city of newnan agenda.pdf · 8/14/2018 · 2. 40% of the city’s hotel/motel tax and motor...
TRANSCRIPT
Newnan City Council Meeting
August 14, 2018 – 2:30 pm A G E N D A
CALL TO ORDER – Mayor Keith Brady INVOCATION READING OF MINUTES
I Minutes from Special Called City Council Meeting July 17, 2018 / Sanitation ......................... Tab A
II Minutes from City Council Meeting July 17, 2018 .................................................................... Tab B REPORTS OF BOARDS AND COMMISSION
I 1 Appointment – Cultural Arts Commission – 3 Year Terms
II 2 Appointments – Keep Newnan Beautiful – 3 Year Terms III 1 Appointment – Urban Redevelopment Agency – Term Expires 4/2019
IV 2 Appointments – Board of Zoning Appeals – 3 Year Terms
V Convention Center Authority Report .........................................................................................Tab C
VI Christmas Commission Request/Presentation 2018 ................................................................Tab D
REPORTS ON OPERATIONS BY CITY MANAGER REPORTS AND COMMUNICATIONS FROM MAYOR
NEW BUSINESS I 2017 CAFR presented by auditors – Clifton, Lipford, Hardison and Parker, LLC .................... Tab E
NEWNAN CITY COUNCIL MEETING AGENDA – August 14, 2018 – 2:30 P.M............................... Page 2
II Consider authorization for the Mayor to execute a Project Framework Agreement
(PFA) between GDOT and the City of Newnan for transportation facility improvements for Lower Fayetteville Road .............................................................................. Tab F
III Agreement between Foresite Group, Inc., and the City for professional engineering
services for a Jackson St/Jefferson St/Clark St traffic study and recommendations .............. Tab G IV Consider contract award for acquisition of Trolley ....................................................................Tab H V Consider contract award for Construction of Fire Station #4 ..................................................... Tab I VI Resolution to Authorize the Commitment of Funds for the Operation of the
Downtown Sanitation Program ................................................................................................. Tab J
UNFINISHED BUSINESS
I 3rd Public Hearing – Property Tax Increase/Millage Rate ....................................................... Tab K
Ordinance to set millage rate for 2018 Property Taxes II Request for official transmittal of the 2018 update to the Capital Improvements
Element (CIE), including the Short-Term Work Program (STWP) to the Three Rivers Regional Commission and the Georgia Department of Community Affairs .................. Tab L
III Consider change order for culvert extension to accommodate protection of existing
utility poles – McIntosh Parkway .............................................................................................. Tab M IV Status Reports – 10 Burch Avenue, 136 Spring Street, 286 West Washington
Street, 121 Pinson Street and 180 West Washington Street ...................................................Tab N
VISITORS, PETITIONS, COMMUNICATIONS & COMPLAINTS
I Richard Mix, Full Circle Toys – Request to close a portion of Madison Street for his Sixth Annual Zombie Day event on Saturday October 13, 2018 ............................................. Tab O
II Mark Vescio, Fido Fest 5K – Request to close portions of City Streets for
approximately one hour around Ashley Park for their 5K that begins at 8:30am on September 29, 2018 ................................................................................................................ Tab P
III The Peach State Early Ford V8 Club of Fayetteville would like to reserve up to 30
downtown parking spaces during lunch (11:30 am to 2:30 pm) to park their vintage vehicles to be viewed on their day trip to Newnan on Saturday August 18, 2018 .................. Tab Q
NEWNAN CITY COUNCIL MEETING AGENDA – August 14, 2018 – 2:30 P.M............................... Page 3
IV Foundation Christian Church request to reserve parking spaces in front of
Greenville Street Park from 3pm to 8 pm for food trucks for their 2nd Pumpkins in the Park event on Saturday October 20, 2018 and charge nominal fees for contests to cover costs ............................................................................................................Tab R
V Request from F. Henderson NHS to change the date of the recently approved
Student Vet-Connect 5K from Saturday November 17th to Saturday November 10th which is the same date as the Veteran’s Day Parade .............................................................. Tab S
VI Request for Newnan McIntosh Masonic Lodge #735 to reserve eight parking
spaces on W. Washington Street on the side of the Alamo from 10:00 am to 2:00 pm which is the ending location of their Charity Benefit Ride................................................... Tab T
EXECUTIVE SESSION – LEGAL, PERSONNEL AND REAL ESTATE ADJOURNMENT
NEWNAN CONVENTION
CENTER AUTHORITYCity Council Update, August 2018
1515 Lower Fayetteville Road
Newnan, GA 30265
www.newnancentre.com
PURPOSE
The Newnan Centre generates an economic impact for the community as well with the goal of placing night stays in local hotels, work for caterers, local restaurants, etc.
Economic Impact of Tourism in Coweta County in 2016 was $201.8 Million up 33% from 2011 (source: U.S. Travel Assoc. Economic Impact GA Counties)
HISTORY
The Newnan Convention Center Authority was
Organized by State of Georgia Statute February 1999
The Authority entered into a joint development
agreement with the Coweta County School System in
January 2002 to purchase and develop approximately
43 acres on Lower Fayetteville Road. All of the initial
land clearing and grading was completed shortly
thereafter. The school system built the Centre for
Performing Arts.
HISTORY
The Newnan Centre construction was begun in July 2011 consisting of Centre building of 16,500 square feet and a 1,050 square foot pavilion and attached covered walkway, grass amphitheater, village green, parking lot and driveways. The cost was $5,044,000 with no debt incurred. The Newnan Centre was completed by Headley Construction, opened Summer 2013.
The Newnan Centre is a multi-functional facility with a ballroom that will seat 480 for dinner. The space breaks up into several smaller rooms for all types of functions.
The City of Newnan entered into a management agreement with the Convention Center Authority to manage the Newnan Centre in February of 2012 as amended in March of 2014.
The City of Newnan completed the additional entrance roundabout into the campus in the Spring of 2015.
GOVERNANCE
The Newnan City Council appoints seven Authority
members to three-year rotating terms.
Current Members: Parks Avery, Chair. Michael
Colpoys, Vice Chair. Theresa Lovett, Treasurer, Katie
McBride, Secretary, additional members: Carles
Stinson, Norma Haynes and Krista Frost
The Authority holds public meetings quarterly on the
third Thursday of the month
OPERATIONAL STAFFING
Carol Moore was hired as Executive Director in February of 2011. Carol has 40 years of experience managing event and hospitality venues. She serves as a Board Member of the Facilities & Event Management Assoc., and was selected as one of the 10 leading women venue executives by that body in 2016.
Jeff Smith has served as Operations Manager since 2013
Scott ______ serves as Assistant Operations
Payton Shellnut serves as Marketing and Administration
Job performance is based on financial performance vs. budget and customer care ratings
Staff are employees of the Authority and receive retirement and healthcare benefits
FINANCIALS
The Authority has two main sources of income:
1. Revenue from operations
2. 40% of the City’s Hotel/Motel tax and Motor Vehicle Rental tax and 100% of the City’s local Motor Vehicle Rental tax
And three main expense areas:
1. Personnel & Benefits
2. Professional Services
3. Supplies & Operations
The City approves the Newnan Centre’s budget in the Fall of each year.
ACTIVITY
From January 2014 to June 2018 The Newnan Centre has hosted
1,031 events with attendance of 118,598
Top five user event categories over the last two years of 397
events are:
Religious 30% Corporate 26%
Government 13% Social 12% Non-Profits 9%
Other user categories include: Education, Associations Political,
Fraternal
CURRENT PROJECTS
Since it’s opening, the Authority has added over $39,000 in
additional equipment, $15,000 in audio/visual upgrades and has
added $20,000 in additional storage space to the Centre.
A capital reserve fund and policy was established and funded in
2017 as a maintenance and replacement reserve. The reserve
position is reviewed annually.
In the Fall of 2017 the Authority embarked on a Capital
Improvements Planning Project. Out of 23 identified potential
projects, four were prioritized for analysis:
1. Extension of the Pavilion Patio
2. Pergola in the Amphitheater
3. Enhancements to our security system
4. Upgraded technology
QUESTIONS
The City of Newnan currently has $10,000 in the 2018 budget for
Christmas decorations. After careful review and consideration of the
City’s budget, condition of current decorations, and the master plan for
the downtown area, the Newnan Christmas Commission is proposing the
following recommendations for the 2018 Season:
1) Purchase new bows for the 12 wreaths that hang on the light poles
throughout the downtown district. The bows were last replaced in
2015, and have been subjected to fading from outside conditions.
Each bow is $115. There are two bows per wreath for a total of 24
bows which total $2760. We have allotted an additional $240 for
any additional bows or ribbon that need to be replaced as
decorations are installed.
Item total: $3000
2) Purchase new holiday banners for the downtown district. The
Christmas Commission has worked with the Main Street
Department to find a design that would complement the downtown
district and would span the season from November through
January. We recommend purchasing 20 banners at $141 each for a
total of $2820.
Item Total: $2820
3) Purchase a new 48 inch wreath for City Hall. The current wreath is
the only foam based wreath left, most of the holiday wreaths have a
metal frame which is more durable. The existing foam wreath has
been repaired so many times it is starting to crumble.
Item total: $145
4) Continue to decorate City Hall, Carnegie Library, Greenville Street
Park, Wadsworth/ Fire Department and First Avenue Park. Install
costs : $1079.95
Item Total: $1079.95
5) Build weighted base for waving Santa statue (purchased in 2015) to
be placed next to the sleigh and Christmas tree on the square
$1500.
Item Total: $1500
6) Repaint the Sleigh and Mail box used on the square. $150 painting
supplies.
Item Total: $150
7) Remaining $1305.05 will be used for bulbs and lighting updates on
existing trees and decorations.
Item Total: $1305.05
Total Cost of itemized items is as follows:
1. $3,000
2. $2820
3. $145
4. $1079.95
5. $1500
6. $150
7. $1305.05
Total Proposed Cost: $10,000
Respectfully Submitted,
Norma Haynes
Newnan Christmas Commission Chair
Date:
Agenda Item:
Prepared By:
Presented By:
City of Newnan, Georgia Mayor and Council
August 14, 2018
2017 CAFR Presentation by Auditor
Katrina Cline, Finance Director
Ken Neil and/or Judy Caudill
Purpose:
Background:
Funding:
To present the completed 2017 Comprehensive Annual Financial Report (CAFR) and a brief overview of the year to Council.
The City contracted with Clifton, Lipford, Hardison and Parker, LLC of Warner Robbins, Georgia, to perform an audit of the City’s financial transactions and data for calendar year 2017. The audit was completed on June 26, 2018. The City received a clean report.
N/A
Recommendation: N/A
Options: N/A
Attachments: None. The 2017 CAFR reports were previously distributed to Council by staff.
Previous Discussion with Council: N/A
City of Newnan, Georgia - Mayor and Council Date: August 14, 2018 Agenda Item: Project Framework Agreement between the Georgia
Department of Transportation and the City of Newnan for Transportation Facilities Improvements- Lower Fayetteville Road
Prepared by: Michael Klahr, Public Works Director/ City Engineer
Purpose: To authorize the Mayor to execute a Project Framework Agreement (PFA) between the Georgia Department of Transportation (GDOT) and the City of Newnan (City) for transportation facility improvements for Lower Fayetteville Road. Background: The City of Newnan represented to the Georgia Department of Transportation a desire to improve Lower Fayetteville Road and to participate in certain activities including funding of certain portions of the project. The Georgia Department of Transportation has agree to provide $500,000 for Preliminary Engineering, scoping. The required match from the City is $125,000. A Resolution of Commitment to Implement Project- Improvements to Lower Fayetteville Road, was executed by the Mayor, May 16, 2017. The limits for the project are from Greison Trail to Sullivan Road. Lower Fayetteville Road is functionally classified as an Urban Minor Arterial Street. Funding: SPLOST 2013 Recommendation: To authorize the Mayor to execute the Project Framework Agreement,
committing $125,000 for Preliminary Engineering Attachments: Project Framework Agreement
Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308
(404) 631-1000 Main Office
July 23, 2018
PI No. 0016052, Coweta County
Lower Fayetteville Road From Greison Trail To Sullivan Road
Honorable Keith Brady
Mayor of the City of Newnan
25 LaGrange Street
Newnan, Georgia
Attn: William M. Klahr, Public Works Director/City Engineer
Dear Mayor Brady:
Enclosed is a Project Framework Agreement (PFA) detailing Preliminary Engineering commitments for the above
referenced project.
Please review the enclosed agreement and if satisfactory, provide signatures on the (4) originals, and return them to this
Office at the following address:
Georgia Department of Transportation
Office of Program Delivery
Attn: Shanda Caldwell
600 West Peachtree Street, NW, 25th Floor
Atlanta, GA 30308
Once the signed agreements are received, they will be routed for GDOT signatures, and then City of Newnan will be sent
one copy of the fully executed agreement for the project file. As mentioned in the PFA, additional Specific Activity
Agreements for Right of Way, Utility Relocation, and Construction will be sent at the appropriate time, if required.
If you have any questions about items contained in this agreement, please contact the Project Manager, Shanda Caldwell
at (470) 591-5484.
Sincerely,
Kimberly W. Nesbitt
State Program Delivery Administrator
AVS:KWN:KESD:MKR:XMJ
Enclosures (4)
Cc: Honorable Lynn Westmoreland, State Transportation Board Member, Congressional District 3
Albert Shelby, Director of Program Delivery
Bobby Hilliard, State Program Control Administrator
Vivan Delgadillo, MPO Planner
Michael Presley, District 3 Engineer
Adam Smith, District 3 Preconstruction Engineer
Attn: Harland Smith, District 3 Planning and Programming Engineer
P.I. 0016052 Coweta County/City of Newnan
PROJECT FRAMEWORK
AGREEMENT
BY AND BETWEEN
GEORGIA DEPARTMENT OF
TRANSPORTATION
AND
CITY OF NEWNAN
FOR
TRANSPORTATION FACILITY
IMPROVEMENTS
Please indicate which Catalog of
Domestic Federal Assistance Number
(CFDA) applies to this agreement
(Check only one):
☒ CFDA # 20.205 - Highway
Planning and Construction
Cluster
☐ CFDA # 20.219 -
Recreational Trails Program
This Project Framework
Agreement for Transportation Facility
Improvements is made and entered into
this day of , 20_ _, by and
between the GEORGIA DEPARTMENT
OF TRANSPORTATION, an agency of
the State of Georgia, hereinafter called
the "DEPARTMENT", and the City of
Newnan, acting by and through its
Mayor and City Council, hereinafter
called the "LOCAL GOVERNMENT".
WHEREAS, the LOCAL
GOVERNMENT has represented to the
DEPARTMENT a desire to improve the
transportation facility described in
Exhibit “A”, attached and incorporated
herein by reference, identified as P.I.
0016052 and hereinafter referred to as the
"PROJECT"; and
WHEREAS, the LOCAL GOVERNMENT
has represented to the DEPARTMENT a desire to
participate in certain activities, as applicable,
including the funding of certain portions of the
PROJECT and the DEPARTMENT has relied upon
such representations; and
WHEREAS, the DEPARTMENT has
expressed a willingness to participate in certain
activities of the PROJECT as set forth in this
Agreement; and
WHEREAS, the Constitution authorizes
intergovernmental agreements whereby state and
local entities may contract with one another “for
joint services, for the provision of services, or for the
joint or separate use of facilities or equipment; but
such contracts must deal with activities, services or
facilities which the contracting parties are
authorized by law to undertake or provide.” Ga.
Constitution Article IX, §III, ¶I(a).
NOW THEREFORE, in consideration of the
mutual promises made and of the benefits to flow
from one to the other, the DEPARTMENT and the
LOCAL GOVERNMENT hereby agree each with
the other as follows:
1. The LOCAL GOVERNMENT has
applied for and received “Qualification
Certification” to administer federal-aid projects.
The GDOT Local Administered Project (LAP)
Certification Committee has reviewed, confirmed
and approved the LAP certification for the LOCAL
GOVERNMENT to develop federal project(s)
within the scope of its certification and pursuant to
and in accordance with the DEPARTMENT’S
current versions of Local Administered Project
Manual, the DEPARTMENT’s Plan Development
Process (hereinafter referred to as “PDP”),
Electronic Data Guidelines, Plan Presentation
P.I. 0016052 Coweta County/City of Newnan
Guide, and any other applicable
DEPARTMENT guidance (except in
those instances where the
DEPARTMENT has by written
correspondence waived the requirement
to follow specific guidance).
2. The DEPARTMENT shall
participate in the PROJECT by funding
all or certain portions of the PROJECT
costs for the preconstruction engineering
(design) activities, herein referred to as
“PE”, as specified in Exhibit “A”. The
LOCAL GOVERNMENT shall
contribute to the PROJECT by funding
those project costs as set out in Exhibit
“A”.
3. The funding portion as
identified in Attachment “A” of this
Agreement only applies to the PE.
Further, the LOCAL GOVERNMENT
shall be responsible for repayment of any
expended federal funds if the PROJECT
does not proceed forward to completion
due to a lack of available funding in future
PROJECT phases, changes in local
priorities, or cancellation of the
PROJECT by the LOCAL
GOVERNMENT without concurrence by
the Federal Highway Administration
(FHWA).
4. RESERVED.
-or-
The DEPARTMENT
entered into a Memorandum of Agreement
with the LOCAL GOVERNMENT to
establish oversight funding, attached
hereto and incorporated by reference as
Exhibit “C”. The LOCAL
GOVERNMENT will be responsible for
providing payment, which represents 100% of the
DEPARTMENT’s PE Oversight funds as estimated in
Exhibit “C” at the time of execution of this
Agreement. If at any time the PE Oversight funds
are depleted within $5,000 of the remaining PE
Oversight balance and project activities and tasks
are still outstanding, the LOCAL GOVERNMENT
shall, upon request, make additional payment to the
DEPARTMENT. The payment shall be determined
by prorating the percentage complete and using the
same estimate methodology as provided in Exhibit
“C”. If there is an unused balance after completion
of all tasks and phases of the PROJECT, then
pending a final audit, the remainder will be
refunded to the LOCAL GOVERNMENT. All
other terms and conditions of Exhibit “C” are
incorporated herein.
5. The LOCAL GOVERNMENT shall
accomplish the PE activities for the PROJECT. The
PE activities shall be accomplished in accordance
and pursuant to with the LAP certification as
outlined above in Paragraph 1, the PDP, the
applicable guidelines of the American Association
of State Highway and Transportation Officials,
hereinafter referred to as “AASHTO”, the
DEPARTMENT's Standard Specifications
Construction of Transportation Systems, and all
applicable design guidelines and policies of the
DEPARTMENT, in order to, among other goals,
produce a cost effective PROJECT. Failure to
follow the PDP and all applicable guidelines and
policies will jeopardize the use of federal funds in
some or all categories outlined in this Agreement,
and it shall be the responsibility of the LOCAL
GOVERNMENT to make up the loss of that
funding.
6. The primary consultant firm or subconsultants
hired by the LOCAL GOVERNMENT to provide
services on the PROJECT shall be prequalified
with the DEPARTMENT in the appropriate area-
classes. The DEPARTMENT shall, on request,
furnish the LOCAL GOVERNMENT with a list of
P.I. 0016052 Coweta County/City of Newnan
prequalified consultant firms in the
appropriate area-classes. If there is
federal aid highway program funding
participation, the LOCAL
GOVERNMENT shall comply with all
applicable state and federal regulations
for the procurement of engineering and
design related services including but not
limited to 23 C.F.R. Part 172, or the
Brooks Architect-Engineers Act of
1972, for any consultant hired to perform
work on the PROJECT. If there are no
federal aid highway program funding in
the engineering and design related
services contract, the contracting agency
may procure the services in accordance
with its own established policies and
procedures which reflect applicable
State and local laws. However, in such
an event, the costs of consultant service
contracts that utilize only State or local
funding which were not procured,
negotiated, or administered in
accordance with applicable Federal laws
and regulations would not be eligible to
apply toward the non-Federal share of
costs for subsequent phases (e.g.,
construction) of a project funded by the
federal aid highway program.
7. The DEPARTMENT will
be responsible for all railroad
coordination on DEPARTMENT Let
and/or State Route (On-System) projects;
the LOCAL GOVERNMENT shall
address concerns, comments, and
requirements to the satisfaction of the
Railroad and the DEPARTMENT. If the
LOCAL GOVERNMENT is shown to let
the construction in Exhibit “A” on off-
system routes, the LOCAL
GOVERNMENT shall be responsible for
all railroad coordination and addressing
concerns, comments, and requirements to
the satisfaction of the Railroad and the
DEPARTMENT for PROJECT.
8. The DEPARTMENT reserves the
right to review and reserves approval authority for
all aspects of the PROJECT provided, however, this
review and approval does not relieve the LOCAL
GOVERNMENT of its responsibilities under the
terms of this Agreement.
9. RESERVED.
-or-
The LOCAL GOVERNMENT as specified
in the Local Let Approval Form, attached and
incorporated herein by reference as Exhibit “B”,
shall be responsible for letting the PROJECT to
construction, solely responsible for executing any
agreements with all applicable utility/railroad
companies and securing and awarding the
construction contract for the PROJECT. The
LOCAL GOVERNMENT shall provide the
DEPARTMENT with a copy of all contracts and
agreements between the LOCAL GOVERNMENT
and any other agency or contractor associated with
construction activities. The DEPARTMENT’s
Project Manager who will be identified by the
DEPARTMENT at a later date shall be the primary
point of contact unless otherwise specified.
10. The LOCAL GOVERNMENT
agrees that all reports, plans, drawings, studies,
specifications, estimates, maps, computations,
computer files and printouts, and any other data
prepared under the terms of this Agreement shall
become the property of the DEPARTMENT if the
PROJECT is being let by the DEPARTMENT. This
data shall be organized, indexed, bound, and
delivered to the DEPARTMENT no later than the
advertisement of the PROJECT for letting. The
DEPARTMENT shall have the right to use this
material without restriction or limitation and
without compensation to the LOCAL
P.I. 0016052 Coweta County/City of Newnan
GOVERNMENT.
11. The LOCAL
GOVERNMENT shall be responsible for
the professional quality, technical
accuracy, and the coordination of all
reports, designs, drawings, specifications,
and other services furnished by or on
behalf of the LOCAL GOVERNMENT
pursuant to this Agreement. The LOCAL
GOVERNMENT shall correct or revise,
or cause to be corrected or revised, any
errors or deficiencies in the reports,
designs, drawings, specifications, and
other services furnished for this
PROJECT. Failure by the LOCAL
GOVERNMENT to address the errors,
omissions or deficiencies within 30 days
of notification shall cause the LOCAL
GOVERNMENT to assume all
responsibility for construction delays and
supplemental agreements caused by the
errors and deficiencies. All revisions
shall be coordinated with the
DEPARTMENT prior to issuance. The
LOCAL GOVERNMENT shall also be
responsible for any claim, damage, loss or
expense, to the extent allowed by law that
is attributable to errors, omissions, or
negligent acts related to the designs,
drawings, specifications, and other
services furnished by or on behalf of the
LOCAL GOVERNMENT pursuant to
this Agreement.
12. The Parties acknowledge
that the following Exhibits and
Attachments to this Agreement are hereby
incorporated into and made a part of this
Agreement as though expressly written
herein:
EXHIBIT A – TIP/STIP Insert
EXHIBIT B – Local Let Approval Form
EXHIBIT C - Memorandum of Agreement by and
Between Georgia Department of Transportation
And Local Government For Preliminary
Engineering
APPENDIX A – Georgia Security and
Immigration Compliance Act Affidavit
APPENDIX B – Federal Award Identification
Worksheet
APPENDIX C – Certification of Local
Government Drug Free Workplace
APPENDIX D – Certification of Compliances
APPENDIX E – Title VI Certification and
Acknowledgement Form
APPENDIX F – Request for Qualifications (RFQ)
and prequalified consultant award selection
package, if applicable
9. COMPLIANCE WITH
APPLICABLE LAWS
a. The undersigned, on behalf
of the LOCAL GOVERNMENT, certifies that the
provisions of Section 45-10-20 through 45-10-28 of
the Official Code of Georgia Annotated relating to
Conflict of Interest and State employees and
officials trading with the State have been complied
with in full.
b. The provisions of Section
50-24-1 through 50-24-6 of the Official Code of
Georgia Annotated relating to the "Drug-Free
Workplace Act" have been complied with in full, as
stated in Appendix A of this Agreement.
c. The LOCAL
GOVERNMENT has read and understands the
regulations for STATE AUDIT REQUIREMENT
as stated in Appendix D of this Agreement and will
comply in full with said provisions of O.C.G.A. §
36-81-7.
d. By execution of this
Agreement, I, on behalf of the LOCAL
P.I. 0016052 Coweta County/City of Newnan
GOVERNMENT, certify under penalty
of law that the LOCAL GOVERNMENT
is in compliance with the service delivery
strategy law (O.C.G.A. Sec. 36-701 et
seq.) and is not debarred from receiving
financial assistance from the State of
Georgia.
e. The LOCAL
GOVERNMENT hereby agrees that it
shall comply, and shall require its
subcontractors to comply, with all
applicable requirements of the American
with Disabilities Act of 1990 (ADA), 42
U.S.C. 12101, et seq. and 49 U.S.C. 322;
Section 504 of the Rehabilitation Act of
1973, as amended, 29 U.S.C. 791; and
regulations and amendments thereto.
f. Pursuant to
O.C.G.A. § 13-10-91, the LOCAL
GOVERNMENT and all contractors and
subcontractors performing work under
this Agreement are, and shall be at all
times, in compliance with the Federal
Work Authorization Program. Prime
contractors and subcontractors may
participate in any of the electronic
verification work authorization programs
operated by the United States Department
of Homeland Security or any equivalent
federal work authorization program
operated by the United State Homeland
Security to verify information of newly
hired employees, pursuant to the
Immigration Reform and Control Act of
1986 (“IRCA”), Appendix A.
g. The LOCAL
GOVERNMENT hereby agrees that
neither it nor its subcontractors shall
discriminate on the basis of age, race,
color, sex, national origin, religion or
disability and that it and its
subcontractors shall comply, at a minimum, with the
following Georgia laws: the Georgia Age
Discrimination Act (O.C.G.A. § 34-1-2 et seq.); the
Georgia Equal Employment for Persons with
Disabilities Code (O.C.G.A. 34-6A-1 et seq.); and
the Sex Discrimination in Employment (O.C.G.A.
34-5-1 et seq.). The LOCAL GOVERNMENT
further agrees that it and its subcontractors will
comply with any and all state and federal laws not
specifically stated herein addressing discrimination
to the extent that such is applicable.
h. LOCAL GOVERNMENT
acknowledges and agrees that failure to complete
appropriate certifications or the submission of a
false certification shall result in the termination of
this Agreement.
10. This Agreement is made and entered
into in FULTON COUNTY, GEORGIA, and shall
be governed and construed under the laws of the
State of Georgia.
11. The covenants herein contained
shall, except as otherwise provided, accrue to the
benefit of and be binding upon the successors and
assigns of the parties hereto.
12. If any provision of this amendment is
determined to be invalid or unenforceable, the
remaining provisions shall remain in force and
unaffected to the fullest extent permitted by law and
regulation.
13. Nothing contained herein shall be
construed as conferring upon or giving to any
person, other than the parties hereto, any rights or
benefits under or by reason of this Agreement.
14. This Agreement supersedes all prior
negotiations, discussion, statements and agreements
between the parties and constitutes the full,
complete and entire agreement between the Parties
with respect hereto; no member, officer, employee
P.I. 0016052 Coweta County/City of Newnan
or agent of either party has authority to
make, or has made, any statement,
agreement, representation or
contemporaneous agreement, oral or
written, in connection herewith,
amending, supplementing, modifying,
adding to, deleting from, or changing the
terms and conditions of this Agreement.
No modification of or amendment to this
Agreement will be binding on either Party
hereto unless such modification or
amendment will be properly authorized,
in writing, properly signed by both Parties
and incorporated in and by reference
made a part hereof.
{SIGNATURES ON NEXT PAGE}
P.I. 0016052 Coweta County/City of Newnan
IN WITNESS WHEREOF, the
DEPARTMENT and the LOCAL
GOVERNMENT have caused these
presents to be executed under seal by their
duly authorized representatives.
GEORGIA
DEPARTMENT OF
TRANSPORTATION
BY:
Commissioner
ATTEST:
BY:
Mayor Keith Brady
Signed, sealed and delivered this day of
, 20__, in the
presence of:
Treasurer
_
Witness
Notary Public
This Agreement approved by Local
Government, the day of
, 20__.
Attest
Name and Title
FEIN:
P.I. 0016052 Coweta County/City of Newnan
EXHIBIT A STIP/TIP Insert
THIS REFLECTS THE CURRENT TIP/STIP AS OF THE EXECUTION OF THIS PFA. ANY MODIFICATION TO THE PE
PHASES WILL TRIGGER A SUPPLEMENTAL PFA. ANY MODIFICATIONS TO THE ROW, UTL or CST PHASES WILL BE
ADDRESSED WITH SUBSEQUENT AGREEMENTS.
Project # County/Municipality
Revised: 2/9/2017
8
9
EXHIBIT B
Local Let Approval Form (LLAF)
Office of Program Control
P.I. #: 0016052 Date:
Project Description: Lower Fayetteville Road From Greison Trail To Sullivan Road
County: Coweta
District: 3
Request Prepared by: Requestor Office:
Local Government: City of Newnan
Is the Local Government LAP Certified?
Reason the Local Government desires a Local Letting: (Describe the factors that make a Local Letting desirable by the
Locals and/or GDOT. Explain why a Local Letting is an efficient use of resources.)
Change Justification (as submitted by Local Government), including Risk Assessment (Experience with Local Lettings
and Federal Requirements), Benefits, Implementation Requirements (Materials Testing resources to be used;
Construction Inspection resources), Contracting ability: (PM should coordinate with District Construction.)
Attachments: Preconstruction Status Report, Project Financial Report, Detailed Cost Estimate, Map, Other supporting
documentation to include letters from Project Sponsor, Future LG projects in the Program.
10
Local Letting Form Approval:
Local Government Date
Project Manager / District Preconstruction Engineer Date
Office Head (for Office of Program Delivery Projects) Date
District Engineer (for all projects) Date
State Materials Engineer Date
Approved: _______________
Director of Construction Date
Upon approval or rejection send the original to the Project Manager (Program Delivery or District Preconstruction Engineer)
PM should send Executed Copies to:
o Office of Planning o Office of Program Control o Office of Financial Management (to change the TPRO designation)
NOTES:
The Local Letting designation cannot be changed after PFPR to a Local Let unless approved by the Chief Engineer.
11
EXHIBIT C
Memorandum of Agreement by and Between Georgia Department of Transportation and Local
Government For Preliminary Engineering
A
12
Attachment B
APPENDIX A
13
APPENDIX B
Federal Award Identification Worksheet
Subrecipient’s name (must match registered name in
DUNS)
City of Newnan
Subrecipient’s DUNS number (see § 200.32 Data
Universal Numbering System (DUNS))
07031751
Federal Award Identification Number (FAIN) 130016052L23R
Federal award date (see § 200.39 Federal Award Date 05/15/2018
Amount of Federal Funds Obligated by this action $500,000.00
Total Amount of Federal Funds Obligated to the
subreceipient
$500,000.00
Total Amount of the Federal Award Refer to Attachment A above
Federal award project description, as required to be
responsive to the Federal Funding Accountability and
Transparency Act (FFATA)
Scope of work in contract document; refer
to page 1
Name of Federal awarding agency, pass-through entity, and
contact information for awarding official
FHWA, GDOT, Kimberly Nesbitt
CFDA Number and Name (the pass-through entity must
identify the dollar amount made available under each Federal
award and the CFDA number at time of disbursement)
Refer to page 1 of contract document
Identification of whether award is R&D No
Indirect cost rate for the Federal award (including if the de
minimis rate is charged per § 200.414 Indirect (F&A) costs)
N/A
This project must comply with all aspects of 2 CFR Part 200.
14
APPENDIX C
CERTIFICATION OF LOCAL GOVERNMENT
DRUG-FREE WORKPLACE
I hereby certify that I am a principal and duly authorized representative of ______________________ whose
address is________________________________________________ and it is also certified that:
1. The provisions of Section 50-24-1 through 50-24-6 of the Official Code of Georgia Annotated, relating to
the "Drug-Free Workplace Act" have been complied with in full; and
2. A drug-free workplace will be provided for the LOCAL GOVERNMENT’s employees during the
performance of the contract; and
3. Each subcontractor hired by the LOCAL GOVERNMENT shall be required to ensure that the
subcontractor's employees are provided a drug-free workplace. The LOCAL GOVERNMENT shall secure
from that subcontractor the following written certification: "As part of the subcontracting agreement with
________________________ ______________________, _____________________________________
certifies to the LOCAL GOVERNMENT that a drug-free workplace will be provided for the subcontractor's
employees during the performance of this contract pursuant to paragraph (7) of subsection (b) of the Official
Code of Georgia Annotated Section 50-24-3"; and
4. It is certified that the undersigned will not engage in unlawful manufacture, sale, distribution, dispensation,
possession, or use of a controlled substance or marijuana during the performance of the contract.
______________________ __________________________________
Date Signature
15
APPENDIX D
CERTIFICATION OF COMPLIANCES
I hereby certify that I am a principal and duly authorized representative of _________________ whose address is
_____________________and it is also certified that:
I. PROCUREMENT REQUIREMENTS
The below listed provisions of State Procurement requirements shall be complied with throughout the contract
period:
(a) Provisions of Chapters 2 and Chapters 4 of the Title 32 of the Official Code of Georgia Annotated.
Specifically as to the County the provisions of O.C.G.A. § 32-4-40 et seq. and as to the Municipality the
provisions of O.C.G.A. § 32-4-92 et seq.
II. STATE AUDIT REQUIREMENT
The provisions of Section 36-81-7 of the Official Code of Georgia Annotated, relating to the “Requirement of
Audits” shall be complied with throughout the contract period in full, including but not limited to the following
provisions:
(a) Each unit of local government having a population in excess of 1,500 persons or expenditures of
$300,000.00 or more shall provide for and cause to be made an annual audit of the financial affairs and
transactions of all funds and activities of the local government for each fiscal year of the local government.
(b) The governing authority of each local unit of government not included above shall provide for and cause to
be made the audit required not less often than once every two fiscal years.
(c) The governing authority of each local unit of government having expenditures of less than $300,000.00
in that government’s most recently ended fiscal year may elect to provide for and cause to be made, in lieu
of the biennial audit, an annual report of agreed upon procedures for that fiscal year.
(d) A copy of the report and any comments made by the state auditor shall be maintained as a public record for
public inspection during the regular working hours at the principal office of the local government. Those
units of local government not having a principal office shall provide a notification to the public as to the
location of and times during which the public may inspect the report.
(e) The audits of each local government shall be conducted in accordance with generally accepted government
auditing standards.
III. SERVICE DELIVERY STRATEGY REQUIREMENT
The provisions of Section 36-70-20 et seq. of the Official Code of Georgia, relating to the “Coordinated And
Comprehensive Planning And Service Delivery By Counties And Municipalities”, as amended, have been
complied with throughout the contract period.
_______________________ _________________________________
Date Signature
16
APPENDIX E
TITLE VI INTRODUCTION
As a sub-recipient of federal funds from Georgia Department of Transportation, all municipalities are required to
comply with Title VI of the Civil Rights Act of 1964 which provides that:
"No person in the United States shall on the grounds of race, color, or national origin, be excluded from participation
in, or be denied the benefits of, or be subjected To discrimination under any program or activity receiving federal
assistance under This title or carried out under this title."
Additionally, the Civil Rights Restoration Act of 1987, expanded the definition of the terms "programs and
activities" to include all programs or activities of federal recipients, subrecipients, and contractors, whether or not
such programs and activities are federally assisted.
The provisions of Title VI apply to all contractors, subcontractors, consultants and suppliers. And is a condition for
receiving federal funds. All sub recipients must sign Title VI assurances that they will not discriminate as stated in
Title VI of the Civil Rights Act of 1964.
In the event that the sub recipient distributes federal aid funds to second tier entity, the subrecipient shall include
Title VI language in all written documents and will monitor for compliance. If, these assurances are not signed, the
City or County government may be subjected to the loss of federal assistance.
All sub recipients that receive federal assistance must also include Federal Highways Administrations 1273 in their
contracts. The FHWA 1273 sets out guidance for ensuring non discrimination and encouraging minority
participation and outreach.
Enclosed you will find Title VI acknowledgment form and the Title VI assurances. The Title VI acknowledgment
form and Title VI assurances must be signed by your local government official if it has not been signed.
17
TITLE VI ACKNOWLEDGEMENT FORM
The _______________________________________ assures that no person shall on the grounds or race,
color, national origin or sex as provided by Title VI of the Civil Rights Act of 1964, and the Civil Rights
Restoration Act of 1987 be excluded from participation in, be denied the benefits of, or otherwise be
subjected to discrimination under any City or County sponsored program or activity.
The_______________________________________ assures that every effort will be made to ensure non
discrimination in all of its programs or activities, whether those programs are federally funded or not.
Assurance of compliance therefore falls under the proper authority of the City Council or the County
Board of Commissioners. The Title VI Coordinator or Liaison is authorized to ensure compliance with
provisions of this policy and with the Law, including the requirements of 23 Code of Federal
Regulations (CFR) 200 and 49 CFR 21.
Official Name and Title Date Citations:
Title VI of the Civil Rights Act of 1964; 42 USC 2000d to 2000d-4;42 USC 4601to 4655;23 USC
109(h); 23 USC 324; DOT Order 1050.2; EO 12250; EO 12898; 28CFR 50.3
Other Nondiscrimination Authorities Expanded the range and scope of Title VI coverage and
applicability
The 1970 Uniform Act (42 USC 4601)
Section 504 of the 1973 Rehabilitation Act (29 USC 790)
The 1973 Federal-aid Highway Act (23 USC 324)
The 1975 Age Discrimination Act (42 USC 6101)
Implementing Regulations (49 CFR 21& 23 CFR 200)
Executive Order 12898 on Environmental Justice (EJ)
Executive Order 13166 on Limited English Proficiency (LEP)
18
NOTICE TO SPONSOR
COMPLIANCE WITH TITLE VI OF THE CIVIL RIGHTS ACT OF 1964
During the performance of this contract, the SPONSOR, for itself, its assignees, and successors in interest (hereinafter referred to as the "SPONSOR"), agree as follows:
1. Compliance with Regulations
The SPONSOR shall comply with the Regulations relative to nondiscrimination in federally-assisted programs of the Department of Transportation (hereinafter referred to as DOT), Title 49, Code of Federal Regulations, part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract.
2. Nondiscrimination
The SPONSOR, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, sex, or national origin in tl1e selection and retention of subcontractors, including procurement of materials and leases of equipment. The SPONSOR shall not participate either directly or indirectly in discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations.
3. Solicitations for Subcontracts, Including Procurement of Materials and Equipment
In all solicitations either by competitive bidding or negotiations made by the SPONSOR for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the SPONSOR of the SPONSOR's obligations under this contract and the Regulations relative to nondiscrimination on the ground of race, color, sex, or national origin.
4. Information and Reports
The SPONSOR shall provide all information and reports required by the Regulations or directives issued
pursuant thereto, and shall permit access to its books, records, accounts, other sources of information and its
facilities as may be determined by the State Department of Transportation or the Federal Highway
Administration to be pertinent to ascertain compliance with such Regulations, orders, and instructions.
Where any information required of a sponsor is in the exclusive possession of another who fails or refuses to
furnish this information, the Sponsor shall so certify to the State Department of Transportation, or the
Federal Highway Administration as appropriate, and shall set forth what efforts it has made to obtain the
information.
5. Sanctions for Noncompliance In t he event of the SPONSOR's noncompliance with the nondiscrimination provisions of this contract, the State Department of Transportation shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate, including, but not limited to:
a. Withholding of payments to the SPONSOR under the contract until the SPONSOR complies; and/or b. Cancellation, termination, or suspension of the contact, in whole or in part.
6. Incorporation of Provisions The SPONSOR shall include the provisions of paragraphs (I) through (6) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.
The SPONSOR shall take such action with respect to any subcontractor or procurement as the State
19
Department of Transportation or the Federal Highway Administration may direct as a means of enforcing such
provisions including sanctions for noncompliance: Provided, however, that in the event a Sponsor becomes
involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the
Sponsor may request the State to enter into such litigation to protect the interests of the state and, in
addition, the Sponsor may request the United States to enter into such litigation to protect the interests of the
United States.
20
APPENDIX F
Request for Qualifications (RFQ) &
Prequalified Consultant Award Selection Package (if applicable)
City of Newnan, Georgia - Mayor and Council Date: August 14, 2018 Agenda Item: Agreement with Consultant- Traffic Study and Recommendations Prepared by: Michael Klahr, Public Works Director Purpose: To consider approval for Agreement between Foresite Group, Inc. and the City of Newnan for professional engineering services for a Jackson St/ Jefferson St/ Clark St traffic study and recommendations, to include pedestrian accommodations and vehicular operational improvements Background: The City of Newnan was awarded a $75,000 grant through the Surface Transportation Block Grant program, to study the Jackson St/ Jefferson St/ Clark St area, and has committed to a grant match of $18,750, for a project total of $93,750. In addition, the Mayor has executed the Project Framework Agreement (PFA) with the Georgia Department of Transportation, which contains straightforward project phase participation commitments. Under the terms of the grant, Foresite Group, Inc. was selected based on qualifications. The City is now ready to enter into an Agreement to begin work. Development of the scope and schedule have been coordinated with the Georgia Department of Transportation. The Agreement will allow the City to maximize the grant and match, not to exceed $93,750.00, billed at the hourly rates show. Options: A. Approve Agreement with Foresite Group, Inc.
B. Other action as directed by Council Funding: SPLOST 2013 Recommendation: Option A Attachments: Agreement Scope and Schedule
This project entails analyzing alternatives to alleviate the traffic congestion issues at the four intersections within the Jackson Street/ Jefferson Street/ Clark Street road segments. These alternatives will be analyzed in order to develop a preferred alignment. The preferred alternative will be determined based on factors such as ROW requirements, construction costs, environmental impacts, safety measures, etc. The general scope and schedule is outlined below:
Kick Off Meeting Meet with the City staff. Discuss scope, timelines, alternatives, data, requirements (from both sides) and future plans
Research and Data Collection Field data to be collected. Vehicular data has already been collected. Other data such as trends, field observations, crash statistics, signal timing, local preferences, etc. will be collected in the field. Recommendations made in the LCI and other documents will be researched and implemented. Environmental Survey of Cultural Resources An environmental screening that would identify natural and cultural resources and permitting requirements for the project will be conducted. A desktop survey of the cultural resources of the corridor will be prepared. The cultural resource survey will include a narrative and analysis of the existing structures. The findings of this effort will be documented in a screening memo for Newnan’s project files. Generally speaking, the ecological field activity would include a site evaluation that includes identification of vegetation communities, land uses, habitat for endangered/threatened species, and the types and condition of wetland and streams. This delineation data would be provided to the design team to aid in project design.
Stakeholder Committee Meeting (1) Introductions, understand everyone's roles and responsibilities, provide project status and future plans. Stakeholder committee is expected to have a representative from the City, County, GDOT, University, downtown organizations, etc.
Model Building
A Synchro model will be built. It will be calibrated (via field observations and travel time runs).
Existing Analysis
Existing conditions will be analyzed using the Synchro Model.
Stakeholder Committee Meeting (2) Results of the data collection, existing analysis, etc. along with future plans will be discussed. This meeting will be formatted like a design charrette.
Traffic Forecasting Traffic volumes will be forecasted using the methodology prescribed in GDOT's Traffic Forecasting Manual. These volumes will be forecasted for Base (+2) and Design Years (+2). Rerouting of traffic will be necessary for each alternative.
Background and Future Analysis Capacity analysis will be performed for No Build and Build conditions. Pedestrian/ Bicycle Analysis A bike/ ped circulation plan will be prepared including safe crossings that will be geared predominantly towards the University students.
Alternatives Analysis Several alternatives will be analyzed using the existing calibrated model and the forecasted volumes for Base and Design Years under build and no build conditions. TE study reports per GDOT guidelines will be prepared.
Signing and Marking Alternatives Signing and pavement marking alternatives will be prepared to minimize clutter and be more informative. These will be prepared for each alternative that is analyzed.
Graphics Production 2D or 3D graphics will be prepared to represent at least three alternatives. A 3D simulation model will also be prepared to show traffic conditions under various scenarios.
Staff Meeting The results of alternative analysis (along with cost and benefit analysis) along with the signing and marking ideas, and the graphics will be discussed with the staff to narrow down the alternatives
Stakeholder Committee Meeting (3) The alternatives narrowed down after the staff meeting will be presented to the stakeholder committee.
PIOH A Public Information Open House will be conducted that will allow citizens to learn about the project, ask questions, and provide comments. This PIOH will be conducted per GDOT guidelines.
Final Report A final report long with graphics will be prepared. This report will have information regarding data collection, stakeholder meetings, alternatives discussed, PIOH information, and recommendations for the improvement of intersection conditions.
TASK 8‐Aug 15‐Aug 22‐Aug 29‐Aug 5‐Sep 12‐Sep 19‐Sep 26‐Sep 3‐Oct 10‐Oct 17‐Oct 24‐Oct 31‐Oct 7‐Nov 14‐Nov 21‐Nov 28‐Nov 5‐Dec 12‐Dec 19‐Dec
NTP
Research and Data Collection
Kick Off Meeting
Environmental Desktop Survey
Stakeholder Committee Meeting (1)
Model Building
Existing Analysis
Stakeholder Committee Meeting (2)
Traffic Forecasting
Background and Future Analysis
Alternatives Analysis
Signing and Marking Alternatives
Graphics Production
Staff Meeting
Stakeholder Committee Meeting (3)
PIOH
Final Report
Presentation to the Council
A RESOLUTION TO AUTHORIZE THE COMMITTMENT OF FUNDS FROM SPLOST
2013, AND GENERAL FUND UNASSIGNED BALANCE FOR THE ACQUISTION OF
A TROLLEY
WHEREAS, the City of Newnan Mayor and Council and the City Manager have discussed the
prioritization of capital projects and project funding for the acquisition of a Trolley; and
WHEREAS, the City of Newnan is in an excellent financial position to consider committing a
specific portion of SPLOST 2013 and General Fund Unassigned Balance to the General Fund
Committed Balance to fund said prioritized capital project; and
WHEREAS, the City of Newnan has in the past, only when beneficial to the community and
without creating financial hardship for necessary operational funding, committed fund balance for
capital projects; and
WHEREAS, the said project estimates require $100,000 in SPLOST 2013 funds and $24,000 of
the General Fund Unassigned Balance to cover the funding deficit; and
NOW, THEREFORE BE IT RESOLVED that the Mayor & Council of the City of Newnan hereby
authorize the Finance Director to commit funds in the amount of $100,000 in SPLOST 2013 funds
and $24,000 of the General Fund Unassigned Balance to fund the deficit of the prioritized project
(Trolley Acquisition); and
.
DONE, RATIFIED AND PASSED in regular session this the ____ day of_____________2018
ATTEST: ________________________ Della Hill, City Clerk REVIEWED AS TO FORM: _________________________ C. Bradford Sears, Jr., City Attorney _________________________ Cleatus Phillips, City Manager
________________________________ Keith Brady, Mayor ________________________________ Cynthia Jenkins, Mayor Pro Tem ________________________________ George Alexander, Councilmember ________________________________ Ray DuBose, Councilmember ________________________________ Rhodes Shell, Councilmember ________________________________ Dustin Koritko, Councilmember ________________________________ Vacant, Councilmember
A RESOLUTION TO AUTHORIZE THE COMMITTMENT OF FUNDS FROM GENERAL FUND
UNASSIGNED BALANCE FOR THE OPERATION OF THE DOWNTOWN SANITATION
PROGRAM
WHEREAS, the City of Newnan Mayor and Council and the City Manager have discussed the importance of the
management of a downtown sanitation program; and
WHEREAS, the City of Newnan is in an excellent financial position to consider committing a specific portion of
General Fund Unassigned Balance to the General Fund Committed Balance to fund said program; and
WHEREAS, the City of Newnan has in the past, only when beneficial to the community and without creating
financial hardship for necessary operational funding, committed fund balance for certain capital projects and
programs; and
WHEREAS, the said program estimates require up to $120,000 of the General Fund Unassigned Balance to
cover the potential funding deficit; and
NOW, THEREFORE BE IT RESOLVED that the Mayor & Council of the City of Newnan hereby authorize the
Finance Director to commit funds in the amount of up to $120,000 of the General Fund Unassigned Balance to
fund the potential deficit of the prioritized program; and
DONE, RATIFIED AND PASSED in regular session, this the ______ day of ____________, 2018.
ATTEST:
__________________________ _______________________________
Della Hill, City Clerk L. Keith Brady, Mayor
REVIEWED AS TO FORM:
_______________________________
Cynthia E. Jenkins, Mayor Pro Tem
_____________________________
C. Bradford Sears, Jr. City Attorney _______________________________
George M. Alexander, Councilman
_____________________________ _______________________________
Cleatus Phillips, City Manager Rhodes H. Shell, Councilman
_______________________________
Ray DuBose, Councilman
_______________________________
Dustin Koritko, Councilman
_______________________________
Vacant, Councilman
City of Newnan, Georgia Mayor and Council
Date: August 14, 2018 Agenda Item: Ordinance to set millage rate for 2018 Property
Taxes Prepared By: Katrina Cline, Finance Director Presented By: Cleatus Phillips, City Manager
Purpose: To adopt an ordinance to set the millage rate for real and personal property taxes
for the City’s 2018 assessment cycle. Background: The 2018 tax digest was received from the Coweta County Tax Commissioner.
The current 2018 tax digest and 5-year history of the levy has been advertised, along with a press release and notice of tentative tax increase for 2018. The proposed rollback millage rate of 3.78 mills per thousand is not sufficient to balance the City’s operational budget. Additionally, a millage rate of 4.00 is the lowest millage rate adopted by Council in the last 15 years, with the exception of 2017, which was set at 3.87 mills per thousand.
Funding: N/A. Recommendation: Staff recommends that Council approve the ordinance as submitted, resulting in a
millage rate for 2018 of 4.00 mills, which is a 5.82% increase over the rollback rate proposed by the Coweta County Tax Commissioner.
Options: 1. Approve the ordinance as submitted. 2. Other action as directed by Council. Attachments: Current 2018 Tax Digest and 5-Year History of Levy
Previous Discussion with Council: N/A.
ORDINANCE IMPOSING TAXES FOR CORPORATE PURPOSES FOR THE YEAR 2018
BE IT ORDAINED, by the City Council of the City of Newnan, Georgia: SECTION I. That for the purpose of paying its expenses of operation and maintenance from the 1st day of January, 2018 to the 31st day of December, 2018, the City of Newnan, Georgia, a body politic, does hereby impose and levy the following taxes: On each one thousand ($1,000.00) dollars of the assessed value of all real estate and all personal property in the City of Newnan, Georgia and in like proportion on less than one thousand ($1,000.00) dollars in assessed value a tax, in the following amount: For the general operations of the City of Newnan, the tax rate of eight and seventy one hundred (8.71) mills is hereby levied upon the real and personal property located within the corporate limits of the City of Newnan. This rate will produce approximately $12,492,062 in ad valorem taxes. In compliance with the original laws regulating local option sales tax, the sum of $6,753,211 is hereby deducted from the total levy, leaving a balance to be collected of approximately $5,738,851, or a reduction in the ad valorem tax levy of four and seventy one hundred (4.71) mills. The effective rate of taxation is four hundred (4.00) mills, which is for the general operations of the City of Newnan. SECTION II. That all taxes imposed or levied by this ordinance shall be due and payable at the office of the Coweta County Tax Commissioner approximately sixty days after billing. If any tax is not paid on or before the last business day of the month following the billing, interest in the amount of 0.542% per month shall be added and collected by the Tax Commissioner. Additionally, a penalty of 5% shall be added after 120 days, with an additional 5% assessed after each successive 120 days, up to a maximum of 20% of the principle amount due. If the taxes are not paid by the 31st day of March, 2019, the Tax Commissioner may issue a tax execution for the tax, penalty, interest, and execution fee of twelve dollars ($12.00) against the property of the defaulting taxpayer, directed to the police chief or any other officer or person designated by the City Council for that purpose, who shall proceed to collect the same according to law. SECTION III. Any taxpayer whose property is under appeal with the Coweta County Tax Assessor may make a partial payment reflecting the tax on the undisputed portion of the appraisal. Taxpayers with pending appeals who make full payment will receive a refund for any reduction in the property valuation resulting from the appeals process. Taxpayers who make partial payments will be liable for penalties on any additional tax due following resolution of the appeals process. SECTION IV. Any ordinance or parts of ordinances in conflict with or inconsistent with this ordinance are hereby repealed.
DONE, RATIFIED AND PASSED in regular session, on this the ______ day of
_______________________, 2018.
ATTEST: ________________________________ L. Keith Brady, Mayor _______________________ Della Hill, City Clerk ________________________________
Cynthia E. Jenkins, Mayor Pro-Tem REVIEWED AS TO FORM: _________________________ ________________________________ Cleatus Phillips, George M. Alexander, Councilmember City Manager
________________________________ _________________________ Rhodes H. Shell, Councilmember C. Bradford Sears, Jr., City Attorney ________________________________
Ray DuBose, Councilmember ________________________________ Dustin Koritko, Councilmember
________________________________ (Vacant), Councilmember
City 2013 2014 2015 2016 2017 2018*
Real and Personal $936,159,264 $1,081,798,682 $1,175,236,951 $1,204,536,961 $1,322,596,403 $1,419,667,563
Motor Vehicles 69,857,690 56,791,200 39,862,510 28,360,230 20,606,520 15,045,190
Mobile Homes 0 0 0 0 0 0
Timber - 100% 0 0 0 0 0 0
Heavy Duty Equipment 0 0 0 0 0 0
Gross Digest $1,006,016,954 $1,138,589,882 $1,215,099,461 $1,232,897,191 $1,343,202,923 $1,434,712,753
Less M & O Exemptions 0 0 0 0 0 0
Net M & O Digest $1,006,016,954 $1,138,589,882 $1,215,099,461 $1,232,897,191 $1,343,202,923 $1,434,712,753
State of Georgia Forest Land
Assistance Grant Value $0 $0 $0 $0 $0 $0
Adjusted Net M & O Digest $1,006,016,954 $1,138,589,882 $1,215,099,461 $1,232,897,191 $1,343,202,923 $1,434,712,753
Gross M & O Millage 9.490 8.805 8.988 9.241 8.709 8.707
Less Rollback 5.120 4.655 4.938 5.191 4.839 4.707
Net M & O Millage 4.370 4.150 4.050 4.050 3.870 4.000
Net Taxes Levied $4,396,294 $4,725,148 $4,921,153 $4,993,234 $5,198,195 $5,738,851
Net Tax $ Increase/(Decrease) $38,569 $328,854 $196,005 $72,081 $204,962 $540,656
Net Tax % Increase/(Decrease) 0.9% 7.5% 4.1% 1.5% 4.1% 10.4%
* Proposed Millage Rate. Actual Millage Rate will be determined by Council at the August 14, 2018 meeting.
PUBLIC NOTICE
The Newnan City Governing Authority does hereby announce that the 2018 millage rate will be set at a meeting to be held at Newnan City Hall on August 14,
2018 at 2:30 PM, and pursuant to the requirements of O.C.G.A. 48-5-32, does hereby publish the following presentment of the current year's tax digest and
levy, along with the history of the tax digest and levy for the past five years. There will be three (3) public hearings at City Hall prior to setting the 2018 millage
rate, as follows: Tuesday, August 7, 2018 at 6:30 PM; Friday, August 10, 2018 at 11:00 AM; and Tuesday, August 14, 2018 at 2:30 PM.
City of NewnanCURRENT 2018 TAX DIGEST AND 5-YEAR HISTORY OF LEVY
City of Newnan, Georgia - Mayor and Council Date: August 4, 2018 Agenda Item: Request for transmittal of the 2018 update to the
Capital Improvements Element (CIE), which includes the Short-Term Work Program (STWP), to the Three Rivers Regional Commission (RC) and the Georgia Department of Community Affairs (DCA)
Prepared and Presented by: Chris Cole, Planner Submitted by: Tracy Dunnavant, Planning & Zoning Director
Purpose: To request official transmittal of the 2018 update to the CIE, including the STWP, to the Three Rivers RC and the Georgia DCA. Background: The Georgia Development Impact Fee Act (GDIFA) was enacted into law in 1990. It sets rules for local governments that wish to charge new development for a portion of the additional capital facilities needed to serve it. Under GDIFA, local governments may impose exactions on developers to help finance the expansion of their infrastructure systems only through an impact fee system and only for the specific types of facilities and infrastructure listed in the law. All local governments that utilize an impact fee system under the GDIFA must include CIEs in their comprehensive plans and update the CIE portion of their plan annually. The STWP is included as a part of the CIE. Per the minimum standards of the planning process, all local governments must hold a minimum of one public hearing prior to the transmittal of each CIE update. The City has previously held the public hearing and staff is now requesting official transmittal of the document to the RC and DCA for review and comments. Formal adoption of the update by this body will be requested once approval is gained by both institutions. Options: A. Adopt the resolution approving transmittal of the 2018 update to the CIE, which includes the
STWP.
Funding: N/A Recommendation: Option A
Attachments: Transmittal resolution Previous Discussions with Council: July 17, 2018
A RESOLUTION AUTHORIZING THE TRANSMITTAL OF THE CITY OF
NEWNAN’S 2018 UPDATE TO THE CAPITAL IMPROVEMENTS ELEMENT,
INCLUDING THE SHORT-TERM WORK PROGRAM, TO THE THREE RIVERS
REGIONAL COMMISSION
CITY OF NEWNAN, GEORGIA
WHEREAS, the City of Newnan has prepared an annual update to a Capital
Improvements Element and Short-Term Work Program; and
WHEREAS, the annual update of the Capital Improvements Element and Short-Term
Work Program was prepared in accordance with the Development Impact Fee Compliance
Requirements and the Minimum Planning Standards and Procedures for Local Comprehensive
Planning established by the Georgia Planning Act of 1989, and a Public Hearing was held on
July 17, 2018 at City Hall.
NOW THEREFORE, IT IS HEREBY RESOLVED, that the Mayor and Council of the
City of Newnan does hereby submit the annual update of the Capital Improvements Element and
Short-Term Work Program covering the one-year period 2018-2019 to the Three Rivers
Regional Commission for Regional Review, as per the requirements of the Georgia Planning Act
of 1989.
This Resolution is adopted this 14th day of August, 2018.
ATTEST:
______________________________
L. Keith Brady, Mayor
______________________________ ______________________________
Della Hill, City Clerk Cynthia E. Jenkins, Mayor Pro Tem
REVIEWED: ______________________________
Rhodes H. Shell, Councilman
______________________________ ______________________________
C. Bradford Sears, Jr., City Attorney George M. Alexander, Councilman
_____________________________ ______________________________
Cleatus Phillips, City Manager Ray Dubose, Councilman
______________________________
Dustin Koritko, Councilman
Comprehensive Plan
2016-2036
Capital Improvements Element
with Short-Term Work Program
2018 Update
TABLE OF CONTENTS
Table of Contents i
I. Introduction……………………………………………………………………….…...1
II. Short-Term Work Program (STWP) Updates and Long-Term and
Ongoing Activities……………………..……….….………………..…….……….2 STWP………………………………………….……………………………………………………….……………..2
Long-Term, Indefinite, and Continuous Activities…………………..…………………………..4
III. Impact Fee Financial Report Updates……….……………....………….…5
IV. Capital Improvements Element (CIE) Project Updates……………..6 Parks and Recreation……………………….……………………………………………………………..….6 Fire Services……………………………………….…………….…….…………….…………………………...6 Police Protection…………………………………….…………………………………………………..……..7 Roads, Streets, and Bridges…………………………………………………………......…………….….7
V. Wastewater Collection and Treatment Updates……………….…….8 Impact Fee Financial Report………………………..…………..…………………………….……..….8
Short-Term Work Program….………………………………….…………….………………….……….9
Long-Term, Indefinite, and Continuous Activities………………………………………………9
Capital Improvements Element………………………….……………………………………………..9
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�1�
I. Introduction
The Georgia Development Impact Fee Act (GDIFA) requires all jurisdictions that levy impact
fees to include a Capital Improvements Element (CIE) within the Community Agenda portion of
their comprehensive plan. Furthermore, GDIFA requires those jurisdictions that prepare a CIE
for their comprehensive plan to update it annually. An annual CIE update includes three
components:
1. An annual update to the Short-Term Work Program (STWP) that covers a five-year
period, which includes the current year plus the next four years.
2. An annual report on impact fee finances.
3. An updated list of all CIE projects that receive funding from impact fees, which covers
the same five-year period as the STWP.
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�2�
II. Short-Term Work Program (STWP) Updates and Long-Term and
Ongoing Activities
Whether or not a jurisdiction is required to have a CIE in their comprehensive plan they
must have a STWP, as required by the Georgia Planning Act. This is necessary to maintain
Qualified Local Government (QLG) status. The STWP is a key implementation tool, which
reflects those activities and strategies the local government has chosen to undertake in the
current five-year period (2018-2022). The City of Newnan has chosen to also provide a long-
term and ongoing activities table for reference.
IMPROVEMENTS | STWP ADDENDUM
Project or Activity
Project
Start
Date
Project
Completion
Date
Estimated
Project
Cost
Portion
Chargeable
to Impact
Fees
Sources of
Funds
(& Share)
Responsible
Party
Develop LINC trail system (Phases 1-4) 2017 2019 $10,035,800 $3,800,000
SPLOST 13,
Impact Fees,
General Fund
City Manager
Acquire a trolley 2015 2019 $100,000 $0 SPLOST 13 Business
Development
Implement gateway signage master plan
and install signage in phases 2014 2019 $250,000 $0 SPLOST 13
Business
Development,
Beautification
Build Fire Station #4 2014 2018 $3,073,797 $1,500,000 SPLOST 13,
Impact Fees City Manager
Improvements to City Hall 2014 2018 $91,500 $0 SPLOST 07 City Manager
Construct McIntosh Parkway 2014 2019 $7,173,000 $2,000,000
Impact Fees,
SPLOST 07,
SPLOST 13,
GTIB Grant
Engineering
Jackson/Jefferson/Clark/Bullsboro
segment traffic study 2015 2018 $75,000 $0
LCI, SPLOST 13,
Match Amount
is $18,750
Engineering
Jackson Street (North) from Elm Street
to Clark Street 2018 2019 $355,350 $0
TBD, City, Match
Amount is
$71,070
Engineering
E. Washington Street from Farmer Street
to Perry Street 2019 2020 $1,234,170 $0
LCI, City, Match
Amount is
$246,834
City
Andrew Street Extension from Augusta
Drive to E. Broad Street 2018 2020 $4,549,000 $2,500,000 Impact Fees, City City
E. Broad/Farmer Signal 2016 2018 $130,000 $0 SPLOST 13 City
Intelligent traffic operations 2016 2019 $200,000 $0 SPLOST 13 Engineering
Obtain fire engine for fire station #4 2016 2018 $500,000 $0 SPLOST 13 Fire
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�3�
Obtain light duty response truck 2016 2018 $200,000 $0 SPLOST 13 Fire
Obtain light duty response truck 2018 2020 $200,000 $200,000 Impact Fees Fire
Acquire a heavy duty vehicle for fire
department 2018 2018 $550,000 $550,000 Impact Fees Fire
Acquire a heavy duty vehicle for fire
department 2019 2019 $600,000 $600,000 Impact Fees Fire
Acquire a heavy duty vehicle for fire
department 2020 2020 $650,000 $650,000 Impact Fees Fire
Work with the Historical Society to
develop an educational program
extolling the benefits of historic
preservation and historic tourism
2014 2019
Staff Time,
Other
materials
$0
City, Historical
Society,
Hotel/Motel Tax,
Grants
(Shares
Unknown)
Historical Society,
Convention &
Visitors Bureau,
PIO, Business
Development
Obtain National Register District
designation for Chalk Level
Neighborhood
2013 2019 $2,000 $0 NURA NURA, Planning &
Zoning
Continue Neighborhood Stabilization
Program (NSP III) 2011 2019 $100,000 $0
Neighborhood
Stabilization
Program Grant
Planning & Zoning,
Housing Authority
Continue Neighborhood Stabilization
Program
(NSP I)
2013 2019 $100,000 $0 NSP Revenue,
NSP Grant
Planning & Zoning,
Housing Authority,
Habitat for
Humanity
Sidewalks along Greison Trail 2014 2019 $400,000 $0 SPLOST 19 Public Works
Sidewalks along Sprayberry Road 2014 2019 $278,000 $0 SPLOST 19 Public Works
Source: City of Newnan
Note: Building, Planning & Zoning, Public Works, Beautification, Information Technology, Police, Fire, Engineering, Business Development refer
to those respective departments of the City of Newnan. County refers to Coweta County. Acronyms used refer to: RC- Three Rivers Regional
Commission, ARC- Atlanta Regional Commission, GRTA- Georgia Regional Transportation Authority, PIO- Public Information Officer, NURA-
Newnan Urban Redevelopment Agency, UWG – University of West Georgia, NCAC – Newnan Cultural Arts Commission, NH – Newnan Hospital.
Other groups referenced, like the Historical Society, represent those organizations servicing either Newnan or Coweta County as a whole.
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�4�
IMPROVEMENTS | STWP ADDENDUM
LONG-TERM, INDEFINITE, AND CONTINUOUS ACTIVITIES*
Project or Activity Project Start
Date
Project
Completion
Date
Estimated
Project Cost
Portion
Chargeable
to Impact
Fees
Sources of
Funds
(& Share)
Responsible Party
Develop LINC trail
system 2017 2027 $27,847,026.90 $3,800,000
Impact
Fees, City,
County
City Manager
Improvements to
Lower Fayetteville
Road
2017 2027 $60,000,000 $2,500,000
Impact
Fees, City,
FHWA
Engineering
Source: City of Newnan
Note: Beautification, Fire, Engineering refer to those respective departments of the City of Newnan.
*Long-Term means any activity that is to begin in or more than five years (2023) from the current year (2018). All activities that have an
indefinite or continuous end date, but a known start date prior to 2023, are included here to have the STWP represent only activities with
known start end dates. Also, it is conceivable that many of the activities with unknown end dates are or may become permanently ongoing
activities.
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�5�
III. Impact Fee Financial Report Updates
The purpose of annually reporting on the financial state of impact fees is to provide an
overview of impact fees collected and spent by category of public facility and service area. As
seen below, there is a report for 2017, which is the last completed year.
ANNUAL FINANCIAL REPORT FOR 2017 Public Facility
Type
Parks and
Recreation Fire Services Police Protection
Roads, Streets, and
Bridges
Total
Service Area City of Newnan City of Newnan City of Newnan City of Newnan
Beginning
Impact Fee
Fund Balance
$1,764,295.13 $328,974.60 $3,829.60 $3,752.21
$2,100,851.54
Impact Fees
Collected $234,893.44 $125,325.12 $0 $114,366.76
$474,585.32
Accrued
Interest $3,669.10 $790.22 $4.37 $86.47
$4,550.16
Project
Expenditures $79,710.50 $0 $3,832.05 $23,827.29
$107,369.84
Impact Fee
Refunds $0 $0 $0 $0 $0
Ending Impact
Fee Fund
Balance
$1,923,147.17
$455,089.94 $1.92 $94,378.15
$2,472,617.18
Impact Fees
Encumbered $0 $0 $0 $0
$0
Source: City of Newnan Finance Department – Fund 375 Impact Fees
Administrative Fees
Three percent of each impact fee is added to the final amount as an administrative fee. This
portion of the impact fee pays for banking fees to maintain the impact fee account and helps
fund the salaries of the administrator who collects the impact fees and other staff members of
the Planning and Zoning Department who update the CIE, prepare financial reports, and other
related activities. For 2017, the only costs associated with implementation were banking fees
and the salaries of those various employees. The amount collected in administrative fees was
$11,984.49.
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�6�
IV. Capital Improvements Element (CIE) Project Updates
A capital improvement is an improvement that increases the service capacity of a public
facility and has a useful life of ten or more years due to new construction or some other action.
The CIE projects tables below show all planned capital improvements with expected completion
dates within the current five-year period.
Capital Improvements Projects: Parks and Recreation
Newnan Capital Improvements Projects - 2018
Public Facility Parks and Recreation
Service Area City Limits
Project Description
Project
Start
Date
Project
End
Date
Estimated
Cost of
Project
Portion
Chargeable
to Impact
Fees
Funding
Sources
Responsible
Party Status
Develop LINC trail system
(Phases 1-4) 2017 2019 $10,035,800
$3,800,000
SPLOST 13,
Impact
Fees,
General
Fund
City Manager
Under
Construction
Source: City of Newnan Planning and Zoning Department
Capital Improvements Projects: Fire Services
Newnan Capital Improvements Projects - 2018
Public Facility Fire Services
Service Area City Limits
Project Description
Project
Start
Date
Project
End
Date
Estimated
Cost of
Project
Portion
Chargeable to
Impact Fees
Funding
Sources
Responsible
Party Status
Obtain fire engine for Fire
Station #4 2016 2018 $500,000 $0 SPLOST 13 Fire Planning
Obtain light duty response
truck 2016 2018 $200,000 $0 SPLOST 13 Fire Planning
Obtain light duty response
truck 2018 2020 $200,000 $200,000
Impact
Fees Fire Planning
Acquire a heavy duty
vehicle for fire department 2018 2018 $550,000 $550,000
Impact
Fees Fire Planning
Acquire a heavy duty
vehicle for fire department 2019 2019 $600,000 $600,000
Impact
Fees Fire Planning
Acquire a heavy duty
vehicle for fire department 2020 2020 $650,000 $650,000
Impact
Fees Fire Planning
Build Fire Station #4 2014 2018 $3,073,797 $1,500,000
SPLOST 13,
Impact
Fees
City
Manager Planning
Source: City of Newnan Planning and Zoning Department
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�7�
Capital Improvements Projects: Police Protection
Newnan Capital Improvements Projects - 2018
Public Facility Police Protection
Service Area City Limits
Project Description
Project
Start
Date
Project
End Date
Estimated
Cost of
Project
Portion
Chargeable
to Impact
Fees
Funding
Sources
Responsible
Party Status
Improvements to Public
Safety Complex 2017 2017 $4,271.27 $4,271.27
Impact
Fees
City
Manager Completed
Capital Improvements Projects: Roads, Streets, and Bridges
Newnan Capital Improvements Projects - 2018
Public Facility Roads, Streets, and Bridges
Service Area City Limits
Project Description
Project
Start
Date
Project
End
Date
Estimated
Cost of
Project
Portion
Chargeable to
Impact Fees
Funding Sources
Responsible
Party
Status
Construct McIntosh
Parkway 2014 2019 $7,173,000 $2,000,000
Impact Fees,
SPLOST 07,
SPLOST 13,
GTIB Grant
Engineering
Under
Construction
Andrew Street Extension
from Augusta Drive to E.
Broad Street
2018 2021 $4,549,000 $2,500,000 Impact Fees, City Engineering Early Concept
Phase
Source: City of Newnan Planning and Zoning Department
* McIntosh Parkway was referred to as East Washington Extension and Greison Trail/Bypass Connector, respectively, in earlier CIEs.
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�8�
V. Wastewater Collection and Treatment Updates
As with the Comprehensive Plan, wastewater collection and treatment is being reported
separately from the other public facilities. This is due to the fact that Newnan Utilities, the
City’s appointed authority for administering public utilities, provides service for this specific
category. The other public facilities included in this update are direct operations of the City.
Newnan Utilities provides all the information for wastewater collection and treatment
concerning the Comprehensive Plan and CIE updates. They also levy and collect the impact fees
for wastewater collection and treatment.
Similar to previous public facilities, those items for wastewater collection and treatment
that have completion dates beyond 2022 are not shown in the CIE and STWP.
ANNUAL FINANCIAL REPORT FOR 2017
Public Facility Type Wastewater Collection and Treatment
Service Area City of Newnan
Beginning Impact Fee Fund
Balance $5,050,370.83
Impact Fees Collected $1,307,142.92
Accrued Interest $0.00
Project Expenditures $1,256,546.00
Administrative Costs $39,215.82
Impact Fee
Refunds $0
Ending Impact Fee Fund Balance $5,061,751.93
Impact Fees Encumbered $0 Source: Newnan Utilities
CITY�OF�NEWNAN��|��Annual�STWP-CIE�Update�2018��
Annual�STWP-CIE�Update�2018� � Page�9�
IMPROVEMENTS | STWP ADDENDUM
Project or Activity Project Start
Date
Project
Completion
Date
Estimated
Project
Cost
Portion
Chargeable
to Impact
Fees
Sources of
Funds
(& Share)
Responsible
Party
Mineral Springs
Upgrade 2016 2021 $4,500,000 $4,500,000
Impact Fees
(100%)
Newnan
Utilities
Collection System
Improvements 2017 2021 $2,000,000 $2,000,000
Impact Fees
(100%)
Newnan
Utilities
IMPROVEMENTS-STWP ADDENDUM
LONG-TERM, INDEFINITE, AND CONTINUOUS ACTIVITIES*
Project or Activity
Project
Start
Date
Project
Completion
Date
Estimated
Project Cost
Portion
Chargeable
to Impact
Fees
Sources of
Funds
(& Share)
Responsible
Party
Phase III – Expansion of
Mineral Springs WPCP Indefinite Indefinite $13,000,000 $13,000,000
Impact Fees
(100%),
Other
Sources
Newnan
Utilities
Phase IV – Expansion
Wahoo Creek Indefinite Indefinite $15,000,000 $15,000,000
Impact Fees
(100%),
Other
Sources
Newnan
Utilities
Land Treatment Indefinite Indefinite $10,000,000 $10,000,000
Impact Fees
(100%),
Other
Sources
Newnan
Utilities
Collection System
Construction Indefinite Indefinite $5,000,000 $5,000,000
Impact Fees
(100%),
Other
Sources
Newnan
Utilities
Source: Newnan Utilities and Wiedeman and Singleton, Inc. *Long-Term means any activity that is to end more than five years (2023) from the current year (2018). It is conceivable that many of the
activities with unknown end dates are or may become permanently ongoing activities. In addition, the figures are not exact totals for the
projects they represent. They are estimates as used in the “Calculation of Impact Fee in 2005” table.
Wastewater Collection and Treatment CIE Newnan Capital Improvements Projects -- 2018
Public Facility Wastewater Collection and Treatment
Service Area City Limits
Project Description Project
Start Date
Project End
Date
Estimated Cost
of Project*
Funding
Sources Status
Influent & Diversion Pump Stations 2015 2017 $3,670,000 Impact Fees
(100%) Completed
Mineral Springs Upgrade 2016 2021 $4,500,000 Impact Fees
(100%) Construction
Collection System Improvements 2017 2021 $2,000,000 Impact Fees
(100%) Planning
City of Newnan, Georgia - Mayor and Council Date: August 14, 2018 Agenda Item: Contract Change Order- Culvert Extension,
McIntosh Parkway Prepared by: Michael Klahr, Public Works Director Purpose: To consider a change order for extending a culvert to accommodate protection of existing utility poles Background: The City is currently under contract with Southeastern Site Development, Inc., for the construction of McIntosh Parkway. After construction began, Georgia Transmission Corporation determined that the stability of two existing utility poles would be compromised from construction of a box culvert in proximity to these existing utility poles. In order to secure an encroachment easement, Georgia Transmission Corporation would require the relocation of these two poles, as well as three additional poles affected. The cost for relocating the five poles is approximately $550,000. Subsequently, our engineers have proposed an alternative for assuring the stability of the existing utility poles, that includes the use of sheet piles and extending the box culvert (still under construction). The cost for extending the box culvert is $150,543.96. Contract unit prices for materials are valid, where applicable. The box culvert is just east of existing McIntosh Parkway, from Roberts Road. Options: A. Approve change order for additional work with Southeastern Site
Development, Inc., for $150,543.96 B. Other action as directed by Council Funding: SPLOST 2013 Recommendation: Option A Attachments: CO Proposal, Southeaster Site Development, Inc. Plan view of extended culvert
ITEM CODE DESCRIPTION UNIT QTY UNIT PRICE SE TOTAL COST
210-0200 GRADING COMPLETE LS 1.00 63,400.00$ 63,400.00$
500-3101 CLASS A CONCRETE CY 158.69 352.50$ 55,938.23$
511-1000 BAR REINF STEEL LB 20,524.00 1.22$ 25,039.28$
163-0232 TEMPORARY GRASSING AC 0.04 435.00$ 17.40$
550-1240 STORM DRAIN PIPE, 24" H 1-10 LF 32.00 55.90$ 1,788.80$
207-0203 TYPE II FOUNDATION BACKFILL MATERIAL CY 106.00 42.50$ 4,505.00$
716-2000 EROSION CONTROL MATS, SLOPES SY 195.00 1.75$ 341.25$
151,029.96$
550-1300 STORM DRAIN PIPE, 30" H 1-10 LF 8 60.75$ $ (486.00)
(486.00)$
150,543.96$
SUBTOTAL
NET CONTRACT CHANGE (ADDITIONAL COST + SAVINGS)
MCINTOSH PARKWAYCULVERT EXTENSION
ADDED TO SCOPE - NOT INSTALLED
SUBTOTAL
REMOVED FROM SCOPE - NOT INSTALLED (SAVINGS)
City of Newnan, Georgia – Mayor and Council
Date: August 14, 2018
Agenda Item: 10 Burch Ave., 136 Spring St., 286 West Washington St., 121 Pinson St., and 180 West
Washington St.
Prepared and Presented by: Adam Cash, Code Enforcement Officer
Submitted by: Bill Stephenson, Chief Building Official
Purpose: To inform Council of the status of 10 Burch Ave., 136 Spring St., 286 West Washington St., 121 Pinson
St. and 180 West Washington St. having been before Council in Public Hearings.
Background: Date of Status Check: August 7, 2018
Property Description Owner
Public Hearing Original #
Of Days
Allowed
Resolution
Deadline
Extended # Of
Days Allowed
Updated
Resolution
Deadline
Status
10 Burch Ave.
Abdul Saeed Kader
March 28, 2017
45 Days
May 12, 2017
180 Days
December
16, 2018
Interior and exterior
progress to structure.
136 Spring St Willie Glen Clay
Estate
January 27, 2015 180 Days July 26, 2015 60 Days September
15, 2018
No Progress
286 West Washington St Irvin Jones Estate February 24, 2015 180 Days August 23, 2015 90 Days October 16,
2018
No Progress
121 Pinson St. Marcus Beasley August 26, 2014 180 days February 22, 2015 180 Days September
11, 2018
No progress to
structure.
180 West Washington St. Render Godfrey September 25, 2017 45 days November 9, 2017 180 Days September
11, 2018
Interior progress to
structure.
Options: 1. Accept status reports, no further action is required.
2. Other direction from Council.
Funding: Not Applicable
Recommendation: Staff is requesting Council’s approval for Option 1.
Previous Discussions
With Council: All have previous history with Council.
CITY COUNCIL REQUEST
From: Richard Mix (Full Circle Toys)
Sent: Monday July 30, 2018
To: Libby Winn
Subject: Madison Street Closure Request – FULL CIRCLE TOYS – Saturday October 13, 2018 - 8am-6pm.
Hi Libby-
It’s that time of year yet again!. We are planning our SIXTH annual Zombie & Super Hero Day for
Saturday October 13 from 10am-2pm.
The same general program as the last 5 years – setup starts at 8 – event starts at 10am and runs through
the late afternoon – we will cleaned up and out of the way before 6pm as in years past.
We would like to request street closure of Madison Street BETWEEN Jefferson St. and Perry Street – no
intersections are affected, and as before, we will leave a path for emergency access. Same exact plans
as before. A map is below for review and reference.
Each year this event raises awareness and thousand of dollars for local charities and hopefully we can
continue our partnership with the City of Carrollton Police Department, Newnan High School, East
Coweta High School, CASA, The Coweta County Library System, Make a Wish, etc., etc. and forward their
causes as well.
We look forward to October and appreciate your assistance getting us on the agenda for city council
approval. Please let me know if you have any questions.
Sincerely,
Richard Mix
Full Circle
17 Jefferson St.
Newnan, GA 30263
770.253.7799 (store 11-6)
770.634.7242 (cell)
CITY COUNCIL MEETING AUGUST 14, 2018
From: Mark Vescio [mailto:[email protected]]
Sent: Monday, July 23, 2018 9:28 PM
To: Mark Vescio <[email protected]>; Libby Winn <[email protected]>
Cc: Mark Cooper <[email protected]>
Subject: Re: Special Event Permit Application Question
Hi Libby,
I just wanted to send you some more detailed information regarding the Fido Fest 5K on September
29th.
First of all, Ashley Park is of course our host and venue. Fido Fest is happening in their parking lot, and
the 5K is their kickoff to the day's festivities.There are two events; the one mile fun run that starts at
8am and stays entirely on Mall property, and the 5K that starts at 830am.
Here is a link to the proposed route; it's a 2 loop course that would start by Best Buy, work its way past
the movie theater, and then take a right turn onto Newnan Crossing Bypass (we'd only take up one lane,
curbside). It will then turn right onto the mall access road, and run against traffic to Ashley Park Blvd
(one lane only), then right onto Ashley Park Dr (one lane only) then back onto mall property to complete
the second loop. It will have a common start/finish line.
http://www.gmap-pedometer.com/?r=7274723
My company and I employ a rolling opening with courses, meaning we will trail the last runner and pick
up cones behind them. Since we go onto surface roads with a lane closure, I know we'd need to hire
police to control the intersections and traffic. With my count, I see 7 posts. We'd keep intersections
open until about 10 min prior to the start, and we'd anticipate all runners to be completely on mall
property by the 45 minute mark of the race.
My company has been producing races all over the Southeast for over 7 years, and we have managed
over 500 events. This is all we do, and we take great pride in producing safe, fun events.
I wanted to see what you would need from the event with regard to permitting, etc. and I'd be happy to
provide all the information you need. If there is anything I can answer or assist with, please don't
hesitate to email or call anytime at 678-895-2631. Thank you in advance for your time, and we look
forward to working with you!
Mark Vescio
Run For It! Productions
www.runforitproductions.com
PO Box 1052
Woodstock, GA 30188
(678) 895-2631
8/2/2018 https://www.gmap-pedometer.com/gp/bookmark/view/id/7278188
https://www.gmap-pedometer.com/gp/bookmark/view/id/7278188 1/2
To view this route online: http://www.gmap-pedometer.com/?r=7278188
http://www.gmap-pedometer.com/gp/bookmark/view/id/7278188
CITY COUNCIL MEETING AUGUST 14, 2018 From: WILLIAM WILSON [mailto:[email protected]] Sent: Tuesday, July 24, 2018 1:04 PM To: Libby Winn <[email protected]> Subject: Early Ford V8 club Ms. Winn: the Peach State Early Ford V8 Club of Fayetteville is planning a day trip and lunch event on the Square in Newnan on August 18. We would like to park up to 30 early Ford V8’s on the square as we enjoy lunch at one of the restaurants and ice cream at the nearby parlor. This is not panned as a formal car show, but we would like to make our vintage vehicles available to the public while parked for viewing and questions and answers. We anticipate up to 30 cars being parked for two to three hours. Several club members are residents of Newnan and Coweta County. Our question is: may we get about 30 spaces set aside from 11:30 am to about 2:30 pm on the Golden’s Corner side of the Square? This informal display would be an attractive event to public passers by, benefitting businesses on the square and providing a brief but nostalgic respite for everyone. We will travel as a motorcade from an earlier gathering point. We do not anticipate causing or adding to any traffic congestion on the Square. We feel this would be a plus for the City and the public. We thank you for your kind and positive consideration. Bill Wilson, Early Ford V8 Club if America. 404-660-6902 [email protected]
X0Fd4lrOZEeg] &fftou$l q6qr gtore ryp dayaFr:oe
qornq3 1s11deg '1e.ru.ra3 4[
ts ppor8 14
.*. 3d 'v.13'dilolS$ uopuay3cyl aq1
I$
s.ra1mor9,aag ecvqd€5
$ ueu++1t1 LeaE puc ]eal Iv elzto soullloo
$lilH}*",,,,0", 6$sarr11s1
ira66o1 g 3fi !t
ueu*ahi luirJr lulo eiJtr
.AS a,urh.g a ,l .rr i i.ip ct
$ uo$utqseii1 l
13a]€| N teanl
, "' '6,
66t'"Tifl|i:l''Y\
spmau
cr'ore*zuesou lS,,
'3 a0Joa!
0 "rnrba unor,,
c
€t@
a unoc elPqordt lluno3 eF,\^oJ
6''' " r?8 rlsns pua
YSVI ela/\io3
6,s,e:puax$
6 , sJalaMac uP6ro!,s]auj.l159 )3aupas
$ suorsraci!6 pco-l
$ sai"a
"1iii,tf lot6Y{sei^ n
au{slni lBqj
s,talndujoo usrrruailri
eisarl er 4$
^. & lfi,t# HM3 trE
{ullnN sEuluur6e8 MaN
3d sdlitlr.td duuqoflo a3lilo *\e-1
A1dsrc11aal ru1 s,laspur1
dnoje aouern$rlUeU/\ AN
z s,Pjpusx
6
og@
asnoqajsjll aq
s
al![ates dey'i
8/2/2018 Google Maps
https://www.google.com/maps/@33.3744425,-84.7999314,19z 1/1
Map data ©2018 Google 50 ft
AUGUST7,2018
LibbyWinnc/o:NewnanCityCouncil25LaGrangeStreetNewnan,GA30263
DearLibby,
We are getting ready to host our second annual Pumpkins in the Park event on October 20, 2018 at Greenville Street Park.
In keeping with City protocol, I am writing this letter to request all parking spaces adjacent to Greenville Street Park to be blocked for this event. We would also like to petition City Council to allow us to invite local Food Trucks out much like Main Street Newnan does with Summer NewnaNights. Each truck would be allowed to sell food items to the people that come through the park for our event. We would need the spots to be blocked off from 3pm until 8pm.
We also would request that we be able to take up nominal fees for entry into contests that will take place at this event; everything else will be free of charge.
We thank you for your time and consideration of these requests.
Warmregards,
JasonWalton
COMMUNITY OUTREACH PASTOR // FOUNDATION CHRISTIAN CHURCH
Foundation Christian Church 30-A East Washington St. Newnan, GA 30263 Tel (770) 396-2220 [email protected] www.FoundationNewnan.com
REQUEST FROM NHS TO CHANGE THE DATE OF PREVIOUSLY APPROVED STUDENT VET CONNECT 5K FROM NOVEMBER 17TH TO NOVEMBER 10TH WHICH IS THE SAME DATE AS THE VETERAN’S PARADE
THE 5K BEGINS AT 8:15 AM AND THE PARADE BEGINS AT 10:00 AM
From: Henderson, Frank [mailto:[email protected]] Sent: Tuesday, August 07, 2018 2:48 PM To: Libby Winn <[email protected]>
Subject: vets 5k
CHANGE DATE
All of the plans are the same for us, route, times, etc... We coordinated with the parade to make
sure we were helping each other out. Sorry for the inconvenience. Nothing changes but the
date Nov. 10th. Thanks
Frankey Henderson, Ed.S
AP European History/Advanced World War 2
Varsity Girls Soccer Head Coach
Pride, Professionalism, Teamwork
5th Annual Newnan High School Student-Vet Connect Veterans Relief Fund 5k and and dog
walk
When: Saturday November 10th, 2018 beginning at 8:15 am
Where: Newnan High School on Armory Road
Run route: This year we will start and finish at the Newnan High School Armory Road location next to
the National Guard Armory. The run will travel past historic Newnan homes and the Coweta County
Veterans Memorial park.
Details: NHS students $20.00 all other participants $25.00 (fun run is free)
All money will directly benefit local Coweta County Veterans through the local VFW, American
Legion Veterans Relief fund and Newnan High School Student Vet Connect.
All participants who register either on Active.com or by mail will receive a Run T-shirt and
packet. T-shirts and packets can be picked up on Friday November 16th at the Newnan High
located on Armory Road between 5:30-7:00 pm. Those that register the day of the event may
not receive a T-shirt. Shirts will not be reordered.
RUNNERS MEDALS WILL BE AWARDED TO TOP THREE FINISHERS IN THESE AGE GROUPS BY
GENDER: 12 and under, 13-19, 20-29, 30-39,40-49, 50-59, 60-69, 70-79, 80+
Water and snacks will be provided as well as event day activities for kids and adults.
Sponsors: All race sponsors will be represented on race day banner and shirts
Medal of Honor Sponsor: 750.00-1000.00 Will co-host the event and receive their name and logo on the
shirts, 4 race entries, can place materials in race day packet, will be given a race day table and place on
race day banner.
Silver Star Sponsors: 500.00-750.00 Will receive large recognition on all event promotions, 3 race day
entries, can place items in race day packet and will be given a table on race day.
Bronze Star Sponsors: 250.00-500.00 Will receive recognition on all event promotions, 2 race day
entries, can place items in race day packet and will be given a table on race day.
Enlisted Sponsors: 100.00-250.00 will receive recognition on t-shirts, 1 race day entry; can place items in
race day packet
Course Description The 5-kilometer (3.1 mile) loop course starts and finishes at the Newnan High School Armory. The course will take you through some beautiful parts of old Newnan.
Entry Fee and Awards Entry fee will be 25.00 for non-NHS students. Student fee is 20.00 (there is no charge for the fun run) T-shirts will be provided to all who pre-register by November 9th. You may also purchase a shirt on the day of the event for 15.00$. (Limited number available)The entry fee is non refundable. Proceeds benefit the Veterans Relief Fund of Coweta Co. Awards will be given to top three finishers male and female based on age group. Registration and Packet Pick Up At Newnan High School on Armory Road on Friday, November 16th from 5:30 to 7:00 p.m. and on race day from 7:00 am to 7:45 am. Races will begin at 8:15. Parking Will be available all around the Newnan High Campus and is free of charge. Plenty of parking is available.
OFFICIAL RACE ENTRY FORM Enter all information below, including shirt size, and sign waiver, which is required to participate. Name __________________________ ______ Age_____ Male [ ] Female [ ] Address____________________________ City/State/ ZIP________ Date__________Email address: ______________________________ I am registering for the: 5K Run Dog YES NO Shirt Size:______________ youth sizes ______________ ENTRY FEE ENCLOSED: $_____ I would like to make an additional tax-deductible donation to the Veterans Relief fund in the amount of $________. Mail Entry To: Newnan High School History Dept. C/O Veterans 5k 190 Lagrange St. Newnan, GA 30263 or drop off at main office. Make checks payable to: NHS Social Studies Dept. C/O Veteran’s 5K Email for more information: [email protected] Website: http://www.cowetaschools.org/nhs/quesinberry/ssweb/ RACE WAIVER – PLEASE READ AND SIGN TO PARTICIPATE I know that running a road race is a potentially hazardous activity. I should not participate unless I am medically able and properly trained. I agree to abide by any decision of a race official relative to my ability to safely complete the event. I assume all risks associated with running this event, including, but not limited to, falls, contact with other participants, the effects of weather, traffic, and conditions of the road, all such risks being known and understood by me, having read this waiver and knowing these facts and in consideration of accepting my entry, I, for myself and anyone entitled to act on my behalf, waive and release Newnan High School and the Coweta County Board of Education and all, sponsors and agencies and municipalities, their representatives, and successors for all claims or liability of any kind arising out of my participation in this event. I grant permission to all of the foregoing to use any photographs, motion pictures, recordings or any other record of this event for any legitimate purpose. ________________________________ _____________________________ Signature of participant Signature of parent/guardian of participant under 18
From: Jay Duhon [mailto:[email protected]] Sent: Tuesday, August 07, 2018 3:23 PM To: Libby Winn <[email protected]> Subject: Parking spot reservation request for Aug. 18th 2018
Hello, my name is Jay Duhon and I am assisting the Newnan McIntosh Masonic Lodge #735
with a benefit ride. I would like to request to reserve eight parking spots on W. Washington St.
on the side of Alamo (ending location of ride) on August 18th starting at 10:00am until 2:00pm.
The benefit is to raise funds for the McIntosh Lodge Scholarship. Provided are pictures of
parking area in question. As previously stated the spots requested will be on Alamo side of W.
Washington St. Thank you for your time.
Jay Duhon 678-315-2943
Motion to Enter into Executive Session
I move that we now enter into closed session as allowed by O.C.G.A. §50-14-4 and pursuant to advice by the City Attorney, for the purpose of discussing
And that we, in open session, adopt a resolution authorizing and directing the Mayor or
presiding officer to execute an affidavit in compliance with O.C.G.A. §50-14-4, and that this body ratify the actions of the Council taken in closed session and confirm that the
subject matters of the closed session were within exceptions permitted by the open meetings law.
Motion to Adopt Resolution after Adjourning Back into Regular Session
I move that we adopt the resolution authorizing the Mayor to execute the affidavit stating that the subject matter of the closed portion of the council meeting was within the
exceptions provided by O.C.G.A. §50-14-4(b).