bacchus marsh urban growth framework … · urban growth framework ... • a high level strategic...

16
Bacchus Marsh Urban Growth Framework Community Engagement February 2017

Upload: truongnhi

Post on 30-Aug-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Bacchus Marsh Urban Growth FrameworkCommunity EngagementFebruary 2017

Urban Growth Framework

What it IS:

• The first stage in a longer process of identifying land for future development.

• A high level strategic document that guides and directs future residential and economic growth.

• A broad indication of sites that may have development potential.

• Part of Council’s Moorabool 2041 strategic planning framework.

What it IS NOT:

• Planning controls.

• Land use plan, subdivision plan or development plan

• A fait accompli!

Why do we need a UGF in Bacchus Marsh? Bacchus Marsh is not an Island.

Metro Rail ticketing zones

Shopping & expenditure

Regional community infrastructure

Jobs & commuting

Growth in Melton & Wyndham

Freight & natural resources

Tourism & business growth

Education within districtWhat affects the metro economy

affects Bacchus Marsh.

In response do we?

26 years to 2041

500 new residents per year

220 new dwellingsper year

3% growthper year

BACCHUS MARSH DISTRICT

IN THE EAST ALONE(MERRIMU, HOPETOUN PARK &

SURROUNDS)

5000 new residents by 2041

1900 new homes (65 per year) by 2041

Not address growth pressures and allow developers to drive it with their own visions.

orActively manage and shape growth to direct how change occurs.

Vision

• A vibrant and sustainable regional centre.

• A 20-minute community with integrated housing, employment opportunities, shopping and daily activities.

• Well-connected and accessible for all.

• A community supported by a range of services and facilities.

• Recognised as the gateway to the Central Highlands region.

Current Planning Scheme – potential Eastern Link Rd

Eastern Link Road –shown in Planning Scheme since 2009

An Eastern Link Road has been an identified need since the mid 2000’s

BM Integrated Transport Strategy – Technical Findings (2015)

Lots of different options exist (and there may be others)

Needs corridor study to confirm alignment

BM Integrated Transport Strategy (2015)

The Challenges

Four key growth needs for Bacchus Marsh:

New residential areas (with schools & recreational facilities)

Potential second train station

Improved transport connections to the east(Eastern Link Road)

More local jobs

Consultations undertaken

850 completed surveys

2 community workshops

Surveyed professionals

Sand & coal mine operators

Studies undertaken – recurring issues

Part of Melbourne but physically separate

Greater retail choice required

Expanded education and health priorities

Change is inevitable but must be managed

Expanded education and health priorities

Ongoing investment in public transport and

non-vehicle movement

Traffic congestion & missing links

Support residents who live at home longer

Wider range of community

infrastructure required

The Background

Closing the gap on key planning matters:

• Prioritising a future eastern link road investigation (Woolpack Road versus alternatives).

• Appropriate buffers for State significant activities eg sand mines, irrigation district, coal mine/landfill.

• Future directions of housing growth once greenfield areas around Bacchus Marsh are developed.

Some of the Studies Undertaken … summary

Activity/Strategy Status

Moorabool Industrial Strategy (SGS) Adopted (2015)

Parwan Precinct Agribusiness

Analysis (CBRE)

Adopted (2015)

Parwan Servicing Plan (P.B) Adopted (2015)

Moorabool Retail Strategy

(Macroplan)

Adopted

(2016)

Moorabool Economic Development

Strategy (Geografia)

Adopted

(2015)

Bacchus Marsh Integrated Transport

Strategy (Cardno)

Completed

Bacchus Marsh Housing Strategy

(Mesh)

Adopted (2016)

Moorabool Shire Community

Infrastructure Framework (MSC)

Ongoing

Recreation and Leisure Strategy

2015-2021 (Simon Leisure)

Adopted

(2015)

Community visioning workshops and

discussion paper (MSC)

Completed mid

2015

Existing industrial estates best suited to service role. Need new precinct with larger buffers -Parwan

Opportunities in hydroponics, intensive agr., expansion of mushroom, poultry, abattoir etc. Infrastructure needs include road access to Western Freeway, water, gas.

Retail expansion in BM from 27,000 sq.m to 70,000 sq.m(2011-2041). 3 centre hierarchy – Main Street, Darley and West Maddingley. Bulky goods precinct TBC.

Increase local jobs from 6,083 (2011) to 10,541 (2031).

Rapid train patronage growth. Heavy vehicle route between Calder Freeway and Port of Geelong causing issues. Congestion in Maddingley. Missing links identified.

Housing supply and demand. Targeted growth around activity centres. Neighbourhood character mapping. New zones and controls. Housing choice/diversity.

Expected recreational gaps identified for 2041 include 5 x cricket ovals, 6 x AFL football ovals, 5 x soccer fields, 8 x netball courts.

See separate slide.* See also BM aerodrome masterplan (2016) and env. Mapping of Bacchus Marsh – Practical Ecology, 2016)

Projects currently underway

• Integrated Water Management Plan (Western Water)• Ballarat Line Upgrade (PTV) – including new platform at B.M• Buffer Assessment - to be commissioned Feb 2017 • Parwan

• Business Case – to be commissioned Feb 2017 • Business Case and Economic Analysis• Traffic Study • Drainage Study

• Bacchus Marsh Irrigation District – Modernisation of Water Supply (SRW)