LTE Radio Access, Rel. RL25TD, Operating Documentation, Issue 02, Documentation Change Delivery 3 Cabling Flexi Multiradio 10 BTS DN09112447 Issue 03 Approval Date 2013-05-24 Confidential Nokia Siemens Networks is continually striving to reduce the adverse environmental effects of its products and services. We would like to encourage you as our customers and users to join us in working towards a cleaner, safer environment. Please recycle product packaging and follow the recommendations for power use and proper disposal of our products and their compo- nents. If you should have questions regarding our Environmental Policy or any of the environmental services we offer, please contact us at Nokia Siemens Networks for any additional information.

Upload: kamalkhan

Post on 18-Nov-2015

224 views

Category:

Documents


29 download

DESCRIPTION

NOKIA

TRANSCRIPT

  • LTE Radio Access, Rel. RL25TD, Operating Documentation, Issue 02, Documentation Change Delivery 3

    Cabling Flexi Multiradio 10 BTS

    DN09112447

    Issue 03Approval Date 2013-05-24

    Confidential

    Nokia Siemens Networks is continually striving to reduce the adverse environmental effects of its products and services. We would like to encourage you as our customers and users to join us in working towards a cleaner, safer environment. Please recycle product packaging and follow the recommendations for power use and proper disposal of our products and their compo-nents.

    If you should have questions regarding our Environmental Policy or any of the environmental services we offer, please contact us at Nokia Siemens Networks for any additional information.

  • 2 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580997fe8Confidential

    The information in this document is subject to change without notice and describes only the product defined in the introduction of this documentation. This documentation is intended for the use of Nokia Siemens Networks customers only for the purposes of the agreement under which the document is submitted, and no part of it may be used, reproduced, modified or transmitted in any form or means without the prior written permission of Nokia Siemens Networks. The documentation has been prepared to be used by professional and properly trained personnel, and the customer assumes full responsibility when using it. Nokia Siemens Networks welcomes customer comments as part of the process of continuous development and improvement of the documentation.

    The information or statements given in this documentation concerning the suitability, capacity, or performance of the mentioned hardware or software products are given "as is" and all liability arising in connection with such hardware or software products shall be defined conclusively and finally in a separate agreement between Nokia Siemens Networks and the customer. However, Nokia Siemens Networks has made all reasonable efforts to ensure that the instructions contained in the document are adequate and free of material errors and omissions. Nokia Siemens Networks will, if deemed necessary by Nokia Siemens Networks, explain issues which may not be covered by the document.

    Nokia Siemens Networks will correct errors in this documentation as soon as possible. IN NO EVENT WILL Nokia Siemens Networks BE LIABLE FOR ERRORS IN THIS DOCUMENTA-TION OR FOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TO SPECIAL, DIRECT, INDI-RECT, INCIDENTAL OR CONSEQUENTIAL OR ANY LOSSES, SUCH AS BUT NOT LIMITED TO LOSS OF PROFIT, REVENUE, BUSINESS INTERRUPTION, BUSINESS OPPORTUNITY OR DATA,THAT MAY ARISE FROM THE USE OF THIS DOCUMENT OR THE INFORMATION IN IT.

    This documentation and the product it describes are considered protected by copyrights and other intellectual property rights according to the applicable laws.

    The wave logo is a trademark of Nokia Siemens Networks Oy. Nokia is a registered trademark of Nokia Corporation. Siemens is a registered trademark of Siemens AG.

    Other product names mentioned in this document may be trademarks of their respective owners, and they are mentioned for identification purposes only.

    Copyright Nokia Siemens Networks 2013. All rights reserved

    f Important Notice on Product SafetyThis product may present safety risks due to laser, electricity, heat, and other sources of danger.

    Only trained and qualified personnel may install, operate, maintain or otherwise handle this product and only after having carefully read the safety information applicable to this product.

    The safety information is provided in the Safety Information section in the Legal, Safety and Environmental Information part of this document or documentation set.

    The same text in German:

    f Wichtiger Hinweis zur Produktsicherheit Von diesem Produkt knnen Gefahren durch Laser, Elektrizitt, Hitzeentwicklung oder andere Gefahrenquellen ausgehen.

    Installation, Betrieb, Wartung und sonstige Handhabung des Produktes darf nur durch geschultes und qualifiziertes Personal unter Beachtung der anwendbaren Sicherheits-anforderungen erfolgen.

    Die Sicherheitsanforderungen finden Sie unter Sicherheitshinweise im Teil Legal, Safety and Environmental Information dieses Dokuments oder dieses Dokumentations-satzes.

  • DN09112447 3

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580997fe8Confidential

    Table of contentsThis document has 77 pages.

    Summary of changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    1 Module interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    2 Cabling principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132.1 Stand-alone BTS cabling principle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132.2 Cabinet cabling principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.3 Cable tie points and cable clamps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

    3 Connecting System Module (FSMx) core cabling . . . . . . . . . . . . . . . . . 193.1 Connecting external power feed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 193.2 Connecting internal optical cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273.3 Connecting transmission cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 313.3.1 Overview of connecting transmission cabling . . . . . . . . . . . . . . . . . . . . 313.3.2 Connecting RJ45 transmission cable. . . . . . . . . . . . . . . . . . . . . . . . . . . 323.3.3 Connecting SFP+ transmission cable . . . . . . . . . . . . . . . . . . . . . . . . . . 343.4 Connecting FSMx core optional cabling . . . . . . . . . . . . . . . . . . . . . . . . 383.4.1 Connecting Sync Out cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 383.4.2 Connecting Sync In cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 393.4.3 Connecting External Alarms and Controls (EAC) cable. . . . . . . . . . . . . 41

    4 Connecting Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) cabling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

    5 Connecting Flexi Multiradio 10 BTS optional Transmission Sub-Module (FTIF) cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

    6 Connecting Flexi Multiradio 10 BTS Capacity Extension Sub-Module (FB-BA) cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

    7 Cabling FZxx RF Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

    8 Installing feederless or distributed site. . . . . . . . . . . . . . . . . . . . . . . . . . 59

    9 Connecting Flexi Power Rectifier (FPRA) alarms for Flexi Multiradio BTS 65

    9.1 Overview of connecting Flexi Power Rectifier (FPRA) alarms. . . . . . . . 659.2 Connecting Flexi Power Rectifier (FPRA) alarm cable . . . . . . . . . . . . . 68

    10 Checklist for cabling Flexi Multiradio 10 BTS. . . . . . . . . . . . . . . . . . . . . 70

    11 Appendices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7111.1 Contents of the Flexi Multiradio 10 BTS optical cable deliveries . . . . . . 7111.2 Contents of the Flexi Multiradio 10 BTS optical transceiver deliveries . 7211.3 Contents of the Flexi Multiradio 10 BTS transmission cable deliveries . 7311.4 Contents of the Flexi Multiradio 10 BTS synchronization cable deliveries.

    7411.5 EAC cable (FTSI 472578A) wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7511.6 Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) control

    panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

  • 4 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580997fe8Confidential

    List of figuresFigure 1 System Module interfaces. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10Figure 2 RF Module (FZHA) interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Figure 3 Power Module interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Figure 4 Plinth interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Figure 5 Routing the cables on wall installation . . . . . . . . . . . . . . . . . . . . . . . . . . 14Figure 6 Routing the cables on pole installation . . . . . . . . . . . . . . . . . . . . . . . . . . 15Figure 7 Location of the bottom cable entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16Figure 8 Cable supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17Figure 9 Cable supports in FCOA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18Figure 10 Routing DC power cable through cable entry . . . . . . . . . . . . . . . . . . . . . 19Figure 11 Loosen screw terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Figure 12 Stripping DC power cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Figure 13 Inserting DC power cable to IP boot . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21Figure 14 Removing narrow end of IP boot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22Figure 15 Removing tape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22Figure 16 Insert DC power cable wires . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23Figure 17 Tighten screw terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24Figure 18 Fixing IP boot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25Figure 19 Install cable entries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26Figure 20 Installing optical transceiver . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Figure 21 Pulling back cable connector seal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29Figure 22 Connecting optical cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29Figure 23 Installing optical cable connector seal . . . . . . . . . . . . . . . . . . . . . . . . . . 29Figure 24 Routing optical cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30Figure 25 Connecting RJ45 transmission cable . . . . . . . . . . . . . . . . . . . . . . . . . . . 32Figure 26 Inserting optical transceiver . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Figure 27 Pulling back the connector seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36Figure 28 Connecting optical cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36Figure 29 Connecting optical cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37Figure 30 Pushing the connector seal in place . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37Figure 31 Connecting Sync Out cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38Figure 32 Connecting Sync In cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39Figure 33 Connecting EAC cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41Figure 34 Pulling FSMx core out. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42Figure 35 Loosening FPFD screw terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43Figure 36 Wrapping tape around wires . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43Figure 37 Inserting cable to IP boot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44Figure 38 Removing tape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44Figure 39 Connecting FPFD DC output cable wires . . . . . . . . . . . . . . . . . . . . . . . . 45Figure 40 Tightening FPFD screw terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45Figure 41 Fixing IP boot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46Figure 42 Connecting FTIF cabling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48Figure 43 Removing FBBA IP seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50Figure 44 Connecting power cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50Figure 45 Chaining power cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

  • DN09112447 5

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580997fe8Confidential

    Figure 46 Connecting QSFP cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51Figure 47 Connecting second QSPF cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52Figure 48 Bending the QSFP cables (1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53Figure 49 Bending the QSFP cables (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53Figure 50 FZHA external interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54Figure 51 Wrapping tape around shielded DC cable . . . . . . . . . . . . . . . . . . . . . . . 56Figure 52 Wrapping an extra tape around DC cable . . . . . . . . . . . . . . . . . . . . . . . 56Figure 53 Inserting DC feeder cable to IP boot . . . . . . . . . . . . . . . . . . . . . . . . . . . 57Figure 54 Removing narrow end of IP boot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57Figure 55 Properly secured shielded DC cable (left) and non-shielded DC cable

    (right) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Figure 56 Securing the power cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Figure 57 Installation principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59Figure 58 Installation principle with AC power supply . . . . . . . . . . . . . . . . . . . . . . 60Figure 59 Installation principle with DC power supply . . . . . . . . . . . . . . . . . . . . . . 61Figure 60 Installing power feed to the RF Module . . . . . . . . . . . . . . . . . . . . . . . . . 62Figure 61 FPRA front view . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65Figure 62 FPRA Power Distribution Assembly unit . . . . . . . . . . . . . . . . . . . . . . . . 66Figure 63 FPRA Alarm Interface card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66Figure 64 Detaching the Alarm Interface card . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68Figure 65 Connecting the FPRA alarm cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69Figure 66 FPFD control panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

  • 6 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580997fe8Confidential

    List of tablesTable 1 System Module core interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Table 2 Power distribution sub-module (FPFD) interfaces . . . . . . . . . . . . . . . . . . 9Table 3 Optional transmission sub-module (FTIF) interfaces . . . . . . . . . . . . . . . 10Table 4 Capacity extension sub-module (FBBA) interfaces . . . . . . . . . . . . . . . . 10Table 5 RF Module (FZHA/FZNC) interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . 10Table 6 Power Module interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Table 7 Plinth interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Table 8 Alarm description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66Table 9 Optical cable deliveries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71Table 10 Optical transceiver deliveries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72Table 11 Transmission cable deliveries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73Table 12 Sync cable deliveries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74Table 13 EAC cable (FTSI) wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75Table 14 FPFD LED indications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

  • DN09112447 7

    Cabling Flexi Multiradio 10 BTS Summary of changes

    Id:0900d8058099803aConfidential

    Summary of changes Changes between document issues are cumulative. Therefore, the latest document issue contains all changes made to previous issues.

    Changes between issues 02 and 03Connecting external power feed (3.1)

    Step 4 updated.

    Connecting Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) cabling (4)

    FPFD-related figures updated. Preconditions updated. Step 2 updated. Step 7 updated.

    Connecting Flexi Multiradio 10 BTS Capacity Extension Sub-Module (FBBA) cabling (6)

    Step 11 updated.

    Cabling FZxx RF Modules (7)

    Preconditions updated.

    Changes between issues 01 and 02Connecting external power feed (3.1)

    Preconditions updated.

    Cabling FZxx RF Modules (7)

    Preconditions added. Step 2 updated. Step 6 updated.

    Issue 01This is the first issue of this document.

  • 8 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d8058099803aConfidential

    Summary of changes

  • DN09112447 9

    Cabling Flexi Multiradio 10 BTS Module interfaces

    Id:0900d80580947298Confidential

    1 Module interfaces

    w NOTICE: Incorrect cables and seals may not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    The following tables and figures describe the Flexi Multiradio BTS module interfaces.

    Interface Number of interfaces Connector type

    48V DC output for power chaining to FBBA (DC out)

    1 FCI Power profile

    48V DC input to System Module (DC in)

    1 Screw terminal 2x16 mm2

    Local Management Port (LMP)

    1 RJ45

    TRS/RP3-01 interface (EIF2/RF/6)

    1 SFP+

    System interface (RF/EXT1...3)

    3 SFP+

    Low latency interconnection interface between FSMxs (SRIO)

    1 SFP+

    FBBA capacity extension module interface (BB EXT1...2)

    2 QSFP

    TRS interface (EIF1) 1 RJ45

    External alarms and controls (EAC)

    1 HDMI

    Synchronization interface (Sync In)

    1 HDMI

    Synchronization interface (Sync Out)

    1 HDMI

    Table 1 System Module core interfaces

    Interface Number of interfaces Connector type

    48V DC output for supply-ing -48V DC to RF Modules and/or other FSMxs (DC out 1...4)

    4 Screw terminal

    Table 2 Power distribution sub-module (FPFD) interfaces

  • 10 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580947298Confidential

    Module interfaces

    w NOTICE: Small form-factor pluggable (SFP) cages are not overvoltage protected. Do not use electrical SFP transceivers in the SFP slots of the transmission sub-modules.

    Figure 1 System Module interfaces

    Interface Number of interfaces Connector type

    PDH interface (IF4/IF8, IF3/IF7, IF2/IF6, IF1/IF5)

    4 RJ45

    Ethernet interface (EIF1...2) 2 SFP

    Ethernet interface (EIF3...4) 2 RJ45

    Table 3 Optional transmission sub-module (FTIF) interfaces

    Interface Number of interfaces Connector type

    Power supply in (DC in) 1 FCI Power profile

    Power supply out (DC out) to the second FBBA

    1 FCI Power profile

    Low latency interconnection interface (SRIO)

    1 SFP+

    FSMx interface 1 QSFP

    System interface 1 SFP+

    Table 4 Capacity extension sub-module (FBBA) interfaces

    Interface Number of interfaces Connector type

    Power supply (DC in) 1 3-pole connector

    RF signal interface to antenna(s)

    FZHA: 8

    FZNC: 6

    QN

    Control and user plane interface to the System Module

    4 SFP optical module

    External equipment (EAC) 1 RJ45

    Table 5 RF Module (FZHA/FZNC) interfaces

  • DN09112447 11

    Cabling Flexi Multiradio 10 BTS Module interfaces

    Id:0900d80580947298Confidential

    Figure 2 RF Module (FZHA) interfaces

    Beamforming calibration 1 QN

    LMP 1 Pin header 2x15, female

    Grounding 2 x M6 Screw terminal

    Interface Number of interfaces Connector type

    AC input 3-phase Delta connection: 115/200 V AC or 120/208 V AC

    3-phase Star connection: 220/380 V AC or 230/400 V AC or 240/415 V AC

    1-phase connection: 200-240 V AC

    HDFK10, 10 mm2 max.

    DC output 4 4 x multibeam

    48 V output 1 2-wire DC cable

    Alarms 2 per FPAA/FPBA/FPBB RJ-45

    Grounding 2 x M5 Screw

    Table 6 Power Module interfaces

    Interface Number of interfaces Connector type

    Table 5 RF Module (FZHA/FZNC) interfaces (Cont.)

  • 12 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580947298Confidential

    Module interfaces

    Figure 3 Power Module interfaces

    Figure 4 Plinth interfaces

    Interface Number of interfaces Connector type

    Site grounding 2 (< 10 Ohm (recom-mended), max. 150 Ohm)

    M8 or 2 x M5 screw

    Module grounding 12

    Table 7 Plinth interfaces

    DN70283655

    Grounding point

    DC output

    AC input

    Alarm Connector

    48 V output

    main site grounding

    module grounding

    ESD Stud

  • DN09112447 13

    Cabling Flexi Multiradio 10 BTS Cabling principles

    Id:0900d8058094729cConfidential

    2 Cabling principles

    2.1 Stand-alone BTS cabling principle

    w NOTICE:Incorrect cables and seals may not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    Cable routing when System Module and RF Module are on separate plinthsIn wall and pole installation options, the RF Module can be installed on a different plinth than the System Module. In that case, all the cabling, including BTS internal cables, should be routed through the lower cable entry whenever possible.

  • 14 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d8058094729cConfidential

    Cabling principles

    Figure 5 Routing the cables on wall installation

    The end of the optical cable is bent to 90 degrees to the left for guidance. Do not break the guiding.

    w NOTICE:Overbending the optical cables damages the cables and can detach or damage the con-nectors. Do not bend optical cables beyond the minimum radius of 70 mm.

    w NOTICE:Optical cables are fragile. Always route the optical cables to the left from the connector.

    Wall

  • DN09112447 15

    Cabling Flexi Multiradio 10 BTS Cabling principles

    Id:0900d8058094729cConfidential

    Figure 6 Routing the cables on pole installation

    Pole

  • 16 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d8058094729aConfidential

    2.2 Cabinet cabling principleIn cabinet installations, base station external cabling is routed along the sides of the cabinet. Cables are fixed to the cabinet with cable ties. Cabling can be routed out through the cabinet roof or bottom.

    w NOTICE: Incorrect cables and seals may not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    g When modules are installed inside a cabinet, no separate earthing (grounding) is required. The cabinet provides adequate earthing (grounding).t To minimise the risk of damaging the cables (for example, water, ice, dirt), the cables should be routed in such a way that they do not lie on the cabinet floor.

    The cables should first go down from the connector so that if there is condensated water, it will not reach the connectors.

    There is a cable entry on the underside of the cabinet. See the position in the following figure.

    Figure 7 Location of the bottom cable entry

  • DN09112447 17

    Cabling Flexi Multiradio 10 BTS

    Id:0900d8058094729bConfidential

    2.3 Cable tie points and cable clampsIn floor, wall or pole installations, strain on cables is reduced by using

    cable tie points in cable entries cable clamps

    Figure 8 Cable supports

    The cables are fixed with standard cable ties, except for the power supply cables. The fixing of power supply cables is done with special isolating cable clamps, which are included in the accessory bag.

    In cabinet installations, there are slots on the sides of the cabinet core and on the cabinet roof for tying the cables. The cables are fixed with standard cable ties, except for the power supply cables.

    See the following figure for the cable supports in the outdoor cabinet.

  • 18 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d8058094729bConfidential

    Figure 9 Cable supports in FCOA

  • DN09112447 19

    Cabling Flexi Multiradio 10 BTS Connecting System Module (FSMx) core cabling

    Id:0900d805809abce0Confidential

    3 Connecting System Module (FSMx) core cabling

    3.1 Connecting external power feedBefore you start

    g The FSMx core DC input is only used when there is no Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) in the configuration.Make sure that the module is grounded.

    Choose a DC power cable between diameters of 6 mm to 20 mm.

    f WARNING! Risk of short circuit.Make sure the main site switch is in the OFF position before you connect the DC power cable.

    w NOTICE: Incorrect cables and seals might not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    The power cable must be connected before power is applied to the system.

    Steps

    1 Route the DC power cable through the cable entry.

    Figure 10 Routing DC power cable through cable entry

  • 20 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abce0Confidential

    Connecting System Module (FSMx) core cabling

    2 Loosen the screw terminals of the DC in port on the FSMx front panel.

    Figure 11 Loosen screw terminals

    3 Strip the DC power cable and wrap tape around the exposed wires in order not to break the IP boot.

    Figure 12 Stripping DC power cable

  • DN09112447 21

    Cabling Flexi Multiradio 10 BTS Connecting System Module (FSMx) core cabling

    Id:0900d805809abce0Confidential

    4 Insert the taped end of the DC power cable to the IP boot.

    Figure 13 Inserting DC power cable to IP boot

    When using a thick cable, the narrow end of the IP boot can be removed using scissors. Cut in one go so that you get a clean cut surface. See Figure 14 Removing narrow end of IP boot for details. Note that you can insert only one DC cable with a diameter of max. 20 mm to the IP boot. Minimum cable diameter is 6 mm.

  • 22 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abce0Confidential

    Connecting System Module (FSMx) core cabling

    Figure 14 Removing narrow end of IP boot

    5 Remove the tape.

    Figure 15 Removing tape

    6 Insert the DC power cable to the screw terminal and make sure that the polarity of the wires is correct.Connect the wires to the V48N- and V48RTN+ connectors according to the markings on the cable.

    Cable diameter 1 - mmcut with scissors in one go

    0.1 17.0

    Cable diameter 1 - 20 mmcut with scissors in one go

    7.1 .0

    Cable diameter - mm(no cutting need)

    6.0 10.0

  • DN09112447 23

    Cabling Flexi Multiradio 10 BTS Connecting System Module (FSMx) core cabling

    Id:0900d805809abce0Confidential

    f WARNING! Risk of power supply failure and, in rare cases, of short circuit.Check that the polarity is correct according to the markings on the cable.

    Figure 16 Insert DC power cable wires

    7 Tighten the screw terminals to 5.0 Nm.Make sure that the DC power cable is not bent to the left or right in order to avoid tension to the DC input terminals.

  • 24 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abce0Confidential

    Connecting System Module (FSMx) core cabling

    Figure 17 Tighten screw terminals

  • DN09112447 25

    Cabling Flexi Multiradio 10 BTS Connecting System Module (FSMx) core cabling

    Id:0900d805809abce0Confidential

    8 Fix the IP boot in place and fix the screw. Tighten to max. 2.0 Nm.

    Figure 18 Fixing IP boot

    1 2

  • 26 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abce0Confidential

    Connecting System Module (FSMx) core cabling

    9 Install the cable entries.

    Figure 19 Install cable entries

    10 Fix the cable entry screws.

    11 Fix the DC power cable to the side of the module casing with cable ties.

  • DN09112447 27

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd04Confidential

    3.2 Connecting internal optical cablesPurposeThe optical cables connected between the System Module and each of the RF Modules or Remote Radio Heads (or the system extension module) are used for transmitting signals between modules.

    See Contents of the Flexi Multiradio 10 BTS optical cable deliveries and Contents of the Flexi Multiradio 10 BTS optical transceiver deliveries for supported cables and optical transceivers.

    Before you start

    f WARNING! Risk of eye damage caused by invisible laser beam.Make sure that the laser beam is switched off when optical cables are installed.

    f CAUTION! Risk of personal injury.Always stop transmission before detaching the optical fibre from an optical fibre connec-tor marked with a warning triangle.

    w NOTICE: Incorrect cables and seals might not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    w NOTICE: Overbending the optical fibre cables damages the cables and can detach or damage the connectors. Do not bend optical fibre cables to a radius smaller than the minimum radius of 70 mm (2.8 inches).

    w NOTICE: The optical fibre connector is fragile. Handle it with care.

    w NOTICE: Optical cables are fragile. Always route the optical cables to the left from the connector.w NOTICE: Optical fibres are sensitive. The presence of contaminants lowers the mechanical strength of the optical fibre and may dampen the transmission of light in the

    fibres. Clean all optical fibre connectors before installation using an optical fibre connec-tor cleaning kit.

    g When using two or three parallel optical fibres per RF Module, the difference in lengths between the cables must not exceed 30 m.Steps

    1 Remove the IP seals from the relevant optical cable connectors in both System and RF Modules.When pulling out the IP seal, bending it to any direction is only allowed for a maximum length of 2 mm. When the IP seal has come out 2 mm out of its slot, only use axial force to complete the IP seal removal.

  • 28 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd04Confidential

    Store the seals for later use.

    Figure 20 Installing optical transceiver

    2 Remove the protective cap from the optical transceiver and push it in the System Module.Make sure you insert the optical transceiver as shown in Figure 20 Installing optical transceiver.

    Once the optical transceiver is inserted, flip the latch up.

    When 2 mm out, only use axial force.

    Bending only allowed for max. 2 mm.

    1

    2 mm

  • DN09112447 29

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd04Confidential

    3 Pull back the optical cable connector seal to uncover the connector.

    Figure 21 Pulling back cable connector seal

    4 Remove the protective plug and clean the connector according to the instructions below.

    a) Moisten a lint-free swab or one section of a lint-free wipe with one drop of 99% alcohol.

    b) Lightly wipe the connector with alcohol moistened swab or wipe.c) Dry any remaining alcohol with a dry swab or the dry section of the wipe.d) Properly dispose of the swab or wipe. Do not reuse.

    5 Connect the cable to the System Module.Make sure it clicks into place.

    Figure 22 Connecting optical cable

    6 Push the connector seal firmly in place.

    Figure 23 Installing optical cable connector seal

  • 30 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd04Confidential

    7 Route the cable between the System and RF Modules.

    Figure 24 Routing optical cable

    8 Coil up the excess cable and fix it on the module casing with cable ties.

    9 Remove the protective cap from the optical transceiver and push it in the RF Module.

    10 Pull back the optical cable connector seal to uncover the connector.

    11 Remove the protective plug and clean the connector according to the instructions given in step 4.

    12 Connect the optical cable to the RF Module.Make sure it clicks into place.

    13 Push the connector seal firmly in place.

    14 Repeat for each RF Module in the configuration.

    15 Make sure that all the connector seals are properly installed.

  • DN09112447 31

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abcfeConfidential

    3.3 Connecting transmission cables

    3.3.1 Overview of connecting transmission cablingWith Flexi outdoor System Module (FSMF/G), there are three options for transmission: two integrated interfaces on the FSMx core and an optional transmission sub-module.

    1) EIF1 interface (RJ45)This integrated transmission interface is marked "EIF1" on the FSMx core front panel. If you are using this transmission option, see Connecting RJ45 transmission cable.

    2) EIF2 interface (SFP+)This integrated transmission interface is marked "EIF2/RF/6" on the FSMx front panel. The interface can be software-configured to either GE Ethernet interface for transport purposes or RP3-01/CPRI interface. Note that it is only available for transport if an optional transmission sub-module is not deployed. If you are using this transmission option, see Connecting SFP+ transmission cable.

    3) Flexi Multiradio 10 BTS optional Transmission Sub-Module If more or other Ethernet interfaces are required then a Flexi Multiradio 10 BTS optional Transmission Sub-Module is needed. For installation instructions, see Installing Flexi Multiradio 10 BTS optional Transmission Sub-Module (FTIF). For cabling instructions, see Connecting Flexi Multiradio 10 BTS optional Transmission Sub-Module (FTIF) cabling.

    See Contents of the Flexi Multiradio 10 BTS transmission cable deliveries for a list of cables available.

  • 32 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808efd4fConfidential

    3.3.2 Connecting RJ45 transmission cable

    Before you start

    w NOTICE:Incorrect cables and seals may not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    Summary

    w NOTICE:Risk of damage to equipment. Flexi BTS transmission cables with weather-resistant boots must be used in outdoor installations.

    Figure 25 Connecting RJ45 transmission cable

    Steps

    1 Remove the IP seal from the EIF1 port on the FSMx core front panel.Store the seal for later use.

    2 Route the transmission cable through the cable entry.

    3 Pull back the connector seal to uncover the connector.

    1 4

    3

    2

    5

  • DN09112447 33

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808efd4fConfidential

    4 Connect the cable to the EIF1 port.Make sure it clicks into place.

    5 Push the cable connector seal firmly in place.

    6 Coil up the excess cable and fix it on the module casing with cable ties.

    7 Make sure that the connector seal is properly installed.

  • 34 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd26Confidential

    3.3.3 Connecting SFP+ transmission cable

    Before you start

    f WARNING! Danger of eye damage caused by invisible laser beam.Make sure that the laser beam is switched off during optical fibre installation.

    w NOTICE: Incorrect cables and seals may not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    w NOTICE: Risk of damage to equipment. Flexi BTS transmission cables with weather-resistant boots must be used in outdoor installations.Steps

    1 Remove the IP seal from the EIF2/RF/6 port on the FSMx core front panel.Store the seal for later use.

  • DN09112447 35

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd26Confidential

    Figure 26 Inserting optical transceiver

    2 Remove the protective cap from the optical transceiver and push it in the EIF2/RF/6 port.Make sure you insert the optical transceiver as shown in Figure 26 Inserting optical transceiver.

    Once the optical transceiver is inserted, flip the latch up.

    3 Route the transmission cable through the cable entry.

    When 2 mm out, only use axial force.

    Bending only allowed for max. 2 mm.

    1

    2 mm

  • 36 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd26Confidential

    4 Pull back the connector seal to uncover the connector.

    Figure 27 Pulling back the connector seal

    5 Remove the protective plug from the optical cable and clean the connector according to the instructions below:

    a) Moisten a lint-free swab or one section of a lint-free wipe with one drop of 99% alcohol.

    b) Lightly wipe the connector with alcohol moistened swab or wipe.c) Dry any remaining alcohol with a dry swab or the dry section of the wipe.d) Properly dispose of the swab or wipe. Do not reuse.

    6 Connect the cable to the EIF2/RF/6 port.Make sure it clicks into place.

    Figure 28 Connecting optical cable

  • DN09112447 37

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809abd26Confidential

    Figure 29 Connecting optical cable

    7 Push the cable connector seal firmly in place.

    Figure 30 Pushing the connector seal in place

    8 Coil up the excess cable and fix it on the module casing with cable ties.

    9 Make sure that the connector seal is properly installed.

  • 38 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808eaac3Confidential

    3.4 Connecting FSMx core optional cabling

    3.4.1 Connecting Sync Out cable

    Steps

    Figure 31 Connecting Sync Out cable

    1 Remove the IP seal from the Sync Out port on the FSMx core.Store the seal for later use.

    2 Connect a Sync cable F (FTSF 472509A) to the Sync Out port.The correct end of the cable is marked with the label "Sync Out".

    3 Push the connector seal firmly in place.

    4 Connect the other end of the FTSF cable to the Sync In port of the second FSMG/F in your configuration.

    5 Fix the excess cable with cable ties.

    1 2 3

  • DN09112447 39

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808eaadfConfidential

    3.4.2 Connecting Sync In cable

    Before you startChoose one of the four cables listed below:

    External synchronization input:

    Sync Cable F (FTSF 472509A) Sync Cable G (FTSG 472576A)Powering and controlling GPS equipment:

    GPS cable assembly 30 m (FTSE 472510A) GPS cable assembly 100 m (FTSH 472577A)

    Steps

    Figure 32 Connecting Sync In cable

    1 Remove the IP seal from the Sync In port on the FSMx core.Store the seal for later use.

    2 Connect the cable to the Sync In port.The correct end of the cable is marked with the label "Sync In".

    1 2 3

  • 40 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808eaadfConfidential

    3 Push the connector seal firmly in place.

    4 Connect the other end of the cable as follows:

    If your cable is a FTSF, connect it to the Sync Out port of the second FSMG/F in your configuration.

    If your cable is a FTSG, connect it to the Sync Out port of FSMC/D/E. If your cable is a FTSE/H, connect it to the GPS antenna.

    5 Fix the excess cable with cable ties.

  • DN09112447 41

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808eaae1Confidential

    3.4.3 Connecting External Alarms and Controls (EAC) cable

    Steps

    Figure 33 Connecting EAC cable

    1 Remove the IP seal from the EAC port on the FSMx core.Store the seal for later use.

    2 Connect an EAC cable (FTSI 472578A) to the EAC port. The correct end of the cable is marked with the label "EAC".

    3 Push the connector seal firmly in place.

    4 Connect the other end of the cable to the Flexi System External Alarm module (FSEB).Alternatively, you can cut off the D connector and connect the other end of the cable to, for example, your patch panel based on the color coding of the cable. See appendix EAC cable (FTSI 472578A) wiring for details.

    5 Fix the excess cable with cable ties.

    1 2 3

  • 42 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809a96dfConfidential

    Connecting Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) cabling

    4 Connecting Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) cablingBefore you start

    w NOTICE: Incorrect cables and seals might not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    f WARNING! Risk of short circuit.Make sure that FSMx core DC input is not used.

    If the DC input cable is not connected yet, see Installing Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) for details.

    If cable entries are installed, remove them.

    If you need to connect DC output cables to the FPFD front panel while it is running, turn the power off from the control panel. See Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) control panel for details.

    Steps

    1 Undo the screws holding the FSMx core in place and pull it out slightly.

    Figure 34 Pulling FSMx core out

  • DN09112447 43

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Multiradio 10 BTS Power DistributionSub-Module (FPFD) cabling

    Id:0900d805809a96dfConfidential

    2 Loosen the screw terminals on the FPFD front panel.

    Figure 35 Loosening FPFD screw terminals

    3 Strip the DC output cable and wrap tape around the exposed wires in order not to break the IP boot.The cable size is range is 4 to 16 mm2.

    Figure 36 Wrapping tape around wires

  • 44 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809a96dfConfidential

    Connecting Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) cabling

    4 Insert the taped end of the cable to the IP boot.

    Figure 37 Inserting cable to IP boot

    5 Remove the tape.

    Figure 38 Removing tape

    6 Insert the cable to the screw terminal and make sure that the polarity of the wires is correct.

    f WARNING! Risk of power supply failure and, in rare cases, of short circuit.Check that the polarity is correct according to the markings on the cable.

  • DN09112447 45

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Multiradio 10 BTS Power DistributionSub-Module (FPFD) cabling

    Id:0900d805809a96dfConfidential

    Figure 39 Connecting FPFD DC output cable wires

    7 Tighten the screw terminals to 3.0 Nm.Make sure that the DC cable is not bent to the left or right in order to avoid tension to the DC output terminals.

    Figure 40 Tightening FPFD screw terminals

    _ +

  • 46 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809a96dfConfidential

    Connecting Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) cabling

    8 Fix the IP boot in place.

    Figure 41 Fixing IP boot

    9 Repeat steps 2 to 8 as many times as necessary.

    10 Reinsert the FSMx core and fix the screws.

  • DN09112447 47

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Multiradio 10 BTS optional Transmis-sion Sub-Module (FTIF) cabling

    Id:0900d805809ac0b3Confidential

    5 Connecting Flexi Multiradio 10 BTS optional Transmission Sub-Module (FTIF) cablingBefore you start

    w NOTICE: Incorrect cables and seals might not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    w NOTICE: If the SFP module is hot swapped, the site reset is required.

  • 48 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809ac0b3Confidential

    Connecting Flexi Multiradio 10 BTS optional Transmis-sion Sub-Module (FTIF) cabling

    Summary

    Figure 42 Connecting FTIF cabling

    Steps

    1 Remove IP seals from the relevant transmission sub-module ports.Store the seals for later use.

    7

    1 2

    If using OPT Ifs:

    3

    6

    4

    8

  • DN09112447 49

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Multiradio 10 BTS optional Transmis-sion Sub-Module (FTIF) cabling

    Id:0900d805809ac0b3Confidential

    2 If using the optical interfaces, insert SFP modules to the EIF1 and EIF2 ports.Use only recommended SFP modules.

    w NOTICE: If the SFP module is hot swapped, the site reset is required.

    3 Route a transmission cable through the cable entry.

    4 Pull back the connector seal covering the transmission cable connector.

    5 If using the optical interfaces, clean the optical cables before connecting them.See Connecting internal optical cables for instructions.

    6 Connect the cable to the transmission sub-module.

    7 Push the cable connector seal firmly in place.

    8 Coil up the excess cable and fix it on the module casing with cable ties.

    9 Repeat steps 3-8 for all the transmission cables required for your configuration.

    10 Make sure that all the connector seals are properly installed.

  • 50 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809ac0b5Confidential

    Connecting Flexi Multiradio 10 BTS Capacity Extension Sub-Module (FBBA) cabling

    6 Connecting Flexi Multiradio 10 BTS Capacity Extension Sub-Module (FBBA) cablingBefore you start

    w NOTICE: Incorrect cables and seals might not provide secured weather protection. In outdoor installations, including the outdoor cabinet, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks. This is also recommended for indoor installations.

    Steps

    1 Remove IP seals from the FBBA ports that you are going to use.Store the seals for later use.

    Figure 43 Removing FBBA IP seals

    2 Connect the power cable (995297_) from the DC out port on the FSMx core to the DC in port on the FBBA front panel.Make sure it clicks into place.

    Figure 44 Connecting power cable

    3 Push the connector seals firmly in place.

  • DN09112447 51

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Multiradio 10 BTS Capacity ExtensionSub-Module (FBBA) cabling

    Id:0900d805809ac0b5Confidential

    4 If using two FBBA sub-modules, chain the power cable from the DC out port of the first FBBA to the DC in port of the second FBBA.

    Figure 45 Chaining power cable

    5 Push the connector seals firmly in place.

    6 Connect a QSFP cable (995298_) from the BB EXT1 port on the FSMx core to the BB EXT port on the FBBA front panel.

    w NOTICE: Make sure the power cable is connected before connecting the QSFP cable.Make sure it clicks into place.

    Figure 46 Connecting QSFP cable

    7 Push the connector seals firmly in place.

  • 52 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809ac0b5Confidential

    Connecting Flexi Multiradio 10 BTS Capacity Extension Sub-Module (FBBA) cabling

    8 If using two FBBA sub-modules, connect a QSFP cable (995298_) from the BB EXT2 port on the FSMx core to the BB EXT port of the second FBBA.

    Figure 47 Connecting second QSPF cable

    9 Push the connector seals firmly in place.

    10 Make sure that all the connector seals are properly installed.

    11 If applicable, install a front cover on the FSMx.

    w NOTICE: Do not break the maximum bending radius of 40 mm (1.57 in) for the QSFP cables. Bend the cables upwards as shown in Figure 48 Bending the QSFP cables (1) and Figure 49 Bending the QSFP cables (2), ensuring that the outer edges of the cables are within the front cover inner dimensions.

  • DN09112447 53

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Multiradio 10 BTS Capacity ExtensionSub-Module (FBBA) cabling

    Id:0900d805809ac0b5Confidential

    Figure 48 Bending the QSFP cables (1)

    Figure 49 Bending the QSFP cables (2)

  • 54 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580999640Confidential

    Cabling FZxx RF Modules

    7 Cabling FZxx RF ModulesPurposeFollow these instructions to cable FZxx modules. Note that the module front panel external interface layout as well as the number of available interfaces vary among module variants. Figure 50 FZHA external interfaces presents an example image of the FZHA module variant.

    Figure 50 FZHA external interfaces

    Before you start

    f WARNING! Risk of electric shock.Before turning RF power on, RF ports should be terminated by nominal 50 load (for example, feeder with antenna).

    However, if these conditions are not met, the plastic caps that are delivered within the unused RF ports should remain in place. The plastic caps isolate RF power from the environment, and thus provide electric shock security in case RF power is accidentally on.

    w NOTICE: The LMP port on RF module is not for customer use. Do not open the cap.Steps

    1 Connect the grounding cable.Ensure that the grounding cable is always the first cable connected to the FZxx. Never commission the FZxx without adequate grounding.

    2 Connect the antenna jumper cables.

    w NOTICE: If you use a large torque wrench for tightening cable connections, be careful not to damage any of the smaller connectors.

  • DN09112447 55

    Cabling Flexi Multiradio 10 BTS Cabling FZxx RF Modules

    Id:0900d80580999640Confidential

    a Remove the necessary seals from the antenna connectors in the RF Module accord-ing to the radio network plan. Store the connector seals for later use.

    b Slide the antenna jumper cable into the RF Module.

    c Route the antenna jumper cables through the cable entry. Wrap the connector with waterproof tape.

    d Repeat steps 1-4 for all the antenna jumper cables required for your configuration.

    e Connect the cables to the antennas as instructed in the Installing Antenna Systems document in Nokia Siemens Networks Antenna Systems Operating Documentation.

    3 Connect the RET cable to BF calibration port.

    a Remove the seal from the QN C/A connector in the RF Module. Store the connector seal for later use.

    b Slide the BF calibration cable into the RF Module.

    c Route the BF calibration cable through the cable entry. Wrap the connector with waterproof tape.

    4 Connect the internal optical cabling.

    a Remove the connector seals from the relevant optical cable connectors in both System and RF Modules. Store the seals for later use.

    b Remove the protective cap from the optical transceiver and push it in the System Module. Pull back the optical cable connector seal to uncover the connector.

    c Remove the protective plugs, clean the connectors according to the instructions below and connect the cable to the System Module. Make sure it clicks into place.

    Moisten a lint-free swab or one section of a lint-free wipe with one drop of 99% alcohol.

    Lightly wipe the connector with alcohol moistened swab or wipe. Dry any remaining alcohol with a dry swab or the dry section of the wipe. Properly dispose of the swab or wipe. Do not reuse.

    d Push the connector seal firmly in place.

    e Route the cable through the internal cable entry between the System and RF Modules. Coil up the excess cable and fix it on the module casing with cable ties.

    f Remove the protective cap from the optical transceiver and push it in the RF Module.

    g Remove the protective plugs, clean the connectors and connect the optical cable to the RF Module. Make sure it clicks into place.

    h Push the connector seal firmly in place. Repeat the above steps for additional RF Modules, if required.

    i Make sure that all the connector seals are properly installed.

    5 Connect the external alarms cable, if required.

    g If the external alarm connection is not used, leave the shipping cap securely in place to prevent the ingress of water or dust.

  • 56 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580999640Confidential

    Cabling FZxx RF Modules

    a Remove the connector seal from the external alarms connector in the RF Module front panel. Store the seal for later use.

    b Route the external alarms cable through the cable entry.

    c Pull back the connector seal covering the external alarms cable connector.

    d Connect the cable to the external alarms connector.

    e Push the cable connector seal firmly in place.

    f Route and connect the other end of the external alarms cable to the external alarms control box or to the distribution frame.

    g If connecting to an FSEB, connect the other end of the cable to the ESM connector in the FSEB. If connecting to another alarm system or distribution frame, cut the end of the cable and connect the appropriate wires to the terminals.

    h Make sure that all connector seals are firmly in place.

    6 Connect the DC power cable as follows:

    a Strip the DC cable about 10 cm (4 in) and wrap tape around GND mesh and cable sheath neck.

    Figure 51 Wrapping tape around shielded DC cable

    b Wrap an extra tape around the exposed wires in order not to break the IP boot

    Figure 52 Wrapping an extra tape around DC cable

    c Insert the taped end of the DC feeder cable into the IP boot.

  • DN09112447 57

    Cabling Flexi Multiradio 10 BTS Cabling FZxx RF Modules

    Id:0900d80580999640Confidential

    Figure 53 Inserting DC feeder cable to IP boot

    When using a thick cable, the narrow end of the IP boot can be removed using scis-sors. Cut in one go so that you get a clean cut surface. See Figure 54 Removing narrow end of IP boot for details. Note that you can insert only one DC cable with a diameter of maximum 25 mm to the IP boot. Minimum cable diameter is 6 mm.

    w NOTICE: The IP boot edge must be smooth. No crack in the edge is allowed, as it breaks boot IP protection.

    Figure 54 Removing narrow end of IP boot

    d Remove the extra tape from DC cable.

    g Keep the tape around the GND mesh and cable sheath neck to protect IP boot from sharp edges.

    Cable diameter 15-25 mm,cut with scissors in one go

    Cable diameter6-15 mm

  • 58 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580999640Confidential

    Cabling FZxx RF Modules

    Figure 55 Properly secured shielded DC cable (left) and non-shielded DC cable (right)

    e Connect the wires to the screw terminal. Tighten to 4.3 Nm.

    f Fix the IP boot in place and fix the screw. Tighten to maximum 2.2 Nm.

    g Secure the cable in place with the cable clamp as shown in Figure 56 Securing the power cable.

    Figure 56 Securing the power cable

  • DN09112447 59

    Cabling Flexi Multiradio 10 BTS Installing feederless or distributed site

    Id:0900d80580947297Confidential

    8 Installing feederless or distributed sitePurposeFlexi Multiradio BTS Feederless and Distributed Site Solutions refer to a situation where the System Module and RF Modules are installed apart from each other. The distance between the System Module and RF Modules can vary from two meters up to 200 m (feederless site) or 20 km (distributed site). Modules can be installed on a pole, wall or floor.

    See the following figures for installation principles.

    Figure 57 Installation principle

  • 60 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580947297Confidential

    Installing feederless or distributed site

    Figure 58 Installation principle with AC power supply

  • DN09112447 61

    Cabling Flexi Multiradio 10 BTS Installing feederless or distributed site

    Id:0900d80580947297Confidential

    Figure 59 Installation principle with DC power supply

    Before you startThe installation of the optical cable between the System Module and RF Module requires two small form-factor pluggable (SFP) optical transceiver units that are plugged into both the System Module and RF Module. A multimode adapter (included in the 100 m optical cable delivery) is required when two optical cables are connected together. Optical cables are used for creating an optical interface between the System Module and RF Module. The length of the cables is 50 m or 100 m. In case you need a cable of a specific length, shorten the cable by cutting and splicing it to the required length.

    In distributed site installations, the System Module and RF Module or can be attached to the existing fibre network by using single mode components, cables, and single mode transceivers. The System Module and RF Module are connected with a 2-metre single mode cable to a long optical cable.

    w NOTICE:Incorrect cables and seals may not provide secured weather protection. In outdoor installations, use only tested IP65 class outdoor cables with seals provided by Nokia Siemens Networks.

    w NOTICE:Overbending the optical fibre cables damages the cables and can detach or damage the connectors. Do not bend optical fibre cables to a radius smaller than the minimum radius of 70 mm (2.8 in).

  • 62 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580947297Confidential

    Installing feederless or distributed site

    Steps

    1 Install the System Module and RF Modules.For more information on the installation of the RF Module, see Installing modules on the floor, Mounting modules on a wall, or Mounting modules on a pole in the Installing Flexi Multiradio 10 BTS Modules for Stack, Wall, and Pole Configurations document.

    2 Install power feed to the RF Module.Depending on your DC power system, first proceed to the appropriate step and then to step 6.

    If you are using Flexi Power Module (FPMA) or MIBBU in the System Module end, proceed to step 3 (feederless site installations).

    If you are using Flexi Power Module (FPMA) in the RF Module, proceed to step 4 (feederless and distributed site installations).

    If you are using a third-party AC/DC system, proceed to step 5 (feederless and dis-tributed site installations).

    Figure 60 Installing power feed to the RF Module

    3 Install DC feed with the FPMA installed in the proximity of the System Module.

    a) Install the FSEx box to the System Module end.b) Cut the other end of the standard DC cable close to the connector.

  • DN09112447 63

    Cabling Flexi Multiradio 10 BTS Installing feederless or distributed site

    Id:0900d80580947297Confidential

    c) Connect the cut end of the cable to the FSEx box. Connect the black wire to the terminal marked with + and the blue wire to the terminal marked with -.

    d) Connect the other end of the cable to the System Module.e) Connect the DC feeder cable to the FSEx.f) Route the DC feeder cable to the RF Module.g) Install the FSEx to the RF Module.h) Cut off the standard DC cable connector.i) Connect the cut end of the standard DC cable to the FSEx box. Connect the black

    wire to the terminal marked with + and the blue wire to the terminal marked with -.j) Connect the other end of the standard DC cable to the RF Module.k) Connect the DC feeder cable to the FSEx.l) Check the FSEx connections.

    4 Install AC feed to the FPMA in the RF Module.

    a) Make the FPMA AC connection. See Installing Flexi Power Module (FPMA) in the Installing Flexi Multiradio BTS LTE Optional Items document for instructions.

    b) Install the required number of FPAAs and FPBA/Bs (max. four). Connect the FPAA AC cables.

    c) Connect the longest FPMA DC cable with a Multibeam connector from the FPMA to the RF Module. Connect the other cables to the FPAA and FPBA/B.

    d) Coil up the FPMA DC output cable and insert it into the free slot in the FPMA.e) Complete the installation and install the module front cover.

    5 Install AC feed to a third-party AC/DC converter at the RF Module.

    a) Install the third-party AC/DC converter.b) Cut off the connector at the end of the standard Nokia Siemens Networks DC cable.c) Connect the cut end to the AC/DC converter. Connect the black wire to the terminal

    marked with + and the blue wire to the terminal marked with -.d) Connect the other end of the cable to the RF Module.

    6 In feederless site installations, plug in the SFP unit to the System Module. In dis-tributed site installations, plug in the single mode unit to the System Module.

    7 Connect the 50 m or 100 m Nokia Siemens Networks optical cables together.

    8 Connect the resulting cable to the System Module and push the connector seal firmly in place.

    If the distance between the System Module and RF Module is more than 100 metres, connect either a 50 m and 100 m or two 100 m Nokia Siemens Networks cables using a multimode adapter to make a 150 m or 200 m long cable.

    g When using a multimode adapter, make sure it is in an IP65-protected environment. If an optical cable of a specific length is needed (for example, there is no room for

    excess cables on the site), shorten the cable by cutting and splicing it to the required

  • 64 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d80580947297Confidential

    Installing feederless or distributed site

    length. Make sure that the optical cable connected to the System Module and RF Module is a Nokia Siemens Networks optical cable.a) Cut the optical cable close to the module.b) Splice the cable carefully with an appropriate tool or machine.c) Make sure that the spliced section of the cable is IP65 protected.

    g When an optical fibre cable of longer than 200 metres is needed, single mode compo-nents must be used. Make the connection following the procedure above.

    9 In feederless site installations, plug in the SFP unit to the RF Module. In distrib-uted site installations, plug in the single mode unit to the RF Module.

    10 Connect the other end of the optical cable to the RF Module and push the connec-tor seal firmly in place.

    11 Complete the installation.Make sure that the DC and optical connections, connector seals, and the module front covers are properly installed.

  • DN09112447 65

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Power Rectifier (FPRA) alarms forFlexi Multiradio BTS

    Id:0900d805809472acConfidential

    9 Connecting Flexi Power Rectifier (FPRA) alarms for Flexi Multiradio BTS

    9.1 Overview of connecting Flexi Power Rectifier (FPRA) alarmsThese instructions show how to connect the alarm cables from the A version of Flexi Power Rectifier (FPRx) to Flexi Multiradio BTS. For full details on the installation of the FPRA, see Flexi Power Rectifier documentation on NOLS.

    Note that the FPRA delivery does not include any alarm cables. The required cables are either supplied with the interconnecting units (Flexi System External Alarm (FSEB) and/or Flexi Cabinet Site Support Module (FCSA)) or must be ordered separately depending upon the configuration.

    When using Flexi Power Rectifier (FPRA) with Flexi Cabinet Site Support Module (FCSA) in an outdoor application, there are two different cabling configurations for Flexi Multiradio BTS which can be used depending upon the number of alarms signals required by the user. See Connecting 3 FPRA alarms and 4 FCSA alarms and Connect-ing 6 FPRA alarms and 4 FCSA alarms.

    The FPRA is a 6kW output power AC rectifier package made up of three individual 2kW AC/DC power modules operating in a parallel mode configuration. The FPRA produces a positive earthed 54VDC as a respective BTS operational supply voltage rail and for site battery charging.

    Figure 61 FPRA front view

    The FPRA also includes a Power Distribution Assembly (PDA), which contains a fully integrated battery protection LVD, load/battery circuit breakers. Alarm signals to the BTS Alarm interface are connected to the PDA unit via a pull out Alarm Interface Card.

  • 66 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809472acConfidential

    Connecting Flexi Power Rectifier (FPRA) alarms for Flexi Multiradio BTS

    Figure 62 FPRA Power Distribution Assembly unit

    Figure 63 FPRA Alarm Interface card

    The PDA supplies six isolated and floating EAC alarms to the BTS, which are sum-marised in the table below.

    EAC alarm Description (see Tip below the table)

    Main 1 Mains phase failure indicates any single phase voltage of the 3-phase FPRA power source configuration that is below 85 V ACMain 2

    Main 3

    Critical Battery low voltage PDA controller fail DC distribution failure (e.g. Circuit

    Breaker tripped)

    Table 8 Alarm description

  • DN09112447 67

    Cabling Flexi Multiradio 10 BTS Connecting Flexi Power Rectifier (FPRA) alarms forFlexi Multiradio BTS

    Id:0900d805809472acConfidential

    t The settings listed in the above table are the factory-default alarm settings. The user can re-configure the alarm settings as required.For full details of alarms and their configuration, see FPRA Flexi Power Rectifier User Manual.

    Major Battery test failure Rectifier fail High float voltage Rectifier Fan Failure Input voltage too high or too low (recti-

    fier shutdown) Surge Protection Device failed

    Minor Battery temperature High/Low Rectifier temperature High Rectifier over current Extended mains voltage range Low mains voltage range

    Ext Alarm In Remote-start for Battery Test

    EAC alarm Description (see Tip below the table)

    Table 8 Alarm description (Cont.)

  • 68 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809472abConfidential

    9.2 Connecting Flexi Power Rectifier (FPRA) alarm cablePurposeAlarm cables are connected to the J11 connector of the Alarm Interface Card.

    Before you start

    w NOTICE:Electrostatic discharge (ESD) may damage the equipment. Wear an ESD wrist strap or use a corresponding method when handling the equipment.

    Steps

    1 Detach the Alarm Interface Card from the PDA by loosening the two screws with a crosshead screwdriver, and pull the card out of the PDA.

    Figure 64 Detaching the Alarm Interface card

    2 To insert the cable, puncture the waterproof seal marked Alarm In on the gasket with an awl (diameter of 2 mm).

    3 Feed the bare end of the cable through the hole.

    4 Strip back the outer sleeve of the cable by approximately 60 mm, leaving the screening and twisted pair cables intact.

    5 Cut the cable screening back to approximately 20 mm and pull it back over the cable.

  • DN09112447 69

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805809472abConfidential

    6 Connect the screening to position A on the drawer assembly with a cable tie. Ensure the cable screen firmly touches the sidewall of the drawer as this provides the grounding of the cable screen.

    Figure 65 Connecting the FPRA alarm cable

    7 Push the drawer back into its slot horizontally until the drawer pin matches the internal connector of the PDA and secure the two thumbscrews.

  • 70 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808ead1dConfidential

    Checklist for cabling Flexi Multiradio 10 BTS

    10 Checklist for cabling Flexi Multiradio 10 BTS

    Work phase Checked

    Grounding cable is connected.

    Internal power cables are connected.

    Optical cables are cleaned and connected.

    Transmission cables are connected.

    Optional cables are connected.

    All cable connector seals are firmly in place.

    Unused connectors are covered with IP seals.

    Only Nokia Siemens Networks provided cables are used.

    Module front panel covers are installed.

  • DN09112447 71

    Cabling Flexi Multiradio 10 BTS Appendices

    Id:0900d8058098215dConfidential

    11 Appendices

    11.1 Contents of the Flexi Multiradio 10 BTS optical cable deliv-eriesThe Flexi Multiradio 10 BTS optical cable deliveries contain the following items:

    Cable type Product code Description

    FSFO Flexi System Fibre HF 2 m

    471851A Halogen free, 2 LC connec-tors and 2 rubber gaskets

    FSFD Flexi System Fibre D 4 m

    471743A 2 LC connectors and 2 rubber gaskets

    FSFF Flexi System Fibre F 10 m

    471707A 2 LC connectors and 2 rubber gaskets

    FSFG Flexi System Fibre G 20 m

    471708A 2 LC connectors and 2 rubber gaskets

    FSFH Flexi System Fibre H 30 m

    471709A 2 LC connectors and 2 rubber gaskets

    FSFI Flexi System Fibre I 40 m

    471710A 2 LC connectors and 2 rubber gaskets

    FSFB Flexi System Fibre B 50 m

    471395A 2 LC connectors and 2 rubber gaskets

    FSFQ Flexi System Fibre HF 50 m

    471852A Halogen free, 2 LC connec-tors and 2 rubber gaskets

    FSFK Flexi System Fibre K 75 m

    471711A 2 LC connectors and 2 rubber gaskets

    FSFC Flexi System Fibre C 100 m

    471396A 2 LC connectors and 2 rubber gaskets

    FSFP Flexi System Fibre P 200 m

    471712A 2 LC connectors and 2 rubber gaskets

    Table 9 Optical cable deliveries

  • 72 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808ea292Confidential

    11.2 Contents of the Flexi Multiradio 10 BTS optical transceiver deliveriesThe Flexi Multiradio 10 BTS optical transceiver deliveries contain the following items:

    Cable type Product code Description

    FOSD Flexi Optical Telecom SFP GbE 850nm MM

    471881A SFP Transceiver 1000Base-SX Ethernet, wave-length 850nm, short haul

    FOSC Flexi Optical Telecom SFP GbE 1310nm

    471880A SFP Transceiver 1000Base-LX Ethernet, Wavelength 1310nm, suitable e.g. for FTCH, long haul

    Table 10 Optical transceiver deliveries

  • DN09112447 73

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808ea291Confidential

    11.3 Contents of the Flexi Multiradio 10 BTS transmission cable deliveriesThe Flexi Multiradio 10 BTS transmission cable deliveries contain the following items:

    Cable type Product code Description

    FTCY OD Cable RJ48C CAT7 15 m

    472427A Dual twisted pair cable for 2xE1, one end with RJ48C and rubber gasket

    FTCB OD Cable RJ48C 120ohm 15 m

    470309A Twisted pair cable for 1xE1, one end with RJ48C and rubber gasket

    FTCV OD Cable RJ48C 120ohm 30 m

    471713A Twisted pair cable for 1xE1, one end with RJ48C and rubber gasket

    FTCX OD Cable RJ48C 120ohm 50 m

    471714A Twisted pair cable for 1xE1, one end with RJ48C and rubber gasket

    FTCH OD Cable LC SM 1310 15 m

    470311A Optical fiber with 2xLC con-nector and one rubber gasket

    FTCR OD Cable RJ45 CAT5E 15 m

    471408A Twisted pair cable for GE, one end with RJ45 and rubber gasket

    FTCS OD Cable RJ45 CAT5E 30 m

    471717A Twisted pair cable for GE, one end with RJ45 and rubber gasket

    FTCT OD Cable RJ45 CAT5E 50 m

    471718A Twisted pair cable for GE, one end with RJ45 and rubber gasket

    FTCL OD Cable RJ48C-RJ48C 120ohm 4 m

    472348A Twisted pair cable for 1xE1, both ends with RJ48C and rubber gaskets

    FTCW OD Cable RJ45-RJ45 CAT5E 4 m

    472347A Twisted pair cable for GE, both ends with RJ45 and rubber gaskets

    FTCA OD Cable RJ48C - TQ-M/0 120ohm 5 m

    470312A Pre-fabricated co-location cable for UltraSite, RJ48C to TQ connector, for 1xE1 with one rubber gasket

    Table 11 Transmission cable deliveries

  • 74 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808ea294Confidential

    11.4 Contents of the Flexi Multiradio 10 BTS synchronization cable deliveriesThe Flexi Multiradio 10 BTS synchronization cable deliveries contain the following items:

    Cable type Product code Description

    FTSF Sync Cable F 472509A 2 x HDMI connector with rubber gaskets to connect Sync In/Out ports of collo-cated FSMF

    FTSG Sync Cable G 472576A S1 x HDMI and one MDR14 connector with rubber gaskets to connect FSMF Sync In to e.g. FSME Sync Out port

    Table 12 Sync cable deliveries

  • DN09112447 75

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808efa9cConfidential

    11.5 EAC cable (FTSI 472578A) wiring

    Conn. 1 (HDMI)Pin no.

    Conn. 2 (D37) Pin no.

    Pair: wire color Description

    1 7 1: Black EXT_AL0_H

    2 8 2: Brown EXT_AL1_H

    3 9 1: White/Black EXT_AL2_H

    4 10 2: White/ Brown EXT_AL3_H

    5 11 3: Red EXT_AL4_H

    6 12 4: Orange EXT_AL5_H

    7 1 + 13 3: White/Red EXT_CTRL0_EXT_AL6_H

    8 2 + 14 4: White/Orange EXT_CTRL1_EXT_AL7_H

    9 3 + 15 5: Yellow EXT_CTRL2_EXT_AL8_H

    10 4 + 16 6: Green EXT_CTRL3_EXT_AL9_H

    11 5 + 17 5: White/Yellow EXT_CTRL4_EXT_AL10_H

    12 6 + 18 6: White/Green EXT_CTRL5_EXT_AL11_H

    13 19 7: Blue P5V0_EAC

    14 20 7: White/Blue P5V0_EAC

    15 23 8: Violet PROT_CAN_H_P5V_EAC

    16 27 9: Grey GND

    17 24 8: White/Violet PROT_CAN_L_P5V_EAC

    18 25 10: Pink GND

    19 28 9: White/Grey GND

    Table 13 EAC cable (FTSI) wiring

  • 76 DN09112447

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808f01ccConfidential

    11.6 Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) control panelThe control panel is located on the front panel of the Flexi Multiradio 10 BTS Power Dis-tribution Sub-Module (FPFD). There are five LEDs for the corresponding output ports, and two push buttons for the ON/OFF functionality of the the outputs.

    Figure 66 FPFD control panel

    LED color Function of the output

    Fault caused by

    No color Output is disabled -

    Yellow Stand-by, output disabled

    Waiting for retry

    Overload, over temperature or short circuit > Automatic restart

    Green Normal operation, output enabled

    -

    Red Fault, output disabled

    Overload, over temperature or short circuit > Remains OFF after fault

    Blinking red Fuse #1 will remain disabled. Fuse #2 to fuse #5 only sig-nalling function.

    Reverse polarity or feed-in into output

    All blinking red All outputs disabled after power on

    Internal hardware failure indication

    Blinking yellow Remote controlled, output disabled

    -

    Table 14 FPFD LED indications

    RF1 RF2 RF3 RF4 SYS

    SETSELECT

  • DN09112447 77

    Cabling Flexi Multiradio 10 BTS

    Id:0900d805808f01ccConfidential

    No function (neutral):Pushing the SET button outside the selection phase does not do anything.

    Entering selection phase (neutral):Pushing the SELECT button enters or resumes the selection phase. Starting at the leftmost position (RF1) the LED starts blinking in blue color (blue color is not used for any other kind of signaling). With each additional push on the SELECT button the blinking position moves forward from the left to right position in a circular way. The selec-tion phase ends automatically after three seconds when no button has been pushed within this time frame.

    Changing output state:Pushing the SET button during the selection phase toggles the selected (blinking blue) output state. As long as the selection phase is active you can toggle the output state with each push on the SET button. When toggling the output state to ON the selection phase is extended to five seconds to give the user enough time to toggle to OFF again (in case of target device malfunction).

    Restrictions:The SET push button can be re-routed to the System Module. This allows the System Module to judge over the ON/OFF functionality via the push button. Default setup is no re-routing.

    Via priority controlling in FPFD it can be prohibited to alter an output state via the push button when a higher priority access line has taken over the control for a specific output. Default setup is all access lines have the same priority level.

    Only implemented or detected outputs can be selected via the SELECT button.

    Blinking blue Selection phase active

    -

    LED color Function of the output

    Fault caused by

    Table 14 FPFD LED indications (Cont.)

    Cabling Flexi Multiradio 10 BTSTable of contentsList of figuresList of tablesSummary of changes1Module interfaces2Cabling principles2.1Stand-alone BTS cabling principle2.2Cabinet cabling principle2.3Cable tie points and cable clamps

    3Connecting System Module (FSMx) core cabling3.1Connecting external power feed3.2Connecting internal optical cables3.3Connecting transmission cables3.3.1Overview of connecting transmission cabling3.3.2Connecting RJ45 transmission cable3.3.3Connecting SFP+ transmission cable

    3.4Connecting FSMx core optional cabling3.4.1Connecting Sync Out cable3.4.2Connecting Sync In cable3.4.3Connecting External Alarms and Controls (EAC) cable

    4Connecting Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) cabling5Connecting Flexi Multiradio 10 BTS optional Transmission Sub-Module (FTIF) cabling6Connecting Flexi Multiradio 10 BTS Capacity Extension Sub-Module (FBBA) cabling7Cabling FZxx RF Modules8Installing feederless or distributed site9Connecting Flexi Power Rectifier (FPRA) alarms for Flexi Multiradio BTS9.1Overview of connecting Flexi Power Rectifier (FPRA) alarms9.2Connecting Flexi Power Rectifier (FPRA) alarm cable

    10Checklist for cabling Flexi Multiradio 10 BTS11Appendices11.1Contents of the Flexi Multiradio 10 BTS optical cable deliveries11.2Contents of the Flexi Multiradio 10 BTS optical transceiver deliveries11.3Contents of the Flexi Multiradio 10 BTS transmission cable deliveries11.4Contents of the Flexi Multiradio 10 BTS synchronization cable deliveries11.5EAC cable (FTSI 472578A) wiring11.6Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD) control panel