    Culvert Analysis Spreadsheet 

    Client: Siddharthanagar Municipality Date:

    Design By: China Guangzhou-Sharma JV Date:Comments:

    Inputs:

    Headwater !pstream "ater Sur#ace$ %le&ation: 'eet

    Cul&ert (nlet (n&ert %le&ation: 'eet

    Cul&ert Diameter: (nches Select Cul&ert Material: CM)

    *ength o# Cul&ert: 'eet Select Cul&ert (nlet +ype: )ro,ecting - +hin %dge

    Cul&ert utlet (n&ert %le&ation: 'eet

     +ailwater Downstream$ %le&ation: 'eet

    Outputs:

    CAPACITY = 0.0 cfs Headwater Elevation EQA!" Tailwater Elevation #

    Manning.s n &alue: /0/12 CM)

    %ntrance Coe3cient4 5e: /06 )ro,ecting - +hin %dge

    Compute

    Print 

  • 8/19/2019 Design of Cross drainage Structures

    2/25

    (annin)*s +n+ ,alues:Culvert (aterial +n+ ,alue

    Concrete /0/71

    CM) /0/12

    )VC8)lastic /0/77

    Corrugated8)% /0/12

    Smooth8HD)% /0/71

    Culvert Entrance T-pe: Source: 'H"9 Hydraulic DesiEntrance T-pe e

    )ro,ecting - Groo&e %dge /01

    )ro,ecting - S>uare %dge /0=

    )ro,ecting - +hin %dge /06

    Headwall - Groo&e %dge /01

    Headwall - S>uare %dge /0=

    Miter?S>uare?1:7 Slope /0@

    Constants for Inlet Control /esi)n Euations

    Culvert "1ape Culvert (aterial

    Circular Concrete

    Circular Concrete

    Circular ConcreteCircular Concrete

    Circular CM)

    Circular CM)

    Circular CM)

    Circular )VC8)lastic

    Circular )VC8)lastic

    Circular Smooth8HD)%

    Circular Smooth8HD)%

    Circular Smooth8HD)%

    Circular Corrugated8)%

    Circular Corrugated8)%Circular Corrugated8)%

  • 8/19/2019 Design of Cross drainage Structures

    3/25

    Ae#erence: 'H"9 Hydraulic Design o# Highway Cul&erts

    Ae#erence: 'H"9 Hydraulic Design o# Highway Cul&erts

    Ae#erence: H< !ser Guide

    Ae#erence: H< !ser Guide

    Ae#erence: H< !ser Guide

    n o# Highway Cul&erts4 +a;le 714 76

  • 8/19/2019 Design of Cross drainage Structures

    4/25

     Constants

     Y 

    /0@

    /0@2

    /06/02 Ae#erenceE r use the same as headwall - s>uare edge0 See Hydra

    /06

    /0@=

    /0=2

    /0@ 'rom H< !ser Guide - same as #or Concrete )ipe S>uare %dge with

    /0@= 'rom H< !ser Guide - same as #or Corrugated Metal )ipe cul&ert4 M

    /0@ 'rom H< !ser Guide - same as #or Concrete )ipe S>uare %dge with

    /0=2 'rom H< !ser Guide - same as #or CM) )ro,ecting - +hin %dge

    /0@= 'rom H< !ser Guide - same as #or Corrugated Metal )ipe cul&ert4 M

    /06 'rom H< !ser Guide - same as #or Corrugated Metal )ipe cul&ert wi

    /0=2 'rom H< !ser Guide - same as #or CM) )ro,ecting - +hin %dge/0@= 'rom H< !ser Guide - same as #or Corrugated Metal )ipe cul&ert4 M

    4eturn to (ain &indow

  • 8/19/2019 Design of Cross drainage Structures

    5/25

    ulic Design o# Highway Cul&erts rd sentence o# last paragraph on p0 1=

    Headwall

      itered to con#orm to slope

    Headwall

      itered to con#orm to slope

      th Headwall

      itered to con#orm to slope

  • 8/19/2019 Design of Cross drainage Structures

    6/25

    with the socFet end pro,ecting #rom the ll$

    Culvert Entrance Conditions:

    Pro5ectin) 6roove Ed)e 9pplies only to Concrete C

    Headwall 7 6roove Ed)e applies to Concrete pipe 

  • 8/19/2019 Design of Cross drainage Structures

    7/25

    socFet end in com;ination with a concrete head

  • 8/19/2019 Design of Cross drainage Structures

    8/25

    non-socFet end o# th

    ul&erts Pro5ectin) "uare Ed)e 

      ith the Headwall 7 "uare Ed)e 

    4eturn to (ain &indow

  • 8/19/2019 Design of Cross drainage Structures

    9/25

    all$

    headwall and a s>ua

    "3oot1 H/PE4 or

  • 8/19/2019 Design of Cross drainage Structures

    10/25

    e pipe pro,ecting #rom the ll$

      9pplies to Concrete Cul&erts #or

    applies to Concrete4 C(P4 P,C plastic4

  • 8/19/2019 Design of Cross drainage Structures

    11/25

    re edge entrance$

    orru)ated PE cul&erts with a concrete

  • 8/19/2019 Design of Cross drainage Structures

    12/25

    Pro5ectin) T1in Ed)e 9pplies to Corrugated Metal )i

    Smooth H/PE or Corru)ated PE cul&erts pro,e

    (iter8"uare89: "lope applies to C(P4 P,C plasti

  • 8/19/2019 Design of Cross drainage Structures

    13/25

    Corru)ated PE cul&erts that are mitered to con

  • 8/19/2019 Design of Cross drainage Structures

    14/25

    e C(P$4

    ting #rom the ll$

    c4 "3oot1 H/PE or

  • 8/19/2019 Design of Cross drainage Structures

    15/25

    #orm to the slope$

  • 8/19/2019 Design of Cross drainage Structures

    16/25

    $ew ser Infor3ation:

    ote that this spreadsheet was designed using %Icel 1//@0 (#

    'ile4 ptions4 'ormulas4 Calculation options4 and then under

    !i3itations of t1e Culvert Anal-sis "preads1eet:

     +his spreadsheet applies to concrete AC)$4 corrugated metal p

    (t does not analyze partially lled with rocF or sediment$ cul&e

    'ree sur#ace channel Kow$ calculations are approIimate0 +hey

    'or &ery high headwater depths e0g0 greater than 7=.$ another

    (# a restriction e0g0 another cul&ert or ;ridge$ is located a shortH%C-A9S more compleI4 ;ut detailed$4 or H-uations that were used #or inlet control su;merged and

    Calculations are made #or each potentially applica;le conditioninput section near the top o# the Cul&ert 9nalysis sheet0 +he c

    Hydraulic Design o# Highway Cul&erts4 Hydraulic Design Series

    If -ou are usin) t1is spreads1eet for t1e ;rst ti3e< it is

    $OTE for E>cel 900:  Be sure that the calculations are set t

     +his spreadsheet applies to sin)le Circular Cul&erts only not r

     +his spreadsheet should not ;e used to analyze cul&erts with

     +he outlet control calculations use the assumption o# a 70/ #or t

     +his spreadsheet does not analyze road o&ertopping0

     +his spreadsheet pro&ides an approIimate cul&ert hydraulic an

    9 downstream tailwater ele&ation must ;e entered as input dat

     +he spreadsheet checFs #or inlet control su;merged and unsu

    4eferences: 

  • 8/19/2019 Design of Cross drainage Structures

    17/25

    H< 'ederal Highway 9dministration.s Cul&ert 9nalysis )rogra

    !S 9rmy Corps o# %ngineers4 Hydrologic %ngineering Center H

    If -ou are 1avin) pro2le3s wit1 )ettin) t1e (acr

    4eturn to (ain &indow

    HE!P for (AC4

  • 8/19/2019 Design of Cross drainage Structures

    18/25

    ou are using %Icel 1// or earlier4 the spreadsheet pro;a;ly wi

    "orF;ooF Calculation ;e sure that automatic is selected0

      ipe CM)$4 )VC plastic4 Smooth HD)%4 or Corrugated )% cul&ert

    ts0

    do not in&ol&e a detailed water sur#ace prole analysisL

     method e0g0 H%C-A9S or H-

  • 8/19/2019 Design of Cross drainage Structures

    19/25

     !ser Guide

    C$4 H%C-A9S4 Ai&er 9nalysis System Hydraulic Ae#erence Manu

    *s to &or in t1is "preads1eet< please "elect +Hel

    "'

  • 8/19/2019 Design of Cross drainage Structures

    20/25

    ll not worF

      aterials0

      oles are re>uired4 another method4 such as

    taFen #rom Ae#erence 7 ;elow0

     and indicated directly ;elow the

    istration4 Ae&ised May 1//=

    ct the Help #or Macros ;utton ;elow and #ollow the instructio

    considered in the eIit loss calculations$0

    tailed water sur#ace prole analysis0

    tly impact  the resulting computed cul&ert capacity0

    te #ree sur#ace channel Kow$ conditions0

  • 8/19/2019 Design of Cross drainage Structures

    21/25

    l4 March 1//<

    p for (acros+ and %ollow t1e instructions

  • 8/19/2019 Design of Cross drainage Structures

    22/25

    ns to install these options0

  • 8/19/2019 Design of Cross drainage Structures

    23/25

  • 8/19/2019 Design of Cross drainage Structures

    24/25

    $E& ser Instructions:ote that this spreadsheet was designed using %Icel 1//@0 (# you are using %Icel 1// or earlier4 the spreadsheet pro;a;ly will not worF

    If -ou are usin) t1is spreads1eet for t1e ;rst ti3e< it is i3portant t1at -ou install several e- E>cel Options'

    It would 1elp to print t1ese instructions to use w1ile -ou are installin) t1ese options

    Select the 3ce Button in the upper le#t corner o# the %Icel Screen:

    "hen the new window opens4 select the N%Icel ptionsO ;utton at the ;ottom o# this window0

    Select the N)opularO option on the le#t side o# the %Icel ptions screen and ;e sure that the option

    NShow De&eloper ta; in the Ai;;onO is selected:

     +hen4 select N9ddP(nsO option #rom the %Icel ptions window:

    ote that you do not need 9dministrati&e )ri&ileges to install these options4 5ust follow t1ese instructions:

    4eturn to (ain &indow

  • 8/19/2019 Design of Cross drainage Structures

    25/25

    9t the ;ottom o# the 9ddP(ns "indow4 select NManage: %Icel 9ddPinsO and then select NGoO and the

    #ollowing window will appear:

    (n this window4 select the N9nalysis +ool)aFO4

    N*ooFup "izardO and NSol&er 9ddPinO and then select

    N5O0

    9dministrati&e pri&ileges are not needed to NinstallO

    these %Icel 9ddPins howe&er4 it will taFe a minute or

    so #or these 9ddPins to ;e loaded0

    4eturn to (ain &indow