ce pt univ ersity april 2011 - pas city... · ril 2011 manc and ook (: city ersity ... kille dharur...
TRANSCRIPT
![Page 1: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/1.jpg)
PSuD P
CE
Ap
erforupplyData B
art II
EPT Univ
pril 2011
mancy and Book (
: City
versity
1
ce Ben Sanit(2008
Profi
nchmtation809)
iles (C
arkinn in Ma
Class C
ng of Uahara
C Citie
Urbanashtra
es)
n Watea:
er
![Page 2: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/2.jpg)
Performance Benchmarking of Urban Water Supply
and Sanitation in Maharashtra: Data Book (2008‐09)
PART II: City Profiles (Class C Cities)
CEPT University
April 2011
![Page 3: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/3.jpg)
PART II: City Profiles (Class C)
Page No.
Abbreviations i
Measurement Units & Symbols ii
Introduction: City Profiles iii
List of Class C Cities
Ahmadpur 1
Akkalkot 3
Alandi 5
Alibag 7
Ambad 9
Ashta 11
Ausa 13
Balapur 15
Bhagur 17
Bhokar 19
Bhokardan 21
Bhoom 23
Bhor 25
Biloli 27
Brahmapuri 29
Chandur Bazar 31
Chandur Rly 33
Chikhaldara 35
Darwha 37
Daryapur 39
Desaiganj 41
Deulgaon Raja 43
Devlali Pravara 45
Dhamangaon Railway 47
Dharangaon 49
Dharmabad 51
Digras 53
Dudhani 55
Erandol 57
Faizpur 59
Gadhinglaj 61
Gangapur 63
Georai 65
Ghatanji 67
Hadgaon 69
Igatpuri 71
Indapur 73
![Page 4: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/4.jpg)
List of Class C Cities Page No.
Jalgaon (Jamod) 75
Jamner 77
Jawhar 79
Jejuri 81
Jintur 83
Junnar 85
Kagal 87
Kalamb 89
Kalamnuri 91
Kalmeshwar 93
Kandhar 95
Kannad 97
Karjat 99
Karmala 101
Katol 103
Khapa 105
Khed 107
Khuldabad 109
Kille Dharur 111
Kinwat 113
Kundalwadi 115
Kurduvadi 117
Kurundvad 119
Loha 121
Lonar 123
Mahabaleshwar 125
Mahad 127
Maindargi 129
Malkapur 131
Malwan 133
Mangalvedhe 135
Mangrulpir 137
Manwath 139
Matheran 141
Mehkar 143
Mhaswad 145
Mohpa 147
Mool 149
Morshi 151
Mowad 153
Mudkhed 155
Mukhed 157
Murgud 159
Murtijapur 161
Murud 163
Murum 165
Naldurg 167
![Page 5: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/5.jpg)
List of Class C Cities Page No.
Nandgaon 169
Nandura 171
Narkhed 173
Nawapur 175
Nilanga 177
Paithan 179
Panchgani 181
Pandharkaoda 183
Panhala 185
Paranda 187
Parola 189
Partur 191
Pathardi 193
Pathri 195
Patur 197
Pauni 199
Pen 201
Pulgaon 203
Purna 205
Rahimatpur 207
Rahta Pimplas 209
Rahuri 211
Rajapur 213
Rajura 215
Ramtek 217
Raver 219
Risod 221
Roha 223
Sailu 225
Sangola 227
Sasvad 229
Satana 231
Savda 233
Sawantwadi 235
Sawner 237
Shahade 239
Shendurjana 241
Shirur 243
Shrigonda 245
Shrivardhan 247
Sindi 249
Sindkhed Raja 251
Sinnar 253
Sonpeth 255
Talode 257
Tasgaon 259
Telhara 261
![Page 6: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/6.jpg)
List of Class C Cities Page No.
Tirora 263
Trimbak 265
Tuljapur 267
Umari 269
Umarkhed 271
Umerga 273
Uran 275
Vadgaon Kasba 277
Vaijapur 279
Vengurla 281
Wai 283
Warud 285
Yawal 287
Yevla 289
![Page 7: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/7.jpg)
i
Abbreviations
Colln. Effi. Collection efficiency
Comm. Community
HH Household
Indiv. Individual
MSW Municipal solid waste
NRW Non‐revenue Water
Nos. Numbers
SW Solid waste
WS Water supply
WW Waste water
![Page 8: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/8.jpg)
ii
Measurement Units & Symbols
km kilometer
km2 square kilometer
l/c/d or lpcd liters per capita per day
M meter
m3 cubic meter
m3/d cubic meter per day
m3/d/c cubic meter per day per capita
mm millimeter
n.a. not available or not applicable
% percent
ʹʹ inch
& and
Sq mi square mile
Sq km square kilometer
Rs/Kl Rupees per kilolitre
![Page 9: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/9.jpg)
iii
Introduction: City Profiles
The urban local bodies (ULBs) in India have a huge databank about various day to day activities and
responsibilities that they carry out. Though, it is not always available in a way, which could effectively
communicate to city managers about service levels and its quality. Hence, quantification of services is not
done and fund allocations are made in an ad hoc manner.
As part of the initial activities under Performance Measurement, PAS Project has collected detailed
information from ULBs in two Gujarat and Maharashtra. All key indicators for assessment of urban water
supply and sanitation services in these two states have been compiled. Also compiled are the local action
indicators.
The following ‘City Reports’ have been designed to provide a snapshot of all the key performance indicators
on the four sectors of water supply, wastewater, solid waste management and storm water drainage. It also
captures certain context information to provide a better understanding and to set a background.
![Page 10: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/10.jpg)
Ahmadpur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Latur Slum population 0
Area (sq. km.) 26 Slum households 0
Total city population 45,000 Total annual city capital receipts (`) 0
Total households 7,251 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 1,738 Total annual city revenue receipts (`) 46,941,000
Total municipal staff 90 Total annual city revenue expenditure (`) 46,633,000
WATER SUPPLYTotal water produced (MLD) 2.8
Ground water (MLD) 0.0
Surface water (MLD) 2.8
Average daily volume treated (MLD) 2.8
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 3,711.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 17.0
No. of days of supply in a month 6.0
Annual revenue receipts from water (`) 46,941,000.0
Annual revenue expenditure on water (`) 18,546,550.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 10.0
Waste collected (TPD) 10.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,509.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
1
![Page 11: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/11.jpg)
Ahmadpur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
2
![Page 12: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/12.jpg)
Akkalkot Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 8
District Solapur Slum population 6,942
Area (sq. km.) 4 Slum households 1,106
Total city population 44,336 Total annual city capital receipts (`) 53,251,190
Total households 7,684 Total annual city capital expenditure (`) 26,213,268
Density (persons per sq. km.) 10,076 Total annual city revenue receipts (`) 39,231,803
Total municipal staff 129 Total annual city revenue expenditure (`) 35,138,786
WATER SUPPLYTotal water produced (MLD) 4.6
Ground water (MLD) 0.1
Surface water (MLD) 4.5
Average daily volume treated (MLD) 4.2
Installed storage capacity (MLD) 2.6
Total water connections (nos.) 3,710.0
Water connections in slums (nos.) 628.0
Area covered by network (sq. km.) 4.4
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 4,787,063.0
Annual revenue expenditure on water (`) 8,911,193.0
Annual capital expenditure on water (`) 6,114,582.0
WASTE WATERArea covered by waste water network (sq. km.) 4.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 505,903.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 15.0
Waste collected (TPD) 11.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,020.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 30,220.0
Annual revenue expenditure on SW (`) 142,887.0
Annual capital expenditure on SW (`) 0.0
3
![Page 13: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/13.jpg)
Akkalkot Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
4
![Page 14: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/14.jpg)
Alandi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Pune Slum population 979
Area (sq. km.) 3 Slum households 246
Total city population 23,713 Total annual city capital receipts (`) 25,490,000
Total households 5,392 Total annual city capital expenditure (`) 957,980
Density (persons per sq. km.) 8,783 Total annual city revenue receipts (`) 35,079,288
Total municipal staff 27 Total annual city revenue expenditure (`) 11,160,462
WATER SUPPLYTotal water produced (MLD) 5.0
Ground water (MLD) 1.0
Surface water (MLD) 4.0
Average daily volume treated (MLD) 2.5
Installed storage capacity (MLD) 2.2
Total water connections (nos.) 2,968.0
Water connections in slums (nos.) 3.0
Area covered by network (sq. km.) 3.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 4,067,000.0
Annual revenue expenditure on water (`) 4,170,346.0
Annual capital expenditure on water (`) 324,005.0
WASTE WATERArea covered by waste water network (sq. km.) 1.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 1.1
Open drains (sq. km) 0.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 396,398.0
Annual revenue expenditure on WW (`) 1,015,437.0
Annual capital expenditure on WW (`) 603,262.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.5
Waste collected (TPD) 5.3
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,435.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,225,770.0
Annual capital expenditure on SW (`) 30,713.0
5
![Page 15: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/15.jpg)
Alandi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
6
![Page 16: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/16.jpg)
Alibag Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Raigad Slum population 1,100
Area (sq. km.) 2 Slum households 253
Total city population 22,567 Total annual city capital receipts (`) 48,940,095
Total households 5,037 Total annual city capital expenditure (`) 28,318,958
Density (persons per sq. km.) 12,537 Total annual city revenue receipts (`) 62,808,071
Total municipal staff 95 Total annual city revenue expenditure (`) 22,258,562
WATER SUPPLYTotal water produced (MLD) 5.5
Ground water (MLD) 0.0
Surface water (MLD) 5.5
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 8.8
Total water connections (nos.) 2,889.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.8
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 7,185,802.0
Annual revenue expenditure on water (`) 14,245,216.0
Annual capital expenditure on water (`) 14,045,216.0
WASTE WATERArea covered by waste water network (sq. km.) 2.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 1.0
Open drains (sq. km) 1.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 348,900.0
Annual revenue expenditure on WW (`) 2,013,874.0
Annual capital expenditure on WW (`) 613,076.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 9.0
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,337.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,750.0
Annual revenue expenditure on SW (`) 5,376,665.0
Annual capital expenditure on SW (`) 5,376,665.0
7
![Page 17: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/17.jpg)
Alibag Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
8
![Page 18: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/18.jpg)
Ambad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Jalna Slum population 7,969
Area (sq. km.) 12 Slum households 1,264
Total city population 30,000 Total annual city capital receipts (`) 49,569,500
Total households 5,671 Total annual city capital expenditure (`) 68,822,001
Density (persons per sq. km.) 2,500 Total annual city revenue receipts (`) 10,209,037
Total municipal staff 71 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 1.5
Ground water (MLD) 0.0
Surface water (MLD) 1.5
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 13.5
Total water connections (nos.) 2,476.0
Water connections in slums (nos.) 285.0
Area covered by network (sq. km.) 10.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 2,090,439.0
Annual revenue expenditure on water (`) 2,620,454.0
Annual capital expenditure on water (`) 1,866,773.0
WASTE WATERArea covered by waste water network (sq. km.) 8.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 8.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 7.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,250.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 35,840.0
Annual capital expenditure on SW (`) 5,338,106.0
9
![Page 19: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/19.jpg)
Ambad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
10
![Page 20: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/20.jpg)
Ashta Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 12
District Sangli Slum population 10,761
Area (sq. km.) 57 Slum households 2,206
Total city population 40,164 Total annual city capital receipts (`) 31,000,000
Total households 7,494 Total annual city capital expenditure (`) 99,071,000
Density (persons per sq. km.) 705 Total annual city revenue receipts (`) 28,616,000
Total municipal staff 50 Total annual city revenue expenditure (`) 9,495,000
WATER SUPPLYTotal water produced (MLD) 1.4
Ground water (MLD) 0.0
Surface water (MLD) 1.4
Average daily volume treated (MLD) 1.4
Installed storage capacity (MLD) 6.8
Total water connections (nos.) 1,919.0
Water connections in slums (nos.) 50.0
Area covered by network (sq. km.) 8.5
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,539,000.0
Annual revenue expenditure on water (`) 3,750,000.0
Annual capital expenditure on water (`) 25,626,000.0
WASTE WATERArea covered by waste water network (sq. km.) 0.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.6
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,526.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 16,000.0
Annual revenue expenditure on SW (`) 286,000.0
Annual capital expenditure on SW (`) 2,412,000.0
11
![Page 21: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/21.jpg)
Ashta Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
12
![Page 22: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/22.jpg)
Ausa Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Latur Slum population 7,035
Area (sq. km.) 5 Slum households 851
Total city population 37,984 Total annual city capital receipts (`) 33,587,635
Total households 6,377 Total annual city capital expenditure (`) 32,970,913
Density (persons per sq. km.) 7,034 Total annual city revenue receipts (`) 45,808,388
Total municipal staff 63 Total annual city revenue expenditure (`) 47,402,970
WATER SUPPLYTotal water produced (MLD) 2.2
Ground water (MLD) 0.0
Surface water (MLD) 2.2
Average daily volume treated (MLD) 1.8
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 2,612.0
Water connections in slums (nos.) 355.0
Area covered by network (sq. km.) 4.3
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,184,944.0
Annual revenue expenditure on water (`) 4,596,608.0
Annual capital expenditure on water (`) 3,055,878.0
WASTE WATERArea covered by waste water network (sq. km.) 3.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 12.0
Waste collected (TPD) 13.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,500.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
13
![Page 23: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/23.jpg)
Ausa Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
14
![Page 24: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/24.jpg)
Balapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Akola Slum population 0
Area (sq. km.) 17 Slum households 0
Total city population 43,156 Total annual city capital receipts (`) 0
Total households 6,375 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 2,569 Total annual city revenue receipts (`) 659
Total municipal staff 69 Total annual city revenue expenditure (`) 577
WATER SUPPLYTotal water produced (MLD) 4.6
Ground water (MLD) 0.6
Surface water (MLD) 4.0
Average daily volume treated (MLD) 5.0
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 3,098.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 30.6
Annual revenue expenditure on water (`) 42.8
Annual capital expenditure on water (`) 43.2
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 2.7
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 2.9
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.8
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,375.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 12.3
Annual revenue expenditure on SW (`) 22.1
Annual capital expenditure on SW (`) 22.1
15
![Page 25: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/25.jpg)
Balapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
16
![Page 26: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/26.jpg)
Bhagur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Nashik Slum population 925
Area (sq. km.) 1 Slum households 185
Total city population 14,325 Total annual city capital receipts (`) 20,741,251
Total households 2,754 Total annual city capital expenditure (`) 7,432,210
Density (persons per sq. km.) 20,464 Total annual city revenue receipts (`) 13,902,728
Total municipal staff 52 Total annual city revenue expenditure (`) 12,237,177
WATER SUPPLYTotal water produced (MLD) 1.3
Ground water (MLD) 0.0
Surface water (MLD) 1.3
Average daily volume treated (MLD) 1.1
Installed storage capacity (MLD) 12.6
Total water connections (nos.) 1,600.0
Water connections in slums (nos.) 50.0
Area covered by network (sq. km.) 0.7
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,647,411.0
Annual revenue expenditure on water (`) 1,830,429.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.5
Open drains (sq. km) 0.1
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 178,310.0
Annual revenue expenditure on WW (`) 2,082,143.0
Annual capital expenditure on WW (`) 1,682,893.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.0
Waste collected (TPD) 4.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,086.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 469,575.0
Annual capital expenditure on SW (`) 669,773.0
17
![Page 27: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/27.jpg)
Bhagur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
18
![Page 28: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/28.jpg)
Bhokar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Nanded Slum population 0
Area (sq. km.) 19 Slum households 0
Total city population 32,651 Total annual city capital receipts (`) 0
Total households 6,530 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 1,728 Total annual city revenue receipts (`) 0
Total municipal staff 1 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 1.2
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.9
Total water connections (nos.) 0.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.0
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
19
![Page 29: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/29.jpg)
Bhokar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
20
![Page 30: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/30.jpg)
Bhokardan Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Jalna Slum population 2,996
Area (sq. km.) 3 Slum households 526
Total city population 25,000 Total annual city capital receipts (`) 29,611,985
Total households 3,300 Total annual city capital expenditure (`) 19,749,517
Density (persons per sq. km.) 9,615 Total annual city revenue receipts (`) 36,932,844
Total municipal staff 12 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 1.1
Ground water (MLD) 0.2
Surface water (MLD) 0.9
Average daily volume treated (MLD) 1.0
Installed storage capacity (MLD) 0.9
Total water connections (nos.) 2,394.0
Water connections in slums (nos.) 472.0
Area covered by network (sq. km.) 2.6
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,411,081.0
Annual revenue expenditure on water (`) 3,431,980.0
Annual capital expenditure on water (`) 3,475,896.0
WASTE WATERArea covered by waste water network (sq. km.) 1.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 2.5
Waste collected (TPD) 2.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,097.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 4,238,770.0
Annual capital expenditure on SW (`) 5,792,114.0
21
![Page 31: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/31.jpg)
Bhokardan Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
22
![Page 32: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/32.jpg)
Bhoom Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Osmanabad Slum population 0
Area (sq. km.) 5 Slum households 0
Total city population 21,000 Total annual city capital receipts (`) 22,191,000
Total households 3,750 Total annual city capital expenditure (`) 22,282,000
Density (persons per sq. km.) 4,565 Total annual city revenue receipts (`) 12,770,000
Total municipal staff 80 Total annual city revenue expenditure (`) 22,133,000
WATER SUPPLYTotal water produced (MLD) 2.1
Ground water (MLD) 0.4
Surface water (MLD) 1.7
Average daily volume treated (MLD) 1.7
Installed storage capacity (MLD) 4.3
Total water connections (nos.) 2,874.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.5
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,502,000.0
Annual revenue expenditure on water (`) 2,268,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.8
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 1,217,000.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 2.0
Waste collected (TPD) 2.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,673.0
Waste segregation at source (Y/N) nd
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,978,000.0
Annual capital expenditure on SW (`) 0.0
23
![Page 33: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/33.jpg)
Bhoom Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
24
![Page 34: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/34.jpg)
Bhor Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Pune Slum population 0
Area (sq. km.) 8 Slum households 0
Total city population 22,500 Total annual city capital receipts (`) 9,537,528
Total households 4,500 Total annual city capital expenditure (`) 28,336,271
Density (persons per sq. km.) 2,679 Total annual city revenue receipts (`) 24,337,196
Total municipal staff 55 Total annual city revenue expenditure (`) 20,903,958
WATER SUPPLYTotal water produced (MLD) 1.5
Ground water (MLD) 0.2
Surface water (MLD) 1.3
Average daily volume treated (MLD) 1.3
Installed storage capacity (MLD) 1.3
Total water connections (nos.) 2,882.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.2
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,382,307.0
Annual revenue expenditure on water (`) 3,706,492.0
Annual capital expenditure on water (`) 4,472,516.0
WASTE WATERArea covered by waste water network (sq. km.) 3.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 1.7
Open drains (sq. km) 1.7
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.6
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,079.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 10,000.0
25
![Page 35: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/35.jpg)
Bhor Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
26
![Page 36: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/36.jpg)
Biloli Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nanded Slum population 0
Area (sq. km.) 0 Slum households 0
Total city population 0 Total annual city capital receipts (`) 21,734,933
Total households 0 Total annual city capital expenditure (`) 11,987,447
Density (persons per sq. km.) 0 Total annual city revenue receipts (`) 0
Total municipal staff 46 Total annual city revenue expenditure (`) 12,293,795
WATER SUPPLYTotal water produced (MLD) 0.0
Ground water (MLD) 0.0
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.3
Total water connections (nos.) 1,170.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 26.0
Annual revenue receipts from water (`) 1,926,650.0
Annual revenue expenditure on water (`) 496,286.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 1,329,354.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 0.0
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) nd
Annual revenue receipts from SW (`) 1,053,922.0
Annual revenue expenditure on SW (`) 1,417,980.0
Annual capital expenditure on SW (`) 0.0
27
![Page 37: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/37.jpg)
Biloli Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
28
![Page 38: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/38.jpg)
Brahmapuri Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 13
District Chandrapur Slum population 0
Area (sq. km.) 22 Slum households 1,382
Total city population 38,000 Total annual city capital receipts (`) 220,000
Total households 7,350 Total annual city capital expenditure (`) 103,000
Density (persons per sq. km.) 1,735 Total annual city revenue receipts (`) 52,600,000
Total municipal staff 81 Total annual city revenue expenditure (`) 38,205,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 0.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 3.0
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 3,365.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 20.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,800,000.0
Annual revenue expenditure on water (`) 3,500,000.0
Annual capital expenditure on water (`) 244,000.0
WASTE WATERArea covered by waste water network (sq. km.) 16.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 3.0
Open drains (sq. km) 13.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 6.2
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
8,474.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 2,293,000.0
29
![Page 39: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/39.jpg)
Brahmapuri Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
30
![Page 40: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/40.jpg)
Chandur-Bazar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 10
District Amravati Slum population 9,826
Area (sq. km.) 2 Slum households 1,859
Total city population 19,960 Total annual city capital receipts (`) 0
Total households 3,606 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 9,980 Total annual city revenue receipts (`) 0
Total municipal staff 87 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 2.4
Ground water (MLD) 0.0
Surface water (MLD) 2.4
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 0.0
Water connections in slums (nos.) 550.0
Area covered by network (sq. km.) 2.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 2.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,994.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
31
![Page 41: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/41.jpg)
Chandur-Bazar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
32
![Page 42: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/42.jpg)
Chandur-Rly Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Amravati Slum population 2,252
Area (sq. km.) 6 Slum households 540
Total city population 20,965 Total annual city capital receipts (`) 25,785,806
Total households 5,004 Total annual city capital expenditure (`) 29,502,646
Density (persons per sq. km.) 3,494 Total annual city revenue receipts (`) 15,181,449
Total municipal staff 41 Total annual city revenue expenditure (`) 9,948,364
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 2.0
Installed storage capacity (MLD) 0.9
Total water connections (nos.) 2,267.0
Water connections in slums (nos.) 260.0
Area covered by network (sq. km.) 5.5
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,317,874.0
Annual revenue expenditure on water (`) 2,843,794.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 5.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 757,163.0
Annual capital expenditure on WW (`) 757,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.5
Waste collected (TPD) 4.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,378.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,042,979.0
Annual capital expenditure on SW (`) 687,000.0
33
![Page 43: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/43.jpg)
Chandur-Rly Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
34
![Page 44: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/44.jpg)
Chikhaldara Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 1
District Amravati Slum population 376
Area (sq. km.) 4 Slum households 80
Total city population 5,500 Total annual city capital receipts (`) 31,146,593
Total households 1,015 Total annual city capital expenditure (`) 32,038,907
Density (persons per sq. km.) 1,410 Total annual city revenue receipts (`) 31,146,000
Total municipal staff 26 Total annual city revenue expenditure (`) 32,039,000
WATER SUPPLYTotal water produced (MLD) 0.5
Ground water (MLD) 0.5
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.3
Total water connections (nos.) 601.0
Water connections in slums (nos.) 30.0
Area covered by network (sq. km.) 3.9
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.9
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.9
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 131,117.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 0.2
Waste collected (TPD) 0.2
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
703.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 636,384.0
Annual capital expenditure on SW (`) 0.0
35
![Page 45: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/45.jpg)
Chikhaldara Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
36
![Page 46: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/46.jpg)
Darwha Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Yavatmal Slum population 1,800
Area (sq. km.) 2 Slum households 360
Total city population 29,000 Total annual city capital receipts (`) 19,662,547
Total households 5,800 Total annual city capital expenditure (`) 24,435,064
Density (persons per sq. km.) 13,182 Total annual city revenue receipts (`) 27,079,004
Total municipal staff 45 Total annual city revenue expenditure (`) 27,174,296
WATER SUPPLYTotal water produced (MLD) 1.7
Ground water (MLD) 0.2
Surface water (MLD) 1.5
Average daily volume treated (MLD) 1.7
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 1,910.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.5
No. of days of supply in a month 10.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 1,413,942.0
Annual capital expenditure on water (`) 1,415,731.0
WASTE WATERArea covered by waste water network (sq. km.) 2.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 2,520,945.0
Annual capital expenditure on WW (`) 2,521,315.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,820.0
Waste segregation at source (Y/N) nd
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 129,020.0
Annual capital expenditure on SW (`) 0.0
37
![Page 47: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/47.jpg)
Darwha Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
38
![Page 48: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/48.jpg)
Daryapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 12
District Amravati Slum population 5,002
Area (sq. km.) 4 Slum households 1,042
Total city population 42,996 Total annual city capital receipts (`) 18,190,208
Total households 8,111 Total annual city capital expenditure (`) 16,353,131
Density (persons per sq. km.) 10,487 Total annual city revenue receipts (`) 72,313,873
Total municipal staff 131 Total annual city revenue expenditure (`) 52,763,962
WATER SUPPLYTotal water produced (MLD) 2.8
Ground water (MLD) 0.0
Surface water (MLD) 2.8
Average daily volume treated (MLD) 2.8
Installed storage capacity (MLD) 2.0
Total water connections (nos.) 4,638.0
Water connections in slums (nos.) 1,042.0
Area covered by network (sq. km.) 4.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 3,264,396.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,606.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,106,000.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 3,451,000.0
39
![Page 49: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/49.jpg)
Daryapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
40
![Page 50: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/50.jpg)
Desaiganj Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Gadchiroli Slum population 2,500
Area (sq. km.) 26 Slum households 500
Total city population 34,700 Total annual city capital receipts (`) 4,370,000
Total households 7,638 Total annual city capital expenditure (`) 4,339,380
Density (persons per sq. km.) 1,314 Total annual city revenue receipts (`) 66,055,459
Total municipal staff 51 Total annual city revenue expenditure (`) 58,163,952
WATER SUPPLYTotal water produced (MLD) 2.4
Ground water (MLD) 0.2
Surface water (MLD) 2.2
Average daily volume treated (MLD) 2.0
Installed storage capacity (MLD) 1.3
Total water connections (nos.) 3,035.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 13.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 4,450,639.0
Annual revenue expenditure on water (`) 4,509,107.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 15.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 2.0
Open drains (sq. km) 13.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,600.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 1,318,013.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
41
![Page 51: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/51.jpg)
Desaiganj Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
42
![Page 52: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/52.jpg)
Deulgaon Raja Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Buldhana Slum population 3,905
Area (sq. km.) 8 Slum households 793
Total city population 30,466 Total annual city capital receipts (`) 47,907,000
Total households 6,931 Total annual city capital expenditure (`) 54,486,000
Density (persons per sq. km.) 3,856 Total annual city revenue receipts (`) 47,907,000
Total municipal staff 108 Total annual city revenue expenditure (`) 54,485,000
WATER SUPPLYTotal water produced (MLD) 2.7
Ground water (MLD) 0.3
Surface water (MLD) 2.4
Average daily volume treated (MLD) 1.8
Installed storage capacity (MLD) 1.3
Total water connections (nos.) 2,527.0
Water connections in slums (nos.) 247.0
Area covered by network (sq. km.) 7.9
No. of days of supply in a month 4.0
Annual revenue receipts from water (`) 2,339,000.0
Annual revenue expenditure on water (`) 3,806,000.0
Annual capital expenditure on water (`) 665,000.0
WASTE WATERArea covered by waste water network (sq. km.) 7.9
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 7.9
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 1,362,000.0
Annual capital expenditure on WW (`) 797,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.0
Waste collected (TPD) 4.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
13,862.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 3,428,000.0
Annual capital expenditure on SW (`) 3,428,000.0
43
![Page 53: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/53.jpg)
Deulgaon Raja Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
44
![Page 54: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/54.jpg)
Devlali Pravara Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 9
District Ahmednagar Slum population 4,875
Area (sq. km.) 43 Slum households 975
Total city population 34,345 Total annual city capital receipts (`) 85,072,000
Total households 6,916 Total annual city capital expenditure (`) 84,770,000
Density (persons per sq. km.) 791 Total annual city revenue receipts (`) 85,072,000
Total municipal staff 129 Total annual city revenue expenditure (`) 74,021,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 0.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 3.0
Installed storage capacity (MLD) 29.5
Total water connections (nos.) 2,490.0
Water connections in slums (nos.) 295.0
Area covered by network (sq. km.) 43.4
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 2,195,000.0
Annual revenue expenditure on water (`) 4,740,000.0
Annual capital expenditure on water (`) 24,438,000.0
WASTE WATERArea covered by waste water network (sq. km.) 3.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 5,805,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 3.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,525.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 2,925,000.0
Annual revenue expenditure on SW (`) 42,000.0
Annual capital expenditure on SW (`) 42,000.0
45
![Page 55: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/55.jpg)
Devlali Pravara Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
46
![Page 56: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/56.jpg)
Dhamangaon Railway Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 8
District Amravati Slum population 6,500
Area (sq. km.) 3 Slum households 1,080
Total city population 23,000 Total annual city capital receipts (`) 34,884,212
Total households 4,298 Total annual city capital expenditure (`) 24,767,000
Density (persons per sq. km.) 7,188 Total annual city revenue receipts (`) 57,919,000
Total municipal staff 39 Total annual city revenue expenditure (`) 22,810,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.1
Surface water (MLD) 1.9
Average daily volume treated (MLD) 1.9
Installed storage capacity (MLD) 11.0
Total water connections (nos.) 2,555.0
Water connections in slums (nos.) 612.0
Area covered by network (sq. km.) 3.2
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 51,906,000.0
Annual revenue expenditure on water (`) 22,742,000.0
Annual capital expenditure on water (`) 6,817,000.0
WASTE WATERArea covered by waste water network (sq. km.) 3.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.2
Open drains (sq. km) 3.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 6,998,000.0
Annual capital expenditure on WW (`) 1,213,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,059.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,500,000.0
Annual capital expenditure on SW (`) 2,500,000.0
47
![Page 57: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/57.jpg)
Dhamangaon Railway Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
48
![Page 58: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/58.jpg)
Dharangaon Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 8
District Jalgaon Slum population 4,500
Area (sq. km.) 5 Slum households 880
Total city population 40,000 Total annual city capital receipts (`) 6,340,428
Total households 6,369 Total annual city capital expenditure (`) 4,500,781
Density (persons per sq. km.) 8,333 Total annual city revenue receipts (`) 31,953,401
Total municipal staff 159 Total annual city revenue expenditure (`) 18,695,891
WATER SUPPLYTotal water produced (MLD) 1.8
Ground water (MLD) 1.8
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 3,443.0
Water connections in slums (nos.) 200.0
Area covered by network (sq. km.) 1.9
No. of days of supply in a month 20.0
Annual revenue receipts from water (`) 3,932,943.0
Annual revenue expenditure on water (`) 5,346,834.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
7,573.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 7,614,876.0
Annual capital expenditure on SW (`) 0.0
49
![Page 59: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/59.jpg)
Dharangaon Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
50
![Page 60: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/60.jpg)
Dharmabad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Nanded Slum population 8,000
Area (sq. km.) 12 Slum households 1,500
Total city population 35,841 Total annual city capital receipts (`) 18,238,406
Total households 10,000 Total annual city capital expenditure (`) 10,752,248
Density (persons per sq. km.) 2,867 Total annual city revenue receipts (`) 40,240,511
Total municipal staff 76 Total annual city revenue expenditure (`) 16,673,570
WATER SUPPLYTotal water produced (MLD) 12.1
Ground water (MLD) 0.2
Surface water (MLD) 11.9
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 2,202.0
Water connections in slums (nos.) 80.0
Area covered by network (sq. km.) 10.6
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,857,817.0
Annual revenue expenditure on water (`) 1,947,929.0
Annual capital expenditure on water (`) 279,777.0
WASTE WATERArea covered by waste water network (sq. km.) 5.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 4,185,175.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,180.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 1,366,700.0
51
![Page 61: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/61.jpg)
Dharmabad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
52
![Page 62: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/62.jpg)
Digras Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 9
District Yavatmal Slum population 10,030
Area (sq. km.) 11 Slum households 2,006
Total city population 44,986 Total annual city capital receipts (`) 32,283,989
Total households 7,579 Total annual city capital expenditure (`) 17,066,947
Density (persons per sq. km.) 3,946 Total annual city revenue receipts (`) 62,087,388
Total municipal staff 192 Total annual city revenue expenditure (`) 57,483,644
WATER SUPPLYTotal water produced (MLD) 5.2
Ground water (MLD) 0.7
Surface water (MLD) 4.5
Average daily volume treated (MLD) 5.0
Installed storage capacity (MLD) 2.5
Total water connections (nos.) 3,865.0
Water connections in slums (nos.) 393.0
Area covered by network (sq. km.) 8.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,186,671.0
Annual revenue expenditure on water (`) 7,520,869.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 4.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 20,200.0
Annual revenue expenditure on WW (`) 7,987,301.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 10.0
Waste collected (TPD) 10.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
8,366.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 620,332.0
Annual capital expenditure on SW (`) 1,690,663.0
53
![Page 63: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/63.jpg)
Digras Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
54
![Page 64: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/64.jpg)
Dudhani Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Solapur Slum population 1,500
Area (sq. km.) 2 Slum households 400
Total city population 14,105 Total annual city capital receipts (`) 4,475,578
Total households 2,275 Total annual city capital expenditure (`) 5,476,653
Density (persons per sq. km.) 8,816 Total annual city revenue receipts (`) 22,845,659
Total municipal staff 37 Total annual city revenue expenditure (`) 6,744,587
WATER SUPPLYTotal water produced (MLD) 0.6
Ground water (MLD) 0.3
Surface water (MLD) 0.3
Average daily volume treated (MLD) 0.3
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 545.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.6
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 617,800.0
Annual revenue expenditure on water (`) 914,888.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.6
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.5
Waste collected (TPD) 3.5
Quantity of waste treated (TPD) 1.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,275.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
55
![Page 65: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/65.jpg)
Dudhani Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
56
![Page 66: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/66.jpg)
Erandol Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 14
District Jalgaon Slum population 4,500
Area (sq. km.) 3 Slum households 862
Total city population 33,459 Total annual city capital receipts (`) 21,600,000
Total households 8,032 Total annual city capital expenditure (`) 33,000,000
Density (persons per sq. km.) 10,139 Total annual city revenue receipts (`) 41,300,000
Total municipal staff 103 Total annual city revenue expenditure (`) 8,000,024
WATER SUPPLYTotal water produced (MLD) 2.5
Ground water (MLD) 0.0
Surface water (MLD) 2.5
Average daily volume treated (MLD) 2.5
Installed storage capacity (MLD) 2.1
Total water connections (nos.) 4,093.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.5
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 3,100,000.0
Annual revenue expenditure on water (`) 3,500,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.2
Open drains (sq. km) 3.3
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,015.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 100,000.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
57
![Page 67: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/67.jpg)
Erandol Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
58
![Page 68: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/68.jpg)
Faizpur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Jalgaon Slum population 2,000
Area (sq. km.) 3 Slum households 456
Total city population 25,803 Total annual city capital receipts (`) 10,689,000
Total households 4,617 Total annual city capital expenditure (`) 20,620,000
Density (persons per sq. km.) 8,601 Total annual city revenue receipts (`) 47,277,000
Total municipal staff 118 Total annual city revenue expenditure (`) 56,742,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 0.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 3.0
Installed storage capacity (MLD) 1.8
Total water connections (nos.) 3,530.0
Water connections in slums (nos.) 40.0
Area covered by network (sq. km.) 4.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,239,000.0
Annual revenue expenditure on water (`) 5,115,000.0
Annual capital expenditure on water (`) 798,000.0
WASTE WATERArea covered by waste water network (sq. km.) 3.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.8
Open drains (sq. km) 2.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
956.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 965,000.0
Annual revenue expenditure on SW (`) 2,457,000.0
Annual capital expenditure on SW (`) 2,457,000.0
59
![Page 69: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/69.jpg)
Faizpur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
60
![Page 70: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/70.jpg)
Gadhinglaj Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Kolhapur Slum population 1,286
Area (sq. km.) 3 Slum households 245
Total city population 29,600 Total annual city capital receipts (`) 25,647,421
Total households 6,895 Total annual city capital expenditure (`) 24,876,310
Density (persons per sq. km.) 8,706 Total annual city revenue receipts (`) 93,601,168
Total municipal staff 199 Total annual city revenue expenditure (`) 87,846,867
WATER SUPPLYTotal water produced (MLD) 3.7
Ground water (MLD) 0.0
Surface water (MLD) 3.7
Average daily volume treated (MLD) 3.6
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 4,478.0
Water connections in slums (nos.) 3.0
Area covered by network (sq. km.) 3.4
No. of days of supply in a month 27.0
Annual revenue receipts from water (`) 5,288,737.0
Annual revenue expenditure on water (`) 8,288,649.0
Annual capital expenditure on water (`) 905,528.0
WASTE WATERArea covered by waste water network (sq. km.) 3.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.6
Open drains (sq. km) 2.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.5
Waste collected (TPD) 7.5
Quantity of waste treated (TPD) 2.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,338.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
61
![Page 71: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/71.jpg)
Gadhinglaj Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
62
![Page 72: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/72.jpg)
Gangapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Aurangabad Slum population 0
Area (sq. km.) 22 Slum households 0
Total city population 27,909 Total annual city capital receipts (`) 27,802,341
Total households 5,077 Total annual city capital expenditure (`) 49,954,000
Density (persons per sq. km.) 1,252 Total annual city revenue receipts (`) 19,621,595
Total municipal staff 53 Total annual city revenue expenditure (`) 50,054,000
WATER SUPPLYTotal water produced (MLD) 2.4
Ground water (MLD) 0.0
Surface water (MLD) 2.4
Average daily volume treated (MLD) 2.2
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 2,644.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 9.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,472,000.0
Annual revenue expenditure on water (`) 4,346,000.0
Annual capital expenditure on water (`) 4,345,000.0
WASTE WATERArea covered by waste water network (sq. km.) 2.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 9,000.0
Annual capital expenditure on WW (`) 9,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.2
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,563.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 238,000.0
Annual capital expenditure on SW (`) 238,000.0
63
![Page 73: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/73.jpg)
Gangapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
64
![Page 74: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/74.jpg)
Georai Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Beed Slum population 0
Area (sq. km.) 4 Slum households 0
Total city population 33,051 Total annual city capital receipts (`) 22,435,000
Total households 5,979 Total annual city capital expenditure (`) 20,263,000
Density (persons per sq. km.) 7,686 Total annual city revenue receipts (`) 49,000,000
Total municipal staff 139 Total annual city revenue expenditure (`) 45,139,000
WATER SUPPLYTotal water produced (MLD) 3.5
Ground water (MLD) 0.0
Surface water (MLD) 3.5
Average daily volume treated (MLD) 3.5
Installed storage capacity (MLD) 3.5
Total water connections (nos.) 4,633.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.2
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,469,000.0
Annual revenue expenditure on water (`) 5,560,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.5
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,040.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 1,034,000.0
65
![Page 75: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/75.jpg)
Georai Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
66
![Page 76: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/76.jpg)
Ghatanji Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 10
District Yavatmal Slum population 4,536
Area (sq. km.) 11 Slum households 900
Total city population 23,218 Total annual city capital receipts (`) 28,757,000
Total households 6,221 Total annual city capital expenditure (`) 13,491,000
Density (persons per sq. km.) 2,130 Total annual city revenue receipts (`) 29,996,000
Total municipal staff 53 Total annual city revenue expenditure (`) 18,044,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.3
Surface water (MLD) 1.7
Average daily volume treated (MLD) 1.7
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 1,715.0
Water connections in slums (nos.) 670.0
Area covered by network (sq. km.) 8.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,066,000.0
Annual revenue expenditure on water (`) 2,498,000.0
Annual capital expenditure on water (`) 1,409,000.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 740,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,738.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 3,206,000.0
Annual capital expenditure on SW (`) 1,775,000.0
67
![Page 77: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/77.jpg)
Ghatanji Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
68
![Page 78: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/78.jpg)
Hadgaon Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Nanded Slum population 1,850
Area (sq. km.) 16 Slum households 400
Total city population 35,000 Total annual city capital receipts (`) 0
Total households 7,000 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 2,188 Total annual city revenue receipts (`) 29,226,000
Total municipal staff 65 Total annual city revenue expenditure (`) 28,938,000
WATER SUPPLYTotal water produced (MLD) 1.5
Ground water (MLD) 1.5
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.2
Total water connections (nos.) 2,336.0
Water connections in slums (nos.) 100.0
Area covered by network (sq. km.) 10.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,539,000.0
Annual revenue expenditure on water (`) 2,169,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,439.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,538,000.0
Annual capital expenditure on SW (`) 0.0
69
![Page 79: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/79.jpg)
Hadgaon Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
70
![Page 80: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/80.jpg)
Igatpuri Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Nashik Slum population 682
Area (sq. km.) 29 Slum households 135
Total city population 39,450 Total annual city capital receipts (`) 29,236,129
Total households 7,890 Total annual city capital expenditure (`) 26,003,453
Density (persons per sq. km.) 1,360 Total annual city revenue receipts (`) 46,553,096
Total municipal staff 91 Total annual city revenue expenditure (`) 32,626,748
WATER SUPPLYTotal water produced (MLD) 2.8
Ground water (MLD) 0.0
Surface water (MLD) 2.8
Average daily volume treated (MLD) 1.6
Installed storage capacity (MLD) 1.2
Total water connections (nos.) 3,667.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 15.8
No. of days of supply in a month 12.0
Annual revenue receipts from water (`) 3,438,246.0
Annual revenue expenditure on water (`) 7,482,314.0
Annual capital expenditure on water (`) 4,608,330.0
WASTE WATERArea covered by waste water network (sq. km.) 15.8
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 15.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,237.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,445,737.0
Annual capital expenditure on SW (`) 2,445,737.0
71
![Page 81: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/81.jpg)
Igatpuri Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
72
![Page 82: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/82.jpg)
Indapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Pune Slum population 750
Area (sq. km.) 3 Slum households 150
Total city population 22,351 Total annual city capital receipts (`) 0
Total households 5,663 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 7,450 Total annual city revenue receipts (`) 0
Total municipal staff 162 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 3.2
Ground water (MLD) 0.2
Surface water (MLD) 3.0
Average daily volume treated (MLD) 2.3
Installed storage capacity (MLD) 4.0
Total water connections (nos.) 2,985.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.5
Open drains (sq. km) 1.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,898.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
73
![Page 83: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/83.jpg)
Indapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
74
![Page 84: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/84.jpg)
Jalgaon (Jamod) Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Buldhana Slum population 4,000
Area (sq. km.) 0 Slum households 800
Total city population 30,053 Total annual city capital receipts (`) 34,298,000
Total households 5,034 Total annual city capital expenditure (`) 28,189,000
Density (persons per sq. km.) 0 Total annual city revenue receipts (`) 34,395,000
Total municipal staff 51 Total annual city revenue expenditure (`) 54,001,000
WATER SUPPLYTotal water produced (MLD) 0.9
Ground water (MLD) 0.9
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 9.8
Total water connections (nos.) 1,949.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.8
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) nd
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
75
![Page 85: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/85.jpg)
Jalgaon (Jamod) Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
76
![Page 86: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/86.jpg)
Jamner Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Jalgaon Slum population 0
Area (sq. km.) 41 Slum households 0
Total city population 45,075 Total annual city capital receipts (`) 107,301,641
Total households 9,022 Total annual city capital expenditure (`) 75,532,618
Density (persons per sq. km.) 1,108 Total annual city revenue receipts (`) 498,725,000
Total municipal staff 125 Total annual city revenue expenditure (`) 515,359,000
WATER SUPPLYTotal water produced (MLD) 3.3
Ground water (MLD) 0.3
Surface water (MLD) 3.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 2.0
Total water connections (nos.) 4,606.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.5
No. of days of supply in a month 10.0
Annual revenue receipts from water (`) 76,070,000.0
Annual revenue expenditure on water (`) 94,320,000.0
Annual capital expenditure on water (`) 23,866,355.0
WASTE WATERArea covered by waste water network (sq. km.) 2.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 5,525,000.0
Annual capital expenditure on WW (`) 78,964.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 8.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,847.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 60,250,000.0
Annual revenue expenditure on SW (`) 60,000,000.0
Annual capital expenditure on SW (`) 4,835,062.0
77
![Page 87: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/87.jpg)
Jamner Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
78
![Page 88: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/88.jpg)
Jawhar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Thane Slum population 0
Area (sq. km.) 4 Slum households 0
Total city population 20,000 Total annual city capital receipts (`) 47,240,000
Total households 4,000 Total annual city capital expenditure (`) 10,519,000
Density (persons per sq. km.) 5,714 Total annual city revenue receipts (`) 15,319,000
Total municipal staff 66 Total annual city revenue expenditure (`) 16,210,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 1.5
Installed storage capacity (MLD) 0.6
Total water connections (nos.) 1,757.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.5
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,122,000.0
Annual revenue expenditure on water (`) 3,786,000.0
Annual capital expenditure on water (`) 2,806,000.0
WASTE WATERArea covered by waste water network (sq. km.) 3.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 10,400.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,800.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,799,000.0
Annual capital expenditure on SW (`) 865,000.0
79
![Page 89: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/89.jpg)
Jawhar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
80
![Page 90: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/90.jpg)
Jejuri Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Pune Slum population 2,200
Area (sq. km.) 7 Slum households 540
Total city population 15,000 Total annual city capital receipts (`) 64,280,000
Total households 3,319 Total annual city capital expenditure (`) 47,937,000
Density (persons per sq. km.) 2,239 Total annual city revenue receipts (`) 64,280,000
Total municipal staff 66 Total annual city revenue expenditure (`) 47,936,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 0.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 3.0
Installed storage capacity (MLD) 3.0
Total water connections (nos.) 2,101.0
Water connections in slums (nos.) 170.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,658,000.0
Annual revenue expenditure on water (`) 5,869,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,424.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
81
![Page 91: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/91.jpg)
Jejuri Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
82
![Page 92: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/92.jpg)
Jintur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Parbhani Slum population 3,972
Area (sq. km.) 26 Slum households 462
Total city population 46,255 Total annual city capital receipts (`) 44,016,989
Total households 7,891 Total annual city capital expenditure (`) 42,133,252
Density (persons per sq. km.) 1,793 Total annual city revenue receipts (`) 44,016,989
Total municipal staff 127 Total annual city revenue expenditure (`) 42,133,252
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 0.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 2.5
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 4,310.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.5
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,839,377.0
Annual revenue expenditure on water (`) 4,164,202.0
Annual capital expenditure on water (`) 4,399,202.0
WASTE WATERArea covered by waste water network (sq. km.) 4.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 15.0
Waste collected (TPD) 12.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,263.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 2,988,000.0
Annual revenue expenditure on SW (`) 7,550,276.0
Annual capital expenditure on SW (`) 1,494,205.0
83
![Page 93: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/93.jpg)
Jintur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
84
![Page 94: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/94.jpg)
Junnar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Pune Slum population 1,250
Area (sq. km.) 3 Slum households 250
Total city population 28,220 Total annual city capital receipts (`) 18,109,000
Total households 6,000 Total annual city capital expenditure (`) 16,930,000
Density (persons per sq. km.) 10,452 Total annual city revenue receipts (`) 91,204,000
Total municipal staff 86 Total annual city revenue expenditure (`) 55,430,000
WATER SUPPLYTotal water produced (MLD) 2.2
Ground water (MLD) 0.0
Surface water (MLD) 2.2
Average daily volume treated (MLD) 2.0
Installed storage capacity (MLD) 2.0
Total water connections (nos.) 3,288.0
Water connections in slums (nos.) 1.0
Area covered by network (sq. km.) 2.7
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,457,000.2
Annual revenue expenditure on water (`) 4,508,000.4
Annual capital expenditure on water (`) 680,000.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 393,000.0
Annual revenue expenditure on WW (`) 1,620,000.0
Annual capital expenditure on WW (`) 905,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.5
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,387.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,912,000.0
Annual revenue expenditure on SW (`) 113,000.0
Annual capital expenditure on SW (`) 113,000.0
85
![Page 95: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/95.jpg)
Junnar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
86
![Page 96: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/96.jpg)
Kagal Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Kolhapur Slum population 2,000
Area (sq. km.) 5 Slum households 400
Total city population 27,603 Total annual city capital receipts (`) 82,575,225
Total households 6,200 Total annual city capital expenditure (`) 82,575,225
Density (persons per sq. km.) 5,308 Total annual city revenue receipts (`) 70,439,126
Total municipal staff 110 Total annual city revenue expenditure (`) 55,413,141
WATER SUPPLYTotal water produced (MLD) 4.3
Ground water (MLD) 0.0
Surface water (MLD) 4.3
Average daily volume treated (MLD) 4.3
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 4,810.0
Water connections in slums (nos.) 280.0
Area covered by network (sq. km.) 5.2
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,884,742.0
Annual revenue expenditure on water (`) 7,175,463.0
Annual capital expenditure on water (`) 1,000,000.0
WASTE WATERArea covered by waste water network (sq. km.) 4.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.5
Open drains (sq. km) 4.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 160,191.0
Annual revenue expenditure on WW (`) 596,321.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 1.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,059.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 5,188,969.0
Annual capital expenditure on SW (`) 1,005,200.0
87
![Page 97: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/97.jpg)
Kagal Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
88
![Page 98: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/98.jpg)
Kalamb Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Osmanabad Slum population 3,800
Area (sq. km.) 3 Slum households 700
Total city population 34,702 Total annual city capital receipts (`) 41,001,000
Total households 4,963 Total annual city capital expenditure (`) 57,307,000
Density (persons per sq. km.) 10,844 Total annual city revenue receipts (`) 20,818,000
Total municipal staff 100 Total annual city revenue expenditure (`) 61,884,000
WATER SUPPLYTotal water produced (MLD) 2.3
Ground water (MLD) 0.0
Surface water (MLD) 2.3
Average daily volume treated (MLD) 23.0
Installed storage capacity (MLD) 1.6
Total water connections (nos.) 2,850.0
Water connections in slums (nos.) 200.0
Area covered by network (sq. km.) 5.2
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,823,000.0
Annual revenue expenditure on water (`) 4,846,000.0
Annual capital expenditure on water (`) 1,140,000.0
WASTE WATERArea covered by waste water network (sq. km.) 2.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 385,000.0
Annual capital expenditure on WW (`) 168,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,971.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,995,000.0
Annual capital expenditure on SW (`) 2,896,000.0
89
![Page 99: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/99.jpg)
Kalamb Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
90
![Page 100: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/100.jpg)
Kalamnuri Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Hingoli Slum population 0
Area (sq. km.) 12 Slum households 0
Total city population 28,000 Total annual city capital receipts (`) 0
Total households 4,066 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 2,333 Total annual city revenue receipts (`) 0
Total municipal staff 49 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 14.0
Ground water (MLD) 0.0
Surface water (MLD) 14.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 12.0
Total water connections (nos.) 0.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 7.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 0.0
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
91
![Page 101: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/101.jpg)
Kalamnuri Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
92
![Page 102: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/102.jpg)
Kalmeshwar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nagpur Slum population 0
Area (sq. km.) 15 Slum households 0
Total city population 22,765 Total annual city capital receipts (`) 25,464,126
Total households 6,919 Total annual city capital expenditure (`) 31,777,484
Density (persons per sq. km.) 1,549 Total annual city revenue receipts (`) 45,484,691
Total municipal staff 75 Total annual city revenue expenditure (`) 35,253,215
WATER SUPPLYTotal water produced (MLD) 5.0
Ground water (MLD) 2.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 3.0
Installed storage capacity (MLD) 9.8
Total water connections (nos.) 2,818.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.9
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 4,967,110.0
Annual revenue expenditure on water (`) 5,167,675.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 318,270.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.1
Waste collected (TPD) 1.5
Quantity of waste treated (TPD) 1.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,868.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 161,112.0
Annual capital expenditure on SW (`) 1,492,212.0
93
![Page 103: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/103.jpg)
Kalmeshwar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
94
![Page 104: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/104.jpg)
Kandhar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nanded Slum population 0
Area (sq. km.) 7 Slum households 0
Total city population 25,532 Total annual city capital receipts (`) 15,319,160
Total households 5,565 Total annual city capital expenditure (`) 18,439,822
Density (persons per sq. km.) 3,868 Total annual city revenue receipts (`) 43,209,750
Total municipal staff 106 Total annual city revenue expenditure (`) 47,113,093
WATER SUPPLYTotal water produced (MLD) 0.6
Ground water (MLD) 0.0
Surface water (MLD) 0.6
Average daily volume treated (MLD) 0.6
Installed storage capacity (MLD) 1.2
Total water connections (nos.) 2,964.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.0
No. of days of supply in a month 10.0
Annual revenue receipts from water (`) 2,171,601.0
Annual revenue expenditure on water (`) 5,451,989.0
Annual capital expenditure on water (`) 4,625,949.0
WASTE WATERArea covered by waste water network (sq. km.) 1.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 281,994.0
Annual capital expenditure on WW (`) 281,994.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,708.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,674,919.0
Annual capital expenditure on SW (`) 1,674,919.0
95
![Page 105: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/105.jpg)
Kandhar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
96
![Page 106: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/106.jpg)
Kannad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Aurangabad Slum population 1,320
Area (sq. km.) 7 Slum households 350
Total city population 40,000 Total annual city capital receipts (`) 63,815,000
Total households 9,091 Total annual city capital expenditure (`) 24,883,000
Density (persons per sq. km.) 5,714 Total annual city revenue receipts (`) 63,815,000
Total municipal staff 126 Total annual city revenue expenditure (`) 49,481,000
WATER SUPPLYTotal water produced (MLD) 3.9
Ground water (MLD) 0.0
Surface water (MLD) 3.9
Average daily volume treated (MLD) 3.9
Installed storage capacity (MLD) 1.8
Total water connections (nos.) 3,988.0
Water connections in slums (nos.) 32.0
Area covered by network (sq. km.) 7.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,462,000.0
Annual revenue expenditure on water (`) 4,240,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 7.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 7.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 285,000.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 10.0
Waste collected (TPD) 10.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
7,932.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 4,040,000.0
Annual capital expenditure on SW (`) 914,000.0
97
![Page 107: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/107.jpg)
Kannad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
98
![Page 108: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/108.jpg)
Karjat Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Raigad Slum population 1,425
Area (sq. km.) 8 Slum households 265
Total city population 35,051 Total annual city capital receipts (`) 13,030,784
Total households 7,909 Total annual city capital expenditure (`) 15,592,625
Density (persons per sq. km.) 4,674 Total annual city revenue receipts (`) 56,371,007
Total municipal staff 66 Total annual city revenue expenditure (`) 42,309,672
WATER SUPPLYTotal water produced (MLD) 4.0
Ground water (MLD) 0.0
Surface water (MLD) 4.0
Average daily volume treated (MLD) 4.0
Installed storage capacity (MLD) 4.4
Total water connections (nos.) 3,570.0
Water connections in slums (nos.) 60.0
Area covered by network (sq. km.) 7.5
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,988,125.0
Annual revenue expenditure on water (`) 6,990,067.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 7.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 7.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 12.2
Waste collected (TPD) 12.0
Quantity of waste treated (TPD) 5.0
Waste received at scientific landfill (TPD) 7.0
Door to door colln.(no. of households andestablishments)
8,500.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,525,506.0
Annual capital expenditure on SW (`) 2,525,506.0
99
![Page 109: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/109.jpg)
Karjat Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
100
![Page 110: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/110.jpg)
Karmala Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Solapur Slum population 4,500
Area (sq. km.) 5 Slum households 900
Total city population 24,000 Total annual city capital receipts (`) 13,142,513
Total households 5,400 Total annual city capital expenditure (`) 18,649,591
Density (persons per sq. km.) 5,000 Total annual city revenue receipts (`) 69,080,409
Total municipal staff 52 Total annual city revenue expenditure (`) 51,616,762
WATER SUPPLYTotal water produced (MLD) 3.5
Ground water (MLD) 0.3
Surface water (MLD) 3.2
Average daily volume treated (MLD) 2.9
Installed storage capacity (MLD) 2.0
Total water connections (nos.) 2,765.0
Water connections in slums (nos.) 50.0
Area covered by network (sq. km.) 4.8
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 5,072,676.0
Annual revenue expenditure on water (`) 5,938,260.0
Annual capital expenditure on water (`) 1,495,826.0
WASTE WATERArea covered by waste water network (sq. km.) 4.8
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 379,609.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,800.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
101
![Page 111: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/111.jpg)
Karmala Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
102
![Page 112: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/112.jpg)
Katol Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 18
District Nagpur Slum population 6,241
Area (sq. km.) 20 Slum households 1,376
Total city population 46,338 Total annual city capital receipts (`) 584
Total households 7,531 Total annual city capital expenditure (`) 711
Density (persons per sq. km.) 2,352 Total annual city revenue receipts (`) 1,107
Total municipal staff 333 Total annual city revenue expenditure (`) 1,210
WATER SUPPLYTotal water produced (MLD) 4.4
Ground water (MLD) 1.1
Surface water (MLD) 3.3
Average daily volume treated (MLD) 3.3
Installed storage capacity (MLD) 4.4
Total water connections (nos.) 5,691.0
Water connections in slums (nos.) 616.0
Area covered by network (sq. km.) 6.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 68.0
Annual revenue expenditure on water (`) 95.5
Annual capital expenditure on water (`) 6.3
WASTE WATERArea covered by waste water network (sq. km.) 3.8
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.3
Open drains (sq. km) 3.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 5.8
Annual revenue expenditure on WW (`) 6.3
Annual capital expenditure on WW (`) 5.7
SOLID WASTE MANAGEMENTWaste generated (TPD) 10.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 6.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
7,605.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 4.1
Annual revenue expenditure on SW (`) 0.8
Annual capital expenditure on SW (`) 21.9
103
![Page 113: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/113.jpg)
Katol Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
104
![Page 114: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/114.jpg)
Khapa Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Nagpur Slum population 2,255
Area (sq. km.) 3 Slum households 439
Total city population 15,554 Total annual city capital receipts (`) 16,669,000
Total households 2,954 Total annual city capital expenditure (`) 23,020,000
Density (persons per sq. km.) 5,017 Total annual city revenue receipts (`) 6,902,000
Total municipal staff 52 Total annual city revenue expenditure (`) 2,872,000
WATER SUPPLYTotal water produced (MLD) 0.7
Ground water (MLD) 0.0
Surface water (MLD) 0.7
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.7
Total water connections (nos.) 1,422.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 5,219,000.0
Annual revenue expenditure on water (`) 617,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 390,000.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.3
Waste collected (TPD) 3.3
Quantity of waste treated (TPD) 2.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,512.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 6,000.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 300,000.0
105
![Page 115: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/115.jpg)
Khapa Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
106
![Page 116: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/116.jpg)
Khed Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Ratnagiri Slum population 0
Area (sq. km.) 2 Slum households 0
Total city population 20,723 Total annual city capital receipts (`) 396
Total households 4,106 Total annual city capital expenditure (`) 215
Density (persons per sq. km.) 10,362 Total annual city revenue receipts (`) 39,564,000
Total municipal staff 84 Total annual city revenue expenditure (`) 47,310,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 2.0
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 3,166.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,829,000.0
Annual revenue expenditure on water (`) 8,290,000.0
Annual capital expenditure on water (`) 40.7
WASTE WATERArea covered by waste water network (sq. km.) 1.8
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 12.5
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,576.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 4.5
107
![Page 117: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/117.jpg)
Khed Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
108
![Page 118: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/118.jpg)
Khuldabad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Aurangabad Slum population 0
Area (sq. km.) 5 Slum households 0
Total city population 15,530 Total annual city capital receipts (`) 21,188,738
Total households 2,700 Total annual city capital expenditure (`) 17,732,000
Density (persons per sq. km.) 3,045 Total annual city revenue receipts (`) 12,991,125
Total municipal staff 61 Total annual city revenue expenditure (`) 10,867,000
WATER SUPPLYTotal water produced (MLD) 1.0
Ground water (MLD) 0.0
Surface water (MLD) 1.0
Average daily volume treated (MLD) 1.0
Installed storage capacity (MLD) 0.7
Total water connections (nos.) 1,636.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,598,000.0
Annual revenue expenditure on water (`) 3,358,000.0
Annual capital expenditure on water (`) 3,434,000.0
WASTE WATERArea covered by waste water network (sq. km.) 5.1
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.1
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 2,268,000.0
Annual capital expenditure on WW (`) 2,140,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 1.5
Waste collected (TPD) 1.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,025.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 28,000.0
Annual capital expenditure on SW (`) 28,000.0
109
![Page 119: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/119.jpg)
Khuldabad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
110
![Page 120: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/120.jpg)
Kille Dharur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Beed Slum population 0
Area (sq. km.) 5 Slum households 0
Total city population 25,000 Total annual city capital receipts (`) 31,238,305
Total households 3,442 Total annual city capital expenditure (`) 2,026,000
Density (persons per sq. km.) 5,000 Total annual city revenue receipts (`) 15,426,747
Total municipal staff 59 Total annual city revenue expenditure (`) 9,448,533
WATER SUPPLYTotal water produced (MLD) 1.0
Ground water (MLD) 0.0
Surface water (MLD) 1.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.0
Total water connections (nos.) 2,705.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 6.0
No. of days of supply in a month 10.0
Annual revenue receipts from water (`) 1,177,396.0
Annual revenue expenditure on water (`) 2,028,508.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.9
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.9
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 2.0
Waste collected (TPD) 2.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,444.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 703,744.0
Annual capital expenditure on SW (`) 627,244.0
111
![Page 121: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/121.jpg)
Kille Dharur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
112
![Page 122: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/122.jpg)
Kinwat Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 9
District Nanded Slum population 5,400
Area (sq. km.) 14 Slum households 720
Total city population 28,659 Total annual city capital receipts (`) 27,602,000
Total households 5,361 Total annual city capital expenditure (`) 30,203,000
Density (persons per sq. km.) 2,077 Total annual city revenue receipts (`) 33,667,000
Total municipal staff 73 Total annual city revenue expenditure (`) 48,364,000
WATER SUPPLYTotal water produced (MLD) 1.3
Ground water (MLD) 0.1
Surface water (MLD) 1.2
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.6
Total water connections (nos.) 1,398.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 942,000.0
Annual revenue expenditure on water (`) 2,625,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 0.6
Waste collected (TPD) 0.6
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,800.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 1,990,000.0
Annual revenue expenditure on SW (`) 1,352,000.0
Annual capital expenditure on SW (`) 0.0
113
![Page 123: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/123.jpg)
Kinwat Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
114
![Page 124: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/124.jpg)
Kundalwadi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Nanded Slum population 670
Area (sq. km.) 2 Slum households 85
Total city population 17,200 Total annual city capital receipts (`) 0
Total households 3,500 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 7,478 Total annual city revenue receipts (`) 0
Total municipal staff 31 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 0.6
Ground water (MLD) 0.6
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.0
Total water connections (nos.) 0.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 2.3
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.3
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 1.0
Waste collected (TPD) 1.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,607.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
115
![Page 125: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/125.jpg)
Kundalwadi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
116
![Page 126: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/126.jpg)
Kurduvadi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Solapur Slum population 0
Area (sq. km.) 6 Slum households 0
Total city population 23,145 Total annual city capital receipts (`) 39,157,613
Total households 3,780 Total annual city capital expenditure (`) 15,403,711
Density (persons per sq. km.) 3,561 Total annual city revenue receipts (`) 53,277,300
Total municipal staff 95 Total annual city revenue expenditure (`) 63,003,663
WATER SUPPLYTotal water produced (MLD) 4.5
Ground water (MLD) 0.0
Surface water (MLD) 4.5
Average daily volume treated (MLD) 3.8
Installed storage capacity (MLD) 5.0
Total water connections (nos.) 4,272.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 6.5
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 5,926,647.0
Annual revenue expenditure on water (`) 13,358,836.0
Annual capital expenditure on water (`) 909,538.0
WASTE WATERArea covered by waste water network (sq. km.) 3.8
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.8
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 214,850.0
Annual capital expenditure on WW (`) 1,673,822.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.5
Waste collected (TPD) 7.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,453.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 788,540.0
Annual revenue expenditure on SW (`) 4,030,115.0
Annual capital expenditure on SW (`) 5,399,087.0
117
![Page 127: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/127.jpg)
Kurduvadi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
118
![Page 128: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/128.jpg)
Kurundvad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Kolhapur Slum population 0
Area (sq. km.) 3 Slum households 0
Total city population 21,737 Total annual city capital receipts (`) 23,316,646
Total households 4,957 Total annual city capital expenditure (`) 9,009,000
Density (persons per sq. km.) 8,360 Total annual city revenue receipts (`) 20,078,000
Total municipal staff 42 Total annual city revenue expenditure (`) 5,725,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 2.0
Installed storage capacity (MLD) 10.0
Total water connections (nos.) 2,501.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.6
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,382,000.0
Annual revenue expenditure on water (`) 3,600,000.0
Annual capital expenditure on water (`) 202,000.0
WASTE WATERArea covered by waste water network (sq. km.) 1.1
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.1
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 1.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,000.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 472,000.0
Annual capital expenditure on SW (`) 906,000.0
119
![Page 129: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/129.jpg)
Kurundvad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
120
![Page 130: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/130.jpg)
Loha Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Nanded Slum population 525
Area (sq. km.) 27 Slum households 105
Total city population 23,673 Total annual city capital receipts (`) 0
Total households 3,979 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 877 Total annual city revenue receipts (`) 0
Total municipal staff 99 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 0.8
Ground water (MLD) 0.8
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 774.0
Water connections in slums (nos.) 54.0
Area covered by network (sq. km.) 26.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 27.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 27.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,350.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
121
![Page 131: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/131.jpg)
Loha Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
122
![Page 132: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/132.jpg)
Lonar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 13
District Buldhana Slum population 3,336
Area (sq. km.) 36 Slum households 631
Total city population 23,346 Total annual city capital receipts (`) 4,331,460
Total households 4,764 Total annual city capital expenditure (`) 815,000
Density (persons per sq. km.) 658 Total annual city revenue receipts (`) 19,281,000
Total municipal staff 91 Total annual city revenue expenditure (`) 22,526,000
WATER SUPPLYTotal water produced (MLD) 1.0
Ground water (MLD) 1.0
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.3
Total water connections (nos.) 2,129.0
Water connections in slums (nos.) 210.0
Area covered by network (sq. km.) 2.5
No. of days of supply in a month 5.0
Annual revenue receipts from water (`) 924,000.0
Annual revenue expenditure on water (`) 2,871,000.0
Annual capital expenditure on water (`) 2,871,000.0
WASTE WATERArea covered by waste water network (sq. km.) 1.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 3,334,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.5
Waste collected (TPD) 4.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,841.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 165,000.0
Annual capital expenditure on SW (`) 666,000.0
123
![Page 133: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/133.jpg)
Lonar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
124
![Page 134: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/134.jpg)
Mahabaleshwar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Satara Slum population 0
Area (sq. km.) 20 Slum households 0
Total city population 14,629 Total annual city capital receipts (`) 200,476,958
Total households 1,569 Total annual city capital expenditure (`) 71,088,719
Density (persons per sq. km.) 746 Total annual city revenue receipts (`) 67,123,780
Total municipal staff 180 Total annual city revenue expenditure (`) 85,201,701
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.4
Total water connections (nos.) 1,316.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 15.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 8,687,182.0
Annual revenue expenditure on water (`) 5,729,494.0
Annual capital expenditure on water (`) 5,729,494.0
WASTE WATERArea covered by waste water network (sq. km.) 24.0
Underground sewerage network (sq. km) 15.5
Closed drains (sq. km) 3.5
Open drains (sq. km) 5.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 5,603,890.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.0
Waste collected (TPD) 4.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,418.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 43,152.0
Annual revenue expenditure on SW (`) 13,499,604.0
Annual capital expenditure on SW (`) 974,110.0
125
![Page 135: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/135.jpg)
Mahabaleshwar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
126
![Page 136: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/136.jpg)
Mahad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Raigad Slum population 0
Area (sq. km.) 4 Slum households 0
Total city population 31,000 Total annual city capital receipts (`) 1,997,000
Total households 8,568 Total annual city capital expenditure (`) 3,000,000
Density (persons per sq. km.) 7,561 Total annual city revenue receipts (`) 73,075,000
Total municipal staff 139 Total annual city revenue expenditure (`) 85,726,000
WATER SUPPLYTotal water produced (MLD) 3.6
Ground water (MLD) 0.0
Surface water (MLD) 3.6
Average daily volume treated (MLD) 3.8
Installed storage capacity (MLD) 2.5
Total water connections (nos.) 3,946.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,575,000.0
Annual revenue expenditure on water (`) 11,747,000.0
Annual capital expenditure on water (`) 10,105,000.0
WASTE WATERArea covered by waste water network (sq. km.) 4.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.4
Open drains (sq. km) 4.1
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
276.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 7.0
Annual capital expenditure on SW (`) 11,700,000.0
127
![Page 137: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/137.jpg)
Mahad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
128
![Page 138: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/138.jpg)
Maindargi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Solapur Slum population 1,400
Area (sq. km.) 2 Slum households 182
Total city population 12,998 Total annual city capital receipts (`) 15,945,124
Total households 4,279 Total annual city capital expenditure (`) 10,202,221
Density (persons per sq. km.) 6,841 Total annual city revenue receipts (`) 25,218,062
Total municipal staff 30 Total annual city revenue expenditure (`) 18,594,537
WATER SUPPLYTotal water produced (MLD) 0.8
Ground water (MLD) 0.8
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 931.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.9
No. of days of supply in a month 20.0
Annual revenue receipts from water (`) 883,692.0
Annual revenue expenditure on water (`) 770,658.0
Annual capital expenditure on water (`) 401,446.0
WASTE WATERArea covered by waste water network (sq. km.) 2.1
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.1
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 6,000.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 1.0
Waste collected (TPD) 1.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 767,000.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 956,363.0
129
![Page 139: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/139.jpg)
Maindargi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
130
![Page 140: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/140.jpg)
Malkapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Kolhapur Slum population 0
Area (sq. km.) 2 Slum households 0
Total city population 7,000 Total annual city capital receipts (`) 6,650,679
Total households 1,158 Total annual city capital expenditure (`) 5,620,572
Density (persons per sq. km.) 3,684 Total annual city revenue receipts (`) 10,790,688
Total municipal staff 92 Total annual city revenue expenditure (`) 1,629,446
WATER SUPPLYTotal water produced (MLD) 0.7
Ground water (MLD) 0.7
Surface water (MLD) 0.0
Average daily volume treated (MLD) 4.0
Installed storage capacity (MLD) 3.4
Total water connections (nos.) 3,347.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 5.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,445,500.0
Annual revenue expenditure on water (`) 2,899,024.0
Annual capital expenditure on water (`) 5,620,572.0
WASTE WATERArea covered by waste water network (sq. km.) 1.9
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.9
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 1.5
Waste collected (TPD) 1.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,218.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,030,107.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
131
![Page 141: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/141.jpg)
Malkapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
132
![Page 142: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/142.jpg)
Malwan Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Sindhudurg Slum population 0
Area (sq. km.) 6 Slum households 0
Total city population 19,576 Total annual city capital receipts (`) 582,708
Total households 5,383 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 3,012 Total annual city revenue receipts (`) 36,243,171
Total municipal staff 36 Total annual city revenue expenditure (`) 36,089,457
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 1.2
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.2
Total water connections (nos.) 876.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.4
No. of days of supply in a month 26.0
Annual revenue receipts from water (`) 1,776,022.0
Annual revenue expenditure on water (`) 2,376,433.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.5
Waste collected (TPD) 5.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,395.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 3,655,605.0
Annual capital expenditure on SW (`) 0.0
133
![Page 143: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/143.jpg)
Malwan Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
134
![Page 144: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/144.jpg)
Mangalvedhe Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Solapur Slum population 0
Area (sq. km.) 2 Slum households 0
Total city population 24,156 Total annual city capital receipts (`) 27,751,000
Total households 4,832 Total annual city capital expenditure (`) 60,654,000
Density (persons per sq. km.) 16,104 Total annual city revenue receipts (`) 54,281,000
Total municipal staff 76 Total annual city revenue expenditure (`) 1,768,000
WATER SUPPLYTotal water produced (MLD) 3.5
Ground water (MLD) 2.0
Surface water (MLD) 1.5
Average daily volume treated (MLD) 1.5
Installed storage capacity (MLD) 13.5
Total water connections (nos.) 2,543.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.5
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 4,896,000.0
Annual capital expenditure on water (`) 30,304,000.0
WASTE WATERArea covered by waste water network (sq. km.) 1.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,149.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,471,000.0
Annual capital expenditure on SW (`) 1,471,000.0
135
![Page 145: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/145.jpg)
Mangalvedhe Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
136
![Page 146: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/146.jpg)
Mangrulpir Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 12
District Washim Slum population 6,200
Area (sq. km.) 4 Slum households 1,236
Total city population 31,000 Total annual city capital receipts (`) 33,256,473
Total households 6,000 Total annual city capital expenditure (`) 22,702,206
Density (persons per sq. km.) 7,209 Total annual city revenue receipts (`) 63,006,348
Total municipal staff 130 Total annual city revenue expenditure (`) 59,590,638
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 0.0
Surface water (MLD) 1.2
Average daily volume treated (MLD) 1.1
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 1,771.0
Water connections in slums (nos.) 89.0
Area covered by network (sq. km.) 3.2
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,415,510.0
Annual revenue expenditure on water (`) 3,438,045.0
Annual capital expenditure on water (`) 2,197,660.0
WASTE WATERArea covered by waste water network (sq. km.) 2.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 1,851,362.0
Annual capital expenditure on WW (`) 268,917.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,425.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,242,703.0
Annual capital expenditure on SW (`) 125,645.0
137
![Page 147: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/147.jpg)
Mangrulpir Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
138
![Page 148: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/148.jpg)
Manwath Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Parbhani Slum population 4,175
Area (sq. km.) 7 Slum households 535
Total city population 36,000 Total annual city capital receipts (`) 46,000,000
Total households 7,500 Total annual city capital expenditure (`) 54,500,000
Density (persons per sq. km.) 4,932 Total annual city revenue receipts (`) 45,931,000
Total municipal staff 133 Total annual city revenue expenditure (`) 54,502,000
WATER SUPPLYTotal water produced (MLD) 2.3
Ground water (MLD) 0.0
Surface water (MLD) 2.3
Average daily volume treated (MLD) 2.3
Installed storage capacity (MLD) 4.1
Total water connections (nos.) 4,449.0
Water connections in slums (nos.) 387.0
Area covered by network (sq. km.) 7.7
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,362,000.0
Annual revenue expenditure on water (`) 2,200,000.0
Annual capital expenditure on water (`) 2,200,000.0
WASTE WATERArea covered by waste water network (sq. km.) 6.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 6.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,350.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 4,200,000.0
Annual capital expenditure on SW (`) 4,200,000.0
139
![Page 149: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/149.jpg)
Manwath Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
140
![Page 150: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/150.jpg)
Matheran Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 8
District Raigad Slum population 2,400
Area (sq. km.) 7 Slum households 480
Total city population 5,515 Total annual city capital receipts (`) 47,140,752
Total households 1,069 Total annual city capital expenditure (`) 42,389,644
Density (persons per sq. km.) 766 Total annual city revenue receipts (`) 23,540,525
Total municipal staff 56 Total annual city revenue expenditure (`) 23,866,687
WATER SUPPLYTotal water produced (MLD) 1.4
Ground water (MLD) 0.0
Surface water (MLD) 1.4
Average daily volume treated (MLD) 1.4
Installed storage capacity (MLD) 1.2
Total water connections (nos.) 1,027.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 7.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 3,155,372.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 14.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 7.0
Open drains (sq. km) 7.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.5
Waste collected (TPD) 6.5
Quantity of waste treated (TPD) 4.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,141.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
141
![Page 151: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/151.jpg)
Matheran Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
142
![Page 152: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/152.jpg)
Mehkar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 1
District Buldhana Slum population 6,480
Area (sq. km.) 6 Slum households 1,296
Total city population 48,139 Total annual city capital receipts (`) 1,526,197
Total households 8,232 Total annual city capital expenditure (`) 27,583,822
Density (persons per sq. km.) 8,752 Total annual city revenue receipts (`) 53,333,261
Total municipal staff 157 Total annual city revenue expenditure (`) 58,700,114
WATER SUPPLYTotal water produced (MLD) 2.2
Ground water (MLD) 0.0
Surface water (MLD) 2.2
Average daily volume treated (MLD) 2.2
Installed storage capacity (MLD) 2.2
Total water connections (nos.) 4,966.0
Water connections in slums (nos.) 720.0
Area covered by network (sq. km.) 5.0
No. of days of supply in a month 10.0
Annual revenue receipts from water (`) 3,153,960.0
Annual revenue expenditure on water (`) 13,138,274.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 4.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 5.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 4,459,588.0
143
![Page 153: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/153.jpg)
Mehkar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
144
![Page 154: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/154.jpg)
Mhaswad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Satara Slum population 0
Area (sq. km.) 88 Slum households 0
Total city population 22,550 Total annual city capital receipts (`) 20,744,712
Total households 4,452 Total annual city capital expenditure (`) 13,187,092
Density (persons per sq. km.) 256 Total annual city revenue receipts (`) 16,366,637
Total municipal staff 41 Total annual city revenue expenditure (`) 13,475,001
WATER SUPPLYTotal water produced (MLD) 2.6
Ground water (MLD) 0.0
Surface water (MLD) 2.6
Average daily volume treated (MLD) 2.5
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 2,346.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 25.1
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 4,779,731.0
Annual revenue expenditure on water (`) 4,607,264.0
Annual capital expenditure on water (`) 6,570,064.0
WASTE WATERArea covered by waste water network (sq. km.) 17.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 17.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 184,891.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 2.0
Waste collected (TPD) 2.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,354.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 2,701,011.0
145
![Page 155: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/155.jpg)
Mhaswad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
146
![Page 156: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/156.jpg)
Mohpa Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nagpur Slum population 0
Area (sq. km.) 2 Slum households 0
Total city population 8,000 Total annual city capital receipts (`) 17,274,000
Total households 1,696 Total annual city capital expenditure (`) 18,431,000
Density (persons per sq. km.) 5,333 Total annual city revenue receipts (`) 13,210,000
Total municipal staff 19 Total annual city revenue expenditure (`) 12,963,000
WATER SUPPLYTotal water produced (MLD) 0.6
Ground water (MLD) 0.1
Surface water (MLD) 0.5
Average daily volume treated (MLD) 0.6
Installed storage capacity (MLD) 0.3
Total water connections (nos.) 872.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.5
No. of days of supply in a month 25.0
Annual revenue receipts from water (`) 738,000.0
Annual revenue expenditure on water (`) 809,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 1.3
Open drains (sq. km) 0.3
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 608,000.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 2.0
Waste collected (TPD) 2.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,221.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 1,799,000.0
147
![Page 157: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/157.jpg)
Mohpa Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
148
![Page 158: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/158.jpg)
Mool Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Chandrapur Slum population 8,020
Area (sq. km.) 23 Slum households 2,553
Total city population 26,537 Total annual city capital receipts (`) 107,491,445
Total households 6,026 Total annual city capital expenditure (`) 16,140,066
Density (persons per sq. km.) 1,134 Total annual city revenue receipts (`) 18,449,732
Total municipal staff 122 Total annual city revenue expenditure (`) 32,860,915
WATER SUPPLYTotal water produced (MLD) 1.0
Ground water (MLD) 0.0
Surface water (MLD) 1.0
Average daily volume treated (MLD) 1.0
Installed storage capacity (MLD) 1.0
Total water connections (nos.) 1,694.0
Water connections in slums (nos.) 447.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,400,054.0
Annual revenue expenditure on water (`) 4,382,823.0
Annual capital expenditure on water (`) 337,334.0
WASTE WATERArea covered by waste water network (sq. km.) 20.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 20.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 3,376,000.0
Annual capital expenditure on WW (`) 838,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 10.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 1.0
Door to door colln.(no. of households andestablishments)
4,829.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,229,995.0
Annual revenue expenditure on SW (`) 2,256,407.0
Annual capital expenditure on SW (`) 2,171,949.0
149
![Page 159: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/159.jpg)
Mool Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
150
![Page 160: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/160.jpg)
Morshi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 8
District Amravati Slum population 3,000
Area (sq. km.) 5 Slum households 700
Total city population 41,000 Total annual city capital receipts (`) 12,300,000
Total households 7,324 Total annual city capital expenditure (`) 14,886,000
Density (persons per sq. km.) 8,367 Total annual city revenue receipts (`) 40,956,000
Total municipal staff 78 Total annual city revenue expenditure (`) 53,483,000
WATER SUPPLYTotal water produced (MLD) 4.5
Ground water (MLD) 0.0
Surface water (MLD) 4.5
Average daily volume treated (MLD) 4.0
Installed storage capacity (MLD) 1.8
Total water connections (nos.) 3,920.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 5.7
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 6,800,000.0
Annual revenue expenditure on water (`) 6,200,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 4.9
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.9
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 4,886,000.0
Annual capital expenditure on WW (`) 1,200,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.5
Waste collected (TPD) 6.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,902.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 300,000.0
Annual capital expenditure on SW (`) 2,520,000.0
151
![Page 161: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/161.jpg)
Morshi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
152
![Page 162: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/162.jpg)
Mowad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Nagpur Slum population 390
Area (sq. km.) 7 Slum households 74
Total city population 9,523 Total annual city capital receipts (`) 27,328,000
Total households 2,039 Total annual city capital expenditure (`) 23,190,784
Density (persons per sq. km.) 1,421 Total annual city revenue receipts (`) 27,327,999
Total municipal staff 30 Total annual city revenue expenditure (`) 23,201,230
WATER SUPPLYTotal water produced (MLD) 0.7
Ground water (MLD) 0.7
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 1,060.0
Water connections in slums (nos.) 24.0
Area covered by network (sq. km.) 2.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,192,063.0
Annual revenue expenditure on water (`) 723,010.0
Annual capital expenditure on water (`) 903,339.0
WASTE WATERArea covered by waste water network (sq. km.) 9.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 4.0
Open drains (sq. km) 5.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 0.5
Waste collected (TPD) 0.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,810.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
153
![Page 163: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/163.jpg)
Mowad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
154
![Page 164: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/164.jpg)
Mudkhed Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 7
District Nanded Slum population 4,250
Area (sq. km.) 0 Slum households 0
Total city population 27,000 Total annual city capital receipts (`) 1,123,244
Total households 3,509 Total annual city capital expenditure (`) 1,451,350
Density (persons per sq. km.) 0 Total annual city revenue receipts (`) 1,123,244
Total municipal staff 60 Total annual city revenue expenditure (`) 1,451,350
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 1.2
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.1
Total water connections (nos.) 1,111.0
Water connections in slums (nos.) 125.0
Area covered by network (sq. km.) 6.7
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 665,568.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.1
Open drains (sq. km) 3.5
Total sewerage connections (nos.) 2,784.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.6
Waste collected (TPD) 5.6
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
125.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
155
![Page 165: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/165.jpg)
Mudkhed Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
156
![Page 166: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/166.jpg)
Mukhed Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Nanded Slum population 6,000
Area (sq. km.) 33 Slum households 400
Total city population 31,123 Total annual city capital receipts (`) 0
Total households 5,342 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 940 Total annual city revenue receipts (`) 41,756,000
Total municipal staff 0 Total annual city revenue expenditure (`) 34,379,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 2.0
Installed storage capacity (MLD) 2.4
Total water connections (nos.) 2,489.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 30.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,189,000.0
Annual revenue expenditure on water (`) 4,508,000.0
Annual capital expenditure on water (`) 4,508,000.0
WASTE WATERArea covered by waste water network (sq. km.) 20.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 20.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 3,488,000.0
Annual capital expenditure on WW (`) 3,488,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
56.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 805,000.0
157
![Page 167: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/167.jpg)
Mukhed Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
158
![Page 168: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/168.jpg)
Murgud Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Kolhapur Slum population 0
Area (sq. km.) 11 Slum households 0
Total city population 10,839 Total annual city capital receipts (`) 8,900,743
Total households 2,300 Total annual city capital expenditure (`) 7,070,380
Density (persons per sq. km.) 985 Total annual city revenue receipts (`) 28,203,263
Total municipal staff 68 Total annual city revenue expenditure (`) 28,166,399
WATER SUPPLYTotal water produced (MLD) 0.8
Ground water (MLD) 0.0
Surface water (MLD) 0.8
Average daily volume treated (MLD) 0.8
Installed storage capacity (MLD) 0.5
Total water connections (nos.) 1,905.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,670,767.0
Annual revenue expenditure on water (`) 3,008,672.0
Annual capital expenditure on water (`) 341,768.0
WASTE WATERArea covered by waste water network (sq. km.) 2.1
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.1
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,365.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,744,932.0
Annual capital expenditure on SW (`) 2,951,169.0
159
![Page 169: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/169.jpg)
Murgud Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
160
![Page 170: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/170.jpg)
Murtijapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Akola Slum population 0
Area (sq. km.) 6 Slum households 0
Total city population 50,000 Total annual city capital receipts (`) 76,866,000
Total households 9,280 Total annual city capital expenditure (`) 3,536,600
Density (persons per sq. km.) 9,091 Total annual city revenue receipts (`) 30,271,000
Total municipal staff 42 Total annual city revenue expenditure (`) 33,606,000
WATER SUPPLYTotal water produced (MLD) 1.0
Ground water (MLD) 0.0
Surface water (MLD) 1.0
Average daily volume treated (MLD) 1.0
Installed storage capacity (MLD) 1.0
Total water connections (nos.) 3,056.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 5.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 4.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 10.0
Waste collected (TPD) 10.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) nd
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
161
![Page 171: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/171.jpg)
Murtijapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
162
![Page 172: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/172.jpg)
Murud Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Raigad Slum population 0
Area (sq. km.) 3 Slum households 0
Total city population 13,000 Total annual city capital receipts (`) 10,687,000
Total households 2,693 Total annual city capital expenditure (`) 11,485,000
Density (persons per sq. km.) 4,062 Total annual city revenue receipts (`) 15,641,000
Total municipal staff 56 Total annual city revenue expenditure (`) 8,147,000
WATER SUPPLYTotal water produced (MLD) 2.2
Ground water (MLD) 2.2
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1,100,000.0
Total water connections (nos.) 2,057.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.2
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 7,300,000.2
Annual revenue expenditure on water (`) 4,030,000.0
Annual capital expenditure on water (`) 625,000.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
387.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 15,000.0
Annual revenue expenditure on SW (`) 3,160,000.0
Annual capital expenditure on SW (`) 20,000.0
163
![Page 173: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/173.jpg)
Murud Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
164
![Page 174: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/174.jpg)
Murum Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 8
District Osmanabad Slum population 9,500
Area (sq. km.) 4 Slum households 2,100
Total city population 22,000 Total annual city capital receipts (`) 18,867,000
Total households 4,217 Total annual city capital expenditure (`) 17,249,000
Density (persons per sq. km.) 6,111 Total annual city revenue receipts (`) 6,087,000
Total municipal staff 33 Total annual city revenue expenditure (`) 18,056,000
WATER SUPPLYTotal water produced (MLD) 5.5
Ground water (MLD) 0.0
Surface water (MLD) 5.5
Average daily volume treated (MLD) 5.5
Installed storage capacity (MLD) 10.0
Total water connections (nos.) 1,746.0
Water connections in slums (nos.) 445.0
Area covered by network (sq. km.) 3.6
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 707,000.0
Annual revenue expenditure on water (`) 884,000.0
Annual capital expenditure on water (`) 609,000.0
WASTE WATERArea covered by waste water network (sq. km.) 1.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.0
Waste collected (TPD) 4.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,202.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,349,000.0
Annual capital expenditure on SW (`) 0.0
165
![Page 175: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/175.jpg)
Murum Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
166
![Page 176: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/176.jpg)
Naldurg Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Osmanabad Slum population 3,383
Area (sq. km.) 11 Slum households 1,153
Total city population 19,858 Total annual city capital receipts (`) 48,636,000
Total households 7,097 Total annual city capital expenditure (`) 41,095,000
Density (persons per sq. km.) 1,805 Total annual city revenue receipts (`) 16,467,000
Total municipal staff 72 Total annual city revenue expenditure (`) 7,362,000
WATER SUPPLYTotal water produced (MLD) 1.6
Ground water (MLD) 0.1
Surface water (MLD) 1.5
Average daily volume treated (MLD) 1.5
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 1,379.0
Water connections in slums (nos.) 793.0
Area covered by network (sq. km.) 11.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,081,000.0
Annual revenue expenditure on water (`) 1,534,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 11.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 11.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 500,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.0
Waste collected (TPD) 4.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,229,000.0
Annual capital expenditure on SW (`) 1,185,000.0
167
![Page 177: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/177.jpg)
Naldurg Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
168
![Page 178: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/178.jpg)
Nandgaon Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nashik Slum population 0
Area (sq. km.) 4 Slum households 0
Total city population 26,415 Total annual city capital receipts (`) 4,998,000
Total households 5,301 Total annual city capital expenditure (`) 6,119,000
Density (persons per sq. km.) 6,951 Total annual city revenue receipts (`) 49,549,000
Total municipal staff 82 Total annual city revenue expenditure (`) 40,935,000
WATER SUPPLYTotal water produced (MLD) 4.5
Ground water (MLD) 3.0
Surface water (MLD) 1.5
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.3
Total water connections (nos.) 3,499.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.8
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 3,166,000.0
Annual revenue expenditure on water (`) 2,798,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.7
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.7
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,590.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 952,000.0
Annual revenue expenditure on SW (`) 849,000.0
Annual capital expenditure on SW (`) 952,000.0
169
![Page 179: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/179.jpg)
Nandgaon Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
170
![Page 180: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/180.jpg)
Nandura Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 7
District Buldhana Slum population 1,400
Area (sq. km.) 6 Slum households 269
Total city population 45,000 Total annual city capital receipts (`) 56,591,000
Total households 8,648 Total annual city capital expenditure (`) 16,435,000
Density (persons per sq. km.) 8,182 Total annual city revenue receipts (`) 62,297,000
Total municipal staff 200 Total annual city revenue expenditure (`) 65,329,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 1.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 1.8
Installed storage capacity (MLD) 1.2
Total water connections (nos.) 4,007.0
Water connections in slums (nos.) 50.0
Area covered by network (sq. km.) 5.6
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,751,000.0
Annual revenue expenditure on water (`) 5,945,000.0
Annual capital expenditure on water (`) 5,974,000.0
WASTE WATERArea covered by waste water network (sq. km.) 5.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 9,322,000.0
Annual capital expenditure on WW (`) 9,311,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,720.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 5,285,000.0
Annual capital expenditure on SW (`) 1,150,000.0
171
![Page 181: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/181.jpg)
Nandura Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
172
![Page 182: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/182.jpg)
Narkhed Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Nagpur Slum population 2,556
Area (sq. km.) 4 Slum households 511
Total city population 25,000 Total annual city capital receipts (`) 19,243,000
Total households 5,000 Total annual city capital expenditure (`) 39,234,000
Density (persons per sq. km.) 6,250 Total annual city revenue receipts (`) 65,318,916
Total municipal staff 52 Total annual city revenue expenditure (`) 83,424,730
WATER SUPPLYTotal water produced (MLD) 1.9
Ground water (MLD) 0.4
Surface water (MLD) 1.5
Average daily volume treated (MLD) 1.9
Installed storage capacity (MLD) 1.9
Total water connections (nos.) 2,910.0
Water connections in slums (nos.) 296.0
Area covered by network (sq. km.) 2.4
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,141,656.0
Annual revenue expenditure on water (`) 1,286,985.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 2.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 4,750,505.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.1
Waste collected (TPD) 7.1
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,870.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 274,965.0
Annual capital expenditure on SW (`) 0.0
173
![Page 183: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/183.jpg)
Narkhed Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
174
![Page 184: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/184.jpg)
Nawapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Nandurbar Slum population 4,028
Area (sq. km.) 14 Slum households 773
Total city population 35,000 Total annual city capital receipts (`) 10,258,000
Total households 5,845 Total annual city capital expenditure (`) 10,042,000
Density (persons per sq. km.) 2,414 Total annual city revenue receipts (`) 26,249,000
Total municipal staff 124 Total annual city revenue expenditure (`) 15,684,000
WATER SUPPLYTotal water produced (MLD) 2.5
Ground water (MLD) 2.5
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 3,199.0
Water connections in slums (nos.) 40.0
Area covered by network (sq. km.) 13.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,609,972.0
Annual revenue expenditure on water (`) 4,282,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 14.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 11.5
Open drains (sq. km) 3.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 826,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 6.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,950.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 1,219,000.0
175
![Page 185: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/185.jpg)
Nawapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
176
![Page 186: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/186.jpg)
Nilanga Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Latur Slum population 0
Area (sq. km.) 17 Slum households 0
Total city population 41,000 Total annual city capital receipts (`) 56,289,508
Total households 5,625 Total annual city capital expenditure (`) 52,625,995
Density (persons per sq. km.) 2,426 Total annual city revenue receipts (`) 56,289,508
Total municipal staff 69 Total annual city revenue expenditure (`) 52,625,995
WATER SUPPLYTotal water produced (MLD) 1.8
Ground water (MLD) 0.2
Surface water (MLD) 1.6
Average daily volume treated (MLD) 1.6
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 2,124.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,995,864.0
Annual revenue expenditure on water (`) 52,625,995.0
Annual capital expenditure on water (`) 5,628,458.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 0.0
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) ND
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 2,296,500.0
177
![Page 187: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/187.jpg)
Nilanga Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
178
![Page 188: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/188.jpg)
Paithan Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Aurangabad Slum population 0
Area (sq. km.) 5 Slum households 0
Total city population 41,518 Total annual city capital receipts (`) 12,421,111
Total households 0 Total annual city capital expenditure (`) 17,563,718
Density (persons per sq. km.) 8,141 Total annual city revenue receipts (`) 74,833,187
Total municipal staff 162 Total annual city revenue expenditure (`) 19,185,000
WATER SUPPLYTotal water produced (MLD) 6.0
Ground water (MLD) 0.0
Surface water (MLD) 6.0
Average daily volume treated (MLD) 6.0
Installed storage capacity (MLD) 2.2
Total water connections (nos.) 4,299.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 5.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 5.1
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.7
Open drains (sq. km) 4.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 525,454.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,800.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 944,482.0
179
![Page 189: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/189.jpg)
Paithan Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
180
![Page 190: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/190.jpg)
Panchgani Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Satara Slum population 930
Area (sq. km.) 7 Slum households 186
Total city population 15,670 Total annual city capital receipts (`) 30,074,324
Total households 3,134 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 2,304 Total annual city revenue receipts (`) 90,922,262
Total municipal staff 63 Total annual city revenue expenditure (`) 104,321,253
WATER SUPPLYTotal water produced (MLD) 1.6
Ground water (MLD) 0.0
Surface water (MLD) 1.6
Average daily volume treated (MLD) 1.6
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 1,457.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 26.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 348,576.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 6.9
Underground sewerage network (sq. km) 1.5
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.4
Total sewerage connections (nos.) 610.0
Sewerage coverage: slums (%) 3.0
Installed STP treatment capacity (MLD) 0.7
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.9
Waste collected (TPD) 3.9
Quantity of waste treated (TPD) 2.2
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,639.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
181
![Page 191: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/191.jpg)
Panchgani Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
182
![Page 192: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/192.jpg)
Pandharkaoda Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Yavatmal Slum population 3,185
Area (sq. km.) 4 Slum households 637
Total city population 35,872 Total annual city capital receipts (`) 10,800,000
Total households 6,023 Total annual city capital expenditure (`) 13,000,000
Density (persons per sq. km.) 8,968 Total annual city revenue receipts (`) 65,690,000
Total municipal staff 103 Total annual city revenue expenditure (`) 67,915,000
WATER SUPPLYTotal water produced (MLD) 7.0
Ground water (MLD) 0.0
Surface water (MLD) 7.0
Average daily volume treated (MLD) 3.2
Installed storage capacity (MLD) 1.6
Total water connections (nos.) 3,657.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 5,140,000.0
Annual revenue expenditure on water (`) 6,127,000.0
Annual capital expenditure on water (`) 10.3
WASTE WATERArea covered by waste water network (sq. km.) 2,400.0
Underground sewerage network (sq. km) 2,400.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 3,625,000.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 5.0
Door to door colln.(no. of households andestablishments)
5,038.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 5.0
183
![Page 193: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/193.jpg)
Pandharkaoda Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
184
![Page 194: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/194.jpg)
Panhala Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Kolhapur Slum population 0
Area (sq. km.) 2 Slum households 0
Total city population 3,952 Total annual city capital receipts (`) 19,960,000
Total households 700 Total annual city capital expenditure (`) 16,412,000
Density (persons per sq. km.) 2,470 Total annual city revenue receipts (`) 18,202,000
Total municipal staff 24 Total annual city revenue expenditure (`) 5,417,000
WATER SUPPLYTotal water produced (MLD) 0.2
Ground water (MLD) 0.0
Surface water (MLD) 0.2
Average daily volume treated (MLD) 0.2
Installed storage capacity (MLD) 0.3
Total water connections (nos.) 618.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.6
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 265,000.0
WASTE WATERArea covered by waste water network (sq. km.) 1.3
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.1
Open drains (sq. km) 1.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 82,000.0
Annual capital expenditure on WW (`) 757,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 1.0
Waste collected (TPD) 0.8
Quantity of waste treated (TPD) 0.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
731.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 606,000.0
Annual capital expenditure on SW (`) 1,451,000.0
185
![Page 195: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/195.jpg)
Panhala Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
186
![Page 196: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/196.jpg)
Paranda Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Osmanabad Slum population 950
Area (sq. km.) 4 Slum households 225
Total city population 20,000 Total annual city capital receipts (`) 27,638,000
Total households 3,863 Total annual city capital expenditure (`) 21,000,000
Density (persons per sq. km.) 4,444 Total annual city revenue receipts (`) 27,638,000
Total municipal staff 49 Total annual city revenue expenditure (`) 26,464,000
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 0.2
Surface water (MLD) 1.0
Average daily volume treated (MLD) 1.0
Installed storage capacity (MLD) 6.7
Total water connections (nos.) 2,017.0
Water connections in slums (nos.) 100.0
Area covered by network (sq. km.) 4.5
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 23,869,000.0
Annual revenue expenditure on water (`) 2,911,000.0
Annual capital expenditure on water (`) 2,569,000.0
WASTE WATERArea covered by waste water network (sq. km.) 2.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.3
Open drains (sq. km) 2.3
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 3,209,000.0
Annual capital expenditure on SW (`) 916,000.0
187
![Page 197: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/197.jpg)
Paranda Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
188
![Page 198: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/198.jpg)
Parola Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Jalgaon Slum population 7,500
Area (sq. km.) 4 Slum households 1,500
Total city population 39,285 Total annual city capital receipts (`) 37,599,000
Total households 7,857 Total annual city capital expenditure (`) 19,808,000
Density (persons per sq. km.) 9,354 Total annual city revenue receipts (`) 32,988,000
Total municipal staff 119 Total annual city revenue expenditure (`) 19,644,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 0.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 3.0
Installed storage capacity (MLD) 22.8
Total water connections (nos.) 3,889.0
Water connections in slums (nos.) 125.0
Area covered by network (sq. km.) 38.0
No. of days of supply in a month 8.0
Annual revenue receipts from water (`) 4,531,000.0
Annual revenue expenditure on water (`) 22,645,000.0
Annual capital expenditure on water (`) 6,364,000.0
WASTE WATERArea covered by waste water network (sq. km.) 4.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 286,000.0
Annual revenue expenditure on WW (`) 660,000.0
Annual capital expenditure on WW (`) 66,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,356.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,122,000.0
Annual revenue expenditure on SW (`) 8,558,000.0
Annual capital expenditure on SW (`) 955,000.0
189
![Page 199: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/199.jpg)
Parola Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
190
![Page 200: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/200.jpg)
Partur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Jalna Slum population 1,000
Area (sq. km.) 10 Slum households 550
Total city population 36,466 Total annual city capital receipts (`) 37,052,000
Total households 4,813 Total annual city capital expenditure (`) 19,867,000
Density (persons per sq. km.) 3,647 Total annual city revenue receipts (`) 37,049,000
Total municipal staff 56 Total annual city revenue expenditure (`) 40,728,000
WATER SUPPLYTotal water produced (MLD) 0.7
Ground water (MLD) 0.6
Surface water (MLD) 0.1
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 3,692.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 6.5
No. of days of supply in a month 7.0
Annual revenue receipts from water (`) 4,212,000.0
Annual revenue expenditure on water (`) 4,475,000.0
Annual capital expenditure on water (`) 887,000.0
WASTE WATERArea covered by waste water network (sq. km.) 5.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 2,431,000.0
Annual capital expenditure on WW (`) 868,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 1.0
Waste collected (TPD) 1.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,824.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,074,000.0
Annual revenue expenditure on SW (`) 393,000.0
Annual capital expenditure on SW (`) 3,903,000.0
191
![Page 201: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/201.jpg)
Partur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
192
![Page 202: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/202.jpg)
Pathardi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 1
District Ahmednagar Slum population 2,107
Area (sq. km.) 28 Slum households 528
Total city population 27,200 Total annual city capital receipts (`) 6,756,000
Total households 5,250 Total annual city capital expenditure (`) 5,391,000
Density (persons per sq. km.) 971 Total annual city revenue receipts (`) 28,290,000
Total municipal staff 126 Total annual city revenue expenditure (`) 151,173
WATER SUPPLYTotal water produced (MLD) 2.3
Ground water (MLD) 0.0
Surface water (MLD) 2.3
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 2.1
Total water connections (nos.) 3,625.0
Water connections in slums (nos.) 145.0
Area covered by network (sq. km.) 28.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,746,000.0
Annual revenue expenditure on water (`) 2,563,291.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 15.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 15.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 12.0
Waste collected (TPD) 12.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,400.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 473,000.0
193
![Page 203: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/203.jpg)
Pathardi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
194
![Page 204: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/204.jpg)
Pathri Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 12
District Parbhani Slum population 6,749
Area (sq. km.) 18 Slum households 1,208
Total city population 40,160 Total annual city capital receipts (`) 26,408,840
Total households 6,150 Total annual city capital expenditure (`) 26,045,000
Density (persons per sq. km.) 2,256 Total annual city revenue receipts (`) 41,604,000
Total municipal staff 131 Total annual city revenue expenditure (`) 40,496,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 2.0
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.9
Total water connections (nos.) 2,091.0
Water connections in slums (nos.) 575.0
Area covered by network (sq. km.) 3.8
No. of days of supply in a month 10.0
Annual revenue receipts from water (`) 1,386,000.0
Annual revenue expenditure on water (`) 2,890,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 8.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 8.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 11.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,205.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 175,000.0
Annual revenue expenditure on SW (`) 6,020,000.0
Annual capital expenditure on SW (`) 0.0
195
![Page 205: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/205.jpg)
Pathri Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
196
![Page 206: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/206.jpg)
Patur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Akola Slum population 0
Area (sq. km.) 0 Slum households 0
Total city population 23,359 Total annual city capital receipts (`) 0
Total households 5,584 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 0 Total annual city revenue receipts (`) 0
Total municipal staff 50 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 1.5
Ground water (MLD) 0.0
Surface water (MLD) 1.5
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 3.0
Total water connections (nos.) 0.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 5.2
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.1
Waste collected (TPD) 1.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,108.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
197
![Page 207: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/207.jpg)
Patur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
198
![Page 208: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/208.jpg)
Pauni Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 15
District Bhandara Slum population 10,800
Area (sq. km.) 3 Slum households 1,896
Total city population 23,807 Total annual city capital receipts (`) 525,000
Total households 4,761 Total annual city capital expenditure (`) 364,000
Density (persons per sq. km.) 8,209 Total annual city revenue receipts (`) 52,500,000
Total municipal staff 72 Total annual city revenue expenditure (`) 33,300,000
WATER SUPPLYTotal water produced (MLD) 2.6
Ground water (MLD) 0.1
Surface water (MLD) 2.5
Average daily volume treated (MLD) 2.5
Installed storage capacity (MLD) 965,000.0
Total water connections (nos.) 2,574.0
Water connections in slums (nos.) 130.0
Area covered by network (sq. km.) 2.9
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 100,000.0
Annual revenue expenditure on water (`) 2,300,000.0
Annual capital expenditure on water (`) 45,000.0
WASTE WATERArea covered by waste water network (sq. km.) 2.9
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.5
Open drains (sq. km) 2.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 4.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,806.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 2,000,000.0
Annual revenue expenditure on SW (`) 1,100,000.0
Annual capital expenditure on SW (`) 3,000.0
199
![Page 209: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/209.jpg)
Pauni Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
200
![Page 210: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/210.jpg)
Pen Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Raigad Slum population 0
Area (sq. km.) 10 Slum households 0
Total city population 45,000 Total annual city capital receipts (`) 43,698,140
Total households 9,000 Total annual city capital expenditure (`) 78,419,843
Density (persons per sq. km.) 4,592 Total annual city revenue receipts (`) 80,152,672
Total municipal staff 229 Total annual city revenue expenditure (`) 78,419,843
WATER SUPPLYTotal water produced (MLD) 6.0
Ground water (MLD) 0.0
Surface water (MLD) 6.0
Average daily volume treated (MLD) 6.0
Installed storage capacity (MLD) 3.1
Total water connections (nos.) 5,654.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 7.4
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 6,993,103.0
Annual revenue expenditure on water (`) 10,625,468.0
Annual capital expenditure on water (`) 3,088,215.0
WASTE WATERArea covered by waste water network (sq. km.) 7.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 7.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 3,853,463.0
Annual capital expenditure on WW (`) 3,853,463.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 12.0
Waste collected (TPD) 12.0
Quantity of waste treated (TPD) 2.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
9,862.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 18,660,970.0
Annual capital expenditure on SW (`) 4,338,169.0
201
![Page 211: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/211.jpg)
Pen Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
202
![Page 212: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/212.jpg)
Pulgaon Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Wardha Slum population 3,284
Area (sq. km.) 3 Slum households 579
Total city population 41,340 Total annual city capital receipts (`) 22,117,000
Total households 8,568 Total annual city capital expenditure (`) 1,616,000
Density (persons per sq. km.) 15,311 Total annual city revenue receipts (`) 61,346,000
Total municipal staff 138 Total annual city revenue expenditure (`) 55,170,000
WATER SUPPLYTotal water produced (MLD) 2.8
Ground water (MLD) 0.0
Surface water (MLD) 2.8
Average daily volume treated (MLD) 2.8
Installed storage capacity (MLD) 2.1
Total water connections (nos.) 3,402.0
Water connections in slums (nos.) 410.0
Area covered by network (sq. km.) 2.7
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,555,000.0
Annual revenue expenditure on water (`) 5,452,000.0
Annual capital expenditure on water (`) 600,000.0
WASTE WATERArea covered by waste water network (sq. km.) 2.7
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.7
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,761.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
203
![Page 213: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/213.jpg)
Pulgaon Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
204
![Page 214: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/214.jpg)
Purna Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 20
District Parbhani Slum population 14,310
Area (sq. km.) 18 Slum households 3,100
Total city population 38,300 Total annual city capital receipts (`) 48,059,390
Total households 5,850 Total annual city capital expenditure (`) 67,342,429
Density (persons per sq. km.) 2,128 Total annual city revenue receipts (`) 59,328,000
Total municipal staff 149 Total annual city revenue expenditure (`) 67,342,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.0
Surface water (MLD) 2.0
Average daily volume treated (MLD) 2.0
Installed storage capacity (MLD) 2.3
Total water connections (nos.) 1,373.0
Water connections in slums (nos.) 410.0
Area covered by network (sq. km.) 9.0
No. of days of supply in a month 20.0
Annual revenue receipts from water (`) 1,226,000.0
Annual revenue expenditure on water (`) 4,229,000.0
Annual capital expenditure on water (`) 1,887,000.0
WASTE WATERArea covered by waste water network (sq. km.) 8.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 8.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 2.0
Waste collected (TPD) 2.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
205
![Page 215: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/215.jpg)
Purna Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
206
![Page 216: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/216.jpg)
Rahimatpur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Satara Slum population 0
Area (sq. km.) 39 Slum households 0
Total city population 18,218 Total annual city capital receipts (`) 34,697,000
Total households 3,607 Total annual city capital expenditure (`) 10,631,000
Density (persons per sq. km.) 468 Total annual city revenue receipts (`) 34,697,000
Total municipal staff 30 Total annual city revenue expenditure (`) 24,074,000
WATER SUPPLYTotal water produced (MLD) 1.7
Ground water (MLD) 0.0
Surface water (MLD) 1.7
Average daily volume treated (MLD) 1.7
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 1,649.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 6.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,491,000.0
Annual revenue expenditure on water (`) 3,403,000.0
Annual capital expenditure on water (`) 3,403,000.0
WASTE WATERArea covered by waste water network (sq. km.) 18.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 12.0
Open drains (sq. km) 6.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 1,282,000.0
Annual capital expenditure on WW (`) 227,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 0.2
Waste collected (TPD) 0.2
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,245.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,938,000.0
Annual capital expenditure on SW (`) 1,938,000.0
207
![Page 217: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/217.jpg)
Rahimatpur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
208
![Page 218: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/218.jpg)
Rahta Pimplas Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Ahmednagar Slum population 3,360
Area (sq. km.) 22 Slum households 672
Total city population 22,208 Total annual city capital receipts (`) 31,115,000
Total households 4,073 Total annual city capital expenditure (`) 25,973,000
Density (persons per sq. km.) 1,010 Total annual city revenue receipts (`) 73,503,000
Total municipal staff 77 Total annual city revenue expenditure (`) 70,434,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 2.0
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.7
Total water connections (nos.) 1,948.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 18.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,650,000.0
Annual revenue expenditure on water (`) 3,898,000.0
Annual capital expenditure on water (`) 1,178,000.0
WASTE WATERArea covered by waste water network (sq. km.) 7.0
Underground sewerage network (sq. km) 2.5
Closed drains (sq. km) 2.5
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 1,197.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 73,000.0
Annual capital expenditure on WW (`) 73,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 0.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,620.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
209
![Page 219: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/219.jpg)
Rahta Pimplas Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
210
![Page 220: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/220.jpg)
Rahuri Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 1
District Ahmednagar Slum population 241
Area (sq. km.) 42 Slum households 43
Total city population 39,330 Total annual city capital receipts (`) 27,970,429
Total households 7,297 Total annual city capital expenditure (`) 35,770,202
Density (persons per sq. km.) 928 Total annual city revenue receipts (`) 89,603,799
Total municipal staff 177 Total annual city revenue expenditure (`) 85,459,665
WATER SUPPLYTotal water produced (MLD) 3.6
Ground water (MLD) 0.0
Surface water (MLD) 3.6
Average daily volume treated (MLD) 3.5
Installed storage capacity (MLD) 2.4
Total water connections (nos.) 4,399.0
Water connections in slums (nos.) 1.0
Area covered by network (sq. km.) 24.8
No. of days of supply in a month 26.8
Annual revenue receipts from water (`) 4,043,114.0
Annual revenue expenditure on water (`) 5,140,155.0
Annual capital expenditure on water (`) 1,550,929.0
WASTE WATERArea covered by waste water network (sq. km.) 4.3
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.3
Open drains (sq. km) 4.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 358,814.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 1.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 8,149,798.0
Annual capital expenditure on SW (`) 1,691,926.0
211
![Page 221: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/221.jpg)
Rahuri Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
212
![Page 222: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/222.jpg)
Rajapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Ratnagiri Slum population 0
Area (sq. km.) 6 Slum households 0
Total city population 11,041 Total annual city capital receipts (`) 6,850,000
Total households 2,760 Total annual city capital expenditure (`) 16,813,000
Density (persons per sq. km.) 1,781 Total annual city revenue receipts (`) 17,481,000
Total municipal staff 67 Total annual city revenue expenditure (`) 15,575,000
WATER SUPPLYTotal water produced (MLD) 1.7
Ground water (MLD) 0.0
Surface water (MLD) 1.7
Average daily volume treated (MLD) 1.7
Installed storage capacity (MLD) 1.9
Total water connections (nos.) 1,845.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 6.2
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,566,000.0
Annual revenue expenditure on water (`) 2,340,000.0
Annual capital expenditure on water (`) 64,000.0
WASTE WATERArea covered by waste water network (sq. km.) 22.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 14.1
Open drains (sq. km) 8.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 13,000.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 275,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 1.0
Waste collected (TPD) 0.3
Quantity of waste treated (TPD) 0.3
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,120.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 1,177,000.0
213
![Page 223: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/223.jpg)
Rajapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
214
![Page 224: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/224.jpg)
Rajura Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Chandrapur Slum population 4,971
Area (sq. km.) 3 Slum households 933
Total city population 33,335 Total annual city capital receipts (`) 99,381,000
Total households 6,553 Total annual city capital expenditure (`) 69,938,000
Density (persons per sq. km.) 11,495 Total annual city revenue receipts (`) 46,133,000
Total municipal staff 175 Total annual city revenue expenditure (`) 45,930,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 0.0
Surface water (MLD) 3.0
Average daily volume treated (MLD) 3.0
Installed storage capacity (MLD) 1.8
Total water connections (nos.) 2,894.0
Water connections in slums (nos.) 350.0
Area covered by network (sq. km.) 98.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,658,000.0
Annual revenue expenditure on water (`) 7,040,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 3,673,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,289.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 770,000.0
215
![Page 225: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/225.jpg)
Rajura Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
216
![Page 226: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/226.jpg)
Ramtek Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Nagpur Slum population 500
Area (sq. km.) 4 Slum households 135
Total city population 24,509 Total annual city capital receipts (`) 30,640,520
Total households 4,932 Total annual city capital expenditure (`) 23,103,165
Density (persons per sq. km.) 7,003 Total annual city revenue receipts (`) 22,973,041
Total municipal staff 46 Total annual city revenue expenditure (`) 13,044,901
WATER SUPPLYTotal water produced (MLD) 1.6
Ground water (MLD) 0.1
Surface water (MLD) 1.5
Average daily volume treated (MLD) 1.5
Installed storage capacity (MLD) 1.0
Total water connections (nos.) 2,400.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.7
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,906,602.0
Annual revenue expenditure on water (`) 4,578,419.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1,900.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 900.0
Open drains (sq. km) 1,000.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 770,228.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,410.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 259,459.0
Annual capital expenditure on SW (`) 0.0
217
![Page 227: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/227.jpg)
Ramtek Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
218
![Page 228: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/228.jpg)
Raver Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Jalgaon Slum population 0
Area (sq. km.) 2 Slum households 0
Total city population 27,633 Total annual city capital receipts (`) 31,496,000
Total households 4,606 Total annual city capital expenditure (`) 30,680,000
Density (persons per sq. km.) 12,560 Total annual city revenue receipts (`) 31,774,100
Total municipal staff 121 Total annual city revenue expenditure (`) 34,875,000
WATER SUPPLYTotal water produced (MLD) 3.3
Ground water (MLD) 0.0
Surface water (MLD) 3.3
Average daily volume treated (MLD) 30.0
Installed storage capacity (MLD) 2.2
Total water connections (nos.) 3,500.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.5
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 4,057,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 18.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 8.9
Open drains (sq. km) 9.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,255.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
219
![Page 229: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/229.jpg)
Raver Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
220
![Page 230: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/230.jpg)
Risod Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Washim Slum population 4,360
Area (sq. km.) 14 Slum households 1,040
Total city population 32,994 Total annual city capital receipts (`) 6,478,371
Total households 6,522 Total annual city capital expenditure (`) 20,931,982
Density (persons per sq. km.) 2,291 Total annual city revenue receipts (`) 17,473,700
Total municipal staff 128 Total annual city revenue expenditure (`) 7,599,500
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 0.0
Surface water (MLD) 1.2
Average daily volume treated (MLD) 1.2
Installed storage capacity (MLD) 1.4
Total water connections (nos.) 2,704.0
Water connections in slums (nos.) 359.0
Area covered by network (sq. km.) 6.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 2,341,000.0
Annual revenue expenditure on water (`) 6,398,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 6.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 6.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,872.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 2,858,000.0
221
![Page 231: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/231.jpg)
Risod Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
222
![Page 232: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/232.jpg)
Roha Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 1
District Raigad Slum population 90
Area (sq. km.) 7 Slum households 18
Total city population 31,254 Total annual city capital receipts (`) 62,065,940
Total households 4,525 Total annual city capital expenditure (`) 50,320,465
Density (persons per sq. km.) 4,596 Total annual city revenue receipts (`) 39,720,183
Total municipal staff 38 Total annual city revenue expenditure (`) 26,785,702
WATER SUPPLYTotal water produced (MLD) 4.0
Ground water (MLD) 0.0
Surface water (MLD) 4.0
Average daily volume treated (MLD) 4.0
Installed storage capacity (MLD) 2.1
Total water connections (nos.) 2,688.0
Water connections in slums (nos.) 4.0
Area covered by network (sq. km.) 6.8
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 4,169,861.0
Annual revenue expenditure on water (`) 3,941,200.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 5.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 2,475,381.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,792.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
223
![Page 233: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/233.jpg)
Roha Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
224
![Page 234: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/234.jpg)
Sailu Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 23
District Parbhani Slum population 16,225
Area (sq. km.) 20 Slum households 3,245
Total city population 45,470 Total annual city capital receipts (`) 75,125,000
Total households 5,873 Total annual city capital expenditure (`) 68,371,000
Density (persons per sq. km.) 2,274 Total annual city revenue receipts (`) 33,170,000
Total municipal staff 177 Total annual city revenue expenditure (`) 33,142,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 3.0
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.4
Total water connections (nos.) 2,915.0
Water connections in slums (nos.) 1,125.0
Area covered by network (sq. km.) 13.8
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 632,000.0
Annual revenue expenditure on water (`) 3,273,000.0
Annual capital expenditure on water (`) 3,273,000.0
WASTE WATERArea covered by waste water network (sq. km.) 9.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 9.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 13.0
Waste collected (TPD) 13.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
500.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
225
![Page 235: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/235.jpg)
Sailu Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
226
![Page 236: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/236.jpg)
Sangola Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Solapur Slum population 2,200
Area (sq. km.) 69 Slum households 450
Total city population 36,000 Total annual city capital receipts (`) 13,913,283
Total households 6,500 Total annual city capital expenditure (`) 13,913,283
Density (persons per sq. km.) 523 Total annual city revenue receipts (`) 72,556,978
Total municipal staff 178 Total annual city revenue expenditure (`) 64,842,522
WATER SUPPLYTotal water produced (MLD) 2.9
Ground water (MLD) 0.8
Surface water (MLD) 2.1
Average daily volume treated (MLD) 2.3
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 3,749.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 8.3
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 5,441,485.0
Annual revenue expenditure on water (`) 8,299,450.0
Annual capital expenditure on water (`) 305,482.0
WASTE WATERArea covered by waste water network (sq. km.) 5.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 1.0
Open drains (sq. km) 4.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 1,068,393.0
Annual capital expenditure on WW (`) 161,756.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 7.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,385.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,998,563.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 3,098,800.0
227
![Page 237: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/237.jpg)
Sangola Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
228
![Page 238: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/238.jpg)
Sasvad Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 1
District Pune Slum population 450
Area (sq. km.) 23 Slum households 150
Total city population 31,174 Total annual city capital receipts (`) 31,379,000
Total households 6,781 Total annual city capital expenditure (`) 7,516,000
Density (persons per sq. km.) 1,379 Total annual city revenue receipts (`) 50,882,000
Total municipal staff 89 Total annual city revenue expenditure (`) 39,982,000
WATER SUPPLYTotal water produced (MLD) 5.0
Ground water (MLD) 0.0
Surface water (MLD) 5.0
Average daily volume treated (MLD) 5.0
Installed storage capacity (MLD) 3.5
Total water connections (nos.) 4,981.0
Water connections in slums (nos.) 32.0
Area covered by network (sq. km.) 15.5
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 8,176,000.0
Annual revenue expenditure on water (`) 9,980,000.0
Annual capital expenditure on water (`) 700,000.0
WASTE WATERArea covered by waste water network (sq. km.) 21.0
Underground sewerage network (sq. km) 10.5
Closed drains (sq. km) 0.0
Open drains (sq. km) 10.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 1,472,000.0
Annual revenue expenditure on WW (`) 1,677,000.0
Annual capital expenditure on WW (`) 231,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
7,081.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 9,498,000.0
Annual capital expenditure on SW (`) 2,332,000.0
229
![Page 239: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/239.jpg)
Sasvad Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
230
![Page 240: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/240.jpg)
Satana Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nashik Slum population 0
Area (sq. km.) 16 Slum households 0
Total city population 37,170 Total annual city capital receipts (`) 21,401,062
Total households 6,562 Total annual city capital expenditure (`) 18,443,143
Density (persons per sq. km.) 2,323 Total annual city revenue receipts (`) 47,418,533
Total municipal staff 198 Total annual city revenue expenditure (`) 48,006,121
WATER SUPPLYTotal water produced (MLD) 2.2
Ground water (MLD) 0.0
Surface water (MLD) 2.2
Average daily volume treated (MLD) 2.2
Installed storage capacity (MLD) 2.2
Total water connections (nos.) 4,875.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 16.0
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 4,607,893.0
Annual revenue expenditure on water (`) 7,184,575.0
Annual capital expenditure on water (`) 3,132,103.0
WASTE WATERArea covered by waste water network (sq. km.) 2.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 2,829,816.0
Annual capital expenditure on WW (`) 534,560.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 11.0
Waste collected (TPD) 11.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,672.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 6,790,425.0
Annual capital expenditure on SW (`) 0.0
231
![Page 241: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/241.jpg)
Satana Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
232
![Page 242: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/242.jpg)
Savda Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Jalgaon Slum population 2,765
Area (sq. km.) 2 Slum households 553
Total city population 20,824 Total annual city capital receipts (`) 1,106,000
Total households 4,156 Total annual city capital expenditure (`) 907,000
Density (persons per sq. km.) 9,916 Total annual city revenue receipts (`) 25,343,000
Total municipal staff 140 Total annual city revenue expenditure (`) 24,961,000
WATER SUPPLYTotal water produced (MLD) 1.5
Ground water (MLD) 0.0
Surface water (MLD) 1.5
Average daily volume treated (MLD) 1.5
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 2,708.0
Water connections in slums (nos.) 14.0
Area covered by network (sq. km.) 1.2
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,743,100.0
Annual revenue expenditure on water (`) 4,332,000.0
Annual capital expenditure on water (`) 4,432,000.0
WASTE WATERArea covered by waste water network (sq. km.) 1.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 836,000.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,631.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 953,000.0
Annual capital expenditure on SW (`) 21,000.0
233
![Page 243: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/243.jpg)
Savda Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
234
![Page 244: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/244.jpg)
Sawantwadi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Sindhudurg Slum population 0
Area (sq. km.) 7 Slum households 0
Total city population 24,174 Total annual city capital receipts (`) 4,661,663
Total households 6,656 Total annual city capital expenditure (`) 11,311,289
Density (persons per sq. km.) 3,555 Total annual city revenue receipts (`) 58,239,978
Total municipal staff 130 Total annual city revenue expenditure (`) 58,128,735
WATER SUPPLYTotal water produced (MLD) 3.5
Ground water (MLD) 0.0
Surface water (MLD) 3.5
Average daily volume treated (MLD) 2.8
Installed storage capacity (MLD) 2,300,000.0
Total water connections (nos.) 3,153.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 6.8
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 7,018,557.0
Annual revenue expenditure on water (`) 5,891,094.0
Annual capital expenditure on water (`) 1,160,510.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,656.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 103,982.0
Annual revenue expenditure on SW (`) 516,028.0
Annual capital expenditure on SW (`) 0.0
235
![Page 245: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/245.jpg)
Sawantwadi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
236
![Page 246: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/246.jpg)
Sawner Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Nagpur Slum population 4,766
Area (sq. km.) 4 Slum households 1,145
Total city population 32,000 Total annual city capital receipts (`) 153,163,000
Total households 6,400 Total annual city capital expenditure (`) 75,194,000
Density (persons per sq. km.) 8,421 Total annual city revenue receipts (`) 153,163,000
Total municipal staff 109 Total annual city revenue expenditure (`) 75,194,000
WATER SUPPLYTotal water produced (MLD) 2.3
Ground water (MLD) 0.0
Surface water (MLD) 2.3
Average daily volume treated (MLD) 2.3
Installed storage capacity (MLD) 11.5
Total water connections (nos.) 3,686.0
Water connections in slums (nos.) 170.0
Area covered by network (sq. km.) 3.8
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 4,414,000.0
Annual revenue expenditure on water (`) 4,676,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 3.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 3,022,000.0
Annual capital expenditure on WW (`) 1,976,778.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 7.9
Quantity of waste treated (TPD) 5.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,727.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 463,150.0
Annual capital expenditure on SW (`) 0.0
237
![Page 247: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/247.jpg)
Sawner Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
238
![Page 248: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/248.jpg)
Shahade Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 11
District Nandurbar Slum population 5,160
Area (sq. km.) 7 Slum households 1,032
Total city population 63,946 Total annual city capital receipts (`) 9,429,000
Total households 11,025 Total annual city capital expenditure (`) 15,725,825
Density (persons per sq. km.) 9,689 Total annual city revenue receipts (`) 54,710,000
Total municipal staff 169 Total annual city revenue expenditure (`) 63,503,000
WATER SUPPLYTotal water produced (MLD) 3.0
Ground water (MLD) 3.0
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 22.5
Total water connections (nos.) 4,761.0
Water connections in slums (nos.) 700.0
Area covered by network (sq. km.) 5.5
No. of days of supply in a month 10.0
Annual revenue receipts from water (`) 7,722,000.0
Annual revenue expenditure on water (`) 6,865,000.0
Annual capital expenditure on water (`) 642,000.0
WASTE WATERArea covered by waste water network (sq. km.) 2.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 11.0
Waste collected (TPD) 11.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
7,642.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 3,126,000.0
239
![Page 249: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/249.jpg)
Shahade Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
240
![Page 250: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/250.jpg)
Shendurjana Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Amravati Slum population 6,099
Area (sq. km.) 19 Slum households 1,210
Total city population 22,523 Total annual city capital receipts (`) 33,846,623
Total households 5,324 Total annual city capital expenditure (`) 10,557,436
Density (persons per sq. km.) 1,173 Total annual city revenue receipts (`) 26,404,838
Total municipal staff 42 Total annual city revenue expenditure (`) 21,950,238
WATER SUPPLYTotal water produced (MLD) 2.3
Ground water (MLD) 0.0
Surface water (MLD) 2.3
Average daily volume treated (MLD) 2.3
Installed storage capacity (MLD) 1.0
Total water connections (nos.) 2,340.0
Water connections in slums (nos.) 65.0
Area covered by network (sq. km.) 14.8
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,983,465.0
Annual revenue expenditure on water (`) 2,249,131.0
Annual capital expenditure on water (`) 2,248,164.0
WASTE WATERArea covered by waste water network (sq. km.) 13.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 13.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 161,496.0
Annual revenue expenditure on WW (`) 1,456,373.0
Annual capital expenditure on WW (`) 57,178.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,351.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,163,608.0
Annual capital expenditure on SW (`) 893,000.0
241
![Page 251: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/251.jpg)
Shendurjana Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
242
![Page 252: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/252.jpg)
Shirur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 11
District Pune Slum population 7,214
Area (sq. km.) 6 Slum households 1,240
Total city population 35,627 Total annual city capital receipts (`) 24,934,989
Total households 7,289 Total annual city capital expenditure (`) 38,499,230
Density (persons per sq. km.) 5,567 Total annual city revenue receipts (`) 77,496,879
Total municipal staff 116 Total annual city revenue expenditure (`) 81,902,543
WATER SUPPLYTotal water produced (MLD) 6.0
Ground water (MLD) 0.0
Surface water (MLD) 6.0
Average daily volume treated (MLD) 5.0
Installed storage capacity (MLD) 4.0
Total water connections (nos.) 3,917.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.9
No. of days of supply in a month 29.0
Annual revenue receipts from water (`) 4,447,604.0
Annual revenue expenditure on water (`) 7,564,464.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 6.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 1.4
Open drains (sq. km) 5.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 2,362,115.0
Annual capital expenditure on WW (`) 1,227,607.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
6,587.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,052,282.0
Annual revenue expenditure on SW (`) 2,194,329.0
Annual capital expenditure on SW (`) 2,184,352.0
243
![Page 253: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/253.jpg)
Shirur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
244
![Page 254: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/254.jpg)
Shrigonda Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Ahmednagar Slum population 0
Area (sq. km.) 86 Slum households 0
Total city population 31,261 Total annual city capital receipts (`) 0
Total households 5,874 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 365 Total annual city revenue receipts (`) 0
Total municipal staff 63 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 0.0
Surface water (MLD) 1.2
Average daily volume treated (MLD) 1.2
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 1,799.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 40.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 37.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 5.0
Open drains (sq. km) 32.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,750.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
245
![Page 255: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/255.jpg)
Shrigonda Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
246
![Page 256: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/256.jpg)
Shrivardhan Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Raigad Slum population 0
Area (sq. km.) 4 Slum households 0
Total city population 15,991 Total annual city capital receipts (`) 0
Total households 3,372 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 3,998 Total annual city revenue receipts (`) 23,757,681
Total municipal staff 42 Total annual city revenue expenditure (`) 33,918,054
WATER SUPPLYTotal water produced (MLD) 3.8
Ground water (MLD) 3.8
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.6
Total water connections (nos.) 1,889.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 4.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,603,144.0
Annual revenue expenditure on water (`) 1,117,002.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 4.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.5
Open drains (sq. km) 4.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 2.0
Waste collected (TPD) 2.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,489,362.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
247
![Page 257: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/257.jpg)
Shrivardhan Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
248
![Page 258: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/258.jpg)
Sindi Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Wardha Slum population 2,475
Area (sq. km.) 10 Slum households 495
Total city population 14,266 Total annual city capital receipts (`) 25,366,000
Total households 2,670 Total annual city capital expenditure (`) 29,563,000
Density (persons per sq. km.) 1,359 Total annual city revenue receipts (`) 25,366,000
Total municipal staff 42 Total annual city revenue expenditure (`) 29,563,000
WATER SUPPLYTotal water produced (MLD) 1.0
Ground water (MLD) 0.0
Surface water (MLD) 1.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.6
Total water connections (nos.) 1,535.0
Water connections in slums (nos.) 132.0
Area covered by network (sq. km.) 7.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 1,294,000.0
Annual revenue expenditure on water (`) 1,495,000.0
Annual capital expenditure on water (`) 1,495,206.0
WASTE WATERArea covered by waste water network (sq. km.) 5.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 969,000.0
Annual capital expenditure on WW (`) 969,279.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 856,000.0
Annual revenue expenditure on SW (`) 265,000.0
Annual capital expenditure on SW (`) 265,000.0
249
![Page 259: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/259.jpg)
Sindi Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
250
![Page 260: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/260.jpg)
Sindkhed Raja Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 2
District Buldhana Slum population 3,117
Area (sq. km.) 40 Slum households 603
Total city population 16,500 Total annual city capital receipts (`) 819,000
Total households 3,273 Total annual city capital expenditure (`) 13,118,000
Density (persons per sq. km.) 418 Total annual city revenue receipts (`) 18,810,000
Total municipal staff 24 Total annual city revenue expenditure (`) 23,712,000
WATER SUPPLYTotal water produced (MLD) 2.0
Ground water (MLD) 0.1
Surface water (MLD) 1.9
Average daily volume treated (MLD) 1.5
Installed storage capacity (MLD) 0.6
Total water connections (nos.) 1,678.0
Water connections in slums (nos.) 65.0
Area covered by network (sq. km.) 6.3
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,495,000.0
Annual revenue expenditure on water (`) 1,764,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 1,424,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 4.0
Waste collected (TPD) 4.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,825.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 3,081,000.0
251
![Page 261: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/261.jpg)
Sindkhed Raja Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
252
![Page 262: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/262.jpg)
Sinnar Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 11
District Nashik Slum population 12,900
Area (sq. km.) 5 Slum households 2,580
Total city population 44,242 Total annual city capital receipts (`) 29,500,000
Total households 8,556 Total annual city capital expenditure (`) 4,000,000
Density (persons per sq. km.) 8,348 Total annual city revenue receipts (`) 83,195,000
Total municipal staff 120 Total annual city revenue expenditure (`) 92,111,000
WATER SUPPLYTotal water produced (MLD) 5.0
Ground water (MLD) 0.0
Surface water (MLD) 5.0
Average daily volume treated (MLD) 5.0
Installed storage capacity (MLD) 28.0
Total water connections (nos.) 5,250.0
Water connections in slums (nos.) 1,500.0
Area covered by network (sq. km.) 5.3
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 83,195,000.0
Annual revenue expenditure on water (`) 86,488,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 5.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 5.0
Open drains (sq. km) 0.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 15.2
Waste collected (TPD) 15.2
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
10,356.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 1,153,000.0
Annual capital expenditure on SW (`) 0.0
253
![Page 263: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/263.jpg)
Sinnar Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
254
![Page 264: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/264.jpg)
Sonpeth Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 10
District Parbhani Slum population 7,700
Area (sq. km.) 13 Slum households 1,340
Total city population 18,874 Total annual city capital receipts (`) 37,974,494
Total households 2,721 Total annual city capital expenditure (`) 41,533,219
Density (persons per sq. km.) 1,441 Total annual city revenue receipts (`) 10,198,942
Total municipal staff 47 Total annual city revenue expenditure (`) 6,672,995
WATER SUPPLYTotal water produced (MLD) 1.6
Ground water (MLD) 1.6
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 0.4
Total water connections (nos.) 1,015.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 13.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 750,154.0
Annual revenue expenditure on water (`) 861,063.0
Annual capital expenditure on water (`) 235,000.0
WASTE WATERArea covered by waste water network (sq. km.) 10.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 10.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 5.0
Quantity of waste treated (TPD) 2.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
218.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
255
![Page 265: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/265.jpg)
Sonpeth Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
256
![Page 266: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/266.jpg)
Talode Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 14
District Nandurbar Slum population 6,808
Area (sq. km.) 2 Slum households 1,417
Total city population 27,704 Total annual city capital receipts (`) 8,064,000
Total households 4,886 Total annual city capital expenditure (`) 7,674,000
Density (persons per sq. km.) 13,192 Total annual city revenue receipts (`) 18,392,000
Total municipal staff 76 Total annual city revenue expenditure (`) 19,826,000
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 1.2
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.4
Total water connections (nos.) 1,445.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.5
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 1,108,000.0
Annual revenue expenditure on water (`) 1,167,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1,502.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 1,500.0
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 6.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,657.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 4,242,000.0
257
![Page 267: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/267.jpg)
Talode Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
258
![Page 268: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/268.jpg)
Tasgaon Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Sangli Slum population 1,764
Area (sq. km.) 43 Slum households 393
Total city population 37,673 Total annual city capital receipts (`) 39,157,613
Total households 5,520 Total annual city capital expenditure (`) 15,403,711
Density (persons per sq. km.) 868 Total annual city revenue receipts (`) 53,277,300
Total municipal staff 92 Total annual city revenue expenditure (`) 63,003,663
WATER SUPPLYTotal water produced (MLD) 4.2
Ground water (MLD) 0.0
Surface water (MLD) 4.2
Average daily volume treated (MLD) 3.8
Installed storage capacity (MLD) 17.5
Total water connections (nos.) 4,272.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 11.0
No. of days of supply in a month 28.0
Annual revenue receipts from water (`) 5,926,647.0
Annual revenue expenditure on water (`) 13,358,836.0
Annual capital expenditure on water (`) 909,538.0
WASTE WATERArea covered by waste water network (sq. km.) 10.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 10.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 214,850.0
Annual capital expenditure on WW (`) 1,673,822.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.0
Waste collected (TPD) 7.4
Quantity of waste treated (TPD) 7.4
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
4,996.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 788,540.0
Annual revenue expenditure on SW (`) 4,030,115.0
Annual capital expenditure on SW (`) 5,399,087.0
259
![Page 269: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/269.jpg)
Tasgaon Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
260
![Page 270: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/270.jpg)
Telhara Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Akola Slum population 0
Area (sq. km.) 21 Slum households 0
Total city population 24,430 Total annual city capital receipts (`) 0
Total households 4,500 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 1,158 Total annual city revenue receipts (`) 0
Total municipal staff 76 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 1.6
Ground water (MLD) 1.6
Surface water (MLD) 0.0
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 1.1
Total water connections (nos.) 0.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 1.7
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.1
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.1
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 5.0
Waste collected (TPD) 4.8
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
0.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
261
![Page 271: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/271.jpg)
Telhara Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
262
![Page 272: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/272.jpg)
Tirora Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Gondia Slum population 5,000
Area (sq. km.) 15 Slum households 1,200
Total city population 28,161 Total annual city capital receipts (`) 52,043,000
Total households 5,587 Total annual city capital expenditure (`) 55,215,000
Density (persons per sq. km.) 1,841 Total annual city revenue receipts (`) 4,593,772
Total municipal staff 99 Total annual city revenue expenditure (`) 18,776,000
WATER SUPPLYTotal water produced (MLD) 1.7
Ground water (MLD) 0.0
Surface water (MLD) 1.7
Average daily volume treated (MLD) 1.7
Installed storage capacity (MLD) 0.8
Total water connections (nos.) 1,679.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 15.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 10.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 10.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.1
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,040.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 2,096,000.0
263
![Page 273: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/273.jpg)
Tirora Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
264
![Page 274: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/274.jpg)
Trimbak Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Nashik Slum population 1,800
Area (sq. km.) 2 Slum households 365
Total city population 12,500 Total annual city capital receipts (`) 3,637,000
Total households 2,337 Total annual city capital expenditure (`) 4,327,000
Density (persons per sq. km.) 6,579 Total annual city revenue receipts (`) 18,913,000
Total municipal staff 47 Total annual city revenue expenditure (`) 15,153,000
WATER SUPPLYTotal water produced (MLD) 1.2
Ground water (MLD) 0.0
Surface water (MLD) 1.2
Average daily volume treated (MLD) 1.2
Installed storage capacity (MLD) 3.8
Total water connections (nos.) 1,412.0
Water connections in slums (nos.) 19.0
Area covered by network (sq. km.) 1.9
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,268,000.0
Annual revenue expenditure on water (`) 2,312,000.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 0.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 0.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 1.2
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 515,000.0
Annual capital expenditure on WW (`) 451,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 3.0
Waste collected (TPD) 3.0
Quantity of waste treated (TPD) 0.5
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,300.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,465,000.0
Annual revenue expenditure on SW (`) 1,454,000.0
Annual capital expenditure on SW (`) 1,454,000.0
265
![Page 275: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/275.jpg)
Trimbak Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
266
![Page 276: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/276.jpg)
Tuljapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Osmanabad Slum population 14,505
Area (sq. km.) 4 Slum households 2,419
Total city population 34,876 Total annual city capital receipts (`) 99,017,571
Total households 6,975 Total annual city capital expenditure (`) 34,438,851
Density (persons per sq. km.) 8,304 Total annual city revenue receipts (`) 104,068,565
Total municipal staff 175 Total annual city revenue expenditure (`) 21,583,144
WATER SUPPLYTotal water produced (MLD) 3.8
Ground water (MLD) 0.1
Surface water (MLD) 3.7
Average daily volume treated (MLD) 3.9
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 3,932.0
Water connections in slums (nos.) 1,107.0
Area covered by network (sq. km.) 3.1
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 3,228,817.0
Annual revenue expenditure on water (`) 6,569,965.0
Annual capital expenditure on water (`) 2,679,020.0
WASTE WATERArea covered by waste water network (sq. km.) 4.2
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 4.2
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 691,189.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 19.0
Waste collected (TPD) 18.4
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
400.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 8,012,470.0
Annual capital expenditure on SW (`) 6,571,956.0
267
![Page 277: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/277.jpg)
Tuljapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
268
![Page 278: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/278.jpg)
Umari Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nanded Slum population 0
Area (sq. km.) 6 Slum households 0
Total city population 20,500 Total annual city capital receipts (`) 2,245,000
Total households 4,228 Total annual city capital expenditure (`) 4,621,000
Density (persons per sq. km.) 3,596 Total annual city revenue receipts (`) 21,347,000
Total municipal staff 61 Total annual city revenue expenditure (`) 8,959,675
WATER SUPPLYTotal water produced (MLD) 0.7
Ground water (MLD) 0.2
Surface water (MLD) 0.5
Average daily volume treated (MLD) 0.5
Installed storage capacity (MLD) 0.7
Total water connections (nos.) 1,373.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 5.7
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 5.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 5.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 10.0
Waste collected (TPD) 10.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
2,120.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
269
![Page 279: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/279.jpg)
Umari Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
270
![Page 280: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/280.jpg)
Umarkhed Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 5
District Yavatmal Slum population 5,179
Area (sq. km.) 2 Slum households 1,028
Total city population 42,054 Total annual city capital receipts (`) 41,104,176
Total households 8,615 Total annual city capital expenditure (`) 36,695,669
Density (persons per sq. km.) 23,363 Total annual city revenue receipts (`) 232,893,597
Total municipal staff 231 Total annual city revenue expenditure (`) 96,468,437
WATER SUPPLYTotal water produced (MLD) 2.4
Ground water (MLD) 0.6
Surface water (MLD) 1.8
Average daily volume treated (MLD) 1.8
Installed storage capacity (MLD) 1.8
Total water connections (nos.) 4,367.0
Water connections in slums (nos.) 565.0
Area covered by network (sq. km.) 1.8
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 4,491,000.0
Annual revenue expenditure on water (`) 9,580,000.0
Annual capital expenditure on water (`) 5,760,000.0
WASTE WATERArea covered by waste water network (sq. km.) 1.3
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.3
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 4,800,000.0
Annual capital expenditure on WW (`) 1,555,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 12.5
Waste collected (TPD) 12.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,457.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 2,773,908.0
Annual revenue expenditure on SW (`) 4,600,000.0
Annual capital expenditure on SW (`) 1,755,202.0
271
![Page 281: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/281.jpg)
Umarkhed Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
272
![Page 282: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/282.jpg)
Umerga Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Osmanabad Slum population 0
Area (sq. km.) 2 Slum households 0
Total city population 40,000 Total annual city capital receipts (`) 96,499,982
Total households 6,790 Total annual city capital expenditure (`) 52,466,472
Density (persons per sq. km.) 18,182 Total annual city revenue receipts (`) 130,749,555
Total municipal staff 261 Total annual city revenue expenditure (`) 72,647,658
WATER SUPPLYTotal water produced (MLD) 2.3
Ground water (MLD) 0.0
Surface water (MLD) 2.3
Average daily volume treated (MLD) 4.2
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 5,793.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 2.0
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 7,083,798.0
Annual revenue expenditure on water (`) 7,525,078.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 1.9
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.9
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 597,315.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 13.0
Waste collected (TPD) 13.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
5,170.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 251,912.0
Annual revenue expenditure on SW (`) 10,285,328.0
Annual capital expenditure on SW (`) 544,500.0
273
![Page 283: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/283.jpg)
Umerga Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
274
![Page 284: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/284.jpg)
Uran Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 3
District Raigad Slum population 768
Area (sq. km.) 2 Slum households 192
Total city population 28,987 Total annual city capital receipts (`) 52,886,850
Total households 8,525 Total annual city capital expenditure (`) 338,157
Density (persons per sq. km.) 12,603 Total annual city revenue receipts (`) 76,936,744
Total municipal staff 188 Total annual city revenue expenditure (`) 74,606,175
WATER SUPPLYTotal water produced (MLD) 3.5
Ground water (MLD) 0.0
Surface water (MLD) 3.5
Average daily volume treated (MLD) 0.0
Installed storage capacity (MLD) 4.0
Total water connections (nos.) 4,108.0
Water connections in slums (nos.) 52.0
Area covered by network (sq. km.) 2.3
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 16,388,482.0
Annual revenue expenditure on water (`) 14,279,387.0
Annual capital expenditure on water (`) 3,009,430.0
WASTE WATERArea covered by waste water network (sq. km.) 2.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 136,460.0
Annual revenue expenditure on WW (`) 15,104,950.0
Annual capital expenditure on WW (`) 1,069,984.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.1
Waste collected (TPD) 8.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
9,848.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 2,770,524.0
Annual capital expenditure on SW (`) 0.0
275
![Page 285: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/285.jpg)
Uran Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
276
![Page 286: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/286.jpg)
Vadgaon Kasba Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Kolhapur Slum population 0
Area (sq. km.) 10 Slum households 0
Total city population 30,000 Total annual city capital receipts (`) 14,784,562
Total households 5,921 Total annual city capital expenditure (`) 14,214,614
Density (persons per sq. km.) 3,000 Total annual city revenue receipts (`) 28,897,049
Total municipal staff 91 Total annual city revenue expenditure (`) 27,008,252
WATER SUPPLYTotal water produced (MLD) 2.1
Ground water (MLD) 0.1
Surface water (MLD) 2.0
Average daily volume treated (MLD) 1.9
Installed storage capacity (MLD) 1.5
Total water connections (nos.) 3,639.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 7.4
No. of days of supply in a month 26.0
Annual revenue receipts from water (`) 1,639,968.0
Annual revenue expenditure on water (`) 3,351,605.0
Annual capital expenditure on water (`) 4,238,005.0
WASTE WATERArea covered by waste water network (sq. km.) 1.3
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 1.3
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 93,487.0
Annual revenue expenditure on WW (`) 1,211,895.0
Annual capital expenditure on WW (`) 918,558.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.9
Waste collected (TPD) 6.9
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,310.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 5,125,605.0
Annual capital expenditure on SW (`) 0.0
277
![Page 287: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/287.jpg)
Vadgaon Kasba Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
278
![Page 288: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/288.jpg)
Vaijapur Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 6
District Aurangabad Slum population 4,110
Area (sq. km.) 11 Slum households 729
Total city population 43,032 Total annual city capital receipts (`) 31,037,468
Total households 7,825 Total annual city capital expenditure (`) 31,269,572
Density (persons per sq. km.) 4,060 Total annual city revenue receipts (`) 41,872,207
Total municipal staff 230 Total annual city revenue expenditure (`) 72,004,468
WATER SUPPLYTotal water produced (MLD) 7.6
Ground water (MLD) 0.5
Surface water (MLD) 7.1
Average daily volume treated (MLD) 4.2
Installed storage capacity (MLD) 17.0
Total water connections (nos.) 6,395.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 8.2
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 4,304,052.0
Annual revenue expenditure on water (`) 9,403,354.0
Annual capital expenditure on water (`) 692,136.0
WASTE WATERArea covered by waste water network (sq. km.) 6.5
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 6.5
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 3,053,383.0
Annual capital expenditure on WW (`) 1,400,758.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 7.0
Waste collected (TPD) 6.5
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
8,878.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 1,249,368.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
279
![Page 289: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/289.jpg)
Vaijapur Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
280
![Page 290: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/290.jpg)
Vengurla Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Sindhudurg Slum population 0
Area (sq. km.) 13 Slum households 0
Total city population 12,645 Total annual city capital receipts (`) 62
Total households 3,011 Total annual city capital expenditure (`) 144
Density (persons per sq. km.) 973 Total annual city revenue receipts (`) 116
Total municipal staff 61 Total annual city revenue expenditure (`) 124
WATER SUPPLYTotal water produced (MLD) 0.9
Ground water (MLD) 0.1
Surface water (MLD) 0.8
Average daily volume treated (MLD) 0.8
Installed storage capacity (MLD) 0.9
Total water connections (nos.) 884.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 13.0
No. of days of supply in a month 27.0
Annual revenue receipts from water (`) 10.5
Annual revenue expenditure on water (`) 7.5
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 13.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 3.0
Open drains (sq. km) 10.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.1
Annual revenue expenditure on WW (`) 10.2
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 6.0
Waste collected (TPD) 6.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
3,350.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 9.4
Annual revenue expenditure on SW (`) 3.9
Annual capital expenditure on SW (`) 17.0
281
![Page 291: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/291.jpg)
Vengurla Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
282
![Page 292: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/292.jpg)
Wai Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 4
District Satara Slum population 1,500
Area (sq. km.) 4 Slum households 342
Total city population 36,110 Total annual city capital receipts (`) 73,236,096
Total households 7,200 Total annual city capital expenditure (`) 14,622,388
Density (persons per sq. km.) 10,031 Total annual city revenue receipts (`) 73,236,096
Total municipal staff 130 Total annual city revenue expenditure (`) 102,294,178
WATER SUPPLYTotal water produced (MLD) 4.8
Ground water (MLD) 0.0
Surface water (MLD) 4.8
Average daily volume treated (MLD) 4.8
Installed storage capacity (MLD) 1.7
Total water connections (nos.) 5,358.0
Water connections in slums (nos.) 18.0
Area covered by network (sq. km.) 3.6
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 4,946,120.0
Annual revenue expenditure on water (`) 7,924,151.0
Annual capital expenditure on water (`) 4,740,665.0
WASTE WATERArea covered by waste water network (sq. km.) 3.6
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 3.6
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 12.0
Waste collected (TPD) 12.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
7,194.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 558,000.0
283
![Page 293: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/293.jpg)
Wai Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
284
![Page 294: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/294.jpg)
Warud Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Amravati Slum population 0
Area (sq. km.) 13 Slum households 0
Total city population 45,106 Total annual city capital receipts (`) 18,425,000
Total households 9,021 Total annual city capital expenditure (`) 15,991,000
Density (persons per sq. km.) 3,580 Total annual city revenue receipts (`) 61,376,000
Total municipal staff 150 Total annual city revenue expenditure (`) 57,213,000
WATER SUPPLYTotal water produced (MLD) 2.1
Ground water (MLD) 0.0
Surface water (MLD) 2.1
Average daily volume treated (MLD) 2.1
Installed storage capacity (MLD) 1.4
Total water connections (nos.) 5,035.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 12.3
No. of days of supply in a month 15.0
Annual revenue receipts from water (`) 6,601,000.0
Annual revenue expenditure on water (`) 8,040,000.0
Annual capital expenditure on water (`) 8,040,000.0
WASTE WATERArea covered by waste water network (sq. km.) 11.0
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 11.0
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 18.0
Waste collected (TPD) 18.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
9,821.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 402,000.0
Annual revenue expenditure on SW (`) 1,210,000.0
Annual capital expenditure on SW (`) 1,209,000.0
285
![Page 295: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/295.jpg)
Warud Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
286
![Page 296: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/296.jpg)
Yawal Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 13
District Jalgaon Slum population 4,500
Area (sq. km.) 3 Slum households 1,260
Total city population 35,000 Total annual city capital receipts (`) 4,528,000
Total households 6,413 Total annual city capital expenditure (`) 4,528,000
Density (persons per sq. km.) 11,290 Total annual city revenue receipts (`) 32,805,000
Total municipal staff 109 Total annual city revenue expenditure (`) 34,187,000
WATER SUPPLYTotal water produced (MLD) 5.0
Ground water (MLD) 0.0
Surface water (MLD) 5.0
Average daily volume treated (MLD) 4.0
Installed storage capacity (MLD) 2.5
Total water connections (nos.) 3,457.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 3.5
No. of days of supply in a month 30.0
Annual revenue receipts from water (`) 2,792,000.0
Annual revenue expenditure on water (`) 5,771,000.0
Annual capital expenditure on water (`) 4,578,000.0
WASTE WATERArea covered by waste water network (sq. km.) 2.1
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 2.1
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 2,032,000.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 8.4
Waste collected (TPD) 8.4
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,004.0
Waste segregation at source (Y/N) Y
Annual revenue receipts from SW (`) 4,307,000.0
Annual revenue expenditure on SW (`) 1,487,000.0
Annual capital expenditure on SW (`) 2,809,000.0
287
![Page 297: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/297.jpg)
Yawal Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
288
![Page 298: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/298.jpg)
Yevla Municipal Council Background
GENERAL INFORMATIONClass Class C No. of slum settlements 0
District Nashik Slum population 0
Area (sq. km.) 13 Slum households 0
Total city population 49,896 Total annual city capital receipts (`) 0
Total households 8,591 Total annual city capital expenditure (`) 0
Density (persons per sq. km.) 3,898 Total annual city revenue receipts (`) 0
Total municipal staff 254 Total annual city revenue expenditure (`) 0
WATER SUPPLYTotal water produced (MLD) 4.0
Ground water (MLD) 0.0
Surface water (MLD) 4.0
Average daily volume treated (MLD) 4.8
Installed storage capacity (MLD) 1.9
Total water connections (nos.) 6,568.0
Water connections in slums (nos.) 0.0
Area covered by network (sq. km.) 0.0
No. of days of supply in a month 0.0
Annual revenue receipts from water (`) 0.0
Annual revenue expenditure on water (`) 0.0
Annual capital expenditure on water (`) 0.0
WASTE WATERArea covered by waste water network (sq. km.) 36.4
Underground sewerage network (sq. km) 0.0
Closed drains (sq. km) 0.0
Open drains (sq. km) 36.4
Total sewerage connections (nos.) 0.0
Sewerage coverage: slums (%) 0.0
Installed STP treatment capacity (MLD) 0.0
Annual revenue receipts from WW (`) 0.0
Annual revenue expenditure on WW (`) 0.0
Annual capital expenditure on WW (`) 0.0
SOLID WASTE MANAGEMENTWaste generated (TPD) 12.0
Waste collected (TPD) 12.0
Quantity of waste treated (TPD) 0.0
Waste received at scientific landfill (TPD) 0.0
Door to door colln.(no. of households andestablishments)
1,170.0
Waste segregation at source (Y/N) N
Annual revenue receipts from SW (`) 0.0
Annual revenue expenditure on SW (`) 0.0
Annual capital expenditure on SW (`) 0.0
289
![Page 299: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/299.jpg)
Yevla Municipal Council
Service Level Benchmark Indicators
WATER SUPPLY
WASTE WATER
SOLID WASTE MANAGEMENT STORM WATER
Blank values represent 'zero', 'not applicable' or 'no data' in the charts above.
290
![Page 300: CE PT Univ ersity April 2011 - PAS City... · ril 2011 manc and ook (: City ersity ... Kille Dharur 111 ... Total city population 44,336 Total annual city capital receipts (`)](https://reader031.vdocuments.mx/reader031/viewer/2022022508/5ace59e07f8b9a8b1e8b6aae/html5/thumbnails/300.jpg)
Th
Th
im
thr
pe
M
CE
Pr
Ce
M
PA
CE
Ka
In
Te
Fa
ww
he Perfor
he PAS Pr
mprove del
ree majo
erformance
aharashtra
EPT Unive
roject. It i
entre (UM
aharashtra
AS Proje
EPT Unive
asturbhai
ndia
el: +91‐79‐2
ax: 91‐79‐26
ww.pas.or
rmance A
roject aim
livery of w
or compo
e improve
a.
ersity has
is being i
MC) in Gu
a.
ect
ersity
Lalbhai C
26302470
6302075
rg.in
Assessme
ms to deve
water and s
nents of
ement. It
received a
mplement
ujarat and
Campus, U
ent System
elop appr
sanitation
perform
covers all
a grant fro
ted by CE
d All Ind
University
m (PAS)
opriate m
in cities a
mance me
l the 400+
m the Bill
EPT Unive
dia Institu
Road, Na
Project
methods an
and towns
asuremen
+ urban l
l and Meli
ersity wit
ute of Lo
avrangpura
nd tools t
in India. T
t, perform
ocal gove
inda Gates
th support
ocal Self‐G
a, Ahmed
to measur
The PAS P
mance m
rnments i
s Foundati
t of Urba
Governme
abad 380
e, monito
Project inc
monitoring
in Gujara
ion for the
n Manage
ent (AIILSG
009 Gujar
r and
cludes
and
at and
e PAS
ement
G) in
rat,