    DESIGN AND CONSTRUCTION OF PRE-TENSIONED SUTLEJ BRIDGE IN PUNJAB

    V.N. HEGGADE*, R.K. MEHTA** & R. PRAKASH***

    Paper No. 524

    SYNOPSIS

    Currently in vogue fast track construction has encouraged the adoption of pre-tension technology for urban flyovers. After having

    successfully experimented pretensioned spans for River Bridge upto span of 30 m in Hadakiya Bridge in Gujarat, the technology was first

    time extended upto 35m spans for Beas and Sutlej river bridges in Punjab. The inherent peculiarities such as single stage prestressing,

    transfer of prestress through bond between concrete and cables by obviation of grouting and sheathing ducts, tensioning of tendons before

    the concrete is cast and transfer of prestress after the attainment of required strength in concrete derive certain advantages in favour of

    pretensioning in terms of durability, quantity reduction, construction speed, design and construction expediency. However, in the Indian

    scenario there are no codal guidelines accounting for these peculiarities for bridges. The enumeration with illustration is intended to

    provide basis for formulating guidelines for pretensioning in bridge building. The Paper also deliberates on optimization of beam cross

    section in relation to lateral stability during transfer of prestress accounting for casting imperfections, handling and erection of beams

    before the beams are transversly stiffened by deck slab which may help the code makers to have fresh look on the guidelines for lateral

    stability of the prestressed beams.

    * Head of Technical Mgt.

    ** Dy. Manager (Tech)

    *** Project Manager

    Written comments on this Paper are invited and will be received upto 30th Sept., 2006.

    1. DESCRIPTION OF THE PROJECT

    The project consisted of design and construction of high-

    level bridge across the river Sutlej including approaches and

    guide-bunds connecting Nakodar and Jagraon. The

    construction of the bridge facilitates in reduction of the distance

    between the towns by 50 km, reduction in traffic of NH-1 due to

    traffic from Rajkot, Maler Kotla and Jalandar and reduction of

    traffic in the city of Ludhiana. The bridge proper, 810 m long

    between the inner faces of dirt walls is made up of 23 spans of

    35.20 m, while the approaches of lengths 1369 m and 1115 m on

    Nakodar side and Jagraon side respectively flanked the bridgeproper.

    The main flow is confined and guided through the bridge

    linear waterway without causing damage to the bridge and its

    approaches by provision of divergent guide-bunds along the

    river flow, upstream and downstream on both the banks.

    The superstructure of 35.20 m span bridge consisted of 6-

    nos. precast pretensioned concrete beams spaced at 2.15 m

    centres and cast-in-situ RCC deck slab. The width of the

    carriageway has been kept 7.50 m flanked either side by 2 m

    wide cycle track making the total width of the bridge deck to be

    12.95 m including crash barriers and steel railings. The vehicularway is separated from cycle ways by crash barriers while

    cyclists are protected by steel railings from being toppled over.

    The beams were simply supported on POT-cum-PTFE bearings

    having slab steel expansion joints between the spans. The

    abutments were solid non spill-through types to go with same

    family of plate type piers flaring towards pier cap in the direction

    of river flow (transverse) to minimise the size of the RCC cap.

    The piers were founded on 6 m dia well foundations while the

    abutments were resting on 7 m dia wells. The detail of the

    general features of the bridge is given in Fig. 1.

    2. DETAILS OF THE CONTRACT

    Punjab Infrastructure Development Board, on behalf of

    Punjab PWD provided developmental outline proposal with

    the condition that the contractor should submit his own

    proposal with the approximate dimensions of various

    components of the bridge structure to fairly establish that thetechnical requirement were met with. The tender proposal of

    the contractors were to include certain obligatory conditions

    such as length of the bridge, approaches and guide-bunds,

    carriageway and cycle track width requirements, linear water

    way and vertical clearance and type of foundations, and

    formation levels. The departmental outline proposal had the

    span of 40.50 m and the variation in span length was permitted

    up to 20 per cent. The contractor had to give detailed design

    calculations and drawings in support of his proposal after the

    award of the work to comply with the design requirements

    stipulated in tender documents. Qualified engineers

    supplemented by independent quality control consultant inline with ISO requirements were supervising the execution of

    the job.

    Some of the salient design parameters specified in the tender

    documents are as below:

    River hydraulics

    Gammon India Ltd., Mumbai

    E-mail : [email protected]

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    2/16

    144

    Design discharge : 18912 Cumecs

    Maximum mean velocity : 4.87 m/sec High flood level : RL 227.868 Depth of water at lowest : 3.0m

    water level

    Scour level : RL 204.255 Seismicity

    Seismic zone : IV Seismic coefficient : 0075G Permissible increase in SBC : 25 per cent Permissible increase in stress : As per IRC: 6

    Soil parameter

    (dry) : 1.8 t/m3

    (angle of internal friction) : 300

    (Friction between soil and face) : 200

    SBC for well foundation : 75 t/m2 gross atfounding level.

    Material

    For condition of exposure : Moderate Concrete grades

    For pretensioned beams : M40For well foundation : M30Reinforcements : HYSD bars

    conforming to

    IS:1786

    Fig. 1. General arrangement of Sutlej bridge

    Loading

    Live load :IRC 70R single laneor Class-A 2 lanes

    Footpath live load : As per IRC: 6 Cycle track loading : As per IRC: 6

    Miscellaneous

    Type of bearings : POT and POT cumPTFE

    Wearing coat : 25 mm thick masticasphalt over 40 mm

    thick bituminous

    concrete

    Cycle track and parapet : As per

    departmentaldrawing

    Software package : STAAD III -Release 22.0

    3. CONCEPTUALISATION

    In many of the river bridges in Punjab upto 45 m spans, the

    slab girder system with cast insitu post-tensioned beams are

    successfully adopted. Beyond 45 m, upto even 65 m cast insitu

    box girders are adopted. However, recently in vogue fast track

    HEGGADE, MEHTA & PRAKASHON

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    3/16

    145

    construction conceptualisation facilitates expeditious

    construction. The conventional cast insitu construction and

    its expediencies like staging/trestle support for superstructure

    in the riverbed is not only time-consuming, also susceptible to

    flood damages, consequently reducing productive working

    period in a season.

    In the recent years, the flyovers in urban areas especially

    in metropolitan cities are realised by precast construction. The

    various options in segmental and non-segmental technology

    is exploited in precast construction using post-tensioning or

    pre-tensioning.

    In case of Sutlej Bridge, among the various options

    available, finally the competition was between post-tensioned

    versus pre-tensioned beams. In this particular context, pre-

    tensioned beams had certain advantages and also peculiarities

    vis--vis its counterpart.

    The inherent peculiarities such as single-stageprestressing, transfer of prestress through bond between

    concrete and cables by obviation of grouting, sheathing ducts,

    tensioning of tendons before the concrete is cast and transfer

    of prestress after the attainment of required strength in concrete,

    warrants specially designed casting bed which should be

    capable of imparting required quantum of prestressing force.

    These peculiarities derive certain advantages in favour of

    pretensioned beams in terms of durability, quantity reduction,

    construction speed, design and construction expediency. As

    the pretensioned girders are manufactured in factory like

    environment where the bonding between concrete and tendons

    is direct due to the absence of grouting inside the sheathing

    duct, the better durability and corrosion resistance is achieved.

    The absence of the cables in the web and the elimination of end

    blocks and blisters to house the anchorages, allows the section

    optimisation from strength criteria alone. This helps in reducing

    concrete quantities rendering in lighter beams, facilitating in

    attenuation in cost of handling, transportation and erection.

    The value engineering carried out during

    conceptualisation stage for Sutlej Bridge revealed that for the

    same span of 35.40 m and number of beams of six on the cross

    section (Fig. 2), the quantities for pre-tensioned girders are

    substantially lesser than post-tensioned beams.

    From the design angle, pre-tensioning uses the prestress

    efficiently on smaller sections with higher eccentricities,

    reduces the immediate losses like friction, wobble and slip,

    reduces initial mass on substructure and foundation due to

    seismic and reduces steel congestion in end blocks and

    anchorage zones. Construction-wise, the activities associatedwith post-tensioning such as threading of cable inside the

    sheathing, grouting operation and number of prestressing

    operations is eliminated.

    Though the pretensioned technology has been used

    extensively for flyovers and ROBs for the span range of 18 to

    22 m, for the first time for bridge across river Surajbari in Gujarat

    the technology was adopted with 26 m spans in India, which

    withstood the otherwise catastrophic earthquake in Gujarath

    on 26th January 2001. Perhaps, it was but natural for Sutlej and

    Beas Bridges in Punjab to extend the span length up to 35 m as

    a part of evolutionary process, on the basis of experience gained

    through the fast track flyovers and Surajbari Bridge.

    4. FOUNDATIONS

    Before the award of the job, as a part of tender documents

    a thorough soil investigation was carried out by the department

    to arrive at soil characteristics, soil bearing capacity and

    founding levels along the bridge alignment (Fig. 3). Overall

    seven numbers of boreholes were drilled for depths up to 40 m

    and standard penetration tests were performed as per IS:2131

    to arrive at N values. Silt factors were calculated on the basis

    of particle size distribution following the principles of Laceys

    silt factor. On the basis of soil investigation, the subsoil strata

    were divided into 3 distinct zones.

    Around 12 m below the ground level along the alignment a

    silty clay strata of average band depth of around 12 m,

    designated as Zone-2 was sandwiched between sandy strata

    designated as Zone-1 and Zone-3. Average value of sandy

    strata was around 340 while clayey strata had undrained shear

    strength of around 1.50 kg/cm2 (Cu). On the basis of 75 mm

    maximum settlement criteria, the bearing pressure at founding

    level in sandy strata after passing through the clayey strata

    was specified as 75T/m2 on conservative side. The silt factor

    for Zone-1 varied from 0.62 to 1.07 while for Zone-3 the same

    was ranging between 0.35 to 1.01. The design scour depths

    near the piers and abutments were evaluated on the basis ofmaximum discharge, river regime and velocity of the river.

    In all 22 numbers of piers were supported on 32 m deep

    and 6 m dia well foundations (Fig. 4), consisting of 2.1 m deep

    kerb, 1.5 m deep well cap. The steining thickness of 1.05 m is

    tapered to 0.75 m at scour depth of around 18 m, below the top

    of the well cap.

    The thickness of the steining was decided by using the

    relationship given in IRC:78 to facilitate smooth sinking by

    gravity without excessive Kent ledge and damage to steining

    DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

    Fig. 2. Pre-tensioning vis-a-vis post-tensioning VE for Sutlej

    bridge

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    4/16

    146

    Fig. 4. Typical well foundation for Sutlej

    Fig. 3. Bore hole details along bridge alignment

    HEGGADE, MEHTA & PRAKASHON

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    5/16

    147

    To raise the steining to the required level, the extensive

    shoring, continuous dewatering, protection with wire crated

    boulders, etc. had to be resorted to apart from stabilising the 6

    m deep false walls by adequate structural bracings.

    To circumvent the creation of sump to sink last 1.2 m depth

    at P3 location, the other measures such as air jetting, water

    jetting and Kent ledge on top of false wall were attempted.

    Finally after 4 months, the combined effect of 450 t Kent ledge,

    5 m excavations outside the well and dewatering yielded the

    well to the required depth.

    DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

    due to differential earth pressure, sand blow and sudden drop,

    etc. it was ensured that the stresses at different levels of steining

    during service conditions and construction stage were within

    permissible limits. As the well foundations were to be plugged

    on soil, the grip for side earth resistance below the scour level

    was ensured to be of the maximum depth of scour below the

    design scour. As normally, well cannot be sunk to the precise

    verticality, the design catered for the cumulative moment effect

    of 1 in 80 tilts and 150 mm shift apart from accounting for other

    severe load combination. The side earth resistance was

    calculated by Bombay Committee Method with the passive

    resistance factor of safeties of 2.0 and 1.6 for normal and seismic

    conditions respectively. The well cap was designed and detailed

    as uniformly thick plate for the external reactions and reaction

    components at the bottom of the pier with boundary condition

    as partially fixed at supports on well steining all around.

    The river bed level varied between RL 222 m to 225.50 mhaving deep channel between the pies P3 and P10 with the low

    water level being at RL 223.723 m. Up to the deep channel i.e.

    P10, the service road was made up to A/R and wells up to P10

    were started simultaneously. After the monsoon was over, on

    recession of floods, the service road was made on A/L side and

    with the help of the site made temporary bridge between P8 and

    P10; the wells were tackled in the channel.

    Initially, the well sinking was planned with four cranes.

    However, the sandwiched clayey strata necessitated overall

    eight cranes, as the sinking through the same was consuming

    almost 7 to 15 days per metre depth.

    Most of the well foundations were constructed

    conventionally on land, barring a couple in deep channels,

    which warranted sand islands.

    In the conventional construction (Photo 1.), the cutting

    edge fabricated of mild steel was laid on the ground level and

    curb with required reinforcements was concreted. The material

    inside was gradually scooped out with grabs to facilitate sinking

    under its own weight. As the sinking proceeded, the steining

    was built up in lifts, normally of around 2.5 m to further the

    sinking due to increase in weight.

    Since the bed profile was having large variations, almost

    all wells were required to be sunk up to 5 m below the ground

    level (Photo 2.) and 3.0 m below the water level. The circular

    cofferdam except a small flare to accommodate piers was cast

    up to water level.

    Photo 1. Curb reinforcements & cutting edge

    Photo 2. Cofferdam with flare to accomodate pier

    Photo 3. Construction of well cap below GL

    Had the well cap level been fixed at ground level or LWL,

    the job could have been completed three to four months earlier

    and substantial additional expenditure as a consequence of

    taking well cap below ground level could have been saved.

    As the cofferdam was quite thin compared to steining, the

    non-availability of required weight hampered the sinking. This

    called for the creation of the sump below the founding level to

    facilitate gradual sinking. At P16 location, the sump required

    was 3 m to enable last 1.80 m sinking. In the process the well

    jumped and sunk by 3.70 m at one go rendering the steining top

    almost 8 m (Photo 3.) below bed level.

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    6/16

    148

    Photo 4. Shuttering Arrangement for Pier

    The height of the first lift was 3.25 m and after concreting

    the first lift, the balance second lift shuttering was fixed

    immediately in 3 to 5 hours. The grout leakage through the

    joints of shuttering was totally avoided by judicious planning

    during the fabrication of shuttering such as overlapping of

    plates, etc. The concreting for each lift was carried out in

    continuous operation without the cold joint. By virtue of large

    shuttering and minimum number of lifts in concreting, the surface

    texture of the concrete pier has been of excellent quality.

    6. SUPERSTRUCTURE

    6.1 Choice of Cross Section

    Due to the obvious advantages enumerated in

    Conceptualisation Para, the an isotropic deck was considered

    to be made up of 35.40 m long precast pretensioned beams,

    transversely held by 200 mm thick RCC deck slab. Though the

    design-wise and from aesthetical considerations, the

    intermediate diaphragms could have been avoided, the same

    has been provided to satisfy contractual requirement which

    are in fact structurally redundant.

    As there are no design criteria laid down in IRC standards

    for pretensioning, invariably IRC:18 meant for post-tensioned

    construction is adopted and insisted upon, for pretension

    construction also. The present post-tensioned Code IRC:18

    prescribes working stress method of design and permissible

    stresses seem to be on highly conservative side. The

    comparable AASHTO-94, the standard that is also based on

    allowable stress method (ASD) design, allows at least 33 per

    cent higher flexural stresses during transfer and 25 per cent

    higher flexural stresses during service condition. To worsen

    the matter further, the IRC stipulates 20 per cent additional

    time dependent losses, 3 times 1000 h relaxation losses, minimum80 per cent of characteristic strength at full transfer of prestress,

    those perhaps are rationalised for post-tensioned construction

    on the basis of past experience, where prestress transfer is

    feasible in stages.

    Universally, though generally there are no separate codes

    for post-tensioning and pre-tensioning, the prestressing code

    itself give separate design parameters such as time dependent

    loss parameters, permissible stresses and transmission length

    for pre-tensioning, etc. In view of this the author had suggested

    to IRC Code Making Committee to make IRC: 18 a common

    code for prestressed concrete road bridges common for both

    pretensioned and post tensioned concrete with the separatedesign parameters wherever relevant and applicable, which is

    yet to be taken into cognisance.

    Selection of the beam cross section for long span

    pretensioned girders warrants experience in field supervision,

    apart from theoretical aspects of prestressed concrete. It is

    expected that the optimum concrete section that is materially

    influenced by prestressing force and loading, is light for

    handling and transportation, prestressing operation and

    concreting friendly. The sizes of bottom and top flanges, the

    depth and width of web are required to be optimised on the

    basis of above constructability issues.

    The pressure line (resultant of stresses) in the prestressed

    concrete flexural member shifts its location within the section

    upon the application of external loads. In simply supported

    beams at the midspan for service condition, the stress at the

    bottom-fibre is zero, i.e. no tension allowed as per codal

    provision. At the midspan pressure line is above the CG of the

    section, warranting the CG of the prestressing force at a

    distance equivalent to moment divided by prestressing force.

    Thus to cater for the compressive force by virtue of pressure

    line above the CG of section at the midspan, the top flange

    requirement is high, whereas nearly zero-stressed bottom fibre

    HEGGADE, MEHTA & PRAKASHON

    Though the aggregate sinking of 854 m was accomplished

    in a short period of 620 days, the good engineering practice of

    fixing the well cap at LWL/bed level, would have reduced the

    sinking duration, efforts and its financial ramification quite

    considerably.

    At the every alternative well location, after reaching the

    founding level, the soil investigation was carried out up to 9 m

    depths to deduce C and values to confirm the soil bearingcapacities. Bottom plugging was carried out by shifting the

    concrete from batching plants through buckets and placing

    by tremie pipes. After having done the recuperation test for

    soundness of plug after 14 days, the sand filling and

    intermediate plugs were expedited. With the help of

    irrecoverable shuttering supported on precast beams and

    cofferdam, each well cap was completed within five to six days

    including reinforcement fixing and concreting.

    5. PIERS

    The RCC piers were of wall type flaring from well cap to

    accommodate the pier cap, with the concrete characteristic

    strength of 35 N/mm2. Though the grade of the concrete is

    same as that of used for well cap, the mix had to be made little

    richer with higher workability in order to enable smooth

    placement of concrete for the thin sections. A system of

    formwork consisting of steel channels and shuttering was used

    in piers, which was concreted in two stages (Photo 4).

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    7/16

    149

    does not require flange, apart from accommodating cables.

    Towards the supports as the moments are gradually reduced to

    zero, the CG of the prestressing force can be judiciously located

    to be concentric to avoid any requirement of flanges.

    However, at the intervening stage before the application ofimposed loads including live load, the section has to store large

    prestressing force at bottom fibre, which would be neutralised

    on application of external intermittent loads latter, bringing the

    bottom fibre stress to zero. The above calls for widening of the

    bottom flange and in fact decides the width. Thus an I section

    where the pressure line can move larger distance without the

    tensile stresses is chosen for pretensioned girders. While the

    span to depth ratio ranges between 16 to 22, the web thickness

    of 150 mm is considered to be adequate for normal I shaped

    beam for honeycomb-free concreting.

    However, in case of Sutlej Bridge as the vertical clearance

    was not a constraint, the lavish span to depth ratio of 14 wasadopted to reduce the prestressing strands with the web

    thickness of 200 mm as constrained by IRC:18, though the same

    was not required by design and constructability angles.

    The decision on the width of the top flange is very crucial

    as the extremely narrow top flanges may buckle the precast

    beams during side shifting, transportation and handling. The

    Indian Codes categorise the beams as slender beams when the

    span to top flange width ratio exceeds 60 or depth to flange

    width ratio exceeds 4 and specifies reduction in permissible

    stresses and adequate temporary restraints during handling

    and erection from lateral stability considerations. Normally,

    for the simply supported beams, the span to depth ratio of 15is considered to be optimum, and when the same is related to

    depth to width ratio of 4, the span to width ratio works out to

    be 60. In Sutlej and Beas bridges, 35 m long beams with 2.5 m

    depth was provided with 0.70 m top flange to keep the weight

    of the girder to minimum with span to flange width ratio of 50

    and depth to width ratio of 3.57 satisfying both the

    considerations given in Indian Codes for slenderness. The

    stretching the slenderness to codal limits to keep the weight

    minimum, was considered to be very bold especially after the

    classical beam collapses of Roop Narayan Bridge on National

    Highway No.6, where the span to width ratio 50 followed the

    depth to width ratio of 3 (safer than Sutlej Bridge). In his paper

    A study of the failures during launching of precast prestressedconcrete beams of the Roop Narayan Bridge on National

    Highway No. 6, while deliberating on Guyons contention that

    for the beams depths of 5 to 8 ft., the thickness of the flanges

    should never be less than 0.1 of the depth and width of the

    flanges should not be less than 0.40 of the depth for

    symmetrical I-beams, Mr. Seetharaman through his

    investigation concludes that the span to depth ratio should

    be 15 and depth to width ratio should be less than 3 for

    transverse rigidity of precast beams. Thus the chosen beam

    section for Sutlej called for thorough investigation and

    justification vis--vis lateral stability during transfer of

    prestress, handling and erection of the beams before the

    beams are transversely rigidised by deck slab.

    The lateral stability of Sutlej beams during handling and

    erection was ensured by extensive investigations on the basis

    of special report lateral stability of long prestressed concretebeams by Robert F. Mait in PCI Journal Jan-Feb 1989.

    The improper lifting hook placement and casting

    imperfection cause the beam to be tilted at an initial angle 1

    near the lifting hook location about the roll axis (Fig. 5).

    Normally the casting imperfections considered 1:1920 in Sutlej

    gets manifested itself by way of curvature in plan of

    prestressed beam after detensioning. Lifting hook placement

    tolerance was allowed to be 6.35 mm during casting. The

    above tilting of beam induces the lateral deflection about

    weak axis of the beam. Because of the transfer of prestress,

    there is already tension at the top fibre of the beam for which

    the tensile stress caused about the weak axis by thecomponent of the self weight due to tilt gets added which

    needs to be within the permissible limits and in fact decides

    the maximum tilt ( max) to which the beam can be subjected

    to. After the tilting is initiated by the initial angle 1

    near the

    support locations, the beam achieves its equilibrium with a

    uniform lift angle (shown at midspan) with CG of the mass

    of the deflected beam right under the roll axis.

    In the figure as Zo

    approaches Yr, the beam starts rotating

    and becomes totally unstable even without the initial

    imperfection and without improper location of lifting hook.

    Thus the safety against the lateral buckling is a measure of

    Yr vis--vis Zo and is called gross factor of safety (FOS = Yr/Z

    o) for a perfect beam without imperfection.

    If one has to account for imperfections causing the initial

    angle q1

    and limiting the maximum lift to max

    , the factor of

    safety reduces to .

    However, it is more logical to deduce the factor of safety

    against lateral stability by dividing maximum possible tilt max

    with that of equilibrium rotation at midspan.

    Moving the lifting position inwards improves the factor

    of safety against lateral stability by virtue of reduced

    deflections caused by rotations about the weak axis.

    However, it has to be ensured that the stresses are within

    the limits in overhang portions.

    Though the very slender cross sections from lateral

    stability considerations was chosen in Sutlej Bridge, the same

    could be successfully executed by adhering to the specified

    casting imperfections, lifting hook location tolerance, etc.

    during execution. The details of the same are given in Fig. 5.

    Unlike in post-tensioning, in case of pre-tensioning as the

    strands are bonded during the transfer of prestress, the

    DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    8/16

    150

    Fig. 5. Laterial stability of long prestressed concrete beams with factor of safeties

    beams cannot buckle which was also taken into cognisance

    during lateral stability investigations.

    The lateral stability guidelines for precast beams given in

    Indian Codes for prestressed concrete members are similar to

    that of for RCC and steel beams in terms of span to depth ratio

    and depth to top flange width ratio. However, in the case of

    prestressed beams, the aspect of prestressing is a new variable

    and as such the same guidelines may not be applicable for

    prestressed beams. In view of this the factor of safeties

    enumerated above may be included for ensuring the lateral

    stability of beams during shifting, transportation and erection

    of prestressed, precast beams in the prestressed concrete

    codes.

    6.2. Design of Superstructure

    The superstructure consists of six numbers of precastpretensioned girders spaced at 2.15 m centre to centre with 250

    mm thick end diaphragms to support 200 mm thick cast-in-site

    RCC deck cantilevering by 1.10 m from the centre line of external

    girders on either side. The pretensioned girders in the casting

    yard were specified to be prestressed after 24 hours when the

    strength of the concrete was 31 MPa, while the concrete grade

    for the beams were M 40.

    The precast girders were transported to site and placed on

    bearings followed by casting of the end diaphragm. The RCC

    deck slab was cast on formwork supported on girders and the

    same was removed after the sufficient attainment of strength in

    the deck. Thereafter, for the further loads such as weight of

    crash barrier, wearing coat, railings and live load, etc. the

    structure was assured to be a composite section. The effect ofdifferential shrinkage and temperature variation were also

    considered in the design.

    For finding all the longitudinal beam reaction components,

    the grillage analysis (Fig. 6) was used for superimposed dead

    loads and live loads, the structure was idealised as a grid of

    longitudinal and transverse members. The composite girders

    consisting of precast beam and deck slab was descretised to

    be placed along the axis of the girder while deck slab and deck

    slab with diaphragm was placed as transverse grillage members

    along the line of each of end diaphragm in the structure. The

    slab acts to transmit applied loads to beams by spanning

    transversely between them, apart from providing means forload sharing between longitudinal beams. Therefore transverse

    members having slab properties were provided to reflect the

    load sharing characteristics of the deck. For the application of

    the loads due to railing, the dummy longitudinal members with

    negligible section properties were provided at the edges and

    transverse grillage members were continued to connect them.

    The flaring properties of precast beams at the end for the

    distance of 2.65 m from 200 mm to 300 mm thick has been

    accounted for in the descretisation.

    The grillage analysis results especially for superimposed

    HEGGADE, MEHTA & PRAKASHON

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    9/16

    151

    dead loads and live loads were compared with Classical Little

    and Morrice method for verification, which were found to be inagreement to a large extent as illustrated in Table 1.

    TABLE 1. GRILLAGE ANALYSIS VIA-A-VIS LITTLE & MORRICE

    METHOD

    The stresses in bottom and top fibres of the beam before

    and after the composite action were ensured to be within the

    permissible limits as specified in IRC:18 at various temporary

    and service stages as tabulated in Table 2.

    TABLE 2. SUMMARYOFSTRESSESATMIDSPAN

    In case of the pretensioned girders with straight tendons,

    the prestressing moments near the simply supported ends

    need to be reduced as the moments induced by self weight

    and external loads gradually diminishes towards the supports

    from midspan. The same is achieved by preventing the portion

    of the tendons from bonding, thereby preventing from

    stressing the concrete at the ends. Normally, the bondprevention is achieved by provision of tight-fitting split plastic

    tube or heavy paper or cloth tape. However, for the accurate

    placement of tubes after the pre-tensioning a 20 mm dia PVC

    tubes were used in Sutlej Bridge as bond prevention media at

    the ends (Fig. 7).

    The length of bond prevention has to be deduced after

    catering for transmission length required to develop full

    tension in the tendons.

    When the pretensioning tendon is stressed, the diameter

    of the tendon is reduced due to poisons effect and the original

    diameter is regained after the release of prestress. In fact thisproperty is responsible for bonding pretensioned wires to

    concrete. After the detensioning, the stress in the wire at the

    end is zero and maximum after certain length, which is called

    transmission length. The Hoyer was the first German

    Engineer who developed the theory of transmission length

    due to the formation of wedge shape in prestressing tendon

    where the stress gradually decreases from maximum to zero

    with the increase in diameter of tendon, which is popularly

    referred as Hoyers effect.

    The transmission length depends upon number of

    variables, the most important being the strength of the concrete

    at the time of transfer, the size of the tendon, friction betweenthe tendon and concrete and initial and effective stresses in

    steel. As per the guidelines of IS:1343, 30 times the diameter of

    the tendon for strands i.e. around 500 mm was considered as

    transmission length in the said bridge. It is interesting to note

    that the stress variation over transmission length being

    parabolic, 80 per cent of the maximum prestress is developed

    over half the transmission length, and as such half of the

    transmission length was projected beyond bearing supports

    for simply supported girders.

    7. PRE-TENSIONING

    The bridge of 23 spans consisted of 138 nos, 35.2 m long,68 tonne weighing, prestressed beams with the depth of 2.50

    m. Each beam consisted of 34 nos. of strands (tendons)

    conforming to class-2 of IS:14268 with UTS of 1900 N/mm2.

    Each strand of 15.2 mm dia was made up of 7 wires with 6 wires

    surrounding the centre wire configuration resulting in

    enhanced bond characteristics due to Hoyers effect, with net

    strand cross sectional area of 140 mm2.

    The key factors in the choice and capacity of

    pretensioning bed was the availability of time for precasting

    girders and the economical considerations. The cost benefit

    DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

    Fig. 6. Grillage idealisation for deck slab with girders

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    10/16

    152

    Fig. 7. Debonding arrangement for stands at the ends

    analysis for various capacities of long line pre tensioning bedwas carried out as per the Table 3. Since the expenditure on

    three beams casting was found to be economically optimum,

    saving almost 15 months, the bed for casting three beams was

    chosen, making perhaps the longest pretensioning bench in

    the country with the length of 122.5 m, for stressing 115 m long

    strands (Fig. 8).

    TABLE. 3. COSTBENEFITANALYSISOFPRETENSIONINGBENCH

    HEGGADE, MEHTA & PRAKASHON

    The largest long line prestressing bed had its own share ofproblems. Each strand was to be stressed to 21 tonnes,

    warranting the capacity of the pretensioning bench to (2x34) =

    714 tonnes. It is essential to design the pretensioning bed to

    additional 20 per cent capacity as the prestressing force on

    reaction abutment (Fig. 9) will increase due to long line bench

    effect after casting of concrete, due to shrinkage and

    temperature variation between the duration of casting of

    concrete and detensioning. Prior to detensioning in the casting

    yard, the strands can be stressed up to 0.80 UTS. Due to the

    shrinkage of concrete clubbed with reduction in temperature,

    shrinks the concrete along with the strands in the bonded lengththereby elongating and inducing further stress in the unbonded

    length. If the increase in stress in unbonded length before

    Fig. 8. Pre tensioning bench of 122.5 m, for stressing 15 m long strands

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    11/16

    153

    shuttering face, the reinforcement cages fabricated in three

    pieces of 11 m each were shifted to casting bed by hydro

    crane. The cages were suitably stiffened by diagonal bars

    during transportation, which were removed once placed in

    position in casting bed.

    HT strands were cut to 115 m length and stacked over

    raised platform along the line of casting bed. While opening

    the coil, HT strands were passed through water tank to

    remove protective coating. The cables were threaded manually

    inserting through 20 mm dia PVC pipes of required length

    meant for debonding. After fixing up the anchorages, the

    cables were prestressed from stressing end in predetermined

    sequence. The debonding pipes were positioned and sealed

    with epoxy and tapes as per the drawing after the stressed

    cables were anchored. The other face of the shuttering was

    then lifted up and connected to already erect face by 16 mm

    through bolts. The gaps were filled with foams for preventing

    leakage and one end of the shuttering was provided with 50

    mm wooden packing and thermo coal to facilitate easy removal

    of shuttering after concreting.

    The concrete produced by batching plant of capacity 30

    m3/hr as per the design mix (Table 4.) transported through a

    lead of 100 m by tractor trolley. As the concrete was to be

    placed at height of 3.5 m from supply level a mechanical mode

    was devised for placement. The device consisted of an

    automatic conveyor designed and fabricated (Fig. 10) at site

    in such way that it could move on a track line parallel to

    pretensioning bed, receive concrete from trolleys up to 0.50m3 at a time, carry the concrete through conveyor for 3.50 m

    height and deliver to tremie for placement through funnel. The

    device could be electrically operated by operator seated on

    it, and reduced the concreting cycle to 2 hours from manual

    concreting cycle of 5 hours. The concrete compaction was

    achieved by poker and shutter vibrators.

    TABLE 4. DESIGNMIXDETAILS

    The transfer of prestress was induced by cutting strand

    by acetylene torch in a pre-decided sequence after concrete

    achieved the strength of 31 MPa. The best cycle time achieved

    in the beam casting was 66 hours though on a average time

    DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

    detensioning is beyond UTS, the strands in some cases may

    even start snapping, as happened in Sutlej Bridge. The increase

    in the stress of the unbonded tendon is directly proportionate

    to the ratio of the length of the embedded strands to that of

    total strand length. This is also affected by curing time and is

    more severe when the ambient temperature during stripping is

    low.

    The key decisive factors in the choice of formwork for

    pretensioned girders were:

    (a) High resistance to damage due to rough handling.

    (b) The precise dimension of the panels to fit together to

    form a large unit with ease.

    (c) Cleaning, setting, adjusting and handling ease.

    (d) The ability of erecting one side independent of other.

    (e) The ability to withstand the form and other vibrations.

    (f) Rigid structural soffit form to secure and hold the side

    form without movement during concreting.

    (g) The minimum joints, which can be tightly sealed to

    avoid leakage and bleeding.

    The shuttering panels of 3 m length were erected using

    8-ton capacity hydro crane, which was supported on ground

    anchors by turnbuckles. After erection of one face of

    shuttering the alignments to the precision could be carried out

    by adjustments of turnbuckles. After the erection of one face

    of shuttering the alignment to the precision could be carried

    out by adjustment of turnbuckles. After the erection of one

    Fig. 9. Cross section of Bulkhead

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    12/16

    154 HEGGADE, MEHTA & PRAKASHON

    cycle was 72 hours with the individual activity break-up as

    shown in Table 5.

    TABLE 5. CYCLETIMEFORBEAMCASTING

    Despite the unforeseen impediments like non-availability

    of stacking facilities, repairs of shuttering panels, maintenance

    of bed alignment, and rain, etc. the casting of 138 nos. of

    beams were completed in 320 days.

    The pretensioning can be done either by stressing each

    tendon individually or all together at a time. As the stressing

    individually called for monostrand jack of 25 T capacity with

    a stroke 1000 mm, the individual stressing of strands wasresorted to.

    8. BEAM ERECTION

    The transportation and erection of beams were

    accomplished (Fig. 11) by 3 pairs of side shifting trolleys, a

    pair of motorised longitudinal trolleys and a pair of 35-toon

    capacity bed gantries. The side shifting trolleys were used

    to shift the beams from casting bed to stacking yard and from

    there to longitudinally motorised trolleys with the help of

    jacks. The longitudinal trolleys being designed at lower levels,

    the beams brought by side shifting trolleys were lowered to

    Fig. 10. Mechanical device for concrete placement

    longitudinal trolleys.

    To facilitate the movement of bed gantries and

    longitudinal trolleys, the track line is laid on wooden sleepers

    at 0.70 m c/c as per railway specification over well-prepared

    compacted embankments. The motorised trolleys were movedup to the span where beam was to be erected. The gantries

    were used at the location to lift, side shift and lowering of

    beam on pedestal as depicted in the Fig. 12 & 13. The lifting

    was done with the aid of 750 mm stroke hydraulic jacks and 16

    m long suspenders. The side shifting was done using the crab

    assembly and winches set on top of gantries. Prior to the

    lifting of the beams, the bearings were fixed at the soffit of

    beams with sleeves already embedded during concreting. The

    surface irregularities were dealt by application of 2 mm thick

    epoxy over the bearings. The lowered beams were rested at

    about 20 mm above the pedestal and the recess was grouted

    using non-shrink cement grout. Till the time the recess was

    grouted and end diaphragms were cast, the beams were placedon wooden sleepers and held by temporary bracings.

    On an average 5 hours cycle was comfortably achieved

    as shown in the Table 6. with the progress of 3 beams per day

    on a regular basis.

    TABLE 6. CYCLETIMEFORBEAMERECTION

    In the water spans, between A/R to P8 and P10 to A/L, the

    bed gantries and longitudinal trolleys were moved on railway

    track over specially constructed embankments with the

    provision of hume pipes at suitable intervals for passing the

    water from u/s to d/s. However, not to constrict the water in a

    too narrow passage, a temporary service bridge was made on

    both sides of the piers to move the bed gantries between P8

    and P10. This temporary bridge had single-line of piling on d/

    s side to cater for the movement of one leg of the gantry where

    as on upstream side two lines of piles were provided to move

    longitudinal trolleys and transport other materials.

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    13/16

    155

    The single line of piles on downstream side was collapsed

    during floods when the erection was in progress between P7 &

    A/L on Nakodar side. However, on Jagraon side the gantry

    was to be brought back to erect the beams on unfinished span

    A/R-P22. Among the alternatives considered, providing a

    trolley on top of the deck slab and supporting half of the gentry

    (Fig. 14) on it proved to be safe, economical and fastest solution.

    This method was adopted for shifting both the gantries across

    P8 & P10 in seven days time without any risk and just taking

    care by dropping plumbs at four locations on both sides of the

    gantry to check the evenness of the movement.

    Fig. 11. Casting Yard Layout for Sutlej

    Fig. 12. Showing the Erection scheme of Beam

    Fig. 13. Erection, side shifting & placement

    Fig. 14. Transportation of gantry on deck

    9. BEARINGS

    POT and POT-cum-PTFE bearings were used in the Sutlej

    Bridge. The typical bearing layout adopted in the bridge is

    shown in the Fig. 15. Earlier, normally for the simply supported

    bridges up to two lanes, fixed bearings (rocker) with a small

    play provision on one end and free bearings (roller) in the

    longitudinal direction having fixity in transverse direction has

    been successfully used for straight superstructure like Sutlej

    bridge. This arrangement for bridges with small deck width can

    DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    14/16

    156

    Fig. 15. Bearing configuration for Sutlej bridge

    be still successfully adopted as expansion/contraction taking

    place in pier caps and diaphragms connecting the superstructure

    are same. Nevertheless, to avoid the transverse restraint likely

    to be caused by thermal effects and wind force, a typical semi

    classical bearing arrangement as shown in the layout was

    adopted in Sutlej Bridge. As could be seen from the layout,

    there were two types of bearings in span and these two types

    of bearings might have different plate sizes and bolting

    locations, depending upon the forces, rotations and movements.In the precast construction like Sutlej Bridge, the grooves have

    to be left in the beams at the bolting locations and as such the

    manufacture of the bearings have to be approved prior to the

    precasting of beams. Normally, the approval of bearing

    manufacture is a very high lead-time item, which was well

    synchronised in this project. At each pier location for a span,

    two central bearings were fixed which were guided

    longitudinally on the other side, where as two extreme girders

    on either side were transversely guided while on other side left

    free. This semi classical layout helped in reducing the types of

    bearings to suit the precast construction.

    10. LOAD TESTING OF SUPERSTRUCTURE

    In line with the contract agreement, one of the spans was

    to be validated by load testing to the designed IRC loading,

    including impact factor. As shown in the Fig. 16 the IRC loadings

    were simulated for the maximum moments in the midspan

    including cycle track loadings. All the pedestals were

    progressively and simultaneously loaded by progressive

    increments of 25 per cent of the test load and the deflections

    were recorded at the midspan of all girders and and th

    span of the third girder from left side. The maximum load was

    sustained for 24 hours; during the period deflection readings

    were taken at one-hour interval for the sustained loading. Then

    the unloading was simultaneously carried out in 25 per cent

    decrements with the readings taken during each decrement.

    The deflection readings of unloaded structure continued at

    one-hour interval for further 48 hours.

    For each stage of loading and unloading, the observations

    were made about the likely appearance of cracks, the linearity

    of the load deflection curves or any other abnormalities in the

    HEGGADE, MEHTA & PRAKASHON

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    15/16

    157DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

    Fig. 16. Load Testing of Super Structure

    load deflection behaviour. It was ensured that the bearings are

    functional by measurement of rotation.

    The deflection measurements were done by suspensionwire method at the required locations using dial gauges. In this

    method stools were embedded in firm ground and dial gauges

    of least count of 0.01mm were clamped to them. The spindles

    of the dial gauges were connected by a pair of adapters in

    plumb line with GI wire. To eliminate the effects of temperature,

    the deflection readings were taken at fixed timings for all the

    operation of loadings and unloading.

    The maximum observed deflection for G3 girder at midspan

    was 5.35 mm vis--vis maximum theoretical deflection of 7.3

    mm, with the percentage recovery of 94.95, calculated as per

    IRC: SP-51.

    11. SUMMARY AND CONCLUSION

    Precast pretensioning technology up to the span of 50 m

    for river bridge decks can be economically exploited due to its

    material efficiency. The following design and construction

    aspects deserve special mention in the context of Sutlej Bridge.

    1. Design aspect

    (a) Separate guidelines applicable to pretensioned

    concrete in IRC:18; Universally, there are no separate

    codes for post tensioning and pretensioning as the

    majority of the aspects of prestressing are applicable

    to both pretensioned and post tensioned concrete.

    However, there is an urgent need to modify the IRC:

    18 which is meant only for post tensioned concrete

    bridges, to be applicable to both types of prestressing

    by giving separate design parameters, such as time

    dependent loss criteria, transmission length for

    pretensioning, permissible stresses, etc. wherever

    relevant and applicable.

    (b) Lateral stability for long span prestressed, precast

    beams; the guidelines for ensuring the lateral stability

    given in the codes are based on steel and RCC beams.

    Apart from span to depth and depth to top flange

    width ratios, the three independent factor of safeties

    i.e. (i) the factor of safety with respect to rotation

    against tidal instability for the nearly perfect beams,

    (ii) the factor of safety with respect to rotation withcasting imperfection (iii) the factor of safety vis--vis

    the maximum rotation permissible has to be

    established, with due recognition of prestressing

    effects.

    (c) Long line bench effect for pretensioning and Hoyers

    effect for transmission length;

    (d) Well cap at the level of LWL/GL to facilitate quality

    construction; Providing well cap below the ground

    level by 3 to 5 m will only enhance construction

    difficulties and does not serve any aspect of good

    engineering practice.

  • 8/6/2019 Design and Construction of Pre-Tensioned Sutlej Bridge in Punjab

    16/16

    158HEGGADE, MEHTA & PRAKASHON

    DESIGNAND CONSTRUCTIONOF PRE-TENSIONED SUTLEJ BRIDGEIN PUNJAB

    2. Construction aspect

    (a) Provision of track-line for gantries as proper

    embankment in the river bed;

    (b) Provision of temporary Service Bridge across the river;

    (c) Mechanisation of concreting for pretensioned beam.

    (d) Use of large panel formwork for piers and beams;

    (e) Bearing configuration, fixing of bearings and

    stabilisation of beams after the erection till the casting

    of diaphragms and deck slab;

    Many of the above design and construction aspects

    warrant in depth knowledge and meticulous micro planning to

    suit the adoption of particular type of technology.

    3. Proposal for codal guidelines for pretensioning

    On the basis of designing and executing long span

    pretensioned bridge spans, the authors propose the following:

    (a) The minimum dimensions of the cross section shall

    be

    (i) Thickness of top flange: 100 mm

    (ii) Thickness of bottom flange: 150 mm

    (iii) Thickness of web: 150 mm

    (b) The span to depth and depth to width ratios for

    optimum beam cross section from lateral stability

    considerations shall satisfy following Factor Of

    Safeties

    (i) FOS with out casting imperfections > 2

    (ii) FOS with initial imperfections > 1.5

    (iii) FOS with Actual angle of tilt > 1.1

    (c) Provided adequate un-tensioned reinforcements are

    designed for pre cast girder, the tension shall be

    permitted at the top fibre of the girder which may be

    restricted to 0.36(Fck)0.5.

    (d) The losses due to seating and friction are not

    applicable to pre tensioning. The elastic shortening

    loss shall be considered for a condition that all strands

    are stressed at the same time and pre stress transfer to

    concrete is simultaneous. In case of pre tensioned

    girders relaxation losses start as soon as pretensioning

    is carried out, but the effect of which is transferred to

    concrete at the time of pre stress transfer due to which

    relaxation losses calculated as per IRC:18 shall be

    divided by 2 for assessment of actually available pre

    stressing force at transfer. It is not necessary to

    consider 20 per cent additional time dependent losses

    for pre-tensioned girders.

    (e) Transmission length due to Hoyers effect shall be

    considered to be 30 times the diameter of tendon.(f) Pre tensioning bench for long line casting shall be

    designed for 20 per cent additional capacity to

    overcome Long Line Bench Effect.

    ACKNOWLEDGEMENTS

    The authors would like to place on record the sincere thanks

    to honourable Managing Director, Joint Managing Director,

    Chief Engineer and his colleagues of Punjab Infrastructure

    Development Board (PIDB) without whose cooperation,

    guidance and encouragement, the successful completion of

    this bridge would not have been possible. The authors would

    also like to thank all the engineers at H.O. and site of GammonIndia Limited for their monumental efforts to construct such a

    large bridge within a very short period.