Biomass Success & Challenges in Public Ins5tu5ons in the Northeast U.S.

Upload: truongque

Post on 09-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

BiomassSuccess&ChallengesinPublicIns5tu5onsintheNortheastU.S.

[email protected]

www.burnchips.com

HistoryofMessersmithManufacturing

•  MessersmithManufacturingwasincorporatedin1982.•  Weofferfullturn-keybiomassboilersysteminstalla5ons

–  EngineeringDesign&LayoutAssistance–  BoilerSystem&FuelHandlingEquipmentManufacturing–  Installa5on,Commissioning&OperatorTraining–  FullService&Supportforthelifeofthesystem

•  Wecurrentlyhaveover120successfulinstalla5onsthroughouttheU.S.fromMainetoAlaska.

•  Ourproductlinerangesfrom500,000BTU/hroutputto35MMBTU/hroutput(~150kwto10,000kwoutput).–  Higheroutputsavailablewithmul5pleboilers

PublicIns5tu5onBoilerSystems

•  Messersmithboilersystemsareinstalledinschools,universi5es,hospitals,statefacili5esandmanyotherpublicins5tu5ons

•  MessersmithWoodChipBoilerSystemsdisplacetheuseoffossilfuelswhileprovidingclean,reliableenergyasheat,hotwater,andsteam

•  Currentinstalla5onsrangeinbuildingfootprintsfrom15,000sq.[.to1.5millionsquarefeet–  Singleandmul5plebuildings–  En5reCampuses–  DistrictEnergy–  CombinedHeat&Power

BoilerRoomEquipment

BoilerRoomEquipmentFuelHandling

TheMessersmithTravelingAugerspullwoodchipfueloutofachipbintoconveytothebiomassboilersystem

BoilerRoomEquipmentFuelHandling

Aseriesofbeltconveyorstransferthefuelfromthechipbintothefuelmeteringbin

BoilerRoomEquipmentFuelHandling

Thefuelmeteringbinacceptsfuelfromthebeltconveyorsandmetersthefuelthatgetstransferredintothecombus5onsystem

BoilerRoomEquipmentFuelStorage

•  Fuelstoragebinscanbedesignedtobeatorbelowgrade

•  Semitrailerswithalivebo]omwalkingflooremptythefuelintothestoragebinwhereitisremovedbytheMessersmithTravelingAuger

BoilerRoomEquipmentCombus5on

TheMessersmithCombus5onSystemburnsavarietyofbiomassfuelsrangingfrom3%to50%moisturecontent(wetbasis)

BoilerRoomEquipmentControls

•  MessersmithboilersystemscomewithPLCcontrolsdesignedforyourfacility•  RemoteMonitoring&Diagnos5cs•  Op5onalBuildingAutoma5onControls

BenefitsofBiomassBoilerSystems

•  Therearemanyeconomic,communityandenvironmentalbenefitstoburningwoodchips:•  Significantlyloweryourfacili5esenergycost•  Createjobsinyourlocalcommunity•  Eliminatewastewoodthatcouldotherwisegotoalandfill•  Decreasedrelianceonfossilfuels•  Stablefuelcostthatdoesn’tfluctuatelikegaseousfuels•  Decreaseyourfacili5escarbonfootprint•  Woodchipsharvestedfrommanaged5mberstandsareacarbonneutralfuelbecausetheCO2producedbytheiruseisreabsorbedbytheecosystemthroughregrowthoftheforest.

WoodChipvs.PropaneCost

•  WoodChips@$45/ton=Propane@$0.56/gallon($0.15/liter)•  WoodChips@$50/ton=Propane@$0.62/gallon($0.16/liter)•  WoodChips@$55/ton=Propane@$0.68/gallon($0.18/liter)•  WoodChips@$60/ton=Propane@$0.74/gallon($0.20/liter)•  WoodChips@$65/ton=Propane@$0.80/gallon($0.21/liter)

WoodChipvs.OilCost

•  WoodChips@$45/ton=Oil@$0.76/gallon($0.20/liter)•  WoodChips@$50/ton=Oil@$0.86/gallon($0.23/liter)•  WoodChips@$55/ton=Oil@$0.94/gallon($0.25/liter)•  WoodChips@$60/ton=Oil@$1.03/gallon($0.27/liter)•  WoodChips@$65/ton=Oil@$1.10/gallon($0.29/liter)

CurrentFuelOilCostinCanada

CaseStudyNorwichUniversity

NorwichUniversityislocatedinNorthfieldVermontandwasfoundedin1819.ThebiomassplantwascompletedinOctober2013

CaseStudyNorwichUniversity

•  Two400HP,150PSIsteamboilershaveatotaloutputof26MMBTU/hr(7.6MW)at125psiinwinterand50psiduringsummermonths.Theygenerateupto230kwwithabackpressuresteamturbine.

•  Thebiomasssystemdisplaces700,000–800,000gallonsoffueloil/yrbyburning10-13,000tonsofgreenwoodchipswhicharepurchasedfromlocalsupplierswithina100mileradius.•  Overallprojectcostof$6millionincludesanewbiomassplant,boiler

equipmentandnewundergroundpipingtotwonewdorms.Savingsof$2.2millioninfirst20monthsofoperaCon!•  Usesbestavailabletechnology(electrosta5cprecipitator)toreduce

par5culateemissionsto0.028lb/MMBtu,lessthanhalfofU.S.EPArequirementforthissizeboilersystem.

CaseStudyHotchkissSchool

TheHotchkissSchoolislocatedinLakeville,Connec5cutandserves635studentsingrades9-12.ThebiomassplantwascompletedinJuly2012andhasshowncostsavingsof$600,000peryear.

CaseStudyHotchkissSchool

CaseStudyHotchkissSchool

CaseStudyHotchkissSchool

•  TwoMessersmith300HP,10MMBTU/hr.150psisteamboilersgenerateacombined20millionBTU/hr(6MW)burningwoodchipsacquiredfromsustainablyharvestedlocalforests.

•  ThisCentralHea5ngFacilityheatsall1.2millionsquarefeetofthe85buildingsthatcomprisethecampusoftheHotchkissSchool.

•  Biomasshea5nghasreducedtheHotchkisscarbonfootprintbymorethan6millionpoundsofCO2/year.SulfurDioxideemissionswerecutbyover90%.

•  Wasteashfromcombus5oniscollectedforuseasfer5lizerfortheschool’sgardenstoincreasethesoilph,andanelectrosta5cprecipitatorremoves98%ofpar5culatema]erfromemissions.

CaseStudyAndroscogginValleyHospital

•  AndroscogginValleyHospitalislocatedinBerlin,NewHampshire.•  ThenewbiomassplantwascompletedinMarch2014andhasshown

costsavingsof$350,000peryear.

CaseStudyAndroscogginValleyHospital

•  OneMessersmith250BHP8.5MMBTU/hr.(2.5MW)150psisteamboileropera5ngat80psi

•  Thehospitalburned135,000gallonsofNo.2fueloilannuallybeforethebiomassboilerinstalla5on.AVHreplacedtheiroilwith2300tonsoflocallysourcedwoodchips.Thebiomassplantsavesthehospital~$350,000annuallyinhea5ngcosts.

•  Thebiomassplantwillpayforitselfineightyears.•  Theprocessedsteamgetsusedtoheatthehospitalfacilityaswellas

sterilizeequipmentintheopera5ngroomsandinthekitchen.

CaseStudyNa5onalLifeInsuranceGroup

•  Na5onalLifeInsuranceheadquartersisa500,000sq.[.facilitylocatedinMontpelier,VT.

•  ThenewbiomassplantwascompletedinDecember2010andyieldsanaveragecostsavingsof$400,000peryear.

CaseStudyNa5onalLifeInsuranceGroup

•  TwoMessersmithboilerswithcombined350BHPor12MMBTU/hr(3.5MW).

•  Lowpressuresteamboilersopera5ngat12psi•  Thebiomasssystemdisplaces210,000gallonsofNo.4fueloil/year.

•  Thebiomassfacilitymeets95%ofthebuilding’sheatdemandwhilereducingthecompany’scarbonfootprintby45%.

•  Costforthenewfacilitywas~$2Millionwithapaybackof5years.

•  AnESPreducespar5cleemissionsby98%.

CaseStudyNewHampshireStateOffice

•  TheNewHampshireStateOfficeFacilityislocatedinConcord,NH.•  ThenewbiomassplantwascompletedinApril2016.

CaseStudyNewHampshireStateOffice

•  This150psisteamboilersystemproduces8.3MMBTU/hr(2.5MW).

•  Thebiomassboilerconsumes2,100lbsperhourofwoodchipsatmaximumoutputanddisplaces422,000thermsofnaturalgasannually.

•  TheStateofNewHampshirewillseean80%reduc5onoffossilfuelusageatthisfacilitywiththeirnewbiomassboilersystem.

•  Thechipsburnedinthissystemarecomingfromlocalvendorsandbeingtruckedbylocaldrivers.ThisenablesNewHampshiretoinvesttheirhea5ngdollarsbackintotheirlocalcommunity.

WoodChipProjectChallengesinPublicIns5tu5ons

•  Successfulprojectsrequirea“LocalChampion”.•  Lackofeduca5ononthebenefitsofwoodbasedfuels•  Longprojectdevelopment5meforpublicins5tu5ons•  Thefootprintneededforabiomassboilerfacilityislarger

thanthatofatypicalboilerroomduetothefuelstoragearearequired.

•  Logis5cswithfueltruckdelivery5mesneedstobecoordinatedaroundhightraffic5mesinparkingareas.

[email protected]

www.burnchips.com

Ques5ons?