asme south african workshop ap1000 overview

39
1 ASME South African Workshop AP1000 Overview Ralph Hill Consulting Engineer Westinghouse Nuclear Services

Upload: others

Post on 12-Sep-2021

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASME South African Workshop AP1000 Overview

1

ASME South African WorkshopAP1000 Overview

Ralph HillConsulting EngineerWestinghouse Nuclear Services

Page 2: ASME South African Workshop AP1000 Overview

2

AP1000 Design Overview

• Introduction• AP1000 Design Overview• Overview of Reactor Pressure

Vessel (RPV) Design Specification

Page 3: ASME South African Workshop AP1000 Overview

3

Page 4: ASME South African Workshop AP1000 Overview

4

AP1000 Design Overview• Background / Design Certification / Licensing / Overall Features• Reactor Core and Vessel Design (core, control rods)• Reactor Coolant System (2 loops, seal-less RCPs)*• Passive Safety Systems (one-time valve actuation)*• Non-Safety Defense-in-Depth Systems (previously safety

systems)• I&C Systems (2 digital I&C w/data highway, AMSAC

replacement)*• Miscellaneous Plant Information• AP1000 Classification System Overview

Page 5: ASME South African Workshop AP1000 Overview

5

AP1000 Investment in Technology

US Licensing Approval

Reduced Components and Commodities

PRA and Severe

Accident Mitigation

FeaturesShort Construction

Schedule

Modular Construction

Simplified Passive Safety

Systems Proven Advanced Design Features

TYPICAL 4 PLACES

CORE

WATER INLET

INSULATION

SHIELD WALL

REACTOR VESSEL

STEAM VENTSREACTOR VESSELSUPPORT STEEL

Extensive Testing of Passive Safety

Systems

Page 6: ASME South African Workshop AP1000 Overview

6

AP1000 - Key Design Features● Integrated Power Plant Design (NSSS and BOP designs) – 60 yr plant life

● Proven Power-Producing Components (reactor, fuel, etc.)

● Simplified RCS – 2 loops (SGs) with 4 seal-less reactor coolant pumps

● Simplified Passive Safety Systems

● Simplified Non-Safety, Defense-in-Depth (DID) Systems

● Microprocessor, Digital-Technology-Based I&C

● Advanced / Compact Control Room / Electronic Operator Interface

● Optimized Plant Arrangement - Construction, Operation, Maintenance, Safety, Cost

● Extensive Use of Modular Construction – Shorter Construction Schedule

Page 7: ASME South African Workshop AP1000 Overview

7

AP1000 Simplifications Drive Economics and Construction Schedule

50% FewerValves

35% FewerPumps

80% LessPipe

45% LessSeismic Building

Volume

85% LessCable

Page 8: ASME South African Workshop AP1000 Overview

8

AP1000 is Smaller and DramaticallySimpler than Evolutionary Plants

Page 9: ASME South African Workshop AP1000 Overview

9

AP1000 Design Overview● For the Power Generation Function, AP1000 is a typical Westinghouse PWR

with advances in materials and components- Fuel - Reactor Vessel- Reactor Coolant Loop - Steam Generators- Pumps - Turbine- Plant Controls

● Reactor Safety Functions are achieved without using any safety-related AC power (accident mitigation without diesel generator operation)

- Battery Powered Valve Actuation - Condensation- Natural Circulation - Evaporation- Compressed gasses (nitrogen, air)

● Passive safety systems actuated by simple, reliable valve position changes. System performance was proven by extensive testing approved by the NRC

Page 10: ASME South African Workshop AP1000 Overview

10

AP1000 Design Overview● Typical PWR safety active systems and safety support systems exist as

simplified non-safety systems located in non-safety building structures- Diesels - Instrument Air- Chilled Water - Hot Water (heating)- Component Cooling - Essential Service Water- Spent Fuel Cooling - Residual Heat Removal- Diesel Support Systems - Startup Feedwater

(Fuel Oil, HVAC) (replaces Auxiliary Feedwater)

● There are no safety-related pumps in the plant and no safety-related ventilation systems.

● The non-safety active systems are credited in the PRA, but are not required for reactor safety and are not required to achieve NRC required CDF

● Severe accident scenarios are mitigated by In-Vessel Retention (IVR) of the melted fuel (the core is retained in a cooled reactor vessel)

Page 11: ASME South African Workshop AP1000 Overview

11

● Fuel, Internals, Reactor Vessel– 14-foot XL core (Doel / Tihange / S.

Texas)– Gray rods / rapid power reduction system– 3-loop RV w/ CE shroud / 18-month

cycle– No bottom-mounted instrumentation

● Steam Generators (inconel 690 TT tubes)

– Similar to large W/CE SGs in operation– System 80, ANO RSG– 1200 MWe / 2 SGs instead of 4

SGs● Reactor Coolant Pumps

– Seal-less pumps, no shaft seals, intermittent CVS operation

– Early commercial reactors (Shippingport, Yankee Rowe) / extensive experience

– Variable speed (start at ~20% speed)– 2 RCPs per SG w/ no cross-over leg

● Pressurizer– About 50% larger than operating plants

● Simplified Main Loop

Proven AP1000 Major Components

Page 12: ASME South African Workshop AP1000 Overview

12

Pump Casing

Pump Diffuser

Pump Impeller

Thermal Barrier

Flywheel

Motor Rotor

Motor Stator

Radial Bearings

Thrust Bearings

AP1000 Reactor Coolant Pump

Page 13: ASME South African Workshop AP1000 Overview

13

Passive Safety Features● Passive Safety Equipment Design

– Reliable, experienced based, nuclear grade equipment

– Design to ASME, Seismic I, full fire / flood / wind protection

– Availability controlled by Technical Specification with shutdown requirements– Technical Specification surveillance requirements

reference Inservice Testing program– Reliability controlled by Inservice Inspection,

Inservice Testing, and maintenance programs

Page 14: ASME South African Workshop AP1000 Overview

14

Passive Safety Features

●Residual Heat Removal– Natural circulation heat exchanger connected to

reactor coolant system● Safety Injection

– Natural circulation / gravity drain core makeup tanks (at reactor coolant system pressure)

– Nitrogen pressurized accumulators (700 psig / ~50 Kg/cm)

Page 15: ASME South African Workshop AP1000 Overview

15

Passive Safety Features● Containment Isolation

– Prevents or limits escape of fission products that may result from postulated accidents.

● Gravity drain refueling water storage tank (at containment pressure)– Automatic transition to gravity recirculation (at

containment pressure)– Automatic depressurization valves (6 from

pressurizer / 4 from hot legs)

Page 16: ASME South African Workshop AP1000 Overview

16

Passive Safety Features●Containment Cooling

– Natural circulation of air / evaporation of water on outside surface of steel containment vessel

●Radiation Removal from Containment Atmosphere– Natural circulation / removal mechanisms

●Main Control Room Habitability– Compressed air pressurization of main control

room envelope

Page 17: ASME South African Workshop AP1000 Overview

17

AP1000 BOP Design• Single Turbine-Generator

• 1 - HP, 3 - LPs

• 2 Moisture-Separator Reheaters

• 3 Condensers and 3 (50%) Condensate Pumps

• 4 LP Feedwater Heating Stages

• 1 De-aerator / Storage Tank

Page 18: ASME South African Workshop AP1000 Overview

18

W e s tin g h o u s e P ro p r ie ta r y C la s s 2 C

R e m o t eS h u t d o w n P a n e l

D is t r ib u te d P la n t N e t w o r kM o n it o r B u s

D a t a D is p la y a n dP r o c e s s in g S y s te m ( D D S )

R P IG a t e w a y s(T y p i c a l)

S a fe ty N e t In fo B u s

O p e ra to rW o r k s ta t io n s

R o d C o n t r o lS y s te m

In c o reS y s te m

(e x is tin g )

N S S SC o n t r o lS y s te m

T u r b in eIs la n d

C o n t r o lS y s te m

P la n t C o m p o n e n ts

C o n t r o lL o g ic

S y s te m

T o N ISS y s te m

I/OC a b in e t

M C Ca n d

S w it c h g e a r

T o M C R /R Ö PIn d ic a to r s

I

I I

I I I

IV

P A M S

T r a inA

In t e g ra te dP r o te c t io nC a b in e ts

N ISI/O C a b in e t

E S F A C

P la n t C o m p o n e n t s

In t e g ra te dC o n t r o l

L o g icC a b in e ts

(IL C )

In fo

L o g ic B u s

P la n t C o m p o n e n ts

In t e g ra te dC o n t r o l

L o g icC a b in e ts

(IL C )

In f o

L o g ic B u sT o M C R /R Ö P

In d ic a to r s

P A M ST r a in

B

P la n tM o n it o r in g

S y s te m s

D iv e r s eA c tu a t io n

S y s te m(D A S )

M o t o r-G e n e r a to r

S e t

R e a c to r T r ip B r e a k e r sP la n t C o n t r o l S y s te m(P C S )

P r o te c tio n a n d S a f e tyM o n ito r in g S y s te m

(P M S )

D iv e r s eA c t u a t io n

S y s te m (D A S )

S p e c ia lM o n ito r in g

S y s te m s

S o f tw a r eD e v e lo p m e n t

H is t o r ic a la n d

R e tr ie v a l

C o m p u ta t io n /A la r m

S e r v e r s

L o gS e r v e r

In te r fa c e toP la n t In fo r m a t io n

S y s te m

D a t a lin kIn t e r fa c e

R IO

E S F A C

M a in C o n t ro lR o o m

H y b id C o n tr o l D e s k s

T ra d it io n a l S ta n d u p P a n e ls

O p e r a to r C o n tr o l a n d

M o n ito r in g L e v e l

C o m m u n ic a t io n L e v e l

P r o c e s s in g L e v e l

P r o c e s sIn te r fa c e

L e v e l

N o n - 1 E F u n c t io n sN o n -1 E F u n c t io n s 1 E F u n c t io n s1 E F u n c t io n s N o n - 1 E F u n c t io n sN o n - 1 E F u n c t io n s

Page 19: ASME South African Workshop AP1000 Overview

19

AP1000 Compact Control Room

Page 20: ASME South African Workshop AP1000 Overview

20

Advanced Control Room

Page 21: ASME South African Workshop AP1000 Overview

21

AP1000 Provides Safety Protection

1 x 10-4 5 x 10-5 1 x 10-5 4 x 10-7

Core Damage Frequency per Year

U. S. NRCRequirements

CurrentPlants

US UtilityRequirements

AP1000Results

Page 22: ASME South African Workshop AP1000 Overview

22

AP1000 General Arrangement● Maintenance / Inspection

– Improved Larger containment diameter– Increased laydown area inside containment– Access platforms provided for equipment maintenance

/ inspection● Improved Access to Containment

– Equipment hatch(s) access from auxiliary building– Equipment hatches and personnel airlocks at both

grade and operating deck levels● Improved Separation

– Radioactive vs nonradioactive– Fire areas, especially inside containment– Safety vs nonsafety

Page 23: ASME South African Workshop AP1000 Overview

23

CVS Equipment Module

Page 24: ASME South African Workshop AP1000 Overview

24

AP1000 Classification Overview

●Safety and seismic classification of plant structures, systems, and components (SSCs)– Safety-related functions are protected during

design basis events– Maintain reactor coolant pressure boundary integrity– Establish and maintain safe shutdown of the reactor– Prevent or mitigate the consequences of accidents that

could result in potential offsite exposures comparable to 10 CFR 100 limits

Page 25: ASME South African Workshop AP1000 Overview

25

AP1000 Seismic Classification●Safety-Related SSCs (Seismic C-I)

– Withstand appropriate seismic loads and other applicable loads without loss of function AND protected from adjacent non-seismic structures

●Nonsafety-Related SSCs (Seismic C-II)– Preclude nonsafety-related SSC structural failure or interaction with

C-I SSCs which could unacceptably degrade safety-related structure SSC, or cause incapacitating injury to main control room occupants

●Nonsafety-Related SSCs (Non-Seismic)– Non-seismic SSCs are those that are not classified C-I or C-II

Page 26: ASME South African Workshop AP1000 Overview

26

AP1000 Safety Classification●Conforms to 10 CFR 50.55a for the development of a Quality Group classification and the use of codes and standards●Developed considering requirements and guidelines of:– ANSI N18.2 (Reference 1) – Safety Classification– ANS 51.1 (Reference 2) – Safety Classification– Regulatory Guide 1.26 – Quality Groups– Regulatory Guide 1.97 – Instrumentation Requirements– 10 CFR 21, Reporting of Defects and Noncompliance

Page 27: ASME South African Workshop AP1000 Overview

27

AP1000 Safety Classification●Safety-Related Classes A/B/C

– Equivalent to ANS Safety Class 1/2/3 for mechanical equipment

– Equivalent to Class 1E for electrical equipment– Seismic Class C-1

●Class A (ANS Class 1)– Reactor coolant system pressure boundary– Includes isolation valves and mechanical supports– Provides highest integrity and lowest leakage probability

Page 28: ASME South African Workshop AP1000 Overview

28

AP1000 Safety Related SSCs●Class B (ANS Class 2)

– Limits leakage of radioactive material from containment following a design basis accident

– Fission product barrier or primary containment radioactive material holdup or isolation

●Class C (ANS Class 3)– Other safety-related functions required to mitigate

design basis accidents / events and NOT in Class A/B– Minor leakage will not prevent Class C structures,

systems, and components from meeting the safety-related function

Page 29: ASME South African Workshop AP1000 Overview

29

AP1000 Safety Classification●Class D - Nonsafety-Related SSCs

– SSC containing radioactivity– SSCs that act to prevent unnecessary actuation of passive

safety systems– Some additional requirements on procurement, inspection, or

monitoring beyond other nonsafety-related class requirements– 10CFR50 Appendix B / 10CFR21 do NOT apply

●Other Nonsafety-Related SSCs– SSCs NOT covered in the above classes– Have no safety-related functions to perform– Do NOT contain sufficient radioactive material that a release

could exceed applicable limits

Page 30: ASME South African Workshop AP1000 Overview

30

AP1000 RPV Design Requirements●ASME and ANS codes and standards● Electric Power Research Institute

– ALWR Utility Requirements Document●Welding Research Council bulletins●ASTM Standards●NRC requirements:

– U.S. Code of Federal Regulations,– NRC Orders, NRC Regulatory Guides– NRC NUREG publications

Page 31: ASME South African Workshop AP1000 Overview

31

AP1000 RPV Design Specification - 1● Sections 3.0 and 4.0 – Functional Description

– provide a functional description of the RPV– define all of the safety, design and seismic

classifications● Sections 5.0 and 6.0 - Design and Analysis

– define the design and analysis boundaries for the RPV

– establish the design requirements and parameters for completing the analysis and Design Report

Page 32: ASME South African Workshop AP1000 Overview

32

AP1000 RPV Design Specification - 2●Section 7.0 - Material

– selection of ASME materials for pressure boundary, structural parts, and items of RPV

– detailed requirements for Alloy 690 material with optimized resistance to PWSCC

– special limits on beltline material residual elements to minimize radiation damage effects

– other material requirements beyond Section III requirements and the requirements of the applicable ASME materials specification from Section II of the Code

Page 33: ASME South African Workshop AP1000 Overview

33

AP1000 RPV Design Specification - 3●Sections 8.2 - Fabrication

– special fabrication processing requirements in more detail than provided by NB-4000

– additional controls are imposed on:– welding processes– selection of weld filler materials– post-weld heat treatment requirements– other special processes

– thermal cutting and cleaning procedures

Page 34: ASME South African Workshop AP1000 Overview

34

AP1000 RPV Design Specification - 4●Section 8.3 – Examination

– addresses examination requirements for RPV materials and welds– for compliance with Code requirements– other industry standards for examinations in addition to the

Section III examinations●Section 8.4 – Testing

– additional testing requirements include material testing beyond minimum Code requirements

– such as fracture mechanics tests

Page 35: ASME South African Workshop AP1000 Overview

35

AP1000 RPV Design Specification - 5●Section 8.5 – Surveillance Program

– defines type and quantity of materials to be provided with the RPV– machined into specimens– installed in surveillance capsule in RPV to monitor response of

beltline materials to fluence over lifetime of plant●Section 8.6 – Archive Materials

– materials retained as contingency, in event that additional testing or characterization of material is needed to resolve an issue during the course of plant operation

Page 36: ASME South African Workshop AP1000 Overview

36

AP1000 RPV Design Specification - 6

●Pre-service and In-service Inspection– techniques, procedures and personnel qualification

requirements used to perform PSI are required to be the same as those that will be used to perform the ISI during operation

– current Section XI performance based requirements for RPV PSI/ISI use sophisticated automated systems with computerized data acquisition systems

Page 37: ASME South African Workshop AP1000 Overview

37

AP1000 RPV Design Specification - 7

●Section 9.0 – Quality Assurance– Subpart 1 of NQA-1-94

– (equivalent to NQA-1-89 edition and up to the 1992 Addenda)– number of other aspects of NQA-1-94 Subpart 2

(formerly NQA-2)– cleaning, cleanliness criteria– packaging, shipping, handling requirements

– Fabricator oversight●Section 10.0 – Packaging and Shipping

– addresses preparation for shipment of the RPV

Page 38: ASME South African Workshop AP1000 Overview

38

Summary and Conclusion● AP1000 Key Features

– 2 Loop Reactor Coolant System– Seal-less pumps

– Passive Safety Systems– Non-Safety Defense-in-Depth Systems

– previously safety systems– Digital I&C Systems with data highway

● AP100 Meets requirements of:– ASME and ANS codes and standards– Regulatory requirements– Other industry requirements

Page 39: ASME South African Workshop AP1000 Overview

39

Questions