DELEGATED POWERS REPORT NO. 1329 SUBJECT: London Borough of Barnet – Local Development Scheme 2011 Control sheet All of the following actions MUST be completed at each stage of the process and the signed and dated report MUST be passed to the Governance Service for publishing All reports Name of BGO Andrew Charlwood 1. Governance Service receive draft report Date 12/05/2011 Name of BGO Andrew Charlwood 2. Governance Service cleared draft report as being constitutionally appropriate Date 12/05/2011 Name of Fin. officer John Hooton 3. Finance clearance obtained (report author to complete) Date 18/05/2011 Name of Res. officer John Hooton 4. Staff and other resources issues clearance obtained (report author to complete) Date 18/05/2011 Name of TU rep. N/A 5. Trade Union response received (Staffing issues only) Date Name of Legal officer Chilime Hayes 6. Legal clearance obtained from (report author to complete) Date 12/05/2011 Name of P&P officer Andrew Nathan 7. Policy & Partnerships clearance obtained (report author to complete) Date 03/05/2011 Name of officer Andrew Nathan 8. Equalities & Diversity clearance obtained (report author to complete) Date 11/05/2011 Name Stewart Murray 9. The above process has been checked and verified by Director, Head of Service or Deputy (report author to complete) Date 19/05/2011 Name of BGO Andrew Charlwood 10. Signed & dated report, scanned or hard copy received by Governance Service for publishing Date 01/06/2011 Name of BGO Andrew Charlwood 11. Report published by Governance Service to website Date 07/06/2011 Name of BGO Andrew Charlwood 12. Head of Service informed report is published and can be implemented. Date 07/06/2011 13. Expiry of call-in period Date Name of DSO Date 14. Report circulated for call-in purposes to Business Management OSC members & copied to Cabinet & Head of Service Date

Upload: others

Post on 04-Dec-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

DELEGATED POWERS REPORT NO. 1329

SUBJECT: London Borough of Barnet – Local Development Scheme 2011

Control sheet

All of the following actions MUST be completed at each stage of the process and the signed and dated report MUST be passed to the Governance Service for publishing All reports

Name of BGO Andrew Charlwood 1. Governance Service receive draft report

Date 12/05/2011

Name of BGO Andrew Charlwood 2. Governance Service cleared draft report as being constitutionally appropriate

Date 12/05/2011

Name of Fin. officer John Hooton 3. Finance clearance obtained (report author to complete)

Date 18/05/2011

Name of Res. officer John Hooton 4. Staff and other resources issues clearance obtained (report author to complete)

Date 18/05/2011

Name of TU rep. N/A 5. Trade Union response received (Staffing issues only) Date

Name of Legal officer Chilime Hayes 6. Legal clearance obtained from (report author to complete)

Date 12/05/2011

Name of P&P officer Andrew Nathan 7. Policy & Partnerships clearance obtained (report author to complete)

Date 03/05/2011

Name of officer Andrew Nathan 8. Equalities & Diversity clearance obtained (report author to complete)

Date 11/05/2011

Name Stewart Murray 9. The above process has been checked and verified by Director, Head of Service or Deputy (report author to complete) Date 19/05/2011

Name of BGO Andrew Charlwood 10. Signed & dated report, scanned or hard copy received by Governance Service for publishing

Date 01/06/2011

Name of BGO Andrew Charlwood 11. Report published by Governance Service to website

Date 07/06/2011

Name of BGO Andrew Charlwood 12. Head of Service informed report is published and can be implemented. Date 07/06/2011

13. Expiry of call-in period Date

Name of DSO

Date

14. Report circulated for call-in purposes to Business Management OSC members & copied to Cabinet & Head of Service

Date

Page 2: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

ACTION TAKEN BY CABINET MEMBER UNDER DELEGATED POWERS (EXECUTIVE FUNCTION)

Subject London Borough of Barnet

Local Development Scheme 2011

Cabinet Member Cabinet Member for Housing, Planning and Regeneration

Date of Decision 27 May 2011

Date Decision Comes Into Effect

27 May 2011

Summary The Local Development Scheme (LDS) is the formal project plan for Barnet’s Local Development Framework (LDF). Cabinet approved the document on 6 September 2010. Following the introduction of the Localism Bill, the LDS has been amended and this report highlights changes made to the document prior to its submission to the Secretary of State and the Mayor of London.

Officer Contributors Assistant Director - Strategic Planning and Regeneration

Status (public or exempt) Public

Wards affected All

Enclosures Local Development Scheme

Reason for Exemption from Call-in (if appropriate)

N/A

Contact for further information: Rita Brar – Principal Policy Planner, 020-8359-4177

Serial No. 1329

Page 3: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

1. RELEVANT PREVIOUS DECISIONS

1.1 The draft of the third Local Development Scheme (LDS) was approved by Cabinet on 6 September 2010. The Cabinet Member for Housing, Planning and Regeneration was delegated (Decision Item 8) to approve the document prior to its submission to the Mayor of London and Secretary of State.

1.2 Cabinet 22 April 2009 (Decision Item 6) approved a request to the Secretary of

State for Communities and Local Government to issue a direction saving 183 policies of the Unitary Development Plan (UDP).

1.3 Special Committee – Constitution Review 9 February 2011 (Decision Item 6)

approved changes to Part 3 of the Constitution with regard to Local Development Frameworks’.

1.4 Cabinet 29 March 2011 approved three separate LDF documents for their

Submission Stages - the Core Strategy (Decision Item 6), Development Management Policies (Decision Item 7) and North London Waste Plan (Decision Item 8).

1.5 Full Council 12 April 2011 (Agenda Item 5.1.1) formally approved all three LDF

documents in 1.4 above. 2. CORPORATE PRIORITIES AND POLICY CONSIDERATIONS

2.1 The LDS sets out a three-year ‘project plan’ for production of the Local Development Framework, which will replace the Unitary Development Plan. The Local Development Framework supports all three Corporate Plan priorities (2010-2013).

2.2 All three priorities in the Corporate Plan 2010 to 2013 and the One Barnet Plans are embedded within the LDF. Barnet’s corporate Plan key priorities include providing better services with less money. LDF documents address the need to make efficient use of our community assets by establishing the Community Infrastructure Levy charging schedule and by developing relevant Development Management Policies for its delivery. In sharing opportunities and sharing responsibilities the LDF addresses the need to provide increased housing choice in mixed communities and improved delivery of clinical care. In enabling Barnet to continue to be a successful London Suburb the LDF addresses the need to protect and enhance Barnet’s natural, historic and suburban environment and foster an enterprising local economy and town centres..

2.3 The LDF documents are required to be in harmony with the Sustainable Community Strategy for Barnet 2010 – 2020 that also reflects the spatial dimensions of the Children and Young People's Plan, Older Adults Strategy, Housing Strategy, Health and Well-being Commissioning Framework and the Safer Communities Strategy. It also reflects the Three Strands Approach that sets out Barnet’s approach to planning, development and regeneration over the next 15 years.

Page 4: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

3. RISK MANAGEMENT ISSUES

3.1 Failure to replace the UDP (adopted in 2006) with an up-to-date development plan will hinder delivery of sustainable development and consolidated growth, proper planning of infrastructure and protection and enhancement of what makes Barnet distinctive as a place and successful London Suburb. As the UDP becomes less relevant and ultimately outdated in the absence of a LDF replacement the Council's ability to justify and defend planning application and related decisions at appeal will be weakened.

3.2 Ensuring that the Core Strategy as the centrepiece of the LDF is adopted in line with the LDS timeframe will provide more certainty for developers and utility providers. An adopted Core Strategy creates the planning framework for successfully implementing a One-Barnet approach helping the Council as well as our key partners to understand how we will shape the future of the borough. Failure to have the Core Strategy in place on time will hinder this approach and diminish the Council’s place shaping role.

3.3 Both the Core Strategy and the Development Management Policies Development Plan Documents (DPDs) are at Submission Stage and will be subject to an Examination in Public by an Independent Planning Inspector in Autumn 2011. The Inspector will assess the soundness of both documents on the basis of them being justifiable, effective and consistent with national policy and the adopted LDS. Failure to have an up to date LDS at time of submission of both documents will hinder their delivery and delay robust decision-making on planning applications in Barnet.

4. EQUALITIES AND DIVERSITY ISSUES

4.1 The related contents of the LDS programme are subject to an Equalities Impact Assessment (EqIA) including the LDF Core Strategy and the North London Waste Plan. These are evaluated and the implications of the plans and policies on diversity and equality are clearly set out. The EqIA will ensure that policies developed and implemented through the LDF process contribute to improving the lives of local communities. The EqIA ensures that equalities considerations are built into the policy development process.

4.2 In order to understand the needs, aspirations and views of all of Barnet’s diverse communities we will continue to ensure that consultation is as far reaching as possible. In line with the requirements of the LDF Statement of Community Involvement document, the Council will continue to seek and reach a wide audience of residents and community stakeholders by attending scheduled meetings and events of a range of community and voluntary organisations.

4.3 The views submitted to the Council as part of various consultations listed in the LDS

will be taken into account and responded to accordingly at each stage.

5. FINANCIAL, STAFFING, ICT AND PROPERTY IMPLICATIONS

5.1 The LDF is a corporate document requiring staff input from across the Council and from external strategic partners, including NHS Barnet, Middlesex University and Metropolitan Police. The cost of preparing the LDF is included in the Planning, Housing and Regeneration Directorate’s approved budget 2011/12.

Page 5: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

5.2 Running a joint consultation and Examination in Public for the Development Management Policies alongside the Core Strategy will ensure that production and consultation costs are minimised, the Inspector’s time is used efficiently and costs are reduced. The Inspector will consider the Core Strategy and Development Management Policies DPDs at the same EIP hearing. Opportunities to publicise two documents at existing community events will be maximised in order to reduce process, consultation and production costs.

6. LEGAL ISSUES

6.1 The Planning & Compulsory Purchase Act 2004 and the Town and Country Planning (Local Development) (England) Regulations 2004 provide guidance on the preparation and adoption of Local Development documents, of which the Core Strategy is the key document setting out the objectives and the policies. Upon adoption the major LDF documents becomes statutory Development Plan Documents that provides part of Barnet's legal planning policy framework.

6.2 The most significant legal issue concerns the necessity for the Council to carefully follow the procedures laid down for the preparation of Local Development Frameworks.

7. CONSTITUTIONAL POWERS

7.1 Council Constitution, Part 3, Responsibility for Functions, Section 3, Responsibility for Executive Functions

8. BACKGROUND INFORMATION

8.1 Following the introduction of the Localism Bill, a few changes have been made to the draft LDS approved by the Cabinet on 6 September 2010, prior to its Submission to the Secretary of State and Mayor of London.

8.2 In December 2010 the Coalition Government introduced the Localism Bill as part of

its objective to shift power back into the hands of individuals, communities and councils and give local people a real share in growth. The main features of the Bill are : introduction of new freedoms and flexibilities for local government introduction of new rights and powers for communities and individuals reform to make the planning system more democratic and more effective reform to ensure that decisions about housing are taken locally

8.3 The Localism Bill introduces Neighbourhood Development Plans (NDPs) known as Neighbourhood Plans, and for planning permission to be granted through Neighbourhood Development Orders (NDOs) and Community Right to Build Orders (CRBOs). The Government’s focus on localism and devolution sets a national context for our aim through One Barnet to provide local leadership and joined up services across the public sector

8.4 The LDS with amendments is enclosed as Appendix 1 to this report.

Minor changes to the written sections of the document on most pages, such as the removal of any references to the wording of Government Office for London (GOL), updating references to the London Plan, Corporate Plan,

Page 6: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

Sustainable Community Strategy, LDF Evidence Base list, staff/department’s new titles and other related basic information.

Alterations to the timetable for the production of various Local Development Framework documents including Development Management Policies and Site Allocations shown on pages 9 onwards. Because of the complexity of preparing these documents, Central Government has advised all local authorities to take a more cautious approach to scheduling their preparation. Some six months have been added to the project timetable for the preparation of the key Development Plan Documents (DPDs).

Additionally, the preparation of Supplementary Planning Documents (SPDs) covering Contributions to Training and Employment Initiatives and the revision of Sustainable Design and Construction have been delayed by approximately one year and will now be completed in 2011/12.

The revised LDS takes into account the timetable for the Community Infrastructure Levy (CIL).

8.5 The LDS will take effect four weeks after being submitted to the Mayor of

London and the Secretary of State, unless they issue a direction to make changes or request more time to consider the draft LDS.

9. LIST OF BACKGROUND PAPERS

9.1 London Borough of Barnet, Local Development Scheme (2007)

9.2 The Town and Country Planning (Development Plan) (England) Regulations 2004

9.3 Planning Policy Statement 12 – Local Spatial Planning (2008)

9.4 Any person wishing to inspect the background papers listed above should telephone Rita Brar on 020 8359 4177.

9.5 DECISION OF THE CABINET MEMBER OF HOUSING, PLANNING AND REGENERATION

I authorise the following action:

a) That the changes described above be made to the version of the LDS approved by Cabinet on 6 September 2010.

b) That it be submitted to the Mayor of London and the Secretary of State.

Signed Signed by Councillor Richard Cornelius

Cabinet Member Housing, Planning and Regeneration

Date 27 May 2011

Page 7: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

1 PREFACE

This version of the London Borough of Barnet’s Local Development Scheme (LDS) replaces the second version, which came into effect on 12 June 2007. We have revised the LDS to take into account changes in the Regulations for Development Plans published since 2008 and our own changes to the programme for production of Barnet’s Local Development Framework (which will be the eventual replacement for the existing Unitary Development Plan).

In summary, the main changes from the previous Local Development Scheme are:

The key milestones for preparing the Core Strategy have changed.

A new timetable has now been agreed for the North London Waste Plan.

The Site Development Policies Development Plan Document (DPD) has been deleted and replaced by two new DPDs – Site Allocations and Development Management Policies.

New SPDs on Residential Design Guidance and Green Infrastructure have been introduced and

will supplement policies in the Core Strategy and Development Management Policies DPDs.

SPDs on Affordable Housing, Planning Obligations and Sustainable Design and Construction will be revised and a new SPD on Contributions to Culture, Recreation and Open Spaces from Development will be produced.

S106 related Supplementary Planning Documents (SPDs) have been deleted as they covers issues that will be funded by the new Community Infrastructure Levy.

A timetable for the production of a charging schedule for the Community Infrastructure Levy has been introduced

The Statement of Community Involvement will be subject to revision.

Copies of the LDS are available at all local libraries in the borough, on the council’s website and can be requested by sending an email to [email protected] or by visiting the planning reception at:

Barnet House 2nd Floor 1255 High Road London N20 0EJ

Page 8: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

1 Introduction

1.1 The Planning and Compulsory Purchase Act 2004 reformed the development plan system, replacing local authorities’ Unitary Development Plans with a requirement to produce a Local Development Framework (LDF). The main elements of the new system are:

The adoption of a ‘spatial planning’ approach to bring together and integrate policies for the use of land with other policies and programmes.

The easier creation, updating and replacement of documents, so that the development plan is constantly up-to-date.

Ensuring a local authority’s development plan is the starting point in the consideration of planning applications for the development or use of land.

1.2 Part 2 of the Act requires the submission to central government by each local authority of a Local Development Scheme (LDS), setting out the three-year ‘project plan’ to be used for the preparation of the separate but interlinked documents that will make up the LDF ‘folder’. This version of the London Borough of Barnet’s LDS updates and supersedes the second, which came into effect in June 2007. The 2011 version focuses on the next three years. It describes Barnet’s overall strategic approach to preparing its LDF, and gives details of the timescales and resources that will be adopted for each of the higher level LDF documents known as Development Plan Documents (DPDs) that will provide our main future policy framework for making planning decisions. This version of the LDS will be binding on the council, although it may be revised in the future if required. Appendix 1 shows a graphical representation of Barnet’s LDF and Appendix 2 shows the duration of tasks against the progression of time in a Gantt Chart.

1.3 On May 13, 2009 the Secretary of State issued a direction to save 183 out of 234 policies in Barnet’s adopted Unitary Development Plan (2006). In her direction the Secretary of State highlighted that the exercise of extending saved policies is not an opportunity to delay DPD production. Policies have been extended in the expectation that they will be replaced promptly and by fewer policies in DPDs. The Secretary of State further highlighted that maximum use should be made of national and regional planning strategy particularly as the Mayor’s London Plan forms part of Barnet’s development plan.

1.4 The document clarifies where input from the council’s major partners will be required. Care has also been taken to ensure the LDS is deliverable – to balance the need for speed of development plan preparation with statutory requirements that DPD documents are justified, effective and consistent with national policy. Changes to this LDS are taking place irrespective of any changes being proposed by the new Coalition Government. In December 2010 the Coalition Government introduced the Localism Bill as part of its objective to shift power back into the hands of individuals, communities and councils and give local people a real share in growth. The main features of the Bill are:

1. introduction of new freedoms and flexibilities for local government

2. introduction of new rights and powers for communities and individuals

3. reform to make the planning system more democratic and more effective

4. reform to ensure that decisions about housing are taken locally

1.5 The Localism Bill introduces Neighbourhood Development Plans (NDPs) known as Neighbourhood Plans, and for planning permission to be granted through Neighbourhood Development Orders (NDOs) and Community Right to Build Orders (CRBOs). The Government’s focus on localism and devolution sets a national context for our aim through One Barnet to provide local leadership and joined up services across the public sector.

Page 9: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

1.6 Although not part of the LDF, if Neighbourhood Plans come forward in Barnet, we will highlight their programmed delivery in the Annual Monitoring Report and all future versions of the LDS.

1.7 This LDS will take effect four weeks after being submitted to the Mayor of London unless he

issue a direction to make changes or request more time to consider the draft LDS.

1.8 Appendix 3 sets out a schematic of the LDF and highlights the linkages and influencing factors between the various documents.

Page 10: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

2 Barnet’s Approach to the LDF

2.1 Barnet’s LDF is a ‘folder’ of documents, of which there are two main types:

Development Plan Documents (DPDs) – prepared according to a statutory process and subjected to an independent examination of ‘soundness’ by the Planning Inspectorate.

Supplementary Planning Documents (SPDs) – not subject to external examination process, but have to be approved by the council executive following significant public consultation.

2.2 In addition, there are other documents that are included within the LDF:

The Statement of Community Involvement – this sets out the minimum standards for community engagement in both LDF document production and the decision process on planning applications.

The Local Development Scheme – the project management tool for preparing the LDF.

The Annual Monitoring Report – this should review actual plan-making progress with targets and milestones set out in the Local Development Scheme.

The Adopted Proposals Map – this should identify proposal sites and areas where specific policies apply – the proposals map will be updated when the Site Allocations DPD is adopted.

2.3 The DPDs which Barnet is producing include the:

Core Strategy

Development Management Policies.

North London Waste Plan – produced jointly by the seven boroughs of the North London Waste Authority.

Site Allocations

Proposals Map

2.4 In addition, the council has adopted the

Mill Hill East Area Action Plan (adopted January 2009)

Colindale Area Action Plan (adopted March 2010)

Progress to Date

2.5 Significant progress has been made since the publication of the second LDS in 2007 :

The Statement of Community Involvement was adopted on 28 June 2007.

The Mill Hill East Area Action Plan was adopted on 27 January 2009.

On May 13, 2009 the Secretary of State issued a direction to save 183 out of 234 policies in Barnet’s adopted Unitary Development Plan (2006).

Page 11: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

The North London Waste Plan – final consultation commenced on the Submission Draft document on 11 May 2011 for six weeks.

The Core Strategy – final consultation commenced on the Pre- Submission Amendments document on 11 May 2011 for six weeks.

The Development Management – final consultation commenced on the Submission Draft document on 11 May 2011 for six weeks.

The Colindale Area Action Plan was adopted on 2 March 2010.

As a part of pre-production stage two rounds of Call for Sites were undertaken for Site Allocations Development Plan Document from February 2010 until May 2010.

2.6 Since the second LDS was produced significant progress has also been made on the production of Supplementary Planning Documents (SPDs):

The SPD on Sustainable Design and Construction was adopted on 28 June 2007.

SPDs on Contributions to Education and Libraries were adopted on 5 June 2008

The SPD on Contributions to Health Facilities was adopted on 30 July 2009.

An addendum to S106 SPDs was produced in order to respond to the economic downturn called Responding to the Recession – Bringing Flexibility to Section 106 Planning Obligations and was adopted on September 2009.

2.7 Overall, progress on the LDF has not kept pace with the timetable outlined in the 2007 LDS. Progress on the AAPs covering smaller, defined areas such as Colindale and Mill Hill East has not been matched by progress on more complex boroughwide DPDs such as the Core Strategy. These boroughwide documents demand a more extensive information base and a major focus of work since 2007 has been evidence gathering and the production of essential studies on open space, town centres, housing and suburban characterisation. Much of that evidence has now been completed in order to support the progress of the Core Strategy as the key document in the LDF.

2.8 In order to reduce the risks of the document becoming unsound and unmanageable it has been decided to delete the Site Development Policies DPD and create two new DPDs which focus separately on Site Allocations and Development Management Policies.

2.9 The North London Waste Plan (NLWP) is one of the largest DPDs in the country and its production involves seven local planning authorities. Each authority has its own governance procedures and timetable for approval of the emerging DPD. The programme for delivery of the NLWP therefore needs to factor in these different procedures.

Page 12: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

Priorities for 2011/12 and Beyond

2.10 Barnet’s overall approach for the three years covered by this third LDS is to focus resources on the production of the major boroughwide DPDs (Core Strategy, Development Management Policies and Site Allocations). The Core Strategy remains the highest priority for resources. Such a focus will provide an up- to-date and flexible policy framework to manage change within Barnet over the next three years.

2.11 The previous LDS set out a programme for the production of a suite of S106 contributions SPDs. Progress on this programme has slowed due to the impact of the recession, the focus of resources on key DPDs and the introduction in April 2010 of the power for local planning authorities to raise funds through the Community Infrastructure Levy (CIL).

2.12 Community Infrastructure Levy (CIL) is a standard charge which will be determined at a local level by individual local authorities and will contribute to the costs of infrastructure arising from development. The CIL definition of infrastructure encompasses physical, social and green infrastructure such as schools and parks. We have incorporated a timetable for the production of a CIL charging schedule including public consultation and examination by an independent planning inspector. Although not formally required as part of the LDS we consider that the CIL charging session merits inclusion partly because of its implications for the production of S106 SPDs.

2.13 The global recession had a significant impact on the viability of development in general, posing a risk to the achievement of growth targets. Barnet Council is considering ways in which it can continue to enable development to be brought forward during the hard times by providing flexibility in the s106 planning obligations process, whilst continuing to ensure the sustainability of schemes through delivery of supporting infrastructure and provision of affordable housing to address housing need.

2.14 With the introduction of CIL, it is it necessary to ensure that developers contribute towards the cost of meeting the service as well as infrastructure needs that arise as a result of their development activity. Service needs fall outside the scope of CIL and therefore the council will prioritise the production of a Contributions to Enterprise, Employment and Training SPD in 2010/11.

2.15 In 2007 we produced an innovative SPD on Sustainable Design and Construction which set out our requirements for environmental design and construction management. As national requirements and available technologies have changed, in particular the Code for Sustainable Homes, it is necessary to update and clarify requirements in the SPD. The SPD will therefore be reviewed and updated in 2011/12.

2.16 In 2008 we produced a Suburban Town Centres Strategy in order to create the right environment to enable and facilitate private sector investment and growth. Town centres1 were identified where more detailed planning frameworks will support the potential for future growth and manage anticipated change. The scope for the Town Centre Frameworks and the individual timelines for production for each of the centres is set out in Appendix 7

2.17 We expect that in 2012 the Local Development Framework will have replaced most of the ‘saved’ policies in the Unitary Development Plan with the exception of the suite of ‘saved’ policies that are specific to Brent Cross – Cricklewood (as listed in Appendix 6). In order to supplement policies in Barnet's LDF, we have set out programmes for the production of two new separate SPDs on Residential Design Guidance and Green Infrastructure. Changes to Barnet’s planning policy framework will guide revisions to SPDs on Planning Obligations and Affordable Housing in 2012. We will also at this stage revise the Statement of Community Involvement.

1 Chipping Barnet, Edgware, North Finchley, Finchley Church End, New Barnet and Whetstone

Page 13: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

2.18 The council’s policy-making work also encompasses preparing new or updating existing guidance documents – Design Guidance Notes and Conservation Area Character Appraisals that do not formally come within the LDF folder but play an important role in the borough’s planning framework. Details of the areas that will be subject to revised Character Appraisals and the order in which they will be produced are set out in Appendix 8.

3 Policy Considerations and Related Influences on the LDF

3.1 Our strategic approach is to focus on managing development, ensuring that we maintain and build on those qualities that make Barnet such a desirable place to live and work while also helping to create new, socially integrated communities. In order to support early delivery of housing on strategic brownfield sites we decided to prepare both the Colindale and Mill Hill East Area Action Plans in advance of the Core Strategy.

The Role of Existing Policies

3.2 The 183 'saved' policies in the Unitary Development Plan (2006) together with the Mill Hill East Area Action Plan (adopted January 2009), Colindale Area Action Plan (adopted March 2010) and the London Plan 2008 currently form the development plan for Barnet. These documents and national planning policy framework form the basis for planning decision making in Barnet.

Conformity

3.3 All LDF documents are required to be consistent with government planning policies. The council will establish a clear chain of ‘general conformity’ by seeking to ensure that:

DPDs are consistent with government policies and in conformity with the London Plan.

DPDs and SPDs are in conformity with the Core Strategy or Unitary Development Plan.

SPDs relate directly to policies adopted in DPDs or the Unitary Development Plan.

Linkages with Other Strategies

3.4 Other influencing factors on the LDF programme include :

Barnet's Sustainable Community Strategy which is an overarching long-term plan that sets out the overall strategic direction and long-term vision for Barnet as a place and provides the vehicle for considering and deciding how to address cross cutting issues such as maintaining the quality of life that makes Barnet an attractive place to live. It is a framework for all other partnership strategies.

Barnet's Corporate Plan sets out our priorities and a work programme for the year ahead. All three priorities in the Corporate Plan are embedded within the LDF and in particular the Core Strategy. The Corporate Plan supports the vision of the Sustainable Community Strategy and highlights the priority objective of progressing the LDF in order to help shape Barnet as a successful London suburb.

Barnet's Three Strands Approach identifies our spatial development priorities and the vision that underpins the LDF. The Three Strands are :

Protection of Green Belt, Metropolitan Open Land and other valued open space from inappropriate development

Enhancement and protection of Barnet's suburbs, town centres and historic areas

Page 14: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

Consolidated Growth that is sustainable so as to achieve successful regeneration and high quality development.

Sustainability Appraisal and Equalities Impact Assessment

3.5 We are required to carry out a sustainability appraisal of each DPD in Barnet's LDF. Sustainability Appraisal (SA) is an analysis of economic, environmental and social objectives as reflected in a given policy. The SA helps us to identify and minimise any potential harmful impacts that a LDF document may have. Local authorities are also required to undertake an ‘Appropriate Assessment’ of plans that are likely to have a significant effect on designated European habitat sites with the assessment feeding into the Sustainability Appraisal.

3.6 We are also required to undertake an Equalities Impact Assessment (EIA) of LDF documents in order to highlight the likely impact on identified key equalities groups who are considered to be at particular risk of discrimination and inequality of opportunity.

4 Programme Management

Resources

4.1 The core team preparing the LDF is the Planning Policy Team which forms part of the Planning, Housing and Regeneration Directorate. In total, the Policy Team comprises 5.5 (full-time equivalent) planners. Other staff from within the Planning and Housing Strategy Service are also involved in LDF production – in particular the Area Action Plans for Colindale and Mill Hill East which were led by the Major Developments Team and the preparation of s106 and design and infrastructure related SPDs.

4.2 Significant involvement in LDF production will also be required from the Development Management Service as well as other departments and services including Environment and Operations, Children's and Adult Services in order to ensure linkages to the wider corporate agenda.

Establishing an Evidence Base

4.3 LDF documents need to provide a reasoned justification for any proposals put forward. In scrutinising any given DPD, a Planning Inspector will assess that the supporting evidence is proportionate and appropriate to the issues and policies within the document. It is important that the LDF is based on an understanding of the characteristics that make Barnet what it is, and a knowledge of how it is likely to change. We have been collecting information from a variety of sources to help us identify the key issues and opportunities for Barnet's future.

4.4 Barnet's published evidence base for the Core Strategy includes, but is not limited to, the following:

Page 15: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Demographic information including Census data and GLA projections

the Sustainability Appraisal

Barnet’s Affordable Housing Viability Assessment

Barnet’s Annual Monitoring Reports

Barnet's Characterisation Study

Barnet Community Buildings Needs Assessment

Barnet Employment Land Review

Barnet Heat Map

Barnet’s Housing Needs Study 2006

Barnet's Infrastructure Delivery Plan

Barnet Open Spaces, Sport and Recreational Facilities Needs Assessment

Barnet Playing Pitch Assessment

Barnet’s Tall Buildings Study

Barnet Town Centres Floorspace Needs Assessment and 2010 Update

Barnet Transport Assessment

BRE Housing Stock Model Update for Barnet 2009

Crime, Disorder and Substance Misuse Strategic Assessment

Joint Strategic Needs Assessment for Health and Social Care

London Biodiversity Action Plan

London Strategic Housing Land Availability Assessment

London Town Centre Health Check Analysis Report

London Regional Landscape Framework

North London Strategic Housing Market Assessment

North London Strategic Flood Risk Assessment

Production Timetable 4.4 The Town & Country Planning (Local Development) (England) Regulations 2004 and the

Town & Country Planning (Local Development) (England) (Amended) Regulations 2008 set out the preparation procedures which local authorities must follow when preparing LDF documents.

4.5 The LDS has been prepared with a consideration to:

Ensure the most efficient use of the council’s and key partner’s resources.

Maintain the realism of the overall programme so that milestones can be delivered.

Explore co-production and at a minimum ensure coordination with the preparation of other council strategies.

Maximise the involvement of external stakeholders in preparing LDF documents.

4.6 The Core Strategy is the key LDF document which sets out the overall vision and spatial strategy for Barnet. As all other elements of Barnet's LDF are required to be in conformity with the Core Strategy, it is a priority that it is adopted as soon as is practicable.

4.7 In order to reduce the risks of the document becoming unsound and unmanageable we have decided to delete the Site Development Policies DPD and create two new DPDs which focus

Page 16: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

separately on Site Allocations and Development Management Policies. This will provide greater flexibility for future revisions. In order to ensure meaningful engagement with these documents, we will set out our preferred approach as the basis for public consultation at the Regulation 25 stage. This will be followed by another period of public consultation at the Regulation 27 to 30 stages known as publication.

4.8 Barnet is working jointly with other members of the North London Waste Authority to produce the North London Waste Plan. The timetable for this and other documents is set out in Appendix 4.

Risk Assessment

4.9 This LDS identifies a range of LDF documents which by statute will have to be prepared. Failure to undertake this work or to undertake it such that the outputs are not fit for purpose, would expose the council to both legal and financial risk. Appendix 5 sets out the council’s risk assessment associated to the production of the LDS.

Decision Making and Governance

4.10 All the higher level LDF documents will be considered initially by the cross-party LDF Member Steering Group which will oversee the preparation of policies and guide officers.2

For the most important LDF documents – DPDs – the Cabinet will give further oversight by approving the document at all stages prior to consultation and recommending to the full Council for the adoption of the DPD.

For the second rank of LDF documents – SPDs – Cabinet approval will be required in order for the document to be adopted and become official council policy.

For Community Infrastructure Levy (CIL) - the Cabinet Resources Committee will give further oversight by approving the document prior to consultation and adoption with a recommendation to the full Council for the adoption of the document.

4.11 The LDF Member Steering Group comprises the Cabinet Member for Housing, Planning and Regeneration, the Cabinet Member for Environment, the Council’s design and heritage champion plus a lead member from each minority party. The Cabinet Member for Housing, Planning and Regeneration as chairman of the Steering Group is entitled to invite other Members of the Council to participate in the efficient working of the Group.

4.12 The LDF Member Steering Group will be supported by a LDF Strategic Steering Group (composed of senior council officers including the Deputy Chief Executive and Director of Planning, Housing and Regeneration.

4.13 All LDF documents will accord with strategies and programmes which are the product of partnership working with members of Barnet's Local Strategic Partnership – the One Barnet Partnership Board as of March 2011 (Barnet College, CommUNITY Barnet, Metropolitan Police, Middlesex University and NHS Barnet).

2 Separate organisational arrangements will oversee decision making on the North London Waste Plan DPD.

Page 17: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

5 Monitoring and Review of Development Plan Policies

5.1 One of the main objectives of the new folder type system of development plans is to respond quickly to changing circumstances. To enable local authority policy making to be flexible, the impact of planning policies ‘on the ground’ must be monitored.

5.2 In common with all other local authorities, Barnet prepares an Annual Monitoring Report (AMR) for each financial year. The purpose of the AMR is twofold. It monitors the progress on LDF document production and whether the milestones set out in the LDS are being achieved. In cases where there is slippage, it is the purpose of the AMR to explain the reasons for the delay. Secondly the AMR monitors the effectiveness of planning policies and performance on meeting targets such as the number of new homes completed.

5.3 The government encourages plan-making to be continuous (with the council regularly preparing and reviewing its various LDF documents), which means the LDS itself should be regularly reviewed. It is Barnet’s intention that this LDS should prevail for the medium-term, and significant efforts have been made to ensure that it is robust and will have a long ‘shelf life’, but the council will amend it if it considers it necessary in light of:

The actual progress in preparing LDF documents and completing the various associated projects, compared with the targets and milestones in this LDS (this is a compulsory element of the Annual Monitoring Report).

The actual impact of saved planning policies contained in the Unitary Development Plan and in the key LDF documents as they emerge and are adopted.

Any changing requirements of national and regional policy objectives and targets.

5.4 It is in the light of such ‘stock taking’ that Barnet may decide to update its LDS, although any revisions to it will have to be submitted to the Mayor of London for approval.

Page 18: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Review of S106 Affordable

Housing SPD

Review of Sustainable Design and

Construction SPD

Green Infrastructure

SPD

Review of Planning

Obligations SPD

Residential Design

Guidance SPD

North London Waste Plan

DPD

Colindale Area Action Plan

DPD

Site Allocations

DPD Development Management Policies DPD

Statement of Community Involvement

Annual Monitoring

Report

Mill Hill East Area Action

Plan DPD

Core Strategy DPD

Local Development

Scheme

Sustainable Community Strategy

Council’s Corporate Plan

Three Strands Approach

Contributions to Enterprise,

Employment and Training SPD

Proposals Map DPD

Community Infrastructure

Levy Document

Appendix 1 – Barnet’s Local Development Framework Structure

Page 19: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Appendix 2 – The LDF Preparation Timetable

Jan 2010 to Dec 2010 Jan 2011 to Dec 2011 Jan 2012 to Dec 2012

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

DPDs

Core Strategy

Development Management Policies

North London Waste Plan

Site Allocations

Proposals Map Proposals Map

SPDs - Design

Sustainable Design and Construction - Revision

Green Infrastructure

Residential Design Guidance

SPDs - S106 Contributions Contributions to Enterprise, Employment and Training

Review of Planning Obligations

Review of Affordable Housing

Other LDF Documents Community Infrastructure Levy-Charging Schedule

Statement of Community Involvement

KEY:

Document Production Consultation on Preferred Approach Publication / Pre-Submission Consultation Submission

Examination Stage Independent Examination Adoption of Document SPD/SCI/CIL Consultation Pre-Submission Amendments Consultation

Page 20: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Appendix 3 – The LDF Documents and Their Inter-relationships

Evidence Base, mainly incl.: Characterisation Study Employment Land Review Town Centres Floorspace Open Spaces, Sport & Recreation Housing Market Assessment Flood Risk Assessment And others as listed in section 4.4

Other Strategies: Corporate Plan Three Strands Approach Sustainable Community Strategy London Plan Local Transport Implementation

Plan Neighbouring boroughs’ LDFs

Supporting Documents: Sustainability

Appraisals Appropriate

Assessment Equalities Impact

Assessment

Pre-production Stage: Preparation of the LDF evidence

base and writing of background papers

Evidence should inform all stages of LDF preparation. These reports will feed into the Issues/Preferred Options that are formally consulted upon.

Additional Documents outside the LDF: Community Infrastructure Levy Neighbourhood Plans

Setting the Context: The LDS and the Statement of

Community Involvement set the background for the preparation of the LDF documents

There will be a continuous process of community engagement

Defining the Development Plan Framework: The Core Strategy defines the

overall strategic approach to planning in Barnet

All other LDF documents have to align with it

Statement of Community Involvement

Explains how, what, when and where residents will be involved in the

preparation of the LDF

Local Development Scheme The 3 year project plan for LDF

preparation It is submitted to the Mayor of

London

Topic Based Guidance (SPDs): Planning Obligations. Affordable Housing.

Enterprise,Empl & Training Sustainable Design and Construction Green Infrastructure Residential Design Guidance

Area Based Guidance: Planning and Development

briefs

Development Management Guidance: Design Guidance Notes Conservation Area Character

Appraisals

Proposals Map Illustrates all the policies and proposals in the LDF – updated every time a DPD changes

Core Strategy This sets the LDF’s aims and

objectives, and lays out the core policies that will govern land use

and spatial planning in Barnet

Su

stai

nab

ility

Ap

pra

isal

s

Co

nti

nu

ou

s M

on

ito

rin

g in

An

nu

al M

on

ito

rin

g R

epo

rt

North London Waste Plan DPD Identify sites and

policy framework for waste management facilities Area Action Plans:

Focusing on the implementation of LDF policies in key areas of Barnet where significant growth and regeneration are expected

Mill Hill East and Colindale

Development Management Policies DPD and Site Allocations DPD : Criteria based policies for assessing

planning proposals Identify sites and proposals for

development

Page 21: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Appendix 4 – Barnet’s Local Development Documents Table A4.1: Core Strategy DPD

Title Core Strategy DPD Purpose To provide the long-term vision for Barnet, reflect the direction and

spatial aspirations of Barnet’s Sustainable Community Strategy To reflect the Three Strands Approach in shaping the kind of place

that Barnet will be in the future, balancing the needs of residents, businesses and future generations

To provide the strategic objectives for the future development of the borough, and in turn the monitoring and implementation framework.

All other LDF documents will have to conform to the Core Strategy once it has been adopted.

Project Manager Planning Policy Manager Linkage to the UDP Saved Polices

The Core Strategy will replace Part 1 and those parts of Part 2 of the Unitary Development Plan which lay out the current strategic vision and monitoring/implementation frameworks.

The Core Strategy will provide a strategic link with the ‘saved’ suite of policies on Brent Cross – Cricklewood, C1-11, (as listed in Appendix 6).

Chain of Conformity In accordance with national planning policy guidance/statements In general conformity with the London Plan

Production Timescales

Consult statutory bodies on scope of Sustainability Appraisal – June 2008

Consultation on Direction of Travel (Preferred Stage) – Reg 25 stage – November 2009

Consultation on Publication (Submission) – Regs 27 to 29 – October 2010

Consultation on Pre-Submission Amendments – Regs 27 to 29 – May 2011

Submission to Secretary of State – Reg 30 – July 2011

Examination by the Planning Inspectorate – Reg 34 – September 2011

Adoption – Reg 36 – December 2011 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Chief Executive’s Service LDF Strategic Steering Group LDF Member Steering Group Officers nominated by other Directorates

Time horizon of document

15 years from adoption.

Page 22: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Table A4.2: Development Management Policies DPD

Title Development Management Policies DPD Purpose A set of criteria-based policies in accordance with the Core

Strategy, against which planning applications for the development and use of land and buildings will be considered.

The policy focus will be on the protection of the natural, visual and residential environment, design, highway and transport issues, and protecting the vitality and viability of town centres.

Project Manager Planning Policy Manager Linkage to the UDP Saved Polices

Will be based upon and develop/review the range of saved policies in Part 2 of the Unitary Development Plan

Chain of Conformity In accordance with national planning policy guidance/statements In general conformity with the London Plan

In conformity with Barnet’s Core Strategy Production Timescales

Consult statutory bodies on scope of SA – June 2008

Consultation on Preferred Approach – Reg 25 stage – October 2010

Consultation on Publication (Submission) – Regs 27 to 29 – May 2011

Submission to Secretary of State – Reg 30 – July 2011

Examination by the Planning Inspectorate – Reg 34 – September 2011

Adoption – Reg 36 – December 2011 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Chief Executive’s Service

Ward Members

LDF Strategic Steering Group LDF Member Steering Group Officers nominated by other Directorates

Time horizon of document

10 years

Table A4.3: Site Allocations DPD

Title Site Allocations DPD Purpose To identify sites and proposals for development in order to ensure

the vision, objectives and targets of the Core Strategy are met. Project Manager Planning Policy Manager Linkage to the UDP Saved Polices

Will take forward unimplemented sites in UDP Schedule of Proposals

Chain of Conformity In accordance with national planning policy guidance/statements In general conformity with the London Plan

In conformity with Barnet’s Core Strategy

Page 23: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Title Site Allocations DPD Production Timescales

Consult statutory bodies on scope of SA – June 2008

Consultation on Preferred Approach – Reg 25 stage – October 2011

Consultation on Publication (Submission) – Regs 27 to 29 – January 2012

Submission to Secretary of State – Reg 30 – May 2012

Examination by the Planning Inspectorate – Reg 34 – July 2012

Adoption – Reg 36 – October 2012 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Chief Executive’s Service

Ward Members LDF Strategic Steering Group LDF Member Steering Group Officers nominated by other Directorates

Time horizon of document

10 years

Table A4.4 : North London Waste Plan DPD

Title North London Waste Plan DPD Purpose To identify sites for development of waste management facilities

To provide a policy framework against which planning applications for waste management facilities can be considered.

Project Manager Principal Planner – Planning Policy Team Linkage to the UDP Saved Polices

UDP Policy GWaste replaced by Core Strategy Policy CS14 on Waste Disposal

Chain of Conformity In accordance with national planning policy guidance/statements In general conformity with the London Plan

In conformity with Barnet’s Core Strategy Production Timescales

Consult statutory bodies on scope of SA – July 2007

Consultation on Preferred Options – Reg 25 stage – October 2009

Consultation on Publication (Submission) – Regs 27 to 29 – May 2011

Submission to Secretary of State – Reg 30 – September 2011

Examination by the Planning Inspectorate – Reg 34 -December 2011

Adoption – Reg 36 – April 2012 Resources – Project team members and/or key stakeholders

Mouchel – lead consultants

Members of the Planning Members Group, Heads of Planning Group and the Planning Officers’ Group of Barnet, Camden, Enfield, Hackney, Haringey, Islington and Waltham Forest

Strategic Planning and Regeneration

Officers in Environmental and Operations Time horizon of Document

10 years as a minimum but with a view to meet longer term needs

Page 24: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Table A4.5: Proposals Map

Title Proposals Map DPD Purpose To allocate sites for particular land use and development proposals

included in any adopted development plan document and set out the areas to which specific policies apply.

Project Manager Planning Policy Manager Linkage to the UDP Saved Polices and the Replacement Policies

The UDP Proposals Map provides the base map for necessary updates arising from the adoption of LDF documents such as the North London Waste Plan, Development Management Policies and Site Allocations DPDs.

Chain of Conformity In accordance with national planning policy guidance/statements In general conformity with the London Plan

In conformity with Barnet’s Core Strategy Production Timescales Production will be continuous Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Chief Executive’s Service

Officers nominated by the Assistant Director of Strategic Planning and Regeneration and other Directorates

Time horizon of document

The Proposals Map will be updated when new boroughwide DPDs are adopted

Table A4.6: Review of Statement of Community Involvement

Title Statement of Community Involvement Purpose To update SCI in accordance with new Regulations and to clearly

set out how the community will be involved in the preparation of Local Development Framework documents and development management decision making.

Project Manager Principal Planner in the Policy Team Chain of Conformity In accordance with Town and Country Planning Regulations

(England) 2004 and the Town & Country Planning (Local Development) (England) (Amended) Regulations 2008

Production Timescales Pre-production - February 2012

Production - Prepare draft document and undertake statutory public consultation – May 2012

Assessment of Representations and issue revised SCI – September 2012

Adoption – December 2012 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Chief Executive’s Service

Officers nominated by the Assistant Director of Strategic Planning and Regeneration and other Directorates

Page 25: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Table A4.7: Community Infrastructure Levy - Charging Schedule

Title Community Infrastructure Levy - Charging Schedule Purpose To set a charging schedule for CIL which will become the primary

means of funding local infrastructure Project Manager Planning Policy Manager Chain of Conformity In accordance with Community Infrastructure Levy Regulations

(2010) Provisional Production Timescales

Pre-production - Start preparation of the evidence base – October 2010

Production - Prepare draft CIL charging schedule and undertake statutory public consultation – July 2011

Second round of consultation - September 2011

Assessment of Representations and submit revised CIL charging schedule to Planning Inspectorate – December 2011

Examination in Public - January 2012

Adoption – April 2012 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Officers nominated by other Directorates

Chief Executive’s Service

Table A4.8: Contributions to Enterprise, Employment and Training SPD

Title Contributions to Enterprise, Employment and Training SPD Purpose To ensure residents have the opportunities to access skills training

and new employment provision within the borough

To support new provision of affordable workspace and affordable shops.

Project Manager Principal Planner in the Policy Team Linkage to emerging policies in Barnet’s Local Development Framework

Supplements replacements for UDP policies on :

Policy IMP1 – Priorities for Planning Obligations replaced by CS15

Production Timescales

Pre-production - Start preparation of the evidence base – September 2011

Production - Prepare draft document and undertake statutory public consultation – February 2012

Assessment of Representations and issue revised SPD – May 2012

Adoption – June 2012 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Officers nominated by other Directorates

Table A4.9: Review of Planning Obligations SPD

Title Planning Obligations SPD Purpose To update Planning Obligations SPD adopted in January 2007 to

reflect new policy approach as set out in Barnet’s adopted Core

Page 26: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Strategy and Development Management Policies DPDs.

To reflect introduction of Community Infrastructure Levy and restrictions on use of Planning Obligations

Project Manager Principal Planner in the Policy Team Linkage to emerging policies in Barnet’s Local Development Framework

Supplements replacements for UDP policies:

Policy IMP 1 – Priorities for Planning Obligations replaced by CS15

Policy IMP 2 – Use of Planning Obligations replaced by CS15

Production Timescales

Pre-production - Start preparation of the evidence base – January 2012

Production - Prepare draft document and undertake statutory public consultation – April 2012

Assessment of Representations and issue revised SPD – July 2012

Adoption – August 2012 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Officers from the Resources Directorate

Officers nominated by the Assistant Director of Strategic Planning and Regeneration and other Directorates

Table A4.10: Review of Affordable Housing SPD

Title Affordable Housing SPD Purpose To update Affordable Housing SPD adopted in January 2007 to

reflect new policy approach as set out in Barnet’s adopted Core Strategy and Development Management Policies DPDs.

Project Manager Principal Planner in the Policy Team Linkage to emerging policies in Barnet’s Local Development Framework

Supplements replacements for UDP policies:

Policy H5 – Affordable Housing replaced by CS4

Policy H8 – Affordable Housing – Commuted Payments replaced by CS4 and DM10

Production Timescales

Pre-production - Start preparation of the evidence base – January 2012

Production - Prepare draft document and undertake statutory public consultation – April 2012

Assessment of Representations and issue revised SPD – July 2012

Adoption – August 2012 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Officers nominated by the Assistant Director of Strategic Planning and Regeneration and other Directorates

Officers from the Resources Directorate

Table A4.11: Review of Sustainable Design and Construction SPD

Title Sustainable Design and Construction SPD Purpose To update SPD to ensure that requirements reflect changes to

generic environmental standards and advances in technology and design.

Page 27: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Project Manager Principal Planner in the Policy Team Linkage to emerging policies in Barnet’s Local Development Framework

Supplements replacements for UDP policies on :

Policy GBEnv2 – Design replaced by CS1, 5 and DM01 and 02

Policy GSD – Sustainable Development replaced by CS1, 13 and DM04

Policy GBEnv4 – Special Area replaced by CS5, 7 and DM06, 15 and 16

Production Timescales Pre-production - Start preparation of the evidence base – January 2011

Production - Prepare draft document and undertake statutory public consultation – September 2011

Assessment of Representations and issue revised SPD – November 2011

Adoption – December 2011 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Officers nominated by the Assistant Director of Strategic Planning and Regeneration and other Directorates

Officers from the Building Control Service

Table A4.12: Residential Design Guidance SPD

Title Residential Design Guidance SPD Purpose To provide design guidelines for places with a consistent and

coherent architectural character

To provide design guidelines for infill development Project Manager Principal Planner in the Policy Team Linkage to emerging policies in Barnet’s Local Development Framework

Supplements emerging design framework in Development Management Policies DPD – Policy DM01

Production Timescales

Pre-production - Start preparation of the evidence base – January 2012

Production - Prepare draft document and undertake statutory public consultation – June 2012

Assessment of Representations and issue revised SPD – October 2012

Adoption – November 2013 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Officers nominated by the Assistant Director of Strategic Planning and Regeneration and other Directorates

Officers from the Resources Directorate

Page 28: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Table A4.13: Green Infrastructure SPD

Title Green Infrastructure SPD Purpose Green infrastructure is the network of green spaces, places and

features that thread through, surround urban areas and connect town to country

To provide guidance on landscaping, trees, biodiversity and sustainable urban drainage systems to reflect new policy approach as set out in Barnet’s adopted Core Strategy and Development Management Policies DPDs.

Project Manager Principal Planner in the Policy Team Linkage to emerging policies in Barnet’s Local Development Framework

Supplements emerging design framework in Development Management Policies DPD – Policy DM 16

Production Timescales

Pre-production - Start preparation of the evidence base – January 2012

Production - Prepare draft document and undertake statutory public consultation – June 2012

Assessment of Representations and issue revised SPD – October 2012

Adoption – November 2013 Resources – Project team members and/or key stakeholders

Strategic Planning and Regeneration

Development Management

Officers nominated by the Assistant Director of Strategic Planning and Regeneration and other Directorates

Page 29: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Appendix 5 – Local Development Scheme – Risk Assessment

Risk Probability Impact Avoidance Process Loss of personnel or key personnel diverted to other duties

Medium/High Delay in programme

The Assistant Director of Strategic Planning and Regeneration, Assistant Director of Development Management allocates experienced staff from other duties or appoints temporary staff.

Build ‘buffers’ into project plans. Underestimate of staff resources needed

Medium Delay in programme

Regular reviews of team work programme by Planning Policy (LDF) Manager and the Assistant Director of Strategic Planning and Regeneration

Programme delayed because of backlog at Planning Inspectorate

Medium Delay in Examination in

Public and therefore in programme

Monitor progress of DPD production so that estimate of when Examination in Public is needed is robust.

Maintain communication channels with the Mayor of London and the Planning Inspectorate.

Delay in political agreement or change in political priorities

Medium Delay in programme

Utilise delegated powers where they are available.

Regular progress briefing for councillors via the LDF Member Steering Group.

Failure to appoint consultants

Low/Medium Delay in programme

Early re-prioritisation of those areas where consultancy is needed.

Poor evidence as part of Infrastructure Delivery Plan

Medium DPD is found not fit for purpose

Target resources to cover evidence gaps particularly on transport infrastructure

Identify any secondary data sources. Delay in contract completion by consultants

Medium Delay in programme

Project Managers have specific responsibility for monitoring the performance of consultants.

Budget constraints

Medium Failure to appoint staff or

consultants or to carry out adequate

community engagement

LDF Strategic Steering Group to regularly review the overall programme and budgets specifically.

The Assistant Director of Strategic Planning and Regeneration to identify specific budget requirement for each part of the LDF’s preparation.

Major DPD faces legal challenge

Medium

DPD is found not fit for purpose

Ensure all statutory guidance and processes governing LDF preparation are followed and DPDs are ‘sound’.

Use of Planning Advisory Service self-assessment toolkit

Skills Gaps Medium/High Particularly with regard to

sustainability

Appoint specialist consultants. Training for existing staff in

sustainability appraisals / economic

Page 30: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

appraisals and economic viability

work

viability assessments if cost-effective.

Insufficient joined-up working from corporate interests and One Barnet Partnership members

Medium Identification by the Planning

Inspectorate of problems with the ‘soundness’ of a

given DPD

Use of LDF Strategic Steering Group to ensure effective corporate working

Regular updates on LDF to One Barnet Partnership Boards

Confusion over conformity with the London Plan

Medium / High

Identification by the Planning

Inspectorate of problems with the ‘soundness’ of a

given DPD

Regular meetings with the Mayor of London to address conformity issues with existing and emerging London Plan while it is subject to review.

Liaise with other London boroughs to ensure clear and consistent guidance is provided by the Mayor.

Page 31: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Appendix 6 – Suite of ‘Saved’ UDP Policies on Brent Cross – Cricklewood

Policy GCrick Cricklewood, Brent Cross and West Hendon Regeneration Area

Policy C1 Comprehensive Development Policy C1(A) West Hendon Policy C2 Urban Design – High Quality Policy C3 Urban Design – Amenity Policy C4 Sustainable Design Policy C5 West Hendon and Cricklewood Town Centres Policy C6 Brent Cross New Town Centre Policy C7 Transport Improvements Policy C8 Parking Standards Policy C9 Housing and Community Development Policy C10 Employment

Policy C11 Implementation

Page 32: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Appendix 7 – Barnet’s Policy Guidance and Documents Outside the LDF

Existing Supplementary Planning Guidance Cricklewood, Brent Cross and West Hendon Regeneration Area Development Framework

(December 2005) Programme for Town Centre Frameworks

Town Centres Status (at present) Indicative adoption date 1 New Barnet Adopted November 2010 2 Chipping Barnet Consultation draft tbc 3 Edgware Consultation draft Summer 2011 4 Finchley Church End Consultation draft Summer 2011 5 North Finchley tbc

Page 33: DELEGATED POWERS REPORT NO. 1329 SUBJECT: London …

LOCAL DEVELOPMENT SCHEME

May 2011

Appendix 8 – Design Guidance Notes and Conservation Area Character Appraisals

Design Guidance Notes

Design Guidance Note No. 1, Advertising and Signs (1993)

Design Guidance Note No. 2, The Selection and Siting of Satellite Antennae (1993)

Design Guidance Note No. 3, The Construction of Hard-standings and Vehicular Crossovers (2011)

Design Guidance Note No. 4, The Removal or Alteration of Chimney Stacks (1993)

Design Guidance Note No. 5, Extensions to Houses (2010) Design Guidance Note No. 6, The Replacement of Windows and Doors (1993)

Design Guidance Note No. 7, Residential Conversions (1994)

Design Guidance Note No. 8, Materials and Colour (1995)

Design Guidance Note No. 9, Walls, Fences and Gates (1994)

Design Guidance Note No. 10, Shopfronts (2011)

Design Guidance Note No. 11, Porches (1995)

Design Guidance Note No. 12, Designing to Reduce Crime (2000)

Conservation Area Character Appraisals

1. Character Appraisal, Monken Hadley (2006)

2. Character Appraisal, Watling Estate Conservation Area (2007)

3. Character Appraisal, Mill Hill Conservation Area (2008)

4. Character Appraisal, Totteridge Conservation Area (2008)

5. Character Appraisal, Golders Green Town Centre (1998), draft being prepared (2011)

6. Character Appraisal, Church End, Finchley – Draft being prepared (2011)

7. Character Appraisal, Church End, Hendon – No existing Character Appraisal

8. Character Appraisal, The Burroughs, Hendon – No existing Character Appraisal

9. Character Appraisal, Finchley Garden Village – No existing Character Appraisal

10. Character Appraisal, Hampstead Garden Suburb (2010)

11. Character Appraisal, College Farm – No existing Character Appraisal

12. Character Appraisal, The Railway Terraces, Cricklewood Conservation Area (1998)

13. Character Appraisal, Hampstead Village (Heath Passage) - No existing Character Appraisal

14. Character Appraisal, Bishop’s Avenue, Hampstead Garden Suburb Conservation Area (1999)

15. Character Appraisal, Glenhill Close (2002)

16. Character Appraisal, Wood Street Conservation Area (2007)

17. Character Appraisal, Moss Hall Crescent – No existing Character Appraisal