class a high rise life science project - loopnet · 2016. 10. 20. · genesis ssf caltrain/bart...

8
GENESIS SOUTH SAN FRANCISCO ONE & TWO TOWER PLACE Class A High Rise Life Science Project FOR LEASE

Upload: others

Post on 24-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • GENESIS SOUTH SAN FRANCISCOONE & TWO TOWER PLACE

    Class A High Rise Life Science Project

    FORLEASE

  • PROJECTOVERVIEW

    Genesis is the first high-rise project to offer life science research space in South San Francisco’s

    biotech cluster. It is fully committed to fostering life science and providing a sense of community

    driven by being a multi-tenant project. The root of innovation starts here - at Genesis.

    N O R T H T O W E R

    Available 2018

    • Planned 21-Story Class A R&D/Office Building

    • ±420,000 Total SF

    • ±20,000 SF Floor Plates

    • Spec Build Out to Include 60/40 Office to Lab Ratio

    • Additional On-Site Retail Space

    • Additional Conference Space

    S O U T H T O W E R

    Available Now

    • Existing 12-Story Class A R&D/Office Building

    • ±400,000 Total SF

    • ±33,000 SF Floor Plates

    • ±14,500 to 132,000 SF Available

    • Spec Build Out to Include 60/40 Office to Lab Ratio

    • Mechanical, Electrical, and Plumbing Infrastructure

    System Upgrades to Existing Shell to Meet Laboratory

    Standards

    FOR LEASE

  • Fitness Centerwith professional training staff,

    full locker rooms and towel service

    Performing Arts Centerwith seating for 230 guests

    • 230 Person Performing Arts Center with Stage, Lighting and Sound

    • Designated Conference and Meeting Areas

    • Fitness Center with Yoga Studio, Cardio & Strength Training Machines and Free Weights

    • Transportation Services to BART, Caltrain and Ferry Stations

    • Parking Structure with 3.2/1,000 Parking Capacity

    • Focaccia Market & Bakery

    • Planned Authentic Gourmet Brewery Restaurant

    • Planned Contemporary Bouquet ±60 Room Hotel

    On-

    Site

    Am

    eniti

    es

    Market & Bakerywith fresh baked bread available daily

    and catering services for tenants

    In-demand lifestyle amenities are built in to support recruiting and retaining top talent.

  • 1

    2

    3

    4

    6

    710

    13

    15 9 8 12

    12

    11

    1

    3

    142

    4

    5

    1

    6

    2

    5

    4

    3

    5

    16

    Bank of AmericaCitiBank (ATM)First National BankUS BankWells Fargo Bank

    Basque Cultural CenterBen Tre Homestyle CuisineBertolucci’s Buon GustoCecilia’s PizzeriaDarby Dan’sDi Napoli PizzeriaGrand PalaceLa TapatiaPeet’s Coffee & TeaSpecialty’s Café & BakeryStarbucks

    Thai SatayTwo Fifty RestaurantVilla Del SolFocaccia Market & Bakery

    Courtyard by MarriottEmbassy SuitesFour Points by SheratonHilton Garden InnLarkspur Landing HotelResidence Inn by Marriott

    B A N K S R E S TA U R A N T S H O T E L S

    1.2.3.4.5.

    1.2.3.4.5.6.7.8.9.

    10.11.12.

    13.14.15.16.

    1.2.3.4.5.6.

    Surrounding Amenities

  • Spec Floor Plan

    South Tower

    Available Now

    • Existing 12-Story Class A R&D/Office Building

    • ±400,000 Total SF

    • ±33,000 SF Floor Plates

    • ±14,500 to 132,000 SF Available

    • Spec Build Out to Include 60/40 Office to Lab Ratio

    • 1.25 Megawatt Emergency Generator

    • Two 4,000 Amp, 480/277V, 3-Phase Electrical Services

    • Enhanced Warm Shell Improvements Include:

    - 5,000 lb. Capacity Service Elevator

    - Beam Stiffening for Enhanced Vibration Control

    - Main Distribution System - HVAC and Process Gases

    - House Compressed Air & Vacuum System

    • Enclosed Rated Hazmat Storage Rooms for Additional Chemicals

    • Additional Caged (Fenced) Storage Rooms for Multi-use

  • Spec Floor Plan

    North Tower

    Available 2018

    • Planned 21-Story Class A R&D/Office Building

    • ±420,000 Total SF

    • ±20,000 SF Floor Plates

    • Spec Build Out to Include 60/40 Office to Lab Ratio

    • Mechanical, Electrical, and Plumbing Infrastructure Systems to

    Meet Laboratory Standards

    • Enclosed Rated Hazmat Storage Rooms for Additional Chemicals

    • Additional Caged (Fenced) Storage Rooms for Multi-Use

    • Additional On-Site Retail Space

    • Additional Conference and Meeting Spaces

    • Relocation of ±20,000 Square Foot State of the Art Gym

  • amTrain Arrives at SSF Caltrain Station

    Northbound Caltrain 7:09 7:29 8:29 9:14 9:32

    Southbound Caltrain 6:41 7:41 9:15

    Train Arrives at SSF BART Station

    Pittsburg/Bay Point Train 6:34 7:19 8:04 8:44 9:49

    Richmond Train 6:42 7:27 7:57 8:42 9:42

    AM SHUTTLE

    Departs SSF BART Station 6:50 7:33 8:11 8:52 9:55

    One Tower Place 7:01 7:41 8:22 9:03 10:06

    Departs SSF Caltrain Station 7:13 7:52 8:33 9:19 9:36

    One Tower Place 7:21 8:00 8:41 9:27 9:44

    pmPM SHUTTLE

    One Tower Place 4:08 4:45 5:17 5:49 6:21 6:53

    Arrives SSF Caltrain Station 4:15 4:52 5:24 5:56 6:28 7:00

    One Tower Place 4:19 4:56 5:28 6:00 6:32 7:04

    Arrives SSF BART Station 4:30 5:07 5:39 6:11 6:43 7:15

    Train Departs SSF Caltrain Station

    Northbound Caltrain 3:56 4:42 5:17 6:08 6:42 7:08

    Southbound Caltrain 3:46 4:35 5:13 6:13 6:40 7:13 Train Departs

    Train Departs SSF BART Station

    Pittsburg/Bay Point Train 4:47 5:17 5:47 6:17 7:02 7:36

    Richmond Train 4:39 5:24 5:54 6:24 6:54 7:29

    amFerry Arrives at SSF Ferry Terminal

    Oakland/Alameda Ferry 7:15 8:15 8:45

    AM SHUTTLE

    Departs SSF Ferry Terminal 7:25 8:20 8:55

    One Tower Place 7:40 8:35 9:10

    pmPM SHUTTLE

    One Tower Place 3:50 4:50 6:30

    Arrives SSF Ferry Terminal 4:10 5:10 6:50

    Ferry Departs SSF Ferry Terminal

    Oakland/Alameda Ferry 4:20 5:20 7:00

    Sister Cities

    Airp

    ort B

    lvd

    Grand Ave

    Oyster Pt Blvd

    Gat

    eway

    Blv

    d

    SSF Business Ctr.

    To:SSF BARTStation Siistttter CCCCitii iei s

    Airp

    ort B

    lvd

    p

    G d A

    SSF

    RT

    BSSF

    SSF CaltrainStation

    GenesisSSF

    Caltrain/BART Shuttle:7 minutes to/from Genesis SSF

    Ferry Shuttle:18 minutes to/from Genesis SSF

    Cul-De-Sac(395/400 OP)

    To:SSF Ferry Terminal

    Forbes/Carlton Eccles/Rozzi

    1120 Veteran’sBlvd

    Gull/OP

    200 220

    384

    550

    Sister Cities

    Airp

    ort B

    lvd

    Grand Ave

    Gat

    eway

    Blv

    d

    Vete

    rans

    Forbes Blvd

    Gull

    Rozzi

    Eccle

    s

    Oyster Pt Blvd

    GenesisSSF

    CALTRAIN/BART Shuttle Schedule

    FERRY Shuttle Schedule

    Shuttles run approximately every 35 minutesduring peak commuting hours.

    Shuttles run approximately once every hourduring peak commuting hours.

  • GENESIS, ONE & TWO TOWER PLACE | SOUTH SAN FRANCISCO, CA 94080

    Phase 3 Real Estate Partners makes no representations or warranties in relation to the information contained herein.

    Jay Leslie

    Randy Scott

    Mary Hines

    Jennifer Vergara

    Becka Studer

    CA RE License #01244555

    CA RE License #00852506

    CA RE License #01281208

    CA RE License #01355979

    CA RE License #02004534

    650 358 5273

    650 688 8510

    650 358 5271

    650 358 5265

    650 600 3783

    [email protected]

    [email protected]

    [email protected]

    [email protected]

    [email protected]

    Procuring broker shall only be entitled to a commission, calculated in accordance with the rates approved by our principal only if such procuring broker executes a brokerage agreement acceptable to us and our principal and the conditions as set forth in the brokerage agreement are fully and unconditionally satisfied. Although all information furnished regarding property for sale, rental, or financing is from sources deemed reliable, such information has not been verified and no express representation is made nor is any to be implied as to the accuracy thereof and it is submitted subject to errors, omissions, change of price, rental or other conditions, prior sale, lease or financing, or withdrawal without notice and to any special conditions imposed by our principal.

    LEARN MORE genesis-ssf.com

    Genesis is developed and operated by Phase 3 Real Estate Partners (P3RE). P3RE

    is a progressive real estate company dedicated to fostering the growth of the

    life science industry by providing premiere, Class A environments that meet the

    needs of today’s and tomorrow’s innovators. P3RE manages each of its projects

    from start to finish to ensure the highest quality product and an enjoyable tenant

    experience.