barrier shell

6
One of the modules moved onto a barge ready for sea transfer to on the Nyhamna project in Norway , The construction was at the OGN Fabrication Yard at Wallsend Newcastle JT

Upload: james-tumilty

Post on 08-Apr-2017

191 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Barrier Shell

One of the modules moved onto a barge ready for sea transfer to on the Nyhamna project in Norway , The construction was at the OGN Fabrication Yard at Wallsend

Newcastle JT

Page 2: Barrier Shell

Facts about Nyhamna Expansion Project:The purpose of the Nyhamna Expansion Project is that the Nyhamna plant should be able to receive gas from other fields on the Norwegian Continental Shelf. In addition, first phase of compression of the Ormen Lange field will be executed by installing dual compressors on the Nyhamna plant.The Nyhamna plant was originally built with a processing capacity of 70 million standard cubic meters of gas per day. After Nyhamna Expansion Project, the capacity of the plant will be 84 million standard cubic meters and thereby correspond to the dimensioned volumes of the Langeled pipeline.

Page 3: Barrier Shell

NORSOK- Insulation sample fitted to specification

Page 4: Barrier Shell

Modules in the construction phase.

Page 5: Barrier Shell
Page 6: Barrier Shell