assessing health and wellbeing in buildings › filelibrary › briefing papers...bre and the...

16
www.breeam.com Briefing Paper Chris Ward & Alan Yates - BRE Jaclyn Whitaker, Shalini Ramesh & Nathan Stodola - IWBI Assessing Health and Wellbeing in Buildings Alignment between BREEAM and the WELL Building Standard TM

Upload: others

Post on 07-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

www.breeam.com

Briefing Paper

Chris Ward & Alan Yates - BREJaclyn Whitaker, Shalini Ramesh & Nathan Stodola - IWBI

Assessing Health and Wellbeing in BuildingsAlignment between BREEAM and the WELL Building StandardTM

BRE and the International WELL Building Institute™ (IWBI™) are collaborating to promote health and wellbeing in the design, construction and operation of buildings and fit-outs, internationally. The two organisations announced their collaboration on 28 November 2016 with the aim to make it more efficient for clients and project teams to pursue both of their respective standards: BREEAM and the WELL Building StandardTM (WELL).

Given that people in the developed world, on average, spend over 90% of their lives in and around buildings, both IWBI and BRE recognise the value and complementary nature of measuring and recognising health and wellbeing elements of building design, construction and operation in the context of a holistic assessment of environmental and social impacts within the built-environment.

Since its launch in 1990, BREEAM has set evidence based standards that go beyond regulatory requirements and standard practice. This includes requirements to optimise internal environments and encourage healthier lifestyles as a part of a broad and holistic evaluation of a building’s social, environmental and economic impacts and benefits. BRE and IWBI recognise the value to the property sector of a wellbeing focused building certification process that sits alongside this holistic rating and are working together to ensure that this can be met efficiently where a client need exists.

To simplify the process for project teams pursuing both assessment methods, BRE and IWBI have worked together to compare performance requirements, harmonise evidence and identify opportunities to streamline the process of achieving dual certification. This work demonstrates the significant synergies between the two methods and the efficiencies that exist between their respective assessment and certification processes. It forms a part of an ongoing collaboration between BRE and IWBI to work together to harmonise their approach to health and wellbeing in the built environment across their standards, research programmes and services generally.

IntroductionThis document provides assistance for those wishing to obtain both a certified BREEAM rating and WELL Certification. It provides guidance on the areas where assessment under one method can result in efficiencies in assessment under the other. It outlines how credits awarded in a certified BREEAM assessment may be used to demonstrate compliance with WELL features post occupation and identifies areas where project teams can demonstrate compliance using the same evidence for both schemes.

The WELL Building Standard was developed in the United States and so addresses a number of issues that are already covered through regulations in the UK and across the EU. For this reason, the document also sets out the areas where WELL requirements are already addressed by UK and/or EU regulations and, where appropriate, where these do not require assessment for buildings undergoing a WELL assessment in these territories.

BRE and IWBI will work together to update this document as and when BREEAM and WELL standards are significantly updated/modified.

Purpose of this document

About BREEAM

BREEAM (Building Research Establishment Environmental Assessment Method) is the world’s first sustainability rating scheme for the built environment. Through its application and use, BREEAM helps clients to measure and reduce the impacts of their buildings and in doing so, create higher value, lower risk assets that are better for people and the environment.

Contact: [email protected]

Website - www.breeam.com

About the WELL Building StandardTM

The WELL Building Standard™ (WELL) is the first building standard to focus exclusively on the health and wellness of the people in buildings. WELL is a performance-based system for measuring and certifying features of buildings that impact human health and well being, through air, water, nourishment, light, fitness, comfort and mind. It marries best practices in design and construction with evidence-based medical and scientific research – harnessing buildings and communities as a vehicle to support human well-being.

Contact: [email protected]

Website - www.wellcertified.com

The document maps requirements between the WELL Building Standard v1 (October 2016) and the following BREEAM scheme versions:

1. BREEAM UK New Construction 2014 (UK NC 2014),

2. BREEAM UK Refurbishment and Fit-out 2014 (UK RFO 2014),

3. BREEAM International New Construction 2016 (INC 2016)1,

4. BREEAM International Refurbishment and Fit-out 2015 (IRFO 2015)1,

5. BREEAM In-Use International 2015 (In-Use 2015)1.

This document is split into four sections:

1. An introductory section outlining the overall approach taken to harmonise the BREEAM and WELL assessment and certification processes.

2. Appendix A sets out BREEAM credits that overlap with WELL. It should be noted that final WELL Certification occurs after the building has been fully occupied and is dependent on a range of in-situ testing and occupant surveys. Compliance with BREEAM requirements does not negate the requirements under WELL for such post occupancy evidence.

3. Appendix B sets out the credit areas within BREEAM New Construction (NC) and Refurbishment and Fit-out (RFO) where WELL evidence can be used to demonstrate compliance with all or part of the BREEAM requirements. It also indicates where there is potential for evidence to be aligned to achieve compliance under both methods.

4. Appendix C sets out the WELL requirements that would be deemed to satisfy BREEAM In-Use requirements and where additional evidence would not be required by BREEAM Assessors and BRE Global to demonstrate compliance with BREEAM criteria. It also indicates where there is potential for evidence to be aligned to achieve compliance under both methods.

Assessors carrying out assessments under the WELL and BREEAM methods listed above will be able to accept certification under the other scheme and/or the related calculation and/or documentary evidence in line with the guidance in this document to confirm:

• Post construction compliance in the case of BREEAM New Construction and Refurbishment and Fit-out schemes

• In-use performance compliance in the case of BREEAM In-Use; and

• Post occupancy performance in the case of WELL.

In addition to setting out mutual equivalencies, the appendices also set out areas where aims and objectives are harmonised but where the level of performance and/or assessment methodology required by BREEAM and WELL are different. In such cases, evidence produced for one scheme may potentially be used in an assessment under the other to avoid the need for duplication of assessment evidence and/or calculations.

Table A defines the levels of overlap:

• For WELL, Appendix A compares the requirements of the BREEAM schemes and outlines a level of overlap for each credit requirement in the associated BREEAM scheme and highlights relevant overlaps with UK/ EU regulations.

• Similarly for BREEAM, Appendices B and C identify and map WELL features that are either fully equivalent or aligned for BREEAM In -Use or where WELL evidence can be used to demonstrate compliance with all or part of the BREEAM NC or RFO requirements.

How to use this document

1 In addition to BRE Global’s BREEAM International schemes, BREEAM also supports a number of National Scheme Operators (NSOs) across the world. The NSOs affiliated to BREEAM and their local schemes are listed on the BREEAM website http://www.breeam.com. These local schemes must be used for international assessments where appropriate, in these instances contact your local NSO for further information. Where a building falls outside of the scope of these local schemes, the pan country BRE Global BREEAM International schemes can be used.

Table A - level of overlap used in the Appendices

Symbol Overlap assignment Definition

EquivalentFormal certification under one scheme can be used as evidence of full compliance with the other. The awarded feature or credit can be used as verification that the requirement has been satisfied.

Aligned

The outcomes and methodologies are aligned but there are material differences between the requirements of the schemes. For instance the required performance levels may be different. In this case it may be possible to carry out a single analysis and use this as evidence in both schemes although this will need to be separately submitted to the relevant assessor.

p Partially equivalentAppendix A only - Formal certification under BREEAM can be used as evidence of partial compliance with WELL features. This indicates that further requirements will need to be met before the feature can be deemed to be fully met.

− Not addressedAppendices A and B – The issue is not covered by BREEAM and so will require full assessment under WELL.

EU/UK directive/regulationAppendix A only – The WELL feature is covered by EU or UK directive/regulation and may not need to be assessed for projects in these countries.

UKR UK regulation Appendix A only – The WELL feature is covered by regulations in the UK.

EUR EU regulation Appendix A only – The WELL feature is covered by directives or regulations across the EU.

BREEAM compliant WELL evidenceAppendix B only – WELL evidence can be used to demonstrate full or partial compliance with the BREEAM requirements but formal review will be required by the Assessor.

IWBI has evaluated this mapping and provided rulings of equivalency for entire features or parts that are satisfied by the BREEAM credits or UK/ EU regulations.

When the level of overlap is considered equivalent, it indicates that a feature or credit has been evaluated and deemed satisfactory to achieve the requirement of the WELL feature indicated. The awarded BREEAM credit can be used as verification that the requirement has been satisfied.

Claiming BREEAM credits in the WELL Building Standard

Appendix A maps the equivalencies between BREEAM credits and WELL for the purpose of carrying out a WELL assessment on a building that has been BREEAM assessed.

Where a project has achieved, or is pursuing a BREEAM certified rating and seeks to apply these efforts to achieve a WELL feature, the project should submit the following during WELL documentation review:

• Short report identifying which BREEAM credits are being used to claim WELL features, in line with the guidance provided in this document; and

• Supporting evidence for each WELL feature or part, in line with the guidance provided in this document.

• If already awarded, proof of BREEAM certification and awarded credits may be submitted in lieu of the ascribed WELL performance verification method in Appendix D of the WELL Building Standard.

• If not yet awarded, use the ascribed WELL performance verification method in Appendix D of the WELL Building Standard. Project teams may reference applicable BREEAM credit requirements in letters of assurance and annotated documents rather than the language in the WELL letters of assurance drawn from the WELL Building Standard.

• Given the stage at which full WELL Certification is carried out, it is most likely that BREEAM compliance through the NC or RFO schemes will be used as evidence in a WELL assessment.

Use of BREEAM certified evidence within WELL assessments

WELL Certification occurs when the building has been occupied for a period of time and post occupancy testing has been carried out to demonstrate performance in operation.

a. BREEAM New Construction/Refurbishment and Fit out schemes:

Whilst there is a defined WELL documentation review process at the design stage this does not result in a formal certification output and as such it is not possible to use WELL Certification as a means of demonstrating compliance at the Design or Post Construction certification stages for BREEAM assessments. Appendix B maps WELL features against the BREEAM credit requirements and indicates where evidence prepared for WELL may be used to justify full or partial compliance with BREEAM requirements for New Construction and Refurbishment and Fit out schemes.

b. BREEAM In-Use:

BREEAM In-Use certification occurs during occupation and as such it is possible to use formal WELL Certification against specific WELL features to demonstrate compliance with BREEAM In-Use requirements. Appendix C maps WELL features against BREEAM In-Use requirements and indicates where WELL Certification can be used to demonstrate compliance with the BREEAM assessment requirements without further or additional assessment. It also indicates where outcomes are broadly aligned.

Claiming WELL Certification as a means of demonstrating compliance with BREEAM criteria

For New Construction and Refurbishment and Fit-out assessments, evidence should be submitted to the licensed BREEAM assessor in the normal way and, in turn, they will reference and submit as part of their assessment report to BRE Global when they request certification. The BREEAM assessor should identify in their report, against the relevant assessment issues, where evidence provided relates to certification under both BREEAM and WELL.

For BREEAM In-Use assessment, entries in the assessment tool should make specific reference to the relevant WELL assessment/certification and evidence documentation. It is important that this referencing fully identifies those BREEAM credits that are being justified through the provision of WELL Certification in line with the guidance provided in this document. Proof of WELL Certification will be required as supporting evidence by the Assessor and BRE Global in lieu of the ascribed evidence outlined in the BREEAM In-Use International Technical Manual for each instance where compliance with a WELL feature is claimed as evidence of compliance with BREEAM In-Use.

Use of WELL Certification within BREEAM assessments

WEL

L Bu

ildin

g St

anda

rdBR

EEA

M C

redi

t(s)

WEL

L - B

REE

AM

Ove

rlap

Feat

ure

No.

Feat

ure

Nam

eFe

atur

e Pa

rtU

K N

C 20

14U

K RF

O 2

014

INC

2016

IRFO

201

5In

-Use

201

5U

K N

C 20

14U

K RF

O

2014

INC

2016

IRFO

20

15In

-Use

20

15

AIR 01

Air

qual

ity

stan

dard

s

Stan

dard

s fo

r vol

atile

su

bsta

nces

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

ost

cons

truct

ion)

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

ost

cons

truct

ion)

Hea

02

Indo

or a

ir qu

ality

Post

-con

stru

ctio

n in

door

air

qual

ity m

easu

rem

ent

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

ost

cons

truct

ion)

HEA

18

Vola

tile

orga

nic

com

poun

ds

Stan

dard

s fo

r pa

rticu

late

mat

ter

and

inor

gani

c ga

ses

Hea

02

Indo

or a

ir qu

ality

- In

door

air

qual

ity

(IAQ

) pla

n; V

entil

atio

n;

Ada

ptab

ility

- Pot

entia

l for

na

tura

l ven

tilat

ion

Hea

02

Indo

or a

ir qu

ality

- In

door

air

qual

ity

(IAQ

) pla

n; V

entil

atio

n;

Ada

ptab

ility

- Pot

entia

l for

na

tura

l ven

tilat

ion

Hea

02

Indo

or a

ir qu

ality

- In

door

air

qual

ity

(IAQ

) pla

n; V

entil

atio

n;

Ada

ptab

ility

- Pot

entia

l for

na

tura

l ven

tilat

ion

Hea

02

Indo

or a

ir qu

ality

- In

door

air

qual

ity

(IAQ

) pla

n; V

entil

atio

n;

Ada

ptab

ility

- Pot

entia

l for

na

tura

l ven

tilat

ion

HEA

14

Inte

rnal

en

viron

men

t: CO

2 M

onito

ring

HEA

15

Inte

rnal

en

viron

men

t: CO

M

onito

ring

HEA

16

Inte

rnal

en

viron

men

t: N

Ox

mon

itorin

g

Rado

nU

KRU

KR

−−

02Sm

okin

g ba

nIn

door

sm

okin

g ba

nU

KRU

KRH

ea 0

2 In

door

air

qual

ity

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Out

door

sm

okin

g ba

n−

−−

−−

03Ve

ntila

tion

effe

ctive

ness

Vent

ilatio

n de

sign

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

HEA

11

Vent

ilatio

n re

quire

men

tsH

EA 1

2 Fr

esh

air r

ates

Dem

and

cont

rol

vent

ilatio

n

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

Syst

em b

alan

cing

Man

04

Com

miss

ioni

ng

and

hand

over

- Co

mm

issio

ning

bui

ldin

g se

rvice

s

Man

04

Com

miss

ioni

ng

and

hand

over

- Co

mm

issio

ning

bui

ldin

g se

rvice

s

Man

04

Com

miss

ioni

ng

and

hand

over

- Co

mm

issio

ning

bui

ldin

g se

rvice

s

Man

04

Com

miss

ioni

ng

and

hand

over

- Co

mm

issio

ning

bui

ldin

g se

rvice

s

04VO

C re

duct

ion

Inte

rior p

aint

s an

d co

atin

gs

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

Emiss

ions

from

bui

ldin

g pr

oduc

ts

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

HEA

18

Vola

tile

orga

nic

com

poun

ds

Inte

rior a

dhes

ives

and

seal

ants

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

Emiss

ions

from

bui

ldin

g pr

oduc

ts

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

HEA

18

Vola

tile

orga

nic

com

poun

ds

Floor

ing

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

Emiss

ions

from

bui

ldin

g pr

oduc

ts

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

HEA

18

Vola

tile

orga

nic

com

poun

ds

Insu

latio

n

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

Emiss

ions

from

bui

ldin

g pr

oduc

ts

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

HEA

18

Vola

tile

orga

nic

com

poun

ds

Furn

iture

and

fu

rnish

ings

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

Hea

02

Indo

or a

ir qu

ality

- Vo

latil

e or

gani

c co

mpo

und

(VO

C) e

miss

ion

leve

ls (p

rodu

cts)

HEA

18

Vola

tile

orga

nic

com

poun

ds−

App

endi

x A

- W

ELL

Build

ing

Stan

dard

alig

nmen

t w

ith

BR

EEA

M c

redi

ts

05A

ir fil

tratio

n

Filte

r acc

omm

odat

ion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Parti

cle fi

ltrat

ion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Hea

02

Indo

or a

ir qu

ality

- Ve

ntila

tion

Air

filtra

tion

mai

nten

ance

MA

N 0

4 O

pera

tion

and

mai

nten

ance

man

uals

MA

N 0

5 M

aint

enan

ce

proc

edur

es

−−

−−

09Cl

eani

ng p

roto

col

Clea

ning

pla

n fo

r oc

cupi

ed s

pace

sH

EA 2

1 D

eep

clean

ing

−−

−−

10Pe

stici

de

man

agem

ent

Pest

icide

use

LE 0

5 Ex

tern

al la

ndsc

apin

g/

mai

nten

ance

−−

−−

11Fu

ndam

enta

l m

ater

ial s

afet

y

Asb

esto

s an

d le

ad

rest

rictio

nEU

REU

RH

ea 0

2 In

door

air

qual

ity -

Prer

equi

site

Hea

02

Indo

or a

ir qu

ality

- Pr

ereq

uisit

eEU

R p

p

pp

p

Lead

Aba

tem

ent

UKR

U

KR p

p

−−

Asb

esto

s ab

atem

ent

EUR

EUR

EUR

EUR

EUR

Polyc

hlor

inat

ed

biph

enyls

aba

tem

ent

EUR

EUR

EUR

EUR

EUR

Mer

cury

Lim

itatio

nEU

REU

REU

REU

REU

R

12M

oist

ure

man

agem

ent

Exte

rior l

iqui

d w

ater

m

anag

emen

t U

KRU

KR

−−

Inte

rior l

iqui

d w

ater

m

anag

emen

t

Wat

03

Wat

er le

ak

dete

ctio

n –

Leak

det

ectio

n sy

stem

; Flo

w c

ontro

l de

vices

Wat

03

Wat

er le

ak

dete

ctio

n –

Leak

det

ectio

n sy

stem

; ; F

low

con

trol

devic

es

Wat

03

Wat

er le

ak

dete

ctio

n –

Leak

det

ectio

n sy

stem

; Flo

w c

ontro

l de

vices

Wat

03

Wat

er le

ak

dete

ctio

n –

Leak

det

ectio

n sy

stem

; Flo

w c

ontro

l de

vices

WAT

07

Leak

det

ectio

n sy

stem

Cond

ensa

tion

man

agem

ent

UKR

UKR

−−

Mat

eria

l sel

ectio

n an

d pr

otec

tion

UKR

UKR

−−

13A

ir flu

shA

ir flu

shH

ea 0

2 In

door

air

qual

ity –

In

door

air

qual

ity (I

AQ

) pla

nH

ea 0

2 In

door

air

qual

ity –

In

door

air

qual

ity (I

AQ

) pla

nH

ea 0

2 In

door

air

qual

ity –

In

door

air

qual

ity (I

AQ

) pla

nH

ea 0

2 In

door

air

qual

ity –

In

door

air

qual

ity (I

AQ

) pla

n

14A

ir in

filtra

tion

man

agem

ent

Air

leak

age

test

ing

Man

04

Com

miss

ioni

ng

and

hand

over

- Te

stin

g an

d in

spec

ting

build

ing

fabr

ic

Man

04

Com

miss

ioni

ng

and

hand

over

- Te

stin

g an

d in

spec

ting

build

ing

fabr

ic

Man

04

Com

miss

ioni

ng

and

hand

over

- Te

stin

g an

d in

spec

ting

build

ing

fabr

ic

Man

04

Com

miss

ioni

ng

and

hand

over

- Te

stin

g an

d in

spec

ting

build

ing

fabr

ic

ENE

04 P

ress

ure/

air

leak

age

test

17D

irect

sou

rce

vent

ilatio

nPo

llutio

n iso

latio

n an

d ex

haus

tH

EA 1

9 Co

ntro

l of

chem

icals

−−

−−

WEL

L Bu

ildin

g St

anda

rdB

REE

AM

Cre

dit(

s)W

ELL

- BR

EEA

M O

verl

ap

18A

ir qu

ality

m

onito

ring

and

feed

back

Indo

or a

ir m

onito

ring

HEA

14

Inte

rnal

en

viron

men

t: CO

2 M

onito

ring

HEA

15

Inte

rnal

en

viron

men

t: CO

Mon

itorin

gH

EA 1

6 In

tern

al

envir

onm

ent:

NO

x m

onito

ring

−−

−−

Air

data

reco

rd

keep

ing

and

resp

onse

−−

−−

Envir

onm

enta

l M

easu

res

Disp

lay

−−

−−

19O

pera

ble

win

dow

s

Full

cont

rol

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

Hea

02

Indo

or a

ir qu

ality

- P

oten

tial f

or n

atur

al

vent

ilatio

n

HEA

03

Ther

mal

con

trol

HEA

04

Vent

ilatio

n co

ntro

ls

Out

door

air

mea

sure

men

t−

−−

−−

Win

dow

ope

ratio

n m

easu

rem

ent

−−

−−

24Co

mbu

stio

n m

inim

izatio

n

App

lianc

e an

d he

ater

co

mbu

stio

n ba

n−

−−

−−

Low

em

issio

n co

mbu

stio

n so

urce

sPo

l 02

NO

x em

issio

nsPo

l 02

NO

x em

issio

nsPo

l 02

NO

x em

issio

nsPo

l 02

NO

x em

issio

nsPO

L 06

NO

x em

issio

ns

Engi

ne e

xhau

st

redu

ctio

n−

−−

−−

WA

TER

30Fu

ndam

enta

l w

ater

qua

lity

Sedi

men

tEU

REU

REU

REU

REU

R

Micr

o-or

gani

sms

EUR

EUR

EUR

EUR

EUR

31In

orga

nic

cont

amin

ants

Diss

olve

d m

etal

sEU

REU

REU

REU

REU

R

32O

rgan

ic Co

ntam

inan

tsO

rgan

ic Po

lluta

nts

EUR

EUR

EUR

EUR

EUR

33A

gricu

ltura

l co

ntam

inan

ts

Her

bicid

es a

nd

pest

icide

sEU

REU

REU

REU

REU

R

Ferti

lizer

sEU

REU

REU

REU

REU

R

34Pu

blic

wat

er

addi

tives

Disi

nfec

tant

sEU

REU

REU

REU

REU

R

Disi

nfec

tant

by-

prod

ucts

EUR

EUR

EUR

EUR

EUR

Fluor

ide

EUR

EUR

EUR

EUR

EUR

WEL

L Bu

ildin

g St

anda

rdB

REE

AM

Cre

dit(

s)W

ELL

- BR

EEA

M O

verl

ap

36W

ater

trea

tmen

t

Org

anic

chem

ical

rem

oval

−−

−−

Sedi

men

t filt

er−

−−

−−

Micr

obia

l elim

inat

ion

−−

−−

Wat

er q

ualit

y m

aint

enan

ce−

−−

−−

Legi

onel

la c

ontro

lU

KRU

KR

Hea

09

Wat

er q

ualit

y -

Build

ing

serv

ices

wat

er

syst

ems:

Min

imisi

ng ri

sk o

f co

ntam

inat

ion

HEA

05

Micr

obia

l co

ntam

inat

ion

HEA

22

Legi

onel

la

man

agem

ent

37D

rinki

ng w

ater

pr

omot

ion

Drin

king

wat

er ta

ste

prop

ertie

s−

−−

−−

Drin

king

wat

er a

cces

s U

KRU

KR

Hea

09

Wat

er q

ualit

y - B

uild

ing

occu

pant

s: Pr

ovisi

on o

f fre

sh d

rinki

ng

wat

er

HEA

06

Wat

er p

rovis

ions

Wat

er d

ispen

ser

mai

nten

ance

−−

−−

LIG

HT

53Vi

sual

ligh

ting

desig

n

Visu

al a

cuity

for f

ocus

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

HEA

08

Illum

inan

ce le

vels

Brig

htne

ss

Man

agem

ent

Stra

tegi

es−

−−

−−

55El

ectri

c lig

ht g

lare

co

ntro

l

Lam

p Sh

ield

ing

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

HEA

08

Illum

inan

ce le

vels

Gla

re m

inim

izatio

n

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

HEA

08

Illum

inan

ce le

vels

56So

lar g

lare

con

trol

View

win

dow

sh

adin

gH

ea 0

1 Vi

sual

com

fort

- G

lare

con

trol

Hea

01

Visu

al c

omfo

rt -

Gla

re c

ontro

lH

ea 0

1 Vi

sual

com

fort

- G

lare

con

trol

Hea

01

Visu

al c

omfo

rt -

Gla

re c

ontro

lH

EA 0

2 G

lare

con

trol

Day

light

m

anag

emen

tH

ea 0

1 Vi

sual

com

fort

- G

lare

con

trol

Hea

01

Visu

al c

omfo

rt -

Gla

re c

ontro

lH

ea 0

1 Vi

sual

com

fort

- G

lare

con

trol

Hea

01

Visu

al c

omfo

rt -

Gla

re c

ontro

lH

EA 0

2 G

lare

con

trol

57

Low

-gla

re

wor

ksta

tion

desig

n

Wor

king

and

le

arni

ng a

rea

surfa

ce

refle

ctivi

ty

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

HEA

08

Illum

inan

ce le

vels

58Co

lor q

ualit

yCo

lor r

ende

ring

inde

x

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

HEA

08

Illum

inan

ce le

vels

59Su

rface

des

ign

Wor

king

and

le

arni

ng a

rea

surfa

ce

refle

ctivi

ty

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

Hea

01

Visu

al c

omfo

rt - I

nter

nal a

nd e

xter

nal

light

ing

leve

ls, z

onin

g an

d co

ntro

l

HEA

08

Illum

inan

ce le

vels

WEL

L Bu

ildin

g St

anda

rdB

REE

AM

Cre

dit(

s)W

ELL

- BR

EEA

M O

verl

ap

60Au

tom

ated

sh

adin

g an

d di

mm

ing

cont

rols

Auto

mat

ed s

unlig

ht

cont

rol

Hea

01

Visu

al c

omfo

rt –

Gla

re c

ontro

lH

ea 0

1 Vi

sual

com

fort

– G

lare

con

trol

Hea

01

Visu

al c

omfo

rt –

Gla

re c

ontro

lH

ea 0

1 Vi

sual

com

fort

– G

lare

con

trol

HEA

02

Gla

re c

ontro

l

Resp

onsiv

e lig

ht

cont

rol

−−

−−

61Ri

ght t

o Lig

htLe

ase

Dep

thH

ea 0

1 Vi

sual

com

fort

– Vi

ew o

utH

ea 0

1 Vi

sual

com

fort

– Vi

ew o

utH

ea 0

1 Vi

sual

com

fort

– Vi

ew o

utH

ea 0

1 Vi

sual

com

fort

– Vi

ew o

utH

EA 2

8 Vi

ew o

ut

Win

dow

acc

ess

Hea

01

Visu

al c

omfo

rt –

View

out

Hea

01

Visu

al c

omfo

rt –

View

out

Hea

01

Visu

al c

omfo

rt –

View

out

Hea

01

Visu

al c

omfo

rt –

View

out

HEA

28

View

out

62D

aylig

ht m

odel

ing

Hea

lthy

sunl

ight

ex

posu

reH

ea 0

1 Vi

sual

com

fort

– D

aylig

htin

gH

ea 0

1 Vi

sual

com

fort

- D

aylig

htin

gH

ea 0

1 Vi

sual

com

fort

- D

aylig

htin

gH

ea 0

1 Vi

sual

com

fort

- D

aylig

htin

gH

EA 0

1 G

lazin

g

63D

aylig

htin

g fe

nest

ratio

n

Win

dow

size

s fo

r w

orki

ng a

nd le

arni

ng

spac

es

Hea

01

Visu

al c

omfo

rt –

Day

light

ing;

Vie

w o

utH

ea 0

1 Vi

sual

com

fort

- D

aylig

htin

g; V

iew

out

Hea

01

Visu

al c

omfo

rt –

View

out

Hea

01

Visu

al c

omfo

rt –

View

out

HEA

01

Gla

zing

Win

dow

tra

nsm

ittan

ce in

w

orki

ng a

nd le

arni

ng

area

s

−−

−−

Unifo

rm c

olor

tra

nsm

ittan

ce−

−−

−−

FITN

ESS

65A

ctivi

ty in

cent

ive

prog

ram

sA

ctivi

ty in

cent

ive

prog

ram

sH

EA 2

6A H

ealth

and

W

ellb

eing

−−

−−

66St

ruct

ured

fitn

ess

oppo

rtuni

ties

Prof

essio

nal f

itnes

s pr

ogra

mH

EA 2

6A H

ealth

and

W

ellb

eing

−−

−−

Fitne

ss e

duca

tion

HEA

26A

Hea

lth a

nd

Wel

lbei

ng−

−−

67Ex

terio

r act

ive

desig

n

Pede

stria

n A

men

ities

−−

−−

Pede

stria

n pr

omot

ion

−−

−−

Nei

ghbo

rhoo

d co

nnec

tivity

Tra

02 P

roxim

ity to

am

eniti

esTr

a 02

Pro

ximity

to

amen

ities

Tra

02 P

roxim

ity to

am

eniti

esTr

a 02

Pro

ximity

to

amen

ities

TRA

03

Prox

imity

to

amen

ities

69A

ctive

tra

nspo

rtatio

n su

ppor

t

Bicy

cle s

tora

ge a

nd

supp

ort

Tra

03 C

yclis

t fac

ilitie

s -

Cycle

sto

rage

Tra

03 C

yclis

t fac

ilitie

s -

Cycle

sto

rage

Tra

03a

Alte

rnat

ive m

odes

of

tran

spor

t – O

ptio

n 5

Tra

01 S

usta

inab

le tr

ansp

ort

acce

ssib

ility

– A

ltern

ative

tra

nspo

rt m

easu

res

(Mea

sure

B)

TRA

01

Cycli

st fa

ciliti

esp

pp

pp

Post

com

mut

e an

d w

orko

ut fa

ciliti

esTr

a 03

Cyc

list f

acilit

ies

– Cy

clist

facil

ities

Tra

03 C

yclis

t fac

ilitie

s –

Cycli

st fa

ciliti

esTr

a 03

a A

ltern

ative

mod

es

of tr

ansp

ort –

Opt

ion

5

Tra

01 S

usta

inab

le tr

ansp

ort

acce

ssib

ility

– A

ltern

ative

tra

nspo

rt m

easu

res

(Mea

sure

C)

TRA

01

Cycli

st fa

ciliti

es

COM

FORT

72A

cces

sible

des

ign

Acc

essib

ility

and

usab

ility

UKR

UKR

Hea

06

Acc

essib

ility

– In

clusiv

e an

d ac

cess

ible

de

sign

HEA

10

Inclu

sive

desig

n

74Ex

terio

r noi

se

intru

sion

Soun

d pr

essu

re le

vel

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

HEA

20

Aco

ustic

co

nditi

ons

WEL

L Bu

ildin

g St

anda

rdB

REE

AM

Cre

dit(

s)W

ELL

- BR

EEA

M O

verl

ap

WEL

L Bu

ildin

g St

anda

rdB

REE

AM

Cre

dit(

s)W

ELL

- BR

EEA

M O

verl

ap

75In

tern

ally

gene

rate

d no

ise

Aco

ustic

pla

nnin

gH

ea 0

5 A

cous

tic

perfo

rman

ce -

Inte

rnal

in

door

am

bien

t noi

se le

vels

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

HEA

20

Aco

ustic

co

nditi

ons

Mec

hani

cal

equi

pmen

t sou

nd

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

Hea

05

Aco

ustic

pe

rform

ance

- In

tern

al

indo

or a

mbi

ent n

oise

leve

ls

HEA

20

Aco

ustic

co

nditi

ons

76Th

erm

al C

omfo

rt

Vent

ilate

d th

erm

al

envir

onm

ent

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

HEA

13

Ope

ratin

g te

mpe

ratu

re

Nat

ural

ther

mal

ad

apta

tion

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

Hea

04

Ther

mal

com

fort

– Th

erm

al m

odel

ling

HEA

13

Ope

ratin

g te

mpe

ratu

re

78Re

verb

erat

ion

time

Reve

rber

atio

n tim

eH

ea 0

5 A

cous

tic

perfo

rman

ce –

Re

verb

erat

ion

time

Hea

05

Aco

ustic

pe

rform

ance

- Re

verb

erat

ion

time

Hea

05

Aco

ustic

pe

rform

ance

- Re

verb

erat

ion

time

Hea

05

Aco

ustic

pe

rform

ance

- Re

verb

erat

ion

time

81So

und

barri

ers

Wal

l con

stru

ctio

n sp

ecifi

catio

n

Hea

05

Aco

ustic

pe

rform

ance

- So

und

insu

latio

n

Hea

05

Aco

ustic

pe

rform

ance

- So

und

insu

latio

n

Hea

05

Aco

ustic

pe

rform

ance

- So

und

insu

latio

n

Hea

05

Aco

ustic

pe

rform

ance

- So

und

insu

latio

n

Doo

rway

sp

ecifi

catio

n−

−−

−−

Wal

l con

stru

ctio

n m

etho

dolo

gy−

−−

−−

MIN

D

86Po

st-O

ccup

ancy

Su

rvey

Occ

upan

t sur

vey

cont

ent

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

HEA

23

Occ

upan

t sa

tisfa

ctio

n

Info

rmat

ion

repo

rting

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

Man

05

Afte

rcar

e - P

ost

occu

panc

y ev

alua

tion

HEA

24

Occ

upan

t sa

tisfa

ctio

n: fe

edba

ck

100

Biop

hilia

II -

quan

titat

ive

Out

door

bio

philia

LE 0

2 Ec

olog

ical v

alue

of

site

and

pro

tect

ion

of

ecol

ogica

l fea

ture

sLE

03

Min

imisi

ng im

pact

on

exis

ting

site

ecol

ogy

LE 0

4 En

hanc

ing

site

ecol

ogy

LE 0

5 Lo

ng te

rm im

pact

on

biod

ivers

ity

LE 0

2 Ec

olog

ical v

alue

of

site

and

pro

tect

ion

of

ecol

ogica

l fea

ture

sLE

03

Min

imisi

ng im

pact

on

exis

ting

site

ecol

ogy

LE 0

4 En

hanc

ing

site

ecol

ogy

LE 0

5 Lo

ng te

rm im

pact

on

biod

ivers

ity

LE 0

2 Ec

olog

ical v

alue

of

site

and

pro

tect

ion

of

ecol

ogica

l fea

ture

sLE

04

Enha

ncin

g sit

e ec

olog

yLE

05

Long

term

impa

ct o

n bi

odive

rsity

LE 0

2 Ec

olog

ical v

alue

of

site

and

pro

tect

ion

of

ecol

ogica

l fea

ture

sLE

04

Enha

ncin

g sit

e ec

olog

yLE

05

Long

term

impa

ct o

n bi

odive

rsity

LE 0

1 Pl

ante

d ar

eaLE

02

Ecol

ogica

l fea

ture

s of

pl

ante

d ar

ea

Indo

or b

ioph

iliaH

EA 2

6A H

ealth

and

W

ellb

eing

−−

−−

Wat

er fe

atur

e−

−−

−−

Appendix B – BREEAM New Construction and Refurbishment and Fit-Out alignment with WELL features

BREEAM Assessment Issue BREEAM Credit(s) WELL Feature Name and PartBREEAM – WELL Overlap

UK NC 2014

UK RFO 2014 INC 2016 IRFO 2015

MANAGEMENT

Man 04 Commissioning and handover

Commissioning and testing schedule and responsibilities

Commissioning building services 03 Ventilation effectiveness – System balancing

Testing and inspecting building fabric

14 Air infiltration management – Air leakage testing

Handover

Man 05 Aftercare

Aftercare support

Seasonal commissioning

Post occupancy evaluation

86 Post-occupancy survey - Occupant survey content86 Post-occupancy survey - Information reporting

HEALTH & WELLBEING

Hea 01 Visual comfort

Glare control

56 Solar glare control – View window shading56 Solar glare control – Daylight management60 Automated shading and dimming controls - Automated sunlight control

Daylighting

62 Daylight modelling – Healthy sunlight exposure63 Daylighting fenestration – Window sizes for working and learning spaces

View out

61 Right to light – Lease depth61 Right to light – Window access63 Daylighting fenestration – Window sizes for working and learning spaces

Internal and external lighting levels, zoning and control

53 Visual lighting design – Visual acuity for focus55 Electric lighting glare control – Lamp shielding55 Electric lighting glare control – Glare minimization57 Low-glare workstation design – Glare avoidance58 Color quality – Color rendering index59 Surface design – Working and learning area surface reflectivity

Hea 02 Indoor air quality

Prerequisite (asbestos) 11 Fundamental material safety - Asbestos and lead restriction

Indoor air quality (IAQ) plan

07 Construction pollution management – Duct protection07 Construction pollution management – Filter replacement07 Construction pollution management – Moisture absorption management07 Construction pollution management – Dust containment and removal13 Air flush – Air flush

Ventilation

02 Smoking ban - Indoor smoking ban03 Ventilation effectiveness - Ventilation design03 Ventilation effectiveness - Demand control ventilation05 Air filtration – Filter accommodation05 Air filtration – Particle filtration15 Increased ventilation – Increased outdoor air supply

Volatile organic compound (VOC) emission levels (products) / Emissions from building products

04 VOC reduction - Interior paints and coatings04 VOC reduction - Interior adhesives and sealants04 VOC reduction - Flooring04 VOC reduction - Insulation04 VOC reduction - Furniture and furnishings

Volatile organic compound (VOC) emission levels (post construction) / Post-construction indoor air quality measurement

01 Air quality standards - Standards for volatile substances

Adaptability - Potential for natural ventilation

03 Ventilation effectiveness - Demand control ventilation19 Operable windows - Full control

BREEAM Assessment Issue BREEAM Credit(s) WELL Feature Name and PartBREEAM – WELL Overlap

UK NC 2014

UK RFO 2014 INC 2016 IRFO 2015

Hea 04 Thermal comfort

Thermal modelling

76 Thermal comfort - Ventilated thermal environment76 Thermal comfort - Natural thermal adaptation

Adaptability - for a projected climate change scenario

Thermal zoning and controls

Hea 05 Acoustic performance

Sound insulation 81 Sound barriers - Wall construction specification

Internal indoor ambient noise levels

74 Exterior noise intrusion - Sound pressure level75 Internally generated noise - Acoustic planning75 Internally generated noise - Mechanical equipment sound levels

Reverberation 78 Reverberation time - Reverberation time

Hea 06 AccessibilitySafe access

Inclusive and accessible design 72 Accessible design - Accessibility and usability

Hea 09 Water quality

Building services water systems: Minimising risk of contamination 36 Water treatment – Legionella control

Building occupants: Provision of fresh drinking water

37 Drinking water promotion - Drinking water access

WATER

Wat 03 Water leak detectionLeak detection system 12 Moisture management - Interior liquid

water management

Flow control devices 12 Moisture management - Interior liquid water management

TRANSPORT

Tra 01 Sustainable transport accessibility

Accessibility Index

Alternative transport measures (Measures B and C)

69 Active transportation support - Bicycle storage and support69 Active transportation support - Post commute and workout facilities

Tra 02 Proximity to amenities Proximity to amenities 67 Exterior active design - Neighborhood connectivity

Tra 03 Cyclist facilitiesCycle storage 69 Active transportation support - Bicycle

storage and support

Cyclist facilities 69 Active transportation support - Post commute and workout facilities

Tra 03a Alternative modes of transport

Alternative modes of transport (Option 5)

69 Active transportation support - Bicycle storage and support69 Active transportation support - Post commute and workout facilities

LAND USE & ECOLOGY

LE 02 Ecological value of site and protection of ecological features

Ecological value of site 100 Biophilia II quantitative - Outdoor Biophilia

Protection of ecological features 100 Biophilia II quantitative - Outdoor Biophilia

LE 03 Minimising impact on existing site ecology

Change in ecological value 1 100 Biophilia II quantitative - Outdoor Biophilia

Change in ecological value 2 100 Biophilia II quantitative - Outdoor Biophilia

LE 04 Enhancing site ecology

Ecologist’s report and recommendations 100 Biophilia II quantitative - Outdoor Biophilia

Increase in ecological value 100 Biophilia II quantitative - Outdoor Biophilia

LE 05 Long term impact on biodiversity Long term impact on biodiversity 100 Biophilia II quantitative - Outdoor Biophilia

POLLUTION

Pol 02 NOx emissions NOx emissions 24 Combustion minimization - Low emission combustion sources

Appendix C - BREEAM In-Use alignment with WELL features

BREEAM In-Use Assessment Issue/Credit(s) WELL Feature Name and PartBREEAM –

WELL Overlap

BIU 2015

MANAGEMENT

MAN 04 Operation and maintenance manuals 04 Air filtration – Air filtration maintenance

MAN 05 Maintenance procedures 04 Air filtration – Air filtration maintenance

HEALTH & WELLBEING

HEA 01 Glazing 63 Daylighting fenestration - Window sizes for working and learning spaces

HEA 02 Glare control56 Solar glare control - View window shading56 Solar glare control - Daylight management60 Automated shading and dimming controls - Automated sunlight control

HEA 03 Thermal control 19 Operable windows - Full control

HEA 04 Ventilation controls 19 Operable windows - Full control

HEA 05 Microbial contamination 36 Water treatment – Legionella control

HEA 06 Water provisions 37 Drinking water promotion - Drinking water access

HEA 08 Illuminance levels (Lux)

53 Visual lighting design - Visual acuity for focus55 Electric lighting glare control - Lamp Shielding55 Electric lighting glare control - Glare minimization57 Low-glare workstation design - Glare avoidance58 Color quality - Color rendering index59 Surface design - Working and learning area surface reflectivity

HEA 10 Inclusive design 72 Accessible design - Accessibility and usability

HEA 11 Ventilation requirements 03 Ventilation effectiveness - Ventilation design

HEA 12 Fresh air rates 03 Ventilation effectiveness - Ventilation design

HEA 13 Operating temperature76 Thermal Comfort - Ventilated thermal environment76 Thermal Comfort - Natural thermal adaptation

HEA 14 Internal environment: CO2 Monitoring 18 Air quality monitoring and feedback - Indoor air monitoring

HEA 15 Internal environment: CO Monitoring 01 Air quality standards - Standards for particulate matter and inorganic gases

HEA 16 Internal environment: NOx monitoring 18 Air quality monitoring and feedback - Indoor air monitoring

HEA 18 Volatile organic compounds

01 Air quality standards - Standards for volatile substances04 VOC reduction - Interior paints and coatings04 VOC reduction – Interior adhesives and sealants04 VOC reduction – Flooring04 VOC reduction – Insulation04 VOC reduction - Furniture and furnishings

HEA 19 Control of chemicals 17 Direct source ventilation – Pollution isolation and exhaust

HEA 20 Acoustic conditions

74 Exterior noise intrusion - Sound pressure level75 Internally generated noise - Acoustic planning75 Internally generated noise - Mechanical equipment sound levels76 Reverberation time – Reverberation time

HEA 21 Deep cleaning 09 Cleaning protocol - Cleaning plan for occupied spaces

HEA 22 Legionella management 36 Water treatment – Legionella control

HEA 23 Occupant satisfaction 86 Post-Occupancy Survey - Occupant survey content

HEA 24 Occupant satisfaction: feedback 86 Post-Occupancy Survey - Information reporting

HEA 26A Health and Wellbeing

65 Activity incentive programs - Activity incentive programs66 Structured fitness opportunities - Professional fitness program66 Structured fitness opportunities - Fitness education100 Biophilia - Indoor Biophilia

HEA 28 View out61 Right to Light - Lease Depth61 Right to Light - Window access

ENERGY

ENE 04 Pressure/ air leakage test 14 Air infiltration management - Air leakage testing

BREEAM In-Use Assessment Issue/Credit(s) WELL Feature Name and PartBREEAM –

WELL Overlap

BIU 2015

TRANSPORT

TRA 01 Cyclist facilities69 Active transportation support - Bicycle storage and support69 Active transportation support - Post commute and workout facilities

TRA 03 Proximity to amenities 67 Exterior active design - Neighborhood connectivity

WATER

WAT 07 Leak detection system 12 Moisture management - Interior liquid water management

LAND USE & ECOLOGY

LE 01 Planted area 100 Biophilia - Outdoor Biophilia

LE 02 Ecological features of planted area 100 Biophilia - Outdoor Biophilia

LE 05 External landscaping/ maintenance 10 Pesticide management - Pesticide use

POLLUTION

POL 06 NOx emissions 24 Combustion minimization - Low emission combustion sources

BRE Global Bucknalls Lane Watford United Kingdom WD25 9XX

T +44 (0)333 321 8811 E [email protected] www.breeam.com

Use of Trademarks

All third-party trademarks are the property of their respective owners. All third-party trademarks referenced in this document are used in an editorial fashion and not to the detriment of the trademark holders.

• BREEAM is a registered trademark owned by BRE (the Building Research Establishment Ltd.) Community Trademark E5778551). The BREEAM Marks and Logos and symbols are the Copyright of BRE and are reproduced by permission.

• WELLTM, WELL Building StandardTM, WELL CertifiedTM, and the WELL Certified & Design Marks (“Marks”) are trademarks or certification marks of IWBI (International WELL Building Institute pbc) or its affiliates and are used herein with permission from IWBI or its affiliates. The Marks are the Copyright of IWBI or its affiliates and are reproduced herein with permission from IWBI or its affiliates.

Copyright

© Copyright 2017 BRE. All rights reserved. No part of this document or the information contained within it may be (a) used for any purpose other than that stated within this document by the recipient; or (b) reproduced, transmitted or translated in any form or by any means, electronic, mechanical, manual, optical or otherwise,

without prior written permission of BRE and International WELL Building Institute, pbc. Unauthorised use of this document violates copyright, trademark, and other laws and is prohibited.

Permission is granted for this report to be distributed in its entirety only, without amendment and with copyright attribution to BRE Global Ltd.

Disclaimer

None of the parties involved in the creation of this document, including the BRE and the International WELL Building Institute, pbc, assume any liability or responsibility to the user or any third parties for the accuracy, completeness, or use of or reliance on any information contained in this document. Although the information contained in this document is believed to be reliable and accurate, all materials set forth within are provided without warranties of any kind, either express or implied, including but not limited to warranties of the accuracy or completeness of information or the suitability of the information for any particular purpose.

Every effort has been taken to ensure the accuracy of this report but no warranty is made in respect of any conclusions or opinions expressed herein. BRE Global’s and IWBI’s liabilities in respect of this report and any reliance thereupon is disclaimed and they shall have no liability to third parties to the extent permitted by law.