSD
SD
SDSD
SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
sdsdsd
SDSD
SD SD SD
SD
SD
SD
SDSD
SD
SD SD
PHASE 1
350 SOUTH
700 W
EST
SDSD SD
SD
SDSD
SD SD SD
PROPOSED PERMANENT GROUNDWATERMONITORING WELL LOCATION FORAMERICAN FORK CITY
1. ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS.
2. ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS.
3. ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLYINCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENTOF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALSAND PLACEMENT OF ACCEPTABLE FILL MATERIAL.
4. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS.
5. ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 45XX.XX ONTHESE PLANS.
6. LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHEDGRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FORADDITIONAL INFORMATION.
7. SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER ORSTORM DRAIN INLETS.
8. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONSBASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONSMAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY ORCOMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TODETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THEFIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'SFAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION INTHEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THECONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR ISRESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TOREMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEERPRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE.
GENERAL NOTES
9. ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANSAND SPECIFICATIONS.
10. ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS.NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED.
11. ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEEPLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVEMINIMUM 1% SLOPE.
12. THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNINGAGENCY'S STANDARDS AND SPECIFICATIONS.
13. NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT,OR STORM DRAIN STRUCTURES OR PIPES.
14. THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC.UNLESS OTHERWISE NOTED ON THESE PLANS.
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
( IN FEET )HORZ: 1 inch = ft.
5.2.a
Packet Pg. 33
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
xxxxxxxxxxxxxxxxx
xx
x
rdrdrdrdrdrdrdrdrd
rd rd
23
22
21RD
RD
RD
RD
RD RDRD
RD
RD
RDRD
RD
RD
RDRDRD
RD RD
RDRD
RDRD
RDRD
RD RD RD RD
FF=4523.00
GF=2
2.67
GF=2
2.67
GF=2
2.67
GF=2
2.67
FF=4523.21
FF=4527.18
350 SOUTH
FL22.40
FL21.63
4525
4522
4523
4524
4526 4527
452545214522
45234524
4520
4521
4522
4526
4525
4524
4526
452045
19
4521 4522
4523
4524
4521
4522 45
23
4524
45254521
4522
4523
4524
45254523
4527
FL22.00
0.5%
0.5%
2.7%
1.9%
1.0%
3.3%
4.3%
4.7%
5.0%
TBC25.49
TBC23.21
TBC25.74
TBC24.86
7.3%
3.4%
3.6%
2.4%
2.7%
TBC23.00
TBC23.00
D
D
D
D
DD
D
D
sd
sd
sdsd
sd sd sd sd
sdsdsdsdsd
sdsd
sdsd
sdsd
sd
SD SD SD SD SD SD SD
SDSD
SD
SDSD
SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
sdsdsd
SDSD
SD SD SD
1.2%
2.0%
0.6%
0.6%1.3%1.4%
1.7% 1.7%
1
2
INSTALL 18" CLASS III RCP-SD8.22 L.F. @ 0.24% SLOPE INSTALL 18" CLASS III RCP-SD 86.68 L.F. @ 0.23% SLOPE
INSTALL RELOCATEDWATER QUALITY UNIT #321
RIM=4521.08FL(OUT-S)=4516.01
FL(IN-N)=4516.01
INSTALL 8" SDR-35 PVC-SD5.12 L.F. @ 11.07% SLOPE
INSTALL 18" CLASS III RCP-SD12.22 L.F. @ 0.26% SLOPE
INSTALL SDCB #323TOG=4520.31
FL(IN-N)=4515.98FL(OUT-S)=4515.98
INSTALL 18" CLASS III RCP-SD20.25 L.F. @ 0.25% SLOPE
INSTALL 5' SDCO #324RIM=4520.80FL(IN-N)=4515.93FL(IN-E)=4516.18FL(OUT-S)=4515.93
INSTALL 18" CLASS III RCP-SD20.25 L.F. @ 0.25% SLOPE
INSTALL SDCB #327TOG=4520.31FL(IN-N)=4515.88FL(OUT-S)=4515.88
INSTALL 18" CLASS III RCP-SD23.62 L.F. @ 0.25% SLOPE
SS III RCP-SD 148.26 L.F. @ 0.50% SLOPE INSTALL 5' SDCO #332RIM=4521.07FL(IN-E)=4515.82FL(OUT-W)=4515.82FL(IN-N)=4515.82
EXIST 18" CLASS III RCP-SD(ABANDON IN PLACE) 131.21 L.F. @ 0.50% SLOPE
EXIST 18" CLASS III RCP-SD(ABANDON IN PLACE)
(GROUT AND CAP ON NORTH END)
EXIST 4' SDCO(ABANDON IN PLACE) #502
RIM=4523.02FL(IN-N)=4516.48
FL(OUT-W)=4516.48
EXIST UNISTORMWATER QUALITY UNITTO BE RELOCATED #500RIM=4523.65FL(IN-N)=4519.11FL(OUT-S)=4519.11
EXIST 18" CLASS III RCP-SDTO BE REMOVED
INSTALL 5' SDCO #337RIM=4522.64FL(IN-N)=4519.34FL(OUT-S)=4519.34FL(OUT-W)=4516.33FL(IN-E)=4516.33
EXIST 18" CLASS III RCP-SD186.55 L.F. @ 0.41% SLOPE
INSTALL 5' SDCOW/ORIFICE PLATE ON SOUTH
WALL PER DETAIL 13/C-500 #345RIM=4521.61
FL(IN-E)=4516.03FL(OUT-S)=4516.03
FL(IN-N)=4516.03
INSTALL 18" N12 HDPE-SD20.73 L.F. @ 0.32% SLOPE
INSTALL SDCB #320TOG=4521.53FL(IN-E)=4516.23FL(OUT-W)=4516.23
INSTALL 18" CLASS III RCP-SD39.15 L.F. @ 0.25% SLOPE
INSTALL 15" CLASS III RCP-SD20.25 L.F. @ 0.50% SLOPE
INSTALL SDCB #328TOG=4521.90FL(OUT-S)=4517.98
INSTALL 5' SDCO #325RIM=4522.38FL(OUT-W)=4517.88FL(IN-E)=4517.88FL(IN-N)=4517.88
INSTALL 15" CLASS III RCP-SD 258.36 L.F. @ 1.00% SLOPE
INSTALL 18" CLASS III RCP-SD 74.85 L.F. @ 0.25% SLOPE
INSTALL 5' SDCO #319RIM=4522.19
FL(IN-N)=4516.52FL(OUT-W)=4516.52
FL(IN-E)=4519.52
INSTALL 18" CLASS III RCP-SD30.83 L.F. @ 0.25% SLOPE
INSTALL 18" CLASS III RCP-SD65.16 L.F. @ 0.25% SLOPE
INSTALL 12"X12" YD #317TOG=4521.76
FL(IN-N)=4516.60FL(OUT-S)=4516.60
INSTALL 15" CLASS III RCP-SD16.95 L.F. @ 2.50% SLOPE
INSTALL SDCB #315TOG=4525.29FL(IN-E)=4517.43FL(OUT-W)=4517.43
INSTALL SDCB #333TOG=4524.00FL(OUT-S)=4517.12 INSTALL 15" CLASS III RCP-SD
14.54 L.F. @ 2.50% SLOPE
INSTALL 15" CLASS III RCP-SD257.70 L.F. @ 1.25% SLOPE
INSTALL 6" SDR-35 PVC-SD58.89 L.F. @ 1.50% SLOPE
INSTALL 12"X12" YD #335TOG=4521.51
FL(OUT-S)=4518.45FL(IN-N)=4518.45
INSTALL 12"X12" YD #336TOG=4521.83
FL(OUT-S)=4519.33
EXIST SDCB-CURB #205TOG=4525.22
FL(IN-N)=4520.11FL(IN-W)=4520.11
FL(OUT-S)=4520.11
1.1%
2.0%
2.0%
FG22.33
TBC25.38
TBC25.98 TBC
26.94 TBC27.99 TBC/HP
28.56
TBC/HP26.86
TBC26.82
TBC26.85
TBC27.18
FG22.33
TOC22.50
TOC22.23
TOC20.85
TOC22.33
4.5%
FG22.33
FL22.02
FL22.90
1.1%
1.4%
20.85TBC
TBC21.44
TBC22.30 TBC
25.07
TBC25.13
TBC22.30TBC
20.7220.49TBC
TBC21.93
TBC22.46
TBC23.14
TBC25.65
TBC24.64
TBC24.42
TBC25.22 TBC
25.96
TBC24.55
TBC26.23
TBC26.11
TBC25.75
TBC27.18
GF=26.85 GF=26.85 GF=26.85 GF=26.85
7.4%
5.9%
4.7%
3.2%
2.0%3.5%
4.8%6.1%
FL26.37FL
25.42
TBC27.14
FG26.51
FG26.51
TS26.50
BS24.66
BS23.77
2.7%
TOC26.56
TOC25.32
TBC26.84
FL25.89
TBC23.10
GF=2
2.88
GF=2
2.88
TBC22.88
3.1%
1.7%
1.5%
2.0%
GRADE BREAK
TBC25.88
TOC25.12
FG22.12
TOC25.80
FG22.80
TOC24.60
FG22.31
TOC23.97
FG22.54
FG22.54TBC
23.42
TOC24.24
FG22.28
INSTALL 30" NYLOPLAST MHW/SLOTTED GRATE #344RIM=4522.01
INSTALL 30" NYLOPLAST MHW/SLOTTED GRATE #334RIM=4522.01
INSTALL 30" NYLOPLAST MH #346RIM=4522.16
2.0%
2.0%
TOC23.21
FG22.54
FG22.57
TOW23.21
TOW26.34
TOC23.05
TOW26.37
TOC22.86
TOW26.39
TOC23.16
TOC23.95 TOW
25.34
TOW25.29
FG26.59 FG
26.68
SDSD
SD SD SD
2.0%
1.5%1.2
%
TBC26.62
TBC26.50
TBC26.77
TBC26.53
TBC26.48
TBC26.75
INSTALL 8" SDR-35 PVC-SD27.65 L.F. @ 7.18% SLOPE
INSTALL 8" SDR-35 PVC-SD71.00 L.F. @ 0.50% SLOPE
INSTALL 12"X12" YD #351TOG=4525.34FL(OUT-W)=4521.51FL(IN-E)=4521.51
INSTALL 12"X12" YD #352TOG=4525.56FL(OUT-W)=4521.86FL(OUT-E)=4521.86FL(IN-E)=4521.86
INSTALL 8" SDR-35 PVC-SD50.25 L.F. @ 0.50% SLOPE
INSTALL 12"X12" YD #354TOG=4526.38FL(OUT-W)=4522.11
INSTALL 6" SDR-35 PVC-SD63.23 L.F. @ 1.50% SLOPE
INSTALL 12"X12" YD #350TOG=4522.11FL(OUT-W)=4517.50FL(IN-N)=4517.50
TOC22.45
TOC22.39
FL22.23
TOC22.18
TOC21.86
START OF 2' RETAININGAGAINST PRECAST FENCE
END OF 2' RETAININGAGAINST PRECAST FENCE
TS26.43
INSTALL 15" CLASS III RCP-SD 141.93 L.F. @ 1.20% SLOPE
TOC22.86
TOC24.36
TOC24.79
TOC25.19
TBC24.79
1
2
UNDERGROUND DETENTION GALLERY #1 - ADS STORMTECH MC-3500 CHAMBER SYSTEM(34 CHAMBERS W/ 4 END CAPS)
BTM GRAVEL = 4515.32BTM CHAMBERS = 4516.10TOP CHAMBERS = 4519.85TOP GRAVEL = 4520.85STORAGE PROVIDED = 6,714 C.F.STORAGE REQUIRED = 6,686 C.F.
UNDERGROUND DETENTION GALLERY #2 - ADS STORMTECH MC-3500 CHAMBER SYSTEM(16 CHAMBERS W/ 4 END CAPS)
BTM GRAVEL = 4516.01BTM CHAMBERS = 4516.76TOP CHAMBERS = 4520.51TOP GRAVEL = 4521.51STORAGE PROVIDED = 3,047 C.F.STORAGE REQUIRED = 3,013 C.F.
SCOPE OF WORK:PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THEDETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS:1. ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS.
2. ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS.
3. ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLYINCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENTOF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALSAND PLACEMENT OF ACCEPTABLE FILL MATERIAL.
4. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS.
5. ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 45XX.XX ONTHESE PLANS.
6. LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHEDGRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FORADDITIONAL INFORMATION.
7. SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER ORSTORM DRAIN INLETS.
8. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONSBASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONSMAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY ORCOMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TODETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THEFIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'SFAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION INTHEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THECONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR ISRESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TOREMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEERPRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE.
GENERAL NOTES
9. ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANSAND SPECIFICATIONS.
10. ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS.NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED.
11. ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEEPLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVEMINIMUM 1% SLOPE.
12. THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNINGAGENCY'S STANDARDS AND SPECIFICATIONS.
13. NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT,OR STORM DRAIN STRUCTURES OR PIPES.
14. THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC.UNLESS OTHERWISE NOTED ON THESE PLANS.
NOT TO SCALEKEY MAP
C-201 C-202
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
SEE
DRAW
ING
C-20
2SE
E DR
AWIN
G C-
202
( IN FEET )HORZ: 1 inch = ft.
5.2.a
Packet Pg. 34
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
xx
xx
xx
xx
xx
xx
xxxxxxxxxxxxx
rd
rd rd rd rd rd
rd
rd
20
19
RD
RD
RD RD
RD
RD
RD
RD
RD
RD
RD RD
RD
RD
350 SOUTH
700 WEST
D
D
D
D
sdsd
sdsdsdsdsdsd
sdsd
sdsd
sdsd
sdsd
sdsd
sd
sd
SD SD SD SD
SD
SD
SD
SD
SDSD
SD
SD SD
4527
4528
4529
4527
4528
4526
45254526
4527
4530
4529
4527
4527
4528
4529
4530
4535
4525
4526
4527
4528
4528
EXIST SDCB(ADJUST GRATE TO GRADE)EXIST GRATE=4528.31 #509
TOG=4528.85FL(OUT-E)=4525.85
EXIST 15" CLASS III RCP-SD45.19 L.F. @ 0.49% SLOPE
EXIS
T 18
" CLA
SS III
RCP
-SD
130.7
4 L.F
. @ 0.
50%
SLO
PEEX
IST
15" C
LASS
III R
CP-S
D 27
8.15 L
.F. @
0.56
% S
LOPE
EXIST 5' SDCO #507RIM=4530.17FL(IN-N)=4525.63FL(OUT-S)=4525.63FL(IN-W)=4525.63
INSTALL 8" SDR-35 PVC-SD 71.53 L.F. @ 1.98% SLOPE
INST
ALL 8
" SDR
-35 P
VC-S
D 70
.12 L.
F. @
0.50
% S
LOPE
INSTALL 8" SDR-35 PVC-SD88.98 L.F. @ 1.84% SLOPE
INSTALL 12"X12" YD #339TOG=4525.87
FL(OUT-W)=4522.86FL(IN-S)=4522.86FL(IN-E)=4522.86
INSTALL 12"X12" YD #342TOG=4527.41FL(OUT-W)=4524.28FL(IN-N)=4524.28
INSTALL 6" SDR-35 PVC-SD18.45 L.F. @ 1.99% SLOPE
INSTALL SDCB #316TOG=4525.89FL(OUT-W)=4520.64FL(IN-E)=4521.22
INSTALL 15" CLASS III RCP-SD257.70 L.F. @ 1.25% SLOPE
INSTALL 5' SDCO #326RIM=4525.26FL(OUT-W)=4520.46FL(IN-N)=4520.46FL(IN-S)=4520.46
INSTALL 15" CLASS III RCP-SD20.25 L.F. @ 0.50% SLOPE
INSTALL SDCB #330TOG=4524.78FL(OUT-S)=4520.56
INSTALL 15" CLASS III RCP-SD16.25 L.F. @ 0.50% SLOPE
INSTALL SDCB #331TOG=4524.93FL(OUT-N)=4520.54
INSTALL 8" SDR-35 PVC-SD41.06 L.F. @ 0.50% SLOPE
INSTALL 12"X12" YD #340TOG=4526.22
FL(OUT-N)=4523.21FL(IN-W)=4523.21
INSTALL 12"X12" YD #341TOG=4525.71
FL(OUT-E)=4523.65FL(IN-W)=4523.65
INSTALL 12"X12" YD #343TOG=4527.28FL(OUT-S)=4525.41
1.1%
0.3%
2.0%
0.6%
1.7%
1.7%
3.2%
3.3%
3.8%
5.3%
5.3%
4.1%
3.6%
1.6%
8.5%
5.9%
4.8%
1.0%
GRAD
E BR
EAK
FF=4527.14
FF=4528.58
0.7%0.6%
GF=4526.81
TBC/HP28.52 TBC
28.21
TBC27.59
TBC28.60
TBC29.02
TBC28.67
28.55TBC
TBC27.62
TBC29.15
TBC28.76
TBC28.69
TBC28.64
TBC28.85
TBC28.79
FL28.27 FL
27.41
FL27.34
TBC30.14
TBC29.62
TBC29.31
TBC29.11
TBC27.84
TBC25.07 TBC
26.46
GF=4526.81 GF=4526.81 GF=4526.81
GF=4
528.2
5
TBC27.91
TBC25.14 TBC
26.52
28.44
TBC
TOC27.51
TOC27.83
TBC29.14
GF=4
528.2
5
TBC28.58
TOC28.58
BS28.42
TS30.10
FG28.55
FG28.57
FL26.33
TBC/HP26.86
TBC26.84
TBC27.13 TBC
27.14
TBC26.98
TBC27.11
FG26.04 FG
26.46
28.5728.83
29.3329.85
28.18
0.5%
TBC/LP28.05
0.9%
2.0% 2.1
%1.8
%
TOC26.64
TOC25.74
TOC27.14
TOC26.63
2.0%
2.0%
SDSD SD
SD
INSTALL 12"X12" YD #347TOG=4526.01FL(OUT-E)=4524.00
INSTALL 6" SDR-35 PVC-SD69.15 L.F. @ 0.50% SLOPE
INSTALL 6" SDR-35 PVC-SD46.90 L.F. @ 0.50% SLOPE
INSTALL 6" SDR-35 PVC-SD38.32 L.F. @ 1.98% SLOPE
INSTALL 12"X12" YD #349TOG=4528.14
FL(OUT-S)=4524.65FL(IN-N)=4524.65
INSTALL 12"X12" YD #348TOG=4526.43
FL(OUT-E)=4523.42FL(IN-W)=4523.42
TBC28.09
TBC28.25
TBC27.50
TBC28.29
2.0%
2.3%
2.0%
PROPOSED PERMANENTGROUNDWATER MONITORING WELL
LOCATION FOR AF CITY
TOC26.50
TOC25.92
4.5%
TOW28.79
FG28.29
TOW30.26
FG28.26
TOW30.06
FG28.07
TOW29.64
FG28.21
TOW28.71
FG28.17
TOW29.67
NOT TO SCALEKEY MAP
C-201 C-202
1
2
UNDERGROUND DETENTION GALLERY #1 - ADS STORMTECH MC-3500 CHAMBER SYSTEM(34 CHAMBERS W/ 4 END CAPS)
BTM GRAVEL = 4515.32BTM CHAMBERS = 4516.10TOP CHAMBERS = 4519.85TOP GRAVEL = 4520.85STORAGE PROVIDED = 6,714 C.F.STORAGE REQUIRED = 6,686 C.F.
UNDERGROUND DETENTION GALLERY #2 - ADS STORMTECH MC-3500 CHAMBER SYSTEM(16 CHAMBERS W/ 4 END CAPS)
BTM GRAVEL = 4516.01BTM CHAMBERS = 4516.76TOP CHAMBERS = 4520.51TOP GRAVEL = 4521.51STORAGE PROVIDED = 3,047 C.F.STORAGE REQUIRED = 3,013 C.F.
SCOPE OF WORK:PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THEDETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS:1. ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS.
2. ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS.
3. ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLYINCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENTOF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALSAND PLACEMENT OF ACCEPTABLE FILL MATERIAL.
4. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS.
5. ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 45XX.XX ONTHESE PLANS.
6. LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHEDGRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FORADDITIONAL INFORMATION.
7. SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER ORSTORM DRAIN INLETS.
8. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONSBASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONSMAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY ORCOMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TODETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THEFIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'SFAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION INTHEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THECONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR ISRESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TOREMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEERPRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE.
GENERAL NOTES
9. ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANSAND SPECIFICATIONS.
10. ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS.NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED.
11. ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEEPLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVEMINIMUM 1% SLOPE.
12. THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNINGAGENCY'S STANDARDS AND SPECIFICATIONS.
13. NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT,OR STORM DRAIN STRUCTURES OR PIPES.
14. THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC.UNLESS OTHERWISE NOTED ON THESE PLANS.
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
SEE
DRAW
ING
C-20
1SE
E DR
AWIN
G C-
201
( IN FEET )HORZ: 1 inch = ft.
5.2.a
Packet Pg. 35
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
xx
xx
xx
xx
x
xxxxxxxxxxxxxxxxxxx
xx
g
gggggggggg
FWL
FWL
w w w w
ss ssss
ss
ssss
w
w w
ssss
ss
w w w
ww
ssss w
w w ww w
ww
rd rd rd rd
rd
rdrdrdrdrdrd
g
g g
g
e
e e e e e e e e e
e
e e e
e
w w
w
w w w w w w w w w w w w
ww
ww
ww
ww
wpi
pipi
pipi
pipi
pipi
pipi
ww
e
GG
GG
23
22
2120
19
SSSS
SSSS
SS
SSSS
SSSS
SSSS
SSSS
SSSS
SSSS
SSSS
SS
WW
W
SSSSSSSS
WW
WW
G
WWWWWWWWWWWWWWWWWW
WW
W W
GG
GG
G G G G G G G G G G G G G G G
SSSS
WW
W
SS
SS
CO
CO
COCO
COCO CO
COCOCO
RD
RD
RD
RDRD
RD
RDRD
RDRD
EE
EE
RD RD RD
G G
G
GG
E
E E E E E E E E E E
E
E E E E
G
RD
W W W
WW
WW
WW
FWL
FWL
FWL
FWL
FWL
FWL FWL
W
WWW
WW
WW
WW
WW
SS SS
SS
SS
SS
SS
SS
SS
COCO
W
WW
FWL
FWL
FWL
FWL
FWLFWL
D
D
D
D
D
D
D
DD
D
D
sd
sdsd
sdsdsdsd
sd
sd sd sd
sdsdsd
sdsd
sdsd
sdsd
sdsd
sd
sdsd
sdsd
SD SD SD SD SD SD
SD
SDSD
SD SD SD SD SD SD SD SD SD
sdsd
SD
SD
SD
SD
SD
SD
SD
S
S
S
S
S
ssssssssssssssssssssssss
ss
ssss
ssssssssss
ssss
ssss
ss
SS SS SS SS SS SS SS SS SS SS SS
PHASE 1
350 SOUTH
700 W
EST
INSTALL 8" SDR-35 PVC-SAN SWR 422.17 L.F. @ 0.40% SLOPEINSTALL 4' SSMH #117RIM=4527.47FL(OUT-W)=4519.25
EXIST 12" SDR-35 PVC-SAN SWR63.02 L.F. @ 1.97% SLOPE
EXIST 5' SSMH #101RIM=4525.40
FL(IN-N)=4518.70FL(IN-E)=4518.90
FL(OUT-S)=4518.60
EXIS
T 12
" SDR
-35 P
VC-S
AN S
WR
193.7
6 L.F
. @ 1.
97%
SLO
PE
INSTALL 5' SSMH #116RIM=4523.44
FL(IN-N)=4517.36FL(OUT-S)=4517.36
FL(IN-E)=4517.56
EXIST 5' SSMH(ADJUST RIM TO GRADE) #110RIM=4521.68FL(IN-N)=4513.54FL(OUT-W)=4513.34
EXIST 12" SDR-35 PVC-SAN SWR 407.71 L.F. @ 0.40% SLOPE
15.0'
7.5'
5.4'
8.5'
11.0'
11.2'
2.9'
EXIST FH
EXIST 12" CULINARY WATER LINE
EXIST 8" PRESSURIZED IRRIGATION LINE
EXIST 12" CULINARY WATER LINE
EXIST 8" PRESSURIZEDIRRIGATION LINE
EXIST 8" D.I. CULINARY WATER LINE
EXIS
T 8"
D.I.
CULIN
ARY
WAT
ER LI
NE
EXIST 8" SDR-35 PVC-SAN SWR 468.78 L.F. @ 0.50% SLOPE
EXIST FH
1(TYP.)
1(TYP.)
1 (TYP.)
2 (TYP.)
3
3510
10
9
2(TYP.)
SD SD
SD
SD SD
1(TYP.)
13
13
13 SEE DETAIL 1SEE DETAIL5
SEE DETAIL 3
8
612
13
SEE DETAIL4
2(TYP.)
SEE DETAIL1
INSTALL 12"X8" TEE W/THRUST BLOCK AND
(1) 8" GATE VALVE AND(1) 12" GATE VALVE
FLANGED TO TEE
2(TYP.)
8
5.0'
8
1. ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS.
2. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONSBASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONSMAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY ORCOMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TODETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THEFIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'SFAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION INTHEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THECONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR ISRESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TOREMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEERPRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE.
3. ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER AMERICAN FORK CITY STANDARD PLANS ANDSPECIFICATIONS.
4. ALL WATER INFRASTRUCTURE TO BE INSTALLED PER AMERICAN FORK CITY STANDARD PLANS ANDSPECIFICATIONS.
6. DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'SSTANDARDS AND SPECIFICATIONS.
7. PROJECT SHALL COMPLY WITH ALL UTAH DIVISION OF DRINKING WATER RULES AND REGULATIONS INCLUDING,BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION.
GENERAL NOTES8. THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS.
9. NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURESOR PIPES.
10. THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNINGAGENCY'S STANDARDS AND SPECIFICATIONS.
11. THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC.UNLESS OTHERWISE NOTED ON THESE PLANS.
12. ALL SANITARY SEWER MAINS AND LATERALS MUST BE INSPECTED AND APPROVED BY THE CITY INSPECTORBEFORE TRENCH BACKFILLING IS COMPLETED.
13. SEWER CLEANOUTS MUST BE INSTALLED AT A MAXIMUM OF 5' FROM BUILDING FOUNDATION AND AT NO MORETHAN 75' SPACING.
14. ALL LATERAL CONNECTIONS SHALL INSERT-A-TEE OR WYE AT TEN O'CLOCK OR TWO O'CLOCK POSITION TOTHE CENTER OF THE MAIN LINE AND SHALL BE ENCASED IN CONCRETE AFTER INSPECTION IS MADE.
15. ANY ABANDONED PIPES SHALL HAVE THE CAPS OR PLUGS VISIBLE FROM THE MANHOLE.
9
10
11
INSTALL 8" C900 PVC CULINARY WATER LINE, INCLUDING ALL MECHANICAL RESTRAINTS, FITTINGS,INSTALLATION, TRACER WIRE, AND TRENCHING PER AMERICAN FORK CITY STANDARDS ANDSPECIFICATIONS.
INSTALL 12" C900 PVC CULINARY WATER LINE, INCLUDING ALL MECHANICAL RESTRAINTS, FITTINGS,INSTALLATION, TRACER WIRE, AND TRENCHING PER AMERICAN FORK CITY STANDARDS ANDSPECIFICATIONS.
NOT USED.
INSTALL (2) 6" PVC CONDUIT W/HANDHOLES ON EITHER END PER AMERICAN FORK CITY SPECIFICATIONS.
INSTALL 2" POLY FIRELINE WITH FDC PER AMERICAN FORK CITY STANDARDS AND SPECIFICATIONS.
12
13
7
8
1
2
3
4
5
6
INSTALL 6" SDR-35 PVC SANITARY SEWER LATERAL @ 2.00% MIN SLOPE PER AMERICAN FORK CITYSTANDARD DETAILS 15.19 AND 15.23 AND SPECIFICATIONS.
INSTALL 1-1/2" WATER METER AND VAULT PER AMERICAN FORK CITY STANDARD DETAILS 15.3-15.5 ANDSPECIFICATIONS.
CONNECT TO EXISTING WATERLINE STUB. (CONTRACTOR TO FIELD VERIFY LOCATION AND ELEVATION.)
NOT USED.
CUT IN 12" TEE W/THRUST BLOCK AND W/(2) 12" GATE VALVES FLANGED TO TEE PER AMERICAN FORK CITYSTANDARDS AND SPECIFICATIONS.
INSTALL (2) #2 CONDUIT W/(2) TYPE III CONCRETE JUNCTION BOXES PER AMERICAN FORK CITYSPECIFICATIONS.
NOT USED.
INSTALL FIRE HYDRANT ASSEMBLY (COMPLETE) PER AMERICAN FORK CITY STANDARD DETAIL 15.3A ANDSPECIFICATIONS.
SCOPE OF WORK:PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THEDETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS:
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
( IN FEET )HORZ: 1 inch = ft.
1 12" TEE & 12"X8" TEE RESTRAINT DETAIL 2 90° BEND RESTRAINT DETAIL 3 8" 22.5° BEND RESTRAINT DETAIL 4 8"X6" TEE RESTRAINT DETAIL
9 Ft. 9 Ft.4 Ft. 4 Ft.
5.2.a
Packet Pg. 36
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
xx
xx
xx
xx
x
xxxxxxxxxxxxxxxxxxx
xx
g
gggggggggg rd rd rd rd
rd
rdrdrdrdrdrd
g
g g
g
23
22
2120
19
RD
RD
RD
RDRD
RD
RDRD
RDRD
RD RD RD
RD
PHASE 1
D
D
D
D
D
D
D
DD
D
D
sd
sdsd
sdsdsdsd
sd
sd sd sd
sdsdsd
sdsd
sdsd
sdsd
sdsd
sd
sdsd
sdsd
SD SD SD SD SD SD
SD
SDSD
SD SD SD SD SD SD SD SD SD
sdsd
SD
SD
SD
SD
SD
SD
SD
4525
4521 4522 4523 4524 4526 4527
4528
4525
45224523
4524 4526
4527
4527
45284528
4528
4523
4524
4520
45254525
4525
4521
4522
4523
4524
4526
4527
4528
4529
4529
452945294529
4520
4519
4520
4520
4525
4521
4522
4522
4522
45234523
4523 4524
350 SOUTH
700 W
EST
SFSF
SFSF
SF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
1
1
1
1
1
1
1
1
11
1
1
1
1
1
11
7
4
5 6
2
2
SD SD
SD
SD SD
31111
1
1
1
2
3
4
5
6
INLET PROTECTION PER DETAIL 5/C-500.
SILT FENCE PER DETAIL 7/C-500.
PORTABLE TOILET PER DETAIL 6/C-500.
VEHICLE WASHDOWN AND STABILIZED CONSTRUCTION ENTRANCE PER DETAIL 4/C-500.
SUGGESTED TEMPORARY CONSTRUCTION SITE PARKING, STAGING, DUMPSTER, AND MATERIAL STORAGEAREA.
SUGGESTED STOCKPILE AREA.
CONCRETE WASHOUT AREA PER DETAIL 3/C-500.
SCOPE OF WORK:PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THEDETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS:
7
1. THIS PLAN IS DESIGNED AS A FIRST APPRAISAL OF NECESSARY MEANS TO PROTECT THE WATERS OF THESTATE FROM POTENTIAL POLLUTION. IT IS THE RESPONSIBILITY OF THE OWNER/OPERATOR TO ADDWARRANTED BEST MANAGEMENT PRACTICES (BMP'S) AS NECESSARY, MODIFY THOSE SHOWN ASAPPROPRIATE, AND DELETE FROM THE PROJECT THOSE FOUND TO BE UNNECESSARY. FEDERAL AND STATELAW ALLOWS THESE UPDATES TO BE MADE BY THE OWNER/OPERATOR ONSITE AND RECORDED BY THEOWNER/OPERATOR ON THE COPY OF THE SWPPP KEPT ONSITE.
2. DISTURBED LAND SHALL BE KEPT TO A MINIMUM. STABILIZATION MEASURES SHALL BE INITIATED AS SOON ASPRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY ORPERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THATPORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. HOWEVER, WHERE CONSTRUCTIONACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH DISTURBING ACTIVITIES WILL BERESUMED WITHIN 21 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THATPORTION OF THE SITE.
3. RESEED DISTURBED LAND WITH NATIVE GRASS MIXTURE WITHIN 14 CALENDAR DAYS OF ACHIEVEMENT OFFINISH GRADE TO STABILIZE SOILS IF LAND IS NOT TO BE RE-WORKED WITHIN 14 CALENDAR DAYS OF THECESSATION OF CONSTRUCTION ACTIVITIES AT THAT LOCATION.
4. DETAILS SHOWN ARE TO BE EMPLOYED TO PROTECT RUNOFF AS APPROPRIATE DURING CONSTRUCTION.NOT ALL DETAILS ARE NECESSARY AT ALL PHASES OF THE PROJECT. IT SHALL BE THE RESPONSIBILITY OFTHE OWNER/OPERATOR TO USE APPROPRIATE BEST MANAGEMENT PRACTICES AT THE APPROPRIATE PHASEOF CONSTRUCTION. SEE SWPPP FOR BMP IMPLEMENTATION SCHEDULE.
5. VARIOUS BEST MANAGEMENT PRACTICES HAVE BEEN SHOWN ON THE PLANS AT SUGGESTED LOCATIONS.THE CONTRACTOR MAY MOVE AND RECONFIGURE THESE BMP'S TO OTHER LOCATIONS IF PREFERRED,PROVIDED THE INTENT OF THE DESIGN IS PRESERVED.
6. NOT ALL POSSIBLE BMP'S HAVE BEEN SHOWN. THE CONTRACTOR IS RESPONSIBLE TO APPLY CORRECTMEASURES TO PREVENT THE POLLUTION OF STORM WATER PER PROJECT SWPPP.
7. A UPDES (UTAH POLLUTANT DISCHARGE ELIMINATION SYSTEM) PERMIT IS REQUIRED FOR ALL CONSTRUCTIONACTIVITIES 1 ACRE OR MORE.
GENERAL NOTES
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
( IN FEET )HORZ: 1 inch = ft.
5.2.a
Packet Pg. 37
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
4540
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
4540
10+00 11+00 12+00 13+00 13+70
4520
.6245
20.2
4520
.8445
18.8
4521
.0645
19.5
4521
.2845
19.7
4521
.5145
19.9
4521
.7345
20.3
4521
.9545
20.9
4522
.1845
21.8
4522
.4045
22.2
4522
.6245
22.3
4522
.8445
22.4
4523
.0745
22.5
4523
.2945
22.6
4523
.5145
22.7
4523
.7445
23.1
4523
.9645
23.4
4524
.1845
23.6
4524
.4045
23.7
1.11%
STA:
10+1
2.90
ELEV
.=45
20.54
1.11%
STA:
10+1
2.90
ELEV
.=45
20.54
FINISH GRADE AT ROAD CL
EXIST GRADE AT ROAD CL
CONNECT TO EXIST WATER LINE(CONTRACTOR TO FIELD VERIFY
LOCATION AND ELEVATION)
11+4
5.52 (
16.50
R)
EXIS
T 5'
SSMH
(ADJ
UST
RIM
TO G
RADE
) #11
0RI
M=45
21.68
FL(In-N)=4513.54FL(Out-W)=4513.34
EXIST 12" SDR-35 PVC-SAN SWR 407.71 L.F. @ 0.40% SLOPE
INSTALL 15" CLASS III RCP-SD
141.93 L.F. @ 1.20% SLOPE
10+3
6.44 (
0.00 )
INST
ALL 5
' SDC
O #3
24RI
M=45
20.80
FL(In-N)=4515.93FL(In-E)=4516.18
FL(Out-S)=4515.93
11+7
8.37 (
0.00 )
INST
ALL 5
' SDC
O #3
25RI
M=45
22.38
FL(In-E)=4517.88FL(In-N)=4517.88
FL(Out-W)=4517.88
INSTALL 15" CLASS III RCP-SD
258.36 L.F. @ 1.00% SLOPE
INSTALL 12" C900 PVC CULINARY WATER LINE
5.0'
STA:
13+7
0.00
ELEV
.=45
24.52
PVI S
TA:10
+34.0
4EL
EV.=
4518
.10
SSSS
SSSS
SS
WW
W
W W
WW
W
WWW
G
WWWWWWWWWWWWWWW
G
G G G G G G G G G G
SSSSSSSS
W
COCO
RD
RD
RD
RD
RD
RD
RD
E
E E E E EE E E E E E EW
G
W
WW
W
FWL
FWL
FWL
FWL
W
10+0
0
11+0
0
12+0
0
13+0
0
10+5
0
11+5
0
12+5
0
13+5
0
xxxxxxxxxxxxxxx
pipi
pi
ww
D
D
D
DD
D
D
sdsdsdsdsd
sd SD
SDSD
SD
SD SD SD SD SD SD SD SD SD SD SD SD SD
sdsd
SD SD SD
Sssssssssssssss
ssss
ss 1
22
2
6 6
3 3
3
44
INSTALL 15" CLASS III RCP-SD
10+36.44 (20.25 L)INSTALL SDCB #323
TOG=4520.31FL(IN-N)=4515.98
FL(OUT-S)=4515.98
INSTALL 18" CLASS III RCP-SD20.25 L.F. @ 0.25% SLOPE
INSTALL 18" CLASS III RCP-SD20.25 L.F. @ 0.25% SLOPE
10+36.44 (0.00 )INSTALL 5' SDCO #324
INSTALL 15" CLASS III RCP-SD
10+36.44 (20.25 R)INSTALL SDCB #327TOG=4520.31FL(IN-N)=4515.88FL(OUT-S)=4515.88
INSTALL 18" CLASS III RCP-SD23.62 L.F. @ 0.25% SLOPE
EXIST 18" CLASS III RCP-SD(ABANDON IN PLACE)10+27.65 (42.18 R)
INSTALL 5' SDCO #332RIM=4521.07FL(OUT-W)=4515.82FL(IN-E)=4515.82FL(IN-N)=4515.82
EXIST 18" CLASS III RCP-SD(ABANDON IN PLACE)(GROUT AND CAP ON NORTH END)
11+58.84 (39.35 R)EXIST 4' SDCO(ABANDON IN PLACE) #502
EXIST 12" SDR-35 PVC-SAN SWR
11+45.52 (16.50 R)EXIST 5' SSMH
(ADJUST RIM TO GRADE) #110
EXIST 12" SDR-35 PVC-SAN SWR193.76 L.F. @ 1.97% SLOPE
EXIST 18" CLASS III RCP-SDTO BE REMOVED
11+59.67 (15.09 R)EXIST UNISTORM
WATER QUALITY UNITTO BE RELOCATED #500
RIM=4523.65FL(OUT-S)=4519.11
FL(IN-N)=4519.11
INSTALL 15" CLASS III RCP-SD20.25 L.F. @ 0.50% SLOPE
11+78.37 (20.25 L)INSTALL SDCB #328TOG=4521.90FL(OUT-S)=4517.98
11+78.37 (0.00 )INSTALL 5' SDCO #325
CONNECT TO EXIST WATER LINE(CONTRACTOR TO FIELD VERIFY
LOCATION AND ELEVATION)
20.89
10+94.67 (28.44 L)INSTALL FIRE HYDRANT
20.49
21.45
21.45 22.01
22.56
22.56
23.12
23.12
23.68
23.68
24.24
24.24
20.7420.80
SD SD SD
11+32.05 (8.50 L)INSTALL 12"X8" TEE
W/THRUST BLOCK AND(1) 12" G.V. AND (1) 8" G.V.
FLANGED TO TEE
12+56.07 (33.75 L)INSTALL FIRE HYDRANT
1
2
3
350 SOUTH ASPHALT PAVEMENT PER GEOTECHNICAL REPORT AND DETAIL 2/C-500.
INSTALL 4” THICK CONCRETE SIDEWALK PER AMERICAN FORK CITY STANDARDS AND SPECIFICATIONS.THICKEN TO 6" AT DRIVE APPROACHES.
INSTALL 24” TYPE "E" CURB AND GUTTER PER AMERICAN FORK CITY STANDARD DETAIL 15.1 ANDSPECIFICATIONS.
12" C-900 PVC POTABLE WATER LINE PER AMERICAN FORK CITY STANDARDS AND SPECIFICATIONS.
NOT USED.
HANDICAP ACCESS RAMP PER APWA STANDARD PLAN NO. 235 WITH DETECTABLE WARNING SURFACE PERAPWA STANDARD PLAN NO. 238.
SCOPE OF WORK:PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THEDETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS:
4
5
6
350 SOUTH ( IN FEET )HORZ: 1 inch = ft.VERT: 1 inch = ft.
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
MATC
HLIN
ESE
E DR
AWIN
G PP
-2
5.2.a
Packet Pg. 38
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
4540
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
4540
13+70 14+00 15+00 16+00 17+00 17+40
2.00%
STA:
16+7
3.45
ELEV
.=45
27.90
STA:
17+0
5.95
ELEV
.=45
28.55
4524
.6345
23.8
4524
.8545
23.9
4525
.0745
23.9
4525
.3045
24.2
4525
.5245
24.6
4525
.7445
25.0
4525
.9645
31.2
4526
.1945
31.3
4526
.4145
28.0
4526
.6345
26.7
4526
.8645
26.0
4527
.0845
26.5
4527
.3045
26.4
4527
.5245
26.8
4527
.7545
27.0
4528
.0345
27.1
4528
.4345
28.4
1.11%
14+3
6.73 (
0.00 )
INST
ALL 5
' SDC
O #3
26RI
M=45
25.26
INSTALL 15" CLASS III RCP-SD
258.36 L.F. @ 1.00% SLOPE
FL(In-N)=4520.46FL(In-S)=4520.46
FL(Out-W)=4520.46
5.0'
INSTALL 12" C900 PVC CULINARY WATER LINE
FINISH GRADE AT ROAD CL
EXIST GRADE AT ROAD CL
CONTRACTOR TO VERIFY LOCATION AND ELEVATION OF EXISTING WATER LINES
STA:
13+7
0.00
ELEV
.=45
24.52
G
WWWWWWWWWWWWWW
G G G G G G G G G G G G G
RD
RD
RD RD
RD
RDG G
G
E E E E E E E E E E E E
EE
W W W W W
WW
WW
WW
WWWW
FWL
FWL
FWL
WW
WWWW
WW
WW
W
W
14+0
0
15+0
0
16+0
0
17+0
0
17+4
0
14+5
0
15+5
0
16+5
0
700 W
EST
xx
xx
xxxxxxxxxxxxxxx
ww
ww
w
pipi
pipi
pi
w
pi
D
D
sdsd
sdsd
SD SD SD
SD
SD
17+08.37 (8.50 L)CUT IN 12" TEEW/THRUST BLOCK &W/(2) 12" G.V.'S FLANGED TO TEE
14+36.73 (0.00 )INSTALL 5' SDCO #326
INSTALL 15" CLASS III RCP-SD20.25 L.F. @ 0.50% SLOPE
INSTALL 15" CLASS III RCP-SD16.25 L.F. @ 0.50% SLOPE
14+36.73 (16.25 R)INSTALL SDCB #331TOG=4524.93FL(OUT-N)=4520.54
14+36.73 (20.25 L)INSTALL SDCB #330
TOG=4524.78FL(OUT-S)=4520.56
27.58
27.66
26.46
26.54
25.91
25.99
25.35
25.43
24.79
24.80
6
6
1
43
2 2
22
3
33
EXISTING 12" CULINARY WATER LINE
EXISTING 8" PRESSURIZED IRRIGATION LINE
EXIST FIRE HYDRANT
EXIS
T 18
" CLA
SS III
RCP
-SD
130.7
4 L.F
. @ 0.
50%
SLO
PE
EXIST 5' SDCO #508
27.99
27.50
28.29
28.44
27.84 28.09
28.25
29.11
SDSD SD
REMOVE EXIST ADA RAMP
25.13
27.02
27.10
16+45.60 (36.54 L)INSTALL FIRE HYDRANT
1
2
3
350 SOUTH ASPHALT PAVEMENT PER GEOTECHNICAL REPORT AND DETAIL 2/C-500.
INSTALL 4” THICK CONCRETE SIDEWALK PER AMERICAN FORK CITY STANDARDS AND SPECIFICATIONS.THICKEN TO 6" AT DRIVE APPROACHES.
INSTALL 24” TYPE "E" CURB AND GUTTER PER AMERICAN FORK CITY STANDARD DETAIL 15.1 ANDSPECIFICATIONS.
12" C-900 PVC POTABLE WATER LINE PER AMERICAN FORK CITY STANDARDS AND SPECIFICATIONS.
NOT USED.
HANDICAP ACCESS RAMP PER APWA STANDARD PLAN NO. 235 WITH DETECTABLE WARNING SURFACE PERAPWA STANDARD PLAN NO. 238.
SCOPE OF WORK:PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THEDETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS:
4
5
6
350 SOUTH ( IN FEET )HORZ: 1 inch = ft.VERT: 1 inch = ft.
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
MATCHLINESEE DRAW
ING PP-1
5.2.a
Packet Pg. 39
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
WW
RD
RD
xx
x
D
D
D
sdsd
SD SD
d
ssss
ssss
0+00
0+60
0+50
350 S
OUTH
0+09.75 (0.00 )INSTALL SDCB #323
INSTALL 18" CLASS III RCP-SD
0+30 (0.00 )INSTALL 5' SDCO #324
INSTALL 18" CLASS III RCP-SD
0+50.25 (0.00 )INSTALL SDCB #327
INSTALL 18" CLASS III RCP-SD
INSTALL 5' SDCO #332RIM=4521.07FL(IN-E)=4515.82FL(OUT-W)=4515.82FL(IN-N)=4515.82
INSTALL 18" CLASS III RCP-SD
INST
ALL 1
5" C
LASS
III R
CP-S
D14
1.93 L
.F. @
1.20
% S
LOPE
4496
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
4496
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
0+00 0+60
4520
.6045
19.0
4520
.6045
19.1
4496
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
4496
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
0+00 0+60
4522
.1845
22.0
4522
.1845
22.3
4496
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
4496
4500
4504
4508
4512
4516
4520
4524
4528
4532
4536
0+00 0+60
4525
.0645
24.3
4525
.0645
24.1
FINISH GRADE AT STORM DRAIN CL
EXIST GRADE AT STORM DRAIN CL
INSTALL 18" CLASS III RCP-SD12.22 L.F. @ 0.26% SLOPE
0+09
.75 (0
.00 )
INST
ALL S
DCB
#323
TOG=
4520
.31
FL(In-N)=4515.98FL(Out-S)=4515.98
INSTALL 18" CLASS III RCP-SD20.25 L.F. @ 0.25% SLOPE
0+30
(0.00
)IN
STAL
L 5' S
DCO
#324
RIM=
4520
.80
FL(In-N)=4515.93FL(In-E)=4516.18FL(Out-S)=4515.93
INSTALL 18" CLASS III RCP-SD20.25 L.F. @ 0.25% SLOPE
0+50
.25 (0
.00 )
INST
ALL S
DCB
#327
TOG=
4520
.31
FL(In-N)=4515.88FL(Out-S)=4515.88
INSTALL 18" CLASS III RCP-SD23.62 L.F. @ 0.25% SLOPE
0+09
.75 (0
.00 )
INST
ALL S
DCB
#328
TOG=
4521
.90
INSTALL 15" CLASS III RCP-SD20.25 L.F. @ 0.50% SLOPE
0+30
(0.00
)IN
STAL
L 5' S
DCO
#325
RIM=
4522
.38
FL(Out-S)=4517.98FL(In-E)=4517.88FL(In-N)=4517.88
FL(Out-W)=4517.88
0+09
.75 (0
.00 )
INST
ALL S
DCB
#330
RIM=
4524
.78
FL(Out-S)=4520.56
INSTALL 15" CLASS III RCP-SD20.25 L.F. @ 0.50% SLOPE
INSTALL 15" CLASS III RCP-SD16.25 L.F. @ 0.50% SLOPE
FL(In-N)=4520.46FL(In-S)=4520.46
FL(Out-W)=4520.46
0+46
.25 (0
.00 )
INST
ALL S
DCB
#331
RIM=
4524
.93
FL(Out-N)=4520.54
0+30
(0.00
)IN
STAL
L 5' S
DCO
#326
RIM=
4525
.26
EXIST 12" SDR-35 PVC-SAN SWR407.71 L.F. @ 0.40% SLOPE
FINISH GRADE AT STORM DRAIN CL
EXIST GRADE AT STORM DRAIN CL
FINISH GRADE AT STORM DRAIN CL
EXIST GRADE AT STORM DRAIN CL
INSTALL 12" C900 PVCCULINARY WATER LINE
5.0'
INSTALL 12" C900 PVCCULINARY WATER LINE
5.0'
INSTALL 12" C900 PVCCULINARY WATER LINE
5.0'
DEFLECT CULINARY WATER LINEUNDER STORM DRAIN TO ACHIEVEREQUIRED VERTICAL CLEARANCE
DEFLECT CULINARY WATER LINEUNDER STORM DRAIN TO ACHIEVEREQUIRED VERTICAL CLEARANCE
DEFLECT CULINARY WATER LINEUNDER STORM DRAIN TO ACHIEVEREQUIRED VERTICAL CLEARANCE
W W
WW
W
WW
W
GG
GG
SSSS
SSSS
COE
EE
E
xx
x
D
D
D
d
sdSD
SD
SDSD
SD
S
ss ss ss
0+00
0+60
0+50
350 S
OUTH
INST
ALL 1
5" C
LASS
III R
CP-S
D14
1.93 L
.F. @
1.20
% S
LOPE
INSTALL 15" CLASS III RCP-SD
0+09.75 (0.00 )INSTALL SDCB #328 0+30 (0.00 )
INSTALL 5' SDCO #325INST
ALL 1
5" C
LASS
III R
CP-S
D25
8.36 L
.F. @
1.00
% S
LOPE
WW
WWG
GG
G
RD
RD
RDRD
G
G
EE
E
WW
WW
W
W W WW W W
WW
xx
xx
DD
SD
SD
0+00
0+60
0+50
350 S
OUTH
INSTALL 15" CLASS III RCP-SD
INSTALL 15" CLASS III RCP-SD
0+46.25 (0.00 )INSTALL SDCB #331
0+09.75 (0.00 )INSTALL SDCB #330
0+30 (0.00 )INSTALL 5' SDCO #326
INST
ALL 1
5" C
LASS
III R
CP-S
D25
8.36 L
.F. @
1.00
% S
LOPE
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
CALL BLUESTAKES@ 811 AT LEAST 48 HOURSPRIOR TO THECOMMENCEMENT OF ANYCONSTRUCTION.
Know what's
R
BENCHMARKNORTHEAST CORNER OF SECTION 22TOWNSHIP 3 SOUTH, RANGE 1 WESTSALT LAKE BASE AND MERIDIAN
ELEV = 4565.30'
STORM DRAIN LATERALS
( IN FEET )HORZ: 1 inch = ft.VERT: 1 inch = ft.
5.2.a
Packet Pg. 40
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
4 NONESTABILIZED CONSTRUCTION ENTRANCE
SWALE TO SEDIMENTATION BASIN
50.0' MIN.
WASH DOWN PAD
15.0' MIN.
3"-6" ROCK, 9" THICK1/2"-3/4" FILTER LAYER
FILTER FABRIC BELOW GRAVEL
1. PLACE SIGN ADJACENT TO ENTRANCE " CONSTRUCTION TRAFFIC ONLY - ALLCONSTRUCTION TRAFFIC SHALL ENTER AND EXIT SITE AT THIS LOCATION"
NOTE:
6 NONEPORTABLE TOILET
GRAVEL PAD
FLOWSIDEWALK
FLOW
SECURE AGAINST WIND
CONTAINMENT EARTH BERM
8 NONE3' WATERWAY
2%ASPHALT SURFACE
9"8"
1 1/4"
3'-0"
3"
4"
BASE COURSE: UNTREATED BASECOURSE, APWA SECTION 32 11 23. DONOT USE GRAVEL AS A BASE COURSEWITHOUT ENGINEER’S PERMISSION.
(3) #4 @ 12" O.C.#4 @ 24" O.C.
S=0.0693
1. CONSTRUCT PER NOTES AND SPECIFICATIONS ASSOCIATED WITH APWA STANDARD PLAN NO. 211.
NOTE:
10 NONESTAIR DETAIL
1. NUMBER OF RISERS AND TREADS MAY VARY SEE CIVILPLAN.
2. HANDRAIL WILL BE REQUIRED FOR STAIRS WITH MORETHAN ONE STEP, SEE DETAIL 1/C-502 FOR HANDRAILDETAILS.
NOTE:
3"
11" MIN.
7" M
AX.
2'-0"
1'-0"
9"
3"
3"
2"
2"
#3 REBAR @ EACH STEP
#4 BAR @ 12"O.C.E.W.
3" CL
R.
CAST IN PLACECONCRETEFOOTING
SIDEWALKSEE PLAN
EXPANSION JOINT W/ # 3DOWEL @ 18" O.C., TOP &BOTTOM OF STAIRS
UNTREATED BASE COURSECOMPACTED TO 95% OF MODIFIEDPROCTOR PER ASTM D-1557
8"
14 NONETYPICAL SURFACE MOUNT HANDRAIL
1-1/2" PIPE DIA.
2'-10
"-36.0
"
12"
1'-0"
12"
X = TREAD DEPTH
3" ASPHALTIC CONCRETEPER SPECIFICATIONS, DM-1/2
8" UNTREATED BASECOURSE COMPACTEDPER GEOTECHNICAL
REPORT AND SPECIFICATIONS
PROPERLY PREPARED FILL OR NATIVE SUBGRADE
PER GEOTECHNICAL REPORT AND SPECIFICATIONS
1. ALL PAVING TO BE PLACED OVER PROPERLY PREPARED NATURAL SOILS AND/OR PROPERLY PREPARED EXISTING FILL SOILS ANDPROPERLY COMPACTED STRUCTURAL FILL WHERE SPECIFIED.
2. ALL STRUCTURAL FILL TO BE COMPACTED TO A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE AASHTOT-180 (D-1557) METHOD OF COMPACTION. LIFTS SHOULD NOT EXCEED 8" IN LOOSE THICKNESS.
3. REMOVE SURFACE VEGETATION AND OTHER DELETERIOUS MATERIALS OVER THE ENTIRE SITE IN PREPARATION OF PROPOSEDIMPROVEMENTS.
ASPHALT NOTES
1 NONESTANDARD ASPHALT SECTION
4" ASPHALTIC CONCRETEPER SPECIFICATIONS,
DM-1/2, PG 58-28, MAX RAP=15%
12" UNTREATED BASECOURSE COMPACTEDPER GEOTECHNICAL
REPORT AND SPECIFICATIONS
18" GRANULAR SUBBASE PER GEOTECHNICAL
REPORT AND SPECIFICATIONS
1. ALL PAVING TO BE PLACED OVER PROPERLY PREPARED NATURAL SOILS AND/OR PROPERLY PREPARED EXISTING FILL SOILS ANDPROPERLY COMPACTED STRUCTURAL FILL WHERE SPECIFIED.
2. ALL STRUCTURAL FILL TO BE COMPACTED TO A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE AASHTOT-180 (D-1557) METHOD OF COMPACTION. LIFTS SHOULD NOT EXCEED 8" IN LOOSE THICKNESS.
3. REMOVE SURFACE VEGETATION AND OTHER DELETERIOUS MATERIALS OVER THE ENTIRE SITE IN PREPARATION OF PROPOSEDIMPROVEMENTS.
ASPHALT NOTES
2 NONE350 SOUTH ASPHALT SECTION 3 NONE
CONCRETE WASTE MANAGEMENT
CONTAINMENT EARTHBERM ALL AROUND
WASHDOWN AREAPONDING STORAGE
CONTAINMENT EARTHBERM ALL AROUND
WASHDOWN AREAPONDING STORAGE
OPTION A OPTION B
5 NONESAG INLET PROTECTION
SILT FENCE REQUIREDBEHIND CURB AT BOX
UNTIL LAND BEHINDCURB IS STABILIZED
NOTES:
1. PLACE WATTLES OR GRAVEL BAGS TIGHTAGAINST CURB TO PREVENT SEDIMENT-LADENWATER FROM GETTING BETWEEN CURB ANDWATTLE/BAG.
2. PLACE WATTLES OR GRAVEL BAGS SUCH THATFLOW DOES NOT OVERTOP CURB OR ROADCENTERLINE.
3. INSPECT INLET PROTECTION AFTER EVERYLARGE STORM EVENT AND AT LEAST BI-WEEKLY,OR PER SWPPP REQUIREMENTS, WHICHEVER ISMORE STRINGENT, TO ENSURE THAT SEDIMENTCONTROL IS MEETING ITS DESIGN INTENT.MAINTAIN AND/OR REPLACE AS NEEDED.
4. REMOVE SEDIMENT ACCUMULATED WHEN ITREACHES 50% OF GRAVEL BAG OR WATTLEHEIGHT.
5. CONTRACTOR MAY SUBMIT AN ALTERNATIVEMETHOD OF INLET PROTECTION. THEALTERNATIVE METHOD SHALL BE APPROVED BYTHE CITY INSPECTOR AND THE ENGINEER OFRECORD.
6. BEFORE PLACEMENT OF CURB, STABILIZATIONOF LAND BEHIND CURB, AND/OR PAVING,MAINTAIN TOP OF INLET AT 6" ABOVE GRADE,AND SURROUND WITH SILT FENCE FORSEDIMENTATION AROUND BOX. MAINTAIN SILTFENCE BEHIND BOX UNTIL LAND BEHIND CURBIS STABILIZED.
SANDBAG OPTION
WATTLE OPTION
FLOW
FLOW
FLOW
FLOW
SILT FENCE REQUIRED BEHINDCURB AT BOX UNTIL LAND
BEHIND CURB IS STABILIZED
EARTH SAVER SEDIMENTSAVER OR EQUAL, FILLED WITH1/2 CF 3/4" GRAVEL, ZIPPER SIDEFACING AWAY FROM INLET
8" DIA. EARTH SAVERWEIGHTED WATTLEOR EQUAL
FLOW
FLOW
FLOWFLOW
FILTER FABRICWRAPPED
COMPLETELYAROUND GATE
7 NONETEMPORARY SILT FENCE
MAX2'-0"
6"
12" M
IN.
SIDEWALK IF ANY
CURB ANDGUTTER IF ANY
UNDISTURBEDGROUND
WOODEN OR STEEL FENCEPOSTS @ 10.0' O.C. MAX. MIRAFI FILTER FABRIC
GRANULAR BACKFILL,SEE NOTE 3
APPROX. 6"x6"TRENCH
EMBED FABRICBELOW BACKFILL
1. EXCAVATE 6"x6" TRENCH ALONGLIMITS OF DISTURBANCE AS SHOWNON CONSTRUCTION DRAWINGS.
2. POSTS SHALL BE POSITIONED ONDOWNSTREAM SIDE OF FENCE.
3. LAY TOE-IN FABRIC FLAP IN BOTTOMOF TRENCH. BACKFILL TRENCH WITHFREE DRAINING GRANULARMATERIAL. COMPACT TRENCH TOSATISFACTION OF THE ENGINEER OFRECORD.
4. SILT FENCE GEOTEXTILE SHALLMEET AASHTO M288-92REQUIREMENTS.
5. REMOVE & DISPOSE OF SEDIMENTWHEN ACCUMULATION IS 50% OFEXPOSED FENCE HEIGHT.
6. 10' MAX. SPACING BETWEEN STAKES.7. SILT FENCES SHALL BE INSTALLED
ALONG CONTOURS, NOT UP ANDDOWN SLOPES, WITH 10' OVERLAPAT BREAKS.
NOTES:
9 NONE24" REVERSE PAN CURB AND GUTTER
1. CONSTRUCT PER NOTES AND SPECIFICATIONS ASSOCIATED WITH APWA STANDARD PLAN NO. 205.
NOTE:
6" 2"
6"
12"
1/2"
6"
24"
1/2"
R=3/4"
6" UNTREATED BASECOURSE
REVERSE FLOW
13 NONEORIFICE PLATE
12" STAINLESS STEEL
BOLTS WITH THREADEDINSERTS (TYP.)
NOTES:
1. STEEL: USE ASTM A 36 STEEL.
2. BOLTS: USE 1/2 INCH STAINLESSSTEEL BOLTS WITH 1/8 INCH STAINLESSSTEEL WASHERS.
3. FINISH: HOT DIPPED GALVANIZED.
ORIFICE SIZE = 7.40 INCHES
STORM DRAIN PIPE(SEE DRAINAGE PLAN)
14" THICK STEEL PLATE
2" T
YP.
4" TYP.
PROPERLY PREPARED SUBGRADE ORFILL PER GEOTECHNICAL
REPORT AND SPECIFICATIONS
12 NONETRASH ENCLOSURE DETAIL11 NONE
ROCK RETAINING WALL
5% SLOPE MIN.
1
2
MAX
'CHINKING' ROCKS ARE TOBE PLACED SECURELY
WALL FACE SLOPE
NOTES:
1. EACH ROCK IS TO BE PLACED INDIVIDUALLY OF THE SIZE AND SHAPE SPECIFIED. ENSURE THAT EACH ROCK IS SET AND SUPPORTED BYUNDERLYING MATERIALS AND ADJACENT ROCKS. REPOSITION OR REPLACE LOOSE ROCKS.
2. UPPER ROCKS ARE TO BE SUPPORTED BY (2) ROCKS IN ROW BELOW. ROCKS ARE TO BE OFFSET SO THAT VERTICAL SEAMS ARE NOTCONSTRUCTED IN WALL.
3. PLACE BASE, FACING, AND CAP ROCKS SO THAT THEIR HEIGHT DIMENSION IS NOT GREATER THAN THEIR WIDTH. THE LONGESTDIMENSION OF THE BASE, FACING, AND CAP ROCKS IS PERPENDICULAR TO THE FACE OF ROCKERY. TYPICAL BASE DIMENSION IS 1.5 xHEIGHT OF ROCK.
4. ROCKS ARE TO BE PLACED SO THAT SLOPE BACK INTO HILLSIDE AT A MIN. OF 5%. PROVIDE 'CHINKS' AS NECESSARY BETWEEN ROCKS TOSLOPE UPPER ROCKS ADEQUATELY.
5. ALL FILL TO BE COMPACTED TO 90% MAX DRY DENSITY PLACED IN 8" LIFTS.
6. STABILITY OF TEMPORARY CUT SLOPES IS THE RESPONSIBILITY OF THE CONTRACTOR.
7. DO NOT CONSTRUCT ROCK WALLS OR SLOPES EXCEEDING THE HEIGHTS SHOWN HERE WITHOUT CONSULTING WITH ENGINEER.
8. ROCKS ARE TO BE ANGULAR TO PROVIDE ADEQUATE 'FLAT SURFACE' FOR ROCK TO ROCK CONNECTION. ROUND SHAPED ROCKS ARENOT ACCEPTABLE.
9. ROCKS ARE TO QUARRIED BY NON-EXPLOSIVE METHODS. ROCKS QUARRIED BY BLASTING METHODS ARE PRONE TO CRACKING AND ARENOT ACCEPTABLE.
10. MAINTENANCE OF ROCK-PROTECTED SLOPES WILL BE REQUIRED AS THE ROCKS SETTLE AND MOVE OVER TIME. LOCALIZED AREAS OFROCK-PROTECTED SLOPE MAY NEED ADJUSTMENTS TO IMPROVE ROCK INTERLOCKING OVER TIME. ADEQUATE BACKFILL OR ROCK TOROCK CONTACT SHOULD BE MAINTAINED TO PREVENT SIGNIFICANT MOVEMENT OF THE TOP ROW OF ROCKS.
11. CARE SHOULD BE TAKEN NOT TO OVER WATER THE SOIL LOCATED ABOVE AND BEHIND THE ROCK-PROTECTED SLOPES. OVER WATERINGWILL LIKELY RESULT IN SOIL ERODING THROUGH THE JOINTS BETWEEN THE ROCKS. GOOD SURFACE DRAINAGE SHOULD BE PROVIDEDUPSLOPE OF THE ROCK-PROTECTED SLOPES TO DIRECT RUNOFF AWAY FROM THE ROCK PROTECTED SLOPES.
UPPER ROCK MIN. SIZE 12" IN HEIGHT
1.0' M
IN.
'H' M
AX 3.
0'
'HT',
TOT
AL H
EIGH
T
MIN. WIDTH = HT/2
3
MAX1
MIRIIFI 140NFABRIC OR EQUALBEHIND WALL
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
5.2.a
Packet Pg. 41
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
MC-3500 STORMTECH CHAMBER SPECIFICATIONS1. CHAMBERS SHALL BE STORMTECH MC-3500.
2. CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENECOPOLYMERS.
3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP)CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 45x76 DESIGNATION SS.
4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULDIMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.
5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURETHAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1)LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATIONFOR IMPACT AND MULTIPLE VEHICLE PRESENCES.
6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787,"STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2)MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK.
7. REQUIREMENTS FOR HANDLING AND INSTALLATION:TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKINGSTACKING LUGS.TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS• • • • •• ••••••••••TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED INSECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION• • • •• • ••• • • • • • • • •• • •• • •• • • • • • • • •• • • • • • • • • • • • ••• • • • • •• • ••• •••• • ••• •••• • • • • • • • •• • • • • •• • •• • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •REFLECTIVE GOLD OR YELLOW COLORS.
8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGNENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFOREDELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS:
THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER.THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FORDEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTOLRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE.THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGNEXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN.
9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.
IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF MC-3500 CHAMBER SYSTEM1. STORMTECH MC-3500 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A
PRE-CONSTRUCTION MEETING WITH THE INSTALLERS.
2. STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE".
3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS.STORMTECH RECOMMENDS 3 BACKFILL METHODS:
STONESHOOTER LOCATED OFF THE CHAMBER BED.BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.
4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.
5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.
6. MAINTAIN MINIMUM - 9" (230 mm) SPACING BETWEEN THE CHAMBER ROWS.
7. INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 mm) INTO CHAMBER END CAPS.
8. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE AASHTO M43 DESIGNATION OF #3OR #4.
9. STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND PRESERVE ROW SPACING.
10. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGNENGINEER.
11. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACESTORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF.
NOTES FOR CONSTRUCTION EQUIPMENT1. STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE".
2. THE USE OF EQUIPMENT OVER MC-3500 CHAMBERS IS LIMITED:NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.NO RUBBER TIRED LOADER, DUMP TRUCK, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCEWITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE".WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE".
3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.
USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO CHAMBERS AND IS NOT AN ACCEPTABLEBACKFILL METHOD. ANY CHAMBERS DAMAGED BY USING THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARDWARRANTY.
CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT.
PROJECT INFORMATION
ADS SALES REP
PROJECT NO.
SALES NAMESALES NUMBERSALES EMAIL
ENGINEEREDPRODUCTMANAGER
EPM NAMEEPM NUMBEREPM EMAIL
MEADOWS @ AF - PHASE IIAMERICAN FORK, UT
ADVANCED DRAINAGE SYSTEMS, INC.
R
70 IN
WO
OD
RO
AD, S
UIT
E 3
| RO
CKY
HIL
L | C
T | 0
6067
860-
529-
8188
|888
-892
-269
4 | W
WW
.STO
RM
TEC
H.C
OM
Det
entio
n R
eten
tion
Wat
er Q
ualit
y
SHEET
OF
DAT
E:
PRO
JEC
T #:
DR
AWN
:
CH
ECKE
D:
THIS
DR
AWIN
G H
AS B
EEN
PR
EPAR
ED B
ASED
ON
INFO
RM
ATIO
N P
RO
VID
ED T
O A
DS
UN
DER
TH
E D
IREC
TIO
N O
F TH
E SI
TE D
ESIG
N E
NG
INEE
R O
R O
THER
PR
OJE
CT
REP
RES
ENTA
TIVE
. TH
E SI
TE D
ESIG
N E
NG
INEE
R S
HAL
L R
EVIE
W T
HIS
DR
AWIN
G P
RIO
R T
O C
ON
STR
UC
TIO
N.
IT IS
TH
E U
LTIM
ATE
RES
PON
SIBI
LITY
OF
THE
SITE
DES
IGN
EN
GIN
EER
TO
EN
SUR
E TH
AT T
HE
PRO
DU
CT(
S) D
EPIC
TED
AN
D A
LL A
SSO
CIA
TED
DET
AILS
MEE
T AL
L AP
PLIC
ABLE
LAW
S, R
EGU
LATI
ON
S, A
ND
PR
OJE
CT
REQ
UIR
EMEN
TS.
4640
TR
UEM
AN B
LVD
HIL
LIAR
D, O
H 4
3026
1-80
0-73
3-74
73AD
VAN
CED
DR
AIN
AGE
SYST
EMS,
INC
.
R
REV
DR
WC
HK
DES
CR
IPTI
ON
MEA
DO
WS
@ A
F - P
HAS
E II
AMER
ICAN
FO
RK,
UT
JG N/A
2 6
NOTES•• MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET #7 FOR MANIFOLD SIZING GUIDANCE.•• DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLEADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD.•• THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS AREMET.•• THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEERIS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTHMAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED.•• NOT FOR CONSTRUCTION
CONCEPTUAL ELEVATIONSMAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED): 12.50MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC): 7.00MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC): 6.00MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT): 6.00MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT): 6.00TOP OF STONE: 5.50TOP OF MC-3500 CHAMBER: 4.5012" x 12" TOP MANIFOLD INVERT: 2.9524" ISOLATOR ROW INVERT: 0.9212" BOTTOM CONNECTION INVERT: 0.86BOTTOM OF MC-3500 CHAMBER: 0.75BOTTOM OF STONE: 0.00
PROPOSED LAYOUT50 STORMTECH MC-3500 CHAMBERS8 STORMTECH MC-3500 END CAPS12 STONE ABOVE (in)9 STONE BELOW (in)40 % STONE VOID
9,761INSTALLED SYSTEM VOLUME (CF)(PERIMETER STONE INCLUDED)(COVER STONE INCLUDED)(BASE STONE INCLUDED)
VARIES SYSTEM AREA (SF)SYSTEM PERIMETER (ft)
67.01'
61.08'
15.3
3'
13.3
3'
*INVERT ABOVE BASE OF CHAMBER
MAX FLOWINVERT*DESCRIPTIONITEM ONLAYOUTPART TYPE
2.06"24" BOTTOM CORED END CAP/TYP OF ALL 24" BOTTOM CONNECTIONS AND ISOLATORROWSAPREFABRICATED END CAP
26.40"12" TOP CORED END CAP/TYP OF ALL 12" TOP CONNECTIONSBPREFABRICATED END CAP1.35"12" BOTTOM CORED END CAP/TYP OF ALL 12" BOTTOM CONNECTIONSCPREFABRICATED END CAP
26.36"12" X 12" TOP, ADS N-12DMANIFOLD1.35"12" BOTTOM CONNECTIONEPIPE CONNECTION
2.5 CFS IN30" DIAMETER (24" SUMP MIN)FNYLOPLAST (W/ ISO ROW)2.0 CFS OUT30" DIAMETER (DESIGN BY ENGINEER)GNYLOPLAST
ISOLATOR ROW(SEE DETAIL)
PLACE MINIMUM 17.50' OF ADS GEOSYNTHETICS 315WTM WOVENGEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBERFEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS
BED LIMITS
BE
D
A
C
F
G
20'
10'
0
ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS
PLEASE NOTE:1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
COMPACTION REQUIREMENTS.4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
NOTES:1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION
45x76 DESIGNATION SS.2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.5. REQUIREMENTS FOR HANDLING AND INSTALLATION:
TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.• • •• • • • • • •• •• • • • • • •• • •• • •• • • •• • ••• • • • • • • • •• • •• • • •• • • • • •• • ••• • • •• • •• • • •• • •• • • •• • • • • • • •• • •• • •• • • • • •• • • •• • •• • • • •• • • • •• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/IN/IN.• • • •• ••• • •• • • •• • •• • • • • • • •• • • • • • • • •• • •• • • •• • ••• • • • • • • • •• • •• • •• • • • • • • • •• • • • • • • • • • • • ••• • • • • •• • ••• •••• • ••• •••• • • • • • • • •• • • • • •• • •• • • • • • • • •• • • • •• • • • • • • •• • •• • • • •• • •• • • • • • •• • • • • • •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
MATERIAL LOCATION DESCRIPTION AASHTO MATERIALCLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
D
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THETOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLEPAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THATPAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A
PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVEDINSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
PREPARATION REQUIREMENTS.
C
INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THETOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm)ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENTSUBBASE MAY BE A PART OF THE 'C' LAYER.
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES ORPROCESSED AGGREGATE.
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THISLAYER.
AASHTO M145••A-1, A-2-4, A-3
OR
AASHTO M43••3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVERTHE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR
WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FORPROCESSED AGGREGATE MATERIALS.
BEMBEDMENT STONE: FILL SURROUNDING THE CHAMBERSFROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYERABOVE.
CLEAN, CRUSHED, ANGULAR STONE AASHTO M43••3, 4
AFOUNDATION STONE: FILL BELOW CHAMBERS FROM THESUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43••
3, 4 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
45"(1140 mm)
18"(450 mm) MIN*
8'(2.4 m)MAX
12" (300 mm) MIN77" (1950 mm)
12" (300 mm) MIN
6"(150 mm) MIN
DEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER 9" (230 mm) MIN
DC
B
A
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVEDINSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 30" (750 mm).
6" (150 mm) MIN
PERIMETER STONE(SEE NOTE 6)
EXCAVATION WALL(CAN BE SLOPED OR VERTICAL)
MC-3500END CAP SUBGRADE SOILS
(SEE NOTE 4)
PAVEMENT LAYER (DESIGNEDBY SITE DESIGN ENGINEER)
NO COMPACTION REQUIRED.
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALLAROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
70 IN
WO
OD
RO
AD, S
UIT
E 3
| RO
CKY
HIL
L | C
T | 0
6067
860-
529-
8188
|888
-892
-269
4 | W
WW
.STO
RM
TEC
H.C
OM
Det
entio
n R
eten
tion
Wat
er Q
ualit
y
SHEET
OF
DAT
E:
PRO
JEC
T #:
DR
AWN
:
CH
ECKE
D:
THIS
DR
AWIN
G H
AS B
EEN
PR
EPAR
ED B
ASED
ON
INFO
RM
ATIO
N P
RO
VID
ED T
O A
DS
UN
DER
TH
E D
IREC
TIO
N O
F TH
E SI
TE D
ESIG
N E
NG
INEE
R O
R O
THER
PR
OJE
CT
REP
RES
ENTA
TIVE
. TH
E SI
TE D
ESIG
N E
NG
INEE
R S
HAL
L R
EVIE
W T
HIS
DR
AWIN
G P
RIO
R T
O C
ON
STR
UC
TIO
N.
IT IS
TH
E U
LTIM
ATE
RES
PON
SIBI
LITY
OF
THE
SITE
DES
IGN
EN
GIN
EER
TO
EN
SUR
E TH
AT T
HE
PRO
DU
CT(
S) D
EPIC
TED
AN
D A
LL A
SSO
CIA
TED
DET
AILS
MEE
T AL
L AP
PLIC
ABLE
LAW
S, R
EGU
LATI
ON
S, A
ND
PR
OJE
CT
REQ
UIR
EMEN
TS.
4640
TR
UEM
AN B
LVD
HIL
LIAR
D, O
H 4
3026
1-80
0-73
3-74
73AD
VAN
CED
DR
AIN
AGE
SYST
EMS,
INC
.
R
REV
DR
WC
HK
DES
CR
IPTI
ON
MEA
DO
WS
@ A
F - P
HAS
E II
AMER
ICAN
FO
RK,
UT
JG N/A
3 6
INSPECTION & MAINTENANCESTEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT
A. INSPECTION PORTS (IF PRESENT)A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAINA.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLEDA.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOGA.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
B. ALL ISOLATOR ROWSB.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROWB.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE
i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRYii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE
B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESSA. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERREDB. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEANC. VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.
STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS
OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
CATCH BASINOR
MANHOLE
MC-3500 ISOLATOR ROW DETAILNTS
24" (600 mm) HDPE ACCESS PIPE REQUIRED USEFACTORY PRE-CORED END CAPPART #: MC3500IEPP24BC OR MC3500IEPP24BW
STORMTECH HIGHLY RECOMMENDSFLEXSTORM PURE INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
COVER PIPE CONNECTION TO END CAP WITH ADSGEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE MC-3500 CHAMBER
OPTIONAL INSPECTION PORT
MC-3500 END CAP
TWO LAYERS OF ADS GEOSYNTHETICS 315WTM WOVENGEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
SUMP DEPTH TBD BYSITE DESIGN ENGINEER
(24" [600 mm] MIN RECOMMENDED)
70 IN
WO
OD
RO
AD, S
UIT
E 3
| RO
CKY
HIL
L | C
T | 0
6067
860-
529-
8188
|888
-892
-269
4 | W
WW
.STO
RM
TEC
H.C
OM
Det
entio
n R
eten
tion
Wat
er Q
ualit
y
SHEET
OF
DAT
E:
PRO
JEC
T #:
DR
AWN
:
CH
ECKE
D:
THIS
DR
AWIN
G H
AS B
EEN
PR
EPAR
ED B
ASED
ON
INFO
RM
ATIO
N P
RO
VID
ED T
O A
DS
UN
DER
TH
E D
IREC
TIO
N O
F TH
E SI
TE D
ESIG
N E
NG
INEE
R O
R O
THER
PR
OJE
CT
REP
RES
ENTA
TIVE
. TH
E SI
TE D
ESIG
N E
NG
INEE
R S
HAL
L R
EVIE
W T
HIS
DR
AWIN
G P
RIO
R T
O C
ON
STR
UC
TIO
N.
IT IS
TH
E U
LTIM
ATE
RES
PON
SIBI
LITY
OF
THE
SITE
DES
IGN
EN
GIN
EER
TO
EN
SUR
E TH
AT T
HE
PRO
DU
CT(
S) D
EPIC
TED
AN
D A
LL A
SSO
CIA
TED
DET
AILS
MEE
T AL
L AP
PLIC
ABLE
LAW
S, R
EGU
LATI
ON
S, A
ND
PR
OJE
CT
REQ
UIR
EMEN
TS.
4640
TR
UEM
AN B
LVD
HIL
LIAR
D, O
H 4
3026
1-80
0-73
3-74
73AD
VAN
CED
DR
AIN
AGE
SYST
EMS,
INC
.
R
REV
DR
WC
HK
DES
CR
IPTI
ON
MEA
DO
WS
@ A
F - P
HAS
E II
AMER
ICAN
FO
RK,
UT
JG N/A
4 6
131.51'
125.78'
15.3
3'
13.3
3'
B
D
A
C
F
GALLERY #1
GALLERY #2
VARIES
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
5.2.a
Packet Pg. 42
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
MC-SERIES END CAP INSERTION DETAILNTS
NOTE: MANIFOLD STUB MUST BE LAID HORIZONTALFOR A PROPER FIT IN END CAP OPENING.
MANIFOLD HEADER
MANIFOLD STUB
STORMTECH END CAP
MANIFOLD HEADER
MANIFOLD STUB
12" (300 mm)MIN SEPARATION
12" (300 mm) MIN INSERTION
12" (300 mm)MIN SEPARATION
12" (300 mm)MIN INSERTION
PART # STUB B CMC3500IEPP06T 6" (150 mm)
33.21" (844 mm) ---MC3500IEPP06B --- 0.66" (17 mm)MC3500IEPP08T 8" (200 mm)
31.16" (791 mm) ---MC3500IEPP08B --- 0.81" (21 mm)MC3500IEPP10T 10" (250 mm)
29.04" (738 mm) ---MC3500IEPP10B --- 0.93" (24 mm)MC3500IEPP12T 12" (300 mm)
26.36" (670 mm) ---MC3500IEPP12B --- 1.35" (34 mm)MC3500IEPP15T 15" (375 mm)
23.39" (594 mm) ---MC3500IEPP15B --- 1.50" (38 mm)
MC3500IEPP18TC
18" (450 mm)20.03" (509 mm) ---
MC3500IEPP18TWMC3500IEPP18BC
--- 1.77" (45 mm)MC3500IEPP18BWMC3500IEPP24TC
24" (600 mm)14.48" (368 mm) ---
MC3500IEPP24TWMC3500IEPP24BC
--- 2.06" (52 mm)MC3500IEPP24BWMC3500IEPP30BC 30" (750 mm) --- 2.75" (70 mm)
NOMINAL CHAMBER SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm)CHAMBER STORAGE 109.9 CUBIC FEET •• •• • •• •••••••••••MINIMUM INSTALLED STORAGE* 175.0 CUBIC FEET •• •• • •• •••••••••••WEIGHT 134 lbs. (60.8 kg)
NOMINAL END CAP SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH) 75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm)END CAP STORAGE 14.9 CUBIC FEET •• •• • •• •••••••••••MINIMUM INSTALLED STORAGE* 45.1 CUBIC FEET •• •• • •• •••••••••••WEIGHT 49 lbs. (22.2 kg)
*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEENCHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY
MC-3500 TECHNICAL SPECIFICATIONNTS
90.0" (2286 mm)ACTUAL LENGTH
86.0" (2184 mm)INSTALLED
BUILD ROW IN THIS DIRECTION
NOTE: ALL DIMENSIONS ARE NOMINAL
LOWER JOINTCORRUGATION
WEB
CREST
CRESTSTIFFENING RIB
VALLEYSTIFFENING RIB
B
C
75.0"(1905 mm)
45.0"(1143 mm)
25.7"(653 mm)
FOOT
77.0"(1956 mm)
45.0"(1143 mm)
STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"END CAPS WITH A WELDED CROWN PLATE END WITH "C"END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"
UPPER JOINT CORRUGATION
22.2"(564 mm)
INSTALLED
CUSTOM PRECORED INVERTS AREAVAILABLE UPON REQUEST.INVENTORIED MANIFOLDS INCLUDE12-24" (300-600 mm) SIZE ON SIZEAND 15-48" (375-1200 mm)ECCENTRIC MANIFOLDS. CUSTOMINVERT LOCATIONS ON THE MC-3500END CAP CUT IN THE FIELD ARE NOTRECOMMENDED FOR PIPE SIZESGREATER THAN 10" (250 mm). THEINVERT LOCATION IN COLUMN 'B'ARE THE HIGHEST POSSIBLE FORTHE PIPE SIZE.
PART # STUB B CMC3500IEPP06T 6" (150 mm)
33.21" (844 mm) ---MC3500IEPP06B --- 0.66" (17 mm)MC3500IEPP08T 8" (200 mm)
31.16" (791 mm) ---MC3500IEPP08B --- 0.81" (21 mm)MC3500IEPP10T 10" (250 mm)
29.04" (738 mm) ---MC3500IEPP10B --- 0.93" (24 mm)MC3500IEPP12T 12" (300 mm)
26.36" (670 mm) ---MC3500IEPP12B --- 1.35" (34 mm)MC3500IEPP15T 15" (375 mm)
23.39" (594 mm) ---MC3500IEPP15B --- 1.50" (38 mm)
MC3500IEPP18TC
18" (450 mm)20.03" (509 mm) ---
MC3500IEPP18TWMC3500IEPP18BC
--- 1.77" (45 mm)MC3500IEPP18BWMC3500IEPP24TC
24" (600 mm)14.48" (368 mm) ---
MC3500IEPP24TWMC3500IEPP24BC
--- 2.06" (52 mm)MC3500IEPP24BWMC3500IEPP30BC 30" (750 mm) --- 2.75" (70 mm)
NOMINAL CHAMBER SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm)CHAMBER STORAGE 109.9 CUBIC FEET •• •• • •• •••••••••••MINIMUM INSTALLED STORAGE* 175.0 CUBIC FEET •• •• • •• •••••••••••WEIGHT 134 lbs. (60.8 kg)
NOMINAL END CAP SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH) 75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm)END CAP STORAGE 14.9 CUBIC FEET •• •• • •• •••••••••••MINIMUM INSTALLED STORAGE* 45.1 CUBIC FEET •• •• • •• •••••••••••WEIGHT 49 lbs. (22.2 kg)
*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEENCHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY
MC-3500 TECHNICAL SPECIFICATIONNTS
90.0" (2286 mm)ACTUAL LENGTH
86.0" (2184 mm)INSTALLED
BUILD ROW IN THIS DIRECTION
NOTE: ALL DIMENSIONS ARE NOMINAL
LOWER JOINTCORRUGATION
WEB
CREST
CRESTSTIFFENING RIB
VALLEYSTIFFENING RIB
B
C
75.0"(1905 mm)
45.0"(1143 mm)
25.7"(653 mm)
FOOT
77.0"(1956 mm)
45.0"(1143 mm)
STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"END CAPS WITH A WELDED CROWN PLATE END WITH "C"END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"
UPPER JOINT CORRUGATION
22.2"(564 mm)
INSTALLED
CUSTOM PRECORED INVERTS AREAVAILABLE UPON REQUEST.INVENTORIED MANIFOLDS INCLUDE12-24" (300-600 mm) SIZE ON SIZEAND 15-48" (375-1200 mm)ECCENTRIC MANIFOLDS. CUSTOMINVERT LOCATIONS ON THE MC-3500END CAP CUT IN THE FIELD ARE NOTRECOMMENDED FOR PIPE SIZESGREATER THAN 10" (250 mm). THEINVERT LOCATION IN COLUMN 'B'ARE THE HIGHEST POSSIBLE FORTHE PIPE SIZE.
70 IN
WO
OD
RO
AD, S
UIT
E 3
| RO
CKY
HIL
L | C
T | 0
6067
860-
529-
8188
|888
-892
-269
4 | W
WW
.STO
RM
TEC
H.C
OM
Det
entio
n R
eten
tion
Wat
er Q
ualit
y
SHEET
OF
DAT
E:
PRO
JEC
T #:
DR
AWN
:
CH
ECKE
D:
THIS
DR
AWIN
G H
AS B
EEN
PR
EPAR
ED B
ASED
ON
INFO
RM
ATIO
N P
RO
VID
ED T
O A
DS
UN
DER
TH
E D
IREC
TIO
N O
F TH
E SI
TE D
ESIG
N E
NG
INEE
R O
R O
THER
PR
OJE
CT
REP
RES
ENTA
TIVE
. TH
E SI
TE D
ESIG
N E
NG
INEE
R S
HAL
L R
EVIE
W T
HIS
DR
AWIN
G P
RIO
R T
O C
ON
STR
UC
TIO
N.
IT IS
TH
E U
LTIM
ATE
RES
PON
SIBI
LITY
OF
THE
SITE
DES
IGN
EN
GIN
EER
TO
EN
SUR
E TH
AT T
HE
PRO
DU
CT(
S) D
EPIC
TED
AN
D A
LL A
SSO
CIA
TED
DET
AILS
MEE
T AL
L AP
PLIC
ABLE
LAW
S, R
EGU
LATI
ON
S, A
ND
PR
OJE
CT
REQ
UIR
EMEN
TS.
4640
TR
UEM
AN B
LVD
HIL
LIAR
D, O
H 4
3026
1-80
0-73
3-74
73AD
VAN
CED
DR
AIN
AGE
SYST
EMS,
INC
.
R
REV
DR
WC
HK
DES
CR
IPTI
ON
MEA
DO
WS
@ A
F - P
HAS
E II
AMER
ICAN
FO
RK,
UT
JG N/A
5 6
NYLOPLAST DRAIN BASINNTS
NOTES1. 8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536
GRADE 70-50-052. 12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-053. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS4. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212
FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC5. FOR COMPLETE DESIGN AND PRODUCT INFORMATION: WWW.NYLOPLAST-US.COM6. TO ORDER CALL: 800-821-6710
A PART # GRATE/SOLID COVER OPTIONS8"
(200 mm) 2808AG PEDESTRIAN LIGHTDUTY
STANDARD LIGHTDUTY SOLID LIGHT DUTY
10"(250 mm) 2810AG PEDESTRIAN LIGHT
DUTYSTANDARD LIGHT
DUTY SOLID LIGHT DUTY
12"(300 mm) 2812AG PEDESTRIAN
AASHTO H-10STANDARD AASHTO
H-20SOLID
AASHTO H-2015"
(375 mm) 2815AG PEDESTRIANAASHTO H-10
STANDARD AASHTOH-20
SOLIDAASHTO H-20
18"(450 mm) 2818AG PEDESTRIAN
AASHTO H-10STANDARD AASHTO
H-20SOLID
AASHTO H-2024"
(600 mm) 2824AG PEDESTRIANAASHTO H-10
STANDARD AASHTOH-20
SOLIDAASHTO H-20
30"(750 mm) 2830AG PEDESTRIAN
AASHTO H-20STANDARD AASHTO
H-20SOLID
AASHTO H-20
INTEGRATED DUCTILE IRONFRAME & GRATE/SOLID TO
MATCH BASIN O.D.
VARIOUS TYPES OF INLET ANDOUTLET ADAPTERS AVAILABLE:
4-30" (100-750 mm) FORCORRUGATED HDPE
WATERTIGHT JOINT(CORRUGATED HDPE SHOWN)
BACKFILL MATERIAL BELOW AND TO SIDESOF STRUCTURE SHALL BE ASTM D2321CLASS I OR II CRUSHED STONE OR GRAVELAND BE PLACED UNIFORMLY IN 12" (305 mm)LIFTS AND COMPACTED TO MIN OF 90%
TRAFFIC LOADS: CONCRETE DIMENSIONSARE FOR GUIDELINE PUPOSES ONLY.ACTUAL CONCRETE SLAB MUST BEDESIGNED GIVING CONSIDERATION FORLOCAL SOIL CONDITIONS, TRAFFIC LOADING& OTHER APPLICABLE DESIGN FACTORS
• • • • • • • •• • • • • • •• • • •• • • • •• •••• • • •••••••••••••••••••••••••••••••••ACCORDING TO PLANS
18" (457 mm)MIN WIDTH
A
AASHTO H-20 CONCRETE SLAB8" (203 mm) MIN THICKNESS
VARIABLE SUMP DEPTHACCORDING TO PLANS
[6" (152 mm) MIN ON 8-24" (200-600 mm),10" (254 mm) MIN ON 30" (750 mm)]
4" (102 mm) MIN ON 8-24" (200-600 mm)6" (152 mm) MIN ON 30" (750 mm)
12" (610 mm) MIN(FOR AASHTO H-20)
INVERT ACCORDING TOPLANS/TAKE OFF
3130
VER
ON
A AV
EBU
FOR
D, G
A 30
518
PHN
(770
) 932
-244
3FA
X (7
70) 9
32-2
490
ww
w.n
ylop
last
-us.
com
••
SHEET
OF
DAT
E:
PRO
JEC
T #:
DR
AWN
:
CH
ECKE
D:
THIS
DR
AWIN
G H
AS B
EEN
PR
EPAR
ED B
ASED
ON
INFO
RM
ATIO
N P
RO
VID
ED T
O A
DS
UN
DER
TH
E D
IREC
TIO
N O
F TH
E SI
TE D
ESIG
N E
NG
INEE
R O
R O
THER
PR
OJE
CT
REP
RES
ENTA
TIVE
. TH
E SI
TE D
ESIG
N E
NG
INEE
R S
HAL
L R
EVIE
W T
HIS
DR
AWIN
G P
RIO
R T
O C
ON
STR
UC
TIO
N.
IT IS
TH
E U
LTIM
ATE
RES
PON
SIBI
LITY
OF
THE
SITE
DES
IGN
EN
GIN
EER
TO
EN
SUR
E TH
AT T
HE
PRO
DU
CT(
S) D
EPIC
TED
AN
D A
LL A
SSO
CIA
TED
DET
AILS
MEE
T AL
L AP
PLIC
ABLE
LAW
S, R
EGU
LATI
ON
S, A
ND
PR
OJE
CT
REQ
UIR
EMEN
TS.
4640
TR
UEM
AN B
LVD
HIL
LIAR
D, O
H 4
3026
1-80
0-73
3-74
73AD
VAN
CED
DR
AIN
AGE
SYST
EMS,
INC
.
R
REV
DR
WC
HK
DES
CR
IPTI
ON
MEA
DO
WS
@ A
F - P
HAS
E II
AMER
ICAN
FO
RK,
UT
JG N/A
6 6
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
5.2.a
Packet Pg. 43
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
5.2.a
Packet Pg. 44
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
CHECKED BYDRAWN BY
PROJECT NUMBER
FOR:
PROJECT MANAGER
PRINT DATE
PHONE:
CONTACT:
SALT LAKE CITY45 W. 10000 S., Suite 500Sandy, UT 84070Phone: 801.255.0529
LAYTONPhone: 801.547.1100
TOOELEPhone: 435.843.3590CEDAR CITYPhone: 435.865.1453RICHFIELDPhone: 435.896.2983
5.2.a
Packet Pg. 45
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
SDSDSD
WW
S5'
S
WWWWWW
WW
WV
WV
W
WW
W
SSSS
W
WW
W
W
WW
SSSS
SSSS
WH Y D
WV
H
YD
WV
HYD
WV
SS SS
W
W
SSSS
SS
W
W
SS
SS
SSSSSSSSSS
WWWWWWWWW
SWSWSWSWSWSWSWSWSW
WVWV
WV
WV
WV
WV
WV
HYD
WV
W
W
WW
W
WW
W
DDSDSDSD
DD
SD D
D
DD
SDSD
SDD
SD
D
xx
xx
xxxxxxxxxx
xx
xx
x
ss
ssssssssssss
g
ggggg
g
w w w
ss
ss
ssss
w w
ssss
w
wss
ss
w w
ss
w
wrd rdrdrdrd
g
g
e
e e e e
e
e
e
w w w w w wss
ssss
ss ss ww
ww
wPI
PIPI
PIPI
sd
sd sdsdsdsd
700 W
EST
STRE
ET
sdsd
sdsd
sdsd
sd
sdsdsd
WV W
V
W
H Y D
WV
WV
W
W W
W
D
D
D
D
D
D
D
D
D
D
D
D
D
EE
E
WV
WV W
V
WV
WV
S
S
WV
WV
WV
IRR
IRRIRR
IRR
D
S
D
HY
D
WV
WV
WV
D
D
D
D
FUTURE STREET
DETENTION AREA
EXISTING BUILDING
EXISTING BUILDINGEXISTING BUILDING
BUILDING 2A
BUILDING 2B BUILDING 2CBUILDING 2D
BUILDING 2E
L101
OVERALL LANDSCAPE PLAN
The designs shown and described herein includingall technical drawings, graphic representation &models thereof, are proprietary & can not becopied, duplicated, or commercially exploited inwhole or in part without the sole and express writtenpermission from ASWN+JSA Architects, Inc.
These drawings are available for limited review andevaluation by clients, consultants, contractors,government agencies, vendors, and officepersonnel only in accordance with this notice.
REVISIONS:
ArchitectureInterior DesignLandscape ArchitectureLand PlanningConstruction Management
5151 South 900 East, Suite 200Salt Lake City, UT 84117
Ph: 801.269.0055Fax: 801.269.1425
www.thinkaec.com
PROJECT NO.
LANDSCAPE
DATE:
SHEET TITLE:
SHEET NUMBER:
20010DEC. 23, 2019
MEA
DOW
S AT A
MER
ICAN
FORK
PHAS
E II
750 W
EST 2
00 SO
UTH
AMER
ICAN
FORK
, UTA
H 84
003
L102 L103
PLANTER BED - ROCK MULCH
LAWN - KENTUCKY BLUEGRASS SOD
NOTE:UTILITIES SHOWN ARE FOR REFERENCE ONLY. SEECIVIL DRAWINGS FOR UTILITY DESING ANDLOCATIONS
5.2.a
Packet Pg. 46
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
D
DDDD
D
D
xx
xx
x
D
D
E
3 CCB4 EFM
6 HEM.S
4 LAH2 EFM
1 MSM3 PAN3 CCB
1 MSM2 EFM4 LAH
8 HEM.S
4 LAH4 HEM.M
3 EFM3 HEM.M
3 CCB2 EFM3 LSM
4 CSK3 EFM
3 LSM4 CSK
3 CCB2 EFM3 LSM
2 EFM3 HSE3 CCB1 MSM3 HEM.M2 EFM3 HOS
6 HEM.S
3 HOS
5 HEM.M
3 MSM3 EFM
4 CSK3 EFM
4 RFC4 CAK
3 CAK3 HEM.M
3 CCB
5 HEM.M
4 LSM3 CCB
1 MSM
2 EFM6 HEM.S
4 LAH2 LSM1 MSM3 PAN3 CCB
1 MSM2 LSM4 LAH
6 HEM.S 4 LAH3 LSM3 HEM.M3 CAK
3 HOS
3 EFM
4 CSK
33
3
3
3 CA3 HS6 HE
5 CAK5 CAK
1 JSB 1 JSB5 HSE
APP1 APP 1 TCG
1 TCG1 TCG
1 TCG
1 APP3 EFM
1 PCC1 PCC
1 PCC
1 PCC
2 PAC
1 PCC
MAT
CHLIN
E L10
2M
ATCH
LINE L
103
1 PCC
1 PCC
1 PCC
1 JSB3 CAK
6 HSE1 JSB
1 JSB
3 CAK1 PAC
2 JSB
3 PAN
3 CAK
3 LSM
3 RFC
10 LAH
8 LAH3 LSM1 HEM.S 3 LSM
10 HSE
5
DETENTION AREA
BUILDING 2A
BUILDING 2B BUILDING 2C
TREES KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPE
APP 7 ACER PLATANOIDES 'PARKWAY' PARKWAY NORWAY MAPLE 2" CAL CONT
PCC 11 PYRUS CALLERYANA 'CHANTICLEER' CHANTICLEER FLOWERING PEAR 2" CAL CONT
TCG 5 TILIA CORDATA 'GREENSPIRE' GREENSPIRE LINDEN 2" CAL CONT
ZSG 1 ZELKOVA SERRATA 'GREEN VASE' GREEN VASE ZELKOVA 2" CAL CONT
PAC 5 PICEA ABIES 'CUPRESSINA COLUMNAR' COLUMNAR SPRUCE 7' HT B&B
GRASSES KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPE
CAK 41 CALAMAGROSTIS ACUTIFOILA 'KARL FOESTER' KARL FOERSTER FEATHER REED GRASS 1 GAL.
HSE 42 HELICTOTRICHHON SEMPERVIRENS BLUE OAT (AVENA) GRASS 1 GAL.
MSM 20 MISCANTHUS SINENSIS MORNING LIGHT MORNING LIGHT MAIDEN GRASS 1 GAL.
PERENNIALS KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPE
HEM.M 62 HEMEROCALLIS SP. DAYLILY 1 GAL.
HEM.S 79 HEMROCALLIS 'STELLA DE ORO STELLA D' ORO 1 GAL.
HOS 18 HOSTA PLANTAIN LILY 1 GAL.
LAH 54 LAVENDULA ANGUSTIFOLIA HIDCOTE BLUE ENGLISH LAVENDER 1 GAL.
LSM 54 LEUCANTHEMUM SUPERBUM 'SNOW LADY' SNOW LADY SHASTA DAISY 1 GAL.
SHRUBS KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPECCB 45 CARYOPTERIS X CLANDONENSIS GRAND BLEU GRAND BLEU BLUE MIST SPIREA 2 GAL.
CSK 25 CORNUS SERICEA KELSEYI DWARF KELSEY DOGWOOD 2 GAL.
EFM 49 EUONYMUS FORTUNEI MOONSHADOW MOONSHADOW EUONYMUS 2 GAL.
JSB 14 JUNIPERUS SABINA 'BUFFALO' BUFFALO JUNIPER 2 GAL.
PAN 12 PICEA ABIES NIDIFORMIS BIRD NEST SPRUCE 2 GAL.
RFC 11 RHAMNUS FRANGULA COLUMNARIS TALLHEDGE BUCKTHORN 2 GAL.
LANDSCAPE BOULDERS
PLANTER BED - ROCK MULCH
LAWN - KENTUCKY BLUEGRASS SOD
PLANT SCHEDULE
GENERAL PLANTING NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR BECOMINGAWARE OR ALL RELATED EXISTING CONDITIONS,UTILITIES, PIPES, AND STRUCTURES, ETC. PRIOR TOBIDDING AND CONSTRUCTION. THE CONTRACTORSHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITYCOMPANIES FOR FIELD LOCATION OF ALLUNDERGROUND UTILITY LINES, INCLUDING DEPTHS,PRIOR TO ANY EXCAVATION. CONTRACTOR SHALLTAKE SOLE RESPONSIBILITY FOR ANY AND ALL COST OROTHER LIABILITIES INCURRED DUE TO DAMAGE OF SAIDUTILITIES/ STRUCTURES/ETC.
2. IF CONFLICTS ARISE BETWEEN SIZE OF AREAS ANDPLANS, CONTRACTOR IS REQUIRED TO CONTACTOWNER'S REPRESENTATIVE FOR RESOLUTION. FAILURETO MAKE SUCH CONFLICTS KNOWN TO THE OWNER'SREPRESENTATIVE WILL RESULT IN CONTRACTORSLIABILITY TO RELOCATE THE MATERIALS.
3. PLANT NAMES MAY BE ABBREVIATED ON THEDRAWINGS. SEE PLANT LEGEND FOR ABBREVIATIONS,BOTANICAL/COMMON NAMES, SIZES, AND OTHERREMARKS.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISHALL PLANT MATERIALS FREE OF PESTS OR PLANTDISEASES AND HAVE NATURAL FULL SHAPES.PRE-SELECTED OR "TAGGED" MATERIAL MUST BEINSPECTED BY THE CONTRACTOR AND CERTIFIED PESTAND DISEASE FREE, IT IS THE CONTRACTOR'SOBLIGATION TO MAINTAIN AND WARRANTY ALL PLANTMATERIALS PER THE SPECIFICATIONS. ALL PLANTSSHALL BE SUBJECT TO OWNER'S APPROVAL PRIOR TOINSTALLATION.
5. PROVIDE MATCHING SIZES AND FORMS FOR EACHSPECIES OF TREES AND PLANTS SPACED EQUALLY INROWS AS SHOWN ON DRAWINGS. ADJUST SPACING(EQUAL TO EQUAL) AS NECESSARY, SUBJECT TOACCEPTANCE BY THE OWNERS REPRESENTATIVE.
6. CONTRACTOR SHALL IMPORT AND PLACE A MINIMUMOF 4" THICK TOPSOIL TO ALL LAWN AREAS AND AMINIMUM OF 12" THICK TOPSOIL TO ALL PLANTINGAREAS. HOWEVER, CONTRACTOR MAY STRIP,STOCKPILE AND SCREEN EXISTING TOP SOIL IN THEPROJECT AREA TO SUPPLEMENT THE IMPORTEDTOPSOIL REQUIREMENT. IF STRIPPED TOPSOIL IS USED ITSHALL BE TESTED AND BE AMENDED ACCORDING TOTHE REQUIREMENTS OF THE HORTICULTURAL / SOIL TEST.NO AMOUNTS OR QUANTITIES OF USEABLE EXITING TOPSOIL ARE AVAILABLE.
7. PLACE 3" DEPTH ROCK MULCH IN ALL SHRUB ANDPERENNIAL PLANTING AREAS TO MATCH EXISTINGSHRUB BEDS IN COLOR, SIZE, AND TYPE.
8. PROVIDE A 4' FOOT DIAMETER SAUCER UNDER ALLTREES PLANTED IN TURF AREAS WITH 3" OF SHREDDEDBARK MULCH.
L102
OVERALL LANDSCAPE PLAN
The designs shown and described herein includingall technical drawings, graphic representation &models thereof, are proprietary & can not becopied, duplicated, or commercially exploited inwhole or in part without the sole and express writtenpermission from ASWN+JSA Architects, Inc.
These drawings are available for limited review andevaluation by clients, consultants, contractors,government agencies, vendors, and officepersonnel only in accordance with this notice.
REVISIONS:
ArchitectureInterior DesignLandscape ArchitectureLand PlanningConstruction Management
5151 South 900 East, Suite 200Salt Lake City, UT 84117
Ph: 801.269.0055Fax: 801.269.1425
www.thinkaec.com
PROJECT NO.
LANDSCAPE
DATE:
SHEET TITLE:
SHEET NUMBER:
20010DEC. 23, 2019
MEA
DOW
S AT A
MER
ICAN
FORK
PHAS
E II
750 W
EST 2
00 SO
UTH
AMER
ICAN
FORK
, UTA
H 84
003
FUTURE STREET
NATURAL EDGE (TYP.)
NATURAL EDGE (TYP.)
5.2.a
Packet Pg. 47
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
xx
xx
S
D
D
OS
FM
CSK
3 EFM3 HOS
3 CSK
3 RFC
3 CAK3 HSE6 HEM.S
4 LAH2 LSM1 MSM3 PAN3 CCB
1 MSM
2 LSM4 LAH
6 HEM.S 4 LAH3 LSM3 HEM.M3 CCB3 HSE 3 HEM.M
3 EFM
2 CCB3 HOS9 HEM.S
3 CCB2 MSM
6 HEM.M
3 HSE5 HEM.M5 CAK13 HEM.S
2 MSM2 EFM3 HOS1 MSM5 HEM.M1 MSM
3 CCB1 MSM5 HEM.M
6 CSK
5 EFM2 JSB
3 EFM
6 HEM.M
3 EFM
7 HEM.M1 JSB
4 JSB
9 HSE
1 MSM3 EFM4 CCB
1 MSM3 EFM
10 HEM.S
1 TCG
2 EFM1 APP
1 PAC1 PCC
1 PCC
1 PCC
1 ZSG
1 PAC
1 APP1 APP
PCC
MAT
CHLIN
E L10
2M
ATCH
LINE L
103
HSE
5 LSM
3 CCB3 CAK6 HEM.S
BUILDING 2D
BUILDING 2E
TREES KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPE
APP 7 ACER PLATANOIDES 'PARKWAY' PARKWAY NORWAY MAPLE 2" CAL CONT
PCC 11 PYRUS CALLERYANA 'CHANTICLEER' CHANTICLEER FLOWERING PEAR 2" CAL CONT
TCG 5 TILIA CORDATA 'GREENSPIRE' GREENSPIRE LINDEN 2" CAL CONT
ZSG 1 ZELKOVA SERRATA 'GREEN VASE' GREEN VASE ZELKOVA 2" CAL CONT
PAC 5 PICEA ABIES 'CUPRESSINA COLUMNAR' COLUMNAR SPRUCE 7' HT B&B
GRASSES KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPE
CAK 41 CALAMAGROSTIS ACUTIFOILA 'KARL FOESTER' KARL FOERSTER FEATHER REED GRASS 1 GAL.
HSE 42 HELICTOTRICHHON SEMPERVIRENS BLUE OAT (AVENA) GRASS 1 GAL.
MSM 20 MISCANTHUS SINENSIS MORNING LIGHT MORNING LIGHT MAIDEN GRASS 1 GAL.
PERENNIALS KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPE
HEM.M 62 HEMEROCALLIS SP. DAYLILY 1 GAL.
HEM.S 79 HEMROCALLIS 'STELLA DE ORO STELLA D' ORO 1 GAL.
HOS 18 HOSTA PLANTAIN LILY 1 GAL.
LAH 54 LAVENDULA ANGUSTIFOLIA HIDCOTE BLUE ENGLISH LAVENDER 1 GAL.
LSM 54 LEUCANTHEMUM SUPERBUM 'SNOW LADY' SNOW LADY SHASTA DAISY 1 GAL.
SHRUBS KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE TYPECCB 45 CARYOPTERIS X CLANDONENSIS GRAND BLEU GRAND BLEU BLUE MIST SPIREA 2 GAL.
CSK 25 CORNUS SERICEA KELSEYI DWARF KELSEY DOGWOOD 2 GAL.
EFM 49 EUONYMUS FORTUNEI MOONSHADOW MOONSHADOW EUONYMUS 2 GAL.
JSB 14 JUNIPERUS SABINA 'BUFFALO' BUFFALO JUNIPER 2 GAL.
PAN 12 PICEA ABIES NIDIFORMIS BIRD NEST SPRUCE 2 GAL.
RFC 11 RHAMNUS FRANGULA COLUMNARIS TALLHEDGE BUCKTHORN 2 GAL.
LANDSCAPE BOULDERS
PLANTER BED - ROCK MULCH
LAWN - KENTUCKY BLUEGRASS SOD
PLANT SCHEDULE
GENERAL PLANTING NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR BECOMINGAWARE OR ALL RELATED EXISTING CONDITIONS,UTILITIES, PIPES, AND STRUCTURES, ETC. PRIOR TOBIDDING AND CONSTRUCTION. THE CONTRACTORSHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITYCOMPANIES FOR FIELD LOCATION OF ALLUNDERGROUND UTILITY LINES, INCLUDING DEPTHS,PRIOR TO ANY EXCAVATION. CONTRACTOR SHALLTAKE SOLE RESPONSIBILITY FOR ANY AND ALL COST OROTHER LIABILITIES INCURRED DUE TO DAMAGE OF SAIDUTILITIES/ STRUCTURES/ETC.
2. IF CONFLICTS ARISE BETWEEN SIZE OF AREAS ANDPLANS, CONTRACTOR IS REQUIRED TO CONTACTOWNER'S REPRESENTATIVE FOR RESOLUTION. FAILURETO MAKE SUCH CONFLICTS KNOWN TO THE OWNER'SREPRESENTATIVE WILL RESULT IN CONTRACTORSLIABILITY TO RELOCATE THE MATERIALS.
3. PLANT NAMES MAY BE ABBREVIATED ON THEDRAWINGS. SEE PLANT LEGEND FOR ABBREVIATIONS,BOTANICAL/COMMON NAMES, SIZES, AND OTHERREMARKS.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISHALL PLANT MATERIALS FREE OF PESTS OR PLANTDISEASES AND HAVE NATURAL FULL SHAPES.PRE-SELECTED OR "TAGGED" MATERIAL MUST BEINSPECTED BY THE CONTRACTOR AND CERTIFIED PESTAND DISEASE FREE, IT IS THE CONTRACTOR'SOBLIGATION TO MAINTAIN AND WARRANTY ALL PLANTMATERIALS PER THE SPECIFICATIONS. ALL PLANTSSHALL BE SUBJECT TO OWNER'S APPROVAL PRIOR TOINSTALLATION.
5. PROVIDE MATCHING SIZES AND FORMS FOR EACHSPECIES OF TREES AND PLANTS SPACED EQUALLY INROWS AS SHOWN ON DRAWINGS. ADJUST SPACING(EQUAL TO EQUAL) AS NECESSARY, SUBJECT TOACCEPTANCE BY THE OWNERS REPRESENTATIVE.
6. CONTRACTOR SHALL IMPORT AND PLACE A MINIMUMOF 4" THICK TOPSOIL TO ALL LAWN AREAS AND AMINIMUM OF 12" THICK TOPSOIL TO ALL PLANTINGAREAS. HOWEVER, CONTRACTOR MAY STRIP,STOCKPILE AND SCREEN EXISTING TOP SOIL IN THEPROJECT AREA TO SUPPLEMENT THE IMPORTEDTOPSOIL REQUIREMENT. IF STRIPPED TOPSOIL IS USED ITSHALL BE TESTED AND BE AMENDED ACCORDING TOTHE REQUIREMENTS OF THE HORTICULTURAL / SOIL TEST.NO AMOUNTS OR QUANTITIES OF USEABLE EXITING TOPSOIL ARE AVAILABLE.
7. PLACE 3" DEPTH ROCK MULCH IN ALL SHRUB ANDPERENNIAL PLANTING AREAS TO MATCH EXISTINGSHRUB BEDS IN COLOR, SIZE, AND TYPE.
8. PROVIDE A 4' FOOT DIAMETER SAUCER UNDER ALLTREES PLANTED IN TURF AREAS WITH 3" OF SHREDDEDBARK MULCH.
L103
OVERALL LANDSCAPE PLAN
The designs shown and described herein includingall technical drawings, graphic representation &models thereof, are proprietary & can not becopied, duplicated, or commercially exploited inwhole or in part without the sole and express writtenpermission from ASWN+JSA Architects, Inc.
These drawings are available for limited review andevaluation by clients, consultants, contractors,government agencies, vendors, and officepersonnel only in accordance with this notice.
REVISIONS:
ArchitectureInterior DesignLandscape ArchitectureLand PlanningConstruction Management
5151 South 900 East, Suite 200Salt Lake City, UT 84117
Ph: 801.269.0055Fax: 801.269.1425
www.thinkaec.com
PROJECT NO.
LANDSCAPE
DATE:
SHEET TITLE:
SHEET NUMBER:
20010DEC. 23, 2019
MEA
DOW
S AT A
MER
ICAN
FORK
PHAS
E II
750 W
EST 2
00 SO
UTH
AMER
ICAN
FORK
, UTA
H 84
003
FUTURE STREET
700 W
EST
STRE
ET
NATURAL EDGE (TYP.)
NATURAL EDGE (TYP.)
5.2.a
Packet Pg. 48
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
UNDISTURBED SOIL TOPREVENT SETTLING
FINISH GRADE
NO SOIL ON TOP OF ROOTBALL
WEED BARRIER FABRIC
INSTALL SOIL RING TO CAPTURE WATER,4" HEIGHT
3" LAYER MULCH, KEEP MULCH AWAYFROM TRUNK
3" MULCH LAYER TO COVER ONLY THE EDGE OF THEROOT BALL.
PLANTING SOIL MIX
FINISH GRADE
EXISTING SUBSOIL
ROOT BALL SHALL BE 1" HIGHER THAN FINISHEDGRADE WHEN PLANTED.
PERENNIAL PLANTING
PLANT
SPACING AS INDICATED ON PLAN
2X ROOT BALL
SHRUB PLANTING
ROOT BALLREMOVE CONTAINER, TOP 1/3 OFBURLAP AND ALL ROPES BINDINGROOT BALL
NOTE:1. TOP OF ROOT BALL TO BE 1" ABOVE FINISH GRADE WHENPLANTED.
32
WIRE ROPE
TREE COLLAR
PLAN
DUCKBILL EARTH ANCHOR TREE SUPPORT KIT,MODEL 40DTS. INSTALLATION PERMANUFACTURER'S WRITTEN INSTRUCTIONS.
ROOT BALLTREE PIT
TREE GUYING
120°
TYP.
WARNING FLAGGING
TREE TRUNK
6
DUCKBILL EARTH ANCHOR TREESUPPORT KIT, MODEL 40DTS.INSTALLATION PER MANUFACTURER'SWRITTEN INSTRUCTIONS.
PLANTS
ON CENTER SPACING ASINDICATED IN PLANTSCHEDULE
REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL
WEED BARRIER FABRICINSTALL SOIL RING TO CAPTURE WATER, 5"HEIGHTBACKFILL SOIL MIXTURE(MIXED TOGETHER BEFORE PLACEMENT):4 PARTS - IMPORTED RICH LOAM TOPSOIL1 PART - RICH ORGANIC PEAT MOSS
ROOT BALL
UNDISTURBED SOIL TO PREVENTSETTLING
FINISHED GRADE 3" MIN. BARK OR ROCK MULCH (SEE PLANS). KEEPMULCH AWAY FROM TRUNK.
EVERGREEN TREE PLANTING3X ROOTBALL DIA.
NOTE:1. GUY ALL EVERGREEN TREES AS INDICATED INTREE GUYING DETAIL OR AS REQUIRED BYLANDSCAPE ARCHITECT
REMOVE ALL ROPES BINDING ROOT BALL
REMOVE TOP 1/3 OF WIRE CAGEWHEN PRESENT
5
TREEWIRE
STAKES
1" WIDE MIN.STRAP AROUNDTRUNK. WIREATTACHED TOEND OF STRAPS
PREVAILING WIND DIRECTION
NO SOIL ON TOP OF ROOT BALL3" MULCH LAYER, KEEP MULCH AWAY FROM TRUNK.
WEED BARRIER FABRIC
INSTALL SOIL RING TO CAPTURE WATER, 5"HEIGHT
BACKFILL SOIL MIXTURE(MIXED TOGETHER BEFORE PLACEMENT):4 PARTS - IMPORTED RICH LOAM TOPSOIL1 PART - RICH ORGANIC PEAT MOSS
TREE STAKES(2) 2"x2"x8' OR 2" DIA. x8'WOOD STAKES. DRIVE STAKESINTO UNDISTURBED SOIL.(STAKES TO BE REMOVED ONEYEAR AFTER PLANTING)ALL GRAFT UNIONSSHALL BE VISIBLEABOVE GRADE
ROOT BALL
UNDISTURBED SOIL TOPREVENT SETTLING
REMOVE TOP 1/3 OF WIRE CAGEWHEN PRESENT, TOP 1/3 OF BURLAPAND ALL ROPES BINDING ROOTBALL
DECIDUOUS TREE PLANTING 1
PLANTING SOIL MIX
6'
3X ROOTBALL DIA.
2X ROOTBALL DIA.
MULCH
EXCAVATED SOILAS BACKFILL
3:1 SLOPE
2:1 SLOPE
3:1 SLOPE
TOPSOIL WHERE INDICATED
SUBSOIL
MULCH
EXCAVATED SOILAS BACKFILL
2:1 SLOPE
1:1 SLOPE
2:1 SLOPE
TOPSOIL WHERE INDICATED
SUBSOIL
Tree Planting on 3:1 Slope
Tree Planting on 2:1 Slope
TREE PLANTING ON SLOPE 7
L501
LANDSCAPEDETAILS
The designs shown and described herein includingall technical drawings, graphic representation &models thereof, are proprietary & can not becopied, duplicated, or commercially exploited inwhole or in part without the sole and express writtenpermission from ASWN+JSA Architects, Inc.
These drawings are available for limited review andevaluation by clients, consultants, contractors,government agencies, vendors, and officepersonnel only in accordance with this notice.
REVISIONS:
ArchitectureInterior DesignLandscape ArchitectureLand PlanningConstruction Management
5151 South 900 East, Suite 200Salt Lake City, UT 84117
Ph: 801.269.0055Fax: 801.269.1425
www.thinkaec.com
PROJECT NO.
LANDSCAPE
DATE:
SHEET TITLE:
SHEET NUMBER:
20010DEC. 23, 2019
MEA
DOW
S AT A
MER
ICAN
FORK
PHAS
E II
750 W
EST 2
00 SO
UTH
AMER
ICAN
FORK
, UTA
H 84
003
5.2.a
Packet Pg. 49
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
SDSDSD
WW
2A
2B
2C2D
2E
S5'
S
WWWWWWWV
WV
W
WW
W
SSSS
W
WW
W
W
WW
SSSS
SSSS
W
H Y DW
V
H
YD
WV
HYD
WV
SS SS
W
W
SSSS
W
W
SS
SS
SSSSSSSSSS
WWWWWWWWW
PIPIPIPIPIPIPIPIPI
WVWV
WV
WV
WV
WV
WV
HYDW
V
W
W
WW
W
WW
W
DDSDSDSD
DD
SD D
D
D D
SDSD
SDD
SD
SSD
W
xx
xx
xxxxxxxxxx
xx
xx
ss
ssssssssssss
g
ggggg
w w w
ss
ss
ss
w w
ss
w
wss
w ww
wrd rdrdrdrdg
e e e e
e
e
w w w w w w
ssss
ss
ss ss ww
ww
ppi
pipi
pi
sd
sdsdsd
700 W
EST
STRE
ET(P
UBLI
C ST
REET
)
sdsd
sd
sdsd
sd
sdsd
WV W
V
W
H Y D
WV
WV
W
W W
W
D
D
D
D
D
D
D
D
D
D
D
EE
E
WV
WV W
V
WV
WV
S
S
WV
WV
WV
IRR
IRRIRR
IRR
D
S
D
HY
DWV
WV
WV
D
D
D
D
POC
POC 1
LATERAL LINES PVC SHED. 40 PIPE.
IRRIGATION LEGEND
PVC SCHED. 40 PIPE SLEEVE & CONTROL WIRE SLEEVE SYMBOL MAY INDICATEMULTIPLE SLEEVES, HOWEVER THERE SHALL BE 1 PIPE PER SLEEVE. MINIMUM SIZESHALL BE 4" OR 2 SIZES LARGER THAN THE PIPE SIZE, WHICHEVER IS GREATER.SLEEVES SHALL EXTEND A MINIMUM OF 1'-0" INTO LANDSCAPED AREA.
POC POINTS OF CONNECTION (2) TO EXISTING IRRIGATION SYSTEM MAIN LINE. CONTRACTOR TOVERIFY THAT THE EXISTING MAIN LINE CAN SUPPLY SUFFICIENT PRESSURE AND FLOW FOR THEPROPOSED IRRIGATION SYSTEM. PROVIDE SHUTOFF ISOLATION VALVE AT THIS POINT.
PROPOSED TREE LOCATIONS, SEE PLANTING PLAN. ALL TREES IN PLANTER BED AREAS SHALLBE IRRIGATED 2 BUBBLERS PER TREE, SEE EQUIPMENT LIST AND DETAIL ____. TREE DRIPIRRIGATION TO BE SEPARATE ZONE FROM SHRUB IRRIGATION ZONE. TREE ZONE(S) MAY BECONNECTED TO EXISTING TREE DRIP ZONE IF AVAILABLE.
MAIN PRESSURE LINE - ALL PIPE 3" DIA. AND SMALLER SHALL BE SCHED. 40 PVC.SEE PLAN FOR ROUTING, SLEEVE UNDER ALL PAVED SURFACES.
EXISTING PVC MAIN LINE. CONTRACTOR TO VERIFY SIZE, PIPE TYPE, ANDPRESSURE.
( ) Q
LATERAL LINE PIPE SIZING CHARTGPM 0-8 GPM 9-12 GPM 13-22 GPM 23-35 GPM 36-50
3/4" 1" 1-1/4" 1-1/2" 2"
IRRIGATION AREAS
DRIP IRRIGATION AREA (13,571 SQ. FT.). EQUIPMENT SHALL INCLUDE THEFOLLOWING AS REQUIRED:
SRAINBIRD XERI-BUG EMITTER: XB SERIES WITH RAINBIRD UNIVERSAL 1/4"TUBING STAKE: TS-025. PERENNIALS AND GRASSES TO RECEIVE (2) 1 GPHEMITTERS PER PLANT. SHRUBS TO RECEIVE (2) 2 GPH EMITTERS PER PLANT.PROVIDE LINE FLUSHING VALVES PER MANUFACTURER'SRECOMMENDATIONS.PROVIDE AIR/VACUUM RELIEF VALVES PER MANUFACTURER'SRECOMMENDATIONS.PROVIDE 2 RAINBIRD RWS-B-1401 BUBBLERS PER TREE ON A ZONESEPARATE FROM ALL OTHER PLANTS. THIS ZONE MAY BE CONNECTED TOEXISTING TREE ZONE IF AVAILABLE.DRIP VALVES: RAINBIRD XCZ-100-PRB-COM DRIP CONTROL ZONE KIT,SIZED AT 1"
SRAY IRRIGATION AREA (21,298 SQ. FT.). EQUIPMENT SHALL INCLUDE THEFOLLOWING AS REQUIRED:
SPRAY HEADS: RAINBIRD 1804-SAM-PRS-U SERIES NOZZLESROTOR HEADS: RAINBIRD 5004-PC-SAMVALVES: RAINBIRD PEB SERIES ELECTRIC CONTROL VALVE SIZE ASREQUIRED INSTALL BRASS BALL ISOLATION VALVE (SIZE TO MATCH MAINLINE) FOR EACH CONTROLLER OR GROUP OF CONTROLLERS.QUICK COUPLER VALVE, RAINBIRD 44-LRC WITH MATCHING VALVE KEYAND HOSE SWIVEL ELL
IRRIGATION SYSTEM NOTES
1. THE IRRIGATION SYSTEM PROPOSED IN THIS PLAN IS INTENDED TO CONNECT TO THE EXISTING IRRIGATION SYSTEM ONSITE. THE CONTRACTOR SHALL VERIFY THAT THE EXISTING SYSTEM CAN ACCOMMODATE THE PLAN. IF THE EXISTINGIRRIGATION SYSTEM DOES NOT HAVE THE CAPACITY TO ACCOMMODATE THE THIS PLAN, THE CONTRACTOR SHALLINFORM THE LANDSCAPE ARCHITECT IN WRITING BEFORE CONSTRUCTION.
2. IRRIGATION CONTRACTOR TO INSTALL A COMPLETE NEW AND OPERATIONAL IRRIGATION SYSTEM WITHIN THE LIMITOF WORK. INSTALL ALL IRRIGATION HEADS WITH NOZZLES OF THE APPROPRIATE DEGREE AND RADIUS FOR THE AREATO BE IRRIGATED.
3. THE NEW IRRIGATION SYSTEM MAY INCLUDE BUT IS NOT LIMITED TO IRRIGATION MAIN LINE (PRESSURE PIPE), LATERALLINES (CIRCUIT PIPE), IRRIGATION VALVES, CONTROL WIRING, CONTROLLER, CONTROLLER ELECTRICAL SUPPLY,BACKFLOW PREVENTER, FILTER, GATE VALVE(S), SLEEVING, ISOLATION VALVES, QUICK COUPLER VALVES, VALVEBOXES, DRIP TUBING AND DRIP COMPONENTS AND IRRIGATION HEADS (FIXED SPRAY, ROTATORS, ROTORS, BUBBLERS).
4. WORK SHALL CONFORM WITH ALL APPLICABLE STANDARDS AND CODES.5. IRRIGATION CONTRACTOR TO INSTALL CIRCUITS SO AS TO MAINTAIN APPROPRIATE OPERATING PRESSURE FOR EACH
HEAD ON THE ENTIRE ZONE AND SHALL BE RESPONSIBLE FOR ENSURING ADEQUATE COVERAGE OF ALL IRRIGATEDAREAS.
6. IT IS THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO BECOME FAMILIAR WITH CONDITIONS OF THE SITEINCLUDING GRADES, LOCATIONS OF WALKS, STRUCTURES AND UTILITIES.
7. THE IRRIGATION CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO LANDSCAPE ARCHITECT FOR APPROVAL OFPROPOSED IRRIGATION SYSTEM PRIOR TO INSTALLATION OF IRRIGATION SYSTEM.
8. THE IRRIGATION CONTRACTOR SHALL REPAIR OR REPLACE ALL ITEMS DAMAGED BY HIS WORK. HE SHALLCOORDINATE HIS WORK WITH OTHER CONTRACTORS FOR THE LOCATION AND INSTALLATION OF PIPE SLEEVES ANDLATERAL LINES THROUGH WALLS, AND UNDER HARD SURFACES. SLEEVES INSTALLED AT IMPROPER DEPTHS WILL BERE-INSTALLED BY BORING METHODS.
8. ALL NEW VALVES SHALL CONNECT TO THE NEAREST COMMON WIRE OF THE EXISTING 2-WIRE SYSTEM AND BEACCOMMODATED WITH THE EXISTING CONTROLLER. CONTRACTOR TO PROVIDE ADDITIONAL MODULES FORCONTROLLER AS REQUIRED.
9. IRRIGATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING CONDUITS AND WIRING FROM VALVES TO CONTROLLERS.10. INSTALL CHECK VALVES AS NEEDED TO PREVENT EXCESSIVE DRAINAGE AT LOW POINT OF EACH CIRCUIT.11. IRRIGATION CONTRACTOR SHALL ADJUST VALVES, FLUSH AND ADJUST IRRIGATION HEADS FOR OPTIMUM
COVERAGE WITH MINIMAL OVERSPRAY ONTO HARD SURFACES AND ELIMINATE SPRAY ON BUILDINGS AND OTHERVERTICAL SURFACES.
12. ALL IRRIGATION SYSTEM COMPONENTS TO BE INSTALLED AS PER MANUFACTURER'S WRITTEN INSTRUCTIONS.13. IT IS THE INTENT TO HAVE ALL PIPING, VALVES, AND WIRING TO BE LOCATED IN PLANTING AREAS, WITH THE EXCEPTION
OF LOCATIONS REQUIRED FOR HARD SURFACE CROSSINGS. ADDITIONAL SLEEVES WILL BE REQUIRED. NOT ALLSLEEVES ARE SHOWN.
14. REFER TO PLANTING PLAN FOR COORDINATING HEAD LOCATIONS WITH TREE LOCATIONS. IRRIGATION HEADS TO BELOCATED TO MINIMIZE TREE CREATED SPRAY SHADOW.
15. ESTIMATED STATIC WATER PRESSURE AT POINT OF CONNECTION: 75 PSI. IRRIGATION CONTRACTOR IS TO NOTIFYLANDSCAPE ARCHITECT IN WRITING IF STATIC PRESSURE IS LESS.
16. ALL VALVE BOXES TO BE SUPPORTED WITH BRICK AS INDICATED.17. LOCATE IRRIGATION CONTROL VALVES IN LANDSCAPE AREAS, ADJACENT TO WALKS AND CURBS TO GREATEST
EXTENT POSSIBLE.18. THE LANDSCAPE ARCHITECT HAS THE RIGHT TO REFUSE MATERIAL OR WORK WHICH DOES NOT CONFORM TO THE
CONSTRUCTION DOCUMENTS. REJECTED WORK SHALL BE BE REMOVED OR CORRECTED AS SOON AS POSSIBLE ATTHE EXPENSE OF THE IRRIGATION CONTRACTOR.
19. IRRIGATION CONTRACTOR TO PROVIDE AS-BULT DRAWINGS AS INDICATED IN SPECIFICATIONS.20. PRIOR TO ACCEPTANCE OF WORK AND AS PART OF THE IRRIGATION PUNCH LIST THE IRRIGATION CONTRACTOR
SHALL CONDUCT A MEETING WITH THE OWNER TO DEMONSTRATE THE OPERATION OF THE ENTIRE IRRIGATION SYSTEMINCLUDING WINTERIZATION AND START-UP PROCEDURES AND PROVIDE A RECOMMENDED IRRIGATION SCHEDULE.REMOTE OPERATING EQUIPMENT, IF ANY, SHALL BE GIVEN TO OWNER AT THIS TIME.
21. GUARANTEE: ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE AGAINST ALL DEFECTSIN MATERIAL, EQUIPMENT, AND WORKMANSHIP. GUARANTEE SHALL ALSO COVER REPAIR FOR DAMAGE TO ANYPART OF THE PROJECT PROPERTY RESULTING FROM LEAKS OR OTHER DEFECTS IN MATERIAL, EQUIPMENT ORWORKMANSHIP, TO THE SATISFACTION OF THE OWNER. REPAIRS, IF REQUIRED, SHALL BE COMPLETED PROMPTLY ANDAT NO COST TO THE OWNER.
22. EACH TREE TO BE IRRIGATED WITH A PAIR OF BUBBLERS AS INDICATED IN THE DETAIL. EACH PAIR OF BUBBLERS ATEACH TREE TO BE PIPED IN AN IRRIGATION CIRCUIT WITH A MAXIMUM FLOW OF 40 GPM. EACH BUBBLER PAIR HAS ATOTAL FLOW OF 1 GPM.
L101
OVERALL LANDSCAPE PLAN
The designs shown and described herein includingall technical drawings, graphic representation &models thereof, are proprietary & can not becopied, duplicated, or commercially exploited inwhole or in part without the sole and express writtenpermission from ASWN+JSA Architects, Inc.
These drawings are available for limited review andevaluation by clients, consultants, contractors,government agencies, vendors, and officepersonnel only in accordance with this notice.
REVISIONS:
ArchitectureInterior DesignLandscape ArchitectureLand PlanningConstruction Management
5151 South 900 East, Suite 200Salt Lake City, UT 84117
Ph: 801.269.0055Fax: 801.269.1425
www.thinkaec.com
PROJECT NO.
LANDSCAPE
DATE:
SHEET TITLE:
SHEET NUMBER:
20010JAN. 17, 2019
MEA
DOW
S AT A
MER
ICAN
FORK
PHAS
E II
750 W
EST 2
00 SO
UTH
AMER
ICAN
FORK
, UTA
H 84
003
5.2.a
Packet Pg. 50
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
3
T X T BUSHING TO LATERALSCH. 80 ELBOW WITH SCHED. 80 NIPPLE INTO
3/4" WASHED GRAVEL, 6" DEPTH MINIMUM16
13
14
15
12
CONTROL WIRES
LATERAL LINE
SCH. 80 NIPPLE ON EITHER SIDE OF UNIONCARSON-BROOKS 1419-1220
BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION)
PROVIDE 24" EXPANSION LOOP ATEACH WIRE CONNECTOR IN BOX.
WATER TIGHT CONNECTORS (3M DBY ONLY)
JUMBO VALVE BOX WITH STAINLESS STEEL BOLTS. (BOLT DOWN LID). (MUST BE APPROVED
15
1254
108
7
9
1
8
11
11
10
9
8
14
13
PVC SCH. 80 UNION
3
2
1
10"-16"
THREADED NIPPLE WITH BUSHING
16
CONTROL VALVE ASSEMBLY 4
NOTE:1. ONE REMOTE CONTROL VALVE PER JUMBO SIZE BOX.2. ALL FITTINGS AND NIPPLES IN MANIFOLD SHALL BE SCH. 80 THREADED PVC, USING TEFLON TAPE AND#5 RECTOR SEAL.3. VALVE MANIFOLD TO BE INSTALLED GOING AWAY FROM MAIN LINE 1 FOOT MINIMUM BEFORECHANGE IN DIRECTION.
9
2
PVC SCH 80 T X T ELBOW4
PVC SCH. 80 NIPPLE; LENGTH AS REQUIRED (TYP.)5
LINE FROM MANIFOLD CONNECTION6
7 ELECTRIC CONTROL VALVE - SEE IRRIGATION SCHEDULE
6
TOP OF VALVE BOX FLUSH WITH FINISH GRADE
DRIP CONTROL ZONE KIT 7
FINISH GRADE/TOP OF MULCH1
VALVE BOX WITH COVER2
30" LINEAR LENGTH OF WIRE, COILED3
WATERPROOF WIRE CONNECTION4
1" BALL VALVE (INCLUDED)5
ID TAG AS REQUIRED6
REMOVE CONTROL VALVE7
PRESSURE REGULATING BASKET FILTER8
PVC SCH 40 FEMALE ADAPTOR9
LATERAL PIPE TO DRIP ZONE10
PVC PIPE AND FITTINGS11
MAIN LINE PIPE12
3" MIN. DEPTH OF 3/4" WASHED GRAVEL13
PVC SCH 80 CLOSE NIPPLE (INCLUDED)14
BRICK (4) AS VALVE BOX FOOTING15
11
1 2 3 4 5 6 7 8 9
10
14 15
12
13
QUICK COUPLING VALVE ASSEMBLY
1
2
3
4
5
7
9
10" ROUND GREEN PLASTIC VALVE BOX,
FINISH GRADE
QUICK COUPLER - SEE EQUIPMENT SCHEDULE
1" GALVANIZED RISER, LENGTH AS REQUIRED
6" MIN. DEPTH 3/4" WASHED GRAVEL
#4 REBAR, DRIVEN INTO SOIL 18" MIN.
12
3
4
5
8
7
9
6
8 1" DOUBLE ELBOW SWING JOINT ASSEMBLY
MAIN SUPPLY LINE6
(MOUNT 4 - 6" BELOW GRADE)
NOTE:1. INSTALL (1) QUICK COUPLING VALVE IN LOCATIONS INDICATED ONPLAN2. INSTALL VALVE BOX SO TOP OF BOX IS AT FINISH GRADE IN TURF AND2" ABOVE FINISH GRADE IN PLANTING AREAS.3. TOP OF QUICK COUPLER VALVE TO HAVE 3" MIN. CLEARANCE FROMVALVE BOX LID4. DO NOT INSTALL IN ROOFTOP PLANTING AREAS OR CONTAINERS
SECURE VALVE TO REBAR WITH (2) MIN. STAINLESS STEELSCREW CLAMPS
3
7
6
5
1
4
2
31
2 EXISTING HARD SURFACE TO BE SAWCUT, PATCH AS REQUIRED
CONCRETE OR ASPHALT PAVING
WIDTH AS REQUIRED3
4 DEPTH TO BE 24" MIN. OR TO MATCH MAIN LINE AS REQUIRED
5
6
7
COMPACTED BACKFILL FREE FROM ROCK GREATER THAN 1" IN DIAMTER
CONTROL WIRE SLEEVE TO BE 6" TO EITHER SIDE OR 6" BENEATH MAIN LINE
MAIN LINE / LATERAL LINE IN PVC SLEEVE
NOTE:1. SLEEVES 4" AND SMALLER TO BE PVC SCH. 40 PIPE.2. SLEEVES LARGER THAN 4" TO BE PVC CLASS 200 PIPE.3. ALL SLEEVES TO BE 2" LARGER THAN PIPE TO BE SLEEVED.4. SLEEVES FOR WIRING TO BE 2" LARGER I.D. THAN CONTROL WIRE BUNDLE.5. CONCRETE OR ASPHALT PATCH TO MATCH EXISTING CONCRETE ORASPHALT CUT FOR PIPE TRENCH.
SLEEVES FOR IRRIGATION PIPE AND WIRE 2
BUBBLER ON 1/4" TUBING STAKE
1/4" DISTRIBUTION TUBING, LENGTH AS REQUIRED
EXTEND DISTRIBUTION TUBING TO CIRCUIT LATERAL
PLANTER FINISH GRADE
BUBBLER SPIKE WITH 1/4" DISTRIBUTION TUBING 8
3
2
11
2
3
44
USE MALE THREAD MODEL
STREET ELBOWS
BETWEEN 30 AND 45 DRG. OF LATERAL PIPE.7
8 DEPTH - SEE NOTES & TRENCH DETAIL
1
SWING JOINT ARM INSTALLED AT ANGLE
ON PLANPVC LATERAL LINE, SIZE AS NOTED
PVC SCH. 40 SxSxT TEE (OR ELL)
SCH. 80 THREADED NIPPLE W/ MARLEX
2" CLEAR OF ALL HARDSCAPE SURFACESNOTE: ALL SPRAY HEADS TO BE PLACED
FINISH GRADE
POP-UP ROTOR SPRINKLER - SEE LEGEND
1
2
3
4
5 6
8
2
3
4
5
6
7
TOP OF ROTOR POP-UP SPRINKLER FLUSHWITH SIDEWALK
POP-UP SPRAY SPRINKLER:SEE LEGEND
FINISH GRADE/TOP OF MULCH1
2
3
4
5 PVC SCH 40 SxSxT TEE OR ELL
PVC LATERAL PIPE
24" MAXIMUM LENGTHSWING ASSEMBLY FLEX TUBE
6 1/2" BARB 90d
7 1/2" MARLEX 90d ELL
ROTOR POP- UP SPRINKLER 5 POP-UP SPRINKLER (LAWN AREA) 6
1
2
3
7 4 6 5
NOTES:1. INSTALL EMITTER PER MANUFACTURER'S WRITTEN INSTRUCTIONS
DIFFUSER BUG CAP
TUBING STAKE
DISTRIBUTION TUBING
TOP OF MULCH
SINGLE-OUTLET BARB INLET X BARB OUTLET EMITTER
1/2" POLYETHYLENE TUBING
FINISH GRADE
DRIP EMITTER WITH DISTRIBUTION TUBING 9
1
2
3
4
5
6
77
6
5
4321
6
5
4
21
1
3
4
5
2
6
7
7
8
83
8
10
BACKFILL SOIL FREE FROM ROCKS GREATER THAN 1" DIAMETER.
TOPSOIL FREE FROM ROCKS GREATER THAN 1" DIAMETER. LAYERTHICKNESS AS INDICATED IN PLANTING NOTES
12"
10 DECTABLE WARNING TAPE AT MAIN LINE
TRENCH DETAIL 1
9
9
IF LAWN IS EXISTING, REPLACE SOD AS PER OWNER'SSPECIFICATIONS
ADJACENT HARD SURFACE
NON-PRESSURE LATERAL LINE
PRESSURE MAIN LINE
DIRECT BURIAL, LOW VOLTAGE CONTROL WIRES; TAPE AND BUNDLEAT 10' O.C. PLACE 6" EITHER SIDE, OR 6" BELOW MAIN LINE PIPE.
MORTAR SAND BEDDING 2" BELOW AND ABOVE PIPE
PIPE DEPTHS:MAIN LINE: 24 - 30" COVERLATERAL LINE: 8 - 16" COVER
L501
IRRIGATIONDETAILS
The designs shown and described herein includingall technical drawings, graphic representation &models thereof, are proprietary & can not becopied, duplicated, or commercially exploited inwhole or in part without the sole and express writtenpermission from ASWN+JSA Architects, Inc.
These drawings are available for limited review andevaluation by clients, consultants, contractors,government agencies, vendors, and officepersonnel only in accordance with this notice.
REVISIONS:
ArchitectureInterior DesignLandscape ArchitectureLand PlanningConstruction Management
5151 South 900 East, Suite 200Salt Lake City, UT 84117
Ph: 801.269.0055Fax: 801.269.1425
www.thinkaec.com
PROJECT NO.
LANDSCAPE
DATE:
SHEET TITLE:
SHEET NUMBER:
20010JAN. 17, 2019
MEA
DOW
S AT A
MER
ICAN
FORK
PHAS
E II
750 W
EST 2
00 SO
UTH
AMER
ICAN
FORK
, UTA
H 84
003
5.2.a
Packet Pg. 51
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
31
EXHIBIT “C”
5.2.a
Packet Pg. 52
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 53
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 54
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 55
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
35
EXHIBIT “D”
5.2.a
Packet Pg. 56
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
36
EXHIBIT “E”
5.2.a
Packet Pg. 57
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 58
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 59
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 60
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 61
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 62
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
5.2.a
Packet Pg. 63
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
700 WEST
200
SO
UT
H
ACQUISITION AREA-A
1,439 Sq. Ft.
(0.03 Acres)
LAKEVIEW MEADOWS LLC
PARCEL NO.: 13-042-0097
ACQUISITION AREA-B
5,820 Sq. Ft.
(0.13 Acres)
P.O.B.
P.O.B.
PROPOSED TEMPORARY
CONSTRUCTION EASEMENT
LAKEVIEW MEADOWS
SOUTH LLC
PARCEL NO.: 13-042-0098
PROPOSED 10' P.U.E,
DRAINAGE, & TEMPORARY
CONSTRUCTION EASEMENTPROPOSED 10' P.U.E,
DRAINAGE, & TEMPORARY
CONSTRUCTION EASEMENT
PROPOSED 10' P.U.E,
DRAINAGE, & TEMPORARY
CONSTRUCTION EASEMENT
P.O.B.
5.2.a
Packet Pg. 64
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an
{https://afcity-my.sharepoint.com/personal/bhunter_americanfork_gov/Documents/Stuff to upload to network/Meadows at American Fork/lakeview_meadows_13-042-0097.docx}
9270 South 300 West, Suite A-2 ● Sandy, UT 84070 ● (801) 562-2521 ● Fax (801) 562-2551 ● www.pepg.net
April 27, 2021
Project: American Fork 200 South Parcel No: 13-042-0097 and 13-042-0098 (Lakeview Meadows LLC)
American Fork City Acquisition Area Acquisition Area-A Beginning at a point which is on the northeast corner of the grantors parcel as defined in Entry 36910:2017, said point being South 89°54’13” East, along the section line 800.93 feet and South 00°05’47” West, 1654.76 feet from the North Quarter Corner of Section 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian (Basis of Bearing is North 89°53’29” West between the Northwest Corner and North Quarter Corner of Said Section 22); and running thence South 01°00'02" West, 31.86 feet; thence North 50°50'13" West, 40.93 feet; thence North 89°13'53" West, 106.21 feet; thence North 80°42'02" West, 43.43 feet; thence South 89°13'48" East, 181.36 feet to the point of beginning. -Together with a 10 foot public utility easement, drainage easement, and temporary construction easement along the southerly borders of the above described parcel. Contains: 1,439 Sq. Ft. or 0.03 Acres more or less ALSO: Acquisition Area-B Beginning at a point which is on the easterly boundary of the grantors parcel as defined in Entry 36910:2017, said point being South 89°54’13” East, along the section line 794.44 feet and South 00°05’47” West, 2140.79 feet from the North Quarter Corner of Section 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian (Basis of Bearing is North 89°53’29” West between the Northwest Corner and North Quarter Corner of Said Section 22); and running thence along a curve turning to the left through 07°06'53", having a radius of 1176.25 feet, and whose long chord bears South 05°09'39" East, for a distance of 145.97 feet to the beginning of a curve; said curve turning to the right through an angle of 09°33'35", having a radius of 1195.93 feet, and whose long chord bears South 03°56'19" East, 199.31 feet; thence South 00°50'29" West, 66.90 feet; thence South 00°49'54" West, 224.91 feet; thence North 89°25'26" West, 13.39 feet; thence North 01°07'44" East, 331.74 feet to the beginning of a curve, said curve turning to the left through an angle of 06°06'18", having a radius of 1061.51 feet, and whose long chord bears North 01°55'59" West, for a distance of 113.05 feet; thence, North 05°03'12" West, 83.88 feet to the beginning of a curve, said curve turning to the right through 05°28'35", having a radius of 1127.49 feet, and whose long chord bears North 02° 24' 12" West, for a distance of 107.72 feet to the point of beginning. -Together with a 10 foot public utility easement, drainage easement, and temporary construction easement along the westerly border of the above described parcel. Contains: 5,820 Sq. Ft. or 0.13 acres more or less
5.2.a
Packet Pg. 65
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
Default Title Page 2 of 2
ALSO: -Together with a 10 foot public utility easement, drainage easement, and temporary construction easement along the northerly and easterly borders of the existing Lakeview Meadows LLC parcel. (Parcel No.: 13-042-0097) ALSO: A Temporary Construction Easement as described below: Beginning at a point which is South 89°54’13” East, along the section line 789.76 feet and South 00°05’47” West, 1735.29 feet from the North Quarter Corner of Section 22, Township 5 South, Range 1 East, Salt Lake Base and Meridian (Basis of Bearing is North 89°53’29” West between the Northwest Corner and North Quarter Corner of Said Section 22); and running thence North 13°28’54” West, 40.40 feet; thence North 50°50’13” West, 24.24 feet; thence North 77°53’31” West, 50.86 feet; thence South 89°13’53” East, 53.35 feet; thence South 50°50’13” East, 32.56 feet; thence South 00°50’53” West, 43.99 feet to the point of beginning. Contains: 771 Sq. Ft. or 0.02 acres more or less
5.2.a
Packet Pg. 66
Att
ach
men
t: M
ead
ow
s at
AF
Ph
ase
2 -
Dev
elo
pm
ent
Ag
reem
ent
(A
gre
emen
t fo
r th
e M
ead
ow
s at
Am
eric
an F
ork
Ph
ase
2)
AGENDA ITEM Review and action on an ordinance adopting an amendment to Section
17.7.507.F.6 of the American Fork City Municipal Code regarding building primary orientation.
SUMMARY RECOMMENDATION The planning commission recommended approval of
the amendment to Section 17.7.507.F.6 of the American Fork City Municipal Code as stated in
the attached minutes of the April 21, 2021 planning commission meeting.
BACKGROUND This development code text amendment proposes additional options for
siting structures in the PC Planned Community zone by expanding options for a building’s
primary orientation from just a street to also include drive aisles, common area and open spaces.
For further analysis, please refer to the attached development code text amendment, application
materials, staff report and planning commission minutes.
BUDGET IMPACT No direct budgetary impact is anticipated as a result of this approval.
SUGGESTED MOTION I move to approve the ordinance adopting an amendment to Section
17.7.507.F.6 of the American Fork City Municipal Code regarding building primary orientation.
SUPPORTING DOCUMENTS
1. Ord (PDF)
2. Staff Report (PDF)
3. Minutes (PDF)
Department Planning
Director Approval Adam Olsen
REQUEST FOR COUNCIL ACTION
CITY OF AMERICAN FORK
MAY 11, 2021
5.3
Packet Pg. 67
ORDINANCE NO _________
AN ORDINANCE AMENDING SECTION 17.7.507.F.6 OF THE AMERICAN FORK CITY MUNICIPAL CODE RELATING TO THE PRIMARY ORIENTATION OF BUILDINGS.
BE IT ORDAINED BY THE CITY COUNCIL OF AMERICAN FORK CITY, UTAH, AS FOLLOWS:
PART I
TEXT OF ORDINANCE
17.7.507.F.6
b. Multiple unit residential, commercial, office, manufacturing and mixed use structures.
1. For portions of the project area intended for development of multiple unit residential, commercial, office, manufacturing and mixed use structures, the plan shall show the location, height, and intended use, number of residential units and square footage of commercial, office, manufacturing or other non-residential uses within each structure.
2. The plan shall show the areas intended for use as off-street parking and landscaping and any other major use or activity to be included as a part of the project.
3. Standards. A. Building primary orientation shall be toward the a public or private street,
drive aisle, common area or other public or private open space rather than the parking area.
B. At least sixty percent of the street frontage shall have buildings within ten feet of the property line. Parking is not permitted in this area.
C. Trash storage areas, mechanical equipment, and similar areas are not permitted to be visible from the street.
D. The principal entrance must be designed to be readily apparent. Buildings that are open to the public and are within thirty feet of the street shall have an entrance for pedestrians from the street to the building interior. This entrance shall be designed to be attractive and functional, be a distinctive and prominent element of the architectural design, and shall be open to the public during all business hours.
5.3.a
Packet Pg. 68
Att
ach
men
t: 1
. Ord
(C
od
e T
ext
Am
end
men
t B
uild
ing
Ori
enta
tio
n P
C Z
on
e)
PART II
PENALTY AND ADOPTION
SECTION 1 – Conflicting Provisions. Whenever the provisions of this Ordinance conflict with the provisions of any other ordinance, resolution or part thereof, the more stringent shall prevail.
SECTION 2 – Provisions Severable. This Ordinance and the various sections, clauses and paragraphs are hereby declared to be severable. If any part, sentence, clause or phrase is adjudged to be unconstitutional or invalid it is hereby declared that the remainder of the ordinance shall not be affected thereby.
SECTION 3 – Amendment to be Added to Development Code. The City Council hereby authorizes and directs that insert pages reflecting the provisions enacted hereby shall be made and placed in the Official copies of the American Fork Development Code in the office of the City Recorder.
SECTION 4 – Penalty. Hereafter these amendments shall be construed as part of the Development Code of American Fork City, Utah, to the same effect as if originally a part thereof, and all provisions of said Code shall be applicable thereto, including, but not limited to, the enforcement, violation and penalty provisions.
SECTION 5 – Effective Date. This Ordinance shall take effect upon its passage and publication as required by law.
PASSED AND ORDERED PUBLISHED BY THE CITY COUNCIL OF AMERICAN FORK CITY, UTAH, THIS 11TH DAY OF MAY 2021.
___________________
Mayor
ATTEST:
___________________
City Recorder
5.3.a
Packet Pg. 69
Att
ach
men
t: 1
. Ord
(C
od
e T
ext
Am
end
men
t B
uild
ing
Ori
enta
tio
n P
C Z
on
e)
Hearing, review and action on various amendments to Section 17.7.507.F.6 of the American Fork City Development Code.
The proposed City-initiated code text amendment deals with building primary orientation for multi-family structures within the PC (Planned Community) zone. Staff recommends that a building’s primary orientation, in addition to being “toward a street” be expanded to include drive aisle, common area or other public or private open space. This will allow buildings to orient toward open spaces (whether public or private), drive aisles as found in traditional multi-family developments or public/private streets. In so doing, this will allow greater flexibility in siting structures--as intended by the PC zone--and be similar to allowances given for building placement in the TOD (Transit Oriented Development) zone. Draft language is included. Potential Motions APPROVAL Mr. Chairman, I move that we recommend approval of the proposed amendments to the Development Code. DENIAL Mr. Chairman, I move that we recommend denial of the amendments to Development Code. TABLE Mr. Chairman, I move that we table action on the amendments to the Development Code.
5.3.b
Packet Pg. 70
Att
ach
men
t: 2
. Sta
ff R
epo
rt (
Co
de
Tex
t A
men
dm
ent
Bu
ildin
g O
rien
tati
on
PC
Zo
ne)
UNAPPROVED MINUTES
4 | P a g e Planning Commission Minutes – April 21, 2021
3. Hearing, review and action on amendments to Section 17.7.507.F.6 of the American Fork 1 City Municipal Code regarding building primary orientation 2
3 Mr. Olsen stated that the proposed City-initiated code text amendment deals with building 4 primary orientation for multi-family structures within the PC (Planned Community) zone. Staff 5 recommends that a building’s primary orientation, in addition to being “toward a street” be 6 expanded to include drive aisle, common area or other public or private open space. This will 7 allow buildings to orient toward open spaces (whether public or private), drive aisles as found in 8 traditional multi-family developments or public/private streets. In so doing, this will allow 9 greater flexibility in siting structures--as intended by the PC zone--and be similar to allowances 10 given for building placement in the TOD (Transit Oriented Development) zone. 11
Mr. Hunter has no engineering concerns or comments. 12
13
Public Hearing Opened 14
No comments were received. 15
Public Hearing Closed 16
17
Mr. Dupaix moved to recommend approval of the proposed amendments to the 18 Development Code. 19
Mr. Brocious seconded the motion. Voting was as follows: 20
Christine Anderson Aye 21 Chris Christiansen Aye 22
Rod Brocious Aye 23 Harold Dudley Aye 24 Geoff Dupaix Aye 25 The motion passed. 26 27 28
4. Hearing, review and action on an amendment to the Lake City Row Planned Community 29 Master Plan, located in the vicinity of 860 East Utah Valley Drive in the PC Planned 30 Community and the PI-1 Planned Industrial zones 31
32 Mr. Olsen reminded commissioners that this item was tabled at the April 7th Planning 33 Commission meeting. The Planning Commission requested additional information regarding the 34 shared parking areas, numbers of stalls included and any buffering proposals. Discussion 35 centered around shared parking, reduced housing units, and the appropriateness of office 36 warehouse uses in a mixed-use community setting. Staff remains opposed to the amended 37
5.3.c
Packet Pg. 71
Att
ach
men
t: 3
. Min
ute
s (
Co
de
Tex
t A
men
dm
ent
Bu
ildin
g O
rien
tati
on
PC
Zo
ne)
AGENDA ITEM Review and action on the final plat of Autumn Crest Phase 1 Plat E
Subdivision, located in the vicinity of 930 East 1040 North in the R-1-9,000 Residential zone.
SUMMARY RECOMMENDATION The planning commission recommended approval of
the Autumn Crest Phase 1 Plat E Subdivision as stated in the attached minutes of the April 21,
2021 planning commission meeting.
BACKGROUND The applicant proposes a final plat for a further phase of the Autumn Crest
subdivision; this ten-lot plat is located in the southwestern portion of the project and backs North
County Boulevard. For further analysis, please refer to the attached final plat, staff report and
planning commission minutes.
BUDGET IMPACT No direct budgetary impact is anticipated as part of this final plat
approval.
SUGGESTED MOTION I move to approve the final plat of Autumn Crest Phase 1 Plat E
Subdivision, located in the vicinity of 930 East 1040 North in the R-1-9,000 Residential zone
and to authorize the mayor and city council to sign the plat and accept the dedications with
instructions to the city recorder to withhold recording of the plat subject to:
• All conditions identified in the public record associated with the April 21, 2021 planning
commission meeting.
SUPPORTING DOCUMENTS
1. Plat (PDF)
2. Staff Report (PDF)
3. Minutes (PDF)
Department Planning
Director Approval Adam Olsen
REQUEST FOR COUNCIL ACTION
CITY OF AMERICAN FORK
MAY 11, 2021
5.5
Packet Pg. 72
':�564''6�.+)*6
�����'#56
�����0146*
�����0146*
������
*#.(419
':�564''6�.+)*6
':�564''6�.+)*6
27$.+%�
27$.+%�
17
1213 11
14
15
76#*
�56#
6'�&'2
6�#&
/+0�5'4
8+%'
5����
����
�
%142
��1(
�24'
5��$+5*1
2%*
74%*
�1(
,'57
5�%*
4+56
�1(�.&
5��
����
���
':�564''6�.+)*6
16
�����0
146*
������
5'9'4
'#5'/'06
�����0146*
������UH
�������27'
�6;2��
�����
27'
6;2��
�����
27'
6;2��
':�����419
������
*#.(
419
':�564''6�.+)*6
':�564''6�.+)*6
':�564''6�.+)*6
'#56��������
2�1�$�5���
������
��9����
����
59�%14
��5'
%���
6�5��4�'
��5.$
/9���
��%1
4��5'%
���
6�5��4�'
��5.$
/
5�����%14��5'%���6�5��4�'��5.$/(170&�/107/'06
%#.%
7.#6
'&(1
70&�/10
7/'0
6
#767/0�%4'56
2.#6��$�
#767/0�%4'56
(7674'�2*#5'5
5�����������'��������
5�����������'�
5�����������'��������
������
�����CE
������������
#767/0�%4'56
�2.#6��&�
�������4
19
&''&�4'564+%6+10
$170
%�
62
0146*�%1706;�$.8&�
������
5+&'9#.
-�'#5'/'
06
�27'
�����
�
������
5���������'��������
%�
������
�
5���������'��������
%�
%�
%�
%�
5�����
����9���
�����
������
�
%�
%��
%��
5�����
����9��
������
%��
5���������9��
������
������ %��
%��
%��
%��
5���������9�
�������
%��
%��
%��
%��
5�����
����9
������
0���������
'�������
������
0���������9
������
0���������9
�������
5���������
9
������
%�
5���������9
�����
��
����5&'#5'/'06
5�����
������9����
����
5�����������'��������0���
��������'�
������ �������
0������
�����'�
������
5�����������'�
&'.6#����������4����������&��������
0���������9��������
%�������
������
������ �����
�
������UH�����CE
60
������UH�����CE
61
�������UH�����CE
59
�������UH�����CE
58
�����������CE
57
�������UH�����CE
56 �������UH�����CE
55
������UH�����CE
54
������UH�����CE
53
5���������'
������
������
����'#56
%��
%��
������
%��
�����
564''6
.+)*6
0�
����'#56
����'#56
����'#
56
�����0146*
�����0146*
�����0146*
�����0146*
�����0146*
����'#56
����'#56
����'#
56
27$.+%�
5���
������
��9����
�����
$#5+5�1(�$'#4+0)�0#&���0�����������'����������$'69''0�%140'45
5'%6+10�.+0'
#767/0
�%4'56
�2.#6��#
�
34:611:0001
DOUGHERTY
34:611:0002FULLER
34:611:0003OSHIDA
34:611:0004COOK
34:611:0005DUNFORD
34:654:0045
34:654:0052CONSTRUCTION
PATTERSON
CONSTRUCTIONPATTERSON
14:004:0342CONSTRUCTION
PATTERSON
CURVE TABLE
������
%��
%��
SITE
SCALE 1"=50'
50 0 10050 150
#<6'%�'0)+0''4+0)����0�����9
14'/��76������
59�%140'4�1(�5'%���6����5���4����'���5.$/'.'8�����������
35,17�1$0(
7,7/( &203$1<
016'5��� 1((Ä5'6�2+05�61�$'�2.#%'&�+0�6*'�$#%-�1(�6*'�%74$�#0&
�����$;�����4'$#4�9+6*�07/$'4'&�5748';�%#2�61�$'2.#%'&�#6�#..�.165�4'#4�%140'45�24+14�61�1%%72#0%;�
�� $7+.&+0)�2'4/+65�9+..�016�$'�+557'&�(14�#0;�*1/'�706+.���#52*#.6�2#8+0)�+5�+056#..'&�#0&����(+4'�*;&4#065�#4'+056#..'&��#22418'&�$;�6*'�(+4'�/#45*#..��#0&�%*#4)'&9+6*�%7.+0#4;�9#6'4�
�� .19'56�(.114�5.#$�'.'8#6+10�/756�$'�#�/+0+/7/�1(��(''6�#$18'�9#6'4�.'8'.�/'#574'&�&74+0)�524+0)�5'#51014�5722146+8'�)'16'%*0+%#.�+0(14/#6+10�+0&+%#6+0)16*'49+5'�
BEGINNING AT A POINT THAT IS S 00°00'07" W 496.88 FEET ALONG THE SECTION LINE AND EAST 357.10FEET FROM THE WEST QUARTER CORNER OF SECTION 7, TOWNSHIP 5 SOUTH RANGE 2 EAST, SALTLAKE BASE AND MERIDIAN;
THENCE S 34°08'18" E 126.13 FEET; THENCE S 14°01'32" E 76.74 FEET; THENCE S 50°07'46" E 119.18 FEET;THENCE S 52°45'26" W 422.34 FEET TO A POINT ALONG THE EASTERLY RIGHT-OF-WAY LINE OF NORTHCOUNTY BLVD; THENCE ALONG SAID RIGHT OF WAY THE FOLLOWING COURSE: ALONG THE ARC OF A988.00 FOOT RADIUS CURVE TO THE RIGHTS A DISTANCE OF 498.95 FEET (CURVE HAVING A CENTRALANGLE OF 28°56'06” AND A LONG CHORD BEARS N17°35'23”W 493.66 FEET); THENCE S 89°10'55" E 112.57FEET; THENCE N 70°06'56" E 67.48 FEET; THENCE S 73°19'26" E 111.33 FEET; THENCE N 23°17'00" E 55.38FEET TO THE POINT OF BEGINNING.
CONTAINING: 3.29 ACRES OR 143,229 SF
# OF LOTS = 10
5.5.a
Packet Pg. 73
Att
ach
men
t: 1
. Pla
t (
Au
tum
n C
rest
1 E
Fin
al P
lat)
- 1 -
AMERICAN FORK CITY MEETING DATE: April 21, 2021 PLANNING COMMISSION STAFF PRESENTATION: Adam Olsen AGENDA TOPIC: Hearing, review and action on the preliminary and final plats for Autumn Crest Subdivision, Plat E, located at approximately 1040 North 930 East, in the R1-9,000 Residential zone. ACTION REQUESTED: Approval of the preliminary plan and recommendation of approval of the final plat.
BACKGROUND INFORMATION
Location: 1040 North 930 East
Applicant: Patterson Homes/Berg Engineering Existing Land Use: Vacant Proposed Land Use: Residential
Surrounding Land Use:
North Vacant South Residential East Residential West Institutional
Existing Zoning: R1-9,000 Proposed Zoning: N/A
Surrounding Zoning:
North R1-9,000 South R1-9,000 East R1-9,000 West S-1 (Special Institutional)
Land Use Plan Designation: Residential Low Density (3 du/ac)
Zoning within density range? x Yes No Background Autumn Crest Subdivision was preliminarily approved in 2012 and 2015 but not all plats received final approval. The area of Plat E is one such example. The preliminary plan has lapsed, and the applicants have returned with a new preliminary plan and final plat for Plat E. Access is provided off an existing stub-street, 1040 North. Plat E is an infill area of the Autumn Crest subdivision, consisting of 10 lots and located directly north of Plat A and west of Plat D. All lots meet or exceed the requirements of the R1-9,000 zone.
5.5.b
Packet Pg. 74
Att
ach
men
t: 2
. Sta
ff R
epo
rt (
Au
tum
n C
rest
1 E
Fin
al P
lat)
- 2 -
Section 17.8.211 of the Development Code The Planning Commission may act to recommend approval of a final plat upon a finding that:
a. The final plat conforms with the terms of the preliminary plan approval.
The preliminary plan and final plat are being processed concurrently.
b. The final plat complies with all City requirements and standards relating to Subdivisions. This criterion has been met.
c. The detailed engineering plans and materials comply with the City standards and policies.
Engineering will address any concerns at the time of the Planning Commission Meeting.
d. The estimates of cost of constructing the required improvements are realistic.
Required improvements for this plat have been constructed.
e. The water rights conveyance documents have been provided. Water rights conveyance shall be satisfied prior to plat recordation.
FINDINGS OF FACT: After reviewing the amended plat for Autumn Crest Plat E, the following findings of fact are offered for consideration:
1. The final plat is consistent with the Land Use Plan.
2. The final plat meets Section 17.8.101 (Intent) of Chapter 17.8 (Subdivisions).
3. The final plat meets the criteria as found in Section 17.8.211 of the Development Code.
POTENTIAL MOTIONS APPROVAL PRELIMINARY PLAN
5.5.b
Packet Pg. 75
Att
ach
men
t: 2
. Sta
ff R
epo
rt (
Au
tum
n C
rest
1 E
Fin
al P
lat)
- 3 -
Mr. Chairman, I move that we approve the preliminary plan of Autumn Crest, Plat E, subject to any findings, conditions and modifications found in the engineering report. FINAL PLAT Mr. Chairman, I move that we recommend approval of the final plat of Autumn Crest, Plat E, with the findings listed in the staff report, and subject to any findings, conditions and modifications found in the engineering report. DENIAL PRELIMINARY PLAN Mr. Chairman, I move that we deny the preliminary plan of Autumn Crest, Plat E. FINAL PLAT If the preliminary plan is denied, there can be no recommendation on the final plat. TABLE PRELIMINARY PLAN Mr. Chairman, I move that we table action on the preliminary plan of Autumn Crest, Plat E. FINAL PLAT Mr. Chairman, I move that we table action on the final plat of Autumn Crest, Plat E.
5.5.b
Packet Pg. 76
Att
ach
men
t: 2
. Sta
ff R
epo
rt (
Au
tum
n C
rest
1 E
Fin
al P
lat)
Page 1 of 2
AMERICAN FORK CITY ENGINEERING DIVISION STAFF REPORT
Planning Commission Meeting Date: 4/21/2021
This report is a summary of the American Fork City Engineering Division plan review comments regarding the subject plan as submitted by the applicant for American Fork City Land Use Authority approval:
Project Name: Autumn Crest Plat E
Project Address: 930 East 1040 North
Developer / Applicant’s Name: Patterson Homes
Type of Application: ☒ Subdivision Final Plat ☒ Subdivision Preliminary Plan ☐ Annexation
☐ Code Text Amendment ☐ General Plan Amendment ☐ Zone Change
☐ Commercial Site Plan ☐ Residential Accessory Structure Site Plan Engineering Division Recommendation: The Engineering Division recommends APPROVAL of the proposed development subject to the following findings and conditions: 1. All Standard Conditions of Approval and items denoted as “Plan Modification(s) Required” in the
4/21/2021 Engineering Division Staff Report for the City Land Use Authority shall be addressed on all final project documents.
2. Right-of-way dedication for North County Boulevard and 1100 North is to be completed prior to recording the mylar and commencing construction.
3. Any redline comments from 3rd party reviews of the plat will need to be addressed once received. Project Map:
5.5.b
Packet Pg. 77
Att
ach
men
t: 2
. Sta
ff R
epo
rt (
Au
tum
n C
rest
1 E
Fin
al P
lat)
Page 2 of 2
STANDARD CONDITIONS OF APPROVAL Standard Conditions of Approval:
APPLICANT is responsible and shall submit/post/obtain all necessary documentation and evidence to comply with these Standard Conditions of Approval prior to any platting, permitting, or any other form of authorization by the City including plat recording or other property conveyance to the City and prior to scheduling a pre-construction meeting. All recording shall take place at the Utah County Recorder’s Office.
1. Title Report: Submit an updated Title Report not older than 30 days or other type of appropriate verification that shows all dedications to the City are free and clear of encumbrances, taxes, or other assessments.
2. Property Taxes and Liens: Submit evidence that all the property taxes, for the current and/or previous years, liens, and agricultural land use roll over fees have been paid in full.
3. Water Rights: Submit evidence that all the required water rights have been conveyed to American Fork City.
4. Performance Guarantee: Post a performance guarantee for all required public and essential common improvements.
5. Easements and Agreements: Submit/record a long-term Storm Water Pollution Prevention Maintenance Agreement signed and dated by the property owner and any required easement documentation.
6. Land Disturbance Permit: Obtain a Land Disturbance Permit. 7. Compliance with the Engineering Division Plan Review Comments: All plans and documents
shall comply with all the Technical Review Committee comments and the City Engineer’s final review.
8. Sensitive Lands: Record all applicable documents required for compliance with the City’s Sensitive Lands Ordinance.
9. Utility Notification Form: Submit a Subdivision Utility Notification Form. 10. Professional Verification: Submit final stamped construction documentation by all appropriate
professionals. 11. Fees: Payment of all development, inspection, recording, street light, and other project related fees. 12. Mylar: Submit a Mylar. All plats will receive final verification of all formats, notes, conveyances,
and other items contained on the plat by City staff (recorder, legal, engineer, GIS, planning).
Plan Modifications Required:
5.5.b
Packet Pg. 78
Att
ach
men
t: 2
. Sta
ff R
epo
rt (
Au
tum
n C
rest
1 E
Fin
al P
lat)
UNAPPROVED MINUTES
1 | P a g e Planning Commission Minutes – April 21, 2021
1 AMERICAN FORK CITY 2
PLANNING COMMISSION MINUTES 3 APRIL 21, 2021 4
5 The American Fork City Planning Commission met in a regular session on April 21, 2021 in an 6 electronic meeting on the Zoom platform, viewable on the City’s YouTube link, commencing at 7 7:00 p.m. 8 9 Present: Vice-Chairwoman Christine Anderson 10 Chris Christiansen 11 Geoff Dupaix 12 Rod Brocious 13 14 15 Absent: Chairman John Woffinden 16 Ryan Hunter 17 Harold Dudley – present for part of meeting 18 19 Staff Present: Adam Olsen, City Planner 20 Wendelin Knobloch, Planner 21 Ben Hunter, Engineer 22 Lisa Halversen, Administrative Assistant 23 24 Others Present: Ken Berg, Ginger Romriell, Buck Swaney 25 26 Public Comments Received: None 27 28 Vice-Chairwoman Anderson referred to the “Notice of Electronic Meeting.” 29 30 1. Hearing, review and action on the preliminary and final plats of Autumn Crest Phase 1 Plat E 31
Subdivision, located in the vicinity of 930 East 1040 North 32 33
Mr. Olsen stated that Autumn Crest Subdivision was preliminarily approved in 2012 and 2015 but 34 not all plats received final approval. The area of Plat E is one such example. The preliminary plan 35 has lapsed, and the applicants have returned with a new preliminary plan and final plat for Plat E. 36
Access is provided off an existing stub-street, 1040 North. Plat E is an infill area of the Autumn 37 Crest subdivision, consisting of 10 lots and located directly north of Plat A and west of Plat D. All 38 lots meet or exceed the requirements of the R1-9,000 zone. 39
Mr. Hunter said that the engineering division has reviewed the plans and they meet the 40 requirements. Some roadway dedications to UDOT are being worked on, they recommend 41 approval. 42
5.5.c
Packet Pg. 79
Att
ach
men
t: 3
. Min
ute
s (
Au
tum
n C
rest
1 E
Fin
al P
lat)
UNAPPROVED MINUTES
2 | P a g e Planning Commission Minutes – April 21, 2021
Mr. Ken Berg, civil engineer, indicated that Autumn Crest Plat F will be coming soon. 1
Public Hearing Opened 2
No comments were received. 3
Public Hearing Closed 4
5 Mr. Brocious moved to approve the preliminary plan of Autumn Crest Plat E, subject to any 6 findings, conditions, and modifications found in the engineering report. 7 8 Mr. Dupaix seconded the motion. Voting was as follows: 9 10
Christine Anderson Aye 11 Chris Christiansen Aye 12
Rod Brocious Aye 13 Geoff Dupaix Aye 14 The motion passed. 15 16 17
Mr. Brocious moved to approve the final plat of Autumn Crest, Plat E, with the findings 18 listed in the staff report, and subject to any findings, conditions and modifications found in 19 the engineering report. 20 21 Mr. Dupaix seconded the motion. Voting was as follows: 22 23
Christine Anderson Aye 24 Chris Christiansen Aye 25
Rod Brocious Aye 26 Geoff Dupaix Aye 27 The motion passed. 28 29 30
31
2. Review and action on the North Binch Annexation agreement located in the vicinity of 800 32 West 500 South 33 34
Mr. Olsen told commissioners that the North Binch Annexation consists of 26.02 acres and is 35 located in the area of 800 West 500 South, south of the Willow Glen townhome development. 36 Existing use of the area is agriculture. The City’s Land Use Map designates the property as TOD 37 (Transit Oriented Development). Within that TOD designation, the property lies within the 38 General Mixed-Use and Neighborhood Edge sub-designations, with density ranges of 8-20 du/ac 39
5.5.c
Packet Pg. 80
Att
ach
men
t: 3
. Min
ute
s (
Au
tum
n C
rest
1 E
Fin
al P
lat)
AGENDA ITEM Review and action on approval of the city's fiscal year ending June 30,
2022, tentative budget.
SUMMARY RECOMMENDATION
The City Administrator and Finance Director would recommend approval of the tentative
budget.
BACKGROUND
American Fork City is required by Utah State Code to adopt a tentative budget at the first City
Council meeting in May. This is a tentative budget and subject to change. Approval of the
tentative budget permits the city to set the public hearing for the fiscal year 2022 final budget to
be approved on June 22, 2021.
BUDGET IMPACT
Budget impacts are detailed in the Fiscal Year 2021-22 Tentative Budget, available on the City's
website www.afcity.org/finance <http://www.afcity.org/finance>
SUGGESTED MOTION
I move to approve the tentative budget for fiscal year ending June 30, 2022, and to set a public
hearing for the final budget for the fiscal year ending June 30, 2022. The hearing shall be set for
Tuesday, June 22, 2021 at 7:00PM.
SUPPORTING DOCUMENTS
FY2022 Tentative Annual Budget (PDF)
Department Recorder
Director Approval Terilyn Lurker
REQUEST FOR COUNCIL ACTION
CITY OF AMERICAN FORK
MAY 11, 2021
5.6
Packet Pg. 81
2022 ProposedBudget
American Fork City, Utah
5.6.a
Packet Pg. 82
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
5.6.a
Packet Pg. 83
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022
Introduction
Table of Contents
INTRODUCTION Elected/Appointed Officials .......................................................................................................... pending
City-Wide Organizational Chart .................................................................................................... pending
Budget Message ............................................................................................................................. pending
Strategic Goals ............................................................................................................................... pending
Community Profile ........................................................................................................................ pending
BUDGET AND FINANCIAL OVERVIEW Budget Process and Timeline ........................................................................................................ pending
Fund Types and Financial Structure .............................................................................................. pending
Revenue Overview ......................................................................................................................... pending
Financial Policies ........................................................................................................................... pending
Debt Overview ............................................................................................................................... pending
BUDGET SUMMARIES Fund Balances ........................................................................................................................................... 2
Combined Revenue Summary – All Funds .............................................................................................. 4
Combined Expenditure Summary – All Funds ......................................................................................... 6
Full-Time Equivalent Summary ............................................................................................................... 8
GENERAL FUND General Fund Summary .......................................................................................................................... 10
General Fund Revenue Detail ................................................................................................................. 11
General Fund Expenditure Summary ..................................................................................................... 14
Department Budgets
Executive .......................................................................................................................................... 16
Legislative ......................................................................................................................................... 17
Legal ................................................................................................................................................. 18
Administration .................................................................................................................................. 19
Community Services Administration ............................................................................................... 20
Parks and Boat Harbor ...................................................................................................................... 21
Cemetery ........................................................................................................................................... 23
Library .............................................................................................................................................. 24
Police ................................................................................................................................................ 25
Fire and Rescue ................................................................................................................................. 27
Public Works Administration ........................................................................................................... 29
Streets ............................................................................................................................................... 30
Building Maintenance ....................................................................................................................... 31
Building Inspection ........................................................................................................................... 32
Engineering ....................................................................................................................................... 33
Recreation ......................................................................................................................................... 34
Planning ............................................................................................................................................ 35
Citizen Committees .......................................................................................................................... 36
5.6.a
Packet Pg. 84
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022
Introduction
Table of Contents
SPECIAL REVENUE FUNDS Municipal Building Authority Fund ....................................................................................................... 40
Fitness Center Fund ................................................................................................................................ 41
PARC Tax Fund ..................................................................................................................................... 43
Celebration Fund .................................................................................................................................... 44
Downtown Redevelopment Fund ........................................................................................................... 45
East Side Redevelopment Fund .............................................................................................................. 46
Business Park Redevelopment Fund ...................................................................................................... 47
Egg Farm Economic Development Fund ............................................................................................... 48
Patriot Station Community Reinvestment Area ..................................................................................... 49
DEBT SERVICE FUND Debt Service Fund .................................................................................................................................. 52
CAPITAL PROJECTS FUNDS General Capital Projects ......................................................................................................................... 54
Bond Capital Projects ............................................................................................................................. 57
Capital Equipment .................................................................................................................................. 58
Park Impact Fee Fund ............................................................................................................................. 60
Road Impact Fee Fund ............................................................................................................................ 61
Fire Impact Fee Fund .............................................................................................................................. 62
Police Impact Fee Fund .......................................................................................................................... 63
PERMANENT FUND Perpetual Care Fund ............................................................................................................................... 66
PROPRIETARY FUNDS Culinary Water and Secondary Irrigation Funds .................................................................................... 68
Sewer and Storm Drain Funds ................................................................................................................ 75
Sanitation and Recycling Fund ............................................................................................................... 81
Broadband Fund ...................................................................................................................................... 82
Fleet Operations and Maintenance Fund ................................................................................................ 84
Fleet Capital Fund ................................................................................................................................... 85
Information Technology Fund ................................................................................................................ 87
CAPITAL INVESTMENTS Capital Projects Overview ............................................................................................................. pending
Capital Projects—5 Year Plan ................................................................................................................ 90
Capital Equipment—5 Year Plan ........................................................................................................... 97
APPENDIX Glossary ......................................................................................................................................... pending
5.6.a
Packet Pg. 85
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Budget Summaries
1
5.6.a
Packet Pg. 86
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22B
udge
t Sum
mar
ies
GO
VE
RN
ME
NT
AL
FU
ND
SA
vaila
ble
Est
imat
edE
stim
ated
Prop
osed
Net
Incr
ease
Est
imat
edFu
nd B
alan
ceFu
nd B
alan
ceR
even
ues
Exp
endi
ture
sT
rans
fers
(Dec
reas
e)Fu
nd B
alan
ceFu
nd20
19-2
020
20-2
120
21-2
220
21-2
220
21-2
220
21-2
220
21-2
2G
ener
al F
und
6,24
5,16
9$
10,1
34,6
08$
27
,282
,527
$
25,7
20,6
31$
(1
,561
,896
)$
-
$
10,1
34,6
08$
Sp
ecia
l Rev
enue
Fun
dsM
unic
ipal
Bui
ldin
g A
utho
rity
891
891
-
-
-
-
891
Fitn
ess C
ente
r-
-
1,
774,
500
2,
423,
006
64
8,50
6
-
-
PA
RC
Tax
333,
995
320,
156
1,30
4,50
0
1,30
4,50
0
-
-
320,
156
Cel
ebra
tion
2,42
3
-
-
-
-
-
-
Dow
ntow
n R
edev
elop
men
t10
3,75
7
96
,176
1,
000
-
-
1,
000
97
,176
R
DA
- Ea
st S
ide
51,0
88
94,0
78
44,8
44
-
-
44,8
44
138,
922
RD
A -
Bus
ines
s Par
k2,
077,
311
2,
394,
489
35
4,74
1
35
4,74
1
-
-
2,
394,
489
ED
A -
Egg
Farm
2,93
2,89
9
1,49
8,93
1
1,05
8,71
4
1,65
6,41
5
(256
,793
)
(854
,494
)
644,
437
CR
A -
Patri
ot S
tatio
n TO
D(1
68,6
99)
(1
68,6
99)
-
-
-
-
(1
68,6
99)
T
otal
Spe
cial
Rev
enue
Fun
ds35
1,38
2
4,
236,
022
4,
538,
299
5,
738,
662
39
1,71
3
(8
08,6
50)
3,
427,
372
D
ebt S
ervi
ce F
und
1,29
2,79
3
1,29
5,14
0
951,
513
1,05
3,50
4
118,
616
16,6
25
1,31
1,76
5
Cap
ital P
roje
cts F
unds
Gen
eral
Cap
ital P
roje
cts
8,51
0,12
0
7,27
8,96
0
4,82
9,35
4
5,78
3,90
4
954,
550
-
7,
278,
960
B
ond
Cap
ital P
roje
cts
8,59
8,97
9
8,52
2,68
1
15,0
00
8,53
7,68
1
-
(8
,522
,681
)
-
Cap
ital P
roje
cts -
Equ
ipm
ent
16,4
48
16,4
48
5,00
0
356,
360
351,
360
-
16
,448
M
eado
ws S
peci
al Im
prov
emen
t Dist
rict
66,6
19
66,6
19
-
-
-
-
66,6
19
Park
Impa
ct F
ees
5,49
7,96
4
7,49
8,27
6
2,32
2,00
0
4,16
7,33
0
(118
,616
)
(1,9
63,9
46)
5,53
4,33
0
Roa
d Im
pact
Fee
s7,
189,
829
7,
502,
913
2,
035,
000
3,
211,
634
-
(1,1
76,6
34)
6,32
6,27
9
Fire
Impa
ct F
ees
1,48
5,08
3
1,31
6,24
7
257,
500
10,0
00
(533
,324
)
(285
,824
)
1,03
0,42
3
Polic
e Im
pact
Fee
s1,
650,
304
1,
588,
992
22
8,00
0
21
1,00
0
(2
62,6
37)
(2
45,6
37)
1,
343,
355
T
otal
Cap
ital P
roje
ct F
unds
33,0
15,3
46
33
,791
,136
9,69
1,85
4
22,2
77,9
09
39
1,33
3
(1
2,19
4,72
2)
21
,596
,414
Perm
anen
t Fun
dPe
rpet
ual C
are
Fund
831,
058
872,
908
60,5
00
-
(2
,000
)
58,5
00
931,
408
Tot
al P
erm
anen
t Fun
d83
1,05
8
87
2,90
8
60,5
00
-
(2,0
00)
58,5
00
93
1,40
8
TO
TA
L G
OV
ER
NM
EN
TA
L F
UN
DS
41,7
35,7
48$
50
,329
,814
$
42,5
24,6
93$
54
,790
,706
$
(662
,234
)$
(12,
928,
247)
$
37,4
01,5
67$
Fund
Bal
ance
s
2
5.6.a
Packet Pg. 87
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22B
udge
t Sum
mar
ies
Fund
Bal
ance
sE
NT
ER
PRIS
E F
UN
DS
Ava
ilabl
eE
stim
ated
Est
imat
edPr
opos
edN
etIn
crea
seE
stim
ated
Fund
Bal
ance
Fund
Bal
ance
Rev
enue
sE
xpen
ditu
res
Tra
nsfe
rs(D
ecre
ase)
Fund
Bal
ance
Fund
2019
-20
2020
-21
2021
-22
2021
-22
2021
-22
2021
-22
2021
-22
Ent
erpr
ise
Fund
sC
ulin
ary
Wat
er15
,448
,139
$
17,1
75,5
64$
13
,100
,225
$
15,2
21,6
61$
20
4,96
5$
(1
,916
,471
)$
15
,259
,093
$
Cul
inar
y W
ater
Impa
ct F
ees
1,91
4,77
3
2,65
4,79
2
1,31
5,00
0
6,21
5,76
7
-
(4
,900
,767
)
(2
,245
,975
)
Se
cond
ary
Irrig
atio
n10
,935
,269
8,86
3,58
7
4,46
9,50
0
11,4
49,1
23
-
(6,9
79,6
23)
1,88
3,96
4
Seco
ndar
y Irr
igat
ion
Impa
ct F
ees
(14,
690,
936)
(14,
800,
071)
830,
000
2,51
4,05
6
-
(1
,684
,056
)
(1
6,48
4,12
7)
Se
wer
8,18
8,83
0
9,90
8,71
7
5,79
5,25
0
5,63
2,84
6
-
16
2,40
4
10
,071
,121
Sew
er Im
pact
Fee
s1,
659,
713
1,
025,
401
42
1,77
4
32
8,96
3
-
92,8
11
1,11
8,21
2
Stor
m D
rain
2,82
1,92
5
2,69
4,56
8
1,35
9,50
0
1,77
9,83
2
-
(4
20,3
32)
2,
274,
236
St
orm
Dra
in Im
pact
Fee
s1,
815,
003
1,
603,
035
42
5,21
8
52
5,78
0
-
(100
,562
)
1,50
2,47
3
Sani
tatio
n an
d R
ecyc
ling
362,
322
383,
857
1,56
3,25
0
1,66
4,88
5
-
(1
01,6
35)
28
2,22
2
B
road
band
(2,1
01,8
43)
(2,0
22,5
52)
181,
417
406,
041
244,
946
20,3
22
(2,0
02,2
30)
Tot
al E
nter
pris
e Fu
nds
26,3
53,1
95
27
,486
,898
29,4
61,1
34
45
,738
,954
449,
911
(15,
827,
909)
11,6
58,9
89
In
tern
al S
ervi
ce F
unds
Flee
t Ope
ratio
ns &
Mai
nten
ance
162,
698
162,
698
387,
902
500,
600
-
(1
12,6
98)
50
,000
Fl
eet C
apita
l68
,921
31
0,92
1
1,
435,
588
1,
794,
911
21
2,32
3
(1
47,0
00)
16
3,92
1
In
form
atio
n Te
chno
logy
132,
809
132,
809
531,
669
601,
669
-
(7
0,00
0)
62
,809
T
otal
Inte
rnal
Ser
vice
Fun
ds36
4,42
8
60
6,42
8
2,35
5,15
9
2,
897,
180
21
2,32
3
(329
,698
)
276,
730
T
OT
AL
EN
TE
RPR
ISE
FU
ND
S26
,717
,623
$
28,0
93,3
26$
31
,816
,293
$
48,6
36,1
34$
66
2,23
4$
(1
6,15
7,60
7)$
11
,935
,719
$
TO
TA
L C
ITY
-WID
E68
,453
,371
$
78,4
23,1
40$
74
,340
,986
$
103,
426,
840
$
-$
(2
9,08
5,85
4)$
49
,337
,286
$
3
5.6.a
Packet Pg. 88
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Budget Summaries
BY FUNDActual Estimated Approved Proposed
Fund 2019-20 2010-21 2020-21 2021-22REVENUES (Excludes Transfers)General Fund 27,393,269$ 28,758,790$ 24,163,553$ 27,282,527$ Special Revenue Funds
Fitness Center 1,519,747 1,518,585 1,499,599 1,774,500 PARC Tax 1,204,050 1,417,059 828,000 1,304,500 Celebration 3,800 - - - Downtown Redevelopment 2,451 619 3,000 1,000 RDA - East Side 50,948 42,990 6,063 44,844 RDA - Business Park 379,313 317,178 332,735 354,741 EDA - Egg Farm 943,595 1,004,120 970,017 1,058,714 Total Special Revenue Funds 4,103,904 4,300,551 3,639,414 4,538,299
Debt Service Fund 1,148,002 1,113,990 1,128,268 951,513 Capital Projects Funds
General Capital Projects 3,263,060 3,109,868 8,428,070 4,829,354 Bond Capital Projects 8,694,858 28,995 15,000 15,000 Capital Projects - Equipment 24 18,629 5,000 5,000 Park Impact Fees 2,581,107 2,633,765 1,564,000 2,322,000 Road Impact Fees 2,821,681 2,545,013 1,520,000 2,035,000 Fire Impact Fees 473,733 338,383 230,000 257,500 Police Impact Fees 336,736 228,760 216,000 228,000 Total Capital Project Funds 18,171,199 8,903,413 11,978,070 9,691,854
Permanent FundPerpetual Care Fund 54,431 44,008 67,500 60,500 Total Permanent Fund 54,431 44,008 67,500 60,500
Enterprise FundsCulinary Water 8,239,100 21,203,554 29,295,848 13,100,225 Culinary Water Impact Fees 1,345,516 1,441,353 715,000 1,315,000 Secondary Irrigation 3,315,590 2,942,270 4,327,563 4,469,500 Secondary Irrigation Impact Fees 840,887 688,322 630,000 830,000 Sewer 6,338,720 6,008,619 5,832,328 5,795,250 Sewer Impact Fees 470,436 485,196 301,774 421,774 Storm Drain 1,761,637 1,486,841 1,295,220 1,359,500 Storm Drain Impact Fees 545,532 381,849 305,218 425,218 Sanitation and Recycling 1,496,757 1,572,578 1,465,745 1,563,250 Broadband 183,034 172,963 192,640 181,417 Total Enterprise Funds 24,537,209 36,383,545 44,361,336 29,461,134
Internal Service FundsFleet Operations & Maintenance 509,872 473,042 487,842 387,902 Fleet Capital 915,259 915,329 891,763 1,435,588 Information Technology 518,841 900,809 913,388 531,669 Total Internal Service Funds 1,943,972 2,289,180 2,292,993 2,355,159 TOTAL REVENUES 77,351,986$ 81,793,477$ 87,631,134$ 74,340,986$
Combined Revenue Summary - All Funds
4
5.6.a
Packet Pg. 89
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Budget Summaries
Combined Revenue Summary - All FundsBY TYPE
Actual Estimated Approved ProposedCategory Type 2019-20 2010-21 2020-21 2021-22REVENUES (Excludes Transfers)
Property Taxes 6,623,183$ 7,039,370$ 6,333,714$ 6,947,376$ Sales Taxes 12,441,885 13,323,161 9,669,350 13,150,000 Other Taxes 2,542,131 2,563,554 2,508,000 2,575,000 Licenses & Permits 1,367,011 1,437,298 950,600 1,386,572 Intergovernmental 3,450,643 2,783,027 10,100,655 5,732,159 Charges for Services 24,968,217 27,208,491 24,997,232 26,402,230 Impact Fees 9,062,826 8,628,485 5,096,000 7,100,000 Fines & Forfeitures 353,424 298,681 320,000 315,000 Miscellaneous #REF! #REF! #REF! #REF!Note Receivable 19,614 - - - Financing Sources 8,665,261 15,000,000 23,721,767 7,300,000 Developer Contributions 3,816,725 - - - Administrative Charges 2,018,084 2,353,770 2,377,833 2,146,576 Use of Money & Property 1,643,068 1,026,323 1,440,883 1,178,348 TOTAL REVENUES #REF! #REF! #REF! #REF!
5
5.6.a
Packet Pg. 90
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Budget Summaries
Actual Estimated Approved ProposedFund 2019-20 2010-21 2020-21 2021-22EXPENDITURES (Excludes Transfers)General Fund 22,158,565$ 21,974,929$ 23,626,722$ 25,720,631$ Special Revenue Funds
Municipal Building Authority 10 - - - Fitness Center 2,313,676 2,389,885 2,197,914 2,423,006 PARC Tax 965,840 1,430,898 837,725 1,304,500 Celebration 54,748 26,759 20,000 - Downtown Redevelopment 32,800 8,200 - - RDA - Business Park - - 332,735 354,741 EDA - Egg Farm 537,746 764,365 1,874,603 1,656,415 CRA - Patriot Station TOD 23,000 - - - Total Special Revenue Funds 3,927,820 4,620,107 5,262,977 5,738,662
Debt Service Fund 1,256,933 1,231,507 1,232,007 1,053,504 Capital Projects Funds
General Capital Projects 1,398,562 5,466,621 11,606,391 5,783,904 Bond Capital Projects 2,675,879 105,293 8,400,000 8,537,681 Capital Projects - Equipment 377,898 271,323 301,648 356,360 Park Impact Fees 1,793,958 513,589 594,000 4,167,330 Road Impact Fees 751,339 2,231,929 2,220,732 3,211,634 Fire Impact Fees 3,455 4,824 - 10,000 Police Impact Fees 9,811 - - 211,000 Total Capital Project Funds 7,010,902 8,593,579 23,122,771 22,277,909
Enterprise FundsCulinary Water 3,161,171 21,104,198 30,025,230 15,221,661 Culinary Water Impact Fees 426,472 701,334 1,144,000 6,215,767 Secondary Irrigation 3,262,726 5,013,952 8,095,301 11,449,123 Secondary Irrigation Impact Fees 139,302 797,457 2,200,000 2,514,056 Sewer 4,384,115 4,288,732 5,597,482 5,632,846 Sewer Impact Fees 54,190 1,119,508 330,704 328,963 Storm Drain 973,306 1,614,198 2,495,340 1,779,832 Storm Drain Impact Fees 69,493 593,817 123,100 525,780 Sanitation and Recycling 1,461,562 1,551,043 1,496,686 1,664,885 Broadband 553,481 390,048 509,016 406,041 Total Enterprise Funds 14,485,818 37,174,287 52,016,859 45,738,954
Internal Service FundsFleet Operations & Maintenance 452,746 473,042 487,842 500,600 Fleet Capital 942,079 1,410,651 1,387,585 1,794,911 Information Technology 386,032 900,809 956,706 601,669 Total Internal Service Funds 1,780,857 2,784,502 2,832,133 2,897,180 TOTAL EXPENDITURES 50,620,895$ 76,378,911$ 108,093,469$ 103,426,840$
Combined Expenditure Summary - All Funds
6
5.6.a
Packet Pg. 91
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Budget Summaries
Combined Expenditure Summary - All FundsBY TYPE
Actual Estimated Approved Adopted Category Type 2018-19 2019-20 2019-20 2020-21EXPENDITURES (Excludes Transfers)
Personnel 17,808,554$ 18,685,983$ 20,018,821$ 21,657,441$ Operations 21,369,718 20,410,549 18,653,794 22,374,853 Capital 8,792,718 32,264,511 63,516,075 53,852,535 Debt Service 2,649,905 5,017,868 5,904,779 5,542,011 TOTAL EXPENDITURES 50,620,895$ 76,378,911$ 108,093,469$ 103,426,840$
7
5.6.a
Packet Pg. 92
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Budget Summaries
DEPARTMENT STAFFING FTE FTE Adopted Increase
Full-time Equivalent Positions 2018-19 2019-20 2020-21 (Decrease)GENERAL FUND
Executive 0.50 0.50 0.50 - Legislative 2.50 2.50 2.50 - Adminstration 11.00 10.50 11.00 0.50 Community Services 2.50 2.50 3.00 0.50 Parks and Boat Harbor 16.17 12.48 14.16 1.68 Cemetery 6.31 5.88 5.68 (0.20) Library and Learning Center 13.74 13.33 13.65 0.33 Police 55.22 58.22 62.22 4.00 Fire and Rescue 48.02 52.02 57.02 5.00 Public Works Administration 2.75 2.75 2.75 - Streets 7.00 7.00 6.83 (0.17) Building Maintenance 4.00 4.00 4.00 - Building Inspection 7.50 7.50 8.00 0.50 Engineering 6.00 7.00 10.00 3.00 Recreation 8.39 8.39 7.92 (0.47) Planning 2.50 2.50 2.63 0.13 Senior Center 4.75 4.75 4.75 - Total General Fund 198.85 201.82 216.61 14.80
SPECIAL REVENUE FUNDSFitness Center 48.99 35.55 39.35 3.80
ENTERPRISE FUNDSCulinary Water 5.25 4.75 6.15 1.40 Secondary Irrigation 3.25 3.75 2.35 (1.40) Sewer 2.75 3.00 3.00 - Storm Drain 2.75 2.50 2.50 - Broadband 2.00 2.00 2.00 - Total Enterprise Funds 16.00 16.00 16.00 (0.00) TOTAL FTE POSITIONS 263.84 253.37 271.96 18.60
STAFFING NOTES1)2) Community Services - Addition of a part-time communications specialist3)4) Police - Addition of 3 police officers/detectives7) Fire and Rescue - addition of five firefigher/paramedics 8) Engineering - Addition of two public works inspectors and one engineer9) Fitness Center - Part-time seasonal positions increased from COVID-19 service levels9)
Full-time Equivalent Summary
Administration - Addition of a part-time management analyst
Parks / Boat Harbor - Part-time seasonal positions increased from COVID-19 service levels
Culinary Water and Secondary Irrigation - positions were reallocated to reflect winter closures of secondary irrigation
8
5.6.a
Packet Pg. 93
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
General Fund
9
5.6.a
Packet Pg. 94
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESTaxes 16,536,603$ 17,489,696$ 14,300,100$ 17,535,000$ Licenses & Permits 1,367,011 1,437,298 950,600 1,386,572 Grants & Intergovernmental 1,609,518 1,249,485 1,270,760 133,000 Charges for Services 6,610,823 7,629,479 6,693,318 7,252,480 Fines & Forfeitures 353,424 298,681 320,000 315,000 Miscellaneous 345,904 77,959 65,000 65,000 Other Financing Sources 569,986 576,192 563,775 595,475 Transfers In 297,566 44,561 2,051,403 53,828 TOTAL REVENUES 27,690,835$ 28,803,351$ 26,214,956$ 27,336,355$
EXPENDITURESGeneral Services 2,155,128$ 2,438,028$ 1,982,462$ 2,222,468$ Community Services 2,759,082 2,726,408 3,021,754 3,009,451 Public Safety 11,424,306 11,385,698 12,653,003 13,847,687 Public Works 4,748,533 4,373,651 4,839,819 5,507,753 Recreation 647,930 631,981 677,529 703,954 Planning 311,056 321,210 333,176 342,035 Citizens Committees 112,530 97,953 118,979 87,283 Transfers Out 2,279,234 2,938,983 2,970,005 1,615,724 TOTAL EXPENDITURES 24,437,799$ 24,913,912$ 26,596,727$ 27,336,355$
General Fund Net Revenue 3,253,036 3,889,439 (381,771) - Beginning Fund Balance 2,992,132 6,245,168 6,245,168 10,134,607 Ending Fund Balance 6,245,168$ 10,134,607$ 5,863,397$ 10,134,607
General Fund Summary
Description
10
5.6.a
Packet Pg. 95
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESTaxes
Property Taxes 3,712,679$ 4,085,518$ 3,533,000$ 4,200,000$ Motor Vehicle Fees 379,395 437,714 328,000 380,000 Delinquent Taxes 293,319 340,829 257,500 250,000 Sales Tax 9,971,598 10,483,739 7,986,600 10,500,000 Cable TV Franchise Tax 131,832 131,093 125,000 125,000 Energy Sales & Use Tax 1,787,645 1,747,102 1,785,000 1,800,000 Municipal Telephone Tax 243,259 247,645 270,000 270,000 Penalties and Interest 16,876 16,056 15,000 10,000
Total Taxes 16,536,603 17,489,696 14,300,100 17,535,000 Licenses & Permits
Business Licenses 90,302 83,820 85,000 90,000 Building Permits 1,208,439 1,196,697 800,000 1,222,853 Beer & Liquor Licenses 3,000 - - - Occupancy Fee - 45,900 30,300 43,740 Alarm Permit - 16,950 6,300 15,776 Other Permits 64,695 83,603 24,000 9,203 Special Events Permits 575 10,328 5,000 5,000
Total Licenses & Permits 1,367,011 1,437,298 950,600 1,386,572 Grants & Intergovernmental
Grants-Library 14,438 8,200 8,000 8,000 Grants-Police 224,527 119,401 132,134 90,000 Grants-Fire 6,211 14,619 6,161 - Grants-Other 2,875 - - - Other Reimbursements 29,044 - 27,391 - CARES Act Relief Fund 1,287,592 1,067,074 1,067,074 - State Liquor Fund Allotment 44,831 40,191 30,000 35,000
Total Grants & Intergovernmental 1,609,518 1,249,485 1,270,760 133,000 Charges for Services
Fire Protection Agreement-County 6,378 6,207 9,200 6,208 Ambulance Fees 2,007,344 2,390,858 1,943,950 2,300,000 Admin Charge-Water 426,475 473,721 473,721 429,007 Admin Charge-Water Impact - - - 4,172 Admin Charge-Sewer 414,036 486,502 486,502 482,711 Admin Charge-Sewer Impact - - - 3,963 Admin Charge-Storm Water 266,111 290,124 290,066 296,049 Admin Charge-Storm Water Impact - - - 780 Admin Charge-Irrigation 253,957 271,503 271,503 276,543 Admin Charge-Irrigation Impact - - - 1,998 Admin Charge-Park Impact - - - 330 Admin Charge-Road Impact - - - 9,171 Admin Charge-Sanitation Fund 96,485 102,757 102,757 102,004 Admin Charge-Fitness Center 241,100 221,066 221,066 217,955
- (continued on next page)
General Fund Revenue Detail
Description
11
5.6.a
Packet Pg. 96
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
General Fund Revenue Detail
DescriptionCharges for Services
Admin Charge-PARC Tax Fund 9,356 7,794 7,794 7,794 Admin Charge-Egg Farm EDA 33,942 39,947 39,947 - Admin Charge-Broadband Fund 40,215 33,483 33,483 21,505 Capital Projects Inspection - 266,209 271,800 297,800 Development Inspection-Engineering 302,974 369,086 190,000 150,000 Development Inspection-Building - - - 100,000 Development Fees 33,539 79,034 35,000 35,000 Plan Check Fees 466,147 472,651 301,000 420,000 Fire Plan Check Fees 75 1,300 - - Fire Site Inspection Fees 28,065 12,091 31,500 31,500 Police Services-Cedar Hills 533,858 544,535 544,535 555,426 Alpine School District Officers 86,268 144,874 100,000 100,000 Fire-Cedar Hills Contract 689,700 703,494 703,494 717,564 Boat Harbor Fees 68,446 69,766 45,000 50,000 Park Fees 6,128 4,740 5,250 8,000 Amphitheater Reservation Fees 20,460 39,150 16,500 20,000 Recreation Fees 334,110 377,841 283,500 355,000 Library Development Funds 2,542 108 4,500 - Library Fees 26,116 26,709 33,750 25,000 Senior Citizen Fees 66,588 32,843 69,000 50,000 Fire Fees 3,398 1,380 2,000 2,000 Recording Fees - - - 5,000 Cemetery Lot Sales 46,550 47,723 45,500 45,500 Grave Opening Fees 98,660 106,920 126,500 120,000 Other Cemetery Fees 1,300 4,725 4,500 4,500 After Hours Fees 500 338 - -
Total Charges for Services 6,610,823 7,629,479 6,693,318 7,252,480 Fines & Forfeitures
Fines 283,664 246,121 260,000 40,000 Fines - Prosecution Restitution - - - 215,000 Traffic School 69,760 52,560 60,000 60,000
Total Fines & Forfeitures 353,424 298,681 320,000 315,000 Miscellaneous
Sale of AF History Books 194 48 300 - Resale Merchandise - 15 - - Safe Sidewalk Funds - - 200 - Recycling Revenue 288 - 500 - Youth Council 870 280 1,000 - Donations-Fire 5,500 100 - - Donations-Other 107 1,408 - - Purchasing Card Rebate 31,205 23,669 20,000 20,000 Other Revenue 25,021 10,583 13,000 4,500 Police Revenue 56,858 41,856 30,000 35,000
(continued on next page)
12
5.6.a
Packet Pg. 97
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
General Fund Revenue Detail
DescriptionMiscellaneous
GRAMA Requests - - - 5,500 Over & Short (163) - - - Developer Contributions-St Lights 226,024 - - -
Total Miscellaneous 345,904 77,959 65,000 65,000 Use of Money & Property
Interest Earnings 89,884 91,540 90,000 97,075 Credit Card Processing Fees - - - 25,000 Sale of Capital Assets 8,880 6,965 - - Police/Courts Building Lease 438,400 438,400 442,775 438,400 Cell Tower Lease 32,822 39,287 31,000 35,000
Total Use of Money & Property 569,986 576,192 563,775 595,475 Transfers In
Transfer From Perpetual Care 6,933 2,158 9,000 2,000 Transfer From RDA - 42,403 42,403 51,828 Transfer From Capital Projects - - 2,000,000 - Transfer From Park Impact Fee 290,633 - - -
Total Transfers In 297,566 44,561 2,051,403 53,828 TOTAL REVENUES 27,690,835$ 28,803,351$ 26,214,956$ 27,336,355$
13
5.6.a
Packet Pg. 98
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
BY FUNCTION AND DEPARTMENTActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENDITURESGeneral Services
Executive 51,783$ 42,029$ 46,171$ 57,628$ Legislative 155,120 159,699 183,410 211,183 Legal 397,548 433,884 432,850 462,000 Administration 1,550,677 1,802,416 1,320,031 1,491,657
Total General Services 2,155,128 2,438,028 1,982,462 2,222,468 Community Services
Community Services Administration 308,497 358,915 410,329 459,103 Parks & Boat Harbor 931,804 942,125 1,045,576 981,906 Cemetery 500,276 473,760 539,771 496,658 Library & Literacy Center 1,018,505 951,608 1,026,078 1,071,784
Total Community Services 2,759,082 2,726,408 3,021,754 3,009,451 Public Safety
Police 6,147,863 6,194,657 7,020,611 7,498,184 Fire 5,276,443 5,191,041 5,632,392 6,349,503
Total Public Safety 11,424,306 11,385,698 12,653,003 13,847,687 Public Works
Public Works Administration 310,964 300,584 424,549 350,653 Streets 1,845,886 1,272,060 1,454,241 1,621,357 Building Maintenance 1,026,775 927,469 982,443 1,041,713 Building Inspection 887,257 842,266 931,060 1,065,844 Engineering 677,651 1,031,272 1,047,526 1,428,186
Total Public Works 4,748,533 4,373,651 4,839,819 5,507,753 Recreation 647,930 631,981 677,529 703,954 Planning 311,056 321,210 333,176 342,035 Citizens Committees 112,530 97,953 118,979 87,283 Total Departmental Expenditures 22,158,565 21,974,929 23,626,722 25,720,631
Transfers OutTransfer to Fitness Center Fund 836,856 905,847 750,135 728,506 Transfer to Celebration Fund - 24,336 20,000 - Transfer to Capital Projects Fund 848,102 499,730 634,706 320,912 Transfer to Capital Equipment 276,062 236,694 267,488 321,360 Transfer to Broadband Fund 318,214 296,376 316,376 224,624 Fund Balance Contribution to Broadband - - - 20,322 Transfer to Fleet Maintenance Fund - - 4,800 - Transfer to Fleet Capital Fund - 525,000 525,500 - Transfer to Information Technology Fund - 451,000 451,000 -
Total Transfers Out 2,279,234 2,938,983 2,970,005 1,615,724 TOTAL EXPENDITURES 24,437,799$ 24,913,912$ 26,596,727$ 27,336,355$
General Fund Expenditure Summary
Description
14
5.6.a
Packet Pg. 99
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
General Fund Expenditure Summary BY TYPE
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENDITURESPersonnel 15,134,365 15,856,964 17,123,811 18,599,488 Operations 6,757,416 6,069,160 6,423,311 7,121,143 Capital 266,784 48,805 79,600 - Transfers Out 2,279,234 2,938,983 2,970,005 1,615,724
TOTAL EXPENDITURES 24,437,799$ 24,913,912$ 26,596,727$ 27,336,355$
Description
15
5.6.a
Packet Pg. 100
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 14,479$ 13,886$ 14,400$ 22,800$ Benefits 22,368 23,568 24,071 28,128
Total Personnel Expenses 36,847 37,454 38,471 50,928 Operating
Travel Allowance 4,200 4,200 4,200 4,200 Education and Travel - - 1,500 1,500 Auditing 10,461 - - - Department Expense and Supplies 275 375 2,000 1,000
Total Operating Expenditures 14,936 4,575 7,700 6,700 TOTAL EXECUTIVE 51,783$ 42,029$ 46,171$ 57,628$
DEPARTMENT PERSONNELFTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Mayor 0.50 0.50 0.50 - Total Executive Positions 0.50 0.50 0.50 -
STAFFING NOTESThe Mayor's compensation is a set amount and not dependent on the number of hours worked. Therefore, theposition has been counted as 0.50 FTE on this schedule.
Executive
Description
The executive of the City is the Mayor who, in conjunction with the City Council, provides governance of theCity. The Mayor is also responsible for the operations of the City and has appointed a City Administrator to
City Council Chambers
16
5.6.a
Packet Pg. 101
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 30,166$ 28,930$ 30,000$ 48,000$ Benefits 66,431 70,358 70,710 80,723
Total Personnel Expenses 96,597 99,288 100,710 128,723 Operating
Travel Allowance 14,832 14,999 15,000 15,000 Education and Travel 40 - 6,000 6,000 Planning Commission 1,220 2,414 2,800 2,800 Department Expense and Supplies - - - 3,500 Other Council Unassigned 1,000 2,354 2,500 2,500 Special Projects 41,394 40,644 56,400 42,660 Steel Days Services - - - 10,000 Youth Council 37 - - -
Total Operating Expenditures 58,523 60,411 82,700 82,460 TOTAL LEGISLATIVE 155,120$ 159,699$ 183,410$ 211,183$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)City Council Members 2.50 2.50 2.50 - Total Legislative Positions 2.50 2.50 2.50 -
STAFFING NOTES
Legislative
The legislative department is comprised of the elected City Council. The purpose of the City Council is toprovide governance in conjunction with the Mayor of the City. Special projects in the fund include dues for theUtah League of Cities and Towns, Utah Lake Commission, and Mountainland Association of Governments.
Description
The Council's compensation is a set amount and not dependent on the number of hours worked. Therefore, theCity Council has been counted as 2.50 FTE on this schedule.
17
5.6.a
Packet Pg. 102
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
OperatingYouth Court 153$ -$ 2,000$ 2,000$ Attorney-Civil 133,811 132,264 140,000 140,000 Attorney-Special Assignments 7,500 1,974 30,850 10,000 Attorney-Public Defender 86,134 142,738 80,000 140,000 Attorney-Criminal 169,950 156,908 180,000 170,000
Total Operating Expenditures 397,548 433,884 432,850 462,000 TOTAL LEGAL 397,548$ 433,884$ 432,850$ 462,000$
Legal
Description
The Legal budget is established to process expenditures for legal and attorney purposes. All attorneys for the Citycurrently act on a contract basis. The attorney services that are expensed out of this department include:Personnel attorneys, defense attorneys for criminal actions (when the accused cannot provide an attorney forthemselves), conflict attorneys for criminal actions (when there is a conflict between the defense attorney andanother individual), the City’s criminal attorney, and the City’s civil attorney. Other attorneys engaged by theCity are used on an as-needed basis and are expended out of different funds. Specialized attorneys used include
18
5.6.a
Packet Pg. 103
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 612,686$ 619,833$ 660,041$ 701,602$ Benefits 268,035 376,052 291,688 293,294
Total Personnel Expenses 880,721 995,885 951,729 994,896 Operating
Subscriptions and Memberships 6,234 6,382 6,167 6,167 Ordinances and Publications 14,622 19,279 25,000 25,000 Education and Travel 382 381 6,500 7,000 Office Supplies and Expense 7,531 15,532 9,000 12,000 Telephone 2,063 2,469 2,160 2,160 Professional and Technical 59,629 49,690 42,000 42,000 Auditing - 23,590 12,000 23,000 Department Expense and Supplies 30,786 5,172 12,000 6,000 Insurance Premium 219,713 228,762 217,300 230,000 Postage and Shipping 6,217 7,910 6,000 7,200 Covid-19 Response 232,480 407,753 - - Credit Card/Bank Processing Fees 12,341 17,382 10,000 15,000 Election Expense 25,491 - - 83,048 Recording Fees 3,790 5,054 3,000 5,000 Admin Charge-Broadband 5,193 2,151 2,151 2,150 Internal Charges-Fleet Operations 1,400 1,000 1,000 775 Internal Charges-Fleet Capital Fund 5,455 - - - Internal Charges-Technology 36,629 14,024 14,024 30,261
Total Operating Expenditures 669,956 806,531 368,302 496,761 TOTAL ADMINISTRATION 1,550,677$ 1,802,416$ 1,320,031$ 1,491,657$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)City Administrator 1.00 1.00 1.00 - Finance Director 1.00 1.00 1.00 - City Recorder 1.00 1.00 1.00 - UB/Business Licensing Supervisor 1.00 1.00 1.00 - Accountant 1.00 1.00 1.00 - Management Analyst - - 0.50 0.50 Administrative Assistant 1.00 0.50 0.50 - Accounts Payable Specialist 1.00 1.00 1.00 - Payroll Coordinator 1.00 1.00 1.00 - Utility Billing Clerk 1.00 1.00 1.00 - Deputy City Recorder 0.40 0.40 0.40 - Utility Billing Clerk 1.60 1.60 1.60 - Total Administration Positions 11.00 10.50 11.00 0.50
Administration
Description
19
5.6.a
Packet Pg. 104
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 160,041$ 174,546$ 175,791$ 212,827$ Benefits 64,094 70,237 75,452 81,978
Total Personnel Expenses 224,135 244,783 251,243 294,805 Operating
Promotional - 30,476 38,298 38,298 Subscriptions and Memberships 249 - 320 320 Education and Travel 703 - 2,500 2,500 Training - - 2,500 4,500 Office Supplies and Expense 660 250 500 500 Telephone 960 1,234 960 960 Communications 53,430 36,704 30,110 30,110 Community Events 2,480 3,722 2,500 2,500 Employee Appreciation 11,592 22,875 20,000 20,000 Human Resources 7,361 7,806 16,160 16,160 Human Resources-Health/Wellness 1,493 3,707 36,150 36,150 Department Supplies and Expense 113 520 2,250 2,250 Admin Charge-Broadband 722 520 520 530 Internal Charges-Technology 4,599 6,318 6,318 9,520
Total Operating Expenditures 84,362 114,132 159,086 164,298 TOTAL COMMUNITY SERVICES 308,497$ 358,915$ 410,329$ 459,103$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Community Services Director 1.00 1.00 1.00 - Human Resources Manager 1.00 1.00 1.00 - Communications Specialist 0.50 0.50 1.00 0.50 Total Community Services Positions 2.50 2.50 3.00 0.50
Community Services-Administration
Description
20
5.6.a
Packet Pg. 105
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 444,174$ 454,896$ 509,709$ 474,345$ Benefits 190,210 193,642 202,762 205,046
Total Personnel Expenses 634,384 648,538 712,471 679,391 Operating
Education and Travel 2,790 960 3,500 3,500 Mower Supplies & Maintenance 25,318 19,954 20,000 20,000 Building & Grounds Maintenance 23,095 23,962 27,000 27,000 Irrigation Repair & Maintenance 16,393 9,205 27,800 25,000 Utilities 23,435 61,186 25,000 25,000 Telephone 3,741 5,093 5,440 5,440 Professional and Technical 31,936 35,398 33,400 33,400 Clothing Allowance 2,040 1,800 1,200 3,600 Debris Hauling - - - 3,000 Department Supplies 3,315 643 3,500 3,500 Interchange Landscaping 2,604 - 6,000 9,700 Christmas Decorations 7,135 7,242 7,000 11,000 Insurance Claims 127 2,574 - - Portable Restrooms 3,389 4,369 5,000 5,000 Tree Purchase & Maintenance 20,689 18,109 20,000 26,000 City Wide Horticulture 8,129 1,534 8,500 8,500 Admin Charge-Broadband 361 1,901 1,901 1,839 Internal Charges-Fleet Operations 59,000 42,000 42,000 32,545 Internal Charges-Technology 2,802 5,193 5,193 6,578 Equipment Purchases 2,250 5,348 6,000 6,000
Total Operating Expenditures 238,549 246,471 248,434 256,602 Capital
Park Furnishings 13,420 2,550 12,000 - Improvements 3,838 6,751 20,000 -
Total Capital Expenditures 17,258 9,301 32,000 - TOTAL PARKS 890,191$ 904,310$ 992,905$ 935,993$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Parks Superintendent 1.00 1.00 1.00 - Parks Supervisor 1.00 1.00 1.00 - Horticulture Specialist 1.00 1.00 1.00 - Parks Maintenance Operator 2.00 2.00 2.00 - Parks Maint Operator/Arborist 1.00 1.00 1.00 - Parks Laborer 8.79 5.10 6.78 1.68 Total Parks Positions 14.79 11.10 12.78 1.68
Community Services - Parks
Description
21
5.6.a
Packet Pg. 106
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 23,330$ 27,094$ 33,508$ 33,508$ Benefits 3,141 3,511 4,197 3,137
Total Personnel Expenses 26,471 30,605 37,705 36,645 Operating
Building & Grounds Maintenance 1,853 595 2,260 2,260 Restroom Maintenance 1,066 211 1,000 1,000 Telephone 605 480 2,818 1,582 Department Expense and Supplies 2,048 2,205 1,492 1,492 Credit Card/Bank Processing Fees 1,985 2,277 2,040 2,040 Admin Charge-Broadband - 356 356 894
Total Operating Expenditures 7,557 6,124 9,966 9,268 Capital
Improvements 7,585 1,086 5,000 - Total Capital Expenditures 7,585 1,086 5,000 -
TOTAL BOAT HARBOR 41,613$ 37,815$ 52,671$ 45,913$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Boat Harbor 1.38 1.38 1.38 - Total Boat Harbor Positions 1.38 1.38 1.38 -
Community Services - Boat Harbor
Description
American Fork Boat Harbor
22
5.6.a
Packet Pg. 107
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 241,130$ 231,891$ 251,042$ 253,443$ Benefits 129,594 118,338 140,051 128,184
Total Personnel Expenses 370,724 350,229 391,093 381,627 Operating
Education and Travel 734 - 1,500 2,500 Office Supplies and Expense - 2,474 3,800 3,495 Small Engine Repair 18,047 10,214 17,500 19,500 Tools and Equipment 26,931 23,491 24,650 26,650 Tree Purchase & Maintenance 12,750 6,668 13,000 13,000 Telephone 1,720 1,817 1,680 3,180 Employee Appreciation 448 - - 470 Clothing Allowance 1,075 900 600 800 Department Expense and Supplies 7,916 1,129 2,430 3,900 Headstone Replacement 2,042 1,275 3,000 4,450 Flag Rotation & Maintenance 7,038 5,901 6,500 6,500 Christmas Decorations 1,607 525 1,250 900 Postage and Shipping 24 78 - - Credit Card/Bank Processing Fees 1,909 1,993 2,500 2,500 Admin Charge-Broadband 1,083 853 853 871 Internal Charges-Fleet Operations 15,000 13,000 13,000 10,073 Internal Charges-Technology 6,411 6,815 6,815 9,242 Equipment Purchases 8,900 7,980 7,000 7,000
Total Operating Expenditures 113,635 85,113 106,078 115,031 Capital
Improvements 15,917 5,818 10,000 - Internal Charges-Fleet Capital - 32,600 32,600 -
Total Capital Expenditures 15,917 38,418 42,600 - TOTAL CEMETERY 500,276$ 473,760$ 539,771$ 496,658$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Cemetery Superintendent 1.00 1.00 1.00 - Cemetery Supervisor 1.00 1.00 1.00 - Park Maintenance Operator 1.00 1.00 1.00 - Administrative Assistant 1.00 1.00 1.00 - Laborer 2.31 1.88 1.68 (0.20) Total Cemetery Positions 6.31 5.88 5.68 (0.20)
Community Services - Cemetery
Description
23
5.6.a
Packet Pg. 108
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 531,347$ 537,779$ 553,216$ 580,993$ Benefits 200,830 196,390 229,257 221,499
Total Personnel Expenses 732,177 734,169 782,473 802,492 Operating
Subscriptions & Memberships 682 638 1,030 1,030 Education and Travel 1,888 1,613 3,500 4,000 Office Supplies and Expense - 7,994 4,100 12,200 Telephone 480 540 480 480 Grant Expenditures 10,765 3,583 8,000 8,000 Employee Appreciation 742 1,100 660 660 Department Expense and Supplies 21,651 2,229 5,000 3,700 Audio/Visual 5,967 2,720 6,180 6,180 Subscriptions Material 2,320 199 2,000 1,020 Cataloging - 8,960 10,750 10,750 Non-Fiction Material 22,177 20,798 22,000 24,200 Fiction Material 25,047 26,628 23,000 25,300 Children's Material 25,846 26,563 24,000 26,400 Young Adult Fiction 9,521 16,937 9,500 10,450 Electronic Resources 21,180 20,454 36,000 28,690 Literacy 2,731 843 3,500 3,700 Programs Expense and Supplies 10,966 4,848 8,000 11,350 Postage and Shipping 6,545 93 - - Credit Card/Bank Processing Fees 1,195 1,146 2,000 2,000 Maintenance Agreement 214 - - - Admin Charge-Broadband 6,498 2,221 2,221 2,180 Internal Charges-Technology 105,163 64,684 64,684 83,602 Equipment Purchases 4,750 2,648 7,000 3,400
Total Operating Expenditures 286,328 217,439 243,605 269,292 TOTAL LIBRARY 1,018,505$ 951,608$ 1,026,078$ 1,071,784$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Director 1.00 1.00 1.00 - Technical Services/Assistant Director 1.00 1.00 1.00 - Librarians 5.00 5.00 5.00 - Literacy Center Coordinator 0.60 0.60 0.60 - Literacy Center Clerk 0.38 0.38 0.38 - Assistant Librarian 0.40 0.40 0.40 - Clerks/Pages 5.36 4.94 5.27 0.33 Total Library Positions 13.74 13.33 13.65 0.33
Community Services - Library
Description
24
5.6.a
Packet Pg. 109
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed
2019-20 2010-21 2020-21 2021-22Personnel
Salaries & Wages 3,001,940$ 3,050,276$ 3,332,351$ 3,624,910$ Benefits 1,789,574 1,832,099 2,223,410 2,297,401
Total Personnel Expenses 4,791,514 4,882,375 5,555,761 5,922,311 Operating
Subscriptions and Memberships 2,246 2,225 3,000 5,250 Education and Travel 15,670 5,025 14,500 14,500 Training - 11,375 5,000 5,000 Office Supplies and Expense 780 6,256 2,640 2,640 Telephone 21,463 37,566 44,220 48,000 Professional and Technical 1,000 400 7,942 4,000 Human Resources-Health/Wellness - 3,750 3,000 4,500 Dispatch/UCAN Fees 222,490 282,823 312,668 328,084 DOJ Vest Grant 5,227 1,125 - - Miscellaneous Grant Expense 25,925 24,345 - - Communities that Care 8,491 1,492 - 26,000 VOCA Grant 850 - 60,000 60,000 Uniforms & Accessories 71,691 83,372 79,660 85,000 Department Expense and Supplies 83,806 32,262 60,000 80,000 Ammunition 6,876 2,832 8,600 12,000 Miscellaneous 4,567 - - - Special Enforcement Fund 24,635 23,956 38,581 33,000 Credit Card/Bank Processing Fees 955 1,513 1,000 1,000 Animal Control 48,396 68,007 59,000 55,000 Deer Mitigation 4,500 - 4,500 4,500 NOVA & Citizens Programs 11,149 11,990 12,000 12,000 K-9 Program 36,820 3,646 4,600 5,200 Alcohol Grant Expenditures 23,141 22,162 45,000 48,000 Equipment Purchases 18,404 6,321 19,100 16,800 Admin Charge-Broadband 13,357 17,605 17,605 18,202 Internal Charges-Fleet Operations 141,342 149,342 149,342 119,331 Internal Charges-Fleet Capital Fund 413,313 416,978 416,978 469,807 Internal Charges-Technology 149,255 95,914 95,914 118,059
Total Operating Expenditures 1,356,349 1,312,282 1,464,850 1,575,873 TOTAL POLICE 6,147,863$ 6,194,657$ 7,020,611$ 7,498,184$
Public Safety - Police
Description
25
5.6.a
Packet Pg. 110
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
Public Safety - PoliceDEPARTMENT STAFFING
FTE FTE Proposed IncreaseFull-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)
Chief of Police 1.00 1.00 1.00 - Lieutenant 2.00 2.00 3.00 1.00 Management Analyst II 1.00 1.00 1.00 - Sergeant 7.00 8.00 8.00 - Officer/Master Officer/Detective 32.00 33.00 36.00 3.00 Records Supervisor 1.00 1.00 1.00 - Records/Information Specialist 2.00 3.00 3.00 - Evidence Technician 1.00 1.00 1.00 - Code Enforcement/Animal Control 1.00 1.00 1.00 - Victim Advocate 1.00 1.00 1.00 - Police Officer 1.00 1.00 1.00 - Crossing Guard 3.72 3.72 3.72 - Records Clerk 1.00 1.00 1.00 - Communities that Care Coordinator 0.50 0.50 0.50 - Total Police Positions 55.22 58.22 62.22 4.00
STAFFING NOTES1) Propose to add two full-time Police Officers and one full-time Detective for the fiscal year 2021-22 budget
26
5.6.a
Packet Pg. 111
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 2,782,619$ 2,972,754$ 2,938,269$ 3,325,059$ Benefits 1,259,394 1,382,392 1,539,456 1,792,784
Total Personnel Expenses 4,042,013 4,355,146 4,477,725 5,117,843 Operating
Subscriptions & Memberships 1,881 2,123 1,100 1,100 Education and Travel 28,313 6,738 25,500 27,000 Training - 13,296 15,000 15,000 Office Supplies and Expense 470 8,710 7,200 7,200 Telephone 14,817 18,256 13,420 13,420 Professional & Technical 26,045 21,206 33,286 30,000 Dispatch/UCAN Fees 29,515 41,367 52,233 49,024 Attorney Fees 156,029 90,352 30,000 30,000 Fire Prevention & Education 14,825 13,719 15,200 12,000 Miscellaneous Grant Expense 6,161 - - - Employee Appreciation 4,379 940 - - Clothing Allowance 28,709 30,417 29,200 32,650 Human Resources-Health/Wellness - 5,250 3,000 3,000 Department Expense and Supplies 52,992 50,433 43,600 40,000 Medical Supplies 97,071 108,419 109,350 110,000 Flag Rotation - - - 2,600 New Members Equipment 52,819 54,651 55,000 50,000 Janitorial Services and Supplies 620 4,196 5,000 5,000 Credit Card/Bank Processing Fees 15,286 27,279 10,000 10,000 Equipment Maintenance Agreement 9,595 10,725 5,000 5,000 Ambulance Billings 111,249 109,945 106,918 126,000 Ambulance Assessments 45,449 44,723 51,726 54,000 Equipment Purchases 46,667 24,101 22,000 30,000 Admin Charge-Broadband 3,610 4,930 4,930 5,386 Internal Charges-Fleet Operations 126,142 117,000 117,000 98,409 Internal Charges-Fleet Capital 325,216 - 371,885 435,782 Internal Charges-Technology 36,570 27,119 27,119 39,089
Total Operating Expenditures 1,234,430 835,895 1,154,667 1,231,660 TOTAL FIRE 5,276,443$ 5,191,041$ 5,632,392$ 6,349,503$
Public Safety - Fire
Description
27
5.6.a
Packet Pg. 112
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
Public Safety - FireDEPARTMENT STAFFING
FTE FTE Proposed IncreaseFull-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Fire Station 51 Positions
Fire Chief 1.00 1.00 1.00 - Battalion Chief 1.00 1.00 1.00 - Captain 3.72 3.72 3.72 - Deputy Fire Marshal/Captain 1.36 1.36 1.36 - Lieutenant 4.69 4.69 4.69 - Fire Marshal 1.00 1.00 1.00 - EMT 6.69 6.69 6.69 - Firefighter/Paramedic 16.88 19.88 24.88 5.00 Ambulance Transport 3.17 3.17 3.17 - Office Manager 1.00 1.00 1.00 - Total Station 51 Positions 40.51 43.51 48.51 5.00
Cedar Hills Station PositionsBattalion Chief - 1.00 1.00 - Captain 3.00 3.00 3.00 - Lieutenant 3.00 3.00 3.00 - EMT 1.51 1.51 1.51 - Total Cedar Hills Positions 7.51 8.51 8.51 -
Total Fire Positions 48.02 52.02 57.02 5.00
STAFFING NOTES1)
2) Propose to add five full-time Fire Fighters for the fiscal year 2021-22 budget.
During fiscal year 2019-20, 7.51 full-time equivalent positions were added as part of the contract to providefire service to the City of Cedar Hills. This increase is funded by contract revenue paid by the City of CedarHills. Additional EMT and ambulance transport personnel are funded through ambulance transport revenue.
28
5.6.a
Packet Pg. 113
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 202,035$ 190,809$ 262,852$ 218,231$ Benefits 84,962 81,775 129,759 97,541
Total Personnel Expenses 286,997 272,584 392,611 315,772 Operating
Subscriptions & Memberships - 309 1,000 1,000 Education and Travel 213 - 2,000 2,000 Office Supplies and Expense - 5,270 4,575 4,575 Telephone 960 1,234 960 960 Department Expense and Supplies 4,145 1,826 7,900 7,900 Postage and Shipping - 22 525 525 Credit Card/Bank Processing Fees 5,535 9,361 5,000 5,000 Miscellaneous 2,912 - - - Admin Charge-Broadband 2,166 981 981 981 Internal Charges-Fleet Operations 1,400 1,400 1,400 1,085 Internal Charges-Technology 6,636 7,597 7,597 10,855
Total Operating Expenditures 23,967 28,000 31,938 34,881 TOTAL STREETS 310,964$ 300,584$ 424,549$ 350,653$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Public Works Director 1.00 1.00 1.00 - Administrative Assistant 1.75 1.75 1.75 - Total Public Works Admin Positions 2.75 2.75 2.75 -
Public Works - Administration
Description
29
5.6.a
Packet Pg. 114
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 348,347$ 330,842$ 372,014$ 388,120$ Benefits 207,244 204,376 223,871 231,076
Total Personnel Expenses 555,591 535,218 595,885 619,196 Operating
Education and Travel 1,574 462 3,000 3,500 Office Supplies and Expense 36 171 - - Equipment Supplies & Maintenance 23,315 17,155 30,000 30,000 Street Lights Power 65,497 55,172 70,000 70,000 Street Lights Maintenance 79,684 101,724 100,000 100,000 Traffic Signal Maintenance 3,535 1,738 5,000 6,000 Telephone 6,289 6,770 6,480 6,480 Professional & Technical 28,592 137 50,000 35,000 Clothing Allowance 2,254 3,026 1,200 2,400 Department Expense and Supplies 8,211 10,544 15,000 15,000 Debris Hauling 1,652 4,499 2,500 2,500 Insurance Claims (1,750) 341 - - Pavement Markings/Signs 115,997 131,175 120,000 135,000 Sidewalk Repair 171,134 172,630 110,000 170,000 Road Maintenance & Repair 397,642 156,019 260,000 350,000 Admin Charge-Broadband 722 825 722 2,282 Internal Charges-Fleet Operations 75,000 68,000 78,000 60,440 Internal Charges-Fleet Capital 71,715 - - 5,000 Internal Charges-Technology 6,022 6,454 6,454 8,559 Equipment Purchases 7,150 - - -
Total Operating Expenditures 1,064,271 736,842 858,356 1,002,161 Capital
Street Lights Capital Improvement 226,024 - - - Total Capital Expenditures 226,024 - - -
TOTAL STREETS 1,845,886$ 1,272,060$ 1,454,241$ 1,621,357$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Street Superintendent 1.00 1.00 1.00 - Street Lead Maintenance Operator 1.00 1.00 1.00 - Street Maintenance Operator II - 2.00 - (2.00) Street Maintenance Operator I 5.00 3.00 1.83 (1.17) Public Works Technician II 2.00 2.00 Public Works Technician I - - 1.00 1.00 Total Streets Positions 7.00 7.00 6.83 (0.17)
Public Works - Streets
Description
30
5.6.a
Packet Pg. 115
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 242,217$ 229,558$ 252,315$ 258,593$ Benefits 144,029 135,119 158,632 156,054
Total Personnel Expenses 386,246 364,677 410,947 414,647 Operating
Education and Travel - 252 4,000 2,500 Telephone 2,777 3,446 2,910 2,910 Clothing Allowance 1,047 1,200 800 800 Maintenance - Legion Hall 3,501 2,136 4,000 4,000 Maintenance - Public Works 72,043 61,190 55,000 64,000 Maintenance - Library 83,274 57,696 67,000 65,000 Maintenance - Senior Center 17,383 13,397 10,000 10,000 Maintenance - Admin Building 23,397 24,448 20,000 20,000 Maintenance - Cemetery 11,586 11,021 10,000 12,000 Maintenance - Police/Courts 176,037 143,127 160,000 175,000 Maintenance - City Hall 15,951 10,825 16,000 16,000 Maintenance - Fire/Ambulance 45,960 46,864 45,000 45,000 Asphalt Maintenance 9,028 - - 20,000 Janitorial Service and Supplies 85,547 95,404 90,000 90,000 Admin Charge-Broadband 361 993 993 1,036 Internal Charges-Utility Funds 82,305 80,000 75,000 82,300 Internal Charges-Fleet Operations 4,700 4,700 4,700 3,642 Internal Charges-Fleet Capital - - - 5,000 Internal Charges-Technology 5,632 6,093 6,093 7,878
Total Operating Expenditures 640,529 562,792 571,496 627,066 TOTAL BUILDING MAINTENANCE 1,026,775$ 927,469$ 982,443$ 1,041,713$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Building Maint Superintendent 1.00 1.00 1.00 - Facility Maint Supervisor 1.00 1.00 1.00 - Building Maint Lead Technician 1.00 1.00 1.00 - Building Maint Technician 1.00 1.00 1.00 - Total Building Maintenance Positions 4.00 4.00 4.00 -
Public Works - Building Maintenance
Description
31
5.6.a
Packet Pg. 116
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 508,121$ 479,055$ 517,202$ 570,844$ Benefits 262,551 255,598 290,215 313,137
Total Personnel Expenses 770,672 734,653 807,417 883,981 Operating
Subscriptions & Memberships 2,186 - 3,000 6,000 Education and Travel 4,825 329 3,500 4,500 Office Supplies and Expense - 731 2,000 2,000 Telephone 5,033 10,612 7,560 7,560 Plan Check Fees 40,195 63,615 20,000 40,000 Professional & Technical 24,393 2,258 22,000 5,000 Clothing Allowance 1,675 1,800 1,200 1,600 Department Expense and Supplies 3,526 385 1,500 1,500 Administrative Charge-Broadband 2,707 3,145 3,145 3,244 Internal Charges-Fleet Operations 7,700 6,700 6,700 5,889 Internal Charges-Fleet Capital 4,330 - 35,000 80,000 Internal Charges-Technology 20,015 18,038 18,038 24,570
Total Operating Expenditures 116,585 107,613 123,643 181,863 TOTAL BUILDING INSPECTION 887,257 842,266 931,060 1,065,844
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Chief Building Official 1.00 1.00 1.00 - Deputy Building Official 1.00 1.00 1.00 - Building Inspector 4.00 4.00 4.00 - Administrative Assistant 1.50 1.50 2.00 0.50 Total Building Inspection Positions 7.50 7.50 8.00 0.50
Public Works - Building Inspection
Description
32
5.6.a
Packet Pg. 117
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 319,873$ 458,684$ 486,053$ 701,200$ Benefits 160,140 241,536 261,238 407,157
Total Personnel Expenses 480,013 700,220 747,291 1,108,357 Operating
Subscriptions & Memberships 2,635 2,711 4,610 5,915 Education and Travel 2,246 983 5,000 6,000 Office Supplies and Expense 10 1,372 - - Telephone 2,328 3,089 3,156 3,948 Professional & Technical 17,549 17,618 25,000 40,000 Development Inspections 119,142 143,044 100,000 150,000 Development Review - - - 35,000 Clothing Allowance 1,654 1,371 1,400 1,800 Department Expense and Supplies 2,707 4,509 3,500 3,000 Admin Charge-Broadband 2,527 1,762 1,542 1,790 Internal Charges-Fleet Operations 5,400 4,457 3,900 3,022 Internal Charges-Fleet Capital - 43,309 43,300 5,000 Internal Charges-Technology 41,388 106,827 106,827 60,854 Equipment Purchases 52 - 2,000 3,500
Total Operating Expenditures 197,638 331,052 300,235 319,829 TOTAL ENGINEERING 677,651$ 1,031,272$ 1,047,526$ 1,428,186$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)City Engineer - 1.00 1.00 - GIS Supervisor 1.00 1.00 1.00 - Project Engineer 2.00 2.00 3.00 1.00 Engineer 1.00 1.00 1.00 - Construction Inspector 1.00 1.00 3.00 2.00 Intern 1.00 1.00 1.00 - Total Engineering Positions 6.00 7.00 10.00 3.00
Public Works - Engineering
Description
33
5.6.a
Packet Pg. 118
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 354,759$ 371,538$ 394,946$ 371,780$ Benefits 139,935 149,702 152,461 147,217
Total Personnel Expenses 494,694 521,240 547,407 518,997 Operating
Subscriptions & Memberships 165 569 500 400 Advertising 651 - 500 900 Education and Travel 939 - 2,250 2,200 Recreation Supplies & Maintenance 2,823 310 500 2,400 Office Supplies and Expense - 10,565 8,000 12,000 Telephone 2,400 2,539 6,000 6,000 Programs Expense and Supplies 118,997 80,237 95,800 140,900 Department Expense and Supplies 11,119 140 500 500 Employee Appreciation 248 629 320 1,000 Admin Charge-Broadband 1,264 1,055 1,055 2,298 Internal Charges-Fleet Operations 4,400 4,400 4,400 3,409 Internal Charges-Technology 10,230 10,297 10,297 12,950
Total Operating Expenditures 153,236 110,741 130,122 184,957 TOTAL RECREATION 647,930$ 631,981$ 677,529$ 703,954$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Recreation & Fitness Center Director 0.50 0.50 0.50 - Recreation Superintendent 1.00 1.00 1.00 - Recreation Program Manager 2.00 2.00 2.00 - Rec Supervisors/Scorekeepers/Referees 4.89 4.89 4.42 (0.47) Total Recreation Positions 8.39 8.39 7.92 (0.47)
Recreation
Description
34
5.6.a
Packet Pg. 119
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
PersonnelSalaries & Wages 189,790$ 184,644$ 182,415$ 204,016$ Benefits 93,755 93,469 99,239 90,558
Total Personnel Expenses 283,545 278,113 281,654 294,574 Operating
Subscriptions & Memberships 991 863 1,625 1,661 Education and Travel 1,376 90 2,000 2,550 Office Expense and Supplies - 119 600 600 Telephone 1,440 1,620 1,440 1,440 Economic Development 16,000 22,159 25,400 25,400 Department Expense and Supplies 1,201 539 2,750 1,200 Admin Charge-Broadband 902 723 723 739 Internal Charges-Fleet Operations 800 800 800 620 Internal Charges-Fleet Capital - - - 5,000 Internal Charges-Technology 4,801 16,184 16,184 8,251
Total Operating Expenditures 27,511 43,097 51,522 47,461 TOTAL PLANNING 311,056$ 321,210$ 333,176$ 342,035$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Planning Director 1.00 1.00 1.00 - Planner 1.00 1.00 1.00 - Administrative Assistant 0.50 0.50 0.63 0.13 Total Planning Positions 2.50 2.50 2.63 0.13
Planning
Description
35
5.6.a
Packet Pg. 120
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENDITURESPersonnel
Salaries & Wages 37,199$ 65,871$ 36,669$ 31,199$ Benefits 3,825 5,916 4,549 3,104
Total Personnel Expenses 41,024 71,787 41,218 34,303 Operating
Office Expense and Supplies - 92 1,000 1,000 Programs Expense and Supplies 57,033 3,700 25,000 5,000 Programs-Senior Meals - 7,613 27,200 27,200 Department Expense and Supplies - - 8,800 2,000 Admin Charge-Broadband 1,083 346 346 338 Internal Charges-Technology 3,581 5,915 5,915 7,942 Equipment Purchases 3,161 - - -
Total Operating Expenditures 64,858 17,666 68,261 43,480 TOTAL SENIOR CENTER 105,882$ 89,453$ 109,479$ 77,783$
DEPARTMENT STAFFING FTE FTE Adopted Increase
Full-time Equivalent Positions 2018-19 2019-20 2020-21 (Decrease)Center Director 0.50 0.50 0.50 Assistant Director 0.50 0.50 0.50 Secretary 0.50 0.50 0.50 Aides 2.50 2.50 2.50 Janitor 0.75 0.75 0.75 Total Senior Center Positions 4.75 4.75 4.75
STAFFING NOTES1)
Citizen Committees - Senior Center
Description
Senior Center's positions are compensated with a stipend, with the exception of janitor, and is not dependenton number of hours worked. Therefore, each position is budgeted at 0.50 hours full-time equivalent.
The Senior Citizens Center provides programs and support for the seniors in American Fork and surroundingcommunities. The center strives to give the community a central place to gather and to get access to resources tohelp meet the needs they face in their daily lives.
36
5.6.a
Packet Pg. 121
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022General Fund Budgets
DEPARTMENT SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENDITURESOperating
Historical Committee -$ -$ 1,000$ 1,000$ Beautification 6,648 8,500 8,500 8,500
Total Operating Expenditures 6,648 8,500 9,500 9,500 TOTAL CITIZEN COMMITTEES 6,648$ 8,500$ 9,500$ 9,500$
Citizen Committees-Historical & Beautificatio
Description
Citizen committees are volunteer boards who support the City in many ways. The Historical Committee andBeautification Committee have small budgets for expenditures furthering the purpose of their respective boards.
37
5.6.a
Packet Pg. 122
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
38
5.6.a
Packet Pg. 123
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Special Revenue Funds
39
5.6.a
Packet Pg. 124
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENDITURESOperating
Ordinances and Publications 10$ -$ -$ -$ Total Operating Expenditures 10 - - - TOTAL EXPENDITURES 10$ -$ -$ -$
Municipal Building Fund Net Revenue (10) - - - Beginning Fund Balance 901 891 891 891 Ending Fund Balance 891$ 891$ 891$ 891$
Municipal Building Authority Fund
Description
The Municipal Building Authority fund was created to account for the activities of the City’s Municipal BuildingAuthority. The Authority was created to provide continuity between City Council changes. This method allowsfor small institutions to participate in financing. The City does not currently have any bonds outstanding issuedby the Building Authority, but sees the organization as a “backstop” if needed. The yearly expenditures for the
FUND BUDGET
40
5.6.a
Packet Pg. 125
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESGeneral Admissions 178,871$ 201,759$ 148,000$ 175,000$ Passes 608,637 548,329 541,029 635,000 Lessons 112,341 151,380 153,600 165,000 Swim Team 277,313 265,291 271,200 345,000 Specialty Classes 187,907 206,623 255,200 299,000 Gymnastics 19,130 20,847 20,000 18,500 Personal Training 23,408 18,842 10,000 15,000 Equipment Rental 855 958 1,120 2,000 Jogging Track 4,157 2,059 2,800 4,000 Child Care 25,771 23,466 24,800 32,000 Resale Merchandise & Concessions 40,306 40,539 47,200 52,000 Room & Pool Rental 34,559 37,457 22,400 30,000 Miscellaneous 5,468 985 2,250 2,000 Donations 1,024 50 - - Total Revenues 1,519,747 1,518,585 1,499,599 1,774,500
TRANSFERS INTransfer From General Fund 836,856 905,847 750,135 728,506 Total Transfers In 836,856 905,847 750,135 728,506 TOTAL REVENUES 2,356,603$ 2,424,432$ 2,249,734$ 2,503,006$
EXPENDITURESPersonnel
Salaries & Wages 1,049,440$ 1,125,918$ 1,053,226$ 1,183,716$ Benefits 252,410 269,900 253,971 267,375
Total Personnel Expenses 1,301,850 1,395,818 1,307,197 1,451,091 Operating
Subscriptions & Memberships 586 - 1,300 1,400 Advertising 4,170 4,577 4,500 7,500 Education & Travel 1,983 - 2,750 3,700 Office Expense and Supplies 760 2,893 21,010 3,000 Employee Appreciation 2,463 1,637 900 2,600 Equipment Supply & Maintenance 13,332 17,060 17,000 29,300 Building Supply & Maintenance 99,117 79,566 70,000 80,000 Utilities 172,913 174,009 162,270 170,000 Telephone 4,115 4,742 5,820 5,900 Contracted Janitorial Service 109,531 113,950 103,200 108,300 Professional and Technical 608 - 1,000 1,000 Resale Merchandise & Concessions 23,725 18,264 24,975 31,800 Clothing Allowance 2,497 7,598 800 1,500 Department Expense and Supplies 19,088 10,743 2,000 22,000 Pool Chemicals 75,380 65,720 61,200 63,000
(continued on next page)
Fitness Center
Description
41
5.6.a
Packet Pg. 126
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
Fitness Center
DescriptionEXPENDITURES
Insurance 37,637 45,245 40,000 40,000 COVID-19 Related Expenses 29,021 70,957 - - Programs Expense and Supplies 8,917 17,923 7,500 9,800 Credit Card/Bank Processing Fees 34,458 43,702 50,000 50,000 Child Care 3,632 247 3,600 4,000 Merit Badge 265 - - - Gymnastics 16,919 17,768 18,750 18,000 Swim Team 66,904 51,038 45,675 66,500 Swimming Pool Programs 11,713 4,461 4,500 7,500 Admin Charge-General Fund 241,100 221,066 221,066 217,955 Admin Charge-Broadband 3,084 3,082 3,082 3,143 Internal Charges-Fleet Operations 1,000 1,000 1,000 775 Internal Charges-Technology 23,873 16,819 16,819 23,242 Equipment 3,035 - - -
Total Operating Expenditures 1,011,826 994,067 890,717 971,915 Transfers Out
Transfer to Capital Projects 123,279 34,547 45,720 50,000 Transfer to Capital Equipment 20,336 - 6,100 30,000
Total Transfers Out 143,615 34,547 51,820 80,000 TOTAL EXPENDITURES 2,457,291$ 2,424,432$ 2,249,734$ 2,503,006$
Fitness Center Fund Net Revenue (100,688) - - - Beginning Fund Balance 100,688 - - - Ending Fund Balance -$ -$ -$ -$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Recreation & Fitness Center Director 0.50 0.50 0.50 - Aquatics/Head Swim Coach 1.00 1.00 1.00 - Aquatics Manager 1.00 1.00 1.00 - Fitness Center Program Manager 1.00 1.00 1.00 - Fitness Center Office Manager 1.00 1.00 1.00 - Part-Time Positions (Multiple Titles) 44.49 31.05 34.85 3.80 Total Fitness Center Positions 48.99 35.55 39.35 3.80
42
5.6.a
Packet Pg. 127
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Sales Tax 1,194,830$ 1,413,678$ 819,000$ 1,300,000$ Interest Earnings 9,220 3,381 9,000 4,500
Total Operating and Capital Revenues 1,204,050 1,417,059 828,000 1,304,500 TOTAL REVENUES 1,204,050$ 1,417,059$ 828,000$ 1,304,500$
EXPENDITURESOperating
Administrative 11,800$ 22,905$ 500$ 19,500$ Fitness Center - 32,000 - - Parks 495,301 698,351 - 350,000 Alpine Community Theater 30,000 105,100 - - Fox Hollow Golf Course - 36,636 - - Friends of American Fork Library 21,383 23,047 - - American Fork Library 108,100 59,000 - - Timpanogos Arts Foundation 240,800 296,622 - - Harrington Center for the Arts 35,500 93,627 - - New Friends Quilt Circle 8,400 - - - Wasatch Music Alliance - 50,266 - - Other Grants 5,200 5,550 829,431 927,206 Admin Charge-General Fund 9,356 7,794 7,794 7,794
Total Operating Expenditures 965,840 1,430,898 837,725 1,304,500 TOTAL EXPENDITURES 965,840$ 1,430,898$ 837,725$ 1,304,500$
PARC Tax Fund Net Revenue 238,210 (13,839) (9,725) - Beginning Fund Balance 95,784 333,994 333,994 320,155 Ending Fund Balance 333,994$ 320,155$ 324,269$ 320,155
PARC Tax Fund
Description
The PARC tax fund collects and expends funds received from the City’s Parks, Arts, Recreation, and Culture(PARC) sales and use tax option. The state of Utah allows cities to impose a sales and use tax for the purpose ofenhancing public financial support of publicly owned and operated recreational and zoological facilities, andbotanical, cultural, and zoological organizations owned or operated by institutions or private nonprofitorganizations. The one-tenth of one percent sales tax collected by businesses within American Fork is accountedfor in this fund, along with grants awarded by the City Council upon recommendation by the PARC tax board.
43
5.6.a
Packet Pg. 128
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Other Event Income 3,800$ -$ -$ -$ Total Operating and Capital Revenues 3,800 - - - Transfers In
Transfer From General Fund - 24,336 20,000 - Total Transfers In - 24,336 20,000 - TOTAL REVENUES 3,800$ 24,336$ 20,000$ -$
EXPENDITURESPersonnel
Salaries & Wages 20,473$ -$ -$ -$ Benefits 2,227 - - -
Total Personnel Expenses 22,700 - - - Operating
Advertising 370 250 - - Miss American Fork Pageant 8,103 278 - - Float 3,575 5,900 - - Steel Days Contract 20,000 20,331 20,000 -
Total Operating Expenditures 32,048 26,759 20,000 - TOTAL EXPENDITURES 54,748$ 26,759$ 20,000$ -$
Celebration Fund Net Revenue (50,948) (2,423) - - Beginning Fund Balance 53,371 2,423 2,423 - Ending Fund Balance 2,423$ -$ 2,423$ -
Celebration Fund
Description
The Celebration fund was initially created to track the revenues and expenditures associated with the City’sannual American Fork Steel Days celebration. In fiscal year 2018, the City entered into a contract with theAmerican Fork Chamber of Commerce to run the majority of Steel Days events. The City now has a limitednumber of responsibilities regarding the yearly event. The proposed budget for fiscal year 2021 includes theitems the City is contractually obligated for. After fiscal year 2021, it is expected the Celebration Fund will be
44
5.6.a
Packet Pg. 129
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Interest Revenue 2,451$ 619$ 3,000$ 1,000$ Total Operating and Capital Revenues 2,451 619 3,000 1,000 TOTAL REVENUES 2,451$ 619$ 3,000$ 1,000$
EXPENDITURESOperating
Professional & Technical 32,800 8,200 - - Total Operating Expenses 32,800 8,200 - - TOTAL EXPENDITURES 32,800$ 8,200$ -$ -$
Downtown Redevelopment Net Revenue (30,349) (7,581) 3,000 1,000 Beginning Fund Balance 134,106 103,757 103,757 96,176 Ending Fund Balance 103,757$ 96,176$ 106,757$ 97,176$
RDA - Downtown Redevelopment Fund
Description
The Downtown Redevelopment fund is used to enhance and promote the City’s core downtown area and toaccount for one small business revolving loan issued by the City that is still outstanding.
45
5.6.a
Packet Pg. 130
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Tax Increment 5,114$ -$ 1,700$ -$ Haircut-East Side 45,071 42,533 4,003 44,081 Interest Earnings 763 457 360 763
Total Operating and Capital Revenues 50,948 42,990 6,063 44,844 TOTAL REVENUES 50,948$ 42,990$ 6,063$ 44,844$
EXPENDITURESTransfers Out
Transfer to General Fund - - 42,403 - Total Transfers Out - - 42,403 - TOTAL EXPENDITURES -$ -$ 42,403$ -$
East Side RDA Fund Net Revenue 50,948 42,990 (36,340) 44,844 Beginning Fund Balance 140 51,088 51,088 94,078 Ending Fund Balance 51,088$ 94,078$ 14,748$ 138,922$
RDA-East Side Redevelopment Agency Fund
Description
The East Side RDA fund (also known as the East Main RDA fund) was created to account for the revenues andexpenditures for the East Main RDA project area created December 1992. The goal of the East Main RDAproject area is to incentivize the commercial and industrial development of several blocks along Main Street inAmerican Fork where conditions of blight were determined to be present. The fund will continue to receive
46
5.6.a
Packet Pg. 131
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Tax Increment 20,444$ 3,937$ -$ -$ Haircut 325,071 300,680 312,101 320,943 Interest Earnings 33,798 12,561 20,634 33,798
Total Operating and Capital Revenues 379,313 317,178 332,735 354,741 TOTAL REVENUES 379,313$ 317,178$ 332,735$ 354,741$
EXPENDITURESOperating and Capital Revenues
Haircut Expenditures - - 332,735 354,741 Total Operating Expenditures - - 332,735 354,741 TOTAL EXPENDITURES -$ -$ 332,735$ 354,741$
Business Park RDA Fund Net Revenue 379,313 317,178 - - Beginning Fund Balance 1,697,998 2,077,311 2,077,311 2,394,489 Ending Fund Balance 2,077,311$ 2,394,489$ 2,077,311$ 2,394,489$
RDA-Business Park Redevelopment Fund
Description
The Business Park RDA fund (also known as the North Valley RDA fund) was created to account for therevenues and expenditures of the North Valley RDA Project Area created September 1987. The goal of the NorthValley RDA project area is to incentivize the commercial and industrial development along I-15 in AmericanFork. The fund will receive tax increment revenue through fiscal year 2019, and haircut monies through fiscal
North Pointe Business Park
47
5.6.a
Packet Pg. 132
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Tax Increment 716,387$ 791,539$ 760,014$ 830,971$ Tax Increment - Housing 179,097 197,885 190,003 207,743 Interest Earnings 48,111 14,696 20,000 20,000
Total Operating and Capital Revenues 943,595 1,004,120 970,017 1,058,714 TOTAL REVENUES 943,595$ 1,004,120$ 970,017$ 1,058,714$
EXPENDITURESOperating
Administrative Expenses 10,500$ 20,614$ 24,510$ 12,629$ Total Operating Expenses 10,500 20,614 24,510 12,629 Capital
Developer Reimbursement 474,253 291,273 291,273 - 860 E Reconstruction 52,993 447,007 447,007 - Widening of 1500 South - 5,270 8,500 - Widening of Sam White Lane - 201 1,103,313 1,643,786
Total Capital Expenditures 527,246 743,751 1,850,093 1,643,786 Transfers Out
Transfer to General Fund 33,942 45,654 39,947 51,828 Transfer to Culinary Water Fund - 1,628,069 1,628,069 204,965
Total Transfers Out 33,942 1,673,723 1,668,016 256,793 TOTAL EXPENDITURES 571,688$ 2,438,088$ 3,542,619$ 1,913,208$
Egg Farm EDA Fund Net Revenue 371,907 (1,433,968) (2,572,602) (854,494) Beginning Fund Balance 2,560,992 2,932,899 2,932,899 1,498,931 Ending Fund Balance 2,932,899$ 1,498,931$ 360,297$ 644,437$
Fund Balance Restricted For:Administration 116,281 99,484 99,325 86,963 Affordable Housing 1,427,407 (2,777) (10,659) - Developer Funded Infrastructure (70,911) - - - Public Infrastructure 1,460,122 1,402,224 271,630 557,474
Ending Fund Balance 2,932,899$ 1,498,931$ 360,296$ 644,437$
EDA-Egg Farm Economic Development Area
Description
The Egg Farm EDA Fund was created to account for the revenues and expenditures of the Egg Farm EDAproject area created in September 2000. The goal of the Egg Farm EDA project area is to incentivize thecommercial and industrial development of a former chicken farm in American Fork City. The fund will receivetax increment revenue through fiscal year 2028, depending on when minimum tax increment levels are reached.It is important to note that 20 percent of tax increment received must go towards affordable housing projects in
48
5.6.a
Packet Pg. 133
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Special Revenue Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed
2019-20 2010-21 2020-21 2021-22EXPENDITURES
OperatingAdministrative Expenses 23,000$ -$ -$ -$
Total Operating Expenses 23,000 - - - TOTAL EXPENDITURES 23,000$ -$ -$ -$
Patriot Station CRA Fund Net Revenue (23,000) - - - Beginning Fund Balance (145,699) (168,699) (168,699) (168,699) Ending Fund Balance (168,699)$ (168,699)$ (168,699)$ (168,699)$
CRA-Patriot Station Community Reinvestmen
Description
The Patriot Station CRA Project Area Plan was drafted in October 2018 to define the method and means oftransit oriented development (TOD) around the vicinity of the American Fork FrontRunner Station. Futuredevelopment within the Project Area includes proposed high and medium density multi-family housing and thecreation of space for offices and commercial businesses, including numerous infrastructure and improvements tocapture the vision and density of the anticipated transit oriented development. As of May 5, 2020, the creation ofthe CRA has been put on hold pending approval by other taxing entities within the project area.
49
5.6.a
Packet Pg. 134
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
50
5.6.a
Packet Pg. 135
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Debt Service Funds
51
5.6.a
Packet Pg. 136
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Debt Service Fund Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Property Tax 784,125$ 760,393$ 760,393$ 583,638$ PARC Tax Grant 350,000 350,000 350,000 350,000 Interest Earnings 13,877 3,597 17,875 17,875
Total Operating and Capital Revenues 1,148,002 1,113,990 1,128,268 951,513 Transfers In
Transfer From Park Impact Fund 108,931 119,864 119,864 118,616 Transfer from Fire Impact Fees Fund - 319,079 - 321,001 Transfer from Police Impact Fees Fund - 261,064 - 262,637
Total Transfers In 108,931 700,007 119,864 702,254 TOTAL REVENUES 1,256,933$ 1,813,997$ 1,248,132$ 1,653,767$
EXPENDITURESDebt Service
2020 General Obligation Bonds - 580,143 580,143 583,638 2018 Sales Tax Revenue Bonds 470,808 469,864 469,864 468,616 2014 General Obligation Bonds 599,027 - - - 2011 General Obligation Bonds 185,098 180,250 180,250 - Trustee Fees 2,000 1,250 1,750 1,250
Total Debt Service Expenditures 1,256,933 1,231,507 1,232,007 1,053,504 Transfers Out
Transfer to Capital Projects Fund 941,411 580,143 - 583,638 Total Transfers Out 941,411 580,143 - 583,638 TOTAL EXPENDITURES 2,198,344$ 1,811,650$ 1,232,007$ 1,637,142$
Debt Service Fund Net Revenue (941,411) 2,347 16,125 16,625 Beginning Fund Balance 1,292,791 351,380 351,380 353,727 Ending Fund Balance 351,380$ 353,727$ 367,505$ 370,352$
Debt Service Fund
Description
The Debt Service Fund is used to account for the accumulation of resources for, and the payment of, long-termdebt principal, interest, and related costs for the governmental funds (excluding enterprise and internal service
52
5.6.a
Packet Pg. 137
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Capital Investments
53
5.6.a
Packet Pg. 138
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed
2019-20 2010-21 2020-21 2021-22REVENUES
Operating and Capital RevenuesProperty Tax 525,000$ 500,000$ 500,000$ 500,000$ Sales Tax 925,457 1,075,744 513,750 1,000,000 Class C Road Funds 1,225,753 1,222,454 1,080,000 1,100,208 Cemetery Lot Sales 40,000 30,000 40,000 40,000 Grants-PARC Tax 322,192 223,401 223,401 439,351 Grants-Utah County Recreation 14,256 13,850 - - Grants-MAG - - 5,573,925 1,651,000 Grants-Utah DOT - - 408,569 66,600 Capital Contributions 84,794 2,340 - - Interest Earnings 125,608 42,079 88,425 32,195
Total Operating and Capital Revenues 3,263,060 3,109,868 8,428,070 4,829,354 Transfers In
Transfer From General Fund 848,102 499,730 634,706 320,912 Transfer From Fitness Center 123,279 45,720 45,720 50,000 Transfer From Debt Service Fund 941,411 580,143 - 583,638
Total Transfers In 1,912,792 1,125,593 680,426 954,550 TOTAL REVENUES 5,175,852$ 4,235,461$ 9,108,496$ 5,783,904$
EXPENDITURESCapital ExpendituresPolice
Police Fences at Public Works Yard - 40,000 - - Total Police - 40,000 - - Streets
Pavement Management Plan 182,592 4,293,824 4,403,180 2,632,403 700 N Connection 21,483 4,183 1,651,000 1,651,000 ADA/Sidewalk Improvements - - 40,000 52,000 Safe Route to Schools 3,220 2,412 70,200 90,000 Transit Loop Feasibility - - 95,000 32,000 HAWK Pedestrian Crossing - - - 11,000 Street Lighting Upgrades - 29,982 50,000 100,000
Total Streets 207,295 4,330,401 6,309,380 4,568,403 Cemetery
Expansion - - 40,000 40,000 Improvements - - - 10,000 Wall Repair - 10,000 - 10,000
Total Cemetery - 10,000 40,000 60,000 (continued on next page)
General Capital Projects Fund
Description
The General Capital Projects Fund accounts for financial resources to be used for the acquisition of major capitalfacilities (other than those financed by enterprise or internal service fund activities). This fund does not accountfor projects accounted for with impact fees which are accounted for in separate impact fee funds.
54
5.6.a
Packet Pg. 139
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
General Capital Projects FundDEPARTMENT BUDGET
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENDITURES Parks
Evergreen Park Irrigation 26,033 - - - Country View Park Irrigation - 10,000 - - Fox Hollow Subsidy 240,000 240,000 250,000 240,000 Utah County Grant-Art Dye Park 14,256 - - - 200 South Bike/Pedestrian Path 135,218 370,857 4,172,925 - Trail Maintenance - - 3,000 6,800 Parking Lot Maintenance - - 15,000 15,000 Pickleball Resurfacing - - 5,500 5,750 Hindley Filter Relocation - 9,868 13,500 - Sprinkler Automation - 101,500 21,500 - Playground Replacement - - - 100,000 Quail Cove Pavers - - - 11,000 Sidewalk Replacement - - - 6,000 Art Dye Park - - - 60,000 Park Improvements - - - 27,600 Dog Park - - 20,000 - Boat Harbor Improvements - - - 10,000 PARC-Art Dye Park 22,050 60,062 60,062 68,000 PARC-Meadowview Park 1,863 - - - PARC-Picnic Tables, Trees, Cans 25,635 - - - PARC-Rotary Park Pavillion 61,390 - - - PARC-Rotary Backstop 92,671 (1,827) - PARC-Easton Dog Park 29,524 - - - PARC-Hindley Park Parking Lot 41,138 3,123 64,612 - PARC-Playground Equipment 78,884 - - 190,351 PARC-Pool Shade Structure 24,800 - - - PARC-Quail Cove Entrance 24,645 - - - PARC-Quail Cove Restroom - 100,000 100,000 - PARC-Scoreboard Replacement - 15,301 15,301 - PARC-Frontage Trail - - - 90,000 PARC-Pool Features - - - 32,000 PARC-Library Expansion - - 176,891 55,000 PARC-Library Balcony Arts - - - 4,000
Total Parks 818,107 908,884 4,918,291 921,501 Fitness Center
Deck Drain Replacement - - 18,000 - Raquetball Court Resurfacing - - - 4,000 Facility Paint and Flooring 11,150 4,368 - 11,000 Roof Replacement 36,233 - - - HVAC Units - 15,000 - - LED Lighting Upgrades 11,945 - - - Front Entry Remodel - - 80,000 -
(continued on next page)
Description
55
5.6.a
Packet Pg. 140
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
General Capital Projects FundDEPARTMENT BUDGET
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENDITURES Fitness Center
Slide Repair - - - 8,000 Shade Structures 533 - - - Security Upgrade 1,787 - - - Pool Boiler 171,026 - - - Pool Deck Resurfacing - - - 12,000 Locker Room Flooring - - - 15,000 Weight Room Expansion - 27,720 27,720 -
Total Fitness Center 232,674 47,088 125,720 50,000 Building & Grounds
HVAC System Replacements 23,085 - - 30,000 Fire Panel Replacements - 52,582 40,000 - Fire Station Flooring - 20,000 20,000 - Fire Station Bay Fans 57,666 50,000 - Boiler Replacements - - 28,000 98,000 Electrical Transmitters - - 15,000 - Library-Carpet Replacement 53,350 - 60,000 - Lighting Upgrades - - - 16,000 Legion Hall Renovations - - - 20,000 Police Security Upgrades - - - 10,000 Police Station Carpet 51,295 - - - Truck Washout Extension - - - 10,000 Administration Building Stairs 3,944 - - -
Total Building & Grounds 131,674 130,248 213,000 184,000 Other
Parade Float 8,812 - - - Total Other 8,812 - - - Total Capital Expenditures 1,398,562 5,466,621 11,606,391 5,783,904 Transfers Out
Transfer to General Fund - - 2,000,000 - Total Transfers Out - - 2,000,000 - TOTAL EXPENDITURES 1,398,562$ 5,466,621$ 13,606,391$ 5,783,904$
Debt Service Fund Net Revenue 3,777,290 (1,231,160) (4,497,895) - Beginning Fund Balance 4,732,830 8,510,120 8,510,120 7,278,960 Ending Fund Balance 8,510,120$ 7,278,960$ 4,012,225$ 7,278,960$
Description
56
5.6.a
Packet Pg. 141
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Bond Proceeds 8,665,261$ -$ -$ -$ Interest Earnings 29,597 28,995 15,000 15,000
Total Operating and Capital Revenues 8,694,858 28,995 15,000 15,000 TOTAL REVENUES 8,694,858$ 28,995$ 15,000$ 15,000$
EXPENDITURESCapital Expenditures
Fire Station 52 10,814 105,293 8,400,000 8,537,681 Art Dye Park-Phase I and II 2,601,170 - - - Bond Cost of Issuance 63,895 - - -
Total Capital Expenditures 2,675,879 105,293 8,400,000 8,537,681 TOTAL EXPENDITURES 2,675,879$ 105,293$ 8,400,000$ 8,537,681$
Debt Service Fund Net Revenue 6,018,979 (76,298) (8,385,000) (8,522,681) Beginning Fund Balance 2,580,000 8,598,979 8,598,979 8,522,681 Ending Fund Balance 8,598,979$ 8,522,681$ 213,979$ -$
Bond Capital Projects Fund
The Bond Capital Projects Fund accounts for financial resources received by bond proceeds to be used for theacquisition of major capital facilities (other than those financed by enterprise or internal service fund activities).
Description
57
5.6.a
Packet Pg. 142
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Interest Earnings 24 - - - Rebate - 4,010 5,000 5,000 Grants - 14,619 - -
Total Operating and Capital Revenues 24 18,629 5,000 5,000 Transfers In
Transfer From General Fund 276,062 236,694 267,488 321,360 Transfer From Fitness Center 20,336 16,000 6,100 30,000
Total Transfers In 296,398 252,694 273,588 351,360 TOTAL REVENUES 296,422$ 271,323$ 278,588$ 356,360$
EXPENDITURESCapital ExpendituresPolice
Equipment, Radios & Tasers 19,544$ 10,000$ 10,000$ 16,000$ Storage Shed 52,550 - - - Message Board & Trailer - 15,000 15,000 - Mobile Field Equipment - 6,000 6,000 - Daschcam Replacement - - - 20,000 Radio Replacement - 10,000 10,000 16,000
Total Police 72,094 41,000 41,000 52,000 Fire
Tech/Rescue Equipment 19,879 8,119 10,000 20,000 Thermal Cameras - - - 9,000 Dispatch Upgrades - 3,951 15,000 - X-Series 12 Lead Zolls - 27,000 27,000 - Burn Prop - - - 10,000 Bobcat - 14,619 - -
Total Fire 19,879 53,689 52,000 39,000 Parks
Mower Replacement - - - 40,294 Snowplow/Salter - - - 11,831 Playground Replacement 54,064 - - - Park Furnishings - - - 17,000 Dump Trailer - - 10,000 -
Total Parks 54,064 - 10,000 69,125 (continued on next page)
Capital Equipment Fund
The capital equipment fund accounts for equipment purchases other than those purchased by enterprise orinternal service fund activities.
Description
58
5.6.a
Packet Pg. 143
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
Capital Equipment FundDEPARTMENT BUDGET
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
StreetsTrackhoe Lease 11,500 11,500 11,500 23,000 Backhoe Lease 7,250 - - - Roller 163 - - 80,000 Salter Racks 1,941 26,750 23,060 - Loader 166,825 - - - Backhoe - 49,900 52,000 - Chip Box - 12,000 12,000 15,000 Mini-X - - 11,500 - Other Equipment - - 11,500 -
Total Streets 187,679 100,150 121,560 118,000 Cemetery
Backhoe Lease 8,519 8,079 8,079 9,620 Excavator Lease 8,716 8,405 8,409 9,500 Mower - - - 14,115
Total Cemetery 17,235 16,484 16,488 33,235 Fitness Center/Recreation
Gymanstics Floor - - - 16,000 Pool Slide Replacement - - - 9,000 Fitness Equipment 20,336 - 5,000 5,000 Revolving Door Replacement - 16,000 - - Camera Upgrades - - 1,100 - Soccer Goals - - 5,500 -
Total Fitness Center/Recreation 20,336 16,000 11,600 30,000 Other
Engineering - Trimble GPS Unit 6,611 - - - Library-Self Checkout Stations - 44,000 44,000 - Holiday Decorations - - 5,000 15,000
Total Other 6,611 44,000 49,000 15,000 Total Capital Expenditures 377,898 271,323 301,648 356,360
TOTAL EXPENDITURES 377,898$ 271,323$ 301,648$ 356,360$ Capital Equipment Fund Net Revenue (81,476) - (23,060) - Beginning Fund Balance 97,921 16,445 16,445 16,445 Ending Fund Balance 16,445$ 16,445$ (6,615)$ 16,445$
Description
59
5.6.a
Packet Pg. 144
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 2,478,170$ 2,603,773$ 1,400,000$ 1,700,000$ Grants-MAG - - 44,000 592,000 Interest Earnings 102,937 29,992 120,000 30,000
Total Operating and Capital Revenues 2,581,107 2,633,765 1,564,000 2,322,000 TOTAL REVENUES 2,581,107$ 2,633,765$ 1,564,000$ 2,322,000$
EXPENDITURESOperating
Professional and Technical 1,872 2,270 - 30,330 Total Operating Expenditures 1,872 2,270 - 30,330 Capital
Art Dye Improvements 1,665,817 495,959 350,000 500,000 Art Dye Trail - - 44,000 637,000 Land Purchase-Parks Open Space - - - 3,000,000 Trail Expansion - - 200,000 Boat Harbor 1,355 - - Developer Reimbursement 124,914 15,360 - -
Total Capital Expeditures 1,792,086 511,319 594,000 4,137,000 Transfers Out
Transfer to General Fund 290,633 - - - Transfer to Debt Service Fund 108,931 119,864 119,864 118,616
Total Transfers Out 399,564 119,864 119,864 118,616 TOTAL EXPENDITURES 2,193,522$ 633,453$ 713,864$ 4,285,946$
Park Impact Fee Fund Net Revenue 387,585 2,000,312 850,136 (1,963,946) Beginning Fund Balance 5,110,379 5,497,964 5,497,964 7,498,276 Ending Fund Balance 5,497,964$ 7,498,276$ 6,348,100$ 5,534,330$
Park Impact Fees Fund
Description
The Park Impact Fee Fund accounts for fees assessed to property developers for new land or park space that mustbe acquired to maintain the established park land level of service as a result of growth due to new propertydevelopment. Each impact fee type is separated into its own fund for greater tracking and accountability.
60
5.6.a
Packet Pg. 145
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 2,707,289$ 2,507,281$ 1,400,000$ 2,000,000$ Interest Earnings 114,392 37,732 120,000 35,000
Total Operating and Capital Revenues 2,821,681 2,545,013 1,520,000 2,035,000 TOTAL REVENUES 2,821,681$ 2,545,013$ 1,520,000$ 2,035,000$
EXPENDITURESOperating
Professional and Technical 24,851 11,561 - 10,000 Total Operating Expenditures 24,851 11,561 - 10,000 Capital
700 N Grant Match - - 272,000 272,000 200 S Design & Engineering 115,243 - - - Traffic Signal-300 N 600 E - 300,000 - - Traffic Signal-500 E Automall 325,000 325,000 - Traffic Signal-620 S 600 E 20,366 - 279,634 Traffic Signal-900 W 500 N 264,408 - - Widening 300 N 1100 E 40,400 - - - 400 S Connection to 500 E - - 300,000 300,000 300 W Pacific Dr Improvements - - 50,000 850,000 300 N 600 E Intersection - - 300,000 - 36" Water line (Street Widening) - - 973,732 - Developer Reimbursement 570,845 1,310,594 - 1,500,000
Total Capital Expeditures 726,488 2,220,368 2,220,732 3,201,634 TOTAL EXPENDITURES 751,339$ 2,231,929$ 2,220,732$ 3,211,634$
Road Impact Fee Fund Net Revenue 2,070,342 313,084 (700,732) (1,176,634) Beginning Fund Balance 5,119,487 7,189,829 7,189,829 7,502,913 Ending Fund Balance 7,189,829$ 7,502,913$ 6,489,097$ 6,326,279$
Road Impact Fees Fund
The Road Impact Fee Fund accounts for fees assessed to property developers to reimburse the city for the cost ofdeveloping new system capacity that allows new development to occur and allows for transportation level ofservice to be maintained. Each impact fee type is separated into its own fund for greater tracking and
Description
61
5.6.a
Packet Pg. 146
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 448,324$ 330,168$ 210,000$ 250,000$ Interest Earnings 25,409 8,215 20,000 7,500
Total Operating and Capital Revenues 473,733 338,383 230,000 257,500 TOTAL REVENUES 473,733$ 338,383$ 230,000$ 257,500$
EXPENDITURESOperating
Professional and Technical 1,147 4,824 - 10,000 Total Operating Expenses 1,147 4,824 - 10,000 Capital
Developer Reimbursement 2,308 - - - Total Capital Expenses 2,308 - - - Transfers Out
Transfer to Debt Service Fund - 290,072 - 321,001 Transfer to Fleet Capital Fund 123,856 212,323 212,323 212,323
Total Transfers Out 123,856 502,395 212,323 533,324 TOTAL EXPENDITURES 127,311$ 507,219$ 212,323$ 543,324$
Fire Impact Fee Fund Net Revenue 346,422 (168,836) 17,677 (285,824) Beginning Fund Balance 1,138,661 1,485,083 1,485,083 1,316,247 Ending Fund Balance 1,485,083$ 1,316,247$ 1,502,760$ 1,030,423$
Fire Impact Fees Fund
The Fire Impact Fee Fund accounts for impact fees charged to new development to recover all or a portion of thecosts of providing fire services to new development. Impact fees collected provide funding for essential publicsafety infrastructure needed by the City to handle the increase in calls that new growth will generate.
Description
62
5.6.a
Packet Pg. 147
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Capital Project Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 309,450$ 218,766$ 196,000$ 220,000$ Interest Earnings 27,286 9,994 20,000 8,000
Total Operating and Capital Revenues 336,736 228,760 216,000 228,000 TOTAL REVENUES 336,736$ 228,760$ 216,000$ 228,000$
EXPENDITURESOperating
Professional and Technical 2,997 - - 46,000 Total Operating Expenses 2,997 - - 46,000 Capital
Police Shooting Range - - - 165,000 Developer Reimbursement 6,814 - - -
Total Capital Expenses 6,814 - - 165,000 Transfers Out
Transfer to Debt Service Fund - 290,072 - 262,637 Total Transfers Out - 290,072 - 262,637 TOTAL EXPENDITURES 9,811$ 290,072$ -$ 473,637$
Police Impact Fee Fund Net Revenue 326,925 (61,312) 216,000 (245,637) Beginning Fund Balance 1,323,379 1,650,304 1,650,304 1,588,992 Ending Fund Balance 1,650,304$ 1,588,992$ 1,866,304$ 1,343,355$
Police Impact Fees Fund
The Police Impact Fee Fund accounts for impact fees charged to new development to recover all or a portion ofthe costs of providing police services to new development. Impact fees collected provide funding for essentialpublic safety infrastructure needed by the City to handle the increase in calls that new growth will generate.
Description
63
5.6.a
Packet Pg. 148
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
64
5.6.a
Packet Pg. 149
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Permanent Fund
65
5.6.a
Packet Pg. 150
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Permanent Fund Budget
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Perpetual Care 21,400$ 20,100$ 26,000$ 26,000$ Interest Earnings 6,781 2,158 9,000 2,000 Loan Payment-Lot Sales 26,250 21,750 32,500 32,500
Total Operating and Capital Revenues 54,431 44,008 67,500 60,500 TOTAL REVENUES 54,431$ 44,008$ 67,500$ 60,500$
EXPENSESTransfers Out
Transfer to General Fund 6,933 2,158 9,000 2,000 Total Transfers Out 6,933 2,158 9,000 2,000 TOTAL EXPENDITURES 6,933$ 2,158$ 9,000$ 2,000$
Perpetual Care Trust Net Revenue 47,498 41,850 58,500 58,500 Beginning Fund Balance 783,560 831,058 831,058 872,908 Ending Fund Balance 831,058$ 872,908$ 889,558$ 931,408$
Perpetual Care Trust Fund
The Perpetual Care Trust Fund is a permanent fund used to hold and manage funds for the purpose ofmaintenance and upkeep of the City’s cemetery. Revenues come from sales of graves and interest earnings.Interest earned on idle funds is transferred to the general fund to offset upkeep of the cemetery.
Description
66
5.6.a
Packet Pg. 151
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Proprietary Funds
67
5.6.a
Packet Pg. 152
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Water Sales 3,934,147$ 4,732,302$ 4,260,261$ 4,465,000$ CUP Water Fee 871,622 895,928 828,120 870,000 Connection Fee 217,783 241,147 195,700 205,000 Late Fee 106,245 171,521 150,000 157,500 Intergovernmental 194,130 56,878 - 250,000 Miscellaneous 29,822 37,861 40,000 37,725 Note Receivable 19,614 - - - Interest Earnings 160,872 67,917 100,000 100,000 Developer Contributions 2,704,865 - - - Loan Proceeds - 15,000,000 23,721,767 7,015,000
Total Operating and Capital Revenues 8,239,100 21,203,554 29,295,848 13,100,225 Transfers In
Transfer From Egg Farm EDA - 1,628,069 - 204,965 Total Transfers In - 1,628,069 - 204,965 TOTAL REVENUES 8,239,100$ 22,831,623$ 29,295,848$ 13,305,190$
EXPENSESPersonnel
Salaries & Wages 211,095$ 308,197$ 354,278$ 366,730$ Benefits 112,382 150,942 162,377 166,511
Total Personnel Expenses 323,477 459,139 516,655 533,241 Operating
Subscriptions & Memberships 1,566 - 1,600 1,600 Education & Travel 2,597 990 4,150 4,550 Postage 11,999 10,278 16,000 16,000 Office Expense and Supplies - 7,860 - - Equipment Supplies and Maintenance 15,178 15,595 15,000 15,000 Insurance 50,140 45,496 53,000 53,000 Utilities 149,857 202,368 200,000 200,000 Telephone 7,958 8,982 9,000 9,000 Professional and Technical 141,231 101,877 60,000 70,000 Clothing Allowance 1,048 1,125 1,400 1,400 Debris Hauling 1,652 4,499 5,000 5,000 Department Expense and Supplies 72,332 98,285 90,000 90,000 CUP-Water Assessment and Fees 572,294 746,625 805,000 805,000 Credit Card/Bank Processing Fees 29,808 35,658 32,000 32,000 No Fault Liability Claims 6,241 - 50,000 50,000 Land Lease 7,260 7,440 7,500 8,000 Meter Replacement 210,390 213,495 100,000 150,000 Depreciation 978,376 980,000 - 1,000,000
(continued on next page)
Public Works - Culinary Water Fund
Description
68
5.6.a
Packet Pg. 153
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
Public Works - Culinary Water Fund
DescriptionDEPARTMENT BUDGET
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
EXPENSESOperating
Admin Charge-General Fund 426,475 473,721 473,721 429,007 Admin Charge-Broadband 2,610 2,627 2,627 2,913 Internal Charges-Fleet Operations 22,000 22,000 22,000 18,597 Internal Charges-Fleet Capital - - - 125,000 Internal Charges-Technology 17,280 15,575 15,575 17,466
Total Operating Expenses 2,728,292 2,994,496 1,963,573 3,103,533 Capital
Equipment - 157,579 160,000 - Backhoe Lease 6,500 6,500 - 26,500 Water Line Projects 25,953 328,508 100,000 1,182,613 Water Line Replacement 3,107 176,553 100,000 500,000 Water Line Replacement-CDBG - 93,990 70,000 500,000 Large Meter Replacement 20,233 32,582 25,000 25,000 Meters-City Facilities 9,500 - 25,000 - Meters-AMI Reading Equipment - - - 840,000 Well Repairs - - 250,000 40,000 Fire Hydrants 29,278 31,011 40,000 40,000 Spring Line Replacement - 330,471 600,000 - 36" Water Line Replacement - 15,000,000 24,279,384 7,898,944 500 E-1100 E Utility Betterments - 304,736 510,158 - 100 E Water Improvements 225 641,842 500,000 - Upper Tank Rehabilitation - 275,690 435,990 - Country Club Well - 50,000 - 260,000 Hospital Well - 14,042 - 100,000
Total Capital Expenses 94,796 17,443,504 27,095,532 11,413,057 Debt Service
2020 Waterline Bonds - - 161,000 119,573 2012 Water Revenue Bonds 14,606 52,221 51,252 52,257 Cost of Issuance - 154,838 237,218 -
Total Debt Service 14,606 207,059 449,470 171,830 TOTAL EXPENSES 3,161,171$ 21,104,198$ 30,025,230$ 15,221,661$
Culinary Water Fund Net Revenue 5,077,929 1,727,425 (729,382) (1,916,471) Beginning Available Fund Balance 10,370,210 15,448,139 15,448,139 17,175,564 Ending Available Fund Balance 15,448,139$ 17,175,564$ 14,718,757$ 15,259,093
Description
69
5.6.a
Packet Pg. 154
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
Public Works - Culinary Water Fund
DescriptionDEPARTMENT STAFFING
FTE FTE Proposed IncreaseFull-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)
Water Superintendent 0.50 0.50 0.70 0.20 Water System Lead Operator 0.50 0.50 0.70 0.20 Water System Technicians 1.50 2.00 2.80 0.80 Water System Specialist 0.50 0.50 0.70 0.20 Public Infrastructure Manager 0.25 0.25 0.25 - Water Meter Specialist 2.00 1.00 1.00 - Total Culinary Water Positions 5.25 4.75 6.15 1.40
STAFFING NOTES1) Culinary Water and Pressurized Irrigation - No new positions added. More Staff time is reallocated to
culinary water to reflect winter closures of secondary irrigation.
70
5.6.a
Packet Pg. 155
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 1,318,741$ 1,430,330$ 700,000$ 1,300,000$ Interest Earnings 26,775 11,023 15,000 15,000
Total Operating and Capital Revenues 1,345,516 1,441,353 715,000 1,315,000 TOTAL REVENUES 1,345,516$ 1,441,353$ 715,000$ 1,315,000$
EXPENSESOperating
Professional and Technical 9,327 2,317 - 29,172 Total Operating Expenses 9,327 2,317 - 29,172 Capital
36" Water Line - - - 5,009,017 Developer Reimbursement 417,145 699,017 500,000 500,000
Total Capital Expenses 417,145 699,017 500,000 5,509,017 Debt Service
Loan Debt Service - - 644,000 677,578 Total Debt Service - - 644,000 677,578 TOTAL EXPENSES 426,472$ 701,334$ 1,144,000$ 6,215,767
Culinary Water Impact Net Revenue 919,044 740,019 (429,000) (4,900,767) Beginning Fund Balance 995,729 1,914,773 1,914,773 2,654,792 Ending Fund Balance 1,914,773$ 2,654,792$ 1,485,773$ (2,245,975)
Culinary Water Impact Fees Fund
Description
71
5.6.a
Packet Pg. 156
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed
2019-20 2010-21 2020-21 2021-22REVENUES
Operating and Capital RevenuesWater Sales 2,769,010$ 2,821,133$ 2,748,813$ 2,887,000$ Connection Fee 113,240 120,751 77,250 81,000 Interest Earnings 2,637 386 1,500 1,500 Grant Revenue - - 1,500,000 1,500,000 Developer Contributions 430,703 - - -
Total Operating and Capital Revenues 3,315,590 2,942,270 4,327,563 4,469,500 TOTAL REVENUES 3,315,590$ 2,942,270$ 4,327,563$ 4,469,500$
EXPENSESPersonnel
Salaries & Wages 210,019 145,495 151,451 156,708 Benefits 106,223 80,634 107,218 93,238
Total Personnel Expenses 316,242 226,129 258,669 249,946 Operating
Postage 11,547 9,461 14,000 14,000 Equipment Supplies/Maintenance 21,250 - 50,000 50,000 Insurance 19,948 22,622 21,200 21,200 Professional and Technical 4,753 50,000 50,000 80,000 Clothing 600 600 600 600 Department Expense and Supplies 15,043 10,000 10,000 15,000 Credit Card/Bank Processing Fees 15,791 18,860 17,000 18,787 Depreciation 1,252,840 1,280,000 1,280,000 1,310,000 Admin Charge-General Fund 253,957 271,503 271,561 276,543 Admin Charge-Broadband 58 58 58 56 Internal Charges-Fleet Operations & Mainte 4,500 4,500 4,500 3,487 Internal Charges-Technology 9,876 10,425 10,425 12,316
Total Operating Expenses 1,610,163 1,678,029 1,729,344 1,801,989 Capital
PI Meters-City-wide - 4,322 3,000,000 6,360,000 PI Meters-City Facilities - 118,184 120,000 50,000
Total Capital Expenses - 122,506 3,120,000 6,410,000 Debt Service
2016 General Obligation Bonds 1,119,827 2,473,250 2,473,250 2,470,750 2015 General Obligation Bonds 215,494 513,038 513,038 515,438 Trustee Fees 1,000 1,000 1,000 1,000
Total Debt Service 1,336,321 2,987,288 2,987,288 2,987,188 TOTAL EXPENSES 3,262,726$ 5,013,952$ 8,095,301$ 11,449,123$
Pressurized Irrigation Fund Net Revenue 52,864 (2,071,682) (3,767,738) (6,979,623) Beginning Available Fund Balance 10,882,405 10,935,269 10,935,269 8,863,587 Ending Available Fund Balance 10,935,269$ 8,863,587$ 7,167,531$ 1,883,964
Public Works - Pressurized Irrigation Fund
Description
72
5.6.a
Packet Pg. 157
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
Public Works - Pressurized Irrigation FundDEPARTMENT STAFFING
FTE FTE Proposed IncreaseFull-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)
Water Superintendent 0.50 0.50 0.30 (0.20) Water System Lead Operator 0.50 0.50 0.30 (0.20) Water System Technicians 1.50 2.00 1.20 (0.80) Water System Specialist 0.50 0.50 0.30 (0.20) Public Infrastructure Manager 0.25 0.25 0.25 - Total Secondary Water Positions 3.25 3.75 2.35 (1.40)
STAFFING NOTES1) Culinary Water and Pressurized Irrigation - No positions deleted. More Staff time is reallocated to culinary
water to reflect winter closures of secondary irrigation.
73
5.6.a
Packet Pg. 158
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 840,887$ 688,322$ 630,000$ 830,000$ Total Operating and Capital Revenues 840,887 688,322 630,000 830,000 TOTAL REVENUES 840,887$ 688,322$ 630,000$ 830,000$
EXPENSESOperating
Professional and Technical 8,699 2,399 - 26,998 Total Operating Expenses 8,699 2,399 - 26,998 Capital
Water Reclamation Facility - 12,942 2,000,000 1,987,058 Devloper Reimbursement 130,603 782,116 200,000 500,000
Total Capital Expenses 130,603 795,058 2,200,000 2,487,058 TOTAL EXPENSES 139,302$ 797,457$ 2,200,000$ 2,514,056
Secondary Water Impact Net Revenue 701,585 (109,135) (1,570,000) (1,684,056) Beginning Fund Balance (15,392,521) (14,690,936) (14,690,936) (14,800,071) Ending Fund Balance (14,690,936)$ (14,800,071)$ (16,260,936)$ (16,484,127)$
Secondary Water Impact Fees Fund
Description
74
5.6.a
Packet Pg. 159
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Sewer Sales 5,720,343$ 5,849,590$ 5,645,916$ 5,610,750$ Connection Fee 98,495 114,563 80,340 84,500 Interest Earnings 130,435 44,466 106,072 100,000 Developer Contributions 389,447 - - -
Total Operating and Capital Revenues 6,338,720 6,008,619 5,832,328 5,795,250 TOTAL REVENUES 6,338,720$ 6,008,619$ 5,832,328$ 5,795,250$
EXPENSESPersonnel
Salaries & Wages 135,344 171,172 177,095 182,110 Benefits 82,126 94,773 103,480 97,374
Total Personnel Expenses 217,470 265,945 280,575 279,484 Operating
Education & Travel 2,311 275 4,500 4,500 Postage 11,978 11,281 12,000 12,000 Equipment Supplies and Maintenance 2,754 1,914 15,000 15,000 Insurance 39,895 45,245 42,400 42,400 Telephone 4,129 5,013 4,200 4,200 Professional and Technical 11,634 2,212 25,000 25,000 Clothing 1,362 771 1,000 1,000 Debris Hauling 1,652 3,936 2,500 - Department Expense and Supplies 17,507 6,829 2,500 2,500 Timpanogos Special Service District 3,099,205 2,924,628 3,100,000 3,100,000 Credit Card/Bank Processing Fees 30,669 36,729 32,000 32,000 No Fault Insurance Claims 4,179 - 15,000 - Operations & Maintenance 14,404 13,809 30,000 30,000 Depreciation 374,608 385,000 400,000 Trackhoe Lease 11,500 11,500 11,500 11,500 Admin Charge-General Fund 414,036 486,502 487,826 482,711 Admin Charge-Broadband 1,316 1,324 1,389 Internal Charges-Fleet Operations 30,000 30,000 30,000 23,246 Internal Charges-Fleet Capital 82,148 - - 40,000 Internal Charges-Technology 11,358 10,125 10,125 11,882
Total Operating Expenses 4,166,645 3,977,093 3,825,551 4,239,328 Capital
Sewer Lining - 24,765 485,892 325,000 Sewer Bursting - 4,499 500,000 550,000 450 W Upsizing - 16,430 255,464 239,034 36" Water Line (Sewer Portion) - - 250,000 -
Total Capital Expenses - 45,694 1,491,356 1,114,034 (continued on next page)
Public Works - Sewer Fund
Description
75
5.6.a
Packet Pg. 160
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
Public Works - Sewer Fund DEPARTMENT BUDGET
Actual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
TOTAL EXPENSES 4,384,115$ 4,288,732$ 5,597,482$ 5,632,846$ Sewer Fund Net Revenue 1,954,605 1,719,887 234,846 162,404 Beginning Available Fund Balance 6,234,225 8,188,830 8,188,830 9,908,717 Ending Available Fund Balance 8,188,830$ 9,908,717$ 8,423,676$ 10,071,121$
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Wastewater Superintendent 0.50 0.50 0.50 - Wastewater Operator 1.00 0.50 0.50 - Wastewater Maintenance Specialist 1.00 1.00 1.00 - Technician - 0.75 0.75 - Public Infrastructure Manager 0.25 0.25 0.25 - Total Sewer Positions 2.75 3.00 3.00 -
Description
76
5.6.a
Packet Pg. 161
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 443,545$ 476,300$ 280,000$ 400,000$ Interest Earnings 26,891 8,896 21,774 21,774
Total Operating and Capital Revenues 470,436 485,196 301,774 421,774 TOTAL REVENUES 470,436$ 485,196$ 301,774$ 421,774$
EXPENSESOperating
Professional and Technical 4,724 - - 28,963 Total Operating Expenses 4,724 - - 28,963 Capital
200 S Design and Engineering 39,861 - 8,575 - 450 W Upsizing - 172,129 172,129 - Devloper Reimbursement 9,605 947,379 150,000 300,000
Total Capital Expenses 49,466 1,119,508 330,704 300,000 TOTAL EXPENSES 54,190$ 1,119,508$ 330,704$ 328,963
Sewer Impact Fee Fund Net Revenue 416,246 (634,312) (28,930) 92,811 Beginning Fund Balance 1,243,467 1,659,713 1,659,713 1,025,401 Ending Fund Balance 1,659,713$ 1,025,401$ 1,630,783$ 1,118,212
Sewer Impact Fees Fund
Description
77
5.6.a
Packet Pg. 162
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Storm Drain Fee 1,411,339 1,442,664 1,260,720 1,325,000 SWPPP Citations 14,710 29,521 - 34,500 Interest Earnings 43,878 14,656 34,500 - Developer Contributions 291,710 - - -
Total Operating and Capital Revenues 1,761,637 1,486,841 1,295,220 1,359,500 TOTAL REVENUES 1,761,637$ 1,486,841$ 1,295,220$ 1,359,500$
EXPENSESPersonnel
Wages & Salaries 152,352 126,016 161,617 169,785 Benefits 82,655 75,749 104,753 92,694
Total Personnel Expenses 235,007 201,765 266,370 262,479 Operating
Postage 11,306 9,557 12,000 12,000 Equipment Supplies/Maintenance - 4,801 5,000 5,000 Insurance 44,882 45,245 47,700 47,700 Professional & Technical 12,463 10,102 30,000 30,000 Debris Basin - 6,000 5,000 7,500 Debris Hauling - 2,565 1,000 56,000 Department Expense and Supplies 6,329 675 15,000 10,000 Credit Card/Bank Processing Fees 7,503 8,983 9,000 9,000 No Fault Insurance Claims 45,272 - - - Depreciation 281,806 310,000 - - Backhoe Lease 11,000 - - - Admin Charge-General Fund 266,169 290,124 290,124 296,049 Admin Charge-Broadband - - - 56 Internal Charges-Fleet Operations 1,500 1,500 1,500 1,162 Internal Charges-Technology 7,577 10,125 10,125 11,882
Total Operating Expenses 695,807 699,677 426,449 486,349 Capital
Equipment - 118,184 120,000 - AF River Rehabilitation - 400,000 611,325 211,325 Curb and Gutter Replacements - 139,904 704,408 769,679 36" Water Line (SD Portion) - - 266,788 50,000 400 S at Orchard to 400 E - 54,668 100,000 - Storm Drain Projects 42,492 - - -
Total Capital Expenses 42,492 712,756 1,802,521 1,031,004 TOTAL EXPENSES 973,306$ 1,614,198$ 2,495,340$ 1,779,832$
Storm Drain Fund Net Revenue 788,331 (127,357) (1,200,120) (420,332) Beginning Available Fund Balance 2,033,594 2,821,925 2,821,925 2,694,568 Ending Available Fund Balance 2,821,925$ 2,694,568$ 1,621,805$ 2,274,236
Public Works - Storm Drain Fund
Description
78
5.6.a
Packet Pg. 163
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
Public Works - Storm Drain Fund
DEPARTMENT STAFFING FTE FTE Proposed Increase
Full-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)Wastewater Superintendent 0.50 0.50 0.50 - Wastewater Operator - 0.50 0.50 - Stormwater Maintenance Specialist 1.00 1.00 1.00 - Technician 1.00 0.25 0.25 - Public Infrastructure Manager 0.25 0.25 0.25 - Total Storm Drain Positions 2.75 2.50 2.50 -
79
5.6.a
Packet Pg. 164
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Impact Fees 516,420$ 373,545$ 280,000$ 400,000$ Interest Earnings 29,112 8,304 25,218 25,218
Total Operating and Capital Revenues 545,532 381,849 305,218 425,218 TOTAL REVENUES 545,532$ 381,849$ 305,218$ 425,218$
EXPENSESOperating
Professional and Technical 67,543 12,897 - 25,780 Total Operating Expenses 67,543 12,897 - 25,780 Capital
200 S Design and Engineering - 10,678 23,100 - Devloper Reimbursement 1,950 570,242 100,000 500,000
Total Capital Expenses 1,950 580,920 123,100 500,000 TOTAL EXPENSES 69,493$ 593,817$ 123,100$ 525,780
Storm Drain Impact Net Revenue 476,039 (211,968) 182,118 (100,562) Beginning Fund Balance 1,338,964 1,815,003 1,815,003 1,603,035 Ending Fund Balance 1,815,003$ 1,603,035$ 1,997,121$ 1,502,473
Storm Drain Impact Fees Fund
Description
80
5.6.a
Packet Pg. 165
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2010-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Refuse Collection Fees 1,164,414$ 1,224,704$ 1,140,242$ 1,217,500$ Recycling Fees 324,849 344,753 318,453 339,000 Miscellaneous 380 1,154 300 - Interest Earnings 7,114 1,967 6,750 6,750
Total Operating and Capital Revenues 1,496,757 1,572,578 1,465,745 1,563,250 TOTAL REVENUES 1,496,757$ 1,572,578$ 1,465,745$ 1,563,250$
EXPENSESOperating
Recycling Fees 250,917 326,683 308,485 323,909 Waste Disposal-First Can 583,690 536,686 534,006 560,706 Waste Disposal-Additional Can 72,456 98,400 84,866 89,109 Solid Waste/Tipping Fees 434,972 453,196 434,105 542,631 Professional and Technical 444 - 1,000 - Credit Card/Bank Processing Fees 8,662 10,373 9,105 10,332 Postage 11,064 9,218 11,630 15,065 Miscellaneous - - 4,200 - Bad Debt Expense - 7,198 - 13,267 Admin Charge-General Fund 96,485 102,757 102,757 102,004 Internal Charges-Technology 2,872 6,532 6,532 7,862
Total Operating Expenses 1,461,562 1,551,043 1,496,686 1,664,885 TOTAL EXPENSES 1,461,562$ 1,551,043$ 1,496,686$ 1,664,885$
Sanitation/Recycling Net Revenue 35,195 21,535 (30,941) (101,635) Beginning Fund Balance 327,127 362,322 362,322 383,857 Ending Fund Balance 362,322$ 383,857$ 331,381$ 282,222
Sanitation & Recycling
Description
The Sanitation and Recycling fund is used to account for sanitation and recycling services provided to City res-idents. These services are provided by an outside contractor. However, the fund is charged for expenses re-latedto billing customers for services provided, and administrative support of the fund.
81
5.6.a
Packet Pg. 166
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2020-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Leasing Fiber Lines 89,752$ 81,728$ 100,000$ 85,000$ Administrative Charges 93,282 91,235 92,640 96,417
Total Operating and Capital Revenues 183,034 172,963 192,640 181,417 Transfers In
Transfer From General Fund 318,214 296,376 316,376 224,624 Contribution from General Fund - - - 20,322
Total Transfers In 318,214 296,376 316,376 244,946 TOTAL REVENUES 501,248$ 469,339$ 509,016$ 426,363$
EXPENSESPersonnel
Wages & Salaries 163,092 178,892 169,208 180,143 Benefits 94,351 101,331 96,336 101,569
Total Personnel Expenses 257,443 280,223 265,544 281,712 Operating
Utilities 326 221 500 500 Office Supplies 177 1,186 - Equipment Maintenance Agreement 27 - - 1,850 Insurance 18,819 22,622 18,780 18,780 Telephone 1,680 2,487 1,680 2,640 Professional & Technical 2,018 - - 35,000 Pole Fees 23 20 50 50 Blue Stakes 9,405 9,734 7,000 9,600 Bandwith for Connection 8,399 9,599 8,500 8,500 Uniform 200 200 200 200 Department Expense and Supplies 1,000 500 500 500 Depreciation 48,433 - - - Broadband System 10,861 1,747 10,000 15,000 Admin Charge-General Fund 40,215 33,483 33,483 21,505 Internal Charges-Fleet Operations 2,500 1,800 1,800 1,395 Internal Charges-Technology 5,468 6,515 5,915 8,809
Total Operating Expenses 149,551 90,114 88,408 124,329 Capital
Feasibility Study 146,487 - 135,064 - OTDR Fiber Tester - 19,711 20,000 -
Total Capital Expenses 146,487 19,711 155,064 - TOTAL EXPENSES 553,481 390,048 509,016 406,041
Broadband Fund Net Revenue (52,233) 79,291 - 20,322 Beginning Fund Balance (2,049,610) (2,101,843) (2,101,843) (2,022,552) Ending Fund Balance (2,101,843)$ (2,022,552)$ (2,101,843)$ (2,002,230)
Broadband
Description
82
5.6.a
Packet Pg. 167
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Enterprise Funds Budgets
BroadbandDEPARTMENT STAFFING
FTE FTE Proposed IncreaseFull-time Equivalent Positions 2019-20 2020-21 2021-22 (Decrease)
Broadband/Technology Director 1.00 1.00 1.00 - Fiber Optic Network Manager 1.00 1.00 1.00 - Total Broadband Positions 2.00 2.00 2.00 -
83
5.6.a
Packet Pg. 168
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Internal Service Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2020-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Charges From General Fund 442,284$ 409,242$ 419,242$ 339,240$ Charges From Fitness Center Fund 1,000 1,000 1,000 775 Charges From Culinary Water 22,000 22,000 22,000 18,597 Charges From Secondary Water 4,500 4,500 4,500 3,487 Charges From Sewer Fund 30,000 30,000 30,000 23,246 Charges From Storm Drain Fund 1,500 1,500 1,500 1,162 Charges From Broadband Fund 2,500 1,800 1,800 1,395 Interest Earnings 2,280 3,000 3,000 - Miscellaneous 3,808 - - -
Total Operating and Capital Revenues 509,872 473,042 483,042 387,902 Transfers In
Transfer From General Fund - - 4,800 - Total Transfers In - - 4,800 - TOTAL REVENUES 509,872$ 473,042$ 487,842$ 387,902$
EXPENSESOperating
Vehicle Maintenance 301,860 340,242 345,042 357,800 Vehicle Repair 150,886 132,800 142,800 142,800
Total Operating Expenses 452,746 473,042 487,842 500,600 TOTAL EXPENSES 452,746$ 473,042$ 487,842$ 500,600$
Fleet Operations Fund Net Revenue 57,126 - - (112,698) Beginning Fund Balance 105,572 162,698 162,698 162,698 Ending Fund Balance 162,698$ 162,698$ 162,698$ 50,000
Description
The Fleet Operations and Maintenance fund accounts for maintenance and repair of the City’s vehicles. The fundincludes expenditures for vehicle maintenance, repair, and fuel. Revenue for the fund comes from charges to thedepartments that receive services from the fund.
Fleet Operations & Maintenance Fund
84
5.6.a
Packet Pg. 169
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Internal Service Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2020-21 2020-21 2021-22
REVENUESOperating and Capital Revenues
Charges From General Fund 820,029$ 891,684$ 891,763$ 1,005,588$ Charges From Culinary Water - - - 125,000 Charges From Sewer Fund 82,148 - - - Capital Lease Proceeds - - - 285,000 Sale of Capital Assets 12,448 13,312 - 20,000 Interest Earnings 634 - - - Miscellaneous - 10,333 - -
Total Operating and Capital Revenues 915,259 915,329 891,763 1,435,588 Transfers In
Transfer From General Fund - 525,000 525,500 - Transfer From Fire Impact Fee Fund 123,856 212,322 212,322 212,323
Total Transfers In 123,856 737,322 737,822 212,323 TOTAL REVENUES 1,039,115$ 1,652,651$ 1,629,585$ 1,647,911$
EXPENSESOperating
Depreciation 892,420 - - - Total Operating Expenses 892,420 - - - Capital
Police Vehicles and Upfitting 2,696 412,171 412,171 432,000 Fire Vehicles and Upfitting 4,918 63,419 45,000 334,000 Cemetery Vehicles - 32,530 32,600 7,350 Parks Vehicles - 227,500 227,500 7,350 Building Maintenance Vehicles - - - 78,500 Streets Vehicles - - - 63,800 Engineering Vehicles - 43,309 43,300 5,000 Building Inspection Vehicles - 39,708 35,000 80,000 Planning Vehicles - - - 5,000 Culinary Water Vehicles - - - 130,000
Total Capital Expenses 7,614 818,637 795,571 1,143,000 Debt Service
Capital Lease-Principal - 537,334 537,334 593,459 Capital Lease-Interest 42,045 54,680 54,680 58,452
Total Debt Service Expenses 42,045 592,014 592,014 651,911 TOTAL EXPENSES 942,079$ 1,410,651$ 1,387,585$ 1,794,911$
Fleet Capital Fund
The Fleet Capital fund accounts for the purchase and disposal of City vehicles. The fund includes not only thepurchase of vehicles, but any associated lease payments on fleet vehicles.
Description
85
5.6.a
Packet Pg. 170
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Internal Service Funds Budgets
Fleet Capital FundFleet Capital Fund Net Revenue 97,036 242,000 242,000 (147,000) Beginning Fund Balance (28,115) 68,921 68,921 310,921 Ending Fund Balance 68,921$ 310,921$ 310,921 163,921
86
5.6.a
Packet Pg. 171
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
American Fork City Proposed Annual Budget Fiscal Year 2021-2022Internal Service Funds Budgets
FUND SUMMARY
DEPARTMENT BUDGETActual Estimated Approved Proposed2019-20 2020-21 2020-21 2021-22
REVENUESOperating and Capital Revenue
Charges From General Fund 439,734$ 373,510$ 386,272$ 438,210$ Charges From Fitness Center Fund 23,873 16,819 16,819 23,242 Charges From Culinary Water 17,280 15,575 15,575 17,466 Charges From Secondary Water 9,876 10,425 10,425 12,316 Charges From Sewer Fund 11,358 10,125 10,125 11,882 Charges From Storm Drain Fund 7,577 10,125 10,125 11,882 Charges From Sanitation Fund 2,872 6,532 6,532 7,862 Charges From Broadband Fund 5,468 6,515 6,515 8,809 Interest Earnings 803 183 - -
Total Operating and Capital Revenue 518,841 449,809 462,388 531,669 Transfers In
Transfers from General Fund - 451,000 451,000 - Total Transfers In - 451,000 451,000 - TOTAL REVENUES 518,841$ 900,809$ 913,388$ 531,669$
EXPENSESOperating
Contracted IT Support 48,408 59,063 65,000 65,000 Software Maintenance 60,223 77,547 112,186 91,500 Software Renewals 57,962 138,425 170,392 233,069 Telephone System 47,239 41,954 48,000 48,000 Admin Charge-Broadband 44,100 44,100 44,100 44,100
Total Operating Expenses 257,932 361,089 439,678 481,669 Capital
Hardware Purchases 100,455 92,930 59,309 100,000 Software Purchases 27,645 446,790 457,719 20,000
Total Capital Expenses 128,100 539,720 517,028 120,000 TOTAL EXPENSES 386,032$ 900,809$ 956,706$ 601,669$
Information Technology Net Revenue 132,809 - (43,318) (70,000) Beginning Fund Balance - 132,809 132,809 132,809 Ending Fund Balance 132,809$ 132,809 89,491 62,809
Information Technology Fund
Description
The Information technology department oversees and is responsible for all technology-related aspects of the City.The City’s information technology contractor works with all departments of the City to provide IT servicesincluding networking services, computer needs, peripheral devices, telephones, network security, servers,troubleshooting and support, and software support. The information technology department is outsourced, but isoverseen by the Broadband (Information Technology) department. This was a department of the general fund
87
5.6.a
Packet Pg. 172
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
88
5.6.a
Packet Pg. 173
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Capital Investments
89
5.6.a
Packet Pg. 174
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
GO
VE
RN
ME
NT
AL
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6St
reet
s & P
ublic
Wor
ksPa
vem
ent M
anag
emen
t Pla
nV
ario
us2,
632,
403
$
3,
700,
000
$
3,
800,
000
$
3,
900,
000
$
4,
000,
000
$
40
0 S
Con
nect
ion
to 5
00 E
*Im
pact
Fee
s30
0,00
0
-
-
-
-
70
0 N
Con
nect
ion*
Gra
nts
1,65
1,00
0
-
-
-
-
700
N C
onne
ctio
n R
OW
* Im
pact
Fee
s27
2,00
0
-
-
-
-
30
0 W
Pac
ific
Dr I
mpr
ovem
ents
Impa
ct F
ees
850,
000
-
-
-
-
Traf
fic S
igna
l-620
S 6
00 E
*Im
pact
Fee
s27
9,63
4
-
-
-
-
A
DA
/Sid
ewal
k Im
prov
emen
tsG
ener
al F
unds
52,0
00
55,0
00
57,0
00
60,0
00
63,0
00
HA
WK
Adv
ance
d D
etec
tion
Upg
rade
Gen
eral
Fun
ds11
,000
-
-
-
-
Sa
fe R
oute
to S
choo
lsG
rant
s90
,000
10
0,00
0
12
0,00
0
13
5,00
0
15
0,00
0
Tr
ansi
t Loo
p Fe
asib
ility
*G
rant
s32
,000
-
-
-
-
St
reet
Lig
htin
g U
pgra
des
Gen
eral
Fun
ds10
0,00
0
10
0,00
0
10
0,00
0
10
0,00
0
10
0,00
0
Sa
m W
hite
Lan
e W
iden
ing
Red
evel
opm
ent
1,64
3,78
6
-
-
-
-
Stor
m D
rain
Pip
e R
edev
elop
men
t-
-
-
58
9,67
1
-
Pu
blic
Wor
ks B
uild
ing
Des
ign
Impa
ct F
ees
-
1,00
0,00
0
-
-
-
Dev
elop
er R
eim
burs
emen
tsIm
pact
Fee
s1,
500,
000
1,
500,
000
1,
500,
000
1,
500,
000
1,
500,
000
T
otal
Str
eets
& P
ublic
Wor
ks9,
413,
823
6,
455,
000
5,
577,
000
6,
284,
671
5,
813,
000
C
emet
ery
Pion
eer G
rove
Roa
d Im
prov
emen
tsG
ener
al F
unds
-
150,
000
-
-
-
Cem
eter
y Im
prov
emen
tsG
ener
al F
unds
10,0
00
-
-
-
-
Expa
nsio
n La
nd P
urch
ase
Perp
etua
l Car
e40
,000
-
-
-
30
0,00
0
W
all R
epai
rG
ener
al F
unds
10,0
00
10,0
00
10,0
00
10,0
00
10,0
00
Tot
al C
emet
ery
60,0
00
160,
000
10,0
00
10,0
00
310,
000
Cap
ital P
roje
cts -
Gen
eral
Cap
ital P
roje
cts
90
5.6.a
Packet Pg. 175
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Gen
eral
Cap
ital P
roje
cts
GO
VE
RN
ME
NT
AL
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6Pa
rks
Fox
Hol
low
Sub
sidy
Gen
eral
Fun
ds24
0,00
0$
24
0,00
0$
24
0,00
0$
24
0,00
0$
24
0,00
0$
O
pen
Spac
e La
nd P
urch
ase
Impa
ct F
ees
3,00
0,00
0
-
-
-
-
Trai
l Mai
nten
ance
G
ener
al F
unds
6,80
0
7,00
0
7,00
0
7,00
0
7,00
0
Play
grou
nd R
epla
cem
ent
Gen
eral
Fun
ds10
0,00
0
10
0,00
0
10
0,00
0
10
0,00
0
10
0,00
0
Pa
rkin
g Lo
t Mai
nten
ance
Gen
eral
Fun
ds15
,000
15
,000
15
,000
15
,000
15
,000
Pi
ckle
ball
Res
urfa
cing
Gen
eral
Fun
ds5,
750
6,
000
6,
000
6,
000
6,
000
H
indl
ey F
ilter
Rel
ocat
ion
Gen
eral
Fun
ds-
14
,000
14
,500
15
,000
15
,500
Sp
rinkl
er A
utom
atio
nG
ener
al F
unds
-
21,5
00
21,5
00
21,5
00
-
Qua
il C
ove
Pave
rsG
ener
al F
unds
11,0
00
-
-
-
-
Cen
teni
al S
win
g Se
tG
ener
al F
unds
-
10,0
00
-
-
-
Rot
ary
Side
wal
k R
epla
cem
ent
Gen
eral
Fun
ds6,
000
6,
500
7,
000
-
-
Pa
rk Im
prov
emen
tsG
ener
al F
unds
27,6
00
-
-
-
-
Boa
t Har
bor I
mpr
ovem
ents
Gen
eral
Fun
ds10
,000
-
-
-
-
A
rt D
ye Im
prov
emen
tsIm
pact
Fee
s50
0,00
0
-
-
-
-
A
rt D
ye R
esur
face
& S
tripe
Par
king
Gen
eral
Fun
ds60
,000
-
-
-
-
A
rt D
ye T
rail
Gra
nts
592,
000
-
-
-
-
Art
Dye
Tra
ilIm
pact
Fee
s45
,000
-
-
-
-
PA
RC
-Art
Dye
Par
kPA
RC
Tax
68,0
00
-
-
-
-
PAR
C-P
layg
roun
d Eq
uipm
ent
PAR
C T
ax19
0,35
1
-
-
-
-
PA
RC
-Fro
ntag
e Tr
ail
PAR
C T
ax90
,000
-
-
-
-
PA
RC
-Poo
l Fea
ture
sPA
RC
Tax
32,0
00
-
-
-
-
PAR
C-L
ibra
ry B
alco
ny A
rtsPA
RC
Tax
4,00
0
-
-
-
-
PAR
C-L
ibra
ry E
xpan
sion
PAR
C T
ax55
,000
-
-
-
-
T
otal
Par
ks5,
058,
501
42
0,00
0
41
1,00
0
40
4,50
0
38
3,50
0
91
5.6.a
Packet Pg. 176
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Gen
eral
Cap
ital P
roje
cts
GO
VE
RN
ME
NT
AL
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6Fi
tnes
s Cen
ter
Dec
k D
rain
Rep
lace
men
tG
ener
al F
unds
-$
11,0
00$
-$
-$
-$
Pool
Dec
k R
esur
faci
ngG
ener
al F
unds
12,0
00
-
-
-
-
Faci
lity
Pain
t and
Flo
orin
gG
ener
al F
unds
11,0
00
-
-
-
-
Pool
& S
pa R
esur
faci
ngG
ener
al F
unds
-
-
150,
000
-
-
Slid
e R
epai
rG
ener
al F
unds
8,00
0
-
-
-
-
Pool
Boi
ler
Gen
eral
Fun
ds-
-
70
,000
-
-
B
ubbl
e R
epla
cem
ent/A
ir H
andl
erG
ener
al F
unds
-
-
500,
000
-
-
Fitn
ess C
ente
r Roo
fG
ener
al F
unds
-
-
90,0
00
90,0
00
-
Lock
er R
oom
Impr
ovem
ents
Gen
eral
Fun
ds15
,000
50
0,00
0
-
-
-
R
aque
tbal
l Cou
rt R
esur
faci
ngG
ener
al F
unds
4,00
0
-
-
-
-
Arc
hite
ct (E
xpan
sion
)G
ener
al F
unds
-
-
-
-
8,00
0,00
0
Tot
al F
itnes
s Cen
ter
50,0
00
511,
000
810,
000
90,0
00
8,00
0,00
0
Bui
ldin
g &
Gro
unds
HV
AC
Sys
tem
Rep
lace
men
tsG
ener
al F
unds
30,0
00
35,0
00
35,0
00
35,0
00
-
Floo
ring-
Bro
adba
ndG
ener
al F
unds
-
-
8,00
0
-
-
City
Hal
l Lig
htin
g U
pgra
des
Gen
eral
Fun
ds-
10
,000
-
-
-
Fi
re S
tatio
n R
oof
Gen
eral
Fun
ds-
75
,000
-
-
-
Li
brar
y Li
ghtin
g U
pgra
des
Gen
eral
Fun
ds16
,000
-
-
-
-
Li
brar
y B
oile
r Rep
lace
men
tG
ener
al F
unds
70,0
00
70,0
00
Lear
ning
Cen
ter R
enov
atio
nG
ener
al F
unds
-
-
15,0
00
-
-
Legi
on H
all R
enov
atio
nsG
ener
al F
unds
20,0
00
20,0
00
-
-
-
Publ
ic W
orks
HV
AC
Rep
lace
men
tG
ener
al F
unds
-
9,00
0
9,00
0
9,00
0
-
Publ
ic W
orks
Tru
ck W
asho
utG
ener
al F
unds
10,0
00
-
-
-
-
Publ
ic W
orks
Boi
ler R
epla
cem
ent
Gen
eral
Fun
ds-
15
,000
-
-
-
Pu
blic
Wor
ks L
ight
ing
Upg
rade
sG
ener
al F
unds
-
10,0
00
10,0
00
-
-
Polic
e Se
curit
y U
pgra
des
Gen
eral
Fun
ds10
,000
-
-
-
-
92
5.6.a
Packet Pg. 177
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Gen
eral
Cap
ital P
roje
cts
GO
VE
RN
ME
NT
AL
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6B
uild
ing
& G
roun
ds (c
ontin
ued)
Polic
e R
oof
Gen
eral
Fun
ds-
$
90
,000
$
90
,000
$
90
,000
$
-
$
Po
lice
Boi
ler R
epla
cem
ent
Gen
eral
Fun
ds28
,000
70
,000
70
,000
-
-
En
gine
erin
g Pa
int &
Car
pet
Gen
eral
Fun
ds-
20
,000
-
-
-
A
dmin
istra
tion
Pain
t & C
arpe
tG
ener
al F
unds
-
30,0
00
-
-
-
Tot
al B
uild
ing
& G
roun
ds18
4,00
0
45
4,00
0
23
7,00
0
13
4,00
0
-
O
ther Mai
n St
reet
Rev
italiz
atio
nR
edev
elop
men
t-
10
0,00
0
10
0,00
0
10
0,00
0
10
0,00
0
C
ourts
Bui
ldin
g Im
pact
Fee
s-
50
0,00
0
10
,000
,000
-
-
Polic
e Fa
cilit
yIm
pact
Fee
s-
-
1,
000,
000
20
,000
,000
-
Polic
e Sh
ootin
g R
ange
Impa
ct F
ees
165,
000
-
-
-
-
Fire
-Sta
tion
52B
onds
8,
537,
683
-
-
-
-
Fi
re-S
tatio
n 53
Impa
ct F
ees
-
-
-
-
10,0
00,0
00
T
otal
Oth
er8,
702,
683
600,
000
11
,100
,000
20,1
00,0
00
10
,100
,000
TO
TA
L E
XPE
ND
ITU
RE
S23
,469
,007
$
8,60
0,00
0$
18,1
45,0
00$
27
,023
,171
$
24,6
06,5
00$
EN
TE
RPR
ISE
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6C
ulin
ary
Wat
er36
" W
ater
Lin
e R
epla
cem
ent
Bon
ds7,
015,
000
$
-
$
-
$
-
$
-
$
36
" W
ater
Lin
e R
epla
cem
ent
Impa
ct F
ees
5,00
9,01
7
-
-
-
-
36"
Wat
er L
ine
Rep
lace
men
t C
ulin
ary
Wat
er88
3,94
4
-
-
-
-
N
ew C
ulin
ary
Wel
l in
TOD
Are
aIm
pact
Fee
s-
25
0,00
0
4,
062,
500
-
-
A
MI M
eter
ing
Cul
inar
y W
ater
840,
000
-
-
-
-
Reh
ab o
f Cou
ntry
Clu
b W
ell
Cul
inar
y W
ater
260,
000
-
-
-
-
93
5.6.a
Packet Pg. 178
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Gen
eral
Cap
ital P
roje
cts
EN
TE
RPR
ISE
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6C
ulin
ary
Wat
er (c
ontin
ued)
Reh
ab o
f Hos
pita
l wel
lC
ulin
ary
Wat
er10
0,00
0$
1,
700,
000
$
-
$
-
$
-
$
W
ell R
epai
rsC
ulin
ary
Wat
er40
,000
-
-
-
-
La
rge
Met
er R
epla
cem
ent
Cul
inar
y W
ater
25,0
00
-
-
-
-
Fire
Hyd
rant
sC
ulin
ary
Wat
er40
,000
40
,000
40
,000
40
,000
40
,000
A
nnua
l CD
BG
Wat
er L
ine
Rep
lace
men
tC
ulin
ary
Wat
er/
250,
000
325,
000
325,
000
325,
000
325,
000
Ann
ual C
DB
G W
ater
Lin
e R
epla
cem
ent
Gra
nts
250,
000
325,
000
325,
000
325,
000
325,
000
Ann
ual W
ater
Lin
e R
epla
cem
ent
Cul
inar
y W
ater
500,
000
500,
000
500,
000
500,
000
500,
000
Wat
er L
ine
Rep
airs
Cul
inar
y W
ater
1,18
2,61
3
150,
000
150,
000
150,
000
150,
000
Stor
age
Bay
s for
Yar
dC
ulin
ary
Wat
er-
1,
000,
000
-
-
-
D
evel
oper
Rei
mbu
rsem
ent
Impa
ct F
ees
500,
000
500,
000
500,
000
500,
000
500,
000
Tot
al C
ulin
ary
Wat
er16
,895
,574
4,79
0,00
0
5,90
2,50
0
1,84
0,00
0
1,84
0,00
0
Seco
ndar
y Ir
riga
tion
Filte
r Scr
eens
Seco
ndar
y -
40
0,00
0
-
-
-
PI
Met
ers f
or C
ity F
acili
ties
Seco
ndar
y 50
,000
50
,000
50
,000
50
,000
50
,000
PI
Met
ers t
hrou
ghou
t City
Seco
ndar
y 3,
000,
000
-
-
-
-
PI
Met
ers t
hrou
ghou
t City
Gra
nts
3,00
0,00
0
3,00
0,00
0
-
-
-
AM
I Met
erin
gSe
cond
ary
360,
000
-
-
-
-
Low
er F
ilter
Sta
tion
Seco
ndar
y -
-
-
1,
200,
000
-
St
udy
& L
and
for P
I Cap
ture
TSS
D*
Impa
ct F
ees
1,98
7,05
8
-
-
-
-
Mitc
hell
Sprin
gs B
oost
erSe
cond
ary
-
-
-
83,0
00
725,
000
Dev
elop
er R
eim
burs
emen
tIm
pact
Fee
s50
0,00
0
50
0,00
0
50
0,00
0
50
0,00
0
50
0,00
0
T
otal
Sec
onda
ry Ir
riga
tion
8,89
7,05
8
3,95
0,00
0
550,
000
1,83
3,00
0
1,27
5,00
0
94
5.6.a
Packet Pg. 179
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Gen
eral
Cap
ital P
roje
cts
EN
TE
RPR
ISE
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6Se
wer
45
0 W
Ups
izin
g*Se
wer
239,
034
$
-$
-$
-$
-$
Ann
ual S
lip li
ning
Sew
er32
5,00
0
35
0,00
0
37
5,00
0
40
0,00
0
42
5,00
0
Se
mi-a
nnua
l Pip
e B
urst
ing
Sew
er55
0,00
0
-
57
5,00
0
-
60
0,00
0
D
evel
oper
Rei
mbu
rsem
ent
Impa
ct F
ees
300,
000
300,
000
300,
000
300,
000
300,
000
Tot
al S
ewer
1,41
4,03
4
650,
000
1,25
0,00
0
700,
000
1,32
5,00
0
Stor
m D
rain
sC
urb
and
Gut
ter R
epai
rsSt
orm
Dra
in50
,000
-
-
-
-
C
urb
and
Gut
ter R
epla
cem
ent -
Stre
ets
Stor
m D
rain
719,
679
700,
000
700,
000
700,
000
700,
000
36"
stor
m d
rain
200
E 2
00 N
Stor
m D
rain
50,0
00
450,
000
-
-
-
Riv
er R
ehab
Cha
nnel
Sou
th M
ain
St.
Stor
m D
rain
-
75,0
00
750,
000
-
-
Stor
age
Bay
s for
Yar
dSt
orm
Dra
in-
-
1,
000,
000
-
-
A
F R
iver
Reh
abili
tatio
n*St
orm
Dra
in21
1,32
5
60
0,00
0
-
-
-
D
evel
oper
Rei
mbu
rsem
ent
Impa
ct F
ees
500,
000
500,
000
500,
000
500,
000
500,
000
Tot
al S
torm
Dra
ins
1,53
1,00
4
2,
325,
000
2,95
0,00
0
1,
200,
000
1,20
0,00
0
T
OT
AL
EX
PEN
DIT
UR
ES
28,7
37,6
70$
11
,715
,000
$
10,6
52,5
00$
5,
573,
000
$
5,
640,
000
$
TO
TA
L C
ITY
-WID
E52
,206
,677
$
20,3
15,0
00$
28
,797
,500
$
32,5
96,1
71$
30
,246
,500
$
95
5.6.a
Packet Pg. 180
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Gen
eral
Cap
ital P
roje
cts
PRO
JEC
T F
UN
DIN
GPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
ed20
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6C
lass
B &
C A
llotm
ent
1,10
0,20
8$
1,10
0,20
8$
1,10
0,20
8$
1,10
0,20
8$
1,10
0,20
8$
Sale
s Tax
1,00
0,00
0
1,00
0,00
0
1,00
0,00
0
1,00
0,00
0
1,00
0,00
0
Prop
erty
Tax
500,
000
500,
000
500,
000
500,
000
500,
000
Gen
eral
Fun
ds
931,
345
2,79
9,79
2
2,82
4,79
2
2,09
8,29
2
9,95
6,29
2
Red
evel
opm
ent
1,64
3,78
6
100,
000
100,
000
689,
671
100,
000
Impa
ct F
ees
15,7
07,7
09
5,
050,
000
18
,362
,500
23,3
00,0
00
13
,300
,000
Deb
t Pro
ceed
s15
,552
,683
-
-
-
-
Gra
nts
5,61
5,00
0
3,42
5,00
0
445,
000
460,
000
475,
000
Perp
etua
l Car
e Fu
nds
40,0
00
-
-
-
300,
000
PAR
C T
ax43
9,35
1
-
-
-
-
C
ulin
ary
Wat
er4,
121,
557
3,
715,
000
1,
015,
000
1,
015,
000
1,
015,
000
Se
cond
ary
Irrig
atio
n3,
410,
000
45
0,00
0
50
,000
1,
333,
000
77
5,00
0
Se
wer
1,
114,
034
35
0,00
0
95
0,00
0
40
0,00
0
1,
025,
000
St
orm
Dra
in1,
031,
004
1,82
5,00
0
2,
450,
000
700,
000
70
0,00
0
TO
TA
L R
EV
EN
UE
S52
,206
,677
$
20,3
15,0
00$
28
,797
,500
$
32,5
96,1
71$
30
,246
,500
$
Des
crip
tion
96
5.6.a
Packet Pg. 181
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
GO
VE
RN
ME
NT
AL
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6St
reet
s & P
ublic
Wor
ksTo
w-b
ehin
d ai
r com
pres
sor
Gen
eral
Fun
ds-
$
24
,000
$
-
$
-
$
-
$
S4
10-
whe
eler
Gen
eral
Fun
ds-
22
0,00
0
-
-
-
C
rack
seal
erG
ener
al F
unds
-
75,0
00
-
-
-
Trac
khoe
(lea
se)
Gen
eral
Fun
ds23
,000
16
0,00
0
-
-
-
G
rade
rG
ener
al F
unds
-
100,
000
-
-
-
Chi
p bo
xG
ener
al F
unds
15,0
00
-
8,00
0
-
-
Chi
p ro
ller
Gen
eral
Fun
ds-
10
,000
-
-
-
R
olle
rG
ener
al F
unds
80,0
00
-
-
-
-
Swee
per
Gen
eral
Fun
ds-
-
-
24
0,00
0
-
Sk
id S
teer
Gen
eral
Fun
ds-
-
-
46
,400
-
M
ini-X
/Tra
iler/C
ompa
ctor
/Ham
mer
Gen
eral
Fun
ds-
84
,000
84
,000
-
-
B
oom
Tru
ckG
ener
al F
unds
-
-
-
-
14,7
00
Tot
al S
tree
ts &
Pub
lic W
orks
118,
000
67
3,00
0
92,0
00
28
6,40
0
14,7
00
C
emet
ery
Mow
er P
rogr
amG
ener
al F
unds
14,1
15
-
-
-
-
Bac
khoe
Lea
se (3
yea
r 201
8-20
21)
Gen
eral
Fun
ds9,
620
9,
000
9,
000
10
,000
10
,000
M
ini X
Lea
se (3
yea
r 201
8-20
21)
Gen
eral
Fun
ds9,
500
9,
500
9,
500
12
,000
12
,000
T
otal
Cem
eter
y33
,235
18,5
00
18
,500
22,0
00
22
,000
Park
sTr
uck
Mou
nt S
alte
rG
ener
al F
unds
11,8
31
-
-
-
-
Mow
er P
rogr
amG
ener
al F
unds
40,2
94
25,2
94
25,2
94
25,2
94
25,2
94
SDI S
pray
erG
ener
al F
unds
-
-
-
-
-
Park
Fur
nish
ings
Gen
eral
Fun
ds17
,000
-
-
-
-
T
otal
Par
ks69
,125
25
,294
25
,294
25
,294
25
,294
Cap
ital P
roje
cts -
Cap
ital E
quip
men
t
97
5.6.a
Packet Pg. 182
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Cap
ital E
quip
men
t G
OV
ER
NM
EN
TA
L F
UN
DS
Fund
ing
Prop
osed
Req
uest
edR
eque
sted
Req
uest
edR
eque
sted
Dep
tart
men
t/Pro
ject
2021
-22
2021
-22
2022
-23
2023
-24
2024
-25
2025
-26
Rec
reat
ion
Mac
hine
Pitc
h M
achi
neG
ener
al F
unds
-$
5,00
0$
-$
-$
-$
Socc
er G
oals
for G
oods
ell P
rop.
Gen
eral
Fun
ds-
8,
000
-
-
-
T
otal
Rec
reat
ion
-
13,0
00
-
-
-
Fitn
ess C
ente
rC
ardi
o &
Wei
ght E
quip
men
tG
ener
al F
unds
5,00
0
32,0
00
27,0
00
34,0
00
34,0
00
Gym
nast
ics S
prin
g Fl
oor
Gen
eral
Fun
ds16
,000
-
-
-
-
D
ispl
ay M
onito
rs-in
faci
lity
Gen
eral
Fun
ds-
-
-
-
-
Po
ol R
obot
Cle
aner
Gen
eral
Fun
ds-
-
-
-
-
Sh
ade
Stru
ctur
es fo
r Poo
l Dec
kG
ener
al F
unds
-
-
-
-
-
Upd
ate
fire
pane
lG
ener
al F
unds
-
-
-
-
-
Bla
ck T
arp
Rep
lace
men
tG
ener
al F
unds
-
25,0
00
-
-
-
Leis
ure
Pool
Boi
ler R
epla
cem
ent
Gen
eral
Fun
ds-
45
,000
-
-
-
W
ibit
Syst
em fo
r Poo
lG
ener
al F
unds
-
-
-
-
-
Pool
Slid
e R
epla
cem
ent
Gen
eral
Fun
ds9,
000
-
-
-
-
R
evol
ving
Doo
r Rep
lace
men
tG
ener
al F
unds
-
16,0
00
-
-
-
Tot
al F
itnes
s Cen
ter
30,0
00
118,
000
27,0
00
34,0
00
34,0
00
Fire Te
chni
cal R
escu
e G
ear
Gen
eral
Fun
ds20
,000
20
,000
20
,000
20
,000
20
,000
Th
erm
al Im
agin
g C
amer
as
Gen
eral
Fun
ds9,
000
-
-
-
-
Fo
rcib
le E
ntry
Doo
r Sim
ulat
or
Gen
eral
Fun
ds10
,000
-
-
-
-
SC
BA
air
pack
s and
bot
tles
Gen
eral
Fun
ds-
27
5,00
0
-
-
-
PP
E w
ashe
r for
Sta
tion
51
Gen
eral
Fun
ds-
18
,000
-
-
-
T
otal
Fir
e39
,000
31
3,00
0
20
,000
20
,000
20
,000
98
5.6.a
Packet Pg. 183
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Cap
ital E
quip
men
t G
OV
ER
NM
EN
TA
L F
UN
DS
Fund
ing
Prop
osed
Req
uest
edR
eque
sted
Req
uest
edR
eque
sted
Dep
tart
men
t/Pro
ject
2021
-22
2021
-22
2022
-23
2023
-24
2024
-25
2025
-26
Polic
eR
adio
Rep
lace
men
tG
ener
al F
unds
16,0
00$
16,4
80$
16,9
74$
17,4
84$
18,0
08$
Das
hcam
sG
ener
al F
unds
20,0
00
-
-
-
-
Equi
pmen
t, R
adio
s, Ta
sers
Gen
eral
Fun
ds16
,000
16
,480
16
,974
17
,484
18
,008
T
otal
Pol
ice
52,0
00
32,9
60
33,9
48
34,9
68
36,0
16
Oth
er Hol
iday
Dec
orat
ions
Gen
eral
Fun
ds15
,000
-
-
-
-
T
otal
Oth
er15
,000
-
-
-
-
TO
TA
L E
XPE
ND
ITU
RE
S35
6,36
0$
1,
193,
754
$
21
6,74
2$
42
2,66
2$
15
2,01
0$
EN
TE
RPR
ISE
FU
ND
SFu
ndin
gPr
opos
edR
eque
sted
Req
uest
edR
eque
sted
Req
uest
edD
epta
rtm
ent/P
roje
ct20
21-2
220
21-2
220
22-2
320
23-2
420
24-2
520
25-2
6Pu
blic
Wor
ksV
ac tr
uck
Sew
er-
$
40
0,00
0$
-
$
-
$
-
$
Sk
id st
eer
Cul
inar
y W
ater
-
-
-
-
-
Hea
ter b
edC
ulin
ary
Wat
er-
-
-
-
-
B
ackh
oe L
ease
Cul
inar
y W
ater
26,5
00
26,5
00
26,5
00
26,5
00
26,5
00
Min
i-XC
ulin
ary
Wat
er-
-
84
,000
-
-
H
ydro
Exc
avat
orC
ulin
ary
Wat
er-
-
-
48
0,00
0
-
V
alve
exe
rcis
e m
achi
neC
ulin
ary
Wat
er-
75
,000
-
-
-
T
otal
Pub
lic W
orks
26,5
00
50
1,50
0
110,
500
50
6,50
0
26,5
00
T
OT
AL
EX
PEN
DIT
UR
ES
-
26
,500
$
501,
500
$
110,
500
$
506,
500
$
26,5
00$
TO
TA
L C
ITY
-WID
E38
2,86
0$
1,
695,
254
$
32
7,24
2$
92
9,16
2$
17
8,51
0$
99
5.6.a
Packet Pg. 184
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)
Am
eric
an F
ork
City
Pro
pose
d A
nnua
l Bud
get F
isca
l Yea
r 202
1-20
22C
apita
l Pro
ject
s Pla
n
Cap
ital P
roje
cts -
Cap
ital E
quip
men
t PR
OJE
CT
FU
ND
ING
Prop
osed
Req
uest
edR
eque
sted
Req
uest
edR
eque
sted
2021
-22
2022
-23
2023
-24
2024
-25
2025
-26
Gen
eral
Fun
ds35
6,36
0$
1,
193,
754
$
21
6,74
2$
42
2,66
2$
15
2,01
0$
C
ulin
ary
Wat
er26
,500
10
1,50
0
11
0,50
0
50
6,50
0
26
,500
Se
we r
-
40
0,00
0
-
-
-
T
OT
AL
RE
VE
NU
ES
382,
860
$
1,69
5,25
4$
327,
242
$
929,
162
$
178,
510
$
Des
crip
tion
100
5.6.a
Packet Pg. 185
Att
ach
men
t: F
Y20
22 T
enta
tive
An
nu
al B
ud
get
(T
enta
tive
Bu
dg
et F
isca
l Yea
r 20
21-2
2)