Community Based Disaster Preparedness Institutionalization and Achievement
DIPECHO Partners in Bangladesh 12 August 2014Dhaka
![Page 3: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/3.jpg)
Bangladesh Multi-hazard map
![Page 4: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/4.jpg)
Context Geography, land-river characteristics and changing climate. Large population, rapid urbanization - multiple vulnerabilities.
Existing strong Disaster Management regulatory framework. Commitments reflected in National Plan for Disaster Management .
Strengthening Disaster Management Committee is mandated by DM Act.
Increasing need for harmonized approach for Disaster Risk Reduction.
Standing order on Disaster enforcement needs reactivation Disaster Management Committee at all levels.
Integration of Disaster Risk Reduction into Development is must.
![Page 5: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/5.jpg)
DIPECHO Partners in Bangladesh
Working area
Caritas
DeSHARI • Save the children• Muslim Aid • Dan Church Aid • Action Contra la farm• Christine Aid
NARRI • ActionAid • OXFAM• Islamic Relief • Concern Universal • Concern Worldwide• Solidarities International
![Page 6: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/6.jpg)
Evolution of the Institutionalisation process DIPECHO II-VI rounds had produced many good practices.
Community Based Disaster Preparedness institutionalisation model evolved through consultation, negotiation and working together.
Alignment with national laws, policies, rules and regulations were primary contributing factors.
Development of Harmonised training module on Disaster Risk Reduction to Disaster Management Committees.
Standardisation process is being facilitated by the model.
DG DDM issued a circular to District Commissioners.
![Page 7: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/7.jpg)
![Page 8: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/8.jpg)
Mode of operation Development of Harmonised training module. Setting up of Masters Trainers pool. Community/Urban Risk Assessment. Conduct Risk Assessment. Develop Risk Reduction Action Plan. Secure Annual Development Plan and other allocation. Prioritise Inclusion (women, children, people with Disability and Elderly people). Policy work on Earthquake resilient curriculum, BNBC,
EWS, HFA, etc. Cooperation within (SDIP, KDIP) across(DeSHARI, Caritas, others).
![Page 9: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/9.jpg)
![Page 10: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/10.jpg)
Achievement – Completed Endorsed the model. Harmonized Training Modules Trained Masters Trainers Pools Conducted and updated URA and CRA Risk Reduction Action Plans developed at Unions
and validated at Upazila. Securing Annual Development Plan allocation. Small scale mitigation are being co-funded Trained and institutionalized Urban volunteers
![Page 11: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/11.jpg)
Project Inception workshops at Union and Upazila
![Page 12: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/12.jpg)
Achievement – On progress Enforcement of building code.
Risk informed planning and budgeting.
Flood early warning dissemination.
Resilient in training curriculums.
Disaster Management Plan (Contingency plan).
![Page 13: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/13.jpg)
Community Consultation at rural area
![Page 14: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/14.jpg)
Good practices Model endorsed by DDM with circular to Deputy
Commissionaires to support. Harmonization of different training modules.
Using government endorsed tools and techniques (e.g. CRA/URA from CDMP).
Adjusting project and community scheme cycle with budget calendar .
Development of Inclusion Guidelines . Taking legal provisions as reference.
![Page 15: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/15.jpg)
Art Competition Volunteers in at school Action
![Page 16: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/16.jpg)
Challenges Time consuming to coordinate with government authorities. Less understanding of Act and law.
Loss of knowledge due to frequent transfer of Government staff . Leveraging resources from different government sources.
Limited geographical coverage to demonstrate in scale. Political interference at local level.
Engagement Disaster Management Committee members in many forums and committees giving less priority .
![Page 17: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/17.jpg)
Volunteers mobilization
![Page 18: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/18.jpg)
Concluding Geo extension (replication) of the CRA/RRAP/ADP. Co-funding RRAP through GOB matching fund.
Making Safety net programme (e.g. Cash for Work schemes) resilient.
Explore alternative resistant and affordable livelihood options (mele, Kasbon etc.)
Strong support of local stakeholders (UNO, PIO, AEO, SAO) are
very important. Engage on Climate Changes issues and access funds
![Page 19: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/19.jpg)
Community volunteers make resilient community
![Page 20: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/20.jpg)
UDMC in their monthly meeting
![Page 21: CBDP Model and Achievement](https://reader036.vdocuments.mx/reader036/viewer/2022062822/587f09821a28abc26f8b5677/html5/thumbnails/21.jpg)
Thank you very much