api 570 study guide _full

Upload: ochable

Post on 01-Jun-2018

313 views

Category:

Documents


9 download

TRANSCRIPT

  • 8/9/2019 API 570 Study Guide _Full

    1/18

    % of Material examiniation for high risk

    piping system with likely material mixup100%

    a 4" thick 5 chrome vessel operates at 1200

    psig and 900F. When is the vessel lest

    likely to fail from Brittle Fracture?

    During normal operation

    According to ASME/ANSI B16.5 flanges

    from plate materials can only be used for:Blind flanges

    According to B31.3, a welder's qualification

    records from a previous employer can:Be accepted if the inspector

    approves

    Advantage of GTAW (Gas

    tungsten arc welding)

    Best control of weld pooling

    API 574 discusses other areas of possible moisture

    ingress that may be causes by the actual inspection

    of the piping systems. Where would these areas be?

    Locations where insulation plugs were removed to

    permit piping thickness measurements

    API 574 7.4.4.2

    ASME code for valves B16.34

    ASME Sec. VIII had few limitations

    concerning Brittle Fracture prior to:1987

    ASME/ANSI B16.5 requires

    flanges to be:

    marked with the class rating.

    Buried piping, without adequate cathodic protection

    should be included in scheduled external inspections.

    What area is to be inspected during these scheduled

    external inspections?

    The soil-to-air interface shall be included

    in the external inspection schedule.

    API 574 7.4.5

  • 8/9/2019 API 570 Study Guide _Full

    2/18

    The calculations for maximum allowable working pressure

    (MAWP) for known materials shall be as provided for in ASME

    B31.3 or the code to which the piping was designed and fabricated

    (applicable code). What information is not required to be available

    and comply with the principles of the applicable code?

    The name of the original manufacturer

    API 570 paragraph 7.2

    Can the inspector give prior general

    authorization for limited or routine repair

    activities?

    Yes, provided the inspector is satisfied with

    the competency of the repair organization.

    API 570 8.1.2

    Carbon steel materials are most likely

    to be incorrectly substituted in:a chrome steel piping system.

    Carbon steel piping which operates above

    what temperature intermittently should be

    inspected for CUI?

    350F

    API 574 7.4.4.1(f)

    Change of an identical item, owing to

    corrosion + MAWP increased for the

    whole system is called?

    repair and re-rating

    Code for Cathodic Protection API 651

    Code for FFS (Fitness for

    Service)

    API 579

    Code for NDE procedures

    guidelines

    ASME Section 5

    Code for PMI (positive material

    identification)

    API 578

    Code for RBI (Risk Based

    Inspection)

    API 580

  • 8/9/2019 API 570 Study Guide _Full

    3/18

    Code for Valve Inspection and

    testing

    API 598

    Code for Weld procedure

    qualification

    ASME Section IX

    Code for Welder qualification ASME Section IX

    Code for Welding on In-Service equipment

    containing Flammables (hot tapping)API 2201

    Code to follow when performing an

    internal inspection on pipeAPI 510

    A combination of corrosion and erosion results in

    greater metal loss than would be expected by either

    corrosion or erosion alone. What three areas should

    be inspected for this type of deterioration?

    Downstream of control valves, downstream of

    pump discharges, and downstream of orifices.

    API 574 7.4.7 (a)(b)(c)

    The corrosion rate for newly installed piping systems

    or for changes in service must be established. API 570

    provides three methods of determination probable

    corrosion rates for these conditions.

    API 570 paragraph 7.1.2

    Corrosion rates on existing piping systems shall be

    calculated on either a short-term or a long-term

    basis. How is the long-term corrosion rate

    calculated?

    Wall thicknesses from the most recent and

    initial (or nominal) inspections shall be used

    API 570 paragraph 7.1.1

    Corrosion rates on existing piping systems shall be

    calculated on either a short-term or a long-term

    basis. How is the short-term corrosion rate

    calculated?

    Readings from the two most recent

    inspections shall be used.

    API 570 paragraph 7.1.3

    Corrosion under insulation (CUI) is a serious

    problem. What should be done to determine

    the possibility of this condition existing?

    Inspect the integrity of the insulation system

    for conditions that could lead to CUI.

    API 574 7.4.4

  • 8/9/2019 API 570 Study Guide _Full

    4/18

    Corrosion under insulation is very aggressive where operating

    temperatures cause frequent condensation and re-evaporation of

    moisture. For carbon steel piping systems, what operating

    temperature range would be considered most susceptible?

    Between 10F and 350F

    API 574 7.4.4.1(e)

    The corrosiveness of soils can be

    determined by measuring the soils:Resistivity

    Describe the 3G welding test

    position.

    Vertical groove Weld

    Design code for fabrication of

    piping relief devices

    ASME section VIII

    Distance to dig when inspectng

    for soil to air corrosion

    6-12 inches

    During a direct visual exam of a pipe weld,

    the minimum light intensity should be:100 footcandles

    During a hydrotest, all joints

    should be:

    left uninsulated

    During a pipe repair, preheat is substituted

    for the required PWHT. What is the

    minimum preheat temperature.

    300

    During pipe fabrication who has overall

    responsibility for compliance with the

    code?

    The owner/user

    During pipe repairs, which welding

    discontinuity is always unacceptable?Cracks and Inadequate fusion

  • 8/9/2019 API 570 Study Guide _Full

    5/18

    During welding, non-esential

    variables:

    Must be recorded only on the WPS

    and must be followed by the welder.

    Effect of T on Soil corrosion

    rate

    Corrosion Increases with

    Increase in T

    Electrode for SMAW (Shielded metal arc

    weld) for low hydrogen applicationBasic

    Excessive repairs to pump

    bearings may be a result of:

    thermal growth

    Flange bolts are unacceptable if

    the bolt threads do not extend:

    inside the nut within 1 thread of

    the nut face

    Flange leaks in certain fluids

    can cause:

    bolts to crack and corrode

    Flux type for low hydrogen use with

    SAW (Submerged arc welding)Agglomerated

    The following is a Ferritic SS 405 series Stainless Steel

    The following is a martensitic

    SS

    410 series Stainless Steel

    The following is an Austenitic

    SS

    316 series Stainless Steel

  • 8/9/2019 API 570 Study Guide _Full

    6/18

  • 8/9/2019 API 570 Study Guide _Full

    7/18

    In a hot tapping system, the high

    point area may corrode. Why is that?

    Corrosion may take place at the high point area of

    deadlegs in hot piping systems due to convective

    currents set up in deadleg.

    API 574 7.4.3

    In order to determine the cause and provide

    corrective action, welding repairs of cracks that

    occurred in-service should not be attempted without

    consultation with:

    The piping engineer

    API 570 8.1.3

    In severe refinery services which

    type of pipe is normally used?seamless pipe

    An inservice process pipe should be

    classified as Class 1 when the % of H2S

    exceeds:

    3%

    Lead letter used during RT to

    check for backscatter

    B

    Lead letter used during RT to

    indicate a film-side IQI

    F

    Length of time before an API

    570 inspector must recertify

    6 years

    Limits of soil to air area distance

    in air away from interface6 inches

    Liquid thermal relief valves should be set

    at a pressure not higher than:120 %

    Loose or broken anchor bolts at pipe

    supports are most easily detected by:hammer testing

  • 8/9/2019 API 570 Study Guide _Full

    8/18

    Low alloy steels can contain up

    to how much chrome?

    9%

    Material most susceptible to

    brittle fracture

    Ferritics CS & Low Alloy SS

    The material verification program

    specified by API 578 covers:only pressure containing

    components.

    Material with highest resistance

    to sulfidation

    18/8 SS

    Materials subject to chloride

    stress corrosion cracking

    300 series Stainless Steel

    Materials subject to temper-

    embrittlement

    Low Alloy Chromes

    Materials where preheat can be

    substituted for PWHT

    P1 & P3

    Maximum allowed SMYS (Specified

    Minimum Yield Strength) for pipe if fillet

    welded patch is installed

    40,000 psi

    Maximum allowed thickness on a WPS

    based on the plate thickness (T) of a PQR

    coupon

    2T

    Maximum External Inspection

    interval for Class 1 & 2 Piping

    5 years

  • 8/9/2019 API 570 Study Guide _Full

    9/18

    Maximum external inspection

    interval for Class 3 piping

    10 years

    Maximum flange size covered

    by B16.5

    NPS 24

    Maximum inspection inerval for

    clean/non fouling service PRD's10 years

    Maximum interval for a visual

    examiner's eye check

    1 year

    Maximum stress allowed

    during a pressure test

    90% of SMYS (Specified

    Minimum Yield Strength)

    Maximum thickness Inspection

    interval for Class 2 & 3 piping:The lesser of 10 years or half

    life of the pipe.

    Maximum thickness Inspection

    interval for injection point

    Lesser 3 years or Half life

    Maximum time before obtaining thickness

    readings when corrosion rate on new pipe

    is not kmown (no other data available)

    3 months

    Maximum time that a welder maintains

    qualifications for a welding process

    without using that process

    6 months

    Mill tolerance of seamless pipe "-12.5%"

  • 8/9/2019 API 570 Study Guide _Full

    10/18

    Minimum downstream limit of

    injection point circuit

    lesser of 1st directional change +25

    feet or 2nd directional change

    minimum duration of hydro test to

    evaluation integrity of a burried pipe8hr

    Minimum length of buried pipe to expose

    when excavating for inspection6-8 feet

    Minimum time an examiner should be in a

    darkened area prior to using a black light

    when performing MT & PT exam

    5 min

    Minimun light intensity when

    performing VT, MT, or PT exam100 foot-candles

    Mixed grades of carbon steel piping in hot corrosive

    oil service are susceptible to service specific and

    localized corrosion above what temperature and oil

    sulfur content?

    450F or higher and sulfur content in the

    oil greater than 0.5% by weight.

    API 574 7.4.6.2(j)

    Modes of GMAW (Gas metal

    arc weld)

    Globular, short circuit, and

    spray transfer.

    most brittle fractures appear as: Cleavage

    Most Brittle Fractures occur: Below the impact transition

    temperature

    NDE personnel qualification ASNT SNT-TC-1A

  • 8/9/2019 API 570 Study Guide _Full

    11/18

    Nickel alloys are what % nickel? 30%

    Per B31.3 how much of the fabrication

    should be visually examined for a pipe in

    severe cyclic service:

    100 %

    Per B31.3, how much RT is conducted on

    circumferential welds of a pipe in normal

    service?

    10%

    pH of hydro test water needed

    to reduce likelihood of MIC

    >10

    a pipe has a thickness designation of

    "40S". what does the "S" mean?Stainless steel

    Piping most involved in

    material mixup

    bypass piping, small diameter

    (2NPS) piping, valves and bolts.

    Piping stress analysis can identify the most highly

    stresses components in a piping system and predict

    thermal movement. Where can this information be

    used to enhance the inspection effort?

    To concentrate inspections at locations prone

    to fatigue and/or creep damage.

    API 570 paragraph 7.5

    PMI stands for Positive Material Identification

    A pneumatic pressure test is to be conducted on a

    Normal Service piping system. During pipe erection,

    how many of the joint assemblies should be

    examined?

    100 %

    A PQR test coupon with a shell thickness

    of "T" can generally be used to qualify a

    wall thickness on the WPS up to.

    2T

  • 8/9/2019 API 570 Study Guide _Full

    12/18

    PQR using a S number qualifies

    ...

    both S-number and P-number

    Materials

    Prefered inspection method for

    injection points

    RT and/or UT

    Preheat should never be

    substituted for PWHT if:

    the PWHT was used to prevent

    environmental cracking.

    Pressure applied inside a pipe creates

    stress in the pipe wall. These stresses are

    highest on which weld orientation?

    longitudinal weld

    A pressure test is always

    required:

    whenever the authorized inspector

    believes one is necessary

    A propane piping system

    should be classified as?

    Class 1

    The removal of surface material by the

    action of numerous individual impacts of

    solid or liquid particles is a definition of:

    Erosion

    API 574 7.4.7

    Resistance to Brittle Fracture is

    called:

    toughness

    The RT procedure used for a pipe repair

    must conform to the requirements of:ASME Section 5

    Seal welding pipe threads: may be used to prevent leaks

  • 8/9/2019 API 570 Study Guide _Full

    13/18

    Suggested interval - Close interval

    Potential Survey of buried pipe w/ poor CP5 years

    Suggested interval for above-grade visual

    surveillance of burried pipe6 months

    Suggested interval for evaluation of

    Soil corrosivity of buried pipe w/o CP5 years

    Thickness measurements are

    suggested at pipe fittings since:

    directional changes generally create

    increased turbulence and corrosion.

    To evaluate the effects of fire damage, FFS

    evaluation should be performed in

    accordance with:

    API 579, section 11

    True or False

    A Brittle Fracture grows very rapidly with

    minimum deformation prior to failure.

    True

    True or False

    The minimum required pipe wall thickness, or

    retirement thickness, is based solely on pressure.

    False

    API 570 paragraph 7.3

    Two main types of

    Environmental cracking

    Caustic stress corrosion cracking and

    Caustic embrittlement

    Two most common CS pipe

    materials

    A53 & A106

    Two primary gamma ray

    radiation sources

    Iridium & Cobalt

  • 8/9/2019 API 570 Study Guide _Full

    14/18

    Typical external corrosion rate

    for dry rural environment

  • 8/9/2019 API 570 Study Guide _Full

    15/18

    What does the "H" mean in

    Austenitic SS, like 316 H?

    High Carbon

    What does the "L" mean in

    Austenitic SS, like 304 L?

    Low Carbon

    What increases the likelihood

    of brittle fracture?

    large grain size & Thicker

    materials

    What indicates internal CO2

    corrosion

    Smooth grooving of pipe wall

    what is the interval for thickness

    measurements on a class 1 piping system?lesser of 5 years or half life of

    the pipe

    What is the limit of soil to air area distance

    in soil away from interface?12 inches

    What is the minimum holding time

    for all pressure tests on piping?10 mins

    What material is subject to polytheonic

    acid stress corrosion cracking?Sensitized 300 SS

    What operating temperature range would be

    considered most susceptible to chloride stress

    corrosion cracking in austenitic stainless steel

    piping?

    Between 120F and 400F

    API 574 7.4.4.1 (h)

    What should be done when unexpected

    movement of a piping system is observed?

    The inspector should discuss these observations with

    the piping engineer and evaluate the need for

    conducting a piping stress analysis.

    API 570 paragraph 7.5

  • 8/9/2019 API 570 Study Guide _Full

    16/18

    What test is used to determine

    a materials toughness?

    Charpy Impact Test

    What type of records is the owner/user

    required to maintain according to API 570?Permanent and progressive records

    API 570 paragraph 7.6.1

    What type of weld for flush insert patches

    can be used in corroded areas?penetration groove weld

    what welding process cannot be

    qualified by radiography

    GMAW (short circuit mode)

    When a relief device or valve is removed

    for repair, the inspector should:

    inspect the inside of the inlet and outlet

    piping where the valve was removed.

    When calibrating a UT instrument, that

    has a delay line with single element unit,

    use:

    At least 2 test blocks with thicknesses near

    the max and min to be examined.

    When can radiography not be

    used to qualify a welder?

    when using the GMAW process

    with the short circuit mode

    When fabricating pipe,

    unknown materials:

    Should never be used (except

    for door stops)

    When is it necessary to inspect for

    corrosion beneath the surface before

    resealing the joint?

    If the buried piping system is over 10 years old, and

    the caulking or seal at the interface has deteriorated.

    API 574 7.4.5

    When making repairs and alterations to

    piping systems covered by API 570, what

    standards must be followed?

    ASME B31.3 or the Code to which the

    piping system was built.

    API 570 8.1.1

  • 8/9/2019 API 570 Study Guide _Full

    17/18

    When performing a visual exam, the

    minimum angle of eye to part30

    When performing preheat prior to welding or

    PWHT, the preheat zone and/or PWHT must

    extend how far beyond the edge of the weld?

    1 inch

    When performing soil-to air inspections

    on uncoated lines, it is recommended to

    excavate the soil:

    6-12 inches.

    when qualifying a weld procedure

    the essential variables must:be recorded on both the WPS &

    PQR

    When recalculating MAWP of piping

    systems for continued use, what thickness

    is used?

    The actual thicknesses determined by inspection

    minus twice the estimated corrosion loss before the

    date of the next inspection.

    API 570 paragraph 7.2

    When shall temporary leak sealing devices

    be removed and pipe repaired?Next turnaround

    When should temporary pipe

    repairs be replaced?

    Next opportunity

    When the MAWP is recalculated for piping

    systems of unknown materials, what

    information is used?

    The lowest grade material and joint

    efficiency in the applicable code.

    API 570 paragraph 7.2

    When welding together piping components

    of different thicknesses, the thicker part

    should be trimmed with a:

    30 degree taper.

    Where should wall thickness on deadlegs

    be monitored by the inspector?

    This inspection should include both the stagnant

    end and the connection to an active line

    API 574 7.4.3

  • 8/9/2019 API 570 Study Guide _Full

    18/18

    Which dimension stay the same regardless

    of the wall scheduled thickness?Outside Diameter

    Which material is Least

    affected by Brittle Fracture?

    300 series Stainless Steel

    Which material must use low chloride

    hydro test water & must be died after

    hydro test?

    300 series Stainless Steel

    Who approves Welding

    procedures qualified by others

    The Inspector

    Who has the responsibility to determine

    the extent of PMI (Positive Material

    Identification) performed?

    The owner/user

    Who must approve all proposed methods

    of design, execution, materials, welding

    procedures, examination, and testing?

    The inspector or the piping engineer

    API 570 8.1.3

    Who must authorize any repair or

    alteration work, prior to commencement

    of the work?

    The inspector

    API 570 8.1.2

    Whose approval for on-stream

    welding is required?

    The owner/user

    API 570 8.1.3

    With regard to alteration work, who must

    the inspector consult with prior to giving

    authorization?

    The piping engineering

    API 570 8.1.2