RESOLUTION NO. 2831
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY
LAKE, PIERCE COUNTY, WASHINGTON, AUTHORIZING THE
AWARD OF A CONTRACT WITH TMG SERVICES FOR THE
GRAINGER SPRINGS ON-SITE CHLORINATION AND ON-LINE
WATER QUALITY ANALYZER UPGRADE
WHEREAS, Grainger Springs water source is a critical part of the Bonney Lake water
system and reliable operation of the chemical feed system is mandatory to protect public
health; and
WHEREAS, the Grainger Springs chlorination system has reached the end of its economic
life cycle; and
WHEREAS, sufficient funds are available in the Water Fund; and
NOW, THEREFORE, BE IT RESOLVED; that the City Council of the City of Bonney
Lake, Washington, does hereby authorize the Mayor to sign the attached contract with
TMG Services in the amount of $50,272.54, which includes tax.
BE IT FURTHER RESOLVED that the City of Bonney Lake Council does hereby
authorize 10% for Construction Contingency in the amount of $5,027.25 based on the
contract amount for a total of $55,299.79.
PASSED by the City Council this 14th day of April, 2020.
________________________________
Neil Johnson Jr., Mayor
AUTHENTICATED:
_________________________________
Harwood T. Edvalson, City Clerk
APPROVED AS TO FORM:
_________________________________
Kathleen Haggard, City Attorney
DocuSign Envelope ID: 6D125233-4298-40F4-9952-DB517267A7E5
Version Oct. 2010
City of Bonney Lake, Washington
City Council Agenda Bill (AB)
Department/Staff Contact:
Assistant Superintendent / Dave
Cihak
Meeting/Workshop Date:
14 April 2020 Agenda Bill Number:
AB20-47
Agenda Item Type:
Resolution Ordinance/Resolution Number:
2831 Councilmember Sponsor:
Agenda Subject: Authorizing the Award of A Contract with TMG Services for the Grainger Springs
On-Site Chlorination and On-line Water Quality Analyzer Upgrade
Full Title/Motion: A Resolution Of The City Council Of The City Of Bonney Lake, Pierce County,
Washington, Authorizing The Award Of A Contract With Tmg Services For The Grainger Springs On-
Site Chlorination And On-Line Water Quality Analyzer Upgrade.
Administrative Recommendation: Approve
Background Summary: Grainger Springs water treatment hypochlorite generation equipment is past its
recommended life cycle. The equipment was installed as part of the facility upgrades in 2006. The
economic life cycle of this equipment is 7-10 years. The reliability and cost to maintain this equipment
necessitates its replacement. Staff met with the local representative, TMG Services, to discuss options for
replacement or upgrades. The recommendation is to completely replace the equipment with a newer
version from the same manufacturer. In 2019 the City replaced the same equipment at Victor Falls. City
staff are familiar with the operation and maintenance of this system and recommend that the City
continue moving forward with this equipment as these systems need replacement.This upgraded
equipment is more reliable, easier to maintain, and less expensive when replacing components. This
equipment is critical to the continued operation of the Grainger Springs water source and is required by
Washington State Department of Health Drinking Water Regulations. There is no economical alternative
to replacement of this treatment system. This purchase is being made sole source because of staff's
experience with this particular product, its critical nature, the need to keep equipment consistent
throughout our system and finally, it is the only economical product available. State law does not
establish any specific bid limits or competitive processes that a first class or code city with a population
over 20,000 must follow for sole source purchases such as this. However, City policy does require a
formal solicitation due to the amount of the purchase. Due to the fact that there is no other economical
alternative available, the system selected is the only choice.
Attachments: Resolution 2831, Operations and Maintenance Contract, Exhibit A-Quote
BUDGET INFORMATION
Budget Amount
$170,000 Current Balance
$166,395.29 Required Expenditure
$55,299.79 Budget Balance
$111,095.50 Fund Source
General
Utilities
Other
Budget Explanation: Water: Eden -401.000.034.534.50.48.19-Infrastructure Renewal Program-
Contract: $50,272.54 + Contingency: $5027.25= $55,299.79.
Water Comprehensive Plan -A6 - Infrastructure Renewal Program
Revenue Source: Rates
COMMITTEE, BOARD & COMMISSION REVIEW
Council Committee Review: Community Development
Date: Approvals: Yes No
Chair/Councilmember Dan Swatman
Councilmember Michelle Keith
Councilmember Tom Watson
Forward to: Consent Agenda: Yes No
Version Oct. 2010
Commission/Board Review:
Hearing Examiner Review:
COUNCIL ACTION
Workshop Date(s): Public Hearing Date(s):
Meeting Date(s): Tabled to Date:
APPROVALS
Director:
Ryan Johnstone, Interim Public
Services Director
Mayor:
Neil Johnson Jr.
Date Reviewed
by City Attorney: (if applicable)
March 18th, 2020 QUOTATION, Rev. 1
Eric Meyer Bonney Lake Water PO Box 7380 Bonney Lake, WA 98390
Re: Grainger Treatment Plant Site, OSEC Upgrade
OSEC PANEL 1 W&T OSEC® L HYPOCHLORITE GENERATOR, 20 PPD Pre-piped and pre-wired system for wall mounting includes: -(4) Electrolyzer cartridges -Manifold rack -Dilution water apparatus with manual isolating valve and solenoid valve -Flow meter with minimum contact, flow control valve -Peristaltic brine pump -Static mixer -Non return valve at manifold inlet -Sample valve -Drain valve -Level switch to detect filling level of electrolyzer cartridge(s) -Sensor to monitor temperature of sodium hypochlorite solution -(4) 540W DC power supply units -Power supply connection box with main switch -Electronic control module with HMI Power supply: 100 - 240 VAC, 50/60 Hz -Misc. parts for installation
SOLUTION TANK 1 200 Gallon Product Tank, w/Adapters & Overflow Alarm -Dimensions: 35” Diameter x 69” Height (2” larger diameter than existing, slightly taller than existing to help relieve Hydrogen buildup) -16” Threaded Lid & Rim Assembly (Not Lever Locking like Victor) -System components for the Hypochlorite tank, mainly comprising: -Filling and degassing arrangement with hydrogen dilution blower (LMF-3) and air flow monitor
-Ultrasonic level sensor with control cable -Level switch as independent safety device to provide overfilling protection with connection cable
-PVC ball valve as withdrawal unit
BRINE TANK 1 Chem-Tainer 55 Gallon Brine Tank w/ Dust Cover (Same as Existing) -Dimensions: 22” x 36” -Level Control w/ Overflow Alarm -Brine Collector (800# Salt Capacity)
SOFTENER 1 Kinetico Water Softener -Twin Style -With Parts Group -Check Valve
SUB PRICE FOR OSEC: $39,183
3216 E. Portland Avenue Tacoma, WA 98404
253-779-4160 [email protected]
Quality Products - Excellent Service Exhibit A
Bonney Lake Water – Grainger Treatment Plant On-Site System Page 2 of 2
1 Evoqua/W&T Depolox 400M Series Residual Analyzer; -Electronic Module: 100-240vAC Power – optional 24vDC -Flow Cell Module: Depolox 5 Bare Electrode -Measurement 1: Bare Electrode Free Chlorine Sensor, Self-Cleaning -Measurement 2: pH Sensor -Ethernet Port -Color Touchscreen, 4.3” -Integral LED Light Status Indicator -Integral Temperature Sensor, PT1000 -Flow Switch -Data Logging SUB PRICE FOR ANALYZER: $6,812
TOTAL PRICE: $45,995* (Price Includes Freight, Installation**, Startup & Training) *Prevailing Wage Included for Installation, Startup & Training Services OPTIONAL EQUIPMENT/ACCESSORIES
(1) ATI Hydrogen Gas Leak Detector w/ Explosion Proof Sensor: ADD $1,868 (4) Evoqua/W&T OSEC L 5PPD Electrolyzer Cell Cartridges: ADD $5,216 (Discounted Price offered only at
time of OSEC L Purchase) (4) Evoqua/W&T OSEC L DC Power Supplies: ADD $3,700 (1) LaMotte Product Strength Test Kit: ADD $70.00
Terms & Conditions of Sale: -F.O.B.: JOBSITE -Payment Terms: Net 30 Days -This price is in effect for 60 days. -Submittals, if required, will be provided 2-4 weeks after receipt of all technical data at T M G Services. -Delivery will be made in approximately 8-10 weeks after receipt of order and/or approvals and resolution of all necessary technical data at T M G Services. -Quotation prices do not include any sales taxes or any other taxes that may apply. -This quotation is limited to the products and/or services as listed and excludes any item or service not specifically listed. ** OSEC INSTALLATION OPTION – SKID MOUNTED SYSTEM -Installation of the On-Site Hypochlorite Generation System includes placing equipment in proposed location(s) and interconnecting piping between components. All work to be performed within the confines of the proposed room layout. Limit of piping installation shall be from inlet of water softener through OSEC system components to discharge side of metering pumps. Installation excludes any concrete work, drilling penetrations through roof or walls, sub-grade work and drilling of metal pipe for sample/injection point connections. Also, excludes any electrical wiring and/or interconnects. However, TMG will assist electrician in locating wiring landing points if they are on site at time of installation. Contractor to assist TMG personnel in placement of the heavier equipment items. If you have any questions or need further information, please contact me. Regards, Jeff Harmon TMG Services, Inc.