Ulan Complex Report Annual Review 2015 Annual Review 2015 Document Number: ULN SD REP 0004 Status: Approved Version: 1.0 Effective: 21/03/2016 Review: N/A Owner: Environment & Community Manager

Upload: others

Post on 01-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Annual Review 2015 Document Number: ULN SD REP 0004

Status: Approved

Version: 1.0

Effective: 21/03/2016

Review: N/A

Owner: Environment & Community Manager

Page 2: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 2 of 107

Uncontrolled unless viewed on the intranet

NAME OF MINE

ULAN COAL MINE

TITLES/MINING LEASES CCL741, MPL315, ML1341, ML1365, ML1366, ML1467, ML1468, ML1511, ML1554, ML1656, EL5573, EL7542

ULAN INTEGRATED MOP (2012-2017) Commenced date 26/09/2012

Completion date 31/10/2017

AR Commenced date 1/01/2015

Completion date 31/12/2015

NAME OF LEASEHOLDER ULAN COAL MINES LIMITED

NAME OF MINE OPERATOR ULAN COAL MINES LIMITED

REPORTING OFFICER Robyn Stoney – CEnvP 369

TITLE Environment & Community Manager

SIGNATURE

DATE 30 March 2016

Page 3: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 3 of 107

Uncontrolled unless viewed on the intranet

Table of Contents

1  Introduction ....................................................................................................................................... 9 

1.1 Report Scope ................................................................................................................................. 9 

1.2 Mine Ownership and Location .................................................................................................. 9 

1.3 Current Operations .................................................................................................................... 10 

1.4 Mine Contacts ............................................................................................................................. 10 

2  Statement of Compliance .............................................................................................................. 14 

2.1 Approvals Compliance ............................................................................................................. 14 

2.1.1  Project Approval ................................................................................................. 14 

2.1.2  Mining Leases & Exploration Licences ............................................................. 15 

2.1.3  Water Licences ..................................................................................................... 17 

2.1.4  Other Approvals ................................................................................................. 19 

2.2 Changes to approvals in 2015 .................................................................................................. 19 

2.2.1  Mine Plan Amendments ..................................................................................... 19 

2.2.2  Environmental Protection Licence Variations ................................................. 20 

2.2.3  Mining Operations Plan Amendments ............................................................. 20 

2.2.4  Subsidence Management & Extraction Plan Approval .................................. 20 

2.3 Independent Audit .................................................................................................................... 21 

2.4 2014 Annual Review Feedback ................................................................................................ 23 

3  Operations Summary ..................................................................................................................... 24 

3.1 Exploration ................................................................................................................................. 24 

3.2 Land Preparation ....................................................................................................................... 24 

3.3 Mining activities ......................................................................................................................... 25 

3.3.1  Ulan West Underground .................................................................................... 25 

3.3.2  Ulan No.3 Underground .................................................................................... 25 

3.3.3  Open Cut .............................................................................................................. 25 

3.3.4  Saleable Production ............................................................................................ 25 

3.3.5  Bobadeen Basalt Quarry ..................................................................................... 26 

3.4 Coal Handling and Processing ................................................................................................. 26 

3.4.1  Mining Waste....................................................................................................... 26 

3.4.2  Coal Loaded and Rail Movements .................................................................... 27 

4  Environmental Performance ......................................................................................................... 28 

4.1 Operational Noise ...................................................................................................................... 28 

4.2 Blasting ........................................................................................................................................ 28 

4.3 Air Quality .................................................................................................................................. 29 

4.4 Heritage ....................................................................................................................................... 34 

4.4.1  Aboriginal Heritage ............................................................................................ 34 

4.4.2  European and Natural Heritage ........................................................................ 35 

Page 4: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 4 of 107

Uncontrolled unless viewed on the intranet

4.5 Biodiversity ................................................................................................................................. 36 

4.5.1  Flora ...................................................................................................................... 39 

4.5.2  Fauna .................................................................................................................... 40 

4.5.3  Microbats .............................................................................................................. 41 

4.5.4  Aquatic ................................................................................................................. 42 

4.6 Salinity Offset Area .................................................................................................................... 42 

4.7 Energy and Greenhouse Gas .................................................................................................... 44 

5  Mine Subsidence ............................................................................................................................ 45 

5.1 Ulan No.3 SMP LW23‐26 & W1 and W2‐W3 ......................................................................... 45 

5.2 Ulan No.3 SMP/EP LW27‐29, W4‐W5 and North 1 ............................................................... 45 

5.3 Ulan West SMP/EP LW1‐2 ........................................................................................................ 45 

5.4 2015 Subsidence Performance .................................................................................................. 47 

5.4.1  Summary from EoP report LW28 ...................................................................... 50 

5.4.2  Summary Ulan West LW1‐2 Annual Report ................................................... 50 

6  Water Management ........................................................................................................................ 53 

6.1 Overview of Mine Water Management System ..................................................................... 53 

6.2 Water Balance ............................................................................................................................. 53 

6.2.1  Compliance with Water Extraction Licence ..................................................... 54 

6.2.2  Water Discharge .................................................................................................. 54 

6.3 Surface Water Monitoring Results........................................................................................... 55 

6.3.1  SW Monitoring sites............................................................................................ 58 

6.3.2  EPL Licensed Discharge Monitoring ................................................................ 64 

6.4 Channel Stability Monitoring ................................................................................................... 67 

6.5 Stream Health Monitoring ........................................................................................................ 70 

6.6 Groundwater monitoring results ............................................................................................. 70 

6.6.1  North Monitoring Network ............................................................................... 71 

6.6.2  Observed and Predicted Groundwater Inflows and Levels .......................... 78 

6.6.3  Private Water Bore Study ................................................................................... 79 

6.6.4  The Drip Monitoring Program .......................................................................... 79 

6.6.5  Baseflow Offsets .................................................................................................. 80 

6.6.6  Bobadeen Monitoring Network ......................................................................... 80 

7  Rehabilitation ................................................................................................................................. 84 

7.1 Mine Rehabilitation Domains .................................................................................................. 84 

7.2 Rehabilitation of Disturbed Land ............................................................................................ 84 

7.3 2015 Rehabilitation Review ...................................................................................................... 87 

7.4 BMP Revision ............................................................................................................................. 98 

7.5 Rehabilitation Activities Planned for 2016 ............................................................................. 98 

7.6 Offset Management Program ................................................................................................... 98 

Page 5: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 5 of 107

Uncontrolled unless viewed on the intranet

7.6.1  Seed Collection Program .................................................................................... 98 

7.6.2  Revegetation ........................................................................................................ 98 

7.6.3  Offset Area Revegetation Walkover ................................................................. 99 

7.6.4  Maintenance ......................................................................................................... 99 

7.6.5  Fauna Habitat Augmentation .......................................................................... 102 

7.6.6  Weed & Feral Animal Control Activities ....................................................... 103 

7.6.7  Hollow bearing tree Assessment Vegetation Offsets .................................... 103 

8  Other Environmental Management Areas ............................................................................... 105 

9  Incidents and non‐compliances ................................................................................................. 105 

10  Community .................................................................................................................................... 106 

11  Activities for next reporting period .......................................................................................... 107 

 

   

Page 6: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 6 of 107

Uncontrolled unless viewed on the intranet

FIGURES 

Figure 1 Ulan Mine Complex Locality Plan ........................................................................................... 11 

Figure 2 Approved Ulan Complex Operations ..................................................................................... 11 

Figure 3 January 2015 Arial Photo ........................................................................................................... 13 

Figure 4 UCML Mining Leases and Exploration Licences ................................................................... 16 

Figure 5 Extension to Bobadeen East Offset Area ................................................................................. 22 

Figure 6 Noise and Air Monitoring Network ........................................................................................ 29 

Figure 7 2015 Flora Monitoring sites ....................................................................................................... 37 

Figure 8 2015 Fauna Monitoring sites ..................................................................................................... 38 

Figure 9: Numbers of Threatened Species Located from 2011 to 2015 ............................................... 41 

Figure 10 Surface Water Monitoring Network ...................................................................................... 57 

Figure 11 (SW01) Goulburn River Upstream Monitoring Results ...................................................... 59 

Figure 12 (SW02) Goulburn River Downstream Monitoring Results ................................................. 60 

Figure 13 (SW02) Goulburn River Downstream Flow .......................................................................... 60 

Figure 14: Comparison 2015 to Historic Average pH Monitoring Results ........................................ 61 

Figure 15: Comparison 2015 to Historic Average EC Monitoring Results ........................................ 62 

Figure 16: Comparison 2015 to Historic Average TSS Monitoring Results ....................................... 62 

Figure 17 Ulan West Creek Stability Monitoring .................................................................................. 68 

Figure 18 Bobadeen Creek Stability Monitoring Assessment Scores ................................................. 68 

Figure 19  Creek Stability Monitoring Locations ................................................................................... 69 

Figure 20 Groundwater North Monitoring Network ........................................................................... 73 

Figure 21 Hydraulic Heads in the Ulan Seam for December 2015 and                                                                 

Drawdown in the Ulan Seam Over the 2015 Calendar Year ....................................................... 74 

Figure 22 Hydraulic heads approximately in the quartzose facies of the Triassic Wollar Sandstone 

for December 2015 and Drawdown in the Facies Over the 2015 Calendar Year ...................... 75 

Figure 23 Hydraulic heads approximately in the quartzose facies of the Triassic Wollar Sandstone 

for December 2015 and Drawdown in the Facies Over the 2015 Calendar Year ...................... 76 

Figure 24 Piper Plot NMN Water Chemistry ......................................................................................... 77 

Figure 25 EC, pH, and Sulphate Vs Time at Selected Wollar Sandstone Piezometers ..................... 78 

Figure 26 Comparison of Modelled and Calculated Groundwater Inflows to the Underground . 79 

Figure 27 Bobadeen Measured Groundwater Levels ........................................................................... 81 

Figure 28  Groundwater Bobadeen Piezometer Monitoring Network ............................................... 82 

Figure 29 Comparison of Variations in Rainfall and Irrigation at Pivot 1 to Pivot 4                                                               

and Variations in EC at IMW06 ....................................................................................................... 83 

Figure 30 Mine Rehabilitated Areas ........................................................................................................ 86 

Figure 31: 2015 Offset Planting Areas ................................................................................................... 100 

Figure 32: 2015 Land Preparation Tree Planting & Direct Seeding in Vegetation Offset Areas ... 101 

Figure 33: Nest Box Installation ............................................................................................................. 102 

Figure 34: Offset Area Dam Habitat Argumentation ......................................................................... 102 

Figure 35: UCML Community Contributions ...................................................................................... 106 

Figure 36 Complaints by Month ............................................................................................................ 107 

Figure 37 Complaints by Type ............................................................................................................... 107 

   

Page 7: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 7 of 107

Uncontrolled unless viewed on the intranet

TABLES 

Table 1 Mine Contacts for UCML ............................................................................................................ 10 

Table 2 Current Development Consents & Project Approvals ............................................................ 14 

Table 3 Mining & Exploration Titles ....................................................................................................... 15 

Table 4 Groundwater Licences held under Part 5 of Water Management Act 1912......................... 17 

Table 5 Water Approvals held under Water Management Act 2000 .................................................. 18 

Table 6 Other Approvals and Licences ................................................................................................... 19 

Table 7 Actions from 2014 AR Review.................................................................................................... 23 

Table 8 Summary of 2015 Exploration Drilling ..................................................................................... 24 

Table 9 Summary of 2016 Exploration Drilling Forecast ...................................................................... 24 

Table 10 2015 Cumulative Production .................................................................................................... 26 

Table 11 Coal Loaded and Train Movements in 2015 ........................................................................... 27 

Table 12 Summary Attended Noise Monitoring Results 2015............................................................. 28 

Table 13 2015 Compliance Summary Air Quality Monitoring ............................................................ 30 

Table 14 Assessment of Salinity Offset Completion Criteria ............................................................... 43 

Table 15 PA08_0184 Subsidence Performance Measures ..................................................................... 47 

Table 16: Actual versus predicted subsidence for LW28 ...................................................................... 50 

Table 17: Actual versus predicted subsidence for LW1 and start LW2 .............................................. 51 

Table 18 Water Balance Annual Calculation .......................................................................................... 54 

Table 19 2015 Extraction/Discharge Volumes ........................................................................................ 55 

Table 20 Adopted Trigger Values for Key Water Quality Parameters ............................................... 56 

Table 21 EPL 394 Concentration Limits for Licensed Discharge Points ............................................. 56 

Table 22 2015 Sampling result Summary ............................................................................................... 58 

Table 23: EPL Licensed Discharge Monitoring Results ........................................................................ 66 

Table 24 Site Rehabilitation Domains ..................................................................................................... 84 

Table 25 Rehabilitation and Disturbance Summary ............................................................................. 85 

Table 26 2015 Review of Rehabilitation Domains ................................................................................. 87 

Table 27: Hollow Bearing Trees (HBT) and hollow estimations from Survey ................................ 104 

 

Page 8: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 8 of 107

Uncontrolled unless viewed on the intranet

PLANS 

Mine and Context   

Surface Operations Land Preparation (Equivalent to MOP Plan 3B) 

Surface Operations Proposed Mining Activities (Equivalent to MOP Plan 4B) 

Surface Operations Proposed Rehabilitation (Equivalent to MOP Plan 5) 

Rehabilitation Status Plan 2015 

ATTACHMENTS 

Attachment A – Attended Noise Monitoring 

Attachment B – Air Quality Monitoring Results 

Attachment C – Surface Water Monitoring Results 

Attachment D – Groundwater Report  

Attachment E – Ecological Reports 

Attachment F – Water Balance   

Attachment G – Creek Stability Report 

Attachment H – Plans & Figures  

Attachment I – Rehabilitation Status Review 

Attachment J – Ulan West Annual Subsidence Report 

ELECTRONIC COPY 

The accompanying CD contains an electronic copy of the 2015 AR and Attachments. This report 

is also available electronically online via the website: http://www.ulancoal.com.au 

Page 9: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 9 of 107

Uncontrolled unless viewed on the intranet

1 Introduction

1.1 Report Scope This consolidated Annual Review1 (AR) was prepared to satisfy consent conditions and reporting 

obligations as specified by NSW Department of Planning and Environment (DP&E). The 

reporting period for this AR is from 01 January 2015 to 31 December 2015, with the AR due by 31 

March 20162. 

In accordance with Condition 3, Schedule 5 of PA08_0184, a copy of this report will be submitted 

to: 

NSW Department of Planning and Environment (DP&E); 

NSW Department of Industry – Division of Resources and Energy (DRE); 

NSW Office of Environment and Heritage (OEH); 

NSW Office of Water (NOW); 

Mid‐Western Regional Council (MWRC); and 

Ulan Coal Mine Community Consultative Committee (the CCC). 

 

This AR will be available for public viewing at www.ulancoal.com.au 

1.2 Mine Ownership and Location Ulan Coal Mines Limited (UCML) is a joint venture between Glencore Coal Assets Australia Pty 

Limited (Glencore) (90%) and Mitsubishi Development (10%).The Ulan No.3 underground mine, 

the Ulan West underground mine, the Open Cut mine and land holdings including the Bobadeen 

Irrigation Scheme, as a collective, are referred to within as the Ulan Complex. The approved 

operations3 and major associated infrastructure at the Ulan Complex are shown in Figure 2. 

The Ulan Complex is located approximately 1.5 kilometres from Ulan Village, within the Mid‐

Western Regional Council (MWRC) Local Government Area (LGA). The project area is located 

approximately 38 kilometres north‐north‐east of Mudgee and 19 kilometres north‐east of 

Gulgong in New South Wales (Figure 1). The UCML landholdings are comprised of 

approximately 19,000 hectares, straddling the Great Dividing Range and are located at the 

headwaters of the Goulburn and Talbragar River Catchments.  

1 The AR was prepared in accordance with the DP&E Annual Review Guideline October 2015 and the AR reporting 

requirements contained in Condition 3, Schedule 5 and Statement of Commitments in Appendix 9 of the PA08_0184.  

2 In accordance with Condition 3, Schedule 5 of Project Approval 08_0184 (PA08_0184). 3 Approved operations as at the end of 2015

Page 10: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 10 of 107

Uncontrolled unless viewed on the intranet

1.3 Current Operations Approved mining operations under consent PA08_01844 consist of underground mining in the 

Ulan No.3 and Ulan West areas as well as open cut mining (Figure 2). The PA08_0184 provides 

for: 

Twenty one years of mining operations; 

Longwall mining of the Ulan No.3 Underground Mine (Ulan No.3); 

Longwall mining of the Ulan West Underground Mine (Ulan West); 

Open cut mining over a 239 hectare area; 

Coal Handling and Preparation Plant (CHPP) and rail loadout facilities with total coal 

production capacity of up to 20 million tonnes per annum (Mtpa) product coal; and 

Surface facilities and ancillary activities to support the abovementioned operations.   

 

UCML has sought a modification to the NSW Project Approval PA 08_0184 pursuant to Section 

75W of the NSW Environmental Planning and Assessment Act 1979, submitted 23 January 2015, 

to provide for proposed changes to the conceptual Ulan West mine plan and associated 

infrastructure.  The Minister for Planning and Environment is the consent authority for the 

modification application.  

1.4 Mine Contacts Table 1 outlines the contact details for site personnel responsible for mining, coal preparation, 

rehabilitation, environmental and community management at the end of the reporting period. 

Table 1 Mine Contacts for UCML 

Name  Position  Contact Details 

Charlie Allan  General Manager  Work: 02 6372 5300 

Email: [email protected]  

Sam Wiseman  Operations Manager – Ulan Surface 

Operations 

Work: 02 6372 5300 

Email: [email protected]  

James Johnson  Operations Manager – Ulan No.3 

Underground Operations 

Work: 02 6372 5300 

Email: [email protected]  

David Ribaux Operations Manager – Ulan West 

Underground Operations 

Work: 02 6372 5300 

Email: [email protected]  

Robyn Stoney  Environment & Community Manager Work: 02 6372 5300 

Email: [email protected]  

 

 

4 UCML was granted PA08_0184 under Part 3A of the Environmental Planning and Assessment Act 1979 (EP&A Act) on 15 

November 2010 for the Ulan Coal – Continued Operations Project. Prior to PA08_0184, UCML operated under four major 

Development Consents, 18 modifications and 16 other minor development approvals. 

Page 11: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 11 of 107

Uncontrolled unless viewed on the intranet

Figure 1 Ulan Mine Complex Locality Plan 

Page 12: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 12 of 107

Uncontrolled unless viewed on the intranet

Figure 2 Approved Ulan Complex Operations 

 

 

Page 13: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 13 of 107

Uncontrolled unless viewed on the intranet

Figure 3 January 2015 Arial Photo  

 

Page 14: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 14 of 107

Uncontrolled unless viewed on the intranet

2 Statement of Compliance

2.1 Approvals Compliance

2.1.1 Project Approval Development consents and project approvals are provided in Table 2.  

Table 2 Current Development Consents & Project Approvals 

Approval 

Modifications  Description Approval 

Authority 

Approval 

Date 

Were all 

conditions of 

the approval 

complied 

with 

DA 113‐

12‐985 

DA 113‐12‐98  Stage 4 MLA 80 Application EIS 

Extension of Underground Mining 

Operations 

DP&E  December 

1999 

 

Modification 

to 

DA 113‐12‐98 

Modification of Stage 4 Consent for 

communication tower 

DP&E  June 2002   

Modification 

to 

DA 113‐12‐98 

Modification of Stage 4 Consent for 

basalt quarry 

DP&E  June 2003   

Modification 

to 

DA 113‐12‐98 

Modification of DA 113‐12‐98 for the 

installation of a reverse osmosis plant 

adjacent to Rowans Dam 

DP&E  December 

2008 

Yes 

PA 

08_0184 

PA 08_0184  Ulan Coal –Continued Operations Project  DP&E  November 

2010 

 

PA 08_0184 

MOD 1 

Longwall extraction of the North 1 

mining area 

Modify Ulan No. & Ulan West mine 

plans 

Concrete Batching Plant 

DP&E  December 

2011 

 

PA 08_0184 

Court Orders 

Land & Environment Court Judgement   DP&E  April 2012   

PA 08_0184 

MOD 2 

Modify Ulan West mine plan LW1‐5 

Remove restrictions on construction 

blasts 

Minor amendments to European and 

natural heritage sites where blasting 

measures are applicable 

DP&E  May 2012  Yes* 

* Written correspondence from the DP&E for timeframe extensions to PA 08_0184 conditions 43 Long term security of 

offset, 45 Conservation Bond, 46 Long term security of proposed conservation areas, 50 Ulan Road strategy, 8 Surrender 

of consents.  

5 The surrender of DA 113‐12‐98 will be provided in accordance with Schedule 2 Condition 9, within 3 months of the 

completion of longwalls 26, West 2, and West 3, or as otherwise agreed by the Director‐General. 

Page 15: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 15 of 107

Uncontrolled unless viewed on the intranet

2.1.2 Mining Leases & Exploration Licences Mining and exploration authorisations are issued in accordance with the Mining Act 1992 and 

regulated by DRE.  UCML’s Mining Tenure is detailed in Table 3 and displayed in Figure 4. 

During the 2015 reporting period; 

Table 3 Mining & Exploration Titles 

Instrument  Authority Date of 

Grant 

Duration of 

Approval 

Mine Area 

Applicability 

Were all conditions 

of the approval 

complied with 

Consolidation Coal Lease 

(CCL) 741 

DRE  2/01/1990  15/05/2027  All operations  Yes 

Mining Purpose Lease 

315 

DRE  3/08/1993  03/08/2014* 

3/08/2035^ 

No. 3 Underground 

(Surface Lease) 

Yes 

Mining Lease 1341  DRE  25/01/1994  25/01/2015* 

25/01/2036^ 

No. 3 Underground  Yes 

Mining Lease 1365  DRE  9/03/1995  24/01/2014*  

9/12/2032^      

No. 3 Underground 

(Surface Lease) 

Yes 

Mining Lease 1366  DRE  9/03/1995  24/01/2014*  

9/12/2032^ 

No. 3 Underground 

(Surface Lease) 

Yes 

Mining Lease 1467  DRE  17/04/2000  16/04/2021  No. 3 Underground 

(Surface Lease) 

Yes 

Mining Lease 1468  DRE  16/05/2000  15/05/2021  No. 3 Underground  Yes 

Mining Lease 1511  DRE  24/04/2002  23/04/2023  No. 3 Underground 

(Surface Lease) 

Yes 

Mining Lease 1554  DRE  1/09/2004  31/08/2025  No. 3 Underground 

(Surface Lease) 

Yes 

Mining Lease 1656  DRE  03/03/2011  03/03/2032  No. 3 Underground 

(Surface Lease) 

Yes 

Mining Lease 1697  DRE  22/05/2014  22/05/2035  Ulan Open Cut  Yes 

Mining Lease Application 

(MLA 469) 

DRE  TBA  Application 

Pending 

Ulan Open Cut  NA 

Mining Lease Application 

(MLA 470) 

DRE  TBA  Application 

Pending 

Ulan Open Cut  NA 

Mining Lease Application 

(MLA 475) 

DRE  TBA  Application 

Pending 

Ulan Open Cut  NA 

Mining Lease Application 

(MLA 507) 

DRE  TBA  Application 

Pending 

Ulan Surface 

Operations 

NA 

Exploration Licence 5573  DRE  12/03/2013  27/02/2017  No. 3 Underground  Yes 

Exploration Licence 7542  DRE  6/05/2010  06/05/2015**  Ulan West  Yes 

 Note: *Expiry date of Lease. ^Period of Lease renewal until. **Renewal application submitted 

 

 

 

   

Page 16: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 16 of 107

Uncontrolled unless viewed on the intranet

Figure 4 UCML Mining Leases and Exploration Licences 

 

Page 17: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 17 of 107

Uncontrolled unless viewed on the intranet

2.1.3 Water Licences Water licences dewatering bores, dams, monitoring bores and wells located on UCML land 

holdings are listed in Tables 4 and 5. 

Table 4 Groundwater Licences held under Part 5 of Water Management Act 1912 

Licence No.  Description  Works Type Extraction 

Limit (ML) Expiry Date 

Were all 

conditions of 

the approval 

complied with 

20BL173821 Existing 

Dewatering Bores6 

Dewatering/ 

Water Supply 7060ML  27/10/2019 

Yes7 

80BL237200  Cavandah Flats  Stock/Domestic Bore  NA  Perpetuity  Yes 

20BL168100  Monitoring Bores   Monitoring Bore  NA  Perpetuity  Yes 

20BL172841 

Bobadeen 

Monitoring 

Network 

Monitoring Bore  NA  Perpetuity  Yes 

20BL172845 

Goulburn River 

Diversion 

Monitoring 

Network 

Monitoring Bore  NA  Perpetuity  Yes 

20BL172846 

Alluvium 

Monitoring 

Network 

Monitoring Bore  NA  Perpetuity  Yes 

20BL172847 

Hydrocarbon 

Monitoring 

Network 

Monitoring Bore  NA  Perpetuity  Yes 

20BL172850 North Monitoring 

Network Monitoring Bore  NA  Perpetuity  Yes 

20BL172851 

Intermittent 

Monitoring 

Network 

Monitoring Bore  NA  Perpetuity  Yes 

20BL168261  1977 Cope Rd  Stock/Domestic Bore  NA  Perpetuity  Yes 

20BL173736  Wilpingjong   Monitoring Bore  NA  Perpetuity  Yes 

 

 

 

   

6 Existing bores covered under this licence: PB1C ,Main North Pump, East 6, East 12 ‐ Bore 1 and 2, East 18, East 19 ‐ Bore 

1, 2 and 3, East 20 ‐ Bore 1 and 2, Ritz, MG22 ‐ Bore 1, 2 and 3, MG23 ‐ Bore 1 and 2, 34CT, MG24, MG25, MG26 ‐ Bore 1 

and 2, MG27 ‐ Bore 1 and 2, MG28 ‐ Bore 1 and 2, MG 29. 7 2015 water year 5289ML was extracted from groundwater within the Goulburn River sub‐catchment of the Hunter 

Catchment under groundwater licence 20BL173872 (licenced extraction limit 7060 ML).

Page 18: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 18 of 107

Uncontrolled unless viewed on the intranet

Table 5 Water Approvals held under Water Management Act 2000 

Licence No.  Description  Works Type 

Extraction 

Limit 

(Shares) 

Water Source  Expiry Date 

Were all 

conditions 

of the 

approval 

complied 

with 

WAL278878 Aquifer (General 

Security) 

Water Allocation 

Licence 750 

Sydney Basin 

Murray Darling 

Basin 

Groundwater 

Source 

13/05/2018 

 

Yes9 

20FW213272 Levy License – 

Goulburn River Levy License  NA  NA  11/01/2017  Yes 

80WA706045  Cavandah Flat Stock/Domestic 

Bore NA  Stock/Domestic  Perpetuity  Yes 

20WA20995310 Moolarben Creek 

Dam/Pump Water Supply  600 

Water Supply/ 

Upper Goulburn 

River Water 

source 

29/06/2023  Yes 

WAL37192 Aquifer (General 

Security) 

Water Allocation 

Licence 704 

Sydney Basin 

Murray Darling 

Basin 

Groundwater 

Source 

Perpetuity  Yes 

WAL36667 Aquifer (General 

security) 

Water Allocation 

Licence 0 

Sydney Basin 

Murray Darling 

Basin 

Groundwater 

Source 

Perpetuity  Yes 

   

8 ^Extraction of water allocated to Wallerawang Collieries Limited by WAL27887 will be undertaken by UCML, facilitated 

under the NSW Office of Water ‘Application to change water access licence’ process.   

9 2015 water year 5289ML was extracted from groundwater within the Goulburn River sub‐catchment of the Hunter 

Catchment under groundwater licence 20BL173872 (licenced extraction limit 7060 ML). 2015 water year 654ML was 

extracted from groundwater within the Sydney Basin of the Murray Darling Basin (MDB) Groundwater Source under 

water access licence WAL37887 (extraction limit 750 ML). 10 Replaces 20SL012504 is nominated work for WAL19047. WAL19047 has entitlement of 600 shares in the Upper 

Goulburn River Water source within the Water Sharing Plan for the Hunter Unregulated and Alluvial Water Sources

Page 19: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 19 of 107

Uncontrolled unless viewed on the intranet

 

2.1.4 Other Approvals Table 6 Other Approvals and Licences 

 Licence/Approval Licence/ 

Approval No. 

Authority Approval/Expires  Were all 

conditions of 

the approval 

complied 

with 

Environment Protection Licence 

(EPL) 

394  EPA  Anniversary Date 18th 

November 

Yes11 

Mining Operations Plan (MOP)  2012‐2017 v3  DRE 

DP&E 

End 2017  Yes 

Ulan No.3 SMP approval LW West 2 

and West 3 

INT09/2211  DRE  Expires 31/03/2018 

 

Yes 

Ulan No.3 SMP/EP approval North 1 

and LW27‐29 & W4‐5 

OUT11/23905 

SO4/01722 

DRE 

DP&E 

 

Approval (North 1) 

30/12/2018 

Approval (LW27‐29 & 

W4‐W5) 31/05/2020 

Yes 

Ulan West SMP/EP approval Ulan 

West LW1 and LW2 

OUT14/10568 

MCV13/607 

DRE 

DP&E 

 

Approval 31/03/2021 

 

Yes 

Section 100 – East Pit tailings dam  07/3144  DRE  Expires 01/05/2018  Yes 

Section 100 – Barrier Pit  07/3144  DRE  Expires 01/06/2016  Yes 

Radiation Licence  5061101  EPA  Expires 29/08/2016  Yes 

Dangerous Goods Notification  NDG023149  WorkCover 

NSW 

Expires 01/12/201512  Yes 

EPBC Approval   2009/5252  Federal DE  Expires Sept 2031  Yes 

EPBC Referral (MOD 4)  2015/7511  Federal DE  Application submitted  NA 

 

2.2 Changes to approvals in 2015

2.2.1 Mine Plan Amendments There were no modifications to PA08_0184 during the reporting period.  

UCML have submitted application to modify PA08_0184 under the provisions of section 75W of 

the EP&A Act 1979 to amend the mine plan for Ulan West. Subsequently, the proposed changes 

were deemed to be a control action under the Environment Protection and Biodiversity 

11 Annual Return with details of technical non‐conformance submitted to the EPA on 13 January 2016. Five HVAS 

samples in 2015 failed to run for standard time.  12 Renewal application submitted

Page 20: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 20 of 107

Uncontrolled unless viewed on the intranet

Conservation Act 1999 (EPBC Act), Section 18: Listed Threatened Species and Communities. The 

assessment process for both the s75W modification and the EPBC referral are currently ongoing. 

Exploration activities within EL7542 have more accurately mapped the location of a geological 

fault, to define the viable resource within the lease that can be efficiently accessed through a 

change in the Ulan West mine plan. The proposal includes turning the main headings after LW5 

and extension of longwall panels LW6 to LW12. Approximately 13 million additional tonnes of 

coal would be produced and the mine life would be extended by approximately 2 years.  

2.2.2 Environmental Protection Licence Variations

The following variations to EPL 394 were approved under Licence Variation No. 1527786 (28 

January 2015): 

L2.4 Water and/or Land Concentration Limits: remove reference to the limit for Point 18 

(Downstream Goulburn River). This limit was associated with increased electrical 

conductivity limits on discharge points 6 and 19 which expired 31 March 2014. 

M2.3 Water and/or Land Monitoring Requirements: amend Point 6 & 19 Total Suspended 

Solids (TSS) Sampling Method from ‘Probe’ to ‘grab sample collected weekly, providing 

discharge occurs on the scheduled sample day’.  UCML previously proposed to convert 

the continuous turbidity (ntu) data to TSS, however the conversion is not considered 

sufficiently accurate.    

M7 Requirement to monitor volume or mass: amend Point 3 Sampling Method from 

‘Flow meter and continuous logger’ to ‘v‐notch weir and continuous logger’.  If Point 3 

was to be used as a discharge point, the volume would be monitored by a v‐notch weir. 

U1.1.2 stabilisation of clean water diversion dams in rehabilitation areas: amend 

completion date to 30 December 2016 consistent with advice of EPA.  

2.2.3 Mining Operations Plan Amendments The Mining Operations Plan (MOP)13 was approved by the DRE on 26 September 2012, under the 

Mining Act 1992. Details of mining activities are provided in Section 3.3. The MOP was amended 

during the reporting period in accordance with the EDG03 Guidelines to extend Longwall Panel 

W3 (Ulan No.3. Mine) to recover coal where the Ulan West Mine plan has moved westward.  

2.2.4 Subsidence Management & Extraction Plan Approval

Subsidence Management Plans (SMP) and Extraction Plans (EP) submitted for longwall mining14 

during the reporting period include: 

13 MOP prepared in accordance with “Guidelines to the Mining, Rehabilitation and Environmental Management Process” 

(Version 3, January 2006), referred to as the “MREMP Guidelines”, integrated with the DRE’s draft Rehabilitation and 

Environmental Management Plan (REMP) Guidelines (Consultation Draft V2.0, June 2010) where applicable. 14 Subsidence Management Plan (SMP) approval in accordance with the conditions of mining leases issued under the 

Mining Act 1992 and an Extraction Plan (EP) approval as required by PA08_0184 (Schedule 3, Condition 26) in accordance 

with the Environmental Planning & Assessment Act 1979 

Page 21: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 21 of 107

Uncontrolled unless viewed on the intranet

The Ulan West Extraction Plan  for LW1 and LW2  (approved 25 March 2014) has been 

revised to include longwalls LW3 and LW4, to produce a consolidated extraction plan now 

titled The Ulan West Extraction Plan for Longwalls LW1 to LW415.  

2.3 Independent Audit Ulan Coal Mines is scheduled for an independent audit in 2016, the last independent audit was 

conducted in 2013. One recommendation made during the 2013 independent audit remains 

pending completion in the Ulan Action Database (CMO). The action relates to conditions 41 & 42, 

schedule 3 of the Project Approval (PA08_0184).  

PA08_0184 Condition 41 states: 

The Proponent shall  implement the offset strategy outlined  in Table 15, described  in the EA, and shown 

conceptually in the figure in Appendix 4 to the satisfaction of the Director‐General.   

 

Table 15: Biodiversity Offset Strategy 

 

Clearing 

Removal 

and/or 

Disturbance 

Spring Gully 

Cliff Line 

Management 

Area 

Brokenback 

Conservation 

Area 

Bobadeen 

Vegetation 

Offset Area 

Bobadeen 

East Offset 

Area 

  Offset Areas 

Native Vegetation (ha)  408  211  58  1,116  229 

EEC/CEEC (ha)  69  ‐  ‐  296  169 

Cliff line (KM)  11.7  9  3  ‐  ‐ 

 

PA08_0184 Condition 42 states: 

The Proponent shall ensure that a minimum area of 244 hectares within the Bobadeen Vegetation 

Offset Area and 169 hectares within the Bobadeen East Offset Area includes the re‐establishment 

and/or improvement of: 

(a) significant and/or threatened plant communities, including: 

•  White Box Woodland; 

•  Blakely’s Red Gum Open Forest; and 

(b) significant and/or threatened plant communities; and: 

(c) habitat for significant and/or threatened animal species. 

2013 Independent Audit Recommendation: Schedule 3, Conditions 41 & 42 ‐ It is recommended that 

the inconsistency in the area quoted in these conditions for the Bobadeen Vegetation Offset Area be rectified 

with DP&E, and the relevant number in the conditions be revised accordingly. 

Correspondence to the DP&E on 11 September 2013 and 30 June 2015 explained that, though 

areas protected through the vegetation offsets have not changed, detailed vegetation monitoring 

since the development of the Environmental Assessment (EA 2009) indicates the actual areas of 

Endangered Ecological Communities (EEC) are inconsistent with the original mapping that was 

referenced in table 15 of PA08_0184. A change to Condition 41, to reflect the actual area of EEC 

within the vegetation offset areas, was requested as part of the project modification that is in 

progress for Ulan West.  

15 The Extraction Plan has been prepared in accordance with the Draft Guidelines for the Preparation of Extraction Plans 

version 5 (as issued by the Department of Planning & Environment (DP&E) 

Page 22: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 22 of 107

Uncontrolled unless viewed on the intranet

The boundary of the Bobadeen East Offset Area was extended to ensure the minimum area of 

EEC stated in Condition 42 is met. The additional 11 hectares of EEC (White Box Woodland) 

added to the Bobadeen East Offset area in 2015 is shown in Figure 5.  

Figure 5 Extension to Bobadeen East Offset Area  

 

Page 23: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 23 of 107

Uncontrolled unless viewed on the intranet

2.4 2014 Annual Review Feedback The 2014 AR was submitted before the end of March 2014 to the relevant authorities and 

members of the CCC16. A joint government agency meeting was held on the 12 May 2015 to 

complete a site inspection of the operation. The 2014 AR was accepted by both the DRE and 

DP&E, subject to their recommendations as provided in Table 7. 

Table 7 Actions from 2014 AR Review 

Action required from previous annual review  Requested by  Action taken by operator 

Where 

discussed in 

Annual 

Review 

The Department has reviewed the Annual 

Review report and considers it to be generally in 

accordance with the mineʹs project approval. 

However, the following points should be 

considered for inclusion in future reporting 

periods to allow the Department to identify and 

review incidents/ exceedances more efficiently: 

•revise the format of the Annual Review report 

to include a section or table titled 

ʹlncident/Exceedance Summaryʹ; 

•include text in the report information 

confirming blasts occurred during approved 

hours (detailed data was provided in an 

appendix); and 

•revise the format of the Annual Review report 

to include a section or table outlining the status 

of actions (completed or outstanding) from the 

last independent environmental audit. 

DP&E on 

13/04/2015 

 

 

 

Incidents and non‐

compliances section added 

to this AR.   

Text confirming blasting 

within approved hours 

added to this AR.  

Section added outlining 

status of actions from last 

independent audit.   

 

 

 

Section 9 

 

Section 4.2 

 

Section 2.3 

The Department also undertook a review of 

Ulanʹs website while reviewing the Annual 

Review 2014. In accordance with Schedule 5, 

Condition 10, Community Consultative 

Committee minutes from any meetings held 

after September 2014 could not be identified. 

Should these documents be available, please 

ensure these documents are uploaded to Ulanʹs 

website within a month of issue of this letter. 

DP&E on 

13/04/2015 

CCC minutes from 

meetings held to 

13/04/2015 were made 

available on the UCML 

website from 14/04/2015.  

CCC minutes for meetings 

held in quarter 4 2014 and 

quarter 1 2015 where 

uploaded to Ulan Website 

4/12/2014 and 5/03/2015 

respectively. There was an 

error with displaying the 

links to these documents 

when the website was 

deployed (published). 

This error was corrected 

14/04/2015 following 

receipt of the letter from 

DP&E on 13/04/2015.  

 

NA 

16 In accordance with Condition 3, Schedule 5 of PA08_0184

Page 24: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 24 of 107

Uncontrolled unless viewed on the intranet

3 Operations Summary

3.1 Exploration Surface exploration included the drilling of 5 boreholes as per Table 8. No prospecting 

operations were undertaken in environmentally sensitive areas of state significance or exempted 

areas as defined by the Mining Act 1992. The forecast for the 2016 program is outlined in Table 9. 

The program is subject to change as required for mining operations.  

Table 8 Summary of 2015 Exploration Drilling  

Project Core 

Boreholes Meters Drilled 

Non Core 

Boreholes 

Meters 

Drilled 

Total Meters 

Drilled 

Boreholes 

Grouted 

Ulan 

Underground  4 1080m chipped, 

170m cored 

1 (Not complete 

Core tail drilled 

2016) 

198m  1448m  4 

Ulan West  0  ‐  0  ‐  ‐  1 

Total  4  1250  1 198 1448  5 

 

Table 9 Summary of 2016 Exploration Drilling Forecast 

2015 Exploration Drilling Forecast

Project  Core Boreholes Non Core Boreholes 

Ulan Underground  5  4 

Ulan West*  4  2 

Open Cut Extension   ‐  ‐ 

Total  9  6 

Notes: *The proposed Ulan West Exploration program for 2016 is currently under review pending the approval of the 

Ulan West Southern Extension s75W modification. Once approved, there is the potential for the exploration program to 

be expanded. 

3.2 Land Preparation Land preparation activities, during the reporting period were carried out in accordance with the 

MOP. Land preparation ahead of mining operations involves the construction of appropriate 

erosion and sediment control structures, the clearing of vegetation and stripping and stockpiling 

of topsoil. This applies to major surface disturbance works17 and is not limited to open cut mining 

operations. 

The Ulan Open Cut did not operate during the reporting period; hence 0 ha of land within the 

Open Cut extension area was cleared.  

17 Prior to any ground disturbance occurring, an CAA Ground Disturbance Permit (GDP) (CAA HSEC PER 0004) is required 

to be signed off by the Environment and Community Coordinator and/or Manager (or delegate) and the Mine Surveyor. 

The GDP ensures appropriate erosion and sedimentation controls are installed, prior to any clearing being carried out. 

Authorised Surface Disturbance Notification (SDN) is required from the DTI‐RE for drilling in exploration licence areas. 

Page 25: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 25 of 107

Uncontrolled unless viewed on the intranet

Approximately 0.4 ha was cleared (outside of the open cut operations) during the 2015 reporting 

period to construct minor surface infrastructure for monitoring and communications.   

3.3 Mining activities

3.3.1 Ulan West Underground Underground mining operations18 included development of roadways for LW03 (MG03), LW04 

(MG04) and the main headings. Secondary extraction of LW01 was completed 2 May 2015 with 

extraction commencing in LW02 on 25 May 2015. LW03 is expected to commence in early April 

2016. During the 2015 reporting period there was 5,728 metres of longwall retreat and 

development of 19,837 metres of roadways. A Production summary is provided in Table 10.    

3.3.2 Ulan No.3 Underground Underground mining operations19 included development of roadways for LW29, LWW3, LWW4, 

LW30 and the main headings. Secondary extraction of LW28 was completed 19 February 2015 

and extraction of LW29 commenced on 21 April 2015. During the 2015 reporting period there was 

2,563 metres of longwall retreat and development of 13,432 metres of roadways. A Production 

summary is provided in Table 10.    

3.3.3 Open Cut The Open Cut mine20 did not operate in 2015; operations were placed on hold in late 2014 coal 

remains in situ with overburden removed in Strip 9 from Block 20 to Block 15 and in the Strip 8 

Southern Extension. The 12,585 tonnes of ROM coal (Table 10) produced from the open cut was 

from a stockpile of open cut coal mined in 2014 and washed in 2015.  

3.3.4 Saleable Production Total product coal for the reporting period was 12,106,922 tonnes. Table 10 provides an overview 

of the production schedule for 2015. 

   

18 The Ulan West underground mines the lower 3 metres of the Ulan seam for thermal coal.  Access to the mine is via the 6 

portals located in the Ulan West Boxcut.  Underground mining utilises standard longwall mining methods and targets 

only the economic portion of the Ulan Coal Seam known as the D Working Section (DWS).  Primary extraction, also 

known as ‘development,’ utilises continuous miners and shuttle cars to develop roadways which form the longwall 

panels. Secondary extraction utilises retreat longwall mining methods, operating a longwall which is 250 metres wide for 

LW01 and between 303 and 400 metres wide for the remaining blocks. 

19 Ulan No 3 mines the base level 3 metres of the Ulan seam for thermal coal.  Access to the mine is via the man and 

materials drift located adjacent to the Underground No. 3 surface facilities.  The longwall is 400 metres wide. 

20 The Open Cut utilises a dragline for overburden removal in a typical single pass strip mining technique, supplemented 

by trucks, excavators and loaders. For coal mining, trucks, excavators and loaders are utilised.

Page 26: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 26 of 107

Uncontrolled unless viewed on the intranet

Table 10 2015 Cumulative Production  

  Unit 

Approved 

limit (specify 

source) 

2014 

Reporting  

Period 

2015 

Reporting 

Period 

2016 

Reporting 

Period 

(Forecast) 

Topsoil Stripped  m3  NA  33,480  0  0 

Topsoil Used/Spread  m3  NA  97,000  0  0 

Overburden Moved   

Open Cut   m3  NA  6,767,266  0  0 

ROM Coal Mined   

Ulan West   tonnes  NA  4,492,143  7,048,147  6,493,455 

Open Cut   tonnes 4,100,000 

(PA08_0184) 1,624,405  10,934  0 

Ulan No.3 

Underground tonnes 

NA 4,579,510  5,047,841  4,737,774 

Total ROM  tonnes  NA  10,696,058  12,106,922  11,231,229 

Processing Waste 

Course Rejects tonnes 

NA 502,055  104,420  164,948 

Processing Waste 

Tailings tonnes 

NA 176,301  85,405  201,603 

Product   tonnes  NA  9,857,562  11,997,168  10,809,250 

3.3.5 Bobadeen Basalt Quarry No rock material was produced from the Bobadeen Basalt Quarry21 during the reporting period.   

3.4 Coal Handling and Processing

3.4.1 Mining Waste The CHPP beneficiates ROM coal to produce thermal coal which is volatile with combustion 

potential.  The CHPP, located at the USO, washed ROM coal from Ulan West and Ulan No. 3 

underground operations as well as stockpiled coal from the Open Cut. 6.1 per cent of Ulan West 

coal and 6.9 per cent of Ulan No 3 ROM produced in 2015 was washed. The reject waste 

represents approximately 18.8% of the ROM coal processed in the plant; classified as either 

coarse reject or tailings.  

For the 2015 reporting period a total of 189,825 tonnes of coal reject was produced; 104,420 tonnes 

of CHPP coarse rejects and 85,405 tonnes of tailings and processing waste. Course rejects were 

emplaced in the Barrier Pit, while tailings were emplaced in the East Pit in accordance with 

21 The Bobadeen Basalt Quarry located near the “Bobadeen Loop Road” was commissioned in September 2005 to provide 

a cost effective rock product for road base and civil works in the mining operations.  The annual production limit is 

100,000 tonnes (PA08_0184).   

Page 27: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 27 of 107

Uncontrolled unless viewed on the intranet

relevant Section 100 approvals. The East Pit will continue to be utilised as the tailings disposal 

area for the duration of the MOP period. 

3.4.2 Coal Loaded and Rail Movements Product coal loaded22 during the reporting period was 11,782,126 tonnes23.  Monthly product coal 

tonnages loaded during the reporting period and laden trains leaving site per day are displayed 

in Table 11.  

Table 11 Coal Loaded and Train Movements in 2015 

Month Daily Movements 

(Maximum) 

Trains Leaving

Site per Day 

(Maximum) 

Total Movements 

for the Month 

Coal Loaded for the 

Month 

January 2014  12  6  273  1247651 

February 2014  12  6  217  953869 

March 2014  7  3  110  485494 

April 2014  8  4  129  553825 

May 2014  11  6  254  1110610 

June 2014   11  6  240  1057036 

July 2014   12  6  246  1094448 

August 2014  12  6  259  1162984 

September 2014  12  6  266  1191321 

October 2014  10  5  202  907557 

November 2014  11  6  183  828068 

December 2014  12  6  264  1189263 

Note: Condition 7(c), Schedule 2 of the PA08_0184 limits UCML to 10 laden trains leaving site per day (i.e. a total of 20 

train movements per day).  

22 Product coal is stacked onto product stockpiles and reclaimed by a rail mounted bucket wheel reclaimer to the rail load 

out bin.  Product coal is transported via rail on the Tallawang to Wallerawang rail corridor to the Port of Newcastle.   23 Demonstrates compliance with PA08_0184 Schedule 2 Condition 6 (b) The Proponent shall not export more than 20 million 

tonnes of coal from the site in each calendar year 

Page 28: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 28 of 107

Uncontrolled unless viewed on the intranet

4 Environmental Performance

4.1 Operational Noise The Noise Management Plan (NMP) (ULN SD PLN 0031)24 and Noise Monitoring Program25 

provide noise management monitoring and control processes. Figure 6 displays the locations of 

the real time noise monitors (which may be relocated as required) and attended26 noise 

monitoring locations.  

Attended noise monitoring27 was conducted in June and December 2015. The attended noise 

monitoring data indicated that noise from Ulan Coal was inaudible during most measurements. 

The LAeq 15‐min noise emission levels from Ulan Coal were demonstrated to satisfy the noise 

limits28 (where applicable) at all assessment locations. All LAmax (interchangeable with LA1(1‐min) 

for assessment purposes) mine related noise levels were below the sleep disturbance limit at all 

assessment locations during the night period. No non‐compliances were measured. A summary 

of the maximum attended noise monitoring results for each compliance monitoring location is 

provided in Table 12, for detailed monitoring results refer to Attachment A. 

 

Table 12 Summary Attended Noise Monitoring Results 2015 

Location  Property ID Noise Criteria 

LAeq 

2015 Site 

Contribution 

Maximum result 

LAeq 

Noise Criteria 

LAmax 

2015 Site 

Contribution 

Maximum result 

LAmax 

NM2  60  35  20 45  21 

NM3  274  n/a  46 n/a  50 

NM4  Ulan School  35  IA n/a  IA 

NM6  1  35  27 45  30 

NM7  254  38  IA 45  IA 

NM8  57  37  IA 45  IA 

Notes: IA – inaudible. NM3 is acquisition upon request noise criteria do not apply (n/a).  

As per Project Approval PA08_0184 Schedule 3 Condition 2 Noise Criteria Property ID 7 not monitored as property 

owned by UCML. Ulan Catholic Church removed from Ulan Village, Ulan Anglican Church not in use.  

4.2 Blasting Blasting activities undertaken during the reporting period were conducted within approved 

hours as per condition L6.2 of EPL394. No blasting activities were undertaken on Sundays or 

Public Holidays.  

UCML did not undertake any blasting activities during the reporting period.  

24 PA08_0184 schedule 3, condition 9 25 Consistent with NSW Industrial Noise Policy and Australian Standards: AS 1055.1, AS 1055.2 and 1055.3 Acoustics ‐ 

Description and measurement of environmental noise; AS 2659.1 ‐ Guide to the use of sound measuring equipment; and 

AS 2659 ‐ Sound level meters.  26 Attended noise monitoring is used for evaluation of compliance with noise criteria in accordance with the NMP. 27 In accordance with the Noise Management Plan (ULN SD PLN 0031) required under Condition 9 Schedule 3 of 

PA08_0184 and consistent with Section L5 of EPL 394 28 Noise criteria PA08_0184 Schedule 3 Condition 2 and EPL394 Section L5 

Page 29: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 29 of 107

Uncontrolled unless viewed on the intranet

4.3 Air Quality The following summary compares the 2015 and historical air quality monitoring results with 

impact assessment criteria, predictions in the EA and any trends in monitored dust levels. Air 

quality monitoring locations are shown in Figure 6. Table 13 presents a compliance summary of 

air quality monitoring results for 2015; all results available in Attachment B. 

Figure 6 Noise and Air Monitoring Network 

 

Page 30: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 30 of 107

Uncontrolled unless viewed on the intranet

Table 13 2015 Compliance Summary Air Quality Monitoring 

Criteria/prediction*  Performance during reporting period  Assessment of Performance 

Data capture/sample 

contamination 

comments 

Deposited Dust 

Annual 

Maximum total  

4 g/m²/month  

Annual Average Depositional Dust Results 

Notes: Contaminated results for 2014 & 2015 removed from the annual average 

The 2015 average annual results indicate that 

depositional dust concentrations were generally 

consistent with the historical average.  None of 

the dust monitoring sites exceeded the annual 

average of 4 g/m²/month during the reporting 

period. The 2015 results are generally consistent 

with predictions in the air quality assessment 

(2009 EA). 

Hummingbird tape, new 

bird spikes and cable ties 

were used as tools to reduce 

contamination of samples at 

Depositional Dust Gauging 

Station sites in 2015.  

Page 31: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 31 of 107

Uncontrolled unless viewed on the intranet

Criteria/prediction*  Performance during reporting period  Assessment of Performance 

Data capture/sample 

contamination 

comments 

Deposited dust 

Annual 

Maximum increase  

2 g/m2/month 

 

 

Notes: Contaminated results for 2014 & 2015 removed from the annual 

average 

 

 

There were no incremental increases of greater 

than 2 g/m²/month when compared to the annual 

average dust deposition levels from the 2014 

reporting period. A review of the historical dust 

depositional averages generally indicates a stable 

trend in deposition dust concentrations.  

 

Page 32: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 32 of 107

Uncontrolled unless viewed on the intranet

Criteria/prediction*  Performance during reporting period  Assessment of Performance 

Data capture/sample 

contamination 

comments 

Total Suspended 

Particulate matter (TSP)  

Annual  

Criterion 90 μg/m3 

2015 TSP Results 

  Flannery’s (HV1) 

μg/m3 

Merlene (HV3) 

μg/m3 

Capture rate  100%  97% 

Annual Average  31  24.7 

Maximum result  80.8  75.7 

 

 

Notes: ARA – annual running average 

There were no average annual TSP concentrations 

above the project specific criteria of 90 μg/m3 in 

2015. The maximum TSP results of 80.8 μg/m3 and 

75.7 μg/m3 from HV1 and HV3 respectively, were 

recorded on 1 December 2015. Other air quality 

monitoring indicates elevated dust levels on 26 

November. This data is supported by the 

Department of Environmentʹs Air Quality Index 

for the Upper Hunter and North‐West Slopes air 

quality monitoring results 

(http://www.environment.nsw.gov.au/AQMS/sea

rch.htm).   

The TSP results for 2015 were lower than Year 1 

and Year 5 predictions provided in the air quality 

assessment within the 2009 EA. 

No sample was collected 

from Merlene (HV1) on 

10/06/2015 and 3/08/2015 as 

the HVAS failed to run due 

to technical failure of the 

monitor.    

There were five occasions in 

2015 where the HVAS 

sample was in‐consistent 

with AS/NZS 3580.9.3:2003 

requirements as reported in 

the EPL394 annual return; 

HVAS failed to complete 

standard runtime of 24:00:00 

hours ∓ 1:00:00 hour. 

Procedural changes and a 

repair of the Merlene TSP 

sampler were undertaken to 

prevent further reoccurrence 

of the sampler error.   

Page 33: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 33 of 107

Uncontrolled unless viewed on the intranet

Criteria/prediction*  Performance during reporting period  Assessment of Performance 

Data capture/sample 

contamination 

comments 

Particulate matter  

<10μm (PM10) 

Annual 

30 μg/m3 

Tapered Element Oscillating Microbalance (TEOM) PM10 Monitoring Results 

(331 Cope Road) 

Reporting Period  TEOM PM10 Results 

2015 

Capture Rate  99% 

Annual Average  13.3 μg/m3 

Maximum (24hr)  74.1 μg/m3 

 

The annual average PM10 was 13.3 μg/m3, below 

the annual average criteria of 30μg/m3.   

Measured annual average PM10 in 2015 was 

lower than predicted in the EA. 

 

Particulate matter  

<10μm (PM10) 

24 hour 

50 μg/m3 

TEOM monitoring data indicates that the 24 hour 

average PM10 concentration exceeded the 50μg/m3 

impact assessment criteria on 6 May 2015 with a 

result of 74.1 μg/m3 during a regional dust storm. 

Data extracted from the Upper Hunter Air 

Quality Monitoring Network (UHAQMN)29 for 6 

May 2015 indicates regional observations for 

particulate matter, measured at the nearest 

UHAQMN locations to the operation, were above 

project approval short‐term criteria 50 μg/m3 as 

follows: 

Bathurst: 94.6μg/m3  

Merriwa: 83 μg/m3  

Jerrys Plains: 70 μg/m3 

Muswellbrook: 72.9 μg/m3 

UCML’s mining operation activities are located in 

the NE to ESE vector from the PM10 monitor and 

are not considered a source for the elevated levels 

recorded.  

Ninety nine percent (99%) of 

1 hour average PM10 results 

were captured during the 

2015 monitoring period. 

Limited data capture 

occurred during a fault with 

the air conditioning unit30 

within the TEOM 12‐14th 

January. 

Notes: *Refer to Condition 19 of Project Approval PA 08_0184 for notes and further details on Criteria

29 http://www.environment.nsw.gov.au/AQMS/search.htm 30 Monitoring is consistent with the requirements of AS 2724.3‐1984 and Section 4.1 of the EPA ‘Requirements for publishing pollution monitoring data’, published 2012 State of NSW. 

Page 34: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 34 of 107

Uncontrolled unless viewed on the intranet

4.4 Heritage

4.4.1 Aboriginal Heritage The Heritage Management Plan (HMP) (ULN SD PLN 0013)31 defines procedures for management 

and mitigation of impacts on Aboriginal, European and natural heritage including responsibilities of 

personnel.  A GIS database displays dot point and spatial distribution of Aboriginal sites within the 

Project area and activities that require clearing or removal of topsoil are assessed against the database 

through the Ground Disturbance Permit (GDP) (CAA‐HSEC‐PER‐0004) process.  Meetings are held to 

discuss issues of archaeological/cultural significance with registered Aboriginal stakeholder 

representatives and, as required, an Archaeologist.  

Aboriginal heritage activities undertaken in accordance with the HMP during the 2015 reporting period 

included: 

The Bobadeen Grinding Groove conservation Agreements are secured and registered on title 

in accordance with PA08_0184, Schedule 3, Condition 46.  No further management actions were 

implemented at the sites in 2015.  The Bobadeen Grinding Grooves site is fenced.  The condition 

of  both  grinding  groove  sites  were  assessed  in  February  2015  as  part  of  the  bi‐annual 

photographic monitoring program and were found to be  in a satisfactory condition with no 

additional actions required. 

Ulan West rock shelter test excavation site ID#1054 (the first of 18 sites selected for excavation 

in  the Aboriginal Rock  Shelter Test Excavation  Sampling  Strategy  report)  commenced  16th 

February. 

Re‐inspection of four of the nominated blast monitoring Aboriginal sites (ID# 74, 445, 1395 and 

1396) occurred on 19th February. 

Ulan West rock shelter test excavation of the Mona creek rock shelter sites ID#646, 164, 165, 476 

and 651 Commenced 31st August. 

Aboriginal Heritage Meetings were held in June and December 2014. Items discussed included: 

o Ulan West Modification Cultural Heritage Programs, conduct residue analysis of Laila 

Haglund’s SG5 artefacts, collect and  investigate bush  food and 3D scanning of rock 

shelters. 

o Location agreed for safe keeping place of heritage artefacts. 

o Grinding Groove  conservation agreements and public exhibition of  the Valley way 

agreement with crown lands. 

o Heritage survey and salvage for 2016 will  include a continuation of Ulan West rock 

shelter sampling according to strategy. 

o Environmental monitoring and subsidence performance results.  

 

In accordance with the Blast Management Plan32 Aboriginal Heritage Sites (ID# 74, 1395 and 1396) 

were inspected by a qualified Archaeologist and Aboriginal Stakeholders on 19 February 2015. The 

purpose was to reassess the physical condition of these sites and to identify if any impacts had 

31 Addresses requirements of: the National Parks and Wildlife Act 1974 (NSW); the Heritage Act 1977 (NSW); the Environment 

Protection and Biodiversity Conservation Act 1999 (EPBC Act) (Cth); PA 08_0184; Development Approval (DA) 113‐12‐98 (PA 

08_0184 prevails to the extent of any inconsistency) and UCML’s Social Involvement Plan (SIP) (ULN SD PLN 0015). 32 ULN SD PLN 0082 

Page 35: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 35 of 107

Uncontrolled unless viewed on the intranet

occurred from blasting activities33 subsequent to the previous inspections (commenced July 2011). 

There has been no perceptible change to or deterioration in the physical condition of Aboriginal sites 

ID# 74 and 1396 between the July 2011 and February 2015 inspections34.  

 

ID# 1395 is formed from crumbly, powdery cavernously weathered conglomerate. Reporting 

concluded that the minor rock fragments (all less than approximately 0.2 metres in maximum 

dimension and with un‐weathered, fresh surfaces consistent with recent detachment) could be a 

result of animal activity, with animals entering the first (higher) ledge and breaking the thin, friable 

lip of conglomerate, or other natural erosive processes or accidental faunal or human contact. 

Alternatively, overblast or vibration pressures may have caused the fragments to detach. Notably, the 

existing cracking in this susceptible conglomerate had not increased in the same period, as could be 

expected were blasting or overblast pressure impacts the cause of the rock detachment. The rock 

detachment in ID# 1395 was very minor and does not detract in any material way from the natural 

context and/or potential significance of the shelter35.  

4.4.2 European and Natural Heritage Section 4 of the HMP details the management, monitoring and mitigation measures for each of the 

identified European and natural heritage sites within the Project Area including monitoring of 

subsidence36 and blast37 impacts on European and natural heritage, identification of previously 

unknown potential historical archaeological material or heritage sites/items and additional 

management, where required.  Of 26 item identified in the 2009 EA, Old Ulan Village, Bobadeen 

Station, Apple Tree Flat farm complex and the Talbragar Fish Fossil Reserve were considered 

significant.   A GDP (CAA‐HSEC‐PER‐0004) is completed, referencing the GIS database including 

European and natural heritage sites, prior to any disturbance.  

The monitoring of Old Ulan Village for subsidence impacts38 continued in 2015 as Ulan West 

continued secondary extraction of Longwall 1 (LW1). A condition report was provided by Stedinger 

Associates in March 2015 following the completion of mining in LW1. This report found no 

discernible reduction to heritage significance to the Old Ulan Village as a result of subsidence from 

mining or other human activities.  

In accordance with the Bobadeen Homestead Management Plan,39 the following actions were taken in 

2015 to protect and secure the Bobadeen Homestead: 

Repaired all broken windows in house.  

Repaired and or fit new door and window latches throughout house.  

Fit board over broken veranda floors. 

Fit wire mesh around homestead verandas to prevent animals entering under the house.  

 

33 No blasts occurred at UCML in 2015, no open cut operations, last blast was 21/10/2014 34 South East Archaeological ‘Ulan Blast Monitoring‐ Aboriginal Heritage Report: Supplementary Advice, February 2015’ 35 South East Archaeological ‘Ulan Blast Monitoring‐ Aboriginal Heritage Report: Supplementary Advice, February 2015’ 36 Condition 26 (Schedule 3) of PA 08_0184 and approved extraction plan and subsidence monitoring program.  37 Blast Management Plan (ULN SD PLN 0082) 38 In accordance with the Ulan West SMP/EP LW1 – 2 (ULN SD PLN 0013) 39 ULN SD EXT 0094 April 2011, revised scope of works ULN SD EXT 0135 January 2014

Page 36: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 36 of 107

Uncontrolled unless viewed on the intranet

4.5 Biodiversity The Biodiversity Management Plan (BMP) (ULN SD PLN 0026), which includes the Offset 

Management Plan (OMP), describes the ecological management strategies, procedures, controls and 

monitoring programs for the management of flora and fauna. 

Flora monitoring was completed by Eco Logical Australia (ELA), terrestrial and aquatic fauna 

monitoring was completed by Biodiversity Monitoring Services (BMS) and micro chiropteran bat 

monitoring was completed by Fly By Night Bat Surveys (FBN). The monitoring reports are provided 

in Attachment E for monitoring sites see Figures 7 & 8.   

Ecological monitoring is undertaken as follows:  

Flora – 74 floristic monitoring plots established across the site (36 monitored in Autumn and 

38 in Spring), 13 Landscape Function Analysis (LFA) sites, 7 subsidence monitoring plots, and 

targeted Acacia ausfeldii surveys. 

Fauna (excluding microbats) – within the Biodiversity Offset and Management Areas, areas 

adjoining Project Approval disturbance areas, residual Project Area and post‐mining 

rehabilitated areas (once habitat is sufficiently established). 

Microbats – monitoring at general fauna monitoring sites, targeted monitoring of clifflines 

sites within Brokenback and Spring Gully Offset and cliffline monitoring within subsidence 

management zones.  

Aquatic fauna and riparian habitat – within creek and river systems internal to, upstream 

and downstream of the project approval area. 

 

   

Page 37: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 37 of 107

Uncontrolled unless viewed on the intranet

Figure 7 2015 Flora Monitoring sites 

 

Page 38: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 38 of 107

Uncontrolled unless viewed on the intranet

Figure 8 2015 Fauna Monitoring sites 

 

Page 39: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 39 of 107

Uncontrolled unless viewed on the intranet

4.5.1 Flora A summary of the 2015 flora monitoring results are provided below, with the full report available in 

Attachment E (Eco Logical 2016). 

EEC/CEEC communities: 2015 results show that, while residual and revegetation/regeneration sites 

have, on average, similar total species richness (38 compared to 35 respectively), residual sites have a 

higher average native species richness (30 compared to 22 in revegetation/regeneration sites).  Four 

residual (BOBE2, BOBC1, RPA13, and RPA8) and seven revegetation/regeneration (BOB9, BOB10B, 

BOB14, BOB17, BOB19, BOBE6 and BOBE12) sites recorded increases in native species richness of 

greater than 25% between 2014 and 2015, predominantly due to the emergence of both annual and 

perennial herbs.  Native species richness in site BOB19 almost doubled between spring 2014 and 

spring 2015, reflecting an increase in both herb and native perennial grass diversity.   

Revegetation/regeneration sites have, on average, higher native ground cover (50% average) 

compared to residual sites.  However, exotic ground cover was also higher in 

revegetation/regeneration sites (14% average), in particular in White Box Woodland vegetation types. 

Non EEC/CEEC revegetation/regeneration communities: Native species richness within all 12 

previously surveyed revegetation/regeneration non EEC/CEEC sites either increased (10 sites) or 

remained stable (two sites) between 2014 and 2015.  The newly established Ironbark Open Forest 

Complex (regenerating) sites (BOB21, BOB22, BOB23) had equal or greater native ground cover than 

the majority of grassland and grassy woodland sites.  This contrasts with previous years’ results, in 

which Ironbark communities had consistently lower ground cover compared to grasslands or grassy 

woodlands.  Three of the four post‐mining open cut rehabilitation sites that had previously been 

identified as having particularly low ground cover (OC6B, OC7, AA1) all increased in ground cover 

between 2014 to 2015, suggesting that there is still potential for ground cover to re‐establish in these 

rehabilitated areas.   Exotic cover was low (<5%) in all non EEC/CEEC sites with the exception of 

BOBC8B, which had a high cover of Saffron Thistle and exotic pasture species.  

Floristic‐based Subsidence Monitoring: All six of the existing (i.e. not newly established) sites 

increased in native species richness between 2014 and 2015. FBS5 (above UW LW1‐previously 

undermined) and BOB13B (above UG#3 LWW3‐ not yet undermined) recorded a decline in native 

ground cover between the 2014 and 2015 monitoring. Canopy cover at FBS4 (above UG#3 LW27‐ 

previously undermined) and BOB13B was observed to decline by 10%, largely due to dieback in 

Rough‐barked Apple canopies that has been recorded throughout the Project Area and wider region 

over the past year of monitoring.  Additional investigations found no statistically significant 

differences in canopy health or cover between historically undermined and non‐impacted sites and as 

such there is no evidence to suggest that this dieback was caused by subsidence.  

Weeds: The suite of dominant exotic species has again changed; in 2015, the most common exotic 

species were Spear Thistle (also seen in high abundance in 2014), St John’s Wort, and Saffron Thistle.  

Saffron Thistle was present in high covers and abundances within a number of 

revegetation/regeneration sites (up to 50% cover in BOB24), and was incidentally observed in 

similarly high covers and abundances across the Biodiversity Offset Areas.  Four Noxious Weeds 

were recorded across 28 sites.  These weeds were St John’s Wort, Prickly Pear, Blackberry and 

Bathurst Burr. 

Landscape function analysis: Results from 2015 LFA monitoring were compared with results from 

previous years to examine trends in landscape organisation, stability, infiltration or nutrient cycling.   

Landscape organisation (LO) – the proportion of the landscape occupied by resource accumulating 

Page 40: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 40 of 107

Uncontrolled unless viewed on the intranet

‘patches’  such as ground cover, litter or logs – increased in seven of the ten monitored rehabilitation 

sites between 2014 and 2015. LO more than doubled in the A. ausfeldii translocation plots within the 

Open Cut.  The three sites (OC2(R), OC4(R) and GRRD2(R)) in which LO decreased still have LO of 

within 10% of relevant analogue sites.  Open Cut and Goulburn River rehabilitation sites are all 

performing well in terms of stability and Goulburn River rehabilitation sites are closely approaching, 

or have exceeded, relevant analogue sites in terms of infiltration and nutrient cycling.  

Acacia ausfeldii Highett Road: The height of mature living individuals ranged from 0.3 m to 4.0 m, 

whilst the diameter of the main stem ranged from 0.1 cm to 4.5 cm at the base.  The average height of 

mature individuals decreased from 2.07 m in 2014 to 1.89 m in 2015, indicating a decline in condition 

and cessation of growth.  This decline in overall population health is also reflected in the poor 

condition ratings and notes recording senescence or snapped stems.  As outlined in the 2013 

monitoring report (ELA 2013), this is consistent with the ecology of A. ausfeldii being a short‐lived 

pioneer species. Transect‐based surveys targeting A. ausfeldii seedlings recorded only one seedling.  

This lack of recruitment in the absence of disturbance is also consistent with the knowledge of the 

ecology of A. ausfeldii. 

Acacia ausfeldii translocation: Results indicate that there continues to be germination of A. ausfeldii 

seedlings from the topsoil seed bank and sub‐soil root zone, and that the majority of the population of 

100 target individuals identified in 2014 are these are continuing to grow and mature into healthy 

saplings.  The density of A. ausfeldii individuals within AA2 has already exceeded (by greater than a 

factor of two) the target density outlined in the BMP (1 individual per 5 m2 or 2000 individuals per 

ha), however the density in AA1 remains relatively low, at an estimated 368 plants per ha.

4.5.2 Fauna A summary of the 2015 fauna monitoring results are provided below, with the full report available in 

Attachment E (BMS 2015).  

A total of 12 amphibian, 23 reptile, 13 native mammal, nine introduced mammal, 143 native bird and 

one introduced bird species were located during the 2015 surveys. The species richness for all four 

groups surveyed is similar to that obtained at Ulan Coal Mine over the last 18 years.  

A total of 204 sightings of 11 threatened species, as listed under the TSC Act, were recorded during 

the 2015 surveys (101 sightings of 8 threatened species in 2011, 151 sightings of 8 threatened species in 

2012 and 182 sightings of 8 threatened species in 2013, 245 sightings of 14 threatened species in 2014).  

The dominant species located were Painted Honeyeater, Speckled Warbler and Varied Sittella, all 

associated with woodland habitats (Figure 9). Targeted searches of preferred tree food species for 

Swift Parrot and Regent Honeyeater did not locate them.   

Results of the surveys indicate:  

no significant differences between the fauna assemblages located from 2011 to 2015; 

no significant differences between the fauna assemblages found at each site and domain; 

no significant differences between the fauna diversities and habitat characteristics found within 

each domain; 

no significant differences between the habitat and biodiversity values from the treatment and 

control sites; 

habitat characteristics and fauna diversities are comparable with previous surveys; and 

Page 41: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 41 of 107

Uncontrolled unless viewed on the intranet

no  discernable  impacts  from  subsidence  upon  threatened  species,  populations,  habitats  or 

ecological communities associated with the terrestrial environment.   

Figure 9: Numbers of Threatened Species Located from 2011 to 2015 

 

4.5.3 Microbats Monitoring commenced in 2015 at two additional sites above the West 3 & 4 panels (LWW3 & 

LWW4) of Ulan #340 and four sites above the fourth longwall panels of Ulan West (LW4)41. 

Fifteen species of microbat were recorded in 2015 surveys (Hoye 2016 Attachment E). Of these, five 

are listed as threatened under State legislation, the Yellow‐bellied Sheathtail Bat (Saccolaimus 

flaviventris); Large‐eared Pied Bat (Chalinolobus dwyeri), Little Pied Bat (Chalinolobus picatus), Eastern 

Bent‐wing Bat (Miniopterus oceanensis) and South‐eastern Long‐eared Bat (Nyctophilus corbeni). The 

Large‐eared Pied Bat is also listed under Commonwealth legislation.  

Monitoring over five years indicates that overall microbat diversity has not declined during this time.  

The age composition and body condition of the two most regularly captured species has remained 

relatively stable over this period. These three indicators provide a means of assessing the overall 

composition and health of the populations within UCML holdings. A gradual decline in body 

condition would be expected if microbat populations are under stress from mining related impacts.  

The current and previous microbat monitoring has established that microbat diversity in the older 

open cut mine rehabilitation is equivalent to that at sites in surrounding forest. Microbats are 

certainly using the rehabilitation for foraging and, to some extent, for roosting. 

40 Monitoring in accordance with the LW27 to LW29 and W4 to W5 subsidence monitoring program (ULN SD PLN 0061) 41 Monitoring in accordance with the Subsidence Monitoring Program Longwall 1 & 2 (ULN SD ANN064) 

0

10

20

30

40

50

60

70

80

2011 2012 2013 2014 2015

Page 42: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 42 of 107

Uncontrolled unless viewed on the intranet

4.5.4 Aquatic A total of 1889 individuals from 51 macro‐invertebrate taxa were located (BMS 2015 Attachment E). 

The number of taxa located was higher than that recorded in 2010 at Ulan Coal Mine and that found 

during the studies at Moolarben and Wilpinjong (27), but not as high as that obtained in 2011 (61 

taxa).    There has been some variation in the number of macro‐invertebrate taxa located over the 

years, however the trend between 2007 and 2014 is relatively constant.  A comparison between the 

data obtained from the 2011 to 2014 surveys shows that there are no significant differences between 

the years (non‐parametric Kruskal‐Wallis One Way Analysis of Variance on Ranks).  Simpson’s Index 

of Diversity and Evenness show an increase in values.  SIGNAL, Salinity, RCE% and RARC% have 

been relatively stable over the years. There have been no discernable impacts from subsidence upon 

threatened species, populations, habitats or ecological communities associated with the aquatic 

environment. 

After four surveys, it has become apparent that the major influence on the monitored aquatic 

ecosystems is land use and the state of disturbance of the land. The lower end of productivity for the 

aquatic ecosystems as well as the riparian habitats and associated bird populations appears to be 

associated with land that has been cleared and is still grazed by domestic stock or is associated with 

urban development. The channelized section of Goulburn River Diversion also demonstrates low 

productivity; the planned rehabilitation of the Goulburn River Diversion should see a positive change 

in the aquatic monitoring results in the years to come.  

4.6 Salinity Offset Area A salinity offset area (SOA) was established as part of the implementation of the Bobadeen Irrigation 

Scheme (BIS) in 2003 to offset, on a 1:1.5 basis, the salt load within the catchment due to irrigation.42  

Objectives and land use management and preliminary assessment criteria (Table 14) for the SOA are 

detailed within the BMP.43  Based on an average irrigation application of 3.25 ML/ha/year (an average 

of 1187 ML/year across 242 ha of irrigation) of water with an average salinity of 1200 μs/cm‐1 an 

average 1208 tonnes/year of salt will be applied to the BIS for the life of the program.  It is estimated 

that 260 tonnes/year of salt leaves the site and reaches the downstream catchment.  Applying the 

offset ratio of 1:1.5, an offset 390 tonnes/year of salt is required.  Over the last 10 years, on average, the 

SOA met salinity offset requirements. 

The mine water balance for the period 1 July 2014 to 30 June 2015 indicates the total volume of water 

irrigated during this period was 1521 ML. The amount of salt (for the same period) in the water 

irrigated was calculated at 1058 tonnes. Therefore the average tonnes of salt applied per hectare 

(based on 242 ha) was determined to be 4.37 tonnes/ha.  Table 14 provides an assessment against the 

salinity offset scheme completion criteria for 2015 (as outlined in the BMP), which was evaluated as 

part of the floristic monitoring program.  

   

42 EPL 394, 9 Special condition, E1.1.   43 Biodiversity Management Plan (BMP) (ULN SD PLN 0026) 

Page 43: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 43 of 107

Uncontrolled unless viewed on the intranet

Table 14 Assessment of Salinity Offset Completion Criteria  

Impact 

Mitigation 

Strategy 

Completion Criteria Assessment Against Criteria 

Controlled 

rotational 

grazing (in pivot 

areas) 

Controlled rotational grazing activities 

implemented in a manner that controls 

pasture in the pivot area. 

Boundary Fences of the Salinity Offset Area were repaired in 

2015. Rotational grazing practices are undertaken by a 

contracted grazing company that manage the area within the 

Bobadeen Irrigation Scheme as well as other grazing areas in 

and around the Salinity Offset Areas.  Rotational Grazing is 

implemented to ensure that ground cover is maintained and 

pasture growth and irrigation in the pivot areas are 

optimised.  

Controlled rotational grazing activities are 

documented. 

Establishment/ 

maintenance of 

stable vegetative 

cover 

Monitoring has shown that sufficient 

groundcover has been established such that 

the percentage of bare ground has reduced. 

Of the 26 flora monitoring sites located within the SOA, two 

flora subsidence monitoring sites (BOB13B and FBS5) and 

two rapid assessment sites (BOB1 and BOB5) within the SOA 

showed declines in native ground cover between 2014 and 

2015. The other 22 monitoring site recorded a stable or 

increasing groundcover between 2014 and 2015 (Eco Logical 

2016, full report Attachment E). 

No significant erosion is present.  No significant erosion present during reporting period.  

There are no significant weed infestations 

and weeds do not comprise a significant 

proportion of the species in any stratum. 

Of the 26 flora monitoring sites located within the SOA, two 

revegetation/regeneration sites located within the SOA 

(BOB19 and BOB24) had particularly high exotic species 

richness and cover, with exotic species comprising the 

dominant proportion of species within the ground cover 

stratum. In BOB19, this corresponded to a 40% decrease in 

native ground cover between 2014 and 2015. The dominant 

exotic species in these areas was Saffron Thistle, which was 

also incidentally observed as dense infestations in cleared 

areas to the north of BOB24. All other sites located within the 

SOA had a predominantly native ground cover (Eco Logical 

2016, full report Attachment E). 

6000 trees 

planted along 

pivot fence lines 

The required number of trees are planted.  6000 trees planted in 2005. Re‐planting of trees lost will 

occur in 2016.  

The 2015 monitoring program indicates that approximately 

35% of trees planted have survived, and 82% of these trees 

were considered to be at 50% or greater health score.  

No significant weed issues were identified within fenced 

pivot planting areas.  

More than 75% of trees are healthy and 

growing as indicated by long term 

monitoring. 

There are no significant weed infestations 

and weeds do not comprise a significant 

proportion of the species in any stratum. 

Natural 

regeneration of 

the vegetation 

cover 

Natural regeneration is shown through 

monitoring to be occurring. 

Natural regeneration of native canopy species was recorded 

in nine floristic and three rapid assessment sites located 

within the SOA. Natural regeneration of Blakely’s Red Gum 

was also incidentally observed to the north and north‐west 

of site RPA13. 

 

Page 44: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 44 of 107

Uncontrolled unless viewed on the intranet

4.7 Energy and Greenhouse Gas Monitoring to assess Greenhouse Gas (GHG) and energy use performance is undertaken consistent 

with requirements.44 Individual facility thresholds for National Greenhouse and Energy Reporting 

System (NGERS)45 are triggered greater than 25,000 tonnes of carbon dioxide equivalent (t CO2‐e) are 

generated and greater than 100 terajoules (TJ) of energy are consumed.  GHG emissions and energy 

consumption are reported via the Emissions and Energy Reporting System (EERS) under UCMLs 

parent company, AZSA Holding Pty Ltd.   

The estimated total GHG emissions (Scope 1 and 2) for the 2015 NGERS reporting period (financial 

year 2015) was 198,912 TCO2‐e, compared to the EA (2009) prediction for  year 1 to 7 of the project 

phase of 419,528 TCO2‐e.  The total energy consumed for Scope 1 and Scope 2 was 804,018 GJ, 

compared to the EA (2009) modelled prediction for  year 1 to 7 of the project phase of 1,224,783GJ. 

The difference between actual and predicted emissions and energy use is attributed to the Open Cut 

not operating in 2015.  

The energy and GHG intensity of the operations is lower than predicted in the EA, the energy 

intensity target.  In 2015 the energy intensity was 0.066 GJ/ tonne of ROM coal produced, compared 

with the average predicted rate of 0.081 GJ/tonne.  The energy intensity was also lower than the 2014 

rate of 0.078 GJ/ tonne.  In 2015 the GHG intensity was 0.016 tCO2e/ tonne of ROM coal produced, 

compared with the average predicted rate of 0.029 tCO2e /tonne and the 2014  rate of 0.018 tCO2e/ 

tonne.       

An energy mass baseline was reviewed in 2013, with the report of the review provided in May 2014.  

The report offered suggestions for electrical and diesel savings opportunities.  The following 

examples are evidenced in projects implemented at the operation to minimise energy and GHG 

intensity: 

Pumps – new purchases to include consideration of energy efficiency; adjust pump speeds 

and automated to switch off when not in use.  

Improve pipe design and eliminate unnecessary flow paths.  

Implement preventative maintenance. 

Variable speed drives and premium‐efficiency motor systems.  

 

Energy and GHG Intensities are predicted to continue at or below current rates in 2016 and will 

remain below the intensities predicted in the EA.   

44 Condition 22, Schedule 3 of PA 08_0184, Air Quality and Greenhouse Gas (GHG) Management Plan (ULN SD PLN 0059), 

National Greenhouse and Energy Reporting Act (NGER) 2007 (Cth) 45 National Greenhouse and Energy Reporting Act (NGER) 2007 (Cth)

Page 45: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 45 of 107

Uncontrolled unless viewed on the intranet

5 Mine Subsidence Subsidence monitoring programs are developed and approved for Subsidence Management Plan/s 

(SMPs) and Extraction Plans (EPs) for Ulan No.3 and Ulan West underground operations. Subsidence 

monitoring aims to confirm subsidence predictions and expected subsidence behaviour and 

assessment of subsidence performance measures46.  Subsidence monitoring programs incorporate 

previous monitoring and include survey, heritage, infrastructure, flora, fauna, groundwater and 

surface water monitoring.  

5.1 Ulan No.3 SMP LW23-26 & W1 and W2-W3

Subsidence monitoring for LW23‐26 and W1‐W3 is carried out in accordance with the Subsidence 

Monitoring Program (HSEC MGP 058) (part of the Subsidence Management Plan (SMP) for mining of 

LW 23‐26 & W147 and W2‐W3).48 W3 is the last remaining longwall to be mined under the SMP 

approval for W2 and W3.  No longwall mining occurred in W3 during the reporting period. 

Development Approval (DA) 113‐12‐98 remains applicable until the completion of longwall mining of 

W3, which is scheduled for completion during 2017. 

5.2 Ulan No.3 SMP/EP LW27-29, W4-W5 and North 1

The SMP/EP49 was revised for longwalls LW27 to LW29 and W4 to W5 and was approved by the 

DP&E on 25 May 2013.  The subsidence monitoring program (ULN SD PLN 0061) describes the 

survey monitoring and infrastructure and environment monitoring for subsidence management 

approval areas:  

2005 SMP Area (LW 23‐26 & W1); 

2007 SMP Area (LW W2 & W3); and  

2011 SMP/Extraction Plan Areas (LW 27‐29 & W4‐5 and North 1 ‐ LW C, E, F & G). 

 

Ulan Underground No.3 secondary extraction of LW28 was completed 19 February 2015 and 

extraction of LW29 commenced 21 April 2015. A summary of the End of Panel report for LW28 is 

provided in section 5.4.1.  

5.3 Ulan West SMP/EP LW1-2 The SMP/EP for Ulan West LW1 and LW2 was approved on 25 March 2014.  Secondary extraction of 

LW1 occurred between 19 May 2014 and 25 May 2015. LW2 secondary extraction commenced 25 May 

2015. The subsidence monitoring program for LW1‐2 is outlined in Subsidence Monitoring Program 

Longwall 1 & 2 (ULN SD ANN064), a component management plan of the Ulan West SMP/EP LW1 – 

46 PA08_0184 Schedule 3, Condition 24, not applicable to existing SMP approved longwall panels, under DA113‐12‐98. 47 Consistent with DA113‐12‐98 and approved by DTI 01 August 2006.  48 Consistent with DA113‐12‐98 and approved by DTI 21 January 2009. 49 Required by Condition 26 of Schedule 3 of PA08_0184.

Page 46: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 46 of 107

Uncontrolled unless viewed on the intranet

2 (ULN SD PLN 0013). The annual report is provided in Attachment J, a summary is provided in section 

5.4.2. 

 

Ulan West SMP/EP LW1 – 2 (ULN SD PLN 0013) has been revised to include longwalls LW3 and LW4 

to produce a consolidated extraction plan now titled The Ulan West Extraction Plan for Longwalls LW1 

to LW450. LW3 is expected to commence in early April 2016. 

50 DP&E Approval for this revision is pending 

Page 47: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 47 of 107

Uncontrolled unless viewed on the intranet

5.4 2015 Subsidence Performance Table 15 outlines compliance with the subsidence performance measure of PA 08_0184 during the reporting period.  

Table 15 PA08_0184 Subsidence Performance Measures 

Subsidence Performance Measures Assessment of Performance 2015 

(LW28 & 29 Ulan No.3, LW1 & LW2 Ulan West) 

Water 

Ulan, Mona & Cockabutta Creeks  No greater environmental consequences than predicted in 

the EA 

EA 2009 predictions:  

Ulan Creek is considered unlikely to be significantly impacted 

by the proposed mining. Some small horizontal movements may 

occur toward the goaf, but the character and capacity of the 

creek to maintain flow is unlikely to be affected by these 

movements.  

Mining below ephemeral creeks is considered to have the 

potential to reduce surface flows and the duration that pools 

retain water following a rainfall event.  

 

Longwall mining in 2015 did not occur near the Mona or Cockabutta Creeks. No 

impacts have occurred in these areas as a result of subsidence from mining in 2015.  

A section of the Ulan Creek runs adjacent to Ulan West LW1. Channel stability 

monitoring is undertaken annually in the Ulan Creek. There were no visible signs of 

subsidence related impacts affecting the stability of the creek systems noted in the 

2015 creek stability monitoring program (Pacific Environmental 2015). 

 

Biodiversity 

Threatened species, populations, habitat or 

ecological communities 

Negligible impact Monitoring results of floristic based subsidence plots monitored pre and during/post 

mining (FBS5 (LW1), FBS6 (LW2), FBS4 (LW27), RPA12 (LW28), FBS8 (LW29)) 

indicate subsidence has had a negligible impact upon the vegetation (Eco Logical 

2016 Attachment E).  

Monitoring of microbats in clifflines above Ulan West LW1 & LW2 indicates there has 

been no significant changes to microbat populations as a result of mining. It is noted 

that changes to microbat populations above mining areas would likely not be 

detectable for several years following mining (Hoye 2016 Attachment E).  

There are no clifflines located above current or recently (within past 2 years) mined 

areas of the Ulan No.3 mine.  

Page 48: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 48 of 107

Uncontrolled unless viewed on the intranet

2015 Fauna monitoring concluded there have been no discernible impacts from 

subsidence upon threatened species, populations, habitats or ecological communities 

associated with the terrestrial environment (BMS 2015 Attachment E). 

Land 

Cliffs in the Brokenback Conservation Area  Nil environmental consequences Longwall mining in 2015 did not occur near the Brokenback Conservation Area. No 

subsidence impacts to sandstone cliff formations in the Brokenback Conservation 

Area were observed in a survey conducted independently by Pacific Environmental 

(Pacific Environmental 2016). 

Other cliffs  Minor environmental consequences 

EA 2009 predictions:  

Mining subsidence is expected to cause rock falls on 10‐20% of 

the sandstone cliff formations directly above the mining area.  

There are no clifflines located over LW28 or LW29.  

Ulan West LW1 & LW2: Inspection of the impacts of mining on the cliff formations 

located above Longwalls 1 and 2 indicates that rock falls are occurring on less than 

20% of the undermined length of cliff consistent with predictions and perceptible 

impacts are apparent on less than 50% of the undermined length, also consistent with 

predictions (SCT 2015 Attachment J).   

Heritage 

Aboriginal sites  Nil impact in the Brokenback Conservation Area, 

Grinding Groove Conservation Areas; and on Mona 

Creek/Cockabutta Creek Rock Shelter Sites 

No mining related impacts were observed at the Valley Way Grinding Groove 

Conservation Area located approximately 470m from the eastern goaf edge of LW 1 

(SCT, 2015). 

The other Aboriginal sites listed in the performance measures were not located within 

the potential subsidence zone (SMP area) for mining in 2015. There have been no 

recordable changes to these sites as a result of mining in the reporting period. 

Talbragar Fish Fossil Reserve  Negligible impact Longwall mining in 2015 did not occur near the Talbragar Fish Fossil Reserve.  

Other Heritage Sites  No greater impact than predicted in the EA 

EA 2009 predictions:  

Subsidence movements are not expected to have any practical 

effect on artefact scatters and isolated finds in open terrain  

Mine subsidence is not expected to cause any acceleration or 

change in the degradation that is occurring naturally over 

time at Old Ulan Village  

Mine subsidence is not expected to significantly impact any of 

the European Heritage sites within the Project Area.  

 

 

Old Ulan Village is located adjacent to LW1. A post mining inspection of the heritage 

area was undertaken by Stedinger in April 2015. The inspection found no visible 

impacts relating to subsidence.  

The aboriginal Rock Shelter Test Excavation Sampling Strategy (created through 

consultation with Aboriginal stakeholders) commenced with the excavation of site 

ID#1054 located above LW2 (the first of 18 sites selected in the strategy) on 16th 

February 2015.  

There have been several minor rock falls at two of the rock shelter monitoring sites for 

LW1; sites 1060 and 1063. The relatively minor level of impacts observed is consistent 

with the predicted probabilities of impact as identified in the 2009 EA. 

Page 49: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 49 of 107

Uncontrolled unless viewed on the intranet

There have been no observable impacts to other Aboriginal Heritage sites located 

above mining areas in the reporting period.  

Built Features  

All built features  Safe, serviceable and repairable unless the owner agrees 

otherwise in writing LW27, LW28, LW1 & LW2 are within areas owned by UCML. There is a pastoral lease 

over the land above LW27 & LW28.  

One single earth return line owned by Essential Energy on the surface over the north 

mains, was inspected during longwall mining of LW27 & LW28. No impacts have 

been recorded. 

No perceptible impact to farm dams, stock fences or access tracks located over LW28 

or LW29.  

No visible or perceptible impacts were observed on the old farm house situated 

approximately 70 m to the east of LW29 goaf edge.  

Observations of surface cracking to access tracks located over LW1 & LW2 were 

consistent with expectations. Road repairs were undertaken to address cracking that 

posed a potential safety risk to mine employees and contractors. There are no built 

structures not owned by UCML located over Longwalls 1 and 2. 

Public Safety    

Public Safety  No additional risk due to mining The areas mined in 2015 are not accessible to the public and there is not considered to 

have been any increase in risk to public safety as a result of longwall mining in 2015. 

No incidents of public safety in relation to mining LW27, LW28, LW1 or LW2 were 

recorded in the reporting period.  

 

Page 50: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 50 of 107

Uncontrolled unless viewed on the intranet

5.4.1 Summary from EoP report LW28 Secondary extraction of LW28 commenced on 22 March 2014 and was completed on 18 February 

2015. The subsidence monitoring results include survey monitoring on the F line51 and observations 

made during a site visit (after the completion of the longwall) conducted on the 5 March 2015 by Ken 

Mills (Principal Geotechnical Engineer for SCT Operations Pty Ltd).  

The measured subsidence is of the expected form and the magnitude of all parameters is less than or 

consistent with predictions in the SCT Report ULA3839 (Table 16).  

Table 16: Actual versus predicted subsidence for LW28 

Parameter  Predicted  Actual (LW28) 

Maximum Subsidence (m)  1.6 (0.9 – 1.5)  1.49 

Chain Pillar Subsidence (m)  0.80  0.52 

Angle of Draw (0)  40 – 55  441 

Goaf Edge of Subsidence (mm)  No predictions made  208 

Maximum Tilt (mm/m)  10 ‐ 20  15 

Horizontal Movements (m)  0.65  0.56 

Horizontal Strain (mm/m)  5 ‐ 15  5 

NOTES: 1  The angle of draw is determined based on allowance for systematic offset in the surveying over the  large distances 

involved.   

The surface terrain above LW28 is comprised of a series of narrow valleys that drain southward into 

the board valley associated with Bobadeen Creek. Bobadeen Creek is an ephemeral creek that aligns 

approximately with the axis of LW26. The surface terrain above LW28 comprises approximately 40% 

open grass land, mainly in the east near the start of the panel and 60% undeveloped bushland with a 

few sandstone outcrops mainly in and alongside gullies. The land above LW28 is owned by UCML and 

partly leased for grazing activities.  

Surface improvements in the area include several farm dams, stock fencing and a number of internal 

access tracks. There is no public access. There were no perceptible mining impacts. No surface cracks 

were detected along the panel edges, on bare surfaces, embankments, dams, compacted road surfaces 

and access tracks. 

5.4.2 Summary Ulan West LW1-2 Annual Report The 2015 Annual Review (AR) for 01 January 2015 to the 31 December 201552 is provided in 

Attachment J. A summary of the Subsidence effects monitoring from the AR is provided below. For 

environmental monitoring results please refer to the full report (Attachment J).  

Subsidence effects monitoring for longwall panels LW1 and LW2 at Ulan West, was undertaken in 

accordance with the approved Appendix G: Subsidence Monitoring Program Longwalls 1 & 2 (ULN 

SD ANN 0064), a key component management plan of the approved Subsidence Management and 

Extraction Plan for Longwalls 1 & 2 (ULN SD PLN 0103). 

51 The F Line is the main subsidence line that crosses LW28 52 In accordance with Condition 18 of the Ulan West SMP Approval for Longwalls LW1 & LW2 UCML are required to prepare 

an Annual Report (AR) within 12 months of the date of SMP approval and annually therafter. The AR report is submitted as an 

attachment to this report.  

Page 51: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 51 of 107

Uncontrolled unless viewed on the intranet

The following summary of the subsidence effects monitoring for LW1 and LW2 during the review 

period, was provided from the 2015 Annual Review of Subsidence Monitoring at Ulan West Mine 

(SCT, March 2016) (Attachment J), prepared by SCT Operations (SCT). SCT prepared this report to 

compare subsidence measured and observed above the Ulan West Mine during 2015 with predictions 

made prior to mining. The report presents a review of the subsidence monitoring and subsidence 

related observations made on the surface above Longwall 1 and Longwall 2 during the 11 months 

from 31 January 2015 (the end of the previous review period) to 31 December 2015 and a comparison 

with predictions. The following information is a summary of the SCT report.  

By the end of the review period on 31 December 2015, Longwall 1 had created an extraction void 

approximately 261 m wide by 5795 m long at a nominal cutting height of 3.2 m and Longwall 2 had 

created a void approximately 315 m wide and 3507 m long. 

Within the area of Longwalls 1 and 2 the overburden depth to the Ulan Seam is greatest at 250 m near 

the northwest corner and start of the panels and gradually decreases to the south to be approximately 

65m in the southeast corner of Longwall 1. There is one major cliff line located in the area between C 

and D Lines and some less prominent sandstone outcrops on the northern side of the ridge line 

immediately to the south of C Line.  

Subsidence related surface cracking is mainly evident along cliff lines and areas of less than about 120 

m of overburden depth where the Permian strata and lower 20 m of the Triassic Sandstone outcrop.  

There are also cracks evident on a ridgeline towards the southern end of the panels and on the north‐

western slopes below this ridge. 

The SMP/EP subsidence predictions for Longwalls 1 and 2 were updated from the predictions in the 

Ulan Coal Continued Operations (UCCO) Environmental Assessment to reflect the changed mining 

geometry and to include an increase in the mining height from 2.9 m used in the UCCO assessment to 

3.2 m.  These updated predictions are used for comparison.   

 

Table 17: Actual versus predicted subsidence for LW1 and start LW2 

Subsidence Line  A B C D

Overburden Depth (m)  65 ‐ 85  75    140    215   

Longwall Panels  1    1    1 & 2    1 & 2   

Subsidence (m)  2.1  1.91 2.1  1.82 1.9  1.36  1.6  0.97

Chain Pillar Subsidence (m)  ‐    ‐  0.2  0.08  0.5  0.3

Angle of Draw (°)  45  18 45  12 & 21 45  29  45  40

Tilt (mm/m)  162  62 162  69 68  34  36  12

Long Panel Horizontal (m)  0.6  0.6 0.6  0.56 0.6  0.32  0.6  0.13

Cross Panel Horizontal (m)  0.6  0.19 0.6  0.49 0.6  0.35  0.6  0.26

Tensile Strain (mm/m)  48  29 48  22 20  10  11  4

Compressive Strain (mm/m)  65  52 65  30 27  23  15  5

Crack width (mm)  250  <250 250  200 150  50  50  ‐

Notes: Predictions in normal typeface and measured subsidence in bold typeface. 

Table 17 compares the predictions made in the SMP/EP for Longwalls 1 and 2 (normal typeface) and 

the subsidence movements measured on the four subsidence lines during the mining of Longwalls 1 

and the first section of Longwall 2 for the reporting period (bold typeface).  The measured subsidence 

parameters are less than or equal to the predictions. 

There is evidence of horizontal movements of the nominal 20 mm resolution of the surveying at 

distances of up to 800 m either side of the longwall panels.  This behaviour is consistent with 

experience at Ulan No 3 Mine and indicates that far field subsidence movements are evident at Ulan 

West even when the overburden depth to the Ulan Seam is only 145 m (as at C Line) although the 

Page 52: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 52 of 107

Uncontrolled unless viewed on the intranet

extent of the horizontal movements is currently less than the 1.8 km evident above longwall panels at 

Ulan No 3 Mine. 

The subsidence monitoring conducted over Longwalls 1 and 2 indicates that the predictions made 

during the EA for the project and subsequently updated in the SMP/EP for Longwalls 1 and 2, are 

providing a reasonable estimate of the subsidence behaviour. 

 

 

Page 53: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 53 of 107

Uncontrolled unless viewed on the intranet

6 Water Management The Water Management Plan (WMP)53 includes a number of sub plans and systems including: 

Site Water Balance; 

Erosion and Sediment Control Plan (ESCP) (ULN SD PLN 0025);  

Surface Water Monitoring Program (SWMP) (ULN SD PLN 0055); 

Groundwater Monitoring Program (GWMP) (ULN SD PLN 0056); and  

Surface Water and Groundwater Response Plan (SWGWRP) (ULN SD PLN 0057); 

Goulburn River Diversion Remediation Plan (GRDRP) (ULN SD PLN 0054);  

Goulburn River Diversion Erosion & Sediment Control Plan (ULN SD PLN 0104).   

6.1 Overview of Mine Water Management System

The mine water management system includes mine dewatering systems, water storages, the 

Bobadeen Irrigation Scheme (BIS), water treatment facilities, sedimentation and retention basins, 

settling and tailings ponds, clean water diversion drains and dirty water catch drains , levee banks 

and earth bunding around stockpiles, hardstand areas and refuelling areas. The key objectives of the 

water management system include: 

preventing the contamination of clean water by mining and related activities; 

reducing the discharge of pollutants from the mine to the environment; 

minimising adverse effects on the Goulburn River and Ulan Creek; 

managing approved water discharges to meet EPL394 license conditions; 

segregating  mine  impacted  water  from  better  quality  water  to  minimise  the  volume  of 

impacted water that requires recycling and treatment; and 

managing  the  inventory  of water  on‐site  in  order  to meet  the  requirements  of  the mining 

operation. 

Pit water and mine surface runoff is directed to the mine water management system to control and 

treat runoff from site.  

6.2 Water Balance The water balance54 consists of micro water balances for discrete operational areas of the water circuit 

(detailed in Attachment F).  The micro balances are summed to provide the overall water inputs and 

outputs (Table 18).  Water sources are rainfall on dams and disturbed areas, groundwater inflows to 

underground mines and the potable water supply.  Water is lost through product coal, the Bobadeen 

irrigation scheme, dust suppression, evaporation, supply to external parties and potable water use.  

Water in excess of operational needs is discharged from licenced discharge points.  Groundwater 

inflow to the underground workings is estimated to average 16.2 ML/day.55   

53 Reference condition 34, Schedule 3 of the Project Approval, DA113‐12‐98, EA 2009, EPL394. 54 In accordance with Condition 34, Schedule 3 of the PA08_0184 55 Water balance period 29 June 2014 to 27 June 2015 

Page 54: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 54 of 107

Uncontrolled unless viewed on the intranet

Table 18 Water Balance Annual Calculation 

Water Balance Period56  Total Inputs57  Total Outputs58  Net Water Balance59 

1 July 2014 to 30 June 2015 8061ML 

(22.1 ML/day)  

‐9617 ML 

(‐26.4 ML/day) 

‐1556 ML 

(‐4.27 ML/day) 

6.2.1 Compliance with Water Extraction Licence Water Balance indicates total groundwater extraction of 5943ML for the 2015 water year (1 July 2014 

to 30 June 2015), of which; 

5289 ML was extracted from groundwater within the Goulburn River sub‐catchment of the 

Hunter Catchment under groundwater licence 20BL17387260 (licenced extraction limit 7060 

ML)  

654 ML was extracted from groundwater within the Sydney Basin of the Murray Darling 

Basin (MDB) Groundwater Source61 under water access licence WAL37887 (extraction limit 

750 ML)  

6.2.2 Water Discharge Water treatment and discharge facilities were operated in accordance with EPL 394 during the 

reporting period.  The discharges were from: 

The Bobadeen Irrigation Scheme (BIS); 62  

The Bobadeen Water Treatment Facility (BTWF);63 and 

The North West Sediment Dam Water Treatment Facility (NWSDWTF).64  

 

Millers Dam, Effluent Storage Dam and Truckfill Dam licensed discharge points did not operate in 

2015. Table 19 provides an overview of water extracted and discharged volumes.  

56 Water balance period 29 June 2014 to 27 June 2015 57 Includes rainfall, seepage from groundwater, coal and spoil, groundwater and water from dewatering bores and 

runoff/drainage from tailings. 58 Includes water used in the CHPP, dust suppression, irrigation, licensed discharge, evaporation, moisture bound to coal, 

rejects and tailings, onsite potable water use and seepage to spoil.  59 Total inputs less total outputs. 60 Licensed under Water Act 1912, Part 5, allocation of 7060ML in any 12 month period beginning 1 July 61 within the NSW Murray Darling Basin Porous Rock groundwater sources Water Sharing Plan 62 The BIS (commissioned 2003) utilises five central irrigating pivots to irrigate approximately 242ha of pasture. 63 The BWTF (commissioned 2006) uses microfiltration and reverse osmosis water treatment and discharges to EPL 394 LDP 6. 64 The North West Sediment Dam WTF (initially commissioned April 2011) uses a reverse osmosis water treatment process and 

discharges to EPL394 LDP19.  Commissioning of the expanded NWSDWTF occurred on the 28 October 2014. 

Page 55: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 55 of 107

Uncontrolled unless viewed on the intranet

Table 19 2015 Extraction/Discharge Volumes 

 

Location  

 

Licence Limit (ML/year) Extracted^/Discharged^^ Volume 

(ML/year) 

Surface Water 

Effluent Storage Dam (LDP1)  31  0 

Millers Dam (LDP2)  219  0 

Rowans Dam (LDP3)  3,650a  0 

Truckfill Dam (LDP4)  730  0 

Discharge to Ulan Creek (LDP 6)  5,475a  1921.17^^ 

Discharge to Ulan Creek (LDP 19)  10,950a  4196.96^^ 

Discharge through irrigation scheme (BIS)  1,694*  1260.34^^ 

Moolarben Dam ‐ Riparian Flows  221  116.3 

Moolarben Dam ‐ Water Use  600  0 

Groundwater 

PB1C   180c  48^ 

Total groundwater extraction    7060c  5895d 

Notes: a The combined annual discharge from LDP3, LDP6 and LDP19 must not exceed 10950 ML/year. c 2015 Financial year 

reporting period 20BL173821. d Annual water balance calculation ^extracted  ^^discharged *Limit is based on modelling 

maximum discharge of 7 ML/ha/yr over 242 ha.  

6.3 Surface Water Monitoring Results The Surface Water Monitoring Program (ULN SD PLN 0055) (SWMP)65 details surface water 

monitoring to measure and assess changes in stream health (including base flows) and channel 

stability that could be attributable to mining activities. The locations of for surface water (SW) 

monitoring and Licenced Discharge Point (LDP) sites are shown in Figure 10.  The assessment criteria 

and trigger values for SWs and LDPs are provided in Table 20 and Table 21 respectively. The results 

from the SWMP are discussed below, for details on parameters sampled, sampling method and 

sampling frequency of each monitoring site see Attachment C.  

   

65 Condition 34, Schedule 3 of the PA08_0184 and EPL 394, plan approved by DP&E on 29 September 2011, a component of the 

WMP (ULN SD PLN 0017). 

Page 56: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 56 of 107

Uncontrolled unless viewed on the intranet

Table 20 Adopted Trigger Values for Key Water Quality Parameters 

Water Quality 

Variable 

Goulburn 

River 

Upstream 

(SW01) 

Goulburn River 

Downstream 

(SW02) 

Talbragar 

River3 

(SW09) 

Watercourses 

flowing to 

Goulburn River4 

Watercourses 

flowing to 

Talbragar River6 

pH  6.5 - 8.01 6.4 to 8.13 6.5 – 8.55 6.5 – 8.06 6.5 – 8.05

EC (μS/cm)  6802 8542 125 – 22005 30 – 3506 30 – 3505

TSS (mg/L)  1112 532 507 507 507

Notes:   1 ANZECC (2000) default trigger value range for lowland east flowing coastal rivers in NSW 

  2 80th percentile based on historical data for the Goulburn River  

  3 Range within Historical data for Goulburn River Downstream  4 SW02 is downstream of the Ulan Mine Complex and as such water quality at this location can be influenced by                                    

other developments in the catchment outside of UCML influence. 5 Interim trigger values based on ANZECC (2000) default trigger values for lowland rivers in NSW.  Site‐specific 

trigger values will be developed as monitoring data becomes available. 6 Interim trigger values based on ANZECC (2000) default trigger values for upland rivers in NSW.  Site‐specific 

trigger values will be developed as monitoring data becomes available. 7 Interim trigger values based on Volume 1 of Managing Urban Stormwater: Soils and Construction (Landcom, 2004). 

8 Sites SW10 and SW11 

  Shaded cells are interim values, selected until site‐specific levels can be determined. 

 

Table 21 EPL 394 Concentration Limits for Licensed Discharge Points 

Location  (LDP) 

Discharge Limits

Iron 

(mg/L) 

Conductivity (S/cm) 

Oil & 

Grease 

(mg/L) 

pH Zinc 

mg/L 

TSS 

mg/L 

 

Volume 

kL/ day 

50th 

Percentile 

100th

Percentile          

Effluent Storage 

Dam 1  ‐  ‐  810  ‐ 

6.5‐

8.5 ‐  ‐  85 

Millers Dam  2  5  ‐  900  10 6.5‐

8.5 5  50  600 

Rowans Dam to 

Ulan Creek 3  5  800  900  10 

6.5‐

8.5 5  50  10000^ 

Truckfill Dam  4  5  ‐  900  10 6.5‐

8.5 5  50  2000 

Bobadeen WTF  6  ‐  800  900  ‐ 6.5‐

8.5 ‐  50  15000^ 

Goulburn River  

Gauging Station 

Downstream 

18  ‐  ‐  900  ‐  ‐  ‐  ‐  ‐ 

North West 

Sediment Dam 

WTF 

19  ‐  800  900  ‐ 6.5‐

8.5 ‐  50  30000^ 

Ulan West Box 

Cut clean water 23  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

Goulburn River  

Gauging Station 

Upstream 

33  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

   Note:   ^ The combined daily discharge from LDP 3, 6 and 19 must not exceed 30,000 kL/day  

 

Page 57: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 57 of 107

Uncontrolled unless viewed on the intranet

Figure 10 Surface Water Monitoring Network  

 

   

Page 58: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 58 of 107

Uncontrolled unless viewed on the intranet

6.3.1 SW Monitoring sites SW01 and SW02 are monitored for pH and EC (μS/cm) via a continuous monitor and TSS collected 

via monthly grab sample. Sites SW03 to SW11 are inspected monthly and following any rainfall 

events greater than 20mm within 24 hours, if flow is present a grab sample is taken. Grab samples are 

monitored for pH, EC (μS/cm), TSS (mg/L), TDS (mg/L) and Turbidity (NTU). The 2015 average, 

maximum and minimum sampling result for each SW site are displayed in Table 22. Monitoring of 

sites SW03 to SW11 commenced in October 2011 as required by the SWMP. The creeks in the vicinity 

of the operation are ephemeral, thus flows are not always available for sampling.  

Several improvements for monitoring capacity were made to Surface Water monitoring sites in 2015. 

A flow monitoring station was installed at SW08, with SW04 and SW05 facilities currently under 

construction. Automatic water samplers with flow monitoring capabilities were installed at sites 

SW06, SW07, SW10 and SW11. A permanent gauging station was installed at SW09 on the Talbragar 

River. Radio communications from the new equipment will establish real time monitoring at the sites. 

The new equipment will assist in improving the quantity and quality of data obtained from the 

surface water monitoring sites. 

Table 22 2015 Sampling result Summary 

 

SW Sites pH EC (µS/cm) TSS (mg/L)

Min Max Ave Min Max Ave Min Max Ave

SW01 6.5 7.1 6.9 230 849 494 <1 84 14

SW02 7.1 8.3 7.8 457 974 776 <1 7 2

SW03 7.1 7.9 7.7 585 1210 846 2 64 28

SW04 7.4 8.5 8.1 633 803 729 3 88 29

SW05 7.3 7.7 7.5 657 807 735 <1 10 4

SW062 6.1 7.8 7.0 93 663 378 30 30 30

SW07 6.8 7.4 7.2 163 274 207 82 178 119

SW08 ^ ^ ^ ^ ^ ^ ^ ^ ^

SW091 7.5 7.5 7.5 309 309 309 54 54 54

SW10 ^ ^ ^ ^ ^ ^ ^ ^ ^

SW11 ^ ^ ^ ^ ^ ^ ^ ^ ^

 Notes:  Bold results are outside the adopted trigger values. SW01 and SW02 pH and EC from real time monitoring.^ Indicates 

no results were obtained during the 2015 reporting period due to no flows in the creek at the time of sampling. 1One sample 

obtained for SW09 on 13th November 2015. 2SW06 two samples collected during 2015, only one sampled for TSS.  

SW01 is located in the Goulburn River upstream of operations, near the confluence of Moolarben 

Creek and Sportsman Hollow Creek (Figure 10). SW01 is sampled at an existing level concrete 

causeway crossing across the Goulburn River, at the end of Short Street in the Ulan Village. SW01 is 

considered outside the influence of mining activities. The results (Table 22 & Figure 11) from the 

surface water monitoring at SW01 indicate that:  

Continuous water monitoring determined the daily average pH values remained within the 

adopted trigger levels for pH. 

Continuous water monitoring determined the daily average EC concentrations were above 

the adopted trigger value of 680 μS/cm from 7‐8 November and 26 November‐21 December. 

Maximum  daily  EC  result  of  849  μS/cm  occurred  on  21  December.  The measured  EC 

readings are consistent with periods of drying and rainfall.  

Page 59: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 59 of 107

Uncontrolled unless viewed on the intranet

The  spike  in  EC  on  7‐8  November  occurred  following  a  13.7 mm  rainfall  event  on  5 

November which would have flushed pooled water from upstream to the monitoring site, 

thus increasing the EC concentration.  

There was  a  dry  period  from  15 November  to  7  December  resulting  in  increasing  EC 

concentration in the pooled water at the gauging station, refer to Figure 11. 15.6mm rain fell 

on 8‐10 December and 6.2 mm on 16 December which resulted in a lower EC following these 

events (EC still above trigger value) until 81.5 mm of rain was received on 22 December at 

which time the EC level fell below the trigger value.  

The 80th percentile 24 hour average EC concentration for the period March 2012 to February 

2016 is 749 μS/cm. This suggests the trigger value of 680 μS/cm should be reviewed in line 

with recent monitoring data in the next management plan review.  

Water quality remained within the adopted trigger levels for TSS. 

Figure 11 shows the reduced pH and EC values following the 22 December rainfall event. 

 

Figure 11 (SW01) Goulburn River Upstream Monitoring Results   

 

SW02 is located in the Goulburn River downstream of UCML’s activities and other non‐UCML 

mining activities (Figure 10).  The results from the surface water monitoring at SW02 (Table 22 & 

Figure 12) indicate that:  

Continuous water monitoring indicates that daily average pH was above the adopted trigger 

value of pH 8.1  intermittently between  10‐16 August,  23 November  to  4 December. The 

highest result 8.27 occurred on 2nd December. Very low rainfall received from 25 July to 11 

August.  3.4mm  received on  12 August. There was  a dry period  from  15 November  to  7 

December  resulting  in  increased pH  in  the pooled water  at  the gauging  station,  refer  to 

Figure 12. The average pH from the water discharged from LDP6 10‐16 August was pH 8.0 

and  pH  7.3  from  LDP19.  The  average  pH  from  the  water  discharged  from  LDP6  23 

November to 4 December was pH 7.4 and pH 7.1 from LDP19. No influences for the higher 

pH reading were identified.  

5.50

5.70

5.90

6.10

6.30

6.50

6.70

6.90

7.10

7.30

0

100

200

300

400

500

600

700

800

900

pH

Ele

ctric

al C

ondu

ctiv

ity µ

S/cm

SW01 Upstream Goulburn River pH and EC

EC daily average pH daily average

Page 60: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 60 of 107

Uncontrolled unless viewed on the intranet

Continuous water monitoring indicates that daily average EC concentrations were above the 

adopted trigger value of 900 μS/cm 28‐30 January 2015, daily averages were 974 μS/cm, 973 

μS/cm and 918 μS/cm. The average EC from the water discharged 27‐30 January from LDP6 

was 819μS/cm, and LDP19 was 830μS/cm. 19.7 mm rain received 27 January. There were no 

other influences identified that may have contributed to the higher EC readings;  

Water quality remained within the adopted trigger levels for TSS.  

River flow monitoring during the reporting period (Figure 13) captured a daily peak flow of 

84.6 ML on 18 June 2015 (combined discharge from LDP6 & LDP19 was 15.7 ML) coinciding 

with a total of 50.4 mm of rain between 16/06/2015 and 18/06/2015, while the average daily 

flow was 18.1 ML.   

 

Figure 12 (SW02) Goulburn River Downstream Monitoring Results 

 

Figure 13 (SW02) Goulburn River Downstream Flow 

 

5.50

6.00

6.50

7.00

7.50

8.00

8.50

400

500

600

700

800

900

1000

1100

pH

Ele

ctric

al C

ondu

ctiv

ity µ

S/cm

SW02 Downstream Goulburn River pH and EC

EC daily average pH daily average

0

10

20

30

40

50

60

70

80

90

Flo

w m

egal

itres

(M

L)

SW02 Goulburn River Downstream Flow

Page 61: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 61 of 107

Uncontrolled unless viewed on the intranet

SW03 is located in Ulan Creek (Figure 10), approximately 15 m upstream of LDP6 and sampled at a 

semi‐permanent pool within the creek.  Ulan Creek is a forth order stream flowing in a southerly then 

easterly direction, though the Project Approval boundary before joining the Goulburn River.  Ulan 

Creek is an ephemeral creek system with flows occurring during storm events or after prolonged 

rainfall. Downstream from SW03, creek flows are augmented by discharge from LDP6. The results 

from surface water monitoring at SW03 (Table 22) indicate:  

Measured pH was within adopted trigger levels.  

Measured EC  exceeded adopted  trigger value of 350  μS/cm  for  all  samples  in 2015. The 

maximum EC from collected sampled was 1210 μS/cm recorded on 23 October 2015 during 

low flow conditions. The semi‐permanent pool of water at SW03 is susceptible to pH and EC 

fluctuations depending on the flow regime at the time of sampling.  

Measured TSS concentrations generally remained within the adopted trigger levels for TSS, 

with the exception of two results, 64 mg/L recorded on 27 January and 21 April 2015. 19.7 

mm rain received 27 January and 25.1 mm 21 April (additional 33.4 mm from 18‐20 April).  

In both cases the TSS value of the next sample taken was less than 50 mg/L and therefore 

there was no trigger for an investigation.  

23 samples of flowing water have been collected from SW03 to date, 22 of these samples have 

an EC concentration greater than the trigger value of 350 μS/cm (range 585 ‐ 1210 μS/cm). 

Once 24 samples have been collected site specific trigger values will be developed for SW03.  

Average pH, EC and TSS results for SW03 in 2015 are generally consistent with the historical 

average (Figures 14, 15 & 16).  

Figure 14: Comparison 2015 to Historic Average pH Monitoring Results  

 

 

   

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

SW03 SW04 SW05 SW06 SW07 SW08 SW09 SW10 SW11

pH

2015 Average pH Historic pH (2011-2014)

Page 62: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 62 of 107

Uncontrolled unless viewed on the intranet

Figure 15: Comparison 2015 to Historic Average EC Monitoring Results 

 

Figure 16: Comparison 2015 to Historic Average TSS Monitoring Results 

 

 

SW04 is located in Ulan Creek approximately 3.7 km downstream from LDP6 at Old Ulan (Figure 10). 

Excluding  significant  rain events, water  flows at SW04 are augmented entirely by discharges  from 

LDP6. The results from surface water monitoring at SW04 (Table 22) indicate: 

Measured pH was within the trigger levels.  

Measured EC exceeded the trigger value of 300 μS/cm for all samples obtained in 2015; however 

all concentrations were below the LDP6 discharge limit of 900 μS/cm which is the primary water 

source for Ulan Creek downstream of LDP6. 

One sample exceeded the trigger value for TSS; 88 mg/L on 24 August 2015. The TSS value from 

the next sample taken was less than 50 mg/L and therefore there was no trigger for an investigation. 

Adopted trigger values for SW04 will be modified in the next management plan review to reflect 

water quality limits for LDP6 (pH: 6.5 – 8.5 and EC 900 μS/cm as per EPL394) as this is the primary 

0

100

200

300

400

500

600

700

800

900

1000

SW03 SW04 SW05 SW06 SW07 SW08 SW09 SW10 SW11

EC

(us

/cm

)

2015 Average EC Historic EC (2011-2014)

0

20

40

60

80

100

120

140

160

180

SW03 SW04 SW05 SW06 SW07 SW08 SW09 SW10 SW11

TS

S m

g/L

2015 Average TSS Historic TSS (2011-2014)

Page 63: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 63 of 107

Uncontrolled unless viewed on the intranet

water source for this monitoring site within the Ulan Creek. 15 samples of flowing water have been 

collected from SW04 to date.  

Average pH and EC  results  for SW04  in 2015 are generally higher  than  the historical average, 

however they are generally consistent with 2014 results. The higher water quality results in recent 

years can be explained through changes in the LDP6 discharge with more frequent discharge events 

at a consistently higher average EC concentration (Figures 14 & 15). 

 

SW05 is located in Ulan Creek approximately 4 km downstream from SW04 at an internal causeway 

crossing (Figure 10). SW05 is approximately 900 m upstream of LDP3 and approximately 2 km from 

joining  the Goulburn River.   Excluding significant rain events, water  flows at SW05 are augmented 

entirely  by  discharges  from  LD6.  The  results  from  surface water monitoring  at  SW05  (Table  22) 

indicate: 

Measured pH and TSS concentrations were within the adopted trigger levels.  

Measured EC exceeded the trigger value of 300 μS/cm for all samples obtained in 2015; however 

all concentrations were below the LDP6 discharge limit of 900 μS/cm which is the primary water 

source for Ulan Creek downstream of LDP6. 

Adopted trigger values for SW05 will be modified in the next management plan review to reflect 

water quality limits for LDP6 (pH: 6.5 – 8.5 and EC 900 μS/cm as per EPL394) as this is the primary 

water source for this monitoring site within the Ulan Creek. 22 samples of flowing water have been 

collected from SW05 to date.  

Average pH and EC  results  for SW05  in 2015 are generally higher  than  the historical average, 

however they are generally consistent with 2014 results. The higher water quality results in recent 

years can be explained through changes in the LDP6 discharge with more frequent discharge events 

at a consistently higher average EC concentration (Figures 14 & 15). 

 

SW06 is located in Spring Gully (off Pleuger Road) and is a second order, ephemeral stream passing 

through remote bushland in the eastern section of the Project Approval boundary (Figure 10).  Spring 

Gully joins Bobadeen Creek outside the Project Approval boundary, approximately 350 m upstream 

of its confluence with the Goulburn River. 9 samples of flowing water have been collected from SW06 

to date, 2 of these samples were collected in 2015. TSS and pH values of 2015 samples were within 

adopted trigger values (Table 22), the EC concentration of one sample on 17/06/2015 exceeded the 

trigger value with a result 663 μS/cm. Once 24 samples have been collected site specific trigger values 

will be developed for SW06.  

SW07 is located in Bobadeen Creek, a fourth order stream flowing through cleared grazing land in 

the north‐eastern section of the Project Approval boundary (Figure 10). The creek flows in a south‐

easterly direction towards the Goulburn River. The creek is ephemeral and generally experiences low 

flows, with pools of permanent or semi‐permanent water present in the downstream reaches.  The 

results from surface water monitoring at SW07 (Table 22) indicate: 

Measured pH and EC were within adopted trigger levels.  

Measured TSS concentrations exceeded the adopted trigger levels for TSS on four occasions, with 

a maximum concentration of 178 mg/L on 13 November. 34.4 mm rain received on 12 November 

and 5.3 mm on 13 November. The elevated TSS coincides with natural flow events and is consistent 

with previous levels recorded after rainfall events.   

15 samples of flowing water have been collected from SW07 to date, once 24 samples have been 

collected site specific trigger values will be developed.  

Page 64: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 64 of 107

Uncontrolled unless viewed on the intranet

Average pH and EC results for SW07 in 2015 are relatively consistent with the historical average 

(Figures 14, 15 & 16). 

 

SW08 is located at the upper reach of Curra Creek, a third order, ephemeral stream, which flows only 

during storm events or after prolonged rainfall, typically in a southerly direction in the very north‐

eastern section of the Project Approval boundary, upstream of the influence of mining activities, 

before joining with Bobadeen Creek (Figure 10).  No flows occurred in Curra Creek at the times of 

sampling in 2015.  2 samples of flowing water have been collected from SW08 to date. A flow 

monitoring station was installed at SW08 in 2015.  

SW09 is located in the Talbragar River, a Category 3 stream and a tributary of the Macquarie River on 

the western side of the Great Dividing Range (Figure 10), within the Murray‐Darling Basin 

catchment.  The Talbragar River flows in a south‐westerly direction across the north‐western corner 

of the Project Approval boundary area and outside mining activities. The results of analysis of 2015 

surface water samples from SW09 (Table 22) indicates:  

One  sample  was  obtained  from  SW09  in  2015  on  13  November  2015,  results  pH  7.5,  EC 

concentration 309 μS/cm and TSS 54 mg/L. 34 mm of rain was received on 12 November 2015. 

14 samples of flowing water have been collected from SW09 to date, once 24 samples have been 

collected site specific trigger values will be developed. 

 

SW10 is located within Mona Creek, a fourth order, ephemeral stream which flows through cleared 

grazing land in the north‐western section of the Project Approval boundary, outside the influence of 

mining activities in a north‐westerly direction, towards the Talbragar River (Figure 10).  Flows in 

Mona Creek are triggered during storm events or after prolonged rainfall and pools of permanent or 

semi‐permanent water are present in the downstream reaches.  No flows occurred in Curra Creek at 

the times of sampling in 2015.  4 samples of flowing water have been collected from SW10 to date. An 

automatic water sampler with flow monitoring capability was installed at SW10 in 2015.  

SW11 is located in Cockabutta Creek, a second order, ephemeral stream, which is not subject to the 

influence of mining activities, flowing in a westerly direction towards the Talbragar River, passing 

through bushland and rural allotments in the western section of the Project Approval boundary 

(Figure 10).  No flows occurred in Cockabutta Creek at the times of sampling in 2015. 2 samples of 

flowing water have been collected from SW11 to date. An automatic water sampler with flow 

monitoring capability was installed at SW11 in 2015.  

6.3.2 EPL Licensed Discharge Monitoring Table 23 displays the 2015 discharge volumes and water monitoring results for EPL 394 LDPs.  

There were no discharges from LDP1 (Millers Dam), LDP2 (Effluent Dams) LDP3 (V‐notch weir plate 

at the end of the discharge channel at Rowans Dam) or LDP4 (Truckfill Dam) during the reporting 

period.  

LDP6 is located at the pipe outlet into Ulan Creek from the Bobadeen Water Treatment Facility. The 

maximum daily discharge volume of 13,077 KL/day was below the discharge limit of 15,000 KL/day 

Page 65: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 65 of 107

Uncontrolled unless viewed on the intranet

(Table 23). LDP6 had an average daily discharge volume of 6,789 KL/day. All pH, EC and TSS 

concentrations were within EPL394 concentrations limits. 

LDP19 is located at the pipe outlet discharging blended product water from the Northwest Sediment 

Dam Water Treatment Facility into Ulan Creek. The maximum daily discharge volume of 

16,474KL/day (Table 23) was below the allowable discharge limit of 30,000 KL/day, with an average 

daily discharge volume of 11,530 KL/day. All pH, EC and TSS concentrations were within EPL 394 

concentrations limits.  

The combined daily discharge  limit  for LDP6 and LDP19  is 30,000KL/day,  the maximum combined 

discharge volume in 2015 was on 27,945 ML on 24 July 2015. 

 

   

Page 66: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 66 of 107

Uncontrolled unless viewed on the intranet

Table 23: EPL Licensed Discharge Monitoring Results 

     

LDP  LDP  LDP  LDP  LDP  LMP   LDP   LDP  LMP  

1  2  3  4  6  18 (SW02)  19  23  33 (SW01) 

Volume  Min              0.0  306^  0.0     * 

(Kilolitres)  Max  ND  ND  ND  ND  13077  84584^  16474  ND  * 

   Ave              5263  18053^  11499     * 

pH  Min              7.2  7.1  6.8     6.5^ 

   Max  ND  ND  ND  ND  8.2  8.3  7.4  ND  7.07^ 

   Ave              7.8  7.8  7.2     6.86^ 

EC  Min              676  457  663     230 

(μS/cm)  Max  ND  ND  ND  ND  856  974  851  ND  849 

   Ave              790  776  788     494 

O&G  Min              *  *  *  *  * 

(mg/L)  Max  ND  ND  ND  ND  *  *  *  *  * 

   Ave              *  *  *  *  * 

Zn  Min              *  *  *  *  * 

(mg/L)  Max  ND  ND  ND  ND  *  *  *  *  * 

   Ave              *  *  *  *  * 

TSS  Min              <1  <1  <1     * 

(mg/L)  Max  ND  ND  ND  ND  9  7.0  22  ND  * 

   Ave              4  1.7  2     * 

BOD  Min     *  *  *  *  *  *  *  * 

(mg/L)  Max  ND  *  *  *  *  *  *  *  * 

   Ave     *  *  *  *  *  *  *  * 

Iron  Min              *  *  *  *  * 

(mg/L)  Max  ND  ND  ND  ND  *  *  *  *  * 

   Ave              *  *  *  *  * 

N  Min     *  *  *  *  *  *  *  * 

(mg/L)  Max  ND  *  *  *  *  *  *  *  * 

   Ave     *  *  *  *  *  *  *  * 

P  Min     *  *  *  *  *  *  *  * 

(mg/L)  Max  ND  *  *  *  *  *  *  *  * 

   Ave     *  *  *  *  *  *  *  * 

Turbidity  Min  *  *  *  *  0  *  0  *  * 

(NTU)  Max  *  *  *  *  15  *  13  *  * 

   Ave  *  *  *  *  4  *  2  *  * 

Notes: ^Data not required by EPL394. Daily averages for pH, Turbidity and EC are calculated at LDP6, LDP19, LMP18 and 

LMP33. No Discharges (ND). LMP18 is the same sites as SW02 Downstream Goulburn River. LMP33 is the same site as SW01 

Upstream Goulburn River.  

Page 67: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 67 of 107

Uncontrolled unless viewed on the intranet

6.4 Channel Stability Monitoring Channel stability monitoring as required by the SWMP, subsidence monitoring programs and 

PA08_0184, is completed annually.  Channel stability monitoring along sections of Ulan Creek, 

Bobadeen Creek and flow lines above Ulan West longwall panels were completed (Figure 19) in 

December 2015 (Attachment G) and build on previous monitoring. 

Monitoring targets specific reaches of the above mentioned creeks proposed to be undermined in the 

next 12 months and those undermined in the previous 24 months. The monitoring involves an 

observational survey of each stream which provides a description of locations and dimensions of 

significant erosive or depositional features and photographs recorded at monitoring points in 

representative locations.  

The results from the creek stability monitoring in 2015 concluded: 

Ulan West Flowline 4:     Flow Line 4 is a tributary to Ulan Creek and flows across the Ulan 

West mine plan in an easterly direction into Ulan Creek. The lower reaches of Flow Line 4 (i.e. 

Sites 1 to 4) were either stable or potential stabilising. Site 1 is characterised by rock bars in the 

channel and  rock embankments. Upstream  from Site 5, bank  stability  is  characterised with 

sections of unstable banks, a defined creek channel and occasional flood debris, indicating high 

velocity flows occur in these locations. Site 7 scored the lowest score with evidence of active 

bank  erosion.    There were  no  obvious  signs  of  subsidence  induced  surface  impacts  (e.g. 

cracking) at Sites 5 to Site 8 as a result of longwall mining LW1 and LW2.  

Ulan West Flowline 2:    Flow Line 2 is a tributary to Ulan Creek and flows across the Ulan 

West mine to the east, before turning south east into Ulan Creek. All four sites surveyed scored 

above 22,  indicating  they were  stable. There were no obvious  signs of  subsidence  induced 

surface impacts (e.g. cracking) at Site 2 and Site 3 as a result of longwall mining LW1 and LW2 

respectively. 

Ulan Creek: As  in previous years,  the 2015 results  indicate a range of creek stability scores 

(Figure 17), with  35  sites potentially  stabilising  and/or  stable, while  the  remaining 21  sites 

recorded active erosion. Sites 9 to 20a creek stability scores were influenced by the actions of 

feral  pigs,  undermining  sections  of  the  creek  foraging  for  food  and  therefore  having  a 

destabilising effect on the shape and aspect ratio of drainage line. 

   

Page 68: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 68 of 107

Uncontrolled unless viewed on the intranet

Figure 17 Ulan West Creek Stability Monitoring 

Source: 2015 Creek Stability Monitoring Report (Pacific Environmental 2015) 

Bobadeen Creek: As in previous years, the 2015 results indicate a range of creek stability scores 

(Figure  18), with  8  sites  potentially  stabilising  and/or  stable.  The  remaining  6  sites  scores 

indicate active and/or very active erosion (i.e. sites 4, 6, 7, 10, 12 & 13) present. The lower scores 

can be attributed to  impacts from cattle grazing pressure, resulting in little or no vegetation 

growing on the creek line floor and walls.  Stock continually crossing the creek is potentially 

contributing to destabilising the shape and aspect ratio of the creek line. Grazing cattle utilise 

all areas within and adjacent  to  the Bobadeen Creek monitoring  sites  throughout  the year. 

There were no obvious signs of subsidence surface cracking at sites 10 to 14 which are located 

directly above LW27.  

Figure 18 Bobadeen Creek Stability Monitoring Assessment Scores 

Source: 2015 Creek Stability Monitoring Report (Pacific Environmental 2015) 

 

0

5

10

15

20

25

30

35

1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55

Cre

ek S

tab

ility

Ass

essm

en

t S

core

s

Ulan Creek Monitoring Locations2015 Stability Assessment Scores Stable Channel Potentially Stabilising

0

5

10

15

20

25

30

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Cre

ek S

tab

ility

Ass

essm

en

t S

core

s

Bobadeen Creek Monitoring Locations

2015 Stability Assessment Scores Stable Channel Potentially Stabilising

Page 69: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 69 of 107

Uncontrolled unless viewed on the intranet

Figure 19  Creek Stability Monitoring Locations 

Source: 2015 Creek Stability Monitoring Report (Pacific Environmental 2015)   

Page 70: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 70 of 107

Uncontrolled unless viewed on the intranet

6.5 Stream Health Monitoring Results of stream health monitoring for the Goulburn River, Talbragar River, Ulan Creek, Bobadeen 

Creek, Mona Creek and Cockabutta Creek (i.e. aquatic surveys) are summarised in Section 4.5.4.  

6.6 Groundwater monitoring results The Groundwater Monitoring Program (GWMP) (ULN SD PLN 0056)66 describes the program to 

monitor trends in groundwater levels and assess groundwater depressurisation and associated 

groundwater inflows against modelled predictions and identify any impact on private licensed bores.  

It includes monitoring of the following elements of the alluvial and hardrock/coal measures aquifers 

in the region: 

Alluvial, Triassic, coal seam and interburden aquifers; 

Baseflows to the Goulburn and Talbragar Rivers and associated creeks; 

Groundwater bores, springs and seeps on privately owned land; and 

‘The Drip’, a groundwater dependant natural site, east of the operations. 

 

Results of groundwater monitoring at the North Monitoring Network (NMN) (Figure 20) and the 

Bobadeen Monitoring Network (BMN) (Figure 26) are summarised below.  Groundwater monitoring 

results are detailed in Attachment D.   

North Monitoring Network (NMN) – A network of 54 environmental monitoring bores (including 

piezometer “nests”) for routine groundwater monitoring.  The NMN was established to monitor 

groundwater levels and quality in the Permian Coal Measures and Mesozoic Sandstones within and 

outside the mine lease.  Locations, depths and monitored stratum vary accordingly. The NMN 

comprises standpipe piezometers (SPs) and vibrating wire piezometers (VWP).   

Groundwater levels in SPs are monitored quarterly (March, June, September, and December) and 

water samples are collected from a subset of the SPs of the NMN annually67 for groundwater analysis. 

Three SPs (R755A, PZ07C, and PZ08C) are also equipped with loggers (for high frequency monitoring 

of water levels). The VWPs are downloaded during each quarterly monitoring event. 

As at December 2015, the currently active NMN comprised 36 SPs (at 17 sites) and 75 VWPs (at 16 

sites). This provides a total of 111 measurement points (at 33 sites) for total hydraulic head in the 

subsurface. 

Bobadeen Monitoring Network (BMN) – a group of nine existing piezometers at shallow depths (1 

mbgl to 11.5 mbgl) provide monitoring for the Bobadeen Irrigation Scheme (BIS), groundwater levels 

and quality are assessed quarterly (March, June, September, and December).  

 

66 Condition 34, Schedule 3 of PA08_0184, a component of the WMP (ULN SD PLN 0017) 67 Note during the 2012 reporting period pH and EC monitoring occurred in June, now scheduled for March.

Page 71: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 71 of 107

Uncontrolled unless viewed on the intranet

6.6.1 North Monitoring Network NMN (Figure 20) groundwater level data indicates continuing falls in water levels due to mining.  

The results support the continued expansion of a groundwater drawdown envelope around the goaf. 

Exceptions are as follows: 

The following piezometers do not appear to have been impacted by mining: PZ01A(Triassic), 

PZ06C(Triassic), PZ09C(Triassic) and PZ09D(Jurassic), PZ14B(Triassic) and PZ14C(Jurassic), 

PZ26C(Triassic) and PZ26D(Jurassic), PZ28A(Triassic) and PZ28B(Jurassic), DDH266‐

3(Triassic), and the upper three VWPs at TAL1. They are located further away from mining, 

to the north, and are exclusive to the Mesozoic strata. 

It is not known whether the following piezometers have been impacted by mining: 

PZ12C(Triassic), DDH270‐3(Triassic), DDH271‐3(Triassic), and DDH336‐1(Triassic). 

Piezometers PZ24A(Ulan Seam), PZ25A(Lower Permian), and PZ25B(Ulan Seam) show 

trends of rising water levels since installation, with recent water level falls. Water levels at 

these sites would have been impacted by mining before piezometer installation. The rising 

water levels in the last few years are likely to be due to increasing water levels in the East Pit. 

Water levels for the current quarter have decreased, probably in response to falling water 

levels in the East Pit. 

Piezometer R752(Basalt) shows trends for which the cause appears to be related to rainfall 

recharge. The impact of undermining is unclear. 

Observations at historic VWP sites DDH242 and R991 show that dry conditions occur over a 

caved panel. 

The interpreted hydraulic head surface for the Ulan Seam for December 2015 (Figure 21) indicates 

that the groundwater flow direction in the Ulan Seam is mainly towards the No.3 Underground 

workings, with some influence from the initial part of the Ulan West main headings. The maximum 

measured drawdown in any of the Ulan Seam piezometers over 2015 was 3.2 m at PZ09B (located to 

the north of the longwalls). The maximum drawdown in the seam is expected to be adjacent to the 

goaf areas created in 2015. The data do not cover the mined panels, and data coverage begins some 

distance beyond the edge of the goaf. The majority of the drawdown in the worked seam is 

experienced in advance of mining. 

The interpreted hydraulic head surface for the quartzose facies of the Triassic Wollar Sandstone for 

December 2015 has remained relatively similar over the last few years, except in close proximity to 

the workings. The maximum measured drawdown over this period was 1.2 m at PZ07C (located 

north of the main workings). Drawdown during 2015 is assessed to have been about 1 m at an 

average distance of about 1 km from the workings (Figure 22). 

The interpreted hydraulic head surface for the lithic facies of the Triassic Wollar Sandstone for 

December 2015 has also remained relatively similar over the last few years, except in close proximity 

to the workings. Drawdown is greater than for the overlying quartzose facies due to smaller distance 

between the lithic Wollar Sandstone facies and the Ulan Seam. The maximum measured drawdown 

over this period was 4.1 m at PZ10A (located over the main headings). Drawdown during 2015 is 

assessed to have been about 1 m at an average distance of about 5 km from the workings (Figure 23).  

The overall groundwater character for the strata of the NMN has not changed over the last decade.  

Averages of EC measurements collected since 2001 indicate that the Triassic contains lower salinity 

Page 72: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 72 of 107

Uncontrolled unless viewed on the intranet

water than the Jurassic or the Ulan Seam (Permian). The Triassic has about half the salinity of the 

Ulan seam, however both strata have lower salinities than the Jurassic. 

The groundwater types remain unchanged between the 2014 and 2015 monitoring rounds. The 

character of groundwater in the basalt is separate to other groups and is dominated by bicarbonate.  

Goaf water shows the results of aeration of the coal measures as indicated by comparatively elevated 

sulphate concentrations. 

A Piper plot of groundwater chemistry (Figure 24) using laboratory analytical results for September 

2015 (including previous years since 2001 inclusive) indicates two major types of water character in 

the strata of the NMN: 

Upper Wollar Sandstone (Triassic) (Calcium / Magnesium type).  

Lower Wollar Sandstone and Permian Coal Measures (Sodium / Bicarbonate type). 

Water quality Results for selected Wollar Sandstone piezometers are indicated on Figure 25.  

Page 73: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 73 of 107

Uncontrolled unless viewed on the intranet

Figure 20 Groundwater North Monitoring Network 

 

 

   

Page 74: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 74 of 107

Uncontrolled unless viewed on the intranet

Figure 21 Hydraulic Heads in the Ulan Seam for December 2015 and                                                         

Drawdown in the Ulan Seam Over the 2015 Calendar Year 

 

 

 

Page 75: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 75 of 107

Uncontrolled unless viewed on the intranet

 

Figure 22 Hydraulic heads approximately in the quartzose facies of the Triassic Wollar Sandstone 

for December 2015 and Drawdown in the Facies Over the 2015 Calendar Year 

 

 

Page 76: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 76 of 107

Uncontrolled unless viewed on the intranet

Figure 23 Hydraulic heads approximately in the quartzose facies of the Triassic Wollar Sandstone 

for December 2015 and Drawdown in the Facies Over the 2015 Calendar Year 

 

 

 

 

Page 77: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 77 of 107

Uncontrolled unless viewed on the intranet

Figure 24 Piper Plot NMN Water Chemistry 

 

 

Page 78: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 78 of 107

Uncontrolled unless viewed on the intranet

Figure 25 EC, pH, and Sulphate Vs Time at Selected Wollar Sandstone Piezometers 

 

6.6.2 Observed and Predicted Groundwater Inflows and Levels

The model developed by Mackie Environmental Research is used to estimate future groundwater 

inflows to the Ulan No.3 and the Ulan West underground mines.  Modelled inflows to the No.3 and 

Ulan West underground mines are similar to the inflows reported in the water balance assessment 

(Figure 26). The average groundwater inflow to the Ulan underground mines for the period 4 January 

2015 to 26 December 2015 was estimated as 15.7 ML/day for the No.3 Underground and 2.2 ML/day 

for Ulan West (Coffey 2016, Attachment F).  

 

Page 79: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 79 of 107

Uncontrolled unless viewed on the intranet

Figure 26 Comparison of Modelled and Calculated Groundwater Inflows to the Underground 

 

Comparison of predicted piezometric trends from the regional groundwater flow model and 

measured trends in piezometers indicates the model is either predicting trends that correlate with 

field observations, or is over‐predicting the rate of depressurisation of the different strata.  

6.6.3 Private Water Bore Study Thirty private bores were gauged in the 2015 private water bore survey which comprised acquiring 

bore coordinates (where required), bore water level (where access was authorised), observation of 

fittings and evaluation of bore use.  A sample was taken from bores where possible and analysed for 

pH and EC. Monitoring indicates water levels and chemistry are stable within the monitored private 

bores. 

6.6.4 The Drip Monitoring Program The EA groundwater modelling68 indicated that no impacts are predicted to occur to ‘The Drip’ as a 

result of UCML mining operations, which are moving northward and westward away from ’The 

Drip’.  A minimal impact monitoring strategy was prepared in consultation with Mackie 

Environmental Research Pty Ltd and the DP&E69 to confirm the EA prediction.70  Hydro geochemical 

monitoring since December 2012 (Attachment D) indicates that an active rainfall recharge regime 

occurs, although a longer period of sampling is required to resolve the lag times and to confirm a 

68 MER, 2009  69 DP&E Director‐General approval of revised monitoring program approved (13 June 2013) 70 PA08_0184, Schedule 3, 39 (d) 

Page 80: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 80 of 107

Uncontrolled unless viewed on the intranet

recharge‐dilution relationship.  Pore pressure monitoring is needed to provide a quantitative 

assessment of the impacts of mining on the Drip.71  

The Drip monitoring piezometer was installed and data collection has commenced. The results of 

groundwater pore pressure monitoring and hydro geochemical assessment will be reported in the 

2016 annual review.   

6.6.5 Baseflow Offsets Significantly greater quantities of water are discharged to the Goulburn River catchment72 at EPL 394 

LDP6 and LDP19 (Section 6.2.2) than the estimated 0.05 ML/day73 lost from baseflow of the Goulburn 

River catchment.74   

Baseflow losses from the Talbragar River catchment75 have not yet been observed based on levels in 

wells to the North West of the Ulan West operations on the Southern side of the Talbragar River. 

Mackie Environment Research estimates baseflow losses in the Talbragar catchment will commence 

in 2019 at 0.135 ML/day in that water year, rising to 0.2 ML/day.  UCML will apply for a Water Access 

Licence (WAL) for the Talbragar Alluvial Water Source in 2016 and seek to obtain allocations through 

the market over the 2017 and 2018 water years. 

6.6.6 Bobadeen Monitoring Network Monitoring of the BMN (Figure 28) during the reporting period indicates: 

Water levels showed small changes (Figure 27), except at IMW05 (southeast boundary of P1 to 

P4) where significant fluctuation typically occurs. 

pH over  the  last  few quarters has  increased slightly overall. pH over  the past year shows a 

rising trend. 

EC over the last few quarters has increased overall. Overall EC has fallen markedly since 2003. 

In  the  last  quarter,  sulphate  concentrations  decreased  slightly  overall. Over  the  past  year, 

concentrations appear approximately stable. 

Sodium concentration over the last few quarters has increased slightly, overall. Over the year, 

sodium has followed the same trend as EC. Sodium and EC are highly correlated. 

In the  last quarter, iron concentrations have showed no consistent trend. Over the  last year, 

iron concentration has decreased overall. Its typical behaviour is oscillation between 0.1 and 

1000  mg/L.  Historically,  iron  concentrations  have  fluctuated  significantly  between  these 

bounds. 

In  the  last  quarter,  potassium  concentrations  have  decreased  overall. Over  the  past  year, 

potassium concentrations have been approximately stable. 

There is a relationship between the cumulative residual of rain plus irrigation and groundwater levels 

for piezometers IMW06 (Figure 29) and IMW07 (both located on the southern perimeter of the Pivot 1 

71 Mackie Environmental Research, 2016  72 Goulburn River – within the area defined for the Water Sharing Plan for the Hunter Unregulated and Alluvial Water Sources 2009 73 based on consistency of observed levels in Jurassic and Triassic strata with modelled prediction 74 PA08_0184, Schedule 3, condition 29 Proponent must offset the loss of any baseflow losses.  75 Talbragar River – within the area defined for the Talbragar Alluvial Groundwater Source, part of the Water Sharing Plan for 

the Macquarie Bogan Unregulated and Alluvial Water Sources 2012 

Page 81: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 81 of 107

Uncontrolled unless viewed on the intranet

to Pivot 4 irrigation area). This indicates that the groundwater levels are controlled in the long term by 

applied irrigation and rainfall, with water flowing into and out of aquifer storage according to the rain 

plus irrigation pattern. 

A negative correlation exists between EC at Pivots 1 to 4 and the cumulative residual of rainfall plus 

irrigation. The inverse correlation suggests that as rainfall and irrigation increase, aquifer EC decreases 

by dilution. 

 

Figure 27 Bobadeen Measured Groundwater Levels 

    

Page 82: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 82 of 107

Uncontrolled unless viewed on the intranet

Figure 28  Groundwater Bobadeen Piezometer Monitoring Network 

 

Page 83: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 83 of 107

Uncontrolled unless viewed on the intranet

Figure 29 Comparison of Variations in Rainfall and Irrigation at Pivot 1 to Pivot 4                                             

and Variations in EC at IMW06  

 

Page 84: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 84 of 107

Uncontrolled unless viewed on the intranet

7 Rehabilitation

7.1 Mine Rehabilitation Domains The conceptual mine closure plan for the eventual decommissioning and rehabilitation of the site 

articulates rehabilitation objectives of a stable and sustainable post mining land use. The site is 

divided into a number of conceptual units or ‘rehabilitation domains’ that focus on the treatment of 

like areas. Domains are assigned based on location, type of land disturbance and remedial aspects. 

Table 25 provides a list of the site rehabilitation domains which are shown in Figure 29.  

Table 24 Site Rehabilitation Domains 

Domain ID  Domain name Contains LOM 

infrastructure 

Disturbed by 

Open Cut 

Mining 

Rehabilitation 

present for 

monitoring 

1  Underground Mine Drift and Facilities Area       

2 Open Cut Administration and Workshop 

Area      

3  Coal Handling and Preparation Plant Area       

4  Water Management Dams       

5a & 5b  Ulan No. 3 & Ulan West ROM handling       

7a  North South Pit Rehabilitation Area       

7b  Open Cut Extension       

8  East Pit Rehabilitation Area       

10  Screen Area Adjacent to Ulan Road       

11 Underground Area (Surface) and Buffer 

Lands      

12  Bobadeen Irrigation Area       

13  Barrier Pit Area       

14  Goulburn River Diversion      # 

Notes: #Review of the remediation monitoring program within the Goulburn River Diversion Remediation Project will be 

undertaken prior to the 2016 monitoring implementation.  

7.2 Rehabilitation of Disturbed Land The Integrated Mining Operations Plan (MOP)76 details the proposed mining, processing and 

rehabilitation of disturbed areas. Section 5 of the MOP provides proposed final rehabilitation plan77.  

The primary objective of rehabilitation and revegetation of the post‐mining disturbance areas, in 

particular the open cut disturbance area, will be to create a stable final landform, being self‐sustaining 

native vegetation communities characteristic of the pre‐mining composition, with a post mining 

landuse capability Class VI  landscape. 

76 As required by mining lease conditions under the Mining Act 1992 77 Rehabilitation Management Plan (RMP) required by Condition 57, Schedule 3 of the PA08_0184.

Page 85: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 85 of 107

Uncontrolled unless viewed on the intranet

No rehabilitation of disturbed land was undertaken during the 2015 reporting period as there were no 

areas available for rehabilitation. No open cut operations were undertaken in 2015, Strip 9 and the 

southern extension of Strip 8 remain uncovered ready for open cut operations to commence again if 

required, and rehabilitation up to the existing mining area was completed in 2014. Table 26 presents a 

summary of current rehabilitation and disturbance areas.  

Table 25 Rehabilitation and Disturbance Summary 

  2014 (ha) 2015 (ha) 2016 Forecast (ha)

A. Total mine 

footprint78 1263.12  1263.12  1264.36 

B. Total Active 

disturbance79 678.76  678.76  680 

C. Land being 

prepared for 

rehabilitation80 

0  0  0 

D. Land under active 

rehabilitation81 584.36  584.36  584.36 

E. completed 

rehabilitation82 0  0  0 

   

78 Total mine footprint includes all areas within a mining lease that either have at some point in time or continue to pose a 

rehabilitation liability due to mining and associated activities. As such it is the sum of total active disturbance, 

decommissioning, landform establishment, growth medium development, ecosystem establishment, ecosystem development 

and relinquished lands (as defined in DRE MOP/RMP Guidelines). Please note that subsidence remediation areas are excluded. 79 Total active disturbance includes all areas ultimately requiring rehabilitation such as: on‐lease exploration areas, stripped 

areas ahead of mining, infrastructure areas, water management infrastructure, sewage treatment facilities, topsoil stockpile 

areas, access tracks and haul roads, active mining areas, waste emplacements (active/unshaped/in or out‐of‐pit), and 

tailings dams (active/unshaped/uncapped). 80 Land being prepared for rehabilitation – includes the sum of mine disturbed land that is under the following rehabilitation 

phases – decommissioning, landform establishment and growth medium development (as defined in DRE MOP/RMP 

Guidelines). 81 Land under active rehabilitation ‐ includes areas under rehabilitation and being managed to achieve relinquishment – 

includes the following rehabilitation phases as described in the DRE MOP/RMP Guidelines – “ecosystem and land use 

establishment” (area seeded OR surface developed in accordance with final land use) and “ecosystem and land use 

sustainability” (revegetation assessed as showing signs of trending towards relinquishment OR infrastructure development) 82 Completed rehabilitation – requires formal sign‐off by DRE that the area has successfully met the rehabilitation land use 

objectives and completion criteria.

Page 86: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 86 of 107

Uncontrolled unless viewed on the intranet

Figure 30 Mine Rehabilitated Areas 

 

 

Page 87: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 87 of 107

Uncontrolled unless viewed on the intranet

7.3 2015 Rehabilitation Review Table 27 provides a status review of Rehabilitation Domains with rehabilitation present for monitoring, for the 2015 reporting period.  Table 27 must be read 

in conjunction with The Rehabilitation Status Review (RSR) provided in Attachment I. The RSR was originally developed for the 2012 AR to collate 

historical information of previous mining, rehabilitation methodologies and monitoring results, including landscape function analysis, flora and fauna 

monitoring and rehabilitation reviews.  

Table 26 2015 Review of Rehabilitation Domains   

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Variations in activities 

undertaken to those proposed 

in the MOP. 

No variations  No variations83  No variations  No variations  In accordance with the revised 

Goulburn River Diversion 

Remediation Plan. 

83 Ulan Surface Operations are did not undertake open cut mining activities during the 2015 calendar year.

Page 88: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 88 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Agreed post rehabilitation 

landuse and whether that 

land use has been achieved at 

this point of time 

Good progression towards the 

agreed final land use of 

ecological linkages with 

adjacent non‐disturbed areas.  

A number of areas with well‐

established eucalypt and acacia 

species. However, there are 

areas requiring various 

remediation measures (see 

below for details). 

Approximately 218 ha of 

Domain 7a has been 

rehabilitated. 

Approximately 69 ha of 

Domain 7a is utilised for 

infrastructure, scheduled to 

remain for the life of the mine 

e.g. Ulan West Box Cut.  

Domain 7b contains the Open 

Cut Extension Area. In 

accordance with the approved 

mining schedule in the MOP, 

only a portion of South 6 Dump 

within this Domain was 

rehabilitated in 2014.  

A significant portion of the 

Domain remains disturbed for 

open cut mining activities. 

Approximately 6.5 ha of 

Domain 7b has been 

rehabilitated. 

Approximately 76 ha of 

Domain 7b will be utilised for 

the Open Cut Extension Area. 

 

 

There is substantial progression 

towards the agreed final land 

use of ecological linkages with 

adjacent non‐disturbed areas at 

a number of areas within 

Domain 8. However, there are 

significant areas requiring 

various remediation measures.  

Approximately 258 ha of 

Domain 8 has been rehabilitated. 

Approximately 51 ha of Domain 

8 is utilised for infrastructure, 

scheduled to remain for the life 

of the mine e.g. Tailings & reject 

emplacement, conveyors etc  

Good progression towards the 

agreed final land use of 

ecological linkages with 

adjacent non‐disturbed areas. 

However, there are areas 

requiring various remediation 

measures. 

Approximately 56 ha of 

Domain 13 has been 

rehabilitated. 

Approximately 32 ha of 

Domain 13 is utilised for 

infrastructure, scheduled to 

remain for the life of the mine 

e.g. Coarse reject 

emplacements, water 

treatment facility, haul roads, 

in‐pit crusher and conveyors. 

The supervising hydrologist has 

conducted several inspections of 

the remediation undertaken in 

the pilot area and is satisfied 

that it has been constructed 

sufficient to meet the design 

intent.  That is the works are in 

line with the objectives of ‘long 

term geomorphological stability of 

the river landform, restore resilient 

revegetation cover throughout the 

channel areas and mitigate negative 

offsite impacts from erosion within 

the diversion.’ 

Workshop held with key 

stakeholders in November 2015 

to review the effectiveness of the 

rehabilitation of the pilot area 

including discussion of the key 

learnings.   

Key learnings from 

implementation of the Pilot area 

and subsequent monitoring will 

feed into the works planned for 

Stage 1 of the remediation to be 

completed in 2016. 

Page 89: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 89 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Post mining rural land 

capability classification84 

and whether that land use 

has been  achieved at this 

point of time;  

Rehabilitation of areas within 

Domain 7a commenced in 2002. 

Current monitoring indicates 

the mature rehabilitated areas 

of Domain 7a would be suitable 

for nature conservation use, 

including: 

Area ID 6 

Area ID 7 

Area ID 10. 

For reference of the Area ID, 

please see the Rehabilitation 

Status Review Plan 2015 in 

Attachment I. 

Domain 7b is considered 

‘Active’ in terms of mining, 

with only a small portion on 

this Domain recently 

rehabilitated in 2014.  

 

Rehabilitation of areas within 

Domain 8 commenced in 1985.  

Current monitoring indicates the 

mature rehabilitated areas of 

Domain 8 would be suitable for 

nature conservation use, 

including: 

Area ID 1b 

Area ID 2 

Area ID 3. 

For reference of the Area ID, 

please see the Rehabilitation 

Status Review Plan 2015 in 

Attachment I. 

Rehabilitation of areas within 

Domain 13 commenced in 

2008/9.  

Current monitoring indicates 

the mature rehabilitated areas 

of Domain 13 would be 

suitable for nature 

conservation use, including: 

Area ID 4 

Area ID 5 

For reference of the Area ID, 

please see the Rehabilitation 

Status Review Plan 2015 in 

Attachment I. 

Post mining rural land 

capability classification was not 

proposed in the revised 

Goulburn River Diversion 

Remediation Plan.   

 

Post remediation, the diversion 

is expected to be hydraulically 

safe and have improved water 

quality, ecological function and 

aesthetics.  

No works were conducted 

within this domain in 2015, 

awaiting outcomes of the 

rehabilitation completed in pilot 

area.  

84 The primary objective of the rehabilitation and revegetation of the post mining disturbance areas, in particular the open cut disturbance areas will be to create a stable final landform with a post 

mining landuse capability commensurate with the adjoining Class VI landscape. Land use restricted to low‐impact land uses such as grazing, forestry and nature conservation. 

Page 90: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 90 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Landform details including 

slopes, erosion controls, and 

drainage lines 

 

(Refer to rehabilitation 

status review for further 

details) 

Dump 3 & Dump 4 maximum 

slope angle 24O. Drainage 

design included graded banks 

spaced at approximately 50m 

intervals. Graded banks 

longitudinal grade (on average) 

at 1.3%. 

Dumps 6 and Channels 3.1 & 

3.2  maximum slopes angles 

8.5‐9O. Drainage design 

included Channel grades 

longitudinal grade 0.5%. 

South 6 Dump maximum 

slopes angles 12.5O. Drainage 

design included a graded bank 

mid slope. Graded banks 

longitudinal grade (on average) 

at 1%. 

South 6 Dump maximum 

slopes angles 12.5O. Drainage 

design included a graded bank 

mid slope. Graded banks 

longitudinal grade (on average) 

at 1%.  

 

 

 

 

 

 

 

 

There were no landform 

establishment activities within 

Domain 8 during the reporting 

period. 

 

 

There were no landform 

establishment activities within 

Domain 13 during the 

reporting period.  

 

In accordance with the 

Goulburn River Diversion 

Remediation Plan Pilot Project, 

works included: 

‐ Rock revetment base and 

walls;  

‐ Re‐ Profile batter; and 

‐ Install storm water catch 

diversion drains, sediment 

basin and drop structure. 

 

Page 91: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 91 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

The physical, relevant 

chemical characteristics, 

acid forming and 

contaminating potential, 

spontaneous combustion 

potential, and thickness of 

emplaced waste materials. 

There are no active coal reject/ 

tailings emplacement areas 

within Domain 7a. 

South 5 tailings dam (located 

adjacent to the Ulan West ROM 

stockpile) was decommissioned 

and capped in 2012.  

There is no identified acid 

forming material in the mine 

waste rock within this Domain. 

Very low spontaneous 

combustion potential as the 

mine waste rock does not 

contain carbonaceous material.  

There are no coal reject/ tailings 

emplacement areas in Domain 

7b. 

There is no identified acid 

forming material in the mine 

waste rock within this Domain. 

Very low spontaneous 

combustion potential as the 

mine waste rock does not 

contain carbonaceous material. 

Minor areas of large waste tyres 

are buried in the spoil of 

previous open cut mining area 

in accordance with EPL394 and 

the UCML Waste Tyre Burial 

Procedure.  

Domain 8 currently receives 

tailings and coarse rejects in 

accordance with the MOP.  

The East Pit is scheduled to 

receive coarse rejects and 

tailings, disposed of in the 

available void space, for the 

remaining life of the Ulan Mine 

Complex. 

There is no identified acid 

forming material in the mine 

waste rock.  

There were no new incidents of 

spontaneous combustion within 

Domain 8. The known areas of 

spontaneous combustion are not 

currently causing significant 

issues. 

Capping of East Pit tailings and 

reject emplacement areas will 

require part removal of material 

within the existing rehabilitation  

area, part of which contains 

known spon comb areas. 

Domain 13 currently receives 

coarse reject material in 

accordance with the MOP. 

There is no identified acid 

forming material in the mine 

waste rock. 

There were no incidents of 

spontaneous combustion 

within Domain 13. 

Minor area of large waste tyres 

are buried in the spoil of 

previous open cut mining 

area.  

Subsoil testing analysis 

confirmed dispersive and 

slightly acidic material present. 

Ameliorants including lime and 

gypsum were applied.  

Moistened topsoil was 

combined with compost 

material and a compaction 

wheel was used to create a 

‘dimple surface’ prior to hydro 

seeding to stabilise the cover as 

quickly as possible. 

Page 92: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 92 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Characteristics of cover 

material including 

sealing/drainage layers, 

subsoil/topsoil, their 

thicknesses and methods of 

laying and compaction.  

 

(Refer to rehabilitation 

status review for further 

details) 

Dump 3 & Dump 4 mine waste rock 

characterisation confirmed a rocky 

sandy loam with small amounts of 

clay. Soil chemistry analysis 

confirmed: 

pH range (5.94 – 6.9) 

EC range (360‐860 μs/cm) 

CEC range (4.03‐12.16) 

Topsoil dumped at the top of slopes 

and then spread to a depth of between 

100‐150 mm with D11 dozers. D6 used 

to rip between 400‐500 mm. 

Dump 6 and Channels 3.1 & 3.2 mine 

waste rock characterisation confirmed 

a rocky sandy loam with small 

amounts of clay. Soil chemistry 

analysis confirmed: 

pH range (5.0 – 6.6) 

EC range (420‐800 μs/cm) 

CEC range (4.1‐8.7) 

Topsoil dumped at the top of slopes 

and then spread to a depth of between 

100‐150 mm with D11 dozers. D6 used 

to rip between 400‐500 mm. 

South 6 Dump mine waste rock 

characterisation confirmed a sandy 

brown loam. Soil chemistry analysis 

confirmed: 

pH range (5.5 – 5.8) 

EC range (400‐930 μs/cm) 

CEC range (3.58‐8.6) 

Topsoil dumped at the top of slopes 

and then spread to a depth of between 

100‐150 mm with D11 dozers. D6 used 

to rip between 400‐500 mm. 

South 6 Dump mine waste rock 

characterisation confirmed a 

sandy brown loam. Soil 

chemistry analysis confirmed: 

• pH range (5.5 – 5.8) 

• EC range (400‐930 μs/cm) 

• CEC range (3.58‐8.6) 

Topsoil dumped at the top of 

slopes and then spread to a 

depth of between 100‐150 mm 

with D11 dozers. D6 used to rip 

between 400‐500 mm. 

 

 

There was no application of 

topsoil material within Domain 

8 during the reporting period. 

Previous soil testing has 

identified areas of acidic, saline 

soils requiring amelioration 

prior to re‐seeding activities.   

There was no application of 

topsoil material within 

Domain 13 during the 

reporting period. 

 

 

Subsoil characterisation of the 

batters confirmed a sandy 

brown loam. Soil chemistry 

analysis confirmed: 

• pH range (5.9 – 6.9) 

• EC range (360‐652 μs/cm) 

• CEC range (3.64‐12.16) 

Topsoil was used from upper 

embankment berm and mixed 

with a compost material at a 

general rate of 100 t/ha. Moisture 

was added to the mixed topsoil 

material and placed along the 

repaired batters with an 

excavator at approximately 30 m 

sections, at a general depth of 

150 mm 

Page 93: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 93 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Vegetation species and their 

density, distribution, and 

state/maturity including of 

any  threatened species;  

 

(Refer to rehabilitation 

status review for further 

details) 

Revegetation of Dump 3, 

Dump 4, Dump 6 and South 6 

Dump tree and shrub species 

mix in accordance with the 

MOP and PA08‐0184. 

i.e.  Required species assembly 

either Grey Box Woodland or 

Ironbark Open Forest Complex 

on Sandstone. 

Two plots of Acacia Ausfeldii 

established within this domain, 

seed bank with topsoil and 

subsoil relocated from open cut 

operations in 2012‐2013.  

Range of maturity and 

densities of vegetation as 

rehabilitated areas planted at 

various times from 2003 to 

2014.  

Revegetation of South 6 Dump 

tree and shrub species mix in 

accordance with the MOP and 

PA08‐0184. 

i.e.  Required species assembly 

either Grey Box Woodland or 

Ironbark Open Forest Complex 

on Sandstone. 

No ecosystem establishment 

activities undertaken within 

Domain 8 during the reporting 

period. 

 

Required species assembly is 

Open Forest/Grassland species. 

 

No ecosystem establishment 

activities undertaken within 

Domain 13 during the 

reporting period. 

 

Required species assembly is 

Woodland formation species. 

 

Vegetation establishment was 

consistent with tree and pasture 

species mix in the Goulburn River 

Goulburn River Diversion 

Rehabilitation Works ‐ Vegetation 

Assessment and Revegetation 

Recommendations85 

The seeding plan followed 

vegetation rehabilitation 

management zones as 

developed by the Goulburn River 

Goulburn River Diversion 

Rehabilitation Works ‐ Vegetation 

Assessment and Revegetation 

Recommendations. 

85 This report should be cited as: ‘Eco Logical Australia (2014) Goulburn River Diversion Rehabilitation Works Vegetation Assessment and Revegetation Recommendations. Prepared for Ulan Coal 

Mines Limited, August 2014ʹ 

Page 94: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 94 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

The anticipated progression 

of vegetation  to maturity, 

and its dependencies and 

risks;  

For results of floristic and LFA 

monitoring please see 

subdomains within the 

Rehabilitation Status Review 

2015 in Attachment I. 

 

Risks associated include weeds, 

unstable landforms and 

revegetation efforts not 

matching mature species 

assemblage of Grey Box 

Woodland or Ironbark Open 

Forest Complex on Sandstone. 

 

 

For results of floristic and LFA 

monitoring please see 

subdomains within the 

Rehabilitation Status Review 

2015 in Attachment I. 

 

Risks associated include weeds, 

unstable landforms and 

revegetation efforts not 

matching mature species 

assemblage of Grey Box 

Woodland or Ironbark Open 

Forest Complex on Sandstone. 

 

 

For results of floristic and LFA 

monitoring please see 

subdomains within the 

Rehabilitation Status Review 

Plan 2015 in Attachment I. 

 

East Pit contains areas (i.e. areas 

1b, 2 & 3) of mature and well 

established Eucalyptus and 

Acacia communities. Other areas 

within Domain 8 are 

characterised by patchy 

vegetation and reseeding with 

open woodland species and 

further soil amelioration works 

proposed after completion of 

works as described in the 

revised Goulburn River 

Diversion Remediation Plan.  

Risks include areas of weeds, 

unstable landforms, spon comb 

and the structural diversity of 

trees and unimproved pasture 

not resembling pre mining 

vegetation communities. 

For results of floristic and LFA 

monitoring please see 

subdomains within the 

Rehabilitation Status Review 

2015 in Attachment I. 

 

Risks include weeds, stable 

landforms and structural 

diversity of trees and 

unimproved pasture 

resembling pre mining 

vegetation communities. 

 

 

Results of floristic and LFA 

monitoring are provided within 

the Rehabilitation Status 

Review 2015 in Attachment I. 

 

Risks include large rainfall 

events which could lead to 

flooding events within the 

Goulburn River Diversion 

Channel.  

Page 95: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 95 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Present and future habitat 

for native and, if identified, 

threatened fauna;  

Terrestrial monitoring and 

habitat complexity monitoring 

completed in 2015 at OC3. 

BAMM assessment score of 1.8 

for habitat complexity in 2015. 

For comparison the highest 

score obtained in 2015 was 

BAMM 2.9 at Infra1. 

Monitoring also reported 

Habitat Complexity Index of 

13, which is comparable to non‐ 

mining area described as 

moderate to high quality in 

terms of value to woodland 

birds and ground fauna. 

Large portion of this domain 

remains uncleared and is 

surrounded by dense bushland, 

presently there is sufficient 

habitat within the Domain.   

Terrestrial monitoring and 

habitat complexity monitoring 

completed in 2014 at OC1 

(Rehab). BAMM assessment 

score of 2.2 for habitat 

complexity in 2015, an increase 

from 2.1 in 2014. For comparison 

the highest score obtained in 

2015 was BAMM 2.9 at Infra1. 

Monitoring also reported 

Habitat Complexity Index of 14, 

which is comparable to non‐ 

mining area described as 

moderate to high quality in 

terms of value to woodland 

birds and ground fauna. 

181 nest boxes for a variety of 

fauna were installed within 

domain 8 in 2015.    

No habitat characteristic 

monitoring is undertaken in 

Domain 13.  

Not applicable  

Weeds/unwanted 

vegetation;  

Annual flora monitoring noted 

presence of St John’s wort and 

saffron thistle in 2015.  

Areas of weed incursions noted 

in the recent annual 

rehabilitation inspections were 

targeted by the 2015 weed 

management program.  

Areas of weed incursions noted 

in the recent annual 

rehabilitation inspections were 

targeted by the 2015 weed 

management program. 

Weeds present during 

rehabilitation inspection in May 

included Paterson’s curse, 

fireweed and prickly pear. 

Broadacre weed spraying was 

conducted were required and 

targeted weed spraying for 

prickly pear and fireweed 

completed in 2015. 

Areas of weed incursions 

noted in the recent annual 

rehabilitation inspections were 

targeted by the 2015 weed 

management program. 

Focus of weed management 

ahead of future earthworks.  

Page 96: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 96 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Details of any erosion 

present;  

 

A small number stable and 

active rill erosion sites 

identified in 2014 rehabilitation 

inspection (most active on 

steeper slopes and entry points 

into CWS). 

Not considered high risk.  

Monitoring in 2015 did not 

reveal any changes.  

None identified   East Pit maintenance timetable, 

as issued to the DRE on 06 

November 2014, includes 

surface water works after 

completion of the revised 

Goulburn River Diversion 

Remediation Plan. 

A small number stable and 

active rill erosion sites 

identified in 2014 

rehabilitation inspection.  

Not considered high risk. 

Monitoring in 2015 did not 

reveal any changes. 

Repairs of historical erosion 

along the Goulburn River 

Diversion in accordance with the 

revised Goulburn River 

Diversion Remediation Plan.   

Pollution risks identified?  No pollution risks identified   No pollution risks identified   No pollution risks identified   No pollution risks identified   No pollution risks identified  

Safety risks identified?   No safety risks identified   No safety risks identified   No safety risks identified   No safety risks identified   No safety risks identified  

Fences and other barriers;   Current controls to limit public 

access are considered adequate  

Current controls to limit public 

access are considered adequate  

Current controls to limit public 

access are considered adequate  

Current controls to limit public 

access are considered adequate  

Current controls to limit public 

access are considered adequate  

Further works necessary to 

meet completion criteria;  

Yes – Remediation works will 

be required as discussed above.  

Yes – Remediation works will 

be required as discussed above. 

Yes – Remediation works will be 

required as discussed above.  

Completion of the EPRMP 

commitments to DRE post 

Goulburn River Diversion 

Remediation. These include; 

Re‐seed with open 

woodland species 

Address erosion, 

carbonaceous material 

and waste 

Address habitat 

argumentation 

deficiencies 

Yes – Remediation works will 

be required as discussed above. 

Yes, as identified in the revised 

Goulburn River Diversion 

Remediation Plan. 

The rehabilitation targets & 

outcomes achieved 

compared to commitments 

described in MOP;  

Yes :  

There was no open cut mining activities undertaken in 2015 and all 

land available for rehabilitation at this stage has been rehabilitated. 

Not Applicable. 

No MOP rehabilitation targets 

for Domain 8. 

Not Applicable. 

No MOP rehabilitation targets 

for Domain 13. 

Yes:  In accordance with the 

revised Goulburn River 

Diversion Remediation Plan 

timetable. 

Page 97: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 97 of 107

Uncontrolled unless viewed on the intranet

Reporting Requirements for 

Rehabilitation of Disturbed 

Land 

Assessment Against Reporting Requirements

Domain 7a: North South Pit 

Rehabilitation Area 

Domain 7b: Open Cut 

Extension 

Domain 8: East Pit 

Rehabilitation Area Domain 13: Barrier Pit Area  Domain 14 

Ensure each area is located 

on the appropriate plan 

with rehabilitation extent, 

cross‐ sections, drainage 

patterns/pathways, slopes, 

and vegetation 

communities shown;  

Refer to Attachment I: 

Rehabilitation Status Review Plan 2015 

Refer to Attachment H 

Surface Operations Proposed Rehabilitation (Equivalent to MOP Plan 5) 

Page 98: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 98 of 107

Uncontrolled unless viewed on the intranet

7.4 BMP Revision The BMP was revised in June 2015 to align with DRAFT Best Practice Guidelines for Biodiversity 

Offset Management Plans (January 2014) including: 

Revise vegetation mapping to Biometric Vegetation Type. 

Introduce revised performance indicators. 

Provide specific risk assessment in BMP. 

Revise Bobadeen Offset area to provide 169ha of EEC after vegetation mapping identified 

shortfall compared with original estimates. 

Include the findings of review of management strategy for Acacia Ausfeldii.  

Include OMP as an appendix to BMP. 

Revise OMP work program to simplified model with earlier establishment timeframe. 

Include trial of natural regeneration technique in fragment area of Bobadeen Offset. 

The revised BMP was approved by DP&E on 11th November 2015.  

7.5 Rehabilitation Activities Planned for 2016 All land available for rehabilitation at this stage has been rehabilitated, therefore zero hectares of 

rehabilitation is planned to occur in the next reporting period. Stage 1 of the Goulburn River 

Remediation86 commences in February 2016.  

7.6 Offset Management Program The purpose of this Offset Management Program (OMP) is to describe the land management works 

that are to be undertaken within the Biodiversity Offset and Management Areas in order to enhance 

the quality and quantity of native vegetation and fauna habitat within these areas. The OMP is 

contained within the BMP.  Implementation of the OMP for Year 4 (2015) is provided in Sections 7.6.1 

to 7.6.6. 

7.6.1 Seed Collection Program Approximately 177 kg of native seeds were collected during 2015.  The seed collection program 

focuses on collection of seed species specific to the target communities for rehabilitation and 

revegetation of the Biodiversity Offset Areas.  

7.6.2 Revegetation Ground preparation was completed across 192 ha of the Biodiversity Offset Areas in 2015 (Figure 30 

& 31).  Ground preparation activities included: 

•  Ripped/hilled (30 ha) 

•  Ripped/hilled and rotary hoed (32 ha) 

•  Scalped/ripped and rotary hoed (58 ha)  86 In accordance with the Goulburn River Diversion Remediation Plan ULN SD PLN 0054 

Page 99: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 99 of 107

Uncontrolled unless viewed on the intranet

•  Scalped/ripped/hilled and rotary hoed (72 ha) 

 

A total of 41,056 Hikos were planted into prepared hilled/rip lines, at an average density of 700 stems 

per ha.  This planting was conducted in March (11,000 plants), August/September (25,000 plants) and 

November (5,000 plants).  Three waterings of the August/September plantings were undertaken; one 

at initial planting then two at approximately one month intervals subsequently.  Initial planting was 

supervised by a qualified ecologist, who also conducted subsequent inspections of planting areas.  

In addition to tubestock planting, 58 ha were direct seeded (ground preparation via scalping to 50‐70 

mm deep using a grader).  Seeding was completed at a rate of 13.6 kg to the hectare.   

7.6.3 Offset Area Revegetation Walkover A review of previously revegetated areas was undertaken to gauge the progress of revegated areas 

toward condition improvement targets, with the aim of informing regeneration activities for the 

forward program.  In the Bobadeen Offset Area 10% of canopy stem counts already meet the target 

criteria, 80% percent are trending toward the criteria and 10% are below 100 stems per hectare and 

will be monitored for intervention, if required, once the revegetation program is complete.  The mid 

story regeneration will be assessed as part of on‐going monitoring.  The ground cover is already 

consistent with the 50 to 90% cover target for the stratum.  In the Bobadeen East Offset Area 85% 

percent are trending toward the criteria and 15% are below 100 stems per hectare and will be 

monitored for intervention, if required, once the revegetation program is complete.  Again, the mid 

story regeneration will be assessed as part of on‐going monitoring and ground cover is already 

consistent with the 50 to 90% cover for the stratum.   

Lower stem counts were attributed to the lower than average rainfall conditions that persisted in the 

year following planting.  Recently plantings have been timed to coincide with favourable conditions, 

and ground preparation techniques have been improved to better retain moisture.  The planting 

programs are augmented with watering in dry conditions.   

The revegetation review showed that overall, the majority of the area that had been revegetated was 

reaching stem densities consistent with those found in White Box Grassy Woodlands (Redpath & 

Benson, 1997) and as defined within the BMP.     

7.6.4 Maintenance Biodiversity Offset Area maintenance activities included maintenance of fencing to control macropod 

grazing, as well as installation and upgrading to electric fences (total 16.392 km). 

Page 100: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 100 of 107

Uncontrolled unless viewed on the intranet

Figure 31: 2015 Offset Planting Areas 

Page 101: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 101 of 107

Uncontrolled unless viewed on the intranet

Figure 32: 2015 Land Preparation Tree Planting & Direct Seeding in Vegetation Offset Areas 

  

Page 102: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 102 of 107

Uncontrolled unless viewed on the intranet

7.6.5 Fauna Habitat Augmentation Qualified ecologists installed 500 nest boxes in early 2015 (Figure 32).  The nest boxes were placed in 

existing woodland areas and adjacent to mining operations and established rehabilitated areas.  The 

nest boxes are constructed to patterns suitable for a range of target species, including the Brown 

Treecreeper, Owlet Nightjar, various microbat species, Glossy‐black Cockatoo, Sugar Glider, and 

Squirrel Glider.  In accordance with the BMP a proportion of the established nest boxes will be 

inspected annually by a qualified ecologist for signs of occupation commencing two years post 

installation.   

Figure 33: Nest Box Installation  

            

Two adjacent dams within the Bobadeen Vegetation Offset area were rehabilitated to enhance their 

biodiversity value (Figure 33). Large woody debris, bush rock, and pipes have been installed to 

improve the habitat value of the area. The area surrounding the dam has been ripped and reseeded to 

promote vegetation growth.  

Figure 34: Offset Area Dam Habitat Argumentation 

 

Page 103: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 103 of 107

Uncontrolled unless viewed on the intranet

7.6.6 Weed & Feral Animal Control Activities Feral pig and wild dog baiting was conducted during 2015 within offset areas.  A kangaroo cull was 

also undertaken to address overgrazing issues. 

Weed management was undertaken across offset areas, targeting noxious weed species including 

Heliotropium amplexicaule (Blue Heliotrope), Opuntia sp. (Prickly pear), Rubus ulmifolius 

(Blackberry) and Hypericum perforatum (St Johns Wort), as well as the exotic Carthamus lanatus 

(Saffron Thistle). Intensive weed management was undertaken in all 2015 and 2016 planting areas 

prior to land preparation.  

7.6.7 Hollow bearing tree Assessment Vegetation Offsets

Eco Logical Australia (ELA) was engaged by Ulan Coal Mines Limited (UCML) to undertake an 

assessment to estimate the density of hollow resources within the UCML Biodiversity Offset and 

Cliffline Management Areas. The UCML Project Approval (08_0184) requires that the offset areas 

contain suitable habitat for threatened species. Hollow‐bearing trees provide potential habitat for a 

number of threatened species listed87. 

The 2009 Environmental Assessment proposed that protection of existing hollows within the 

Biodiversity Offset and Cliffline Management Areas, and hollow augmentation with nest boxes or 

salvaged hollows should be used to address the loss of hollow resources resulting from clearing 

activities. The UCML Offset Management Program (UCML, 2012) further outlines the contribution of 

Biodiversity Offset and Cliffline Management Areas and nest box augmentation to achieving the EA 

commitment of no net loss of hollow resources within the Project Area. 

As such, the existing offset areas will contribute to offsetting the loss of hollow resources resulting 

from activities within the Project Area. In order to identify the extent to which hollow‐bearing trees 

exist to offset these losses and provide habitat for threatened species, a survey to estimate the 

densities of hollow resources was carried out in Biodiversity Offset and Cliffline Management Areas 

on 12‐16 January 2015. 

A total of 60 locations were surveyed across 15 defined vegetation communities were surveyed88 (Full 

report available in Attachment E). At each site, a 0.25 ha (50 m by 50 m) plot was established. The 

field survey identified 727 hollow‐bearing trees (HBT)  and 2,702 hollows across the 60 survey plots. 

Approximately 67% of hollows recorded were small hollows( <5cm in diameter), 17% were medium 

(5‐10cm) and 16% were considered large (>10cm).  

Based on the results obtained from the field survey, an estimate of the hollow bearing resources 

across the Biodiversity Offset and Cliffline Management Areas was calculated (Table 28). This survey identified that the majority of mature forest and woodland vegetation formations across the 

Biodiversity Offset and Cliffline Management Areas contain a high density of hollow‐bearing trees. In 

particular, hollows are abundant in the Brokenback and Spring Gully domains. A history of clearing 

for agriculture has resulted in modified woodland remnants and patches of younger aged, smaller 

sized stands across the Bobadeen offset areas. 

   

87 As listed under both the NSW Threatened Species Conservation Act 1995 (TSC Act) and Commonwealth Environmental 

Protection and Biodiversity Conservation Act 1999 (EPBC Act). 88 Ecological Australia ‘Hollow‐bearing tree assessment on Ulan Biodiversity Offset and Cliffline Management Areas’ March 

2015

Page 104: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 104 of 107

Uncontrolled unless viewed on the intranet

Table 27: Hollow Bearing Trees (HBT) and hollow estimations from Survey 

 

Should augmentation of hollow‐bearing resources with nest boxes or salvaged habitat features be 

considered in the future, the existing densities and size distribution of hollows within the Biodiversity 

Offset and Cliffline Management Areas should be used to target installation within areas of lower 

hollow abundance, such as regenerating/second‐growth areas and low hollow density woodland 

formations in the Bobadeen offset areas. However, ongoing conservation and management of 

regenerating vegetation within the Bobadeen offset areas should result in these communities 

maturing and increasing in hollow densities over time. 

Based on the results of the hollow‐bearing tree assessment, the hollow‐bearing resources that were 

identified within the Biodiversity Offset and Cliffline Management Areas are considered to supply 

suitable habitat for a range of various fauna species including threatened species that are likely or 

have the potential to occur within these areas. 

Page 105: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 105 of 107

Uncontrolled unless viewed on the intranet

8 Other Environmental Management Areas No material improvements or changes occurred in the environmental management areas of 

meteorological monitoring, erosion and sediment, contaminated land, weeds and pests, visual and 

landscape management, spontaneous combustion, bushfire, methane drainage/ventilation, public 

safety or waste management.  

9 Incidents and non-compliances There were no reportable incidents or non‐compliances89 with approvals during the reporting period  

 

Approval   Condition Summary Date 

occurred Cause  Action taken 

           

 

89 Technical non‐compliances which resulted in no perceivable environmental impact are identified as footnotes to the relevant 

approval in Section 2.1 

Page 106: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 106 of 107

Uncontrolled unless viewed on the intranet

10 Community UCML held four meetings with the Community Consultative Committee (CCC) in 2015. Operational 

progress, community complaints, monitoring results and environmental performance from the recent 

quarter were presented and discussed at each of these meetings. The 2015 CCC meetings also 

presented and discussed the following; Goulburn River Diversion Remediation, water monitoring 

technology (guest speakers Matt Austin and Chris Fink‐ EI Solutions), Glencore Environmental 

Management System (guest speaker John Watson‐ Glencore), Ulan Road Strategy (guest speaker Sally 

Mullinger‐ Mid‐Western Regional Council) and the Ulan West Extraction Plan Extension.  

Glencore’s Corporate Social Involvement (CSI) Program invests in Health, Arts and Culture, 

Education and Enterprise, Environment and the Community.  At a corporate level Glencore 

continued support for Mudgee for Doctors which received a NSW Minerals Council Award (Figure 

34). Glencore also supported the Mudgee High School Link Program and provided donations to the 

region under the Junior Sports Development Program.  

The local support program provided investment in the development of the Mudgee Regional Air 

Service, regional events and support to the local schools. The operations provided assistance to the 

following organisations; Lifeskills  for the purchase of an aquabed (Ulan No.3), the Mudgee PCYC for 

their Colour Run event (Ulan West) and Mudgee Hospital for the purchase of an infant warmer (Ulan 

Surface Operations).  

Figure 35: UCML Community Contributions 

    

 

Nine complaints were received during the 2015 reporting period (Figure 35) compared to 40 

complaints received in 2014. Eight complaints were with regard to noise and one dust (Figure 36). A 

community complaint summary is available from the Ulan Coal Website ulancoal.com.au.  

   

Page 107: Annual Review 2015 FINAL - Mining News · Report Annual Review 2015 Number: Owner: ULN SD REP 0004 Environment & Community Manager Status: Version: Approved 1.0 Effective: Review:

Ulan Complex Report Annual Review 2015

Number:

Owner:

ULN SD REP 0004

Environment & Community Manager

Status:

Version:

Approved

1.0

Effective:

Review:

21/03/2016

N/A Page 107 of 107

Uncontrolled unless viewed on the intranet

Figure 36 Complaints by Month  

 

 

Figure 37 Complaints by Type  

Complaint Type  2015 Complaints 2014 Complaints 2013 Complaints 

Noise  8  36  46 

Dust  1  1  1 

Blast  0  2  2 

Water  0  0  1 

Other  0  1  0 

Total  9 40 50

11 Activities for next reporting period The following activities are planned to be undertaken in the next Reporting Period (2016): 

Revise  Surface Water Monitoring  Trigger  Values  in  the  Surface Water Monitoring 

Program in line with recommendations made in Section 6.3.1 of this report. 

Offset Management Program implementation Year 6. 

Goulburn River Diversion Remediation Project continues.  

Triennial Independent Audit scheduled for April 2016. 

Develop and obtain  relevant approvals  for an extraction plan  for Ulan Underground 

No.3 Panels LW30 and LW31. 

Finalise Ulan West Southern Extension Project (MOD4). 

Finalise Valley Way Grinding Groove Conservation Agreement. 

Anaylse  and  report  on monitoring  data  collected  from  newly  installed monitoring 

infrastructure at the Surface Water Monitoring Sites.  

Analyse and report on pore pressure monitoring from The Drip piezometer.  

Commence MOD3 Heritage Works: conduct  residue analysis of Laila Haglund’s SG5 

artefacts, collect and investigate bush food and 3D scanning of rock shelters.  

Continue Aboriginal Heritage rock shelter excavations as per strategy.