caiso workshop on reactive power requirements … · • capability of reactive compensation with...

32
GE Energy Consulting GE Energy Consulting GE Proprietary Information CAISO Workshop on Reactive Power Requirements and Financial Compensation Jason MacDowell

Upload: danghuong

Post on 26-Aug-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

GE Energy Consulting

GE Energy Consulting

GE Proprietary Information

CAISO Workshop on Reactive Power Requirements and Financial Compensation Jason MacDowell

Page 2: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

Wind Turbines and Reactive Power Control

Page 3: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

3

GE 1.5 MW Reactive Capability

• Full leading and lagging range over full power range

• Faster reactive response than synch. generator

• Capability of reactive compensation with no wind

• No need for FACTS devices

Page 4: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

4

WTG Reactive Power Capability

Terminal Bus

P gen

Q gen

WTG

Reactive Power for Voltage Support

• Steady-state PF range - 0.90 under-excited/0.90 over-excited

• Dynamic range meets or exceeds steady-state range

• WTG reactive capability often sufficient to satisfy PF requirements at POI

• VAR capability reduced at low power due to units cycling off-line

Rating Point

Active Power

Page 5: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

5

WindCONTROL

QWTG

PWTG

QWTG

PWTG

QWTG

PWTG

QWTG

PWTG

QWTG

PWTG

QWTG

PWTG

QL

QC

HV Bus

LV Bus

Reactive Compensation

(if required)

PWP

QWP

Substation

Point of Interconnection

(POI)

Reactive

Power

Controller

LTC

Plant Level Control System

• Coordinated turbine and plant supervisory control structure

• Voltage, VAR, & PF control

• PF requirements primarily met by WTG reactive capability, but augmented by mechanically switched shunt devices if necessary

• Combined plant response eliminates need for SVC, STATCOM, or other expensive equipment

• Integrated with substation SCADA

Page 6: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

6 /

Wind Plant vs. Wind Turbine Reactive Capabilities

Wind Plant pf capability wind turbine pf spec

Reactive Losses

• I2X of unit transformer

• I2X of collector lines and cables

• I2X of substation transformer

• V2BL of shunt reactors

• QL of dynamic compensator

Reactive Gains

• V2BC of collector cables

• V2BC of harmonic filters

• V2BC of shunt cap banks

• QC of dynamic compensator

Extra compensation provided to make up the difference

• Switched caps and reactors all step-wise compensation

• Dynamic compensation needed for smooth control unless WTG has variable reactive capability

Page 7: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

7 /

Voltage-Dependent Power Factor Spec From UK grid code

Assumes less reactive power injection when grid voltage is above nominal

Page 8: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

8 /

System Strength

What is it?

• Usually measured in short circuit MVA

• MVAsc = kVb2/Xsc = 3½kVbkIsc

Why is it the single most important factor?

• Maximum short circuit (I.e. max kIsc or min Xsc) dictates breaker duties, many equipment ratings (later lecture)

• Minimum short circuit (I.e. min kIsc or max Xsc) dictates worst sensitivities, e.g. dV/dC, dV/dP, etc. (we’ll look at this some more below)

Page 9: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

9 /

Wind Farm P, Q, V Relationship

E n tire F a rm

-3 5

-3 0

-2 5

-2 0

-1 5

-1 0

-5

0

0 5 0 1 0 0 1 5 0 2 0 0 2 5 0

P (M W )

Q (

MV

Ar)

Fixed PF Fixed V

E n tire F a rm

-3 5

-3 0

-2 5

-2 0

-1 5

-1 0

-5

0

0 5 0 1 0 0 1 5 0 2 0 0 2 5 0

P (M W )

Q (

MV

Ar)

Fixed PF Fixed V

Voltage Control Takes Advantage of Reactive Power Capability

Page 10: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

10 /

• System Response

• Voltage, P & Q Flows at POI

• Input Wind Speed

Voltage Regulation

Page 11: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

11 /

• Individual WTG Response

• Selected Variables

Voltage Regulation

Page 12: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

Wind Turbine Fault Tolerance

Page 13: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

13 /

Ride-Thru Capabilities

Remains on-line and feeds reactive power through system disturbances

Meets present and emerging grid requirement with Low/Zero Voltage Ride Through (LVRT/ZVRT) capability

Meets transmission reliability standards similar to thermal generators

Active Power

Reactive Power

Voltage

Apparent Power

Zero Voltage Event

GE's Standard WindRIDE-THRU Offerings

0

20

40

60

80

100

120

-1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0

Time (seconds)

Vo

lta

ge

at

Po

int

of

Inte

rco

nn

ec

tio

n (P

erc

en

t)

200 ms

LVRT

ZVRT

Page 14: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

14 /

FAULT RIDE-THROUGH NERC PRC-024: Generator Frequency and Voltage Protective Relay Settings

Requirement 1: Frequency Ride-Through

• Each Generator Owner (GO) shall:

– Set in service frequency protective relaying so that it does not operate to trip the generating unit during frequency excursions within the band described in Attachment 1

– Conditions and exceptions: – Must operate between 59.5 and 60.5 Hz continuous – May trip if rate of change >2.5 Hz/sec (Aurora exclusion)

Requirement 2: Voltage Ride-Through

• Each Generator Owner (GO) shall:

– Set in service voltage protective relaying so that it does not operate to trip the generating unit during voltage excursions within the specified band

– Conditions and Exceptions: – Consider 3-phase Zone 1 faults with normal clearing – Site-specific clearing time may be used – Generator tripping for SPS, RAS or to clear the fault allowed

Page 15: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

15 /

NERC PRC-024: Voltage Ride-Through

HVRT DURATION LVRT DURATION

Time (Sec) Voltage

(p.u.) Time (Sec)

Voltage

(p.u.)

Instantaneous 1.20 Instantaneous 0.00

0.20 1.175 0.15 0.45

0.5 1.15 0.30 0.65

1.0 1.10 2.0 0.75

3.0 0.9

Generators / Plant must not trip for credible faults inside the zone unless:

•SPS / RAS requires it

•Generator critical clearing time requires it (synchronous generators)

Page 16: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

16 /

NERC PRC-024: Frequency Ride-Through QUEBEC

High Frequency Low Frequency

Time (Sec) Frequency (Hz) Time (Sec) Frequency (Hz)

0 - 5 66 0 – 0.35 55.5

5 -90 63 0.35 - 2 56.5

90 - 660 61.5 2 - 10 57

> 660 60.6 10 - 90 57.5

90 - 660 58.5

> 660 59.4

EASTERN INTERCONNECTION

High Frequency Low Frequency

Time (Sec) Freq. (Hz)

Time (Sec) Freq. (Hz)

0 – 10(90.935-1.45713*f) 61.8 0 – 10(1.7373*f-100.116) 57.8 10(90.935-1.45713*f)

- Continuous 60.5

10(1.7373*f-100.116) - Continuous

59.5

Continuous 60.5 Continuous 59.5

WECC

High Frequency Low Frequency

Time (Sec) Frequency (Hz) Time (Sec) Frequency (Hz)

0 – 30 61.7 0 – 0.75 57

30 – 180 61.6 7.5 - 30 57.3

>180 60.6 7.5 - 30 57.8

30 - 180 58.4

>180 59.4

ERCOT

High Frequency Low Frequency

Time (Sec) Frequency (Hz) Time (Sec) Frequency (Hz)

0 - 30 61.8 0 – 2 57.5

30 - 540 61.6 2 - 30 58

>540 60.6 30-540 58.4

>540 59.4

Page 17: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

Transient Stability

Page 18: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

18 /

Transient Stability

DFAG wind farms are more stable than conventional synchronous generators.

Page 19: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

19 /

Transient Stability

In fact, wind farms will survive some disturbances that trip conventional synchronous generators.

Page 20: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

Plant reactive coordination problems and solutions

Page 21: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

21 /

WTG terminal Voltage with Uncoordinated PI regulators with PT error

Page 22: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

22 /

WTG terminal Voltage with Uncoordinated PI regulators with PT error

Page 23: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

23 /

Thermal

Plant

Thermal Plant Voltage Regulator

WF3

Grid

Several Miles

Several Miles

Connecting nodes

X1 X2 Wind Plant

Voltage Control

PT2

WF1 WF2

Wind Plant Voltage Control

Wind Plant Voltage Control

PT1

Multi-Plant Topology is Complex

Page 24: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

24 /

Volt/Var Control (simplified block diagram)

Voltage Reference

Measured Voltage PI Control:

(Kpv, Kiv gains)

Voltage Error

Reactive Command to Wind Turbines

Droop: %, LPF

Reactive Power delivered from wind plant to grid

+ -

-

Page 25: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

Study results demonstrating voltage droop

Page 26: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

26 /

Where are we? Six Wind Plants in a region with relatively little load and a couple large thermal plants that normally anchor system voltage. Local penetration is high. Voltage management is significant challenge.

20% change in power from Wind causes ~4% dV at 230kV

Page 27: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

27 /

Response of One Plant to a major line outage

Reactive Power Output

Point-of-regulation Voltage

Terminal Voltage Behavior

Page 28: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

28 /

Wind Plant Droops Field and Tuned Gains

Wind Plant Droop %

(on plant MVAr base)

Proportional

Gain

Integral Gain

Plant 1 5 6.0 1.5

Plants 2 1.3 1.5 0.5

Plants 3 1.3 3.5 0.83

Plant 4 2.0 0.18 0.09

Plant 5 1.3 1.5 0.5

Plant 6 1.5 0.4 0.2

Page 29: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

Field test results

Page 30: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

30 /

Voltage Behavior – 5 Uncoordinated Wind Plants

System

conditions

moving

System conditions

moving

Grid capacitor

switching

Voltage Limit

overrides power factor control

Page 31: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

31 /

Voltage Behavior – 5 Coordinated Wind Plants

System conditions

moving

System

conditions

moving

Grid capacitor

switching

Page 32: CAISO Workshop on Reactive Power Requirements … · • Capability of reactive compensation with no wind ... Remains on-line and feeds reactive power through ... Meets transmission

32 /

Thank You