A Revolutionary Renewable Energy Company

Biomass Gas & Electric LLC

“Creating Energy Solutions from Biomass Waste”

Page 2: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

2

A Renewable Energy Project Development Company focused on providing the best renewable energy solution to match customer & project needs

BG&E projects use “advanced gasification” technologies

BG&E has an extensive Knowledge of the top gasification processes currently available

BG&E’s experienced development and management team:

Has over 60 years in the industry and over 4000 MW installed/managed.

Principals developed & operated the largest advanced gasification facility in the U.S.

BG&E project benefits include:

Off balance sheet benefits for inside the fence and external energy projects

No capital outlay by the client

Clean renewable energy with lowest emissions

Long-term predictable energy costs

Biomass Gas & Electric, LLC

Page 3: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

3

Current Biomass Technologies

Stoker Combustion

Fluid Bed Combustion

Air Blown Gasification(includes air starved)

Pyrolysis (advanced gasification)(no air/oxygen)

Thermal Energy

Thermal Energy

Thermal Energy

Syngas

Syngas

Process Output History

→ Longest History→ Highest level of Pollutant

i.e. 250tn for 20MW→ No Fuel Flexibility

→ Latest Advancement (10+ years)→ Lowest possible emissions

i.e.10 to 50tn for 20MW→ Widest range of fuel flexibility

→ Extensive history & use→ Controlled Emissions

i.e. 50 to100tn for 20MW→ Limited Fuel Flexibility

→ Short History (30+ years)→ Controlled Emissions

i.e.50 to 100tn for 20MW→ Limited fuel Flexibility

Page 4: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

4

Gasification – A Proven Technology

Page 5: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

5

Advanced Gasification Technology – Key Points

Standard gasification is a high heat partial burn process which breaks down feedstock into it’s basic gaseous elements

Advanced Gasification is a pryolysis process without oxygen or burning which:

offers up to 35% greater efficiency over stoker technology

Produces a reduced emission of 98% below conventional fossil fuel plants & 40% below conventional biomass plants.

Can accommodate a variety of organic feedstock of varying moisture content without impacting Btu content.

Gasification to advanced gasification improvements have been provided by world renowned programs such as: Battelle Labs, NREL, U.S. Department of Energy

At completion, the biomass material is reduced to a minimal inert ash residue with multiple commercial use. (road bed material, landfill fillers, fertilizer extenders, etc)

1st commercially-sized demonstration Biomass gasification

operation using wood waste

Page 6: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

6

When additional or replacement fuels are required:

Advanced Gasification = More Fuel Flexibility

“Clean” C&D debris – Includes road & land clearing debris, industry waste (palates, sawdust, paper waste, etc), felled storm debris, urban biomass wastes

• excludes painted and CCA treated wood

Forest Wood Waste – supports proper forest management, is easily processed, and offers good BTU value

Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning

Energy Crops – such as switch grass and Arundo Donax • Can be grown providing a stable fuel source• provides new industry opportunities

Chicken litter and agricultural waste offer:• high output feedstock• ash becomes usable fertilizer• removes land spread issues

Page 7: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

7

Process Flow• Organic feedstock at 3”-

is fed thru a hopper and through an air lock

• In the air lock nitrogen purges out the oxygen

• Blended with steam the feedstock is mixed with 18000f heat

• As the heat mixes an instantaneous reaction “gasifies” the feedstock breaking it down into it’s basic elemental gases

• Cyclones separate the Syngas and any Char

• Gas & char is burned in the combustor generating heat sent to the gasifier

SynGas

18000

Advanced Gasification Process Overview

Char &/or

SynGas

Page 8: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

8

Development Milestones of the Forsyth Project

EPC• Experienced contractor selected

• Project contract includes schedule & performance guarantees

• Market driven liquidated damage requirements

• Shared savings contract to support schedule.

Permit• Site-specific Engineering completed

• Emission Modeling

• Application made within 90 days of PPAFinancing• Checklist completed to achieve financing

• Closing set to follow receipt of final air permit and interconnection agreement

Feedstock Contracted• Multiple contracts to be signed by using the advantage of below market landfill rates

Permanent financing completed

Equipment Ordered

Construction Ground-breaking• Site work commences

Project Site• In escrow pending financial close

Project shakedown• Systems performance tested

• Output, emissions, feed systems all tested to spec.

• Following acceptable runs –BG&E begins PPA services

Permitting review• Local and federal requirements reviewed during PPA/EPA stage

• Emission requirements & limits

• Other permit issues

Feedstock identified• Preliminary Analysis for availability and cost

• Market research identified 300+% of project requirements

Project Site• Access to required interconnects & utilities

• Preliminary zoning review

• Acquisition terms negotiated and site closed in escrow

PPA Developed• Financial modeling

• Equipment identified and preliminary bids received

• BG&E worked with the Georgia Public Service Commission and Georgia Power to develop a market driven pricing structure called the “Proxy Pricing Formula”

PPA completed* Air Permit received Construction Completed

For external or off-balance sheet projects

Site purchase completed

24+ months* 6 months 15 months 3 months

*may be shortened or excluded for “in the fence” projects

Page 9: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

9

Forsyth Power Project Requirements

Forsyth Virtual Site Layout

Financing & Lender Requirements

Predictable revenue

30% Liquidated Damages

Tax Credits w/ 3rd party

Permit Issues

Non Attainment Limits

Technology Selection

Cost & Fuel Flexibility

Public Concerns

Community Impact

Comprehensive Fuel Plan

Minimum Requirements

Page 10: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

10

Forsyth Power Project – Solutions

Forsyth Virtual Street View

PPA – 20 year - 28 MW net to the grid under a with the financible buyer - Georgia Power Company

Equity Partner to purchase Production Tax Credits

EPI/InDeck supports:

Fuel Flexibility

Permit Constraints

EPC & Construction Schedule

Zoning limits feedstock receipt & processing to “daytime” only

EPC commitment to “fully wrap” project

Page 11: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

11

Forsyth Power Project – Technology Emission Driven

BG&E selected technology is an EPI starved air fluid bed gasifier coupled with an InDeck recovery boiler.

Back-end emissions controls include a hot ESP followed by a CO2 catalyst and SCR to manage NOx

540 DTPD produces 268 MMBTU/Hr of steam at 9500 F and 1215 psi which directly feeds a 32 MW STG

Project Construction time is 15 to 18 months from ground breaking thru commissioning

Page 12: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

12

Technology Supports Feedstock Sources

Extensive private and public studies provided initial support for project and indicated what, where and how much was available.

Selected Feedstock: “Clean” C&D debris – industry waste (palates, sawdust, paper waste, etc), forestry mgmt waste, felled storm debris, urban biomass wastes (from land clearing, landscaping, trimmings, yard biomass, etc), creosote treated woods (telephone poles, RR Ties, etc),

• excludes painted and CCA treated wood

Future Fuel Alternatives

Chicken litter and agricultural waste offers:• high output feedstock• ash becomes usable fertilizer• removes land spread issues

Page 13: “Creating Energy Solutions from Biomass Waste”Rice hulls & bagasse – an excellent fuel source and beneficial alternative to burning Energy Crops – such as switch grass and

13

Location and partnership with local landfill provides:

Ability to manage landfill tipping fees to attract local wood waste for feedstock

21 days of covered fuel to allow natural drying and plentiful onsite reserves

potential added revenue (from tipping fees) to offset project fuel processing costs

Provides existing staff (at landfill) reducing project fuel management

Solution for ash residue from project

Forsyth Power Project – Primary Feedstock Program