Page 1: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

Atlin Hydro Expansion

Prefeasibility Study

Prepared for: Atlin Tlingit Economic Limited Partnership

General Information Meeting - April 18, 2015

Prepared by: Forest Pearson, P.Eng.

Logo by Wayne Carlick

Page 2: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

2

1. Background to the study

2. Study objective

3. Study tasks

4. Power production opportunity

5. Concept layout

6. Preliminary cost estimates

7. Next steps

Presentation Overview

Page 3: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

3

• In March 2009 the Atlin Hydro project was

commissioned to provide green energy to Atlin.

Background to the Study

• The power plant has an

installed capacity of

2.1MW

• ATELP has a power

sales obligation to BC

Hydro for a minimum &

maximum supply until

2033

Page 4: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

4

• The existing power

plant is under-

utilized.

• The plant has an

estimated average

potential generating

capacity of

11.6GWh/yr

• Long-term power

delivery obligation to

BC Hydro is only

8.3GWh/yr

Background to the Study

• The renewable power potential of Surprise Lake and Pine Creek is only partially

developed

Page 5: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

5

• The Yukon

forecasts that it will

not have enough

renewable energy

to meet growth in

electrical demand.

• An opportunity

exists for Atlin to

provide renewable

energy to help

meet Yukon’s

needs.

Background to the Study

Yukon’s Diesel/LNG Generation Requirements

Page 6: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

6

• Atlin Hydro Expansion prefeasibility study successfully awarded funding

in September 2014 from Aboriginal Affairs and Northern Development

Canada’s ecoENERGY for Aboriginal and Northern Communities

Program

Background to the Study

• Additional funding provided

by:

• Yukon Energy Corporation;

and

• In-kind contribution by

ATELP

At the end of the study ATELP will

have an asset regarding hydropower

development potential of Pine Creek.

Page 7: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

7

Goal of this study is:

1. What is the total hydropower potential of Pine Creek? How much

renewable energy can be produced by this natural resource?

2. How could this renewable energy potential be developed?

3. Does it appear to be economically feasible to develop?

Study Objective

How big is the green-

energy opportunity here

and is it worth pursuing?

Page 8: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

8

A Prefeasibility Study is to look at scale of opportunity – how big is it? What is the power

production opportunity?

Limitations of this phase of study include:

1. The project layout is developed to estimate power production and project costs

2. The project layout and operating scheme has not been optimized at this stage

3. Environmental constraints have not yet been taken into consideration. At this phase

we are just trying to determine the maximum opportunity before environmental

mitigations are applied.

These items are all next steps. These steps should be conducted if the project looks

attractive and if it is recommended to proceed to the next phase of study.

Study Objective

Page 9: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

9

1. Initial site visit by engineering team to understand existing infrastructure and the terrain

constraints (completed late September 2014).

2. New 1-meter contour mapping required for design of penstocks etc. (received in Dec. 2014)

3. Develop a preliminary layout for power plant expansion

4. Power production study (complete)

5. Flood study (to size spillways, etc., completed)

6. Preliminary design (currently in draft)

7. Prepare cost estimates (in progress)

Not included:

• Transmission line to Yukon – assumed from 2011 scoping study from Yukon Energy Corp.

Other studies in progress:

• New stream-flow monitoring program setup in fall 2014

• Environmental data gap & regulatory needs assessment currently in progress.

Study Tasks

Page 10: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

10

Power Production Opportunity

Existing

Head pond

& IntakeExisting

Penstock

Existing

Powerhouse

Proposed

New

Penstock

Proposed

Powerhouse

Expansion

(add 2.9 MW)

Proposed

New

Headpond

Proposed

New Lower

Penstock

Proposed

New Lower

Powerhouse

(2.5 to 3MW )

Atlin

Page 11: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

11

• Findings of power production

analysis for Surprise Lake &

Pine Creek:

• Total average annual power

production estimate:

42.5 GWh/yr

• Available for sale to Yukon:

35.6+ GWh/yr

• 2013 Atlin actual power

consumption:

5.3GWh

Power Production Opportunity

7.0

4.6

16

15

0

5

10

15

20

25

30

35

40

45

An

na

ul

Av

era

ge

En

erg

y P

rod

uct

ion

(G

Wh

/yr)

New lower powerhouse at

Atlin Lake (3MW +/-)

Expand existing powerhouse

(add 2.9MW)

Unused capacity (existing

2.1MW)

Atlin forecast need (2033)

11.6 GWh/yr total

potential estimated

from current

powerhouse

Page 12: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

12

Simulated Monthly Average Power Production

Power Production Opportunity

0.8 0.7 0.7 0.6 0.5 0.4 0.4 0.4 0.5 0.6 0.6 0.7

2.52.5

2.8

2.3

0.81.2

0.8 0.60.7

0.8

3.0 2.9

1.51.4

1.6

1.3

1.0

1.5

0.9

0.6

0.80.8

1.7 1.6

0.0

1.0

2.0

3.0

4.0

5.0

6.0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Mo

nth

ly A

ve

rag

e E

ne

rgy

Pro

du

ctio

n (

GW

h)

Lower Plant Production (3MW +/-)

Surplus from Expanded Upper Plant (5MW Installed Capacity)

Atlin Forecast Load (2033)

• Proposed operating

regime to maximize

winter power

production: when

electricity is needed.

• This maximizes

value for Yukon

energy sales.

Summer energy has

little or no value.

• Winter power

production is

achieved by storing

water in Surprise

Lake during the

summer to create

power (stream flow)

in winter months.

Page 13: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

13

New project elements includes:

1. Modification to Surprise Lake control structure to increase

water storage range in Surprise Lake.

2. Expansion to existing (“Upper”) Powerhouse:

• New intake at existing head pond

• New 5’ (1.52m) diameter penstock

• Expansion of powerhouse with 2 x 1.45MW new turbines

3. New Lower Powerhouse

• New head pond at confluence of Spruce and Pine Creeks

• 4km 7’ (2.2 m) diameter steel penstock

• Powerhouse at Atlin Lake

4. 100km 69kV transmission line to Jakes Corner

Conceptual Layout for Costing

Page 14: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

14

Conceptual Layout for Costing

Upper power plant head drop: 107m

Lower power plant head drop: ~50m

Page 15: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

15

• Twin existing penstock with

second penstock

• Re-use existing headpond

• Expand powerhouse to add

two more turbines

• Total generating capacity:

5MW

Conceptual Layout:

Upper Power Plant

Page 16: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

16

• New excavated head pond with overflow rockfill weir

• 4km long 2.2m (>7’) steel penstock (pending further evaluation)

• One 2.5 or 3MW Francis-type turbine

• Transmission line from lower to upper powerhouse

• Five different powerhouse locations considered, preferred location

below Monarch Mt. trail parking lot.

Conceptual Layout:

Lower Power Plant

Page 17: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

17

Conceptual Layout:

Lower Powerhouse

Page 18: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

18

Conceptual Layout:

Lower Powerhouse

Due to relative low

head (50m) a

Francis-type turbine

is required at the

lower powerhouse

This also requires a

“surge tank” or

surge-pipe up the

hillside. Example of similar Francis turbines at

Mayo-B powerhouse

Page 19: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

19

Key cost estimate considerations:

• Current project completed in 2009 was done at relatively low cost – ATELP

achieved good cost efficiencies in the project overall.

• For proposed expansion the cost estimate is prepared based on more

conventional project costs from recent project experience (Mayo-B, Taykwa

Tagamou Nation’s New Post hydro project etc.)

• Many items are significantly more costly in this estimate, however optimization

has not been conducted.

• Further work is needed to address the higher costs utilized – in particular related

to penstock costs.

Discussion of Cost Estimate

Page 20: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

20

1. Complete Pre-feasibility study

• Additional analysis of lower plant capacity is needed (2.5MW vs. 3MW), along with

penstock optimization (steel vs. two smaller HDPE?)

• Additional work warranted to better assess penstock costs

2. Initiate Feasibility Study

a. Start with “Project Confirmation” – preliminary geotechnical, confirm layout

assumptions and optimization of penstock costs.

b. Update cost estimate for transmission line

c. Conduct full feasibility study including site drilling, etc.

Next Steps

3. Initiate Regulatory & Environmental Assessment

work

4. Negotiations regarding Power Purchase

Agreement with Yukon

Page 21: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited

21

Original question: How big is the green-energy opportunity here and is it

worth pursuing?

• Atlin Hydro Expansion is a reasonable “small hydro” project with good energy

production:

• Atlin Hydro Expansion could produce a total annual average energy of 42 GWh/yr, of

which about 36 GWh/yr is available for sale to Yukon.

Conclusions

• The project is worth pursing and moving to the next

step:

• The project appears to be financially positive,

however work is needed to manage the range of

costs and will depend on the financial terms (price

Yukon is willing to pay, financing costs, etc.)

Page 22: Atlin Hydro Expansion Prefeasibility Studyyukonconservation.org/docs/Atlin_Hydro_Expansion...Atlin Hydro Expansion Prefeasibility Study Prepared for: Atlin Tlingit Economic Limited