Shell Global Solutions International B.V. CONFIDENTIAL 1
Development of a New Emergency System for High Pressure Gas Transfer Arms
Pablo Vega PérezProcess Engineer Gas & LNG
February 2019
The Hague, February 2019
Shell Global Solutions International B.V. CONFIDENTIAL
Content of the presentation
1
2
3
4
Background
Managing Technology Risks
Concept Development
Proof of Concept
2February 2019
5 Commercialisation and Advocacy
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL 3
Background
February 2019
1.0
Shell Global Solutions International B.V. CONFIDENTIAL
Feed gas extraction
1
Gas treating
2
Gas liquefaction
3
Large scale LNG transportation
4
Regasification,breakbulk, bunkering, LNG for transport
5
Overseas market development
6
Exploration &production
Gas treating,separation Liquefaction LNG
transport Regasification Distribution/Sales
LNG supply chain
4February 2019Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
Onshore LNG regasification terminals
5February 2019
HIGH PRESSURE PUMPS
GAS GRID
VAPORISERSPRIMARYPUMPS
STORAGE TANKS
VISITING LNG CARRIER
60 – 100 barg
Shell Global Solutions International B.V. CONFIDENTIAL 6February 2019
Floating storage & regasification units (FSRU)
VISITING LNG CARRIER FSRU
60 – 100 barg
GAS GRID
Shell Global Solutions International B.V. CONFIDENTIAL
FSRU population
7February 2019
0
5
10
15
20
25
30
35
40
45
2006 2008 2010 2012 2014 2016 2018 2020 2022
Num
ber o
f FSR
Us
Calendar Year
FSRU POPULATION
Shell Global Solutions International B.V. CONFIDENTIAL February 2019 8Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL February 2019 9
Marine loading arms
Mechanical structure supporting of a set of
articulated pipes.
Designed to operate within a specific envelope
An emergency release system (ERS) protects
the arm in case of excessive movement
The ERS is able to automatically isolate the arm
from the ship and then disconnect
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL February 2019 10
Marine loading arms
Mechanical structure supporting of a set of
articulated pipes.
Designed to operate within a specific envelope
An emergency release system (ERS) protects
the arm in case of excessive movement
The ERS is able to automatically isolate the arm
from the ship and then disconnect
Shell Global Solutions International B.V.
Emergency release system
LNG High Pressure Gas
Pressure < 5 barg Pressure <100 barg
Shell Global Solutions International B.V. CONFIDENTIAL 11
Managing Technology Risks
February 2019
2.0
Shell Global Solutions International B.V. CONFIDENTIAL
Technology development release
12February 2019
New technology undergoes a thorough review process beforefirst project deployment
The goal is to assess level of maturity and to understand the associated technical risks
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
Risk management
13February 2019
UNACCEPTABLE
TOLERABLE IF ALARP
BROADLY ACCEPTABLE
Incr
easi
ng R
isk
“ALARP is achieved when risk is reduced to a level at which the cost and effort (time and trouble) of further risk reduction are grossly disproportionate to the risk reduction achieved.”
Shell Global Solutions International B.V. CONFIDENTIAL
Initiating events
THE RISK RETURN FREQUENCY CHANGES WITH THE SPECIFIC FSRU LOCATION
Extreme waves/currents/winds
Tropical cyclone
Squalls
Tsunami
Earthquake
Ship Collision
Human error of commission
FSRU Engine testing
Ballasting Procedure
Accidental Release of Mooring Hooks
Rupture of a FSRU Mooring Line
Floating Storage and Regasification Unit (FSRU)
14February 2019
Shell Global Solutions International B.V. CONFIDENTIAL
The hazard
Flammable substance. There is a potential for ignition leading to fire,explosions, etc.
Pressurised gas in large volume. Being compressible, gases canstore significant potential energy that could lead to a violent anddestructive set of events if rapidly released, due to the effect of theexplosive decompression and reaction forces (even without ignition).
Compressed Natural Gas
HAZARD
THE CONSEQUENCE SEVERITY IS IMPACTED BY THE POTENTIAL ENERGY OF THE SYSTEM
15February 2019
Shell Global Solutions International B.V. CONFIDENTIAL
Safety barriers
16February 2019
A safety barrier is an element that prevents, controls ormitigates a risk
The risk reduction of a barrier is measured by itsprobability of failure on demand (PFD)
A risk assessment process establishes whether the armsrequire an emergency release system (ERS) anddetermines its required risk reduction target.
Shell Global Solutions International B.V.
Prevention Barriers
Recovery Barriers
HA
ZA
RD
CO
NSE
QU
ENCE
Loss of Containment
Shell Global Solutions International B.V. CONFIDENTIAL
Safety hardware critical failures
Critical failure effect
Dangerous Safe
On demand Spurious
17February 2019Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
Spurious ERS activation incident during LNG transfer to shore
18February 2019
Shell Global Solutions International B.V. CONFIDENTIAL
Risk of spurious ERS activation
19February 2019
Loading arm
proximity switches
ERS activation pushbutton
PLC Solenoid
Sensor
Logic Solver
Electro-hydraulic valve
Legend
Actuator
CONVENTIONAL LOW PRESSURE LNG EMERGENCY RELEASE SYSTEM
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
History of spurious ERS activations during LNG transfer operations
20February 2019
8.57E-03 7.84E-03 5.60E-03 4.03E-032.35E-03
6.35E-03
1.E-06
1.E-05
1.E-04
1.E-03
1.E-02
1.E-01
1.E+00
Historic Spurious Failure Rate LNG ERS [yr-1]Cause of Release Number of Incidents
% of Reported Incidents
Component Failure 9 28%
Operational 8 25%
Software related 5 16%
Multiple causes 3 9%
Commissioning 1 3%
Others 6 19%
Total 32 100%
Data source: LNG Emergency Release Systems. Recommendations, Guidelines and Best Practices [Report] / auth. SIGTTO. - [s.l.] : Witherby, 2017
Data collected since 1995
Component Failure: a spurious activation as a result of a hardware failure.
Operational: a spurious activation as a result of human error.
Software Related: a spurious activation as a result of a software fault.
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
Risk of spurious disconnection
21February 2019
Loading arm
proximity switches
ERS activation pushbutton
Solenoid
Solenoid
Solenoid
Solenoid
PLC
PT
Sensor
Logic Solver
Electro-hydraulic valve
Legend
InstrumentedPermissive
CONVENTIONAL HIGH PRESSURE GAS EMERGENCY RELEASE SYSTEM
Actuator Low Pressure
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
CFD explosive decompression of high pressure natural gas
February 2019 22
High pressure gas line Coupler location Open air
Shell Global Solutions International B.V. CONFIDENTIAL
Pneumatic test accident Shanghai LNG import terminal. Feb. 2009
23February 2019
Human scale
Shell Global Solutions International B.V. CONFIDENTIAL
Safety hardware critical failures
24February 2019
Critical failure effect
Dangerous Safe
On demand Spurious
Safe
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL 25
Concept Development
February 2019
3.0
Shell Global Solutions International B.V. CONFIDENTIAL
Design Objectives
26February 2019
Integrity to achieve the required PFD:
Component selection
Architecture design
Testing frequency
Sufficient spurious fault tolerancespurious fault tolerance
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
HP ERS concept design features
ESDVESDV
BDV
BDVGAS TOPIPELINE
FCFC
FO
FO
GAS TO FSRU VENT MAST
Hydraulic Power Unit
GAS FROM FSRU
27February 2019Shell Global Solutions International B.V.
ARM DRIVE CYLINDERS
Hydraulic Power Unit
FSRU Jetty
Shell Global Solutions International B.V. CONFIDENTIAL
Required failsafe operation of the coupler
Coupler not pressurised
Coupler pressurised
FAIL TO OPEN
FAIL TO CLOSE
Pressure-gated link
28February 2019Shell Global Solutions International B.V.
Two distinct failsafe scenarios
Shell Global Solutions International B.V. CONFIDENTIAL
Pressure-gated link connection
29February 2019Shell Global Solutions International B.V.
ESDVESDV
BDV
BDVGAS TOPIPELINE
FCFC
FO
FO
GAS TO FSRU VENT MAST
Hydraulic Power Unit
GAS FROM FSRU
ARM DRIVE CYLINDERS
Hydraulic Power Unit
FSRU Jetty
Shell Global Solutions International B.V. CONFIDENTIAL 30
Proof of Concept
February 2019
4.0
Shell Global Solutions International B.V. CONFIDENTIAL 31February 2019
1
Proof of concept
Intellectual Property
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL 32February 2019
1 2
Proof of concept
Intellectual Property
Contracting Strategy
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL 33February 2019
1 2 3
Proof of concept
Intellectual Property
Contracting Strategy
Detail Engineering
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL 34February 2019
1 2 3 4
Proof of concept
Intellectual Property
Contracting Strategy
Detail Engineering
Testing Protocol
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL 35
1 2 3 4 5
Proof of concept
Intellectual Property
Contracting Strategy
Detail Engineering
Testing Protocol
Prototype Construction
Shell Global Solutions International B.V. February 2019
Shell Global Solutions International B.V. CONFIDENTIAL 36
1
Intellectual Property
2 3 4 5 6
Contracting Strategy
Detail Engineering
Testing Protocol
Prototype Construction
Testing & Certification
Proof of concept
Shell Global Solutions International B.V. February 2019
Shell Global Solutions International B.V. CONFIDENTIAL
HP ERS testing
February 2019 37
Shell Global Solutions International B.V. CONFIDENTIAL
Key test results
38February 2019
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0 50 100 150 200 250 300 350 400 450
Pres
sure
, bar
Test cycle
Disengagement Pressure (PGL-B)
0
1
2
3
4
5
6
0 50 100 150 200 250 300 350 400 450
Pres
sure
, bar
Test cycle
Disengagement Pressure (PGL-A)
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
Rigorous design review (FMEA, HAZID, HAZOP, etc.)
Successfully tested simulating emergency release at real pressure conditions
500 testing cycles
Design and testing supervised and certified by TÜV Rheinland:
Design validation and certification
39February 2019Shell Global Solutions International B.V.
PFD: SIL 2 capability
SPT: 3.5E-6 yr-1
Shell Global Solutions International B.V. CONFIDENTIAL
HP gas transfer arm connection
40February 2019
ARM SIDE
FSRU SIDE
Shell Global Solutions International B.V. CONFIDENTIAL
HP gas transfer arm emergency release
ARM SIDE
FSRU SIDE
41February 2019
Shell Global Solutions International B.V. CONFIDENTIAL 42
Commercialisation and Advocacy
February 2019
5.0
Shell Global Solutions International B.V. CONFIDENTIAL
Commercialisation
43February 2019
▪ Shell retains ownership of the Shell HP ERS IP
▪ Shell HP ERS commercialised by Emco Wheaton under license
▪ Third parties have full access to Shell HP ERS
▪ Shell HP ERS can be retrofit in existing HP gas transfer arm
Shell Global Solutions International B.V.
Shell Global Solutions International B.V. CONFIDENTIAL
Advocacy
44February 2019
▪ Shell Project Partners
▪ FSRU Owners & Providers
▪ Classification Societies
▪ Loading Arms OEMs
▪ Industry Groups
▪ Technical standards working groups
▪ Industry Exhibitions and Conferences
TARG
ET G
ROU
PS
Shell Global Solutions International B.V.