december 16, 2015 annual and regular board meeting materials
DESCRIPTION
ÂTRANSCRIPT
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
Annual and Regular Meeting of the Capitol Region Watershed District (CRWD) Board Of Managers, for
Wednesday, December 16, 2015, 5:00 p.m. at the Wilder Center Auditorium, 451 Lexington Parkway, St.
Paul, Minnesota.
ANNUAL MEETING AGENDA
I. Call to Order (President Collins)
A) Attendance
B) Review, Amendments and Approval of the Agenda
III. Election of Officers and Committee Appointments (Mike Thienes)
IV. Other Assignments and Duties (Board President)
Bank/Depository for District Funds, 2016 Manager per diem and mileage reimbursement rate,
designation of the Official newspaper and adopt Conflict of Interest Policy
V. Annual Meeting Calendar (Board President)
VI. Public Question and Comment Period
VII. Adjournment of Annual Meeting
REGULAR MEETING AGENDA
I. Call to Order of Regular Meeting (President Joe Collins)
A) Attendance
B) Review, Amendments and Approval of the Agenda
II. Public Comment – For Items not on the Agenda (Please observe a limit of three minutes per person.)
III. Permit Applications and Program Updates (Permit Process: 1) Staff Review/Recommendation, 2) Applicant Response, 3) Public Comment, and 4) Board Discussion and Action.)
A) Permit Program/Rules Update (Kelley)
B) Permit Closeout #13-029 Island Station (Hosch)
C) Permit #15-023 Villa Park North Restoration (Kelley)
IV. Special Reports –– No Special Reports
V. Action Items
A) AR: Approve Minutes of the December 2, 2015 Regular Meeting (Sylvander)
B) AR: Approve Accounts Payable/Receivables for November 2015 (Sylvander)
C) AR: Appoint 2016 Citizen Advisory Committee (Doneux)
D) AR: Adopt Final 2016 Budget and Levy (Doneux)
VI. Unfinished Business
A) Upper Villa Stormwater Improvement Project Update (Kelley)
Materials Enclosed
Note Change of
Location and Time
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
VII. General Information
A) Administrator’s Report
VIII. Next Meeting
A) Wednesday January 6, 2016 Board Meeting
IX. Adjournment to attend CRWD Annual Recognition and Awards Ceremony
W:\04 Board of Managers\Agendas\2014\December 17, 2014 Agenda - Annual and Regular Mtg.docx
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
Annual Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday,
December 16, 2015, 5:00 p.m.
Agenda Item III. Election of Officers – Mike Thienes, Nominating Committee
Motion: To elect the officers to serve the Capitol Region Watershed District from December 16, 2015
to the District’s Annual Meeting in 2016 as follows:
Office Current/Past Officers (2015) December 16, 2015-Annual Mtg 2016
President 1 Joe Collins ____________________
Vice President Mary Texer ____________________
Secretary 1 Seitu Jones ____________________
Treasurer 1 Mike Thienes ____________________
Education/Information Shirley Reider ____________________
1 – Required
W:\04 Board of Managers\Annual Meetings\2015\2016 Election of Officers for packet.doc
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
Annual Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday, December 16, 2015, 5:00 p.m.
Agenda Item III. Committee Appointments – Manager Thienes Motion: To appoint committee members to serve the Capitol Region Watershed District from December 16, 2015 to the District’s Annual Meeting in 2016 as follows was made by Thienes/Texer. Current Appointments December 16, 2015 - Annual Mtg 2016 Personnel Committee (Two Managers) 1) Mary Texer 2) Joe Collins 3) Alternate – Shirley Reider Ramsey Conservation District Board Liaison 1) Seitu Jones 2) Alternate - Shirley Reider Citizen Advisory Committee Liaison 1) Mike Thienes 2) Alternate - Seitu Jones 3) Alternate – Joe Collins 4) Alternate – Mary Texer 5) Alternate – Shirley Reider Minnesota Association of Watershed Districts (State) Delegate: 1) Joe Collins 2) Mary Texer 3) Alternate - Mike Thienes Finance Committee 1) Mike Thienes 2) Joe Collins
Personnel Committee (Two Managers) 1) ________________________________ 2) ________________________________ 3) Alternate –_______________________ Ramsey Conservation District Board Liaison 1) ________________________________ 2) Alternate -_______________________ Citizen Advisory Committee Liaison 1) ________________________________ 2) Alternate -_______________________ 3) Alternate -_______________________ 4) Alternate -_______________________ 5) Alternate -_______________________ Minnesota Association of Watershed Districts (State) Liaison: 1) ________________________________ 2) Alternate -_______________________ 3) Alternate -_______________________ Finance Committee 1) ________________________________ 2) ________________________________
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
Committees/Liaison Positions Continued Current Appointments Trout Brook 1) Joe Collins 2) Seitu Jones Rules Committee 1) Mary Texer 2) Seitu Jones 3) Shirley Reider 4) Joe Collins 5) Mike Thienes Subwatershed Committee 1) Mike Thienes 2) Alternate – Joe Collins Education/Outreach Committee 1) Mary Texer 2) Seitu Jones 3) Shirley Reider Special Projects/Grants Committee 1) Seitu Jones 2) Mike Thienes Partner Grants Committee 1) 2) 3) Alternate Awards Program Committee 1) 2) 3) Real Estate/Building Committee 1) Mary Texer 2) Mike Thienes 3) Alternate
Metro MAWD 1) Mike Thienes 2) Mary Texer
December 16, 2015 - Annual Mtg 2016 Trout Brook 1) ___________________________ 2) ___________________________ Rules Committee 1) __________________________ 2) __________________________ 3) __________________________ 4) __________________________ 5) __________________________ Subwatershed Committee 1) __________________________ 2) Alternate -_________________ Education/Outreach Committee 1) __________________________ 2) __________________________ 3) __________________________ Special Projects/Grants Committee 1) __________________________ 2) __________________________ Partner Grants Committee 1) __________________________ 2) __________________________ 3) Alternate-__________________ Awards Program Committee 1) __________________________ 2) __________________________ 3) Alternate-__________________
Real Estate/Building Committee 1) __________________________ 2) __________________________ 3) Alternate-__________________ Metro MAWD 1) __________________________ 2) __________________________
W:\04 Board of Managers\Annual Meetings\2015\2016 Committee Appointments.doc
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
Annual Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday, December 16, 2015, 5:00 p.m. Agenda Item IV. Other Administrative Assignments – Mark Doneux Motion: To make administrative assignments to serve the Capitol Region Watershed District from December 16, 2015 to the District’s Annual Meeting in 2016 as follows:
A) Bank/Depository of Funds 2015 2016
Bank US Bank US Bank Depository of Funds 4M Fund 4M Fund
B) Managers Per Diem
2015 2016 Per Diem $75/meeting $75/meeting
C) Mileage Reimbursement
2015 2016 Mileage $0.565/mile $0.560/mile
D) Official Newspaper
2015 2016 Newspaper St. Paul Pioneer Press St. Paul Pioneer Press
E) Accountant 2015 2016
Accountant Redpath CPAs Redpath CPAs
F) Auditor 2015 2016
Auditor Office of the State Auditor Office of the State Auditor
W:\04BoardofManagers\AnnualMeetings\2015\2016AdministrativeAssignments.doc
CONFLICT OF INTEREST POLICY
Capitol Region Watershed District
The Board of Managers of the Capitol Region Watershed District shall not enter into any contract or
transaction on behalf of the Capitol Region Watershed District with:
a. One or more of its Managers
b. A Manager’s immediate family member.
c. An organization in which a Manager of the Capitol Region Watershed District or a
Manager’s immediate family member is a director, officer, or legal representative, or in
some way has a material financial interest.
Unless all of the following are met:
1. That interest is disclosed or known to the Board of Managers.
2. The Board approves, authorizes, or ratifies the action in good faith.
3. The approval is by a majority of Managers (not counting the interested Manager).
4. At a meeting where a quorum is present (not counting the interested Manager).
The interested Manager may be present for discussion to answer questions, but may not advocate for the
action to be taken and must not vote on the action. The minutes of all actions taken on such matters shall
clearly reflect that these requirements have been met.
Should a conflict of interest occur which does not meet the above requirements, Minnesota Statue 317A
will define the procedure to be followed.
Conflict of Interest Policy Created: April 21, 2005
Last Reviewed: December 16, 2009
W:\04 Board of Managers\Annual Meetings\2015\CONFLICT OF INTEREST POLICY.doc
ANNUAL STATEMENT CONCERNING POSSIBLE
CONFLICT OF INTEREST
Capitol Region Watershed District
The undersigned person acknowledges receipt of a copy of the Capitol Region Watershed District
"Conflict of Interest Policy" dated December 18, 2013. By my signature below I acknowledge my
agreement with the spirit and intent of these documents, and I agree to report to the Board President or
Vice-President any possible conflicts (other than those stated below) that may develop before
completion of the next annual statement.
_____________ I am not aware of any Conflict of Interest.
____________ I have a Conflict of Interest in the following area (s):
________________________________________________________________
________________________________________________________________
Signed _____________________________________ Date _______________________
_______________________________________
(Type or print name)
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
Annual Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday,
December 16, 2015, 5:00 p.m.
V. Annual Meeting Schedule – Mark Doneux
Motion: To set the regular meetings of the Board of Managers of the Capitol Region Watershed
District for 6:00 P.M. at the District office on the 1st and 3rd Wednesday of each month, with the
exception of July, as follows:
Wednesday, January 6, 2016
Wednesday, January 20, 2016
Wednesday, February 3, 2016
Wednesday, February 17, 2065
Wednesday, March 2, 2016
Wednesday, March 16, 2016
Wednesday, April 6, 2016
Wednesday, April 20, 2016
Wednesday, May 4, 2016
Wednesday, May 18, 2016
Wednesday, June 1, 2016
Wednesday, June 15, 2016
Wednesday, July 6, 2016
Wednesday, July 20, 2016
Wednesday, August 3, 2016
Wednesday, August 17, 2016 - Public Hearing for Budget & Levy
Wednesday, September 7, 2016 - Adoption of Preliminary Budget and Levy
Wednesday, September 21, 2016
Wednesday, October 5, 2016
Wednesday, October 19, 2016
Wednesday, November 2, 2016
Wednesday, November 16, 2016
Wednesday, December 7, 2016
Wednesday, December 21, 2016 – 2016 Annual Meeting, Adoption of Final Budget and Levy
The Board of Managers meetings are held the 1st and 3rd Wednesday of each month.
Unless otherwise noted or a special meeting is called.
W:\04 Board of Managers\Annual Meetings\2015\CRWD Meeting Schedule 2016.doc
The Board of Managers
January – December 2016
Meeting Schedule
2
Capitol Region Watershed District
Citizen Advisory Committee
January 2016 – December 2016 Meeting Schedule
The CRWD Citizen Advisory Committee Meetings are held the 2nd Wednesday of each month
7:00 p.m. – 9:00 p.m.
1410 Energy Park Drive, Suite 4
St. Paul, MN 55108
Wednesday, January 13, 2016
Wednesday, February 10, 2016
Wednesday, March 9, 2016
Wednesday, April 13, 2016
Wednesday, May 11, 2016
Wednesday, June 8, 2016
Wednesday, July 13, 2016
Wednesday, August 10, 2016
Wednesday, September 14, 2016
Wednesday, October 12, 2016
Wednesday, November 9, 2016
Wednesday, December 14, 2016
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
DATE: December 8, 2015
TO: CRWD Board of Managers
FROM: Elizabeth Hosch
RE: Permit Closeout
Background
Construction activity is complete for permit #13-029, Island Station.
Issues
Island Station #13-029
Construction was completed on this demolition project in 2013/2014. As a demo project, floodplain and
erosion and sediment control permitting requirements applied. Final inspection was conducted in Fall
2015 to confirm final site stabilization.
Action Requested
Approve Certificate of Completion and $7,000 surety return for permit #13-029, Island Station.
W:\07 Programs\Permitting\Board Memos\2015-12-16 Permit Closeout Board Memo.docx
December 16, 2015
III. Permit Applications
(A) Permit Close Out
(Hosch)
Capitol Region Watershed District Permit 15-023 Villa Park North Wetland Restoration
Permit Report 15-023 Board Meeting Date: 12/16/15
Applicant: Jeff Evenson City of Roseville 2660 Civic Center Drive Roseville, MN 55113
STAFF RECOMMENDATION: Approve with 1 Condition: 1. Provide a plan that identifies type and location of practices that will be used to minimize erosion of
disturbed soils and contain sediment.
Consultant: Paul Bockenstedt Stantec
2335 Highway 36 West Roseville, MN 55113
Description: Removal of drain tile and installation of ditch checks to restore hydrology to a previously farmed wetland Stormwater Management: None, Wetland Restoration Only District Rule: —E F Disturbed Area: 0.16 Acres Impervious Area: 0 Acres
Permit Location 1953 Aerial Photo
County Road B
Dale Street
W:\07 Programs\Permitting\2015\15-023 Villa Park North Wetland Restoration\15-023 Villa Park Wetland Restoration.doc Page 1 of 2
Capitol Region Watershed District Permit Report
CRWD Permit #: 15-023 Review date: December 10, 2015 Project Name: Villa Park Wetland Restoration Applicant: Jeff Evenson Roseville Parks Superintendent 2660 Civic Center Drive Roseville, MN 55113 Purpose: Drain tile removal and ditch checks and grading to restore
hydrology to a previously farmed wetland Location: 1174 East 7th Street, St. Paul, MN 55106 Applicable Rules: E and F Recommendation: Approve with 1 Condition EXHIBITS:
1. Joint application form, site map and wetland restoration exhibit dated 02/03/15, recd 4/15/15
2. CRWD application packet and site plan dated and recd 12/07/15 HISTORY & CONSIDERATIONS: Project was intended to be completed winter of 2015, but Army Corps of Engineers permitting delayed activities. CRWD awarded $22,410 Special Grant for the wetland restoration work RULE E: WETLAND MANAGEMENT Standard
Wetlands shall not be drained, filled (wholly or in part), excavated, or have sustaining hydrology impacted such that there will be a decrease in the inherent (existing) functions and values of the wetland.
A minimum buffer of 25 feet of permanent nonimpacted vegetative ground cover abutting and surrounding a wetland is required.
Findings
W:\07 Programs\Permitting\2015\15-023 Villa Park North Wetland Restoration\15-023 Villa Park Wetland Restoration.doc Page 2 of 2
1. There are wetlands located on the property. 2. The wetland impacts will include small excavations to locate and block drain
tiles, , fine grading to direct water away from the existing path, and will restore hydrology to reduce invasive species within the wetland area
3. A WCA permit is not needed due to wildlife habitat and wetland type exemptions.
4. The project will improve the water attenuation capabilities of the existing wetland return it to a condition more representative of pre-settlement.
RULE F: EROSION AND SEDIMENT CONTROL
Standards A plan shall demonstrate that appropriate erosion and sediment control
measures protect downstream water bodies from the effects of a land-disturbing activity.
Erosion Control Plans must adhere to the MPCA Protecting Water Quality in Urban Areas Manual.
Findings 1. Erosion and sediment control measures are not consistent with best
management practices, as demonstrated in the MPCA manual Protecting Water Quality in Urban Areas.
2. Adjacent properties are protected from sediment transport/deposition. 3. Wetlands, waterbodies and water conveyance systems are not protected from
erosion/sediment transport/deposition. 4. Project site is less than one acre; an NPDES permit is not required.
Recommendation: Approve with 1 Condition Conditions:
1. Provide a plan that identifies type and location of practices that will be used to minimize erosion of disturbed soils and contain sediment.
>
>
>
>
>
>
>
>
>
>
>>
>>
>>
> > > >
>
>>
>>>
>>
>
>>
Plot
Da
te:11/24/2014
-10:08amD
raw
ingna
me
:\\Us1291-f01\w
orkg
roup
\1937\ac
tive\193703095\05_re
port_deliv\dw
gs_desgn\prelimplan
FIG1.dw
gXre
fs:
DATE: PROJ. NO.:
2335 Highway 36 WSt. Paul, MN 55113www.stantec.com
WORK MAP
CITY OF ROSEVILLE, MINNESOTA
VILLA PARK
NOV 2014 193703095
FIGURE 1
N
0 30 60
W2 FUTUREPROJECT PHASE
W1 CURRENTPROJECT SITE
DITCH
DITCH BLOCK EL. 960.0 G SPILLWAY
DITCH BLOCK EL 959.0 G SPILLWAY
DITCH BLOCK EL 958.5 G SPILLWAY
DITCH BLOCK EL 958.0 G SPILLWAY
DITCH BLOCK EL 957.0 G SPILLWAY
TILE INVESTIGATION/BLOCK
TILE INVESTIGATION/BLOCK
GRADE NEW SWALE OUTLETADJACENT TO TRAIL
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
Regular Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday,
December 2, 2015 6:00 p.m. at the office of CRWD, 1410 Energy Park Drive, Suite 4, St. Paul, Minnesota
REGULAR MEETING MINUTES
I. A) Call to Order of Regular Meeting (President Joe Collins)
Managers
Joe Collins
Seitu Jones
Shirley Reider
Mary Texer
Mike Thienes
Staff Present
Bob Fossum, CRWD
Forrest Kelley, CRWD
Michelle Sylvander, CRWD
Nate Zwonitzer, CRWD
Public Attendees Pat Cavanaugh, CAC Member
B) Review, Amendments and Approval of the Agenda
President Collins opened the meeting at 6:00 p.m. and asked for any additions or changes to the agenda. Mr.
Fossum requested the addition of Action Item H. Appoint Claudia Hochstein to the Citizens Advisory
Committee.
Motion 15-248: Approve the November 18, 2015 Agenda with the addition of Action Item H.
Reider/Thienes
Unanimously approved
II. Public Comment
No comments.
III. Permit Applications and Program Updates
A) Permit #15-037 MNDOT Pedestrian Bridges (Kelley)
Mr. Kelley reviewed Permit #15-037 MNDOT Pedestrian Bridges. The applicant is MnDOT. MnDOT is
constructing two new pedestrian bridges over Highway 94 at Grotto and Mackubin. The applicable rules are
Stormwater Management (Rule C) and Erosion and Sediment Control (Rule F). The disturbed area of this
project is 1.51 acres with .55 acres of impervious surface.
Motion 15-249: Approve Permit #15-037 MnDOT Pedestrian Bridges with 3 Conditions:
1. Provide plans signed by a professional engineer per the Minnesota Board of AELSLAGID.
December 16, 2015 Board Meeting
V. Action Item A) Approve Minutes
of December 2, 2015
DRAFT Regular Board Meeting
(Sylvander)
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
2. Provide a copy of the NPDES permit.
3. Provide a detail or specification for structure 5001A (“Special 1”). This appears to be the SAFL Baffle,
but it is not specifically identified.
Reider/Texer
Unanimously approved
Motion 15-250: Approve withdrawal of 2,196 cubic feet from MnDOT’s volume reduction bank.
Reider/Thienes
Unanimously approved
IV. Special Reports
A) Special Grants Update (Zwonitzer)
Mr. Zwonitzer reviewed Special Grant Projects that are near completion in the District. Mr. Zwonitzer shared
how CHS Field was initially awarded $225,000 for BMPs treating beyond permit requirements. In January
2014 the award was increased to $325,000 to include rainwater harvesting. In May 2015 the award was
increased again to $335,000 for interpretive concrete etching. The BMPs at CHS Field include: 27,000 gallon
rainwater harvesting cistern, tree trenches with Stockholm soil, vegetated swale, rain garden in parking lot and
underground filtration. Mr. Zwonitzer explained how the harvested rainwater is stored and treated. Manager
Jones asked about monitoring of the BMPs. Mr. Zwonitzer explained that the system will measure how much
was captured, but 2015 was not a full season. The system is meeting standards for improving water quality.
Manager Reider asked about when the system is shut down. Mr. Zwonitzer replied that is depends on the
weather. For winterizing, the system is completely drained and closed so it is not capturing runoff in the winter
season.
The Great River School was awarded $110,000 for rain water reuse, slope stabilization, permeable parking, play
surface, and soil testing. Manager Texer asked who is responsible for the maintenance of the rainwater
harvesting system. Mr. Zwonitzer replied that as the contract is stated, Great River School will be responsible
for the maintenance of the system. Mr. Zwonitzer reviewed the Pioneer Endicott Green Roof project. The
grant agreement was amended in October 2014 and reduced to $16,276. As the designs progressed the scope of
green roof system was reduced. The Pioneer Endicott Green Roof project is near completion and just waiting
for signage to be installed. The Twin Cities German Immersion School was awarded $10,000 in 2013. In
2014, the grant was amended to $20,000 for increased scope. In 2015 the Twin Cities German Immersion
School was amended again to $26,450 because of an increased scope. Mr. Zwonitzer provided an update on
plans for Central High School. In 2013, $10,000 was awarded for investigation and a feasibility study. In 2014,
$50,000 was awarded for additional design work. Construction at Central High School is scheduled for 2016
and CRWD has awarded $150,000 for installation. The Harambee Elementary School in Maplewood was
awarded $55,000 in 2015 for design and construction of rain gardens. The Managers thanked Mr. Zwonitzer for
his review.
V. Action Items
A) AR: Approve Minutes of the November 18, 2015 regular Meeting (Sylvander)
Manager Texer noted a correction.
Motion 15-251: Approve Minutes of the November 18, 2015 regular meeting with correction.
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
Jones/Reider
Unanimously approved
B) AR: Approve 2016 Special Grants (Zwonitzer)
Mr. Zwonitzer reviewed that typically a preliminary budget amount is set and then applications for projects to
fund are solicited. Applications for 2016 Special Grant funds were due October 2, 2015. Six application were
received totaling $1.04 million. The review committee met to develop funding recommendations. Five projects
were selected for full or partial funding, one project was determined not to provide sufficient benefit to warrant
funding. A total of $319,150 of the $350,000 available funds available is recommended for projects. The
remaining funds will be reserved to supplement projects if additional opportunities are identified or to fund
additional projects.
Motion 15-252: Approve funding for 2016 Special Grants agreements and authorize Board President and
Administrator to execute agreements pending approval of Assistant Ramsey County Attorney.
1. Catholic Charities - $10,000 for additional feasibility for a rainwater harvesting system at the
new Dorothy Day Center
2. East Side Neighborhood Development Company - $37,500 for “Pocket Neighborhood”
stormwater management feasibility study
3. Rondo Community Land Trust - $95,000 For feasibility, construction documents, construction
and educational signage
4. St. Paul Parks - $136,650 for construction of Swede Hollow stream improvements
5. St. Paul Parks - $40,000 for North Lake Como stabilization and habitat improvements
Reider/Thienes
Unanimously approved
C) AR: Approve Vehicle Purchase (Fossum)
Mr. Fossum reviewed how the District has been leasing vehicles from the City of St. Paul since 2005. The cost
of leasing from St. Paul continues to increase about 7% each year. The District is transitioning from leasing
from the City of St. Paul to leasing from Midway Ford. The district is currently leasing a sedan and SUV from
Midway Ford with the option to purchase at the end of the lease. Staff have determined a more customized
truck would increase efficiency of the District’s monitoring program. Staff have worked with Midway Ford to
design a customized 2016 F250 with a Knapheide canopy service body. This truck would have four wheel
drive, more storage for tools and monitoring equipment allowing staff to be more efficient. Purchasing this
vehicle could save the District an estimated $60,000 over ten years and provide a vehicle with a trade in or
resale value. The truck would be purchased with funds available from the 2015 budget.
Motion 15-254: Authorize Administrator to purchase 2016 F250 with customized box with Midway Ford for an
amount not to exceed $42,000.
Reider/Thienes
Unanimously approved
D) AR: Approve Engineering Work Order with Barr Engineering for TBI Repair Work (Eleria)
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
Mr. Fossum reviewed the 5-year capital improvement plan for TBI in place of Ms. Eleria. The plan identifies
four major CIP repairs in sections of the tunnel that are in fair or fair to poor condition. The first project
involves addressing missing mortar in the limestone blocks, sealing cracks, patching damaged concrete and
voids in nearly 3,000 feet of tunnel (starting downstream end) of CRWD’s ownership of TBI. The estimated
cost of construction is $1,110,000. Barr Engineering has prepared a draft work order. Tasks include pre-design
in-tunnel inspection to determine the estimated quantities for each type of repair, designing the tunnel repairs,
estimating construction cost, preparing bidding/contract documents, and administrating the bidding process.
Motion 15-255: Approve TBI Work Order No. 10 in an amount not to exceed $75,000 and authorize
Administrator to execute work order amendments not to exceed $7,500.
Thienes/Jones
Unanimously approved
E) AR: Approve Comments on Draft City of St. Paul Chapter 52 Ordinance on Stormwater
(Kelley)
Mr. Kelley reviewed that the City of St. Paul is required by their NPDES Phase I MS4 permit to update
stormwater requirements to include volume reduction. CRWD staff have participated in a City initiated
ordinance revision stakeholder group. Staff have reviewed the draft proposed ordinance and have provided a
comment letter that outlines three overarching concerns.
Water Quality for Small Sites
As outlined in Strategy 2.15 of the City’s Water Resource Management Plan, CRWD recommends the City
revise Chapter 52 to require volume reduction practices on developments greater than 10,000 square feet. Since
2009, CRWD has attempted to advance water quality and volume reduction practices on projects less than one
acre. At the City’s request, CRWD removed proposed language within its Rules that would require volume
reduction on projects less than one acre. At the time, the upcoming City Ordinance revision process was
identified as a potential solution to address these small sites, and the Water Resources Management Chapter of
Saint Paul Comprehensive Plan identifies Strategy 2.15 to develop water quality standards on small sites.
Current and proposed revisions require private developments to invest in significant rate control infrastructure
for all sites greater than 10,000 square feet, but do not require any water quality practices for sites less than one
acre. Through previous analysis of actual small sites with municipally approved plans, CRWD determined that
volume reduction and water quality practices could be implemented through slight modifications to rate control
infrastructure with a nominal cost increase of approximately 1-3% of total project cost.
Permitting and Review Process
Currently, Chapter 52 requirements are reviewed as part of the City Site Plan Review process. However, unlike
other City ordinances, Chapter 52 does not specify what city department is responsible to review and determine
compliance with stormwater runoff standards, or how inspection and enforcement will be implemented post
approval. CRWD understands and supports the efforts to eliminate duplicative review processes by exempting
projects that require Watershed District permits, but it is unclear what impact the review for projects that are not
within Watershed Districts, including street projects (and small sites if implemented), will have on City staffing
and budget constraints. CRWD recommends clear delineation of responsibilities between Public Works and the
Department of Safety and Inspections within the ordinance, and a guidance or policy document intended for use
by applicants to navigate the permitting process.
Ordinance Focus
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
The current ordinance has a clear focus on erosion and sediment controls during construction. Many of the
definitions and requirements pertain to temporary practices appropriate for implementation on active
construction sites. The proposed updates add limited language that requires permanent stormwater volume
control and water quality practices. With this required expansion of focus, much of the terminology and intent
becomes inconsistent and at times confusing. CRWD recommends significant effort be taken to eliminate
redundancies, and utilize terms and language more commonly used by stormwater practitioners found within
existing local, state, and national regulations. For example, Stormwater Pollution Control Plan should be
replaced by Storm Water Pollution Prevention Plan. Additional clarification and consistency is required to
provide clear differentiation between temporary best management practices (BMPs) to control construction site
runoff and permanent Stormwater BMPs for post-construction stormwater management
Managers felt the letter was well written and did not have any recommendations for changes.
Motion 15-256: Approve Draft Comment Letter on City of St. Paul’s Proposed Revised Stormwater Runoff
Ordinance.
Reider/Jones
Unanimously approved
F) AR: Approve Amendment for Special Grant for the Midway Stadium Redevelopment
(Zwonitzer)
Mr. Zwonitzer reviewed that in December, 2014 the Board approved a grant totaling $150,000 to the St. Paul
Port Authority (SPPA) for the Midway Stadium redevelopment site. Of those funds, $10,000 was designated for
educational signage, and $10,000 was designated to install water sampling wells. The remaining grant funds
were designated for innovative BMPs that treat above and beyond CRWD rules. There was an added stipulation
that since the proposed infiltration BMP was so large it should treat runoff from other properties, primarily
Energy Park Drive.
Though Energy Park Drive is a County road, the stormwater infrastructure is managed by St. Paul. SPPA
approached the City about directing flow from the sewer to the large infiltration BMP at the Midway site. The
City would not allow it due to liability concerns. SPPA also approached the property to the west, but they were
unable to reach an agreement. The project will treat a small area of the fire safety facility to the east as well as the
site’s entire footprint to roughly a three inch event. Since the project will have less benefit than the original
proposal, staff are recommending a reduction in the grant award to a total of $120,000.
Motion 15-257: Amend 2015 Special Grant award to Saint Paul Port Authority for the Midway Stadium
Redevelopment project as follows: $10,000 for educational signage, $6,500 for monitoring equipment
installation, and $103,500 for BMP installation for a total grant award of $120,000.
Reider/Thienes
Unanimously approved
G) AR: MAWD Annual Meeting Resolution Recommendations (Texer)
Manager Texer reviewed that as part of the annual meeting of the Minnesota Association of Watershed District
(MAWD), delegates are asked to consider and take action resolutions submitted to the membership. Manager
Texer shared that Coon Creek has withdrawn resolution number seven. Manager Texer viewed the six items
listed on the Annual Meeting Resolution Agenda. Agenda item number one is to amend language by adding
Association of Minnesota Counties to represent. The second agenda item is to raise road levels so not to
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
become flooded. The third agenda item is to raise the Managers per diem to $100 per meeting. The fourth
agenda item is for Watersheds to have input in a buffer protection map. The fifth agenda items is from Crow
River on water improvements for permitting. The sixth agenda item is from the Lower Minnesota Watershed.
H) AR: Appoint Claudia Hochstein to the Citizen Advisory Committee (Doneux)
Managers reviewed the application of Claudia Hochstein to join the Citizen Advisory Committee. Ms.
Hochstein is a resident of St. Paul. She lives in the Summit-University neighborhood. Ms. Hochstein is an
Environmental Specialist with the Minnesota Pollution control Agency. Her experiences include development
of the 2015 Environmental Quality Board Water policy Report, President of the Headwaters Ecology Club,
Classics Club at University of Minnesota, and an internship in education/outreach planning at Milwaukee
Metropolitan Sewerage District.
Motion 15-258: Appoint Claudia Hochstein to the Citizens Advisory Committee.
Reider/Thienes
Unanimously approved
VI. Unfinished Business
A) Upper Villa Park Stormwater Improvement Project (Kelley)
Mr. Kelley provided an update to the Board of Managers on the Upper Villa Stormwater Improvement Project.
The project was started on November 2nd and construction is going well. Mr. Kelley shared up to date pictures
of the project. Mr. Kelley noted that the field will not be sodded due to the weather. Additional conversations
are planned to take place with the City of Roseville about sodding in the fall of 2016 and using a temporary
field surface for the 2016 season.
VII. General Information
A) Administrators Report
1) Administrator Approved or Executed Agreements
a) Consultant Services Agreement with Cathryn Kennedy Consulting Ltd for CRWD media
engagement not to exceed $5,000. Stewardship Grant Agreement for a rain garden at 1462 Charles
Ave, Saint Paul not to exceed $317.Stewardship Grant Agreement with Saint Anthony Greens HOA
/ Omega Management for cost associated with the installation of a rain garden at 814 Seal Street in
St. Paul not to exceed $11,263.
b) Change Order No. 11 with Sunram Construction for Highland Ravine for additional stabilization
$6,050.45 with a total not to exceed $407,105.20.
c) Consultant Services Agreement with Applied Ecological Services, Inc. for the Como Pond Buffer
Management Plan not to exceed $4,260.
d) Contract Purchase Agreement with Vacker Inc. for the fabrication and installation of 19 new
interpretive signs at Green Line tree trench locations.
e) Amendment No. 4 to Consultant Services Agreement with Barr Engineering for additional work and
flood control alternatives for the Eustis Street Stormwater Improvement Feasibility Study for $3,000
with a total not to exceed $61,080.
f) Amendment No. 7 to Work Order No. 1 for Trout Brook Storm Sewer Interceptor for 2015 general
engineering services to increase from $15,000 to $25,000.
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District
g) Grant Agreement with AD Green Roof for green roof monitoring at the Penfield building not to
exceed $7,025.
h) Stewardship Grant Agreement for cost associated with a curb cut rain garden at 1851 Chelton Ave.
not to exceed $5,340.
i) Stewardship Grant Agreement for costs associated with a curb cut rain garden at 1227 Seminary
Ave. not to exceed $6,205.
j) Stewardship Grant Agreement for costs associated with construction of four rain gardens, two dry
wells and two porous pavements at 1778 Colvin Ave. not to exceed $3,410.
VIII. Next Meeting
A) Wednesday, December 2, 2015 Board Meeting.
B) Wednesday, December 9, 2015 CAC Meeting. Manager Thienes will be attending.
C) Wednesday, December 16, 2015 Annual Meeting and Awards Program,
Annual Meeting to be held at Wilder Foundation, business meeting to begin at 5:00 p.m.
Motion 15-259: Adjournment of the December 2, 2015 Regular Board Meeting at 7:15 p.m.
Thienes/Reider
Unanimously Approved
Respectfully submitted,
Michelle Sylvander
W:\04 Board of Managers\Minutes\2015\December 2, 2015 DRAFT.docx
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
DATE: December 10, 2015
TO: CRWD Board of Managers
FROM: Michelle Sylvander, Office Manager
RE: November 2015 Accounts Payable/Receivable and Administrative/Program Budget
Report
_________________________________________________________________________________
Background
Enclosed are the Accounts Payable/Receivable and the Administrative/Program Budget Reports for the
Month of November 2015.
Issues
Summary of Accounts Payable/Receivable Report: Accts Payable $ 926,520.99
(Total Expenses) Accounts Receivable $ 13,806.22
Summary of Preliminary Budget Report: Administrative Budget $ 45,201.87
(November Expenses) Program Budget $ 112,073.17
Project Budget $ 100,622.64
Capital Improvement Budget $ 612,670.59
TOTAL $ 870,568.27
Request Action
Approve November 2015 Accounts Payable/Receivable and Budget Report, direct Treasurer and Board
President to endorse and disperse checks for these payments.
enc: November 2015 Accounts Payable
November 2015 Preliminary Budget Report
W:\02 Budget and Finance\Board Memos\Board Memos 2015\BD Memo AP Budget Report 12.16.15.docx
December 16, 2015, 2015
Board Meeting
V. Action Items – B) Accounts
Payable & Budget Update
(Sylvander)
CAPITOL REGION WATERSHE DISTRICTJOB COST RECAP
FOR THE PERIOD November 1, 2015 - November 30, 2015
2015 CURRENT MONTH YEAR-TO-DATE BALANCE OF BUDGET % OF BUDGET JOB COST #/NAME ANNUAL BUDGET EXPENDITURES EXPENDITURES REMAINING EXPENDED
15970 - General Adminitration 15 584,200.00 45,201.87 702,338.46 (118,138.46) 120.22%15999 - New Office 150,000.00 0.00 22,052.15 127,947.85 14.70%00000 - Administration Allocation (122,500.00) - - (122,500.00) 0.00%
TOTAL GENERAL ADMINISTRATION: $611,700.00 $45,201.87 $724,390.61 ($112,690.61) 118.42%200 - Administration 80,850.00 - - 80,850.00 0.00%201 - Groundwater 8,050.00 - 6,131.22 1,918.78 76.16%207 - Rulemaking/Rule Revisions 21,150.00 - 5,007.77 16,142.23 23.68%208 - Permitting 192,590.00 7,611.90 85,572.11 107,017.89 44.43%210 - Stewardship Grants 257,980.00 34,686.95 252,392.41 5,587.59 97.83%211 - Monitoring & Data Collection 560,874.00 47,532.25 405,216.38 155,657.62 72.25%220 - Education & Outreach 185,590.00 19,049.18 160,686.38 24,903.62 86.58%225 - Technical Resources & Information Sharing 33,610.00 2,057.85 37,190.48 (3,580.48) 110.65%228 - Innovative BMP's Research 108,420.00 405.82 15,164.64 93,255.36 13.99%230 - Geographic Informatin Systems (GIS) 77,710.00 191.18 8,112.19 69,597.81 10.44%240 - Safety Program 35,790.00 538.04 12,999.35 22,790.65 36.32%
TOTAL PROGRAMS: $1,562,614.00 $112,073.17 $988,472.93 $574,141.07 63.26%300 - Administration 41,650.00 - - 41,650.00 0.00%301 - Shoreline & Streambank Maintenance 36,200.00 - 926.00 35,274.00 2.56%305 - Como Lake Subwatershed 133,400.00 30,934.50 73,845.46 59,554.54 55.36%310 - Lake McCarron's Subwatershed 63,660.00 (640.00) 13,001.20 50,658.80 20.42%313 - Loeb lake Subwatershed 27,000.00 20,503.61 53,436.97 (26,436.97) 197.91%315 - Trout Brook Subwatershed 231,635.00 9,628.95 245,815.80 (14,180.80) 106.12%317 - Crosby Lake Subwatershed 12,000.00 430.24 9,487.70 2,512.30 79.06%325 - Wetland, Stream & Ecosystem Restoration 77,000.00 83.15 189.28 76,810.72 0.25%330 - Mississippi River Subwatershed 125,158.00 37,954.66 214,051.59 (88,893.59) 171.03%370 - Watershed Management Plan 60,000.00 1,727.53 30,301.31 29,698.69 50.50%
TOTAL PROJECTS: $807,703.00 $100,622.64 $641,055.31 $166,647.69 79.37%TOTAL OPERATING FUND: $2,982,017.00 $257,897.68 $2,353,918.85 $628,098.15 78.94%
401 - Shoreline & Streambank Restoration 32,000.00 - 1,361.25 30,638.75 4.25%405 - Como Lake BMP's 85,000.00 24,162.48 144,636.78 (59,636.78) 170.16%410 - Lake McCarron's BMP's 929,050.00 562,370.10 728,432.81 200,617.19 78.41%415 - Trout Brook BMP's 90,600.00 - 50,663.65 39,936.35 55.92%417 - Crosby Lake BMP's 38,200.00 4,634.68 83,959.17 (45,759.17) 219.79%425 - Wetland, Stream & Ecosystem Restoration 154,000.00 - 952.31 153,047.69 0.62%430 - Mississippi River Subwatersheds BMP's 110,000.00 - 1,337.11 108,662.89 1.22%440 - Special Projects & Grants 735,250.00 21,503.33 167,420.89 567,829.11 22.77%
TOTAL CAPITAL IMPROVEMENT: $2,174,100.00 $612,670.59 $1,178,763.97 $995,336.03 54.22%15104 - Debt & Loan Service 15 368,131.00 - 56,321.88 311,809.12 15.30%
TOTAL DEBT SERVICES: $368,131.00 $0.00 $56,321.88 $311,809.12 15.30%
TOTAL ALL FUNDS: $5,524,248.00 $870,568.27 $3,589,004.70 $1,935,243.30 64.97%Fund Balance Year-to-Date Year-to-Date Fund Balance
FUND BALANCES @ 12/31/14 2015 Fund Transfers Revenue Expenditures @ 10/31/15 Operations 1,787,686.00 - 1,456,372.41 $2,353,918.85 890,139.56 Capital Improvement 3,654,692.00 - 407,490.99 1,178,763.97 2,883,419.02 Debt Service 58,693.00 - 185,867.63 $56,321.88 188,238.75
TOTAL FUND BALANCE: $5,501,071.00 $0.00 $2,049,731.03 $3,589,004.70 3,961,797.33
CAPITOL REGION WATERSHE DISTRICTJOB COST DETAIL
FOR THE PERIOD November 1, 2015 - November 30, 2015
2015 CURRENT MONTH YEAR-TO-DATE BALANCE OF % OF BUDGET
JOB COST #/NAME ANNUAL BUDGET EXPENDITURES EXPENDITURES BUDGET REMAINING EXPENDED15970 - General Adminitration 15 584,200.00 45,201.87 702,338.46 (118,138.46) 120.22%15999 - New Office 150,000.00 - 22,052.15 127,947.85 14.70%10000 - Administration Allocation (122,500.00) - - (122,500.00) 0.00%
TOTAL GENERAL ADMINISTRATION: $611,700.00 $45,201.87 $724,390.61 ($112,690.61) 118.42%20000 - Administration Allocation 80,850.00 - - 80,850.00 0.00%15000 - Implement Permit Program 99,060.00 7,239.54 74,457.95 24,602.05 75.16%15101 - Permit Tracking Data Mgmt 15 9,930.00 158.50 7,105.44 2,824.56 71.56%15102 - Construction Inspection 15 62,950.00 213.86 2,175.12 60,774.88 3.46%15103 - Permit Closure & Post Construction 20,650.00 - 1,833.60 18,816.40 8.88%15120 - Evaluate Rules & Conduct 15 21,150.00 - 5,007.77 16,142.23 23.68%15130 - Groundwater Prot Well Seal 15 8,050.00 - 6,131.22 1,918.78 76.16%15143 - Stewardship Grants 15 92,560.00 15,638.55 147,180.68 (54,620.68) 159.01%15144 - Partner Grants 15 85,900.00 619.82 32,883.91 53,016.09 38.28%15145 - Inspiring Communities Prog 15 60,600.00 2,127.42 22,487.82 38,112.18 37.11%15146 - RSVP Rain Garden Proj 15 18,920.00 16,301.16 49,840.00 (30,920.00) 263.42%15200 - Baseline Monitor & Data Col 15 301,254.00 20,891.04 289,457.89 11,796.11 96.08%15205 - Lake Monitor & Data Coll 15 89,980.00 18,256.83 42,318.45 47,661.55 47.03%15210 - Villa Park Mon & Data Coll 15 36,700.00 309.16 5,273.29 31,426.71 14.37%15215 - Wetland Bio Monitoring 15 20,020.00 1,548.49 7,532.96 12,487.04 37.63%15220 - Long-term Mon Data Devel 15 16,320.00 - 16,582.18 (262.18) 101.61%15225 - Remote Data Acct/Set-up 15 - - 1,565.42 (1,565.42) 0.00%15230 - BMP Monitoring 15 96,600.00 6,526.73 22,024.46 74,575.54 22.80%15231 - AHUG Exfiltration Monitoring - - 20,461.73 (20,461.73) 0.00%15250 - General 15 49,740.00 10,052.87 79,139.34 (29,399.34) 159.11%15253 - Community Capacity Assess 15 34,450.00 122.91 2,008.31 32,441.69 5.83%15254 - Strategic Communications 15 0.00 - 23.81 (23.81) 0.00%15255 - Clean Streets Outreach 15 17,900.00 - 661.27 17,238.73 3.69%15260 - Municipal Outreach 15 16,150.00 3,659.37 14,515.26 1,634.74 89.88%15262 - Youth Outreach - - 1,544.61 (1,544.61) 0.00%15265 - Partnerships 15 12,550.00 292.62 28,064.01 (15,514.01) 223.62%15270 - Website & Social Media 15 12,900.00 2,062.14 7,164.12 5,735.88 55.54%15271 - Master Water Stewards - 321.15 3,553.77 (3,553.77) 0.00%15275 - Events 15 30,000.00 889.60 21,078.55 8,921.45 70.26%15285 - Awards & Recognition Prog 15 11,900.00 1,648.52 2,933.33 8,966.67 24.65%15300 - Local & Agcy Plan Rev Tech Com 16,840.00 221.22 8,469.75 8,370.25 50.30%15303 - BMP Database Maint Updates 15 16,770.00 1,836.63 28,720.73 (11,950.73) 171.26%15330 - Innovative BMPs Research 15 9,000.00 249.47 14,215.78 (5,215.78) 157.95%
CAPITOL REGION WATERSHE DISTRICTJOB COST DETAIL
FOR THE PERIOD November 1, 2015 - November 30, 2015
2015 CURRENT MONTH YEAR-TO-DATE BALANCE OF % OF BUDGET
JOB COST #/NAME ANNUAL BUDGET EXPENDITURES EXPENDITURES BUDGET REMAINING EXPENDED15333 - Public Art Program 15 24,920.00 - - 24,920.00 0.00%15334 - Green Infrastructure Incentive 8,350.00 - - 8,350.00 0.00%15335 - Existing Site Stormwater Retro 11,000.00 - - 11,000.00 0.00%15336 - Climate Change Impacts 15 18,150.00 156.35 507.20 17,642.80 2.79%15337 - Floating Island Pilot Proj 15 37,000.00 - 441.66 36,558.34 1.19%15370 - GIS Program Developement 15 27,850.00 191.18 6,479.77 21,370.23 23.27%15375 - Data Acquisition 15 10,000.00 - 29.23 9,970.77 0.29%15376 - Internal Mapping System 15 11,600.00 - 1,435.75 10,164.25 12.38%15377 - Impervious Surface Data Set 15 28,260.00 - 167.44 28,092.56 0.59%15390 - Safety Training 15 12,830.00 312.73 5,321.77 7,508.23 41.48%15395 - Safety Program Update/Audit 15 10,650.00 225.31 2,810.08 7,839.92 26.39%15396 - CSE Equipment 15 12,310.00 - 4,867.50 7,442.50 39.54%
TOTAL PROJECTS: $1,562,614.00 $112,073.17 $988,472.93 $574,141.07 63.26%30000 - Administration Allocation 41,650.00 - - 41,650.00 0.00%15100 - Watershed Plan Audit 15 60,000.00 1,727.53 30,301.31 29,698.69 50.50%15400 - Lake McCarrons Shoreline Resto 16,600.00 - 926.00 15,674.00 5.58%15405 - St Paul Natural Res Inter Prog 8,000.00 - - 8,000.00 0.00%15410 - Loeb Lake Shoreline Asses 15 5,800.00 - - 5,800.00 0.00%15411 - Crosby Lake Shoreline Asses 15 5,800.00 - - 5,800.00 0.00%15420 - Como Reg Park Stormwater 15 70,000.00 28,706.30 57,981.72 12,018.28 82.83%15421 - Como BMP Maint & Insp 15 42,750.00 2,228.20 15,399.43 27,350.57 36.02%15422 - Como Lake Impl Rpt Aud 15 20,650.00 - 464.31 20,185.69 2.25%15470 - Aquatic Plant Harvest 15 40,460.00 (640.00) 13,001.20 27,458.80 32.13%15471 - Aquatic Invasive Mgt Plan 15 23,200.00 - - 23,200.00 0.00%15510 - Willow Reserve Mgnt Plan 15 27,000.00 20,503.61 53,436.97 (26,436.97) 197.91%14550 - TB Inspection/Minor Maintenance - - 62,486.43 (62,486.43) 0.00%15550 - Inspection & Annual Maint 112,725.00 8,240.21 111,074.34 1,650.66 98.54%14552 - TBI Easement Verification/Doc 78,000.00 1,284.50 14,565.40 63,434.60 18.67%15554 - TBI Hydraulic/Hydrolic Model 17,000.00 - - 17,000.00 0.00%15570 - NPDES MS4 Stormwater Prog 15 7,170.00 52.12 4,312.93 2,857.07 60.15%15575 - Illicit Discharge Detn/Elim 15 16,740.00 - 1,070.25 15,669.75 6.39%15576 - Lafayette Stormwater Project - 52.12 52,306.45 (52,306.45) 0.00%15600 - Wetland/Stream Reestab Feas 15 77,000.00 83.15 189.28 76,810.72 0.25%15620 - Green Line Redevelop SSGI 15 36,000.00 1,215.63 8,759.04 27,240.96 24.33%15622 - Ford Stie Planning 15 - 30,609.95 132,762.99 (132,762.99) 0.00%14625 - Eustis St Stormwater Improv 30,100.00 1,588.70 49,101.75 (19,001.75) 163.13%15624 - CCLRT BMP Maintenance 15 59,058.00 4,540.38 23,427.81 35,630.19 39.67%15631 - Crosby Lake Mgmt Pl Imple 15 12,000.00 430.24 9,487.70 2,512.30 79.06%
TOTAL PROGRAMS: $807,703.00 $100,622.64 $641,055.31 $166,647.69 79.37%TOTAL OPERATING FUND: $2,982,017.00 $257,897.68 $2,353,918.85 $628,098.15 78.94%
CAPITOL REGION WATERSHE DISTRICTJOB COST DETAIL
FOR THE PERIOD November 1, 2015 - November 30, 2015
2015 CURRENT MONTH YEAR-TO-DATE BALANCE OF % OF BUDGET
JOB COST #/NAME ANNUAL BUDGET EXPENDITURES EXPENDITURES BUDGET REMAINING EXPENDED15680 - Shoreline & Streambank Restoration 15 - - - - 0.00%15681 - Ravine Stablization Poj 15 32,000.00 - 1,361.25 30,638.75 4.25%13700 - Curtis Pond * 85,000.00 24,162.48 144,636.78 (59,636.78) 170.16%12751 - Villa Park Subwatershed BMP 929,050.00 562,370.10 728,432.81 200,617.19 78.41%12801 - Highland Ravine Stabilization * 38,200.00 4,634.68 83,959.17 (45,759.17) 219.79%12815 - TBI Repair 35E to Cayuga - - 45,961.33 (45,961.33) 0.00%13818 - Farrington/Cottage 90,600.00 - 4,702.32 85,897.68 5.19%13852 - Trillium Site Water Resource * 154,000.00 - 952.31 153,047.69 0.62%15881 - Green Line Redev BMPs 15 110,000.00 - 52.12 109,947.88 0.05%15882 - East Kittsondale Retrofit Project - - 1,284.99 (1,284.99) 0.00%15910 - Special Grants 15 616,000.00 20,865.27 140,657.94 475,342.06 22.83%14916 - Central High School - 150.48 9,722.07 (9,722.07) 0.00%14918 - Great River School - - 1,644.22 (1,644.22) 0.00%15913 - Stormwater Retrofit Program 15 119,250.00 - 350.24 118,899.76 0.29%15915 - Dellwood Gardens - - 151.52 (151.52) 0.00%15916 - Upper Villa Park Wetland - - - - 0.00%15917 - Harambee Elementary - 94.70 3,283.38 (3,283.38) 0.00%15918 - Midway Stadium Redevelopment - 242.06 499.46 (499.46) 0.00%15919 - Swede Hollow Final Design - 150.82 590.71 (590.71) 0.00%15920 - Rondo Education Complex - - - - 0.00%15921 - Wilder Square - - 116.39 (116.39) 0.00%15922 - Northern Iron Rain Harvesting - - 10,404.96 (10,404.96) 0.00%
TOTAL CAPITAL IMPROVEMENT: $2,174,100.00 $612,670.59 $1,178,763.97 $995,336.03 54.22%15104 - Debt & Loan Service 15 368,131.00 - 56,321.88 311,809.12 15.30%
TOTAL DEBT SERVICES: $368,131.00 $0.00 $56,321.88 $311,809.12 15.30%
TOTAL ALL FUNDS: $5,524,248.00 $870,568.27 $3,589,004.70 $1,935,243.30 64.97%
CAPITOL REGION WATERSHED DISTRICTPERMITS
FOR THE PERIOD November 1, 2015 - November 30, 2015
PERMIT CURRENT MONTH YEAR-TO-DATE BALANCE OF % OF PERMITNUMBER PERMIT NAME PERMIT FEE EXPENDITURES EXPENDITURES PERMIT REMAINING EXPENDED
15001 Raymond Avenue 0.00 329.67 4,136.00 (4,136.00) 0.00%15002 2700 University 2,000.00 989.82 5,153.12 (3,153.12) 257.66%15003 A-Line Brt. 70,200.00 2,127.11 10,603.93 59,596.07 15.11%15004 McDonough A-Plex 2,000.00 782.71 4,543.00 (2,543.00) 227.15%15005 Murray Middle School 0.00 - 4,906.05 (4,906.05) 0.00%15006 Xcel Gas Phase III 2,000.00 224.48 9,780.16 (7,780.16) 489.01%15007 Ramsey County Building Demo 0.00 - 1,692.50 (1,692.50) 0.00%15008 Victoria Street Roseville 0.00 201.47 8,414.29 (8,414.29) 0.00%15009 Third Street 0.00 - 1,063.30 (1,063.30) 0.00%15010 Como Chatsworth 0.00 18.90 6,432.84 (6,432.84) 0.00%15011 Zittle Green House Demo 0.00 - 187.39 (187.39) 0.00%15012 Pierce Butler Rt. Ext. Bld. Demo 0.00 - 124.38 (124.38) 0.00%15016 Franklin Avenue 0.00 - 309.58 (309.58) 0.00%15017 Kellogg Blvd. Bridge 0.00 44.56 1,991.77 (1,991.77) 0.00%15018 Highland's Assisted Living 2,000.00 - 433.67 1,566.33 21.68%15019 Northern Salt 2,000.00 - 3,348.67 (1,348.67) 167.43%15020 Villa Park Bridge Replacement 0.00 - 122.94 (122.94) 0.00%15021 Joy of the People 0.00 - 714.88 (714.88) 0.00%15022 The Good Acre 2,000.00 231.52 6,413.84 (4,413.84) 320.69%15023 Villa Park N Wetland Restoration 0.00 - 41.08 (41.08) 0.00%15024 Saints Tailgating Parking Lot 2,000.00 - 1,952.42 47.58 97.62%15025 Stewart Street 0.00 - 2,179.50 (2,179.50) 0.00%15026 Victoria Park Apt. Phase II 0.00 - 2,187.21 (2,187.21) 0.00%15027 Midway Stadium Demo 0.00 - 131.02 (131.02) 0.00%15028 Como Park Transportation 0.00 - 2,584.75 (2,584.75) 0.00%15029 Midway Office Warehouse 1,500.00 28.35 3,375.13 (1,875.13) 225.01%15030 Farrington Estates 2,000.00 83.00 3,254.72 (1,254.72) 162.74%15031 Met Council Sanitary Realignment 0.00 9.45 258.99 (258.99) 0.00%15032 Victoria Park East Trail 0.00 - 1,607.33 (1,607.33) 0.00%15033 MacQueen Equipment 0.00 476.50 2,530.74 (2,530.74) 0.00%15034 TH 94 @ West 7th 0.00 258.15 1,193.57 (1,193.57) 0.00%15035 Madison Studio Apartments 0.00 400.40 2,113.53 (2,113.53) 0.00%15036 Regions Ambulance Canopy 2,000.00 786.20 786.20 1,213.80 39.31%15038 Higland Mixed Use Permit 2,000.00 53.46 53.46 1,946.54 2.67%15039 Sunrise Banks Office Building 2,000.00 35.64 35.64 1,964.36 1.78%
TOTAL PERMITS: $93,700.00 $7,081.39 $94,657.60 ($957.60)
Capitol Region Watershed District
Check RegisterFor the Period From December 1, 2015 - December 31, 2015
Date Payee Amount Check Total Check # Description
12/16/15 AD Green Roof $5,450.00 $5,450.00 17037 Website/Activation Fee12/16/15 Al's Coffee 10.76 10.76 17038 Oasis Filter12/16/15 Applied Ecological Services, Inc. 14,825.85 14,825.85 17039 Professional Services12/16/15 Barr Engineering 24,372.83 24,372.83 17040 Engineering Expense12/16/15 Barr Engineering 1,284.50 1,284.50 17041 Engineering Expense12/16/15 Barr Engineering 3,567.36 3,567.36 17042 Engineering Expense12/16/15 Barr Engineering 1,588.70 1,588.70 17043 Engineering Expense12/16/15 Benefit Extras, Inc. 238.25 238.25 17044 Emplyee Benefits12/16/15 Blue Stem Heritage Group 1,398.36 1,398.36 17045 Professional Services12/16/15 C Lanphear Communications 450.00 450.00 17046 Design Work12/16/15 Cathryn Kennedy Consulting, LTD 1,356.25 1,356.25 17047 Communications Services12/16/15 City of St. Paul Financial Services 2,700.00 2,700.00 17048 Vehicle Rental12/16/15 Computer Revolution 12,152.29 12,152.29 17049 IT Services12/16/15 Emmons & Olivier Resources 1,533.50 1,533.50 17050 Engineering Expense12/16/15 Energy Park Plaza 5,927.15 5,927.15 17051 Rent12/16/15 Fleet One, LLC 66.89 66.89 17052 Vehicle Expense12/16/15 Ford Credit 535.81 535.81 17053 Equipment Lease/Purchase12/16/15 Ford Credit 454.44 454.44 17054 Equipment Lease/Purchase12/16/15 Forrest Kelley 600.00 600.00 17055 Monthly Office Cleaning12/16/15 Fourth Sector Consulting 1,530.10 1,530.10 17056 Web Support Services12/16/15 Fresh Color Press 1,107.89 1,107.89 17057 Postcards12/16/15 Frogtown Green 300.00 300.00 17058 Restoration Plan12/16/15 Geosyntec 12,475.83 12,475.83 17059 Professional Services/Optirtic Inst.12/16/15 Great River Greening 16,145.00 16,145.00 17060 Raingarden Events/Planning12/16/15 HealthPartners 13,279.84 13,279.84 17061 Emplyee Benefits12/16/15 Houston Engineering, Inc. 28,101.50 28,101.50 17062 Engineering Expense12/16/15 Houston Engineering, Inc. 1,592.50 1,592.50 17063 Engineering Expense12/16/15 Houston Engineering, Inc. 232.00 232.00 17064 Engineering Expense12/16/15 Integra-Monthly 794.02 794.02 17065 Utilities12/16/15 Joseph Collins 934.93 934.93 17066 Manager Per Diem/Expense12/16/15 Kevin Slattery 500.00 500.00 17067 Stewardship Grant12/16/15 Liz Richards 8,540.23 8,540.23 17068 Stewardship Grant12/16/15 Marco-HP 67.50 67.50 17069 Scanning/E-Mail Issue12/16/15 Marco-Minolta 703.44 703.44 17070 Copier Lease12/16/15 MetLife 654.63 654.63 17071 Emplyee Benefits12/16/15 Midway Ford 44,184.90 44,184.90 17072 2016 F250 Purchase12/16/15 New Look Contracting, Inc. 533,638.27 533,638.27 17073 Pay Request #112/16/15 Outdoor Lab 8,178.99 8,178.99 17074 Landscape Maintenance12/16/15 Pioneer Endicott, LLC 16,276.00 16,276.00 17075 Grant Reimbursement12/16/15 Pitney Bowes-Reserve Account 500.00 500.00 17076 Postage Meter Refill12/16/15 Project for Pride in Living 1,000.00 1,000.00 17077 596 Geranium12/16/15 Project for Pride in Living 1,000.00 1,000.00 17078 701 Maryland Ave. E.12/16/15 Ramsey Conservation District 18,060.00 18,060.00 17079 2015 Data Collection12/16/15 Ramsey County-Attorney 1,443.75 1,443.75 17080 Legal Fees12/16/15 Rhithron Associates, Inc. 1,260.00 1,260.00 17081 Invertebrate Indentifications12/16/15 Sentry Systems, Inc. 1,045.00 1,045.00 17082 Office Expansion12/16/15 SRF Consulting, Inc. 11,936.43 11,936.43 17083 Construction Support12/16/15 St. Paul Department of Public Works 150.00 150.00 17084 Encroachment Permits12/16/15 St. Paul Stamp Works, Inc. 13.94 13.94 17085 CAC Name Tag12/16/15 Staples Business Advantage 55.60 55.60 17086 Office Supplies12/16/15 Teledyne Isco, Inc. 445.34 445.34 17087 Service Order12/16/15 Tyco Simplex Grinnell 95.00 95.00 17088 Emergency Light Service Call12/16/15 Veit & Company 23,376.08 23,376.08 17089 Final Pay #4
12/9/2015 at 1:28 PM Page: 1
Capitol Region Watershed District
Check RegisterFor the Period From December 1, 2015 - December 31, 2015
Date Payee Amount Check Total Check # Description
12/16/15 Verizon Wireless 72.00 72.00 17090 iPads12/16/15 Verizon Wireless 210.06 210.06 17091 iPads12/16/15 Viking Industrial Center 86.09 86.09 17092 Bump Gas Cylinder12/16/15 Walters 22.86 22.86 17093 Recycling Service12/16/15 Waste Management 32.24 32.24 17094 Trash Service12/16/15 Wenck Associates, Inc. 11,145.47 11,145.47 17095 Engineering Expense12/16/15 Wilder Foundation 825.00 825.00 17096 Awards Ceremony12/16/15 Xcel Energy 17.13 17.13 17097 Utilities12/16/15 Xcel Energy 570.00 570.00 17098 Utilities/Monitoring Station12/16/15 US Bank 1,290.27 1,290.27 17099 Various/Credit Card
November A/P: $842,402.77 $842,402.77
November Payroll/Benefits: $84,118.22 $84,118.22
NOVEMBER TOTAL: $926,520.99 $926,520.99
APPROVED FOR PAYMENT: 12/16/2015
NOVEMBER, 2015 RECEIPTS:
Regions Ambulance Canopy 2,000.00 Permit FeeCity of St. Paul 7,085.90 Highland Ravine Elizabeth Hosch 9.00 ApparelDahlberg-Weed Harvesting 640.00 Aquatic Plant HarvestingAckerberg Investors Fund, LLC 2,000.00 Permit FeeSunrise Banks Office Building 2,000.00 Permit Fee4M Fund 71.32 November Interest
NOVEMBER RECEIPTS: $13,806.22
12/9/2015 at 1:28 PM Page: 2
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
DATE: December 10, 2015
TO: Board of Managers
FROM: Mark Doneux, Administrator
RE: Citizen Advisory Committee 2016 Reappointment Recommendation
Background
Regular attendance is a requirement to be a member of the Citizen Advisory Committee in accordance
with their By-Laws. State statute also requires that the Board of Managers must annually appoint the
Citizen Advisory Committee.
Issues
The Board of Managers must annually appoint the Citizen Advisory Committee members. In order to
maintain an orderly CAC roster and fully comply with state statute the Citizen Advisory Committee has
submitted and approved a recommended roster to the Board of Managers. The Board must appoint CAC
members for 2016 at the CRWD Annual Meeting on December 16, 2015.
Requested Action
Appoint the following individuals to the District’s Citizen Advisory Committee through December
2016:
David Arbeit, 1384 East Como Blvd., St. Paul, MN 55117
William Barton, 533 Cretin Ave South, St. Paul, MN 55116
Patricia Cavanaugh, 908 Saint Paul Ave., St. Paul, MN 55116
Steven Duerre, 76 Bates Street, St. Paul, MN 55106
Claudia Hochstein, 487 Dayton Ave., #3, St. Paul, MN 55102
Michael MacDonald, 1391 Almond Ave., St. Paul, MN 55108
Rick Sanders, 363 S. McCarrons Blvd., Roseville, MN 55113
Nicole Soderholm, 108 N. Pierce St., Apt #3, St. Paul, MN 55104
Kathryn Swanson, 2798 16th Terrence NW, New Brighton, MN 55112
Michelle Ulrich, 1561 Lincoln Ave., St Paul, MN 55105
Richard Weil, 25 Charles Ave, St. Paul, MN 55103
Gwen Willems, 1880 Tatum Street, Falcon Heights, MN 55113
W:\04 Board of Managers\Annual Meetings\2015\Boad Memo - 2016 CAC Reappointments 12-10-15.docx
December 16, 2015
V. Action Items
C) Appoint 2016 Citizen
Advisory Committee (Doneux)
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.
DATE: December 10, 2015
TO: CRWD Board of Managers
FROM: Mark Doneux, Administrator RE: Adopt Final 2016 Budget and Certification of Levy
Background
The Board has discussed and reviewed the preliminary 2016 Budget and Tax Levy during several
meetings and workshops this summer. A copy of our summary budget and hearing notice was sent to
the affected cities and Ramsey County officials in August. The Citizen’s Advisory Committee reviewed
and provided comments on the proposed 2016 budget and levy at their August meeting. A duly noticed
Public Hearing was held on August 19th to collect public comment on the proposed 2016 budget and
levy.
Issues
The Board of Managers must adopt and certify a Final 2016 Budget and Levy Certification before the
December 30, 2015 deadline. The Board of Managers held a special workshop on July 27th to review the
draft budget and levy.
Based on the Board recommendations, the final budget provides $459,950 for Administration, $1,879,389
for Programs, $787,391 for Projects for a total Operations Budget of $3,126,730 and $5,697,701 for
Capital Improvement Projects. This results in a total 2016 Budget of $8,824,431. This is an increase of
$3,300,183 from the 2015 Budget. The proposed 2016 tax levy is $4,267,771. This levy includes
$3,897,230 for the general levy and $369,336.00for debt. This levy is $863,104 or 25.35% higher than
2014.
Requested Action
Approve and adopt the Final 2016 Budget and Levy Certification.
enc: Final 2016 Project List (with annotations, 11”x17”)
Final 2016 CRWD Expenditure, Revenue and Levy Summary (11”x17”)
Draft Levy Certification form
Draft Debt Levy Certification form
Draft Resolution – Adopting 2016 Budget & Levy
W:\02 Budget and Finance\Budget - 2016\Budget Files\Final 2016 Budget and Levy 12-16-15\Board Memo - Adoption of Final 2016 Budget and Levy - 12-
10-15.docx
December 16, 2015 Board Meeting
V. Action Item D) Approve Final
2016 Budget and Levy (Doneux)
2016 Capitol Region Watershed Project List November 30, 2015 Final Draft
Fund # Fund Name Project # Project Name
Priority / Comment Project Description
2016 Project Budget
2016 Fund Total
Change
101-16970 General Administration Critical General Administration of District Operations 574,700$ 101-16999 New Office Critical Costs Relating to Consulting, Due Diligence and Design of New Office Facility 178,400
Administrative Allocation Ongoing Annual Cost Allocation to Project and Programs (293,150) 459,950$
201-16130 Groundwater Protection - Well Sealing Beneficial Provide grant reimbursements for well sealing 7,040$ 201-16135 District Groundwater Assessment Important Conduct Assessement of District Groundwater Resources 30,000
37,040$
207-16120Evaluate Rules and Conduct Annual TAC Meeting
Critical Conduct TAC process to update Rules10,450$
10,450$ 208-16000 District Permit Program Critical Continue Implementing District Permit Program 126,180$ 208-16101 Permit Tracking and Database Management Critical Implement BMP Database for previous permits - 208-16102 Construction Inspection Critical Inspect active permits sites for compliance 88,130
208-16103Permit Closure & Post Construction Inspection/Maintenance
Important Inspect completed permit projects for compliance and maintenance21,250
235,560$ 210-16143 Stewardship Grants Important Administer, promote, and outreach on Stewardship Grants 146,480$ Staff Adjustment
210-16144 Partner Grants ImportantProvide Grants to Partners to help Implement Education/Outreach Programming 83,310
210-16145 Inspiring Communities Program Important Provide design & projects funds for City ICP Program 51,600 210-16146 RSVP Rain Garden Projects Important Assist City & Residents with RSVP Rain Gardens 14,500
295,890$ 211-16200 Baseline Monitoring & Data Collection Critical Monitoring of 7 baseline sites, 14 level logger sites, and 4 rain gauges 319,210$
211-16205 Lake Monitoring & Data Collection CriticalMonitoring of 5 CRWD lakes, including chemistry and biological sampling and qualitative parameters 90,190 Staff Adjustment
211-16210 Villa Park Monitoring & Data Collection CriticalMonitoring of 2 FWQ sites in Villa Park as well as 2 level loggers and Lake McCarrons flow only station 38,470
211-16215 Wetland Bio-monitoring ImportantAnnual Monitoring of CRWD wetlands including IBI assessments, water quality analysis, data analysis, and reporting 12,750
211-16220 Long-term Monitoring Database Development CriticalDevelopment of a long term monitoring database for effective data management 29,430
211-16225 Remote Data Access & Set Up Important Implement Remote Data Access Program 23,260
211-16230 BMP Monitoring ImportantMonitoring of BMP sites--Como 7 (6), CCLRT (2), Bdale (1), and 24 level logger sites 79,120 Staff Adjustment
211-15231 Upper Villa Exfiltration Monitoring Beneficial Exfiltration Monitoring of an Underground Infiltration BMP - 592,430$
211Monitoring and Data
Collection
207Rulemaking/Rule
Revisions
208 Permitting
210 Stewardship Grants
ADMINISTRATION
PROGRAMS
101 Administration
201 Groundwater
Page 1
2016 Capitol Region Watershed Project List November 30, 2015 Final Draft
Fund # Fund Name Project # Project Name
Priority / Comment Project Description
2016 Project Budget
2016 Fund Total
Change
220-16250 General Critical General Communication and Outreach 73,480$ 220-15253 Community Capacity Assessment Critical Develop a Community Capacity in Partnership w/RWMWD & MWMO - 220-16255 Clean Streets Outreach Critical Develop and Implement a Clean Streats Outreach Program 10,900
220-16260 Municipal Outreach ImportantTurf and winter maintenance Best Practices training for municipalities and Parks staff 19,400
220-16270 Website and Social Media ImportantMaintenance and improvement of CRWD website, implementation of Contact Management System 28,600 Staff Adjustment
220-16271 Master Water Stewards Important Participate in Master Water Stewards Program 49,400 Increase of $12,500 per Board Motion220-16265 Partnerships Beneficial Contributions to partner organizations and collaborative groups 20,700 220-16275 Events Beneficial Events: Community and CRWD-sponsored events and activities 36,200 220-16285 Awards and Recognition Programs Important Support Blooming St. Paul Awards and CAC Recognition Program 5,160 Staff Adjustment220-16262 Youth Outreach Important Develop and Implement Outreach Prgramming to District Youth 14,120
257,960$
225-15300Local and Agency Plan Review & Tech Committee
CriticalReview plans, serve on local, state, national committees related to stormwater/water quality 19,470$ Staff Adjustment
225-16303 BMP Database Maintenance/Updates Important Provide Maintenance and Updates to BMP Database 17,790 Staff Adjustment37,260$
228-16330 District Research Program Important Develop and Implement Comprehensive Research Program 114,130$ 228-16333 Public Art Program Important Implement Public Art Policy work with Watershed Artist in Residence 25,260 228-16334 Green Infrastructure Incentive Program Beneficial Develop incentive program for Green Infrastructure. - 228-16335 Existing Site Stormwater Retrofit Strategy Beneficial Develop strategy for achieving stormwater retrofits on existing sites - 228-16336 Climate Change Impacts-Research and Action Important Research Climate Change impacts on design Standards (Atlas--14) - 228-16337 Floating Island Pilot Project Important Design and Build a Floating Island Demonstration Project -
139,390$ 230-16370 GIS Program Development Important Manage GIS needs for CRWD 41,000$ 230-16375 Data Acquisition Critical Purchase and update data layers 10,500
230-16376 Internal Mapping System Critical Maintain and update internal mapping system layers and troubleshoot issues3,500
230-16377 Impervious Surfaces Data Set CriticalCoordinate with GIS user group to obtain updated impervious surfaces data set 700
55,700$ 240-16390 Safety Training Critical Conduct CSE/first aid/CPR training for CRWD staff 7,920$ Staff Adjustment
240-16395 Safety Program Updates/Audits CriticalConduct safety audit including assessment of program plan, CSE protocols, office procedures, and equipment 7,210 Staff Adjustment
240-16396 CSE Equipment CriticalProper equipment for safe entry into confined spaces including new equipment, calibration, maintanence, and repair expenses 9,100
24,230$ Administrative Allocation -$ 193,479$
PROGRAMS TOTAL 1,879,389$
228Future Trends: Research and
Positioning
230Geographic
Information Systems (GIS)
240 Safety Program
220Education and
Outreach
225Technical Resources
and Information Sharing
Page 2
2016 Capitol Region Watershed Project List November 30, 2015 Final Draft
Fund # Fund Name Project # Project Name
Priority / Comment Project Description
2016 Project Budget
2016 Fund Total
Change
301-16400 Lake McCarrons Shoreline Restoration Project Important Implement shoreline restoration project around Lake McCarrons 1,760$ 301-16405 St. Paul Natural Resources Intern Program Important Sponser intern with St. Paul for BMP maintenance or other activities 8,000 301-16410 Loeb Lake Shoreline Assessment Important Conduct assessment of the lake shore - Moved to 305-16424301-16411 Crosby Lake Shoreline Assessment Important Conduct assessment of the lake shore - Moved to 305-16424
9,760$ 305-16420 Como Regional Park Stormwater Plan Important Complete a Como Regional Park Stormwater Plan 49,240$ 305-16421 Como BMP Maintenance and Inspection Critical Maintenance and Inspection of Arlington-Pascal BMPs 18,500 305-16422 Como Lake TMDL Reporting & Audit Important Annual MS4 TMDL compliance reporting 10,000 305-16424 Como Lake Aquatic Plant Harvesting Beneficial Harvest Nusiance Aquatic Plants 11,760 Added from 301305-16425 Curtiss Pond Opti RTC O&M Important Operate, Minatian and Inspect Opti RTC System 7,240 Moved from 405 and reduced by $10,000
305-16426 Como Lake, In-Lake Management Assessment Important Conduct In-Lake Management Assessment 86,200 182,940$
310-16470 Aquatic Plant Harvesting Beneficial Harvest Nusiance Aquatic Plants 12,460$ 310-15471 Aquatic Invasive Mgt Plan Critical Develop an Aquatic Invasive Species Mgt Plan 22,240 Staff Adjustment310-16475 Lake McCarrons Internal Loading Assessment Important Conduct an Assessment of the Internal Loading 41,200
75,900$ 313-15510 Willow Reserve Management Plan Critical Planning for the protection and restoration of Willow Reserve in St. Paul 19,500$
19,500$
315-16550 Inspection and Annual Maintenance CriticalManage, operate, inspect, maintain, and repair TBI, including 5yr comprehensive inspection 81,000$
315-14552 TBI Easement Verification & Documentation Critical Complete TBI easement verification, acquisition, and documentation work 81,400
315-15554TBI Hydraulic/Hydrologic Model Calibration & Update
Completed Update TBI Model with Atlas 14 Data48,670
315-15560 TBI Subwatershed Study Important Conduct a Subwatershed Study on a Priortiy TBI Catchment 24,110
315-16570 NPDES MS4 Stormwater Program CriticalImplement Stormwater Management Plan and coordinate work to meet MS4 requirements 5,520
315-16575 Illicit Discharge Detection & Elimination Program CriticalRefine and implement IDDE program. Include monitoring , notification protocols and year-end reporting 23,420 Staff Adjustment
264,120$
317-16630 Crosby Lake Management Plan Implementation Critical Design project in the Crosby Lake Management Plan10,000$
317-16631 Highland Ravine BMP Maintenance Critical Maintain Gully Stabilization BMPs 23,800 33,800$
325-15600Wetland/Stream Reestablishment Feasibility Study
Important Conduct Wetland Inventory and Develop Wetland Management Plan25,600$
25,600$ 330-16620 Green Line Redevelopment SSGI Design Critical Planning, Design Green Line SSGI and Signage 7,700 330-16622 Ford Site Planning Future Provide Design and Planning Assistance for Former Ford Site 25,600 Reduced from $116,800330-14625 Eustis Street Stormwater Improvement Project Important Design Stormwater BMPs along Eustis Street 2,200 330-16624 CCLRT BMP Maintenance Critical Maintain and repair CRWD's green infrastructure along CCLRT 40,600
76,100$ 370-15100 Watershed Plan Audit Future Conduct a 5 year audit of progress on WMP -$
-$ Administrative Allocation 99,671$
PROJECTS TOTAL 787,391$
325Wetland, Stream, and
Ecosystem Restoration
330Mississippi River
Subwatershed
370Watershed
Management Planning
313Loeb Lake
Subwatershed
317Crosby Lake
Subwatershed
315Trout Brook
Subwatershed
310Lake McCarron's
Subwatershed
PROJECTS
301Shoreline & Streambank Maintenance
305Como Lake
Subwatershed
Page 3
2016 Capitol Region Watershed Project List November 30, 2015 Final Draft
Fund # Fund Name Project # Project Name
Priority / Comment Project Description
2016 Project Budget
2016 Fund Total
Change
401-15680 Shoreline and Streambank Restoration Projects Important Implement shoreline restoration and aquatic plant management-$
401-16681 Ravine Stabilization Projects Important Complete design & installation of ravine stabilization projects 27,200 27,200$
405-16700 Curtis Field Opti RTC Maintenance Critical Maintain and Inspect Opti RTC System -$ Moved to 305 and reduced by $10,000405-16705 Como Lake BMP Preliminary Engineering 55,600
55,600$
410-12751 Upper Villa Park Stormwater Improvement Project Critical Complete the Construction of the Upper Villa BMP183,900 Reduced from $276,900
183,900$ 413-16720 Willow Reserve Restoration Project Important Conduct Phase I of Ecological Restoration Project 121,700 Increased from $66,700
121,700$
415-13818 TBI Repair - Farrington/Cottage CriticalComplete TBI Flood Control and Water Quality Project at Farrington and Cottage 6,000
415-16811Grand Round North Loop Green Infrastructure Practices - Phase I
Beneficial Support and Provide Grant for Green Infrastructure8,750
415-16813Lafayette Park Campus Stormwater Improvement Project
Important Design and Construct Stormwater Improvements20,880 Reduced from $111,980
415-16815 TBI Repairs - St. I35+06 to 180+29 Important Design Repairs for Sta. 135+06-180+29 91,900 127,530$
-$
425-16851 Wetland Reestablishment: Implementation FutureImplement feasible reestablishment projects identified in Wetland and Ecosystem Restoration -Planning (325 C). 104,480
425-13852Trout Brook Nature Sanctuary Water Feature - Construction
Critical$150K balance of $400K due in 2017 for stream elements in the TB Nature Sanctuary -
425-16853 Victoria Park Water Features Beneficial Design Victoria Park Water Features 85,080 New - Added at City Request189,560$
430-16881 Green Line Redevelopment BMPs Important Design and Construction of Innovative BMP(s) the Green Line 53,800 430--15883 East Kittsondale Stormwater Retrofits Important Design and Implement Stormwater Retrofits as part of CWF Project 104,400
430-16885 Downtown Bike Loop Green Infrastructure Project Beneficial Support and provide grant for Green Infrastructure40,670
430-16886Lauderdale Subwatershed Stormwater Improvement Project
Important Design and Construct Stormwater Improvements108,970
307,840$ 440-16910 Special Grants Critical Implement Special Grant Program 380,900$ Staff Adjustment440-16913 Stormwater Retrofit Program Important Implement Stormwater BMPs Recommended by Subwatershed Studies 64,400 440-14916 Central High School Critical Implement Stormwater Improvements 369,735
815,035$ 450-16950 New Office Facility Critical Plan, Design and Construct New Office Facility for CRWD 3,500,000$
3,500,000$ 490-15001 Debt & Loan Service Critical Annual Payment for 2007A, CWF Loan and 2013A Debt 369,336$
369,336$
CAPITOL IMPROVEMENT PROGRAM TOTAL 5,697,701$
490 Debt Service
425Wetland, Stream, and
Ecosystem Restoration
430Mississippi River Subwatersheds
BMP's
440Special Projects and
Grants
450Future Trends: Implementation
Lake McCarron's BMP's
413 Loeb Lake BMP's
415 Trout Brook BMP's
417 Crosby Lake BMP's
405 Como Lake BMP's
CAPITAL IMPROVEMENT PROJECTS
401Shoreline and Streambank Restoration
410
Page 4
2016 Capitol Region Watershed Project List November 30, 2015 Final Draft
Fund # Fund Name Project # Project Name
Priority / Comment Project Description
2016 Project Budget
2016 Fund Total
Change
BUDGET SUMMARY ADMINISTRATION 459,950$ No ChangePROGRAMS 1,879,389$ Increased by $15,300PROJECTS 787,391$ Reduced by $ 90,080ADMINISTRATIVE ALLOCATION $293,150
OPERATIONS TOTAL 3,126,730$ Reduced by $ 74,780
CAPITOL IMPROVEMENT PROGRAM 5,697,701$ Reduced by $72,060
TOTAL 2016 BUDGET 8,824,431$ Reduced by $ 146,850
Update NotesJuly 8, 2015 First Draft Budget review with Board of Managers
July 27, 2015 Second Draft Budget with Board of ManagersAugust 5, 2015 Preliminary Draft Budget for Public Comment
November 30, 2015 Final Draft Budget
Page 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
A B C G H I J K N O P T U V W X Y
2016 CRWD Expenditure, Revenue and Levy Summary8/28/2015
OPERATIONS2012 Actual 2013 Actual 2014 Actual 2015 Estimated 2016 Proposed 2012 Actual 2013 Actual 2014 Actual 2015 Estimated 2016 Proposed
Revenue Tax Levy (1) $2,140,918 2,222,828$ 2,259,222$ 2,661,017$ 3,065,730$ Revenues Property Tax Levy (1) 2,445,771$ 2,656,412$ 2,960,882$ 3,404,667$ 4,267,771$ Intergovernmental (MVHC) $35,000 32 2 5,000$ - Bond Proceeds - 1,800,000 - - 3,500,000 Fees $199,000 30,000 22,650 20,000$ 20,000 Partner Funding - 400,000 - 200,000 182,500 Interest Income $233 352 319 500$ 1,000 Met Council 3,075,594 2,000,000 1,219,463 40,000 - Other $5,540 6,607 6,406 36,000$ 40,000 Intergovernmental 35,000 455,000 321,366 5,000 - Total $2,380,691 $2,259,819 2,288,599$ 2,722,517$ 3,126,730$ Fees 199,000 20,000 22,650 20,000 20,000
Other 5,540 220,000 67,500 70,200 290,000 Expenditures Administration $384,594 444,229$ 539,911$ 700,000$ 459,950$ Other - Clean Water G - 65,000 228,484 59,000 70,000
Programs $916,412 1,294,373 1,464,033 1,200,000 1,879,389$ Interest Income 588 3,500 971 1,500 1,000 Projects $451,802 330,517 362,596 750,000 787,391$ Fund Balance - 79,700 6,406 1,186,000 493,160 Total $1,752,808 2,069,119$ 2,366,540$ 2,650,000$ 3,126,730$ Total 5,761,493$ 7,699,612$ 4,827,722$ 4,986,367$ 8,824,431$
Fund Balance Beginning Balance $1,047,044 1,674,927$ 1,865,627$ 1,787,686$ 1,824,203$ Expenditures Administration 384,594$ 376,900$ 539,911$ 700,000$ 459,950$ 50% of Budget Programs 916,412 1,318,616 1,464,033 1,200,000 1,879,389
Ending Balance (2)$1,674,927 1,865,627$ 1,787,686$ 1,824,203$ 1,784,203$ $1,563,365 Projects 451,802 624,844 362,596 750,000 787,391
ok ok ok Capital Improvement 4,862,038 5,379,252 1,949,004 2,201,350 5,697,701 Total 6,614,846$ 7,699,612$ 4,315,544$ 4,851,350$ 8,824,431$
Fund Balance Beginning Balance 4,255,685$ 3,402,332$ 4,902,658$ 5,414,836$ 4,551,353$ CAPITAL
2012 Actual 2013 Actual 2014 Actual 2015 Estimated 2016 Proposed Ending Balance (2)3,402,332$ 4,902,658$ 5,414,836$ 4,363,853$ 4,058,193$
Revenue Property Tax Levy (1) 304,853$ 375,109$ 701,660$ 743,650$ 1,202,041$ Intergovernmental (MVHC) 5$ $3,402,332 $4,902,658 $5,414,836 $4,551,353 4,058,193$ Bond Proceeds $0 $3,015,451 $0 $3,500,000
Villa Park Wetland Partner Funding (3)$0 $0 $321,364 TAX LEVY 2012 Actual 2013 Actual 2014 Actual 2015 Estimated 2016 Proposed
Met Council/MNDOT (TBI) $3,075,594 $573,602 $1,219,463 $40,000 Operations $2,182,675 2,222,828$ 2,259,222$ 2,661,017$ 3,065,730$
MPCA Loan - Villa Park Wetland (4) $0 $430,000 $0 Capital Improvement $310,799 375,109$ 701,660$ 743,650$ 1,202,041
McCarrons Subw - Upper Villa Grants (5) $100,000 $0 $180,000 $0 $290,000 Total $2,493,474 $2,597,937 $2,960,882 $3,404,667 4,267,771$
McCarrons Subw - Upper Villa Partner Funding (6) $182,500 Difference from previous year $155,394 $162,938 $362,945 $443,785 863,104$
CWL - Highland Ravine (7) $0 $15,000 % Change 6.65% 6.53% 13.97% 17.08% 25.35%
Como Subwater 7 Partner Funding (8)$0 $200,000 Historical Adopted Levy Increase 6.65% 6.53% 11.78% 14.65% 25.35%
Clean Water Grant - East Kittsondale $100,000Clean Water Grant - Central High School $87,500 $70,000Other - Clean Water Grant (9) $0 $0 $48,484 $44,000
Stormwater Impact Fund-Ramsey County $67,500 $70,200Interest Income $355 $27,972 $652 $1,000Fund Balance $0 $0 $1,150,000 $453,160Total 3,480,802$ 4,422,139$ 2,539,123$ 2,451,350$ 5,697,701$
Expenditures Capital Improvement Program $4,862,038 3,112,513 1,949,004 2,201,350 5,697,701 Note (10) Fund Transfer of BWSR CCLRT Grant of $598,500 from Operations to Capitol
Total $4,862,038 3,112,513$ 1,949,004$ 2,201,350$ 5,697,701$
Fund Balance Beginning Balance $3,208,641 1,727,405$ 3,037,031$ 3,627,150$ 2,727,150$
Ending Balance $1,727,405 3,037,031$ 3,627,150$ 2,727,150$ 2,273,990$
Bond Expenditure $625,000 $1,225,000 $1,150,000
Bonds Balance $2,375,000 $1,150,000 $0
OP
ER
AT
ION
SC
AP
ITA
L
Note (5) McCarron's Subw - Upper Villa -Clean Water Legacy Grant from BWSR-total grant $360,000. $180,000 received in 2014, $144,00 in
Note (1) The Property Tax Levy is based on actual or projected property tax collections. The Tax Levy section refers to what was certified to the Note (2) Not UsedNote (3) Partner Funding - Villa Park Wetland from Projects Partners, $321,364 (2014)Note (4) MPCA Loan for Villa Park ProjectNote (5) McCarron's Subw - Upper Villa -CWP -MPCA-total grant $275,000. $110,000 received in 2012.
Note (7) Clean Water Legacy - BWSR, total grant $150,000, $75,000 received in 2012, $60,000 when substantially complete in 2015, $15,000 Note (8) Partner Funding for Curtis Field (Pond) Improvements, estimated to be $200,000 in 2014.Note (9) Final Payment of Clean Water Legacy Grant from BWSR for Central Corridor BMPs to be received in 2013
The CIP Fund Balance includes the Boulevard Restoration Fund with a $10,000 balance. Current year Fund Balance based on mid year revenue and expenditure estimates
12/1/20156:47 PM
COUNTY, CITY AND SPECIAL TAXING DISTRICT LEVY CERTIFICATION FINAL TAXES PAYABLE IN 2016
FOR CAPITOL REGION WATERSHED DISTRICT
(Governmental Agency)
LEVY PURPOSE
CERTIFIED FINAL TAX LEVY
NET TAX CAPACITY BASED LEVIES 1) General
$ $3,898,383.51
2) Debt
$ 369,388.49
3) Other (Please Specify)
4)
5)
6)
7)
8)
9)
10) Total Net Tax Capacity Based Levies
(Total 1 through 9)
$ 4,267,771.00
MARKET VALUE BASED LEVIES 11) $ 12)
13)Total Market Value Based Referendum Levies
(Total 11 & 12)
$ 0.00
14)Total Certified Levy
(Total 10 & 13)
$ 4,267,771.00
I, the authorized representative of the above mentioned Governmental Agency, certify that the foregoing information is accurate to the best of my knowledge. ____________________ Signature of Authorized Representative Title Date Phone Number of Contact Person W:\02 Budget and Finance\Budget - 2016\Budget Files\Final 2016 Budget and Levy 12-16-15\LEVYCERT 2016.docx
CAPITAL REGION W/S
===================
ADDITIONS OR CERTIFIED
ORIGINAL DATE PAYABLE 2016REDUCTIONS BY DEBT
BOND ISSUES PRINCIPAL ISSUED DEBT LEVY RESOLUTION LEVY
==================== =========== ========= ============ ============= =============
TX SUPP 2007A 1,555,000 4-Jan-07 $118,971.57 0.00 $118,971.57
GO Note 2010 447,200 15-Dec-10 50,040.04 0.00 50,040.04
GO 2013A 3,000,000 15-May-13 200,326.88 0.00 200,326.88
--------------------- ----------------------- ----------------------
$369,338.49 $0.00 $369,338.49
============ ============= =============
I hereby certify that the above schedule of
bond levies to be spread on the payable 2016
tax rolls agrees with Capital Region W/S records
and is true and correct. Copies of any resolutions
which increase or reduce these levies are attached.
Signed: ___________________________________
Date: _______________
W:\02 Budget and Finance\Budget - 2016\Budget Files\Final 2016 Budget and Levy 12-16-15\[P2016DBTLV.xlsx]Capital Reg Watershed
Resolution Capitol Region Watershed District
In the matter pertaining to: The 2016 Final Budget and Levy
Board Member: _____________ introduced the following resolution and moved its adoption, seconded by
Board Member ______________.
WHEREAS, A Board workshop was held July 8th and 27th, 2015 to review the detailed Operations Budget,
CIP and Project Financing Plans and
WHEREAS, At the July 22, 2015 Board meeting, the draft 2016 Work Plan was reviewed, and
WHEREAS, at the CRWD Board of Managers meeting on August 2, 2015 the Preliminary 2016 Budget and
Levy was reviewed and approved for distribution for Public Review and Comment, and
WHEREAS, on August 12, 2015 the Citizens’ Advisory Committee reviewed and recommended adoption
of the budget and levy as presented; and
WHEREAS, a duly noticed Public Hearing was held on August 19, 2015 at 6:00 PM at the CRWD Offices,
1410 Energy Park Drive, Suite 4 with no members of the public present commenting on the budget, and
THEREFORE BE IT RESOLVED that the CRWD Board of Managers approves and adopts the 2016
Final Operations Budget of $3,126,730 and a Capital Improvement Budget of $5,697,701 for a total budget
of $8,824,431.
BE IT FURTHER RESOLVED, the proposed 2016 tax levy is $4,267,711. This levy includes $3,898,383
for the general levy and $369,338 for debt.
Vote: Approved/Denied
*Approval must receive minimum of 3 Yeas
W:\04 Board of Managers\Motions\Resolutions 2015\Resolution 15-xx-xx CRWD Final 2016 Levy.doc
Requested By: Mark Doneux
Recommended for Approval:
Approved by Attorney: N/A
Funding Approved: N/A
Manager Yeas* Nays Absent Abstain
Collins
Texer
Jones
Thienes
Reider
TOTAL
Supporting Documentation Incorporated By Reference
Date Document Prepared By
7/8/15 Prelim. 2016 Work Plan CRWD
7/12/15 Prelim. 2016 Budget and Levy CRWD
7/27/15 Prelim. 2016 Budget and Levy CRWD
8/10/15 Public Notice for Budget Hearing CRWD
8/17/15 Public Notice for Budget Hearing CRWD
8/19/15 Public Review Draft Budget CRWD
9/02/15 Proposed 2016 Budget and Levy CRWD
Resolution # 15-XXX____
Date Adopted: December 16, 2015
Resolution Adoption Certified By the Board of Managers:
By: _____________________________________________ Date: December 16, 2015