cedar from flammable gas safety point of view

16
31/03/11 FV 1 CEDAR from flammable gas safety point of view

Upload: malory

Post on 22-Jan-2016

36 views

Category:

Documents


0 download

DESCRIPTION

CEDAR from flammable gas safety point of view. CEDAR – ČErenkov Differential counter with Achromatic Ring focus. Pumping outlet. Diaphragm motor and diaphragm opening potentiometer – inside of motor cover. Motors and gas control unit – will be replaced. 8 q uartz w indows. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CEDAR from flammable gas safety  point of view

FV 131/03/11

CEDAR from flammable gas safety point of view

Page 2: CEDAR from flammable gas safety  point of view

VF 231/03/11

CEDAR – ČErenkov Differential counter with Achromatic Ring focus

Pumping outlet

Diaphragm motor and diaphragm opening potentiometer – inside of motor cover

Motors and gas control unit – will be replaced

8 quartz windows

Page 3: CEDAR from flammable gas safety  point of view

VF 331/03/11

CEDAR inside

Page 4: CEDAR from flammable gas safety  point of view

VF 431/03/11

CEDAR – in the TTC8

Page 5: CEDAR from flammable gas safety  point of view

VF 531/03/11

CEDAR – Vessel and gas

Vessel: Geometry:

Total length - 6.2m Main vessel length - 4.5m Inner diameter - 53.4cm

Steel pipe Polyurethane foam thermal insulation – 10cm around the

counter Gas:

Volume -1.1m3

Composition – 100% H2

Operating pressure – between 2.5 and 3.5 bar absolute, up to 4 bar during a pressure scan

Page 6: CEDAR from flammable gas safety  point of view

VF 631/03/11

CEDAR – gas system, nitrogen enclosure

H2N2

Page 7: CEDAR from flammable gas safety  point of view

VF 731/03/11

Pumping outlet

Diaphragm motor and diaphragm opening potentiometer – inside of motor cover

Safety valve

PT100

Big O-ring of the nose

Entrance window

Page 8: CEDAR from flammable gas safety  point of view

VF 831/03/11

CEDAR – control unit below the nose

Page 9: CEDAR from flammable gas safety  point of view

VF 931/03/11

CEDAR – list of possible leaks (Jens Spanggaard) Entrance Window Quartz Windows Big o-ring for the noise Top vacuum valve Top safety valve Diaphragm motor axe feed-trough (on top of H2!) Gas pipe for pressure gauge (Should be Ex

proof !) Gas pipe for servo regulator Gas pipe for inlet/outlet Big o-ring for end-cap End window

Page 10: CEDAR from flammable gas safety  point of view

VF 1031/03/11

Entrance Window

Quartz Windows

Big o-ring for the noise

Top vacuum and safety valves

Diaphragm motor axe feed-trough

Gas pipe for pressure gauge

Big o-ring of end cup

Exit Window

Page 11: CEDAR from flammable gas safety  point of view

VF 1131/03/11

CEDAR – other features Equipment inside of nitrogen enclosure

240 photomultipliers operating at high voltage Preamplifiers and signal-shaping electronics Heat exchangers

Electrical equipment of CEDAR (all motors and end-switches are 24V) Diaphragm end-switches – inside the H2 volume ( !) Diaphragm motor and Diaphragm opening potentiometer

– inside of motor cover, on top of the front flange Control unit below the nose Horizontal and Vertical Position motors with end-switches

and position potentiometers – downstream support 4 PT100’s: entrance window, front and back flanges, air

Page 12: CEDAR from flammable gas safety  point of view

VF 1231/03/11

CEDAR – Noise conceptual design

Page 13: CEDAR from flammable gas safety  point of view

VF 1331/03/11

From the minutes of H2 safety CEDAR meeting 24-11-2008 (Lau Gatignon) The diaphragm motors,  the PMTs and the control unit below the nose must be enclosed in a

Nitrogen enclosure at slight overpressure. Inside this enclosure a Hydrogen detector must be placed. No special precaution is required for the X/Y motors for the Cedar alignment. Quartz Windows

The Hydrogen bottle will be stored in a gas building outside the cavern. Gas will be brought to the counter via a stainless tube of minimum diameter 6 mm. The gas pressure will be limited by a safety valve to a maximum of about 4 bars. This valve will be inspected regularly like all pressure valves. The return tube must be stainless steel as well and of at least 8 mm diameter, to avoid the build up of local gas concentrations. It should be equipped with no-return valves. It should release the gas outside at a sufficient height (about 3 meters above ground level).

The CEDAR pressure pumps must be Hydrogen rated (“EX” norm). Similarly the nearby pumps in the beam vacuum sections just upstream and downstream. Note that the vacuum window may be damaged by the Cedar entrance or exit windows in case they rupture.

Two domes shall be installed, one above the nose and control unit and one above the exit window. Both shall be equipped with Hydrogen detectors. In case all purged Nitrogen enclosures are equipped with Hydrogen detectors, the domes are probably not necessary.

In case of rupture of one of the windows or Hydrogen detection by one of the detectors, a Level-3 alarm will be sent automatically to the Fire Brigade. And the Cedar pumps, motors and PMTs, as well as nearby beam vacuum pumps will be stopped. Sector valves will be closed in the nearby beam line vacuum sectors.

Procedures will be made available that describe all steps in the normal operation of the CEDAR (empty before filling with Hydrogen, how to vent), as well in case of e.g. leak detection or window rupture. This includes the technical intervention, but also whom to inform and what alarms to send where.

Page 14: CEDAR from flammable gas safety  point of view

VF 1431/03/11

Spares

Page 15: CEDAR from flammable gas safety  point of view

VF 15

Beam pipe connection

31/03/11

The CEDAR must be connected to the vacuum beam pipe at both ends in such a way that a hydrogen leak is not accompanied by any admixture of air in order to prevent any risk of explosion. An important secondary consideration is that damage to sensitive detectors must be minimised by mitigating the effects of hydrogen leaks and the shock wave resulting from the potential rupture of the window at either end of the CEDAR

Page 16: CEDAR from flammable gas safety  point of view

VF 1631/03/11

CEDAR – gas operation

Before introducing any H2 gas, the entire system (including the detector) is filled with clean and dry N2

The detector is then pumped to vacuum using a dry membrane vacuum pump down to 5 mbar and willed with H2 gas

At the end of a physics run the Hydrogen is pumped out and the detector is refilled with nitrogen.