Global Environment Facility Food and Agriculture Organization of the United Nations Bharathi Integrated Rural Development Society Strategic Pilot on Adaptation to Climate Change GCP/IND/181/GFF Reversing Environmental Degradation and Rural Poverty through Adaptation to Climate Change in Drought Stricken Areas in Southern India: A Hydrological Unit Pilot Project Approach ANNUAL WORK PLAN AND BUDGET 2011 Project Management Office H. No. 127/1, Habsiguda Polyclinic Compound, Kakatiyanagar, Habsiguda, Hyderabad – 500 007, A.P, India. Phone : +91 40 27173351 Fax : +91 40 27173361 Email : [email protected]

Upload: phungduong

Post on 08-Sep-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Global Environment Facility  Food and Agriculture Organization of the United Nations   

Bharathi Integrated Rural Development Society  Strategic Pilot on Adaptation to Climate Change 

  

GCP/IND/181/GFF Reversing Environmental Degradation and Rural Poverty through Adaptation to 

Climate Change in Drought Stricken Areas in Southern India:  A Hydrological Unit Pilot Project Approach 

ANNUAL WORK PLAN AND BUDGET 2011

       

Project Management Office  H. No. 1‐2‐7/1, Habsiguda Polyclinic Compound,  

Kakatiyanagar, Habsiguda, Hyderabad – 500 007, A.P, India. Phone : +91 40 27173351  Fax : +91 40 27173361 

Email : [email protected]  

AWPB 2011

2

ANNUAL WORK PLAN AND BUDGET 2011  Project No:  FAO Project (ID): 604144 GEF Project (ID): 3882  Project title:    Reversing Environmental Degradation and Rural Poverty  through Adaptation  to Climate Change  in Drought Stricken Areas in Southern India: A Hydrological Unit Pilot Project Approach  Executing Partner:   Bharathi Integrated Rural Development Society (BIRDS)  Project commencing date:   December 6, 2010  Project ending date:   December 5, 2013  Work Plan/Budget year:   2011 

1. Narrative description by components  

1.1   Component 1: Information tools for decision making and local institutional capacity development 

 Outcome 1, expected  to happen as a  result of  implementing  component 1, describes  the desired situation after project intervention, as follows:   “Information  tools  and  local  institutional  capacities  developed  for  farmers  and  CBOs  to  make informed decisions on land and water management based on scientific and local knowledge, taking into account impact of climate variations”  Three Outputs are envisaged to occur and contribute to realizations of Outcome 1, discussed in the following section.  

AWPB 2011

3

Output 1.1: Completed study on local and scientific knowledge on impacts of climate variability/change on natural resources in Andhra Pradesh 

 Realization  of  Output  1.1  is  possible  only  when  four  results  are  generated  viz.,  1.1a  – climate/weather  data  analysed;  1.1b  –  present  farmer  knowledge  on  climate  variability  and  its impact surveyed; 1.1c – present scientific knowledge on climate variability and its impact reviewed; and 1.1d – present  local and scientific knowledge documented. All the results of Output 1.1 will be generated during the plan period – 2011.   Output  Indicators  and  targets  for  the  Output  1.1,  listed  in  table  C‐1.1,  are  derived  from  the statements in the column 2 (Objectively Verifiable Indicators) of the Project Results Framework (PRF) – Annex 2 of the project document. These indicators are grouped under four expected results.  

Table C‐1.1: Targets for Output 1.1 for the year 2011  Code  Output /Result Indicator  Target1.1a  Climate/weather data analysed1.1a‐I1  Number of climate related graphics generated 31.1b  Present farmer knowledge on climate variability; its impact on natural resources; and present 

adaptation practices in Andhra Pradesh (AP), surveyed 1.1b‐I1  Number of Sample locations (HUs) covered in the study 91.1b‐I2  Number of farmers interviewed in the study 4501.1b‐I3  Number of Women farmers interviewed in the study 2251.1c  Present scientific knowledge on climate variability; its impact on natural resources; and present 

adaptation practices in Andhra Pradesh, reviewed 1.1c‐I1  Number of scientific documents on climate variability in AP reviewed 51.1c‐I2  Number of scientific documents on climate variability impact in AP reviewed  51.1c‐I3  Number of scientific documents on climate change adaptation reviewed 51.1d  Present local and scientific knowledge on climate variability; its impact on natural resources; and 

present adaptation practices in Andhra Pradesh, documented 1.1d‐I1  Study Report: Present local and scientific knowledge on climate variability; its impact 

on natural resources; and present adaptation practices in AP 1 

1.1d‐I2  Computer database: Climate, CC Impact Indicators, and adaptation practices  1 Five activities are planned for generating four results, mentioned in the previous section, viz., 1.1.1 Climate/weather data analysis; 1.1.2 Knowledge Attitude and Practice (KAP) Study; 1.1.3 Review of literature; 1.1.4 Study Report; and 1.1.5 Computer database.   All  the  activities  under  output  1.1 will  be  contracted  out.  PMO will  prepare  the  draft  Terms  of Reference  (ToR), keeping  in view  the requirement of  the project document. FAOIN will review  the ToR  and  send  it  for  comments  and  approval  of  Investment  Centre Division  (TCI),  FAO.  After  the approval of TCI‐FAO,  the  final version of ToR will be used  in  the  tendering process. The  standard procedures  of  FAO  will  be  applicable  in  the  tendering  and  award  of  the  contract.  The  agency contracted  for  implementation of activities under output 1.1 will be  responsible  for generating all the results listed in table C‐1.1. However, PMO will conduct monthly reviews to monitor the progress and quality of work of the contracted agency.  Climate/weather  data  analysis  starts  in  July  and  ends  in  September  2011.  Initial  interpretations stemming  out  of  the  analysis will  be  used  in  KAP  study,  starting  in  July  and  ending  in October. Participation of PNGOs and CBOs will be crucial  in  the conduct of KAP  study. Review of  literature starts simultaneously climate/weather data analysis  in June but ends  in September. Drafting of the Study  Report  will  start  after  completion  of  the  first  three  activities  in  October.  The  contracted agency will submit the draft report to PMO in November. After review, PMO will submit the revised 

AWPB 2011

4

version to FAOIN, early December. FAOIN will review the Study Report and send it for comments and approval of Investment Centre Division (TCI), FAO. After the approval of TCI‐FAO, the final version of the Study Report will be ready by the end of December. All the data collected or results generated during implementation of first four activities of output 1.1 will be stored in a computer database in the PMO. While  the  contracted agency  is  responsible  for providing  inputs  required  to  create and update the computer data base, during the contracting period,  it will be taken forward, for rest of the project period, by PMO.  Key  indicators of climate variability that will be considered  in the study are: temperature; onset of monsoon;  rainfall  received; wind  velocity  and  direction;  sunshine  hours;  and  evaporation  rate. A minimum of 3 key climate variability indicators of will be short‐listed for usage in the study, based on the availability of secondary data. Key indicators of climate variability impact that will be considered in the study are: temperature; water availability (in surface/groundwater sources); water quality; soil moisture; soil organic carbon; crop yields; pests and plant diseases; food supplies; labour, migration and  conflict;  health;  land  use;  livestock;  forest  cover; morbidity  and mortality  rates;  income  on agriculture; and weather forecasting. A minimum of 10 key indicators of impact of climate variability will  be  short‐listed  for  usage  in  the  study,  based  on  the  availability  of  secondary  data.  Climate variability and climate variability impact data will be grouped under three categories for analysis viz., normal year, drought year, and years of extreme events.  Output 1.2: Local monitoring system of climate variability and its impacts operating  The best time to start the climate monitoring system is at the beginning of a fresh monsoon year i.e., June. As it is not possible to start climate monitoring, under GEF, this June, and it is planned in June 2012. However, the monitoring system established as part of the APFAMGS project will be continued by CBOs, with the backstopping of PNGOs, in the hydrological year June 2011 – May 2012, also. This would generate data on one climate variable – rainfall and three climate impact variables i.e., water level in wells, annual groundwater balance, and cropping.   Output  1.3:  CBOs  with  capacities  to  integrate  climate  variability  adaptation  measures  in 

Sustainable Land and Water Management (SLWM)    Realization of Output 1.3 is possible only when four results are generated viz., 1.3a – Climate Change Adaptation  Committees  (CCAC)  formed;  1.3b  –  CBO  leaders  trained  in  climate  monitoring  and adaptation practices;  1.3c  – Adaptation measured  identified;  and  1.3d  – CBOs with  local Climate Change Adaptation Plan (CCAP).  Result 1.3a will be generated during the plan year. The remaining results will not occur during 2011. However, platform will be created for generation of the Result 1.3b, in the plan year, which will be the foundation for reaching it in the next plan years.  Output  Indicators  and  targets  for  the  Output  1.3,  listed  in  table  C‐1.3,  are  derived  from  the statements in the column 2 (Objectively Verifiable Indicators) of the Project Results Framework (PRF) – Annex 2 of the project document. These indicators are grouped under two (of the total 4) expected results.  Five  activities  are  planned  for  generating  four  results,  viz.,  1.1.1  Selection  of  pilot  HUs;  1.1.2 Formation of CCAC; 1.1.3 CCAC Orientation; 1.1.4 CCAC meetings; and 1.1.5 CCAC  linkages. While the  first  two  activities will  generate  the  result  1.3a,  the  remaining  three  activities  contribute  to generation of the result 1.3b.  

AWPB 2011

5

 Table C‐1.3: Targets for Output 1.3 for the year 2011 

 Code  Output /Result Indicator  Target1.3a  Climate Change Adaptation Committees (CCAC) formed1.3a‐I1  Number of Pilot HUs selected suiting the selection criteria 91.3a‐I2  Number of HU/HUN level CCACs formed 581.3a‐I3  Number of habitation/GMC level CCACs formed 6381.3b  CBO leaders trained in climate monitoring and adaptation practices1.3b‐I1  Number of CCAC Orientation Camps held 271.3b‐I2  Number of farmers oriented towards SPACC 7001.3b‐I3  Number of Women farmers oriented towards SPACC 3501.3b‐I4  Number of CCAC meetings held 6381.3b‐I5  Number of CCAC meetings with more than 70% member attendance 6381.3b‐I6  Number of CCAC meetings with 50% attendance of women members 6381.3b‐I7  Number of CBO leaders officers workshops held 91.3b‐I8  Number of Officers participating in CBO leaders officers workshops 45 Of  the  63  HUs,  covered  under  APFAMGS  project,  5  are  very  small  (constituted  with  a  single habitation  or  consisting  of  abandoned  habitations).  This  leaves  58  HUs  for  consideration  of formation of CCACs. From these 58, 9 HUs will be selected for field testing the integration of climate change adaptation measures with sustainable  land and water management practices. Five Criteria will be used for selection of a pilot HU: (i) should have been covered under APFAMGS Project; (ii) a natural drainage basin with a single outlet; (iii) forms part of a mandal/s earlier declared as drought‐prone  by  the  Government  of  Andhra  Pradesh  (GoAP);  (iv)  stream  flow measurement  is  already started  in APFAMGS, preferably; and  (v) proven positive  community  response  (indicated by more than  50%  attendance  in meetings,  changes  in  cropping  pattern,  and    funds  raised  independently from sources other than APFAMGS).   Climate  Change  Adaptation  Committees  (CCACs)  will  be  formed  at  two  levels,  parallel  to Hydrological Unit Networks  (HUNs)  and Groundwater Monitoring Committees  (GMCs),  formed  as part of the APFAMGS project. 58 HU level and 638 habitation level CCACs will be formed, during the plan  year.  Before  the  actual  skill  development  training  can  take  place,  it  is  essential  that  the community  is  oriented  towards  issues:  observed  changes/variability  in  the  climate;  projected changes/variability;  present  mitigation  and  adaptation  efforts;  community  based  adaptation practices;  present  practices  of  SLWM;  and  integration  of  SLWM  and  climate  variability/change adaptation options.  It  is planned that 27 (3 at each pilot HU) CCAC Orientation Camps will be held during  the  plan  year. On  the  average,  about  30  CCAC members will  be  oriented  in  each  camp, putting the year target at about 700 (about 50% women). One (first) CCAC meeting at the habitation level  is planned for the plan year, putting the target at 638. This meeting will provide platform for the  newly  formed  CCAC members  to  come  together  and  discuss  the  future  course  of  action,  in coming  plan  years.  Community  capacity  building  will  also  include  the  capacity  to  tap  existing government funding sources for  implementation of CCAC activities. As part of establishing  linkages of CCAC government officers, one workshop will be held at the HU level, putting the target plan year at 9.   All  the  activities  under  output  1.3 will  be  executed  by  PNGOs  and  CBOs, with  backstopping  and monitoring of PMO.  PMO will conduct random field checks to make sure that pilot HU is confirming to the selection criteria. PMO will also depute its personnel/consultants to provide on‐field guidance and monitoring of: formation of CCAC; conduct of CCAC Orientation Camps; and CBO leaders officers workshops, to ensure the quality of content and presentation.  

AWPB 2011

6

Component  2:  Pilots  on  SLWM  including  climate  variability  adaptation  in  farming  systems  in drought prone areas  Outcome 2, expected  to happen as a  result of  implementing  component 2, describes  the desired situation after project intervention. The statements used in the project document for component 2 and outcome 2 are similar in verbatim.  “Pilots on SLWM including climate variability adaptation in farming systems in drought‐prone areas”  Two Outputs are envisaged to occur and contribute to realizations of Outcome 1, discussed  in the following section.  Output  2.1:  Farmers  acquire  skills  in  managing  climate  variability  and  testing  adaptation 

technologies      in  farming  systems  through  participation  in  Climate  Change  Schools (CCS) 

 Realization  of  Output  2.1  is  possible  only  when  four  results  are  generated  viz.,  2.1a  –  General awareness  on  climate  variability,  its  impact  and  adaptation  options,  is  built  up;  2.1b  –  Common Interest Groups (CIG) of SLWM formed; 2.1c – Curricula developed for Climate Change Schools (CCS), suiting CIG requirement; and 2.1d – CCS sessions conducted.   Results 2.1a and 2.1b will be generated during  the plan year. The  remaining  results will not occur during the plan year. However, platform will be created for generation of the Result 2.1c and 2.1d, in the plan year, which will be the foundation for the next plan years.  Output  Indicators  and  targets  for  the  Output  2.1,  listed  in  table  C‐2.1,  are  derived  from  the statements in column 2 of the PRF – Annex 2 of the project document. These indicators are grouped under two (of the total 4) expected results.  

Table C‐2.1: Targets for Output 2.1 for the year 2011  Code  Output /Result Indicator  Target2.1a  General awareness on climate variability, its impact and adaptation options, is built up 2.1a‐I1  Number of cultural shows organized focussing on climate variability adaptation  902.1a‐I2  Number of participants in cultural shows 15,0002.1a‐I3  Number of audio visual shows organized focussing on climate variability adaptation  902.1a‐I4  Number of participants in cultural shows 15,0002.1a‐I5  Number of wall writings highlighting climate variability adaptation 10002.1a‐I6  Number of leaflets, highlighting climate variability adaptation, distributed in pilot HUs  10,0002.1b  Common Interest Groups (CIG) of SLWM formed2.1b‐I1  Number of Criteria for selection of farmers for CIGs 52.1b‐I2  Number of Common Interest Groups formed 92.1b‐I3  Number of farmers in CIGs  4502.1b‐I4  Number of women farmers in CIGs 2252.1b‐I5  Number of workshops of common interest groups conducted 92.1b‐I6  Number of farmers participating in CIG workshops 4502.1b‐I7  Number of women farmers participating in CIG workshops 225 Two activities are planned for generating two results, respectively, which are: 2.1.1 Mass Awareness Campaign; and 2.1.2 Workshops of Common Interest Groups.   

AWPB 2011

7

Mass Awareness Campaign (MAC) starts in the month of June and ends in November, 2011. MAC will be  carried  out  using  four  methods  viz.,  cultural  show,  audio‐visual  show,  wall  writing,  and distribution of leaflets. MAC will not only generate the Result 2.1a, but also will be the first means of mass  communication  of  concepts  of  climate  change,  observed  climate  variability,  projections  of climate change, observed and projected  impacts of climate variability/change, current practices of adaptation  to  climate  variability,  and  probability  of  integrating  SLWM  practices  with  climate variability adaptation options.   The  responsibility of  implementation of MAC  lies with PNGOs and CBOs. However, PMO, with  the backstopping  of  FAOIN  will  collect  the  material  required  for  MAC,  from  secondary  sources. Information  gathered as part of generating Output 1.1 will also be used as an  input  in  the MAC. Selection of cultural troupes  is the responsibility of PNGOs, based on the criteria communicated by PMO. PNGOs will ensure  that  the  troupe  is  constituted with at  least 30% of women artistes. The secondary material (CDs and tapes) needed for the audio‐visual shows will be collected and used by PNGOs. PMO will provide guidance,  if required  in procurement of suitable AV material. Slogans for wall writing will be  communicated  to PNGOs by PMO. PNGOs on  their own  can  collect or design slogans,  but  they  can  be  used  only  after  the  approval  of  PMO.  The  responsibility  of  producing leaflets lies with PMO, while the responsibility of their distribution at the village level is with PNGOs.  9 pilot HUs,  taken up  for project  intervention  fall  in different  geological  and  agro‐climatic  zones. Though there are no major differences in climate, one district (Chittoor) is different in the sense that it receives rainfall from both south‐west and north‐east monsoons. There are marked differences in availability of water, agronomic practices, cropping pattern, and irrigation practices, to name a few. Therefore,  the  interests  of  farmers  in  one  pilot  HU  will  be  quite  different  from  the  other  HU. Therefore, there  is a need for formation of Common  Interest Groups (CIGs), based on the  location and farming practices of farmers. 9 CIGs will be formed during the plan period, each consisting of 50 farmers of similar/common interests in land (including soil) and water management.   Formation of CIGS will start (towards concluding phase of MAC) in the month of November and end in December, 2011. PNGOs will identify 50 farmers in each HU for forming them into CIGs, based on the criteria communicated by PMO. Members of each CIG will have the first opportunity of coming together at a HU level workshop of CIGs. While the responsibility of organizing workshop of CIG lies with  the  PNGO,  PMO  will  participate,  randomly,  to  provide  support  and  ensure  quality  of deliberations  in the workshop. Additionally,  local Government Officers will be  invited to participate in the workshop to give information on government programs in the area from which the group can benefit.  Output 2.2: Pilot testing of alternative adaptation technologies and practices in SLWM  No activity related to Output 2.2 is planned, as pilot testing can only start after the start of Climate Change Schools, which are also not planned in the plan year.  Component 3: Platform  for  land based climate change adaptation measures suitable  to drought prone areas  Outcome 3, expected  to happen as a  result of  implementing  component 2, describes  the desired situation after project intervention, as follows:   “A platform  for  land based  climate  change  adaptation measures  suitable  to drought prone  areas developed;  adaptation of  a package of methods,  tools  and  institutional  approaches  in  support of District and State level Natural Resource Management initiative to address the impacts of drought”  

AWPB 2011

8

One Output  is  envisaged  to  occur  and  contribute  to  realizations  of Outcome  1,  discussed  in  the following section.  Output  3.1:  Project  lessons,  results,  and  products  (CCS  Curriculum,  field  testing  methods, adaptation  technology  and  practices manuals,  and  institutional  approaches)  documented  and disseminated  Realization  of Output  3.1  is  possible  only when  three  results  are  generated  viz.,  3.1a  –  Platform website  operating;  3.1b  –  Media  campaign  carried  out;  and  3.1.c  –  Dissemination  workshops conducted. Result 3.1a will be  generated during  the plan  year. The Results 3.1b  and 3.1c will be partly generated in the plan year, and expected to be achieved fully at the end of the project.  Output  Indicators  and  targets  for  the  Output  3.1,  listed  in  table  C‐3.1,  are  derived  from  the statements in column 2 of the PRF – Annex 2 of the project document. These indicators are grouped under two expected results.  

Table C‐3.1: Targets for Output 3.1 for the year 2011  Code  Output /Result Indicator  Target3.1a  Platform website operating 3.3a‐I1  Dedicated website for the project created 13.3a‐I2  Number of times project website is updated 33.3a‐I3  Number of persons visiting the project website 3003.1b  Media campaign carried out 3.1b‐I1  Number of press meets organized by the project 33.1b‐I2  Number of newspaper articles published on the project 103.1b‐I3  Number of TV telecasts on the project 103.1c  Dissemination workshops 3.1c‐I1  Number of dissemination workshops organized 13.1c‐I2  Number of participants in dissemination workshops 150 Three  activities  are  planned  for  generating  three  results,  viz.,  3.1.1  Project Website  3.1.2 Media campaign; and 3.1.3 Dissemination workshop.   Creation of a dedicated project website will start  in April and end  in September 2011. PMO will be responsible for creation of website. The draft design and content of the project website will be sent to FAOIN, and made operational after  its approval. The  information for creation of website will be provided by PNGOs and CBOs. Existence of website will be publicized  through printing on visiting cards of the project personnel and  informing all stakeholders through email. Number of visitors to the project website will be monitored through usage of the software – Webalizer.  New  information will be uploaded and  the existing  information will be updated on  to  the project website, once in every month, which starts in the month of October and continues till the end of the project.  3 Press meets will be  conducted during plan  year,  scheduled  in  the months of  July, October  and December. Press meets will be called at the state level inviting the local as well as national print and electronic media persons. Press meets provide the project with an opportunity to share its inception, progress and results, on a regular basis. The responsibility of conducting press meets  lies with  the PMO. FAOIN and PNGOs will be invited to participate in the press meets. PNGOs, at their level, will also invite press on implementation of important project activities.  

AWPB 2011

9

One dissemination workshop will be organized  in the month of November 2011. The main purpose of  the  dissemination workshop  is  to  present  the  finding  of  the  Study  Report:  Present  local  and scientific knowledge on climate variability;  its  impact on natural resources; and present adaptation practices in AP, conducted by the contracted agency. About 150 stakeholders from different parts of the country will be invited to participate in the deliberations on the study report and implications of its findings on the project implementation. The responsibility of organizing dissemination workshop lies with PMO, with the backstopping of FAOIN. PNGOs and CBOs will be invited to participate in the workshop.  Component 4: Project Management  Though  no  direct  Outcome  is  expected  as  a  result  of  implementing  component  4  i.  e.,  Project Management  is  quite  essential  for  generating  the  first  three  outcomes.  The  following  narrative stems out of the review of sections 4, 5 and 6 of the project document.    Three Outputs can be  listed, under the project management viz., 4.1 Project  implemented  in close co‐ordination with agencies envisaged  in  the project document; 4.2 Project monitored, evaluated and  reported;  4.3  Finances managed  to meet  fiduciary  requirement  and  the  same  is  reported. Description of these outputs is given in the following section.  Output:  4.1  Project  implemented  in  close  co‐ordination with  agencies  envisaged  in  the  project document  Realization  of  Output  4.1  is  possible  only  when  four  results  are  generated  viz.,  4.1a  –  Project implementation  carried  out  in  coordination with  the  Government  of  India  (GoI);  4.1b  –  Project implementation carried out  in coordination with the Sustainable Land and Ecosystem Management (SLEM)  –  Technical  Facilitation  Organization  (TFO);  4.1c  –  Project  implementation  carried  out  in coordination  with  the  Government  of  Andhra  Pradesh  (GoAP);  and  4.1d  –Project  Steering Committee (PSC) constituted as per the requirement of the project document. All the results under output 4.1 are expected to be generated through out the project life, including the plan year.   Output Indicators and targets for the Output 4.1, listed in table C‐4.1, are derived from the sections of the project document, cited above. These indicators are grouped under four expected results.  

Table C‐4.1: Targets for Output 4.1 for the year 2011  Code  Output /Result Indicator  Target4.1a  Project implementation carried out in coordination with the GoI4.1a‐I1  Number of meetings with MoEF 4 4.1a‐I2  Number of MoEF participants in project events 3 4.1a‐I3  Number of meetings with MoWR 4 4.1a‐I4  Number of MoWR participants in project events 3 4.1b  Project implementation carried out in coordination with SLEM–TFO  4.1b‐I1  Number of meetings with SLEM‐TFO 4 4.1b‐I2  Number of SLEM‐TFO participants in project events 3 4.1c  Project implementation carried out in coordination with GoAP  4.1c‐I1  Number of meetings with GoAP 4 4.1c‐I2  Number of GoAP participants in project events 3 4.1d  PSC constituted as per the requirements of the project document  4.1d‐I1  Number of FAO representatives on PSC 2 4.1d‐I2  Number of MoEF representatives on PSC 5 4.1d‐I3  Number of Ministry of Water Resources (MoWR) representatives on PSC 1 4.1d‐I4  Number of GoAP representatives on PSC 3 

AWPB 2011

10

 Four  activities  are  planned,  in  the  plan  year,  for  generating  their  respective  results,  viz.,  4.1.1 Coordination with GoI; 4.1.2 Coordination with SLEM‐TFO; 4.1.3 Coordination with GoAP; and 4.1.4 Constitution of PSC.   Coordination with GoI will be a continuous activity, starting with the signing of agreement of BIRDS with  FAO.  The  Project  will  establish  functional  linkages  with  MoEF  and  the  GEF‐  Empowered Committee  (EC)  and  the  Desertification  Cell  (DC)  within  the MoEF. Ministry  of Water  Resources (MoWR)  and  its  Regional Office  (Southern  Region)  in  Hyderabad  – Office  of  the  Regional  Director, Central  Groundwater  Board  (CGWB)  will  be  contacted  and  invited  to  participate  in  the  project implementation.  The  Project  Manager  will  be  responsible  for  coordination  with  GoI,  with  the backstopping  of  the  National  Project  Coordinator  –  Land  and Water  (NPC‐L&W),  FAOIN.  The  FAO Representative  in  India will  provide  diplomatic  support  to  the  NPC‐LW  in  establishing  coordination mechanism with GoI. Four meetings are planned with GoI  in  the plan year. The coordination will be strengthened by inviting the GoI Officers to participate in 3 project events.  Coordination  with  SLEM‐TFO  will  be  a  continuous  activity,  starting  after  establishing  functional relationship  with  the  MoEF.  The  project  will  establish  co‐ordination  mechanisms  with  the  GEF Sustainable Land and Ecosystem Management (SLEM) – Country Partnership Program (CPP), within MoEF,  in  the  plan  year.  The  National  Steering  Committee  (NSC)  of  SLEM‐CPP  is  chaired  by  the Additional Secretary of the MoEF. The Project Manager – SPACC Project  is a member of NSC along with  Project Managers  of  other  six  SLEM  projects.  Functions  of NSC  are  described  in  section  4.1 (Institutional Arrangements) of the project document. The Project Manager will participate in 2 NSC meetings, in the plan year, apart from 2 meetings with the Officers of the Indian Council of Forestry Research  and  Education  (ICFRE),  the  Technical  Facilitation  Organization  (TFO  for  SLEM‐CPP.  The project will also coordinate with ICFRE’s arm in Hyderabad – Forest Research Centre, by inviting their Officers to 3 project events.   Coordination with GoAP will also be a continuous activity, starting with the signing of agreement of BIRDS  with  FAO.  The  Principal  Secretary,  Panchayati  Raj  and  Rural  Development  (PR&RD)  will  be contacted  by  the  project  to  get  a  person  nominated  as  the  Chairman  of  the  PSC.  The  Special Commissioner – RD will be  invited to be a member of PSC. The Project Convergence Secretariat (PCS) within DRD will be contacted and informed about the launch of the SPACC Project. The Project Manager will  be  responsible  for  coordination  with  GoAP,  which  will  be  done  by  participating  in  4  of  their meetings.  Contacts  will  also  be  established  with  all  the  relevant  GoAP  departments  including Agriculture,  Horticulture,  Irrigation,  and  Groundwater  to  pave way  for  utilization  of  their  technical support during the implementation of the project. At the district level, the Partner NGOs will establish working relationship with the Project Directors (PDs) of Drought Prone Area Program (DPAP), Regional Agricultural  Research  Stations  (RARS)  and  other  relevant  institutions,  and  the District  Collector.  The project will also invite GoAP representatives to participate in 3 of the project events.  A Project Steering Committee  (PSC) will be constituted by FAO and BIRDS with stakeholders at the national  and  state  level  to  guide  project  implementation,  in  the  month  February  2011.  The representation on PSC will be on the lines indicated in table C‐4.1. The constitution of PSC will be the result of meetings of the Project Manager with the agencies cited in above paragraphs. Functions of PSC in will be in accordance with the narrative in section 4.2 (Implementation Arrangements) of the project  document.  As member  convenor,  the  Project Manager  will  coordinate  with  PSC,  for  all project related matters.    

AWPB 2011

11

Output 4.2: Project monitored, evaluated and reported  Realization  of  Output  4.2  is  possible  only  when  six  results  are  generated  viz.,  4.2a  –  Project Management  Office  (PMO)  established;  4.2b  –  PNGO  Offices  established;  4.2c  –  PNGOS  sign Memorandums  of Understanding  (MoU) with HU  level  CCACs;  4.1d  –  Project Monitoring  System established; 4.2e PMO implements activities earmarked for direct implementation; and 4.2f Project progress  reports  generated. Results of output 4.2  are expected  to be  generated  through out  the project life, including the plan year.   Output Indicators and targets for the Output 4.2, listed in table C‐4.2, are derived from the sections of the project document, cited above. These indicators are grouped under six expected results.  

Table C‐4.2: Targets for Output 4.2 for the year 2011  Code  Output /Result Indicator  Target4.2a  Project Management Office (PMO) established4.2a‐I1  Infrastructure established for running PMO  14.2a‐I2  Number of Professional staff on PMO/Nodal Desk rolls 114.2a‐I3  Number of General service staff on PMO/Nodal Desk rolls 174.2a‐I4  Number of Consultants hired by PMO  84.2b  PNGO Offices established 4.2b‐I1  Infrastructure established for running PMO  94.2b‐I2  Number of Professional staff on PNGO rolls 354.2b‐I3  Number of General service staff on PNGO rolls 544.1b‐I4  Number of LoA of BIRDS with PNGOs 84.2c  PNGOS sign MoU with HU level CCACs4.1c‐I1  Number of MoUs between PNGOs and HU level CCACs 04.2d  Project Monitoring System established4.2d‐I1  Reporting formats finalized and communicated 14.2d‐I2  Reporting schedule agreed upon 14.2d‐I3  Computer based Monitoring System established 14.2d‐I4  PMO personnel make field visits and compile Monitoring Reports 504.2e  PMO implements activities earmarked for direct implementation4.2e‐I1  Number of Project Inception Workshops organized 14.2e‐I2  Number of participants in the Project Inception Workshop 504.2e‐I3  Number of PSC Meetings conducted 24.2e‐I4  Number of participants in PSC meetings4.2e‐I5  Number of Plan and Budget Workshops conducted 24.2e‐I6  Number of participants in the Plan and Budget Workshops 1504.2e‐I7  Number of agencies contracted for Study as part of Output 1.1 14.2e‐I8  Number of Staff Orientation Camps conducted 34.2e‐I9  Number of staff oriented on the SPACC project 1004.2e‐I10  Number of staff meetings conducted 124.2e‐I11  Number of participants in staff meetings 1204.2e‐I12  Number of project level meetings conducted 44.2e‐I13  Number of participants in project level meetings 2004.2f  Project progress reports generated4.2f‐I1  Number of Project Inception Reports 14.2f‐I2  Number of Annual Plan and Budget Documents 14.2f‐I3  Number of Half‐yearly Progress Reports 14.2f‐I4  Number of Half‐yearly Financial Reports 14.2f‐I5  Number of Annual Co‐financing Reports 1 

AWPB 2011

12

Six activities are planned,  in  the plan year,  for generating  their  respective  results, viz., 4.2.1 PMO Office establishment; 4.2.2 PNGO Offices establishment; 4.2.3 MoUs of PNGOS with HU level CCACs; 4.2.4 Project Monitoring System; 4.2.5 PMO implemented activities; and 4.2.6 Report writing.   PMO Office will be established by February 2011,  starting  from  the date of  signing of agreement between BIRDS and FOAIN. The office will be equipped with personnel and material  required and foreseen  in  the project document. The Project Manager will be  responsible  for establishing PMO Office, with  the backstopping of NPC‐L&W, FAOIN. PMO  staff  recruited earlier at  the  start of  the project will participate  in  the activity and assist  the project manager. Functions of PMO will be  in accordance  with  the  narrative  in  section  4.2  (Implementation  Arrangements)  of  the  project document.   9  PNGO  Offices  will  be  established  by  February  2011,  after  signing  of  LoA  with  BIRDS.  Staff recruitment will start in February and end in March 2011. The responsibility of office establishment and  staff  recruitment  lies with  the PNGO Chiefs. PMO will prepare Terms of Reference  for PNGO staff  and  communicate  to  PNGO  Chiefs.  PNGOs  will  get  approval  of  the  Project  Manager  for recruiting  the  Professional  staff.  Functions  of  PNGOs will  be  in  accordance with  the  narrative  in section 4.2 (Implementation Arrangements) of the project document.    The activity – MoUs of PNGOs with HU level CCACs is not planned in the year 2011. This will happen in 2012, before pilots on climate variability adaptation are implemented. Functions of CCACs (CBOs in  the project document) will be  in accordance with  the narrative  in  section 4.2  (Implementation Arrangements) of the project document.   Putting  up  of  Project Monitoring  System  will  start  in  the month  of  April  and  end  in  June.  The responsibility  of  putting  up  monitoring  system  lies  with  PMO,  with  the  backstopping  of  FAO. Monitoring Indicators will be listed by PMO and sent to FAO for approval. After finalization of list of monitoring  indicators  (in  accordance with  the Annex 2: Project Results  Framework  in  the project document),  reporting  formats will be designed  and  communicated  to PNGOs. Reporting  schedule will also fixed by PMO, in consultation with FAOIN and communicated to PNGOs. A computer based monitoring system will be established at PMO to store the monitoring information and generation of graphics and reports. Additionally, PMO personnel will make field visits to monitor project activities, randomly and their reports would form part of the monitoring system.  PMO will directly  implement some of the project activities,  in the plan year, viz., Project  Inception Workshop, PSC meetings, Annual Plan and Budget Workshops, Contracting agency for Study as part of  Output  1.1,  Staff  Orientation  Camps,  Staff meetings,  and  project  level meetings.  FAOIN  will provide backstopping  for  implementation of  these activities at  the project  level. PNGOs and CBOs will participate in all these PMO executed activities. PSC, GoI and GoAP will also participate in these activities. Among the PMO executed activities, the one‐timers are: Project Inception Workshop and contracting  agency  for  study  as  part  of  Output  1.1.  The  Project  Inception  Workshop  will  be conducted  in  the  month  of  March,  with  the  participation  of  members  of  PSC,  Scientific Organizations,  Civil  Service  Societies,  CBOs  and  Universities.  PMO  will  start  the  process  of contracting an agency for study as part of Output 1.1 in the month of April and end it by end of May (See  section on Output 1.1  for more  information on  this  activity).  Two AWPB Workshops will be conducted,  in  the  plan  year,  one  in  the  month  of March  and  another  in  December.  Two  PSC meetings will be conducted, in the plan year, one in the month of March and another in October. 3 staff orientation  camps will be  conducted during  the April/May. Staff meetings will be  conducted once in every month. Project level meetings will be conducted once in a quarter, with participation of PNGOs and CBOs.  

AWPB 2011

13

Reports that will be generated during the plan year are: Project Inception Report (May), Annual Plan and Budget Document (May), Half‐yearly Progress Report (July), Half‐yearly Financial Reports (July), and Annual Co‐financing Report  (November). PMO will be  responsible  for  generation of  all  these reports. Drafts of all the reports will be sent to NPC‐L&W, FAOIN, for review and comments. After the finalization at FAOIN, the reports will be sent to TCI and LTO (FAO Head Quarters) for review and comments. PMO will make all the changes necessary based on the comments of FAO, TCI and LTO, before printing in bulk.  Output 4.3: Finances managed to meet fiduciary requirement and reported  Realization of Output 4.3  is possible only when two results are generated viz., 4.3a – BIRDS meets the  fiduciary  requirements of FAO; and 4.3b – PNGOs meet  fiduciary  requirements of FAO/BIRDS. Results of output 4.3 will be generated during the first six month of the planned year it self.   Output Indicators and targets for the Output 4.3, listed in table C‐4.3, are derived from the sections of the project document, cited above. These indicators are grouped under two expected results.  

Table C‐4.3: Targets for Output 4.3 for the year 2011  Code  Output /Result Indicator  Target4.3a  BIRDS meets the fiduciary requirements of FAO4.3a‐I1  BIRDS makes necessary changes in the present system to meet FAO requirements   14.3a‐I2  FAO Finance Department certifies  14.3b  PNGOs meet fiduciary requirements of FAO/BIRDS4.3b‐I1  PNGOs makes necessary changes in the present system to meet FAO requirements  84.3b‐I2  FAO/BIRDS Finance Department certifies  8 Two activities are planned, during the first six months of the he planned year, for generating their respective results, viz., 4.3.1 BIRDS fiduciary requirements; and 4.3.2 PNGOs fiduciary requirements.   Based  on  the  recommendations  of  the  Finance Mission  of  FAO,  BIRDS will make  changes  in  its financial management system and  report  to FAO,  in  the month of April. The Executive Director of BIRDS will be solely responsible for this activity.   BIRDS  will  commission  a  Mission  to  appraise  the  financial  management  system  of  8  PNGOs contracted for execution of the project, in the month of January. Based on the recommendations of the Mission, PNGOs will start making changes in their financial management (including the selection criteria  described  in  the  project  document)  in  the month  of  January  and  report  to  BIRDS  in  the month of March. A report certifying the fiduciary status of contracted PNGOs will be submitted to FAOIN  in  the month  of  April.  The  Executive Director  of  BIRDS will  be  solely  responsible  for  this activity.     

AWPB 2011

14

Table 1: Work Plan 2011 

Output  Activities Q1  Q2  Q3  Q4 

M1  M2  M3  M1  M2  M3  M1  M2  M3  M1  M2  M3 Component 1: Information tools for decision making and local institutional capacity development 

                       

Output 1.1: Completed study on local and scientific knowledge on impacts of climate variability/change on natural resources in Andhra Pradesh 

                       

Indicator a): Balanced representation of gender and vulnerable groups/sectors in at least 9 pilot HU in farmer survey covering key indicators on climate viability and its impact. 

1.1.1 Climate/weather data analysis                       

1.1.2 KAP Study                       

1.1.3 Review of literature                       

Indicator b): Farmers understanding of climate change in pilot HUs documented and combined with available scientific data in completed study document, 9 months from project start. 

1.1.4 Study Report                       

Indicator c): Climate change impact database established 

1.1.5 Computer database                       

Output 1.2: Local monitoring system of climate variability and its impacts operating 

                       

Indicator a): At least 9 CBOs in pilot HU are collecting data on at least 3 key indicators by the end of the second project year  

No Activity planned in 2011         

Output 1.3: CBOs with capacities to integrate climate variability adaptation measures in Sustainable Land and Water Management (SLWM)   

                       

Indicator a): At least 9 CBOs have established climate change adaptation committees 6 months after project start 

1.3.1 Selection of pilot HUs      

                 

1.3.2 Formation of CCA Committees                       

AWPB 2011

15

 

Output  Activities Q1  Q2  Q3  Q4 

M1  M2  M3  M1  M2  M3  M1  M2  M3  M1  M2  M3 Indicator b): At least 100 CBO leaders and representatives trained in climate variability monitoring and adaptation measures integrated in SLWM by the end of year two 

1.3.3 CCAC Orientation                       

1.3.4 CCAC Meetings                       

1.3.5 CCAC Linkages                       

Indicator d): At least 7 CBOs have local climate change adaptation plans 18 months after project start     

No Activity planned in 2011         

Component 2: Pilots on SLWM including climate variability adaptation in farming systems in drought prone areas 

                       

Output 2.1: Farmers acquire skills in managing climate variability and testing adaptation technologies   in farming systems through participation in Climate Change Schools (CCS)  

                       

Indicator a): 2 Curriculum developed for CCS with focus on  adaptation in drought‐prone areas including methods on identification and field testing of  adaptation measures , 18 months after project start 

2.1.1 Mass Awareness Campaign                        

2.1.2 Workshops of CIGs                        

Indicator b): At least 7 CCS are functioning with at least 350 female and male farmers attending and disseminating best experimental practices for adaptation measures by the end of the project 

No Activity planned in 2011         

AWPB 2011

16

 

Output  Activities Q1  Q2  Q3  Q4 

M1  M2  M3  M1  M2  M3  M1  M2  M3  M1  M2  M3 Output 2.2: Pilot testing of alternative adaptation technologies and practices in SLWM  

                       

Indicator a): At least 3 pilots with the participation of at least 7 CBOs and 50 female and male farmers produce results on adaptation performance of technologies and practices by the end of the project 

No Activity planned in 2011         

Indicator b): At least three best adaptation practices and technology manuals  by the end of the project 

No Activity planned in 2011         

Component 3: Platform for land based climate change adaptation measures suitable to drought prone areas 

                       

Output 3.1: Project lessons, results, and products (CCFS Curriculum, field testing methods, adaptation technology and practices manuals, and institutional approaches) documented and disseminated 

                       

Indicator a): Project lessons, results and products available on platform website with 100 visitors per month. 

3.1.1 Project Website      

                 

Indicator b): At least 3 dissemination workshops with at least 150 participants have been held by the end of the project 

3.1.2 Media campaign                    

3.1.3 Dissemination workshops                       

Component 4: Project Management                                                    Output 4.1: Project implemented in close coordination with agencies envisaged in the project document 

                       

Indicator a): Project implemented in close coordination with the Government of India (GoI) 

4.1.1 Coordination with MoEF                         4.1.2 Coordination with SLEM‐TFO                         4.1.3 Coordination with GoAP                         4.1.4 Constitution of PSC                       

AWPB 2011

17

 

Output  Activities Q1  Q2  Q3  Q4 

M1  M2  M3  M1  M2  M3  M1  M2  M3  M1  M2  M3 

Indicator b): Project monitored, evaluated and reported 

4.2.1 PMO Office establishment                         4.2.2 PNGO Offices establishment                         4.2.3 MoU of PNGOs with CCACs  Not planned in 2011 4.2.4 Project Monitoring System                         4.2.5 PMO implemented activities                         i)   Project Inception Workshop                         ii)  Contract: Study for Output 1.1                     iii) AWPB Workshops                       

iv)  PSC meetings                       v)   Staff Orientation Camps                       vi)  Staff meetings       vii) Project level meetings                   

4.2.6 Report writing                         i)   AWPB Document                       ii)  Project Inception Report                       iii) Half‐yearly Progress Report                       iv)  Half‐yearly Financial Report                     v)   Annual Co‐financing Report                         

Indicator c): Finances managed to meet fiduciary requirement and the same is reported 

4.3.1 BIRDS fiduciary requirements                       

4.3.2 PNGOs fiduciary requirements                       

AWPB 2011

18

2. Budget revision   Budget  lines,  under GEF  Financing,  showing more  than  10%  deviation  are:  5501  Climate  change Modeling; 5571 Bench Mark Survey, Mid term review, Website creation, and 8 Lump Sum Contracts for PNGOs; 5905 CRP Training  Internal, CRP Training External, Training of Trainers  (CRPs), Climate Change Field Schools, Village Assembly, CBO  leaders exposure visits, Meeting with media persons, CCS  Curriculum  Development  Workshop,  CCS  Session  guide  preparation  workshops,  Project Inception Workshop,  Policy/Advocacy workshops,  Cultural  Shows,  and  Audio  visual  Shows;  5924 Operation  &  Maintenance;  5941  Other  Field  Supplies  ‐  Design  &  Execution  of  Pilots;    6012 Teleconferencing  Equipment,  and Video Conferencing  Equipment;    and 6152  Extension materials.    Reasons for more than 10% deviation in the revised budget in comparison to the approved budget (Annex 1 of the project document) are:   1) The  budget  of  2010  moved  to  2011  due  to  late  start  of  the  project:  5501Climate  change 

Modeling; 5571 Bench Mark Survey, Website creation, and 8 Lump Sum Contracts  for PNGOs; 5905  Village  Assembly,  Project  Inception  Workshop;  6012  Teleconferencing  and  Video Conferencing equipment; and 6152 Extension Material.  

2) The budget of 2010/11 moved to 2012 due to  late start of the project: and 5905 CRP Training Internal, CRP Training External, Training of Trainers  (CRPs), Climate Change Field Schools, and CBO  leaders  exposure  visits,  CCS  Curriculum Development Workshop,  and  CCS  Session  guide preparation workshops. 

3) The budget of 2010 and 11 equally spread across 2011/12/13 to cover more themes as per the need during the project implementation: 5905 Cultural Shows, and Audio visual Shows.  

4) The budget of 2012 spilt equally for 2011 and 12, to  involve media/policy makers/stakeholders from the beginning of the project: 5905  Policy/  Advocacy  workshops,  and  Meeting  with media persons.  

5) The season dependent budget lines of 2010/11/12/13 moved to 2012/13: 5924  Operation & Maintenance  (Climate monitoring stations will be established only 2012, as the data collection can  only  start  at  the  beginning  of  the monsoon  year  in  June, which  is  not  possible  in  2011, keeping in view the time needed for pre‐establishment process); and 5941 Other Field Supplies – Design & Execution of Pilots (pilots can only start at the completion of bench mark survey and start of CCS. As CCS is not possible this year, so is the execution of pilots). 

6) The Budget of 2011‐ Midterm Review was moved to 2012.  

 FAO Co‐financing  Budget lines, under FAO co‐financing, showing more than 10% deviation are: 5905 Formation of CC Adaptation Committees, CBO Training Internal, CBO  leaders scientists workshops, and Participation in policy level workshops; 5924 Other Expendable Equipment; 6004 Computer Hardware and Laptop; 6007  Photocopy Machine  and  Printer  and  Accessories;  6008  Audio‐visual  equipment;  and  6011 Motorbikes.  Reasons for more than 10% deviation in the revised budget in comparison to the approved budget – FAO co‐financing are:   

AWPB 2011

19

1) The  budget  of  2010 moved  to  2011  due  to  late  start  of  the  project:  5905  Formation  of  CC Adaptation  Committees;  5924  Photocopy  Machine,  Printer  and  accessories,  Audio‐visual equipment, and Motorbikes. 

2) The budget of 2010 added to the budget of 2011: 6004 Computer Hardware 

3) The budget of 2010/11/12 moved to 2011 due to immediate need: 6004 Laptop.  

4) Budget  of  2011/12  moved  to  2012/13  due  to  late  start  of  the  project:  5905  CBO  leaders scientists workshops, and Participation in policy level workshops. 

5) The season dependent budget  lines of 2010/11/12/13 moved to 2012: 5924 Other Expendable equipment (recurring budget line ‐ no allocation for 2011 as climate monitoring stations will be established only in 2012). 

6) Allocation reduced: 5905 CBO Training Internal (27 (9x3) trainings budgeted against 36, as only 3 quarters will remain by the time BIRDS signs contracts with PNGOs).  

 BIRDS and partner NGOs (in kind)  Budget  lines,  under  co‐financing  of  BIRDS  and  partner  NGOs  (in  kind),  showing more  than  10% deviation are: 5337 Climate Change Schools, Bench Mark Survey, Village Assembly, Formation of CCA Committees,  CRP  Training  &  Exposures;  5922  Rain  gauge  stations,  Water  Level  Indicators, Observation wells, Discharge measuring  equipment, Groundwater  Recharge  Structures,  and Data processing  supplies;  6007  Photocopy Machine,  6004  Computer  Hardware/UPS;  6007  Printer  and accessories;    6004  Laptop;  6006  Furniture;  6008  Audio‐visual  equipment;  6011  Car/Jeep,  Motorbikes, Mopeds; and 6012 Office Equipment.    Reasons for more than 10% deviation in the revised budget in comparison to the approved budget – BIRDS and partner NGOs (in kind) are:   1) The budget of 2010 moved to 2011 due to late start of the project: 5337 Village Assembly; 5337 

Formation  of  CCA  Committees.  5922  Rain  gauge  stations,  Observation  wells,  Discharge measuring  equipment,  Groundwater  Recharge  Structures,  Water  Level  Indicators  and  Data processing supplies; 6007 Photocopy Machine, 6004 Computer Hardware/UPS; 6007 Printer and accessories;    6004  Laptop;    6006  Furniture;  6008  Audio‐visual  equipment;  6011  Car/Jeep,  Motorbikes, Mopeds; and 6012 Office Equipment.(The Budget of Non expendable equipments have been reduced as the number of the units available in working condition is now less.)  

2) The budget entire value of   (5932) Display Boards for the years 2010, 2012 and 2013 has been moved to 2011 itself instead of spreading it over a period of 3 years. 

3) The salaries Professionals is reduced as number of NGO chiefs have been reduced from 9 to 8 as one NGO chief has already budgeted separately for the Executive Director.     

4) The Budget of 2010 & 2011 moved to 2012 due to late start of the project: 5337 Climate Change Schools, Cultural Shows, and Audio‐visual shows. 

    

AWPB 2011

20

Table 2: Detailed Budget 2011  

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Total project 2011  1,626,095

 GEF:  

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Total GEF  302,110

 Subtotal component 1:  83,851Subtotal salaries professional  4,709

Finance Officer  3,028 Unit: person month; no. of units: 4; unit cost: USD 841; deliveries in relation to component output 1.1 – agency for base line study contracted  

Field Officer  1,681 

Unit: person month; no. of units: 4; unit cost: USD 467; deliveries in relation to component output 1.1 ‐ bench mark survey conducted in 1 pilot HU; and output 1.3: 1 pilot HUs selected 

Subtotal salaries general service  5,034

3 Field Facilitators  2,268 

Unit: person month; no. of units: 12; unit cost: USD 210; deliveries in relation to output 1.1: bench mark survey conducted in 1 pilot HU; and output 1. 18 CCAC meetings conducted  

3 Drivers  2,766 

Unit: person month; no. of units: 12; unit cost: USD 226; deliveries in relation to output 1.1: bench mark survey conducted in 1 pilot HU; and output 1. 18 CCAC meetings conducted  

Subtotal national consultants  19,450

Climate change modelling  952 Unit: person day; no. of units: 10; unit cost: USD 93; deliveries in relation to output 1.1: climate/weather data analysis of Andhra Pradesh analyzed 

Soil Management  3,547 

Unit: person day; no. of units: 38; unit cost: USD 93; deliveries in relation to output 1.1: soil organic content and soil moisture measured and base line marked in 9 pilot HUs  

Climate change adaptation  6,720 

Unit: person day; no. of units: 72; unit cost: USD 93; deliveries in relation to output 1.1: present practices of adaptation to climate variability in 9 pilot HUs documented  

Dry land Agriculture  6,272 

Unit: person day; no. of units: 67; unit cost: USD 93; deliveries in relation to output 1.1: risks and vulnerabilities in agriculture in 9 pilot HUs assessed and documented  

Institutions and Gender  1,960 

Unit: person day; no. of units: 21; unit cost: USD 93; deliveries in relation to output 1.1: knowledge, attitude and practices of male/female farmers in coping with climate variability in 9 HUs assessed and documented  

 

AWPB 2011

21

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Subtotal contracts  53,243

Bench Mark Survey  11,111 

Units: lump sum; no. of units: 1; unit cost: USD 11,111; deliveries in relation to output 1.1: farmer survey conducted in 9 pilot HUs with balanced representation of gender and vulnerable groups/sectors on climate variability and its impact conducted; and farmers understanding of climate change in 9 pilot HUs documented; current scientific understanding on climate variability and its impact, in Andhra Pradesh, reviewed and documented 

8 lump sum Contracts for PNGOs  42,132 

Units: lump sum; no. of units: 8; unit cost: variable; deliveries in relation to component output 1.1 ‐ bench mark study document compiled and output 1.3: 8 pilot HUs selected; and 120 CCAC meetings conducted 

Subtotal training  1,415

Village Assembly  1,292 Unit: each; no. of units: 76; unit cost: USD 17; deliveries in relation to output 1.3: 76 CCAC meetings conducted 

CBO leaders officers workshops  123 Unit: each; no. of units: 1; unit cost: USD 123; deliveries in relation to output 1.3: One CBO leaders officers workshop conducted 

Subtotal component 2:  114,965Subtotal salaries professional  9,418

Finance Officer   6,055 

Unit: person month; no. of units: 7; unit cost: USD 841; deliveries in relation to component output 2.1 – finances made available to conduct mass awareness campaign and workshops of common interest groups  

Field Officer  3,362 

Unit: person month; no. of units: 7; unit cost: USD 467; deliveries in relation to component output 2.1 – cultural troupes selected and trained; time‐schedules prepared for MAC sub‐activities; and workshops of common interest groups conducted 

Subtotal salaries general service  7,953

3 Field Facilitators  4,536 

Unit: person month; no. of units: 21; unit cost: USD 210; deliveries in relation to component output 2.1 – cultural shows and AV shows organized; leaflets distributed; and slogan written on walls;  troupes selected and trained; time‐schedules prepared for MAC sub‐activities; and farmers mobilized for common interest groups workshops 

3 Drivers  3,417 

Unit: person month; no. of units: 15; unit cost: USD 226; deliveries in relation to component output 2.1: project staff and government officers transported to villages 

 

AWPB 2011

22

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Subtotal national consultants  22,250

Climate change modelling   1,848 

Unit: person day; no. of units: 20; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with climate variability projections in Andhra Pradesh; and leaflets, wall paintings, AV shows include projections of climate variability 

Soil management  3,547 

Unit: person day; no. of units: 38; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with knowledge of soil characters; and leaflets, wall paintings, and AV show include methods of soil management 

Organic Agriculture  2,800 

Unit: person day; no. of units: 30; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with knowledge of organic agriculture; and leaflets, wall paintings, and AV show include methods of organic agriculture 

Irrigation management  4,088 

Unit: person day; no. of units: 44; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with knowledge of irrigation management; and leaflets, wall paintings, and AV show include methods of irrigation management  

Climate change adaptation  2,240 

Unit: person day; no. of units: 24; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with knowledge of climate change adaptation options; and leaflets, wall paintings, and AV show include suitable adaptation options 

Integrated Pest Management  2,650 

Unit: person day; no. of units: 28; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with knowledge of integrated pest management; and leaflets, wall paintings, and AV show include methods of integrated pest management 

Dry land Agriculture  2,464 

Unit: person day; no. of units: 26; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with knowledge of dry land agriculture and leaflets, wall paintings, and AV show include methods of sustainable dry land agriculture 

Institutions and Gender  2,613 

Unit: person day; no. of units: 28; unit cost: USD 93; deliveries in relation to output 2.1: cultural troupes imparted with knowledge of gender balanced institution building around climate change adaptation; and leaflets, wall paintings, and AV show include methods of gender balance institution building around adaptation to climate change 

Subtotal contracts  72,355

8 lump sum contracts for PNGOs   72,355 

Units: lump sum; no. of units: 8; unit cost: variable; deliveries in relation to component output 2.1: 80 cultural shows, 80 AV Shows, 8,000 leaflets, 800 wall paintings distributed in 8 pilot HUs for generation of mass awareness climate variability, its impact and adaptation options; and 8 workshops of common interest groups conducted to generate a list of options for pilot testing in 8 pilot HU 

AWPB 2011

23

  

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Subtotal training  1,146 

  Cultural shows  690 

Units: each; no. of units: 10; unit cost: 69; deliveries in relation to output 2.1: 10 cultural shows conducted highlighting climate variability, its impact and adaptation options, for mass awareness generation in 1 pilot HU 

  Audio visual shows  190 

Units: each; no. of units: 10; unit cost: 19; deliveries in relation to output 2.1: 10 audio visual shows conducted highlighting climate variability, its impact and adaptation options, for mass awareness generation in 1 pilot HU 

Workshops of common interest groups   

266 

Units: each; no. of units: 1; unit cost: 266; deliveries in relation to output 2.1: One workshop of common interest groups conducted to generate a list of options for pilot testing in 1 pilot HU 

 Subtotal GOE  1.843

Extension materials  1,843 Units: lump sum; no. of units: 1; unit cost: 1,843; deliveries in relation to output 2.1: 10,000 leaflets  and 1,000 wall paintings done in 9 pilot HUs 

Subtotal component 3:  40,217Subtotal salaries professional  1,570

Finance Officer   1,009 

Unit: person month; no. of units: 1; unit cost: USD 841; deliveries in relation to component output 3.1: finances made available to create project website, media campaign, stakeholder workshop; and HU level meetings  

Field Officer  560 

Unit: person month; no. of units: 1; unit cost: USD 467; deliveries in relation to component output 3.1: updates from field provided as inputs for project website, media campaign, stakeholder workshop; and 3 HU level meetings conducted 

Subtotal salaries general service  1,326

3 Field Facilitators  756 

Unit: person month; no. of units: 3; unit cost: USD 210; deliveries in relation to component output 3.1: updates from field provided as inputs to field officer as inputs to project website, media campaign, stakeholder workshop; and 3 HU level meetings conducted 

3 Drivers  570 

Unit: person month; no. of units: 3; unit cost: USD 226; deliveries in relation to component output 3.1: project personnel, participants of stakeholder workshop and media persons transported 

Subtotal national consultants  17,098

Climate change modelling   2,800 

Unit: person day; no. of units: 30; unit cost: USD 93; deliveries in relation to output 3.1: inputs provided on climate variability provided for updating project website; and dissemination at stakeholder workshop and press meets 

AWPB 2011

24

  

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

 

Soil management  2,240 

Unit: person day; no. of units: 24; unit cost: USD 93; deliveries in relation to output 3.1: inputs provided on soil management for updating project website; and dissemination at stakeholder workshop and press meets 

Organic Agriculture  2,800 

Unit: person day; no. of units: 30; unit cost: USD 93; deliveries in relation to output 3.1: inputs provided on organic agriculture for updating project website; and dissemination at stakeholder workshop and press meets  

Irrigation management  1,512 

Unit: person day; no. of units: 16; unit cost: USD 93; deliveries in relation to output 3.1: inputs on irrigation management provided for updating project website; and dissemination at stakeholder workshop and press meets 

Climate change adaptation  2,240 

Unit: person day; no. of units: 24; unit cost: USD 93; deliveries in relation to output 3.1: inputs on adaptation to climate variability provided for updating project website; and dissemination at stakeholder workshop and press meets 

Integrated Pest Management  1,083 

Unit: person day; no. of units: 12; unit cost: USD 93; deliveries in relation to output 3.1: inputs on integrated pest management provided for updating project website; and dissemination at stakeholder workshop and press meets 

Dry land Agriculture  2,464 

Unit: person day; no. of units: 27; unit cost: USD 93; deliveries in relation to output 3.1: inputs on dry land agriculture provided for updating project website; and dissemination at stakeholder workshop and press meets 

Institutions and Gender  1,960 

Unit: person day; no. of units: 21; unit cost: USD 93; deliveries in relation to output 3.1: inputs on gender balanced institution building for adaptation to climate variability provided for updating project website; and dissemination at stakeholder workshop and press meets 

Subtotal contracts  17,200

Website creation  2,778 

Units: lump sum; no. of units: 1; unit cost: 2,778; deliveries in relation to component output 3.1: A platform website is created for dissemination of project activities, results and products 

8 lump sum contracts for PNGOs   14,422 

Units: lump sum; no. of units: 8; unit cost: variable; deliveries in relation to component output 3.1: 24 HU level meetings conducted to plan and implement project activities and review of their results with participation of 200 CBO leaders  

  

AWPB 2011

25

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Subtotal training  2,288

Policy Advocacy Workshop  1,245 

Units: each; no. of units: 1; unit cost: 1,245; deliveries in relation to component output 3.1: One stakeholder workshop conducted to disseminate results of base line study for 150 participants who can influence government policy 

HU level meetings  792 

Units: each; no. of units: 44 (11x4); unit cost: 18; deliveries in relation to component output 3.1: 3 HU level meetings conducted to plan and implement project activities and review their results with participation of 25 CBO leaders 

Meeting with media persons  251 

Units: each; no. of units: 1; unit cost: 251; deliveries in relation to component output 3.1: Three press meets conducted to disseminate project activities and results for about 150 media persons 

Subtotal GOE  735

Extension material  490 

Units: lump sum; no. of units: 1; unit cost: 490; deliveries in relation to component output 3.1: material required for dissemination of project activities, results and products produced for usage in press meets, website, workshops and meetings 

Maintenance – Website  245 

Units: lump sum; no. of units: 1; unit cost: 245; deliveries in relation to component output 3.1: project website updated on a monthly basis to provide up to date information of project activities, results and products 

Total Project Management: 63,077Subtotal salaries professional  19,620

Project Manager  19,620 

Unit: person months; no. of units: 12 (50%); unit cost: USD 1,635; deliveries in relation to component output 4.1 ‐  coordination with FAO, MoEF, SLEM‐TFO, GoAP, and constitution of PSC; output 4.2: management including establishing PMO, LoA of BIRDS with FAO, LoA of BIRDS with PNGOs, MoU of PNGOs with CBOs, conduct of project inception workshop, PSC meetings, AWPB workshop, contracting for BMS, staff orientation, staff meetings, project level meetings; output 4.3: reporting including project inception report, AWPB, half‐yearly progress report, annual co‐financing reports, financial statements; and output 4.4: establishing monitoring system and field level monitoring 

Subtotal salaries general service  10,491

Accountant   5,604 

Unit: person month; no. of units: 12; unit cost: USD 467; deliveries in relation to component output 4.2: management including preparation of consolidated financial statements; book keeping; and release of funds;  

Cashier cum Administrative Assistant  3,504 

Unit: person month; no. of units: 12; unit cost: USD 292; deliveries in relation to component output 4.2: management including all cash/cheque payments and helping the accountant in keeping books of accounts; assisting PM in administration tasks; maintenance of files; and correspondence 

 

AWPB 2011

26

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

3 Drivers  1,383 Unit: person month; no. of units: 6; unit cost: USD 226; deliveries in relation to component output 4.2: management – vehicle maintenance and log‐book  

Subtotal contracts  18,893

8 lump sum contracts for PNGOs   18,893 

Units: lump sum; no. of units: 8; unit cost: variable; deliveries in relation to component output 3.1: 24 HU level meetings conducted to plan and implement project activities and review of their results with participation of 200 CBO leaders 

Subtotal training  13,037

Staff training  1,278 

Units: lump sum; no. of units: 1; unit cost: 1,278; deliveries in relation to component output 4.2: Project staff oriented towards project results framework, implementation project activities (2011), key technical aspects of the project, progress monitoring, and reporting 

Staff training External  955 Units: lump sum; no. of units: 1; unit cost: 955; deliveries in relation to component output 4.2: Project staff learn from similar initiatives in the country 

Project partners meeting  4,904 

Units: each; no. of units: 4; unit cost: 1,226; deliveriesin relation to component output 4.2: project progress, at PNGO level, reviewed quarterly and implementation plan evolved for the next quarter 

Steering Committee meetings  3,678 

Units: each; no. of units: 2; unit cost: 1,839; deliveries in relation to component output 4.2: guidance provided to PMO in execution or project; project outputs reviewed; review, amend and approve draft AWPB; and relevant project findings mainstreamed into national policy  

Project Inception Workshop  2,222 

Units: lump sum; no. of units: 1; unit cost: 2,222; deliveries in relation to component output 4.2: project inception report prepared as per the requirement of the project document  

Subtotal non‐expendable procurement 

889   

Teleconferencing equipment  222 

Units: each; no. of units: 2; unit cost: 111; deliveries in relation to component output 4.4: efficient communication system with PNGOs established to monitor project progress 

Video conferencing equipment  667 

Units: each; no. of units: 2; unit cost: 333; deliveries in relation to component output 4.4: efficient communication system with PNGOs established to monitor project progress 

Subtotal GOE  147

Miscellaneous – Staff meetings  147 

Units: lump sum; no. of units: 1; unit cost: 147; deliveries in relation to component output 4.2: monthly staff reports reviewed monthly staff work plans prepared 

 

AWPB 2011

27

 FAO:  

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Total FAO  456,630Subtotal component 1:  126,752Subtotal salaries professional  60,420

3 Subject Experts  22,416 

Unit: person month; no. of units: 12; unit cost: USD 1,868; deliveries in relation to component output 1.1: terms of reference for base line study drafted; methodology and tools (formats, schedules, etc.) of base line study reviewed, random field checks of base line study carried out; literature on climate variability adaptation reviewed; base line study document reviewed; deliveries in relation to component output 1.3: criteria for selection of pilot HUs evolved; guidelines for formation of CCAC compiled; and linkages established between the project and GoAP, research institutes and other relevant agencies    

3 Project Officers  8,412 

Unit: person month; no. of units: 12; unit cost: USD 701; deliveries in relation to component output 1.1: methodology and tools (formats, schedules, etc.) of base line study reviewed; random field checks of base line study carried out; and literature on land & water management reviewed; deliveries in relation to component output 1.3: criteria for selection of pilot HUs evolved 

18 Professionals  29,592 

Unit: person month; no. of units: 72; unit cost: USD 411; deliveries in relation to component output 1.1: conduct of base line study at field level organized; formats, schedules, etc field tested and reviewed; collection of climate/weather data organized; deliveries in relation to component output 1.3: pilot HUs selected as per selection criteria 

Subtotal salaries general service  13,020

12 Field Data Collection and Monitoring Assistants 

8,028 

Unit: person month; no. of units: 36; unit cost: USD 223; deliveries in relation to component output 1.1: data collected as part of base line study stored in computers; a system established for climate variability and its impact monitoring; deliveries in relation to component output 1.3: technical data on pilot HUs collected and stored in computers 

13 Office Attendants  4,992 

Unit: person month; no. of units: 39; unit cost: USD 128; deliveries in relation to component output 1.1: documents and materials collected as part of base line study systematically stored and referenced; photocopying, postage and office assistance provided; deliveries of component output 1.3: maps and materials related to pilot HUs stored and referenced  

 

AWPB 2011

28

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Subtotal Travel  9,338

Duty Travel  9,338 

Units: lump sum; no. of units: 1; unit cost: USD 9,338; deliveries in relation to component output 1.1: random field checks of base line study carried out; deliveries in relation to component output 1.3: random field checks carried out to ensure selection of pilot HUs as per criteria; and linkages established between the project and GoAP, research institutes and other relevant agencies   

Subtotal training  1,982

Formation of CCA Committees  1,334 Unit: HU; no. of units: 58; unit cost: USD 23; deliveries in relation to output 1.3: 58 HU level Climate Change Adaptation Committees formed 

CBO Training Internal  648 

Unit: each; no. of units: 27; unit cost: USD 24; deliveries in relation to output 1.3: 58 HUN level CCAC members (700) oriented on climate variability, its impact, and adaptation practices 

Subtotal non‐expendable procurement 

12,565   

Photocopy machine  667 

Unit: each; no. of units: 1; unit cost: USD 2222; deliveries in relation to component output 1.1: relevant documents used in base line study photocopied; deliveries in relation to component output 1.3: training material of CBO training Internal photocopied   

19 Computer hardware  2,228 

Unit: each; no. of units: 17; unit cost: USD 452; deliveries in relation to component output 1.1: information collected as part of base line study stored; deliveries in relation to component output 1.3: information related to CCACs and CBO training Internal stored  

10 Printer and accessories  599 

Unit: each; no. of units: 10; unit cost: USD 222; deliveries in relation to component output 1.1: relevant documents of base line study printed; deliveries in relation to component output 1.3: relevant document of CCACs and CBO training Internal printed 

5 laptops  1031 

Unit: each; no. of units: 5; unit cost: USD 1145; deliveries in relation to component output 1.1: information collected as part of base line study stored; deliveries in relation to component output 1.3: information related to CCACs and CBO training Internal stored 

Furniture  874 

Unit: lump sum; no. of units: 1; USD 874; deliveries in relation to component output 1.1: 10 offices furnished for organizing base line study; deliveries in relation to component output 1.3: 10 offices furnished for facilitating formation of CCACs and conducting CBO training Internal stored 

Audio visual equipment  607 

Unit: lump sum; no. of units: 1; unit cost: USD 607; deliveries in relation to component output 1.1: AV equipment used in interaction with community during base line study; deliveries in relation to component output 1.3: AV equipment used in interaction with community during formation of CCACs and CBO training Internal 

AWPB 2011

29

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

18 Motorbikes  6,000 

Unit: each; no. of units: 18; unit cost: USD 1,111; deliveries in relation to component output 1.1: men and material transported to the venue of base line study; deliveries in relation to component output 1.3: men and material transported to the venues of formation of CCACs and CBO training Internal 

Other non‐expendable equipment   560 

Unit: lump sum; no. of units: 1; unit cost: USD 560; deliveries in relation to component output 1.1: other equipment needed to conduct base line study made available; deliveries in relation to component output 1.3: other equipment needed for formation of CCACs and CBO training Internal made available 

Subtotal GOE  29,427

Other operating costs  23,805 

Unit: lump sum; no. of units: 1; unit cost: USD 23,805; deliveries in relation to component output 1.1: necessary infrastructure operated to conduct base line study; deliveries in relation to component output 1.3: necessary infrastructure operated for formation of CCACs and conducting CBO training Internal made available 

Publications and Communications  5,622 

Unit: lump sum; no. of units: 1; unit cost: USD 5,622; deliveries in relation to component output 1.1: literature reviewed to document current scientific knowledge on climate variability, its impact and adaptation practices; and 100 copies of base line study document published and communicated  

Subtotal component 2:  229,907Subtotal salaries professional  105,735

3 Subject Experts  39,228 

Unit: person month; no. of units: 21; unit cost: USD 1,868; deliveries in relation to component output 2.1: guidelines issued for selection of cultural troupes; key themes identified for cultural/AV Shows; cultural troupes oriented on themes; AV tools made available for AV shows; leaflets designed; guidelines issued for wall writing; and key climate variability adaptation options (practices and technologies) short‐listed for pilot testing  

3 Project Officers  14,721 

Unit: person month; no. of units: 21; unit cost: USD 701; deliveries in relation to component output 2.1: key themes identified for cultural/AV Shows; cultural troupes oriented on themes; and key climate variability adaptation options (practices and technologies) short‐listed for pilot testing 

18 Professionals  51,786 

Unit: person month; no. of units: 126; unit cost: USD 411; deliveries in relation to component output 2.1: on‐field guidance provided for refining cultural/AV Shows; community response documented on mass awareness generation activities; and key climate variability adaptation options discussed in common interest group workshops and finalized for pilot testing 

  

AWPB 2011

30

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Subtotal salaries general service  28,716

12 Field Data Collection and Monitoring Assistants 

18,732 

Unit: person month; no. of units: 84; unit cost: USD 223; deliveries in relation to component output 2.1: progress of activities (mass awareness generation and workshops of common interest groups) recorded in computers 

13 Office Attendants 9,984

 

Unit: person month; no. of units: 78; unit cost: USD 128; deliveries in relation to component output 2.1: documents and materials generated as part of mass awareness generation campaign and workshops of common interest groups systematically stored and referenced; and photocopying, postage and office assistance provided;  

Subtotal Travel  18,563

Duty Travel  18,563 

Units: lump sum; no. of units: 1; unit cost: USD 18,563; deliveries in relation to component output 2.1: random field checks of mass awareness generation campaign and workshops of common interest groups, carried out  

Subtotal non‐expendable procurement 

25,076   

Photocopy machine  1,333 

Unit: each; no. of units: 1; unit cost: USD 1,333; deliveries in relation to component output 2.1: relevant documents used in mass awareness generation campaign and workshops of common interest groups photocopied 

19 Computer hardware  4,380 

Unit: each; no. of units: 17; unit cost: USD 452; deliveries in relation to component output 2.1: information collected as part of mass awareness generation campaign and workshops of common interest groups stored  

10 Printer and accessories  1,199 

Unit: each; no. of units: 10; unit cost: USD 222; deliveries in relation to component output 2.1: relevant documents of mass awareness generation campaign and workshops of common interest groups printed 

5 laptops  2,061 

Unit: each; no. of units: 5; unit cost: USD 1145; deliveries in relation to component output 2.1: information collected as part of mass awareness generation campaign and workshops of common interest groups stored 

Furniture  1,748 

Unit: lump sum; no. of units: 1; USD 874; deliveries in relation to component output 2.1: 10 offices furnished for organizing mass awareness generation campaign and workshops of common interest groups 

Audio visual equipment  1,213 

Unit: lump sum; no. of units: 1; unit cost: USD 607; deliveries in relation to component output 2.1: AV equipment used in interaction with community during mass awareness generation campaign and workshops of common interest groups 

18 Motorbikes  12,000 

Unit: each; no. of units: 18; unit cost: USD 1,111; deliveries in relation to component output 2.1: men and material transported to the venue of mass awareness generation campaign and workshops of common interest groups 

AWPB 2011

31

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Other non‐expendable equipment   1,143 

Unit: lump sum; no. of units: 1; unit cost: USD 560; deliveries in relation to component output 2.1: other equipment needed to implement mass awareness generation campaign and conducting workshops of common interest groups made available 

Subtotal GOE  51,816

Other operating costs  45,540 

Unit: lump sum; no. of units: 1; unit cost: USD 45,540; deliveries in relation to component output 2.1: necessary infrastructure operated to mass awareness generation campaign and workshops of common interest groups made available 

Publications and Communications  6,276 

Unit: lump sum; no. of units: 1; unit cost: USD 6,276; deliveries in relation to component output 2.1: 10,000 leaflets published and distributed in 143 habitations; and 1000 wall writings giving key messages of climate variability adaptation 

Subtotal component 3:  36,037Subtotal salaries professional  15,105

3 Subject Experts  5,604 

Unit: person month; no. of units: 3; unit cost: USD 1,868; deliveries in relation to component output 3.1: material required for dissemination of project activities, results and products compiled for usage in press meets, website, workshops and meetings

3 Project Officers  2,103 

Unit: person month; no. of units: 3; unit cost: USD 701; deliveries in relation to component output 3.1: A platform website is created and updated on a monthly basis to provide up to date information of project activities, results and products 

18 Professionals  7,398 

Unit: person month; no. of units: 18; unit cost: USD 411; deliveries in relation to component output 3.1: material required for dissemination of project activities, results and products generated for usage in press meets, website, workshops and meetings 

Subtotal salaries general service  4,340

12 Field Data Collection and Monitoring Assistants 

2,676 

Unit: person month; no. of units: 12; unit cost: USD 223; deliveries in relation to component output 3.1: data and information required for dissemination of project activities, results and products stored in computers and made available for usage in press meets, website, workshops and meetings 

13 Office Attendants  1,664 

Unit: person month; no. of units: 13; unit cost: USD 128; deliveries in relation to component output 3.1: documents materials, data and information required for dissemination of project activities, results and products stored, referenced and made available for usage in press meets, website, workshops and meetings; and photocopying, postage and office assistance provided 

Subtotal Travel  2,988

Duty Travel  2,988 

Units: lump sum; no. of units: 1; unit cost: USD 2,988; deliveries in relation to component output 3.1: documents materials, data and information required for dissemination of project activities, results and products transported and made available for usage in press meets, website, workshops and meetings 

AWPB 2011

32

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Subtotal non‐expendable procurement 

4,147   

Photocopy machine  222 

Unit: each; no. of units: 1; unit cost: USD 1,333; deliveries in relation to component output 3.1: information required for dissemination of project activities, results and products photocopied 

19 Computer hardware  692 

Unit: each; no. of units: 17; unit cost: USD 452; deliveries in relation to component output 3.1: information required for dissemination of project activities, results and products stored in computers 

10 Printer and accessories  200 Unit: each; no. of units: 10; unit cost: USD 222; deliveries in relation to component output 3.1: information required for dissemination of project activities, results and products printed 

5 laptops  344 Unit: each; no. of units: 5; unit cost: USD 1145; deliveries in relation to component output 3.1: information required for dissemination of project activities, results and products stored 

Furniture  294 Unit: lump sum; no. of units: 1; USD 874; deliveries in relation to component output 3.1: 10 offices furnished for organizing press meets, workshops meetings and hosting project website 

Audio visual equipment  210 Unit: lump sum; no. of units: 1; unit cost: USD 607; deliveries in relation to component output 3.1: AV equipment used in press meets, workshops and meetings 

18 Motorbikes  2,000 

Unit: each; no. of units: 18; unit cost: USD 1,111; deliveries in relation to component output 3.1: men and material transported to the venue of press meets, workshops and meetings 

Other non‐expendable equipment   187 

Unit: lump sum; no. of units: 1; unit cost: USD 560; deliveries in relation to component output 3.1: other equipment needed to implement press meets, workshops and meetings made available 

Subtotal GOE  9,457

Other operating costs  8,280 Unit: lump sum; no. of units: 1; unit cost: USD 8,280; deliveries in relation to component output 3.1: necessary infrastructure operated for organizing press meets, workshops and meetings 

Publications and Communications  1,177 

Unit: lump sum; no. of units: 1; unit cost: USD 1,177; deliveries in relation to component output 3.1: necessary materials published and communicated for press meets, workshops and meetings 

Total Project Management: 63,935Subtotal salaries professional  15,420

Finance Officer  8,412 

Unit: person month; no. of units: 12; unit cost: USD 701; deliveries in relation to component output 4.2: annual work plans and budgets prepared; deliveries in relation to component output 4.3: annual co‐financing reports prepared; and annual financial statements prepared; deliveries in relation to component output 4.4: proper and cost‐effective implementation of planned project activities monitored through field reviews; deliveries in relation to component output 4.6: system of management controls evaluated and supported for their effectiveness 

 

AWPB 2011

33

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Administrative Officer  7,008 

Unit: person month; no. of units: 12; unit cost: USD 584; deliveries in relation to component output 4.2: administrative guidelines prepared and communicated to contracted agencies; contracted agencies trained in procedures of General Administration; deliveries in relation to component output 4.3 Half Yearly Progress Report compiled; deliveries in relation to component output 4.4: monitor implementation of administrative guidelines through field reviews; facilitate random checks of FAO/PM; monitoring the implementation of the Annual Work Plans and Budget  

Subtotal salaries general service  10,204

Accountant   4,200 

Unit: person month; no. of units: 12; unit cost: USD 350; deliveries in relation to component output 4.2: Guidelines on Financial Systems prepared and communicated to contracted agencies; contracted agencies trained in keeping books of accounts; records kept for fund disbursement and utilization; and fund flows tracked  

12 Field Data Collection and Monitoring Assistants 

2,676 

Unit: person month; no. of units: 12; unit cost: USD 223; deliveries in relation to component output 4.4: data and information required for project implementation stored in computers and made available for usage of senior staff 

13 Office Attendants  3,328 

Unit: person month; no. of units: 26; unit cost: USD 128; deliveries in relation to component output 4.2: documents materials, data and information required for project implementation stored, referenced and made available for usage of senior staff; and photocopying, postage and office assistance provided  

Subtotal Travel  6,462

Duty Travel  6,462 

Units: lump sum; no. of units: 1; unit cost: USD 6,462; deliveries in relation to component output 4.2: men and material transported field level monitoring of project implementation  

Subtotal training  1,751

Plan and Budget workshop  1,751 

Units: lump sum; no. of units: 1; unit cost: 1,751; deliveries in relation to component output 4.2: Annual Work Plan and Budget document drafted for review of PSC, FAO and NSC 

Subtotal non‐expendable procurement 

4,223   

19 Computer hardware  384 

Unit: each; no. of units: 17; unit cost: USD 452; deliveries in relation to component output 4.3: information required for project implementation and reporting stored in computers 

10 Printer and accessories  222 

Unit: each; no. of units: 10; unit cost: USD 222; deliveries in relation to component output 4.3: information required for project implementation and reporting printed 

AWPB 2011

34

  

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

5 laptops  2,290 

Unit: each; no. of units: 5; unit cost: USD 1145; deliveries in relation to component output 4.3: information required for project implementation and reporting stored 

Furniture  580 

Unit: lump sum; no. of units: 1; USD 874; deliveries in relation to component output 4.2: 10 offices furnished for project implementation and hosting project website 

Audio visual equipment  303 Unit: lump sum; no. of units: 1; unit cost: USD 607; deliveries in relation to component output 4.2: AV equipment used in project implementation 

Other Non Expendable Equipment  443Subtotal GOE  25,875

Other operating costs  25,875 

Unit: lump sum; no. of units: 1; unit cost: USD 25,875; deliveries in relation to component output 4.2: necessary infrastructure operated for project implementation and reporting 

  

AWPB 2011

35

Local Contribution (LC):  

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Total LC  867,355

 Subtotal component 1:  667,676Subtotal salaries professional  5,856

8 PNGO Chiefs  5,856 Unit: person day; no. of units: 96 (8x12); unit cost: USD 61 ; deliveries in relation to component output 1.1: bench mark survey conducted in 63 HUs 

Subtotal salaries general service  149,987 (This is the total of Salaries General Service & Farmer’sContribution)

2 Documentation Assistant  442 Unit person month: No. of units (2x1.2) 2.4; Unit costUSD 184.

Farmer Contribution 

2118 Observation well volunteers  59,896 

Unit: person day; no. of units: 48696 (2029x24); unit cost: USD 1.23; deliveries in relation to component output 1.1: water level data available for climate/weather data analysis and bench mark survey; deliveries in relation to component output 1.2: fortnightly water levels (24 data sets) in wells collected 2118 observation wells; deliveries in relation to component output 1.3: water level data available for discussions in CCAC orientation, meetings and linkages

188 Rain gauge volunteers  17,150 

Unit: person day; no. of units: 13943 (73x191); unit cost: USD 1.23; deliveries in relation to component output 1.1: rainfall data available for climate/weather data analysis and bench mark survey; deliveries in relation to component deliveries in relation to component output 1.2: daily rainfall data collected at 188 rain gauge stations; 1.3: rainfall data available for discussions in CCAC orientation, meetings and linkages 

2775 GMC members  16,384 

Unit: person day; no. of units: 13320(24 x 555); unit cost: USD 1.23; deliveries in relation to component output 1.1: GMC members participate in bench mark survey and KAP study; deliveries in relation to component output 1.2: daily rainfall and fortnightly water level data recorded at habitation level; deliveries in relation to component output 1.3: GMC members participate in formation of 555 habitation level CCACs 

315 HUN members  1,860 

Unit: person day; no. of units: (63x24) 1512 ; unit cost: USD 1.23; deliveries in relation to component output 1.1: HUN members participate in bench mark survey and KAP study; deliveries in relation to component output 1.2: daily rainfall and fortnightly water level data recorded at HU level; deliveries in relation to component output 1.3: HUN members participate in formation of 63 HU level CCACs 

Bench mark survey  7,847 Unit: person day; no. of units: 6,380 (638x10); unit cost: USD 1.23; deliveries in relation to component output 1.1: bench mark survey conducted in 638 habitations 

Village assembly  39,237 Unit: person day; no. of units: 31900 (638x50); unit cost: USD 1.23; deliveries in relation to output 1.3: 555 GMC level CCACs formed;

 

AWPB 2011

36

 

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Formation of CCA committees  1,427 Unit: person day; no. of units: 1160 (58x20); unit cost: USD 1.23; deliveries in relation to output 1.3: 58 HU level CCACs formed 

CBO training and exposures  266 

Unit: person day; no. of units: 216 (9x24); unit cost: USD 1.23; deliveries in relation to output 1.3: 63 HUN level CCAC members (1080) oriented on climate variability, its impact, and adaptation practices 

Village level meetings  5,480 Unit: person day; no. of units: (494x9) 4455 ; unit cost: USD 1.23; deliveries in relation to output 1.3: 495 formation of CCACs reviewed  

Subtotal Travel  1,936

Duty Travel  1,936 

Units: month; no. of units: 2.7; unit cost: USD 717; deliveries in relation to component output 1.1: random field checks of base line study carried out; deliveries in relation to component output 1.2: random field checks of climate monitoring stations carried out; deliveries in relation to component output 1.3: random field checks carried out to ensure selection of pilot HUs as per criteria; and linkages established between the project and GoAP, research institutes and other relevant agencies   

Subtotal expendable procurement  509,897

Rain gauge stations  127,397 

Unit: each; no. of units: 191; unit cost: USD 667; deliveries in relation to component output 1.1: 188 rain gauge stations available for data generation used in bench mark survey and climate/ weather data analysis; deliveries in relation to component output 1.2: 188 rain gauge stations established; deliveries in relation to component output 1.3: rainfall data available for discussions in CCAC orientation, meetings and linkages 

Observation wells  89,276 

Unit: each; no. of units: 2029; unit cost: USD 44; deliveries in relation to component output 1.1: 1948 observation wells available for data generation used in bench mark survey and climate/ weather data analysis; deliveries in relation to component output 1.2: 1948 observation wells established; deliveries in relation to component output 1.3: water level data available for discussions in CCAC orientation, meetings and linkages 

Water level indicators  28,600 

Unit: each; no. of units: 650; unit cost: USD 44; deliveries in relation to component output 1.1: 650 water level indicators used in collection of water level data, used in bench mark survey and climate/ weather data analysis; deliveries in relation to component output 1.2: 650 water level indicators procured; deliveries in relation to component output 1.3: water level data available for discussions in CCAC orientation, meetings and linkages 

Discharge measuring equipment  30,921 

Unit: each; no. of units: 937 unit cost: USD 33; deliveries in relation to component output 1.1: 940 discharge measuring equipment used in collection of well discharge data, used in bench mark survey and climate/ weather data analysis; deliveries in relation to component output 1.2: 940 discharge measuring equipment procured; deliveries in relation to component output 1.3: groundwater draft data available for discussions in CCAC orientation, meetings and linkages  

 

AWPB 2011

37

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Groundwater Recharge structures  85,017 

Unit: each; no. of units: 51; unit cost: USD 1667; deliveries in relation to component output 1.1: data generated from 54 groundwater recharge structures used in bench mark survey; deliveries in relation to component output 1.2: 54 groundwater recharge structures constructed; deliveries in relation to component output 1.3: groundwater recharge data available for discussions in CCAC orientation, meetings and linkages 

Display boards  100,122 

Unit: each; no. of units: 3034; unit cost: USD 33; deliveries in relation to component output 1.2: 3062 display boards erected; deliveries in relation to component output 1.3: display boards used for discussions in CCAC orientation, meetings and linkages  

Data processing supplies  48,564 

Unit: each; no. of units: 38; unit cost: USD 1278; deliveries in relation to component output 1.1: data generated from PHM is processed and used in bench mark survey; deliveries in relation to component output 1.2: 38 units of data processing supplies procured; deliveries in relation to component output 1.3: data processing supplies used for data analysis, results of which used in discussions in CCAC orientation, meetings and linkages     

Subtotal non‐expendable procurement 

0   

Subtotal component 2:  63, 010Subtotal salaries professional  11,712

8 PNGO Chiefs  11,712 

Unit: person day; no. of units: 192 (8x24); unit cost: USD 61; deliveries in relation to component output 2.1 – cultural troupes selected and trained; time‐schedules prepared for mass awareness generation and workshops of common interest groups conducted 

Subtotal salaries general service  46,781 (This is the total of Salaries General Service & Farmer’s Contribution) 

2 Documentation Assistant  442 

Unit person month: No. of units (1.2 x 2) 2.4; Unit cost USD 184 ; deliveries in relation to component output 4.4: data and information required for project implementation stored in computers and made available for usage of senior staff 

Farmer Contribution 

2775 GMC members  20,480 

Unit: person day; no. of units: (30X555) 16650; unit cost: USD 1.23; deliveries in relation to component output 2.1: GMC members participate in mass awareness campaigns and workshops of common interest groups 

315 HUN members  2,325 

Unit: person day; no. of units (26x63)1890; unit cost: USD 1.23; deliveries in relation to component output 2.1: HUN members participate in mass awareness campaigns and workshops of common interest groups 

CBO Trainings & Exposures  1,063 

Unit: person day; no. of units: 864 (9x96); unit cost: USD 1.23; deliveries in relation to output 1.3: 63 HUN level CCAC members (1080) oriented on climate variability, its impact, and adaptation practices 

AWPB 2011

38

 

Expenditure category Projection of Expenditure 

(USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

Workshops  9,686 

Unit: person day; no. of units:7875 (1x63x125); unit cost: USD 1.23; deliveries in relation to component output 2.1: results of CWB used in mass awareness campaigns and workshops of common interest groups 

Village level meetings  12,786 Unit: person day; no. of units: 10395 (495x21); unit cost: USD 1.23; deliveries in relation to output 2.1: 495 village level meetings organized  

Subtotal Travel  4,517

Duty Travel  4,517 

Units: month; no. of units 6.3; unit cost: USD 717; deliveries in relation to component output 2.1: random field checks of base line study carried out; deliveries in relation to component output 1.2: men and material carried to mass awareness generation campaign and workshops of common interest groups  

Subtotal expendable procurement  0Subtotal component 3:  12,625Subtotal salaries professional  5,856

8 PNGO Chiefs  5,856 Unit: person day; no. of units: 96 (8x12); unit cost: USD 61 ; deliveries in relation to component output 1.1: bench mark survey conducted in 63 HUs 

Subtotal salaries general service  6,769 (This is the total of Salaries General Service & Farmer’s Contribution) 

2 Documentation Assistant  2,208 

Unit person month: No. of units 12(6x2); Unit cost USD 184; deliveries in relation to component output 4.4: data and information required for project implementation stored in computers and made available for usage of senior staff 

Farmer Contribution 

2775 GMC members  4,096 

Unit: person day; no. of units: (6x555) 3330,  unit cost: USD 1.23; deliveries in relation to component output 3.1: GMC members participate in project website, media campaign, stakeholder workshop and HU level meetings 

315 HUN members  465 

Unit: person day; no. of units ( 63x6) 378 unit cost: USD 1.23; deliveries in relation to component output 3.1: HUN members participate in project website, media campaign, stakeholder workshop and HU level meetings 

Total Project Management: 124,044Subtotal salaries professional  46,896

Executive Director  11,760 Unit: person day; no. of units: 120; unit cost: USD 98; deliveries in relation to component output 4.7: fiduciary requirements of FAO and GEF met with 

8 PNGO Chiefs  35,136 Unit: person day; no. of units: 576 (8x72); unit cost: USD 61 ; deliveries in relation to component output 1.1: bench mark survey conducted in 63 HUs 

Subtotal salaries general service  16,205 (This is the total of Salaries General Service & Farmer’s Contribution) 

10 Cashier cum Accountant   13,560 

Unit: person month; no. of units: (10x12)120; unit cost: USD 113; deliveries in relation to component output 4.2: management including all cash/cheque payments and helping the accountant in keeping books of accounts; assisting PM in administration tasks; maintenance of files; and correspondence 

AWPB 2011

39

Expenditure category Projection of Expenditure (USD) 

Clarification (no of units and unit cost and deliveries in relation to component output) 

2 Document Assistant  1,325 

Unit: person month; no. of units: (3.6 x2) 7.2; unit cost: USD 184; deliveries in relation to component output 4.4: data and information required for project implementation stored in computers and made available for usage of senior staff 

Office Attendant  1,320 

Unit: person month; no. of units: 12; unit cost: USD 110; deliveries in relation to component output 4.2: documents materials, data and information required for project implementation stored, referenced and made available for usage of senior staff; and photocopying, postage and office assistance provided 

Subtotal non‐expendable procurement 

60,943   

Photocopy machine  2,222 

Unit: each; no. of units: 2; unit cost: USD 1111; deliveries in relation to component output 4.3: information required for dissemination of project activities, results and products photocopied 

24 Computer hardware  3674 

Unit: each; no. of units: 22; unit cost: USD 167; deliveries in relation to component output 4.3: information required for project implementation and reporting stored in computers 

15 Printer and accessories  871 

Unit: each; no. of units: 13; unit cost: USD 67; deliveries in relation to component output 4.3: information required for project implementation and reporting printed 

17 laptops  3,996 Unit: each; no. of units: 12; unit cost: USD 333; deliveries in relation to component output 4.3: information required for project implementation and reporting stored 

Furniture  15,222 Unit: lump sum; no. of units: 1; USD 15,222; deliveries in relation to component output 4.2: 10 offices furnished for project implementation and hosting project website 

Audio visual equipment  2,622 Unit: lump sum; no. of units: 1; unit cost: USD 2622; deliveries in relation to component output 4.2: AV equipment used in project implementation 

7 Car/Jeep  22,228 Unit: each; no. of units: 4; unit cost: USD 5557; deliveries in relation to component output 4.2: men and material transported for project implementation 

Motorbikes  6,327 

Unit: each; no. of units: 19; unit cost: USD 333; deliveries in relation to component output 1.1: men and material transported for conduct of bench mark survey; output 1.2: 7 car/jeeps procured; deliveries in relation to component output 1.3: men and material transported for formation of CCACs and CCAC orientation, meetings and linkages     

Mopeds  1,670 

Unit: each; no. of units: 10; unit cost: USD 167; deliveries in relation to component output 1.1: men and material transported for conduct of bench mark survey; output 1.2: 7 car/jeeps procured; deliveries in relation to component output 1.3: men and material transported for formation of CCACs and CCAC orientation, meetings and linkages     

Office equipment  2,111 Unit: lump sum; no. of units: 1; USD 2111; deliveries in relation to component output 4.2: 10 offices equipped with needed supplies for project implementation 

AWPB 2011