District Irrigation Plan (Kargil District)
Under
Pardhan Mantri Krishi Sinchayee Yojana
(PMKSY)
Deputy Commissioner / CEO
LAHDC, Kargil
2
FOREWORD
The Kargil district is gateway to cold desert of Ladakh.
The rich agro climate particularly in summer has immense
potential for agricultural and allied activities on commercial
lines particularly vegetables .The topography and harsh
conditions limit the scope of agricultural growth .However,
the melting glaciers offer great scope for argumentation of
irrigation potential . The precipitation in the form of snow
accumulates in the glaciers during winter and the water flows
in summer.
The line Departments of Agriculture, Horticulture,
Irrigation, Forest, Command Area Development, Soil
Conservation, Rural Development and Watershed were asked
to prepare District Irrigation Plan (DIP) under Pardhan
Mantri Ktrsihi Sinchayee Yojana (PMKSY))
The painstaking efforts of all the District officers and
their supporting staff in the line departments deserves
commendation for preparing District Irrigation Plan
(Hassan Khan ) KAS
Deputy Commissioner /Chief Executive Officer
Ladakh Autonomous Hill Development Council (LAHDC)
Kargil
3
Project Summary
Name of the
Organization and
Status
Ladakh Autonomous Hill Development Council Kargil ,
(Jammu and Kashmir)
Project Title District Irrigation Plan
Project Location Distt. Kargil (Jammu & Kashmir)
Project Context Development of Infrastructure/Capacity Building
Project Budget Rs 119576.75 lacs
Detailed Proposal
Project Background:
Title of the project Strengthening of Irrigation in Kargil
Project Location Distt. Kargil
Project Context
(Describing the situation
or problem the project
seeks to address)
Development of Infrastructure/Capacity Building
Organizational information:
4
Chapter I
5
Executive Summary
I. Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY) -Introduction
PMKSY has been approved on 11th July 2015 by Govt. Of India for the
period of five years to ensure access to some means of protective irrigation
to all agricultural farms (Har Khet Ko Pani) in the country, to produce „per
drop more crop‟, thus bringing much desired rural prosperity. The
programme is an amalgamation of on-going schemes of Ministry of Water
Resources, River Development and Ganga Rejuvenation, Ministry of
Agriculture & Cooperation and Ministry of Rural Development.
Components of PMKSY
AIBP
Medium & Major Projects
National Projects
PMKSY (Har Khet ko Pani)
Surface Minor Irrigation
Command Area Distribution
Water Diversion System
Lift Irrigation, Ground water development
Traditional Water harvesting,
RRR of water bodies
PMKSY( Per drop More Crop)
On farm water management
Precision irrigation
Distt/State irrigation. Plan
Extension Activities
Coordination & Monitoring
PMKSY (Watershed)
Soil & Moisture Conservation
Rain water harvesting
Runoff Mgmt & Treatment
Livelihood support activities
Need for convergence
• Water Sources
6
• Distribution
• Management
• For achieving the goal of bringing irrigation water to every farm, there
is need to converge all ongoing efforts and to bridge the gaps through
location specific interventions.
• Vision
Access to Irrigation to every farm (Har Khet ko Pani)
• Strategy
Increase gross irrigated area
Bridging the gap between irrigation potential & utilisation
Creating/Strengthening Water distribution network
Enhance water use efficiency & Management
Outcome
More crop per drop
Enhanced Farm productivity
Rural Prosperity
Focus: End to End Solution to Irrigation Supply Chain
Water Sources
• Rain water harvesting /Micro storage e.g. ponds/tanks.
• Community water tanks/check dams.
• Secondary storage structures
• Groundwater sources-Dug wells/Tube wells
• River lift irrigation
Cement Nala Bund,
Distribution
• Command Area Development
• Underground pipe conveyance system
Water Use Efficiency
• Drip & Sprinkler System;
• Cropping alignment, on-farm development
•
SWOT Analysis
The role of SWOT analysis is to take the information from the concerned
agencies for the formation of Project and departments to make a viable time
bound implementation schedule so that the fixed targets are achieved in
full.
7
Some of the highlights of strengths, weaknesses, opportunities and threats
are to be analyzed so that we are clear in our goal.
Strengths
• Suitable agro-climatic conditions for cultivation of cereal crops,
vegetable crops, fruit crops and rearing of animals etc.
• Largely light soils are to be cultivated.
• Soil fertility is good and be helpful in increasing the income of farmers
if irrigation is made available.
Weaknesses
• Rainfall with erratic distribution.
• Canal water available only for limited area.
• Soil health deteriorating due to erosion and runoff in sloppy fields
having less humus cover.
• Light textured soils have poor water and nutrients retention capacity.
• In cold desert areas moisture stress resulting in lower yields.
• Lack of water harvesting and management practices.
• Insufficient financial infrastructure.
Opportunities & Threats
Opportunities
• Horticulture plantation with less irrigation requirement in comparison to
Cereal crops
• Good scope for water conservation technology adoption.
• Good scope for adoption of micro irrigation system in horticultural and
vegetable crops.
• More areas can be brought under assured irrigation for floriculture,
vegetables and other allied sectors.
Threats
• Non judicious use of water leading to water bankruptcy supply.
• Lack of adoption of recommended technology e.g. drips irrigation,
sprinkle irrigation.
• Non- availability of green fodder leads to poor health of animals.
• Fragmented holdings.
Objectives
The main objectives of PMKSY are:
• Preparation of District level plan based on the plans to be prepared at
block level for irrigation i.e. (DIP).
8
• Extend cultivable area under assured irrigation (Har Khet ko Panni).
• Integration of water sources, distribution and its efficient use, to make
best use of water through appropriate technologies and practices.
• To improve the measures to reduce wastage of water and increase
availability both in duration and extent.
• More crop per drop to enhance the adoption of precision irrigation and
other water saving technologies.
• Regeneration of ground water, arresting, runoff, integrated development
of rainfed areas using the watershed approach towards soil and water
conservation.
• Recharging of the ground water by appropriate technologies and
practices.
Exploration of private investment in irrigation
Vision
1. Creation of new water sources:
a. Repair, restoration and renovation of defunct water sources.
b. Construction of water harvesting structures, secondary and
micro storage.
c. Ground water development
d. Enhancing potential of traditional water bodies at village level.
2. Distribution network development of irrigation sources (both assured and
protective).
3. Promotion of Scientific moisture conservation and reduce runoff to
improve ground water recharge.
4. Promotion of underground piping system, drip and sprinklers and other
application devices.
5. Promotion of community irrigation through registered users groups / Farm
producer organizations / NGOs
9
A brief history of Kargil
Kargil with a population of 1.40 lakhs is scattered over an area of 14,086
Sq. Km. It is situated at a distance of 205 KM from Srinagar towards Leh.
Kargil is called the land of Agas in the present day world. It is due to the
fact that Kargil is mostly inhabited by Shia Muslims and Agas are the
religious head and preachers.
The name Kargil is derived from two words Khar and rKil. Khar means castle
and rKil means center thus a place between castles as the place lay between
many kingdoms. In the views of many critics, the word Kargil has been
derived from the words Gar and Khil. Gar in local language mean „Any where‟
and Khil means a central place where people could stay. This has the support
of the fact that the place is equidistant from Srinagar, Skardo, Leh and
Padum with around 200 Kms. With the passage of time Khar rKil or Gar Khil
came to be known as Kargil. The present bureaucrat and historian Parvez
Dewan in his contribution to the book “Kargil Blunder” reveals that a pioneer
namely Kargeel cleared the forests in Poyen and Shilikchay area before
the advent of Thatha Khan to dwell in the area and later the place
assumed its name.
Gasho Tha Tha Khan is said to be the first renowned crusader who
established a dynasty in the area. Tha Tha Khan was a scion of the royal
family of Gilgit who captured Kargil in early 8th century. His dynasty ruled
the Sod area of Kargil in early period and later permanently settled in
Shakar Chiktan area where the dynasty is till in existence. Kacho‟s of Kargil
are believed to be the off-shoots of Tha Tha Khan. Purik Sulatan believed to
be a renowned builder of Kargil who established his domain in Suru area and
ruled from Karchay Khar near Sankoo. Kunchok Sherabtan of Fokar, Kalon of
Mulback and many Kachos, Sultans and Maqpons of Sod, Pashkum, Wakha,
Chiktan, Karchey ruled the area of Kargil and expanded their
principalities to be merged with the State of Jammu and Kashmir.
In ancient time, the major part of present Kargil was named as Purik. This
name has been given by the Tibetan scholars as the people living in this part
of the land have the features of Tibetans. Drass is inhabited by the people
of the Dard race and Zanskar has Ladakhi – Tibeto stock. The racial stocks
of Kargilis are Aryans, Dard, Tibetans and Mongoloids. Kargil is a place
where people of multi- ethnic, multi-languish, multi- cultural are living in.
The types of people are Brogpas, Baltis, Purik, Shinas and Ladakhi. The
10
languages spoken are Shina, Balti, Purig , Ladakhi ec. As the Balti and Shina
languages are written in Urdu script, Urdu is common in the area.
Islam came to Kargil in 15th century. Mir Shams-ud-Din Iraqi, a scholar of
Shia school of central Asia visited Baltistan and Kargil with his missionaries
to preach Islam. The chief of Baltistan embraced Islam first and it was
later followed by the Chiefs of Kargil. Prior to Mir Shams-ud-Din Iraqi
Khawaja Noorbaksh visited Kargil and done a lot of Islamic preaching. Thus
Buddhism remained sequeezed in Kargil to the places like Sapi, Phokar,
Mulback, Wakha Bodh-Kharboo areas a Darchik Garkon and Zanskar.
Kargil became a separate district in the Ladakh region during the year 1979
when it was bifurcated from the erstwhile Leh district.
Ladakh Autonomous Hill Development Council Kargil was commissioned in
July 2003 in the district. The Ladakh Autonomous Hill Development Council
has 30 Councilors out of which 26 Councilors are elected while the remaining
4 are nominated. Kargil district is consisting of fifteen administrative
Blocks.
Geography of the district
Ladakh is a part of Jammu & Kashmir State situated in North of India
consisting of two districts Leh and Kargil. It is a mountainous desert. This
region is separated from the rest of the State by high mountains which are
crossed through passes at various points. The lowest pass to Ladakh is Zojila
which is at 11,500'. It has an area of 14036 Sq. Km. It is situated between
30 to 35 degree North latitude and 75 to 77 degree East West longitude. It
is surrounded by Bandipora, Ganderbal and Kishtwar Districts in the South-
West, Leh District in the East, Himachal Pradesh in the South and Pakistan
in the North-West. The District is divided into four high level natural
Valleys namely the Suru Valley, the Drass Valley, the Indus Valley and the
Upper Sindh Valley of Kanji Nallah Valley.
Zojila and Fotulla passes situated at the height of 3567 and 4192 meters
above the sea level are called gateways for Kashmir Valley and Leh District
for entry in Kargil District. High peaks of Namikala and Penzila are called
the sky pillars of the District.
The whole District is of high rocky mountains, desert arid, snow bound
and devoid of natural vegetation. It occupies unique position because of its
high altitude area in the country which ranges from 8000 to 23000 ft. above
the sea level.
11
The topography of the region is mountainous with little or no vegetation. The
mountains are of sedimentary rocks and are in process of disintegration due
to weathering. The terrain being hilly, available land for agriculture is
meager. The summer being short, only one crop of local grim or wheat is
grown.
The District Headquarter is situated at a distance of 205 Kms from
Srinagar and 230 Kms from Leh. Kargil district comprises of Kargil town and
127 inhabited villages and 2 un-inhabited villages.
The normal concept of a village as a contiguous and compact habitation does
not apply in Kargil district. Here a number of house holds have settled down
here and there depending upon land availability and irrigation facility. These
clusters are spread on large distant and in view of good number of Rivers,
etc.. The area of the district is mountainous with difficult terrain.
The climate and soil condition of the district
Ladakh lies on the rain shadow side of the Himalayan where dry monsoon
winds reaches Kargil after being robbed of its moisture in plains and the
Himalayan mountain. The district combines the condition of both arctic and
desert climate. Therefore Ladakh is often called “ COLD DESERT”. Rainfall
in the area is negligible. Heavy snowfall is experienced in winter. The average
snowfall is about 2 to 5 ft. in villages. In winter mercury drops to minus 48
degree Celsius at Drass (Kargil), which is the second coldest inhabited place
in the world after Siberia. The main features of the climate are :-
Wide diurnal and seasonal fluctuations in temperature with -40° C in
Winter and +35° C in Summer.
Precipitation is very low with annual precipitation of 10 cm mainly in
the form of snow
Soil is thin, sandy and porous
The entire area is partly or devoid of any natural vegetation
Irrigation is mainly through channels from the glacier-melted snow
The climate of the District is milder than that of Leh (Ladakh). The villages
situated on the banks of Indus and on the Sangham of Suru and Drass rivers
are very warm and fine. The snow falling happens to be quite heavy and
rainfall normal but it does not help in irrigating the fields. The crops are
subjected to irrigation. In Nutshell, the winter season of the District
experiences severe cold and temperature often goes down redundantly but
summer season remains dry and little hot.
12
The soil of the District is sandy to loamy in nature and deficient in organic
matter and availability of phosphorus and potashes low and mixed with
stones and gravels . It is shallow in formation, weak friable and vulnerable to
all types of erosion. Fertility of the soil varies from place to place and
growing season is very short. The average rain fall at Kargil is 26 cms only.
The district has some deposits of chromed at Drass and around it. Copper is
also found in Lungnak valley, Zanskar and Tai-Suru. Besides, deposits like
lime stone, marble and building material are also existing. However, these
mineral resources are yet to be exploited.
About population and density of the district
In Kargil district the Schedule Tribes of Ladakh region constitute about
99% of the total population of the district. Thus the benefit of the plans in
the district squarely flow to the Schedule Tribes which is healthy sign and
can improve a lot for the schedule tribes in the district so as to bring them
at par with the other communities on a sound footing of equality.
The block wise population break up is given as under :- Blocks wise Population
Name of the Block Units No of
Panchayats
Census
2001
Census 2011
1-2. Kargil-Soudh Souls 22 40718 41512
3-4. Drass-Bhimbat Souls 20 11662 21988
5. Shakar-Chiktan Souls 11 9606 11233
6-8. Shargole-Pashkum-
Lotsum
Souls 15 10893 11728
9-10. Sankoo-Barsoo Souls 14 16198 17735
11 G. M. Pore Souls 5 9716 12754
12 Tai-Suru Souls 17 8345 10059
13-14 Padum- Karsha Souls 18 10090 11653
15. Lungnak Souls 7 2079 2140
Total 95 119307 140802
13
Demographic Features
Population as per 2011
Census
1,40,802
Decennial Growth Rate
(2001-2011)
18.01 %
Breakup of Population
Census 2011
Male 77785
Female 63017
Rural and Urban
breakup of Population
Census 2011
Rural 124464
Urban 16338
Schedule Tribe
Population Census 2011
1,22,336
Sex Ratio 810 per 1000
DISTRICT KARGIL AT A GLANCE
S. No Item Unit Reference
Period
Magnitude
1 Geographical Area Sq. Kms. 2011 14036.00
2 No. of villages
a) Inhabited Nos. 2011 127.00
b) Un-inhabited Nos. 2011 3.00
Total 130.00
15 Agriculture
a) Reporting Area Hectares 2011-12 19437.00
b) Area under Forest Hectares 2011-12 64.00
c) Cultivable waste land Hectares 2011-12 7983.00
d) Net Area Sown Hectares 2011-12 11454.00
14
Biomass and Livestock of District KARGIL
Small Animals Large Animals
Equine
Poultry (No.) Goats
(Nos.) Sheep (Nos.)
Indigenous
Cow (Nos.)
Hybrid Cow
(Nos.)
Yak and its
Hybrids
Hybrid
Buffalo
(Nos.)
65414 118011 192384 13751 26105 16608 Nil 7951
15
LAND USE PATTERN OF DISTRICT KARGIL
No. of the
Gram
Panchayat
No. of
Villages
Total
Geographical Area
Area under Agriculture (in Ha.)
Area
under
Forest
(in Ha.)
Area
under
Waste
land
(in Ha.)
Area under
Other Uses
(in Ha.) Total
Cultivable
area
Net
Sown
Area
Area Sown
more than
once
Cropping
Intensity
%
95 129 14036 sq.kms 19459 11454 1500.35 113% 64 3576 1176
16
Chapter II
17
District Water Profile
BLOCK WISE EXISTING IRRIGATION STATUS Before DIP Project
IN DISTT.KARGIL
S.no. Name of the Block Total (Area in Ha.)
Total Irrigated Rainfed
1 Kargil 1400.95 0.0 1400.95
2 Soudh
3 Drass 2390 0.0 2390
4 Bhimbat
5 Shakar- Chiktan 814.15 0.0 814.15
6 Shargole
1475.3 0.0 1475.3 7 Lotsums
8 Pashkum
9 TSG
1991.1 0.0 1991.1 10 Sankoo
11 Barsoo
12 Taisuru 1139.6 0.0 1139.6
13 Zanskar
2243.05 0.0 2243.05 14 Lungnaq
15 Karsha
G.Total: 11454.15
11454.15
18
BLOCK WISE EXISTING IRRIGATION STATUS AFTER DIP Project
IN DISTT.KARGIL
S. no Name of the Block
Existing Net
Irrigated area
(in ha)
Net irrigated area
creation under
Project (in ha)
Total net
irrigated area
after completion
of project (in
ha)
1 Kargil 1400.95 2235 3635.95
2 Drass 2390 1380 3770
3 Shakar- Chiktan 814.15 902 1716.15
4 Shargole 1475.3 734 2209.3
5 TSG 0 321 321
6 Sankoo 1991.1 583 2574.1
7 Taisuru 1139.6
0(462 ha from ongoing
scheme) 1601.6
8 Zanskar 2243.05 710 2953.05
9 Lungnaq 0 80 80
10 G.Total: 11454.15 7407 18861.15
19
STATUS OF ALL CROP VARITIES AND THEIR CROPPING PATTERN BEFORE AND AFTER PROJECT
PMKSY IN RESPECT OF DISTRICT KARGIL (AREA IN HECTARES)
S.
no. Name of the crop
Existing
Irrigated
Existing
Un
irrigated
Total
Existing
Area
Irrigated
area after
project
proposal
Un irrigated
area after
project proposal
Total
proposed
area after
project
Season Kharif
1 Wheat 2099.8 - 2099.8 3599.8 - 3599.8
2 Barley 5356.44 - 5356.44 6556.44 - 6556.44
3 Fodder 2728.75 - 2728.75 3428.95 - 3428.95
4 Pulses 910.95 - 910.95 3010.95 - 3010.95
5 Vegetables(all var.) 306.4 - 306.4 2116 - 2116
6 Others 51.81 - 51.81 149.21 - 149.21
Total 11454.15 - 11454.15 18861.35 - 18861.35
Horticultural crops(all
crops) 2395.00 - 2395.00
3595.00 - 3595.00
Gross Total:- 13849.15 - 13849.15 22456.35 - 22456.35
20
CROP WATER REQUIREMENT (PRESENT LAND USE) OF DISTRICT KARGIL
S.
no
.
Crops Area Sown
(Ha)
Gross
Irrigated
area (Ha)
Crop
Water
Demand
(mm)
Water potential
required (BCM)
Existing water
Potential (BCM)
Water Potential to be created
(BCM)
1 Wheat 2099.8 2099.8 260 0.00545948 0.00545948 For additional expansion area only
2 Barley 5356.44 5356.44 260 0.013926744 0.013926744 For additional expansion area only
3 Fodder 2728.95 2728.95 500 0.01364475 0.01364475 For additional expansion area only
4 Pulses 910.95 910.95 67 0.0006103365 0.0006103365 For additional expansion area only
5 Vegetable
s
316.00 316.00 500 0.00158 0.00158 For additional expansion area only
6 Others 42.21 42.21 140 0.000059094 0.000059094 For additional expansion area only
7 Area sown
more than
once
1500 1500 500
0.0075 0.0075
For additional expansion area only
Sub total 12954.35 12954.35
0.0427804045 0.0427804045
8 Horticultu
ral
crops(all
crops)
2395.00 2395.00 600
0.01437 0.01437
Total 13849.35
+ 1500
more than
once
13849.35
+ 1500
more than
once
0,0571504045 0,0571504045 For additional expansion area only
21
CROP WATER REQUIREMENT (PROPOSED LAND USE) OF DISTRICT KARGIL
S.no. Crops Area Sown
(Ha)
Gross
Irrigated
area (Ha)
Crop
Water
Demand
(mm)
Water potential
required (BCM)
Existing water
Potential (BCM)
Water Potential to be created
(BCM)
1 Wheat 3599.8 3599.8 260 0.00935948 0.00545948 0.0039
2 Barley 6556.44 6556.44 260 0.017046744 0.013926744 0.00312
3 Fodder 3428.95 3428.95 500 0.01714475 0.01364475 0.0035
4 Pulses 3010.95 3010.95 67 0.0020173365 0.0006103365 0.001407
5 Vegetables 2116 2116 500 0.01058 0.00158 0.009
6 Others 149.21 149.21 140 0.00208894 0.000059094 0.002029846
7 Area Sown
more than
once
4200 4200 500
0.021 0.0075 0.0135
Sub Total
0.0792372505 0.0427804045 0.036456846
8 Horticultural
crops(all
crops)
3595.00 3595.00 600
0.02157 0.01437 0.0072
Grand Total
22456.35+
4200 (more
than once
22456.35+
4200 (more
than once
0.1008072505
0,0571504045
0.043656846
22
Chapter III
23
AREA-WISE CLASSIFICATION OF CROPS
Particulars J&K State
(Area in lac Ha.)
Kargil
(Area in lac Ha.)
Wheat (Kharif) 2.7 0.020998
Barley (Kharif) 2.55 0.0535644
Pulses (Kharif) 0.583 0.0091095
Fodder (Kharif ) 0.642 0.0272875
Vegetables (Kharif 0.60 0.003064
Others (Kharif ) - 0.0005181
Net Area cropped 0.7 0.13849.15
Avg. Land holding size
(Hectares)
0.67 0.61
24
MAJOR CROPPING PATTERN OF DISTRICT KARGIL
S.no. CROPPING PATTERN
1 Barley/ Wheat- Kangni /China (Millets)
2 Barley/ Wheat- Buck wheat
3 Oats/Barley-Turnip
4 Potato/Peas – Turnip
VEGETABLE CROPS
a Onion , Tomato, Cabbage,Cauliflower, Radish,Turnip,Carrot,Kale,Knol
Khol ,Lettuce,Swiss Chard,Beetroot ,Sweede Local ,Coriander,Garlic,
Cucumber,Pumpkin,Bottlegourd ,
25
DIFFERENT SOURCES OF IRRIGATION IN DISTRICT KARGIL
Department wise before project
S. no.
Source of
Irrigation Name of Deptt. Net Irrigated
area (in ha.)
1 Canals Irrigation Division Kargil
10306.05
2 Canals Irrigation Division Zanskar
2243.05
3 Water bodies / Khuls
Rural Dev. Deptt. Kargil 1300.05
Total: 13849.15
26
Status of Ground water availability
\
Status of District as per central ground water notification
Ground water BCM
Critical Semi-Critical Safe Draft Recharge Gap
Safe ( as per Central Ground Water Board , North Western Himlyan Region) Stage of Ground water Developemnt (%) 4.26 s
0.00138 0.03399 0.03261
• Critical level- 3000 gallons/hr • Semi Critical level-2500 gallons/hr • Safe level- 2000 gallons / hr • Draft- Gross Ground water draft for all uses • Recharge- Total Annual Ground water Recharge
27
Water Requirement / Demand
WATER DEMAND OF THE DISTRICT FOR VARIOUS SECTORS
S.
no.
Name of the sector Water demand
during 2015
(in BCM )
Water demand
during 2020
( in BCM )
1 Agriculture 0.0427804045 0.0792372505
2 Horticulture 0.01437 0.02157
3
Livestock
A) Animal Husbandry 0.00006909749 0.0007606169
B) Sheep Husbandry 0.00147282427 0.00151742727
4 Domestic 0.00258055 0.0026864
5 Industries 0.000025594 0.0000462128
Total: 0.04692847026 0.08424790747
28
Chapter IV
29
Water Budget
No. of
Blocks
Existing water availability
(BCM)
Total (BCM) Water Demand (BCM) Water Gap (BCM)
Surface water Ground
water
Present Projected
(2020)
Present Projected (2020)
15 0.03519635269 0.02176 0.05695635 0.04692847026 0.08424790747 0.01002787974
(Surplus)
0.0272915574700 (Deficit)
30
Strategic Action Plan for Irrigation in District under PMKSY
STRAGETIC ACTION PLAN FOR IRRIGATION OF DIFFERENT
DEPARTMENTS IN DISTRICT KARGIL
S. No. Name of the Deptt. Financial proposals (in lacs )
for five years
1 Irrigation Division Kargil 76429.20
2 Irrigation Division Zanskar 6669.08
3 Soil Conservation Forest 129.17
4 Development of Cultivable waste Land
Command Area Development
7008.70
5 Horticulture 1100.00
6 IWMP Kargil 10868.73
7 Agriculture 523.00
8 Command Area Development Kargil 4778.81
9 Divisional Forest Office, Kargil 161.61
10 Assistant Commissioner, (Development)
Kargil
8425.03
Total: 116093.93
Miscellaneous expenditure 3% of the
project cost
3482.82
Grand Total:- 119576.75
31
COMPILED STRATEGIC ACTION PLAN FOR IRRIGATION IN DISTRICT
UNDER PMKSY
S.
No Concerned ministry Component
Estimated Cost
(in Rs.)
1 Ministry of water resources (MoWR) AIBP 83098.28
2 Ministry of water resources (MoWR) Har khet ko Paani 4778.81
3
Deptt. of Rural Development-Ministry
of rural development (DoRD-MoRD)
Convergence with
MNREGA 8425.03
PMKSY watershed 11160.11
4
Ministry of Agriculture & Famers
welfare-Deptt. of agriculture, Co-
operative and famerswelfare (MOA
&FW-DAC &FW)
Per drop more crop 8541.70
5 (MOA &FW-DAC &FW) Capacity Building 90.00
Total:-1-5 116093.93
Miscellaneous Expenditure 3482.82
G Total 119576.75
32
INDIRECT BENEFITS OF THE PROJECT
Apart from the direct benefits, many indirect benefits of DIP under PMKSY
will lead to tremendous development in all the socio-economic aspects of the
region.
1) Direct employment opportunities for the agricultural labourers and for other
professionals in this sector and several job opportunities would become
available for the local people during the construction of the project.
2) living standards of the local farmers, in general, would improve because of
better yields from their fields and hence higher returns for their work.
3) Agro-based industries, dairy farms, poultry farms, marketing facilities for
the agricultural inputs like pesticides and fertilizers etc. are likely to come up
in the region, leading to general prosperity and economic up liftment of the
people of the towns and villages in the enroute area.
4) The ground water availability in the command area would get enhanced on
account of the increased recharge to the ground water since a part of the
water supplied for irrigation get percolated into the ground.
5) Infrastructural facilities would improve due to increased industrial and
marketing activity in the enroute region.
33
Benefit Cost Ratio 1. Total cost of the Project = Rs 119576.75 lacs
2. Project period = 5 years
3. Infrastructure Cost = Rs 83098.28 lacs
4. Interest on Infrastructure cost @ 10% for 5 years
= Rs 41549.14 lacs
5 Variable Cost (Agriculture+ Horticulture) = Rs 8684.729 lacs
6 Total Cost (4+5) = Rs 50233.869 lacs
7 Total Returns = Rs 113707.96 lacs
8 Net Returns = Rs 63474.09 lacs
Benefit Cost Ratio = 1.26 :1
Economic Rate of Return = 126%
District Irrigation Plan of District Kargil under Pradhan Mantri Krishi
Sinchayee Yojna is projected feasible and viable with Benefit Cost ratio of
1.26 : 1 after the completion of the project in proposed five years span
34
1 Wheat (Kharif) 3599.8 32 115193.6 2500 2879.84 36 129592.8 2000 2591.86 5471.70 30000 1079.94 4391.76
2 Barley
(Kharif)
6556.44 30 196693.2 2000 3933.864 35 229475.4 2000 4589.51 8523.37 30000 1966.932 6556.44
3 Pulses
(Kharif)
3428.95 12 41147.4 7000 2880.318 0 0 0 0.00 2880.32 20000 685.79 2194.53
4 Fodder (Kharif
)
3010.95 0 0 0 0 40 120438 2700 3251.83 3251.83 30000 903.285 2348.54
5 Vegetables
(Kharif
2116 250 529000 5500 29095 0 0 0 0.00 29095.00 40000 846.4 28248.60
6 Others (Kharif
)
149.21 10 1492.1 3200 47.7472 0 0 0 0.00 47.75 15000 22.3815 25.37
7 Area sown
more than
once
4200 250 1050000 5500 57750 0 0 0.00 57750.00 40000 1680 56070.00
8 Horticultural
crops (Dry
3595 6688.00 1500 5188.00
Total 26656.35 1933526.3 479506.2 113707.96 8684.729 105023.23
Cost Benefit after Project
Avarag
e Rate
Rs./Qtl
Total
producti
on of
fodder
Qt.
S.No Particulars Kargil
Area in
Ha.
Avg
Production
of
grains/fres
h veggies
(Qt)/ Ha
Total
Production
of
grains/vegg
ies (Qt)
Total
cost of
cultivati
on
Rs in
Lacs
Net Profit
Rs in Lacs
Total
Returns
from
grains
/veggies
Rs in Lac
Avg.
Produ
ction
of
Fodde
r (Qt)
Rate of
Fodder
Rs/Qtl
Total
Returns
from
fodder
Rs in
Lacs
Total Returs
from fodder and
grains Rs in
Lacs
Avg cost of
cultivation Rs
35
1 Wheat (Kharif) 2099.8 20 41996 1800 755.928 30 62994 1500 944.91 1700.84 30000 629.94 1070.90
2 Barley (Kharif) 5356.44 22 117841.68 1400 1649.78352 30 160693.2 1500 2410.40 4060.18 30000 1606.932 2453.25
3 Pulses (Kharif) 2728.95 8 21831.6 5000 1091.58 0 0 0 0.00 1091.58 20000 545.79 545.79
4 Fodder (Kharif ) 910.95 0 0 0 0 30 27328.5 2000 546.57 546.57 30000 273.285 273.29
5 Vegetables (Kharif 316 150 47400 3000 1422 0 0 0 0.00 1422.00 40000 126.4 1295.60
6 Others (Kharif ) 42.21 9 379.89 2500 9.49725 0 0 0 0.00 9.50 15000 6.3315 3.17
7 Area sown more
than once
1500
150 225000 3000 6750 - - - - 6750 40000 600 6150
Horticultural crops 2395
3400.9 820.3 2580.5
Total 15349.35 454449.17 251015.7 18981.57 4608.9785 14372.49
Cost Benefit before Project
Rate of
Fodder
Rs/Qtl
Avg Production
of grains/fresh
veggies (Qt)/ Ha
Avarage
Rate
Rs./Qtl
S.No Total Production
of
grains/veggies
(Qt)
Total
Returns
from grains
/veggies Rs
in Lac
Avg.
Production of
Fodder (Qt)
Particulars Kargil Area in
Ha.
Total
production
of fodder Qt.
Total
Returns
from fodder
Rs in Lacs
Total Returs
from fodder
and grains Rs in
Lacs
Avg cost of
cultivation
Rs
Total cost of
cultivation
Rs in Lacs
Net Profit
Rs in Lacs
36
37
38
39
40
41
42
43
44
45
46
CCA in Ha
Ist Year
(5%)
2nd Year
(25%)
3rd Year
(25%)
4th Year
(25%)
5th Year
(20%)
A) Kargil Block
1 Construction of irrigation
canal from Lankerchey
Sankoo to Goma Kargil 5000 2000
18000.00 900.00 4500.00 4500.00 4500.00 3600.00 18000.00
2 Development of Sheerbagh
and construction of
concrete bund along both
side of River suru at spots
upto steel garder bridge at
Poyen.
45 18
5500.00 275.00 1375.00 1375.00 1375.00 1100.00 5500.00
3 Chanigund irrigation canal
Kargil 5000 0
4200.00 210.00 1050.00 1050.00 1050.00 840.00 4200.00
4 Dhathang irrigation canal
5000 0
327.00 16.35 81.75 81.75 81.75 65.40 327.00
5 Latoo to Karkitchoo
irrigation canal 5000 0
1400.00 70.00 350.00 350.00 350.00 280.00 1400.00
6 Gongyour/ youkyour khul
Poyen 155 62
517.00 25.85 129.25 129.25 129.25 103.40 517.00
7 Percolation tank at
Shagaran Yourbatak.45 18
267.00 13.35 66.75 66.75 66.75 53.40 267.00
8 Construction/ Remodeling
Gongyour/ youkyour khul
Shilikchey 152.5 61
582.58 29.13 145.65 145.65 145.65 116.52 582.58
Construction of Gongyour
irrigation canal Baroo
Shagaran 190 76
694.18 34.71 173.55 173.55 173.55 138.84 694.18
5000 2235 31487.76
B) Drass Block 5000 0
1 Mushkoo to Smartthang
irrigation canal 2750 1100
6500.00 325.00 1625.00 1625.00 1625.00 1300.00 6500.00
2 Construction of Terriace at
avalanches prone area of
kharboo village5000 0
355.00 17.75 88.75 88.75 88.75 71.00 355.00
3 Kharboo irrigation canal
700 280
995.00 49.75 248.75 248.75 248.75 199.00 995.00
5000 1380 7850.00
C) Shargole. 5000 0
1 Kapila to Akchamal
irrigation canal525 210
2600.00 130.00 650.00 650.00 650.00 520.00 2600.00
2 Reconst. Of Choskore
Wakha Canal 167.5 67
400.00 20.00 100.00 100.00 100.00 80.00 400.00
3 Balance work of Rong
Wakha irrigtion canal 917.5 367
550.00 27.50 137.50 137.50 137.50 110.00 550.00
4 Construction of Tumbur
khul Wakha 105 42
305.00 15.25 76.25 76.25 76.25 61.00 305.00
5 Construction Water
Reservoir tank at Naran
Karith 40 16
150.00 7.50 37.50 37.50 37.50 30.00 150.00
6 Construction/ Remodeling
of Gonyour Youkyour khul
Tharumsa Pashkum80 32
250.00 12.50 62.50 62.50 62.50 50.00 250.00
1835 734 4255.00
D) Chiktan Block 0
1 Namlingthang irrigation
canal (Balance work/Ph-II) 1675 670
3800.00 190.00 950.00 950.00 950.00 760.00 3800.00
2 Const. of strengthening/
Raising of Shashi lake
Sandoo
5000 0350.00 17.50 87.50 87.50 87.50 70.00 350.00
3 Ladoo to Dargoo irrigation
canal 200 80
995.00 49.75 248.75 248.75 248.75 199.00 995.00
4 Remodeling of Skilma
zamindari khul Hagnis 165 66
250.00 12.50 62.50 62.50 62.50 50.00 250.00
5 Phosathang irrigation canal
(Phase - 2nd)215 86
385.00 19.25 96.25 96.25 96.25 77.00 385.00
5000 902 5780.00
E) TSG Block 5000 0
1 Killingthang irrigation canal
Tambis 802.5 321
1900.00 95.00 475.00 475.00 475.00 380.00 1900.00
2 Construction of wier at
kuru khul Trespone0 0
318.00 15.90 79.50 79.50 79.50 63.60 318.00
802.5 321 2218.00
F) Sankoo Block 5000 0
1 Karpokhar Sankoo
irrigation canal 160 64
250.00 12.50 62.50 62.50 62.50 50.00 250.00
2 Construction of irrigation
canal from Khandi to
Yarchoks
222.5 89
1800.00 90.00 450.00 450.00 450.00 360.00 1800.00
3 Construction of Linkber to
Gramating Barsoo
irrigation canal
1075 430
6000.00 300.00 1500.00 1500.00 1500.00 1200.00 6000.00
Total
Sankoo 1457.5
583 8050.00
G Total 6155 59640.76
DIP of Irrigation Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Kargil (Year - wise) Irrigation Kargil
S.No Name of the Block
Concerne
d
Ministry/
Departme
Program
me
Compone
nt
Activity
Command
area
(in acres)
E.Cost of
Scheme in (Rs
in Lacs)
Budget Requirement (In Lakhs)G. Total (In
Lakhs)
MOW
R
AIBP
Min
or ir
rigat
ion
MOW
R
AIBP
Min
or ir
rigat
ion
47
48
CCA in Ha
Ist Year
(5%)
2nd Year
(25%)
3rd Year
(25%)
4th Year
(25%)
5th Year
(20%)
A) Kargil Block
1 Construction of irrigation
canal from Lankerchey
Sankoo to Goma Kargil 5000 2000
18000.00 900.00 4500.00 4500.00 4500.00 3600.00 18000.00
2 Development of Sheerbagh
and construction of
concrete bund along both
side of River suru at spots
upto steel garder bridge at
Poyen.
45 18
5500.00 275.00 1375.00 1375.00 1375.00 1100.00 5500.00
3 Chanigund irrigation canal
Kargil 5000 0
4200.00 210.00 1050.00 1050.00 1050.00 840.00 4200.00
4 Dhathang irrigation canal
5000 0
327.00 16.35 81.75 81.75 81.75 65.40 327.00
5 Latoo to Karkitchoo
irrigation canal 5000 0
1400.00 70.00 350.00 350.00 350.00 280.00 1400.00
6 Gongyour/ youkyour khul
Poyen 155 62
517.00 25.85 129.25 129.25 129.25 103.40 517.00
7 Percolation tank at
Shagaran Yourbatak.45 18
267.00 13.35 66.75 66.75 66.75 53.40 267.00
8 Construction/ Remodeling
Gongyour/ youkyour khul
Shilikchey 152.5 61
582.58 29.13 145.65 145.65 145.65 116.52 582.58
Construction of Gongyour
irrigation canal Baroo
Shagaran 190 76
694.18 34.71 173.55 173.55 173.55 138.84 694.18
5000 2235 31487.76
B) Drass Block 5000 0
1 Mushkoo to Smartthang
irrigation canal 2750 1100
6500.00 325.00 1625.00 1625.00 1625.00 1300.00 6500.00
2 Construction of Terriace at
avalanches prone area of
kharboo village5000 0
355.00 17.75 88.75 88.75 88.75 71.00 355.00
3 Kharboo irrigation canal
700 280
995.00 49.75 248.75 248.75 248.75 199.00 995.00
5000 1380 7850.00
C) Shargole. 5000 0
1 Kapila to Akchamal
irrigation canal525 210
2600.00 130.00 650.00 650.00 650.00 520.00 2600.00
2 Reconst. Of Choskore
Wakha Canal 167.5 67
400.00 20.00 100.00 100.00 100.00 80.00 400.00
3 Balance work of Rong
Wakha irrigtion canal 917.5 367
550.00 27.50 137.50 137.50 137.50 110.00 550.00
4 Construction of Tumbur
khul Wakha 105 42
305.00 15.25 76.25 76.25 76.25 61.00 305.00
5 Construction Water
Reservoir tank at Naran
Karith 40 16
150.00 7.50 37.50 37.50 37.50 30.00 150.00
6 Construction/ Remodeling
of Gonyour Youkyour khul
Tharumsa Pashkum80 32
250.00 12.50 62.50 62.50 62.50 50.00 250.00
1835 734 4255.00
D) Chiktan Block 0
1 Namlingthang irrigation
canal (Balance work/Ph-II) 1675 670
3800.00 190.00 950.00 950.00 950.00 760.00 3800.00
2 Const. of strengthening/
Raising of Shashi lake
Sandoo
5000 0350.00 17.50 87.50 87.50 87.50 70.00 350.00
3 Ladoo to Dargoo irrigation
canal 200 80
995.00 49.75 248.75 248.75 248.75 199.00 995.00
4 Remodeling of Skilma
zamindari khul Hagnis 165 66
250.00 12.50 62.50 62.50 62.50 50.00 250.00
5 Phosathang irrigation canal
(Phase - 2nd)215 86
385.00 19.25 96.25 96.25 96.25 77.00 385.00
5000 902 5780.00
E) TSG Block 5000 0
1 Killingthang irrigation canal
Tambis 802.5 321
1900.00 95.00 475.00 475.00 475.00 380.00 1900.00
2 Construction of wier at
kuru khul Trespone0 0
318.00 15.90 79.50 79.50 79.50 63.60 318.00
802.5 321 2218.00
F) Sankoo Block 5000 0
1 Karpokhar Sankoo
irrigation canal 160 64
250.00 12.50 62.50 62.50 62.50 50.00 250.00
2 Construction of irrigation
canal from Khandi to
Yarchoks
222.5 89
1800.00 90.00 450.00 450.00 450.00 360.00 1800.00
3 Construction of Linkber to
Gramating Barsoo
irrigation canal
1075 430
6000.00 300.00 1500.00 1500.00 1500.00 1200.00 6000.00
Total
Sankoo 1457.5
583 8050.00
G Total 6155 59640.76
DIP of Irrigation Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Kargil (Year - wise) Irrigation Kargil
S.No Name of the Block
Concerne
d
Ministry/
Departme
Program
me
Compone
nt
Activity
Command
area
(in acres)
E.Cost of
Scheme in (Rs
in Lacs)
Budget Requirement (In Lakhs)G. Total (In
Lakhs)
MOWR
AIBP
Mino
r irrig
ation
MOWR
AIBP
Mino
r irrig
ation
49
CCA in Ha
Ist Year
(5%)
2nd Year
(25%)
3rd Year
(25%)
4th Year
(25%)
5th Year
(20%)
A) Padum Block
1 Pishu Canal 400 2000 500.00 25.00 125.00 125.00 125.00 100.00 500.002 Dam Zangla 40 16 450.00 22.50 112.50 112.50 112.50 90.00 450.003 Sheela Chazar 678 271.2 2600.00 130.00 650.00 650.00 650.00 520.00 2600.004 Kumik Canal 45 18 570.00 28.50 142.50 142.50 142.50 114.00 570.005 Phey Canal 45 62 50.00 2.50 12.50 12.50 12.50 10.00 50.006 Haftal canal 24 18 260.00 13.00 65.00 65.00 65.00 52.00 260.00
Total Padum 1232 2385.2 4430.00 221.50 1107.50 1107.50 1107.50 886.00 4430.00
Lugnak Block
1 Skiing Canal 34 61 270.00 13.50 67.50 67.50 67.50 54.00 270.002 Itcher Canal 55 76 325.00 16.25 81.25 81.25 81.25 65.00 325.003 Surlay Canal 45 4907.4 260.00 13.00 65.00 65.00 65.00 52.00 260.00
B) Total Lugnak 134 5044.4 855.00 42.75 213.75 213.75 213.75 171.00 855.00
MO
WR
AIB
P
Min
or
irri
ga
tio
n
DIP of Irrigation Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Kargil (Year - wise) Irrigation Kargil
PWD Division Zanskar
S.No Name of the Block
Concerne
d
Ministry/
Departme
Program
me
Compone
nt
Activity
Command
area
(in acres)
E.Cost of
Scheme in (Rs
in Lacs)
Budget Requirement (In Lakhs)G. Total (In
Lakhs)
50
Ist Year
(5%)
2nd Year
(25%)
3rd Year
(25%)
4th Year
(25%)
5th Year
(20%)
I. Irrigation Department
1 Minor irrigation Scheme (ongoing) 10151.44 507.57 2537.86 2537.86 2537.86 2030.29 10151.44
2 Minor irrigation Scheme 59640.76 2982.04 14910.19 14910.19 14910.19 11928.15 59640.76
3 Lift irrigation Scheme 6637.00 331.85 1659.25 1659.25 1659.25 1327.40 6637.00
G. Total 76429.20 3821.46 19107.30 19107.30 19107.30 15285.84 76429.20
Year / Department wise District irrigation Plan under PMKSY District Kargil.
Irrigation and Flood Control Division PWD Ist Kargil.
S.No Name of the Department
Budget
Requirement
(In lakhs)
Budget Requirement (In Lakhs)G. Total (In
Lakhs)
51
Ist Year
(5%)
2nd Year
(25%)
3rd Year
(25%)
4th Year
(25%)
5th Year
(20%)
I. Irrigation Department
1 Minor irrigation Scheme (ongoing) 784.08 39.20 196.02 196.02 196.02 156.82 784.08
2 Minor irrigation Scheme 5285.00 264.25 1321.25 1321.25 1321.25 1057.00 5285.00
3 Lift irrigation Scheme 600.00 30.00 150.00 150.00 150.00 120.00 600.00
G. Total 6669.08 333.45 1667.27 1667.27 1667.27 1333.82 6669.08
Year / Department wise District irrigation Plan under PMKSY District Kargil.
Irrigation and Flood Control Division PWD Zanskar
S.No Name of the Department
Budget
Requirement
(In lakhs)
Budget Requirement (In Lakhs)G. Total (In
Lakhs)
52
S.
N
o
Name
of the
Block
Concerned
Ministry/
Department
Programme
ComponentActivity Location
CCA
(in
acres)
CCA in
Ha
Amou
nt (In
lakhs)1 Kargil MOWR Her Khet ko
Pani
Lift
irrigation
scheme
Lift irrigation scheme
Sodth Ph. II/III
870 300 2770
Lift irrigation scheme
Kharol Kargil
25 40 115
Lift irrigation scheme
Hardass thang
55 50 160
Lift irrigation Scheme
Gund Hardass
56 45 150
Lift irrigation scheme
Dass, Pishu, Lankhore,
Abagrong.
300 200 1800
Lift irrigation scheme
Latoo
88 35.2 280
1394 670.2 5275
2 Chiktan MOWR Her Khet ko
Pani
Lift
irrigation
scheme
Multi stage Lift irrigation
scheme Mangshandow
Shakar
270 120 1362
270 120 1362
1664 790.2 6637
3 Karsha
MOWR Her Khet ko
Pani
Lift
irrigation
scheme
Lift Irrigation Scheme
Karsha 120 130 600
120 130 600
Block Wise DIP Under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Kargil Irrigation Kargil
PWD Division No Ist Kargil.
53
S.
N
o
Name
of the
Block
Concerned
Ministry/
Department
Programme
ComponentActivity Location
CCA
(in
acres)
CCA in
Ha
Amou
nt (In
lakhs)1
Karsha
MOWR Her Khet ko
Pani
Lift
irrigation
scheme
Lift Irrigation Scheme
Karsha 120 130 600
120 130 600
Block Wise DIP Under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Kargil Irrigation Kargil
PWD Division Zanskar
54
CCA
Ha
Ist
Year
(5%)
2nd Year
(25%)
3rd
Year
(25%)
4th Year
(25%)
5th Year
(20%)
1
Parkachik
Khows
irrigation
canal
5584.00 2233.60 154 4829.59 3090.36 1739.23 86.96 434.81 434.81 434.81 347.85 1739.23
2
Lamoochan
Yulboo
irrigation
canal
695.00 278.00 25 663.40 430.36 233.04 11.65 58.26 58.26 58.26 46.61 233.04
3
Const. of
Lankerchey
Thuina
irrigation
canal
580.00 232.00 85 622.21 204.30 417.91 20.90 104.48 104.48 104.48 83.58 417.91
4
Const. of Grib
Choskorethan
g irrigation
canal
1650.00 660.00 48 1350.00 805.54 544.46 27.22 136.12 136.12 136.12 108.89 544.46
5
Construction
of Stakchey
Samrah
irrigation
canal.
1670.00 668.00 25 974.93 56.19 918.74 45.94 229.69 229.69 229.69 183.75 918.74
6
Construction
of Rama khul
Pargue
250.00 100.00 18 146.77 90.07 56.70 2.84 14.18 14.18 14.18 11.34 56.70
7
Construction
of Azoori to
Shahi Bagh
canal Drass
810.00 324.00 27 487.21 109.25 377.96 18.90 94.49 94.49 94.49 75.59 377.96
8
Constt. Of
Distributory
channel at
Khurbathang
Platue
800.00 320.00 40 403.59 168.43 235.16 11.76 58.79 58.79 58.79 47.03 235.16
9
Construction
of Shangshi
Maita
irrigation
canal
1111.50 444.60 22 673.74 98.66 575.08 28.75 143.77 143.77 143.77 115.02 575.08
13150.50 10151.44 5098.28
MO
WR
AIBP
Min
or ir
rigat
ion
DIP of Irrigation Sector under "Pradhan Mantri Krishi Sinchayee Yojana" (PMKSY) District Kargil (Year - wise) Irrigation Kargil
PWD Division No Ist Kargil. (Ongoing Scheme)
S. NoName of the
Block
Concern
ed
Ministry
/
Programm
e
Componen
t
Activity
Command
area
(in acres)
Discha
rge
(in
cusecs
E.Cost of
Scheme
in (Rs in
Lacs)
Comm.
Expdt.
Up to
03/2016
Balance
Estt. Cost
up to
03/2016
Budget Requirement (In Lakhs)G. Total
(In Lakhs)
55
Department / Component District Wise District Irrigation Plan under PMKSY District Kargil
AIBP PMKSY (Her
Khet ko Pani)
PMKSY (Per
Drop More
Crop)
PMKSY
(Watershed)
MGNREGA
Rural Development Department Nil Nil Nil Nil 8425.03 8425.03
Proejct Officer,
Wage Employment (ACD) Kargil
Programme Component Budget
Requiremnt
(In Lakhs)
Name of the Department SR. No:
56
BLOCK WISE DIP OF RURAL DEVELOPMENT DEPARTMENT UNDER " Pradhan Mantri Krishi Sinchayee Youjana (PMKSY) District Kargil
Sr. No: Name of the
Block
Concerned
Ministery /
Deparments
Component Activitiy Total No. /
Capacity
(cum)
Command
Area/
Irrigation
Potentional
(Ha)
Period of
Implement
s (5/7 Yrs)
Estimated Cost (Rs. In
Lacs)
1 KARGIL13 5 Yrs 36.97
2 SOUDH13 5 Yrs 36.97
3 DRASS6 5 Yrs 16.81
4 BHIMBAT6 5 Yrs 16.51
5 SHARGOLE 5 5 Yrs 13.87
6 PASHKUM2 5 Yrs 7.62
7 LOTSUM4 5 Yrs 8.29
8 SHAKER12 5 Yrs 30.59
9 TSG11 5 Yrs 30.46
10 SANKOO10 5 Yrs 27.34
11 BARSOO7 5 Yrs 18.12
12 TAISURU11 5 Yrs 27.58
13 ZANSKAR 8 5 Yrs 23.59
14 KARSHA7 5 Yrs 19.11
15 LUNGNAK 2 5 Yrs 7.98
119 0.00 0.00 321.80
Wat
er C
onse
rvat
ion
DoL
R-M
oRD
M G
N R
E G
A
57
1 KARGIL
20 177.80 5 Yrs 55.45
2 SOUDH
20 177.80 5 Yrs 55.45
3 DRASS
9 391.16 5 Yrs 25.21
4 BHIMBAT
9 391.16 5 Yrs 24.76
5 SHARGOLE
7 488.95 5 Yrs 20.81
6 PASHKUM
4 977.90 5 Yrs 11.44
7 LOTSUM
5 651.93 5 Yrs 12.44
8 SHAKER
18 195.58 5 Yrs 45.88
9 TSG
16 217.31 5 Yrs 45.69
10 SANKOO
14 244.48 5 Yrs 41.01
11 BARSOO
11 325.97 5 Yrs 27.18
12 TAISURU
16 217.31 5 Yrs 41.37
13 ZANSKAR
13 279.40 5 Yrs 35.39
14 KARSHA
11 325.97 5 Yrs 28.66
15 LUNGNAK
4 977.90 5 Yrs 11.96
Total 177 6040.62 0.00 482.70
Wa
ter
Ha
rves
tin
g
Do
LR
-Mo
RD
M G
N
R
E
G
A
58
59
1 KARGIL
76 1110.45 5 Yrs 485.33
2 SOUDH
76 1110.45 5 Yrs 485.33
3 DRASS
34 504.75 5 Yrs 220.61
4 BHIMBAT
34 504.75 5 Yrs 220.61
5 SHARGOLE
27 403.8 5 Yrs 176.48
6 PASHKUM
14 201.9 5 Yrs 88.24
7 LOTSUM
21 302.85 5 Yrs 132.36
8 SHAKER
69 1009.5 5 Yrs 441.21
9 TSG
62 908.55 5 Yrs 397.09
10 SANKOO
55 807.6 5 Yrs 352.97
11 BARSOO
41 605.7 5 Yrs 264.73
12 TAISURU
62 908.55 5 Yrs 397.09
13 ZANSKAR
48 706.65 5 Yrs 308.85
14 KARSHA
41 605.7 5 Yrs 264.73
15 LUNGNAK
14 201.9 5 Yrs 88.24
Total 673 9893.10 0.00 4323.86
Do
LR
-Mo
RD
Crea
tio
n o
f Ir
rig
ati
on
Ca
na
ls a
nd
Dra
ins
M G
N
R
E
G
A
60
1 KARGIL
58 5 Yrs 208.00
2 SOUDH
58 5 Yrs 208.00
3 DRASS
27 5 Yrs 94.55
4 BHIMBAT
27 5 Yrs 94.55
5 SHARGOLE
21 5 Yrs 75.64
6 PASHKUM
11 5 Yrs 37.82
7 LOTSUM
16 5 Yrs 56.73
8 SHAKER
53 5 Yrs 189.09
9 TSG
48 5 Yrs 170.18
10 SANKOO
42 5 Yrs 151.27
11 BARSOO
32 5 Yrs 113.45
12 TAISURU
48 5 Yrs 170.18
13 ZANSKAR
37 5 Yrs 132.36
14 KARSHA
32 5 Yrs 113.45
15 LUNGNAK
11 5 Yrs 37.82
Total 519 1853.08
Pro
vid
ing
in
fra
stu
ctu
re f
or
irri
ga
tio
n
Do
LR
-Mo
RD
M G
N
R
E
G
A
61
CA (in Hac)
1 KARGIL
22 9.35 5 Yrs 102.79
2 SOUDH
22 9.35 5 Yrs 102.79
3 DRASS
10 4.25 5 Yrs 46.72
4 BHIMBAT
10 4.25 5 Yrs 46.72
5 SHARGOLE
8 3.4 5 Yrs 37.38
6 PASHKUM
4 1.7 5 Yrs 18.69
7 LOTSUM
6 2.55 5 Yrs 28.03
8 SHAKER
20 8.5 5 Yrs 93.45
9 TSG
18 7.65 5 Yrs 84.10
10 SANKOO
16 6.8 5 Yrs 74.76
11 BARSOO
12 5.1 5 Yrs 56.07
12 TAISURU
18 7.65 5 Yrs 84.10
13 ZANSKAR
14 5.95 5 Yrs 65.41
14 KARSHA
12 5.1 5 Yrs 56.07
15 LUNGNAK
4 1.7 5 Yrs 18.69
Total 199 83.30 0.00 915.78
Lan
d D
evelo
pm
en
t
Do
LR
-Mo
RD
M G
N
R
E
G
A
62
Renovation of water bodies including desilting
1 KARGIL
Do
LR
-Mo
RD
M G
N
R
E
G
A
Ren
ovati
on
of
wate
r b
od
ies in
clu
din
g d
esilti
ng
28 5 Yrs 41.47 2 SOUDH
28 5 Yrs 41.47 3 DRASS
13 5 Yrs 18.85 4 BHIMBAT
13 5 Yrs 18.85 5 SHARGOLE
10 5 Yrs 15.08 6 PASHKUM
5 5 Yrs 7.54 7 LOTSUM
8 5 Yrs 11.31 8 SHAKER
25 5 Yrs 37.70 9 TSG
23 5 Yrs 33.93 10 SANKOO
20 5 Yrs 30.16 11 BARSOO
15 5 Yrs 22.62 12 TAISURU
23 5 Yrs 33.93 13 ZANSKAR
18 5 Yrs 26.39 14 KARSHA
15 5 Yrs 22.62 15 LUNGNAK
5 5 Yrs 7.54
Total 246.96 0.00 0.00 369.47
63
1 KARGIL
15 5 Yrs 17.77
2 SOUDH
15 5 Yrs 17.77
3 DRASS
7 5 Yrs 8.08
4 BHIMBAT
7 5 Yrs 8.08
5 SHARGOLE
5 5 Yrs 6.46
6 PASHKUM
3 5 Yrs 3.23
7 LOTSUM
4 5 Yrs 4.85
8 SHAKER
14 5 Yrs 16.16
9 TSG
12 5 Yrs 14.54
10 SANKOO
11 5 Yrs 12.93
11 BARSOO
8 5 Yrs 9.69
12 TAISURU
12 5 Yrs 14.54
13 ZANSKAR
9 5 Yrs 11.31
14 KARSHA
8 5 Yrs 9.69
15 LUNGNAK
3 5 Yrs 3.23
Total 132 0.00 0.00 158.34
G. Total 2067 16017.02 0.00 8425.03
Do
LR
-Mo
RD
M G
N
R
E
G
A
Ren
ovati
on
& M
ain
ten
an
ce o
f Ir
rig
ati
on
Can
als
& D
rain
s
64
YEAR / DEPARTMENT WISE DISTRICT IRRIGATION PLAN UNDER PMKSY RURAL DEVELOPMENT DEPARTMENT (RDD)
DISTRICT KARGIL
1st Year (5%) 2nd Year (25%) 3rd Year (25%) 4th Year (25%) 5th Year (25%)
8425.03 421.25 2106.25 2106.25 2106.25 1685.00 8425.00
1 KARGIL 947.78 47.39 236.95 236.95 236.95 189.56 947.782 SOUDH 947.78 47.39 236.95 236.95 236.95 189.56 947.783 DRASS 430.82 21.54 107.70 107.70 107.70 86.16 430.824 BHIMBAT 430.07 21.50 107.52 107.52 107.52 86.01 430.075 SHARGOLE 345.73 17.29 86.43 86.43 86.43 69.15 345.736 PASHKUM 174.58 8.73 43.64 43.64 43.64 34.92 174.587 LOTSUM 254.01 12.70 63.50 63.50 63.50 50.80 254.018 SHAKER 854.07 42.70 213.52 213.52 213.52 170.81 854.079 TSG 775.99 38.80 194.00 194.00 194.00 155.20 775.99
10 SANKOO 690.44 34.52 172.61 172.61 172.61 138.09 690.4411 BARSOO 511.87 25.59 127.97 127.97 127.97 102.37 511.8712 TAISURU 768.80 38.44 192.20 192.20 192.20 153.76 768.8013 ZANSKAR 603.31 30.17 150.83 150.83 150.83 120.66 603.3114 KARSHA 514.33 25.72 128.58 128.58 128.58 102.87 514.3315 LUNGNAK 175.46 8.77 43.87 43.87 43.87 35.09 175.46
8425.03 421.25 2106.26 2106.26 2106.26 1685.01 8425.03
G. Total (in Lakhs)Sr.
No:
Name of the
Department
Budget
Requirement
(in Lakhs)
Budget Requirement (in Lakhs)
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
Image 1
Suru River
86
Image 2
Confluence of Drass & Suru Rivers
87
Image 3
Zanskar River
88
Image 4
Indus River in Batalik
89
Image 5
Kargil Road Map
90
SOIL FERTILITY MAP OF DISTRICT KARGIL
91
Image 6
92
93
94
95
96