capstone project final presentation
TRANSCRIPT
1
Final PresentationMAE 4810
24 April 2014
Amberley Snyder
2
3
Design Question
How can a paraplegic safely
and independently mount and dismount a
horse?
4
Design Requirements Lifting capacity 260 lbs Attach to a horse trailer Powered by DC (battery) Comfortable speed/
smooth operation Independent operation/
simple controls Padded seat/ wheelchair
Lap belt/ safety restraints
Meets ADA requirements
Low noise Max height of horse 17
hands (5’8”) Horse restraint Mount horse from left
side Durability/ travel cover Conforms to traffic
safety laws
Design Goals, Performance Objectives Goals:
Aesthetically pleasing
Ability to saddle horse independently
Assumptions: Level ground Docile horse Wheelchair with
brakes Person and
wheelchair weigh less than 260 lbs
Rider has strong upper body strength
5
Critical Design Solution
6
Subsystem: Trailer Supports
7
Subsystem: Tracks
8
Subsystem: Platform
9
Subsystem: Fold-Up
10
Subsystem: Horse Restraints
11
12
Design Test & EvaluationDesign
Requirement Outcome Design Requirement Outcome
Lifting Capacity of 260 lbs
PASS(400 lbs)
Lap Belt/ Safety Restraints PASS
Attach to Horse Trailer PASS Meets ADA
RequirementsPASS (SF > 5)
Powered by DC PASS Maximum Height of Horse 17 Hands
PASS (48.5”)
Comfortable Speed
PASS (.6/ .4 ft/s) Low Noise Level
FAIL (72.4/ 87 dB)
Smooth Operation
PASS (.6/ 1 g) Horse Restraint PASS
Independent Operation PASS Mount Horse from
Left Side PASS
Simple Controls PASS Durability/ Travel Cover ONGOING
Padded Seat/ Wheelchair PASS Conforms to
Traffic Safety LawsPASS (5 15/16”)
Performance FactorsComponent Safety Factor Horizontal Arms 5Support Link Bolts 10Chain Attachment Bolts 9Vertical Tracks 6Horizontal Tracks 5Hinge Point Bolts > 30Platform 7
13
46.5” vertical motion 15” horizontal motion 260 lbs (SF > 5.0), tested up to 400 lbs
Budget
14
Subsystem Outcome
Tracks/ Structure $5265
Lift System $2394
Restraints $254
Deploy $200
Platform $346
Controls $742
Powder Coating $637
Stabilization System $599
Miscellaneous $277
TOTALS
SPENT $10,715
ALLOCATED $10,000
Special Thanks
Intuitech Inc. Richard Eversull Amberley Snyder John Rasmussen Intermountain
Hydraulics Shalee Killpack Ducworks Inc.
Vincent S. Clay Christensen Mike Morgan Lowes Home Depot
15
Questions?
16
APPENDIX:
17
Failure Mode Effects and Analysis
18