Two inTegraTed building designs

Integrated Design Process (IDP)

Ecobatys (FR)

Building Information Modeling (BIM)

The Green Build Hub (EN)

Page 2: Booklet two integrated building designs
Page 3: Booklet two integrated building designs

3

inTegraTed building design : The french and english

experience

Integrated Design Process (IDP) Ecobatys

Building Information Modeling (BIM)Green Build Hub

This project was achieved with the financial support of the European Commission (N°

4243 of the Interreg IVA Programme France (Channel) - England)

Page 4: Booklet two integrated building designs

4

Printed in France by Média Graphic - Rennes

Février 2015

Page 5: Booklet two integrated building designs

5

Contents

inTroducTion ..............................................................................6a french experience .....................................................................7Employment in the construction sector in FRANCE .............................. 8Current Building Legislation in France for sustainable construction and renovation with low environmental impact .................................. 9The gradual rise of environmental awareness ............................................................................... 9An increasingly demanding regulatory context ..........................................................................10Financial support to speed up the number of renovations ....................................................11Increasingly complex construction and renovation projects .................................................11What is the PCI method? ........................................................................ 12A global and collaborative approach ..............................................................................................12ECOBATYS Process from Design to Build ............................................. 14The Ecobatys project, a project in relation to the territory .....................................................14How the project unfolded : the collaborative workshops .......................................................16How IDP has changed our way of working on the Ecobatys ............. 19IDP, the view expressed by an architect : Sofia MELLAH .........................................................19

a briTish experience ..................................................................23Employment in The Construction Sector .............................................. 24Current Building Legislation in the UK shaping sustainable construction ............................................................................................. 25UK Legislation & Standards ................................................................................................................25Financing models & incentives ..........................................................................................................27What is BIM? ............................................................................................ 28BIM, a collaborative way of working ...............................................................................................29Green Build Hub Process from Conception to Build .......................... 30The original idea ......................................................................................................................................30Finding the team .....................................................................................................................................31The team start work ...............................................................................................................................32Signing the contract ..............................................................................................................................33How BIM has changed our way of working on the Green Build Hub ...

35BIM from a personal viewpoint as an Architect : Allison Tatterton .....................................36

le projeT libnaM....................................................................39crédiTs .....................................................................................40auTeurs ....................................................................................41

Page 6: Booklet two integrated building designs

6

As part of our work on the LIBNAM cross-Channel partnership, Pays de Fougères (France) and the Cornwall Sustainable Building Trust (CSBT) (England) shared their experiences of introducing a new design methodology for a commercial building.These new methods have been used to facilitate the development of the teams’ skills to enable the design of a high-performance building with low environmental impact, whilst also retaining maximum control over the cost of construction.

ECOBATYS will be a useful building for eco-building industry (design, construction and training centre). Five areas in the building will serve as an educational platform dedicated to eco-renovation, research and innovation, knowledge and expertise for

businesses, resources and educational resource trajectory dedicated to biodiversity.

The GREEN BUILD HUB (GBH) will be a ‘living laboratory’ where eco-building products will be installed, tested and monitored to produce objective and comprehensive performance data in a real building setting. The building will

serve as a distinctive training centre, and encourage inward investment by companies such as specialist green suppliers by enabling them to showcase and test innovative products within the building. This BREAAM ‘Outstanding’ building located at the Eden Project, Cornwall, England, tangibly demonstrates what can and is being done in Cornwall. GBH will act as a key resource of specialist green building knowledge, enhancing the region’s expertise. It will also become the office base for CSBT.

This booklet is made up of two main parts: the first part focuses on French experience and the second part the English one. Each explains the reasons that led to their choice and explores the two methods - the Integrated Design Process (IDP) and Building Information Modelling (BIM).

inTroducTion

Page 7: Booklet two integrated building designs

7

a french experience

Integrated Design Process (IDP)

Ecobatys

Page 8: Booklet two integrated building designs

8

In 2010, a total of 431,091 companies were actively engaged in the construction sector in France. As this graph shows, 58% have no employees and only 6% have more than 10 employees.

There are 599 companies operating in the construction industry, including both the construction and design sectors, in the Pays de Fougères. 48% have no employees and only 8% have more than 10 employees. With a higher rate than in Brittany or in France as a whole, 44% of the companies have between 1 and 9 employees. The area’s construction

industry is made up of 25 different business sectors and has only one general contracting business. In particular, this diversity stems from a culture of high independence among company managers in the construction industry and the fact that invitations to tender have historically been broken down into small lots.This historical reality complicates construction or renovation project management due to the number of stakeholders and responsibilities.

Sources: 2010 Build-up skills France, Analysis of the National Status Quo, Organising the

skills development of construction workers and construction trades

There are more medium-sized enterprises in the Pays de Fougères

Employment in the construction sector in FRANCEConstruction in France is dominated by small companies

Page 9: Booklet two integrated building designs

9

Current Building Legislation in France for sustai-nable construction and renovation with low envi-ronmental impact The gradual rise of environmental awareness

The Haute Qualité Environnementale [High Environmental Quality] (HQE®) approach started in the early 1990s to improve environmental quality within projects. The certification standards were made public in November 2001.When chosen by the client, this method allows solutions aimed at managing the environmental impacts of buildings as early as possible during the project. There are three components to this approach :

• Introducing an environmental management system for the project (EMS) to set the objectives and specify the roles of the various stakeholders,• Structuring the technical, architectural and financial response based on 14 targets. 3 “highly efficient” targets, 4 “efficient” ones, 7 “regulatory or standard practice” ones),• Setting performance indicators.

The 14 targets break down into 4 families :• Eco-construction targets,• Eco-management targets,• Comfort targets,• Health targets.

In October 2007, the Grenelle Environment Laws 1 and 2, France made an undertaking to take environmental factors into account in a more effective manner. The development of the «green growth industries” became a priority and among them the use of «bio-sourced materials».

The general objectives : • A fourfold reduction in greenhouse gases between 1990 and 2050,• A 38% reduction in energy consumption of the existing housing stock by 2020.

The accompanying Government measures: • The renovation and energy retrofits of 400,000 private residences per year between 2013 and 2020 and of the 800,000 social residences that consume most energy, by 2020,

Page 10: Booklet two integrated building designs

10Source : Bâtiment et démarche HQE®, ADEME

• Thermal regulation (RT 2012): average primary energy consumption of < 50 kWh/m2/year for new-build projects,• Use of wood and biomass in construction (décret bois et Label Bâtiment biosourcé [Wood and Bio-Sourced Building Standard] : Decree No. 2012---518 of 19/04/2012 and the Order of 19/12/2012),• Article 5 of the French Code on Public Procurement requires public purchasers to comply with the environmental quality of the building during construction stages.

Regulation Advances Energy consumption inkWhep/m²

RT 2020 Positive energy buildings BEPOS

RT 2012Residential and commercial building

Performance obligation,Renewable energy for the generation of clean hot water Air permeability of less than 0.6 m3/h/m2 in individual houses

RT 2005Construction and extension

SafeguardsInsulation, heating, hot water, ventilation, lighting

RT 2000Residential or accessory building

Thermal characteristics of the insulation, heating and hot water requirementsRequirements relating to comfort in summertime

RT 1988Residential and commercial building

EMinimum performance requirements for the building envelope and systems

RT 1974Residential building Total level of heat loss (G)

5020

025

028

047

0

An increasingly demanding regulatory context

Following the first oil crisis in 1973, France approved the first thermal regulation (RT) to reduce household energy bills. It was reassessed four times, gradually tightening restrictions on the energy consumption of new buildings.

Page 11: Booklet two integrated building designs

11

Financial support to speed up the number of renovations

For several years now, there has been some financial support available in France aimed at meeting the energy commitments on a worldwide, European and, of course, national level. The criteria change is very often in thermal renovation work (insulation, equipment, etc.) ; there are six to date :

• Tax credits,• Reduced-rate VAT,• Zero interest eco-loans,• Grants from the ANAH [French National Housing Agency],• The energy efficiency benefit,• Energy saving certificates.

All this financial support is granted to the client, subject to compliance with minimum performance requirements for equipment and materials.

There are currently two regulations in force governing the renovation of existing residential and commercial buildings :

• The «overall thermal» regulation for buildings with a net floor area exceeding 1000 m²,• The «item by item thermal» regulation for buildings with a net floor area inferior to 1000 m².

Increasingly complex construction and renovation projects

The Grenelle environment initiative quickly brought about developments in energy requirements for both new builds and renovations, although many other regulations were also developed at the same time. The Law of 11 February 2005 provided for obligations in terms of access to all types of disabilities. As for seismic regulations, they evolved with the decrees and order of 22 October 2010.These increasingly demanding regulations and dedicated standards, along with the demand from customers for environmentally-friendly products and technological innovations associated with research in these fields are among the many factors that have had an influence on the complexity of construction projects.Numerous studies have been carried out in France in relation to these developments and have had an impact on sectors of activity, in particular the construction industry. One of these studies, entitled “Construction activity

Page 12: Booklet two integrated building designs

12

What is the PCI method?A global and collaborative approachThe Integrated Design Process is a design methodology for a building project based on collaboration which was developed in Canada. The linear method, which is usually used on public projects, breaks down and separates the issues into successive stages. During these stages, the various trades use their expertise, supervised by the architect. This type of project management does not allow for technical choices to be re-examined easily, or makes it much more costly to do so. As with this approach, the IDP method aims to be global – it brings together the entire design team at key points during the project. The characteristics of the integrated design process are as follows :

• It is guided by clear objectives that have been defined with all project stakeholders during the first workshop,• It requires a facilitator who takes responsibility for the effective functioning of the process : for the Ecobatys project the facilitator was WIGWAM,• The process is structured (reporting and monitoring),• Decision making is clear and precise, supported by collective analysis,• Each stakeholder – the client, users, architect, the structural engineers, etc. makes a key contribution to the design,

in Brittany faced with the challenges of the Grenelle environment issues in terms of market, employment and training, Forecast of developments by 2015”, conducted by the Cellule Economique de Bretagne [Breton Economic Division] in July 2009, looked at this matter. The study pointed two types of developments: behavioural developments (working together, working in a network, self-monitoring, etc.) and technical developments (processes, systems, materials and innovative and environmentally-friendly techniques and technologies). Likewise, as part of its « BBC pour tous experiment [Low-energy housing for all] » experiment between 2008 and 2013, Rennes Métropole [Rennes urban community] reached the same conclusion, focusing on difficulties associated with working methods: «More than the technical solutions, the working methods employed throughout the construction chain must be re-examined in order to allow widespread low-energy housing at affordable costs.». Source: Technical report no. 1 accompanying the «BBC pour tous» initiative led by Rennes Métropole, November 2013, updated January 2014.

Page 13: Booklet two integrated building designs

13

• It is a collective process,• The project is thought out as a whole and across its various aspects – it is a systemic process,• The budget is managed for the project as a whole,• The process is iterative, making it possible to go into further and further detail,• It allows the use of non-traditional skills : users, maintenance operators, etc.

Source : Guide sur le processus de conception intégré [Guide to the integrated design process], by Alex

Zimmerman, T.S.Sc.A.

WIGWAM, Marika FRENETTE, managers of the IDP methodOriginally from QUEBEC, Marika Frenette settled in France following her architecture. She then sought to better understand the overall context of green building and how it is changing architectural design. She did her research on an international scale. Familiar with the French context, she was also interested in the German approach as well as Scandinavian, American and finally the Japanese approach. It was in her native country that she discovered an adaptation to architecture with the Integrated Design Process (IDP) previously used in the aviation industry.She then distinguished two large categories of issues : one related to the products and the other related to the process i.e. to the methods :

AMO

Programmiste

Architecte

Économiste

Structure

Thermique

Fluide

Paysagiste

BE contrôle

Maitre d’ouvrage

Traditionnel

Architecte

Économiste

Structure

Thermique

BE fluide

Paysagiste

Contrôle et SPS

Usagers AMO

Programmiste

Maitre d’ouvrage

Usagers

PCI

projet

Page 14: Booklet two integrated building designs

14

ECOBATYS Process from Design to BuildThe Ecobatys project, a project in relation to the territory

This project is the result of a long territorial process combining technical expertise (studies), effective ownership by the professional stakeholders and political involment to support the economic development of the Pays de Fougères and the evolving needs of building companies. This regional project has held a quality label Pôle d’Excellence Rurale [Centre of Rural Excellence] in 2012, the building will comprise five areas :

• An educational platform dedicated to eco-renovation to provide training and adapt the skills of the sector’s stakeholders and, therefore, increase their competitiveness and performance.• A «Research and Innovation» area to encourage engineering and local research through interaction between materials and health.• A knowledge and expertise area for businesses to exchange and showcase the knowledge and expertise of business groups by developing business networks and public-private partnerships to promote entrepreneurship and innovation among SMEs in the construction industry, etc.• A resources area to disseminate the knowledge gained through exchanging of information, experiences, results and good practices. • A learning path dedicated to biodiversity and the sustainable management of green spaces in order to allow future designers to apply the new environmentally-friendly design and management

• The first can be summarized as follows: an environmentally efficient building is a set of products themselves performing together.• The second, which is found in the High Environmental Quality (HQE ©) and its Environmental Management System (SME ©) is interested in the working method and design.

Her path then crossed with Alex Zimmerman and Bill Reed and these meetings strengthened her conviction that an effective construction project is primarily a social, cultural, environmental and eventually financial system, new for each project. Indeed, the team (project owner, user, designer, and builder) is never the same and therefore the design and construction criteria are different. Since she created her company WIGWAM in 2007 she has sought to relate/combine technical expertise and collaborative design methods through IDP.

Page 15: Booklet two integrated building designs

15

techniques. The aim is to conserve and enhance local biodiversity in the areas concerned.

This new system offers several benefits :• The companies will be able to use it as a showroom for their eco-building products, It promotes businesses that engage in the process, in a practical and physical manner.• It welcomes both private and public clients, to guide them towards highly efficient eco-construction projects.• It reinforces and completes both initial and ongoing training of employees, who require specific training throughout their careers.• It is a unique learning environment (for the companies involved, and schools, etc.).

Presentation of the team involved in the IDPA territorial project which is led by Pays de Fougères. The client for Ecobatys building is the municipality communities Coglais Marches de Bretagne.

Preparation Design Building Use

Programme Concept Développement Technical matters

ACT ESQ APS APD PRO ACT EXE OPC VISA DET AOR Use

Works contract 12 lots

Contract on project managementAgent : Atelier Loyer ArchitectesQuantity surveyor & Building engineers : Ingénierie AssociésStructural Engineering : ETSBFluid Engineering Department : ThalemGround Study Office : Sol explorer

Client – Coglais Communauté Marches de Bretagne

Agent : WIGWAM Conseil : Environmental design officeThermal and Fluid Engineering – Renewable Energy : Airéo EnergiesProgramming team : AMOFI LOT N°1 Service infrastructure / Excavation works - CF

CONSTRUCTIONLOT N°2 Carpentry / Timber frame / Straw/ Cladding – DAR-RAS SARLLOT N°3 Sealing/Roofing - FOGERAISE ETANCHEITE LOT N°4 Timber external joinery – LCQVCLOT N°5 Locksmith company – METAL PERFORMANCELOT N°6 Partitions / Linings /ceilings - SAS VEILLELOT N°7 Internal joinery – BINOISLOT N°8 Floor covering – Faïence – LEBLOIS LOT N°9 Wall painting – LE COUP DE MAIN PINTOLOT N°10 ElectricityLOT N°11 Heating / Ventilation/ Sanitory plumbing – GUERINLOT N°12 PV panels – SARL CHRISTO ERNERGIE

Public contract on intellectual services: MANAGEMENT ASSISTANCE : PARTICIPATORY APPROACH TO REFLECTION AND DESIGN

IDPOpen forum

Page 16: Booklet two integrated building designs

16

Collaborative Design Workshop 1: 19 and 20 February 2013This first meeting brought together the client, the assistants to the client and, lastly, the project management team. Companies could not be integrated at that stage because of public procurement.The aim of this first meeting was to generate a feeling of cooperation and team spirit for the project. Therefore, the first morning was spent going over the Ecobatys project and the challenges it faced. This was followed by the statement of shared objectives that were approved by all parties in the afternoon. Initially working in small groups allowed everyone to work on a common vision of green building. Sub-groups then worked on the nine families of environmental and social criteria. Whenever possible, these objectives should be broken down into measurable and verifiable quantitative criteria (means of verification to be defined), not only throughout the design stage but also during operating stages.

1 Energy management2 Water management3 Materials and resources4 Dumping/emissions/waste5 Sustainable mobility

6 Outdoor environmental quality7 Indoor environmental quality8 Quality of use9 Culture and communal life

On the second day, the groups worked through collaborative methods in well-coordinated teams (assistant to project manager, client, project manager, MOE, users). The architects drawings and synthesis skills were essential during this stage. 3 scenarios were developed based on the

advantages and constraints of the site: microclimate, circulation, links to neighbouring buildings, space densification and finally biodiversity.At the end of the second day, the three scenarios were analysed by various experts (quantity surveyor, heating engineer, environmental

How the project unfolded : the collaborative workshops

Page 17: Booklet two integrated building designs

17

Collaborative Design Workshop 2: 13 and 14 March 2013After some short group work sessions on materials, texture and atmosphere, the different sub-groups developed three scenarios, both in terms of volume and space.This time the analytical work of the various experts deepened interest and provided areas to review for each scenario on the use, circulation, thermal and the overall. This time, the analytical work of the various experts allowed an in-depth investigation to be conducting into interesting issues and points to be re-examined for each scenario concerning use, circulation, heat and the overall economics of the project.In-depth work in sub-groups made it possible to produce a detailed report on the envelope of the building, the educational models and, lastly, on biodiversity.This second workshop ended with tasks and studies to be carried out for the next meeting, in particular the scenario to be chosen by the client: the Communal Council of Coglais.The analysis of the different scenarios was resumed between workshop 2 and 3 by the project manager to allow the elected officials of Coglais Municipalities Community Council to validate them according to the following criteria: compliance with the tender and with the budget.

assistant to project manager). They used technical and economic criteria.This first workshop ended with tasks and studies to be carried out for the next meeting.

Page 18: Booklet two integrated building designs

18

Collaborative Design Workshop 3: 2 April 2013The client validated the third scenario; therefore, this third workshop was focused on the analysis of the building details with specialists in the first group (architect, thermal and structural engineers, quantity surveyor, users).A second group looked at biodiversity while a third one refined the educational tools, in particular to define the aesthetics of the furniture

on which they would rest. At this stage, the project management team could prepare the next phase: the project studies [PRO] and the drafting of the Business Consulting Records (DCE).By late afternoon about ten users of the future platform came «to express their point of view.

Collaborative Design Workshop 4: 12 June 2013On the agenda: In-depth exploration of the issue of structure and fluids The whole project team (Elected officials ,assistants to project managers, project managers) to make a decision on the heating system for the project :

• Despite the distribution of natural gas in the area, the other passive spaces will be heated by means of a pellet boiler equipped with radiant heaters. The double flow ventilation is coupled to the boiler

Page 19: Booklet two integrated building designs

19

“The occupation of architect is difficult and dangerous for the architect himself or herself, but mostly for the others. I would not make any project without having in mind a strong and clear message of responsibility that is not only aesthetic but also moral.” Renzo Piano, Disobedience of the architect, Editions Arléa, 2007 p106Renzo Piano’s words clearly find an echo in me. Architecture is a public concern. The architect is certainly responsible by law and in practice but he/she is not the only one. Sponsors, project managers must not shirk their responsibilities as they sometimes tend to forget that architecture is a co-production.To build is a commitment but also to commission a construction.Some project owners have understood this and among them Coglais Communauté with which our firm is currently working on the ECOBATYS project. It took Coglais Communauté more than three years to succeed in convincing and finding funds for the ECOBATYS project, an eco-construction performance centre.Integrated Design Process is an emerging practice in the design stage of a building project. The principle is to bring together all the key stakeholders of the project to create a different context in which they become a team. The idea is to reverse the current work habits where the architect first designs the shape of the building in which various stakeholders come next with their constraints to be “crammed”.

How IDP has changed our way of working on the EcobatysIDP, the view expressed by an architect : Sofia MELLAH

through the hot water coil,• The airlock space devoted to the «process/phenomena models» will not be heated first, branch connections are provided for heating via radiant heaters,• The space devoted to the full scale model will be unheated and uninsulated initially (except the floor) but designed to be heated and insulated in the long term.

The final details for the air tightness are discussed, on the roof the vapour barrier will be positioned on the steel deck and glued to the insulation material.This session ended with the vision of the building in 10 years.

Page 20: Booklet two integrated building designs

20

For ECOBATYS, six days of workshops were organized to bring together all stakeholders to connect all different skills so that every decision had the largest positive impact on other areas of the project.

The philosophy of this method relies on the collaborative environment that is put forward and on the goals the team has set and has to comply with in designing the project. The whole process is conducted by an independent professional named “facilitator”, who guides the work team and acts as a catalyst to get the best from each stakeholder. Also it seems important to point out that, in terms of sustainability, this practice can optimize a large number of factors that are found in a sustainable building project. For achieved projects, the benefits linked to this type of design process are significant ; they make it possible to generate savings on the total cost of the project, to make coordination of the project easier, to create synergies and much more.I think this working method broadens the stakeholders’ vision of the project by directly confronting their ideas, knowledge and perspectives that are all different approaches to the same building. This method also allows transparency between the project owner and the project manager. Some projects are praised for their architectural quality, others are outstanding by their achievements or by the dialogue the two key stakeholders - project owner and project manager - were able to establish. Dialogue improves working conditions for everyone.We have to bear in mind that what is built today has a lifespan of 50 to 100 years. As for our society, there is no planned obsolescence for architecture. Time dedicated to design compared to other stages is paramount. Time devoted to create is a valuable and important time in our practice. Such temporality allows us to step back and take a long and overall view. This time should be protected from daily emergencies in order to preserve the quality of the project. The IDP method is probably the tool to find the temporality that is too often ignored.I must admit that I was somewhat reluctant, curious and full of apprehension about the design process in the ECOBATYS project. But after six workshops, I realized that a collective practice of architecture does not prevent the expression of individual talent, as demonstrated by many disciplines and, that work sharing and expertise networking create wealth and inventiveness.Through this process the client allowed us to take the time for creation, which was crucial at the school of architecture but has become rarer and more valuable in our professional practice.

Page 21: Booklet two integrated building designs

21

Also this approach which was formalized in our contracts, further reinforced ties with the project owner. It made them feel included in the design process and they became aware of the ability of the architect to summarize all the constraints and turn them into assets.Users also felt they had a role to play. They are not often called upon and too often left aside in the development of the programme. Their opinion is too often neglected.

Finally, as stated by Philippe Madec1, I would just add, that we must “be attentive to natural resources and to the environmental quality of materials, integrate human and physical local resources, involve users in the design process, design shapes favouring energy saving, think about the users’ health and quality of life. These are five of the terms in an environment friendly project that change the architectural and planning project, as well as our views on built heritage.”Philippe Madec. The environment friendly ambition. Speech at the 2012 European Symposium “Urban ambitions” organized by the National Society of Architects for French listed buildings, Lyon, 8 Oct. 2012

Page 22: Booklet two integrated building designs

22

noTes

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

Page 23: Booklet two integrated building designs

23

Building Information Modeling (BIM)

a briTish experience

The Green Build Hub

Page 24: Booklet two integrated building designs

24

Employment in The Construction SectorThere were 2.12 million jobs in the construction industry in quarter four of 2013, 6.5% of the national total. There are approximately 212,000 people employed in the construction and real estate sectors in Cornwall and the Isles of Scilly; this equates to 8.6% of those in employment. The Government’s Construction 2025 strategy predicts that the global construction sector will see 70% growth by 2025.

The European Union Structural & Investment Fund and Local Growth Fund investments provide opportunities for the construction sector in Cornwall and the Isles of Scilly. Whilst performance of the construction sector will always be linked to the performance of local and national economies. Every £1 invested in construction activity generates at least £2 ‘spending power’ through wages and profits, spending with suppliers and so forth. This figure rises to well over £3 per £1 invested for housing activity specifically.This can best be realised through the use of local companies, who, in addition will invest in more local jobs and training, in turn leading to more sustainable local growth.A high level of self-employment presents its own set of challenges. The industry is traditionally very fragmented and high levels of sub-contracting mean that working relationships are dependent upon contract success and reputation, however, this can represent a strength as well as a challenge.Source : http://www.cornwallandislesofscillylep.com/assets/file/LEP%20construction%20strategy%20FINAL.pdf

Page 25: Booklet two integrated building designs

25

Current Building Legislation in the UK shaping sus-tainable constructionUK Legislation & Standards

There are several drivers shaping sustainable construction in the UK today. These are: the Climate Change Act 2008; the Energy Act 2011; UK Building regulations; and discretionary standards including the Code for Sustainable Homes; the Zero Carbon policy; and AECB (Association for Environmentally Conscious Builders) Silver standard.

Climate Change Act 2008The 2008 Climate Change Act introduces the world’s first long term legally binding framework to tackle the dangers of climate change. The Act creates a new approach to managing and responding to climate change. The key targets of the Act are a 20% reduction in carbon by 2020 ; and an 80% reduction by 2050.

Energy Act 2011The 2011 Energy Act has three principal objectives: tackling barriers to investment in energy efficiency; enhancing energy security; and enabling investment in low carbon energy supplies. The flagship policy in the bill is the ‘Green Deal’, a scheme through which householders, private landlords and businesses are given finance upfront to make energy efficiency improvements, which is then paid for by energy bill savings. It also introduces a range of other provisions including the roll-out of smart meters.

Building Regulations Part L : Conservation of Fuel & PowerPart L sets the energy efficiency standards required by Building Regulations. It controls the insulation values of building elements, the allowable area of windows, doors and other openings, air permeability of the structure, the heating efficiency of boilers and the insulation and controls for heating appliances and systems together with hot water storage and lighting efficiency. It also sets out the requirements for SAP (Standard Assessment Procedure) calculations and carbon emission targets for dwellings.

Page 26: Booklet two integrated building designs

26

Fabric U values – comparison of UK Building Regulations with Passivhaus

Element 2006 2010 2013 PassivhausRoof 0.25 0.2 0.2 0.15Wall 0.35 0.3 0.3 0.15Floor 0.25 0.25 0.25 0.15Window 2.2 2 2 0.8Air permeability 10 10 10 0.6

Standards : Code for Sustainable HomesThe Code for Sustainable Homes is the current national standard for the sustainable design and construction of new homes. The Code is not a mandatory standard, but aims to promote higher standards of sustainable design above the current minimum set out by the building regulations.So far 100,000 new homes have been rated under the Code. In 2015 housing design standards are under review and it is anticipated that the Code will be replaced with a new standard in the near future.

Standards : Zero CarbonIn 2006, the UK Government set the target for all new housing to be Zero Carbon by 2016. The implementation of this target has been subject to debate, in particular the fact that some elements of energy consumption can be off-set through a variety of on-site and off-site mitigation measures, known as ‘allowable solutions’. There are three core requirements which must all be met for a home to qualify as zero carbon :

•The fabric performance must, at a minimum, comply with the defined standard known as the Fabric Energy Efficiency Standard (FEES),• Any CO2 emissions that remain after consideration of heating, cooling, fixed lighting and ventilation, must be less than or equal to the Carbon Compliance limit established for zero carbon homes, • Any remaining CO2 emissions, from regulated energy sources (after requirements 1 and 2 have been met), must be reduced to zero.

Sources : Zero Carbon Policy : http://www.zerocarbonhub.org/zero-carbon-policy/zero-carbon-policy

Page 27: Booklet two integrated building designs

27

Standards : AECB ‘Silver’ (Association of environmentally conscious builders)The AECB Silver Standard is aimed at those wishing to create high-performance buildings using widely available technology at little or no extra cost.

Financing models & incentives

Type Funding CoversIncome Feed In Tariff (FiT) Renewable electricity

Renewable Heat Incentive (Rhi) Renewable heat

Loans Green Deal Energy efficiency / renewables

Mortgages Energy efficiency

Grants Energy Company Obliga-tion (ECO) Energy efficiency

Other Reduced rate VAT (5%) Energy efficiency

Energy Performance Certificate (EPC)An EPC is required for any house sale or letting. It provides a list of things the property owner can do to improve energy efficiency. It outlines the typical savings per year and the potential performance ratings after the improvements have been made. The improvements are divided into ‘lower cost measures’ of up to £500 and ‘higher cost measures’ for larger amounts. The EPC rates a building’s performance in terms of: energy use per square metre of floor area, energy efficiency based on fuel costs and environmental impact based on carbon dioxide (CO2) emissions. This provides an energy efficiency and environmental impact (CO2) rating from A (good)

Source : http://www.greendealenergysolution.co.uk/about-energy-performance-certificates/

Page 28: Booklet two integrated building designs

28

Hoare Lea managers of the BIM methodBuilding Information Modelling has rapidly come to the forefront of building design over the past few years, and Hoare Lea have been actively using, developing and supporting this process since 2009. We’ve previously had a long history of using 3D Modelling, a key element of BIM, both for 3D coordination and within our specialist groups.As of April 2013, we have fully collaborative BIM projects in all of our UK offices either live or completed. Industry sectors include healthcare, education, defence, sports and residential. We have the capability to deliver

What is BIM?Building Information Modelling (BIM) is a collaborative way of working, underpinned by the digital technologies which unlock more efficient methods of designing, creating and maintaining our assets. BIM embeds key product and asset data and a three-dimensional computer model that can be used for effective management of information throughout a project lifecycle – from earliest concept through to operation.BIM processes are mainstream to both new buildings/infrastructure and have further potential in retrofit and refurbishment projects when complementary workflows such as laser scanning and rapid energy analysis are employed. BIM technology should be seen as a collaboration between the construction sector and the software industries, and creates an environment in which there are opportunities and synergies for both.

to G (poor). From 2018, energy efficiency standards in the private rented sector will be increased and it will become illegal for a landlord to let a property with an EPC rating of F or G.

Page 29: Booklet two integrated building designs

29

BIM on projects of any size, sector or location.Hoare Lea considers BIM to be more about process than about a particular technology. We believe in adopting a flexible and pragmatic approach to BIM implementation that considers the current BIM capabilities of the entire design team and fully considers how each stakeholder expects to benefit from employing a BIM process. We will bring our experience, knowledge and passion for BIM to the table and are able to both advise and challenge the wider team in respect to Mechanical, Electrical and Plumbing (MEP) requirements within a BIM process.

BIM, a collaborative way of working

Beginning with the Architect model, we work through by adding in all mechanical and electrical (M&E) relevant information and the intelligent calculations within the software which generates the schedule. An advantage to the industry of using BIM is that if a change is made to a parametric value, for example flow rate, within the model it will update the model and all associated items and in turn changes the schedule. This alters the changes in the plan and the sections or elevations as well, which in CAD would be a lengthy task to produce the drawings. This is more efficient and time saving as you do not need to reschedule and redo calculations.You can also export Revit model to Navisworks, which is another software package, allowing better navigation around the model. This also allows

Page 30: Booklet two integrated building designs

30

clash detection to aid co-ordination with all the different parametric information from each party of the design team. It will produce a schedule of clashes which when clicked will take you to the location in the model where the clash has occurred and highlight it in red for you.

BIM can export a file format to produce the information to populate rooms in Relux, which is an application we use to calculate the levels of artificial light required in a room.

BIM can produce many different visualisations for co-ordination purposes.Traditionally, the design, procurement and construction stages have been segregated and input into the process is fragmented throughout.

BIM is evolving the way a building is designed, creating a more collaborative process. The model enables the team to manage information more effectively at each stage and to ensure smooth transition between different stages as the level of detail and complexity develops.

Green Build Hub Process from Conception to Build

The original idea

Cornwall Sustainable Building Trust (CSBT) worked on the original conceptual drawings with an architect from ID+EA, Gareth Jones. The original idea was generated by the shape of the site offered to us by the Eden Project. Paul Bright, Chief Executive Office (CEO) of CSBT and Gareth Jones, sat down and talked about the shape of the building and the vision for its future use. It was at this stage that the idea of having removable panels to trial and monitor new and exciting products in sustainable construction was first thought about.

Page 31: Booklet two integrated building designs

31

CSBT has worked hard to achieve the funding necessary to build the Green Build Hub. The Hub is a building for professionals to see the latest in low impact materials and techniques, and act as a resource for the existing construction sector in Cornwall to learn the skills necessary to exploit the emerging

market for energy efficient retrofit on existing housing stock.

Finding the team

We then looked for collaborators to join us on this adventure. The first people to show an interest in the building were Ward Williams Associates and Ocean Group (a local social housing provider who have a building company as part of their Group – Gilbert and Goode). These companies gave their time to us to develop the conceptual design to RIBA Stage C, and to obtain planning permission. Most of this time was given freely, as they were interested in the concept and wanted to see the building, and the opportunities it presented for the construction sector in Cornwall, come to fruition.

Page 32: Booklet two integrated building designs

32

The team start work

At this stage we then put out a tender, which is a request for specialists to put forward a costed summary of how they could deliver our specific proposal ; in this case it was for our specialist consultants to manage the development. This would involve project management, of the whole design and build process, to include health and safety (CDM), Building Research Establishment Environmental Assessment Method (BREEAM) and quantity surveyors (QS). The contract was awarded to Ward Williams Associates (WWA). They then took the project to RIBA Stage D. The software used at this stage was 2D CAD. At this time we were still awaiting a funding decision from the European Regional Development Fund (ERDF) and we

were trying to secure matched funding though our bank – Triodos Bank plc. WWA started on the project uncertain of whether the money to pay their fees would be forthcoming. When funding was secured, WWA issued a tender for main contractor for the design and build contract, which was awarded to Gilbert & Goode in conjunction with the local architects PBWC, who would take the project to detailed design. The tender began with a 12 week detailed design phase, at this stage the design team agreed to use Buildings Information Modelling (BIM) to take the project forward. The design team consisted of WWA, the architects PBWC, the structural engineers CDEC and mechanical and electrical engineers Hoare Lea Ltd, the main contractor and the client.At the end of the detailed design phase, the main contractors then asked sub- contractors to cost different work packages as sub contracts for each part of the build.

Page 33: Booklet two integrated building designs

33

St ra teg i c Defi nition

Preparation and Brief

Concept Design

Developed Design

Technical Design

Construction Handover and Close

Out

In Use

0 1 3 4 5 6 7A & B C D E & F G H J & K L

Design and Build tender1 Project manager and Quantity surveyor1 BREEAM Assessor1 CDM Coordinator 1 Consultant engineers : Hoare leaMechanical/electrical and structural and thermal engineers

Ward Williams Associates

Ocean Service

2 D drawing 1 plan designer

Program and grant fi le

Project management Design and build tender

Gilbert & Goode : Main contractor

RoofWallsWidowsEtc.,

SubcontractorsArchitect : PBWC

3 D drawing and BIM conversion

The Architect ID+EA

The green line begins when you start working with the par-tner and stop when they are no longer working

COLLABORATION PROPOSAL

Green writing is the name of the tenderOrange the name of the companie

On the Green Build Hub we have decided to use NEC3 (New Engineering Contract) contracts throughout the project. NEC3 is a new contract which focusses on collaboration, goodwill and trust. CSBT secured further funding to seek expert advice and training on the NEC3 contract for the collaborators on the Green Build Hub.The NEC contract formalises the requirement for good practice project management systems to help project teams understand the time and cost status throughout the lifecycle of the project. It is intended to provide mechanisms for contractors and project managers to work collaboratively, and is designed to contribute to the effectiveness of the management of the work and the understanding between the two parties. NEC contracts are founded on a number of key principles, which include:

1. Foresight applied collaboratively mitigates problems and shrinks risk2. A regularly accepted programme allows the parties to understand where they are and assess future progress and change. It also avoids the inevitable arguments over disruption that would be brought about with retrospective assessments

Signing the contract

Page 34: Booklet two integrated building designs

34

3. Provides a prescriptive process for assessing change, for example - compensation events, of which there is a strict series of processes to follow. These result in a contractual conclusion, with the event being “implemented” and not liable for subsequent change from either party4. The processes within the contract rely upon the fact that an up-to-date and realistic programme maintained by the contractor is used in joint decision-making between the two parties.

Within the contract there are two key players from the employer’s side of the fence. The Project Manager is the named person within Contract Data

part 1 who will administer the contract on behalf of the employer and is the designated authority to issue all instructions, notifications and other communications required under the contract. The sole responsibility of the Supervisor is to check for compliance to the Works Information (basically to check for defects, and is independent of the Project Manager). The Supervisor on the Green Build Hub is a member of the CSBT staff.

Page 35: Booklet two integrated building designs

35

How BIM has changed our way of working on the Green Build Hub

“BIM is the first truly global digital construction technology in common with all innovation this presents both risk and opportunity. The UK programme based on the BIS (Department of Business, Innovation and Skills).BIM Strategy is currently the most ambitious and advanced centrally driven programme in the world. In taking on the role it will greatly enhance the global image of UK designers, contractors and product manufactures which in turn will translate into winning new work, growth opportunities and increased employment. The comprehensive scope and integrated structure of the current UK programme is also an ideal platform on which to take BIM to the next logical level and aim for a fully integrated BIM - which will bring untold benefits.

Patrick MacLeamy - Chief Executive Officer of HOK Y Quoted in the HM Government’s “Industrial strategy : government and industry in partnership- Building Information Modelling” 2012One key competitive advantage of BIM is its ability to promote greater transparency and collaboration between suppliers and thereby reduce waste (procurement, process and material) through all levels of the supply chain. A key driver of the rapid adoption of BIM by clients and industry is that the benefits it creates are shared by the client and the entire supply chain – with downstream benefits to customers who make use of built assets and to society at large.

Page 36: Booklet two integrated building designs

36

I see BIM as having two parts to it, the actual Building Information Modelling and the sharing and integrated use of the information.There is no doubt that computers and software have advanced so significantly that they enable us to visualise and represent buildings quite rapidly in three dimensions. This is very useful both as a tool to verify the form and massing and to determine how a proposed building sits within its context. This can then be used to communicate ideas to the client, planners and other professionals involved in a project. I have worked in a couple of practices in Cornwall that consider using BIM for all sizes and complexity of project when a practice has made the significant investment, both financially and in staff training into the computers and 3D software (primarily Revit and ArchiCAD). They then want to maximise the use of these skills and capabilities. The benefits for a large, complex project are clear, but even with individual houses there are still benefits. The use of the 3D model allows a greater level of accuracy when producing 3D contextual views. Materials can be modelled and interchanged to give option studies, that help with pricing (cost is usually very significant on small scale projects). Clients, planners, consultants and builders can all get a clearer understanding of the project involved, so even if the model is not shared, or used beyond producing co-ordinated information for statutory approvals, pricing and construction drawings, there is still a benefit. The documents produced can of course be used to showcase the skills of the practice and the images taken directly to be used for marketing purposes, websites, seminars, etc.The second part, the use of integrated information and sharing the model across the design team, and then for use by the FM team post occupation, has been used for many years in the profession. There is no doubt that it is now much more powerful and has the ability to provide more information about actual building materials and components, across all levels. When I worked on Bluewater in Kent (at the time, it was the largest shopping centre in Europe), we shared project documents and drawings across the entire team (several hundred people involved) on a bespoke project database that allowed the sharing of files to ensure we were using the most up to date information for co-ordination. There were strict protocols in place for commenting and giving each document a status. The process was so lengthy that document control provided a full time job for two people

BIM from a personal viewpoint as an Architect : Allison Tatterton

Page 37: Booklet two integrated building designs

37

in just our one architecture practice. These processes have now been simplified and are much faster and more readily accessible, although I do feel there are some grey areas with the sharing of information (copyright, responsibility, ease of un-authorised change and potential sabotage) that require a degree of trust that is unusual in this litigious world.As an architect originally trained on a drawing board, I still think with a pencil in my hand. I have been through a phase where CAD drawings were the common representation of what was in the architect’s head, although they were often prepared by other specialist CAD draftsmen. A small change had to be followed up across a number of separate drawings, with a high risk of anomalies. As team leader, I often felt detached from the drawing process and spent large amounts of time checking the work of others to ensure it was co-ordinated. Now, the move to modelling in 3D in a sense takes away the middleman, and puts the architect back in control. Yes there are still often various team members involved, with differing skills and experience. But the days of drawing lines that don’t actually represent anything (a common trait among trainee architects I have found) are gone. The software prompts for quite a large degree of information from an early stage, so even if you don’t know what the walls are made of at concept stage, the prompt is there that discourages an un-achievable 200mm thick external wall that causes setting out issues further down the line. The freedom to come up with unusual or daring designs is still there, but for the majority of buildings, the software available is of huge benefit to be embraced.

Page 38: Booklet two integrated building designs

38

noTes

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

......................................................

Page 39: Booklet two integrated building designs

39

le projeT libnaMWhat is the LIBNAM project about?The LIBNAM project (Low Impact Building using NAtural Materials) is a Franco-British project. Its ambition is to help the building sector to be prepared for the future thermal regulations 2020 (in France) and 2016 (in the UK). It focuses on promoting the use of natural materials in an energy efficient building (low-impact buildings, passive or positive energy buildings).

Duration of the projectThe period of achievement of the «LIBNAM tools» started on January 1, 2012 and ended on March 31, 2015.

Outputs

Theme 1 «Change management support» themeChange practices towards more green building practices ;

• This booklet with the IDP and BIM methods,• The booklet : “Experience feedback on eco-construction building sites“,• The “supporting methods for building professionals” booklet,• Study visits in France and in Great-Britain,• “Feedback on practices” workshops.

Theme 2 «innovate with natural materials»Promote natural materials in construction

• Support the establishment of two paired resource centers specialized in eco-construction, in Britain and France,• Organise 20 technical demonstrations on natural materials with drafting of technical and educational sheets,• Conduct an inventory on local production sectors of non-industrial materials such as earth, straw and hemp,• Prepare an economic feasibility study for the establishment of an innovation center on the earth material.

Page 40: Booklet two integrated building designs

40

Warning :The content of this publication does not necessarily reflect the opinion or position of the European Commission.The information collected and presented in this booklet were provided by interviewees who certified their accuracy. This information is therefore of their responsibility and should in no way commit the authors of this study.

Copyright : Franco-British Collective LIBNAM project -French and English experience on two design methods for a commercial building - 2014/2015. Copyleft : This work may be used and disseminated under the terms of the Art Libre License http://artlibre.org

crédiTs

Couverture : Illustration © Servane Guihaire - études ET chantiersPage 4 : Ecobatys - Image de synthèse © Atelier Loyer Architectes, Green Build Hub - Image de synthèse © ID+EAPage 5 : Ecobatys - Image de synthèse et plan © Atelier Loyer Architectes, Bâtiment en cours de construction - Photo © Servane Guihaire - études ET chantiers, Réunion - Photo © Pays de FougèresPage 11 : Traditionnel / PCI - Schéma © Pays de FougèresPage 13 : Organisation du projet - Schéma © Pays de FougèresPage 14 et 15 : Photos © Pays de Fougères, Ecobatys - Image de synthèse et plans © Atelier Loyer ArchitectesPage 19 : Green Build Hub - Image de synthèse © ID+EA, photos © CSBTPage 25 : Green Build Hub - Image de synthèse © ID+EAPage 26 : Green Build Hub - Image de synthèse © ID+EAPage 27 : Green Build Hub - Image de synthèse © ID+EAPage 28 : Green Build Hub - Peinture © CSBT, Réunion - Photo © CSBTPage 29 : Réunion - Photo © CSBTPage 30 : Organisation du projet - Schéma © CSBTPage 29 : Conseils d’expert à propos du contrat nec3 - Photo © CSBT Page 32 : Green Buid Hub - Photo © CSBT

Page 41: Booklet two integrated building designs

41

auTeurs

Cornwall Sustainable Building Trust | http://csbt.org.uk/Network of professionals in eco-constructionPO Box 288 St Austell Cornwall PL25 9DY Tel : +44 (0)1726 810 241Paul Bright, Claire Maye and Celia Robbins : [email protected]

Pays de Fougères | www.pays-fougeres.org Territory comprising 58 communes in Ille-et-Vilaine 36 rue de Nantes BP 50306 35303 Fougères Cedex (FR) Tel : +33(0)2 99 17 08 82 Stéphanie Geslot : [email protected]

This project was achieved with the financial support of the European Commission (N° 4243 of the Interreg IVA

Programme France (Channel) - England)

Page 42: Booklet two integrated building designs

To meet energy efficiency challenges, we need to improve the design and build process. Changes in regulations and technology prompt us to increase the number of experts and work with more and more partners. Project management becomes more complex and changes our working habits.

In this booklet, you will learn about two collaborative methods of building design: the Integrated Design Process and the Building Information Modelling - the first one developed in France and the second one in Great Britain. Both are implemented in the early stages of design and carry on through the construction stage to final completion.

IDP is based on human relationships and strengthens the role of users.BIM is a «software tool» that drives partners to collaborate and regulates the management of information throughout a project. This starts at design stage and is pursued during construction to ensure optimum operational management.