1City of Tallahassee ITS Master Plan

City of TallahasseeITS Master PlanCRTPA Board Retreat

2City of Tallahassee ITS Master Plan

Agenda

• Project Progress• Existing Conditions• Needs Assessment• Deployment Recommendations

• Implementation Plan• Prioritization Criteria• Project Evaluation• Project Ranking

• Next Steps

3City of Tallahassee ITS Master Plan

What is the ITS Master Plan?

• A comprehensive roadmap for planning, implementation, operation,and maintenance of Intelligent Transportation Systems and ITScommunications assets.

• This plan will enable the City of Tallahassee to evolve the currentsystem to one that will meet the mobility, safety, and quality of lifeneeds of the City.

4City of Tallahassee ITS Master Plan

Stakeholders

ITSMaster

Plan

ITSMaster

Plan

TrafficOperations

TrafficOperations

PlanningPlanning

TrafficEngineering

TrafficEngineering

CountyGrowth

Management

CountyGrowth

Management

TransitTransit

Public WorksPublic Works

City GrowthManagementCity Growth

Management

TSM&OOffice

TSM&OOffice

• Kick-off Meeting

• Meeting Objectives:• bring together key stakeholders• understand processes and current

coordination between the variousdepartments

• determine how they support traffic,incident, work zone, and special eventmanagement

5City of Tallahassee ITS Master Plan

Project Vision

Maximize the transportation systemefficiency and performance using

innovative technologies and regionalcollaboration to promote reliable mobilitythroughout the vibrant capital city region.

6City of Tallahassee ITS Master Plan

Existing Conditions

• Kick-off meeting with project stakeholders• Developed a comprehensive summary of existing technologies

deployed throughout the City• Final memo shared with stakeholder group on April 17th

7City of Tallahassee ITS Master Plan

357Traffic Signals

3Automated Bicycle

Counters

190Miles of FiberOptic Cable

24Cellular Modems

22DSRC Radios

97CCTV Cameras

80BlueTOAD Devices

73Buses with AVL

Systems

400System Detectors

8City of Tallahassee ITS Master Plan

Needs Assessment

• Conducted an analysis of current congestion and safety data tocomplement stakeholder identified needs

• Congestion data from RITIS• Crash Data from Signal Four Analytics

9City of Tallahassee ITS Master Plan

Needs Assessment

• Evaluation of Additional ITS Technologies• Connected and Autonomous Vehicles• Network Architecture Enhancement• Performance Measures

• Final memo shared with stakeholder group on April 17th

10City of Tallahassee ITS Master Plan

11City of Tallahassee ITS Master Plan

Deployment Recommendations

• Project Development• General Functional Areas

• Traffic Management• Transit Management• Traveler Information• Transportation Management Center• Performance Measures• Bicycle Technology• Communications

12City of Tallahassee ITS Master Plan

Prioritization Criteria

Accountability

20%

Safety

40%

Mobility

25%

RegionalSupport

15%

13City of Tallahassee ITS Master Plan

Regional Support

• In some instances, it may be possible to have a proposed projectsatisfy a significant need that is not demonstrated through availabledatasets.

• Additional consideration was given to stakeholder input on theimportance of the needs specific to each project and is accounted forin the regional support criterion.

14City of Tallahassee ITS Master Plan

Interactive Stakeholder Workshop

• Worksheets with project list• Think of what’s important to your

department• We want your input!

15City of Tallahassee ITS Master Plan

Project List• Traffic Management

• Adaptive Traffic Signal Control• System Detectors• Cabinet Upgrades• Switch Replacement• CCTV Cameras• Smart Work Zones• Flashing Yellow Arrows• Travel Time Reliability• ATMS Upgrade• Connected Vehicle Infrastructure

• Transit Management• Transit Signal Priority

• Traveler Information• Mobile Application• I-10 Trailblazers

• Performance Measures• ATSPM Dashboard / Performance

Monitoring• Bicycle Technology

• Bicycle Detection• Transportation Management Center

• Traffic Signal Management Plan• Communications

• Redundancy Plan

16City of Tallahassee ITS Master Plan

Connected Vehicle Infrastructure

• Following successful testing of the pilot corridor, this project extendsthe Dedicated Short Range Communications (DSRC) deploymenteast along US 90 (Tennessee Street).

• The additional 21 intersections extends the corridor to create a 15-mile connected vehicle test bed for the City of Tallahassee.

18City of Tallahassee ITS Master PlanLooking to the Future

19City of Tallahassee ITS Master Plan

20City of Tallahassee ITS Master Plan

Industry Trends• Babcock Ranch

• autonomous shuttle service providingrides to residents and visitors from thetown center to amenities andresidential neighborhoods

• developed a 5-year plan integratingboth autonomous transportationservices to provide guests and residentsalternatives to personally ownedvehicles

• “On Demand” local autonomous rides fortravel within Babcock Ranch

• autonomous package and goods deliveryto and from Babcock Ranch businessesand homes

21City of Tallahassee ITS Master Plan

Industry Trends• Suntrax

• 475-acre Central Florida researchand development facility

• connected and autonomousvehicles are being tested,advanced, and readied for full-scale public deployment

• features a variety of projects like amini-city, a simulated airport dropoff and pick up location and aroadway geometry track whereresearchers will test how vehicleshandle different terrain

The multi-lane track is the only high-speed autonomous car testing facility in the southeastern U.S.

22City of Tallahassee ITS Master Plan

Challenges

• Safety Issues• Integration onto the road network with appropriate signage and markings in

place or updated

• Public Perception• Vehicle Certification• Data Overload

• Evaluate how existing communication networks will be able to supportfuture CAV and connected traveler data

23City of Tallahassee ITS Master Plan

Transit Signal Priority

• This project proposes StarMetro Route L (Live Oak) as therecommended TSP expansion corridor. Implementation along thishigh transit corridor is recommended based on available ridershipdata.

• As more transit data (ridership, on time arrival, etc.) becomesavailable, reevaluation of the transit routes for ideal TSP deploymentis recommended.

24City of Tallahassee ITS Master Plan

Traffic Signal Management Plan

• This document will provide step-by-step instructions for currentactivities related to traffic signal design, operations, maintenance,and management.

• This project will clearly define objectives, relating them to the City'sgoals, and offers a structure that shows how the activities of all staffinvolved in traffic signal management support those objectives. Astaffing plan with additional recommended operator positions isincluded in this project.

25City of Tallahassee ITS Master Plan

Geographic ProjectsStakeholder Priority Project Title

Adaptive Traffic Signal Control (US 90)

Adaptive Traffic Signal Control (US 27)

CCTV Cameras – Group A

CCTV Cameras – Group B

CCTV Camera Upgrade

Travel Time Reliability System – Group A

Travel Time Reliability System – Group B

Connected Vehicle Infrastructure

I-10 Trailblazers

Bicycle Detection

26City of Tallahassee ITS Master Plan

Non-Geographic ProjectsStakeholder Priority Project Title

System Detectors

Cabinet Upgrades

Managed Field Ethernet Switch Replacement

Smart Work Zones

FYA Upgrades PilotATMS Upgrade

Transit Signal Priority

Mobile Application Pilot

ATSPM Dashboard/Performance Monitoring

Traffic Signal Management Plan

Communications Network – Redundancy Expansion

27City of Tallahassee ITS Master Plan

Implementation Plan

• The rankings will be used to group the recommended projects intotiered deployment timeframes. For example, the top three highestranking projects in each category will be grouped as near-termdeployments.

• Near-Term (2 to 5 year horizon)• Mid-Term (5 to 10 year horizon)• Long-Term (over 10 year horizon)

28City of Tallahassee ITS Master Plan

Additional Factors

• Project Dependence• Proximity to Planned Programmed Roadway ITS Project• Proximity of Proposed Project to Existing ITS Project• Funding Opportunities/Availability

29City of Tallahassee ITS Master Plan

Next Steps

qFinalize Project PrioritizationqExecutive SummaryqFinal Report

30City of Tallahassee ITS Master Plan