condition based maintenance, the maintenance execution ... · condition based maintenance, the...

17
ARL Penn State Condition Based Maintenance, the Condition Based Maintenance, the Maintenance Execution Process and the Maintenance Execution Process and the Open Systems Standards Open Systems Standards An Overview of Activities at Penn State An Overview of Activities at Penn State Defense Maintenance Conference Reno, Nevada October, 2006 Ed Crow 814/863-9887 [email protected]

Upload: others

Post on 19-Oct-2020

23 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Condition Based Maintenance, the Condition Based Maintenance, the Maintenance Execution Process and the Maintenance Execution Process and the Open Systems StandardsOpen Systems StandardsAn Overview of Activities at Penn StateAn Overview of Activities at Penn State

Defense Maintenance Conference

Reno, Nevada October, 2006

Ed Crow

814/863-9887

[email protected]

Page 2: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Common, Joint Needs to Transform Enterprise Processes

-Collect & Share Data

-Have Visibility

-Work Together Off a Common Operating Picture

-Effective

-Speed

-Time

-Safety

-Cost

-Mass

-Volume

-Manpower

Architecture

Interoperability

Technology Infusion

Common Standards

Path to Implementation

Capabilities Measures Needs

Page 3: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

DEVELOP:Sensor Systems that report status and health of combat critical items

Message and IT linkages from tactical units into Global Combat Service Support

MATURE:Pilot buildout of Log Operational Architecture(s)

Championing Open Standards

Standardized Engineering Methodology for Implementation

Further the Metrics & Business Case Analysis

What is Our Involvement Developing and Maturing Logistics and Supportability?

Doing demonstrations to show organizational and technical interfaces, gaps and overlaps, challenges and benefits

Concepts

Processes

ProductsSolutions

Technologies

AcquisitionDOTMLPF

DoctrineOrganization

Training Materiel Leadership Education Personnel FacilitiesStandards

Trials &

Evaluation

By a Non-Vested Party

NEED

Concepts

Processes

ProductsSolutions

Technologies

AcquisitionDOTMLPF

DoctrineOrganization

Training Materiel Leadership Education Personnel FacilitiesStandards

Trials &

Evaluation

By a Non-Vested Party

NEED

Page 4: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Synchronize & Reduce redundant effortsEstablish Configuration Control of ArchitectureBusiness Process baseline for Autonomic

LogisticsProvide Adaptable Technologies

GCCSCommandersS2S3

Value Added: End-to-End Prototyping from Vehicle to Enterprise

Off-PlatformArchitecture

On-PlatformArchitecture 1

Synchronize

3Commonality

4Interoperability

5ERP

2Integration

GCSS MCS4MaintainersPM’s

Common Standards, Specifications, ProtocolsCommonality

&Interoperability

Situational Awareness & Situational Understanding for Commanders in Mission Planning

Critical platform data for planning and executionReach as required

Embedded Health Management System

Research DesignDevelop

TestImplement

Network Enabled

Distributed Processing

Data Requirements

Sensor Based & Linked

Page 5: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

-Detect and isolate component degradation and incipient failure-Give appropriate alerts to operator, maintainer, log/supply and C2

Failure Prevention Failure Response

Normal Operation

Fault InitiationFunctional Failure

Collapse Return to Service

Diagnostics- High Supportability Payoff

Prognostics-Very High Tactical Value

Platform “Sensors”the Key Enabler- get data flowing

Apply appropriate sensors (data), analysis (knowledge), and reasoning (interpretation) to provide system level health assessment.

Earlier Notification Buys Time

Page 6: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Mobility ElectricalPower

Combat Resources

Sensors

Engine/ Motor Drive Train Generator

Alternator Batteries Fuel, LubeH2O Ammo

Sensors

SubsystemMonitor

SubsystemMonitor

Diagnostic/Prognostic

Unit

Operator /Commander

SubsystemMonitor

Planner /Logistics

Knowledge

Data

Platform Status and Health Reporting Architecture

Page 7: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

USMC Autonomic LogisticsRequest Management Process

Platform

BattalionS4

(RM)

OrderManager

(OM)

InventoryCapacityManager

(ICM)

DistributionCapacityManager(DCM)

MaintenanceCapacityManager(MCM)

MobileContactTeam(ME)

•SkillsPartsTools

•Parts

•Transport

•Skills / Tools

Command& Control

(C2)•Log Status

Automated Demand Flow

Focused & Tailored Response

•Work package for platform fault/failure

repair action

•AL Demand Message

•Condition-based demand triggered by sensors on platform

Page 8: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Demo- Relation of individual maintenance action to Combat

Readiness and Capability

Vibration Management Enhanced ProgramUS ARMY

Page 9: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Show HEMTT Maintenance Demonstration Here

Page 10: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Championing Open Standards

ISO-13374 Condition Monitoring and Diagnostics of Machines

THE SITUATION•Increasingly DOD acquisition programs are requiring availability, readiness, supportability and life cycle cost•Response is to ambitiously reaching toward prognostics•Each is developing a unique data architecture•Vendors want to protect proprietary solutions

THE CHALLENGE•Implement a common architecture framework that:

•Has a foundation in open standards•Approaches the goal of plug and play•Allows vendors to protect proprietary solutions

OSA-CBM Open System Architecture for Condition-Based Maintenance

OSA-EAI Open System Architecture-Enterprise Application Integration

www.mimosa.org

Page 11: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Prognostics/CBM Effect on LCC

$400,000,000

$500,000,000

$600,000,000

$700,000,000

$800,000,000

$900,000,000

$1,000,000,000

$1,100,000,000

$1,200,000,000

$1,300,000,000

$1,400,000,000

5 7.5 10 12.5 15 17.5 20 22.5

Length of Estimate (Years)

Tota

l Life

Cyc

le C

ost

Adjusted Prognostics

LCC Without Prognostics

LCC With Prognostics

Cost-Benefit

Benefits increase as service life is

extended3-4 yr. payback

“s” shape effect due to deferred depot overhauls

AAV RAM/RS Data (Hours) W/O Prog W/ProgMean Time Between Failures 64 73.6Mean Time To Repair 0.87 0.87Mean Logistics Delay Time 5.4 2.7675

AAV RAM/RS Calculations W/O Prog W/ProgForecasted Op Availability 91.08% 95.29%Increase in Op Avail w/Prog 4.21%Increased AAVs Mission Capable w/Prog 29Total LCC Costs per AAV w/Prog $973,504Operational AvailabilityOpportunity Benefit of Prognostics $27,890,754

Benefits can either be: increased Ao; decreased life cycle cost or reduced number of assets for same total operational availability

Page 12: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Joint Involvement

ELog 21HQ I&L Log Modernization

MCSC GCSS

MCSC Autonomic Logistics, EMSS

MCSC Platforms- LAV, MTVR, Howitzer, HWWMV

LTA- Common Logistics Operating Environment

Future Combat Systems

KSC, JSC & MSFC

Sea Basing

Sea Based Sense & Respond Logistics

HBCT- Vehicle Health Management CBM+

FCS- LDSS, P/SMRS Analysis

Joint ARMY/USMC AL

TWV- HEMTT, FTTSShip CBM

ONR S&T

Page 13: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn StateSummary

Ed Crow, Div Head(814) [email protected]

Karl Reichard, Head Complex Systems Dept.

(814) [email protected]

Bob Walter, Head Enterprise Systems Dept.

(814) [email protected]

•Engineering of Embedded Diagnostics and Prognostics •Architecture Design for Logistics/Command-Control Systems•Full Time Dedicated Science & Engineering Staff•US Citizens, cleared for DoD•Established Tech Transfer Processes

Motive- Measurable benefit to the platform

Means- becoming part of the formal engineering process

Format- Use of open system standards (OSA)

Framework- Joint requirements

Page 14: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

“Sensors” at the Platform Level- Batteries

SubSystem Monitoring

Component Monitoring

System Monitoring

Signal

Condition

Health

CapabilityDemand

C2Log/Suppl

Sensors• impedance sensor

Sensors• impedance sensor

Feature determination:-signal processing-models-automated reasoning

Feature determination:-signal processing-models-automated reasoning

Determination of State-State of Charge-State of Health-State of Life

Determination of State-State of Charge-State of Health-State of Life

Targeted Degraders• Charge• Cold Cranks• Cycle life

Targeted Degraders• Charge• Cold Cranks• Cycle life

3233

3435

36 9

9.5

10

10.5

4.4

4.6

4.8

5

5.2

5.4

Re(Z)

Im(Z

)

Ω

DLCω1

θ+Ω

ωσ

DecreasingFrequency

Ohmic Resistance

Diffusion Layer Impedance Charge Transfer ResistanceσΩ

θ

CDLElectrical Double Layer Capacitance

Good Short Circuit

Open Circuit Passivation

Battery is healthy

Battery is healthy, but low charge

Battery has failed- passivation Will need Battery

Need Battery

Page 15: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Battery Graveyard… ¼ - 1/3 of these are still good…

Page 16: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Foundational Data

• 98% of log load by (lift) weight is supply Subsistence (H20), Fuel/Lube (fuel) and Ammunition*

• Class I, III, IV comprise 85% by volume in OEF and OIF**• Class IX Parts (and batteries) next biggest contributor• Op tempo and variations to mission plan outpaces log ability

during combat pulse

Suggests prioritized focus for embedded diagnostics and prognostics:

Consumables: fuel, water, ammo

System Health

-failure (diagnostics)

-fault localization (adv. Diagnostics)

-fault initiation and remaining useful life (prognostics)*Ref: Sea-Based Combat Service Support for Ship to Objective Maneuver Center for Naval *Analysis, CRM 95-144, Sept 1995 ** multiple anecdotal sources

Focus AreaSystems Health

Page 17: Condition Based Maintenance, the Maintenance Execution ... · Condition Based Maintenance, the Maintenance Execution Process and the Open Systems Standards An Overview of Activities

ARLPenn State

Force

on

Force

Logistics & Maintenance Transformation Needs a New LogC2 Calculus

SENSE

Interpret Demand

RESPOND

Non-Linear, Adaptive,Capabilities Based

Slow, Linear, Reactive

TODAY

Days/Hours

“Demand Drives Everything”- the log/C2 systems need to be informed by real-time, accurate demands from platforms in service (autonomic logistics)

Thus log response is highly flexible, rather than highly optimized (global combat support system)

Distributed

Ops

OBJECTIVE

Minutes