defense logistics agency standard operating procedure€¦ · defense logistics agency standard...
TRANSCRIPT
1
Defense Logistics Agency
STANDARD OPERATING
PROCEDURE
DLA SOP J72.001
Effective August 1, 2014
J7
SUBJECT: Contractor Common Access Card (CAC) Issuance and Accountability Process for
DLA Contracts
References:
(a) Defense Logistics Acquisition Directive (DLAD) 4105.01, updated February 12, 2014
(b) Federal Acquisition Regulation (FAR)
(c) DoDM 1000.13, Volume I, DoD Identification Cards: (ID) Card Life-Cycle, January 23,
2013
(d) DLA Instruction 1000.13: Common Access Card (CAC) Issuance Program and the
Trusted Associate Sponsorship System (TASS)
1. PURPOSE: In accordance with the authority cited in reference (a), this SOP assigns
responsibilities and provides procedures for the issuance and accountability of contractor
CACs when issued in support of a DLA contract.
2. APPLICABILITY: This SOP applies to all DLA Contracting Officers (COs), Contracting
Officer’s Representatives (CORs), to include Alternate Contracting Officer’s Representatives
(ACORs), and Trusted Agents (TAs). This SOP only covers the process for contractor
CACs. As part of the contractor on-boarding process, individuals may be required to submit
additional forms and follow other processes described elsewhere.
3. DEFINITIONS: See Glossary.
4. RESPONSIBILITIES: See Enclosure 1.
5. PROCEDURES: See Enclosure 2.
2
6. INFORMATION REQUIREMENTS:
a. For contracts where a COR has been designated, the Contracting Officer Representative
Tracking Tool (CORT Tool) is used to store and maintain the Contractor CAC Log and
Contractor CAC Turn-In Receipts throughout the life of the contract.
b. For contracts where a COR has not been designated, EProcurement Records Management
is used to store and maintain the Contractor CAC Log and Contractor CAC Turn-In Receipts
throughout the life of the contract. Note: Records Management may not yet be available for all
contracts. If Records Management is not available, the Contractor CAC Log and Contractor
Turn-In Receipts shall be kept as part of the official contract file.
7. INTERNAL CONTROLS:
a. The CAC Justification Form (Figure 1) documents the applicant’s need for a CAC and the
sponsor’s acceptance of the responsibilities assigned to them.
b. The electronic Contractor CAC Log (Figure 3) prepared and maintained by the COR (or
by the CO, as applicable) and monitored by the CO, tracks contractor CACs from issuance
through turn-in for disposal, and provides accountability of all contractor CACs issued under a
contract.
c. The Government-Issued Contractor CAC Turn-In Receipt (Figure 4) documents the chain
of custody, from the contractor to the COR to the nearest Real-Time Automated Personnel
Identification System (RAPIDS) office, for each contractor CAC issued under the contract.
d. Contractors are required to submit a monthly report of all employees who currently
possess a CAC. The reports are used to validate the Contractor CAC Log and to assist the CO in
determining whether CACs that are no longer needed have been properly turned-in.
e. When requested by the TA, CORs/COs will provide a digitally signed email to reverify a
contractor employee’s continuing need for a CAC. Revalidation is to occur every six months,
per references (c) and (d).
f. COR/COs will immediately notify the TA and installation security when a contractor
employee is unexpectedly terminated to ensure the immediate revocation of the CAC and
associated credentials.
8. RELEASEABILITY: RESTRICTED. This SOP is approved for restricted release. It is
available to users with CAC authorization on the eWorkplace DLA Audit Readiness Tool
Website at: https://eworkplace.dla.mil/sites/S18/Pages/SOP.aspx.
3
9. EFFECTIVE DATE: This SOP is effective on August 1, 2014, and remains in effect until it
is either superseded or cancelled. Thereafter, the SOP will be reviewed annually and either
certified as current or revised, whichever is applicable.
___________________________________
MATTHEW R. BEEBE
Director
DLA Acquisition
Enclosures
1. Responsibilities
2. Procedures
Attachments
A. Contractor Instructions
B. COR Designation Language
Figures
1. CAC Justification Form
2. DD Form 1172-2, Application for Identification Card/DEERS Enrollment
3. Contractor CAC Log
4. Government-Issued Contractor CAC Turn-In Receipt
5. Contractor CAC Process Flow
BEEBE.MATTHEW.RI
CHARD.1012725473
Digitally signed by
BEEBE.MATTHEW.RICHARD.1012725473
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
ou=DLA,
cn=BEEBE.MATTHEW.RICHARD.1012725473
Date: 2014.08.02 12:05:33 -04'00'
4
ENCLOSURE 1
RESPONSIBILITIES
1. DLA Acquisition (J7). J7 will:
a. Develop procedures for COs and CORs to follow regarding the management and
oversight of CACs issued to contractor employees working under DLA contracts.
This includes procedures related to the issuance, retrieval and revalidation of CACs,
as well as standard language to be included in contracts.
b. Coordinate with DLA Installation Support (DS) to ensure that J7 procedures and
guidance supports the DLA CAC Program.
c. Maintain and update this SOP, as required.
d. Coordinate with DS to ensure compliance through periodic spot checks and other
verification checks as determined by the TASS Service Point of Contact (SPOC).
2. DLA Installation Support (DS). DS will:
a. Inform J7 whenever there are changes to the DoD or DLA CAC Program that may
necessitate a change in J7 procedures.
b. In coordination with J7, ensure compliance with procedures through periodic spot
checks and other verification checks as determined by the DLA TASS SPOC.
c. Ensure that TAs understand their responsibilities and follow the procedures set forth
in this SOP and references (c) and (d).
3. DLA J-codes, Primary Level Field Activities (PLFAs) and other DLA Organizations.
Organizations will:
a. Ensure that the employee meets the requirements of paragraph 4(b) of reference (d)
for issuance of a CAC when submitting to the COR/CO and TA that a contractor
employee requires a CAC.
b. Ensure CORs fully understand their responsibilities for the management and
accountability of contractor CACs and follow the procedures of this SOP.
4. Contracting Officers (COs). CO’s will:
a. Follow this SOP and include a requirement in COR designation letters directing
CORs follow this SOP.
b. Pursue remedies against the contractor in accordance with the terms and conditions of
the contract, upon contractor non-compliance.
5
c. Revalidate a contractor employee’s continuing need for a CAC when requested by the
TA (for contracts in which no COR has been designated).
d. Participate in compliance reviews.
5. Contracting Officer’s Representatives (CORs). CORs will:
a. Follow this SOP.
b. Revalidate contractor employee’s continuing need for a CAC when requested by the
TA.
c. Participate in compliance reviews.
6. DLA TASS SPOC. The DLA TASS SPOC will:
a. Maintain a group email address for COR/COs to contact when questions arise about
TASS Site, TASM and TA assignment.
b. When necessary, assist COR/COs in identifying the appropriate DLA TASS Site for a
DLA contract.
7. Trusted Agent (TA). The TA will:
a. Follow the procedures of this SOP and perform the responsibilities in reference (d).
b. When notified by the COR/CO that a contractor employee no longer requires a CAC,
immediately revoke the contractor’s credentials in TASS.
c. Notify installation security when informed by the COR/CO that a contractor refuses
to return their CAC.
6
ENCLOSURE 2
PROCEDURES
OVERVIEW: Contractor employees performing work under a contract may, in full or in part,
require physical access to a Federally-controlled facility or installation and/or access to a
Federally-controlled information system. When soliciting the contract, the CO must determine
whether the contract performance will require “contractors to have routine physical access to a
Federally-controlled facility and/or routine access to a Federally-controlled information system”
(FAR 4.1303). In determining whether the contractor will require routine physical access, the
CO, working with the customer and COR, as applicable, must assess whether the contractor
employee(s) meet(s) the requirements for a CAC in accordance with paragraph 4(b) of DLAI
1000.13 related to logical and physical access (Note: If only physical access is required, a
contractor must require access to multiple DoD facilities or multiple non-DoD federally
controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or
more to necessitate issuance of a CAC. DLAI 1000.13 defines “recurring basis” as at least two
times per week and/or eight times per month for multiple facilities). If a contractor employee
does not meet the requirements for a CAC as stated in reference (d), the COR/CO will work with
the local installation security office for issuance of a local credential.
If the contract will require contractor employees to have either physical or logical (i.e. access to
information systems) access, the CO inserts FAR clause 52.204-9, Personal Identity Verification
of Contractor Personnel, and DLAD 52.204-9000, Contractor Personnel Security Requirements,
in the solicitation and subsequent contract. If performance is to occur at a non-DLA site that has
physical site and/or information security requirements specific to that location, the CO will work
with the customer to include those requirements in the solicitation and subsequent contract, in
addition to the CAC requirements of this SOP.
NOTE 1: All email communications covered in this SOP are to be digitally-signed. All emails
containing Personally Identifiable Information (PII) are to be encrypted.
NOTE 2: This SOP provides procedures for contracts where a COR has been designated, as well
as for contracts where no COR has been designated. In cases where no COR has been
designated, COs are responsible for the entire range of COR activities included in this SOP. In
some instances, COR/COs may also serve as the Trusted Agent (this is not a requirement).
NOTE 3: Many DLA contracts use Alternate Contracting Officer’s Representatives (ALTCORs)
in addition to CORs. As used in this SOP, CORs include ALTCORs and the terms should be
considered interchangeable.
NOTE 4: DoD policy does not allow for a contractor employee to possess more than one CAC,
even when working simultaneously on multiple contracts. If a contractor employee already
possesses a valid CAC related to another DLA or DoD contract, the contractor must notify the
COR/CO that the employee already has a CAC. The COR will annotate the contractor
employee’s CAC information on the Contractor CAC Log. Contractors must ensure that
individuals who fall into this situation are identified in the monthly report.
7
1. DESCRIPTION:
a. Pre-Award:
(1) The CO, by consulting with the customer, determines whether the contract will
require contractor employees to obtain a CAC based on the criteria in references (c)
and (d). If the contractor will require a CAC, the CO:
(a) Incorporates in the solicitation and in the subsequent contract, the current versions
of FAR clause 52.204-9 and DLAD clause 52.204-9000.
(b) Ensures that the Performance Work Statement (PWS)/Statement of Work (SOW)
for the solicitation and the subsequent contract includes the required standardized
language (Attachment A) which provides detailed instructions to the contractor
regarding issuance, control, and accountability of contractor CACs.
(c) Issues the COR, as applicable, a designation letter, which includes standard
language regarding contractor CACs (Attachment B) in the COR responsibilities,
and provides electronic copies of the CAC Justification Form (Figure 1),
Contractor CAC Log (Figure 3) and the Contractor CAC Turn-In Receipt (Figure
4).
b. Post-Award:
(1) The CO:
(a) Reiterates to the COR his/her responsibilities regarding contractor CACs, as
prescribed in the COR designation letter, during the COR Initial Orientation for
the contract.
(b) Reiterates to the contractor its responsibilities regarding contractor CACs, as
prescribed in the contract, during the Pre-Performance Conference or other pre-
performance discussion for the contract.
(2) The COR (or CO if a COR is not designated):
(a) Receives the completed (Sections I and II) and signed DD Form(s) 1172-2,
Application for Identification Card/DEERS Enrollment, from the contractor via
hand-carry, secure mail, or digitally signed/encrypted email, for each contractor
employee working under the contract that requires access to a Federally-
controlled facility or installation and/or Federally-controlled information system.
(NOTE: The form(s) may be forwarded individually or as a group from the
contractor.)
(b) Uses the Contractor CAC Log for the contract and logs the receipt of each DD
Form 1172-2 application.
(c) Completes and signs Section III of the DD Form(s) 1172-2.
8
(d) Completes and signs the CAC Justification Form (Figure 1).
(e) Forwards the DD Form(s) 1172-2 and the CAC Justification Form to the TA for
processing of the CAC application(s). If the TA cannot be identified, the COR
sends an email to the DLA TASS SPOC at [email protected] to
indicate that they have a contract that requires assignment to a DLA TA.
(3) The TA:
(a) Receives the completed and signed (Sections I, II, and III) DD Form(s) 1172-2
(Figure 2), Application for Identification Card/DEERS Enrollment and the CAC
Justification Form, from the COR.
(b) Sends an encrypted email to DLA Intelligence (DI)/Personnel Security (PERSEC)
identifying him/herself as the TA and verifies that contractor has been vetted per
references (c) and (d).
(c) Inputs the data from the DD Form(s) 1172-2 application(s) to the TASS and
creates a contractor employee account for each application.
(d) Forwards an email to each contractor employee requesting the individual verify
his/her account information in TASS. The email contains the web link for TASS
and a username and password generated by the system for the contractor
employee to use to access TASS.
(e) Approves the verified contractor employee account in TASS. The system then
forwards an email to the contractor employee notifying the individual that his/her
account has been approved and requesting the contractor employee to obtain a
Government-issued CAC from the nearest RAPIDS office. The email provides a
link that identifies the locations of RAPIDS offices.
(4) The COR (or CO if a COR was not designated):
(a) Receives written notice via email from the contractor for receipt of each
contractor CAC issued. The notice shall identify the contractor employee’s name,
the date of issuance, and the date of expiration of the CAC. The notification may
be made individually for each contractor employee or together for a group of
contractor employees.
(b) Logs the issuance of each contractor CAC in the Contractor CAC Log.
(c) When a COR has been designated, the COR notifies the CO immediately of any
issues that arise at any time involving contractor CACs as follows:
a. In person, followed within (1) business day by a written notice via email,
or
9
b. In writing, via email, or
c. By telephone, followed within one (1) business day by a written notice via
email.
(d) During the performance of the contract and when requested by the TA, reverifies
the contractor employee’s continuing need for a CAC via digitally signed email.
(e) Ensures that the contractor provides a monthly report of all employees working
under that contract who still require a CAC and those who do not. For those that
no longer require a CAC, ensure that contractor follows/has followed the
procedures for turn-in to the COR/CO. This monthly report is a contract
deliverable (CDRL), whether priced or not separately priced, and must be
received with the monthly invoice.
(f) Notifies the CO of non-compliance if the contractor fails to provide the monthly
report.
(g) Maintains the Contractor CAC Log in the CORT Tool or EProcurement Records
Management, as applicable.
(h) At any point during the life of the contract, notifies the TA and CO, as applicable,
as soon as it is determined that a contractor employee no longer requires a CAC.
(5) The CO:
(a) Routinely monitors for currency and completeness the Contractor CAC Log
prepared and maintained by the COR in the CORT Tool.
(b) Takes immediate action if notified by the COR that there is an issue with a
contractor CAC based on the nature of the non-compliance and in accordance
with the remedies available per the contract (i.e. stop work order, negative
CPARS report and/or delay/withholding of payment).
c. Special Circumstances
(1) Contractor Employee Termination/Reassignment (this includes any reason the
employee is no longer working for the contractor under the contract):
(a) The COR or CO (if a COR was not designated):
1. Receives notification immediately from the contractor that the employee is no
longer working for the contractor under the contract, as follows:
a. In person, followed within (1) business day by a written notice via
email, or
b. In writing, via email, or
10
c. By telephone, followed within one (1) business day by a written notice
via email.
2. Logs receipt of the notification in the Contractor CAC Log. NOTE: If COR
has been designated, the COR also notifies the CO immediately of the
contractor employee’s termination/reassignment.
3. Immediately notifies the TA that the contract employee has been
terminated/reassigned. The TA will revoke the credentials in TASS.
4. Receives a request from the contractor, within one (1) business day after
notification, to arrange turn-in of the contractor employee’s CAC.
5. If the COR/CO is co-located or near enough that in-person transfer of CACs
can be arranged, the COR/CO:
a. Receives (via hand-carry) all turned-in contractor CACs from the
contractor.
b. Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt with the contractor, and provides the contractor a copy of the
receipt.
6. If in-person transfer of CACs cannot be arranged, the COR/CO:
a. Receives notice that contractor CACs have been sent to the COR/CO
via certified mail.
b. Receives all turned-in contractor CACs from the contractor.
c. Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt, and provides the contractor a copy of the receipt via email or
mail.
7. Within two (2) business days, hand-carries the turned-in contractor CACs to
the nearest RAPIDS office for turn-in and disposal.
8. Completes and signs the Government-Issued Contractor CAC Turn-In Receipt
with the RAPIDS office.
9. Logs receipt and turn-in of the contractor CAC in the Contractor CAC Log.
10. Provides final status of CACs to the TA (and CO as applicable) via digitally
signed email.
11
11. Maintains the completed Government-Issued Contractor CAC Turn-In
Receipt in the CORT Tool or EProcurement Records Management, as
applicable.
(2) Lost or stolen contractor CAC:
(a) The COR or CO (if a COR was not designated):
1. Receives immediate notification from the contractor detailing the
circumstances regarding the lost or stolen contractor CAC, as follows:
a. In person, followed within one (1) business day by a written notice via
email, or
b. In writing, via email, or
c. By telephone, followed within one (1) business day by a written notice
via email.
2. Logs receipt of the notification in the Contractor CAC Log for the lost or
stolen CAC. NOTE: If COR has been designated, the COR also notifies the
CO immediately of the lost or stolen CAC card.
3. Immediately notifies the TA that contractor CAC has been lost or stolen.
4. Ensures that the contractor reports the lost or stolen CAC card to the local
DLA Police/host installation police, who will provide the contractor a police
report. If there is no local DLA Police/host installation police, or no police
report is provided, COR (or CO where COR was not designated) prepares a
signed memorandum (on organization letterhead) detailing the circumstances
of how the CAC was lost or stolen based on information provided by the
contractor and any other available information.
5. If the CAC can be reissued within 24 hours, directs the contractor to bring the
report/memorandum to the nearest RAPIDS office for CAC reissuance.
6. If the CAC cannot be reissued within 24 hours, the TA will revoke the CAC in
TASS and the contractor, COR/CO, and TA are responsible for completion of
the steps in 1.b. (Post-Award) above, as applicable, for issuance and logging
of a replacement CAC.
7. When contractor notifies issuance of a new CAC in accordance with 1.b.
(Post-Award) above, logs the issuance of the new contractor CAC in the
Contractor CAC Log.
(3) Contractor CAC expiration date is prior to completion of the contract:
12
(a) The COR or CO (if a COR was not designated):
1. Receives notice from the contractor that a CAC is expiring and the employee
still requires a CAC, as follows:
a. In person, followed within one (1) business day by a written notice via
email, or
b. In writing, via email, or
c. By telephone, followed within one (1) business day by written notice
via email.
2. Follows the steps under 1.b. (Post-Award), above, for issuance of a new
contractor employee CAC. (NOTE: The contractor shall begin the process for
issuance of a new contractor CAC no later than two (2) weeks prior to
expiration of the old contractor CAC).
3. When contractor notifies issuance of a new CAC, logs the issuance of the new
contractor CAC in the Contractor CAC Log.
d. Contract Completion or Termination:
(a) The COR or CO (if a COR was not designated):
1. Receives a request from the contractor, within one (1) business day after the
contractor collects the contractor CACs at contract completion or termination,
to arrange for the turn-in of the contractor CACs for the contract.
2. Notifies the TA that the contract has ended. The TA will revoke the CACs in
TASS.
3. If the COR/CO is co-located or near enough that in-person transfer of CACs
can be arranged, the COR/CO:
a. Receives (via hand-carry) all turned-in contractor CACs from the
contractor.
b. Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt with the contractor, and provides the contractor a copy of the
receipt.
4. If in-person transfer of CACs cannot be arranged, the COR/CO:
a. Receives notice that contractor CACs have been sent to the COR/CO
via certified mail.
13
b. Receives all turned-in contractor CACs from the contractor.
c. Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt, and provides the contractor a copy of the receipt via email or
mail.
5. Within two (2) business days, hand-carries the turned-in contractor CACs to
the nearest RAPIDS office for turn-in and disposal.
6. Completes and signs the Government-Issued Contractor CAC Turn-In Receipt
with the RAPIDS office.
7. Logs the receipt and turn-in of the contractor CACs in the Contractor CAC
Log.
8. Tracks all CACs issued under the contract until all have been received,
logged, and turned-in for disposal.
9. Maintains the Contractor CAC Log in the CORT Tool or EProcurement
Records Management, as applicable. COR provides the final log to the CO
for inclusion in EProcurement Records Management.
10. Maintains all completed Government-Issued Contractor CAC Turn-In
Receipts in the CORT Tool or EProcurement Records Management, as
applicable.
11. Notifies the TA via digitally signed email when all contractor CACs issued
under the contract have been received and turned-in.
12. Notifies the TA, CO and installation security if the contractor refuses to turn-
in the CAC.
(b) The CO:
1. If the contractor does not return CACs, withholds final payment in accordance
with FAR 52.204-9.
2. Uploads a copy of the completed Contractor CAC Log to EProcurement
Records Management.
3. INPUTS/OUTPUTS: The following are the data requirements or inputs needed to perform
the procedures for issuing and accounting for contractor CACs, and the subsequent end-products
or outputs once all steps in the procedures have been performed.
a. Inputs:
14
(1) Contract clauses in the solicitation/contract regarding contractor personnel security
and identity verification.
(2) Standardized language in the solicitation/contract PWS/SOW regarding contractor
responsibilities for the issuance, control, and accountability of contractor CACs.
(3) Completed DD Form(s) 1172-2, Application for Identification Card/DEERS
Enrollment.
(4) Completed CAC Justification Form, whereby the sponsor documents the applicant’s
need for a CAC and accepts the responsibilities assigned to them.
(5) COR designation letter that includes COR responsibilities regarding contractor CACs,
and provides electronic copies of the Contractor CAC Log and the Contractor CAC
Turn-In Receipt.
(6) Tracking of contractor CACs from issuance to turn-in for disposal via the Contractor
CAC Log.
(7) Chain of custody acknowledgements for turned-in contractor CACs via the
Government-Issued Contractor CAC Turn-In Receipt.
b. Outputs:
(1) Issuance of contractor CACs for the contract.
(2) Accountability for contractor CACs for the contract from issuance to turn-in and
disposal.
(3) Retrieval of contractor CACs once the contract is completed/terminated or contractor
employee no longer needs.
15
GLOSSARY
PART I. ABBREVIATIONS AND ACRONYMS
ALTCOR Alternate Contracting Officer’s Representative
CAC Common Access Card
CO Contracting Officer
COR Contracting Officer’s Representative
CORT Tool Contracting Officer Representative Tracking Tool
DEERS Defense Enrollment Eligibility Reporting System
RAPIDS Real-Time Automated Personnel Identification System
SPOC Service Point of Contact
TA Trusted Agent
TASM Trusted Agent Security Manager
TASS Trusted Associate Sponsorship System
PART II. DEFINITIONS
Unless otherwise noted, these terms and their definitions are for the purposes of this SOP:
Common Access Card. A smart card about the size of a credit card that is the standard
identification for U.S. military and Department of Defense (DoD) civilian employees, and
eligible contractor personnel.
Contracting Officer Representative Tracking Tool. A Department of Defense (DoD) web
management capability for the appointment of CORs. Other capabilities provided by the system
include identifying all training completed by the COR by complexity of the work/requirement
(Type A/B/C), including basic and refresher training requirements, adding and reviewing
documents, such as a Status Report, COR trip report, correspondences and other miscellaneous
documents to one or more of the COR appointed contracts, and terminating the COR
appointment. The CORT Tool is a secure website available at: https://wawf.eb.mil/.
EProcurement Records Management. A DLA application that serves as the official repository
for contractual documents. Takes the place of the traditional hard copy contract file.
16
Real-Time Automated Personnel Identification System. Applicable software that allows users to
issue a DoD identification (ID) card.
Service or Agency Point of Contact. The individual that manages TASS for the service or
agency; coordinates with Defense Manpower Data Center; and establishes sites with TASS
capability, oversees TASM registration and ensures the maintenance of other required field
support.
Trusted Agent. The individual that inputs CAC application data into the Trusted Associate
Sponsorship System (TASS) and completes the sponsorship process, including but not limited to,
confirmation of completed background vetting.
Trusted Agent Security Manager. The individual that oversees the activity for TASS site TAs
that assigned under them.
Trusted Associate Sponsorship System. A catalyst for streamlining the in-processing of
contractor personnel by providing a tool to reduce the time it takes to verify, certify and approve
contractor information. TASS is a secure website available at: https://www.dmdc.osd.mil/tass/.
17
ATTACHMENT A
Contractor Instructions
Include the following language in each Performance Work Statement (PWS) or Statement of
Work (SOW) where contract employees are required to obtain a CAC:
Common Access Card (CAC) Procedures
Performance under this contract may require the contractor to obtain a Common Access Card
(CAC). If CACs are issued under this contract, the contractor shall complete and comply with
the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish
procedures to control and account for contractor CACs at all times. This process is only for the
issuance and accountability of CACs. Contractors may be required to provide additional forms
and follow additional procedures for other forms of access and/or background/security checks
depending on local site/installation requirements.
1. The contractor has each contractor employee requiring a CAC complete and sign
Sections I and II of the DD Form 1172-2. The instructions for completing the DD Form
1172-2 are located at http://www.cac.mil/docs/1172-2-Instructions.pdf.
o For Section II, Block 22 - If the contractor employee signs and the DD Form
1172-2 it is then forwarded by the contractor. This provides verification for the
employee information. If the contractor is submitting a DD Form 1172-2 for
him/herself (e.g., the owner), with no higher authority above them for verification,
then the signature in Block 22 must be notarized to verify identity.
2. The contractor forwards the DD Form(s) 1172-2 via hand-carry, secure mail, or
encrypted email to (NOTE: The contractor may forward these forms individually or as a
group):
o The Contracting Officer’s Representative (COR) for the contract, if a COR was
designated.
o The Contracting Officer (CO) for the contract, if no COR was designated.
3. Each contractor employee must verify his/her account information upon receipt of an
email from the Government containing a username and password for the Trusted
Associate Sponsorship System (TASS). The web link for TASS is included in the email.
4. Each contractor employee will receive an email via TASS when his/her account has been
approved. The email will notify the employee to obtain a Government-issued CAC from
the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The
email will also provide a link that identifies the locations of RAPIDS offices.
5. Each contractor employee shall obtain his/her issued CAC from the RAPIDS office.
6. The contractor, within one (1) business day of issuance, provides written notice via email
to the COR (or the CO, if no COR was designated) for each contractor CAC issued
18
identifying the contractor employee’s name, the date of issuance, and the date of
expiration of the CAC. This notification may be made individually for each contractor
employee or together for a group of contractor employees.
7. The contractor establishes procedures to control and account for Government-issued
contractor CACs at all times, to include the following:
o Ensure contractor CACs issued for this contract are only used for the purpose of
performing under this contract.
o Ensure contractor CACs are secured in a manner that precludes unauthorized use
and that recognizes the CAC is the property of the U.S. Government.
o Ensure contractor employees do not abuse or place holes in their CACs.
o Ensure contractor employees do not display their CACs in public.
8. If a contractor CAC is lost or stolen:
o The contractor employee shall immediately notify the contractor that the
contractor CAC has been lost or stolen.
o The contractor shall immediately notify the COR (or the CO, if no COR was
designated), detailing the circumstances regarding the lost or stolen contractor
CAC, as follows:
In person, followed within one (1) business day by a written notice via email,
or
In writing, via email, or
By telephone, followed within one (1) business day by a written notice via
email.
o The contractor shall report the lost or stolen CAC card to the local DLA
Police/host installation police, who will provide the contractor a police report. If
there is no local DLA Police/host installation police, or no police report is
provided, the contractor shall provide information to the COR/CO, as applicable,
detailing the circumstances of how the CAC was lost or stolen. The COR/CO
will provide a memorandum for the contractor employee to support issuance of
new CAC.
o The contractor has the contractor employee bring the report/memorandum to the
nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the
report/memorandum to the nearest CAC office for reissue. If the CAC cannot be
reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.
9. If the expiration date for a contractor CAC is prior to completion of the contract and the
contractor employee is to continue working under the contract and still requires a CAC,
the contractor:
o Notifies the COR as follows:
In person, followed within one (1) business day by a written notice via email,
or
In writing, via email, or
By telephone, followed within one (1) business day by a written notice via
email.
19
o No less than two (2) weeks prior to the current CAC’s expiration date, completes
and complies with the steps above beginning with Step 2 for issuance of a new
contractor CAC for the employee.
o Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC.
o Notifies the COR once a new CAC has been issued.
10. The contractor/contractor employee turns in any found CACs immediately, via hand-
carry, to the nearest Federal law enforcement office.
11. The contractor immediately collects all contractor CAC(s) from the contractor
employee(s) at:
o Contract completion or termination
o Termination/Reassignment of an employee (this includes any reason the
employee is no longer working for the contractor under the contract or otherwise
no longer requires a CAC)
12. The contractor:
o For contract completion or termination – within one (1) business day after
collecting the contractor CAC(s), arranges for turn-in via one of the below
methods:
i. If the COR/CO is co-located or near enough that in-person transfer of
CACs can be arranged, the contractor:
Arranges to meet the COR (or the CO, if no COR was designated)
to turn-in the collected contractor CAC(s).
Hand-carries all collected contractor CACs for turn-in to meet the
COR (or the CO, if no COR was designated).
Completes and signs the Government-Issued Contractor CAC
Turn-In Receipt with the COR (or the CO, if no COR was
designated). The contractor is provided a copy of the receipt.
ii. If in-person transfer of CAC cannot be arranged, the contractor:
Sends, via certified mail, the CACs to the COR/CO. The
contractor includes in the package the Government-Issued
Contractor CAC Turn-In Receipt, with signed acknowledgement of
contractor turn-in.
Notifies COR/CO that CACs have been sent via certified mail.
Receives a completed copy of the receipt from the COR/CO once
the COR/CO has received the CACs.
o For termination/reassignment of an employee:
i. Immediately notifies the COR (or the CO, if no COR was designated) that
the employee is no longer working for the contractor under the contract or
otherwise no longer requires a CAC, as follows:
20
In person, followed within one (1) business day by a written notice
via email, or
In writing, via email, or
By telephone, followed within one (1) business day by a written
notice via email.
ii. Follows the turn-in procedures above for contract completion or
termination, as applicable.
Contractor Reporting Requirements: The contractor is required to submit, on a monthly basis, to
the COR (or the CO, if no COR was designated) a report of all employees working on the
contract who have been issued CAC cards and a verification of whether each listed employee
still requires a CAC. The report must note where changes have occurred (additions or deletions)
since the previous month. Contractor employees who already have a CAC related to another
DLA or DoD contract must be included in the monthly report. Contractor shall note the issuing
organization and the CAC expiration date. Contractor is still responsible for notifying the
COR/CO when the individual is no longer working under the subject contract.
The above procedures have been established as a DLA security measure. Contractors are
advised that failure to comply with any of the above requirements will be considered a violation
of the terms and conditions of the contract and the Contracting Officer may take action to
remedy such violations. Specifically, failure to safeguard, follow these procedures, including
reporting requirements, or turn-in CACs within the established timeframes may result in the
following actions, which are in addition to other actions the Contracting Officer may take under
governing law and regulation and the terms and conditions of the contract:
Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution
of CAC issue
Disapproval of invoices and delay of payment
Withholding of final payment (in accordance with FAR 52.204-9)
Documentation of CAC Non-Compliance in the Contractor Performance Assessment
Reporting System (CPARS)
21
ATTACHMENT B
The following language shall be included in COR Designation Letters for all contracts where
contract employees will be issued CACs. COs may include the language as either an attachment
to the designation letter or provide a reference to the Standard Operating Procedure (SOP),
Contractor Common Access Card (CAC) Issuance and Accountability, located at:
https://eworkplace.dla.mil/sites/S18/Pages/SOP.aspx.
Common Access Card (CAC) Management
The COR is responsible for coordinating the issuance and turn-in and monitoring of contractor
Common Access Cards (CACs) by accomplishing the following:
1. Post-Award:
Receives the completed (Sections I and II) and signed DD Form(s) 1172-2, Application
for Identification Card/DEERS Enrollment, from the contractor via hand-carry, secure
mail, or digitally signed/encrypted email, for each contractor employee working under
the contract that requires access to a Federally-controlled facility or installation and/or
Federally-controlled information system. (NOTE: The form(s) may be forwarded
individually or as a group from the contractor.)
Uses the Contractor CAC Log for the contract and logs the receipt of each DD Form
1172-2 application.
Completes and signs Section III of the DD Form(s) 1172-2.
Completes and signs the CAC Justification Form.
Forwards the DD Form(s) 1172-2 and the CAC Justification Form to the TA for
processing of the CAC application(s). If the TA cannot be identified, the COR will send
an email to the DLA TASS SPOC at [email protected] to indicate that
they have a contract that requires assignment to a DLA TA.
Receives written notice via email from the contractor for receipt of each contractor CAC
issued. The notice shall identify the contractor employee’s name, the date of issuance,
and the date of expiration of the CAC. This notification may be made individually for
each contractor employee or together for a group of contractor employees.
Logs the issuance of each contractor CAC in the Contractor CAC Log.
Notifies the CO immediately of any issues that arise at any time involving contractor
CACs as follows:
o In person, followed within one (1) business day by a written notice via email, or
o In writing, via email, or
o By telephone, followed within one (1) business day by a written notice via email.
When requested by the TA, reverifies the contractor employee’s continuing need for a
CAC via digitally signed email.
Ensures that the contractor provides a monthly employee report of all employees working
under that contract who still require a CAC and those who do not. For those that no
longer require a CAC, ensure that contractor follows/has followed the procedures for
turn-in.
If the contractor fails to provide the monthly report, notifies the CO of non-compliance.
Maintains the Contractor CAC Log in the CORT Tool.
22
At any point during the life of the contract, notifies the TA and CO as soon as it is
determined that a contractor employee no longer requires a CAC.
2. Contract Completion or Termination:
Receives a request from the contractor, within one (1) business day after the contractor
collects the contractor CACs at contract completion or termination, to meet to turn-in the
contractor CACs for the contract.
Notifies the TA that the contract has ended. The TA will revoke the CAC in TASS.
Arranges for physical turn-in of CACs:
o If co-located or near enough that in-person transfer of CACs can be arranged:
Receives (via hand-carry) all turned-in contractor CACs from the
contractor.
Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt with the contractor, and provides the contractor a copy of the
receipt.
o If in-person transfer of CACs cannot be arranged:
Receives (via certified mail) all turned-in contractor CACs from the
contractor.
Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt, and provides the contractor a copy of the receipt via email or
mail.
Within two (2) business days, hand-carries the turned-in contractor CACs to the nearest
RAPIDS office for turn-in and disposal.
Completes and signs the Government-Issued Contractor CAC Turn-in Receipt with the
RAPIDS office.
Logs the receipt and turn-in of each contractor CAC in the Contractor CAC Log.
Tracks all CACs issued under the contract until all have been received, logged, and
turned-in for disposal.
Maintains the Contractor CAC Log in the CORT Tool and forwards an electronic copy of
the completed log to the CO for uploading to EProcurement Records Management.
Maintains all completed Government-Issued Contractor CAC Turn-In Receipts in the
CORT Tool.
Notifies the TA and CO in writing via email when all contractor CACs issued under the
contract have been received and turned-in.
If contractor refuses to return CACs, immediately notifies the CO, TA and installation
security.
3. Special circumstances:
a. Contractor Employee Termination/Reassignment (this includes any reason the employee is
no longer working for the contractor under the contract):
Receives notification immediately from the contractor that the employee is no longer
working for the contractor under the contract, as follows:
23
o In person, followed within one (1) business day by a written notice via email, or
o In writing, via email, or
o By telephone, followed within one (1) business day by a written notice via email.
Logs receipt of the notification in the Contractor CAC Log.
Notifies the TA and CO immediately of the contractor employee
termination/reassignment.
Receives a request from the contractor, within one (1) business day after notification, to
meet the COR to arrange for turn-in of the contractor CAC.
Arranges for physical turn-in of CACs:
o If co-located or near enough that in-person transfer of CACs can be arranged:
Receives (via hand-carry) all turned-in contractor CACs from the
contractor.
Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt with the contractor, and provides the contractor a copy of the
receipt.
o If in-person transfer of CACs cannot be arranged:
Receives (via certified mail) all turned-in contractor CACs from the
contractor.
Completes and signs the Government-Issued Contractor CAC Turn-In
Receipt, and provides the contractor a copy of the receipt via email.
Within two (2) business days, hand-carries the turned-in contractor CAC to the nearest
RAPIDS office for turn-in and disposal.
Completes and signs the Government-Issued Contractor CAC Turn-In Receipt with the
RAPIDS office.
Logs receipt and turn-in of the contractor CAC in the Contractor CAC Log.
Provides final status of CACs to the TA and CO via digitally signed email.
Maintains the completed Government-Issued Contractor CAC Turn-In Receipt in the
CORT Tool.
b. Lost or stolen contractor CAC(s):
Receives immediate notification from the contractor detailing the circumstances
regarding the lost or stolen contractor CAC, as follows:
o In person, followed within one (1) business day by a written notice via email, or
o In writing, via email, or
o By telephone, followed within one (1) business day by a written notice via email.
Logs receipt of the notification in the Contractor CAC Log for the lost or stolen CAC.
Immediately notifies the TA and CO of the lost or stolen card.
Ensures that the contractor reports the lost or stolen CAC to the local DLA Police/host
installation police, who will provide the contractor a police report. If there is no local
DLA Police/host installation police, or no police report is provided, prepare a signed
memorandum (on organization letterhead) detailing the circumstances of how the CAC
was lost or stolen based on the information provided by the contractor and any other
available information.
If the CAC can be reissued within 24 hours, direct the contractor to bring the police
report/memorandum to the nearest RAPIDS office for reissuance.
24
If the CAC cannot be reissued within 24 hours, ensure the contractor completes steps in
#1 for a replacement CAC.
Receives written notice via email from the contractor, within one (1) business day of
issuance, once a new contractor CAC has been issued for the contractor employee.
Logs the issuance of the new contractor CAC in the Contractor CAC Log.
c. Contractor CAC expiration date is prior to completion of the contract:
Receives notice from the contractor, as follows:
o In person, followed within one (1) business day by a written notice via email, or
o In writing, via email, or
o By telephone, followed within one (1) business day by a written notice via email.
Follows the steps under Post-Award, above, for issuance of a new contractor employee
CAC. (NOTE: The contractor shall begin the process for issuance of a new contractor
CAC no later than two (2) weeks prior to expiration of the old contractor CAC).
Receives written notice via email from the contractor, within one (1) business day of
issuance, once a new contractor CAC has been issued for the contractor employee.
Logs the issuance of the new contractor CAC in the Contractor CAC Log.
25
FIGURE 1
CAC Justification Form
Section I: Applicant and Contract Data
Applicant Name:
Contract Number (include task order number if applicable):
Contract End Date:
Contracting Office:
Section II: Eligibility Requirements
(Select all that apply)
☐ The applicant requires both physical access to a DoD facility and access, via logon, to DoD networks on-site or
remotely. Access to the DoD network must require the use of a computer with Government-controlled configuration
or use of a DoD-approved remote access procedure in accordance with the Defense Information Systems Agency
Security Technical Implementation Guide.
☐ The applicant requires remote access, via logon, to a DoD network using DoD-approved remote access
procedures.
☐ The applicant requires physical access to multiple DoD facilities or multiple non-DoD federally controlled
facilities on behalf of the DoD on a recurring basis for a period of six months or more. The frequency of “recurring
basis” shall be at least two times per week/or eight times per month.
☐ The applicant is supporting a contract at a non-DLA site and the local site/installation security policy requires the
contractor to obtain a CAC for installation entry control or physical access to facilities and buildings.
Section III: Sponsor Responsibilities
(Select all boxes to acknowledge compliance)
I (the sponsor) understand I am responsible for each task listed below:
☐ I will provide a digitally signed email to the TASS Trusted Agent every six months when requested by the
Trusted Agent to reverify the applicant’s requirement for a CAC.
☐ I will immediately notify the Trusted Agent when the applicant’s affiliation with DLA is terminated prior to the
applicant’s CAC expiration.
☐ If the applicant leaves, is terminated/reassigned or is no longer supporting the contract for any reason, I will
retrieve the credential and properly dispose of it by returning it to a RAPIDS office.
____________________ ______________ _______________________
Sponsor’s Name Sponsor’s Phone Sponsor’s Email
____________________ ______________
Sponsor’s Signature Date
28
FIGURE 3
CONTRACTOR CAC LOG
Contract Number: Contractor: Location: Contract/Order Start Date: Contract/Order Completion Date: Contract/Order Termination (if prior to Contract/Order Completion Date):
Contractor Employee Name
DD Form 1172‐2 Receipt Date
CAC Issuance Date
CAC Expiration
Date
Contractor Employee Termination
Date (if
applicable)
CAC Turn‐In Date to COR
CAC Turn‐In Date to RAPIDS Office
Comments/Issues (e.g. notifications, lost or stolen CAC, CAC issued by another
agency, etc.)
29
FIGURE 4
GOVERNMENT‐ISSUED CONTRACTOR COMMON ACCESS CARD (CAC) TURN‐IN RECEIPT
The contractor shall complete the following information:
Contract Number:
Contractor:
Location:
The contractor shall identify the following information for each contractor CAC being turned‐in:
Employee Name Issue Date Expiration Date
The contractor shall return the above identified contractor CACs to the Contracting Officer’s Representative (COR) for the contract for turn‐in. The COR will enter the turn‐in date for the contractor CACs. The contractor shall acknowledge turn‐in of the contractor CACs and the COR will acknowledge receipt below:
Turn‐in Date
to COR Contractor Acknowledgement of Turn‐In COR Acknowledgement of Receipt
Signature: Signature:
Print Name: Print Name:
The COR will hand‐carry the above identified contractor CACs to the nearest Real‐Time Automated Personnel Identification System (RAPIDS) office for turn‐in. The RAPIDS office will enter the turn‐in date for the contractor CACs. The COR will acknowledge turn‐in of the contractor CACs and the RAPIDS office will acknowledge receipt below: Turn‐in Date to RAPIDS Office
COR Acknowledgement of Turn‐In RAPIDS Office Acknowledgement of Receipt
Signature: Signature: