Our client, a producer of confectionary icings and fi llings among some of their impressive food products, is a highly innovative company, constantly looking to increase their factory effi ciencies and to reduce their environmental impact.
The Challenge
Since implementing a waste reduction plan, the client was looking to drastically reduce their water consumption, as their current method of water fl ushing was resulting in high volumes of effl uent to treat.
Key Requirements
Reduce water consumption and CIP chemical use
Reduce waste product discharged as effluent
Increase product yield during product transfer
Reduce system downtime during start up, changeover and shutdown
FOOD & BEVERAGE
CREAM TOPPING, Ice Pigging Case Study
The Project - Cream topping lineIce Pigging proved to be highly effective at the removal and recovery of a thick and creamy cake topping from our client’s production lines while also significantly reducing their water consumption and the amount of effluent produced compared to their previous method of cold water flushing. There were also reductions in CIP chemicals used, system downtime and an overall increase to the efficiency of the plant. Per week, Ice Pigging would save the factory 124,000litres of water, 121,000litres of effluent and an additional 16,000litres in product recovered.
THE RESULTS:
Reduced water consumption resulting in much less effluent produced
Improved product recovery rates
Reduced CIP & sanitation requirements
Reduced system downtime
020,00040,00060,00080,000
100,000120,000140,000
Productrecovered
Water saved Effluentsaved
Litres saved per week 16,431 124,461 121,116
16,431
124,461 121,116
Litr
es
FOOD MANUFACTURING
SUEZ Advanced Solutions UK, 290 Aztec West, Almondsbury, Bristol BS32 4SY, United Kingdom
Email: [email protected]: +44 1454 804040
To find out more about Ice Pigging visit our dedicated website at:
www.ice-pigging.com