Orica Botany Groundwater Cleanup Project - Progress Update 08/12/2009 CLC quarterly meeting 1 08/12/2009 Botany Groundwater Cleanup Project Progress Update for CLC Bill Crowe, Stephen Corish, John Lear, James Stening & Lucy Archer CLC quarterly meeting 08/12/2009 Groundwater Treatment Update GTP shutdown successfully completed on time & with no injuries - GTP started up 5 December Recent investigations into the possibility of pumping more groundwater to maximise hydraulic containment: - Identified that extraction beyond ~7 ML/day increases risk of subsidence, particularly on the BIP Continue industrial reuse of treated groundwater Will look for opportunities to treat other water sources for industrial reuse, but no feasible projects have been identified Plan to improve the efficiency of the biological treatment of water

Upload: others

Post on 23-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

20091208_ALL_PresentationsBill Crowe, Stephen Corish, John Lear, James Stening & Lucy Archer
CLC quarterly meeting
- GTP started up 5 December
• Recent investigations into the possibility of pumping more groundwater to maximise hydraulic containment:
- Identified that extraction beyond ~7 ML/day increases risk of
subsidence, particularly on the BIP
• Continue industrial reuse of treated groundwater
• Will look for opportunities to treat other water sources for industrial
reuse, but no feasible projects have been identified
• Plan to improve the efficiency of the biological treatment of water
Orica Botany Groundwater Cleanup
• Cumulative 6.1 billion litres of groundwater treated and 730 tonnes
of contaminants destroyed (as of Sep ’09)
0
1000
2000
3000
4000
5000
6000
7000
Feb-05 Aug-05 Feb-06 Aug-06 Feb-07 Aug-07 Feb-08 Aug-08 Mar-09 Sep-09
T o ta
l t re
ry e d C
continues to be achieved
Orica Botany Groundwater Cleanup
• As expected, results consistent with previous monitoring rounds
• Large decrease in the estimated average CHC concentration for entire PCA aquifer between Jul 2002 and Sep 2009
• Contaminant concentrations less than ANZECC Trigger Values for
all pore water discharge interface samples in Penrhyn Estuary
• Surface water concentrations in Springvale Drain and Estuary hundreds of times lower than 5 years ago
• Conclusions of Consolidated Human Health Risk Assessment
(2005/2006) do not change
• Trial extension proposed to test anti-fouling agent and injection well
maintenance techniques to extend life of wells in case of long term
shutdown
– Maintenance & optimisation of hydraulic containment
– Chemical & hydraulic monitoring programs for:
- Groundwater & surface water
– Source area management
– Follow-up on 2004-2005 bioremediation field trials
– North-east corner of Southlands Block 2
– Injection of bio culture developed by Centre for Marine
Bio-Innovation (at UNSW)
– To see whether it can achieve greater bioremediation that with
nutrients alone
– Targeting EDC
2008-2009 EPL2148 Annual Return – BGC Project Conditions
• Seven minor non-compliances; all other discharges to air and water from the GTP met stipulated licence conditions
1. GTP weather station unavailable for 24 hrs due to lightning strike
2. Total Solid Particles exceedance at GTP stack
- 42.2 mg/m3 compared to limit of 20 mg/m3
- No harm to human health or the environment (Prof B Priestly IMC Task 24)
3. Loss of a treated water test sample by the testing laboratory
4. Minor exceedance of oxidised nitrogen in discharged treated water
- 0.11 mg/L compared to limit of 0.1 mg/L
- No environmental harm (URS risk assessment)
5. Treated water discharge temperature exceedances
- Shroud to reduce pipeline heating up in hot weather
6. Minor spill of groundwater from a pump at the BIP Containment Line
- Preventative measures in place
Presentation to the Botany
Chris Gray Chris Gray
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
Communications Programs Communications Programs
Cooks River Councils Education Program Cooks River Councils Education Program
Parramatta City Council CALD Environmental Parramatta City Council CALD Environmental Education Project Education Project
Various Stormwater Education Projects Various Stormwater Education Projects
ICI Ambassadors Program ICI Ambassadors Program
Botany Sands Aquifer Education Project Botany Sands Aquifer Education Project
Presentation to the Botany
StrategyStrategy
A series of logical steps A series of logical steps
Needs to establish evaluation factors as a Needs to establish evaluation factors as a
part of communications planning part of communications planning
Needs a rigorous plan.Needs a rigorous plan.
Developing a Communications Developing a Communications
StrategyStrategy
Step 1 Step 1 -- What is the challenge?What is the challenge?
Why do we even need a communications Why do we even need a communications
strategy?strategy?
If we do decide we need one, then what is its If we do decide we need one, then what is its
purpose. Should help to identify overall program purpose. Should help to identify overall program
messages. messages.
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
Step 2 Step 2 -- Who are the stakeholders?Who are the stakeholders?
Who are the people or groups who have an Who are the people or groups who have an
interest in this program?interest in this program?
Stakeholders do not necessarily have to Stakeholders do not necessarily have to
targets for communication. Just important to targets for communication. Just important to
recognise they have a stake in the program.recognise they have a stake in the program.
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
Step 3 Step 3 –– Who are our Target Groups?Who are our Target Groups?
Who do we really want to communicate Who do we really want to communicate
with? Not always necessarily local.with? Not always necessarily local.
List them all and then establish a priority List them all and then establish a priority
order linking back to the purpose of the order linking back to the purpose of the
communications programcommunications program
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
Step 4 Step 4 -- What are our objectives and What are our objectives and outcomes for each of the priority Target outcomes for each of the priority Target Groups ?Groups ?
Complete the following statement for each Complete the following statement for each group group ‘‘ This communication strategy will be This communication strategy will be a success for this group when a success for this group when
•• short term short term •• medium to long term medium to long term
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
Step 5 Step 5 -- What methods should we use?What methods should we use?
Draw a big box with the name of the Priority Draw a big box with the name of the Priority Target group in the middle of a sheet of paper. Target group in the middle of a sheet of paper. Then identify all the different ways/tools that group Then identify all the different ways/tools that group receives information.receives information.
Then prioritise these tools in terms of which tools Then prioritise these tools in terms of which tools are going to give you the best results in terms of are going to give you the best results in terms of objectives.objectives.
eg eg –– school studentsschool students
Presentation to the Botany
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
Step 6 Step 6 -- What budget do we have/need?What budget do we have/need?
Step 7 How will we put in place our Step 7 How will we put in place our
strategies? (Action Plans) strategies? (Action Plans) -- samplessamples
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
Step 8 Step 8 -- How will we monitor and evaluate How will we monitor and evaluate
the project?the project?
Where the Committee is at now.Where the Committee is at now.
How effective has the communication been How effective has the communication been
to date? What baseline data is available?to date? What baseline data is available?
Presentation to the Botany
A couple of ideas A couple of ideas
After School Teachers Network (Primary and After School Teachers Network (Primary and
Secondary) Secondary) –– a range of opportunities for Local a range of opportunities for Local
Area Study type activitiesArea Study type activities
Key Opinion Makers Forum Key Opinion Makers Forum
Two excellent opportunities to gather baseline Two excellent opportunities to gather baseline
knowledge data knowledge data
Who gets invited to a Key Opinion Makers Forum?Who gets invited to a Key Opinion Makers Forum?
Botany Groundwater Clean Up CLCBotany Groundwater Clean Up CLC
CouncillorsCouncillors
Members of Parliament Members of Parliament
Local school teachers and local Streamwatch groups or Local school teachers and local Streamwatch groups or other school based environment groupsother school based environment groups
Local environment groupsLocal environment groups
Industry and Industry Associations Industry and Industry Associations
Local media Local media
Scout and Guide leaders Scout and Guide leaders
Leaders of the CALD communities Leaders of the CALD communities
Scientific and Technical Community Scientific and Technical Community
Local Aboriginal Land Council representativesLocal Aboriginal Land Council representatives
Presentation to the Botany
Questions ?Questions ?
Chris Gray Chris Gray
02 9744 5252 or [email protected] 9744 5252 or [email protected]
DECCW update on regulation 08/12/09
CLC quarterly meeting 1
Groundwater Clean Up Project
Groundwater Community Liaison Committee
- Former Chlor Alkali Plant
compliance and related matters
CLC quarterly meeting 2
• Orica has submitted a draft VMP to DECCW for
review and DECCW is finalising comments.
• Content of VMP includes:
- Maintenance of hydraulic containment;
HHRA; and
4
Former Chlor Alkali Plant
• DECCW’s Contaminated Site Section has reviewed Orica’s scope of works to address mercury contamination and provided comments.
• We understand that Orica is in the process of
preparing a separate VMP for mercury. If approved by DECCW, the VMP will be the key regulatory instrument for the mercury clean up and management.
DECCW update on regulation 08/12/09
CLC quarterly meeting 3
• EPA currently processing a Notice which will vary EPL 2148:
- Align wording of EPL and CPWE project Approval;
- Amend timetable for CPWE works; and
- Add new PRP – implement options report related to discharge temperature.
• 2008/2009 Licence Annual Return submitted – 8 non- compliances.
6
Groundwater Injection and Recovery (GIR)
• Orica has written to DECCW presenting results of GIR trial to date and seeking extension of trial.
• DECCW reviewing report and considering request
for extension with a view to permitting full scale
works if trial results are satisfactory.
DECCW update on regulation 08/12/09
CLC quarterly meeting 4
• Change to the Deed of Cross Guarantee - DECCW
sought further advice on the shareholder transfer of Orica IC Assets in relation to EPL condition E7:
Financial Assurance.
• Orica’s advice states the Financial Assurance will be unaffected.
FCAP mercury investigations 08/12/09
8/12/2009
CLC Update
James Stening
– Render FCAP site suitable for industrial/commercial use
• Voluntary Management Proposal - aim to submit to DECCW this year
• Chris Jewell appointed as DECCW accredited Site Auditor
• URS engaged to prepare a Remediation Action Plan (RAP)
– Soil remediation plans, including treatment criteria
– Environmental controls, including mercury emission controls
– Environmental monitoring program
• Soil remediation currently scheduled for July 2010 for ~5 months
– Category 2 works – does not require an Environmental Assessment
• Orica will consult with the CLC, BIP employees, Denison Street
residents and railway operators as the project progresses
FCAP mercury investigations 08/12/09
Quarterly CLC Meeting
– To be established on Block L
– Limited plant availability
on site) – preliminary estimate
• Contaminated soil fractions - plan to
send to licensed landfill
• ~12,000 tonnes of contaminated
licensed landfill Source: highlandsremediation.com
Mitigation of mercury emissions
• Air emission modelling required to plan detailed design of remediation approach and emission control measures
• Mercury emission sources to be managed: - Fugitive emissions from soil washing plant - Excavated soil stockpile (at soil washing plant) - Contaminated soil fractions (at soil washing
plant) - Excavated surfaces
• Trials planned to determine approach to control emissions from excavated surfaces - Trials at areas excavated during concrete
cutting trials - Custom-made tarpaulins to be trialled to
capture vapour - Vapour might be directed to small stack with
activated carbon filters – licence change to be requested from DECCW
FCAP mercury investigations 08/12/09
Quarterly CLC Meeting
Further Groundwater Investigations
• Two new wells installed west of railway line • Additional offsite groundwater sampling to
further understand movement of mercury plume
• Geochemical analyses to better understand how groundwater conditions could be influencing the mobility of mercury