VIRGINIA POWER Corporate Emergency Plan Implementing Procedure ~: Corporate Response Manager Situation Appraisal Procedure Procedure Number: CPIP-1.0 Revision Summary: Rev. 0 - Entire CPIP. ,-----=,-,=l- 1 -:;-.l "':I .-00, ,:.v, 1 ·',"Fr:.n°7'o9-,qi 7 ciY) :1n. 1n. i~!::1i .. -. --'\ ' .. .. ·-··- .s .., 1- .. - ·-1···11 '() l c·,:c1F·,.. (.)1[1n1-:'< 0.:,01J1_ ··~·::, - I •. · · ' - •. r . F'DC F Revision Number: 0 Effective Date: 10/15/90 //-/2-9" Date JI -J'f -9 , Date l

Upload: others

Post on 17-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• • VIRGINIA POWER

Corporate Emergency Plan Implementing Procedure

~: Corporate Response Manager Situation Appraisal Procedure

Procedure Number: CPIP-1.0

Revision Summary:

Rev. 0 - Entire CPIP.

,-----=,-,=l-1-:;-.l "':I .-00, ,:.v,1·',"Fr:.n°7'o9-,qi7 ciY) :1n. 1n. i~!::1i .. -. --'\ ' .. ~ .. ·-··- .s .. , • 1- .. - ·-1···11 '()

lc·,:c1F·,.. (.)1[1n1-:'< 0.:,01J1_ ··~·::, - I •. · · ' - •. r . F'DC F

Revision Number: 0

Effective Date: 10/15/90

//-/2-9" Date

JI -J'f -9 , Date

l

Page 2: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 1.0 Page 1-1 10-15-90

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 1.0

CORPORATE RESPONSE MANAGER

SITUATION APPRAISAL PROCEDURE

Purpose: This procedure provides for establishing a description of the emergency and a written record of the event. It also provides direction for the Corporate Response Manager to assist him in the first sequence of steps to respond to the emergency.

1.0 Immediate Assessment

1.1 The Corporate Response Manager shall initiate the following steps:

Initial

1. Call a CERO meeting to get description of event and determine course of action.

2.

3.

Determine from General Office Building Security the status of emergency callout •

Establish communication with the affected station if the LEOF is not activated.

4. Have a written description of the incident prepared and make this description available as soon as possible to a member of the Innsbrook News Team.

5. Establish direct communication with the Recovery Manager at the LEOF and the Station Emergency Manager at the TSC.

6e Establish the need for the Technical Support Manager and Plan/Design/Construction Manager to report to the site in coordination with the Recovery Manager.

7. Direct responsible CERO members to establish communication with the NRC, vendors, and industry emergency response organizations.

a. Establish a recovery work schedule.

9. Make provision for ongoing assessment meetings.

10 • Establish official log of events. Record data on "Emergency Event Log" booklet, available in the CERC storage cabinet.

Page 3: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

11.

CPIP 1.0 Page 1-2 10-15-90

Call the President of the Company to brief him on the emergency.

12. Periodically brief the CERO organization on event status and coordination of the response effort using the PA system.

2.0 Delegation of Authority

Should the Corporate Response Manager need to leave the CERC for any reason he should appoint another team member to assume his responsibilities until his return .

Page 4: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

I.i.1.k: JPIC Activation

Procedure Number: CPIP-2.0

Revision Summary:

Rev. 0 - Entire CPIP .

Revision Number; 0

. __ ,,fr'- ~/h-~ Recommended Approval.~ /?'::-( ~ - - - , - -

( Direq tor Nuclear Emergency Preparedness

Approved by: QP~ Vice President-Nuclear Seivices

Effective Date: 10/15/90

/l-/2-90 Date

11- 1z'-7t, ' Date

Page 5: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CPIP 2.0 Page 2-1 10-15-90

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 2.0

JOINT PUBLIC INFORMATION CENTER DIRECTOR

ACTIVATION

This procedure provides the necessary steps to notify the Corporate Response Coordinator who in turn will notify members of the Joint Public Information Center and Local Media Center Staff and/or their alternates.

/ Activation Activation occurs when the Corporate Security

Control Center has been notified by station Security of an emergency condition at North Anna or Surry Power Station. The appropriate group call of emergency pagers is conducted The JPIC Director or alternate, and the Chief Technical Spokesperson or alternate must report to the Joint Public Information Center at Innsbrook Technical Center. Once notification by Security has been completed, the Public Information Director alternates notify the JPIC Call out Coordinators, who immediately initiate the call-out to the Public Affairs CERO members.

1.0

· In the event the Public Information Director alternates are unsuccessful in contacting any one of the JPIC call out Coordinators, it shall then be the responsibility of the Public Information Director alternates to ensure the call-out of Public Affairs CERO members is completed.

Immediate Action

1.1 The JPIC Director shall note the time and date of the call from Security. The JPIC Director and the Chief Technical Spokesperson shall then proceed immediately to the JPIC at Innsbrook Technical Center.

Likewise, all Public Affairs CERO members report to their pre-assigned duty stations •

1

Page 6: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 2.0 Page 2-2 10-15-90

1.2 In the absence of the Chief Technical Spokesperson and with the concurrence of the Corporate Response Manager the JPIC Director is authorized to report to the news media any change in the emergency status of the affected station i.e., when the status is upgraded from ALERT to SITE AREA EMERGENCY' or GENERAL EMERGENCY', etc. This announcement shall be made utilizing the following pre­approved message format: "The status of the North Anna/Surry Power Station has been changed from to Additional information will be provided to you as soon as possible."

Once this announcement has been made, the JPIC Director shall immediately advise the Public Affairs Emergency Coordinator, the Public Information Director, and other appropriate Public Affairs personnel of the change in the status of the station.

2.0 Call-Out

2 .1 The JPIC Call out Coordinator ·shall call the Public Affairs CERO members with the following message:

"This is . An emergency 'condition has been declared at the (Surry) (North Anna) Power Station. In accordance with the Corporate Emergency Response plan, report immediately to the Joint Public Information Center, Innsbrook Technical center, or to your assigned work area.

The Public Information Director alternates ensure that the call-out is complete.

Page 7: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• 2.2 Call-out List:

CPIP 2.0 Page 2-3 10-15-90

Implement Section 2 of the Emergency Telephone Directory (ETD Section 2).

Corporate Response Coordinator

Prin. Prin. Alt. Alt.

Chief Technical Spokesperson

Prin. Alt.

Public Information Director

Prin. Prin. Alt.

D. s. Cox A. W. Powell R. J. Randolph B. A. Jones

J.P. Maciejewski L. N. Hartz

• Alt.

·Local Media

I. Holliday M. N. Healy H. T. Sink B. J. Kennedy

Prin. Alt.

Center Director (Surry)

F. R. Ellis D. J. Genest

Local Media Center Director (North Anna)

Prin. Alt. Alt. Alt.

c. Gillespie F. c. Carmichael D. J. Genest D. Tompkins-Lipscombe

Joint Public Information Center Director

Prin. Alt.

E. S. Teig w. N. Curry

Page 8: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Public Information Specialist:

Prin. Prin. Prin. Prin. Prin. Prin. Prin. Prin. Prin. Prin. Prin. Prin. Prin. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt.

Media Monitoring Specialist:

Prin. Alt.

D. A. Pickett s. F. Lewis L. P. Wilson M.A. Spanel J. T. Evans M. G. Jackson G. R. Short B. Gannon D. A. Schneider R. B. Brand H. s •. Wheary V. M. Board L. E. Spiller Pat Balderson David Barron Barry Choate Lela Chupka

CPIP 2.0 Page 2-4 10-15-90

Cynthia Y. Claiborne Katrina Crawford Lori Dillon Jim Faehl Steve Fortin Melanie Galderise Jeanette Johnson Ann Lang Candee G. Lovett M. R. McCormack Ann McGee Willie Miles Linda Parrish Debbie Pritchett Mildred Pugh Jim Ramey Sharon Rose Sal Salomone Connie s. Seay Susan H. Varner Dennis J. O'Brien

A. W. Powell F. H. Williams

Page 9: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

JPIC Technical Advisor:

Prin. Alt.

B. H. Wakeman M. L. Smith

Videodisk Information Management System Operator:

Prin. Alt.

R.H. Adams c. L. Walker

Public Information Technical Advisor - North Anna:

Prin. Alt. Alt.

G. F. Winks J. B. Scott s. R. Crawford

Public Information Technical Advisor - Surry:

Prin. Alt. Alt.

D. Grady J. H. warren H. E. Linde

Public Information Room Tech. Advisor:

Prin. Alt. Alt.

Instant News Coordinator:

Prin. Alt.

Headquarters Telephone Operator:

Prin. Alt.

L.A. Johnson H. s. McKay J. T. Benton

C. L. Wall F. R. Hansen

K. L. Collins Roxanne Henshaw

Local Media Center Coordinator: (Surry)

Prin. Alt •

c. Elmore c. Fleming

CPIP 2.0 Page 2-5 10-15-90

Page 10: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Local Media Center Coordinator:

Prin. Alt. Alt.

(North Anna)

E. Musser R. E. Stiles c. H. Mann

CPIP 2.0 Page 2-6 10-15-90

Joint Public Information Center Control Clerk (Sign-in):

Prin. Prin. Alt.

JPIC Clerk (Conference Room B):

Prin. Prin. Alt.

A. E. Williams B. A. Jones D. s. cox

C. P. Balderson B. B. Mitten R. J. Randolph

Assistant Local Media Center Coordinator: (Surry)

Prin. Janis Moore Prin. Wanda Bradshaw Prin. Susan Turner Alt. Perlene Montgomery Alt. Sandra Davis Alt. Brenda Rickmond

Assistant Local Media Center Coordinator: (North Anna)

Prin. Prin. Prin. Alt. Alt. Alt.

Government Information Director:

Prin. Alt.

Investor Information Director: Federal Reserve:

Prin. Alt .

Patty Huckstep Kathy Duncan Gertrude Short Barbara .Crane Judy Stone Beulah Boles

E. L. Crump, Jr. H. T. Sink

W. c. Hall, Jr. D. w. Hedgepeth

Page 11: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Innsbrook:

Prin. Alt.

P. M. Feine M. G. Lazenby

Public Affairs Emergency Coordinator:

Prin. Alt.

Innsbrook News Team:

Prin. Prin. Alt. Alt.

OJRP Director:

Prin.

3.0 Temporary Assignment

M.A. Thompson K. D. Russell

J. w. Norvelle C. F. Baab D. F. Cochran K. J. Farlow

Charles Hardy

· CPIP 2. 0 Page 2-7 10-15-90

3 .1 If both the principal and alternate cannot be reached, another member of the JPIC staff may be assigned on a temporary basis.

Page 12: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Implementing Procedure

1. 0

2.0

2.1

2.2

2.3

2.4

2.5

2.6

3.0

3.1

3.2

4.0

4.1

5.0

5.1

5.2

VIRGINIA POWER CORPORATE PLAN IMPLEMENTING PROCEDURES

SUBJECT INDEX

Subject

Corporate Response Manager Situation Appraisal Procedure

JPIC Activation

Media Activation

Initial Press Release

Local Media Center Activation

Local Media Center Duty Assignment Description

LMC Evacuation Plans-NAPS

LMC Evacuation Plans-Surry

Administrative Services Activation

CERC Activation

LEOF Activation-North Anna

LEOF Activation-Surry

Plan/Design/Construction Activation

Plan/Design/Construction support Duties

Technical Support Activation

Operations Support Activation and Duties

Reactor Core Analysis Activation and Duties

CPIP-1.0 Page i-1 10-15-90

1-1

2-1

2-8

2-10

2-11

2-13

2-15

2-16

3-1

3-2

3-5

3-11

4-1

4-2

5-1

5-2

5-3

Page 13: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Implementing Procedure

5.3

5.4

5.5

5.6

5.7

5.8

6.0

6.1

6.2

6.3

7.0

7.1

VIRGINIA POWER CORPORATE PLAN IMPLEMENTING PROCEDURES

SUBJECT INDEX

Subject

Radiological Control and Waste Management Activation and Duties

Licensing Activation and Duties

Chemistry Activation and Duties

Meteorological Assessment Activation and Duties

Safety and Analysis Activation and Duties

ERF - Computer Support Activation and Duties

Recovery Manager Activation

Recovery Manager Guidance

Radiological Assessment Coordinator

Emergency Plan Advisor LEOF Responsibilities

Medical Advisor Activation

Medical Activation Duties

CPIP-1.0 Page i-2 10-15-90

5-4

5-5

5-6

5-7

5-8

5-9

6-1

6-2

6-4

6-6

7-1

7-2

' I

Page 14: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• • Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

Ii.tJJ:.: Media Activation

Procedure Number: CPIP-2.1

Revision Summary:

Rev. 0 - Entire CPIP.

Revision Number; 0

---~,r ' /J,- •

Effective Date: 10/15/90

//~)2-?o Recommended Approv~ /7 __/ ~ -0 ~ ~ .: _. \. -Dii¢tor Nuclear Emergency Preparedness Date

'--J

Approved by: /1 {? ~ -e ¥vice President-Nuclear Services /,/-_) '-/· q

Date

Page 15: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 2.1

MEDIA ACTIVATION

CPIP 2.1 Page 2-8 10-15-90

Purpose This procedure provides the necessary steps to notify the media that an emergency has been declared at one of the Company's nuclear power stations.

Activation Once the Innsbrook News Team has been advised that an emergency has been declared, a principal and alternate shall report to the Public Affairs Work Area, Conference Room B, Innsbrook Technica_l Center and prepare a news release for the news media. Releases shall be prepared at the Innsbrook Technical Center. Once the LEOF is operational, station status and recovery information shall be sent to the Innsbrook Technical Center by the Public Information Technical Advisor for preparation of press releases. All press releases shall be issued after the approval of the Recovery Manager and/ or the Corporate Response Manager or their alternates.

The initial press release upon activation of the Public Information Room, shall be telecopied to the LEOF,LMC, OJRP, Associated Press, United Press International and u. s. Newswire after approval and then brought to the immediate attention of the Chief Technical Spokesperson.

Items To Be Included In The Initial Press Release:,

A definition of the emergency condition is provided to the media and the public. Additional information can be obtained by calling a special emergency hotline manned by Public Af~airs emergency personnel. The number is This special hot line number for the public activates a bank of 20 telephones and serves as the Company's public information number. Collect calls will be accepted at this number.

1. The Public Information number is activated by press release, only after the phone bank in the Public Information Room has been declared activated.

Page 16: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 2.1 Page 2-9 10-15-90

Call-out List: following:

The initial press release should be phoned to the

Media

Associated Press

United Press International

U.S. Newswire

Virginia Circuit

Non-Media

Director-Investor Information

NRC Public Information Atlanta, GA

Telephone

Federal Legislative Affairs Repesentative

Daniel v. Flanagan, Jr.

state Department of Emergency Services

Mike LaCivita

After Hours

Page 17: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

~: Initial Press Release

Procedure Number: Revision Number; 0 CPIP-2.2

Revision Summary:

Rev. 0 - Entire CPIP.

RecommendedApprov~ ~A./~ __ _:... ( Dir4ctor Nuclear Emergency Preparedness

Approved by: a e ~k, Vice Presidnt-NuclearServices

Effective Date: 10/15/90

//-/7-.,0 Date

JJ-1 'I -9o Date

Page 18: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 2.2

INITIAL PRESS RELEASE ISSUED BY THE COMPANY

CPIP 2.2 Page 2-10 10-15-90

The initial press release issued by the Innsbrook News Team should contain the following:

1. Virginia Power declared an (Alert) (Site Area Emergency) (General Emergency) on (date) at (time) at its (Surry) (North Anna) Power station.

2. The (Alert) (Site Area Emergency) (General Emergency) was declared because ------------------------------

3. Virginia Power has established a special phone number to provide information to the public regarding the Alert or Emergency. Collect calls will be accepted at this number. The number is

4. Virginia Power has established a Joint Public Information Center in the Company's Innsbrook Technical Center located at 5000 Dominion Boulevard in Glen Allen, Virginia. The Company has Local Media Centers located in the Nuclear Information Centers approaching the entrance to North Anna and Surry Power stations. However, official company statements regarding the emergency will be provided at the Joint Public Information Center •

Page 19: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

~: Local Media Center Activation

Procedure Number: Revision Number; CPIP-2.3 0

Revision Summary:

Rev. 0 - Entire CPIP.

Effective Date: 10/15/90

Recommended Approval~p __/1 ...£.//.-~4 Di.re#;:tor Nuclear Emergency Preparedness

//-12-9" Date

~

Approvedby: a Q~ Vice President-uclearServices Date

Page 20: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 2.3

LOCAL MEDIA CENTER ACTIVATION CHECKLIST

CPIP 2.3 Page 2-11 10-15-90

This procedure provides for the timely and orderly activation of the Local Media Center. It also provides the LMC director with a reference document to verify that t'he LMC and its equipment are in proper working order.

The LMC coordinator or alternate will ensure the following:

Initial

1. During normal working hours the LMC is open and the LMC staff has access to all necessary rooms and equipment.

2. During after hours the first LMC staff person should check to see if the LMC is open. If not, proceed to the visitors access window of station security, pr·esent company ID with CERT sticker on back, and request that security open LMC for CERP activation purposes. The lone LMC staff should maintain vigil at the unlocked entrance until additional Virginia Power LMC staff arrive. All early arrival non­company individuals (e.g. media) should be ushered to the display area.

3. When additional staff arrive the LMC sign-in area is established, the proper equipment is available and the location is manned.

Ja. Extensions and at North Anna and extension , or (located in Virginia Power work area called

LMC Public Information. Room) at Surry are constantly monitored to receive notification of evacuation of all non-essential personnel. Notification will come from Station Emergency Manager and/or Emergency Administrative Director from one of the following locations: Control Room, TSC, or Station Security.

Jb. In the event of notification of evacuation:

1. Bring notification to immediate attention of LMC Director. Notify JPIC Director or Public Affairs Emergency Coordinator using automatic-ringdown phone that LMC is evacuating.

2. Leave equipment in place 3. Gather immediate personal effects 4. Deposit badges in box at sign-in 5. Exit building 6. Proceed to PRAA or SRAA as instructed

Page 21: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 2.3 Page 2-12 10-15-90

4. The media room (Conference Room A) is set up with at least 25 working telephones and that the lines are active. Allow media access at this time.

5. The automatic ring down phones to the LEOF and JPIC are hooked up and operating (Conference Room D and both front offices. At Surry LMC only, remove telephone super set from kitchen, receptionist desk and FEMA office. Return to proper jack when emergency condition terminates.)

6. LMC personnel have reported and are assigned specific duties (the LMC Director or alternate, LMC Coordinator or alternate, (3) LMC Assistant Coordinators or alternates in order that LMC activated).

Ga.Make coffee when time allows.

7. The audio-conferencing system (jack at front of Auditorium B for Surry LMC; North Anna jack is in Conference Room D) to the JPIC is set up and operational.

8. The speaker phone is set up and operational in conference room D at Surry. The North Anna speaker phone is at the front of auditoriums A and B.

9. The telecopier is moved to conference room D, in operating order and there are adequate supplies.

10. The IBM typewriter used for telecopier backup (press releases phoned to LMC and typed) is operational and has an adequate paper supply.

11. The FEMA (Information Center Director Office), NRC (Conference Room C), and State (Conference Room B) conference rooms are set up with signs, telephones, paper supply, pens and pencils.

12. Remote monitors for viewing the Auditorium B press conferences should be set up (plugs to B jacks) in the following locations:

Theater FEMA office (Information Center Director office) NRC (Conference Room C) State (Conference Room B) Media (Conference Room A)

In Auditorium B a microphone ( in drawer on left behind screen, with hexagonal wrench) should be connected to floor jack and placed on podium •

Page 22: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

~: Local Media Center Duty Assignment Description

Procedure Number: CPIP-2.4

Revision Summary:

Rev. 0 - Entire CPIP .

Revision Number; 0

RecommendedAwrnvAP A/ h,"J!_;,, D1 rector Nuclear Emergency Preparedness

\-.._)

Approved by: Q {}_())LL Vice President:.Nuclear Services

Effective Date: 10/15/90

//-/2-ft:J Date

Page 23: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 2.4

CPIP 2.4 Page 2-13 10-15-90

LOCAL MEDIA CENTER DUTY ASSIGNMENT DESCRIPTIONS

1. Reception Area

The reception area will be manned by an assistant coordinator. The site will be manned at all times. It will be the responsibility of the assistant coordinator assigned to the post to ensure that it is set up and has the proper equipment. Equipment needed includes: sign­in sheet, LMC roll call list, identification badges. This equipment is stored in the file cabinets located in the equipment room behind the viewing screen in the auditorium.

The assistant coordinator will ensure that all persons entering the LMC have signed the sign-in sheet and have the proper identification badge. No person shall be allowed to enter the LMC without signing in. All persons leaving the LMC must surrender their badge and sign out. To re-enter they must again sign in.

The assistant coordinator assigned to the post will not leave that post unless a replacement is already on hand.

2. Telecopier

The telecopier and photocopy machine will be moved to Conference Room D and will be manned by an assistant coordinator. It will be the responsibility of the assistant coordinator assigned to this post to ensure that all equipment is operational by conducting a test with the LEOF. Responsibilities also will include ensuring that all equipment has adequate supplies.

After the telecopier and Xerox machine have been set up, the person assigned to that post will assist in setting up the auditorium, media communications room and NRC, FEMA, and State Office of Emergency Services' rooms.

Once the LMC is activated, the person assigned to the post will leave only to deliver press releases or other telecopied information.

When a press release arrives, the assistant coordinator will make sure it is a complete copy by calling the verification number for the JPIC. A minimum of 25 copies must be made of each release. (If more copies are needed, the director will inform the LMC coordinator)

Completed press releases (One Copy) will be distributed to the FEMA, NRC, and state Office of Emergency Services' conference rooms. The remaining copies will be delivered to the LMC Coordinator or if that person is not available to the LMC Director.

Page 24: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 2.4 Page 2-14 10-15-90

Under no circumstances should a press release or any other telecopied matter be delivered directly to the press.

3 • Ring Down Phone

An assistant coordinator will be assigned to man the ring down phone in conference room D. Phone sets with the extensions to be called in the event of an evacuation or other use are also located in Conference Room D and the adjoining office, which may be used by LMC staff. This person shall be responsible for testing the phone by calling and receiving calls from the JPIC and LEOF. This person also will be responsible for setting and testing the speaker phone to the JPIC.

In addition, this person shall assist in setting up the Audio Conferencing System in the auditorium and the phones in the media communications room, if needed.

Once the LMC has been activated, the assistant coordinator assigned to the ring down phone will answer all calls and log them on the phone sheet. If a call comes in for a specific person, the assistant coordinator is not to leave the room, but may go to the door and pass the message on to someone who can relay it to the proper person.

4 ~ LMC COORDINATOR

The LMC Coordinator will supervise the activation of the LMC. Once the LMC is activated, the coordinator will serve as a liaison, between the LMC staff and the LMC Director. The coordinator will keep the director abreast of all problems that might affect the operation of the LMC. In addition, the coordinator shall post press releases; inform the media, NRC, FEMA and State officials of pending news briefings and distribute press releases to the media.

Page 25: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• VIRGINIA POWER

Corporate Emergency Plan Implementing Procedure

Ii.,tk: Local Media Center Evacuation Plans - NAPS

Procedure Number: CPIP-2.5

Revision Summary:

Rev. 0 - Entire CPIP.

"-J

Revision Number; 0

Effective Date: 10/15/90

l/-12-~'1 Date

Approved by: _/J~__,_p~---=@-+· ~~""""'"~L~-­~ice President::Nuclear Services Date

Page 26: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 2.5 Page 2-15

.10-15-90

CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 2.5

LMC EVACUATION PLANS - NORTH ANNA

A. EVACUATION PLAN "A" - Evacuation without Radiological Release

Assemble your materials and supplies

Proceed to your vehicle.

Exit parking area cautiously and depart the area.

Media Representatives - may proceed to the Virginia Power Joint Public Information Center (JPIC), Innsbrook Technical Center, 5000 Dominion Blvd., Glen Allen, Virginia, to continue event coverage.

Virginia Power Personnel - proceed to location specified by the LMC Director.

B. EVACUATION PLAN "B" - Evacuation with Radiological Release ·

Assemble your materials and supplies.

Proceed to your vehicle as expeditiously as possible.

Keep windows closed and ventilation systems off.

Exit parking area and follow directional signs to the Designated Remote Assembly Area.

PRIMARY REMOTE ASSEMBLY AREA -

SECONDARY REMOTE ASSEMBLY AREA -

Proceed to the intersection of Rt. 700 and 618. Turn left on Rt. 618 and proceed 0.8 mile to the assembly area.

Proceed to the intersection of Rt. 700 and 652. Turn left on Rt. 652 and proceed to Rt. 622. Turn left on Rt. 622 and proceed to Rt. 701. Turn left on Rt. 701 and proceed to Rt. 601. Turn left on Rt. 601 and proceed 0.1 mile. The assembly area will be on your left, through the gate, at the dam •

Await arrival of Health Physics Personnel for Radiological Monitoring and additional instructions.

Page 27: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• VIRGINIA POWER

Corporate Emergency Plan Implementing Proc~dure

~: Local Media Center Evacuation Plans - SURRY

Procedure Number: CPIP-2.6

Revision Summary:

Rev. 0 - Entire CPIP.

Revision Number; 0

RecommendedApproval~1.? A/~,~~ Dire</tor Nuclear Emergency Preparedness

Effective Date: 10/15/90

//-17-90 Date

Approved by: --=a~~----/J_,...._.,.~~~-..... ..........._L~-Vicerr:;ic1em:Nuclear Services

JJ-J'/-z:c Date

Page 28: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 2.6 LMC EVACUATION PLANS-SURRY

CPIP 2.6 Page 2-16 10-15-90

A. EVACUATION PLAN "A" - Evacuation without Radiological Release

Assemble your materials and supplies

Proceed to your vehicle

Exit parking area cautiously and vacate the area.

Media Representatives - may proceed to the Virginia Power Joint Public Information Center (JPIC), Innsbrook Technical Center, 5000 Dominion Blvd., Glen Allen, Virginia, to continue event coverage.

Virginia Power Personnel - proceed to location specified by the LMC Director.

B. EVACUATION PLAN "B" - Evacuation with Radiological Release

Assemble your materials and supplies

Proceed to your vehicle as expeditiously as possible

Keep windows closed and ventilation systems off

Exit parking area and proceed to the Designated Remote Assembly Area

PRIMARY REMOTE ASSEMBLY AREA - Proceed to the intersection of Rt. 650 and 628. Turn left on Rt. 628 and

proceed 1. 3 miles to the assembly area on the right under transmission line.

SECONDARY REMOTE ASSEMBLY AREA - Proceed to the intersection of Media center Exit Road and Rt. 650. Turn

right on Rt. 650 and proceed to Hog Island Wildlife Management area.

Await arrival of Health Physics Personnel for Radiological Monitoring and additional instructions.

Page 29: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• VIRGINIA POWER

Corporate Emergency Plan Implementing Pro<;edure

Iilk.: Administrative Services Activation

Procedure Number: CPIP-3.0

Revision Summary:

Rev. 0 - Entire CPIP.

Revision Number; 0

Effective Date: 10/15/90

RecommendedApprov~ ::,~ r· Director Nuclear Emergency Preparedness //-/2-f'tJ

Date

11-1 'I- 9o Date

Page 30: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 3.0

ADMINISTRATIVE SERVICES MANAGER

ACTIVATION

CPIP 3.0 Page 3-1 10-15-90

Purpose: This procedure provides the Administrative Services Manager (ASM) with a sequence of events to serve as a guide in organizing his team and marshalling the required resources to performm assigned tasks.

Activation: When the Corporate Security Control Center is notified of an emergency at either station they will initiate the Corporate Emergency Response Organization Call-Out. The Primary and Alternates for the Administrative Services Manager, Clerical support and the CERC Communicator will be notified of the emergency.

1.0 Required Actions

1.1 The Primary and alternates for the above positions will report to the Corporate Emergency Response Center and initiate CPIP 3.1.

Page 31: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

Iilk: CERC Activation

Procedure Number: Revision Number; 0 CPIP-3.1

Revision Summary:

Rev. 0 - Entire CPIP .

-tC /J • Recommended Approv~ V _:_r ~_/ ~-~

( DiI1~tor Nuclear Emergency Preparedness

\...___/

Effective Date: 10/15/90

//-12-'/o Date

Approved by: --=Q~(?_. ~{~~---=--=....,:;..~~-

Vice President-Nuclear Services LL -/,Y -?c

Date

Page 32: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURES 3.1

CERC ACTIVATION

CPIP 3.1 Page 3-2 10-15-90

Purpose: This procedure provides a sequence of steps to be followed for setting up the Corporate Emergency Response center (CERC) in order to perform assigned tasks.

Activation: This procedure will be activated by the first person arriving at the CERC after an emergency has been declared.

1.0 Immediate Action

The following steps should be carried out in the order listed:

1.1 Retrieve from Corporate Security Control Center two (2) keys:

1 key opens the door to the CERC, CEOF, and CERC storage

1 key for the tape recorder in the CEOF

Unlock the doors to each room.

If unable to obtain keys from Corporate Security, use the breakaway box outside of the CEOF (Box contains key to CERC, CEOF, and CERC storage room).

Key for tape recorder located in keybox inside CEOF (keybox on wall inside CEOF).

1.2 Verify that the ground floor and 2nd floor lights are turned on. If not on. inform Corporate Security on extension

1.3 Perform Call-Out in accordance with CPT Section 3, Step 1.2, (Minimum call-out)

1.4 Verify that the CERC and the Corporate EOF console clocks are synchronized with time display on the Emergency Response computer system Monitor. (To synchronize, remove front panel of CEOF console to gain access to the clock controls).

Page 33: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 3.1 Page 3-3 10-15-90

1.5 Turn on the CEOF tape recorder by following the directions posted on it.

1.6 Retrieve badges and sign-in books from the CERC cabinet, and table from the storage room. Set up for the receptionist to issue badges and maintain sign-in.

1.7 Verify that the red phone(s) and monitor(s) are connected for the affected site (Blue-North Anna, Gray-Surry).

1.8 Select the affected station switch for Automatic Ring Down (ARD) located on the Corporate Response Manager's Console.

1.9 Using the ARD, contact the TSC and LEOF at the affected site. Ensure that station TSC and LEOF call back to verify circuits.

~-1-10

1.11

~1-12

~-1-13

~1-14

~1-15

NOTE: LEOF may not be manned during initial try; verify when LEOF is activated .

Remove the telephones from the CERC cabinet and place in appropriate areas.

Verify that the affected station maps (10 mile EPZ/Evacuation map) and (Emergency Response Matrix board) are properly displayed.

Turn around room signs located outside of each room.

Set up CERC floor plan, security access, and CERP boards on easels and post in appropriate areas.

Acquire typewriter from Records Management and place in the reception area.

In Records Management Office:

a. Ensure copy machine is operational with appropriate toner and paper supplies.

b. Ensure aperture card reader/printer is operational with appropriate toner and paper supplies •

Page 34: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

1.16

__ 1.17

__ 1.18

CPIP 3.1 Page 3-4 10-15-90

c. Ensure telecopier is operational by transmitting and receiving a test message to the affected station TSC and LEOF.

NAPS TSC NAPS LEOF

SPS TSC SPS LEOF

Verify that the Staffing board is kept current. Provide the Corporate Response Manager with the time in which CERC minimum staffing is activated. (Log time on Status Board on front wall).

When requested by Corporate Response Manager, d'irect telecommunications to monitor the Whelen Siren Control System and obtain siren status if system is activated.

After event is terminated:

1)

2)

collect documentation from each area and forward to the Corporate Emergency Planning Group

return all appropriate materials to their original location and restock/replace as needed. (i.e., Operating Procedures, maps, stationary supplies, etc.)

Reviewed By: Clerical Coordinator

Reviewed By: Administrative Services Manager

Page 35: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

Ii.th:.: LEOF Activation

Procedure Number: CPIP-3.2

Revision Summary:

Rev. 0 - Entire CPIP .

Revision Number; 0

Effective Date: 10/15/90

ll-/2--9'.a RecommendedApprovft" -~~ ~_/_h..- ,::( ( D~ ~tor Nuclear Emergency Preparedness Date

\__ Approvedby: 22, p ~~

Vice President-Nuclear Services /J-J c/-9cJ

Date

Page 36: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 3.2 ACTIVATION OF LEOF - NORTH ANNA

ACTION ITEMS CHECK-OFF LIST

CPIP 3.2 Page 3-5 10-15-90

NOTE: The first person to report to the LEOF should implement this procedure and then give it to either the serices Coordinator or the Office Services Coordinator upon his/her arrival.

1. INITIATE PROCEDURE:

Initiated BY:

Date:

Time:

2. Verify Security activation and establishment of access control to LEOF per EPIP-3.04.

3. Get assigned folders and binders from_the Administrative Services Area and place at the appropriate work stations.

4. Distribute Virginia Power Emergency Phone Books-to appropriate work stations.

* Recovery Manager/Communicator Console * Department of Emergency Services * state Bureau of Radiological Health * Health Physics Area * NRC Area * Administrative Services Area * Public Relations Area

s. Verify headsets for the CERC and the TSC Phonetalkers are at the appropriate work stations. If not present or if communicator determines headset is not operable, replace with spare headset from Administrative Cabinet.

6. Ensure PA operable.

7. Open cabinet containing the Emergency Status Information and Emergency Action Level Matrix {cabinet located to the outside right of the Admin. Services Area door) .

Page 37: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 3.2 Page 3-6 10-15-90

a. Verify routing status bins in place to collect/disseminate appropriate hard copies.

* Department of Emergency Services * State Bureau of Radiological Health * Recovery Manager/Communicator console * Health Physics/HPN Communicator Area * EPIP Table {Emergency Plan Advisor Area) * NRC Area * Administrative Services Area * Public Relations Area

9. Adjust brightness on ERFCS terminals.

10. Verify operability of ERFCS printer by depressing "PRINT DSPLY" key one time on one keyboard.

11. Verify operability of photo copier.

12. verify operability of telecopier in Administrative Services Area by sending test message transmission to TSC and CERC.

13. Verify LEOF digital clock is synchronized with time in upper right hand corner of ERFCS CRT.

NOTE: LEOF clock controls are located on the Recovery Manager/Communicator console .

14. Retrieve cart containing station drawings from the Training Center Library.

15. Verify minimum LEOF staffing via the Staffing Board.

16. Inform the Recovery Manager that LEOF is ready to be activated and minimum staffing is present.

17. Report any discrepancies to either the Services Coordinator or the Office Services Coordinator.

Page 38: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP-3.2 Attachment 1

LEOF TAKE-DOWN - NORTH ANNA

CPIP 3.2 Page 3-7 10-15-90

Upon termination of the drill, emergency and/or recovery operation the Services Coordinator will ensure the LEOF is deactivated and readied as soon as possible by ensuring the following steps are completed.

1. Ensure all documentation pertaining to the event is retrieved and given to the Station Coordinator-Emergency Planning.

2. Realign ventilation system using Attachment 2.

3. Have Station Records restock procedures.

NOTE: station records is to restock procedures within one hour following termination of drill, emergency and/or recovery operation.

4. Direct HP to perform PT on Emergency Kit.

5. Arrange for cleaning of LEOF.

6. Turn brightness down on all ERFCS CRTs.

7. Check emergency admin. supplies and restock as required .

a. Return headsets to appropriate locations.

9. Report any communication hardware problems to telecommunications.

10. Clean all status boards.

11. Replace break-away lock on Administrative Supply Cabinet if appropriate.

12. Request Station Coordinator-EP to submit work orders on any equipment malfunctions .

Page 39: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

••

CPIP-3.2 Attachment 2

NORTH ANNA SETTING THE HEATING VENTILATION AND

AIR CONDITIONING SYSTEM (HVAC) IN THE NON-EMERGENCY MODE

CPIP 3.2 Page 3-8 10-15-90

To align the system for normal non-emergency operation, perform the system line-up in the sequence indicated. Following this sequence is required to ensure the system interlocks do not defeat the start­up.

NOTE:

1.

2 •

If the system has tripped due to a power failure, all equipment should be cyclefd to the stop position and restarted using CPIP-3.2 Attachment 4, LEOF startup and Restart.

Perform the following steps in sequence.

a. D-1 Damper Start (Open) b. S-1 Air Handler Fan Start (On) c. D-3 Damper start (Open) d. F-1 HEPA Filter Fan Stop (Off) e. D-2 Damper Stop (Off) f. S-2 Computer Room HVAC Start (On)

Verify the system indication light colors.

a. D-1 Red b. S-1 Red c. D-3 Red d. F-1 Green· e. D-2 Green f. S-2 Red

3. Refer to CPIP-6.2 Attachment 4 if realignment problems develop.

Page 40: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP-3.2 Attachment 3

CPIP 3.2 Page 3-9 10-15-90

LEOF SERVICES COORDINATOR GUIDELINE - NORTH ANNA

1. Verify LEOF activated and functional.

2. Verify Services Organization:

a. Office Services Coordinator b. Clerks - 2 c. Telecommunications Coordinator d. ERFCS Operator e. Technical Advisor

3. Determine routing of status information, verify bins in place and assign staffing to keep information current and posted on the Emergency Status Information and Emergency Action Level Matrix.

NOTE: Minimum information to be routed includes the following:

* Report of Emergency to State/Local Governments, Attachment 1 of EPIP-2.01 (original from State/Local Communicator).

* News Releases (original from Public Relations Area).

* Report of Radiological Conditions to the state, Attachment 2 of EPIP-2.01 (original from State/Local Communicator).

* Plant Status, Attachment 1 of EPIP-2.04, issued if ERFCS inoperable (original faxed from TSC).

4. Verify station drawings retrieved from Training Center library.

5. Ensure Personnel Staffing and Time/Event boards are maintained.

6. Direct Telecommunications Coordinator to poll the siren system and to prepare for verification of activation.

7. If sirens are activated, direct Telecommunications Coordinator to poll siren system for verification.

a. Make arrangements for acquisition, delivery and serving of meals with the Emergency Administrative Director in the TSC.

9. Maintain a list (name and response position) of responders present in the LEOF and identify those actively filling positions.

10. Arrange for shift rotation of Emergency Response Personnel.

Page 41: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 3.2 Page 3-10 10-15-90

11. Retrieve any needed procedures/documentation from the NATC.

12. In the event of loss of power to the LEOF, direct ERFCS Operator to initiate Attachment 4, LEOF Startup and Restart.

13. Upon termination of drill, emergency and/or recovery operation, ensure LEOF is returned to ready state.

Page 42: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 3.2 ACTIVATION OF LEOF - SORRY

ACTION ITEMS CHECK-OFF LIST

CPIP 3.2 Page 3-11 10-15-90

NOTE: The first person to report to the LEOF should implement this procedure and then give it to either the Services Coordinator or the Office Services Coordinator upon his/her arrival.

1. INITIATE PROCEDURE:

Initiated By:

Date:

Time:

2. Verify Security activation and establishment of access control to LEOF per EPIP-3.04. If not, direct Security to complete EPIP 3.04.

3. Assign an Office Services clerk to initiate and maintain -Staffing Board.

4. Remove assig~ed folders and notebook binders from Administrative Services area and place at appropriate work stations.

5. Unlock Administrative Services Emergency cabinet (Obtain key from LEOF Security, if necessary).

6. Place headsets for CERC, TSC, and HPN Communicators at the appropriate work stations.

7. Retrieve LEOF Public Address System microphone, plug in and test.

a. Open Emergency Action Level Matrix/Emergency Status Information cabinet.

9. Verify routing status bins are at the following stations:

* Department of Emergency Services * state Bureau of Radiological Health * Recovery Manager/Communicator Console * Health Physics/HPN Communicator Area * EPIP Table (Emergency Plan Advisor Area) * NRC Area * Administrative Services Area * Public Relations Area

10. Adjust brightness on ERFCS terminals.

Page 43: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 3.2 Page 3-12 10-15-90

11. Verify operability of ERFCS printer by depressing "PRINT DSPLY" key one time on one keyboard.

12. Verify operability of photo copier by making a copy.

13. Verify operability of telecopier in Administrative Services Area by sending test message transmission to CERC.

14. Verify LEOF digital clock is synchronized with time in upper right hand corner of ERFCS CRT.

15. Verify operability of Aperture Card printer by making a print.

16. Verify minimum LEOF_staffing via the Staffing Board.

17. Inform the Recovery Manager that LEOF is ready to be activated and minimum staffing is present .

Page 44: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 3.2 - SORRY Attachment 1

LEOF SERVICES COORDINATOR GUIDELINE

CPIP 3.2 Page 3-13 10-15-90

1. Inform Recovery Manager when LEOF is fully staffed.

2. Route status information, verify status bins in place and assign staffing to keep information current and posted on the Emergency Status Information and Emergency Action Level Matrix cabinet doors.

NOTE: Minimum information to be routed and posted:

* Report of Emergency to State/local governments, Attachment 1 of EPIP 2.01 (obtain from State/local communicator)

* Report of Radiological Conditions to the state, At'tachment 2 of EPIP 2. 01 (obtain from State/local communicator)

* Plant Status, Attachment 1 of EPIP-3.02, if applicable.

* News Releases (original obtained from Public Info Technical Advisor)

3. Obtain copy of MIDAS print out from RAC and send to Radiological group in CERC.

4. Ensure Telecommunications Coordinator polls the Whelen System for activation when sirens are activated or as directed by the Recovery Manager.

5. Make arrangement for meals for LEOF personnel.

6. Develop a shift rotational schedule for LEOF responders and obtain Recovery Manager approval.

7. Retrieve any needed procedures/documentation from the Surry Training Center •

Page 45: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP-3.2 - SURRY Attachment 2

LEOF RESTORATION TO PREACTIVATION STATUS

CPIP 3.2 Page 3-14 10-15-90

Upon termination of the event, the Services Coordinator will ensure the LEOF is deactivated and readied as soon as possible by ensuring the following steps are completed.

1. Ensure all documentation pertaining to the event is retrieved and given to the Station Coordinator-Emergency Planning.

2. Verify HP realigns LEOF HVAC to normal operation in accordance with Attachment 3.

3. Notify Station Records of the need to restock procedures.

4. If HP emergency kit seal is broken notify HP to perform a PT on emergency kit.

5. Turn brightness down on all ERFCS CRTs.

6. Check Emergency Administrative Supplies and restock as required. (Refer to EPAP-0001, Emergency Facilities and Equipment Readiness).

7. Return headsets, packages and binders to appropriate locations.

8. Report any communications problem to Telecommunications.

9. Clean all Status Boards.

10. Provide to Station Coordinator-EP a list of any equipment malfunctions.

Page 46: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• I.

CPIP-3.2 - SURRY Attachment 3

LEOF HVAC OPERATIONAL SEQUENCES

CPIP 3.2 Page 3-15 10-15-90

NORMAL OPERATION MODE

NOTE: 1. If the system has tripped due to a power failure, all equipment should be cycled to the off/closed position.

2. Red light indicates "ON" or "OPEN" and green light indicates "OFF" or "CLOSED."

CAUTION: When performing HVAC operation, the indicator lights should show the fully closed or open position prior to performing the next step in the sequence.

1.

2.

3.

Equipment

Damper D-1

Damper D-2

Damper D-3

status

Open

Closed

Open

4. Upper Main Air Handler Switch on Automatic setting Automatic

NOTE: The Air Handler is interlocked with the thermostat which allows automatic cycling of air handler and its condenser to maintain desired temperature. The manual setting overrides this automatic mode and the system will remain on.

5. Lower Main Air Handler Switch on

6.

7.

NOTE:

Normal Setting Normal

HEPA Filter Off

Computer Room Air Handler and its Condenser on

The Thermostat and Humidity Control for the Computer Room HVAC System is inside the Air Handler Unit •

Page 47: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

A.H. FAN C. FAN SWITCH

AUTOMATIC. e START

MODE SWITCH

NORMAL e 0 STOP

• • ON ON

0 0 OFF OFF

HVAC CONTROL PANEL

NORMAL MODE

H. FAN D-1

0 • START OPEN

e 0 STOP CLOSE

0 • ON OPEN

e 0 OFF CLOSE

D-2

0 OPEN

• CLOSE

0 OPEN

• CLOSE

0 OVER­LOAD

·S-3

D-3

• OPEN

0 CLOSE

• -OPEN

0 CLOSE

0 .OVER­LOAD S-2

CPIP3.2 Page 3-16 10-15-9.0

RED BUTTONS

GREEN BUTTONS

RED LIGHTS

GREEN LIGHTS

AMBER LIGHTS

Page 48: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 3.2 Page 3-17 10-15-90

II. EMERGENCY MODE: The facility if manned for an Emergency or Exercise.

NOTE: 1. Red light indicates "ON or "OPEN" and green light indicates "OFF" or "CLOSED."

CAUTION: When performing HVAC operations, the indicator lights should show the fully closed or open position prior to performing the next step in the sequence.

Equipment

1. Upper Main Air Handler switch on Automatic Setting

*2. Lower Main Air Handler Switch on Emergency Setting

*3. Damper D-2

4. HEPA Filter

*5. Damper D-1

6. Damper D-3

7. Computer Room Aire Handler

Status

Automatic

Emergency

Open

On

Closed

Open

On

*Indicates change of equipment status from normal operation mode.

A.H. FAN C. FAN SWITCH

AUTOMATIC. • START

MODE SWITCH

EMERGENCY. 0 STOP

• • ON ON

0 0 OFF OFF

HVAC CONTROL PANEL

EMERGENCY MODE

H FAN D-1

• 0 START OPEN

0 • STOP CLOSE

• 0 ON OPEN

0 • OFF CLOSE

D-2 D-3

• • RED i,uTTONS

OPEN OPEN

0 0 GREEN i,uTTONS

CLOSE CLOSE

• • RED L18HTS

OPEN OPEN

0 0 8REEN Ll8HTS

CLOSE CLOSE

0 0 AM8ER LIGHTS

OVER- OVER-LOAD LOAD 5-3 5-2

Page 49: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 3.2 Page 3-18 10-15-90

III.ISOLATION MODE: The Airborne Radiation Monitoring System detects a predetermined radiation level entering the facility down-stream of the HEPA Filter.

NOTE: 1. Use of the isolation mode for an extended period of time will result in a loss of positive pressure within the LEOF.

2. The airborne radiation monitoring system DOES NOT monitor air activity within the LEOF when the HVAC system is in the Isolation Mode.

3. Red light indicates "ON" or "OPEN" and green light indicates "OFF" or "CLOSED."

CAUTION: When performing HVAC operations, the indicator lights should show the fully closed or open position prior to performing the next step in the sequence.

Equipment status

*l. HEPA Filter Off

*2. Dampert D-2 Closed

*3. Damper D-3 Closed

4. Damper D-1 Closed

5. Upper Main Air Handler Switch on Automatic Setting Automatic

6. Lower Main Air Handler switch on Emergency Setting Emergency

7. Computer Room Air Handler on

*Indicates change of equipment status from normal operation mode •

Page 50: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• A.H.FAN C. FAN SWITCH

AUTOMATIC- e START

MODE SWITCH

EMERGENCY. 0 STOP

e e • ON ON

0 0 OFF OFF

HVAC CONTROL PANEL

ISOLATION MODE

H. FAN D-1

0 0 START OPEN

e e STOP CLOSE

0 0 ON OPEN

• • OFF CLOSE

D-2 D-3

0 0 OPEN OPEN

e e CLOSE CLOSE

0 0 OPEN OPEN

• • CLOSE CLOSE

0 0 OVER- OVER-LOAD LOAD S-3 S-2

CPIP 3 .2 Page 3-19 10-15-90

RED BUTTONS

GREEN BUTTONS

RED LIGHTS

GREEN LIGHTS

AMBER LIGHTS

Page 51: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

Ii1J.s:.: Plan/Design/Construction Activation

Procedure Number: Revision Number: CPIP-4.0 0

Revision Summary:

Rev. 0 - Entire CPIP.

Effective Date: 10/15/90

//-12-?'o Recommended App~ -·c;::: _h/ h - :,, , Dfrector Nuclear Emergency Preparedness Date

_/

Approvedby: ~ Vice President-Nuclear Services

11-1'1-96 Date

Page 52: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 4.0 PLAN/DESIGN/CONSTRUCTION SUPPORT

ACTIVATION

CPIP 4.0 Page 4-1 10-15-90

Purpose This procedure provides guidance to implement the Plan/Design/Construction support group to support Corporate Emergency Response Center functions.

Activation When the Corporate security Control Center is notified of an emergency at either station they will initiate 1 the corporate Emergency Response Organization Call- \

1 out. The Primary and Alternates for the Plan/Design/ Construction Manager will be notified of the emergency.\

1.0 Required Action

1.1 The Primary and/or Alternates for the Plan/Design/ Construction Manager will report to the Corporate Emergency Response Center and initiate CPIP 4.1.

Page 53: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• VIRGINIA POWER

Corporate Emergency Plan Implementing Procedure

I.Uk,: Plan/Design/Construction Support Duties

Procedure Number: CPIP-4.1

Revision Summary:

Rev. 0 - Entire CPIP .

Recommended Appro

Revision Number; 0

Effective Date: 10/15/90

//-/?-?tJ Date

/1-/y -7'.d Date

Page 54: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 4.1 PLAN/DESIGN/CONSTRUCTION SUPPORT

DUTIES

CPIP 4.1 Page 4-2 10-15-90

This procedure provides guidance to implement the Plan/Design/ construction support activities.

1.0 Initial Actions

Upon arrival at the Corporate Emergency Response Center (CERC) the Plan/Design/Construction Manager should report to the corporate Response Manager and perform the following:

(Initial)

1. Determine the emergency classification.

2. Determine the description of events leading to the classification, and station needs regarding planning, design and/or construction.

3. Determine the need for staffing the following positions:

(Circle one)

Consultant & Equipment Support Director Power station Engineering Director Power station Construction Director Recovery Ops Planning Coordinator (If personnel are needed to fill these refer to ETD Section 4.0)

Yes/No Yes/No Yes/No Yes/No

positions

4. Determine the need to establish communication with the A/E and NSSS Vendor. (If communications are needed, refer to ETD section 4.0 for applicable phone numbers)

5. Establish a shift schedule for personnel relief.

6. Make appropriate work assignments as needed.

7. Ensure all personnel are informed of any changes in emergency status or identified needs.

Page 55: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

2.0 Duties

CPIP 4.1 Page 4-3 10-15-90

2.1 Once the incident is terminated and/or downgraded, determine the need for recovery support.

2.2 Ensure the following is accomplished as needed:

(Initial)

1. Develop an overall schedule for completion of recovery operations.

2. Develop a schedule for completing construction facilities needed for the recovery phase.

3. Identify key problems, resource limitations and technical decisions needed.

4. Identify milestones and monitor and report the progress of the recovery operations.

s. Develop an agenda (if needed) for response staff meetings and followup with expediting commitments .

Page 56: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

Ii.11..t: Technical Support Activation

Procedure Number: CPIP-5.0

Revision Summary:

Rev. 0 - Entire CPIP .

Revision Number; 0

Effective Date: 10/15/90

ReconunendedApp~~-:-1-(6;~ ...... ~~~~· .. ~~~~,,,,~~~-~51__-=-~~~~ - \ · --- · Dijector Nuclear Emergency Preparedness

//-/2-~o Date

,_,/

Approved by: q p (/;)I fl ,,,,,L Vice Pr~clear Services

U -/ 't - zc Date

Page 57: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 5.0 TECHNICAL SUPPORT MANAGER

ACTIVATION

CPIP 5.0 Page 5-1 10-15-90

This procedure provides the necessary steps to call the members of the Technical Support Staff, and/or their alternates, and have them report to the Corporate Emergency Response Center (CERC) or, when required, to the affected station.

1.0 Required Action

1.1 Implement Section 5 of the Emergency Telephone Directory .

Page 58: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

Iillt: Operations Support Activation and Duties

Procedure Number: CPIP-5.1

Revision Summary:

Rev. 0 - Entire CPIP.

Revision Number; 0

Recommended Approval~~//~:-~ Din ctor Nuclear Emergency Preparedness

\____)

Approved by: {)_. POi4-a. ~ Vice President-Nuclear Services

Effective Date: 10/15/90

//-/2-?o Date

/ J -/ t-91) ~~ Date

l

Page 59: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURES 5.1 OPERATIONS SUPPORT

ACTIVATION AND DUTIES

CPIP 5.1 Page 5-2 10-15-90

Purpose This procedure provides guidance to implement the operations support aspects of the Technical Support Group.

1.0 Immediate Assessment

Upon notification and discussion with Staff Support personnel or the Technical support Manager, the individual responsible for Operations Support shall report to the Corporate Emergency Response Center (CERC) ground floor Innsbrook Technical Center, or to the affected station, ascertain the emergency classification, and determine required staffing to support the emergency response.

2.0 Duties

2.1 Implement staffing to support emergency response activities.

2.2 Coordinate the efforts of the technical specialists.

2.3 Analyze systems for operation in a degraded mode.

2.4 Recommend alternate procedures and prepare those procedures, where required.

2.5 Assist in recovery.

2.6 Remain cognizant of staffing requirements.

l

Page 60: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

I.i.U.t: Reactor Core Analysis Activation and Duties

Procedure Number: Revision Number; 0 CPIP-5.2

Revision Summary:

Rev. 0 - Entire CPIP.

RecommendedAppro...i:":: PA.t1~-d' ( - D~tor Nuclear Emergency Preparedness

Approved by: ~ /? O?l-a~ Vice President-Nuclear Services

Effective Date: 10/15/90

//-/2-?<J Date

LI -It- z:ci Date

Page 61: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURES 5.2 REACTOR CORE ANALYSIS

ACTIVATION AND DUTIES

CPIP 5.2 Page 5-3 10-15-90

Purpose This procedure provides guidance to implement the reactor core analysis aspects of the Technical Support Group.

1.0 Immediate Assessment

Upon notification and discussion with Staff Support personnel or the Technical Support Manager, the individual responsible for Reactor Core Analysis Support shall report to the Corporate Emergency Response Center (CERC) Innsbrook Technical Center, or to the affected station, ascertain the emergency classification, and determine required staffing to support the emergency response.

2.0 Duties

2.1 Implement staffing to support emergency response activities.

2.2 Analyze reactor core for operations in degraded mode.*

2.3 Recommend alternate procedures and prepare those procedures where required.

2.4 Assist in recovery.

2.5 Remain cognizant of staffing requirements.

*Core damage assessment procedure entitled, "Core Damage Assessment Procedure for Virginia Power Corporate Emergency Response," NE Technical Report No. 422, is available for use in the Innsbrook Records Management area •

Page 62: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

I.i..tk: Radiological Control and Waste Management Activation and Duties

J

Procedure Number: Revision Number; CPIP-5.3 0

Revision Summary:

Rev. 0 - Entire CPIP.

Recommended Approv~ 1r _A~/./~.:.. r - Director Nuclear Emergency Preparedness

'-.__)

Approvedby: 0 {?(bl"" L ¥v~ervices

Effective Date: 10/15/90

/1-/2-?°o Date

J/-/ t -.Yo Date

Page 63: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CPIP 5.3 Page 5-4 10-15-90

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURES 5.3 RADIOLOGICAL CONTROL AND WASTE MANAGEMENT

ACTIVATION AND DUTIES

This procedure provides guidance to implement the radiological control and waste management aspects of the Technical Support Group.

1.0 Immediate Assessment

Upon notification and discussion with Staff Support personnel or the Technical Support Manager, the individual responsible for Radiological Control and Waste Management Support shall report to the Corporate Emergency Response Center (CERC) Innsbrook Technical Center, or to the affected station, ascertain the emergency classification, and determine required staffing to support the emergency response. In particular, an immediate assessment of the need for meteorological support shall be made.

2.0 Duties

2.1 Implement staffing to support emergency response activities.

2.2 Perform radiation dose calculations as a backup to the stations.

2.3 Review radiation controls in effect; make appropriate recommendations.

2.4 Analyze and coordinate waste management schemes.

2.5 Assist in recovery.

2.6 Remain cognizant of staffing requirements.

Page 64: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

e

• VIRGINIA POWER

Corporate Emergency Plan Implementing Procedure

Title: Licensing Activation and Duties

Procedure Number: CPIP-5.4

Revision Summary:

Rev. 0 - Entire CPIP.

Revision Number: 1

Effective Date: 12/01/91

Rev. 1 - Reissue; supercedes 10/15/90 revision with 12/01/91 revision date for consistency with

other CPIPs.

//.27'9/ Date

1-1-27-91 Date '

Page 65: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURES 5.4 LICENSING

ACTIVATION AND DUTIES

CPIP 5.4 Page 5-5 12-01-91

Purpose This procedure provides guidance to implement the licensing aspects of the Technical Support Group.

1.0 Immediate Assessment

Upon notification and discussion with Staff S~pport personnel or the Technical Support Manager, the individual responsible for Licensing Support shall report to the Corporate Emergency Response Center (CERC) Innsbrook Technical Center, or to the affected station, ascertain the emergency classification, and determine required staffing to support the emergency response.

2.0 Duties

2.1 Implement staffing to support emergency response activities.

2.2 Resolve questions concerning operating license requirements with NRC representatives.

2.3 Assist in recovery.

2.4 Remain cognizant of staffing requirements.

2.5 Make courtesy notification to NRC Project Manager and/or NRC Regional Office as directed by the Technical Support Manager. (See ETD, Section 5)

2.6 Notify INPO (See ETD, Section 5)

Page 66: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

-

-

• VIRGINIA POWER

Corporate Emergency Plan Implementing Procedure

Title: Chemistry Activation and Duties

Procedure Number: CPIP-S.5

Revision Summary:

Rev. 0 - Entire CPIP.

Revision Number; 1

Effective Date: 12/01/91

Rev. 1 - Reissue; supercedes 10/15/90 revision with 12/01/91 revision date for consistency with

other CPIPs.

//27,t:f/ Date

/J-?Z-91 Date '

Page 67: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

e

Purpose

CPIP 5.5 Page 5-6 12-01-91

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 5.5 CHEMISTRY

ACTIVATION AND DUTIES

This procedure provides guidance to implement the Chemistry aspects of the Technical Support Group.

1.0 Immediate Assessment

Upon notification and discussion with Staff Support personnel or the Technical Support Manager, the individual responsible for Chemistry Support shall report to the Corporate Emergency Response Center (CERC) Innsbrook Technical Center or to the affected station, ascertain the emergency classification, and determine required staffing to support the emergency response.

2.0 Duties

2.1 Implement staffing to support emergency response activities.

2.2 Provide assistance in chemical/radiochemical data evaluation.

2.3 Assist in recovery.

2.4 Remain cognizant of staffing requirements.

Page 68: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• VIRGINIA POWER

Corporate Emergency Plan Implementing Procedure

Ii.U.t: Meteorological Assessment Activation and Duties ,

Procedure Number: CPIP-5.6

Revision Summary:

Rev. 0 - Entire CPIP .

Revision Number; 0

Effective Date: 10/15/90

RecommendedApproval(-; -~fl/h~ 1 Dire<; tor Nuclear Emerg;ency Preparedness

//-/;,-9o Date

\J Approved by: a p Oi21-o__.~.&-.-u

Vice President-Nuclear Services J1-1t-<2c) ~ I

Date

Page 69: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CPIP 5.6 Page 5-7 10-15-90

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 5.6 METEOROLOGICAL ASSESSMENT

ACTIVATION AND DUTIES

This procedure provides guidelines to implement the Meteorological Assessment aspects of the Technical support Group.

1.0 Immediate Assessment

Upon notification and discussion with staff support personnel or the Technical support Manager, the individual responsible for Meteorological Assessment shall call and report to his team leader or the alternate at the corporate Emergency Response Center (CERC) Innsbrook Technical Center, and then go to meteorological operations, Innsbrook lE, first floor, to determine current meteorological situation and ascertain the emergency meteorological staffing required.to support the emergency response.

2.0 Duties

2.1 Implement staffing to support emergency response activities.

2.2 Provide assistance in meteorological assessment data evaluation.

2.3 Provide meteorological support to assist in recovery.

2.4 Remain cognizant of current meteorological assessment in each phase of emergency.

2.5 Telephone number through the PBX in the meteorological area is

Page 70: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

~: Safety Analysis Activation and Duties

Procedure Number: CPIP-5. 7

Revision Summary:

Rev. 0 - Entire CPIP .

~

Revision Number; 0

Approved by: ~ P / !) /,_.,1 -.£-n_

¥Vice Pre~lear Services

Effective Date: 10/15/90

J/-/J.-9D Date

JI-/ i -9c .- Date '

Page 71: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CPIP 5.7 Page 5-8 10-15-90

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 5.7 SAFETY ANALYSIS

ACTIVATION AND DUTIES

This procedure provides guidelines to implement the safety analysis aspects of the Technical Support Group.

1.0 Immediate Assessment

Upon notification and discussion with staff support personnel or the Technical Support Manager, the individual responsible for Safety Analysis Support shall report to the Corporate Emergency Response Center {CERC) Innsbrook Technical Center, or the

-affected station, ascertain the emergency classification and determine the required staffing to support the emergency response.

2.0 Duties

2.1 Implement staffing to support emergency response activities.

2.2 Provide safety analysis support for emergency operations.

2.3 Recommend alternate procedures and prepare those procedures where required.

2.4 Assist in recovery.

2.s Remain cognizant of staffing requirements •

Page 72: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

Iitk: ERF Computer Support Activation and Duties

Procedure Number: CPIP-5.8

Revision Summary:

Rev. 0 - Entire CPIP .

Revision Number; 0

~/) ~ RecommendedApp~V...-1' _z//~-- 1

Di -ector Nuclear Emergency Preparedness

\J Approvedby: G C~~4£,___,

Vice President-uclear Services

Effective Date: 10/15/90

1/-/i -7() Date •

Page 73: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 5.8 ERF-COMPUTER SUPPORT

ACTIVATION AND DUTIES

CPIP 5.8 Page 5-9 10-15-90

Purpose This procedure provides guidelines to implement the ERF­Computer support function of the Technical Support Group.

1.0 Immediate Assessment

Upon notification and discussion with staff support personnel or the Technical Support Manager, the individual responsible for ERF-Computer Support shall report to the Corporate Emergency Response Center (CERC), Innsbrook Technical Center, ascertain the emergency classification, and determine the required staffing to support the emergency response.

2.0 Duties

2.1 Activate the Emergency Response Facility Computer Systems as required or requested by the Technical Support Manager or the Corporate Response Manager.

2.2 Using the SPDS, monitor and trend plant parameters as directed •

2.3 Assist in recovery.

2.4 Remain cognizant of staffing requirements .

Page 74: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Proc~dure

VIRGINIA POWER

I.iJ,k: Recovery Manager Activation

Procedure Number: Revision Number; 0 CPIP-6.0

Revision Summary:

Rev. 0 - Entire CPIP .

RecommendedAppro~ ...... ~/h.-~ ( Diri ~tor Nuclear Emergency Preparedness '-___ /

Approvedby: Q ~ Vice President-Nuclear Services

Effective Date: 10/15/90

//-12-?o Date

Page 75: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

Activation

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 6.0 RRECOVERY MANAGER ACTIVATION

CPIP 6.0 Page 6-1 10-15-90

This procedure provides the necessary steps to call personnel responsible for manning the Local Emergency Operations Facility at the affected station or the Corporate Emergency Response Center at the Innsbrook Technical center.

The Station Emergency Manager has initiated the Corporate Emergency Response Plan due to an Alert, Site Area Emergency, or General Emergency at the affected station.

1.0 Required Actions

1.1 Implement Section 6 of the Emergency Telephone Directory.

Page 76: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

~: Recovery Manager Guidance

Procedure Number: Revision Number: 0 CPIP-6.1

Revision Summary:

Rev. 0 - Entire CPIP.

RecommendedAppro--<_;.,,~4:- ~ 'f; ~ ctor Nuclear Emergency Preparedness

'-.... J -

Approve,! by: a e ct,u ~ Vice Presiden~ar Services ·

Effective Date: 10/15/90

//-/2-'fo Date

//-J'-/-z:() .- Date

Page 77: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 6.1 RECOVERY MANAGER GUIDANCE

CPIP 6.1 Page 6-2 10-15-90

1.0 Primary Responsibilities

The Recovery Manager is responsible for coordinating offsite actions necessary to mitigate the consequences of any emergency condition at North Anna/Surry Power station. The Recovery Manager reports to the Local Emergency Operations Facility and coordinates with the Station Emergency Manager, Corporate Emergency Response Manager, and Federal, State, and local governments.

2.0 Conditions

Declaration of an Alert, Site Area Emergency, or General Emergency.

3.0 Actions and Limitations

3.1

3.2

3.3

3.4

3.5

3.6

3.7

Establish communications with the Technical support Center (TSC), Corporate Emergency Response Center (CERC), and offsite authorities.

Synchronize time in all facilities using the time of the ERF computer. May be read off any CRT monitor in the upper right corner.

Obtain a comprehensive update of the current plant status, emergency conditions, actions that are underway to mitigate the event, the emergency class, etc.

Obtain the operational status of the TSC and the CERC.

Verify that minimum staffing is met. '

Verify that the LEOF Services Coordinator has provided each emergency response team work station with designated plans, supplies and materials necessary for their operation.

Verify that the Radiological Assessment Coordinator is evaluating the impact of an actual or potential radiological release.

3.8 Notify all LEOF personnel (using P.A. system) of your name, duty position, and the operational status of the LEOF. If minimum staff is present, declare LEOF activated. (i.e., operational)

Page 78: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP 6.1 Page 6-3 10-15-90

3.9 Notify the SEM, Corporate Response Manager (CRM), and LEOF staff when the LEOF has been activated.

3.10 As soon as practical assume the Notification of State and local governments using EPIP 2.01 and following attachments.

Attachment 1

Attachment 2

Report of Emergency to State and local governments.

Report of Radiological Conditions to the State.

3.11 Evaluate EPIP-1.05 and consult with Radiological Assessment Coordinator prior to making protective action·recommendations to the State.

3.12 Coordinate with the CERC, as needed, to augment specialized equipment, services and/or staff for the station and/or LEOF.

3.13 Review and approve news releases for technical accuracy .

3.14 Direct that all communications failures in the ERFs (CR, TSC, osc, and LEOF) be identified and brought to the attention of the LEOF Telecommunications Coordinator for repair.

3.15 Direct LEOF Telecommunications Coordinator to monitor Whelen Siren Control system and to obtain siren status if system is activated.

3.16 Establish a 24-hour working schedule.

4.0 Recovery

Implement the Recovery Procedure in EPIP-6.01, if the conditions of the following checklist have been or have the potential of being met:

4.1 Station EALs no longer indicate a potential or actual emergency exists.

4.2 The release of radioactivity from the station no longer exceeds permissible levels, and there is no danger to the public .

4.3 The station is capable of sustaining itself in a stable shutdown condition.

Page 79: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• • Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

.Ii.tk: Radiological Assessment Coordinator

Procedure Number: CPIP-6.2

Revision Summary:

Rev. 0 - Entire CPIP.

Revision Number; 0

Recommended Appro ~ L' ~ /~.:. _

Effective Date: 10/15/90

//-/2-ra . ~ ~-,~ '

Dm ctor Nuclear Emergency Preparedness Date

~ Approved by: ~?uxla-..L

ice President-Nuclear Services 11-1 z'.'.-?o

Date

Page 80: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose:

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 6.2 RADIOLOGICAL ASSESSMENT COORDINATOR

CPIP 6.2 Page 6-4 10-15-90

This procedure directs the Radiological Assessment Coordinator (RAC) and the LEOF Dose Assessment staff.

Activiation: This procedure is activated upon declaration of an ALERT or greater or when directed by the SEM or RM.

1.0 Required Actions (check)

--

--

1.1 Implement EPIP 4.08, Initial Offsite Release Assessment, as necessary.

1. 2 Implement EPIP 4. 03, controlling Procedure.

Dose Assessment Team

1.3 Implement EPIP 4.12, Monitoring Instructions.

Offsite Environmental

1.4

1. 5

1. 6

1.7

1.8

1.9

Implement EPIP 4. 13, Offsi te Release Assessment with Environmental Data.

Implement EPIP 4 .19, Radio Operations for Heal th Physics Monitoring.

Implement EPIP 4.07, Protective Measures.

Implement EPIP 4.29, TSC/LEOF Radiation System, if not in progress.

Implement EPIP 4.18, Monitoring of LEOF.

Provide state and local communicator with proper information to complete EPIP 2.01 Attachment 1 and 2 in a timely manner.

NOTE: Update the S&L Communicator every 30 minutes during an ALERT or higher classification.

NOTE: Update the S&L Communicator within 15 minutes after a classification upgrade or when Radiological Conditions change.

NOTE: The RAC should verify information to be transmitted by S&L Communicator by ini tialling appropriate attachments.

NOTE: Ensure copy of MIDAS Special Reports are sent to CERC Radiological representative.

Page 81: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• CPIP 6.2 Page 6-5 10-15-90

1.10 Update the Recovery Manager as conditions change or information becomes available regarding Offsite Release Assessment, radiological trends and protective action recommendations.

1.11 Continously update the Commonwealth of Virginia DES liaison and the Bureau of Radiologial Health representative.

1.12 Verify the proper EPIP for operation of MIDAS is being utilized:

1.12 .1 EPIP 4. 3 0, Use of MIDAS Class A Model.

1.12. 2 EPIP 4. 31, Use of MIDAS Class B Model.

1.12. 3 EPIP 4.32, Dose Assessment Team Procedure - MIMIC LAPTOP Computer.

1. 13 Implement, when necessary, EPIP 4. 04, Emergency Radiological Exposure

and EPIP 5. 06, Emergency Radiation Exposure Authori­zations.

1.14 Implement EPIP 5.07, Administration of Radio­protective Drugs, if necessary.

1. 15 If Radiological or Meteorological conditions change, review CPIP 3.2, Attachment 3, 4, or 5 for proper LEOF HVAC line-up. (Surry)

1.16 When directed by Recovery Manager, secure from the emergency.

1.16 .1

1.16.2

1.16.J

1.16.4

Determine the need for further use of offsite teams for data/sample collection.

Return equipment and the LEOF HVAC to Normal Mode, as appropriate.

Ensure Offsite Teams are informed of _status.

Submit completed forms and records to the LEOF Service Coordinator.

Page 82: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

.I.illi:.: Emergency Plan Advisor - LEOF Responsibilities

Procedure Number: CPIP-6.3

Revision Number; 0

Effective Date: 10/15/90

Revision Summary:

Rev. 0 - Entire CPIP .

RecommendedApprov.~ A/~~~ (

0

nl1ector Nuclear Emergency Preparedness

\_,)

Approved by: _/J~· --L-P____._.{:f)J.~~«<t~.-,~~.__..~...a,:;....-..-._ ¥vice President-Nuclear Services

/l-/2-70 Date

JJ-IY-9c• ~ Date

Page 83: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 6.3 EMERGENCY PLAN ADVISOR

LOCAL EMERGENCY OPERATIONS FACILITY

CPIP 6.3 Page 6-6 10-15-90

This procedure provides the Emergency Plan Advisor with a general listing of responsibilities during an emergency.

1.0 Immediate Functions

1.1 Principle Responsibilities:

1.1.1 Advise the Recovery Manager on procedural matters during the emergency and recovery phases.

1.1.2 Assure that station Emergency Plan and procedures are implemented to mitigate the emergency.

1.1.3 Act as liaison with offsite emergency agencies, i.e., NRC, DOE, and DES to aid in assessment of the station conditions.

1.1.4 Assist in long term recovery efforts at the request of the Recovery Manager.

1.1.5 Coordinate with the NRC to ensure compliance with regulations during the recovery phase. -

1.1.6 Review recovery program procedures for possible impact on offsite governmental agencies.

2.0 Collateral Responsibilities

2.1 Interface with Emergency Response Directors, Managers, and Team leaders.

2.2 Coordinate meetings/briefings with Corporate Executives, Public Affairs Representatives and outside agencies.

2.3 Identify communication needs and coordinate support to expedite the recovery effort.

2.4 Assist in the administration of the LEOF.

2.5 Provide recommendations and assistance to the Recovery Manager as requested •

Page 84: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Procedure

VIRGINIA POWER

IitJ..t: Medical Advisor Activation

Procedure Number: Revision Number; CPIP-7.0 0

Revision Summary:

Rev. 0 - Entire CPIP .

Recommended Approv~---t;;; _/l_L/ _/1,,- ~ Dire :tor Nuclear Emergency Preparedness

\.___)

Approved by: /) p /b ~ ,,L ~Vice Pre~~dear Services

Effective Date: 10/15/90

//-/2-9'6 Date

J/-/'f-9C' 0

bate 1

Page 85: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Purpose

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 7.0 MEDICAL ACTIVATION DUTIES EMPLOYEE HEALTH SERVICES

ACTIVATION

CPIP 7.0 Page 7-1 10-15-90

This procedure provides the necessary steps for the Medical Advisor, and/or alternate, System R.N., to report to the corporate Emergency Response Center or when required, to the affected station Medical Treatment center.

Activation This procedure will be activated on the notification of the Medical Advisor or alternate, system R.N., that an Alert, Site Area Emergency or General Emergency has been declared.

1.0 Required Actions

1.1 Implement Section 7 of the Emergency Telephone Directory .

Page 86: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Corporate Emergency Plan Implementing Proc~dure

VIRGINIA POWER

.I.it.le.: Medical Activation Duties

Procedure Number: Revision Number; 0 CPIP-7.1

Revision Summary:

Rev. 0 - Entire CPIP .

.A~ /J ' Recommended Approval;.--:::::::: ~ ~ / 4_,.. --

( Direc~or Nuclear Emergency Preparedness

Effective Date: 10/15/90

1/,-./2-?d Date

Approved by: -'(}~. -'--''M'--t/ ~~~~ -1-~rY\--::':"~-­~Vice ~ar Services

/J-/z'-9u ' Date

Page 87: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN

IMPLEMENTING PROCEDURE 7.1

MEDICAL ACTIVATION DUTIES

EMPLOYEE HEALTH SERVICES

CPIP-7.1 Page 7-2 10-15-90

1) Medical Advisor and/or alternate (System R.N.) reports to CERC.

2) Monitor medical care of injured/exposed persons and maintain a log that includes: (see attached information on the form shown on page 7-4)

3) Assist with interpretation of medical information and procurement of consultative medical services as needed and as requested by the Corporate Response Manager.

4) Notify the nuclear station physicians if local medical assistance is needed.

(1) North Anna: Beaverdam Family Physicians

Dr. Sherrod

(2) Surry: Smithfield Medical Clinic

Dr. Longford

5) If injured/exposed person needs emergency hospital care, notify the:

(1) MCV Hospital Superintendent (after hours, telepage will answer and have superintendent return the call), and

(2) Radiation Safety Office (Dean Braga) (after hours and emergency number:

Information needed for other hospitals in the appropriate Station areas is located on page 7-5.

Enter on the log the name and title of person notified and the time •

Page 88: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

I -

'

6)

CPIP-7.1 Page 7-3 10-15-90

Have administrative personnel services team runner obtain name, address and phone number of the injured person's next of kin. Supply this information to the Medical Advisor.

Record on the log the name and relationship of the family member notified and the time .

Page 89: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

• Oorill

0 Actual Event

Flow Sheet Log For Injured/Contaminated -Nuclear Power Station Employees

CPIP 7.1 Page 7-4 10-15-90

Instruction: Please print. Individual completing each section is to immediately pass form to next person for completion .

A. To be Completed by CERC Communicator

Time CERC Notified of Injury Dam Dpm

Station

Name of Injured 0Employee D C t ct I Time of Injury on ra or Dam

Description of event and Injury

Contamination: DNo D Yes ~ If yes, Amount:

Transport for Medical Care: 0No 0Yes ~ If yes, to

Mode of Transport: D Station ambulance D Public ambulance D Helicopter D0ther

I

'

Dpm

Is transport being simulated only? D Yes I Time Left Station Dam D pm I Expected Arrival Time at Hospital Dam Dpn

Communicator (Signature)

B. To be Completed by Administrative Services Clerical Support

Name of Injured (First, Middle, Last)

Social Security Number

Job Tttle

Next of Kin (Name)

Address

Name of Injured (First, Middle, Last)

Social Security Number

Supervisor (Name)

Time Hospital Notified Dam Dpm

Hospital Official(s) Notified

Date of Birth (Month/Date/Year)

Date of Hire (Month/Date/Year)

Relationship

Phone Number

Company (Name)

MCV Telephone Numbers 786-0958 - Superintendent

1. Name/Title ______________________ 1786-9131 - Radiation Safety (Dean Braga)

786-9834 - Radiation Safety (after hours) 2. Name/Title------'------------------, 786-7409 - E. R. Disaster Coard. (Brenda Strohl)

Patient Arrival Time Diagnosis Treatment

Dam Dpm

I

D Admitted D Released (Time ___ ~ Dam D pm D Condition, _______ __,.----------

Time Next of Kin Notified: D Yes D No Dam Dpm Distribution: Corporate Emergency Response Manager, Public Affairs

Medical Advisor (Signature)

Page 90: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CORPORATE EMERGENCY RESPONSE PLAN HOSPITAL TELEPHONE NUMBERS

University of Virginia Hospital Charlottesville, VA

Mary Washington Hospital Fredericksburg, VA

Culpeper Memorial Hospital Culpeper, VA

Medical College of Virginia Richmond, VA

Norfolk Sentra Hospital Norfolk, VA

DePaul Hospital Norfolk, VA

Leigh Memorial Hospital Norfolk, VA

Riverside Regional Medical Center Newport News, VA

Newport News General Hospital Newport News, VA

Mary Immaculate Hospital Newport News, VA

U.S. Naval Hospital Portsmouth, VA

Maryview Hospital Portsmouth, VA

Portsmouth General Hospital Portsmouth, VA

Virginia Beach General Hospital Virginia Beach, VA

Hampton sentra Hospital Hampton, VA

CPIP-7.1 Page 7-5 10-15-90

Page 91: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

Chesapeake General Hospital Chesapeake, VA

(Louise) Obici Memorial Hospital Suffolk, VA

CPIP-7.1 Page 7-6 10-15-90

Page 92: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

PROTOCOL FOR USE OF HELICOPTER EMERGENCY AIR

TRANSPORT SERVICE

CPIP-7.1 Page 7-7 10-15-90

A helicopter should be used for transporting injured persons when life or limb is severely threatened and time is of the essence.

It is estimated that the time necessary for removal of the injured from the site of the injury to an appropriate medical facility would be reduced by 30 to 60 minutes depending on weather conditions and traffic congestion. The helicopter will carry a maximum of two injured persons.

Therefore, the following recommendations are submitted as guidelines for the appropriate use of the helicopter emergency transport service:

1. A critically injured patient with rapidly deteriorating vital signs, severe brain injury, intra-cavity hemorrhage, heat stroke, or progressive shock unresponsive to first aid measures on site.

2. Any severely mangled or amputated extremity where there is a possibility of salvage through reconstructive surgery.

In situations where there are multiple casulties, it is important to reserve the helicopter for those in the above categories. It is highly improbable that either the nature or degree of radiation exposure would be a significant factor in determining whether or ·not a helicopter should be used.

The most convenient helicopter services available in our service area are as follows:

Surry Nightingale (Norfolk) Call EVMS at

North Anna Pegasus (Charlottesville)

Richmond

Call Univ. of Virginia at or

Med Flight (Richmond) Call Virginia EOC at or MCV at

Page 93: Corporate Emergency Plan Implementing Procedure · cpip 1.0 page 1-1 10-15-90 corporate emergency response plan implementing procedure 1.0 corporate response manager situation appraisal

CPIP-7.1 Page 7-8 10-15-90

Helicopter range is 125 miles so that all of our service areas are within reach of one or more of the helicopter services mentioned above.

Other helicopter services available within or in close proximity to our service areas include the following:

Dare County EMS

Med Star

Duke Life Flight

Life Guard 10

Manteo, NC

Washington, DC

Durham, NC

Roanoke, VA