AT L F Y 2 0 2 2 B O N D L I S T R E C O M M E N D AT I O N S
Background
The ATL is statutorily required to annually prepare and submit a list of projects of regional and state significance to the Governor’s Office of Planning and Budget (OPB) and General Assembly for potential inclusion in the state bond package.
2
Project Eligibility
Project is included in the ATL’s adopted ARTP
Project performed well in Project Performance Framework
Project must fully spend bond funds within 5 yearsper state requirements (85% within 3 years)
Projects included in the Bond List scenarios were required to meet the following criteria:
3
Project Performance Framework
4
R E G I O N A L S I G N I F I C A N C E C R I T E R I A
Project NameCrosses 2+ Counties or Connects 2+ Transit Operators
Improves Transit Reliability
Connects to 1+ Regional Activity Centers
Leverages Regional Mobility Improvements
Is or Connects to Transportation Terminal
Provides High Capacity Service
Capitol Ave/ Summerhill BRT Clayton County Transit Initiative – BRT
I-285 Transit in Express Lanes Transit Signal Priority SR 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center
Regional SignificanceEnhancement and expansion projects were required to meet three of the six criteria below to be considered “regionally significant”
6
Q1Higher Impact/
Lower Cost
Q2aHigher Impact/
Higher Cost
Q2bLower Impact/
Lower Cost
Q3Lower Impact/
Higher Cost
C1
C2
C3
B1
B2
B4
A3
A2
Cost Effectiveness (Millions)
Tota
l Po
ints
B3
A – Geographic Equity B – High Impact/Low Cost C – State of Good Repair Not on Bond List
Capitol Ave/ Summerhill BRT
Clayton County Transit Initiative BRT
I-285 Transit inExpress Lanes
Cobb Transit Signal Priority
SR 316 Park & Rides and Commuter Express Service
Capitol Ave/ Summerhill BRT
Cumberland Transfer Center
Track Renovation Phase IV
Station Rehabilitation Program
Cobb ADA Compliant Sidewalks
A1
A2
A3
B1
B2
B3
B4
C1
C2
C3
Bond List ProjectsScatterplot of ARTP Projects
Project Key
Projects included in the Bond List scenarios were required to meet the following criteria:
• Project is included in the ATL's adopted ARTP• Project performed well in the Project Performance
Framework• Project must fully spend bond funds within 5 years
per state requirements (85% within 3 years)
A1
Governing Principles quantified for each project by sorting against most relevant project-level performance criteria for each Principle and breaking into quartiles.
Project Alignment with Governing Principles• Regional Integration and Connectivity• Existing and Projected Population Density• Existing Employment Density• Land Use Mix and Community Impacts
• Transit Ridership Potential• Increased Useful Life• Safety, Security, and Environmental Impacts
• Existing Population – Communities of Interest• Low Wage Employment Density• Land Use Mix and Community Impacts• (Re) Development Potential
Equity
Environmental Sustainability
Economic Development and Land Use
• Transit Reliability• Safety, Security, and EnvironmentalImpacts
• Regional Integration and Connectivity• Existing/Projected Population Density• Existing Employment Density• Transit Reliability
• (Re) Development Potential• Projected Population• Transit Trips• Land Use Mix and Community Impacts
Return on Investment
Mobility and Access
Innovation
8
Project Name Governing Principles Alignment
Economic Development & Land Use
Environmental Sustainability Equity Innovation Mobility
& AccessReturn on
Investment
Capitol Ave/ Summerhill BRT Strongly Aligned
Clayton County Transit Initiative – BRT Strongly Aligned
I-285 Transit inExpress Lanes Strongly Aligned
Transit Signal Priority Strongly Aligned
State Route 316 Park-and-Rides Strongly Aligned
Cumberland Transfer Center Strongly Aligned
Track Renovation Phase IV Strongly Aligned
Station Rehabilitation – Program Schedule Well-Aligned
ADA Compliant Sidewalks Aligned
Governing Principles Alignment
9
RecommendedProject List
10
Project Name Sponsor Description Project Type QuadrantTotal
Capital Cost
Funding PhaseEstimated
Construction Start Date
Capitol Ave/ Summerhill BRT MARTA BRT service from the Atlanta BeltLine on the south to the
downtown core in the north. Expansion Q1: HI/LC $96M Implementation Q1 FY23
Clayton County Transit Initiative – BRT MARTA
BRT along routes 191 and 196 connecting Hartsfield-Jackson Atlanta International Airport to Clayton County Justice Center.
Expansion Q2a: HI/HC $375M Design/ Engineering Q3 FY23
I-285 Transit inExpress Lanes Various
High capacity transit from I-20 in DeKalb County, along the Top End of I-285 to I-20 in Cobb County with stations in Fulton County. Four segments correspond to the GDOT Express Lanes program.
Expansion Q2a: HI/HC* $660M* Design Q3 FY23**
Transit Signal Priority CobbLinc Transit signal priority on routes from City of Marietta to Cumberland CID/Town Center CID. Enhancement Q1: HI/LC $500K Implementation Q2 FY22
State Route 316 Park-and-Rides and Commuter Express Service
GCT Expansion of commuter service to SR 316, with two new park-and-rides and new route. Expansion Q1: HI/LC $35.875M Implementation Q1 FY22
Cumberland Transfer Center CobbLinc Development of new Cumberland Mall Transfer Center. Enhancement Q1: HI/LC $50M ROW/Design/
Potential P3 Q2 FY25
Track Renovation Phase IV MARTAFourth phase of MARTA’s rail restoration efforts in restoring heavy rail lines as part of the Authority’s ongoing State of Good Repair work and systemwide upgrades.
State of Good Repair Q1: HI/LC $205M Implementation Ongoing
Station Rehabilitation –Program Schedule MARTA Rehabilitation for all 38 stations, staged six or seven a
year until complete.State of
Good Repair Q2a: HI/HC $685M Implementation Ongoing
ADA Compliant Sidewalks CobbLincSidewalks, curbs, ramps, and crosswalk in compliance with the ADA, along CobbLinc local bus routes within unincorporated Cobb County.
State of Good Repair Q2b: LI/LC $6.25M Implementation Q2 FY22
ATL Bond Funding - Recommended Project List
* Does not include westside segment** Date aligns with planned GDOT I-285 Top End East construction start date. All other project segments construction dates follow I-285 Top End East segment. 11
§̈¦285
§̈¦20
§̈¦75
§̈¦85
¬«54
¬«8¬«10
D E K A L B
F U L T O N
285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project Type: Expansion
Project Sponsor: MARTA
District(s): 5
Quadrant: Q1 (Higher Impact/Lower Cost)
Funding Phase: Implementation
Est. Construction Start Date: FY23
Est. Project End Date: FY25
Strongly Aligned with ATL Governing Principles
Project ID: #34
109
7
62
8
4
1
3
5
Project Description: Bus rapid transit (BRT)service from the Atlanta BeltLine on the south to the downtown core in the north.
Funding Strategy: State funding would allowexisting local funding to be reinvested into other areas of MARTA’s capital program.
Funding Share
Capitol Ave/ Summerhill BRT
15
§̈¦20
§̈¦85
§̈¦75
§̈¦675
§̈¦285
¬«14
¬«85
¬«139
¬«54
F U L T O N
D E K A L B
R O C K D A L E
H E N R Y
C L A Y T O N
F A Y E T T E 285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project Type: Expansion
Project Sponsor: MARTA
District(s): 5, 9, 10
Quadrant: Q2a (Higher Impact/Higher Cost)
Funding Phase: Design/Engineering
Est. Construction Start Date: FY23
Est. Project End Date: FY27
Strongly Aligned with ATL Governing Principles
Project ID: #90
109
7
62
8
4
1
3
5
Project Description: Bus rapid transit (BRT)along routes 191 and 196 connecting Hartsfield Jackson Atlanta International Airport to Clayton County Justice Center.
Funding Strategy: State funding wouldreduce the level of planned federal funding required to complete the project.
Funding Share
Clayton County Transit Initiative BRT
16
Top End West
Top End East
WestsideEastside
§̈¦75
§̈¦85
§̈¦20
§̈¦285
§̈¦675
¬«400
F U L T O N
C O B B
D O U G L A S D E K A L B
R O C K D A L E
N E W T O N
G W I N N E T T
C L A Y T O N
1Does not include westside segment. 2Based on GDOT’s I-285 Express Lanes Schedule.
285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project Type: Expansion
Project Sponsor: Various
District(s): 3, 4, 5, 7, 8, 9
Quadrant: Q2a (Higher Impact/Higher Cost)1
Funding Phase: Design
Est. Construction Start Date: FY23
Est. Project End Date: FY322
Strongly Aligned with ATL Governing Principles
Project ID: #46
109
7
62
8
4
1
3
5
Project Description: High capacity transitfrom I-20 in DeKalb County, along the Top End of I-285 to I-20 in Cobb County with stations in Fulton County. Foursegments correspond to the GDOT Express Lanes program.
Funding Strategy: State funding would ensurethat transit stations are not precluded from the ongoing GDOT I-285 Express Lanes design/ROW acquisition in the same way State funding did on the SR 400 Express Lanes Transit project.
Funding Share
I-285 Transit inExpress Lanes
17
§̈¦75
§̈¦85
§̈¦20
§̈¦285
§̈¦
¬«400
F U L T O N
C O B B
D O U G L A S
D E K A L B
R O C K D A L E
G W I N N E T T
285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project Type: Enhancement
Project Sponsor: Cobb County
District(s): 3, 4, 8
Quadrant: Q1 (Higher Impact/Lower Cost)
Funding Phase: Implementation
Est. Construction Start Date: FY22
Est. Project End Date: FY23
Strongly Aligned with ATL Governing Principles
Project ID: #69
109
7
62
8
4
1
3
5
Project Description: Transit signalpriority on routes from City of Marietta to Cumberland community improvement district (CID)/Town Center CID.
Funding Strategy: State funding wouldeliminate the need for planned federal funding, expediting the current project delivery timetable.
Funding Share
Transit Signal Priority
19
§̈¦85
§̈¦285
§̈¦¬«400
¬«316 ¬«8
¬«20
¬«
G W I N N E T T
D E K A L B
F U L T O NBuford Drive Harbins
Rd
Project Type: Expansion
Project Sponsor: Gwinnett County
District(s): 2, 3, 5, 6, 7
Quadrant: Q1 (Higher Impact/Lower Cost)
Funding Phase: Implementation
Est. Construction Start Date: FY22
Est. Project End Date: FY24
Strongly Aligned with ATL Governing Principles285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project ID: #3G
109
7
62
8
4
1
3
5
Project Description: Expansion ofcommuter service to State Route 316, with two new park-and-rides and new route.
Funding Strategy: State funding wouldsupport incremental construction of the two park-and-ride lots with either Harbins Road Phase 1 ($10M) and/or Buford Drive ($15M).
Funding Share
SR 316 Park & Rides and Commuter Express Service
20
§̈¦75§̈¦285
¬«3
¬«280
F U L T O N
C O B B
285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project Type: Enhancement
Project Sponsor: Cobb County
District(s): 8
Quadrant: Q1 (Higher Impact/Lower Cost)
Funding Phase: ROW/Design/Potential P3
Est. Construction Start Date: FY25
Est. Project End Date: FY29
Strongly Aligned with ATL Governing Principles
Project ID: #72
109
7
62
8
4
1
3
5
Project Description: Development of newCumberland Mall Transfer Center.
Funding Strategy: State funding wouldreduce the level of planned local and/or planned federal funding required while providing leverage for project to be completed as a P3.
Funding Share
Cumberland Transfer Center
22
§̈¦75
§̈¦285
§̈¦85
§̈¦20
§̈¦675
F U L T O N
C L A Y T O N
C O B B
D O U G L A S
G W I N N E T T
W A L T O N
D E K A L B
B A R R O W
¬«400
Project Type: State of Good Repair
Project Sponsor: MARTA
District(s): 3, 5, 8, 9, 10
Quadrant: Q1 (Higher Impact/Lower Cost)
Funding Phase: Implementation
Est. Construction Start Date: Ongoing
Est. Project End Date: FY27
Strongly Aligned with ATL Governing Principles
Project ID: #126
285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
109
7
62
8
4
1
3
5
Project Description: Fourth phase ofMARTA’s rail restoration efforts in restoring heavy rail lines as part of the Authority’s ongoing State of Good Repair work and systemwide upgrades.
Funding Strategy: State funding would allowexisting local funding to be reinvested in other areas of MARTA’s capital program and support the State of Good Repair on the region’s rail network.
Funding Share
Track Renovation Phase IV
24
§̈¦75
§̈¦285
§̈¦85
§̈¦20
§̈¦675
F U L T O N
C L A Y T O N
C O B B
D O U G L A S
G W I N N E T T
W A L T O N
D E K A L B
B A R R O W
¬«400
285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project Type: State of Good Repair
Project Sponsor: MARTA
District(s): 3, 5, 8, 9, 10
Quadrant: Q2a (Higher Impact/Higher Cost)
Funding Phase: Implementation
Est. Construction Start Date: Ongoing
Est. Project End Date: FY32
Well Aligned with ATL Governing Principles
Project ID: #122
109
7
62
8
4
1
3
5
Project Description: Rehabilitation for all38 stations, staged six or seven a year until complete.
Funding Strategy: State funding would allowexisting local funding to be reinvested in other areas of MARTA’s capital program and support the State of Good Repair on the region’s rail network.
Funding Share
Station Rehabilitation Program Schedule
25
§̈¦75
§̈¦285
§̈¦85
§̈¦20§̈¦20
F U L T O N
C O B B
P A U L D I N G
D O U G L A S
G W I N N E T T
D E K A L B
¬«400
109
7
62
8
4
1
3
5
285 Top End Transit in Express LanesClayton County Transit Initiative BRT Transit Signal Priority State Route 316 Park-and-Rides and Commuter Express Service
Cumberland Transfer Center Track Renovation Phase IV Station Rehabilitation Program ADA Compliant Sidewalks
$12.5M
Total
$660M1Total
$500KTotal
$96MTotal
$375M
Total
$685MTotal
$6.25MTotal
$50MTotal
$205M
Total
$35.9M
$83.5M
$100M
$1M
$9M
$40M $205M
$342.5M
$342.5M
$275M
$150M
$200K
$1.05M
$5M
$27.5M
$482.5M
$1.8M
$17.9M$16.1M
$100K
$400K
Capitol Ave/ Summerhill BRT
FundingCommitted Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed FederalFundingCommitted Local
Planned FederalFunding
Planned Local FundingPlanned FederalFundingRemaining Funding Gap
Planned FederalFunding
Planned Local Funding
Remaining Funding Gap
FundingCommitted Local
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
FundingPlanned Local Funding
Committed Local
Planned FederalFunding
Funding
Funding
Committed Local
Committed Federal
Project Description: Sidewalks, curbs,ramps, and crosswalks in compliance with the Americans with Disabilities Act along CobbLinc local bus routes within unincorporated Cobb County.
Funding Strategy: State funding wouldreduce or eliminate the need for planned local and/or planned federal funding, expediting the current project delivery timetable.
Project Type: State of Good Repair
Project Sponsor: Cobb County
District(s): 3, 4, 8
Quadrant: Q2b (Lower Impact/Lower Cost)
Funding Phase: Implementation
Est. Construction Start Date: FY22
Est. Project End Date: FY28
Aligned with ATL Governing Principles
Project ID: #70
ADA Compliant Sidewalks
Funding Share
26