Distributed Generation in Vermont ISO-NE Consumer Liaison Group March 13th, 2015
Douglas C. Smith Director, Power Supply
Discussion Topics
1. Vermont context
2. Key features of Vermont DG programs
3. Value proposition for DG solar
4. Kingdom Community Wind
2
Vermont Context for DG Deployment
• Vertically integrated utilities; no retail access
• Policy context values retail rate stability
• Significant long-term contracts & utility generation ownership
• Most supply sourced from outside Vermont – Many DG sources; no major thermal plants
– Largest plants are McNeil (biomass) & Kingdom Community Wind
• Desire to support deployment of renewable DG – Including associated economic activity
– Long-term contracting can help
3
Note that GMP’s ultimate fuel mix could differ from this illustration. For example, if GMP sells RECs (e.g., from the
premium renewable category), the associated energy would be depicted as New England “system residual.”
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
4,500,000
5,000,000
FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
Green Mountain PowerProjected Energy Resources Compared to Load
Fiscal Years 2015 to 2025
System Contracts
Fossil Fuels
Other Renewables*
Premium Renewables
Millstone
NextEra Nuclear
HQUS
HQ VJO
Load
A managed portfolio: long-term supply commitments
limit exposure to market price changes.
4
0.120
0.140
0.160
0.180
0.200
0.220
0.240
0.260
2007 2008 2009 2010 2011 2012 2013 2014
Illustrative Residential Rate Trends(EIA data; partial year 2014)
Green Mountain Power Corp
City of Burlington Electric - (VT)
Connecticut Light & Power Co
Fitchburg Gas & Elec Light Co
Massachusetts Electric Co
New Hampshire Elec Coop Inc
NSTAR Electric Company
Public Service Co of NH
The Narragansett Electric Co
United Illuminating Co
Western Massachusetts Elec Co
GMP's hedged portfolio yields relatively stable rates,which sometimes diverge from regional market.
5
Vermont Renewable Programs • VT SPEED (new renewable) goal: 20% by 2017
– Renewable project development (contracts & ownership), not consumption
– Utility-scale projects and DG projects are eligible – Utilities are generally expected to sell the associated RECs
• For GMP, currently $30M/year of revenue to reduce retail rates • But cannot claim this power as renewable supply to its customers
• SPEED Standard Offer – Long-term PPAs, solicited annually (presently 5 MW/year) – Mostly solar PV so far; allowances for other technologies
• Solar pricing has declined greatly (30 cents/kWh >> 12 cents/kWh) • Recent pricing competitive with larger new renewables (e.g., utility-scale wind)
• Net Metering – Solar “adder” above retail electric rate
• Current total pricing = 19 to 20 cents/kWh (for first 10 years)
– Group/virtual net metering is allowed – Maximum project size = 500 kW – “Net Metering 2.0” docket to review program features for 2017+
6
Under consideration, a new renewable framework: • Tier 1 = Total Renewables Requirement
– 55% of sales in 2017, increasing to 75% in 2032 – Renewables broadly defined (including existing)
• Tier 2 = DG carve-out (counts toward Tier 1) – 1% of sales in 2017, increasing to 10% in 2032 – Plant size 5 MW or less, instate only – Net metering can count, if customers assign attributes
• Tier 3 = Energy Transformation – Customer-facing measures that lower costs and GHG
emissions – Ex: efficiency, EVs, heat pumps above baseline path – 2% in 2017, increasing to 10% in 2032
Proposed Bill H.40 (“RESET”)
7
RESET: Thematic Directions • Promotes very substantial in-state DG
– Challenging, but achievable with focus & innovation
• Tier 3 aims at all fuels, not just electricity • Supportive of Vermont’s Comprehensive Energy Plan
goals (i.e., 90% renewable by 2050) • Cost containment
– Significant new requirements, growing gradually – Some compliance flexibility provisions (e.g., banking)
• Would end the SPEED framework – Renewable consumption requirements (via RECs), not
counting renewable generation – More clarity, alignment with neighboring RPS programs – Enable Vermont utilities to remain REC sellers and buyers
8
Illustrative Build-out of DG Capacity
Context: GMP’s recent annual peak load has been roughly 760 MW.
0
50
100
150
200
250
300
350
400
450
500
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032
MW
Inst
alle
d
Existing/Queue DG and Net Metering (to 15% Cap) New Net Metering RECs Retained by Owner
New Net Metering RECs Assigned to GMP Standard Offer
Other New Renewable DG
One potential DG future that would comply with RESET Tier 2
9
Value Streams From DG • Wholesale market products
– Energy, Capacity, RECs
• Potential additional value for “load reducers” – Displacement of RNS transmission charges – Additional capacity value (if output at ISO summer peak is high)
• Sum of these: estimated 12 to 15 cents/kWh levelized – Comparable to recent prices for some utility-scale solar PPAs
• Potential additional values in some locations – Reduction in local T&D losses – Deferral of T&D capital investments
• Bulk (VELCO), or GMP
– Support grid resiliency (particularly if combined with storage)
• Societal values (not monetized in market products) – Externalized cost of GHG emissions – For some technologies (e.g., digesters), local waste management
10
Increasing DG Penetration: Potential Challenges
Benefits and costs of DG can be very location-specific. The following are challenges that are likely to arise in some cases, and will need to be managed as DG penetration increases:
• Loading of T&D equipment – Ex: distribution circuit becomes export-constrained
• Review of protective devices & regimes • Voltage fluctuations
– Quick changes in DG output
• Unintended islanding • Interconnection queue dynamics • Also, intermittence of aggregate DG output
– Fluctuation in GMP’s net power supply costs
11
Management of DG Penetration • Thoughtful system impact studies
– Identify required upgrades & protection regimes – Leverage smart meter data, where applicable
• Develop screening tools (e.g., solar mapping) – Help projects find areas where interconnection cost is
likely low; avoid high-cost areas
• Utilization of advanced inverter features – Ex: to control “up” ramp of solar production
• Strategic deployment of distributed storage • Responsive demand
– Controllable end uses that can decrease/increase consumption very quickly
12
Choreography: A Rutland Case Study • A collaboration with NRG and Spirae • Focus on local distribution circuit “ER-51”
– About 4 MW of load, mixed residential & commercial – Stafford Hill project (2 MW PV, 4 MW storage, co-located) – 1 MW+ of other solar PV – About 150 controlled electric water heaters – Emergency shelter (high school)
• Grouping & management for multiple operating modes – Frequency regulation – Peak management
• Reduction of capacity & transmission expenses • Part of an “NTA” reliability plan to defer local transmission investment
– Smoothing solar output – Microgrid (part of circuit)
• Tools, experience, lessons to inform broader application
13
DG Value Proposition: Themes to Watch
• Cost trends for all-in cost of solar PV
– To what degree will recent gains (performance, delivered price/kWh) continue?
– Federal tax incentives (e.g., 2017 ITC expiration)
• Availability & permitting of low-cost sites
• Management of local interconnection queue
– And allocation of system upgrade costs
• Solar penetration could shift system peak hours
– If ISO/VT peaks shift to evening hours, diminishing capacity/RNS value for future solar volumes
14
Kingdom Community Wind
• 63 MW plant, COD late 2012 – 21 Vestas turbines, 3 MW each
– 8 MW to Vermont Electric Cooperative via long-term PPA
• A significant part of GMP’s owned generation fleet – Projected all-in cost (25 years): roughly 9.5 cents/kWh
– Potential for additional customer value thereafter
• Projected average capacity factor about 34% – 3.5% to 4% of GMP energy needs; weighted to winter
months
– Production to date has been consistent with this
– Output was curtailed by ISO-NE during significant hours in 2013, due to northern VT contingency exposures
– Since installation of a local reactive device, curtailment has not been a major factor
15
Some Take-Aways • Vermont context is unique in several respects
• DG can make sense for several reasons – Part of a low-cost portfolio strategy
– Local NTA and grid resiliency
– Consistent with our customers’ preferences
• Vermont DG & renewable programs have been relatively low-cost – Substantial project development, limited retail rate impact
• Vermont renewable policy will soon evolve significantly – RESET would institute renewable consumption requirements,
and require large amounts of local renewable DG
– Implementation appears challenging, but achievable
– Pricing & other features of net metering
16