bmo global metals & mining conference - amazon s3 · bmo global metals & mining conference...

28
BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer TSX: CG www.centerragold.com

Upload: others

Post on 20-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

BMO Global Metals & Mining ConferenceScott Perry - Chief Executive Officer

TSX: CGwww.centerragold.com

Page 2: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Caution Regarding Forward-Looking Information

Information contained in this presentation which are not statements of historical facts, and the documents incorporated by reference herein, may be “forward-looking information” for the purposes of Canadian securitieslaws. Such forward-looking information involves risks, uncertainties and other factors that could cause actual results, performance, prospects and opportunities to differ materially from those expressed or implied by suchforward looking information. The words “believe”, “expect”, “anticipate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” “understand” and similar expressions identifyforward-looking information. These forward-looking statements relate to, among other things: expectations relating to the Company’s 2016 outlook; the Company’s 2016 cash flow, cash and short-term investments, futurebusiness plans, production and cost estimates, reserve and resource estimates, development project pipeline, future dividends, exploration opportunities, grades, strip ratios and recoveries, and future financing; mattersspecific to the Öksüt Project, including timing and manner of future mining and processing, financial projections, including net present value and internal rate of return; matters specific to the Greenstone Gold Property,including investments into the project, future tax savings, the timing of a bankable feasibility study and sensitivities; matters specific to the Gatsuurt Project, including expected mine life and capital estimates; mattersrelating to the Kumtor Project, including underground opportunities and business process opportunities.

Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable by Centerra, are inherently subject to significant political, business, economic andcompetitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward looking information. Factors that could cause actual results orevents to differ materially from current expectations include, among other things: (A) strategic, legal, planning and other risks, including: political risks associated with the Company’s operations in the Kyrgyz Republic,Mongolia and Turkey; resource nationalism including the management of external stakeholder expectations; the impact of changes in, or to the more aggressive enforcement of, laws, regulations and government practicesin the jurisdictions in which the Company operates including any unjustified civil or criminal action against the Company, its affiliates or its current or former employees; the impact of any actions taken by the KyrgyzRepublic Government and Parliament relating to the Kumtor Project Agreements which are inconsistent with the rights of Centerra and KGC under the Kumtor Project Agreements; any impact on the purported cancellationof Kumtor’s land use rights at the Kumtor Project pursuant to a court claim commenced by the Kyrgyz Republic General Prosecutor’s Office; the risks related to other outstanding litigation affecting the Company’soperations in the Kyrgyz Republic and elsewhere; the impact of the delay by relevant government agencies to provide required approvals and permits, including the delay currently being experienced at the Kumtor Projectover the Kumtor 2016 life of mine plan and ecological passport; the terms pursuant to which the Mongolian Government will participate in, or to take a special royalty rate in, the Gatsuurt Project; the impact of changes to,the increased enforcement of, environmental laws and regulations relating to the Company’s operations; the impact of any sanctions imposed by Canada, the United States or other jurisdictions against various Russianindividuals and entities; the ability of the Company to negotiate a successful development agreement for the Gatsuurt Project; potential defects of title in the Company’s properties that are not known as of the date hereof;the inability of the Company and its subsidiaries to enforce their legal rights in certain circumstances; the presence of a significant shareholder that is a state-owned company of the Kyrgyz Republic; risks related to anti-corruption legislation; risks related to the concentration of assets in Central Asia; Centerra’s future exploration and development activities not being successful; Centerra not being able to replace mineral reserves;difficulties with Centerra’s joint venture partners; and aboriginal claims and consultative issues relating to the Company’s 50% interest in the Greenstone Gold Property; potential risks related to kidnapping or acts ofterrorism; (B) risks relating to financial matters, including: sensitivity of the Company’s business to the volatility of gold prices, the imprecision of the Company’s mineral reserves and resources estimates and theassumptions they rely on, the accuracy of the Company’s production and cost estimates, the impact of restrictive covenants in the Company’s revolving credit facility which may, among other things, restrict the Companyfrom pursuing certain business activities, the Company’s ability to obtain future financing, the impact of global financial conditions, the impact of currency fluctuations, the effect of market conditions on the Company’sshort-term investments, the Company’s ability to make payments including any payments of principal and interest on the Company’s debt facilities depends on the cash flow of its subsidiaries; and (C) risks related tooperational matters and geotechnical issues, including: movement of the Davidov Glacier and the waste and ice movement at the Kumtor Project and the Company’s continued ability to successfully manage such matters,including the continued performance of the buttress; the occurrence of further ground movements at the Kumtor Project and mechanical availability; the success of the Company’s future exploration and developmentactivities, including the financial and political risks inherent in carrying out exploration activities; inherent risks associated with the use of sodium cyanide in the mining operations; the adequacy of the Company’s insuranceto mitigate operational risks; mechanical breakdowns; the Company’s ability to obtain the necessary permits and authorizations to (among other things) raise the tailings dam at the Kumtor Project to the required height;the Company’s ability to replace its mineral reserves; the occurrence of any labour unrest or disturbance and the ability of the Company to successfully re-negotiate collective agreements when required; the risk thatCenterra’s workforce may be exposed to widespread epidemic; seismic activity in the vicinity of the Company’s operations; long lead times required for equipment and supplies given the remote location of some of theCompany’s operating properties; reliance on a limited number of suppliers for certain consumables, equipment and components; illegal mining on the Company’s Mongolian properties; the Company’s ability to accuratelypredict decommissioning and reclamation costs; the Company’s ability to attract and retain qualified personnel; competition for mineral acquisition opportunities; and risks associated with the conduct of jointventures/partnerships, including the Greenstone Gold Partnership; the Company’s ability to manage its projects effectively and to mitigate the potential lack of availability of contractors, budget and timing overruns andproject resources. See “Risk Factors” in the MD&A dated February 24, 2016 and in the Company’s most recently filed Annual Information Form available on SEDAR at www.sedar.com.

Furthermore, market price fluctuations in gold, as well as increased capital or production costs or reduced recovery rates may render mineral reserves containing lower grades of mineralization uneconomic and mayultimately result in a restatement of reserves. The extent to which resources may ultimately be reclassified as proven or probable reserves is dependent upon the demonstration of their profitable recovery. Economic andtechnological factors which may change over time always influence the evaluation of reserves or resources. Centerra has not adjusted mineral resource figures in consideration of these risks and, therefore, Centerra cangive no assurances that any mineral resource estimate will ultimately be reclassified as proven and probable reserves. There can be no assurances that forward-looking information and statements will prove to beaccurate, as many factors and future events, both known and unknown could cause actual results, performance or achievements to vary or differ materially, from the results, performance or achievements that are or maybe expressed or implied by such forward-looking statements contained herein or incorporated by reference. Accordingly, all such factors should be considered carefully when making decisions with respect to Centerra, andprospective investors should not place undue reliance on forward looking information. Forward-looking information is as of February 29, 2016. Centerra assumes no obligation to update or revise forward looking informationto reflect changes in assumptions, changes in circumstances or any other events affecting such forward-looking information, except as required by applicable law. Except as otherwise noted herein, Gordon Reid,Professional Engineer and Centerra’s Vice President and Chief Operating Officer, has reviewed and approved the scientific and technical information contained in this presentation. Mr. Reid is a Qualified Person within themeaning of NI 43-101. For more information, please refer to the Company’s 2014 AIF and the technical reports referenced therein, which are available on SEDAR. All figures are in United States dollars unless otherwisestated.

2February 2016

Page 3: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Built for Success

Internationally Diversified Gold Producer

Up to 530kozpa at AISC1 of up to $877 per ounce

Significant operational cash flow profile

Internally funded, late-stage development pipeline

Projects drive 100% increase in gold production by 2020

Net Cash Position of US$466MM2

Trading at a discount to peers

Quarterly Dividend Distributions (2.4% Yield4)

Positive Retained Earnings of US$728MM2

Centerra: Built For Success

Kumtor Five Year Gold Production Profile

Profitably Growing to 1Moz’s Per Annum

3

0

1,000

Kumtor Oksut Gatsuurt Greenstone Total

Oun

ces

(000

’s)

February 2016

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

0

100,000

200,000

300,000

400,000

500,000

600,000

2015 2016 2017 2018 2019 2020

grad

e g/

t

Oun

ces

Page 4: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra: Capital Markets Profile

Strong Balance Sheet (US$)

Debt$76MM

Cash$542MM

(as of Dec. 31, 2015)

Stable Share Count

Share Price(as of Feb.18, 2016)

C$7.38

Basic Shares Outstanding 239.4MM

Market Capitalization C$1,767MM

Cash on Hand2 US$542MM

Debt2 US$76MM

Enterprise Value US$822MM

Capital Structure (CG:TSX)

4

216.2 216.3 216.3 226.7 235.5 236.1 236.4 236.4 236.4 237.9

0.0

50.0

100.0

150.0

200.0

250.0

300.0

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

mill

ions

February 2016

Internally Funded Business (US$)

562

158 76

73

29 542

200

300

400

500

600

700

800

2014 Cash KumtorCashflow

GreenstoneAcquisition

Other(Projects,G&A, etc)

ShareholderDividends

2015 Cash

US$

Mill

ions

Page 5: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Top Ten Shareholders3

32.3% Kyrgyzaltyn JSC

9.6% Paulson & Co

6.5% Van Eck Associates

3.7% BlackRock Investment Management (UK)

2.3% Dimensional Fund Advisors

1.8% Newton Investment Management Ltd.

1.8% USAA Investment Management Company

1.4% Gabelli Funds

1.0% Capital International Inc.

0.9% BlackRock Asset Management Canada

Centerra: Capital Markets Profile

Diversified Portfolio (Consensus NAV)

Shareholder Base

Retail, 22%

Institutional, 45%

Kyrgyzaltyn JSC, 33%

5February 2016

Net Cash, 24%

Kumtor, 42%

Oksut, 13%

Gatsuurt, 12%

Greenstone, 9%

Page 6: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra: Internationally Diversified Portfolio

6February 2016

Page 7: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Operating Cash Flows $334 MM

Investing Cash Flows $244 MM

Operating Cash Flows $376 MM

Cash Flows Invested $282 MM

170U/G miners

240U/G miners

240U/G miners

Centerra:Robust Financial Margins in all Cycles

YE target of 4,000tpd

2014 Free Cash Flow Profile (US$)

2015 Free Cash Flow Profile (US$)

7

Cash Reserves Profile (US$)

0

400

800

1,200

1,600

2,000

0

200

400

600

800

1,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Gol

d Pr

ice

(US$

/oz)

US$

Mill

ions

Cumulative Dividends Cash Balance Gold Price

February 2016

Retained Earnings Profile (US$)

0

400

800

1,200

1,600

2,000

0

200

400

600

800

1,000

1,200

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Gol

d Pr

ice

(US$

/oz)

US$

Mill

ions

Retained Earnings Cumulative Dividends Gold Price

Page 8: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra: Shareholder Value Creation

Financial Discipline Equals Peer Leading Dividend Distributions

Historical cumulative dividend payments of US$240 million

Peer leading dividend

Quarterly dividend distribution of C$0.04 cents per share

Annual Dividend Declared (US$MM’s) Dividend Yield4

8February 2016

Source: Scotiabank GBM

2.4%2.4%

1.6%

1.2% 1.2%1.0% 0.9%

0.8% 0.7% 0.7%0.5% 0.4%

CG CEE G YRI ACA GFI AEM RRS ELD ABX AGI NEM

$14

$99

$28$36 $34

$29

2010 2011 2012 2013 2014 2015

Page 9: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

507,500 520,000

536,921

250,000

300,000

350,000

400,000

450,000

500,000

550,000

Original Revised Actual

Increased Gold Production Guidance - Mid-Points, Actual

Centerra: Operational Execution

2015 GUIDANCE: GROWING PRODUCTION AND DECLINING COSTS

2015 production and costs exceed revised guidance, production increased: 3%; costs declined: 5%;

› Underpins strong financial performance

2015 Company-Wide Operational Guidance Highlights

9Gold Production and cost guidance includes 15,000 oz from secondary leaching and mill clean out from Boroo which is in care and maintenanceFebruary 2016

915

852

814

500

600

700

800

900

1,000

Original Revised Actual

Reduced All-In Sustaining Cost Per Ounce Guidance (US$/oz) -Mid Points, Actual

Page 10: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

170U/G miners

207U/G miners

240U/G miners

240U/G miners

Kumtor:World Class Open Pit Gold Mine

2015 2016E

Gold Production (koz) 521 480-530

Adjusted Operating Costs ($/oz) (1) $326 $426-$471

All-In Sustaining Costs ($/oz) (1) $731 $817-$902

Growth Capital ($MM)(1) $14 $26

Projected Asset Life (years) +10

Reserves (Moz) (5) 5.6

Au Grade (g/t) 2.5

Resources M&I (Moz) (5) 2.6

Au Grade (g/t) 2.7

World Class Cornerstone Asset

Kumtor Five Year Gold Production Profile

Reserve Replacement Profile

YE target of 4,000tpd

+18 years of uninterrupted profitable production

Over 10M ounces produced since 1997

5.6M ounces remaining in open pit reserves

Low cost, long life production

High-grade underground opportunity

Strong stable platform to grow Centerra

10February 2016

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

0

100,000

200,000

300,000

400,000

500,000

600,000

2015 2016 2017 2018 2019 2020

grad

e g/

t

Oun

ces

(12,000)

(10,000)

(8,000)

(6,000)

(4,000)

(2,000)

0

2,000

4,000

6,000

8,000

10,000

12,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Au

Oun

ces

(000

's)

Kumtor Reserves

Kumtor Ounces Mined

Page 11: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

170U/G miners

207U/G miners

240U/G miners

240U/G miners

Kumtor:Continuous Improvement Opportunities

YE target of 4,000tpd

Work force optimization

Mill availability up to 96.5%

Mill throughput up to 16,500 tpd

Blending: Gold recovery up to 80%

‘Hot shift’ changes in mining operations

Increase truck tray size to improve fill factor

Two haul trucks parked in 2016

One shovel to be parked in Q4-2016

Processing of carbon gold fines

2015/16 Business Process Opportunities

11February 2016

Page 12: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

170U/G miners

207U/G miners

240U/G miners

240U/G miners

Kumtor: Over 18 Years Uninterrupted Operations

YE target of 4,000tpd

Successful Parliamentary elections Oct.2015

New Government formed (continuity)

Largest employer

Largest taxpayer

Paid >US$1 Billion to budget and social fund

Spend >US$80MMpa in local procurement

Kyrgyz: Long-term shareholder since IPO

Kyrgyz Republic: Kumtor

12February 2016

Cash Reserves Profile (US$)

0

400

800

1,200

1,600

2,000

0

200

400

600

800

1,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Gol

d Pr

ice

(US$

/oz)

US$

Mill

ions

Cumulative Dividends Cash Balance Gold Price

Page 13: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Öksüt: Fully Funded High Margin Gold Production

Mine Type Open Pit, Heap Leach

Avg. LOM Annual Production 110koz Au

Avg. LOM AISC1 (US$/oz) $490

Reserve Mine Life 8 years

Development Capex (US$MM) $221

Reserves6 (Moz) at $1,250 gold 1.2

Au grade (g/t) 1.40

Life of Mine Strip Ratio (w:o) 2:1

First Gold Pour Q3-2017

IRR (after tax) 43%

NPV(8%) - after tax >$240MM

2015 Feasibility Highlights

EIA approval received in November 2015

Construction expected in mid-2016

Heap leach processing start expected mid-2017

2 stage crushing, stack at 11,000 tpd

Life of mine recovery of 77%

Significant exploration upside

Bought back Stratex and Teck royalties

Near-Term Gold Production

0.00

0.50

1.00

1.50

2.00

2.50

0

50

100

150

200

250

2016 2017 2018 2019 2020 2021 2022 2023 2024

Proc

ess

Gra

de (

g/to

nne)

Gol

d Pr

oduc

tion

(000

's)

Catalyst Schedule

13

Öksüt Gold Project

February 2016

Page 14: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Greenstone: One of Canada’s Largest Undeveloped Open Pit Gold Mines

Cornerstone Canadian Development Project

50:50 development partnership with Premier Gold

Open pit resources7 (100%) in excess of 4M oz @ 1.47 g/t

Historic gold production of 4.12M oz (~1934-1970)

Large land package covers 337km2, good infrastructure

Significant exploration and underground resource potential

Bankable feasibility study expected in H1-2016

Ontario: Top Tier Mining Jurisdiction

Greenstone GoldProperty

Greenstone Development Project

Location: Ontario, Canada

Geraldton

Beardmore

JellicoeBrookbank

HardrockViper

11

Beardmore – Geraldton Greenstone Belt +110 km

Brookbank Deposit

Hardrock Deposit

14February 2016

Page 15: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Greenstone: Greenstone Gold Property Resources

500mOblique Longitudinal View to North

* As reported in Premier Gold Mines’ NI 43-101 Technical Report and Mineral Resource Estimate Update for the Hardrock Deposit, Issue Date: August 22, 2014, Effective Date: July 4, 2014 and in Centerra and Premier’s NI 43-101 on the Trans-Canada Property, Issue Date: February 5, 2015, Effective Date: March 20, 2015.

Indicated Resource Model BlocksInferred Resource Model Blocks

Hardrock Deposit*

In-Pit Resources at 0.50 g/t Au cutoff gradeIndicated: 83.87 Mt @ 1.47 g/t Au for 3.97 MozInferred: 10.23 Mt @ 1.53 g/t Au for 0.50 Moz

Underground Resources at 3.00 g/t Au cutoff gradeIndicated: 5.17 Mt @ 5.40 g/t Au for 0.90 Moz Inferred: 12.92 Mt @ 5.40 g/t Au for 2.24 Moz

Brookbank Deposit*

Open Pit Resources at 0.50 g/t Au cutoff gradeIndicated: 2.64 Mt @ 2.01 g/t Au for 171,000 ozInferred: 0.17 Mt @ 2.38 g/t Au for 13,000 oz

Underground Resources at 2.80 g/t Au cutoff gradeIndicated: 1.85 Mt @ 7.21 g/t Au for 429,000 oz Inferred: 0.40 Mt @ 4.02 g/t Au for 53,000 oz

Hardrock Deposit

15February 2016

Page 16: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Gatsuurt: Gold Development Project

2015 Highlights

Boroo mill on care & maintenance awaiting Gatsuurt approval

Gatsuurt declared strategic January 23rd, 2015

3% royalty (versus 34% ownership) approved by government

Investment development agreement negotiations commenced

Potential production 12-18 months after approval

Reserves8 of 1.6M contained ounces @ 2.9 g/tonne

Strip ratio of 6:1 and process recoveries in excess of 76%

Significant exploration upside

In-Place 5ktpd Processing Facility (Boroo)Boroo’s Historical Cumulative Net Cash Generation (US$MM)

(100)

0

100

200

300

400

500

600

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 201416February 2016

Page 17: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra: Built For Success

Kumtor: World Class Open Pit Gold Mine

Öksüt: High Margin Open Pit Heap Leach Gold Mine

Gatsuurt: Large Scale Open Pit Gold Mine

World class cornerstone asset underpinning Company’s growing production portfolio

Long lived, lower cost quartile asset generating significant positive cash flow

Fully funded, late-stage gold development project

Near-term high margin gold production

Investment agreement negotiations underway

Surface processing infrastructure in-place (gold production 12-18 months after approval)

Greenstone: Large Scale Open Pit Gold Mine

One of Canada’s largest undeveloped open pit gold mines

Feasibility and mine permitting work underway

17February 2016

Page 18: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

$3.6

7

$2.2

9

$2.2

6

$2.0

3

$1.2

5

$1.2

5

$0.7

8

$0.7

5

$0.6

2

$0.5

7

$0.5

7

$0.5

4

$0.4

8

$0.4

6

$0.4

5

$0.3

1

$0.1

2

$0.0

9

SSRI

GO

LD CG IMG

AGI

ASR

DG

C

NG

D

GFI

ELD

ACA K

TAH

O

SMF

BVN

OG

C

DPM BTO

$2.2

4

$2.1

4

$1.9

6

$1.7

2

$0.9

5

$0.8

1

$0.4

0

$0.2

7

$0.0

3

($0.

02)

($0.

16)

($0.

22)

($0.

26)

($0.

33)

($0.

34)

($1.

25)

($1.

94)

($2.

27)

K

DG

C

GFI

BVN

DPM

NG

D

BTO

ELD

OG

C

AGI

SMF

ACA

TAH

O

IMG

SSRI

ASR

CG

GO

LD

18.6

x

13.1

x

12.8

x

12.3

x

10.4

x

9.4x

9.0x

8.0x

7.4x

6.8x

6.6x

6.5x

6.5x

6.0x

4.7x

4.7x

4.1x

3.2x

GO

LD

BVN

ELD

DG

C

TAH

O

AGI

NG

D

OG

C

SMF

ACA

BTO

GFI K

ASR

IMG

DPM

SSRI CG

$7,1

82

$5,0

84

$4,8

21

$4,5

14

$4,3

02

$3,0

82

$3,0

39

$2,5

57

$2,4

01

$2,3

12

$2,2

21

$1,9

49

$1,6

20

$1,5

48

$1,2

79

$995

$958

GO

LD

NG

D

DG

C

ELD

OG

C

SMF

BVN

ASR

AGI

BTO

GFI K

ACA

DPM CG IM

G

SSRI

Centerra: Investment Opportunity

Enterprise Value/2016E Production (US$MM) Enterprise Value/2016E CFPS

Net Debt per Share (US$) Cash per Share (US$)

18February 2016

Source: Scotiabank GBM

Page 19: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra: Footnotes

19

(1) Adjusted operating costs, all-in sustaining costs (AISC), all-in costs and all-in costs - including taxes as well as sustaining capital, growth capital, average realized gold price per ounce and cost of sales per ounce sold are non-GAAP measures and are discussed under “Non-GAAP Measures” in the Company’s MD&A filed on SEDAR.

(2) As of December 31, 2015.(3) According to Thomson Reuters as of February 18, 2016.(4) As of February 17, 2016 according to Thomson Reuters, Scotiabank GBM.(5) The mineral reserves at Kumtor have been estimated based on a gold price of $1,200 per ounce, as at December 31, 2015. The open pit

reserves and resources at Kumtor are estimated based on a cut-off grade of 0.85 grams of gold per tonne for the Central Pit and 1.0 grams of gold per tonne for the Southwest and Sarytor deposits. Open Pit resources at Kumtor are constrained by a pit shell developed using a gold price of $1,450 per ounce. Mineral resources are in addition to reserves. Mineral resources do not have demonstrated economic viability. Further information including key assumptions, parameters and methods used to estimate mineral resources and reserves, as well as legal, political, environmental and other risks are described in Centerra’s 2014 Annual Information Form dated March 31, 2015 filed on SEDAR.

(6) The mineral reserves at Öksüt have been estimated based on a gold price of $1,200 per ounce, as at December 31, 2015. The open pit reserves are estimated on a cut-off grade of 0.3 grams of gold per tonne. Further information including key assumptions, parameters and methods used to estimate mineral resources and reserves, as well as legal, political, environmental and other risks are described in the Technical Report on the Öksüt Gold Project dated September 3, 2015, Effective Date: June 30, 2015 filed on SEDAR.

(7) As reported in Centerra Gold Inc. and Premier Gold Mines NI 43-101 Technical Report on the Trans-Canada Property, Issue Date: March 20, 2015, Effective Date: February 5, 2015 filed on SEDAR.

(8) The mineral reserves at Gatsuurt have been estimated based on a gold price of $1,200 per ounce, as at December 31, 2015. The open pit reserves are estimated using a 1.4 grams of gold per tonne cut-off grade. Further information including key assumptions, parameters and methods used to estimate mineral resources and reserves, as well as legal, political, environmental and other risks are described in Centerra’s 2014 Annual Information Form dated March 31, 2015 filed on SEDAR.

February 2016

Page 20: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

February 2016Appendix

Page 21: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Industry Experience Background

20 years• Appointed Chief Executive Officer in November, 2015

• Former Chief Executive Officer at AuRico Gold

25 years • Appointed President in November, 2015

• Joined Centerra in 2004

30 years• Appointed Chief Operating Officer in 2013

• Joined Centerra in 2004

28 years• Appointed Chief Financial Officer in 2008

• Joined Centerra in 2006

SCOTT PERRYChief Executive Officer

FRANK HERBERTPresident

GORDON REIDChief Operating Officer

Centerra: Senior Management

JEFF PARRChief Financial Officer

21February 2016

Page 22: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Board of Directors Background

STEPHEN A. LANG Chairman Appointed Director of Centerra’s Board, June 2008

BRUCE V. WALTER Vice Chair Appointed Director of Centerra’s Board, May 2008

SCOTT G. PERRY Director Appointed Director of Centerra’s Board, January 2016

RICHARD W. CONNOR Director Appointed Director of Centerra’s Board, June 2012

RAPHAEL A. GIRARD Director Appointed Director of Centerra’s Board, August 2010

EMIL OROZBAEV Director Appointed Director of Centerra’s Board, May 2014

MICHAEL S. PARRETT Director Appointed Director of Centerra’s Board, May 2014

SHERYL K. PRESSLER Director Appointed Director of Centerra’s Board, May 2008

TERRY V. ROGERS Director Appointed Director of Centerra’s Board, February 2003

KALINUR SADYROV Director Appointed Director of Centerra’s Board, May 2014

KYLYCHBEK SHAKIROV Director Appointed Director of Centerra’s Board, July 2013

Centerra: Directors

22February 2016

Page 23: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Analyst Coverage

BMO Capital Markets

BofA, Merrill Lynch

GMP Securities L.P.

RBC Capital Markets

Scotiabank

TD Securities Inc.

TSO & Associates

UBS

Centerra: Capital Markets Profile

Diversified Portfolio (Consensus NAV)

Shareholder Base

Retail, 22%

Institutional, 45%

Kyrgyzaltyn JSC, 33%

23February 2016

Net Cash, 24%

Kumtor, 42%

Oksut, 13%

Gatsuurt, 12%

Greenstone, 9%

Page 24: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra: 2016 Guidance

24

2016 Gold Production2016 All-in Sustaining

Costs1

(ounces) (per ounce sold)

Kumtor Mine 480,000 – 530,000 $817 – $902

Centerra 480,000 – 530,000 $877-$968

Projects 2016 Growth Capital1 2016 Sustaining Capital1

(millions) (millions)

Kumtor Mine $26 $84

Öksüt Project $157 -

Greenstone Property $12 -

Corporate and other - $1

Consolidated Total $184 $85

1 Non-GAAP measure, see discussion under “Non-GAAP Measures” in the Company’s MD&A filed on SEDAR.

2 Greenstone growth capital excludes $4.5 million representing capitalized expenditures related to the Greenstone Property.

February 2016

Page 25: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

1 Non-GAAP measure, see discussion under “Non-GAAP Measures” in the Company’s MD&A filed on SEDAR.2 Other costs include $14-$16 of Boroo costs for maintaining the mill on care and maintenance and ongoing closure costs, net of gold sales, and global exploration expenses, business development expenses and project development costs not related to current operations.3 Excludes Öksüt and Greenstone growth projects.4 Includes revenue-based tax that reflects a forecasted gold price assumption of $1,125 per ounce sold.

Operating costs(1) $400-442 $400-442Changes in inventories (8)-(9) (8)–(9)Operating costs (1) $392-433 $392-433Adjusted operating costs(1) $426-471 $426-471Capitalized stripping costs - cash 230-254 230-254Capital expenditures (sustaining)(1) 158-174 161-177Accretion expense (reclamation) 3 4Corporate general & admin costs - 56-62All-in sustaining costs $817-902 $877-968Capital expenditures (growth)(1) 49-54 49-54Other costs(2) - 39-44All-in costs (excluding growth projects)(1,3) $866-956 $965-1,066Revenue-based tax(4) 157 157All-in costs excluding growth projectsincluding taxes(1,3,4) $1,023-1,113 $1,122-1,223

Centerra: 2016 Expected All-in Costs1

Kumtor Centerra($ per ounce sold)

25February 2016

Page 26: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra Gold Inc. 2015 Year‐End Gold Reserve and Resource Summary  (as of December 31, 2015)

Centerra: Reserves & Resources

26

Gold Mineral Reserves (1) (11) (12)

(tonnes and ounces in thousands)

Proven Probable Total Proven and Probable

Property (3) Tonnes Grade(g/t)

Contained Gold (oz)

Tonnes Grade(g/t)

Contained Gold (oz)

Tonnes Grade(g/t)

Contained Gold (oz)

Kumtor (5) 8,832 1.4 402 60,406 2.7 5,240 69,239 2.5 5,641Gatsuurt (7) - - - 17,129 2.9 1,603 17,129 2.9 1,603Öksüt(10) - - - 26,137 1.4 1,161 26,137 1.4 1,161Total 8,832 1.4 402 103,672 2.4 8,004 112,505 2.3 8,405

Gold Measured and Indicated Mineral Resources(2) (11) (12)

(tonnes and ounces in thousands)Measured Indicated Total Measured and Indicated

Property (3) Tonnes Grade(g/t)

Contained Gold (oz)

Tonnes Grade(g/t)

Contained Gold (oz)

Tonnes Grade(g/t)

Contained Gold (oz)

Kumtor Open Pit (4) (5) 19,450 2.9 1,787 10,151 2.4 777 29,602 2.7 2,564Boroo (6) 452 2.2 32 4,464 1.5 210 4,916 1.5 242Gatsuurt (7) - - - 5,098 2.4 398 5,098 2.4 398Ulaan Bulag (8) - - - 1,555 1.5 73 1,555 1.5 73ATO (9) 9,663 1.5 465 8,920 1.1 306 18,583 1.3 771Öksüt(10) 2,100 0.7 45 4,698 0.7 111 6,798 0.7 156Total 31,665 2.3 2,329 34,886 1.7 1,875 66,552 2.0 4,204

Gold Inferred Mineral Resources(2) (11) (12) (13)

(tonnes and ounces in thousands)

Property (3) Tonnes Grade(g/t)

Contained Gold (oz)

Kumtor Open Pit (4) (5) 3,894 1.2 148Kumtor Stockwork Underground (5) 931 11.6 348Kumtor SB Zone UG (6) 3,806 10.7 1,315Boroo (6) 7,323 1.0 235Gatsuurt (7) 5,475 2.5 440Ulaan Bulag (8) 315 1.3 13ATO (9) 386 0.6 8Öksüt (10) 2,380 0.8 65Total 24,511 3.3 2,573

See footnotes page 27February 2016

Page 27: BMO Global Metals & Mining Conference - Amazon S3 · BMO Global Metals & Mining Conference Scott Perry - Chief Executive Officer ... including timing and manner of future mining and

Centerra: Reserves & Resources

27

Footnotes for Reserve and Resource Table as of December 31, 2015:

(1) The mineral reserves have been estimated based on a gold price of $1,200 per ounce.(2) Mineral resources are in addition to reserves. Mineral resources do not have demonstrated economic viability.(3) Centerra’s equity interests as of this news release are: Kumtor 100%, Gatsuurt 100%, Boroo 100%, Ulaan Bulag 100%, ATO 100%, and Öksüt 100%.(4) Open pit resources at Kumtor are constrained by a pit shell developed using a gold price of $1,450 per ounce.(5) The open pit reserves and resources at Kumtor are estimated based on a cut-off grade of 0.85 grams of gold per tonne for the Central Pit and 1.0

grams of gold per tonne for the Southwest and Sarytor deposits. Underground resources occur below the open pit resources shell and are estimated based on a cut-off grade of 6.0 grams of gold per tonne. Further information concerning the Kumtor deposit, including key assumptions, parameters and methods used to estimate mineral resources and reserves, as well as, political, environmental and other risks are described in Centerra’s most recently filed Annual Information Form and the Technical Report on the Kumtor Project, dated March 20, 2015 each of which has been filed on SEDAR.

(6) The open pit resources at Boroo are estimated as all material below the pit above a 0.5 grams of gold per tonne cut-off grade.(7) The open pit reserves and resources at Gatsuurt are estimated using a 1.4 grams of gold per tonne cut-off grade. Resources are estimated as all

material below the reserve pit above the 1.4 grams per tonne cutoff grade. Further information concerning the Gatsuurt deposit, including key assumptions, parameters and methods used to estimate mineral resources and reserves, as well as, political, environmental and other risks are described in Centerra’s most recently filed Annual Information Form and the Technical Report on the Gatsuurt Project, dated May 9, 2006 each of which has been filed on SEDAR.

(8) The open pit resources at Ulaan Bulag are estimated on a cut-off grade of 0.8, 0.9 or 1.0 grams of gold per tonne depending on ore type and process method.

(9) The ATO open pit resources are estimated based on a Net Smelter Return (NSR) cut-off grade of $6.50 NSR per tonne for oxide mineralization and $25.50 NSR per tonne for sulphide mineralization

(10) The open pit reserves at Öksüt are estimated based on a 0.3 grams of gold per tonne cut-off grade. Open pit resources are constrained by a pit shell developed using a gold price of $1,450 per ounce and are estimated based on a 0.2 grams of gold per tonne cut-off grade. Further information concerning the Öksüt deposit, including key assumptions, parameters and methods used to estimate mineral resources and reserves, as well as, political, environmental and other risks are described in Centerra’s most recently filed Annual Information Form and the Technical Report on the ÖksütProject, dated September 3, 2015 each of which has been filed on SEDAR.

(11) A conversion factor of 31.10348 grams per ounce of gold is used in the reserve and resource estimates. (12) Numbers may not add up due to rounding.(13) Inferred mineral resources have a great amount of uncertainty as to their existence and as to whether they can be mined economically. It cannot be

assumed that all or part of the inferred resources will ever be converted to a higher category.

February 2016