Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved. 1 Yves Brachet President Europe, Middle East and African Region The Westinghouse AP1000 ® Plant: Passive, Proven Technology to Meet European Energy Demands AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorised use is strictly prohibited. Other names may be trademarks of their respective owners.

Upload: dohanh

Post on 08-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

1

Yves Brachet President Europe, Middle East and African Region

The Westinghouse AP1000® Plant: Passive, Proven Technology to Meet European Energy Demands

AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorised use is strictly prohibited. Other names may be trademarks of their respective owners.

Page 2: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

2

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

• Offices, support centers and manufacturing units:

• Belgium: Brussels* and Nivelles • Bulgaria: Sofia • Czech Republic: Prague and Temelín • France: Orsay, Marseille, Metz and Lyon • Germany: Mannheim • Spain: Madrid, Vandellós, Hospitalet

del Infante and Asco • Sweden: Västeras and Täby • Switzerland Baden • Ukraine: Kiev and Kharkov • United Kingdom: Chorley and Springfields • South Africa: Cape Town and

Johannesburg

Westinghouse in Europe Today Serving our Customers Across the Region

* Westinghouse EMEA Headquarters

Page 3: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

3

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

• 1962 First Pressurized Water Reactor (PWR) in Europe commissioned

under Westinghouse license (Belgian Reactor 3 or BR3) • 60% of Europe’s nuclear power plants are based on Westinghouse

technology • 54 out of the 58 French reactors are based on Westinghouse licensed

technology • 25 commercial reactors designed and supplied by Westinghouse across

Europe • 4,000 highly-skilled and trained people across Europe, plus an

additional 1,500 contractors • Two nuclear fuel facilities (Springfields & Västeras) in Europe • 65 PWRs (including VVERs), Advanced Gas-cooled Reactors (AGR)

and Boiling Water Reactors (BWR) are currently fuelled by Westinghouse in Europe

Westinghouse in Europe Today Sits at the Heart of Europe’s Nuclear Industry

Page 4: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

4

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Westinghouse AP1000 PWR Westinghouse Focus on Commercial Nuclear Technology

Our newest design – the AP1000 pressurized water reactor (PWR) – features innovative passive safety systems and

proven technologies based on Westinghouse’s 50+ years of experience

Nearly 50 percent of the nuclear power plants in operation worldwide are based on Westinghouse technology

Page 5: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

5

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

● Passive Safety-Related Systems – Use “passive” processes only, no active pumps,

diesels, …. – One-time alignment of valves – No support systems required after actuation – Greatly reduced dependency on operator

actions ● Active Defense in Depth-Related Systems

– Reliably support normal operation – Redundant equipment powered by onsite

diesels – Minimize challenges to passive safety systems – Not necessary to mitigate design basis

accidents ● Severe accident scenario effects are mitigated

by in-vessel retention of the melted fuel

Westinghouse AP1000 PWR Major Safety Advancements

Page 6: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

6

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Westinghouse AP1000 PWR Plant Value Drivers

Passive Safety, through Proven

Technology

Delivery Certainty, through Experience

Regulatory Certainty

Reviewed by multiple countries; first and only Generation III+ reactor to

receive design certification from the U.S. NRC

Passive safety replaces dependence on mechanical and electrical systems – harnesses natural forces like gravity,

convection and condensation to achieve safe shutdown

Provides a plant that is easier and less expensive to build, operate and

maintain

6

Page 7: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

7

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

• EUR confirms the AP1000 plant can be successfully deployed in Europe (May 2007)

• AP1000 plant amended design approved by NRC (December 2011)

• UK regulators grant Interim Design approval (December 2011)

• China licensing activities on-track, with Final Safety Analysis Report (FSAR) submitted to customer (2012)

• Combined construction and operating licenses (COL) approved for Vogtle 3&4 site (February 2012) and V.C. Summer 2&3 site (March 2012)

• Canada (CNSC) Phase 2 Pre-License (2013)

Westinghouse AP1000 PWR Regulatory Certainty

Page 8: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

8

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

V.C. SUMMER

VOGTLE

HAIYANG

SANMEN

• Eight AP1000 units under construction worldwide - Four units in China - Four units in the United States

Photos © Georgia Power Company; South Carolina Electric & Gas Company; Sanmen Nuclear Power Company Ltd.; Shandong Nuclear Power Company Ltd. All rights reserved.

Westinghouse AP1000 PWR Global Project Delivery

Page 9: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

9

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Haiyang 1&2 Shandong Province

Sanmen 1&2 Zhejiang Province

Westinghouse AP1000 PWR China Projects

Page 10: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

10

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

• Major equipment delivered and installed at Sanmen Unit 1 and Haiyang Unit 1 includes: – Reactor Vessel – Steam Generators – Reactor Vessel Internals – Polar Crane – Integrated Head Package

● Shield Building Conical Roof set at Sanmen Unit 1 and Haiyang Unit 1

● Passive Containment Cooling Water Tank set at Sanmen Unit 1 and Haiyang Unit 1

● Digital I&C turnover to Startup staff in progress ● Sanmen operator candidates have completed

simulator training; Haiyang operator candidates started simulator training in July 2013

● Technology transfer well advanced

Photo © Sanmen Nuclear Power Company, Ltd. All rights reserved.

Haiyang Site – May 2014

Photo © Shandong Nuclear Power Company, Ltd. All rights reserved.

Sanmen Site – May 2014

Westinghouse AP1000 PWR Progress of China Projects: Summary

Page 11: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

11

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

2009 to 2014

Sanmen Site Progress: Time Lapse View

Page 12: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

12

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

V.C. Summer 2&3 Jenkinsville, South Carolina Vogtle 3&4

Waynesboro, Georgia

Westinghouse AP1000 PWR U.S. Projects

Page 13: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

13

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

• Nuclear Island basemat concrete pours completed for V.C. Summer Units 2&3; Vogtle Units 3&4

• Containment Vessel Bottom Head (CVBH) set in nuclear island for Vogtle Units 3&4; V.C. Summer Units 2&3

• First CV Ring set for V.C. Summer Unit 2; fabrication of additional rings continues at both sites

• Component and module fabrication proceeding; CA20 module (Auxiliary Building) set at Vogtle Unit 3 and V.C. Summer Unit 2

• Reactor Vessels delivered for initial units at each site; additional equipment and component deliveries continue to proceed

Vogtle Unit 3 Nuclear Island – May 2014

V.C. Summer Unit 2 Nuclear Island – June 2014

Photo © Georgia Power Company. All rights reserved.

Photo © South Carolina Electric & Gas Company. All rights reserved.

Westinghouse AP1000 PWR Progress of U.S. Projects: Summary

Page 14: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

14

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

• Strong reference plant design established

• Licensed in the country of origin

• Commitment to sustainable localization

• Multiple plants built and operating

• Experiences captured and applied for optimized delivery of future plants

Westinghouse AP1000 PWR Requirements for a Successful New-Build Program

Photo © Sanmen Nuclear Power Company, Ltd. All rights reserved.

Sanmen Site – May 2014

Page 15: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

15

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000 Plant Optimization Continuum

SCHEDULE

COST

CERTAINTY

Current Projects

2nd of a Kind

Nth of a Kind

Achieving reduced schedule and cost, increased certainty through: - Lessons Learned - Optimization Concepts - Best Practices - Technical Advances

Westinghouse AP1000 PWR Continuous Improvement in Project and Product Delivery

Page 16: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

16

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Sanmen 1

Haiyang 1

Sanmen 2

Haiyang 2

V.C. Summer 2

Vogtle 3

V.C. Summer 3

Vogtle 4

Xudapu 1&2

Lufeng 1&2

Haiyang 3&4

Sanmen 3&4

FNC 2009

FNC 2009

FNC 2009

FNC 2010

FNC 2013

FNC 2013

FNC 2013

FNC 2013

FNC 2014

FNC 2014

FNC 2014

FNC 2015

Westinghouse AP1000 PWR New Build – Forward Program

Page 17: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

17

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Moorside 1, 2 & 3 West Cumbria, United Kingdom

Page 18: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

18

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

• Toshiba and GDF SUEZ complete NuGeneration Ltd (NuGen) deal (30 June).

• NuGen plans to build three AP1000 reactors in West Cumbria (Moorside Project) - largest, single proposed nuclear power plant construction project in Europe:

Westinghouse AP1000 PWR Westinghouse New Build in the U.K.

- Delivering 3.4 GW of safe power at a competitive strike price, due to our modular design, fewer components and smaller footprint, enabling a shorter construction schedule.

- First AP1000 reactor targeted for operation in 2024 (each reactor will take approx. four years to build), due to our modular design, existing progress in Generic Design Assessment (GDA) and progress on site evaluation.

Page 19: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

19

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Westinghouse AP1000 PWR Westinghouse New Build in the U.K.

- Providing nearly seven percent of U.K.’s projected electricity requirements; delivery enough low-carbon electricity to power six million homes.

- Creating between 14,000 and 21,000 U.K. jobs (4,000 to 6,000 at peak construction) and reinvigorating the U.K. nuclear supply chain through Westinghouse’s “We Buy Where We Build™” policy; creating sustainable, skilled manufacturing jobs.

Page 20: The Westinghouse AP1000 Plant: Passive, Proven … · 2014-07-03 · The Westinghouse AP1000® Plant: Passive, Proven ... First Pressurized Water Reactor ... First AP1000 reactor

20

Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved.

Westinghouse AP1000 PWR Thank You

Photo © Sanmen Nuclear Power Company, Ltd. All rights reserved.