combined cementing technologies achieve long-term zonal

2
SCP in UGS reservoir in Hungary The Hungarian oil and gas group MOL, one of the largest corporations in Central Europe, converted the Szoreg reservoir in Hungary’s Algyo Basin to a UGS facility. Because there is evidence of SCP in other UGS fields in the area, MOL contacted Schlumberger for a solution to ensure long-term zonal isolation across the UGS reservoir to withstand the stresses caused by gas storage cycles bring cement to surface across the low-fracture-gradient formations control gas migration during cement setting. Combination of technologies for primary cementing The wells in this project included 34 vertical wells and 10 horizontal wells. The CemSTRESS* cement sheath stress analysis software was used to gain a better understanding of the stresses in the cement sheath through analyses of tensile strength, Young’s modulus, and expansion properties. The CemSTRESS analysis led to the selection of FlexSTONE cement technology as the most appropriate cementing system. Under the challenging conditions of the Szoreg reservoir, FlexSTONE cement system reduces the risk to zonal isolation by creating a robust cement sheath matched to the specific stress environment of the reservoir. Challenge Control gas migration and ensure long-term zonal isolation across an underground gas storage (UGS) reservoir to withstand the stresses caused by gas storage cycles throughout the life of the well. Solution Used the D600G GASBLOK* gas migration control cement additive, in combination with CemNET* advanced fiber technology to control losses, FlexSTONE* advanced flexible cement technology, and AccuSET* broad temperature range engineered cement hydration control system to contain sustained casing pressure (SCP). Results Achieved long-term zonal isolation in 44-well campaign with no remedial cementing and no QHSE incidents. Combined Cementing Technologies Achieve Long-Term Zonal Isolation in MOL’s UGS Wells Case study: Successful primary cementing prevents gas migration to surface in 44-well campaign in Hungary Cementing Gyor Banja Luka Graz Miskolc Pecs Arad Novi Sad Rijeka Kosice Plzen Ruzomberok Debrecen Szeged Brno Ostrava Krakow Cluj Timisoara Belgrade Lvov ezia Zagreb Budapest Bratislava Vienna Ljubljana AUSTRIA HUNGARY ROMANIA CZECH SLOVAKIA CROATIA SLOVENIA Szeged reservoir in Hungary’s Algyo Basin.

Upload: others

Post on 06-Jun-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Combined Cementing Technologies Achieve Long-Term Zonal

SCP in UGS reservoir in HungaryThe Hungarian oil and gas group MOL, one of the largest corporations in Central Europe, converted the Szoreg reservoir in Hungary’s Algyo Basin to a UGS facility. Because there is evidence of SCP in other UGS fields in the area, MOL contacted Schlumberger for a solution to

■■ ensure long-term zonal isolation across the UGS reservoir to withstand the stresses caused by gas storage cycles

■■ bring cement to surface across the low-fracture-gradient formations

■■ control gas migration during cement setting.

Combination of technologies for primary cementingThe wells in this project included 34 vertical wells and 10 horizontal wells. The CemSTRESS* cement sheath stress analysis software was used to gain a better understanding of the stresses in the cement sheath through analyses of tensile strength, Young’s modulus, and expansion properties. The CemSTRESS analysis led to the selection of FlexSTONE cement technology as the most appropriate cementing system. Under the challenging conditions of the Szoreg reservoir, FlexSTONE cement system reduces the risk to zonal isolation by creating a robust cement sheath matched to the specific stress environment of the reservoir.

Challenge

Control gas migration and ensure long-term zonal isolation across an underground gas storage (UGS) reservoir to withstand the stresses caused by gas storage cycles throughout the life of the well.

Solution

Used the D600G GASBLOK* gas migration control cement additive, in combination with CemNET* advanced fiber technology to control losses, FlexSTONE* advanced flexible cement technology, and AccuSET* broad temperature range engineered cement hydration control system to contain sustained casing pressure (SCP).

Results

Achieved long-term zonal isolation in 44-well campaign with no remedial cementing and no QHSE incidents.

Combined Cementing Technologies Achieve Long-Term Zonal Isolation in MOL’s UGS WellsCase study: Successful primary cementing prevents gas migration to surface in 44-well campaign in Hungary

Cementing

Annaba

Constant ine

Vi tebsk

Vej le

Parnu

Ioannina

Patra i

Gyor

L iepaja

Bergen

Severodvinsk

Banja Luka

Batna

GrazInnsbruck

Gomel

L idaMogi lev

Tartu

Tampere

Vaasa

Pot i

Sochi

I rak l ion

Khania

Lar isa

Xanth i

Miskolc

Pecs

Bar i

Catania

Daugavpi lsKla ipeda

Trondheim

Bydgoszcz

Olsztyn

Arad

Botosani

Brai la

Arkhangelsk

Kaluga

Novgorod

Ordzhonik idze

Orel

Pskov

Smolensk

Sovietsk

Voronezh

Gavle

Ostersund

Skel lef tea

Umea

Uppsala

Antalya

Zonguldak

Lutsk

Simferopol

Vinni tsa

Novi SadRi jeka

Spl i t

T i tograd

Ti tov Veles

Vologda

Verona

Mikhaylovgrad Pleven

Stara Zagora

Hradec Kralove

Kosice

Plzen

Ruzomberok

Odense

Bastia

Bremen

Dresden

Kiel

Magdeburg

Debrecen

Szeged

Enschede

Groningen

Kaliningrad

Malmo

Burgas

Varna

Brno

Ostrava

Lyon

Marseille

Bonn

Frankfurt

Hamburg

Leipzig

Munchen

Nurnberg

Stuttgart

Agrinion

Thessaloniki

Mosel

Bologna

Firenze

Genova

Turin

Krakow

Lodz

Poznan

Wroclaw Breslau

Cluj

Constanta

Timisoara

Gorkiy

Krasnodar

Leningrad

Volgograd

Yaroslavl

Belgrade

Goteborg

Geneva

Zurich

Aleppo

Adana

Bursa

Istanbul

Izmir

Dnepropetrovsk

Donetsk

Frunze

KharkovLvov

Odessa

Voronezh

Zaporozhye

Strasbourg

Karlsruhe

Wiesbaden

Milano

Naples

Palermo

Venezia

Gdansk

Lubin

Rostov

Krivoy Rog

Tirane

Yerevan

Minsk

Sarajevo

So�a

Zagreb

Prague

Copenhagen

Helsinki

Tbilisi

Athens

Budapest

Rome

Riga

Vaduz

Vilnius

Skopje

Vallelta

Chisinau

Monaco

Amsterdam

Oslo

Warsaw

Bucharest

Moscow

Bratislava

Stockholm

Bern

Tunis

Ankara

Kiev

Algers

Vienna

Brussels

Nicosia

Tallinn

Berlin

Luxembourg

The Hague

Ljubljana

FINLAND

AUSTRIA

ITALY

SWEDEN

NORWAY

GERMANY

FRANCE HUNGARY

ROMANIA

BULGARIA

TURKEY

DENMARK

POLAND

BYELARUS

UKRAINE

CZECH

SLOVAKIA

GREECE

NETH.

BELGIUM

SERBIA

ALBANIA

MOLDOVA

LITHUANIA

LATVIA

ESTONIA

LUX.

MONTENEGRO

BOSNIA

CROATIA

SLOVENIA

SWITZERLAND

MACEDONIA

TUNISIAMALTA

RUSSIA

SYRIA

North Sea

Tyrrhenian Sea

Adriatic

Baltic Sea

Gulf of Bothnia

Aegean

Ionian Sea

Mediterranean Sea

Black Sea

Szeged reservoir in Hungary’s Algyo Basin.

Page 2: Combined Cementing Technologies Achieve Long-Term Zonal

*Mark of SchlumbergerCopyright © 2009 Schlumberger. All rights reserved. 09-CE-0055

www.slb.com/cementing

The D600G GASBLOK cement additive created an impermeable barrier that prevented gas migration into the cement slurry by improving cement bond to the casing and formation interfaces. When cementing casing, some of the cement can be lost into natural fractures, fissures, vugs, or highly porous zones even when the fracture pressure is not exceeded. CemNET advanced fiber cement was used in the lead slurry to cover low fracture gradient zones to ensure top of cement to surface. CemNET cement is composed of an inert, fibrous material capable of forming a network across the loss zone.

AccuSET smart cement hydration control technology was used to shorten compressive strength development time, a benefit in the horizontal wells where additional drilling occurred for the openhole completion.

Long-term zonal isolationZonal isolation was achieved on all 44 primary cementing jobs, preventing gas migration to surface and requiring no remedial cementing for cement to surface. The cement slurry’s short compressive strength development saved waiting-on-cement time. In addition, there were no QHSE incidents during the process. The success of this combination of services proved that this package can be deployed at any location to ensure safer, properly executed cementing jobs and long-term zonal isolation.

CemSTRESScement sheath stress analysis software

FlexSTONEadvanced flexible cement technology

CemNETadvanced fiber technology to control losses

D600G GASBLOKadditive to pre-vent gas migra-tion in medium-temperature applications

The combination of Schlumberger services helped MOL achieve its goals, ensuring long-term zonal isolation across the UGS reservoir.

Long-term zonal isolation achieved

Gas migration prevented

No remedial cementing required

broad-temperature- range, engineered cement hydration control system

AccuSET

Case study: Successful primary cementing prevents gas migration to surface in 44-well campaign in Hungary