detail project report on solid waste managementhprural.nic.in/kullu.pdf · detail project report on...
TRANSCRIPT
-
Detail Project Report on Solid
Waste Management
Development Block Kullu
District Kullu( HP)
-
1.
रूप रेखा
Basic Data of Block kullu
Sr.no Description Total 1 No of house holds 31676
2 Population of GP 134144
3 No of Schools/Anganwadies/Other Educational
institutions
680
4 No of other offices 110
5 No of markets places 33
6 No of Shops 1437
7 No of Dhabas/restourents/Hotels 390
8 No of industrial establishment 82
8 No of petrol pumps 4
9 No of tourist destinations 28
10 No of temples/gurudwara/other religious places etc 316
11 No of hotspots of Garbage in GP 218
12 Detail of CBOs in GP -
13 SHGs 400
14 Mahila mandal /Yuvak Mandals 300/100
15 NGOs -
16 VH & SC/VW & HC -70
17 No of natural water resources in GP 419
18 No of CSCs/ Sulabh Toilets in GP 68
19 No of Migratory laborers in GP (Approximately) 2968
20 Are toilets available for all laborers YES
21 No of community Vermin – compost units 0
22 No of individual Vermin – compost units 1428
-
ऩंचायतो का वर्गीकरण ग्रामीण ऩररवेश की ऩंचायते
(51)
नजदीक राष्ट्रीय उच्च मार्गग की ऩंचायते
(9)
ऩयगटन/ धार्मगक दृष्ष्ट्ट से हत्वऩूणग ऩंचायते (3)
शहर के साथ ऱर्गती ऩंचायत े
(7 )
मोहल
-
2.
2.1
incinerator
-
2.2
sewrage
RDF
bricks
-
2.3
-
twin pit
Hot spots
Adopt Hot spots
composting and incineration
प्राकृततक स्त्रोत की ऩहचान
बाबड़ी हैंडऩंऩ प्राकृतिक स्रोि 150 200 100
प्राकृतिक स्त्रोि की ऩहचान कर ऱी गई है इन्हें महहऱा मंडऱ, स्त्वयं सहायिा द्वारा हर महीने साफ़ ककया जाएगा
-
4. Solid Waste Management Plan4.1 Type of generated waste & quantity assessment
BLO
CK
NA
ME
Total H
ou
se H
old
s
Total shops/Commercial buildings/temple/tourist spots
Total re
store
nts an
d
Dh
abas/h
ote
ls etc.
Total in
stitutio
ns/o
ffices
Total n
o. o
f garbag e
ho
tspo
ts
Tppe of waste generated and approximate quantity per DAY
Biodegradable
Non Biodegradable
Kitch
en
waste
/pap
er/
bo
ard//re
sidu
e o
f fruits
Plastic/p
olyth
en
e
Diap
ers/n
ep
ki
ns
Ho
use
ho
ld
hazard
ou
s w
aste(C
FL/tu
be
lights/p
aind
rum
e)
Discard
ed
glass
Tetra p
acks
Discard
ed
Clo
th
1 2 3 4 5 6 7 8 9 10 11 12 13
KULLU 31676
1881 390 772 218 3000(KG) 50 KG 200 KG
100 KG
100 KG
30 KG
50 KG
4.2 Collection of Waste Plan Mode of garbage Collection at ward level
1. Door to door collection 2. Picking from identified spot in Panchayat
Mode of transportation from spot to collection centre/segregation unit (manual/vehicle)
Manual/vehicle
Mode of segregation Manual
Duration of cleaning hotspots in GP regularly
ONCE IN A MONTH
Provision of fine for open littering in GP areas
Yes Provison of fine by the gram panchayat
4.3 Dustbin Requirment
No of community dustbin already installed
No. of community dustbin to be installed
Expected expenditure
50 210@10000 2100000/
-
4.4 Mode of Disposal of Waste
Type of waste Mode of disposal Facility required Biodegradable(Household level /community level through vermin-composting/Bio-composter
Biodegradable waste community leval/vermin composting and disposed at house hold leval
Each family will do its own system
Non Bio-degradable (Recyclable/reusable)i.e plastic, polythene,metal
Will be collect in every village and will handover to kawadiwalas / shareded at waste management unit
All the waste will be sold to kabadibala.
Non - Biodegradable (non -Recyclable/non-reusable
Land fill Dumping site
House hold hazardous waste Hazardous waste of each house will be disposed off in better manner .
Mahila mandal ,yuvak mandal wil be taken care of .
Glass & Cloths Glass Will used for filling and cloths will recycle
Recycle unit
4.5 IEC activities - 1. Motivation of peoples for segregation of waste aty household level. 2 Motivation of peoples for disposal of Biodegradable waste at HH level. 3Motivation of peoples for use of dustbins for HH waste. 4Motivation of peoples for proper use of community dustbins for HH waste collection. 5Motivation of peoples for handing over recyelable waste to Kabadies. 6Motivation of peoples for making use of reusable waste for different requirments 7Making provision of fine for open littering of garbage in open and public place. 8Installation of Sign boards depicting not to drop garbage and fine provision at Hotspots, public places, Water resources and, Highways
-
6. Liquid Waste Management
6.1
Duration of cleaning natural water resources and
water bodies
Once in a Month
Name of block
Water Sources Waste water
Drinking water Non Drinking water Drains,bathrooms & kitchen water
Bowdis/ natural bodies
Well Handpump
Tank Streams/ khads
Kuhal SOAK PIT
1 2 3 4 5 6 7 8 9 kullu 419 - 70 650 20 50 450 300
Activity Number Expected
expenditure
Provision of
fund
No of individual soak pits to be constructed
500@2000 1000000/ MGNREGA,
14 FFC, SBM-G
No of community soak pits to be constructed
200@20000 4000000/ MGNREGA/ SBM-G
No of drains to be constructed 200@100000/ 20,000,000 MGNREGA /14 FFC
-
6.2 IEC Activities 1motivating HH to construct Soak pits in their houses 2 motivating peoples/MM/SHG/YM to take up regular cleaning of 3waterbodies and drains Of locality at regular intervals. 4-Motovating peoples to use waste bathroom/kitchen watwr in kitchen gardens. 5 Motivation for Adoption of water resources of GP by MM/SHG/YM for regular Maintenance and cleaning
7. र्गततववधध समय सीमा
क्र र्गततववधध समय सीमा 1 ऩंचायिो का ठोस एवम िरऱ कचरा प्रबंदन को अऩने बगग अनुसार
जैसे की ऩंचायि का ऩूर्ग रूऩ से ग्रामीर् ऩररवेश की है या राष्ट्रीय उच्च मागग के साथ ऱगिी की ऩहचान कर अऩनाना
कर लऱया गया है
2 ऩंचायि का कचरे के को चचन्न्हि करना कर लऱया गया है 3 ऩंचायिो कचरे के प्रकार ब मारा का आकऱन करना कर लऱया गया है 4 घरेऱु स्त्िर/ ब्याब्सातयक सस्त्थान ऩर कचरे को वगीक्रि कर इकठा
करने बारे जनसमान्य सस्त्थनो को जागरूक करना ऩंचायिो का कबाडडयों के साथ सम्ऩकग कर उन्हें ऩंचायि में ऩंजीक्रि
करना व कबाड़ीयों का ऩंचायि ऺेर से कचरा इकठा करने बारे उन्हें अचधक्रि करना
1
योजना कक्रयान्वयन ऩूर्ग रूऩ से ग्रामीर् ऩररवेश की ऩंचायिों .12.19 राष्ट्रीय उच्च मागो के साथ ऱगिी ऩंचायिों 30.11.19 ऩंचायिे जो की ऩयगटन / धालमगक द्रन्ष्ट्ट से महत्वऩूर्ग है 30.08.2019 ऩंचायि जो शहरों के साथ ऱगिी है 30.10.2019
8. Category wise time line for door to door Collection & Segregation
Sr. No. Category of GPs Tentative Time Line 1 Rural 1
st May 2019
2 Semi Urban 05 June 2019 onwards
3 NH/ Road side 15 August 2019 onwards
4 Religious/
Tourist
15 August 2019
-
9. ग्राम पंचायतो को कूड़ा कचरा मुक्त बनाने की समय सीमा
क्रमांक पंचायतो के प्रकार कुल
पंचायत े
कचरा मुक्त करने का समय
1 ग्रामीण पररवेश की पंचायते 51 1) 5 पंचायते कचरा मुक्त कर ली गई ह ै
2) 12 पंचायत े1.5.19 to 30.08.19
3) 17 पंचायत े1.9.19to 30.10.19
4) 17 पंचायत े1.11.19 to 30.12.19
2 पययटन/ धार्ममक दषृ्टि से महत्वपूणय
पंचायते
3 30.12.2019
3 नजदीक राष्ट्रीय उच्च मागयकी पंचायत े 9 30.11.2019
4 शहर के साथ लगती पंचायत े 7 30..12.2019
कुल 70
-
Buduget Plan
Consolidated Plan of Block for installation and construction
of structures regarding Swachh Bharat Mission(G)-
Compon
ents
Activity Area of operation No. of units
Unit cost Estimated
fund
required
Source of
income
ODF
Sustainability
IHHL All left out Nil N/A N/A N/A
CSCs prominent places of
BLOCK/Temple/market/NH/
Public places
40 200000/ 800000/ SBM
Liquid waste
Drains
BLOCK area as per
requirement
200
100000
20,000,000/ MGNREGA/
SBM
-Do-
Soak pits 200 50000/ 10,000,000
Underground
channels
BLOCK area as per
requirement 50 50000/ 2500000/ MGNREGA/
SBM
-Do-
Bowdies/tank/wells
etc.
BLOCK area as per
requirement 100
50000/ 5000000/ MGNREGA/
SBM
-Do-
Solid waste
Vermin compost
pits/ paper
recycling units
BLOCK area as per
requirement (community
level)
280 40000/ 11,200,000 MGNREGA/ SBM
Dustbins BLOCK area as per
requirement 210 10000 2100000/ MGNREGA/
SBM/FFC
Collection &
segregation units
BLOCK area as per
requirement 35 50000/ 1,750,000 MGNREGA/
SBM/
14th
FFC
Dumping &
landfill sites
BLOCK area as per
requirement 30 50000/ 1,500,000 MGNREGA/
SBM/
14th
FFC
Plastic
shredder/Bala r
Cluster level/BLOCK level 25 30000/ 750,000 MGNREGA/ SBM/
14th
FFC
bio composter/
recycling unit etc.
Cluster level/BLOCK level 10 700000 7,000,000
Sanitary pad
incinerators
Community level 35 10000 350000/ MGNREGA/ SBM/
Water ATM Community level 1 300000/ 300000/
70,4,50,000/