cv beudeker frank int

14
Curriculum Vitae (CV) Beudeker Frank Email: [email protected] Tel. nr.: +84 (0)91 9033728 Address: Phan Tru Trinh 55/16, Vung Tau City, Vietnam Nationality: Belgian (residing in Vietnam) Civil status: Married, one child 1. Proposed Position COMMISSIONING IR 2. Name of Firm FREE LANCE CONTRACTOR 3. Name BEUDEKER FRANK P. P. 4. Date of Birth 13/07/1963 Nationali ty : BELGIUM 5. References Gordon Gill company +32 2 5121444 Mr. Gerhard Hirth + 32 492.928.860 + 33. 631.70.35.48 6. Education T.I.B ANTWERP & TECHNICUM RERUM NOVARUM ANTWERP, ELECTRICITY DIPLOMA LOWER & HIGH SCHOOL, MATURATY ACCESS DIPLOMA TO UNIVERCITY (1983)

Upload: frank-beudeker

Post on 14-Apr-2017

316 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CV BEUDEKER Frank int

Curriculum Vitae (CV)

Beudeker FrankEmail: [email protected]

Tel. nr.: +84 (0)91 9033728Address: Phan Tru Trinh 55/16, Vung Tau City, Vietnam

Nationality: Belgian (residing in Vietnam)Civil status: Married, one child

1. Proposed Position COMMISSIONING IR2. Name of Firm FREE LANCE CONTRACTOR3. Name BEUDEKER FRANK P. P.4. Date of Birth 13/07/1963 Nationality : BELGIUM

5. References Gordon Gill company

+32 2 5121444

Mr. Gerhard Hirth

+ 32 492.928.860+ 33. 631.70.35.48

6. Education T.I.B ANTWERP & TECHNICUM RERUM NOVARUM ANTWERP, ELECTRICITY DIPLOMA LOWER & HIGH SCHOOL, MATURATY ACCESS DIPLOMA TO UNIVERCITY (1983)

7. Social & organisational skills

EASY SOCIAL BEHAVIOUR, GET ALONG WITH EVERYBODY, HAVE A LISTENING EAR. PRO-ACTIVE PROFESSIONAL ON HANDS ON PROBLEM SOLVING.

EXPERIENCED IN TROUBLE SHOOTING/CORRECTING AND IMPLEMENTING COMPLEX ENERGY AND PROCESS SYSTEMS. TEND TO WORK ORDERLY AND STRUCTURED, ORGANISE OWN WORK AND DELEGATE WORK TO OTHERS. PREFER A PLAIN COMMUNICATION STYLE.

Page 2: CV BEUDEKER Frank int

8. Other Training SPECIALITY COURSE INSTRUMENTATION (ANTWERP,1984), FIREFIGHTING INDUSTRIAL AT RISK ROTTERDAM, ON JOB PROCESS EDUCATION 4 YEARS, WEEKLY BASE, 1886 TILL1990 (ANTWERP EXXON)

9. Countries of Work Experience

KUWAIT, CYPRUS, TRINIDAD, GREECE, GERMANY, QATAR, BRUNEI, NETHERLANDS, ALGERIA, VIETNAM, USA, ISRAEL, DUBAI, BRAZIL, SPAIN, TAIWAN, PORTUGAL, POLAND, BELGIUM, INDIA, EGYPT, IVORY COAST.

10. Languages Speaking Reading Writing DUTCH FLUENT FLUENT FLUENTENGLISH FLUENT FLUENT FLUENTSPANISH FLUENT FLUENT AVERAGEFRENCH AVERAGE FLUENT AVERAGEGERMAN AVERAGE AVERAGE BADBasic understanding of Italian and Portugese.

10. Employment Record:

Detailed TaskAssigned

TFA COMBINED CYCLE

HOUSE CONSTRUCTION

Work Undertaken

Name of assignment or project: Azito phase 3Year: 2014/15 (23/12/14 till 31/08/15Location: Abidjan, Ivory CoastClient: AZITO O&MMain project features: 2GT (Alstom 145MW), 2HRSG’s (Korean), BOP and ST (GE 150MW)Positions held: Technical advisorActivities performed: Follow up and guide through the commissioning process. Chemical clean, steamblow, DCS configuration and testing, operator follow up.

Location: Vung Tau, Ba Ria Vung Tau, VietnamYear: 02/01/14 to 22/09/14Client: Private client

MECHANICAL AND INSTRUMENTATION TROUBLESHOOTING AND COMMISSIONING OF 2 WATER STEAM CYCLES

Name of assignment or project: Al ZourYear: 2013 (23/08/13 to 23/11/13)Location: KuwaitClient: ALSTOMMain project features: 5 GT’s (Alstom), 5 HRSG’s divided in 3 + 2 blocks, 2 WSC (BOP) and 2 ST (Alstom)Positions held: Commissioning engineer.Activities performed: Field, mechanical, instrumentation (calibration and adjustments) pre-commissioning and commissioning on WSC’s

COMMISSIONING OF 2 HRSG’S AND BOP

Name of assignment or project: Vasilikos add on 5A/BYear: 2012 (26/07/12 to 28/11/12)Location: CyprusClient: J&P AVAXMain project features: 2GT (GE 70MW), 2HRSG’s (NEM), BOP and ST (Alstom 90MW)

Page 3: CV BEUDEKER Frank int

Positions held: Commissioning engineer.Activities performed: Field: mechanical inspections HRSG’s and BOP, Instrumentation checks and MOV/pneumatic valve setting and adjustments, preparations for and follow up chemical clean, follow up on temporary steam blow piping plus re-instatement before start-up. CCR: Steam blows, DCS adjustments (ABB assisted for implementation), all testing required for plant integrity (safety testing, purity runs etc…) including 50% and 100% rejection load on ST. Operations during reliability run (including operator training) of the full unit (GT’s, HRSG’s, BOP and ST)

COMMISSIONING OF 6 HRSG’S

Name of assignment or project: Year: 2012 (12/04/12 to 16/07/12)Location: TrinidadClient: EBE FerrostaalMain project features: 6GT’s, 6HRSG’s (China), 2 STPositions held: Mechanical and instrumentation commissioning engineer.Activities performed: Mechanical follow up and instrument/MOV adjustments.

COMMISSIONING OF ASU

Name of assignment or project: Year: 2012 (16/12/11 to 23/12/11 and 08/01/12 to 18/01/12)Location: Elefsina, GreeceClient: AIR PRODUCTSMain project features: ASU Positions held: Commissioning engineerActivities performed: Field follow up, dry out and production

COMMISIONING CO2 PILOT PLANT

Name of assignment or project: Year: 2011 (20/11/11 to 15/12/11)Location: Vattenfall, GermanyClient: AIR PRODUCTSMain project features: CO2 recovery pilot plantPositions held: Commissioning engineer Activities performed: CCR start-up and production

COMMISSIONING AND TROUBLESHOOTING ON 4 HRSG’s, FIELD & CCR

Name of assignment or project: Year: 2011 (30/01/11 to 07/03/11)Location: Ras Laffan, QatarClient: NEMMain project features: 4HRSG’s, ST (Siemens)Positions held: TFAActivities performed: Follow up and trouble shooting, assist in CCR

COMMISSIONING 1 HRSG IN FIELD

Name of assignment or project: Shell BLNGYear: 2010 (20/08/10 to 19/12/10)Location: Lumut, BruneiClient: NEM/SHELLMain project features: GT (GE), 1 HRSG, ST (Siemens)Positions held: TFAActivities performed: Field mechanical check ups pre start and during shut down. Adaption on piping.

Page 4: CV BEUDEKER Frank int

COMMISIONING OF 2 HRSG’S AND BOP

Name of assignment or project: Vasilikos add on 4A/BYear: 2009 (06/04/09 to 20/07/09)Location: CyprusClient: J&P AVAXMain project features: 2GT (GE 70MW), 2HRSG’s (NEM), BOP and ST (Alstom 90MW)Positions held: Commissioning engineer.Activities performed: Field: mechanical inspections HRSG’s and BOP, Instrumentation checks and MOV/pneumatic valve setting and adjustments preparations for and follow up chemical clean, follow up on temporary steam blow piping plus re-instatement before start-up. CCR: Steam blows, DCS adjustments (ABB assisted for implementation), all testing required for plant integrity (safety testing, purity runs etc…) including 50% and 100% rejection load on ST. Operations during reliability run (including operator training) of the full unit (GT’s, HRSG’s, BOP and ST)

Name of assignment or project: ConstructionYear: 2008 (26/12/07 to 22/08/08 and 18/12/08 to 06/04/09)Location: Tri Ton, VietnamClient: PrivateMain project features: House construction Positions held: LeadActivities performed: Construction of 56 foundation points to support house and water wall of 3800m3 granite

PRE-COMMISIONING2 DUAL HRSG’S

Name of assignment or project: Year: 2007 (06/06/07 to 22/12/07)Location: Rotterdam, NetherlandsClient: AIR LIQUIDE/SHELLMain project features: 2GT’s (GE 125MW), 2 dual HRSG’sPositions held: Commissioning engineer.Activities performed: Finalizing construction, pre-commissioning of 2 dual HRSG’s, loop checks, BPS check (boiler protection system).

COMMISSIONING HELIUM RECOVERY PLANT

Name of assignment or project: Helium recovery/liquifierYear: 2006 (31/05/06 to 21/12/06)Location: Skikda AlgeriaClient: LINDE BV.Main project features: Helium and nitrogen recovery (from LNG plants) and liquifiers. Loading docks. Return purified gas (GAN, CH4) back for processing.Positions held: Commissioning engineer.Activities performed: commissioning (compressor, compander, dry out), start up included operator training.

COMMISSIONING MANAGER 2 HRSG’S

Name of assignment or project: Phu Mi 2.2Year: 2004/2005 (05/01/04 to 27/01/05)Location: Phu Mi, VietnamClient: NEMMain project features: 2 GT (GE 260MW), 2 HRSG’s (NEM), 1 ST (GE 290MW).

Page 5: CV BEUDEKER Frank int

Positions held: Commissioning manager (HRSG’s only)Activities performed: Responsible for on time delivery of both units, in charge of 1 commissioning ir., 1 construction/ commissioning ir. And 4 operators (including logistics) also hands on commissioning from my part. Main contractor EDF.

LAY UP OF HRSG’S STOPPED IN CONSTRUCTION

Name of assignment or project: Year: 2003 (20/09/03 to 16/10/03 and 11/11/03 to 27/11/03)Location: Dresden, Ohio, USAClient: NEMMain project features: HRSG units stopped during constructionPositions held: TFAActivities performed: Dry out and nitrogen lay up on unit stopped during construction (i.e. none of the main piping welded). N2 preservation of piping, bundles on the unit and lay down yard piping.

PRE-COMMISSIONING AND COMMISSIONING 2 HRSG’S

Name of assignment or project: Possom Point Year: 2003 (23/03/03 to 16/06/03)Location: Dumfries, USAClient: NEMMain project features: 2 HRSG,s, SCR, burnersPositions held: TAActivities performed: pre-commissioning and commissioning of 2 units including SCR bay (Hitachi) and burner bay (DeJong Coen)

STAND-IN COMMISSIONING ON 4 HRSG’S

Name of assignment or project: Year: 2002 (25/10/02 to 18/12/02)Location: Hagit, IsraelClient: NEMMain project features: 4 GT’s (GE 100MW), 4 HRSG’s vertical (NEM), 1 ST (ABB 110MW) Positions held: TAActivities performed: Stand in for NEM personnel on leave. During this period 3 HRSG’s economizers failed. Preparation for works to be started on repairs (equipment, personnel)

TECHNICAL ADVISOR ON PRE-COMMISIONING AND COMMISSIONING OF 2 HRSG’S

Name of assignment or project: Year: 2002 (13/09/02 to 04/10/02)Location: Rise, Rhode Island, USAClient: NEMMain project features: GT’s (Siemens), 2 HRSG’s (NEM)Positions held: TAActivities performed: Advise on pre-commissioning and commissioning.

RE-COMMISSIONING BURNER BAY ON HRSG’S

Name of assignment or project: Year: 2002 (03/08/02 to 21/08/02)Location: Dubai, UAEClient: NEMMain project features: 2 HRSG’s Positions held: TAActivities performed: Burner modifications after internal explosion. Burner lanses disengaged from supports after the blast. Installation of

Page 6: CV BEUDEKER Frank int

explosion bumpers (external) and refurbish the burner supports (internal)

OUTAGE OVERHAUL HRSG’S

Name of assignment or project: Year: 2002 (19/06/02 to 23/07/02)Location: Uruguaiana, BrazilClient: NEMMain project features: HRSG’sPositions held: TA, commissioning engineerActivities performed: Outage repairs and modifications on internal insulation and piping/casing penetrations.

STAND-IN COMMISSIONING ON 2 HRSG’S

Name of assignment or project: Year: 2002 (28/05/02 to 19/06/02)Location: Castellon, SpainClient: NEMMain project features: 2 GT (GE 260MW), 2 HRSG,s (NEM), 1 ST (GE 290MW)Positions held: TAActivities performed: Stand in for NEM personnel on leave. Mechanical modifications during SD

TECHNICAL ADVISOR ON 4 HRSG’S

Name of assignment or project: RedhawkYear: 2002 (31/01/02 to 26/05/02)Location: Arlington, Arizona, USAClient: NEMMain project features: 4 GT (GE 160MW), 4 HRSG’s (NEM), 2ST (ABB 190MW)Positions held: TAActivities performed: Pre- commissioning, commissioning, iso checks, support modifications, P&ID checks, DCS compliance with BPS.

TECHNICAL ADVISOR ON 2 HRSG’S

Name of assignment or project: Santee CooperYear: 2001 (10/05/01 to 16/11/01)Location: Anderson, South Carolina, USAClient: NEMMain project features: 2 GT (GE 160MW), 2 HRSG’s (NEM), 1 ST (GE 140MW)Positions held: TAActivities performed: Pre-commissioning checks (iso, P&ID, expansions internal and external etc…). Advise and follow up on commissioning (chem. clean, steam blow, operations).

COMMISSIONING IR Name of assignment or project: Ba Ria Year: 1999/2000 (06/06/99 to 18/09/99 and 27/03/00 to 02/05/00)Location: Ba Ria, VietnamClient: NEMMain project features: 3 GT,s (30MW), 3 HRSG’s (NEM), 1 ST (Siemens)Positions held: Commissioning engineer.Activities performed: Mechanical inspections and corrections. Instrumentation, pneumatic valves & MOV,s. Chem clean, steam blows, production, operator training.

Page 7: CV BEUDEKER Frank int

COMMISSIONING IR Name of assignment or project: HaifuYear: 1999/2000 (15/03/99 to 16/04/99 and 19/09/99 to 26/03/00)Location: Haifu, Taipei, TaiwanClient: AE&EMain project features: 4 GT’s (ABB 160MW), 4 HRSG’S (AE&E), 2 ST’s (ABB 160MW)Positions held: Commissioning engineerActivities performed: Pre-commissioning checks (iso, P&ID verification), instrumentation, mechanical commissioning. Pressure testing, chem. clean, steam blows, safety valves testing, chemistry skids commissioning.

COMMISSIONING IR Name of assignment: TapadaYear: 1998 (16/02/98 to 16/10 98)Location: Tapada di Outeiro, Oporto, PortugalClient: NEMMain project features: 3 GT’s/ST’s Single shaft (Siemens GT 220MW/ST 110MW each), 3 HRSG’s (NEM)Positions held: Commissioning engineerActivities performed: Pre-commissioning checks (iso, P&ID verification), instrumentation, mechanical commissioning. Pressure testing, chem. clean, steam blows, safety valve testing, reliability run follow up.

COMMISSIONING IR Name of assignment:Year: 1997 (24/10/97 to 06/12/97)Location: Oporto (Tapada) & Lisbon, PortugalClient: KTI/MANNESMANNMain project features: In line warm bath gas heaters at let down stations.Positions held: Commissioning engineer.Activities performed: Gas line blows, instrumentation disassembly function testing and reconstruction. Burner adjustments and emission testing.

OPERATIONS Name of assignment:Year: 1997 (30/06/97 to 28/07/97)Location: Amsterdam, The NetherlandsClient: SHELLMain project features: Boilers, service air compressors, water treatment and back up power generator.Positions held: operatorActivities performed: Shift operator

Page 8: CV BEUDEKER Frank int

COMMISSIONING IR Name of assignment: Year: 1997 (06/04/97 to 15/06/97)Location: Plock, PolandClient: KTIMain project features: 110000NM3/h multiple feed hydrogen unit.Positions held: Commissioning engineerActivities performed: Pre-commissioning gas line blows, leak testing, mechanical checks, catalyst loading. Commissioning, refractory dry-out, reformer piping adjustments, steam system blow-out and safety popping, ID/FD fan modifications, start up.

OPERATIONS Name of assignment:Year: 1997 (14/03/97 to 06/04/97)Location: Antwerp, BelgiumClient: FINAMain Project features: Ethylene unitPositions held: Commissioning engineerActivities performed: Burner adjustments

START-UP OPERATIONS Name of assignment: CarilonYear: 1996 (26/08/96 to 31/10/96)Location: Amsterdam. The NetherlandsClient: SHELLMain project features: Batch process carillon pilot plantPositions held: Start-up operatorActivities performed: Start up and shut down on carillon batch process unit.

OPERATIONS Name of assignment:Year: 1996 (15/07/96 to28/07/96)Location: Rozenburg, Rotterdam, The NetherlandsClient: AIR PRODUCTSMain project features: Hydrogen and CO unit with loading docksPositions held: OperatorActivities performed: Field shift operator

COMMISSIONING IR Name of assignment:Year: 1996 (17/04/96 to 30/06/96)Location: Mangalore, IndiaClient: KTIMain project features: 400000m3/h multiple feed hydrogen unit.Positions held: Commissioning engineerActivities performed: Pre-commissioning gas line blows, leak testing, mechanical checks, catalyst loading. Commissioning, refractory dry-out, reformer piping adjustments, steam system blow-out and safety popping, ID/FD fan modifications, start up.

Page 9: CV BEUDEKER Frank int

OPERATIONS Name of assignment:Year: 1995/1996 (29/09/95 to 27/12/95 and 04/02/96 to 03/04/96)Location: Pernis, Rotterdam, The NetherlandsClient: AIR PRODUCTSMain project features: Demin unit, steam street and power generatorPositions held: OperatorActivities performed: Field shift operator

COMMISSIONING IR Name of assignment: Damanhour/MahmoudiaYear: 1994/1995 (30/11/94 to 24/02/95 and 20/05/95 to 24/09/95)Location: Damanhour/ Mahmoudia, EgyptClient: NEMMain project features: Damanhour: 4 GT’s, 4 HRSG’s, 1 ST, Mahmoudia: 8 GT’s, 8 HRSG’s, 2 ST’sPositions held: Commissioning engineerActivities performed: Pre-commissioning, i.e. instrumentation, MOV’s, mechanical inspections support checks, iso and P&ID checks, pressure testing, alkaline boil-out, steam blows, DCS adjustments, start up and reliability runs

COMMISSIONING IR Name of assignment: RFA BernburgYear: 1994 (01/09/94 to 21/11/94)Location: Bernburg, East GermanyClient: KTIMain project features: 6500Nm3/h Hydrogen unitPositions held: Commissioning engineerActivities performed: Pre-commissioning gas line blows, leak testing, mechanical checks, catalyst loading. Commissioning, refractory dry-out, reformer piping adjustments, steam system blow-out and safety popping, ID/FD fan modifications, start up.

Name of assignment: Year: 1992/1993 (01/05/92 to 01/11/93)Location: Balen, Antwerp, BelgiumClient: PrivateMain project features: Reconstruction housePositions held: LeadActivities performed: Partially rebuild a 350m2 farm house and full restoration.

OPERATIONS Name of assignment:Year: 1991/1992 (01/09/91 to 01/12/91 and 01/03/92 to 01/05/92)Location: Rozenburg, Rotterdam, The NetherlandsClient: AIR PRODUCTSMain project features: Hydrogen/ co plant with loading docksPositions held: OperatorActivities performed: Field shift operator

Page 10: CV BEUDEKER Frank int

OPERATIONS Name of assignments:Year: 1986/1990 (01/01/86 to 01/08/90)Location: Antwerp, BelgiumClient: EXXONMain project features: RefineryPositions held: OperatorActivities performed: operator on atmospheric crude distillation, LGO/HGO hydrofining, Kero-Varsol splitters, Waste treatment furnace, slop recuperation, ballast tanks, BIOX water treatment.

ELECTRO TECHNICAL DESIGN AND DRAWING

Name of assignments:Year: 1985/1986 (01/10/85 to 01/01/86)Location: Antwerp, BelgiumClient: EGEMINMain project features: Transport systems (various)Positions held: Electro technical design and drawingActivities performed: Custom design transport systems with additional electro technical drawings

ARMY SERVICE Year: 1985 (01/01/85 to 01/10/85)

ELECTRIC LAB ASSISTENT

Name of assignment:Year: 1984Location: Antwerp, BelgiumClient: ATLAS COPCO AIRPOWERMain project features: Test cellsPositions held: Electric lab assistantActivities performed: Installation of test cells for prototype compressors