1 Confidential – all rights reserved Distribution Automation Program Automation Towards a Distribution Management System at ATCO Electric Presented by Chris Loo at the APIC Power & Energy Innovation Forum – 2013 University of Alberta, ETLC Solarium 6 November 2013

Upload: others

Post on 25-May-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

1

Confidential – all rights reserved

Distribution Automation Program

Automation Towards a Distribution Management System at ATCO Electric

Presented by Chris Loo at the

APIC Power & Energy Innovation Forum – 2013

University of Alberta, ETLC Solarium

6 November 2013

Page 2: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

2 Confidential – all rights reserved

DA Program Overview

Purpose: To improve system reliability through automation and Distribution Management System technologies

Key Goals:

1. Control and manage SAIDI, CAIDI, operational risk: cities,

important customers & sites, worst-performing feeders

2. Support operation of complex cities, remote sites,

specific customer requirements

3. Support inexperienced operational staff and

undermanned districts

Page 3: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

3 Confidential – all rights reserved

DA Program Overview

Page 4: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

4 Confidential – all rights reserved

DA Program Overview

Horizontal development Extending reach in the field Visibility & control “Things That Go On A Pole” Vertical development Extending what we can do with existing field assets “Things That Go On A Server”

Page 5: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

5 Confidential – all rights reserved

DA Program Overview

Things That Go On A Server

Things That Go On A Pole

Page 6: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

6

Confidential – all rights reserved

Things That Go On A Pole

Field SCADA Projects

Page 7: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

7 Confidential – all rights reserved

SCADA – Overview

Existing DSCADA site

Under construction

Future DSCADA site

Control centre

?

?

Goals • Switch visibility • Switch control • Fault location • Faster response times!

Page 8: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

8 Confidential – all rights reserved

SCADA – Overview

Cities

High-density area -> any improvement helps many people

Modest improvement to many people

Materially improve SAIDI, etc. indices

‒ SAIDI: amount of time an average customer is out each year

‒ More customers improved -> better SAIDI performance

Rurals

Long distances -> any improvement saves much time

Large improvement to few people (but may include key industrial

customers)

Target strategic feeders: worst performers, special conditions

Page 9: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

9 Confidential – all rights reserved

SCADA – Technologies

Gang switches (overhead & switch cubicle):

field retrofit with motors

No need to change switchgear

Manufacturer-supported design

Labour-intensive retrofit

SEL-751A controller

One size fits all

Built-in overcurrent -> fault detection

Logic for field-level automation

Page 10: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

10 Confidential – all rights reserved

SCADA – Technologies

Reclosers

ABB OVR comes SCADA ready

Insert radio, receive SCADA

SMP-16 data concentrator

Ease of configuration & commissioning

Troubleshooting tools

Designed with security in mind

Remote administration capabilities

Page 11: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

11 Confidential – all rights reserved

SCADA – Challenges & Lessons Learned

Field retrofits are labour intensive!

‒ Difficult to spare for quick responses

‒ Inappropriate for new construction

• One is okay, ten is doable, a hundred is madness

‒ External cables are target for vandalism

‒ Working with manufacturer to get a kit design

Need field support to be successful

‒ Engage front-line workers as well as management early

‒ Engage affected engineering groups early: standards, asset management,

designers

Page 12: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

12

Confidential – all rights reserved

Things That Go On A Pole

Field SCADA Projects – Telecom

Page 13: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

13 Confidential – all rights reserved

Distribution Telecommunications

Purpose: Distribution Telecommunications

will support

Distribution Automation

Metering

Mobile

???

Page 14: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

14 Confidential – all rights reserved

Technology Options

Many environments:

Urban/Rural

Many options:

Mesh Network (In pilot stage)

Fixed point-to-point

Cellular/satellite phone

Page 15: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

15 Confidential – all rights reserved

Mesh Network

One or more gateways create mesh connections to nodes.

Streetlight and Pole mounted devices

Redundant paths

Low install cost per node

Central management system

Unlicensed frequency (2.4 GHz)

Page 16: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

16 Confidential – all rights reserved

End Devices

Pilot Mesh Network (Fort McMurray)

Page 17: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

17 Confidential – all rights reserved

Installed Nodes connect devices to the Tower

Pilot Mesh Network (Fort McMurray)

Page 18: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

18 Confidential – all rights reserved

Fixed Point-to-Point/Point-to-Multipoint

Communication connection from:

‒ Tower to end device (PTP)

‒ Tower to many end devices (PTMP)

Advantages:

‒ Longer range

‒ Full control

Disadvantages:

‒ Possible licensing requirements

Page 19: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

19 Confidential – all rights reserved

Cellular/Satellite Communication

Cellular Communication

‒ Existing local infrastructure

‒ Slower than fixed radio

‒ Monthly contract for end device

Satellite Communication

‒ Is global

‒ Slower than fixed radio

‒ Monthly contract for end device

Page 20: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

20 Confidential – all rights reserved

Cellular/Satellite Communication

ATCO Towers – Sited for

Substation Communications

Telus & Rogers Cell Towers – Sited

for Customer Communications

Page 21: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

21 Confidential – all rights reserved

Key Learnings & Opportunities

1. Involve the Cyber Security Office as soon as possible with new

technologies to ensure compliance with security standards (and to

mitigate risks).

2. 2.4 GHz is a very cluttered frequency

‒ this impacts range significantly

‒ choose your channel

3. Mesh network is designed to be used in small clusters

‒ More path options provides higher redundancy

4. Combine technologies (Mesh + Cellular/PTP/PTMP)

‒ Can use the cellular network as a backhaul device

Page 22: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

22

Confidential – all rights reserved

Things That Go On A Server

IT / OT Integration SCADA / OMS Integration

Page 23: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

23 Confidential – all rights reserved

IT / OT Integration – Phases

Current state: separate IT and OT networks

1. One-way integration ‒ SCADA data availabe to OMS

‒ Automatic outage generation

‒ Proof of concept: bridging the networks

‒ Pave the way for…

2. Two-way integration ‒ SCADA controls from OMS

‒ Streamline operator interface

‒ Proof of concept: controls initiated from IT network environment

‒ Pave the way for…

3. Goal – Distribution Management System ‒ …and other applications?

Page 24: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

24 Confidential – all rights reserved

IT / OT Integration – Overview

Page 25: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

25 Confidential – all rights reserved

IT / OT Integration – Benefits

Automatic outage generation

‒ Save administrative work (manually entering data)

‒ Improve accuracy of outage data

Reduce operator screen clutter

‒ SCADA, OMS, and real-time managed map can all be consolidated

‒ Eventual goal: one screen (OMS, future DMS)

Reduce manual map maintenance

‒ OMS imports maps from GIS

‒ SCADA screens are built by hand – duplicated effort

Proof of concept for bridging networks

‒ Pave way for future DMS, which needs data from both sides

‒ Other future applications that need data from both sides?

Page 26: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

26 Confidential – all rights reserved

IT / OT Integration – Challenges

Additional support and data management needed on OMS

Security considerations

‒ Closing the air gap

‒ Controls from the “untrusted” corporate IT network?

Potential flood of new applications once proof of concept is accepted

Page 27: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

27 Confidential – all rights reserved

IT / OT Integration – Lessons Learned

Complete visibility of the IT and OT networks

‒ Assembled a holistic view in order to decide architecture

Engaging stakeholders at all levels from the beginning

‒ Front line and upper management

‒ Key project acceptance and risk management

Better understanding of the complexities (Corporate and IT related)

involved with automating SCADA-controlled components

Page 28: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

28

Confidential – all rights reserved

In Conclusion

And so…

Page 29: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

29 Confidential – all rights reserved

Bringing It All Together

Horizontal expansion Visibility / control of

more sites

Vertical expansion Do more with existing

visibility / control

Page 30: Distribution Automation Program - ualberta.caapic/uploads/Forum/P3.pdf · 2013-11-07 · Distribution Automation Program Automation Towards a Distribution Management System at ATCO

30 Confidential – all rights reserved

Key Takeaway

• Engineering projects

• Isolated one-off solutions

Past

• Program

• Cross-discipline involvement

• Sustainability

Present

• Improved tools

• Better ways to do work

• Many groups benefit

Future

More than just engineering!