cross drainage system for hilly non-metalled roads

31
PRESENTATION ON CROSS DRAINAGE SYSTEM

Upload: s40

Post on 20-Aug-2015

736 views

Category:

Design


2 download

Tags:

TRANSCRIPT

PRESENTATION ON

CROSS DRAINAGE SYSTEM

RCC PIPE DRAIN

Required Materialsa. RCC Pipeb. Wooden Plankc. Stone Chipsd. Cemente. Nails

STEP-1: ROAD CUTTING

Required Portion to be Cut

STEP-1: ROAD CUTTING

STEP-2: PLACING RCC PIPE

STEP-3: BASE CASTING

STEP-4: SOIL FILLING

STEP-5: BOTTOM PLANK PLACING

STEP-6: TOP PLANK PLACING

STEP-7: LEMONITE LAYER FINISHING

GABION BOX DRAIN

Required Materials

a. Gabion Boxb. Wooden Log(Large & Small)c. Wooden Plankd. Stone Chipse. Nailsf. GI Wires

STEP-1: ROAD CUTTING

STEP-2: STONE LAYER

STEP-3: GABION BOX PLACING

STEP-4: GABION BOX FILLINGStone Chips

STEP-5: VERTICAL LOG PILING

STEP-6: HORIZONTAL LOG PLACING

STEP-7: BOTTOM PLANKS PLACING

STEP-8: TOP PLANKS PLACING

STEP-9: LEMONITE LAYER FINISHING

LOG DRAIN

Required Materialsa. Wooden Log(Small)b. Wooden Log(Large)c. Wooden Plankd. Stone Chipse. Nails

STEP-1: ROAD CUTTING

STEP-1: ROAD CUTTING

STEP-2: VERTICAL LOG PILING

STEP-3: HORIZONTAL LOG PLACING

STEP-4: BOTTOM PLANKS PLACING

STEP-5: TOP PLANKS PLACING

STEP-6: LEMONITE LAYER FINISHING