Appleby Lodge Site, Sywell Road,
Wellingborough
Environmental Impact Assessment Scoping Report
July 2012
2
Contents
1 Introduction ............................................................................................... 3
2 Screening and Scoping Exercise .............................................................. 4
3 Location and Site Description ................................................................... 6
4 Description of the Development ................................................................ 8
5 Consideration of Alternatives .................................................................. 10
6 Likely Environmental Effects ................................................................... 11
7 Approach to the EIA ................................................................................ 17
Appendices:
Appendix 1 – Site Boundary
3
1 Introduction
1.1 Prologis UK is proposing to submit an outline planning application for the
development of land at Appleby Lodge, Sywell Road, Wellingborough for a
strategic employment park (Use Classes B1(c), B2 and B8) with associated
parking, highway infrastructure and landscaping. This site currently
comprises of farmland and extends to 65 hectares.
1.2 Having assessed the proposals in the context of the Environmental Impact
Assessment (EIA) Regulations 2011, it is considered that the project needs to
be subject to a process of EIA.
1.3 Prologis have appointed a consultant team to undertake the EIA. The team
comprises:
Delta Planning – EIA Co-ordination, Planning Policy and Socio-
Economic Impacts
Stephen George and Partners – Masterplanning Architects
Barry Chinn Associates – Landscape Architects and Landscape and
Visual Impact
Peter Brett Associates – Traffic and Transport, Ground Conditions,
Flood Risk and Drainage, Noise , Vibration and Air Quality
Ecology Solutions- Ecology and Nature Conservation
Prospect Archaeology – Archaeology
1.4 This Scoping Report seeks to identify the likely effects on the environment,
the studies necessary to assess them and the level of detail required to
enable a planning decision to be made. It is submitted to the Borough Council
of Wellingborough to allow for a formal scoping opinion to be issued.
4
2 Screening and Scoping Exercise
Need for an EIA
2.1 The proposed development is for an employment park involving Use Classes
B1(c), B2 and B8. The development falls within Schedule 2 of the projects to
which the Town and Country Planning (Environmental Impact Assessment)
(England and Wales) Regulations 2011 apply (hereafter referred to as the EIA
Regulations).
2.2 Specifically, it can be regarded as falling within Category 10 (Infrastructure
Projects), as being both an ‘industrial estate development project’ and an
‘urban development project’. The applicable size threshold for projects in this
category is the area of the site exceeding 0.5ha. Further indicative criteria
are provided, including:
In relation to ‘Industrial Estates’, paragraph A17 advises that EIA is
more likely to be required if the site area of the new development is
more than 20 hectares. In considering whether significant effects are
likely, particular consideration should be given to the potential for
increase in traffic, emissions and noise’.
With regard to ‘Urban Development Projects’ paragraph A18 further
advises that EIA is unlikely to be required for the development of land
unless the new development is on a significantly greater scale than
the previous use, or the types of impact are of markedly different
nature or there is a high level of contamination.
2.3 In this instance, the site area significantly exceeds the suggested thresholds.
The site is also currently non-urbanised, its current use being agricultural
land, such that the development is on a significantly greater scale than the
existing use.
2.4 Prologis has therefore concluded that the development proposal should be
subject to formal EIA to ensure that all environmental effects are fully
considered in the planning process, and that the planning application should
be accompanied by an Environmental Statement.
Scoping Exercise
2.5 Schedule 4 of the EIA Regulations outlines the statutory provisions with
respect to the content of Environmental Statements. Certain of these
provisions are mandatory and are set out in Part II of Schedule 4 as follows:
A description of the development comprising information on the site,
design and size of the development;
5
An outline of the main alternatives studied by the applicant and an
indication of the main reasons for the choice, taking into account
environmental effects;
A description of the aspects of the environment likely to be
significantly affected by the development;
A description of the measures envisaged in order to prevent, reduce
and, if possible, offset any significant adverse effects;
A non-technical summary
An indication of any difficulties encountered in compiling the
information required
2.6 In addition, Part 1 of Schedule 4 covers information which, at the discretion of
the local planning authority, is required to assess the environmental effects of
the development. This may include a description of the aspects of the
environment likely to be significantly affected and a description of those
effects (including direct/indirect, secondary/cumulative, short, medium and
long term, permanent/temporary and positive/negative).
2.7 The remainder of this Scoping Report describes the site and proposed
development and identifies the aspects of the environment to be considered
in the EIA and the methodology of assessment.
6
3 Site Description and Policy Context
Site and Surroundings
3.1 The application site comprises 65.31 hectares of farmland as identified in the
plan attached as Appendix 1. It is located approximately 4 kilometres to the
west of Wellingborough Town Centre.
3.2 The site incorporates existing residential properties and farm buildings
associated with Appleby Lodge farm. A number of agricultural buildings have
been used for businesses including a wedding car hire business, joinery
manufacturers and waste management facility. Car boot sales also occur on
site. All existing operations will cease and buildings will be demolished as
part of the application proposals.
3.3 The site is accessed off Sywell Road which is connected to the Trunk Road
network including the A509 and A45.
3.4 Immediately to the east of the site is the Park Farm Industrial Estate. This
estate provides modern light industrial units, warehousing and distribution
facilities and a health club. Some of the current occupiers include RICOH,
House of Fraser, Dunkleys, Homebase, DHL, Booker, Dana, Retco, Mykal,
Edel, Nimlok and Cummins and Bannatynes.
3.5 To the north of the site is the Wellingborough Old Grammarians Sports and
Social Club at the Memorial Sports field which hosts facilities for football,
rugby, tennis and cricket. The site has 47 acres of sports fields and a club
house which provides changing facilities, bar and function rooms.
3.6 Land to the south and west of the site incorporates open countryside
including existing public footpaths.
Planning Policy Context
3.7 The adopted North Northamptonshire Core Spatial Strategy (CSS) identifies
that North Northamptonshire is set to grow significantly in the next 15-20
years. Between 2006 and 2021 it is anticipated that the population will
increase from 298,000 to 370,000 and to accommodate that growth some
52,000 new homes will be required. Although these figures are under review
the scale of growth will still be significant and the CSS recognises that the
area must also attract business investment to generate new jobs and achieve
a broad balance between homes and jobs. Failure to do so would result in the
area becoming a commuter dormitory. The CSS acknowledges that logistics,
storage and distribution remain growth sectors for North Northamptonshire’s
business economy.
7
3.8 Following a strategic Employment Land Assessment for Northamptonshire,
the Borough Council of Wellingborough published a Site Specific Proposals
Development Plan Document Preferred Options in December 2010. This
identified the westward extension of Park Farm at Appleby Lodge, Sywell
Road as a preferred site for the further development of employment uses.
3.9 In July 2012 the North Northants Joint Planning Unit approved a Core
Strategy Review for consultation. This review proposes that a net increase
of 28,500 jobs will be sought through a number of measures including
prioritising the enhancement of existing employment sites, the regeneration of
appropriate previously developed sites, safeguarding existing employment
areas, ensuring sufficient high quality new sites are identified. In relation to
the distribution of jobs, the review identifies committed and new sites
including urban extensions and additional sites. The site at Appleby Lodge is
identified as a new additional site to meet the growth required. With regards
to sites for Strategic Distribution, the review also notes the need to facilitate
the delivery of a mix of jobs and that proposals must provide a maximum of
70% of the total site floorspace for B8 uses with the provision of smaller
employment units to unlock complementary employment uses. Strategic
Distribution sites need to be located close to existing strategic distribution
sites, have good access to the road network, have good access to local
labour supply, maximise the use of sustainable design techniques, be in
locations which allow 24 hour operations, be in locations that minimise
environmental, community and landscape impact and address local
operational requirements of HGV parking arising from the development.
8
4 Description of the Development
4.1 The proposed development will comprise employment development within
Use Classes B1 (c), B2 and B8, together with associated roads, parking and
landscaping.
4.2 The planning application is to be submitted in outline with detailed matters
relating to layout, scale, appearance and landscaping reserved for
subsequent approval. Details relating to access however, will be submitted
for approval at outline stage. Although the detail of how the site will be
developed is not yet fully established, the application will be accompanied by
the following:
A ‘Development Parameters’ drawing showing separate development
zones proposed within the site, and an indication of the minimum and
maximum heights and sizes of buildings within each zone
A schedule of development setting out proposed uses and quantum of
overall floorspace
A landscape strategy plan
An ‘indicative’ masterplan showing how the site could be developed as
currently envisaged by the applicants, and
Full details of the proposed vehicular access
4.3 At this stage the precise quantum of development is not yet established.
However, the net developable areas following the provision of infrastructure
will provide for approximately 47 hectares of employment land. Total
employment floorspace is therefore likely to be in the region of 233,000 sq.m.
It is currently envisaged that the development will be split into 3 zones as
follows:
Zone A – This will form the eastern part of the site and extends to
approximately 22 hectares. It will provide for large units for B8 use
with ancillary offices providing in the order of 147,000 sq.m
Zone B – This will form the northern part of the site and extends to
approximately 13.5 hectare. It will provide for a broad range of unit
sizes and a mixture of B1(c), B2 and B8 uses with ancillary offices. It
will provide for up to 65,000 sq.m.
Zone C – This will form the southern part of the site and extends to
approximately 11 hectares. It will provide for large or medium sized
units for B2 or B8 use totalling in the order of 56,000 sq.m.
4.4 The industrial/distribution buildings will be of a high specification. They will be
in the size ranges known to be of interest to occupiers currently in the market.
9
The intention is therefore to bring them forward for development as demand
dictates.
4.5 Prior to submission of the application the Parameters drawing, Land Use
Schedule and illustrative masterplan will be discussed with the planning
authority and statutory consultees. Members of the public will also be
consulted on the proposals.
10
5 Consideration of Alternatives
5.1 The alternative employment sites within North Northamptonshire are being
considered as part of the Local Development Framework process. The
Appleby Lodge site has been identified as a Preferred Option for additional
employment development as it is considered to form a natural extension to
the Park Farm Industrial Estate on Sywell Road.
5.2 Alternatives will also be considered as part of the EIA process.
11
6 Likely Environmental Effects
6.1 The following section identifies aspects of the environment to be considered in
the Environmental Statement. Known baseline conditions, the data required to
assess impacts and the scope for any mitigation measures are discussed.
6.2 It is considered that the key issues for this development will be:-
Traffic and Transport
6.3 A Transport Assessment (TA) in accordance with NPPF and other relevant
background documents will be produced to describe access arrangements and
demonstrate that this complies with relevant standards and can satisfactorily
accommodate traffic associated with the development.
6.4 This assessment will also deal with the response of the development
proposals to sustainable transport policy and the broad transport and related
environmental impacts of the development. The assessment will identify the
local traffic impacts of the development on the adjacent network including the
nearby A509 and A45 routes. The transport baseline position, relevant impacts
and mitigation measures and residual impacts and their significance will be
included within the Environmental Impact Assessment.
6.5 The accessibility of the site by sustainable transport modes, including public
transport, cycle and by foot will be analysed. Sustainable transport modes will
be identified and quantified. The capacity for enhancing non-car borne trips,
opportunities for pedestrian access including existing/potential rights of way
and opportunities for bus penetration of the site will be considered.
6.6 The full scope of the TA will be agreed between Peter Brett Associates
(Prologis’ highways consultant), the Highways Agency and Northamptonshire
County Council.
Air Quality
6.7 Existing air quality around the Appleby Lodge site and Park Farm Industrial
Estate is influenced by its proximity to the strategic road network.
6.8 The Borough Council of Wellingborough undertakes an annual review and
assessment of local air quality as required under the Environment Protection
Act 1995. The main pollutant of concern is nitrogen dioxide (NO2) although
there are no Air Quality Management Areas (AQMAs) in Wellingborough, and
the nearest diffusion tube monitoring site is approximately 3km from the
proposed development. Monitoring indicates that NO2 concentrations are
significantly below Air Quality Strategy Objectives and there is little risk of
breaching the objectives. As such, we would not propose additional local air
12
quality monitoring and the suitability of the site for development would not
need consideration, as there is no residential development proposed.
6.9 The potential for the proposed development to result in significant effects on
air quality relates to the following:
Dust associated with the construction phase; and
Changes in traffic flow characteristics associated with the completed
phase of the proposed development.
6.10 Construction of the proposed development has the potential to generate dust
which may have effects on nearby sensitive receptors. The air quality
assessment will therefore include an assessment of the impacts of
construction dust in accordance with best practice guidance. The impacts of
emissions from construction traffic and machinery are likely to be screened out
from detailed consideration.
6.11 The potential for the proposed development to result in effects on air quality
relates mainly to the potential for changes in traffic flow and/ or the
characteristics of the traffic on the local road network in the completed phase
of the proposed development. Therefore, the ES would include an assessment
of the effects on existing air quality from road traffic during the operational
phase.
6.12 Consultation will be undertaken with the Environmental Health Officers at the
Borough Council of Wellingborough to identify any particular issues of
concern.
Noise and Vibration
6.13 Existing noise sources around Appleby Lodge are the strategic road network,
together with existing industrial uses on the adjacent Park Farm Industrial
Estate. There are few, if any, noise or vibration sensitive receptors in the
proximity of the site and this will be discussed and agreed with the Borough
Council of Wellingborough.
6.14 If any receptors are identified a baseline noise survey will be undertaken to
include measurements over a typical 24 hour period to establish existing noise
levels at those receptors and an assessment will be carried out to consider the
potential noise and vibration impacts from site clearance and construction
processes at existing noise-sensitive properties in accordance with the
methodology in BS 5228 Noise and Vibration Control on Construction and
Open Sites. The construction impact assessment will be qualitative at this
outline stage. Noise limits will be sets following the 'ABC Method' described in
BS5228. A quantitative assessment may be undertaken once a contractor is
appointed and the construction methods are known. Changes in road traffic
noise as a result of the development-generated traffic will also be considered
and potential effects assessed. Noise from fixed plant and vehicular activity
13
associated with the proposed industrial and distribution development will be
considered in accordance with BS4142 Method for Rating industrial noise
affecting mixed residential and industrial areas. All assessments will be
undertaken in accordance with the principles set out in the relevant sections of
the National Planning Policy Framework (NPPF),
6.15 If required, the assessment will set out outline mitigation measures and
residual impacts will be quantified where possible.
Ecology
6.16 The ecological baseline of the site has been assessed through an Extended
Phase 1 Habitat Survey carried out by Ecology Solutions. During the survey,
the presence, or potential presence of protected species was also recorded.
6.17 Investigations have been undertaken into the presence of protected species
which are on-going. The previous field survey identified limited potential to
support roosting Bats. If Bats are present upon the site, a suitable mitigation
strategy will be devised. Natural England will advise the Borough of
Wellingborough Council on this matter.
6.18 No evidence of badgers was recorded during the surveys, although the
hedgerows and grass margin habitats could offer some limited potential for
badgers. The nearest protected mammal was a water vole and this was
recorded at Park Farm Industrial Estate at a location approximately 0.75 km
east of the application site in 2006.
6.19 Local water bodies were assessed for amphibian species and it is
recommended that newt surveys are carried out to ascertain whether Great
Crested Newts are present on the application site.
6.20 There is no overriding ecological constraint to the development of the site and
there is considerable scope for the incorporation of a range of mitigation and
enhancement measures within the proposed development. A number of
surveys have been recommended for protected species which will identify
whether these groups are present or absent and will guide the
recommendations for mitigation and enhancement.
6.21 The full details of the ecology assessment using an extended phase 1 habitat
survey will be provided in the Environmental Statement which will outline
mitigation measures and residual impacts.
Drainage, Flood Risk and Water Quality
6.22 The proposed development has the potential to impact on the existing foul and
surface water drainage networks in and around the site. The assessment of
the impact of the development on the existing drainage networks will involve
the establishment of the baseline position; the determination of post-
14
development conditions and the establishment of any mitigation measures that
may be necessary. The Environment Agency (EA), the Lead Local Flood
Authority, the Water and Sewerage Undertaker and the local SuDS Approving
Body (SAB) will all be consulted during the assessment.
6.23 As part of the assessment, based on the topographical survey information, the
existing natural surface water drainage catchments and outfalls will be
identified. The existing greenfield rates of runoff for all natural catchments will
be calculated. The Parameters Plan will be used to identify post-development
drainage catchments and individual surface water discharge from these will be
assigned to the previously identified outfalls. A surface water drainage strategy
will be developed to ensure that runoff generated by the proposed
development, as far as possible, mimics the natural catchment response to
rainfall events. The proposed surface water drainage strategy will make an
allowance for increase in rainfall intensities due to climate change.
6.24 The surface water drainage strategy for the site will make use of the principles
of sustainable drainage systems (SuDS).
6.25 A NPPF compliant Flood Risk Assessment will be prepared for the site.
6.26 Foul water drainage will be designed in compliance with Sewers for Adoption
6th Edition (March 2006, WRc) and Building Regulations Part H.
6.27 The potential risks to groundwater from hydro carbon pollution associated with
on plot re-fuelling, vehicle wash facilities and car parking areas will also be
assessed and appropriate mitigation measures identified.
Soils, Geology and Contamination
6.28 Geology and Geomorphology The natural ground conditions on the site
comprise a surface layer of topsoil/subsoil overlying a sequence of Glacial Till,
the Blisworth Limestone Formation, the interbedded sandstone and limestone
of the Rutland Formation and the ironstone of the Northampton Sand
Formation.
6.29 The natural geomorphology in the vicinity of the site comprises the valley of
the River Nene. The Site itself is situated on the undulating ground to the west
of the river valley around the upper parts of the valley of a tributary of the River
Nene that flows south through the southern part of the Site.
6.30 There are no designated geological or geomorphological sites or features of
conservation value in the area affected by the proposed scheme. Given that
the proposed development will have no material change on the geology and
geomorphology in the vicinity of the Site, assessment of the impact of the
scheme on the geology and geomorphology will be excluded from the
proposed Environmental Statement
15
6.31 Mineral Resources The Site does not fall within any Mineral Safeguarding
Area in the Northamptonshire Minerals and Waste Development Framework
adopted in May 2010. In addition, the Glacial Till present on the Site is not
considered to represent a mineral resource of any significant value. On this
basis, assessment of the impact of the scheme on mineral resources will be
excluded from the proposed Environmental Statement.
6.32 Land Contamination The Site is undeveloped agricultural land with no
significant previous development. There are no known sources of
contamination or hazardous ground gases within the site and use of the Site
for agriculture makes the presence of significant concentrations of potential
contaminants or hazardous ground gases unlikely. On this basis, the
proposed development is not expected to present a significant risk to sensitive
receptors including site workers, site occupiers/neighbours, ground and
surface waters, ecology and wildlife, and the built environment. On this basis,
an assessment of the indirect effects of the development on human health, the
environment and the proposed structures relating to contamination and
hazardous ground gases will be excluded from the proposed Environmental
Statement.
6.33 Notwithstanding the above assessment, a desk based Phase 1 Ground
Condition Assessment for the Site will be prepared to identify the
geoenvironmental risks in relation to the proposed development in accordance
with the requirements of National Planning Policy Framework (DCLoG, 2012).
6.34 The scope of work carried out for this assessment will include a site
reconnaissance, review of historical maps and records and identification of
potential contaminant sources, pathways and receptors that may be present
on the site, together with a qualitative Tier 1 assessment of the risks and
hazards associated with existing or potential future contamination and
hazardous gases in the ground. In accordance with the requirements of the
National Planning Policy Framework (DCLoG, 2012), the assessment will be
carried out in accordance with "established procedures" using current UK best
practice and guidance as given in British Standard (BS) 10175 (2001),
Contaminated Land Report (CLR) 11 (EA, 2004) and NHBC Standards
Chapter 4.1 (NHBC, 2011a). The Phase 1 Ground Condition Assessment will
be presented within the ES as an appendix.
6.35 Unstable Ground The geology and geomorphological setting of the Site is
such that the potential for unstable ground to be present is, in general, very
low. On this basis, assessment of the impact of the scheme on ground
stability will be excluded from the proposed Environmental Statement.
Archaeology and Cultural Heritage
6.36 There is evidence for Roman activity in Mears Ashby to the south of the site
and prehistoric finds are also known locally. Although an initial search of
sources has not identified anything from within the site, it lies in an area
16
of archaeological activity and the potential exists for as yet unidentified
heritage assets to exist. The EIA will therefore include a heritage
assessment which will be scoped and agreed with Northamptonshire County
Council Heritage Team. It will include:
A review of national, regional and local archives and sources of
information
A site visit & walkover survey
An historical account of the site’s development
The identification of any known heritage assets that may be directly or
indirectly affected by the development and an assessment of their
significance
An assessment of the potential for other heritage assets to exist
Recommendations for evaluation and/or mitigation if appropriate
Landscape and Visual Impact
6.37 An assessment of the landscape and visual impacts of the development will be
undertaken and the scope of such will be agreed with the Council. In brief, the
assessment will:
Describe the baseline conditions, the site and its surroundings
covering landscape features, character and quality and review the
importance within the existing landscape framework and its sensitivity
to change.
Establish a visual envelope for the proposed development and identify
key sensitive viewpoints with the Council requiring detailed
assessment to include photomontages of the proposed development.
Identify and evaluate the impacts of the development and provide
mitigation strategy
Quantify any residual impacts.
Socio-Economic Effects
6.38 The socio-economic benefits of the proposed development will be considered
with reference to job creation, skills and training and investment, and on the
social fabric of the surrounding area.
17
7 Approach to the Assessment
7.1 The ES will take a topic-based approach, identifying data requirements for
assessing environmental effects, outlining baseline conditions and
differentiating between construction and operational phase effects. The scope
for and effectiveness of mitigating measures will then assessed, concluding
with the extent of any residual effects. The ES will then summarise the overall
construction and operational effects of the proposed development, the
mitigating measures envisaged and the cumulative and residual effects likely
to arise.
7.2 The consultant team will identify the nature, scale and significance of impacts
within their own disciplines, in terms of positive, neutral and negative effects.
In relation to negative effects, the key for EIA is to establish the significance
of such impacts and determine what, if any, mitigating measures can be
introduced to avoid, reduce or remedy those effects. In cases where
mitigating measures are not effective, the EIA will identify any residual
impacts and determine their significance. Similarly, the related nature of
impacts (i.e. the extent to which they are cumulative) will also be taken into
account.
18
Appendix 1
Site Boundary
0 50 100 200
Metres at scale 1:2,500
250
HUXLEY CLOSE
DARBY CLOSE
FARADAY COURT
EDISON CLOSE
Appleby Gate
MOONSHINE G
AP
SYWELL ROAD
BOO
TH D
RIV
E
RU
THER
FOR
D D
RIVE
HUXLEY CLOSE
WALL
IS C
LOSE
RYLE DRIVE
RU
TH
ER
FO
RD
DR
IVE
BOOTH DRIVE
DARBY CLOSE
FARADAY CLOSE
SIN
CLA
IR D
RIV
E
NE
WTO
N C
LOS
E
MORRIS CLOSE
SYWELL ROAD
DAVY CLOSE
FARADAY COURT
ENTERPRISE COURT
MO
RR
IS C
LOS
E
RU
TH
ER
FO
RD
DR
IVE
EDISON CLOSE
PA
RK
FA
RM
WA
Y
SH
ELL
EY
RO
AD
SH
AW
CLO
SE
BR
UN
EL
CLO
SE
BAIRD COURT
SH
AW
CLO
SE
MO
RR
IS C
LOS
E
WHITTLE CLOSE
SINCLAIR DRIVE
NE
WTO
N C
LOS
E
MORRIS CLOSE
SYWELL ROAD
NORTHAMPTONSHIRE COUNTY WELLINGBOROUGH DISTRICT
NORTHAMPTONSHIRE COUNTY
NORTHAMPTONSHIRE EURO CONST
CR
NORTHAMPTONSHIRE AND BLABY EURO CONST
Def
(a)
(a)
QU
EE
NS
WA
Y W
AR
D
QU
EE
NS
WA
Y E
D
QU
EE
NS
WA
Y W
AR
DQ
UE
EN
SW
AY
ED
Def RH
1.22m RH
CDH
ED
& W
ard Bdy
NORTHAMPTONSHIRE COUNTY WELLINGBOROUGH DISTRICT QUEENSWAY WARD
QU
EE
NS
WA
Y E
D
1.22m
RH
ED and W
ard B
dy
ED and Ward Bdy
CR
NO
RT
H W
AR
D
NORTHAMPTONSHIRE AND BLABY EURO CONST WELLINGBOROUGH CO CONST QUEENSWAY ED QUEENSWAY WARD
FIN
ED
ON
ED
NORTHAMPTONSHIRE AND BLABY EURO CONST WELLINGBOROUGH CO CONST
ED & Ward Bdy
Def
ED & Ward Bdy
ElSub Sta
El Sub Sta
El Sub Sta
El Sub Sta
Tank
7
1
9
10
6
Gas Gov
El Sub Sta
1
5
9
5
Edison Court
Wilby Hall
WilbyHall
Tk
Appleby Lodge
The Bungalow
Gas Gov
ElSub Sta
5
7
Gas Gov
1
2
Business ParkElSubSta
Dencora
31
to 3
5
39
43
El SubSta
45
El Sub Sta
1
2
3
5
ESS
42 t0 4
6
2 to 6
El Sub Sta
Gas Gov
El Sub Sta
El Sub Sta
TankGas Gov
Gas Gov
11 to 17
1 to 9
2 to 20
El Sub Sta
El Sub Sta
Gas Gov
El Sub Sta
El Sub Sta
El Sub Sta
ChieftanBusiness
Park
Tank
20
7
1
21
24
Gas Gov
Gas Gov Tank
10
4
5
Gas Gov
El Sub Sta
9
10
6
Sub StaEl
3
Gas Gov
El Sub Sta
1
5
1
7
4
3
4
6
4
22
5
1
Edison Court
13323
0
21
8
194
196
23
1
6
1
24
5
24
7
25
9
26
725
7
26
9
27
9
28
5
28
1
28
7
29
5
30
1
29
7
188
23
22
38
260
30
3
30
9
321
331
329
323
270
353
341
363
355
38937
539
1
395
El Sub Sta
Tank
3
BusinessPark
Dencora
A5
ESS
3
ESS
18
Tank
19
to 2
9
ENTERPRISE COURT
Tanks
El Sub Sta
18
1
El Sub Sta
12
GasGov
Gas Gov
24 to 27
F
8 to 9
5
11
14
12
13
16
to 2
0
Vivian's Covert
WB
The
Corrie's Spinney
TheRookery
Track Post
117.7m
BM 1
18.09m
117.7m
117.0m
115.8m
114.9m
Vivian's Covert
BM 110.94m
ETL
ETL
Guide
WE
LLING
BO
RO
UG
H
Park FarmIndustrialEstate
Tra
ck
Sports Ground
Mast
Park Farm Industrial Estate
Regent Park
SM
SM
Industrial Estate
Park Farm
Cycle Way
Cyc
le W
ay
Vivian's Covert
SM
TCB
LB
Industrial EstatePark Farm
BM 98.71m
97.3m
99.4m
95.3m
92.9m
Gas Compound
Park Farm Industrial Estate
Pa
th
Regent Park
Park Farm Industrial Estate
Tank
Cycle Way
Cycle
Way
SM
SM
SM
SM
Industrial EstatePark Farm
Vivian's Covert
Tra
ck
Sports Ground
Tra
ck
Pond
Pond
Pond
Pond
Pond
Drain
Issues
5000
6190
1700
2197
1172
0351
Ref:
Appleby Lodge Farm
Wellingborough
EIA Site Identification Plan
10074P002
BW
JN
07/2012
1:2,500 @ A1
10074 P002 -
Drawing status:
CAD reference:
Drawn:
Team:
Date:
Scale:
Project no: Rev:Dwg no:
1 Monkspath Hall Road
Solihull, West Midlands B90 4FY
t: 0121 711 6929 f: 0116 254 1095
www.stephengeorge.co.uk
This drawing, the works and concepts depicted are copyright of Stephen George & Partners and may not be reproduced or made use of, either directly or indirectly without express written consent. Do not scale off this drawing. All heights, levels, sizes and dimensions to be checked on site before any work is put to hand.
Notes:
To be read in conjunction with relevant consultants
drawings.
O/S Licence Number 100020449
Application Boundary
Area = 65.32ha/161.41 acres
Revision: