city of tallahassee wastewater treatment system hydrogeology workshop – 2005 may 12 – 13, 2005

18
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Upload: abraham-black

Post on 18-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

City of Tallahassee Wastewater Treatment System

Hydrogeology Workshop – 2005

May 12 – 13, 2005

Page 2: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Description of System Population Served –

170,000+ Treatment Plants:

LBR – 4.5 mgd TPS – 27.5 mgd Total = 32 mgd Effluent Discharges: SWS – 1.04 mgd SEF – 27.39 mgd Total = 28.43 mgd

Page 3: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Southeast Farm

Page 4: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

City’s Wastewater Treatment System Highly Regulated FAC 62-610 – Reuse, including land

application FAC 62-600 – Wastewater Treatment

Facilities FAC 62-601 – Wastewater Monitoring 503 Rule – Federal Biosolids regulationsMyriad others regarding safety, chemicals,

stormwater, etc.

Page 5: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Chapter 62-610, F.A.C. Created in 1989 Earlier Rules From 1980 Revised in 1999 Comprehensive Detailed Consistent With National Guidelines

Page 6: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Ground Water Standards Potable Ground Water Drinking Water Standards

Primary Standards Secondary Standards

Total Coliforms < 4/100 mL Nitrate - 10 mg/L (as N)

Page 7: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Other Controls Monitoring

Reclaimed Water Ground Water

Operator Staffing Access Controls Storage

Page 8: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Monitoring Wells

Ground Water Flow

100 ft.Land Application

Zone of Discharge

Page 9: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

SEF Monitoring Wells

Page 10: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Total Nitrogen from TPS, Lbs.Total Lbs N/Month from TPS, 1995-2003

0

10000

20000

30000

40000

50000

60000

70000

80000

Jan-95

Apr-95

Jul-95

Oct-95

Jan-96

Apr-96

Jul-96

Oct-96

Jan-97

Apr-97

Jul-97

Oct-97

Jan-98

Apr-98

Jul-98

Oct-98

Jan-99

Apr-99

Jul-99

Oct-99

Jan-00

Apr-00

Jul-00

Oct-00

Jan-01

Apr-01

Jul-01

Oct-01

Jan-02

Apr-02

Jul-02

Oct-02

Jan-03

Apr-03

Jul-03

Oct-03

N L

bs

.

LBS

Page 11: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Nutrient Uptake Rates for Selected Crops

0

100

200

300

400

500

600

NITROGEN PHOSPHOROUS POTASSIUM

PO

UN

DS/

AC

RE

Alfalfa Coastal Bermuda RyegrassSweet Clover Corn Grain SorghumSoybeans Cotton

Page 12: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Estimated N Allowable at SEF Total acres in pivots = 2000 80% in bermuda grass @ 400 lbs. N 10% in corn @ 210 lbs. N 10% in other crops @ 150 lbs. N Total N allowed per year = 712,000 lbs. Or 1950 lbs/day average

Page 13: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

SE Farm Pond EffluentNitrate + Nitrite 1983-2002

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

1/13/1983

10/7/1985

3/25/1987

8/21/1988

2/19/1990

7/31/1991

1/6/1993

6/27/1994

12/11/1995

9/24/1997

3/10/1999

8/23/2000

Date Collected

mg

/l a

s N

Page 14: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Successes in Reducing Nitrogen Loads Stopped applying biosolids in Wakulla

County 2001 Start-up of Class A dryer March 2004 85% reduction of total biosolids land

applied at airport 85% Class A product or Class B to landfill Obtaining more N reduction at TPS

effluent

Page 15: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

City Actions in Finding Solutions USGS Study - $495 K over three years Treatment Master Plan – Review treatment

and disposal options for long-term sustainability

Planning additional biosolids treatment to produce 100% Class A Biosolids for reuse

Nutrient Management Plan for near-term Farm Operations

Page 16: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Economic Impacts $66 million proposed to upgrade TPS Additional $millions for full nutrient

removal (2 ppm nitrates) Could lead to large rate increase Does not include O&M costs

Page 17: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

Water Utility Approach1. Collect Data

2. Develop Alternatives through Master Plan

3. Prepare Plan of Action for Improvements

4. Obtain Funding & Implement Near-term Items

5. Participate in TMDL process to fine-tune Plan of Action and priorities

Page 18: City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005

TMDL Schedule for Wakulla River

2007 - Begin developing TMDL 2008 - Adopt TMDL by rule (APA) 2009 - Establish TMDL implementation

plan 2010 – Implementation