bharat heavy electricals · pdf filebhel, r.c. puram, hyderabad for ... shop, stator winding,...

31
1 BHARAT HEAVY ELECTRICALS LIMITED RAMACHANDRAPURAM::HYDERABAD-32 TENDER BOX IS AVAILABLE AT OFFICE OF SR.DGM / PLANNING (EM), 02 ANNEXE, GROUND FLOOR BHEL, R.C. PURAM, HYDERABAD FOR DROPPING FILLED TENDERS NOTICE INVITING TENDER ELECTRICAL MACHINES :: Ph.040-23185068, Email : venkatrv@ bhelhyd.co.in _______________________________________________________________________________________________ Name of Department : ELECTRICAL MACHINES Tender Notice No. : HY/EMP/TENDERS/ 2012-13/07 Dt : 19.11.2012 ________________________________________________________________________________ Sealed tenders, in two separate sealed cover (Techno-Commercial Bid PartA, Price Bid PartB) super scribing the tender notice number and name of the work will be received by the SR.DEPUTY GENERAL MANAGER, Plng (EM), 202 shop, BHARAT HEAVY ELECTRICALS LIMITED, RAMACHANDRAPURAM :: HYDERABAD-32 and will be opened by the undersigned or his nominee in VENDOR COMPLEX, BHEL, RAMACHANDRAPURAM :: HYDERABAD in the presence of tenderers or their authorized agents. TECHNO COMMERCIAL BID PART - A 1. Name of the Work : Partial off- loading for additional Semi-skilled operations in core assly & machine assly, machine shops, copper shop, coil shop, stator winding, rotor winding and insulation shop area of 02 shop. 2. EMD : Rs.1,00,000/- 3. Approximate estimated value : Rs.36,75,188/- 4. Cost of tender documents : Rs.1000/- ( Rs 750/- if downloaded from Website) 5. Sale of tender Documents : From : 21/11/2012(10.00 AM) to 29/11/2012(2.00 PM) 6. Last date for receipt of tender : 30/11/2012 (11.00 AM) Documents 7. Date and time of tender opening : 30/11/2012 (1.00 PM) 8. Period of contract : Up to 31/03/2013 from date of awardal. I. PRE-QUALIFICATION REQUIREMENTS : The following conditions have to be satisfied by the tenderer, with documentary proof to be enclosed with tender bid. In case the agency fails to enclose the following documentary proof with tender, the tender will be liable for rejection. Particulars of experience for the works successfully completed/executed of similar nature. Similar nature means jobs like: Electrical, fitting, machinist jobs in Engineering/Manufacturing /Process industries which are semiskilled nature of works consisting at least any one of the scope given below.

Upload: lehuong

Post on 08-Mar-2018

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

1

BHARAT HEAVY ELECTRICALS LIMITED RAMACHANDRAPURAM::HYDERABAD-32

TENDER BOX IS AVAILABLE AT OFFICE OF SR.DGM / PLANNING (EM), 02 ANNEXE, GROUND FLOOR BHEL, R.C. PURAM, HYDERABAD FOR DROPPING FILLED TENDERS

NOTICE INVITING TENDER

ELECTRICAL MACHINES :: Ph.040-23185068, Email : venkatrv@ bhelhyd.co.in

_______________________________________________________________________________________________

Name of Department : ELECTRICAL MACHINES

Tender Notice No. : HY/EMP/TENDERS/ 2012-13/07 Dt : 19.11.2012

________________________________________________________________________________

Sealed tenders, in two separate sealed cover (Techno-Commercial Bid – PartA, Price Bid – PartB)

super scribing the tender notice number and name of the work will be received by the SR.DEPUTY

GENERAL MANAGER, Plng (EM), 202 shop, BHARAT HEAVY ELECTRICALS LIMITED,

RAMACHANDRAPURAM :: HYDERABAD-32 and will be opened by the undersigned or his

nominee in VENDOR COMPLEX, BHEL, RAMACHANDRAPURAM :: HYDERABAD in the

presence of tenderers or their authorized agents.

TECHNO COMMERCIAL BID PART - A

1. Name of the Work : Partial off- loading for additional Semi-skilled operations in

core assly & machine assly, machine shops, copper shop, coil

shop, stator winding, rotor winding and insulation shop area

of 02 shop.

2. EMD : Rs.1,00,000/-

3. Approximate estimated value : Rs.36,75,188/-

4. Cost of tender documents : Rs.1000/- ( Rs 750/- if downloaded from Website)

5. Sale of tender Documents : From : 21/11/2012(10.00 AM) to 29/11/2012(2.00 PM) 6. Last date for receipt of tender : 30/11/2012 (11.00 AM)

Documents

7. Date and time of tender opening : 30/11/2012 (1.00 PM)

8. Period of contract : Up to 31/03/2013 from date of awardal.

I. PRE-QUALIFICATION REQUIREMENTS :

The following conditions have to be satisfied by the tenderer, with documentary proof to be

enclosed with tender bid. In case the agency fails to enclose the following documentary proof

with tender, the tender will be liable for rejection. Particulars of experience for the works successfully completed/executed of similar nature. Similar

nature means jobs like: Electrical, fitting, machinist jobs in Engineering/Manufacturing /Process

industries which are semiskilled nature of works consisting at least any one of the scope given below.

Page 2: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

2

Scope of work : The above work consists of execution of semiskilled work with ITI qualified

Fitters, Electricians, Turners, Machinists, Welders, in assembly of generators, taping of coils,

winding of 2 Pole/4 Pole rotors, winding works in stator winding. Fitter operations in the area of

power generation equipments, machine tools or equipments assembly, disassembly/ Electrical works

in the area of tapping or winding or brazing operations related to electrical equipments or machines/

turning works on lathes/milling work on milling machines/welding operations in the area of welding

of pipes, plates etc., Contractor has to carry-out any type of relevant works as per the instructions of

the concerned officials.

BHEL SCOPE: BHEL will arrange electrical power supply, instruments, tools and necessary battery

trucks, forklift etc., required for carrying out the works.

1. The contractor should have a minimum of one year experience (on the date of opening of

tender) in execution of similar works contract as mentioned in scope of work above.

2. Experience of having successfully completed similar works during last 7 years ending last day

of month previous to the one in which applications are invited should be either of the following:-

(Relevant documents to be submitted) :

a. Three similar completed works costing not less than the amount

equal to 40% of the estimated cost.

or

b. Two similar completed works costing not less than the amount

equal to 50% of the estimated cost.

or

c. One similar completed work costing not less than the amount equal

to 80% of the estimated cost

3. The contractor should submit the following documentary evidence in support of similar

works experience :

Work awardal copy, Contract Agreement copy and certificate of satisfactory completion of

work indicating contract period, scope of work and value of contract (work completion

certificate)

4. Average Annual financial turnover during the last 3 years, ending 31st

March of the previous

Financial year, should be at least 30% of the estimated cost. Relevant documents of computation

of income, P&L statement and IT returns duly certified by practicing CA are to be submitted.

5. The Contractor should invariably furnish details and submit a photostat copy :

(i) A valid Labour licence issued by Central Labour Commissioner/competent

authorities(central). In case Labour license is not available the same can be submitted

before commencement of work.

(ii) PF code (if available), in case PF code is not available the same can be submitted before

commencement of work.

(iii) ESI code

(iv) Income Tax PAN number.

(v) Service Tax Registration number.

Tenderer shall affix signature along with rubber seal on each page of the tender document and

also on all supporting documents enclosed with tender.

Tenders submitted without enclosing tender document cost or EMD are liable to be rejected.

Page 3: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

3

II. TENDERING PROCESS :

1. Tender documents can be collected from Electrical Machines Dept./Planning, 02 Annexe, Ground

floor on all working days from 21/11/2012 (10.00 AM ) to 29/11/2012 (2.00 PM) after paying

Rs.1000/- at BHEL cash office or DD in favour of BHEL, R C Puram, Hyd - 32.

Tender documents can also be had through BHEL web site http://www.bhel.com

Bidders can download the tender document till the due date and time of submission of the

tender document. The cost of Tender documents Rs.750/- (if down loaded from website) shall be

paid in the form of Demand Draft in favour of BHEL, R C Puram, Hyderabad – 32 and shall be

enclosed to the Techno Commercial Bid (Part -A). No other means of payment shall be accepted.

The cost of tender documents is Non refundable. 2. Earnest Money Deposit (EMD) :

An amount of Rs.1,00,000/- towards EMD shall be paid in cash at BHEL cash office or by

Demand Draft drawn in favour of M/s. Bharat Heavy Electricals Limited, R C Puram, Hyderabad

payable at Hyderabad and shall be enclosed to the Techno Commercial Bid (Part -A). One time

EMD will also be accepted as per terms of BHEL works policy. No other means of payment shall be

accepted.

3. Tender box is available at OFFICE OF SR.DGM / PLANNING (EM), 02 ANNEXE, GROUND

FLOOR, BHEL, R.C. Puram, Hyderabad – 502 032; tenders can be dropped in Tender Box before

the due date & Time. Tenders can also be sent through post.

4. The bids shall be submitted in two parts.

Techno - Commercial bid - Part A

Price bid - Part B

a) Techno - Commercial Bid (Part A): The envelope shall contain the Techno- Commercial

Bid as per the enclosed technical bid proforma with relevant documents like copies of ESI,

PF code, Labour license , PAN No & relevant Experience meeting pre qualification criteria,

turnover etc; Acknowledged IT returns copies duly certified by chartered accountant for

the 3 previous years, EMD, cost of tender document. The envelop shall be super scribed

"Technical bid" for Name of work: Partial off- loading for additional Semi-skilled

operations in core assly & machine assly, machine shops, copper shop, coil shop, stator

winding, rotor winding and insulation shop area of 02 shop, Tender notice no. :

HY/EMP/ TENDERS / 2012-13/07 Dt : 19.11.2012. b) Price bid (Part B): The second envelope shall contain only the quoted price bid. The

envelope shall be sealed and super scribed “Price Bid” for Name of work: Partial off-

loading for additional Semi-skilled operations in core assly & machine assly, machine

shops, copper shop, coil shop, stator winding, rotor winding and insulation shop area

of 02 shop, Tender notice no. : HY/EMP/ TENDERS / 2012-13/07 Dt : 19.11.2012.

c) Both the above two sealed envelopes must be kept into another sealed cover. The cover

shall be super-scribed with - Name of work: Partial off- loading for additional Semi-

skilled operations in core assly & machine assly, machine shops, copper shop, coil

shop, stator winding, rotor winding and insulation shop area of 02 shop, Tender notice

no. : HY/EMP/ TENDERS / 2012-13/07 Dt : 19.11.2012., Tender due date :30/11/2012,

and it should also contain from address and shall be addressed to Sr.Dy. General

Manager/Planning, Electrical Machines, 02 Annexe, Bharat Heavy Electricals

Limited, Ramachandrapuram, Hyderabad – 502 032 to reach on or before due date by

11.00 hrs. Covers with out Name of work and type of bid (Techno- Commercial/ Price

Bid) shall not be opened. BHEL is not responsible for any postal delay.

Page 4: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

4

5. Tenders received as Technical & Price bid documents kept together in same envelope

(combined bid) without putting in separate sealed envelopes shall be rejected. Offer submitted in

single bid instead of two part bid will not be considered.

6. The techno commercial bids will be opened at, Vendor complex, BHEL R.C.Puram

Hyderabad- 32 on tender due date at 13.00 hrs in presence of those tenderer who choose to be

present.

7. Date of opening of price bids (in case reverse auction is not resorted) will be intimated later to

the agencies technically qualified during the scrutiny of the techno commercial bid.

8. Security Deposit should be collected from successful tenderer as per terms of BHEL Works

policy. EMD of successful tenderer shall be converted and adjusted against the security deposit.

Security deposit shall not carry any interest.

9. The EMD will be refunded to the unsuccessful tenders on application after rejection of the

tender is intimated.

10. Copy of BHEL Works Policy, HR Circulars and OMI 195 applicable for job work contracts is

available for reference to contractors/contract representatives in the office of Sr.Dy. General

Manager/Plng (EM), 02 Annexe, Ground floor, BHEL, R.C.Puram, Hyd-32 during office hours.

III. TERMS AND CONDITIONS : 1. Quantities mentioned are approximate and may be operated fully or partially.

2. Quotations should be valid for at least 90 days from date of opening of technical bid.

3. The data required as per prequalification criteria and NIT conditions should be submitted

inevitably along with tender document. No extra time will be given for submitting the

documents as the contract is to be finalised and execution is to be started immediately due

to urgency of production work. Contractor/tenderer is not allowed to submit any data/

supporting documents at later stage during technical bid processing. If any contractor/

tenderer fails to submit all the supporting documents to fulfil the prequalification and

NIT conditions along with tender document it is the contractor/tenderer risk to forgo the

offer. This is one time contract job work activity up to 31.03.2013 only.

4. The Contract shall be executed in accordance with MODEL CONTRACT conditions and as

per OMI-195 applicable to job works.

5. The contractor shall not resort to subcontracting under any circumstances. If found

subcontracting at a later date, BHEL reserves the right to take whatever action it deems fit,

including cancellation of the contract.

6. PENALTY : If there is any delay or any interruption in execution of work, Penalty will be

recovered from the contractor @ Rs 5,000/- per day subject to maximum of 10% of total

contract value.

7. Any statutory increase in the labour wages during the period of execution shall be borne

by the agency. The agency shall quote the rates considering the possible labour wages

escalation also.

8. The contractor shall pay 20% bonus to contract work force as per Bonus Act 1965 and BHEL

circular.

9. Any increase in rate of DA/Wage hike shall not be reimbursed to the contractor.

Contractor shall anticipate such hike and quote accordingly.

10. The contractor should pay double the wages to the labour, if engaged on over time.

As per the provisions of Factories Act 1948 and its AP rules thereof.

Page 5: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

5

11. The tenderer should quote the value exclusive of Service Tax.

Service Tax will be payable extra as per applicable rules subject to submission of document

proof.

12. BHEL reserves the right to reject or cancel the tender at any stage of the tendering process

without assigning any reasons thereof.

13. The contractor shall pay wages to the workmen as per minimum wages act 1971,

For daily wage rates applicable with effect from 01.10.12 please refer BHEL Circular No.

HR/IR/CL/DA/01.10.2012 Dt : 16.10.12. Contractor shall make payment as per the

applicable rate at the time of execution of the contract including arrears if any.

14. BHEL reserves the right to verify the information provided by the vendor/ contractor and

call for such of documentary evidence as required for the above including payment details

with cheque no‟s/TDS. In case the information provided by vendor/contractor is found to be

false/ incorrect , the offer shall be rejected and EMD of such vendors shall be forfeited.

15. The contractor is wholly responsible for loss of life or partial disability of any of their employees

while on duty. In case of occurrence of any accident/ injury to contractor labour, BHEL will not

pay any compensation. Contractor shall indemnify BHEL against all such costs resulting out of

accident to his employees.

16. The contractor shall submit the daily progress report to the concerned Engineer-in-charge.

17. Offers not accepting BHEL terms and conditions or offers with counter conditions are liable

for rejection.

18. The Tenderer should quote the unit rate per operation in the price bid. If the unit rate is

not quoted, the offer shall be rejected. BHEL will not work back for unit rate. Offers

will be evaluated based upon unit rate.

19. All columns must be filled with proper information. In complete bids are liable to be rejected.

20. Payment: progressive payments at monthly intervals for the work completed on quantifiable

basis in all respects as per Measurement Book. Contractor shall submit muster roll, wage

register, overtime register, PF challan and ESI challan for billing executed quantities. All

payments will be released subject to submission of clearance certificate issued by HR - IR

dept. Payments will be credited to bank account through electronic funds transfer.

21. If there is a delay in execution of work or denial, the work shall be awarded to another

contractor on “RISK PURCHASE BASIS” and the extra cost incurred on account of delay

or denial shall be recovered from the contractor.

22. If any information furnished by the tenderer is found false at a later stage, the tenderer shall be

Banned and the existing agreement and contract will also be cancelled at the risk and cost of the

contractor.

23. B.H.E.L reserves the right to short close the contract at any stage in case the performance of the

contractor is not satisfactory or any other reasons detrimental to the interests of BHEL.

24. Contractor shall have sufficient pool of experienced manpower in various semiskilled jobs like

Fitting jobs, Electrician jobs for assisting in taping of coils, stator/rotor winding, welding works

and machinist works for deploying them in three shifts as per work requirement without

operating any extra hours/over time beyond normal working hours.

25. Contractor shall obtain prior approval/permission of contract executing officer for engaging

contract workers on extra hours/over time.

26. Upon awardal of the work, within 7 (seven) days the party has to execute an agreement with

BHEL as per model contract before commencement of work.

27. Payment to the workers by contractor to be made on or before 7th

day of every month

without fail through their Bank accounts, otherwise suitable action shall be taken at

contractor’s risk and cost. Contractor has to issue wage slips to their workers.

Page 6: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

6

28. The company does not expressly or by implication agree that the actual amount of the work

to be done shall correspond there with, but reserves the right to increase or decrease the

quantity of any item or portion of the work as it deems necessary.

29. Supervision of contract work force shall be monitored by contract supervisor. Contractor

And supervisor shall be available whenever required.

30. A tender may be rejected while scrutiny of technical bid, in case there is any unsatisfactory

past performance in the execution of an earlier contract.

IV. SAFETY MEASURES :

(a) The Contractor shall provide the required safety equipment like helmets, uniform,

safety belt, safety shoes, hand gloves, Nose mask etc., to the contract labourers engaged

by him. All sorts of safety measures to be taken shall be deemed to form an integral part of

the agreement and non-compliance with safety requirement amounts to breach of the contract.

(b) Contractor has to obtain work permit for “ working at heights above 3 meters height

from ground level ” wherever applicable .

(c) All tools, tackles, lifting appliances, scaffolds, cradles, safety nets, ladders, equipments etc. used

by the contractor shall be safe design and construction. The authorized BHEL officials shall

have the right to ban the use of any item, if such use is considered to be dangerous by the

concerned BHEL officials.

(d) If the contractor fails to take appropriate safety precautions or to provide necessary safety

devices and equipment or to carry out instructions issued by the authorized BHEL officials,

BHEL shall have the right to take corrective steps at the risk and cost of the contractor.

The contractor shall take necessary fire safety precautions as per directions of the authorized

BHEL officials.

(e) In case of a fatal or disabling injury accident to any person due to lapses by the contractor

BHEL shall have the right to impose appropriate financial penalty on the contractor and

recover the same from payments due to the contractor for suitably compensating the victim or

his/her dependents. Before imposing the penalty, appropriate enquiry shall be held by

BHEL.

(f) In case of any damage to property due to lapses by the contractor, BHEL shall have the right to

recover the cost of such damages from the payments due to the contractor after holding an

appropriate enquiry.

CONTRACTOR ISSUING AUTHORITY

Page 7: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

7

V. SPECIAL INSTRUCTIONS

1. If the tender is made by an individual, it shall be signed with his full name and his address shall

be furnished. If it is made by firm, it shall be signed with the co-partnership name by a member

of the firm, who shall also sign his own name also furnish the name and address of each member

of the firm. If the tender is made by a corporation it shall be signed by a duly authorized officer

who shall produce with the tender satisfactory evidence of his authorization. Such tendering

corporation firm is required to furnish evidence of its existence along with bid.

2. The EMD will be refunded to the unsuccessful tenders on application after rejection of the tender

is intimated. The earnest will be retained in the case of successful tenders and either of the cases

will not carry any interest. It will be dealt with as provided in the conditions attached to the

tender.

3. Whenever a tender is to be accepted, the tenderer, who‟s tender is under consideration, shall

attend the office of “Officer inviting the tender” on the date fixed by written intimation to him.

He shall forth with, upon intimation being given to him by the “Officer inviting the Tender” for

acceptance of his tender, completed the execution of the agreement by signing all the documents

connected there with. Failure to do so and not to commence the work with in one month from

date of intimation shall entail forfeiture of the earnest money.

4. Tenderers shall pursue carefully the instructions and directions to parties in tendering and the

conditions of the agreement and all other relevant documents before tendering the rates for the

work. The approximate quantity of work to be executed under each clause is given in the

schedule. The quantities are given with a view to enable tenderer to quote his overall rate for

each class of work in the tender form and for an uniform comparison of tenders. It shall be

definitely understood that BHEL does not accept any responsibilities for the correctness or

completeness of this schedule and the schedule is liable to alternations by omissions, deductions

or additions at the discretion of accepting authority.

5. The tenderer shall keep the offer valid for a period of 90 days from the date of opening of tender.

It is being understood that the tender documents have been sold/issued to the tenderer is being

permitted to tenderer in consideration of the stipulation on his part that after submitting the

tender, he will not recall his offer or modify the terms and conditions there of in a manner not

acceptable to the “Officer inviting the Tender”. Should the tenderer fail to observe to comply

with foregoing stipulations, the EMD shall be forfeited.

6. Tenderers have to quote their rates in the tender schedule legibly written in figures and words

and those not submitted in proper form are liable for rejection.

7. Contractor shall be deemed to have included in his tender price of all the appliances required

for the purpose of all operations connected with the work embraced under the contract to

secure a satisfactory quality of work and rate of progress which in the opinion of the

" Contract Signing Officer" will ensure the completion of the work within the time specified.

8. BHEL reserves the right to negotiate for price reduction with L1 party and negotiated price

will be considered as contract amount for all practical purposes.

Page 8: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

8

9. BHEL reserves the right to terminate the contract at any stage without assigning any reason.

10. Contractor need to comply statutory obligations :

a) payment to contract labour as per the minimum wages act 1971 latest by 7th

of every month

through their bank account. b) Issue of monthly pay slip to contract labour indicating basic wage,

Dearness allowance and PF , ESI deductions and PF accumulation. c) Copies of PF and

ESI contributions paid through bank challan to be submitted to Contract executing officer

before submitting monthly bill.

11. Contractor is wholly responsible for injuries/ death of the person employed by him arising

due to accident during the contractual period. At any point of time BHEL will not be responsible

for any loss/ damage to the person arising out of accident for performing the contractual obligations.

12. Withdrawal from contract during contract period in BHEL will entail forfeiture of security deposit.

13. Labour engaged by the contractor should be disciplined & exhibit good behavior in dealing

with employees of BHEL. In case of any misbehavior or misconduct of any Peron engaged

by the contractor, contractor shall change that person immediately or else it may even

lead to termination of the contract & security deposit will be forfeited as penalty.

14. The contractor should abide by the company‟s CISF Security/ safety rules and provide such

safety requirements as per statutory rules and requirements of the factories act.

15. In case of breach of any of the terms and conditions of the contractor, BHEL reserves the right to

cancel the contract either in part or full.

16. In the agreement no mention shall be made regarding the number or the sex of the labourers to

be employed by the contractor. The agreement shall not contain provision to hire labour like

number of men, category of men, and number of mandays from the contractor for any type of

work. All types of job work agreements shall be based on clearly quantified volume of work

only.

17. The Executing Officer shall ensure the execution of work on quantifiable basis taking into

account equipment and machinery deployed rather than availability of labour.

18. Disputes, grievances between the contractor and his labour, will have to be settled by the

contractor only.

19. The contractor must satisfy himself by personal study and examination of the drawings/

specifications furnished and understand thoroughly the scope of proposed work in detail

and all conditions affecting the work before entering into the contract. There shall not be at

any time, dispute/complaint of any misunderstanding with regard to nature or omission of the

work to be done nor shall any application for compensation in terms of time and money

shall be accepted by BHEL regarding the above.

Page 9: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

9

20. The contractor shall ensure adherence to all statutory requirements under the State rules in respect

of service conditions for the employment of contract labour. The contractor shall get himself

licenced from the Central Labour Commissioner as a contractor. It is understood by the

contractor that for this agreement to be effective, the prime condition is his fulfilling the

conditions of being licenced as a contractor and continuance of this agreement is subject

to the sustained ensurance of fulfillment to all statutory requirements in respect of

employment conditions for contract labour specified by Government from time to time.

Further as and when there are changes in the service conditions/wages rates for contract

labour, as notified by the State Labour Department, the same will be implemented even

if some modification is given at any time after the conclusion of the agreement.

21. Before quoting rates for the work, the tenderer shall inspect the site of work and should satisfy

himself about the nature and scope of work to be executed. BHEL will not, however, after

acceptance of a contract rate, Pay extra charges for any other reason. In case the contractor is

found later on to have misjudged the nature and scope of the work and also the availability of

materials.

22. BHEL reserves the right to deviate whether by addition or by deletion from the schedule of

items of work given in the tender document after awarding the work.

VI. GENERAL TERMS AND CONDITIONS

BHEL has the privity of the contract with the contractor only and will give instructions to the

contractor or his authorized representative. BHEL will have nothing to do or be concerned with the

employment of employees working for the contractor. The relationship between BHEL and the

Contractor will be that of independent entities and nothing herein contained will amount to joint

venture, partnership or an employer-employee relationship.

1. SELECTION AND CONTROL OF EMPLOYEES

a) Contractor to ensure that the employees deployed in the premises of BHEL are physically

and mentally fit and do not have any criminal record.

a) Contractor to maintain appropriate records of his employees deployed to carry out the job(s).

b) Contractor to provide employment card/Identity card with photograph duly attested by the

Contractor to his employees.

c) Contractor to provide uniforms / safety appliances to his employees.

d) In the event of completion/ termination/closure of contract for any reason whatsoever, the

contractor shall withdraw all his employees from the establishment of BHEL. In case

contractor decides to terminate services of his employees he should settle all terminal dues

including retirement compensation at his own cost.

e) Contractor shall obtain complete bio-data, of the labour employment certificate and

Antecedent verification in the prescribed form for each labour and supervisor engaged by

him and shall submit the same to the personnel department/IR section through the contract

executing officers before commencement of the work.

Page 10: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

10

f) The contractor should engage only those who shall be more than 18 (Eighteen) years of

age.

g) A copy of the agreement between contractor and his labour shall be submitted to the

personnel department.

h) Personnel engaged in welding/painting work shall be qualified and their certificates to be

submitted along with the quotation.

i) In case of employment of women for work by the contractor, contractor will have to discharge

his obligations under relevant laws, Acts.

2. STATUTORY LIABILITIES

a) All statutory requirements under Minimum Wages Act, 1948, Payment of Wages Act, 1936,

Workmen Compensation Act. 1923, EPF & MP Act, 1952, Payment of Gratuity Act, 1972, ESI

Act, 1948, The Contract Labour (R&A) Act, 1970, Payment of Bonus Act, 1965, Income Tax Act

etc. shall be complied with by the contractor.

b) Contractor shall comply with all statutory requirements, rules, regulations, notifications in

relation to employment of his employees issued from time to time by the concerned authorities.

c) Contractor shall ensure payment of statutory prescribed minimum wages as applicable from time

to time through bank accounts and maintain proper records of their timely disbursement. These

records need to be preserved for a period of at least 3 years and should be made available even

after the contract is over for any verification by the statutory authorities.

d) Contractor to provide PF pass book to his employees and ensure payment of PF, EDLI, pension

dues under EPF & MP Act , 1952 to the RPFC.

e) Contractor shall ensure payment of ESI contribution under ESI Act, 1948.

f) Contractor shall produce proof of deductions as well as remittances of PF, EDLI, Pension, ESI

contribution, administrative charges etc. wherever applicable and shall maintain proper records.

g) Contractor shall furnish proper returns to the concerned statutory authorities.

h) Contractor shall be solely responsible for non payment/ delayed payment of wages, contributions

under EPF & MP Act, ESI Act etc.

i) In case the contractor fails to make payment of wages to his employees or remittance of

contribution to the concerned authorities, the security deposit/other dues under the contract can be

utilized by BHEL to discharge the liability of the contractor.

j) Contractor shall indemnify BHEL against all claims and losses under various statutes or any civil

or criminal law in connection with employees deployed by him.

Page 11: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

11

k) The liability for any compensation on account of injury sustained by an employee of the

contractor will be exclusively that of the contractor.

l) Contractor to obtain insurance cover for his employees and take third party risk insurance

coverage at his own cost .

m) Contractor should have independent code numbers under EPF & MP Act, 1952 and ESI Act, 1948

and shall cover his employees under the said codes.

n) Every contractor shall submit a notice regarding commencement and completion of work in

Form-VI A&B (Rule 25 (viii) & 81 (3) to personnel department, IR section through the contract

executing officer, for forwarding the same to Central Labour Commissioner.

o) The contractor shall attend to all inspections notified/conducted by the personnel department,

Labour department, P.F authorities, Factory Inspectors ESI Inspectors, or any other such

authorities.

p) Non-Compliance of any provisions under the act/rule/instructions /guidelines shall make the

contractor liable for penal action including termination of contract.

q) Contractor shall furnish in a separate letter his place of residence and postal address. The delivery

at the above mentioned place or posting in a post box regularly maintained by the post and

telegraph department or sending letters registered for acknowledgement of any notice, letter or

other communication to the contractor shall be deemed sufficient service thereof upon the

contractor. Change in address shall come into force at any time by an instrument executed by the

contractor and delivered to the BHEL official who has signed the contract.

3. SUPERVISION

a) Contractor shall supervise the work allotted to him and to be carried out by his employees or to

post a supervisor for this purpose.

b) Contractor will be responsible for the good conduct of his employees/supervisors. In case of any

misconduct/misbehaviour by any employee/supervisors, the contractor will replace such

employee /supervisors immediately.

c) Contractor will ensure that the job is executed through his employees on his rolls and under no

circumstances the contractor will deploy any casual employee to carry out the job nor shall sub-

contract the job.

d) Contractor will keep watch on his employees and he will be liable for any pilferage / loss to

BHEL due to acts of omission and commission by his employees. Similarly, liability for any

compensation to outsiders on account of any act of omission and commission by the employees

deployed by the contractor shall lie exclusively with him.

e) Contractor to ensure that all precautions are taken for safety of his employees.

Page 12: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

12

4. SUPPLY OF TOOLS, TACKLES AND MATERIALS

a) Contractor shall provide safety appliances at his own cost which may be required under the

statute or otherwise.

b) Contractor shall provide all material at his cost as mentioned in the contract to his employees for

carrying out the job.

5. OBLIGATION OF THE CONTRACTOR

a) Contractor shall fully comply with the following (General Terms and conditions) and

special instructions / enactments:

1) Contract Labour (R&A) Act,1970 and rules formed there under in A.P.

2) Wage Rates not less than that notified by State Labour Department /from time to time.

3) Payment of Wages Act.

4) ESI Act, 1948.

5) EPF Act, 1952.

6) Workmen's Compensation Act, 1923.

7) BHEL instructions as issued from time to time in regard to working hours, holidays,

or any other statutory provision.

8) Payment of Bonus Act, Gratuity Act, works contract Act, Service Tax Act,

Factories Act, Income Tax Act and any other applicable Acts. And all

other Act applicable in execution of contract.

b) The contractor shall obtain License from the Competent Authority if he engages 5 (Five) or more

workmen.

c) Contractor has to pay double the wages to his labour, if engaged beyond normal working hours.

d) Contractor shall pay the wages to the labour on or before 7th

of the following month.

e) The Contractor shall produce the following registers and forms before commencement of work,

for verification by the Executing Officer.

1) Form XII - Register of Contractor‟s

2) Form XIII - Register of workmen employed by contractor (Rule 75)

3) Form XIV - Employment card issued by contractor (Rule 76)

4) Form XVI - Muster roll (Rule 78 (I) (a) (I)

5 Form XVII - Register of wages (Rule 78 (I) (a) (I)

6) Form XVIII - Register of Wages-cum Muster Roll (in case of weekly payment)

7) Form XIX - Wage slip (Rule 78 (b)

8) Form XX - Register of deduction for damages or loss.

9) Form XXI - Register of Files (Rule 78 (I) (a) (II)

10) Form XXII - Register of advances (Rule 78 (I) (a) (II)

11) Form XXIII - Register of over time (Rule 78 (I) (a) (III)

12) Form XXIV - Return to be sent by the contractor to licensing officer (Rule 82) (I)

Page 13: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

13

The Contractor shall maintain the above neatly, completely and legibly for inspection by

various authorities even at short notice. The Executing Officer of BHEL shall periodically inspect

these registers and forms and shall send his inspection note to Industrial relation (IR) section of

personnel department.

f) The contract shall observe

1) Weekly rest day

2) BHEL list of holidays

g) The contractor shall ensure that entry and exit of labour shall be as per the procedure laid down

by the BHEL personnel department. Entry permits for the labour are to be issued by the

contractor with contractors monogram.

h) Contractor shall in his absence keep competent agent constantly on the works and any direction

or explanations given by the “Contract signing officer” or his representative to such agent shall

be held to have been given to the contractor himself.

i) Contractor on the advice of BHEL official shall immediately remove any person employed by

him, who may in the opinion of the BHEL official is incompetent or misconduct‟s himself such

persons shall not be again employed on the works without written permission of the BHEL

official.

j) The contractor shall give all notices required by the acts, regulation, bylaws, legal acts and pay

all fees in connection therewith unless and otherwise arranged and decided in writing with

BHEL. He shall also ensure that no attachments are made against materials or work forming part

of or for the used of the contractor. In all such cases, contractor shall protect and indemnity

BHEL against any claim or liability arising from or based on the violation of any such laws,

ordinances, regulations, orders, decrees or attachment either by himself or by his employees.

k) It shall be contractor‟s sole responsibility to protect the public and his employees against

accident from any cause and provide required safety equipments and shall indemnify BHEL

against any claims for damages for injury to the person or property resulting from any such

accidents and shall, where the provisions of the workmen‟s compensation Act apply, take steps

to property insure against claims there under.

l) In the event of any accident in respect of which compensation may become payable under the

workmen‟s compensation Act, VIII of 1923 whether by the contractor or by BHEL as principal,

it shall be lawful or BHEL to retain out of moneys due and payable to the contractor such sum or

sums of money as may, in the opinion of BHEL shall be final in regard to all matter raising in

this clause.

m) No work shall be done on Sunday or any other declared Holidays of BHEL with out the written

permission of BHEL official In-charge of the work. The contractor shall comply with the

provisions of the factory act if the same are applicable.

n) The contractor shall keep his work place clean and safe to avoid injuries to men and damage to

finished products/equipment.

Page 14: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

14

o) On the occurrence of an accident, which results in the death of any of the workmen employed by

the contractor or which is so serious as to be likely to result in the deathly of any such workmen,

the contractor shall within 24 hrs. of the happening of such an accident intimate in writing to the

BHEL official In-charge of the work.

p) Not withstanding the above clause, in case of any financial loss incurred by company on account

of contravention of the Provident Fund regulations or any regulations of rule touching the same

by the contractor, the contractor shall submit an undertaking to indemnify the company to the

extent of the loss incurred by the company.

q) The contractor shall provide the required safety equipment to the labours engaged by him.

r) Contractor shall issue “Employment Card” to all labour and supervisors covered under the job

work contract.

s) The contractor shall be responsible to settle the grievances of the labour deployed by him.

t) The daily wages to be paid to the contract Labour by the contractor after deducting the

employee contributions towards PF & ESI at the rate of 12% and 1.75% respectively, and

deposit the same to the appropriate authority. In addition to this the contract Labour are entitled

for Weekly off,11 paid Holidays per year and 18 paid leaves per year as per Wage rates as on

date. Contractor has to pay 20% Bonus to his workforce.

6. RIGHTS AND OBLIGATIONS OF THE PRINCIPAL EMPLOYER

a) In case the contractor does not carry out the contractual/statutory obligations or the services

rendered by him are found to be unsatisfactory, BHEL shall bring the same to his notice and he

will be obliged to discharge the obligations and rectify the deficiency / anomaly within three

days time failing which BHEL reserves the right to terminate the contract without assigning any

reason whatsoever. In such an event, no damages will be payable for short closure of the

contract.

b) Without prejudice to the aforesaid clause, BHEL reserves its right to terminate the contract

without assigning any reason thereof by giving 30 days notice in writing to the contractor.

c) The decision of BHEL regarding interpretation of any terms and conditions set forth in the

Agreement shall be final and binding on the contractor.

7. ARBITRATION AND GOVERNING LAW

a) In case of any dispute concerning the terms and conditions of the contract or its implementation,

attempts need to be made by the parties to settle the matter amicably. In case the dispute is not

resolved, the dispute needs to be referred for conciliation by an officer of BHEL. In case it

remains unresolved, the dispute be referred for arbitration by an officer of BHEL. In case

arbitration by an officer of BHEL is not acceptable, the same could be entrusted to any mutually

agreeable Government functionary or an independent person.

b) In case of any suit or other legal proceeding arising under this contract, the courts at Sangareddy

(Medak Dist.) A.P only shall have the jurisdiction.

Signature of the officer

on behalf of the company

Signature of the contractor

Page 15: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

15

VII. SPECIAL CONDITIONS

1. Whenever the term „CONTRACTOR‟ is used, it shall be understood to refer to the particular

person, full of co-operation with whom an agreement has been made by the concerned the

company official for Executing the work defined in the concerned agreement and for the purpose

of instructions regarding the complaints with contract conditions, it shall include the contractor‟s

authorised agents who are entrusted with the work by the contractor.

2. The quantities mentioned may or may not be actuals required for execution.

3. The company does not expressly or by implication agree the actual amount of the work to be

done shall correspond there with, but reserves the right to increase or decrease the quantity of

any clause or portion of the work as he deems necessary.

4. All work shall be carried out in accordance with the directions and to the satisfaction of the

company official in accordance with the drawings, specifications and instructions.

Supplementary or explaining the same as may from time to time shall be done by the company

official.

5. For all modifications, omissions or additions to the approved drawings and specifications, the

company shall issue revised plans or written instructions and no modifications, omission or

addition shall be made unless so authorised and directed by the company in writing.

6. The company shall have the privilege of ordering modifications, omissions, or additions at any

time before completion of the work.

7. All materials, articles and workman ship shall be the best of their respective kind for the class of

work described in the contract specifications and schedule and materials to be obtained by the

contractor shall be from sources approved by the company.

8. Sample of materials shall be furnished by the contractor at his expense to the company when

called for before execution of any work.

9. The company shall have power to reject at any stage. Any work which is considered to be

defective in quality of material or workmanship and shall not be debarred from rejecting wrong

materials by reasons or having previously passed them in an unworked condition. Any portion

of the work or materials rejected or pronounced to be inferior or not in accordance with

specifications shall be taken down and removed from the work site at the contractor‟s expenses.

10. The decision of the company shall be final and binding on the contractor on all technical

questions which may raise in the contract with respect to material, workmanship, removal of

improper work, interpretation of the working drawings, specifications, notes, procedures etc.

11. The decision of the “Contract Signing Officer” or any other officer deputed by him duly

authorised on his behalf, in respect of the rate of progress and the quality of work or material

shall be final.

Page 16: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

16

12. Contractor shall be deemed to have included in his tender price of all the plant machinery and

appliances required for the purpose of all operations connected to secure a satisfactory quality of

work and rate of progress which in the opinion of the company will ensure the completion of the

work within the time specified.

13. If any time, during the progress of work or any part of it such methods or equipment appear to

the company official to be insufficient or inappropriate for ensuring the quality of work required

or rate of progress, he may order the contractor to increase their efficiency or to improve their

quality of work and the contractor shall comply with such order and on failure of which the

company may take such action as it deems it fit to improve the quality of work or the progress

required from the contractor and all such actions taken by the company shall be at the cost and

risk of the contractor.

14. It is open to the company to lend or supply to the contractor any tools, implements, materials and

machinery that are needed by the contractor, which in the opinion of the company is essential to

improve the quality or progress of work. The contractor shall pay such deposit or charges that

may fixed or determined by the company for any such articles or machinery lent or hired to the

contractor.

15. Any electric power required for contractors machinery for the purpose of work shall be supplied

by the company at the written request of the contractor at one point subject to the observance of

rules and regulations of Electricity Board/Company and charges there on shall be recovered from

the contractor.

16. The contractor shall conform to the regulations and laws of Central/State Govt. or any local

authority and that of the company with whose system the machinery is supposed to be

concerned.

17. All rubbish as it accumulates shall be removed from the site to the point of disposal as indicated

from time by the company. If this is not adhered to the company shall remove the scrap and

recover the cost of these operations from the bills of the contractor.

18. Any sum due from the contractor on account of tools and plants, stores or any other items

provided by the company shall be deducted from the respective bill due to him.

19. In case of breach of any of the terms and conditions of the contractor a claim shall be lodged

under the bank guarantee with the guarantor at the discretion of the competent authority of the

company. On successful completion of the contract to the satisfaction of the company, the bank

guarantee shall be released after due claim period.

20. In the event of any question or dispute under his contract, the same shall be referred to a

competent authority in the company for sole arbitration and his decision shall be final and

binding on the parties to this contract.

21. The company reserves the right to enter into parallel agreement with one or more contractor at

their discretion.

22. Disputes, grievances between the contractor and his labour will have to be secured by the

contractor only.

Page 17: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

17

23.The labour employed by the contractor, if found in abetting any fellow labour or contractors or

any BHEL employee, the same shall be considered as an act of indiscipline. Such labourers shall

be removed from the services of the contractor, on the advice of BHEL. Further the contractor

shall initiate every necessary action in accordance with the relevant laws, Rules & Regulations

and enactments of State and Central govt.

24. Wherever BHEL/Company standards are mentioned, copies of which are enclosed shall be

strictly followed.

25. Nothing contained in the contract agreement and its conditions shall be deemed to preclude or

render inoperative the service of any notice, letter or other communication upon the contractor

personally.

26. The decision of the “Contract Signing Officer” shall be final and binding on the contractor on

all technical questions which may raise touching the contract with respect to the quality of

material, workmanship, removal of improper work, interpretation of the working drawings,

specifications, notes, procedure etc.

27. Entry and exit from the factory will be controlled by CISF Security as per the rules and which

the contractor has to follow.

28. The contractor has to execute the job in shifts as directed by the Sr. DGM/Plng. (EM).

29. Material/Facilities and tools required for carrying out the works inside the factory will be

supplied by the department free of cost.

30. The work is fully intermittent in nature and can be operated in spells in accordance with our

requirement.

31. In case it is found that particular area has not been attended to and /or the requirement of labour

as specified has not been engaged on the work, recoveries will be made from the bills in

proportion of the rates quoted.

32. All BHEL General Conditions of contract will apply to this work.

33. The decision of the SR.DGM/PLNG(EM) will be final and binding on the contractor in all the

matters of the contractor.

34. The contractor and his men should follow BHEL security regulation in force and amended from

time to time. Suitable action will be taken including summary termination/legal action for

breach of out security regulation by either the contractor or his men.

35. Any partner / Director of the firm/Company of the contractor banned by BHEL earlier and got

registered under different company/firm name are not eligible to quote.

Signature of the officer

on behalf of the company

Signature of the contractor

Page 18: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

18

TO BE FILLED BY BIDDER

Name of the vendor and their address/ Contact person

1. Name of the Contractor / Firm :

2. Permanent Address & Phone Nos. :

3. Present Address & Phone Nos. :

4. Contact person name :

5. Mobile No. :

6. E mail :

Agency shall provide e-mail id for

communication. BHEL will

communicate through e-mail for required

data/ intimation of dates.

7. Fax :

ALTERNATE PERSON

8. Name :

9. Mobile No. :

Page 19: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

19

INFORMATION ABOUT THE CONTRACTOR/FIRM

The following information shall be furnished by the tenderer.

1.0 In case of Individual

1.1 Name of Business :

1.2 Whether his business is registered / :

Licensed

1.3 Date of commencement of business :

1.4 Proprietary certificate with attestation :

by notary to be enclosed

(in case of proprietary firm)

2.0 In case of Partnership / Limited Company

2.1 Name of Partners :

2.2 Whether the partnership is registered :

If so, copies of registration of firm and

Partnership deed.

2.3 Date of establishment of firm :

2.4 Power of Attorney holder :

(copy to be enclosed)

2.5 Article of Association in case of :

Limited Company

Page 20: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

20

TECHNICAL CUM COMMERCIAL BID

Name of work : Partial off- loading for additional Semi-skilled operations in core assly & machine

assly, machine shops, copper shop, coil shop, stator winding, rotor winding and insulation shop area

of 02 shop.

S.No. Description Data to be filled by Bidder/Contractor

1 Details of tender document cost

(DD or Cash receipt No.)

(DD has to be enclosed

along with Technical bid).

Amount : Rs

C.R/DD No :

C.R/DD date :

Bank :

Branch :

2 Details of EMD

(DD or Cash receipt No.)

(If vendor have produced one time EMD that

copy should be renewed or attested by issuing

officer otherwise bid will be liable for rejection )

Amount : Rs

C.R/DD No :

C.R/DD date :

Bank :

Branch :

Valid up to date:

3 Particulars of Experience/Credentials

As per pre qualification requirements. (Work

completion certificates to be enclosed)

(If vendor have submitted Pvt. Company

experience, the following details should be

submitted along with technical bid:

1. Awardal Copy

2. Agreement Copy

3. Completion certificate

4. Payment details

5. TDS

6. ESI Challans

7. PF Challans

Otherwise bid will be liable for rejection )

:

4 Annual turnover during 3 years

(30% of the estimated cost) (Audited/CA

Certified)

( supporting documents along with IT returns

are to be enclosed )

Assessment years

2012-13 :

2011-12 :

2010-11 :

5 P.F. Code No. (Copy to be enclosed) In case not

available, party shall submit the PF code before

commencement of the work

:

6 E.S.I. Code No. (Copy to be enclosed) :

7 PAN No. (Copy to be enclosed) :

Page 21: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

21

8

Labour License(Central)

Validity up to

In case not available, bidder shall submit the

License before commencement of the work

:

9 Service Tax No.

(Copy of certificate/Proof of application to be

enclosed)

:

NOTE:

1. In case valid proof in support of any of the items mentioned above at serial nos 1 to 9 is not

enclosed then the tender will be rejected summarily.

2. In case the agency has not satisfied all the above conditions with documentary proof, the bid is liable to be rejected and their price bid will not be opened. Any of the documents submitted is found to be false, action will be taken as per CVC guide lines strictly.

3. In case of a firm, all the above shall be in the name of the firm. However in case of sole proprietor or individuals these can be on the name of the sole proprietor or individual.

4. Though some of above documents are available with BHEL for those agencies who are presently working with BHEL, they also should submit one copy of the same.

5. All the columns shall be filled with proper information.

6. BHEL reserves the right to reject or cancel the tender at any stage of the tendering process without assigning any reasons there of in the interest of the Company.

7. After scrutiny of technical bids, reverse auction will be resorted only if required or normal sealed price bids will be opened for finalisation of contract.

8. I/We accept all the terms and conditions of the Techno commercial bid.

9. Any corrigendum or extension of due dates will be posted on BHEL website only. Signature of Tenderer ISSUING

Page 22: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

22

BUSINESS RULES FOR REVERSE AUCTION

GENERAL TERMS AND CONDITIONS OF REVERSE AUCTION Against this Enquiry for the subject with detailed scope of supply/services as per our requirement, BHEL may resort to “ONLINE REVERSE AUCTION PROCEDURE” i.e. ONLINE BIDDING on INTERNET.

1. For the proposed reverse auction, technically and commercially acceptable bidders only shall be eligible to participate.

2. BHEL will engage the services of a Service Provider who will provide all necessary training

and assistance before commencement of on line bidding on Internet.

3. Business rules like event date, time, start price, bid decrement, extensions, etc. also will be communicated through Service Provider for compliance.

4. Contractors have to email a scanned copy of the Process Compliance Form (provided by

Service Provider) before start of Online Initial Sealed Bid. Without this form, the vendor will not be eligible to participate in the event.

5. Reverse auction will be conducted on schedule date & time.

6. At the end of reverse auction event, the lowest bidder value will be known on the network.

7. The lowest bidder has to email a scanned copy of the price break-up & confirmation duly

signed filled-in prescribed format (as per BHEL’s price excel sheet) as provided on case-to-case basis to BHEL through Service Provider within 24 hours of the reverse auction without fail.

8. Any variation between the on-line bid value and signed document will be considered as

sabotaging the tender process and will invite disqualification of vender to conduct business with BHEL as per prevailing procedure.

9. In case BHEL decides not to go for Reverse auction procedure for this tender

enquiry, the price bids and price impacts, if any already submitted and available with BHEL shall be opened as per BHEL standard practice.

10. Only those vendors, who participate in the Online Initial Sealed Bid, will be eligible to

participate in the subsequent Online English Reverse Auction.

11. The reverse auction will be treated as closed only when the bidding process gets closed in all respects for the works listed in the tender.

Signature of Tenderer ISSUING OFFICER

Page 23: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

23

Please go through the guidelines given below and submit your acceptance to the same. 1. Computerized reverse auction shall be conducted by BHEL, on pre-specified date, while the

vendors shall be quoting from their own offices/ place of their choice. Internet connectivity shall have to be ensured by vendors themselves. In extreme case of failure of Internet connectivity, (due to any reason whatsoever may be) it is the bidders’ responsibility / decision to send fax communication immediately to Service Provider. Furnishing the price the bidder wants to bid online with a request to the Service Provider to upload the faxed price on line so that the Service Provider will up load that price on line on behalf of the Bidder. It shall be noted clearly that the concerned bidder communicating this price to Service Provider has to solely ensure that the fax message is received by the Service Provider in a readable / legible form and also the Bidder should simultaneously check up with Service Provider about the clear receipt of the price faxed. It shall also be clearly understood that the bidder shall be at liberty to send such fax communications of prices to be up loaded by the Service Provider only within the closure of Bid time and under no circumstance it shall be allowed beyond the closure of Bid time / reverse auction. It shall also be noted that the service provider should be given a reasonable required time by the bidders, to upload such prices online and if such required time is not available at the disposal of the Service provider at the time of receipt of the fax message from the bidders, the Service Provider will not be uploading the prices and either BHEL or the Service Provider are not responsible for this unforeseen circumstances. In order to ward-off such contingent situation bidders are requested to make all the necessary arrangements/ alternatives whatever required so that they are able to circumvent such situation and still be able to participate in the reverse auction successfully. Failure of power at the premises of vendors during the Reverse auction cannot be the cause for not participating in the reverse auction. On account of this, the time for the auction cannot be extended and neither BHEL nor Service Provider are responsible for such eventualities.

2. Service Provider shall arrange to demonstrate/ train your nominated person(s), without any cost to you. They shall also explain you, all the Rules related to the Reverse Auction/ Business Rules Document to be adopted along with bid manual. You are required to give your compliance on it before start of bid process.

3. The quoted rates on all works shall be Exclusive of all taxes as applicable. 4. The prices quoted should be firm.

Signature of Tenderer ISSUING OFFICER

Page 24: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

24

5. Procedure of Reverse Auction:

i. Online Initial Sealed Bid: The opening bid (In the initial auction) of the bidders shall be same as that quoted in their Final Sealed price submitted to BHEL. The bidders shall confirm in writing to BHEL that their opening bid shall be same as that quoted in their final valid Sealed price bid submitted against tender notice no. HY/EMP/TENDERS/2012-13/07 Dt.19/11/2012. If it is found to be otherwise at a later date, the bidder will be disqualified from the tender.

ii. Online English Reverse (no ties) Auction {Dynamic Reverse Auction}: BHEL will

declare its Opening Price (OP), which shall be visible to all the vendors during the start of the Dynamic Reverse Auction. You will be required to start bidding after announcement of Opening Price and decrement amount. Also, please note that the start price of work in the online reverse auction is open to all the participating bidders. Any bidder can start bidding, in the online reverse auction, from the start price itself. If the start price is your own Online Initial Sealed Bid price, you still need to bid in the online reverse auction. Moreover, please note that the first online bid that comes in the system during the online reverse auction can be equal to the auction's start price, or lesser than the auction's start price by one decrement, or lesser than the auction's start price by multiples of decrement. The second online bid and onwards will have to be lesser than the L1 rate by one decrement value, or lesser than the L1 rate by multiples of the decrement value.

iii. The bid decrement amount shall be specified by BHEL.

iv. After the completion of English Reverse (no ties), the Closing Price (CP) shall be

available for further processing. 6. Successful vendor shall be required to submit the final prices, quoted during the English

Reverse (no ties) in the Format after the completion of Auction to BHEL, duly signed and stamped as token of acceptance without any new conditions other than those already agreed to before start of auction.

7. English Reverse (no ties) shall be for a period of 30 minutes. If a bidder places a bid in the

last 5 minutes of closing of the Reverse Auction and if that bid gets accepted, then the auction’s duration shall get extended automatically for another 5 minutes, for the entire auction (i.e. for all the items in the auction), from the time that bid comes in. Please note that the auto-extension will take place only if a bid comes in those last 5 minutes and if that bid gets accepted. If the bid does not get accepted, the auto-extension will not take place even if that bid might have come in the last 5 minutes. In case, there is no bid in the last 5 minutes of closing of Reverse Auction, the auction shall get closed automatically without any extension. However, vendors are advised not to wait till the last minute or last few seconds to enter their bids during the auto-extension period to avoid complications related with internet connectivity, network problems, system crash down, power failure etc.

Signature of Tenderer ISSUING OFFICER

Page 25: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

25

8. During the Online English Reverse (No Ties) Auction, if no bid is received in the auction

system/website within the specified time duration of the reverse auction, then BHEL, at its discretion, may decide to revise the auction's Opening Price / scrap the online reverse auction process / proceed with the conventional mode of tendering (opening of the hard copy final bids submitted by you earlier to BHEL).

9. Your bid will be taken as an offer to execute the work. Bids once made by you, cannot be

cancelled/withdrawn and you shall be bound to execute the work as mentioned above at your final bid price. Should you back out and not execute the contract as per the rates quoted, BHEL shall take action as appropriate.

10. You shall be assigned a Unique User Name & Password by BHEL or/ Service Provider.

You are advised to change the Password and edit the information in the Registration Page after the receipt of initial Password from BHEL/ Service Provider to ensure confidentiality. All bids made from the Login ID given to you will be deemed to have been made by your company.

11. You shall be able to view the following on your screen along with the necessary fields in the

English Reverse (no ties) { Reverse Auction} :

a. Leading Bid in the Auction (only total price of package) b. Bid Placed by you c. Your rank d. Opening Price & decrement value.

12. At the end of the Reverse Auction, BHEL will decide upon the winner. BHEL’s decision on award of Contract shall be final and binding on all the Bidders.

13. BHEL shall be at liberty to call the lowest bidder for negotiations / cancel the reverse auction

process / tender at any time, before ordering, without assigning any reason. 14. BHEL shall not have any liability to bidders for any interruption or delay in access to the site

irrespective of the cause. 15. Other terms and conditions shall be as per your techno-commercial offers and other

correspondences till date. 16. You are required to submit your acceptance to the terms/ conditions/ modality given above

before participating in the reverse auction. 17. Those vendors, who have participated in the Online Initial Sealed Bid, will only be eligible to

participate in the subsequent Online English Reverse Auction.

Signature of Tenderer ISSUING OFFICER

Page 26: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

26

19. Material for Bid

i. Works contract for Partial off- loading for additional Semi-skilled operations in core assly

& machine assly, machine shops, copper shop, coil shop, stator winding, rotor winding

and insulation shop area of 02 shop as per Tender notice no.HY/EMP/TENDERS/12-13/07

Dt.19/11/2012 for a quantity of 3,187.5 M T, equivalent to 6,375 Mandays for total

value of Rs.36,75,188/-.

ii. Starting bid/Bid decrement : The opening price of Reverse Auction and Bid

decrement value shall be available to the bidders. At start of RA the same

will be displayed on the auction website.

iii. Bidding currency and unit of measurement, bidding and evaluation will

be conducted in Indian Rupees (INR) of the item.

iv. The above work consists of execution of semiskilled works by Fitters, Electricians,

Turners, Machinists, Welders, in assembly of generators, taping of coils, winding of 2

Pole/4 Pole rotors, winding works in stator winding. Fitter operations in the area of power

generation equipments, machine tools or equipments assembly, disassembly/ Electrical

works in the area of tapping or winding or brazing operations related to electrical

equipments or machines/ turning works on lathes/milling work on milling

machines/welding operations in the area of welding of pipes, plates etc., Contractor has

to carry-out any type of relevant works as per the instructions of the concerned officials.

v. BHEL SCOPE: BHEL will arrange electrical power supply, instruments, tools

and necessary battery trucks, forklift etc., required for carrying out the above

works.

vi. Rates are to be quoted Exclusive of all taxes and rates are to be quoted in

figures and words by the tenderer. In case of discrepancy in figures and words

the rates quoted in words shall only be considered by BHEL.

vii. BHEL estimates semiskilled worker can work for 0.5 MT of Material processing in

a Man-day.

viii. No increase in rate of DA / Wages hike shall be reimbursed to the

contractor. Contractor shall anticipate such hike and quote in the tender.

ix. The prices quoted should be valid for a period of 60 days from the date of Reverse

Auction and firm till the complete execution and extension period (if any) , in the event

of order.

Page 27: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

27

TERMS AND CONDITIONS FOR REVERSE AUCTION

1. LOG IN NAME & PASSWORD: Each Bidder is assigned a Unique User Name & Password by Service Provider. The Bidders are requested to change the Password and edit the information in the Registration Page after the receipt of initial Password from Service Provider. All bids made from the Login ID given to the bidder will be deemed to have been made by the bidder.

2. BIDS PLACED BY BIDDER: The bid of the bidder will be taken to be an offer to execute the

work. Bids once made by the bidder cannot be cancelled. The bidder is bound to execute the work as mentioned above at the price that they bid. Should any bidder back out and not make the supplies as per the rates quoted, BHEL and / or Service Provider shall take action as appropriate.

3. LOWEST BID OF A BIDDER: In case the bidder submits more than one bid, the lowest bid

will be considered as the bidder’s final offer to execute the work.

4. AUCTION TYPE: 1) Online Initial Sealed Bid / Initial Auction. 2) Online English Reverse (No Ties) Auction (refer Bidder Manual for details) / Dynamic Reverse Auction.

5. DURATION OF AUCTION: The duration of Auction will be for 30 Minutes. If a bidder places

a bid in the last 5 minutes of closing of the Reverse Auction and if that bid gets accepted, then the auction’s duration shall get extended automatically for another 5 minutes, for the entire auction (i.e. for all the items in the auction), from the time that bid comes in. Please note that the auto-extension will take place only if a bid comes in those last 5 minutes and if that bid gets accepted. If the bid does not get accepted, the auto-extension will not take place even if that bid might have come in the last 5 minutes. In case, there is no bid in the last 5 minutes of closing of Reverse Auction, the auction shall get closed automatically without any extension. However, vendors are advised not to wait till the last minute or last few seconds to enter their bids during the auto-extension period to avoid complications related with internet connectivity, network problems, system crash down, power failure, etc. (THIS SCHEDULE IS TENTATIVE. IN CASE OF CHANGE IN SCHEDULE, THE SAME SHALL BE COMMUNICATED TO YOU)

6. BID DECREMENT: The minimum Bid decrement shall be available to the Bidders at the

start of the auction. The bidder can view the same by clicking on the Item details at the start of the auction. The bidder can bid lower than the Lowest Bid in the auction by a decrement, multiples of the minimum Bid decrement. Also, please note that the start price of an item in the online reverse auction is open to all the participating bidders. Any bidder can start bidding, in the online reverse auction, from the start price itself. If the start price is your own Online Initial Sealed Bid price, you still need to bid in the online reverse auction. Moreover, please note that the first online bid that comes in the system during the online reverse auction can be equal to the auction's start price, or lesser than the auction's start price by one decrement, or lesser than the auction's start price by multiples of decrement. The second online bid and onwards will have to be lesser than the L1 rate by one decrement value, or lesser than the L1 rate by multiples of the decrement value.

7. VISIBLITY TO BIDDER: The Bidder shall be able to view the following on his screen along

with the necessary fields during English Reverse –No ties Auction: - Leading Bid in the Auction - Bid Placed by him - His Own Rank - Start Price & Bid Decrement Value

Signature of Tenderer ISSUING OFFICER

Page 28: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

28

8. AUCTION WINNER: At the end of the Reverse Auction, BHEL will evaluate all the bids

submitted and will decide upon the winner. 9. PROXY BIDS: Proxy bidding feature is a pro-supplier feature to safe guard the supplier’s

interest of any Internet failure or to avoid last minute rush. The Proxy feature allows Bidders to place an automated bid against other Bidders in an auction and bid without having to enter a new amount each time after competing Bidder submits a new offer.

The bid amount that a Bidder enters is the minimum that the Bidder is willing to offer. Here the software bids on behalf of the supplier.

- The proxy amount is the minimum amount that the Bidder is willing to offer. During the course of bidding, the Bidder cannot delete or change the amount of a Proxy Bid.

- Bids are submitted in decrements (decreasing bid amounts). The application

automates proxy bidding by processing proxy bids automatically, according to the decrement that the auction originator originally established when creating the auction, submitting offers to the next bid decrement each time a competing Bidder bids, regardless if competing bids are submitted as proxy or standard bids. However it may please be noted that if a manual bid and proxy bid are submitted at the same instant manual bid will be recognized as the L1 at that instant.

- This feature can be used only once during a particular Reverse Auction and only

after the L1 rate is equal to or less than the minimum bid amount that the bidder has put in the system will he get the option to manually bid for the same. In no case during the bidding till the L1 rate or less is not reached as equivalent to the minimum bid amount offered by the bidder, will the bidder get the option to manually bid for the same.

10. OTHER TERMS & CONDITIONS:

- The Bidder shall not involve himself or any of his representatives in Price

manipulation of any kind directly or indirectly by communicating with other suppliers / bidders.

- The Bidder shall not divulge either his Bids or any other exclusive details of BHEL to any other party.

- BHEL’s decision on award of Contract shall be final and binding on all the Bidders. - BHEL along with Service Provider can decide to extend, reschedule or cancel any

Auction. Any changes made by BHEL and / or Service Provider after the first posting will have to be accepted if the Bidder continues to access the site after that time.

- Service Provider shall not have any liability to Bidders for any interruption or delay in access to the site irrespective of the cause.

- Service Provider is not responsible for any damages, including damages that result from, but are not limited to negligence.

- Service Provider will not be held responsible for consequential damages, including but not limited to systems problems, inability to use the system, loss of electronic information etc.

11. The details of Service Provider and other formats related to Reverse Auction will be intimated to Contractors, who are technically and commercially acceptable bidders only.

Signature of Tenderer ISSUING OFFICER

Page 29: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

29

Guidelines and statutory payments for submitting tenders for

Partial off- loading for additional Semi-skilled operations in core assly & machine assly,

machine shops, copper shop, coil shop, stator winding, rotor winding and insulation shop area

of 02 shop.

As per BHEL HR Circular HR/IR/CL/DA/01.10.2012 Dt : 16.10.12 the daily wage rate is

exclusive of Holiday and Leave ,Bonus, PF,ESI, PPE‟s and Uniform. Wage rates with effect from

01/10/2012

U S W : Rs.359.65 per day inclusive of Weekly off

S S W : Rs.393.30 per day inclusive of Weekly off

S W : Rs.426.42 per day inclusive of Weekly off

i) Leaves and Holidays

11 days paid holidays / per year

+ 18 paid leaves / per year.

ii) P F and E S I contributions

PF @ 12 % and ESI @ 4.75 % of basic wages should be contributed by the contractor on above

daily wages.

iii) Bonus @ 20%

iv) PPE‟s @3%

v) Uniform per year (Rs.1000/-)

vi) One supervisor to be deployed along with workers.

Note : Daily wage rate may change as per the changes in minimum wages /DA declared by

Government.

Page 30: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

30

CONTRACTOR’S DECLARATION

I/We have quoted my/our rate for the work of "Partial off- loading for additional Semi-

skilled operations in core assly & machine assly, machine shops, copper shop, coil shop, stator

winding, rotor winding and insulation shop area in 02 shop" taking into account minimum

wages payable to my workers as follows :

1. Un skilled worker Rs. 359.65

2. Semiskilled worker Rs. 393.30

3. Skilled worker Rs. 426.42

I/We promise to pay my/our workers minimum wages, over time wages and bonus under the

payment of bonus act 1965 as above besides adhering to other statutory obligations under contract

labour (Regulation & Abolition) Act.1970 and Rules framed there under with subsequent revisions if

any.

I/We have read and understood the Terms & Conditions, Special instructions, Special

conditions along with General Terms and Conditions before submitting this offer and I/We will

abide to them.

Also, I/We have thoroughly examined the tender specifications, nature and scope of

work/schedule of work, drawings and the location where the said work is to be done to understand

the intention of same and the requirements, covenants, agreements, stipulations and restrictions

contained in the contract and distinctly agree that I/We will not hereafter make any claim or demand

upon the Bharat Heavy Electricals Limited based upon or arising out of the said requirements,

covenants, agreements, stipulations, restrictions and conditions.

Thanking you,

Your‟ Faithfully

Date: Signature of Contractor with seal

Page 31: BHARAT HEAVY ELECTRICALS · PDF fileBHEL, R.C. PURAM, HYDERABAD FOR ... shop, stator winding, rotor winding and insulation shop area ... Bharat Heavy Electricals Limited, R C Puram,

31

PART - B

PRICE BID

Name of the Work : Partial off- loading for additional Semi-skilled operations in core assly &

machine assly, machine shops, copper shop, coil shop, stator winding, rotor winding and insulation

shop area of 02 shop.

Tender Notice no. : HY/EMP/TENDERS/ 2012-13/07 Dt : 19.11.2012.

Sl.

No Description of Work Unit

Approx.

Qty Unit Rate Total Amount

1

Partial off- loading for additional

Semi-skilled operations in core assly

& machine assly, machine shops,

copper shop, coil shop, stator winding,

rotor winding and insulation shop area

of 02 shop.

M .T

3,187.5

In words

Unit Rate : Rupees ________________________________________________________________

Total Amount : Rupees _____________________________________________________________

1) Unit one (1) M.T. equivalent to two (2) Man days i.e., 3,187.5 M.T. equivalent to 6,375 Mandays. 2) The units mentioned above is only indicative and subject to variation. The actual

units may increase or decrease depending upon actual production requirement. 3) The Prices quoted above must be exclusive of Service Tax, which will be payable extra as per applicable rules and subject to submission of documentary evidence. 4) No increase in rate of DA / Wages hike shall be reimbursed to the Contractor. Contractor shall anticipate such hike and quote in the tender. Signature Signature

of the contractor with seal Sr.DGM/Plng.(EM)

.