    Building on Success & Creating aBuilding on Success & Creating a Future Future

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    2/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    3/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    4/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    5/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    6/40

    1.1. GlobalGlobal releaserelease

    2.2. AA--List actorsList actors

    3.3. #1#1 box office hitbox office hit

    4.4. MediaMedia junket junket atat Clearwater Clearwater BeachBeach

    5.5. 75% national awareness upon release75% national awareness upon release

    6.6. #1#1 individual movie for tourism creationindividual movie for tourism creation

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    7/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    8/40

    8

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    9/40

    1. USF and SPC College of Business

    2. Five-year projected impact on tourism

    .

    4. Ranging from $2.1 to $4.9 billion

    5. 300,000 visitors came from out of statebecause of the movie

    6. Trend will continue

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    10/40

    CMAs attendance growth, even before DolphinTale , was outperforming local/national industrypeers in a down economy. In 2012, CMA exceeded

    Florida Aquarium attendance by almost 150,000.

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    11/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    12/40

    $14.5-million expansion to be completed 1 st quarter 2014 will allow us to accommodate another 250,000

    visitors a year to our marine rescue center.

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    13/40

    CMA has a limited opportunity to grow/expand:

    Island Estates is primarily residential. Footprint of land surrounding CMA is

    m e . We have no space for Winters Dolphin Tale

    Adventure if Harborview is demolished.

    To continue our growth and community impact,

    wewe must think must think strategically.strategically.

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    14/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    15/40

    Clearwater Marine Hospital Using its name from Dolphin Tale , nearly allof the current Island Estates facilit would beused as the hospital,with a research andeducation element. It would continue tohave only a minor tourism aspect .

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    16/40

    Clearwater Marine AquariumThis downtown Clear-

    house the primarytourism and educationcomponents of theCMA mission, includingresident animals suchas Winter and Hope.

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    17/40

    N

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    18/40

    N

    MainMain AquariumAquarium Facility (~203K SquareFacility (~203K Square- -Feet)Feet)

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    19/40

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    20/40

    N

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    21/40

    ConceptualConceptualDrawingsDrawings

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    22/40

    LevelLevel 11 -- ParkPark LevelLevel

    N

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    23/40

    LevelLevel 22 ExhibitsExhibits

    N

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    24/40

    TwoTwo--StoryStory Coral Reef Coral Reef Exhibit (Conceptual)Exhibit (Conceptual)

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    25/40

    Level 3Level 3 - - Upper Upper LevelLevel

    N

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    26/40

    Exhibit/Venue Construction Cost $50.7 M

    Non Exhibit Construction Cost 8.2 M Building Systems 50.0 M FF&E, Site and Utilities 2.8 M Total Construction Cost $119.3 M

    Soft Costs $41.2 M Total Construction Costs $160.5 M

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    27/40

    Pre-construction Costs for Design & Engineering$9.5 million

    ase os on sProgramming 2% .2 2Schematic Design 13% 1.6 4

    Design Development 20% 2.4 6Construction Documents 45% 5.3 10Total 100% $9.5 22

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    28/40

    Duration:

    22 Months - Pre-construction 24 Months - Construction 42 Months - Project duration from time of

    approval

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    29/40

    Bob Carter Companies - Sarasota, FL

    Bob Carter, Principal: Past President of nationally known

    organization for 16 years. Leader in philanthropic counsel and

    fundraising consulting, serving education,healthcare, human services, and arts.

    National Chair of Association of Fundraising Professionals.

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    30/40

    Source Contribution Range

    Major Donors $20 M 45 M

    Small Donors $5 M 10 M

    Government Entities $35 M 60 M

    Corporate $10 M 30 M

    Grants $5 M 10 M

    NOI - Current Facility $15 M 20 M

    Bank financing $60 M 80 M

    Total Needed $160.5 M

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    31/40

    Activity Date City Council Review Mar 13 Referendum Nov 13 Fundraising Mar 13

    Project FundingCommitments in place Mar 15

    Design Completed Mar 15 Construction to begin Apr 15 Grand Opening Apr 17

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    32/40

    Two-million new visitors/year to the Downtown& Coachman Park vicinity. Visitor impact onhotels, restaurants, & local merchants.

    CMA projects 430 jobs to be created.

    Expanded/revitalized green space & waterfrontat Coachman Park and a new aquarium will be amajor draw to visitors.

    Enhanced capability to better perform mission.

    Reduced stress on Island Estates/local traffic.

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    33/40

    New facility would benefit citizens,tourists, & area businesses.

    Many citizens desire waterfront parks andreen s ace.

    Removal of Harborview Center andexpansion of existing green space would

    create waterfront vistas to the upland. City would avoid costly repairs to fix &

    maintain the Harborview Center.

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    34/40

    Saltwater access is a key element

    Proximity to our existing facility

    Positive economic im act

    Ease of accessibility for tourists andothers

    Feasibility of assembling land Acceptance by the community

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    35/40

    Super Block (East side of Osceola Ave, Southside of Drew St., West of Ft. Harrison Ave. andNorth of Cleveland St.)

    Large enough & close enough for water access o e eas e a erna ve

    Owned by multiple entities; likelihood of assembly is quite uncertain

    Constructing a non-profit aquarium onthis site would limit future developmentfor tax revenue optimization

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    36/40

    Current Harborview Site

    Engineering evaluations precludeexisting building from conversion Key constituencies with interest in the

    Coachman Park area would prefer HVCto be replaced w/ Coachman Parkexpansion

    Constructing in the HVC footprint wouldblock vistas to the water from the upland. CMA lost revenue during construction

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    37/40

    City Hall Site Building is obsolete; high maintenance

    cost to the City Good water access

    Provides an opportunity to expand andcreate a master plan for Coachman Park Excellent proximity to downtown

    CMA owns adjacent South property for additional development

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    38/40

    Consent for CMA funded special

    referendum to lease City Hall site tobuild aquarium facility

    w w wmemorandum of understanding withdetails for a land lease

    Assistance in drafting language for special referendum

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    39/40

    Lease extension of Harborview Center

    until completion of new facility Extension of Tax Increment Financing

  • 7/28/2019 Clearwater Marine Aquarium Downtown Expansion Plan

    40/40

    Building on Success & Creating a FutureBuilding on Success & Creating a Future