2.15871 - geology ontario

62
S2H06SW002S 2.15871 WABIKON LAKE 010 2.15871 GEOPHYSICAL REPORT WHISTLE LAKE EAST PROJECT NTS 52-H-6 BY: PHANTOM EXPLORATION SERVICES LTD. 103-79 NORTH COURT STREET THUNDER BAY, ONTARIO P7A 4T7 OCTOBER, 1994

Upload: khangminh22

Post on 26-Mar-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

S2H06SW002S 2.15871 WABIKON LAKE 010

2.15871

GEOPHYSICAL

REPORT

WHISTLE LAKE EAST PROJECT

NTS 52-H-6

BY: PHANTOM EXPLORATION SERVICES LTD. 103-79 NORTH COURT STREET THUNDER BAY, ONTARIO P7A 4T7 OCTOBER, 1994

l52H06SWO025 2.15871 WABIKON LAKE Q*| QQ

TABLE OF CONTENTS

INTRODUCTION...................................1

GRIDING.LOCATION AND ACCESS....................1

LIST OF CLAIMS.................................2

PROPERTY GEOLOGY...............................2

THEORY OF OPERATION............................3

SURVEY PROCEDURE...............................3

DISCUSSION OF RESULTS..........................4

CONCLUSIONS AND RECOMMENDATIONS................5

MAPS INCLUDED IN THIS REPORT

MAXMIN PROFILES 444 HZ "north" grid.......1:2500

MAXMIN PROFILES 1777 HZ "north" grid......1:2500

MAXMIN PROFILES 444 HZ "east" grid........1:2500

MAXMIN PROFILES 1777 HZ "east " grid......1:2500

INTRODUCTION

During the fall of 1994, Phantom Exploration

Services of Thunder Bay, Ontario was contracted by

Cumberland Resources Ltd. of Thunder Bay, to complete a

MaxMin II+ geophysical survey on two grids on their Whistle

Lake East Project. The property consists of 77 unpatented

mining claims containing 104 units numbered TB 1082884-899

inclusive, TB 1083000-003 inclusive, TB 1083035-036

inclusive, TB 1083041-070 inclusive, TB 1083073-082

inclusive, TB 1083084-092 inclusive, TB 1088209-210

inclusive, TB 1195981, TB 1209446, TB 1204894 and TB 1205107

which are located in the Thunder Bay Mining Division.

GRIDING. LOCATION AND ACCESS

Approximately 29.6 Kilometres of line were cut,

chained and picketed at 25 metre intervals on two grids:

11.5 kilometres on the "north" grid and the remainder on the

"east" grid. The baseline was orientated east-west and the

grid lines were cut perpendicular to it at 100 metre

intervals. The line cutting was completed by Vytyl

Exploration Services of Thunder Bay, Ontario while the

geophysical survey was carried out by Phantom Exploration

Services Ltd.

The property is located about 100 kilometres due

north of Thunder Bay, Ontario and about 4km east of Highway

1

north of Thunder Bay, Ontario and about 4km east of Highway

#527. Access is provided to the general area by highways

1117*17 and #527. At a point about 100 kilometres north of

the junction of these two highways, access is gained by

travelling (5km) north and east on old logging roads to the

survey area.

CLAIMS COVERED BY THIS REPORT

TB 1082884 TB 1082893 TB 1082894

TB 1083035 TB 1083050 TB 1083051

TB 1083052 TB 1083053 TB 1083054

TB 1083059 TB 1083060 TB 1083061

TB 1083062 TB 1083065 TB 1083066

TB 1083067 TB 1083068 TB 1083074

TB 1083075 TB 1204894

PROPERTY GEOLOGY

The property is underlain by an east-west trending

sequence of volcanic rocks which are capped by a diabase

sill. This sill, which in general thickens to the east, is

relatively thin in the survey area and in some areas is

completely removed. The volcanics exposed in these windows

are for the most part felsic in composition and exhibit

zones of alteration associated with varying amounts of

sulphides consisting of mainly pyrite and pyrrhotite.

A relatively thin, flat lying, fine grained, white

recrystallized dolomitic limestone is closely associated

spatially with the diabase sill.

THEORY OF OPERATION

The Max Min IH-

Since the horizontal loop E.M. system is maximum

coupled, measurement at the receiver is most conveniently

made in terms of the ratios of the in phase and out of phase

voltages induced in a reference coil. The reference coil is

mounted directly on the transmitting coil in the orientation

of the maximum coupling. The reference and the receiver

voltage are compared in a bridge ratiometer circuit, the

output of which is displayed on the in and out of phase

meters. These meters will read zero when the signal is

entirely due to the primary field and its phase shift is

ninety degrees (i.e. no E.M. anomaly present). When readings

are taken in the vicinity of a conductor, the in phase and

the out of phase components of the secondary field are

measured as a percentage of the primary field intensity and

phase at the receiver.

SURVEY PROCEDURE

The Max Min II+

The equipment used for this survey was a Max Min

II+ manufactured by Apex Parametries Limited of Uxbridge,

Ontario. The survey was conducted using the in-line array,

with coplanar coils moving in tandem along survey lines

orientated perpendicular to the geologic strike. The

horizontal separation between the coils is kept constant by

means of accurate secant chaining of the lines. A continuous

inclinometer survey is carried out by the receiver operator

as he travels from station to station. By simple arithmetic

averaging, the percentage slope (tilt) between coils can be

calculated and thus any errors due to elevation differences

between the transmitter and the receiver can be eliminated

by using the tiltmeter to keep the coils coplanar. Both in

and out of pase readings were taken at 25 meter intervals

along the survey lines for two frequencies ( 1777 Hz and 444

Hz). These readings are plotted at mid point between the

transmitter and the receiver.

DISCUSSION OF RESULTS

The Max Min II+ Survey

The survey area is presented in plan form at a

scale of 1:2500 with the vertical scale set at 1 cm - 25X

for the EM profiles with one map for each frequency

surveyed. Two maps cover the "east" grid and two maps cover

the "north" grid.

No conductive trends were located in the surveyed

areas. The "bump" in the profiles located on lines 43+OOE bo

47+OOE at about 6+50S on the "east" grid is coincident with

a severe topographic feature (cliff bounded "ditch" or

mini graben) that probably presented chaining problems arid

hence short cable effects. On the other hand this feature

probably represents a fault zone and as such could be a site

of a weak conductor that is not easily recognized due to the

short cable effects.

In personal conversation with project geologists,

it has been strongly suggested that the thickness of the

diabase sill in of the survey areas may be in the order of

100 plus metres making the possibility of the EM survey of

picking up any conductors present remote if not impossible.

CONCLUSIONS AND RECOMMENDATIONS

The survey area is underlain by a predominately

felsic volcanic sequence of rocks overlain for the most part

by a diabase sill. The thickness of the sill in the survey

areas is thought to be in excess of 100 metres and as such

would make the possibility of finding EM conductive trends

under the sill/sills with a max min unit with a 200 metre

coil separation, highly unlikely.

A EM survey that has sufficient penetrating

ability such as a pulse EM survey should be considered to

evaluated the volcanic sequence located under the diabase

sill areas of the property.

Detailed mapping and prospecting should be carried

out to better understand and evaluate the geophysical

results. A lithogeochemical survey of the volcanic sequence

of rocks, to outline any alteration halos present, should be

done to aid in evaluating the base metal potential of the

area.

Subsequent to the above recommendations, a drill

program should be considered to test any resulting target

areas.

Submitted by

6

S2H06SW0025 2.15871 WABIKON LAKE Q20

1587

WHOLE ROCK GEOCHEMISTRY

DATA RESULTS AND LOCATION MAP

WHISTLE LAKE EAST PROPERTY

WABIKON CLAIM MAP (G-773)

CUMBERLAND RESOURCES LTD.

JANUARY 4, 1995

FEB V ' r.r-

LI.MG Lz,NDS BRANCH

Jan 4, 1995

To: W. Mccrindle Fm: M.W.Leahey

REj Whole Rock Geochemistry

On the enclosed map, Figure 3, 74 whole rock sample locations were plotted on Cumberland's Whistle East property. The samples are -From both outcrop and float locations. This map is a compilation of the data from the 1994 reconnaissance geological mapping, the 1994 geological mapping of the West, the North and the East grids of the Whistle Lake East property. All analyses were undertaken by Accurassay Laboratories. The whole rock results +X- trace element values and a listing of the grid co-ordinates are presented in the attached appendix.

SAMPLE12O871208812O891209O120911209212O93120941209512096120971209812O99121OO121O1121O5121O612107121O81211112112121131211412115121161297612978129791298O1298112982129831298412985129861298712988129891299012991129921299312994129951299612997129991300113OO213O0313OO413OO513OO6

EAST269O300030153245341534751165115511651165142548OO51 OO510O51004OOO4000400O40003BOO3475460045OO4190421048558550545O45O275177399099O1055105813OO135514OO14OO1405131013151320129O1270126O118012901285157514OO1385

NORTH192016001650154021OO130014OO145017OO1800115O1OOO14OO135012751535155015752075675500190019508951013375212175

-175-23O-95

-79O-95

-195-510-475-735-725-465-410-357-325-300-16O-180-275-295-3108551O2O-41O-23O-175

13007 1510 110013011 169O 121013012 1580 117513013 16O3 1O9O13014 1623 107313015 2110 109513029 469O 1O7513030 4685 135O13031 4575 173513032 4O15 162513033 4615 122513034 44OO 17OO13035 4425 1O1513036 4385 95O13037 449O 85513038 419O 176513039 LOST LOST13040 42OO 86O13041 4290 90013042 3815 146013043 3485 1255

ACCURASSAY UBORATORIESA UI\1SION Of ASSAY IAOORA1ORY SERVICES INC.

CMffmAIIB RESOURCES LID.

74 ttlrmlprf Aw*thunder toy, Ontario

r 70 3r9

S 102

SMple 1 X

12087 67.72

12088 65.11

12089 TO. 6912090 71.83

12091 66.65

12092 70.0712093 70.7812094 69.45

12095 54.37

12096 66.14

12097 67.18

12O98 69.3713099 64.4512100 69.27121O1 62.54

12102 62.85

12103 #9.19

12104 70.92

121O5 70.66

121O6 65.05

12107 70.79

12108 67.59

12111 64.76

12112 1.90

12113 65.73

12114 72.09

12115 68.82

12116 68.44

A1203

X

14.81

17.02

14.7314.68

16.49

13.2413.7714.71

13.31

15.33

16.2114.8514.0615.1216.37

18.32

15.63

14.76

15.03

18.33

14.59

14.36

14.60

0.61

15.17

13.30

14.3915.40

Fe2o3X

2.92

2.88

2.79

1.23

4.05

4.283.72

3.33

13.48

2.15

2.93

2.356.362.835.894.16

3.70

3.85

4.533.513.533.526.500.124.32

1.694.103.59

t

HgO

x

1.57

0.58

0.58

0. 46

1.52

1.570.891.14

5.17

0.85

1.181.022.661.142.45

1.66

1.86

1.41

0.82

1.62

1.05

2.00

3.74

19.19

1.63

0.54

1.23

1.81

taoX

2.113.011.921.981.812.57C.9A3.385.40

1.86

2.673.614.512.652.90

5.85

4.22

3.40

1.86

2.35

2.272.652.85

38.261.470.44

3.284.34

Na20X

5.08

5.06

4.54

5.07

5.38

3.982.61

3.26

3.04

3.72

3.662.942.084.063.673.74

1.94

4.51

5.465.874.250.761.850.151.991.464.16

1.70

1 10/0 1 lil HUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P/B 6G3

, PHONE (807) 623 64481 1 FAX (807) 623-6820i Fag* 11

June 17, 1994

1 Job *944448

K20 f 205 T 102 tM BaO Cr2Oj SrO LOI total

xxxlxxfxx x

1.82 0.177 0.583 0.070 0.041 0.082 0.028 1.9 98.9

3.36 0.148 0.496 0.060 0.082 0.076 0.022 0.9 98.8

2.52 0.101 0.325 0.054 O.O46 0.141 0.019 1.2 99.7

1.41 O.O69 0.392 0.028 O.O34 0.116 0.021 0.8 98.1

1.30 0.117 0.624 0.147 0.037 0.21O 0.022 1.4 99.8

1.25 0.077 0.305 0.055 0.033 0.106 0.022 1.5 99.19.99 O.OM 0.**8 O.M4 O.OfJ 0.081 O.O20 1.1 100.*2.25 0.072 0.318 0.0(8 0.039 0.124 0.029 .7 99.9

1.74 0.227 1.610 0.209 O.057 0.085 0.028 .8 100.5

1.82 O.O95 0.448 0.056 0.034 0.099 0.023 .2 95.8

2.86 0.069 0.283 0.035 O.053 O.039 0.020 .8 99.0

1.50 0.080 0.323 0.036 0.036 0.135 0.020 .6 97.91.58 0.153 0.667 0.124 0.061 0.154 O.O2S .O 98.91.67 0.093 0.338 O.O49 0.056 0.111 0.013 .7 99.12.33 0.064 0.363 O.O56 0.038 O.O55 O.O22 .7 98.4

1.28 0.132 0. 408 0.0*2 0.050 O.090 0.034 .5 100.1

3.35 O.106 0.351 O.O55 O.074 0.131 0.021 2.1 102.7

1.25 0.093 0.329 0.042 0.028 O.O60 0.020 1.0 101.7

1.56 0.090 0.329 0.042 0.033 0.066 0.023 0.4 100.91.98 0.103 0.411 0.035 0.042 0.096 0.028 1.0 1OD.4

1.74 0.093 0.336 0.056 0.041 0.152 0.027 1.1 100.0

7.02 0.098 0.331 0.088 0.084 0.091 0.025 1. 100.21.35 0.232 0.725 0.089 6.046 0.139 0.017 2. 99.40.01 0.138 0.016 0.168 0.015 0.008 0.004 45. 1O5.95.49 0.127 0.377 0.041 0.104 0.124 0.012 3. 100.2

7.35 0.074 0.372 0.014 0.105 0.178 0.010 1. 99.2d.7l 0.109 0.32) 0.060 0.028 0.090 0.022 3. 100.72.9ft 0.122 0.360 0.050 0.074 0.117 0.016 1. 100.5

Certified By:

M

L l O. Ui 17 o.

ACCURASSAY UBORATORIESX DMSION Of ASSAY LABORATORY SERVICES INC.

1070 UTHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 603

PHONE (807) 623-6448FAX (807) 623-6820

CUHBCHUMO RESOURCES LTD. 74 Winnipeg Avc. Thunder Bay, Ontario P7B 3P9

9, 1994

Job 19441201

Met: Bayshor* Saology

Saaple f

12976

12978

12979

12980

12981

12902

12983

12984

12985

1298*

12987

129M

12989

12990

1Z991

12992

12993

1299*

12993

12996

12997

12999

13001

13002

13003

1300*

13005

13006

sioex

65.07

68.40

TO. 90

68.82

62.36

68.72

69.70

68.06

72.9964.69

65.38

66.17

65.08

67.66

67.34

69.63

67.33

50. 0*

65.27

66.92

68.11

70.68

65.64

72.33

68.22

68.8072.7370.79

A1203X

12.9813.8212.6912.2113.7113.6612.2713.6712.4213.7813.8513.7013.0813.93U.3313.7213.6213.2*12.2714.0914.0213.8414.2114.3414.00

13.25

13.95

13.92

FC203X

7.214.494.4

5.474.824.322.383.89

1.2

4.89

4.&C

4.56

6.24

4.394.84

2.54.8412.15.884.74

4.76

2.24

4.83

1.62

2.78

4.232.384.16

ngoX

3.8

2.4

1.54

3.96

3.6

1.71

2.58

2.69

1.3

4.01

3.76

1.75

3.73

1.87

2.21

0.92

3.02

8.04

2.76

2.16

2.53

1.09

2.56

0.41

2.36

1.88

1.42

2.49

CaO

X

2.94

2.85

2.2

2.08

6.21

3.1T

0.8

3.37

1.26

2.61

3.4

3.6

1.69

3.73

3.37

2.67

2.76

10.26

1.96

3.13

3.85

2.66

2.98

2.7

2.77

2.98

i. K

3.79

NB20X

1.39

3.02

3.29

0.87

1.222.720.441.121.582.892.833.29

0.82

2.552.833.441.061.312.512.872.282.742.854.621.292.772.391.73

K20X

1.561.361.241.802.301.784. 452.883.021.211.841.713.651.771.841.443.220.991.461.651.962.081.A41.002.831.701.912.70

P205X

0.0190.0380.0270.0160.0330.0300.0140.0180.0010.034O.0280.0130.0230.06S0.0360.0220.0310.0210.0190.0260.0300.0010.0300.0120.0140.0290.0100.045

Hoex

0.4720.4680.4390.4070.4480,4800.2320.4380.0340.5240.4880.4670.4280.4900.5390.2490.5480.7310.4720.5310.5200.2090.5110.2860.2590.4370.2470.519

IhrtX

0.0890.0410.0430.0580.0870.0530.0260.0520.0250.0460.0420.0500.0500.0480.0480.0270.0730.1740.0410.0340.0540.0340.0400.0290.0380.0440.0220.046

BaOX

0.0220.0220.0220.0280.0250.0300.0440.0310.0260.0190.028O.OZ70.0290.0250.0280.0270.0420.0130.0180.0260.0310.0260.0190.0220.0270.0300.0270.030

Cr203X

0.122

0.0610.0700.0610.0700.0700.0700.0870.0520.0440.0440.0610.0520.0520.0790.0440.0610.0520.0520.0700.0870.0440.0790.079O.O910.0960.0320.052

SroX

0.0120.0130.0150.0090.0130.0150.0030.0100.0070.0130.0150.0190.0030.0090.0130.0160.0070.0110.0080.0120.0110.0190.0140.0260.0080.0150.0100.010

LDI

x

3.12.12.13.12.11.72.92.01.61.71.40.81.91.21.51.11.71.32.41.81.81.32.60.81.91.91.20.9

TotalX

98.8

99.1

99.0

98.9

97.2

98.5

95.9

98.3

95.5

96.5

97.7

96.2

98.8

98.0

99.0

95.8

98.3

98.3

95.1

98.1

100.0

97.0

97.6

98.3

96.6

98.2

99.2

101.2

Certified By fa.tee

ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.

CUMBERLAND RESOURCES LTD. 74 Winnipeg Ava.

Thunder Bay, Ontario MB 3P9

1070 LITHIUM DRIVE, UNIT 2THUNDER BAY, ONTARIO P7B 603

PHONE (807) 623-6448FAX (807) 623-6820

rao.1

NbveMber 10, 1994

Job 19441201

f

12976129781297912980

129811298212983129841298512986129871298812989129901299112992129931299412995129961299712999130011300213003130041300513006

13007

A0

PP"

0.60.20.10.1

0.20.40.10.10.10.10.10.10.10.30.20.2

0.0.0.0.O.0.0.0.10.10.20.1O. 1

0.1

AtX

1.480.770.511.320.930.530.441.460.461.381.370.982.25

1.1

1.210.261.510.671.491.291.350.531.160.251.21

10.671.43

0.75

A*

PP"

81049

15

42

411754

161298

168

104

1816109

5

Bm

PP*

45327745

5991236117

16024628527323728566

3161994

170120486730

1074075

13154

Be

PP*

CI

rtrtCI

rtCI

rtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrtrt

Bf

PP*

o4343

43

43

43

43

43

543

43

43

43

43

43

44343

43

43

43

43

43

43

434343

43

43

eax

0.60.340.190.540.850.320.110.720.070.180.180.260.180.230.270.210.5

0.630.240.260.490.2

0.330.36

0.420.480.19

0.330.17

CdPP*

rt1

rtCI

rtrtCI

rtrtrtrtrti

rtrtrtrtrtrtrtrtrtrtrtrtrtrtCI

rt

Co

PP*

a11i

134

147

22

8416

107

117

124

2

1

1110

44

crPP*

420

327365317366357381402374232217321231261447274319123279355452248417463328507293237212

CuPP"

242

2073

2829

156147010131119135443281298

40594in4789145830305011

r*x

4.633.152.913.552.21

2.991.542.380.783.133.153.194.053.3

3.491.7

3.161.334.47

3.573.331.543.4

1.091.813.071.642.651.49

LaPP"

191911202422

626

42116221616192122

11016251822118

248

248

"9X

1.931.3

0.831.911.130.941.251.280.631.911.881.022.691.061.210.491.490.641.521.221.360.6

1.350.251.131.050.761.221.1

Certified B/:

SPM BVrlinADER RAY. o\l. l : 12PM : \( C l R\SS\Y l \RS l TO. - 8117 57 :- n

JL A DIVISION OF ASSAY LABORATORY SERVICES INC.

RESOURCES LTD.

74 Winnipeg Ave. Thunder toy, Ontario P7B 3P9

1070 UTHIUM DRIVE. U' ' 2THUNDER BAY, ONTARIO P7B ,5

PHONE (607) 623-6448FAX (807) 623-6820

P*3t1

Novober 10, 1994

Job 19441201

i

1297612978129791298012981129821298312984129851298612987129881298912990129911299212993129941299512996129971299913001130021300313004130051300613007

NnPP*

Ml36934350939048226144122S392394487499462444277563194458369530352380190344439220330278

ItoPP*

322212112121213221213212116492

NBX

0.040.040.040.060.080.040.020.120.020.030.030.040.08O.OS0.080.020.1

0.080.030.040.070.020.040.03O.070.060.040.070.03

N1PP*

292315212124142682326282518271124362332321328232031122218

PPP*

587562476489602607313504155580606596499604632600609222538708675336608311351562356579247

PbPP*

2626253422231813410121819171681911610189871511171115

SbPP*

42424242^^9

^2K2424242424242424424242

424242424242424242

42

SIX

0.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.01O.OIO.OI0.01O.OI0.010.010.010.010.010.01O.OI0.01

SfPP*

97791571

172

1624735689473

Tl

X

0.30.220.2

0.190.180.210.020.150.020.2

0.250.280.290.260.280.110.250.080.250.236.220.120.210.080.110.210.110.230.14

VPP*

5334434394615399

6565585561742270365770611658272555224728

UPP*

4?

4242927542424242^5424242

144242422

4242

4242

242

4242

InPT*

70433035414322284

3439444662404846154132514525224329373528

certified By:

SfM RVillRNDER BAY. : M - 11 -94 V "l : -I5PM : ACCfRASSAY LABS LTD. - 807 57

in A r*r* nw i Anr*rm-rr\r*ir-r*

ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC

1070 LITHIUM DRIVE, UNIT 2THUNDER BAY. ONTARIO P7B6G3

PHONE (807) 623-6448FAX (807) 623-6820

Peg* 2

CUMBERLAND RESOURCES LT6. T* Wlnn1|Mt Av*. Thunder Bay, Ontario fTB 3P9

9, 1994

Job 19*41201

Ret: Bnyahor* Geology

Saaple l

13007 13011 15012 13013 1301*

SW2 A1203 Fe203 XXX

68.06 71.75 68.73 67.10 69.2?

16.5915.361*.36 15.60 15.67

2.142.4

2.232.813.17

ngoX

21.371.33

1.811.65

cao Ba2O X X

1.7* 1.06 1.1* 2.8

*.53

3.43 3.13 2.37 (.22 3.13

K20 X

1.53 3.09 2. K1.77 1.62

P205X

O.006 0.013 0.036 0.015 O.GZ7

T102X

0.255 0.288 0.269 0.2*3 0.237

feoX

0.026

0.017

0.012

0.027

0.0*3

BaO

X

0.028

0.0*7

0.031

0.033

0.026

Cr203 X

0.035 0.0(4 0.017 0.033 0.05?

SrOX

0.014 0.011 0.012 0.014 0.018

totx

1.7

1.5 1.8

1.3

1.1

Total

X

99.6

100.195.2

99.8

100.6

13015 72.53 14.18 2.7 0.89 2.87 2.75 3.38 0.034 0.280 0.036 0.033 0.079 0.019 0.8 100.6

tr bk

Certified By

q M p.i :iiir\nrR li 11 ni : rwci-pxssu i .\RS i in. - r.O7 577 HrtHr*:- i:

YTYAl,l,OKA55Ar LABORATORIESJL A DIVISION OF ASSAY LABORATORY SERVICES INC.

Tu,mlX70 LITHIUM "W*. UN" 2 THUNDER BAY. ONTARIO P7B 6G3

PHONE (807) 623-6448 FAX (807) 623-6820

Page 2CUHBCRIAMD RESOURCES LTD.

74 "*"*WI *"- Thunder Bay, OntarioP7B 3W

TO, 1W4

Job I9U1201

PP*

At

XA* Bf

13011130121301315014

0.10.10.10.2

0.390.570.840.85

5668

48245693

CaX

0.130.140.12

0.29

CdPP*

CI

CI

CI

tf

CO

pp*

2

259

CrPP*

271130235263

CoPP"

87

2362

r*x

1.231.321.962.08

UPP"

81157

"B

X

0.680.660.950.89

13015 0.1 O.S4 12 28 O 0.36 467 12 1./3 11 0.45

Certified

srxr B\Y. t*\r. n-oi :ACCIHASSAY LABS LTD.- BO? 577

ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.

CUMBERLAND RESOURCES LTD. 74 IMmlpeg Av*. Thunder Ray, Ontcrlo PTB 3f9

1070 LITHIUM DRIVE. UNIT 2 THUNDER BAY. ONTARIO P7B 603

PHONE (807) 623-6448 FAX (807) 623-6820

rage Z

NovMter 10, 199*

Job 19441201

Nt Si

XT1

X

13011 13012 13013 13014 13015

173 138 294 382 325

2 11 13

0.03 0.01 0.02 0.03 0.02

13 9

22 22 30

310 406 247 278 522

42 9 3 93

42 O.O1G 0.01 42 0.01 *2 0.01 42 0.01

3 32 4 5

0.11 0.07 0.14 0.13 0.13

15 9

31 29 25

in

183028

64

41

ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.

1070 LITHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 663

PHONE (807) 623-6448FAX (807) 623-6820

Page l

CUMBERLAND RESOURCES LTD. 74 Winnipeg Ave. Thunder Bay, Ontario P7B 3P9

ATTENTION: B. MCCRINDLE

November 30, 1994

Job 19441382

REP: BATSHORE

Sample i Accurassay Customer

123456789

101112131415

130291303013031130321303313034130351303613037130381303913040130411304213043

Copper ppm

19764

135

123565

191073

Lead ppra

<2

tttt2

tt tt

Zinc ppra

364115283318582239563741305163

Certified By s

ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC

CWBERlAm HESOUICES LTD. 74 Ufmlpcg Av*. Thunder B*y, enterlo P7B 3F9

1070 LITHIUM DRIVE. UNIT 2THUNDER BAY, ONTARIO P78 6G3

PHONE (007) 623-6448FAX (807) 623-6820

Pigtl

November 30, 1594

Job K441382

KEF: BAYSHOtt

SanpU ff

13029.' 13030

1303113032

1303313034

: 13033

i 13036

i 13037

j 13038130391304013O411304213043

3102

X

69.3570.35

68.3268.9469.89

67.60

69.3871.14

72.3167.76

67.7164.9573.2669.2271.81

A1203

X

16.5914.43

13.6814.56

14.30

14.46

14.3514.10

15.0914.96

14.8517.1514.3914.6315.57

F0203

X

3.262.63

2.312.58

2.94

2.54

3.352.52

2.64.15

2.513.572.163.663.22

flgO

X

1.061.84

4.151.531.97

3.15

1.391.14

0.861.97

0.881.720.861.361.6

CaO

X

1.68

2.35

1.582.97

4.84

0.85

2.691.58

2.93.28

2.353.231.453.451.89

Ha20

X

3.593.87

3.113.92

2.67

3.08

2.434.64

2.212.65

3.724.064.323.314.17

K20

X

2.121.78

3.182.23

1.19

4.84

2.351.72

1.632.26

2.171.261.862.001.81

P205

X

0.0320.078

0.0730.019

0.0660.100

0.020

0.029

0.0470.043

0.0470.0790.0100.0380.055

T102

X

0.2150.255

0.2940.313

0.2960.304

0.2690.267

0.3120.312

0.3070.3670.2060.3090.283

HnO

X

0.013

0.057

0.0150.027

0.0450.012

0.0340.021

0.0370.035

0.0370.0(90.0150.0620.031

BsO

X

0.0210.026

0.0420.032

0.022

0.081

0.0340.025

0.0260.025

0.037O.OJ20.0220.0300.024

Cr203

X

0.0480.238

0.1200.106

0.0450.128

0.0420.150

0.0820.119

0.0530.1010.0360.1250.043

SrO

X

0.0490.014

0.0200.0380.043

0.027

0.081

0.056

0.068

0.0560.0680.0770.0690.0690.058

toiX

1.2

1.4

2.21.21.4

1.9

2.11.2

1.1

1.21.41.30.91.41.3

Total

X

99.299.5

99.1

98.599.7

99.1

98.7

98.6

99.398.8

96.1100.O99.699.799.8

Certified B'

SENT BY:THUNDER BAY. ONT. : i- 3-95 :in:i?AM :ACCII?ASSAY LABS LTD.- 807 577 3833:* 3/ 3

52H06SW002S 2.15871 WABIKON LAKE 030

GEOLOGICAL MAPPING OF THE NORTH AND EAST GRIDS

ON THE 2.15871WHISTLE LAKE EAST PROPERTY

OF

CUMBERLAND RESOURCES LTD.

AND

INTERNATIONAL VESTOR RESOURCES LTD.

THUNDER BAY MINING DIVISION

WABIKON LAKE AREA

DECEMBER 30, 1994 BAYSHORE GEOLOGY INC.

NTS: 52 H 6 MICHAEL W. LEAHEY

l52H06SW0025 2.15871 WABIKON LAKE 030C

TABLE OF CONTENTS

I. INTRODUCTION P 3

2 . LOCATION, ACCESS, TOPOGRAPHY P 3

3. CLAIM DATA P 4

4. EXPLORATION HISTORY P 5

5. GEOLOGY P 6

6. ALTERATION St MINERALIZATION P 9

7. CONCLUSION A RECOMMENDATIONS P IO

8. REFERENCES P 11

LIST OF FIGURES

FIGURE l CLAIM MAP P 4a

FIGURE 2 GEOLOGY PLAN SCALE 1:5000 [IN POCKET]

APPENDIX I - WHOLE ROCK ANALYSIS

l INTRODUCTION

This report describes the results from the fall 1994 mapping on the Whistle Lake North and East grids on claims owned by Cumberland and International Vestor Resources Ltd. to determine the base metal potential of the property. The report is prepared to meet assessment requirements. The North grid is defined as Lines 2000E to 2900E from 1900N to 2800N; the East grid runs from 3500E to 3800E between l DOON to l SOON and 3900E to 4700E from 100S to l SOON. Bayshore Geology Inc. was contracted by Cumberland Resources Ltd., the operator, to conduct the geological mapping program.

The fieldwork was begun in October and completed November 15, 1994 and is the follow-up program of grid line cutting, ground EM and detailed geological mapping as recommended in the September 30, 1994 report by the author. Prospecting and mapping was undertaken on the grid with the data plotted at a scale of l :5000. 15 rock samples were collected and forwarded to Accurassay Laboratories for whole rock and trace element analyses. Sample results are included in Appendix l. The results of the HLEM ground surveys on these grids are the basis of a separate report by Phantom Exploration Services Ltd.

2 LOCATION, ACCESS, TOPOGRAPHY

The Cumberland Resources Ltd.'s property is located some 125 kilometers north of Thunder Bay. Road entry is gained to the south end of the claims by old logging roads off the forestry access road between Dubroy and Ollett Lakes, four kilometers east of Highway 527. Access to the East grid is gained by foot from the replanted area at the south end of L2200E at 200S. Road access to the North grid of the claim block can be gained from the logging road that skirts the south end of Wabikon Lake 1.6 kilometers east of Highway 527. This road enters the grid on L2000E at 2200N. The topographically low areas of the grids are wet, cedar and alder covered; the higher ground is a mixed forest of spruce, balsam fir and poplar with moose maple and tag alder undergrowth. Maximum relief on the grids is 98 meters, from a low of 415 to the height of land between Ollett and Lever Lakes on the grid at 513 meters.

3 CLAIM DATA

Since the initial staking of 202 claims in 1988, the property has been adjusted to currently consist of three separate claim groups as follows:

a) The western property: 8 claims, 64 units comprising 2560 acres, staked in December 1993 and February 1994 by the Joint Venture. In late 1994 claims were staked to connect the east and west properties.

b) The central property: 107 claims, 117 units totalling 4680 acres, optioned to Noranda Exploration Company Ltd.

c) The eastern property(Figure 1): 85 claims, 188 units totalling 7520 acres. A complete listing of the individual claims and units in the eastern property is as follows:

CLAIM NUMBER # UNITS DATE RECORDED

TB1082884-TB1082899 16TB1083000-TB1083003 4TB1083035-TB1083936 2TB1083041-TB1083070 30TB1083073-TB1083082 10TB1083084-TB1083092 9TB1195981 3TB 1188209 5TB1188210 5TB 1209446 8TB 1209447 4TB1205107 4TB 1204894 6TB1205I39 2TB1205140 15TB1205I41 15TB 1205142 6TB1205143 16TB1205144 16TB 1205146 12TOTAL 85 CLAIMS 188 UNITS

SEPT 12, 1988 SEPT 12, 1988 OCT 5, 1988 OCT 5, 1988 OCT 5, 1988 OCT 5, 1988 NOV 2, 1992 AUG M, 1992 AUG 11,1992 JULY 28, 1994 JULY 28, 1994 OCT 17, 1994 OCT 17, 1994 NOV l, 1994 NOV 25, 1994 NOV 25, 1994 NOV 25, 1994 NOV 25, 1994 NOV 25, 1994 NOV 18, 1994

\ x—

v—. ;

M.;.

M'^

JM

B

*

M^

Wi M

M M

4*L

* ** r*"^

"

:i.

i -

2031

07.

J205

I42

Ofl

ON

AL

IN

FO

RM

AT

ION

T

HE

ST

ATU

S O

P

TH

Iut

xos

SHOW

NMIN

W1M

V

UP

08V

ILO

P-

NT

AN

D M

INIS

. P

OM

AO

-

l O o O) o o 13 w O

L*tL

f E

~*S

T

The claims are owned 50*^6 by Cumberland Resources Ltd. and 50*54 by International Vestor Resources Ltd. (the Joint Venture). The registered owner and operator of the property is Cumberland Resources Ltd. The claims are shown on the Wabikon Lake (G-773) mapsheet (Figure l) in the Thunder Bay, Mining Division.

4 EXPLORATION HISTORY

The area was covered in part by two government mapping programs, in 1964 by Milne and in 1974 by Sage. N.L. Black's regional work for Canadian Pacific in 1960 of the Block Creek and Black Sturgeon prospecting area covered the current Whistle Lake property. Base metal and gold exploration began in the area before the Second World War, however, the most active documented period occurred with the construction of the Armstrong highway in the early sixties.

In 1965 Steep Rock Iron Mines Limited optioned the Armstrong property and undertook soil sampling, ground magnetometer and geology mapping east of Nault Lake and straddling the new highway. Also in 1965 Fred Koosel investigated limestone occurrences on Wabikon Lake with three short drill holes.

In 1970 Phelps Dodge drilled 526 feet in EX holes on the Adams gold property immediately south of the current Noranda option. In 1973 Clark Noyes and Mineral Resources International Limited drilled one hole, W-1, east of Whistle Lake on the current Noranda property. Trenching and blast pits work was also done in 1973 but was not documented.

In 1974 Hanna Mining Company drilled 548 feet of AQ core to test ground conductors on its Highway property west of highway 527. During 1975, Hanna also undertook 550 feet of drilling in four holes on its Lever Lake property as follow-up to geology and ground geophysical surveys. These holes are 300 - 500 meters north of Cumberland's eastern property.

In 1975 Phelps Dodge reported four diamond drill holes totalling 582 feet on individual EM targets. Hole P150-3, 300 feet, was drilled at approximately I650E station 750N on Cumberland's eastern property. Hole P150-4, 582 feet, was drilled at Lever Lake. Assessment records put the setup for hole 150-4 on a peninsula in the lake. Inspection of this area in 1993 failed to locate any evidence of the hole. A drill site was found 200 meters north and 300 meters west of the peninsula on the west side of Lever Lake. Neither Phelps Dodge nor the assessment files had any documentation on this later hole.

In 1980 Amoco Canada Petroleum Company Ltd. drilled 1087 feet in three holes north of Whistle Lake. They encountered felsic to mafic rocks with anomalous zinc and copper values. In 1982 Bill Haynes reported physical work on his Highway property some 800 meters south of the current Noranda option. In 1988 Mingold optioned the Haynes1 gold property. They completed linecutting, geology, ground VLF-EM, magnetometer surveys and six diamond drill holes and returned the ground to the current owner Bill Haynes.

In 1989 Cumberland Resources contracted Questor Surveys Limited to fly their property with an airborne EM and magnetometer survey. In 1993 reconnaissance geology, whole rock geochem, linecutting, ground geophysics and trenching was undertaken on the property. In December 1993 the western half of the property was optioned to Noranda Exploration Company Ltd. In 1994, Noranda extended the original grid to 30 kilometers and completed an HLEM ground survey as well as prospecting and geological mapping. The ground HLEM located two distinct anomalies on separate horizons. A third weak HLEM conductor was surveyed with DEEPEM that returned a strong, very deep conductor. The four widely spaced primary conductors were each tested with one drill hole. All holes intersected stringer and/or massive sulphide mineralization. The best hole, (94-4) interested 72 feet of massive, semi- massive and stringer sulphide mineralization. Minor copper and zinc sulphides were visible in the core. The best assay was G.24% zinc and 2.4 grams per tonne silver. On the eastern property in the spring of 1994 Cumberland cut a 4200 meter control baseline from which prospecting and geological mapping were completed on flagged grid lines . During the summer of 1994 Cumberland undertook a work program that included a ground EM survey and geology mapping between lines 1200E to 3200E from 500S to 1200N.

5 GEOLOGY

The property is located within the Bo Lake - Heaven Lake greenstone belt of the Archean Wabigoon subprovince. Proterozoic rocks cap the Archean throughout the whole property.

A contract line cutting crew from Vylyl Exploration Services of Thunder Bay cut 31.8 kilometers of picket lines and tie lines in September 1994. Two grids were established. A North grid was turned off from line 2000E with lines running from 2000E to 2900E on tie lines at 1900N and 2800N. The North grid includes 11.5 kilometers of line. A second grid, the East grid, was turned off from the 1000N baseline enclosing the area from L3500E to L3800E between 1000N to l SOON, and from L3900E to L4700E between station 100S to l SOON. The East grid consists of 20.3 kilometers of picket lines. All grid lines run at 360 degrees azmuith and tie lines run at 090 degrees, the line separation was maintained at 100 meter inverals with station separation of 25 meters. The author undertook the geological

mapping and lithogeochemical sampling of the property.

The additional Whistle Lake grids were mapped at a scale of l :5000, (Figure 2). The Archean volcanic rock outcrop exposure on this property is very limited with numerous occurrences of Proterozoic diabase.

WHISTLE LAKE EAST PROPERTY

TABLE OF FORMATIONS

PROTEROZOIC

10 dolomitic limestone/marble

9 diabase flows, sills, 9a fine grained 9b medium grained 9c coarse grained

8 mudstone, sandstone, 8a conglomerate

ARCHEAN

7 granite7a felsic synvolcanic intrusive 7b porphyritic granite

3 FV - felsic volcanic QE - quartz eye Lap - lapilli LT -lapilli tuff T -tuff Frags- fragmentals

l MV - mafic volcanic

8

Unit 1 . mafic volcanics, consists of fine grained dark green to black mafic volcanic flows. In outcrop vague pillow selvages and rims can be seen. The outcrops are often sheared and foliated with local gneissic character development, foliation trends 250 degrees with a 48 degrees north dip. Near to the granite contact a number of pegmatite dykes and dykelets stope into the mafic volcanics. The contact with the granitoid rocks is often baked and bleached. Exposure of the mafic unit is restricted to the North grid near the logging road from 2300N to 2800N. Two exposures of larger granitoid dykes occur 200 meters south of the main granite supracrustal contact. Glacial striations on the mafic volcanics trend 240 degrees.

Unit 3, felsic volcanics, occur as four outcrop or rubble areas between 1400N to 1 700N on lines 4000E to 4700E and as numerous float boulders on the East grid. The outcrop consists of laminated felsic tuff trending 100 to 1 25 degrees with north dips from 20 to 40 degrees . The felsics are usually light gray to greenish gray in colour and occur as tuff, lapilli tuff and coarse fragmentals. Quartz eyes are quite prominent in the unit, most are ^mm in size. Alteration seen in outcrop and float consisted of hematite (orthclase feldspar), weak sericite and locally biotite. The majority of the North and East grids are no doubt underlain by felsic volcanic stratigraphy, but covered by a Proterozoic cap of diabase except in the northeast corner of the East grid where glaciation has removed the cover rocks or the diabase thins out or was not deposited and provided a window through the Proterozoic. An area of numerous felsic float boulders occurs across the East grid from L4000E to 4700E from SOON to 1200N on top of diabase outcrop. The boulder train source is assumed to be felsic supracrustal to the northeast.

Unit 7, granite, is medium to coarse grained . The granite has ^5*^ potash feldspar as the total feldspar and >10% quartz. There are a number of round granite boulders of various sizes on the property.

Unit 7a, felsic synvolcanic intrusive, is similar in appearance to unit 3, but contains large euhedral quartz crystals ^mm and white or blue in colour. It may be a porphyry phase of the felsic volcanics or a synvolcanic intrusive. Unit 7a was found only on the west grid-

Unit 7b, porphyritic granite occurs as a pink granite similar in composition to Unit 7 but with 10- 20*54 large orthclase phenocrysts that vary in size from 2-4cm. The granitoid rock is well exposed near the road on the North grid in large outcrops and in contact with Unit l . As the granite forms dykes it becomes coarse grained pegmatite with a simple feldspar and quartz composition.

Unit 8a. conglomerate consists of a heterlothic mixture of granite and porphyries clasts in a fine matrix of sandstone or mudstone. The float exposure of this unit is deeply weathered and friable. There are only a few occurrences of this unit on the East grid.

Unit 9 is the Proterozoic diabase. Some 95"^o of the outcrop and float on the grid consists of diabase. The unit has a brown chocolate to green concentric weathered surface. The fresh rock is dark to black and composed of calcic plagioclase and pyroxene. The texture varies from fine grained

through medium grained to coarse grained with the majority as coarse grained. Individual sills or flows were not seen in the field nor was the Archean/Proterozic contact exposed. Most of the diabase on the grids is coarse grained and outcrops as steep sided to flat lying outcrop. From the deeply incised valley south of 600S on the East grid it is speculated that the diabase cap thickens to at least 100m in this area.

Unit 10, the dolomitic limestone/marble unit was not encountered on either grid.

6. ALTERATION AND MINERALIZATION

On the East grid visual alteration consisted of a few outcrop exposures of hematitized felsic volcanics. For the fifteen felsic volanic samples collected on the grids an Ishikavvi index was calculated and plotted at the sample site(Figure 2). The index is determined by the following formula (^O+MgOVtFaO+MgO+CaO+NAZOJx 100. Two sample sites 13031 and 13034 returned moderately altered indices of 61 and 67 respectively, the remaining sites give background values in the low 30's. All whole rock data and trace element results are presented in Appendix l. Previous alteration in the few felsic volcanic outcrops on the Whistle Lake grid consists of weak sericite development, local biotite and silicification. Mineralization consists of trace amounts of disseminated chalcopyrite and pyrite.

Assessment drill hole P150-3 was logged as being altered, chloritized at the top. silicified with depth and locally the development of blue corderite? spots with blue quartz fragments and sericite. Garnets are reported from the top of the sulphide horizons.

Mineralization reported in the log for hole P150-3 consists of 20 feet of massive sulphides (po and py), plus banded and stringer type mineralization. Drill hole PI 50-4 reported a thick sulphide zone from 332 feet to the bottom of the hole at 582 feet. Generally, the zone consists of stringers and banded sulphides (po, py) with magnetite. The sulphide zone is capped by cherty metasediments. Generally the sulphide content of the zone increases with depth and the magnetite component decreases.

The log from hole P150-3 suggests an altered felsic volcanic stratigraphy hosting sulphide mineralization. This hole probably correlates with the stratigraphy reported in the log of hole W-1 at the west end of the property optionned to Noranda. The log from hole P150-4 suggests this is the top of the volcanic pile representing a total felsic thickness of 1600 meters.

10

7. CONCLUSION AND RECOMMENDATIONS

In the current geological survey a window of felsic volcanic stratigraphy has been defined on the East grid. Alteration similar to that encountered in the previous grid work has also been noted. Encouraging DEEPEM results were returned through thick diabase cover by Noranda in the western felsic stratigraphy and a number of weak deep airborne EM trends remain to be investigated through DEEPEM and diamond drilling. Two moderately altered Ishikawi indices were returned from sampled felsics which may be indicative of pipe-like alteration below a massive VMS horizon.

Michael W. Leahey

H

8 REFERENCES

Franklin JM et al 1982 A Proterozoic Geology of the Northern Lake Superior Area, Field Trip Guide Book #4 G AC/MAC, 71 p.

Jensen LS 1976 A New Cation Plot for Classifying SubalkalicVolcanic Rocks, Ontario Divison of Mines, MP66, 22p.

Milne VC 1964 Geology of the Garden Lake Area, District of Thunder Bay, ODM, GR 25, 21 p.. Map 2058

Sage R et al 1974 Operation l gnance-Armstrong, Obango Lake, Lac des Iles Sheet, District of Thunder Bay, ODM Preliminary P963.

Various Assessment Reports, Thunder Bay Mining Divison

Various Internal Reports, Cumberland Resources Ltd.

12

APPENDIX 1:

LITHOGEOCHEM ANALYSIS

TRACE ELEMENT ANALYSIS

ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.

CUMBERLAND RESOURCES LTD. 74 Winnipeg Aw*. Thundtr Bay, Ontario P7B 3P9

1070 LITHIUM DRIVE, UNIT 2THUNDER BAY, ONTARIO P7B 6G3

PHONE (807) 623-6448FAX (807) 623-6820

Pag*1

November 30, 1596

Job 49441382

REF: BAYSHORE

3102 A1203Savple 1 X X

i

! 13029 69.35 16.59: 13030 70.35 14.43

13031 68.32 13.68j 13032 68.94 14.56j 13033 69.89 14.30j 13034 67.60 14.46' 13033 69.38 14.35I 13036 71.14 14.10

13037 72.31 15.0913038 67.76 14.96

i 13039 67.71 14.85i 13040 64.95 17.15; 13041 73.26 14.39

: 13042 69.22 14.63' 13043 71.81 13.57

F*203X

3.262.632.312.582.942.543.352.522.6

4.152.513.572.163.663.22

HgOX

1.061.844.151.531.973.151.391.140.861.970.881.720.861.361.6

tooX

1.682.551.582.974.840.852.691.582.9

3.282.355.231.453.451.89

NaZOX

3.593.873.113.922.673.082.434.642.212.653.724.064.323.314.17

K20X

2.121.783.182.231.194.842.351.721.632.262.171.261.862.001.81

P205 T102X X

0.032 0.2150.078 0.2550.093 0.2940.089 0.3130.086 0.2960.100 0.3040.020 0.2690.029 0.2670.047 0.3120.045 0.3120.047 0.3070.079 0.3670.010 0.2060.038 0.3090.03S 0.283

nnoX

0.0150.0570.0150.0270.04S0.0120.0340.0210.0370.0350.0370.0490.0150.0620.031

BaoX

0.0210.0260.0420.032O.OZ20.0810.0340.0250.0260.0250.0370.0320.0220.0300.024

Cr203X

0.0480.2380.1200.1060.0450.1280.0420.1500.0620.1190.0530.1010.0360.1250.043

SrOX

0.0490.0140.0200.0380.0430.0270.0810.0560.0680.0560.0680.0970.0690.0690.058

LOIX

1.21.42.21.2I.*1.92.11.21.11.21.41.30.91.41.3

TotalX

99.299.599.198.599.799.198.798.699.398.896.1

100.099.699.799.8

Certified B:

SENT BY:THUNDER BAY. ONT. : l- 3-95 :10:17AM :ACCURASSAY LABS LTD.- 807 577 3833:* 3/ 3

ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.

1070 UTHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 6G3

PHONE (807) 623-6448FAX (807) 623-6820

Page l

CUMBERLAND RESOURCES LTD. 74 Winnipeg Ave. Thunder Bay, OntarioP7B 3P9

ATTENTION: B. MCCRINDLE

November 30, 1994

Job 19441362

REP: BAYSHORE

Accurasaay

123456789

101112131415

Sample lCustomer

130291303013031130321303313034130351303613037130381303913040130411304213043

Copper ppm

19764

135

123565

191073

Lead ppm

tt tt tt tt 2

tt

Zinc ppm

364115283318582239563741305163

Certified By:. JPA

Ministry ofNorthern Development

Report of Work Conducted After Recording Claim

Ontario

Pereon* In ,aNoncotectedonlN*termliobtalnedunoVlh*authoityoltfwM i should bs atocMd to Ilw PnwkicW fttansg*. MMng Lsncte. Mki

Sudbury. Ontario. P3E 8A5. totaphoftt (70S) 870-7884.

hutrucuons: - Please type or print and submit In duplicate- Refer to the Mining Act and Regulations for re*.

- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany tfMS form In duplicate.- A sketch, showing the deJms the work is asskjrted to. must accompany this form.

900

Work Performed (Check One Work Group Only)WorkGroup

Qeotechnlcej Survey

tndudbiQ Drifang

Rahat^attonOther Authorized c• M*— -J- ^wont ^

AssaysS) 1 i fTjT-ILUM-

RatSve

Type^ \

w/i/e" CUiTdJ 4 -f- (Teo^ffyi/o* t- Surfi/ry f /M4jr-XfVw)

i -^ " ; ;ECTION 18 ONLY ! ^BI :

;

Total Assessment Work Claimed on the Attached Statement of Coste t ——Note: The Minister may reject for assessment Work credit at) of part of tt* assessment Work submitted if the recorded

holder cannot verity expenditures claimed hi the statemOht of coste Within 30 days of a request for verification.

Person* and Survey Company Who Performed tt* Work (Give Nams and Address of Author of Report)Address

OA^

M- fl 7

A A^^A.^U^A IAB •CTMOUIV li

A^ ***-*--- 4*-l 4 J.A --.------*- *jJjisee rvon no. i on reverse awe

1c^9*XMtn*Mmrtw*p*1omrt.thtdllmtca*Mdin1N*ma* tqnrtw^nconMintocunrthcl&tnirtatb&wtolbinttMtt^ by O* conant nconM hoUsr.

AacanladHolclarorAgart(Sipiafwar

^- --j*- --* - ^ -J li* -^ rtaniuifaeiuiicauon or worn neponl canjfy Sial l hsjfw S pafsonaJ knoMadQa of Ins facts sat HMtti In thht Worii faport* M

maxad report H toua.ngpi idtha*orlior aama during and/tor aftar

2±.

SOT Office Use OnlyToUVaWCr. lUsnseonU' *- lu-i— Mi.'- J.I'•anwBj naBoniar

1 1 61 fST

ii

l! 0 **4 rv

oo*)

SoO

-O0*

S MS

11)8

O04

T* p*

o y*

Sf!

VPos^

^~- -i

s,-^o o oc

S

-*06" D

O

-

4- Oo

-lu\•K

Oiy

-Auv4^

\

4sC5

D4*0c

V *

i

*o o

trt

-*o o

-4^ oo

0 0

y - s

-^ Oo

- r .

4^CSO

ri-.j i.

^ o O

* oO

^

S

V

^ OO

VtlutofAMMMWnt •**--j. *^~— - WQrK UOnejon this CWm

*If

i

• oO eO

Ul

'.•"f

4A

iCredNs you are claiming hi this report may be cut back. In order to tainttMzA thA AdvArAe effect* of such OttAttohs. plAftM Indicate fn— *-*-*- n lil tmrnt m ttntm •MtakA* AM MMtrut^-M. Hi n -*—"—Mr* r* **f nant i HI A f^JmfiMli ••i il ali t \ *t~u* dtf Hi AJ *—**— -- *— —wmcn dan i is you wwn 10 pnonzo me oorouon of cfBom. rwaso niaiR 1*^1 ocw Of ma foao*jiingi .

1. D Credits are to be cut back startingwtth the dahriteted last, WoHdng backward*.2. D Credits are to be cut back equally over al daims contained to thtt report ol Work.A I l f*—M*m^* Am* AM ftWMk 4MAB iMLoiV —-*- •taLml^M il dh^ lil a ***-^—i-a*** A*kflAAVijAA3. LJ urooRs are 10 DO cui DOCW as pnonzoo on mo afjocrioo apporan.

hi IhA AvAnt that you hftve not ApecHied your chote* of priority, option ort* Ml fa

NAtel: ^epHoiiaftieimenu. l AJAAJIAAUAAAA A A aklieV -- -*- - -*r aojfooffioffoj, oic*f wiui mpoci

HotA l- M *otk hAA bAArt pArfornttd AA paiArttAd dr lAAAAd (And. plAAM COInplAtA the foMeM

ttwl MM rtcontwl hofctec hed A twntfcM Mennl In IM tnl*nMd*——-* AA AAkA MBMA ei^A JMII! j^^ •VnO mi HW Qm9 HW wvrK WFJ9

Od*

0\

-

11

-

1tA

O

0* OCAf^fc. ^*'•^ 3

——

0DO

VP 0 CA

-~

O

VJJ 0 IA0*

~-

o00 VPo

V*

oOQ. IPO W

*~

oCKJ0* O •A O

0 eaVP O

-D

O O*

IP O

00

io oa IP o

t.

O00u* O4*

1 c

IP o

•8

f

7

orO U*O

IV

171P*

LV O

-

ii!iK -f

iH

,rH i

~v

i!

i

i

CmwM

1.

2.

3.

kit

S

1 i iuJ

s

^

v\

S

(A

J

lA

s

V*

iA

\

V

00

\ i

o 0

o0tC

o' 1 o. C

o 0

Oc

i*

m

lA

1

H K J t 5

1 i

,- .,-,

^ t -

-•.:;r-

•Lb

: *.'C L

TT—

:~.J

• ••^

—— a,^^

•J*r

jj

W

t^flBM j.ni* ———— niiitaaifci ra k* tt*l*ions you w cvstfTwng wi mi^^L ^^^^^—^ K^i^a --^^B^^^^ — , -f -Cfl doanlv ymi vWVI lv |HHJ

D Cradfls ara to be cut 1 D Cradfls ara to ba cut 1 D CraoHs ara to ba cut 1

ha aven! Vtai you hava no

i report may be cut brlze tfw oewtion of c

iMck equally over aN Mck as pilmuad on

1 apacNIad your cho)

ack. hi order to mhihi, ,, Ma- *** — t- a i' j iTfjoeis. rmsv HWH i ctalnt listed Msl, tip deJms conteJned hima aiiacnsd sa of pi lw dy.

nteetf* (^)onortdng ttitsra

cpttortonewl

B adverse effect!— ,-J fi, — *-M — -^ ao or mo lunowin backwards, port of wu k.

I kA hi^illnnfll l oa •npieniern

i d such deletions. ptosM hiIP

Id.

idles** from

t^,

MnMt- raan^yai nlkHiJilirliltMliitaat atn^rikitoillifciilaii MMHMH aMMHOnU mantHMtulmii^*-**' -*- ** **- ^^u-*~ --*to tl^m aiifciiiill J t all i it Haw liannl^p IHVnnV*

Mo***: tt *ork hM bean performed M p*t*nted or leMed lirM), ptflU bohiplell Hit

l cwllfy ttwl Vi* raoonlwl haUw had A b l tend HI aw Onw Hw work Ms t

t ia. ** -l m vn9

- 1

-o CO

o-

I

O

Oto o

o

o

o oA

o

i

O

c-J

— -

o

VH O

Oto 0*o

o

\yos:—

A afv 4

c

0*^3 ^^x

1

oDO VP0

51

o

0

J "J

0

' l-1

soCA

If1'f

i? ||

m

i S 0* 0* U*v/v 0* O*

x

-A wv O1

-A v\O1

%/vV)1

li

f*vP

0o

0O

O 0

cr O o

oo O

M -0

SJ-o ir

S uv lA OJ

LWuv tA

O* t C U) Oi

w. r ''

Ji**dalmlnglnt^r*!^i^Jwcu^w you wWi to priorize the doraHon of credits. PkMsi mark (*^) one of the foNowhig:

1. O Credits are to be cut back starting with the dahn ftsfod laftt. working backwards.2. O Credit* ara to be cut back equally over al dahns contained hi ttib report of work.3. D CredNs are to be cut back as priorized on the attached append*.

hi Via event that you have not apedflad your choice of priority, optkxt on* wM b* hnptemeniad.

Hotel: fa*mplM ef b to IM lunkie]

Hereai art mnecotded Hanileli. opttoH JgiMiiialiU. rrtffriorandUtH ot taraemelita. tie.. with letpect

Note 2: It *ocfc hai bMn peitonneil on pMenled or tealed HHd, plUM fcofriJJW* Hit

t ceiWy thai Vw racontod hahtor iMd a tMor toaswl tand Hi ttw am* tfw wmk tras pwformad.

si ni Inft pstontoo Slgnatura Date

Mmtotry of

Ontarioand Mhws

D. ippemant du Nord^A je^aaa BOV OJOVJ

Statement of Costs for Assessment Creditttat des coQts aux fins du credit devaluationMining Act/Lot sur tes mhws

NoJN* de transaction

Personal information coaected on tnto farm to obtainedl under the authority off efio MeMnoj Act. TWo Inioinullun VM bo uooo lo nwntoJn o tMUWl ond.

? of ttio nibiing cWin(s). ftioooons opoul IhJo coHoctfon ohouhf be dkected to ma Provincial Manager. MWngs Lands. MmMry of Northern Development and Mhws. 4th Floor. 159 Cedar Street. Sudbury. Ontario P3E 6AS. telephone (705) 670-7264.

Loo forooipjnofnonls pofsonnols contonuo oons lo pffoonto tonnulo oontrocuaamsenvtjfludotoUlou^ooo coftcosBeOflS fflinlofoo. Aoraooor toulo ojuooHon our lo ooBoco ilo coog^M^B^abM^BMHa^MMSjal ^MS jJa^uf •^MMJaw^Jaal tffta^ AB^M^^^BI ••akat^^iak ^lala^^AAa^ J*B*renoosynovnonoi au COOT pmvnicioi uoo eBnOano nwofB* nwiujiofo ou Devetoppement du Nord at des Mhws. 159. nw Cedar. 4* etage. Sudbury (Ontario) P3E 6A5. wwphorw (70S) 670.7264.

1. Direct Cocta/CoOts directs

Type

Contra

etdefcxpett-

Foumttoree

Labour Mahvd'oeuvreField Supervision Supervision sur to terrain

Type

Type

Amount

Total Direct Coste Total dee coote dlrecte

Totah Total gtobal

2. Indirect CostaVCoOts Indtrects** Not*: VWwn ctoJming RehabHRaMon work Mki

Pour la rarnbouraemant das tnwaux da r4habHtaUon. tos cuotoliiJudsna am A pas eonwsPjlsa en tant ojue traveux d'evaJuatlon.

Type

rOOO OflQLodging Noun It IN o ot

•H*??•-"tir i

Amount

Sub Total of Indirect CostsTotal!

Amount Mtowflbtv (not ojpoolot* ilton 2D*A of Dwoct Cootoj••IAAAA^A .^^—^^m— j—*^——J .a——a ——— dMk BwV ^AA A^AaW ^B^^^A^k••onnni oonivoBNtj pi •xcvcawi paw zu i* ooo coom QWOCWJTotal Vahia of (ToMolDlract

Totals ToW global

this aMamant of costs waMn 30 days of a request for verification. HIs not msdatv tna MMstar may refect for assessment Hoik

el or pert of Hw assessment work submitted.

:LettuWn itenudev*Martos(lo pffaont Atat (tos coOts (tens tos 30 fours sulwnt uns dttflMncto *l col olVot. Si ta vociticoBon n ool pojs oflocluoOt lo nrintolnB pout fojotof tout ou one pertk* des travaux (TevafuaBon prfaenlei.

1. Work med wftNn two years of completion Is claimed at KXWbof the above Total Value of Assessment Credit.

1. Las travaux deposes dans tos dam ens suivant tour acMvement sonl rembouraes

2. Work fled three, four or five years atter completion is dahnedat 50*4 of the above Total Value of Assessment Credit. See

ToW VdMTot Assessment CredR Total Aa ICWnx 0.50

2. Lestravaux deposes trols.quatreoudnq ansaprestour achevement sonl rembourses a SO tt de to. vatour totato du credit devaluation

Vatour totato du credit tfVvehjattonx 0,50 -

EvahMtfa otetode

Ceitlflcaillon Vcilfylnoj SlAleineiit of Costs

l hereby certify:that the amounts shown are as accurate as possible and these costs were Incurred whUe conducting assessment work on the lands shown on the accompanying Report of Work hwrn.

that as(Rocordwl HoUsr, AojMt* PosMon In CotTapMiy)

to make this certification

Attestation de I'etat des coOts

J'atteste par la presente :que tos montants Indiques sent to phis exact possible et quo ces defenses ont ete engagees pour effectuer toe travaux cTevaluation sur tos terrains Indiques dans la formuto de rapport de travail d-ioint.

l am authorized Et qu'a tJtre de^oulobo •nrajotaM, fopffaofatonl, pool*) occupy

a faire cotte attestation.

Jesubautorisedont to conpoQnl*)

Note : Dans cane formuto. torsqul deskjne das personhes. to mascuHn ea) uMtoe au sens neutra.

.... •H-.I i < 'l -'^:l ! t* - -i-.-- .

j-J l -l-^--.-'--

1L-,-

Umatryol

Ontario

Report of Work Conducted After Recording Ctalin

AcLTI*l MUM*. FwrtiROOT. 1WC*dv

type or print end eubn* Indupicate. Rsisf to ttw MMnQ Act snd RoQuUtons for WQUirenionis of •fci t or eoneuR the MMng

A Mparato copy of thb form must to completed tor each Work Group.Techrtoel reports end rmpe muat accompenyltofarm hi dupteate.A ekatch. allowing the ctokne the work bj eeetajned to, muat accompany (hit form.

2.15871tiuU.rt

Cujk i* TO.

74- t Ji rf di Pet - 1/ e. A**tld

. 344-^ryyicrQHHiiMjL

^-773

Work PertotMed (Check One Work Group Only)Wo* (to**

Qeatoehnleal Suney

Typ*

SECTION 18 OMI v

nt Wnrtr CMm^l an *m JUt^A^i jajrti

RSCEiVED

ttBl i 1^'db

MINING Lr :v "i- i" '-

Note: The M holder

ay refect tor.irlfy idRms dunMo In VM

KM el or pert of the i M! at lil a a Ji r 11 mftm ftra B 019 recofosoof coats wMrin 30 days of e reqiiMt tor venHcMkm.

Ponmis sno Swvsy Conpony Who Psffomwd MiA Woih (Qlvo Nsfno Bno Address off Author of RoporQ

-flfilce

of

r*.B*j

80S) MOSB NO* i OH fSWSVOS) VMS;

by e*

Of Wofm nSpOft

Wm iKtt MI tofc bi Mi Wafc Mpo*t ha*fc^ poiaimd t* *oifc at i

74 frA/rfA///^ ^g. 7^y lOkWtaa By (BlB"*lMP*9

l l. A^J jx

r^or Office UM Only

9fi C Ud 81 NHP S6,••.'CISIAI3 C.'.MNIH

lj

i i

1

ti

-

P

S

T*

-S)

Oi 0

- —

VP O

U

——

o ox

— -

0

O

O

——

IM

u\

——

03 O s/v

O '

^

——

|;

——

D) O (A [P

——

OXI

i4

O

5.

03 O O

1 1 9

u^

^

0o

— -

88

JO

——

7\

1

T

-r-i

8!!t

iH

i

-

^

-

-

-

-

^

i

^

*

*

-A

*

t*

**^^

* t.

*

Y

. :.! ,- ,-

•t

-,

*

*

*

*

-A

*'. "w

V^ V *

*

^

*

V

W

m

. "!

h

1

R

FM'fJ'.N

rCI

Bl

'i U.N

IVt

)3BR

D

.NCH

. r-

wIR!-

-l

Cradtts you are claiming In thte report may be cut back. In ordtt td fnmiinlzftm^i^^m^ *- ~S^^—^^ *MMa -ftjAB- A— •••(••••^dh M*A dtM^^JIritta* — * 4k*^hdJl^M a^^-^A^ i&mti 1 ' \ — —wracn damn you wian to pnonza ma oowiion 01 cream, naaaa mane t**) on

i. D CradtoaMtoMcutbackaojJaNyoveral i D CrftdNft art to b* cut tack as priortaad onLi ** -- ^'-^"* laVAA tMai ItAtlA akMl ill *i ilia li tartaaft AlwtJHI nw ovom mat you navo noi spocmoo your cnoi

Haiti: EtttNpM MttMfl

*i l* A. || -*---* 1NOW 2: n wonc i

1 carttfy mat tha rt or Maaad land at

LA Ajt B^AAaAdtUhljll *--a**-'• Of ovnvnwi miwii*AB^Ka^ g a^a.-.fc^WnB CvBHlaV*

PMHHIIIM

toordad IMttml

kttara

Ion p

BOBim nnjQI j^A^—A ^luJii dam IB uuiiuiIti .ll.-l.-Oma anacnao

— ji ^J u^^^^ftMea or pnomfj

Md 4pp

w

AfldvarM^fecteoflft of wift fo8o*JinnQt

wiuny UBCKIDiLl* la^-J kl

Billfca vimiA.

OpHononvw

uiMato4dadtrafti*aft.6|

kftAnftaV! Atf IftAaUjt lAHll-

hoktor had * banMdal M*r*M In tha pUMttd

. . ~~

fiuri ui

• btV

VOS.

thoJik.

HpNNIM• .-•^ tnm.

U.—1L iJ*lJ.A**Jg-^ *-*^^.afc^ **^ ^*- jat^ fl^A^Amen oBiBwons, piBBao •MHCHIV iimii

tt* J * t M 4 M il AM^ Lm/tTT ^1 C^^*^*^^

kHim ajUAAJBAAlA MUBJttftliAi^ AA A^lAA^aAAAa *fc* ^^MA. . ^ ^^ ^ a*"wn •grvOTiMinat mamoianoHin vi aajraaniainat aiB*i w nil raapaci

^•fcAfc* ttJUAAlAlA |La lnM*^i||nptaaaa compivn ma niavwingt

S**** Date

g

rij o[XJ

VP oo)o-

/o?

rfi

^XJ

irf

i!

H

ti* -i ji

Y

•in :

•H*

ITT

* ,.

i

^

\

-^v\

^

* f\ --

^-

^J ~r f

1 ' '

3.

. S

i

-A

.-rt f--"'*"

^

, .

^

-. -i.

^

-

i t

^

i

*filil!

Siii

fi

• W-.

.-...4 j

CiwRI VoO m9 dHffilnd lit nw ffipon thfly M cut bAck. M 6roBr 0 nWiNRIU IH8 AdVBfM BracH M Wen MWMBAIi BMH IkKAM IroM^LjkkJa MvUlBHBal laHAi ^bt4Uk b4 M*4j**4^A MlA tlAiiatirirt **J M*BB*AI4I 01*****^ tt^lll ftflt AUfl jj MftA 4M*JLBBBBUBJ|Vwmcn CMnns jvU wwn ID iwiufizw inv oBioDun w cwmiv. rmBv ifHiTti f"/ ww 01 mij fowivfinQ.

i. Oc*dwirttaM6trfbirt*ttitifl0wihlMdilffll^A l~l —-*-*"* Ai* i.. i.* t.J LAilt *----** - a..^t AM -'A*-*-A AAji**iaa^ M •T. UJ VftVOma W ID D* CUI DaCK WJUBWy vW BH CWWflB OOfnoWmi WlA t i ^lAilttA AfM In IvM tfiil 1^^^ MA juffiiUAf! fm MI

iftoiipwJfiKJy8uft*H)(eifllprt8flly' ••-- - * ' -*- "l_______________- r* ~

fJMH..X^M—.-.y -T-i —i

ldntiMnlnoel.tiM:M.z*ott ttMM MM tt M MM M1 n

Ontario

Mv pement du Nord at des mines

Statement of Coste tor Assessment CreditEtat des coOts aux fins du credit devaluationBttMku* A.4tAJI 4*1 mmmm a —— BM tga m mMining ACVLOI sur ws mineo

of the11 •tinn i i nalairiai J *M* **-*— few*-* aW niSfaln m ft u~u*t^ Ot&A an JinaafcifitODon oooocioo on w ionn m oumnoo unoor 010 oumovvyA^A Tib^B k^aju^B^dSMM ^^B) *- — B^B^MA aVk •B*AB*^ABM A M^MM^MJ ———aACV. IIH* afNorinoDon w DO UMQ to invniavn o roconj ono of Bio tieinlnQ ctoavn|8). Quosoono shout Into coOoctton snoirto

IMM^wJ ftAa^MiaBM^BM' UaMkMs*) l AMMSM) a\Ja*i^O*M j^ fclinlli •••i ncaw MtwojOr t iMonpiiojB Lonoo* WewWuy or nonnoniDevelopment and Mmea. 4th ROOT. ISO Cedar Street. Sudbury. Ontario P3E 6A5. telephone (70S) 670-7264.

Las laiutiloiMinuiMi paraonnals oonlanuB dana la pftoanla formula amtivcu0MOT^^o^^awrlaan*waalaBrvlr^atanlra)oiirimdas concessions mMaras. Adrasaar touta quasNon aw la oolaca da ess

Devateppsmant du Nord at das Mhwa. 1S0. nw Cedar. 4* Maga. Sudbury (Ontario) P3E 6A5. MMphone (70S) 670-7264.

1. Direct Coajta/CoOts dbvcte 2. IncHrect Costs/Coots IndlfccM

Typa

Contradar'a

MakHfoauvreFtold Supervision Supervision st* b terrain

TIPS

Typs

TIPS

Amount Totals Total global Pour la rernboursartienl dsslravde rehabBtoHon.

cools Indktocts no wnt posad"evaJuatlon.

Type

Peedsnd

Nourritursst

TIPS

Amount

Total Direct Coats Total dee coots directs

Total Vahisol IstOhsd

Sub Total of tndkect Costs Total partial daa coOta InrArects

(net greater than 20* at Direct Gaels)t fn •XCOQMI pot 20 "A QBO oootel obocta)

Tows Tow global

Note: The recanted holder wff be required lo l of costs wM*t 30 days ol a request tor ve

voflflcttBon to not inodo, Ino MonMor moy re|oct for ol Of port of uio ossossnwnt vork submHIoo.

l hi .If

tonudevMtortox:Le lepresaritataldascoutsdamlasaolouraaulvanturwdaniandBftcat^f^^ d 1^ *^AflMb*^4ldMk ***^^4 m*^^ ^^^Mdd**A^ ^M ^^k^^d*^ ^l^^rf m^l^Am* ^Ma^anal, oi w vanncanon n aai pas enaciuaa. la nvraaira paul rejeiar vjui ou une parfto daa travaux ffi

1. WorfcfltedwUhln two years of completion to ctoJmed at lOIWfcof the above Total Value of Assessment CredM.

1. Los tavoux d4poo4o dsno tos dsux ono sulvonl tour ocMvomonl sont iwnbounno lOO^ooto

2. Work Wed three, four or five years after completion to cteknedat 50* of the above Total Value of Assessment Credit. See

x 0.50

2. Los travaux deports trote,qualroou cinq ansaprtotouracWvomgnl oont romboursos A 50 ^ oo to votour toCvo du CfodM o ovohMflon susmenttoond. Votr loo colculo d-doosouo.

x 0^0 B

CoiUHcflrtlon Voilfylny StBjtwiwnt of Costs

l hereby certify:that the amounts shown are as accurate as possible and thwere Incurred whBe conducting asscmsmont work on the lands shownon the accompanying Report of Work form.

col

AttsstsUon ds I'Atst dss coots

J'attosto par to preeanto :qua tos montants Indlqufe sont to plus exact possfcte at que ess doponsos ont 4t6 engagdos pour effactuer tos travaux d"evahisBon sur tos terrains bKXques dans to formuto de rapport da travaJ cHoM.

hi Company). l am authorized Et qu'a tttre de

to make this certification h faJre cette attestation.

Mote : Dans csns tomwls. torsqul dMgna dss psisonnas. Is msscuan sat utBsl au i

L-,-

Ministry ofNorthern Development

OtMario

Report of Work Conducted After Recording Claim

IflnlndAc*jp^cotscled on triform Is obtained under me eurJiorfr^

IMS ooMcHon should be Directed lo Hw Provincial Manager. MHng Lands. MMstry of Norttwrn Development snd Mnes. Fourth Floor. ISO Cedsf Street. Sudbury. Ontario. P3E 8A5. Kephons (705) 670-7264. O * mv ^ — . -.~* loo 7 linstruction*: - Ptoase type or print and submit In duplicate. * *

- Refer to the Mining Act and Regulations for requirementa of fffing assessment work or consult the Mining Recorder.

- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany tnts lot in hi duplicate.- A sketch, showing the darms the work is assigned to, must accompany this form.

Recontod HoUHM/T/2.

Telephone No."

74 (A\IV\J M /Per: i H±LlJlOWnewllpviFVBel

Asu* m J/ 344-HMng

At*r V "Uke

MerG Pten No.a- 773

To:

Work Performed (Check One Work Group Only)Work Group

GBotechnlcaf Survey

Physical Work. tnchidhiQ DfWnQa*^^B- ^laSJSja/^aiCTja• *0Vl8DHfDD)Ovi

Oil MI Authorized t•••--*- " wane ^

AssaysAssfQjntnent h^iib Reserve

Type

(ZetLoticAL /liffA/VeV

SECTION 18 ONLY ———————— 1

RECEIVED ]

tLB \ : ' —— 1 ——1

j-— —— ~^J

nt Work Claimed on the Attached Statement of CostsTotal^ ^ ^^ ____ __ S 'Note: The Minister may rojoct for assessment work ci edit aff of part of the assessment work Submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of A request for vei ideation.

Persona and Survey Company Who Performed the Work (Gtv* Name and Address of Author of Report)

^^dA^M^fe

**-— *'^*- fcJ-i 4 — ii - - -- -- - ^i-t-ovv nuisj no. i on reverse srae

l certify mat at me time the work was pertormed. me cMms covered m this work report were recorded In the currenl holder's name or hstd under abeneflcMI by the current recorded holder.

necofOBO HdOBr or AQMV (S^nelure)

Cai Undation of Wuik fleportlcertiyihatlliii*apsf*oiialla^^ Ma completion and annexed report Is true.

i during and/or after

CwWtod By (9gnalure)

Fof Office Os* Onfy

t*Domed Approval Pen Approved

ter Sent

NUP SB.-3 eiswrn

ii

ii 3

il

fa?^*If

'{if

o oq

o

tP

o

O^^^^

c*

O*o-

9

0

\^ ^

^*

CA

-

O

o l/voA

-

0X)

-i

~-

O

uv

——

i0* 0

^

-~-

o oQ

0 UV0*

— *

o OQV)* 0

Vi

c

2

oMt|J

^^

"^

~-

-OOQ

IAO

, 5o"OQ

os(A

8

oOQ

S-D

*

7

O

1

S

4*-

4

lin-l

j)^

H^W

^

~A

^

S

vf*r

•A

•Q

l/V K Wo*

IV)t^JOc\

UJNJOQ

h^o^"^A

Y

o**

' ". -

IA

OQ

U\

CKJ

v\

g v\OQ oQ

'v\ w to S OP 1

KCO

ri

i .'

W\

'T,'^'

- -,

* *V*^B*K.

**

:r;~

, .i

-" WHV

u\

•~TT

-^ iL^

8f^

wf

't*a^3r|l

Oi'

VJV.

I 1 S Wm

H;'*

c.2?!?8J5!iar* ^Z!"9 ^nthte,reP0ft "fyj* cul back ln Ofdel to i****1 thiwhich clalnu you wish to pikNize the detotion of ci edits. Please mark (*x) on i of the foltowlng:

UftdhA* J j li oil* i aa al m • la**r-— -* **- Ja — ^.a— aV^.^^ucn ooteuons, ptooso inciicaw irom

1. D Credits are to be cut back starting wfth the dalm feted last, working backwards.2. D CredNs are to be cut back equafy over ei dakitt contained in thtt report of work.3. D CredNs are to be cut back as priortzed on the attached appendix.

In the event that you have not specified your choice of priority, bpttori one wM be Implemented.

Kl^l*. f,,*m.mt*t~ll.mmmltmtmttmllmm*mt**m~~*~~~t*JI,tUttm-t Umttm* * l..ja-J .i.t* fc-a~—— *^J-.C1 ^ * —— • •-.t..l* *i- ^jrf. —— . ———— 1

fat Hi*ni mv

•t* li aaadMfe l-A a. t, A. .a.— •tAv&MafVHAui tfM^m aihakAAaHA^kjl ^^a* eWa^a^akjA *A---* ^*—*** —-a.———*^A^ AaWA *—**—-**-**-*-iZI If WOfK IMS D9M1 |MIIUIIIIOU Oil |WIOIHOU Or mWO taWlO, pW8*W COmpWw HW fOaiOwinQ;

l carify that Ins recorded holder had a beneficial Merest In the patented or lemd land at the Urn* the work Was performed.

i

i!

iIfi

rriirt

e*•y\ iy

-

oq O

lA.PC

-~

0

ooQ

——

C'

OJ

e)

O

0

0

*

O

O* 0

-G

-

-^. ^

o

-

S s 00

O o

Oo

rQ

O^^^v

^^^l

cT

c

oCO

O^^^C/l

-

O

^—

DO

0

t

D*Qaj^

O

O

^

2

o^

^^Bi

——

.1

C

——

5

0oq

•^.^^

•)

3o"OQ

WO

r j

OJo

V*

f

r*

^OJc

'BS

f|

iH

O -O

W^^^

OQ SY

S1 1

^ ^

^

A

0 CC

\J\

c^c 03 OP 1 00

Se/V

^

* t ~". . 'm

WJ

~"" i tm

— -^^^^l^J^^CH^

CP OD

Qjy —t*

CD

to

Hirf:

iilri

Mr

M

^S^JSL?0 Jlli?9 "JjfejyPrt maySe-cut backJn order 1 which claims you wish lo priorize Ihe dofottoii of credits. Please1. D Credits are to be cut back starting wNh Ihe dahn fisted 2. D CredNs are to be cut back equally over all dabns cental 3. D CredRs are lo be cut back as priorteed on the attached

In Ihe even! that you have not specified your choice of piluiHy,

Hotel: Ei lo

Mote 2: It

1 certify tt* or teased 1

[ample

o minimize the adverse effects of such dotettens. please Indicate from mark (^) one of the following:

last, working backwards, nod hi this report of work, appendix.

option one wM be Implemented.

• c4rjetM(flcWtntere^ are unrecorded h attifert.c^^

work hat been performed on patented or teased IWtd, pKlM complete the foiowlng:

•no M Ins tfnM the work was performed.

— *- - -^. -'* al. .. HI - — --*•ivenMiiia, ens., wiui reepeci

patented 9Vt n Date

!x

-^—

o-SILn 3

^Ta^[

^.DJA

o)

oQ

V0

W

—s^uv

ooO

^

——

iVH O

^5!

m

iV*oo

2.

o DOo-D

i0oQ

OS

st0

OoQ

i;o

O

S—

(•ioo) cc?—

^

^•M*

g

f zf

Mft' K•s

cgo |

i,rJl'Siftr—

a:

P|f

in*

-0 -0

o\^

O

o0o 0o

*

o

! i -

0o 0 0

0r-*.O

R

FI

o 0

ECE

Bl

OO

IVE

^'~

4* D

3

— - -**--i

oo k

5*irf'

wIA ir

s;

CredNs you are claiming In this report may be cut back. In order to minimize the adverse effects of such deletions, please Mfeate from which dafcns you wish to priorlze the deletion of credits. Ptease mark (r) one of the foaowbig:1. D CredNs ara to be cut back starting wNh the claim Nsted last, working backwards.2. O CredNs are to be cut back equally over aR claims contained In this report of work.3. D CredNs are to be cut back as priorlied on the attached appendix.

m the event that you have not specified your choice of priority, option one wM be hi^duiranted.

Hotel: Exempt**efbeneftetalaitereatareumecuniedliamreia.optionagreements.MetneHHdurhof lo the mining Harms.

Note 2: tt work has been performed on patented or teased land, pfttfte complete IM foHowtrig:

etc.. with respect

l certify that Ilw racorded holder had a beiwdcM hitoml In the patented Of W890O IMW ftn Ino HHW Vi0 wotfc wss pvtfovmoo.

Skjnahm Dale

l t- m

l-

r--v-4:r-—— 4

Tf ~ Q" *

i- 'S 15 --, ...-L.—— JIB 'B ! -l

MnMryolNorthern Development

OntarioJCnisteredu

•etoppement du Nord

Statement of Costs for Assessment Creditiztat des coOts aux fins du credit devaluation

Mining Act/Lot sur tes mines

Transaction NoJN* de transaction

ccaoctod on this form Is obtained under the authority- m f^^ Bfl^M^A^ M a B Yl^^ l*t^**MMMti*M* ^Jtt I*A a^M^Mfl bt MtMkrfttka A MMJMMvt — — -*of me •mnfj ACI. iras HNUfineuuii wei oe useo w maaiiawi e lecmu eno ongoing status of the mining daJm(s). QueaBone ebout this cofectton shoutd be dbected to the Provincial Manager. MMngs Lands. MbiMry of Northern Development and Mnes. 4th Floor. 158 Cedar Street. Sudbury. Ontario P3E 6A5. telephone (70S) 670-7264.

mswgr, tents personnels contenus dane la preeente atantrak

formate sorti en vertu de la td eur lea mhwa ei servkont 4 lantr a Jour un regtstre

des concessions mlntares. Adreeeer toute quesHon eur la coHece de ces ronsoignemonts au chef provincial dee terrains mtniors. ministers du Devetoppement du Nord et des Mhws. 150. rue Cedar. 4* wage. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.

1. Direct Costs/CoOts directs

Type

Draft* de

etderexpart-

Description

Labour MahxToeuvreHeld Supervision Supervision sur to terrain

Type

Type

Type

Amount

/l,

Total Direct i Total des coots directs

Totals Total global

2. Indirect Costs/Coots mdlrects** Note; When dehnlng RehebaTtatlon work mdfcect costs are mn

Pour w remboursement des travaux de rehabnRation. tes

Type

Lodging

Description

ShCts

ftu

Amount

Sub Total of Indirect Costs Total partJel des coots mdlrects

Amount Allowable (not greater than 20* of Olreet Costs)

Total Vafae of ASMSSB (Total of Urea ai

Totals Total global

Note: The recorded holder wH be required to verify expenditures dafcned hi this statement of costa wKWn 30 days of a request for verification. M verification Is not made, the MMster may reject for assessment work a* or pert of the assessment work submitted.

Note: l^ttaWreeniegMie sera tarw da vaiffisr tostw present etat des coots dans lee 30 Jours autvani une demande a cet effet. SI la verification n'est pas effectuas. w mMstrepeutre)slertout ou une paitw des travaux d'evaJuallon pntoentas.

FMng Dtacounts

1. Work fled wttt^ two years of completion b claimed at 10(m the above Total Value of Assessment Credit.

pour depot

1. Les travail* deposes dans tes deux ans savant tour achevement sent

2. Work Wed three, four or five years after completion Is claimed at SOTb of the above Total Value of Assessment Credit. See calcufatJons belowt

Total VelueoTAsaeMnient CredKx 0.50

2. Les travaux deposes trots, quatreoudnq ana aprte tour achevement aont rambourees a 50 H de la vafeur totaw du credtt d'evahiation

s. Volr las catcuts d-desaous.

Valeur Male du cnMl d'evalx 0.50 -

Certification Verifying Statement of Costs

l hereby certify:that the amounts shown are as accurate as possible and these costs

i incurred whJe conducting assessment work on the lands shown

am authorized

on the accompanying Report of Work form,

that as ___."^(*C***T-——^^—^————(Recorded Holder. Agent. Portion hi Company)

to make tMs certification

Attestation de I'etat des coOts

J'atteste par la presente:Que tes montants indiojuta son! to plus exact possible et que ces dtfponses ont 6td enojarjdes poOr effectuer tes travaux d'Avatuation sur tes terrains indlques dans la formuto de rapport de travail ti-Joint.

Etqu'atttrede. Je sute autorisdre. npreNntmt. poilv occiew J^^ hj COMPSOJM)

a faire cette attestation.

oeiz (04/91) Note : Dans cette formuto. torsqu'l dftshjne des personnes. to mescuan eel utSet au sans neutre

OntarioMinistry ofNorthern Developmentand Mines

Ministere du Developpement du Nord et des Mines

Geoscience Approvals Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

Telephone: (705) 670-5853 Fax: (705) 670-5863

March 07, 1995 Our File: 2.15871 Transaction f: W9540.00019

W9540.00020 W9540.00021

Mining RecorderMinistry of Northern Development i Nines435 James Street SouthSuite B003Thunder Bay, OntarioP7E 6E3

Dear Mr. Weirmeir:

Subject: APPROVAL OF ASSESSMENT WORK CREDITS OM TB 1082884 *t ml. IM WABIKON* LAKE AREA

XMO

Assessment work credits have been approved as outlined on the report of work forms. The credits have been approved under Section 12 (Geology), Section 14 (Geophysical) and Section 17 (Assays) of the Mining Act Regulations.

The approval date is March 06, 1995.

If you have any questions regarding this correspondence, please contact Steven Beneteau at (705) 670-5858.

ORIGINAL SIGNED BY:

Ron C. GashinskiSenior Manager, Mining Lands Section Mining and Land Management Branch Mines and Minerals Division

SBB/jl Enclosure:

cc: Resident Geologist Thunder Bay, Ontario

ssessment Files Library 'Sudbury, Ontario

0033XVH NOXISVM L/BSL Z 9ZOOMS90HZ9

REFERENCES

Cheeseman Lake AreaAREAS WITHDRAWN FROM DISPOSITION

S R MJHt Ai l is'CiHr', MR MININd HKiHTS

SAND AND GRAVEL

NO (c GRAVEL PIT No 1O3&

" " No. 1037

" ' " No. 1063 , FILK 1879*6THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKE MIN

CLAIMS SHOULD CONSULT WITH THE MINING R

NT AND MINES, FORDTIONAL INFORMATION

THE STATUS OF THEL/jDS SHOWN HEREON

LEGEND 1195204

1193206 '~-- 'l- 'j^^^fV l- " TroTT^^i

108^042 l 1083049

195207-***-L- A T TB ~A ~ '"TB" ~ ~:?B—— ,2642 l IOMM3 l JOMSte l J09268I [ 1092692

J?——l—— —* l "l TB , ra — ~0"* J — ™-?02l JOMOJW (0*8039 .1092820 '™ "i™ l TB lTB~~TT7--'

083043 UH304S j1083032 , I08J025 ; IO83023

l 1188210

""TOWJ.I 10*3044 J 10*3047

1205146. ~120894 . l 10*2*44 ! 101

P88209 ra*8030 l 1088037 .1092618 IJ083483 J 1083488 \

— —' —— - - ! I08348Z , 1083489

JJ08348I i 1083490 i'TB083063 l W3062

i . ' i r j ' i i \ \ J- — — — — ^- — -iJ^HfJ1"*!*. j?4* J^l8! 'joMfV 'l0^

--r~— -1081374 i TB |TB

108232610*3078 l 10*3074 ' 1083073

r r — -f--| 120-5107 i j2-"i5l42i , i i i ' '083078 , 1083079 f 10*3080 J '083O8I ' IO83Oe2 " l

DISPOSITION OF CROWN LANDS 1082889 , 10828.11 f 08Mfl9

T YPt L)| DOClMl N'l

L If t

ORDf R IN i '

Rf St RVA ' L \

AN( fill'

SAND LAND USE PERMITS FOR COMMERCIAL TOURISM.OUTPOST CAMPS

RECEIVED

MAR B 01005

WABIKON LAKEM N R ADMINISTRATIVE DISTRICT

THUNDER BAY

(AND HILLS/ REGISTRY DIVISION

THUNDER BAYfcilinjijn l itMiNtf'

Ministry of landNatural Management

6S Branch

Max Lake Area G-741G-773

Che/esemonAflEV.S WITHDRAWN FROM DISPOSITION

SAND AND QBAX/BI' X

"^i-ri" ;' THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED. THOSE WISHING .TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RfQORDER, MINISTRY OF NiRTHERN DEVELOP

NT AND MINES, FOR AD-IONAL INFORMATIONTHE STATUS. OF THE1195204 .

UfJDS SHOWN HEREON.

II9 207 p - -,- - - . 083048 J j~ ~~

i:r-^{jO*M43 j M040J ^ — -.....

i H882ian... J- -———f l l iM8UI|f,QMWpU l to ~ — —J— — —. —j ^ 1205146^^r -1-'2!"S?U"*fi?t,-~"-1

""

??^u -w-rf'ivL"!??*^0""'k. ! uu.^^.l ^ l ~~T~~ ~~

'OMOa 1082886 | 1082*81 '———!~ ^ ' l ' l

J2-J5I42 h—— -- ---.1082322 J --——iT" - —^—- fc-- A— -L - - -L,.JL-^-; -A1209447-—---4 1209446

\ V IN i Ml! " i4lN

HK.HT , ONio , mf,

^si nrvy r H u,m'.'i,IN L Y

\l. ICf M f Of iji l l li'A I K IN -^

OROF R IN ri )i Rf st RVATION

-— ——-..... j

, . ( L4WD USE PERMITS F,OR COMMERCIAL VoMMSHOUTPbsT C/

NOTE M lNINd Hi "' i- A m ( i -iI'll) VIS'lO N OH.'.iNA, P AIfM'M 'H LANDS *t. t R S (l ") M l CiiAI' IBO S t '

WABIKON LAE

VNHHM

AUD JITUSV REGSTRY DIV

•v ""Ministry

Lqke Area G-741

52H06SW0025 2 15871 WABIKON LAKE 210

\

LJ

O O•foOJ

LJ

o o-f*—t OJ

U

Oo*OJ OJ

U

o o*CO CU

U

Oo-h OJ

U

O O* inOJ

uo o

OJ

U

O O

OJ

O O* 00 OJ

uO O

OJ

28+00 N 28+00 N

27+00 N 27+00 N

26+00 N 26+00 N

25+00 N 25+00 N

24+00 N 24+00 N

23+00 N

22+00 N

21+00 N

20+00 N

19+00 N

TB 108J035

FB10830-Z JL O

N

22+00 N

TB 1082894

21+00 N

20+00 N

•i i- \

GEOPHYSICAL LEGENDINSTRUMENT: APEX MAX-MIN II+

PROFILE SCALE: t CM = 25KPOSITIVE READINGS TO THE RIGHT OF LINE

COIL SEPARATION: 200 METRES

OUT OF PHASf PROFILS

IN PHASE READINGS

IN PHASE PROFILS

CONDUCTOR AXIS

OUT OP PHASE READINGS

TOPOGRAPHIC LEGEND

19+00 N

U

Oo-H O OJ

Oo

OJ

U

Oo-H OJ OJ

U

Oo

OJ

u oo

OJ

uo o-h inOJ

uo o*•JD OJ

U

CD O

OJ

uo oH- 00 OJ

uo o•fCTs OJ

O m 100 m 200 m 300 n 400 n 500n

l

CLAIM POST:

LAKE SHORE:

STREAM:

SWAMP:

ROAD:

CUMBERLAND RESOURCES LTD

WHISTLE LAKE EAST PROJECTTHUNDER BAY MINING DIVISION

WABIKON LAKE AREA

r

l

RECEIVED

FEB l 71995

MINING LANDS BRAMCH

MAX MIN II+ 444 HZ PROFILES

SCALE: 1:2500 DATE: OCT 1994 N.T.S. 52-H-6

PHANTOM EXPLORATIO S LTD.52HOB8W0025 2 15871 WABIKON LAKE 220

LJ

CD O4- LOen

LJ

CD o

ro

uo o

m

LJ

o o*00ro

uo o-I-CT*

uoo

LJo o

LJo OH- OJ

LJCDo

uCD CD-f-

uoo 4- LD

LJCD O

LJ

CD CD

TB 1083051

18+00 N

17+00 N

16+00 N

15+00 N

14+00 N

N

12+00 N

1 + 00 N

BL 10+00 N

9 + 00 N

8 + 00 N

7 + 00 N

N

5+00 N

4 + 00 N

3 + 00 N

TB 1083054

O m

2 + 00 N

1+00 N

TB1083052 TB 1083053

1,083060

TB 1083065

TB 10S3366 TB 1083

TB 1083075 TB1083010

TB 1083080

18+00 N

17+00 N

16+00 N

15+00 N

TB 108305914+00 N

13+00 N

12+00 N

11+00 N

BL 10+00 N

TB 1083068

9 + 00 N

8+00 N

7+00 N

6-00 N

5 + 00 N

4 + 00 N

3 + 00 N

100 m

2 + 00 N

1 + 00 N

TB 1083081

LJ

CD O

CO

U

CD O±CD

LJ

o o-t-

LJ

CD O±OJ

LJ

CD CDH-ro

LJ

1 O CD

LJ

CD CD•fin

LJ

Oo

LJ

Oo

KH06SW0025 2 1 5B71 WAB.KON LAKE 230

W

GEOPHYSICAL LEGENDINSTRUMENT: APEX M AX-M IN II ±

PROFILE SCALE: 1CM = 257o

POSITIVE READINGS TO THE RIGHT OF LINE

COIL SEPARATION: 200 METRES

OUT OF PHASE PROFILE IN PHASE PROFILE

- -K30

if-30

25

'25

- -25

- -4

CONDUCTOR AXIS

20

13

118

IN PHASE READINGS OUT OF PHASE READINGS

TOPOGRAPHIC LEGEND

CLAIM POST:

LAKE SHORE:

STREAM:

SWAMP:

ROAD:

CUMBERLAND RESOURCES LTD

WHISTLE LAKE EAST PROJECTTHUNDER B A Y MINING DIVISION [-RECEIVED

WABIKON LAKE AREAFEB l

MAX M IN 7J+2.15871

HZ PROFILES

SCALE: 1:2500 DAffE: O C T: 1994 N.T.S. 52-H-6

PHANTOM EXPLORATION SERVICES LTD.

LJ

O o4-m ro

LJ

Oo

co

LJ

o o

CO

LJ

O CD4- 00 CO

LJ

o o-f- (T*co

LJ

o o4- o

LJ

CD O

LJ

CD O4-(XJ

LJ

CD O± CO

LJ

CD CDH-

LJ

Oo-hin

LJ oCD

LJ

CD CD

TB 1083051 TB 1083054

18+00 N

17+00 N

16+00 N

15+00 N

14+00 N

13+00 N

12+00 N

11+00 N

BL ::

8

5 + 00 N

4 + 00 N

3+00 N

O m

2+00 N

1+00 N

TB 1083053TB1083052

TB 108B 1082

TB 1083065

TB 108

TB1083012

TB 1083075

TB 1083080

100 m

TB 1083081

LJ

O CD+ [D CO

LJ

Oo-J- vjQ CO

LJ

Oo-J- r^CO

LJ

O CD+ OD

LJ

CD O-H CT. CO

LJ

CD CD

LJCD CD

LJ

Oo+CXJ

LJ

Oo4- CO

LJ

CD CD

LJ

O CD*in

LJoCD

LJ

OoH-r*-

52H06SW00252 15871 WABIKON LAKE 240

18+00 N

17+00 N

16+00 N

15+00 N

TB 108305914+00 N

13+00 N

12+00 N

11+00 N

BL 10+00 N

TB 1083068

9 + 00 N

8+00 N

7+00 N

N

5 + 00 N

4+00 N

3+00 N

2 + 00 N

1 + 00 N

w- E

GEOPHYSICAL LEGENDINSTRUMENT: APEX M AX-MIN II+

PROFILE SCALE: 1 CM = 25%

POSITIVE READINGS TO THE RIGHT OF LINE

COIL SEPARATION: 200 METRES

OUT OF PHASE PROFILE

IN PHASE READINGS

IN PHASE PROFILE

—— CONDUCTOR AXIS

OUT OF PHASE READINGS

TOPOGRAPHIC LEGEND

CLAIM POST:

LAKE SHORE:

STREAM:

SWAMP:

ROAD:

CUMBERLAND RESOURCES LTD

WHISTLE LAKE EAST PROJECTTHUNDER BAY MINING DIVISION

WABIKON LAKE AREA2.15871

RECEIVED

FEB l 7 1995

MINING LANDS BRANCH

MAX MIN II+ SURVEY 1777 HZ PROFILES

SCALE: 1:2500 DA 1994 N.T.S. 52-H-6

PHANTOM EXPLORATION SERVICES LTD

uo o-t- o oj

uo o-I-1—lOJ

uo o-*- OJ OJ

uoo

OJ

uoCD4- s*- OJ

U

Oo-f in ru

uo o-I-•vDru

uo o

OJ

U

Oo+ CO OJ

uo o•fON OJ

28+00 N 28+00 N

27+00 N 27+00 N

26+00 N 26+00 N

25+00 N 25+00 N

24+00 N

23+00 N

22+00 N

2UOO N

20+00 N

19+00 N

TB 1082894

W

GEOPHYSICAL LEGENDINSTRUMENT: APEX MAX-MIN II+

PROFILE SCALE: 1CM = 257*

POSITIVE READINGS TO THE RIGHT OF LINECOIL SEPARATION: 200 METRES

OUT OF PHASE PROFILE

IN PHASE READINGS

IN PHASE PROFILE

CONDUCTOR AXIS

.— OUT OF PHASE READINGS

TOPOGRAPHIC LEGEND

CLAIM POST:

LAKE SHORE:

STREAM:>

SWAMP:

ROAD:

CUMBERLAND RESOURCES LTD

U

Oo -f o ru

o of

1—lru

uo o +OJ OJ

U

o o+m ru

uo o

OJ

uoo ^ in ru

uCD O•f

•JDru

UJ

o o

ru

uoo •f00 OJ

U

CD CD+

CFNru

O H 100 n 200 n 300 n 400 n 500m

H06SW0025 2 15871 WABIKON LAKE

WHISTLE LAKE EAST PROJECTRECEIVER

THUNDER BAY MINING DIVISION FEB l 71995

MINING LANDS BPAflp,, j

WABIKON LAKE AREA

MAX M IN II + 1777 HZ PROFILES

SCALE: 1:2500 DATE: OCT 1994 N.T.

PHANTOM EXPLORATWNSERV. LTD.

250

-vT-*-"-^*^*S^^:. ,./;:" -

,v ':^- t: ^f'*t ^ *" z **iLiiiii -3 . -- " -. v.

rj* *^4-tzl- , f

3400N

330QN

3200N

STOON

•* " ~* t *f ',.v.A"

^j- . ^ . .__

/^•-^^'-.

CM CO' ' l " '

f

rr

*t

3300N

aaooH

3100N

3000N

*s^ .•ijfc,-^ -

2908N

MOO*is

2SOON

2400M

2*3!

r

210QN

2BQDN

190QN

180*1

17QON

1600N

1500W

1400N

12QON

J100N

l DOON

fiOQN

800W

TOON

BOOM

500H

400N

300N

200N

100N

-100N

-200V

-WON

. ,

/D^

loooM

f

i

(

l

t

i

; 1

"^ (v--

A^lm- *

-r h ^oe?^0^ "

-Q-

C !

UJ g3 8

UJ UJ8

UJ UJ

,h

*a**- 3-: C-OtCif* *0nf ,

7

rrn-f/c. \jo i Cc, m c

rxsrk*y*~c.

2000N

25QON

2400N

2300N

2200M

ZtOON

2DOOM

1900N

1800N

1700N

1600N

1500N

1400N

1300N

1200N

1100N

13031

1000N

900N

800N

i* clt

' a c ' -i. f 7 r 'fc-f-' C"-' -5

PZL

2.15871

600N

SOON

400N

aooN

200N

100N

ON

ST ~

S*r S" 1":-! -1

-200N

-300N

(iiMtan)

UJ

CUMBERLAND RESOURCES LTD.

GRID LINE MAPPING

ISTLE UKE PROPERTYENSIGN MAIN GRID NORTH Se EAS"

PROJECT:SCALE: 1/5QQO

26: 1994BG1 OMP-56

*.A- If

S2H06SW0025 2 15B71 WABIKON LAKE 260

3300N 2

3200N

3100N

3000N

2900N

2800N

2700N

2600N

2500N

2400N

2300N

2200N

2100N

2000N

1900N

1BOON

1700N

1600N

1500N

1400N

1300N

1200N

1100N

1000N

900N

BOON

700N

600N

SOON

400N

300N

200N

100N

ON

-100N

-200N

-300N

-400N

-SOON

-600N

-TOON

-BOON

-900N

u UJ

lui UJ

i

X 12096

X 12095

X 12094

x 12093

X 1301212097

13007 , 13013 l x 13014

x 1X03

x 13002

x 13039

x 12995 x 12996 x 13006

x 13005

x 12997129|9 1 2994

x 12993

X 12992

X 12991

12990

x 13004

12989

UJ

eg

UJ

M

UJ

X 12091

X 12089

X 12088

X 12090

UJ UJ

, x 342

2092

13043

111

X 12112

UJ u oSin

X 12108

X 12113

X 13031

X 12107 jX 12106 !X 12105 l

x 13030

X 12099

x 12100

X 12101

X 13033

13029

X 12116 13035x 12098

x 13036

. 12115 x ,13041

x ! 1X40 x 13037

if. 158 r rRECEIVED

FEB171995

MINING LA.NDC. BRANCH

UJ

in

-TOON

-BOON

3300N

3200N

31 DON

3000N

2900N

2800N

2700N

2600N

2500N

2400N

2XON

2200N

2100N

2000N

1900N

1800N

1700N

1600N

1500N

1400N

1300N

1200N

11 DON

1000N

900N

BOON

700N

600N

SOON

400N

300N

200N

100N

ON

-100N

-200N

-300N

-400N

-SOON

-SOON

UJl UJ UJ \ -10001UJ

in

REVISIONS CUMBERLAND RESOURCES LTD.

WABIKON LAKE AREA

EAST WHISTLE PROPERTYWHOLE ROCK SAMPLE SITES

PROJECT:SCAI.F; 1/SOQO

JAN 4. 1994BGI DMP-5fi

52H06SW0025 2 1 5671 WABIKON LAKE 270