bureau of indian standards (administration department) · bureau of indian standards...
TRANSCRIPT
BIS/DGO (414)/2014
BUREAU OF INDIAN STANDARDS
(ADMINISTRATION DEPARTMENT)
30 October 2014
OFFICE ORDER
Subject: Submission of information for DG‐MIS in the requisite formats
This has reference to note no. DDG (PP&C)/G‐43 dated 12 Feb 2014 vide which all the activity heads were advised to send a monthly report to DG in the form of D.O. letter by the 5th of each month. The D.O. letter should reflect the achievements of the departments under them for the current month and the expected output/plan of action of subsequent month. The activity heads were also advised that the D.O. letters should be accompanied by suitable formats for showing the performance on important parameters of their departments which could be decided by the concerned activity till such time these were finalized as part of DG‐MIS system.
2. Now, the format of various activities has been compiled in different formats and the list along with formats is enclosed at Annex 1. These formats aim to cover all the parameters targeted in Annual Action Plan & RFD. These formats may, henceforth, be used for sending the performance of their department along with the monthly D.O. letter from the month of November 2014. It may be noted that these formats are subject to modification and shall be reviewed after 3 months based on the suggestions received/problems faced during the initial implementation period. Suggestions on improving these formats are welcome from all stakeholders.
3. The information in the applicable formats shall be filled up by the concerned Department/BO Heads/MSC‐O/I CARE‐O, HM‐O etc. as indicated at Col. 4 and sent to the respective activity heads/DDGRs as indicated in Col. 5 Col. 6 in case of ‘‐’ in Col. 5) by 28th of the each month. The officers (as indicated in Col. 5) shall compile the information received from all BOs/Deptt. Heads under them and submit the same to concerned Activity Heads as indicated in Col. 6 latest by 1st of the next month. The activity heads shall compile the information received by them and send the same to DG with a copy to P&C Department latest by 4th of next month. The period of information to be submitted shall be 26th of last month to 25th of current month on monthly basis. The first set of information shall be submitted for the period 26th of October 2014 to 25th of November 2014.
4. It is expected that the Activity Heads shall, in the D.O. letter, indicate the steps being taken by them to meet/exceed the KPI targets wherever there are shortfalls in the current month.
5. It may be noted that the above information shall be utilized by DG for monitoring the performance of Activity Heads vis‐à‐vis the targets given in the annual action plan and also initiate review the APARs. Similarly, this information should be utilized by Activity Heads for monitoring the performance of department/ BO heads under them, vis‐à‐vis the targets assigned to them. The Dept./BO heads are expected to do the same for the officers and staff working under them.
6. Comprehensive application software are being developed by ITS Department for all activities of BIS. Each of these software application should have a facility to generate the monthly reporting formats that are required for monthly monitoring. The computer application should generate the MIS formats once the day to day transactions are entered into this computer application system. Once such software application has been developed and deployed and the targets filled up, there should be no need to separately compile/fill up any other formats either in physical or electronic
form to generate the DG‐MIS formats. This shall, in addition to ensuring accurate reporting of various parameters, also ensure efficient utilization of time of all concerned. Each of the concerned department getting the software application developed/IT department shall ensure the above.
7. IT department is independently developing another application for DG‐MIS which should be used by all concerned till such time an individual department application is developed. This application shall make available an online system for filling of various MIS formats. This system shall allow the officer in column 4 to enter the monthly data and also enable officer in column 5/6 to compile the data and submit the monthly report to DG/PP&C Department.
8. It shall be ensured that no monthly report other than those in the DG‐MIS is called from any level by any Activity/Deptt./Branch Head or any other authority in BIS. In case any such report is currently being called & is required to be continued, the format for the same may be forwarded to P&C Department for inclusion in the DG‐MIS to put in place a computerized MIS system latest by 20 Oct 2014. Directions received from the Hon’ble Prime Minister, Cabinet Secretary and Secretary CA have already been communicated to all concerned. IT department shall take up development of such formats and include them in DG‐MIS once the same are seen & approved by DG. It is expected that this shall be completed before the end of Nov 2014.
9. The DG‐MIS application shall also allow the officers at various levels to allocate the KPI targets assigned to them to their subordinate staff, and also to assign weight to the KPI target so that the total score is kept at 100 for all officers. The performance of each officer as well as the subordinates (upto 2 levels based on reporting/reviewing authority) shall be visible to all officers for his own self evaluation on a monthly basis as well as to review the performance of the staff below her/him.
10. The officers and staff may be encouraged to use the feedback to continuously improve their performance so that not only the performance and image of BIS but their own performance becomes better over time. The officers should especially take up counseling/guidance of at least 3 officers/staff members every month whose performance is not upto the mark and ensure that these 3 staff members do not appear at the bottom of the performance table in the succeeding month. The officers whose performance exceeds the minimum targets may be suitably appreciated /encouraged.
11. This issues with the approval of DG BIS.
Sd/‐
(Anuj Kumar)
Dy. Director General (Administration)
Ref: P&C/16
Circulated to: All departments at BIS HQ, ROs/BOs/NITS/T&Cs
ANNEX‐I
Activity/
Department
Form No. Title Responsibility to submit the details by 28th of each
month
Responsibility to compile the information received from Column (4) and submit by 1st of next
month
Responsibility to compile the
information received from (Column 4 or 5) and submit by 4st of next month to P&C
Department
(1) (2) (3) (4) (5) (6)
Standardization
S‐01 Work in Hand of Department
Head (Technical Departments)
Head (SPPD) DDG(Std.) S‐02 Technical Committee Meetings
S‐03 Review of Standards
S‐04 Standards Formulation
S‐05 Plan Fund Head (SPPD) ‐ DDG (Std.)
S‐06 Participation in International Technical Committees and Balloting Plan Head (IRD) Head (SPPD) DDG (Std.)
S‐07 Trade Facilitation Cell
Certification
C‐01 Time Management for Inspecting Officer (IO)‐ Utilization of IO
BO Heads DDGRs DDG (Certification)
C‐02 Grant of Licence (Normal Procedure)
C‐03 Grant of Licence (Simplified Procedure)
C‐04 Grant of Licence (Tatkal Scheme)
C‐05 Pending Licences for Renewal
C‐06 Surrender/ Expiration of Licence (Excluding cases
under SOM)
C‐07 Stoppage of Marking Cases in BO
C‐08 Resumption of Marking / Cancellation cases in BO
C‐09 Surveillance Visit of Premises of a Licencee
Testing & Calibration
T‐01 Sample management Head (T&C)
Head (PP&C‐T&C) DDG (T&C)
T‐02 Test Reports Status (w.r.t. Sample cell receipt/sample room receipt/OSL receipt for direct samples
Head (T&C)
T‐03 Test Report status at any specific lab (BIS TC or OSL)
Head (T&C)
T‐04 Performance of BIS T&Cs Head (T&C)
T‐05 Time taken for issue of test reports by BIS TCs Head (T&C)
T‐06 Overall Performance of OSLs/ Any specific OSL Head (T&C)
T‐07 Bills settlement of OSLs Head (T&C)
T‐08 LRS Management (Applications and Grant of Recognition)
Head (T&C)
T‐09 Pendency of Applications under LRS Head (T&C)
T‐10 Surveillance Audits under LRS Head (T&C)
T‐11 Renewals of OSLs under LRS Head (T&C)
T‐12 OSLs under Suspension under LRS Head (T&C)
T‐13 Management of Audits of Assaying & Hallmarking Centres
Head (T&C)
T‐14 QA Testing Head (T&C)
T‐15 Inter Lab Comparison (ILC) Head (T&C)
T‐16 Training for industry Head (T&C)
T‐17 Overall Test facility availability data and management
Head (T&C)
T‐18 Test facility augmentation in BIS T&Cs Head (T&C)
T‐19 Test facility/ infrastructure maintenance in BIS T&Cs
Head (T&C)
T‐20 Condemnation and disposal of Equipment / Instruments
Head (T&C)
T‐21 Condemnation and disposal of Office Equipment and Furniture
Head (T&C)
T‐22 Remnant & scrap management and disposal Head (T&C)
T‐23 External auditors utilization and performance Head (T&C)
T‐24 NABL accreditation of BIS T&Cs Head (T&C)
Hallmarking
H‐01 Licensing of Jewelers BO Heads DDGRs DDG (Hallmarking)
H‐02 Market Surveillance of Jewelers
H‐03 Recognition of A & H Centres
HM‐O DDGRs DDG (Hallmarking) H‐04 Surveillance of A & H Centres
H‐05 Surveillance of Referral Laboratory
MSCD
M‐01 Management Systems Certification Activity (Auditor)
MSC‐O ‐ DDG (MSCD)
M‐02 Management Systems Certification Activity (Recognized Certification Bodies)
M‐03 Management Systems Certification Activity (GOL/Income)
M‐04 Management Systems Certification Activity (Renewal/Surveillance)
i‐CARE
I‐01 State Level Committee Meetings
i‐CARE ‐O in consultation with BO
DDGRs DDG (i‐CARE)
I‐02 Licensees Meeting
I‐03 Complaints on Quality
I‐04 Testing of Public Samples
I‐05 Educational Utilization of Standards Programmes
I‐06 Standards Forums in Educational Institutions
I‐07 Consumer Organization Recognition & Consumer Awareness Programmes
I‐08 Consumer Protection‐ Detection of Misuse
I‐09 Consumer Protection‐ Legal Action‐Misuse
I‐10 Consumer Protection‐ Detection of Violation of Mandatory QC Orders
I‐11 Publicity
I‐12 Sales & Distribution
I‐13 Single Window System
Administration
AG‐01 Administration Matters DRA/Head (GSD) for BIS HQ
Head (NITS)
Lab Heads
BO Heads
‐ DDGA
AG‐02 Procurement of Goods & Services
RTI Matters AR‐01 RTI Matters in BIS offices Respective CPIOs DRA DDGA
Bureau Sectt. AB‐01 Bureau Sectt. Activities at BIS HQ BS ‐ DDGA
Hindi AH‐01 Hindi Activities Head (Hindi)
Head (NITS) Head (Hindi) DDGA
Lab Heads
BO Heads
HRD
AP‐01 Manpower Details in BIS offices
DHRD ‐ DDGA AP‐02 APAR Management (Group ‘A’ Officers)
AP‐03 Review of Promotions (Group ‘A’ Officers)
AP‐04 Review of Training (Group ‘A’ Officers)
Establishment AE‐01 Manpower Details in BIS Offices‐ Group A (Other than Scientific Cadre Officers), Group B, C & D
DEST ‐ DDGA
Library
AL‐01 Library Activities at BIS HQ DLSC ‐ DDGA
AL‐02 Library Activities at Other Offices of BIS Departmental/ BO Heads
Respective Activity Heads DDGA
Legal L‐01 Legal Activities in BIS Offices DRL/ BO Heads DDGA ADG(AP)
Finance
F‐01 Books of Accounts & Accounting FunctionsDAC for BIS HQ
Head (NITS)
Lab Heads
BO Heads
‐
DDG(NITS)
DDG (T & C)
DDGRs
DDGF
F‐02 Income & Expenditure vis‐à‐vis Budget Estimates
F‐03 Compliance to Observations in Half Yearly Internal Audit Report(s)
F‐04 Compliance to Para(s) in the Statutory AG Audit Report(s)
NITS
N‐01 Summary of Programmes Conducted (Programme wise)
Head (NITS) ‐ DDG(TI)
N‐02 Summary of Programmes Conducted (Chairwise)
N‐03 Programmes Conducted
N‐04 Summary of Utilization of Training & Hostel Facilities
N‐05 Summary of Faculty Utilization
N‐06 Summary of Expenditure on Capital Works
Vigilance
V‐01 Vigilance Department, BIS HQ, (in respect of Group “A” employees) VOs ‐ CVO
V‐02 Vigilance Sections in Sectt of various DDGs (Group ‘B’, ‘C’ & ‘D’ employees)
DDGRs
DDG(T&C)
DDGA
‐ DDGA
P&C PC‐01 Parliament Questions
Head (P&C) ‐ DDG (PP&C) PC‐02 Ministerial References
Form S-01 STANDARDIZATION- WORK IN HAND Period of review: From To
Dept. No. of feedbacks/ comments on Indian Standard
Work in Hand Average time taken in formulation of standards from P Stage to Gazetting
Received Referred to TC’s
Cases Subjects approved but draft not yet available
P-drafts WC drafts
F-drafts Under process for printing
No. of standards Gazetted
P-I P-II Normal
Accepted closed
CED
CHD
ETD
FAD
LITD
MED
MHD
MSD
MTD
PCD
PGD
TED
TXD
WRD
Total
Form S-02
STANDARDISATION - TECHNICAL COMMITTEE MEETINGS Period of review: From To Dept Meetings of
Sectional committee and Sub Committees
Total Number of Members
Evaluation of performance of Committee Members
Outcome of evaluation Number ofvacancies
No of Nominations Received
Nominations Accepted
No of Experts Identified
Experts found suitable for representing ISO/IEC meetings
Annual Target
Achievement Terminated
Term expired
Re-appointed
C I TG C I T GObservers
Members
Held Cumulative
Total Number
Number Attended
Non participating
MarginSignificant Exceptional
CED
CHD
ETD
FAD
LITD
MED
MHD
MSD
MTD
PCD
PGD
TED
TXD
WRD
Total
* Note- C- Consumer Org/ Buyer, I- Industrial Representation, T- Technologists and testing Org, G- Govt/ regulating body representations
Form S-03
REVIEW PROFORMA - STANDARDIZATION – REVIEW OF STANADARDS Period of review : From To
Dept Technical evaluation of IS
Review of IS Result of Technical Evaluation/ Review
Target Achieved Target Achievement To be Amended To be Revised
To be Reaffirmed To be withdrawn Amenable to Multiple Grading
Technical evaluation
Review Technical evaluation
Review Technical evaluation
Review Technical evaluation
Review Technical evaluation
Review
CED CHD ETD FAD LITD MED MHD MSD MTD PCD PGD TED TXD WRD Total
Form S-04
STANDARDIZATION - STANDARDS FORMULATION Period of review: From To
Dept New standards Revision Harmonization with International SDO’s
Harmonization with National SDO’s
Multiple Grading (in line with AAP)
Target Achieved Target Achieved Target Achieved Target Achieved Target AchievedDuring this period
Cumulative
During this period
Cumulative
Adopted Tech. Eqvt
During this period
Cumulative During this period
Cumulative
CED
CHD
ETD
FAD
LITD
MED
MHD
MSD
MTD
PCD
PGD
TED
TXD
WRD
Total
Form S-05 REVIEW PROFORMA - STANDARDIZATION- PLAN FUND
Period of review: From To PLAN FUND HEAD REVIEW FIGURES DEPARTMENTS
SPPDCEDCHD ETD FAD LITD MED MHD MSD MTD PCD PGD TED TXD WRDTotal
R&D Projects
T* Physical Financial
A
Phy
si Sanctioned
Ongoing Total
Fin
Sanctioned Ongoing Total
Intensifying participation of BIS officials, Technical Committee Members, other officials and experts in international standardization by participation in International/Regional/Bilateral meetings/trainings.
T
Physical Financial
A Physical Financial
Intensifying participation of BIS Technical Committee Members, in BIS Technical Committee meetings.
T Physical Financial
A Physical Financial
Organizing ISO/IEC and other International/Regional/Multilateral/Bilateral Meetings/Seminars/Workshops/Training in India
T Physical Financial
A Physical Financia
Training programme for SDO’s (5 days)
T Physical Financial
A Physical Financial
Training programme for TC members (2 days)
T Physical Financial
A Physical Financial
Seminars/Workshops for other stake holders (1 day)
T Physical Financial
A Physical Financial
Seminar for promoting active use of Standards, process, service and systems (Regional Level in conjunction with i-care)
T Physical A Financial
Note- *T- Target, A- Achievement.
Form S-06
STANDARDISATION – PARTICIPATION IN INTERNATIONAL TECHNICAL COMMITTEES AND BALLOTING
Period of review: From To
International Organization
Total No. of
Membership status of BIS
Number of Ballots casted voting
Number of Ballots Cast
TC SC TC SC During the period
Cumulative Month Cumulative‘P’ ‘O’ ‘P’ ‘O’
ISO
IEC
(Data to be provided by IRD)
Form S-07
STANDARDISATION – TRADE FACILITATION CELL
Period of review: From To
Trade facilitation cell
Interaction/ sensitisation programme for stakeholders
Target
Achieved
New/ renewal of MOU/MRA
Target
Achieved (Data to be provided by IRD)
Form C‐01
DG MIS – TIME MANAGEMENT FOR INSPECTING OFFICER (IO)
(UTILIZATION OF IO)
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW: NAME OF HEAD:
Name of the IO & Designation
Total No. of working days (in a month)
Total No. of pending surveillance visits at the beginning of the month
Application Stoppage of Marking/Resumption of
Marking
Surveillance Inspections
(SI)
Additional work done during PI/RoM/SI Total No. of days spent in processing GOL/inclusion, renewals, preparation for Inspections & writing Reports
Total No. of pending surveillance visits at the end of the month
No. of days for Preliminary Inspection/ Verification visits
No. of days for follow up visits
No. of cases under SoM
No. of days for ROM
Total No. of days utilized in Surveillance inspections during the month
Market Sample
Discreet Investigation
i‐Care Contact Visits
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
TOTAL TOTAL TOTAL TOTAL TOTAL
SUMMARY Average No. of Days taken in = Total No. of Days taken in Surveillance Inspection (Col 8) Average No. of Days taken in = Total No. of Days taken in PI & RoM (Col 4&7) Surveillance Inspection by IOs Total No. of IOs (Col 1) x Total No. of Working Days (Col2) PIs & RoMs by IOs Total No. of IOs (Col 1) x Total No. of Working Days (Col2)
Form C‐02
DG MIS – GRANT OF LICENCE (NORMAL PROCEDURE)
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW:
NAME OF HEAD:
Name of the Firm/Application No.
IS No. Date of Receipt of application in Branch Office
First Scrutiny (Single Window) Second Scrutiny
Whether the documents of application are as per the check list and with fees
Date of recording of application
Return of application‐not recorded
Reasons for return of application‐ (clearly recorded/not recorded)
Name of the Dealing Officer
Date of communication of addl information to be provided during prelim inspection by the dealing officer
(1) (2) (3) (4) (5) (6) (7) (8) (9)
TOTAL
Preliminary Inspection (PI) Grant of Licence Total No. of days taken in
Grant of Licence from the date of receipt of Application (18)‐(5)
Deviation from time norms Remarks
Date of Preliminary Inspection
Communication of DV Report to the applicant, if any
Date of receipt of Sample by Sample Cell
Date of submission of IR to BO
Date of receipt of test report
Date of 2nd visit, if required
Put up for Grant of Licence after TR received and applicant submits compliance to DV Report/2nd visit
Date of Grant of Licence/ Rejection by BO
Date of Payment of Marking Fee by Applicant
In carrying out Preliminary Inspection within Time Norms
In delivery of sample to sample cell
IR not put up to BO in Time
In Grant/ Rejection of application after PI
(10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24)
TOTAL
SUMMARY Average No. of Days taken in = Total No. of Days taken in GOL (Col 19) GOL under Normal Procedure Total No. of Licences Granted (Col 1)
Time Norms for: i) Scrutiny of Application: ........... ii) Processing of Application (Normal/Simplified/Tatkal): ....................
Form C‐03
DG MIS – GRANT OF LICENCE (SIMPLIFIED PROCEDURE)
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW:
NAME OF HEAD:
Name of the Firm/Application No.
IS No. Date of Receipt of application in Branch Office
First Scrutiny (Single Window) Second Scrutiny
Whether the documents of application are as per the check list along with fees & complete Test Report
Date of recording of application
Return of application‐not recorded
Reasons for return of application‐ (clearly recorded/not recorded)
Name of the Dealing Officer
Date of communication of addl information to be provided during verification visit by the dealing officer
(1) (2) (3) (4) (5) (6) (7) (8) (9)
TOTAL
Verification Visit Grant of Licence Total No. of days taken in Grant of Licence from the date of
receipt of Application(17)‐(5)
Verification Sample
Test Report
Deviation from time norms Remarks
Date of Verification Visit
Communication of DV Report to the applicant, if any
Review of Test Report
Date of submission of IR to BO
Date of 2nd visit, if required
Put up for Grant of Licence after TR received and applicant submits compliance to DV Report/2nd visit
Date of Grant of Licence/ Rejection by BO
Date of Payment of Marking Fee by Applicant
Review of Test Report
In carrying out Verification visit within Time Norms
In delivery of sample to sample cell
IR not put up to BO in Time
In Grant/Rejection of application after PI
(10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24)
TOTAL
SUMMARY Average No. of Days taken in = Total No. of Days taken in GOL (Col 18) GOL under Simplified Procedure Total No. of Licences Granted (Col 1)
Time Norms for: i) Scrutiny of Application: ........... ii) Processing of Application (Normal/Simplified/Tatkal): ....................
Form C‐04
DG MIS – GRANT OF LICENCE (TATKAL SCHEME)
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW:
NAME OF HEAD:
Name of the Firm/Application No.
IS No. Date of Receipt of application in Branch Office
First Scrutiny (Single Window) Second Scrutiny
Whether the documents of application are as per the check list and with fees
Date of recording of application
Return of application‐not recorded
Reasons for return of application‐ (clearly recorded/not recorded)
Name of the Dealing Officer
Date of communication of addl information to be provided during Preliminary inspection by the dealing officer
(1) (2) (3) (4) (5) (6) (7) (8) (9)
TOTAL
Preliminary Inspection (PI) Grant of Licence Total No. of days taken in Grant of Licence from the date of
receipt of Application(18)‐(5)
Deviation from time norms Amount of Tatkal Fee refunded/ adjusted against Marking Fee
Remarks
Date of Preliminary Inspection
Communication of DV Report to the applicant, if any
Date of receipt of Sample by Sample Cell
Date of submission of IR to BO
Date of receipt of test report
Date of 2nd visit, if required
Put up for Grant of Licence after TR received and applicant submits compliance to DV Report/2nd visit
Date of Grant of Licence/ Rejection by BO
Date of Payment of Marking Fee by Applicant
In carrying out Preliminary Inspection within Time Norms
In delivery of sample to sample cell
IR not put up to BO in Time
In Grant/ Rejection of application after PI
(10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)
TOTAL
SUMMARY Average No. of Days taken in = Total No. of Days taken in GOL (Col 19) GOL under Tatkal Scheme Total No. of Licences Granted (Col 1)
Time Norms for: i) Scrutiny of Application: ........... ii) Processing of Application (Normal/Simplified/Tatkal): ....................
Form C‐05
DG MIS – PENDING APPLICATIONS FOR RENEWAL
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW:
NAME OF HEAD:
Licence Number Name of the
Firm IS No. Date of Receiving of
Renewal Application at Counter
Name of Scrutiny/Dealing Officer
Date of putting up of renewal
Date of approval by Head of BO
Issue of Renewal Licence
Remarks
(1) (2) (3) (4) (5) (6) (7) (8) (9)
TOTAL TOTAL SUMMARY Percentage of Renewals = Total No. of Renewals Processed(Col 8) Of Licences Processed Total No. of Renewal applications Received (Col 4)
Form C‐06
DG MIS – SURRENDER/EXPIRATION OF LICENCE (EXCLUDING CASES UNDER SOM)
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW: NAME OF HEAD:
Licence No.
Name of the Firm
IS No.
Name of Dealing Officer/IO
Suggestions for Corrective and/or Preventive Action. Other steps taken to persuade the licensee to continue with the licence
Date of cancellation notice/Non‐renewal cum expiry notice
Whether the concurrence of the CA taken for cancellation/expiry of licence
Date of Hearing
Orders of Cancellation/ Expiry
Reasons for cancellation/ expiry
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL
SUMMARY Total No. of Licences Cancelled/Expiry = Total No. of Licences (Col 1)
Form C‐07
DG MIS – MONITORING OF STOPPAGE OF MARKING (SoM) CASES IN BO
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW: NAME OF HEAD: No. of licences in Branch: No of licences under SoM/Deferred: (excluding due to non receipt of RA/MF) Licence No. Name of
Licensee IS No. No. of other Licences
held by the LicenseeDate of Stop Marking
Date of Communication
Reasons for Stop Marking
Was the stop marking justified? (Indicate Clause No. of OMPC/ other guidelines referred)
Whether timely approval from DDGR obtained?
Whether adequate publicity given to ensure that public is aware of stop marking.
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL
SUMMARY Total No. of Licences put under Stop Marking = Total No. of Licences (Col 1)
Form C‐08
DG MIS – MONITORING OF RESUMPTION (RoM)/CANCELLATION CASES IN BO
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW: NAME OF HEAD: No. of licences in Branch: No of licences processed for RoM:
Steps taken for Resumption of Marking Steps taken for Cancellation, if required Total No. of Days taken in processing
RoM
(16‐5)
Whether adequate follow up being done to ensure timely corrective action by Licensee.
Whether sufficient Guidance provided to Licensee to comply to the requirements for RoM .
Date of Receipt of Compliance Report from Licensee
Date of factory visit carried out for verification of Corrective actions and Factory Testing
Whether RoM permitted after factory visit and sample for Independent Testing drawn for long duration tests, if any
Whether timely action taken on receipt of IR/TR to promptly allow RoM and Date of RoM.
Date of delivery of Sample to Sample Cell
Submission of case to DDGR for cancellation/ expiry of licence under SOM
Date of cancellation notice/Non‐renewal cum expiry notice
Date of Hearing by DDGR
Cancellation/Expiry of Licence by DDGR
(11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22)
TOTAL
SUMMARY Average No. Days taken in Processing RoM = Total No. of Days taken in RoM (Col 22)
Total No. of Licences (Col 1)
Form C‐09
DG MIS – SURVEILLANCE VISIT OF PREMISES OF A LICENSEE
NAME OF THE BRANCH OFFICE (CODE): DATE(S) OF AUDIT: PERIOD OF REVIEW: NAME OF HEAD:
Licence Number
Name of the Firm
IS No.
Date of Visit
Nature of Licence Actions required during surveillance visit Subsequent actions after the visit
Star Normal Marginal Verification of Pending Actions
Verification of Production Details since last visit and maintenance of test records
Collection of Customer details & despatch of ISI Mark Goods
Stock Position
Verification of Raw Materials/ Components
Verification of Test Records
Verification of Calibration
Drawl of Sample for FT & IT
Factory Testing
Deposition of Sample at sample Cell
Issue of DV Report, if any
Discussion with Top management on Test Reports on previous sample & STI/Standard
Submission of IR to BO
Irregularities Observed & Suggestions for Corrective and/or Preventive Action
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
Form T‐01
Sample management
T&C Name
Total samples pending for distribution as on start of the period
Samples brought directly by IOs during the period
Samples received through BO/BO sample room during the period
Samples received through transport/courier during the period
Total Samples received during the period
Samples received from other BIS TCs
Sample distributed to own T&C for testing during the period
Sample distributed to T&Cs other than own during the period
Samples diverted to OSLs during the period
Samples pending for distribution on the last day of the period
Disputed samples awaiting clarification as on the last day of the period
Pendency of Samples for distribution
1 2 3 4 5 6 7 8 9 10 11
12 13 14 15 16 17 18 19 20 21 22 23 24 25
PR NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR NPR
PR
NPR
PR NPR
PR NPR
<7d >7d <7d >7dCTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Samples received from RTC will be counted only at one stage i.e. at RTC where they are received first.
Form T‐02
Test Reports Status (w.r.t. Sample cell receipt/sample room receipt/OSL receipt for direct samples)
BIS T&Cs OSLs At Samples
for which test reports uploaded during the
period
Samples tested within time
norms by BIS labs
Samples tested within time
norms by OSLs
Pendancy of test report
Upto 30 days beyond testing
time norms
Pendancy of test report
From 31-60 days beyond testing time
norms
Pendancy of test report from 61-90 days
beyond testing time
norms
Pendancy of test report
Over 90 days
beyond testing
time norms
Pendancy of test report Upto 30
days beyond testing time
norms
Pendancy of test report
From 31-60 days beyond testing
time norms
Pendancy of test report from 61-90 days
beyond testing
time norms
Pendancy of test report
Over 90 days
beyond testing time
norms
1 2 3 4 5 6 7 8 9 10 11 12CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐03
Test Report status at any specific lab (BIS TC or OSL)
Name of the Lab:
No of Samples for which
test reports uploaded during the
period
No of Samples
tested within time
norms
Pendancy of test report
Upto 30 days beyond testing time norms
Pendancy of test report
From 31-60 days beyond testing time
norms
Pendancy of test
report from 61-90 days
beyond testing
time norms
Pendancy of test report Over 90
days beyond testing time
norms
Total pendency
beyond time norms
1 2 3 4 5 6 7
Form T‐04
Performance of BIS T&Cs
T&C Name
Total samples pending at the start of the period with TC
Samples received from the Sample Cell during the period
Samples tested during the month for whichTRs sent to Sample Cell
Balance samples pending for testing atthe end of the period
Annual target (nos)
Pro‐rata target upto end of the period
% achieved against thepro‐rata target
Annual revenue target
Pro‐rata target upto end of the period
Notional value of samples tested during the period
% of pro‐rata target achieved
Pendancy of samples for issue of test reports within time norms
Pendancy of samples for issue of test reports within 30 days of time norms
Pendency of samples for issue of test reports beyond 30 days of time norms
1 2 3 4 5 6 7 8 9 10 11
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
27 28 29
PR NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR
NPR
PR NPR
PR
NPR
PR NPR
PR NPR
PR
NPR PR NPR
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐05
Time taken for issue of test reports by BIS TCs
TC Within time norms Within 30 days of time norms
Within 31 to 60 days of time norms
Within 61 to 90 days of time norms
Within 91 to 180 days of time norms
Above 180 days of time norms
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐06
Overall Performance of OSLs/ Any specific OSL (All or by selection from drop down menu)
S.No. Total samples pending at the start of the period
Samples received during the period
Samples tested during the period for whichTRs uploded
Balance samples pending for testing at the end of the period
Pendency of samples for issue of test reports within time norms
Pendency of samples for issue of test reports within 30 days of time norms
Pendency of samples for issue of test reports beyond 30 days of time norms
Test reports issued Within time norms
Test reports issued within 30 days of time norms
Test reports issued within 31 to 60 days of time norms
Test reports issued within 61 to 90 days of time norms
Test reports issued beyond 90 days of time norms
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 PR N
PR
PR
NPR
PR
NPR
PR
NPR
PR NPR
PR NPR
PR NPR PR NPR
PR NPR
PR NPR PR NPR
PR NPR
Form T‐07
Bills settlement of OSLs
S No Description Amount in Rs. 1. Invoices pending at the start of the month 2. Invoices received during the month3 Payment settled during the month 4 Balance payments pending at the end of the month 5 Cumulative payments made since 01 Apr 20146 Payments made for the previous years during the month 7. Cumulative payments made since 01 April for the
previous years
Form T-08
LRS Management (Applications and Grant of Recognition)
Sl. No
No. of recognized labs as on last day of previous period
No. of Applications pending as on last day of previous period
No. of Applications received & recorded during the period
No. of labs recognized during the period
No. of labs de-recognized during the period
No. of Applications closed during the period
No. of labs recognized as on last day of current period
No. of labs recognized since 1 Apr. (cumulative)
No. of labs de-recognized since 1 Apr.(cumulative)
CTCC WRTC SRTC ERTC NRTC BNBTC
Form T-09
Pendency of Applications under LRS
TC Total No. of application pending under LRS
Pending for 0-3 M Pending for 3-6 M Pending for >6 M
On BIS Account
On Applicant account
On BIS Account
On Applicant account
On BIS Account
On Applicant account
On BIS Account
On Applicant account
CTCC WRTC SRTC ERTC NRTC BNBTC
Form T-10
Surveillance Audits under LRS
TC Surv Audits pending on the first day of the period
Surveillance audits added as due in the current month
Surv Audits carried out during the month
Surv audits pending on the last day of the period
Findings w.r.t Quality issues
Details, if not satis
Any other important finding
QA testing on remnants during surv audit, if done
Satis Not satis
Satis Not Satis
CTCC WRTC SRTC ERTC NRTC BNBTC
Form T-11
Renewals of OSLs under LRS
Renewals pending at the start of the period
Renewals added as due during the period
Renewals processed during the period
Renewals pending at the end of the period
Renewals pending at the end of the period for >3 M
Renewals under Deferment at the start of the period
Renewals deferred during the period
Deferred cases renewed during the period
Deferred renewals pending at the end of the period
Deferred renewals pending at the end of the period for >3 M
CTCC WRTC SRTC ERTC NRTC BNBTC
Form T‐12
OSLs under Suspension under LRS
OSLs under suspension as on last day of the previous period
OSLs suspended during the period
Suspended OSLs renewed during the period
Suspended OSLs derecognized during the period
OSLs under suspension as on last day of the period
OSLs under suspension for >3 M
Reasons for continued suspension beyond 3 M
CTCC WRTC SRTC ERTC NRTC BNBTC
Form T-13
Management of Audits of Assaying & Hallmarking Centres
Audits of A&HMCs pending with T&C Centre’s officers from the previous period
Audits of A&HMCs allotted during the period
Audits of A&HMCs carried out during the period
Audits of A&HMCs pending with T&C Centre’s officers at the end of the period
Pendency of Audits A&H centres with T&C Officers
Upto 2 Months
2‐4 Months Above 4 Months
CTCC WRTC SRTC ERTC NRTC BNBTC
Form T‐14
QA Testing
TC No of Samples tested for QA during the period
Findings Findings of root cause analysis for not OK cases
CAs & PAs OK Not OK
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐15
Inter Lab Comparison (ILC)
TC ILC organized ILC participated in No of ILC
organized Results within +2
Results outside +2
Root cause analysis
CAs/PAs No of ILC participated
Results within +2 Results outside +2 Root cause analysis
CAs/PAs
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐16
Training for industry
T&C Centre
Training programme to be organized as per AAP
Training programs organized till start of the period
Training programs organized during the period
Subject of Training Program organized
No of Organizations participated
No of participants
Fee earned during the period
Overall feedback
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐17
Overall Test facility availability data and management
T&C Centre
No of ISS for which Test facility available at the start of the period
No of ISS for which test facility added during the period
No of ISS for which Test facility available at the end of the period
CTCC X* Y* Z* WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
∗ Will have hyperlink to the following table
S.No Test facility for ISS No. Remark relating to exception, if any
Form T‐18
Test facility augmentation in BIS T&Cs
TC Augmentation planned as per AAP
Progress during the period Remarks
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐19
Test facility/infrastructure maintenance in BIS T&Cs
List of equipments under break down / repair / not under use (Lab-wise)
Sl.
No.
Equipment/ Other infra issue
Under breakdown/ non-use since
Steps taken for restoration Reasons for delay
1
2
3
Form T‐20
Condemnation and disposal of Equipment / Instruments
TC Total Equipments/ Instruments in the lab discarded & not in use at the start of the period
Equipments/instruments already condemned
Condemned during the month
Balance pending for condemnation at the end of the period
Equipment/Instruments Condemned and not disposed off at the start of the period
Disposal done during the month
Balance to be disposed off
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐21
Condemnation and disposal of Office Equipment and Furniture
TC Total Furniture Items in the lab discarded & not in use at the start of the period
Items already condemned
Condemned during the month
Balance pending for condemnation at the end of the period
Items condemned and not disposed off at the start of the period
Disposal done during the month
Balance to be disposed off
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form T‐22
Remnant & scrap management and disposal
TC Quantity of Scrap/ Remnants available for disposal at the start of the period
Scrap/Remnants generated during the period
Disposal done during the month
Balance to be disposed off
Remarks
CTCC
WRTC
SRTC
ERTC
NRTC
BNBTC
PBTC
GBTC
Form T‐23
External auditors utilization and performance
TC
Audits pending with External Auditors at the start of the period
New audits allotted during the period
Audits carried out during the period
Balance Audits pending at the end of the period
CTCC X Y A+ B* WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Hyperlinked table
A+ For individual TC
Sl. No.
Auditor’s Name Feedback Received
Satisfactory Not Satisfactory Details for Not Satisfactory
Hyperlinked table
B* For individual TC
Sl. No.
Auditor’s Name Date of Allotment Reason(s) for Pendency Remarks
Form T‐24
NABL accreditation of BIS T&Cs
TC Status of NABL Accreditation (Yes/No/Applied for/Deferred)
Validity of Accreditation
Scope Fields Covered (Chem/Micro /Mech./Elect./ Calibration
Last NABL Audit Date & Type (Desktop / On‐site)
Action Taken on pending NCs (if any)
Last Internal Audit
Actions pending on IQA findings
Last MRM
Actions pending on decision of MRM
Remarks
CTCC WRTC SRTC ERTC NRTC BNBTC PBTC GBTC
Form H‐01
DG MIS – LICENSING OF JEWELLERS
NAME OF BRANCH OFFICE (CODE): DATES OF AUDIT: PERIOD OF REVIEW:
NAME OF HEAD:
Temp.
Application Number
Name of the
Jeweller
Product Gold/Silver/
Both
Date of Recording of Application
Name of dealing Single‐ Window Officer
Application Scrutiny
If application returned,
whether clear reasons recorded
Date of Grant of Licence
No. of days taken in grant of licence
(8) ‐ (4)
Date of signing of agreement
No of days taken in
signing the Agreement
(10) ‐ (8)
Whether Licence granted/ Agreement Signed within time norms
Remarks
Whether ID Proof valid
Whether Address
proof valid
Whether fee paid
(1) (2) (3) (4) (5) (6a) (6b) (6c) (7) (8) (9) (10) (11) (12) (13)
TOTAL
TOTAL
SUMMARY Average No. of Days taken in = Total No. of Days taken in GOL (Col 9) GOL to Jewellers under Hallmarking Total No. of Licences Granted (Col 1)
Time Norms for: i) Scrutiny of Application: ........... ii) Grant of Licence: ....................
Form H‐02
DG MIS – MARKET SURVEILLANCE OF JEWELLERS
NAME OF BRANCH OFFICE (CODE): DATES OF AUDIT: PERIOD OF REVIEW:
NAME OF HEAD:
Licence Number
Name of the Jewe‐
ller
Inspection Date of Receipt of
Test Report in
BO
No of days taken for receipt of
Test Report
(12) ‐ (4)
Test Res‐ult
Credit Note Rectified to value in Rs,if reqd
Penal Action and recovery of Penalty,
if any Name of IO/BIS Repre‐sentative
Date of Inspection
Drawal of sample Observation on other matters Against Jeweller
Against Centre Fineness /
size of sample taken
Name of Lab
Date of Receipt by Referral Lab
Credit note issued for value in Rs.
Display Require‐ments
Records Cash memo issued
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
TOTAL
TOTAL
SUMMARY Average No. of Days taken in = Total No. of Days taken in Receipt of Test reports (Col 13) Receipt of Test reports Total No. of Licences (Col 1)
Time Norms for: i) Submission of Test Reports: ...........
Form H‐03
DG MIS – RECOGNITION OF A & H CENTRE
NAME OF REGIONAL OFFICE: DATES OF AUDIT: PERIOD OF REVIEW:
NAME OF HMO:
Application No.
Name of the Centre
Product Gold/ Silver/ Both
Date of issue Of LOI
Date of Recording of Application
If application returned,
whether clear reasons recorded
Whether fee paid
Date of pre‐recognition
Audit
Whether Assessment report is
satisfactory
Date of Grant of Recognition
No. of days taken in grant of licence
(10) ‐ (5)
Date of signing of agreement
No. of days taken in
signing the Agreement
(12) ‐ (10)
Whether Agreement
Signed within time norms
Remarks
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
TOTAL
TOTAL
SUMMARY Average No. of Days taken in = Total No. of Days taken in Signing of Agreement (Col 13) Grant of Recognition to A&H Centres Total No. of A&H Centres (Col 2)
Time Norms for: i) Scrutiny of Application: ........... ii) Grant of Recognition: ....................
Form H‐04
DG MIS – SURVEILLANCE OF A & H CENTRE
NAME OF REGIONAL OFFICE (CODE): DATES OF AUDIT: PERIOD OF REVIEW:
NAME OF HMO:
Recognition Number
Name of the A&H Centre
Surveillance Audits Monthly visits for cornet melting
Samples tested in Referral Lab
Names of IO/ BIS
Representative
Dates of Audit
Grading of the AHC
Action taken, if grading less
than 70
Category of discrepancies observed, if
any
Penalty imposed and recovered, if applicable
Date of suspension, if Applicable
Date of Revocation of suspension, if applicable
Date(s) of visit when cornet record found
not satisfactory and action taken
Dates of intimation of
Failures reported in Market
Surveillance
Penal action and recovery of penalty
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
Total No. of AHCs reviewed: Total No. of AHCs for which Audits conducted as per stipulated frequency: Total Penalty Amount collected:
Form H‐05
DG MIS – SURVEILLANCE OF REFERRAL LABORATOTY
NAME OF THE LAB (CODE): DATES OF AUDIT: PERIOD OF REVIEW:
NAME OF HEAD (LAB):
Sl No. Sample Code Sample recd
on
TR issued on
No. of days taken in testing (4)‐(3)
Whether TR issued in time norm
Test report No.
Result Weight of cornet
Date of auction of cornet & rate
Value of cornet
Cornet value informed to
BO on
No. of days taken to inform cornet value to
BO
(12)‐(4)
Whether cornet value
informed in time norm
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
Total No. of TRs issued: Total Value of the Cornet Collectedy: Total Penalty Amount collected:
Form M‐01
REVIEW PROFORMA FOR MGMT SYSTEMS CERTIFICATION ACTIVITY (Auditor )
Name of the Deptt : Period of review:
IS/ISO no. No. of auditors required
No. of auditors available
No. of Initial Audit carried out
No. of Surveillance Audit carried out
No. of Renewal audit carried out
No. of auditors whose performance
is less than 70%
BIS External BIS External BIS External BIS External BIS External
IS/ISO 9001:2008
IS/ISO 14001:2004
IS/ISO 22000:2005
IS/ISO 50001:2011
IS/ISO/TS 16949:2009
IS 15000:2013
IS 15700:2005
IS 15793:2007
IS 15930(Part 1):
2010
IS16001:2012
IS 16019:2012
IS 16020:2012
IS 16021:2012
IS 16070:2013
IS 18001:2007
IS/ISO 22000:2005
Grading of Auditor
8‐10 : Excellent
7‐8 : Very Good
<7 : Needs improvement
Summary at a Glance for 2014‐15
No. of audits carried out by BIS during the month
No. of audits carried out by External auditor BIS during the month
No. of auditors whose evaluated performance is less than 70%
Form M‐02
REVIEW PROFORMA FOR MGMT SYSTEMS CERTIFICATION ACTIVITY (Monitoring of Recognized Certification Bodies)
Name of the Deptt : Period of review:
IS/ISO no. Name of Recog. CB
Grant of licence (GOL) Renewal No. of surprise audits undertaken by BIS
Overall grading of CB
No. of licence granted
No. of witness audits by BIS
Performance
No. of renewals done
No. of witness audits byBIS
Performance
IS/ISO 9001:2008 1
2
3
IS/ISO 14001:2004
1
2
3
IS/ISO 22000:2005 1
2
3
IS/ISO 50001:2011 1
2
3
IS/ISOTS 16949:2009
1
2
IS 15000:2013 1
2
IS 15700:2007 1
2
IS 15793:2007 1
2
IS 15930(Part 1): 2010 1
2
IS16001:2012 1
2
IS16019:2012 1
2
IS 16020:2012 1
2
IS 16021:2012 1
2
IS 16070:2012
1
2
IS 18001:2007 1
2
Grading of CB
8‐10 : Excellent
7‐8 : Very Good
<7 : Needs improvement
Summary at a Glance for 2014‐15
No. of licence granted by recognized CB
No. of witness audits done by BIS
No. of renewal audits done by CB
No. of witness of renewal audits done by BIS
No. of CB whose performance graded is less
than 70%
Form M‐03
REVIEW PROFORMA FOR MGMT SYSTEMS CERTIFICATION ACTIVITY (GOL/Income)
Name of the Deptt : Period of review:
IS/ISO No. Grant of licence( GOL)
Income
No of GOL by BIS during the
month
No. of GOL by Recog CB’s during the month
No of GOL within time norms
Cumulative GOL BIS MSC Income Income thru Recog CB’s
Cumulative Income
Target Achievement
Target Achievement
Target Achiev ement
Target
Achievement
GOL within time norms
Target Achievement
Target Achievement
Target Achievement
IS/ISO 9001:2008
IS/ISO 14001:2004
IS/ISO 22000:2005
IS/ISO 50001:2011
IS/ISO/TS
16949:2009
IS 15000:2013
IS 15700:2005
IS 15793:2007
IS 15930(Part 1): 2010
IS16001:2012
IS 16019:2012
IS 16020:2012
IS 16021:2012
IS 16070:2013
IS 18001:2007
Summary at a Glance for 2014‐15
Target Cumulative achievement
GOL through BIS 150
GOL through CB 350
GOL within time norms 67
Income through BIS 600
Income through CB
Form M‐04
REVIEW PROFORMA FOR MGMT SYSTEMS CERTIFICATION ACTIVITY (Renewal/Surveillance)
Name of the Deptt : Period of review:
IS/ISO No. Applications
( Appl)
Surveillance audit Renewal
No of appl. recd
No of initial audit carried out
No. of appl pending
No of surveillance audit due
No of surveil.
audit don
No of surveil. audit pending
Reason for pending
No. of ren due
No of ren. audit done
No of ren audit pending
Reason for pending
IS/ISO 9001:2008
IS/ISO 14001:2004
IS/ISO 22000:2005
IS/ISO 50001:2011
IS/ISO/TS 16949:2009
IS 15000:2013
IS 15700:2005
IS 15793:2007
IS 15930(Part 1): 2010
IS16001:2012
IS 16020:2012
IS 16021:2012
IS 16070:2013
IS 18001:2007
Total
Summary at a Glance for 2014‐15
Applications pending Surveillance audit pending
Renewal audit pending
Form I-01
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (State Level Committee Meetings)
NAME OF THE REGION OFFICE (CODE): PERIOD OF REVIEW:
NAME OF HEAD:
1 2 3 4 5 6 7 8 9 10
RO/BO Total
No of
States
No of
SLC’s for
States done
No of State Govt
Provided Information
of BIS Activities
-Standard formulation
-Certification scheme
-Management systems
-i-CARE Programme
No of
States/State
Agency
provided
Information
On QC Orders
Has the Nodal
Point for
Implementatio
n of QC Order
Identified
No of
Licensees
In the
State
Were the State
Govt
Encouraging
Industries to
go for ISI
Mark/BIS
Certification
% Increase in
Licence
Was state Govt
promoting
Management
System
Certification in
State Govt Offices/
Undertaking
-No of Deptt taken
Management
System
Certification
Was the State
Govt Promoting
Use of Standard
and purchase of
ISI Marked Goods
No of Dept
Purchasing Goods
with ISI Mark.
Total
Wednesday, 23 July 2014
Form I-02
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (Licensees Meet)
NAME OF THE REGIONAL OFFICE (CODE): PERIOD OF REVIEW:
NAME OF HEAD:
1 2 3 4 5 6 7 8 9
Regional
Office
Targets
for
Meeting
No of
Licensees
Meet
Conducted
No of
Participants
Information
Provided on
New
Initiatives of
BIS
Intimation
Provided
Regarding QC
Orders/
Mandatory
Certification
Awareness
Regarding
RGNQA
Promotion
of
ISI Licence
SDoC Scheme
MSC Schemes
Suggestion/
Feedback received & Analysis.
Pending
From
last
meeting
Raised
in this
meeting
No of
Issues
Resolved
No of
Issues
Carried
forward.
Wednesday, 23 July 2014
Form I-03
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (Complaint on Quality)
Regional Office /Branch Office:
1 2 3 4 5 6 7
Activity No Complaint Received
No of Acknowledgement Sent
No of Complaints
Investigated No of
Complaints
Closed
No of Complaints
Reopened on
request of
Complainant
No of complaints Pending From date
of recording
Complaints Testing of
Public Samples
Complainant
End
Licensee
End
More
than 2
Month at
BO
Between
2-3
Month
at RO
Between 3-4
Month at i-
CARE Deptt.
Product
Hallmarking
Service
Others
Total
Wednesday, 23 July 2014
Form I-04
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (Testing of Public Samples)
For Ros/Bos offices:
Period From:
1 2 3 4 5 6
No of samples received No of Sample
Sent to lab No of TR’s received
Results No of Refunds
made
Amount refund in Rs/-
Pass Fail
Wednesday, 23 July 2014
Form I-05
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (Education Utilization of Standards)
NAME OF THE BRANCH OFFICE(CODE): PERIOD OF REVIEW:
NAME OF HEAD:
Remarks /Any Other Information.
Wednesday, 23 July 2014
1 2 3 4 5 6 7 8
How Many Educational
Institution under
BO
No’s of
Request
Received from
these
Institution
No of Education
Institutions Contacted
by BIS
No of Education Utilization of
Standards Programmes Conducted
No of Institution Covered under EUS in percentage
% age of total
Institution
covered
No of
Standards
Purchased by these
Institutions
Feedback /Perception
Students perception
& Feedback of
programme
No of ISS Considered
for Adoption in
Curriculum Projects
Form I-06
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (Standards Forum)
NAME OF THE BRANCH OFFICE (CODE): PERIOD OF REVIEW:
NAME OF HEAD:
1 2 3 4 5 6 7
No’s of Coordinators/Faculty
Appointed for Interaction with BIS
No’s of Standards Forum Formed in
Educational Institutions
No’s of Coordinators/Faculty
Trained in the Concept of Formation of Standards Forum in Educational
Institutions
Effectiveness of Educational Utilization Programs Conducted by Standards Forum
No of Students Involved in Standards
Forum
No of Standards Forum Provided
Financial Incentives
Remarks/Any Other Information
Wednesday, 16 July 2014
Form I‐07
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (Consumer Organization Recognition & Consumer Awareness Programme)
NAME OF THE BRANCH OFFICE(CODE): PERIOD OF REVIEW:
NAME OF HEAD:
1 3 4 5 6 7 8 9
No of Consumer Organiza
tion in the State
No of
Consumer Organizatio
n Applied
for recognition
No of Consumer
Organizatio
ns
Recognized
No of
Consumer
Organization
s Whose Representative
Trained
No of Consumer
Organization Utilized for
work on
Behalf
of BIS
Districts
Under BO
Utilization of Consumer Organizations
No of Programmes
where claims
made by
consumer
Organization
and actual
amount paid
No Cov
ered
No of Consumer Awareness programmes
No of
Detectio
ns
Of
Misuse
No of
Market
Surveys
Done
No of
Market
Sample
Drawn
No of
Public
testing
samples
No of Programmes Conducted
No of
Partici
pants
Awareness
For
Significance
of all BIS
Scheme &
Activities
Feed
back
Wednesday, 23 July 2014
Form I-08
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (CONSUMER PROTECTION- DETECTION OF MISUSE) NAME OF THE BRANCH OFFICE(CODE): PERIOD OF REVIEW:
NAME OF HEAD:
Remarks/Any Other Information:-
Wednesday, 23 July 2014
1 2 3 4 5 6 7
No’s of leads
received
No of Surveys for Misuse carried out/Misuse
detected by BIS
No’s of Misuse Detected
No’s of Violation of QC orders
detected
No Of Investigation Carried Out
No’s of Search & Seizure Operations Carried Out
No’s of Search & Seizure Operations Carried Out
Success
Unsuccessful
Form I-09
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (CONSUMER PROTECTION- LEGAL ACTION- MISUSE) NAME OF THE BRANCH OFFICE (CODE): PERIOD OF REVIEW:
NAME OF HEAD:
Wednesday, 23 July 2014
1 2 3 4 5 6 7 8 9 16
No of Court cases
in Progress
No’s of court Cases
Launched
No’s of Court Cases Closed
No’s of Court Cases
Pending
No’s of Court Cases decided in favour of
BIS
No’s of Court Cases decided Against BIS
No’s of Press Release Issued
No’s of Claims for Reward
No’s of Cases Eligible
for Reward
No’s of Rewards Given
Form I-10
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (CONSUMER PROTECTION- DETECTION VIOLATION OF MANDATORY QC ORDERS) NAME OF THE BRANCH OFFICE(CODE): PERIOD OF REVIEW:
NAME OF HEAD:
Remarks/Any Other
Information:-
1 2 3 4 5 6
No’s of leads
received No of Surveys carried out for
detection of Violation of QC Order
No’s of QC Orders implemented
No’s of Violation of QC orders detected
No Of Investigation Carried Out
No’s of actions initiated for violation of QC orders legal
action/Intimation to the Implementing Authority
Form I-11
REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME (Publicity)
NAME OF THE BRANCH OFFICE(CODE): PERIOD OF REVIEW:
NAME OF HEAD:
1 2 3 4 5
RO/BO Public Relations
No of
Stake Holders
Contacted
Publicity
Participation at Exhibition
Publicity Expenditure
during the Months
(Total Expenditure)
Print Media
(No of advertisement /Press Release for )
Audio Visual Media
First
licence for
ISS
Stop
Marking
Detection
of Misuse
Mandatory
certification
BIS
Activities No of
Programmes No of
Advertisements
Hoardings
Wednesday, 23 July 2014
Form I-12 REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME
(Sales and Distribution)
Sale of Standards For Ros/Bos Sales offices:
Period From:
1 2 3 4 5 6 7 8 9 10
HQ/ RO/BO
Hard Copy Sales
E-Sales Hard Copy through Portal
Retrocession from
ISO/IEC
Commission & Procurement
Total No of Hard Copy of Standards available in stock
Operation
of sales counter as per sales
guidelines
No of standards
printed from outsides
No of Standards printed
In-House
No Revenue No Revenue No Revenue Permanent
Sale
Other Sale No of
standards No of copies
No of standards
No of copies
Wednesday, 23 July 2014
Form I-13 REVIEW PROFORMA FOR IMPLEMENTATION OF I-CARE PROGRAMME
(SINGLE WINDOW SYSTEM)
For Ros/Bos Sales offices:
Period From:
1 2 3 4 5
Designated Space for Single Window System
Availability of Pc’s Connectivity to CMMS Display about various Schemes
Display of Citizen Charter
Form AG‐01
DG MIS – CHECK LIST FOR MONITORING OF ADMINISTRATION MATTERS
NAME OF THE HQ/REGION/BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Sl. No. Items to be checked Observation Suggestions for Corrective and/or
Preventive Action
(1) (2) (3) (4)
1. Analysis of man‐power requirement vis‐à‐vis the functions performed
‐ Man‐power planning/Deployment of persons as per Job description ‐ Problem Area:
2. Review of APRs
3. Review of Leave of Officers & Staff
4. Review of Procurement of Goods & Services as per GFR
5. Engagement of contractual workers/agencies
‐ Approval of Tender Document by Competent Authority
‐ Attendance Record being maintained
‐ Payment is being made as per State/Central Govt norms
‐ EPF, ESI facility being provided
6. Store & Inventory Management
‐ Record of Procurement of goods being maintained
‐ Record of item issued to section/officer being maintained
‐ Maintenance of Asset Register
7. Record Room & Weeding out
‐ Record room is functioning
‐ No. of files in the Record Room
‐ Weeding out of records
8. Maintenance of Files and Records as per Office Procedure
‐ Maintenance of Files Index Register
9. R&I Activities
‐ Proper registers have been maintained for receipt & issue of Dak
10. Condemnation and Disposal of Items
‐ Whether condemned by meeting
‐ Whether witten off from Asset Register
‐ Whether written off from Accounts
11. Meeting with Officers & Staff representatives
12. Observations given in the last C&AG Audit Report and compliance thereof
13. Observations given in the last Internal Audit Report and compliance thereof
Form AG‐02
DG MIS – MONITORING OF PROCUREMENT OF GOODS & SERVICES
NAME OF THE HQ/REGION/BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Sl. No.
Nature of goods/services
procured
Name of the party
Whether tender was created
using model tender
document
Tender Evaluation Whether tender
published on CPP Portal,
BIS website & local
newspaper
Estimated cost of goods
Whether bids invited in single/two
bid
Whether bids invited through limited
tender/open tender enquiry
Whether purchase of goods/services is
approved by competent authority
Whether implementation is as per
tender Eligibility Criteria Checked
Terms & Conditions Checked
Penalty Clause Checked
Other Criteria to meet the Requirements
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
Form AR‐01
DG MIS – RTI MATTERS IN BIS OFFICES
NAME OF THE HQ/REGION/BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Location
(HQ/RO/BO/SBO/NITS/T&C)
Opening Balance (Pending at end of Previous Quarter)
Applications Received Applications Disposed of Closing Balance
(Pending at end of Current Quarter)
First Appeals Fee Received
From Informati
on Seeker
From Other Public
Authority (Outside BIS)
Total Reply Sent
Transferred to Other Public Authority
(Outside BIS)
Applications Rejected
Total Closing Balance (Pending at end
of Current Quarter)
No. of Appeals Recd
No. of hearings organized
Appeals Disposed
Off
Appeals Pending
Application Fee
Information Charges
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
TOTAL
Form AB‐01
DG MIS – BUREAU SECRETARIAT ACTIVITIES AT BIS HQ, NEW DELHI
NAME OF HEAD REPORTING: PERIOD OF REVIEW (MONTH/YEAR):
Sl. No.
Major Activities Meeting No./Date Action Taken No. of Action pending
Remarks
No. of Items for Decision
No. of Items for Information
No. of Decisions Taken
No. of Action completed
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1. Bureau Meetings
2. EC Meetings
3. Advisory Committees
a) Standards
b) Certification
c) Laboratories (Testing & Calibration)
d) Finance
e) Consumer Policy
f) Planning & coordination
TOTAL
Form AH‐01
DG MIS – HINDI IMPLEMENTATION
NAME OF THE HQ/REGION/BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Correspondence Region wise
Compliance of rule 3 (3)
To reply Letters in Hindi for Letters
received in Hindi
To reply Letters in Hindi for Letters
received in English
Noting in Hindi in Files Region wise
OLIC Hindi Fortnight Celebration
Hindi workshops
Standards translated in a
year
To participate in TOLIC
Training
A B C A B C Hindi Language
Steno‐ graphy
Typing
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18)
Target 100% 100% 65% 100% 100% 100% 75% 50% 30% One in each Quarter
Once in a Year
One in each Quarter
12 Standards per Year by
each Translator
Once in 6 months
100% 100% 100%
Form AP‐01
DG MIS – MANPOWER DETAILS IN BIS OFFICES (SCIENTIFIC CADRE OFFICERS)
NAME OF HQ/REGION/BRANCH/SUB BRANCH/LOT CELL: PERIOD OF REVIEW (MONTH/YEAR):
NAME OF HEAD REPORTING:
Activity Sanctioned Strength Existing Strength Vacancy
MCM FCT EEE MCM FCT EEE MCM FCT EEE
Certification
Standardization
Testing & Calibration
Technical Support services
Training
Others
TOTAL
Sanctioned Strength of Scientific Cadre Officers: 560 Existing Strength of Scientific Cadre Officers: 497
Activity Sc‐B Sc‐C Sc‐D Sc‐E Sc‐F Sc‐G Total %age
Certification 164 35 23 59 45 03 329 66
Standardization 37 02 07 27 14 01 88 18
Testing & Calibration
14 0 03 18 09 01 45 9
Others 05 03 06 11 09 01 35 7
TOTAL 220 40 39 115 77 06 497 100
Form AP‐02
DG MIS – APAR MANAGEMENT (GROUP ‘A’ OFFICERS)
NAME OF HQ/REGION/BRANCH/SUB BRANCH/LOT CELL: PERIOD OF REVIEW (MONTH/YEAR):
NAME OF HEAD REPORTING:
Period No. of APAR Due
No. of APAR Received
No. of APAR Pending
Adverse Remarks (Yes/No)
Remarks Conveyed (Yes/No)
Representa‐tion Given (Yes/No)
Decision Reporting Officer
Reviewing Officer
Accepting Officer
TOTAL
Form AP‐03
DG MIS – REVIEW OF PROMOTIONS (GROUP ‘A’ OFFICERS)
NAME OF HQ/REGION/BRANCH/SUB BRANCH/LOT CELL: PERIOD OF REVIEW (MONTH/YEAR):
NAME OF HEAD REPORTING:
Category No. of Officers Due for Promotion at the Beginning of the Year
Screening Committee No. of Officers Promoted during the Year
Balance No. of Officers to be Promoted
Remarks
Sc ‘B’
Sc ‘C’
Sc ‘D’
Sc ‘E’
Sc ‘F’
Sc ‘G’
TOTAL
Form AP‐04
DG MIS – REVIEW OF TRAINING (GROUP ‘A’ OFFICERS)
NAME OF HQ/REGION/BRANCH/SUB BRANCH/LOT CELL: PERIOD OF REVIEW (MONTH/YEAR):
NAME OF HEAD REPORTING:
No. of Officers Due for Training Type of Training Organized
Duration of the Training No. of Officers Participated
Remarks
Form AE‐01
DG MIS – MANPOWER DETAILS IN BIS OFFICES – GROUP ‘A’ (Other than Scientific Officers), ‘B’, ‘C’ & Group ‘D’ (upgraded to Gr C)
NAME OF THE HQ/REGION/BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Sanctioned Strength Existing Strength Vacant Posts
Group A (Administrative, Finance & other Posts) 57 31 26
Group B 717 439 278
Group C 521 303 218
Group D (Upgraded to Group C) 403 238 164
Total 1698 1011 686
Sl. No.
Major Activities Action Taken during the month/Work Done
Action Pending Remarks
1. Recruitment
2. Promotion (DPC)
3. Financial Upgradations (MACP)
4. Retirement
5. Departmental Examinations
6. Disciplinary Cases/Legal Cases
7. Constitution of SHC/Selection/ Promotion/Screening Committees
8. Compassionate Appointment Cases
9. Reservation & Post Based Rosters
10. Union Matters & Employee Relations
11. Premature retirement under FR 56 j/ APAR Management
12. General Insurance Scheme/RTI Related Queries
13. Any other/Miscellaneous Work
Form AL‐01 DG MIS – LIBRARY ACTIVITIES AT BIS HQ, NEW DELHI
NAME OF HQ/REGION/BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR):
NAME OF HEAD REPORTING:
Sl. No. Items to be checked Work Done in Previous Month
Work Done in Current Month
Increase/Decrease Suggestions for Corrective and/or Preventive Action
(1) (2) (3) (4) (5) (6)
1. Total No. of Publications: ……………… Number of Publications added:
a) Standards b) Books c) Misc
2. No. of Visitors who utilized the facilities: a) General b) Govt.
3. Number of Standards/Books/Periodicals loaned: INTERNAL LOAN a) Standards b) Books c) Periodicals EXTERNAL LOAN a) Standards b) Books
c) Periodicals
4. Enquiries about Information on Standards and & related matters
5. Computerization/Automation:
a) Standards Codified for Data Base b) Publications entered and Bar coded
6. Library Membership: a) Category A (New) b) Category B (New) c) Renewal
7. Income from Library Membership
Last Financial Year
Rs.
Last Financial Year
Rs.
From AL‐02
DG MIS – LIBRARY ACTIVITIES AT OTHER OFFICES OF BIS*
NAME OF HEAD REPORTING: PERIOD OF REVIEW:
Sl. No.
Items to be checked ERO NRO WRO
(1) (2) (3) (4) (5)
Work Done in Previous Month
Work Done in Current Month
Increase/ Decrease
Work Done in Previous Month
Work Done in Current Month
Increase/ Decrease
Work Done in Previous Month
Work Done in Current Month
Increase/ Decrease
1. Total No. of Publications: ………………
Number of Publications added:
d) Standards e) Books f) Misc
2. No. of Visitors who utilized the facilities:
c) General d) Govt.
3. Number of Standards/Books/Periodicals loaned:
INTERNAL LOAN
d) Standards e) Books f) Periodicals
EXTERNAL LOAN
d) Standards e) Books f) Periodicals
4. Enquiries about Information on Standards and & related matters
*Note‐‐Library at Central (T&C), NITS and SRO is not functional.
Form L‐01
DG MIS – LEGAL ACTIVITIES IN BIS OFFICES
NAME OF HEAD REPORTING: PERIOD OF REVIEW (MONTH/YEAR):
Category of Court Case Name of the Courts and RO/BO etc Pending cases at the end of previous month
Cases filed during the month
Cases decided Closing balance (cases pending) at
the end of the month Total In favour
of the Bureau
Against
the
Bureau
(A) Civil cases at HQs, New Delhi Supreme Court of India
Delhi High Court
District Courts (in Delhi Region)
National Consumer Disputes Redressal Commission (NCDRC)
Delhi State Consumer Disputes Redressal Commission (SCDRC)
TOTAL
(B) Civil cases at Regional/Branch Offices of the Bureau
CENTRAL REGIONAL OFFICE
Eastern Regional Office(ERO)
Northern Regional Office(NRO)
Southern Regional Office (SRO)
Western Regional Office (WRO)
TOTAL
(C) Criminal/ Enforcement cases at Regional/ Branch Offices of the Bureau
CENTRAL REGIONAL OFFICE (CRO)
Eastern Regional Office (ERO)
Northern Regional Office (NRO)
Southern Regional Office (SRO)
Western Regional Office (WRO)
TOTAL
Form F‐01 DG MIS – MONITORING OF BOOKS OF ACCOUNTS & ACCOUNTING FUNCTIONS
NAME OF THE REGION/BRANCH/SUB‐ BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Sl. No. Items to be checked Observation Suggestions for Corrective
and/or Preventive Action
(1) (2) (3) (4)
14. All Income & Expenditure have been accounted for in Books of Accounts
15. All payments made as per sanctions and statutory provisions followed
16. The expenditure made by the branch is as per Budget allocated. Reasons for any
excess/underutilization of Budget
17. Trial Balance upto last month prepared by the branch as per the proforma prescribed. All
items in the Trial Balance have been authenticated. Inter Account with other ROs/BOs/HQ
have been reconciled. All the Current Assets/Current Liabilities Account as per last Trial
Balance reconcile with the party wise ledger/list
18. The funds were transferred to HQ as per the instructions relating to transfer of funds
19. The daily collection of marking fee, sale of standards, cash sales and other receipts have been
deposited in the bank within next working day
20. Bank Reconciliation of all the Bank accounts have been finalized upto last month
21. Actions have been taken to recover/write off certification dues
22. Service Tax has been timely paid to Govt. during the current year after adjustment of Cenvat
Credit. Whether Service Tax Returns have been filed by due dates?
23. The income tax deducted from contractors/parties has been timely deposited, whether return
has been filed by due dates and TDS certificates have been issued by due dates
24. The TDS Certificates have been obtained from all parties which deducted tax at source from
payment made to BO during last quarter
Form F‐02 DG MIS – ANALYSIS OF INCOME & EXPENDITURE VIS‐À‐VIS BUDGET ESTIMATES
NAME OF THE REGION/BRANCH/SUB‐ BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Sl. No.
Account Head Expected Actuals for the period under Review (i.e. proportionate BE)
Actuals for the period under
Review
% Actual Over Expected
(3‐4/4x100)
Actuals for the same period of last
Financial Year
% Increase over last year
(4‐6/6x100)
Suggestions for corrective
Action, if any
(1) (2) (3) (4) (5) (6) (7) (8)
1. Income
1.1 Product Certification
1.2 Gold Hallmarking
1.3 System Certification
1.4 Training Fee
1.5 Sales of Indian Standards
1.6 Other Income
Total (1)
2. Expenses
2.1 Staff Benefits(Medical/ Staff Welfare/ LTC
2.2 Travelling Expenses
2.3 Testing
2.4 Publicity
2.5 i‐CARE Expenses
2.6 Office Expenses (Entire Group)
2.7 Repairs & Maintenance (Entire Group)
2.8 Training Expenses (in case of NITS)
2.9 Other Expenses (all remaining)
Total (2)
3. Capital Expenses
Form F‐03
DG MIS – COMPLIANCE TO OBSERVATIONS IN HALF YEARLY INTERNAL AUDIT REPORT(s)
NAME OF THE REGION/BRANCH/SUB‐ BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Internal Audit Observation No. Internal Audit Observation
(in brief)
Reasons for non compliance/non completion of action
Observation Suggestion if any
(1) (2) (3) (4) (8)
Form F‐04
DG MIS – COMPLIANCE TO PARAS IN THE STATUTORY AG AUDIT REPORT(s)
NAME OF THE REGION/BRANCH/SUB‐ BRANCH OFFICE (CODE): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING:
Audit Para No. Year of Audit to which Para relates
Subject of the para Whether reply was given Whether action has been taken/completed as suggested
by Audit
Suggestion, if any
(1) (2) (3) (4) (8)
Form N‐01
TRAINING INSTITUTE (NITS) – SUMMARY REPORT OF PROGRAMMES CONDUCTED (Programme wise)
Type of
Programme
No. of Programmes No. of Participants
No. of Organiations/ Countries (in case of ITP
Amount Received (Actual/ Notional/ Grant)
Expenditure
Surplus Generated
No. of Faculty
Feedback received
Target Achievement Training
Infrastructure
BIS Outside On Faculty
On Programmes
On Infrastructure BIS Outside
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
In‐house Programmes
Open Programmes
Programmes for BIS
Employees
ITP
XII Plan Programme
Form N‐02
TRAINING INSTITUTE (NITS) – SUMMARY REPORT OF PROGRAMMES CONDUCTED (Chair wise)
Chair
Type of Programme (In house/ Open/ BIS Employees/ ITP/ XII Plan)
No. of Programmes No. of Participants
No. of Organiations/ Countries (in case of ITP
Amount Received (Actual/ Notional/ Grant)
Expenditure Surplus Generate
d
No. of Faculty
Feedback received
Target Achievement Training
Infrastructure
BIS Outside On Faculty
On Programmes
On Infrastructure BIS Outside
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16)
Form N‐03
TRAINING INSTITUTE (NITS) ‐ REPORT OF PROGRAMMES CONDUCTED
Period:..........................................
Chair Type of Program
(In house/ Open/ BIS
Employees/ ITP/ XII Plan)
Total No. of
Programmes
Title of the
Program
Organization at which conducted (NITS/Outsi
de)
Date of
Program
Duration of the
Program
No. of Participants
No. of Organiations/
Countries (in
case of ITP)
Amount Received (Actual/ Notional/ Grant
Expenditure Surplus Generat
ed
Faculty
Feedback Received*
Training
Infrastructure
On Faculty On Programme
On Infrastructure Ta
rget
Achieved
BIS Outside BIS Outside
(2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21)
* Feedback to be received on a scale of 1‐10 as per the following:
9‐10 Excellent 7 – 8 Very Good 5 – 6 Good < 5 Not to be used
Form N‐04
TRAINING INSTITUTE (NITS) – SUMMARY REPORT OF UTILIZATION OF TRAINING & HOSTEL FACILITIES
Period……………………………
Facility
No. of Rooms available
% of Occupancy
Income generated
Expenditure incurred Expenditure as % of Income
Feedback on Facilities
Caterin
g
Hou
sekeep
ing
Mainten
ance
Total
Housekeeping
Caterin
g
Room
Infrastructure
Post lecture
recreatio
n
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
Training Halls (Large) ‐ Normal days
Training Halls (Large) ‐ Non BIS working days
Training Halls (Small) ‐ Normal days
Training Halls (Small) ‐ Non BIS working days
Hostel Rooms
Faculty Rooms
From N‐05
TRAINING INSTITUTE (NITS) – SUMMARY REPORT OF FACULTY
Period………………………
Programme Type
No. of Empanelled Faculty
% Utilized Rating of Faculty (Avj.) Faculty with Rating of
% Change in no. of Faculty since
beginning of year Outside BIS Outside BIS Outside Outside Excellent Very
Good Good Not to
be used
Outside BIS
(1) (2) (3) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
Form N‐06
TRAINING INSTITUTE (NITS) – SUMMARY REPORT OF EXPENDITURE ON CAPITAL WORKS
Period…………………………….
Item No. of Works Identified Expenditure
As per Plan Works in process
Works completed
Plan Of which Budgeted
Expenditure % Expenditure to Budget
(1) (2) (3) (4) (5) (6) (7) (8)
AC System
Electrical & Plumbing
Civil Work
Office Equipment
Furniture
Total
Form V‐01 NAME OF THE BIS OFFICE (CODE): BIS HQ PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING: CVO PART A – Vigilance Department, BIS HQ, New Delhi (in respect of Group “A” employees)
Sl. No.
Activity Opening Balance Received during the month
Disposed of during the month
Closing Balance Cumulative No. of Complaints received
since 1 April (1) (2) (3) (4) (5) (6) (7) 1. Complaints under investigation:
2. Disciplinary proceedings: a) CVC 1st stage advice pending for processing
b) Oral Inquiries pending with IA
c) Oral inquiry reports received and pending for obtaining DA’s
views
d) CVC 2nd stage advice pending for processing
e) Representations of CO pending for submission to DA
f) Final order of DA pending for issue after decision
g) Appeals pending for submission to Bureau Secretariat with
DG’s comments thereon
h) Submission of period reports to CVC/DoCA/CBI, etc.
3. Processing of information related to Movable & Immovable
Property Transactions
4. Processing of Annual Immovable Property Returns (AIPRs)
Form V‐02
DG MIS – VIGILANCE ACTIVITIES IN BIS OFFICES NAME OF THE Secretariat of DDG (ADMN/REGION/T&C): PERIOD OF REVIEW (MONTH/YEAR): NAME OF HEAD REPORTING: PART B – Vigilance Sections in Sectt of various DDGs (Group ‘B’, ‘C’ & ‘D’ employees)
Sl. No.
Activity Opening Balance Received during the month
Disposed of during the month
Closing Balance Cumulative No. of Complaints received
since 1 April (1) (2) (3) (4) (5) (6) 1. Complaints
a) DDG(Administration)
b) DDG(CRO)
c) DDG(ERO)
d) DDG(SRO)
e) DDG(NRO)
f) DDG(WRO)
g) DDG(T&C)
2. Processing of Movable & Immovable Property transactions
a) DDG(Administration)
b) DDG(CRO)
c) DDG(ERO)
d) DDG(SRO)
e) DDG(NRO)
f) DDG(WRO)
g) DDG(T&C)
3. Cases processed for vigilance clearance
a) DDG(Administration)
b) DDG(CRO)
c) DDG(ERO)
d) DDG(SRO)
e) DDG(NRO)
f) DDG(WRO)
g) DDG(T&C)
4. Processing of Annual Immovable Property Returns (AIPRs)
a) DDG(Administration)
b) DDG(CRO)
c) DDG(ERO)
d) DDG(SRO)
e) DDG(NRO)
f) DDG(WRO)
g) DDG(T&C)
5. Disciplinary Proceedings cases pending
a) DDG(Administration) b) DDG(CRO)
c) DDG(ERO)
d) DDG(SRO)
e) DDG(NRO)
f) DDG(WRO)
g) DDG(T&C)
Form PC‐01
PLANNING & COORDINATION DEPARTMENT – PARLIAMENT QUESTIONS
Department Head Month & Year
No. of Parliament Questions
Pending at the beginning of the
month
No. of Parliament Questions received
No. of Parliament Questions Replied
No. of Parliament Questions
Pending at the end of the month
No. of Parliament Questions replied
Delay, if any,n on account of
During the
month
Cumulative During the
month
Cumulative Before due date
On or after due date
P&C Input providing
departments
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Form PC‐02
PLANNING & COORDINATION DEPARTMENT – MINISTERIAL REFERENCES
Department Head Month & Year
No. of Ministerial References Pending at the beginning of the
month
No. of Ministerial References received
No. of Ministerial References Replied
No. of Ministerial References Pending at the end of the month
During the month
Cumulative During the month Cumulative
(1) (2) (3) (4) (5) (6)